782x
110% 0.9 = 48.297 x 2.718-0.782x
100% 0.019 = 2.718-0.782x
f(x) = 48.2971215429 exp( - 0.7816052824 x ) log (0.019) = log (2.718-0.782x)
90% R² = 0.9790828539
log (0.019) = -0.782x . (log 2.718)
80%
-0.782x =
70% -0.782x = -3.964
60%
x = 5.07
50%
40%
30%
20%
10%
0%
4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5
3 Perhitungan ESAL
Tipe Jalan
Serviceability
Terminal serviceability index (pt) mengacu pada Tabel 3.17. (diambil dari AASHTO 1993 hal II-10).
Initial serviceability untuk rigid pavement : po = 4,5 (diambil dari AASHTO 1993 hal. II-10).
pt 2.5
p0 4.5
Total Loss of Serviceability (∆Psi)
∆Psi =
=
k = 𝑀𝑅⁄19.4
= 392.01030928
- Tie Bar
1 feet = 0.3048 m
1 inch = 2.54 cm
Grade 40
LHR Umur Rencana
Jalan (2039)
31271.00
10103.96
710.80
1892.30
13620.91
5563.65
5408.21
5388.78
796.66
ZR = -1.037
3
40% x 365 hari
146
5-30%
17.5%
Ditetapkan pemilihan mutu drainase
Baik (Good)
Cum ESAL
-
-
8853.468
128174.747
749440.236
6616281.033
11272936.756
15590754.559
17623683.727
51990124.526