Anda di halaman 1dari 2

KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

LABORATORIUM HIDROLIKA
UNIVERSITAS SUMATERA UTARA
FAKULTAS TEKNIK
DEPARTEMEN TEKNIK SIPIL
Jalan Perpustakaan No. 5, Telp. 8201826, email : ft.sipil@usu.ac.id Medan (20155)

==LEMBAR KEHADIRAN

PRAKTIKUM HIDROLIKA

GRUP 8

SEMESTER A T.A. 2018/2019

NAMA : TASYA SABILLA SIAGIAN

NIM : 17 0404 146

NO TANGGAL MODUL KETERANGAN TANDA TANGAN


Hydrostatic Force On Plane Surface (Gaya
1
Hidrostatis Pada Permukaan Datar)
Matecentric Height Of Floating Bodies
2
(Matecentric Height Pada Benda Terapung)
3 Osborn Reynold (Pengukuran Bilangan Reynold)
4 Drag Force Measurment (Pengkuran Gaya Hela)
Flow Over Sharp Weirs (Aliran Diatas Ambang
Tipis)

1. Flow Over Rectangular Notch (Aliran


5
Diatas ambang persegi

2. Flow Over Triangular Notch/V-Notch


(Aliran Diatas Ambang Segitiga)
Flow In Open Channel (Aliran Pada Saluran
Terbuka

1. Flow Over Sharp, Round And Broad Crest


Weir (Aliran Diatas Ambang Tipis, Ambang
6 Bulat Dan Ambang Lebar)

2. Flow Under Sluice Gate & Demonstration


Of Hydraulic Jump (Aliran Dibawah Pintu
Sorong Dan Demonstrasi Olakan Air)

7 Flow Through Orifice (Aliran Melalui Orifice)


KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

LABORATORIUM HIDROLIKA
UNIVERSITAS SUMATERA UTARA
FAKULTAS TEKNIK
DEPARTEMEN TEKNIK SIPIL
Jalan Perpustakaan No. 5, Telp. 8201826, email : ft.sipil@usu.ac.id Medan (20155)

Flow Metering In Piper (Pengukuran Debit


8
AliranPadaPipa)

TELAH DIPERIKSA DAN DISETUJUI

MEDAN, 2018

KEPALA LABORATORIUM

Ir. MAKMUR GINTING, M.SC.

NIP: 19551201 198103 1 005

Anda mungkin juga menyukai