Anda di halaman 1dari 202

REKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM : GEDUNG DAN BANGUNAN


KEGIATAN : PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBAR
PEKERJAAN : PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)
LOKASI : KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG
TAHUN : 2015

NO. URAIAN PEKERJAAN

I PEKERJAAN STRUKTUR BAWAH

II PEKERJAAN STRUKTUR ATAS


II.1 PEKERJAAN STRUKTUR LANTAI 1 (SATU)

II.2 PEKERJAAN LANTAI 2 (DUA)


II.3 PEKERJAAN LANTAI 3 (TIGA)
II.4 PEKERJAAN LANTAI 4 (EMPAT)
II.5 PEKERJAAN STRUKTUR LANTAI 5 (LIMA)
II.6 PEKERJAAN STRUKTUR LANTAI DACK
II.7 PEKERJAAN STRUKTUR ATAP

JUMLAH SUB TOTAL


PPN 10 %
JUMLAH TOTAL
DIBULATKAN

Terbilang : Sebelas Milyar Seratus Tujuh Puluh Satu Juta Rupiah

Diketahui/Disetujui Oleh : Diketahui/Disetujui Oleh :


PEJABAT PEMBUAT KOMITMEN PENGELOLA TEKNIS PROYEK
LPMP PROVINSI SUMATERA BARAT DPU. PROVINSI SUMBAR

HERRY HERLAMBANG Ir. APRIMENSYAH, MM.SP.


NIP. 19770924 200112 1003 NIP. 19620420 199203 1 006

Diketahui/Disetujui Oleh :
KEPALA
LPMP PROVINSI SUMATERA BARAT

Prof.Dr. JAMARIS JAMNA, M.Pd.,


NIP. 19621010 198602 1 0021
LPMP PROVINSI SUMATERA BARAT

Prof.Dr. JAMARIS JAMNA, M.Pd.,


NIP. 19621010 198602 1 0021
REKAPITULASI RENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBAR


PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)
KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG

SUB TOTAL

Rp 2,813,187,601.97

Rp 1,456,758,540.50

Rp 1,288,339,371.75
Rp 1,289,375,978.15
Rp 1,145,633,245.05
Rp 1,340,987,328.51
Rp 442,299,254.12
Rp 378,876,109.43

Rp 10,155,457,429.48
Rp 1,015,545,742.95
Rp 11,171,003,172.43
Rp 11,171,000,000.00

Padang, April 2015


Diketahui/Disetujui Oleh : Konsultan Perencana
PENGELOLA TEKNIS PROYEK PT. NATURAL SUMATERA
DPU. PROVINSI SUMBAR CONSULTANT

Ir. APRIMENSYAH, MM.SP.


NIP. 19620420 199203 1 006 Ir. CHANDRA SURYA
Direktur

Diketahui/Disetujui Oleh :
KEPALA
LPMP PROVINSI SUMATERA BARAT

Prof.Dr. JAMARIS JAMNA, M.Pd.,


NIP. 19621010 198602 1 0021
LPMP PROVINSI SUMATERA BARAT

Prof.Dr. JAMARIS JAMNA, M.Pd.,


NIP. 19621010 198602 1 0021
RENCANA ANGGARAN BIAYA (R.A.B)
KEGIATAN : PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBAR
PEKERJAAN : PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)
LOKASI : KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG

NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

I PEKERJAAN STRUKTUR BAWAH


I.1 PEKERJAAN PERSIAPAN
I.1.1 Pembersihan Lapangan M2 989.50
I.1.2 Pekerjaan Pemasangan Bowplank M1 155.00
I.1.3 Pagar Keliling Sementara (Seng Gelombang Tinggi 2 Meter ) Bisa dipakai sampai pekerjaan struktur atas M1 179.93
I.1.4 Konstruksi Plank Nama Proyek Uk.1mx2m Konstruksi Pipa Baja + Baja Siku Dilas Unit 2.00
I.1.5 Direksi Keet (Kantor Sementara) Dengan Lantai Plesteran (lengkap dgn toilet + ruang shalat) M2 36.00

I.2 PEKERJAAN PONDASI KSLL


I.2.1 Pondasi Konstruksi Sarang Laba-Laba (KSLL) M2 856.00
Galian Tanah Pondasi (Asumsi MT. -1,00 dari lantai dasar +0,00)
Urugan Tanah Kembali
Urugan Tanah Baru Dalam Pondasi
Urugan Pasir 40 cm
Pemadatan
Tes Kepadatan Pasir Urug
Rib 10/80, 11/110, 12/130, 12/220, 12/260 F'C = 21,7 MPa (K 250), SLUMP (12 ± 2) CM, W/C = 0,56
Beton Pertebalan Rib dan Voute F'C = 21,7 MPa (K 250), SLUMP (12 ± 2) CM, W/C = 0,56
Beton Plat Tebal 12 cm F'C = 21,7 MPa (K 250), SLUMP (12 ± 2) CM, W/C = 0,56
Lantai Kerja Rib Adukan 1 Pc : 5 Ps
Lantai Kerja Plat Adukan 1 Pc : 5 Ps

RAB Page 5 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

I.3 PEKERJAAN LAIN-LAIN


Stek Setinggi (H/2)+Tinggi Rip Konstruksi
I.3.1 ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 29,955.49
(Stek Kolom, Tangga, Pit Lift, Shear Wall)

I.4 PEKERJAAN REMODELING RUANG GENSET


I.4.1 PEKERJAAN PERSIAPAN
- Pembersihan lapangan M2 65.00
- Pekerjaan pemasangan Bouwplank M1 33.00
- Bongkaran bangunan lama Ls 1.00
- Pemindahan Genset beserta instalasi Ls 1.00

I.4.2 PEKERJAAN PONDASI


I.4.2.1 Pekerjaan Tanah
- Galian tanah pondasi ( Asumsi MT.-0,60 dari lantai dasar ± 0,00) M3 25.00
- Urugan tanah kembali M3 11.00
- Urugan Tanah Pilihan M3 28.80
- Urugan Pasir T.10 cm M3 3.60
- Pemadatan Per 20cm M3 28.80

I.4.2.2 Pekerjaan Pondasi Batu Kali


- Pasang Aantampang Tinggi 20cm M3 5.00
- Pasang Pondasi Batu Kali 1Pc:4Ps M3 9.00
- Beton Lantai K225 Untuk Lantai Ruang Genset t.15cm M3 5.40

I.4.3 PEKERJAAN LAIN-LAIN


- Stek Kolom ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 54.68

RAB Page 6 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
II PEKERJAAN STRUKTUR ATAS
II.1 PEKERJAAN STRUKTUR LANTAI 1 (SATU)
PENDAHULUAN
- Pekerjaan Pengukuran Pengukuran Horizontal Beserta Vertikal Ls 1.00
- Pagar Keliling Sementara Sudah Ada
- Konstruksi Plank Nama Proyek Uk.1mx2m Konstruksi Pipa Baja + Baja Siku Dilas Unit 2.00
- Direksi Keet (Kantor Sementara) Penambahan Yang Sudah Ada M2 20.00

II.1.1 PEKERJAAN KOLOM


II.1.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 9,114.34
- Bekisting Kualitas Beton Expose M2 198.66
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 38.40

II.1.1.2 PEKERJAAN KOLOM TYPE 2 (K2)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,576.16
- Bekisting Kualitas Beton Expose M2 204.86
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 31.68

II.1.1.3 PEKERJAAN KOLOM TYPE 3 (K3)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 294.14
- Bekisting Kualitas Beton Expose M2 13.97
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.44

II.1.2 PEKERJAAN BALOK


II.1.2.1 PEKERJAAN BALOK BI.1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,502.40
- Bekisting Kualitas Beton Expose M2 264.11

RAB Page 7 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 37.99

II.1.2.2 PEKERJAAN BALOK BI.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,494.73
- Bekisting Kualitas Beton Expose M2 107.65
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 15.23

II.1.2.3 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,635.48
- Bekisting Kualitas Beton Expose M2 63.99
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 7.90

II.1.2.4 PEKERJAAN BALOK BA.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 556.12
- Bekisting Kualitas Beton Expose M2 18.26
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.96

II.1.3 PEKERJAAN PLAT BETON BERTULANG


II.1.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 12,402.79
- Bekisting Kualitas Beton Expose M2 601.12
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 69.11

II.1.4 PEKERJAAN DINDING BETON


II.1.4.1 PEKERJAAN DINDING LIFT
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,174.98
- Bekisting Kualitas Beton Expose M2 146.76
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 14.31

RAB Page 8 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

II.1.4.2 PEKERJAAN SHEAR WALL


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 568.23
- Bekisting Kualitas Beton Expose M2 26.60
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.66

II.1.5 PEKERJAAN TANGGA


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,112.04
- Bekisting Kualitas Beton Expose M2 41.66
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 5.01

II.1.6 PEKERJAAN STRUKTUR ENTRANCE


II.1.6.1 PEKERJAAN ENTRANCE (E)
II.1.6.1a PEKERJAAN BADAN TEBAL 20CM
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 364.99
- Bekisting Dinding Kualitas Beton Expose M2 40.25
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 3.23

II.1.6.1b PEKERJAAN PLAT S2 TEBAL 10 CM


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 379.23
- Bekisting Plat Kualitas Beton Expose M2 21.74
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.34

II.1.6.1c PEKERJAAN WATERPROOFING Waterproofing Membrane Coating tebal 4mm + Aci Kasar M2 21.55
II.1.6.1d PEKERJAAN SCREEDING M2 21.55
II.1.6.1e PASANG ROOF DRAIN Outlet 2" (50mm) Setara RFS01 Brass Bh 2.00
II.1.6.1f PASANG INSTALASI AIR HUJAN Pipa Pvc Type AW Diameter 2" beserta fitting M1 5.00

RAB Page 9 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
II.1.6.2 PEKERJAAN ENTRANCE (E1)
II.1.6.2a PEKERJAAN BADAN TEBAL 20CM
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 310.47
- Bekisting Dinding Kualitas Beton Expose M2 33.74
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.75

II.1.6.2b PEKERJAAN PLAT S2 TEBAL 10 CM


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 334.36
- Bekisting Plat Kualitas Beton Expose M2 19.43
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.09

II.1.6.2c PEKERJAAN WATERPROOFING Waterproofing Membrane Coating tebal 4mm + Aci Kasar M2 19.00
II.1.6.2d PEKERJAAN SCREEDING M2 19.00
II.1.6.2e PASANG ROOF DRAIN Outlet 2" (50mm) Setara RFS01 Brass Bh 2.00
II.1.6.2f PASANG INSTALASI AIR HUJAN Pipa Pvc Type AW Diameter 2" beserta fitting M1 5.00

II.1.6.3 PEKERJAAN ENTRANCE (E2)


II.1.6.3a PEKERJAAN BADAN TEBAL 20CM
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 362.34
- Bekisting Dinding Kualitas Beton Expose M2 39.38
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 3.21

II.1.6.3b PEKERJAAN PLAT S2 TEBAL 10 CM


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 335.76
- Bekisting Plat Kualitas Beton Expose M2 18.83
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.01

II.1.6.3c PEKERJAAN WATERPROOFING Waterproofing Membrane Coating tebal 4mm + Aci Kasar M2 19.08

RAB Page 10 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
II.1.6.3d PEKERJAAN SCREEDING M2 19.08
II.1.6.3e PASANG ROOF DRAIN Outlet 2" (50mm) Setara RFS01 Brass Bh 2.00
II.1.6.3f PASANG INSTALASI AIR HUJAN Pipa Pvc Type AW Diameter 2" beserta fitting M1 5.00

II.1.7 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 314.13

II.2 PEKERJAAN LANTAI 2 (DUA)


II.2.1 PEKERJAAN KOLOM
II.1.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,670.85
- Bekisting Kualitas Beton Expose M2 188.42
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 36.48

II.2.1.2 PEKERJAAN KOLOM TYPE 2 (K2)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,157.55
- Bekisting Kualitas Beton Expose M2 194.30
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 30.10

II.2.1.3 PEKERJAAN KOLOM TYPE 3 (K3)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 279.99
- Bekisting Kualitas Beton Expose M2 13.25
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.37

II.2.2 PEKERJAAN BALOK


II.2.2.1 PEKERJAAN BALOK BI.1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,501.24
- Bekisting Kualitas Beton Expose M2 264.06
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 37.98

RAB Page 11 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

II.2.2.2 PEKERJAAN BALOK BI.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,494.73
- Bekisting Kualitas Beton Expose M2 107.65
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 15.23

II.2.2.3 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,635.48
- Bekisting Kualitas Beton Expose M2 63.99
- Beton Kualitas Beton Expose M3 7.90

II.2.2.4 PEKERJAAN BALOK BA.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 556.12
- Bekisting Kualitas Beton Expose M2 18.26
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.96

II.2.3 PEKERJAAN PLAT BETON BERTULANG


II.2.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 12,389.59
- Bekisting Kualitas Beton Expose M2 600.38
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 69.02

II.2.4 PEKERJAAN DINDING BETON


II.2.4.1 PEKERJAAN DINDING LIFT
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,004.51
- Bekisting Kualitas Beton Expose M2 137.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.40

RAB Page 12 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

II.2.4.2 PEKERJAAN SHEAR WALL


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 539.82
- Bekisting Kualitas Beton Expose M2 25.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.51

II.2.5 PEKERJAAN TANGGA


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,112.04
- Bekisting Kualitas Beton Expose M2 41.66
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 5.01

II.2.6 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 341.40

II.3 PEKERJAAN LANTAI 3 (TIGA)


II.3.1 PEKERJAAN KOLOM
II.3.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,627.45
- Bekisting Kualitas Beton Expose M2 164.86
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 29.18

II.3.1.2 PEKERJAAN KOLOM TYPE 2 (K2)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 9,128.04
- Bekisting Kualitas Beton Expose M2 194.30
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 30.10

II.3.1.3 PEKERJAAN KOLOM TYPE 3 (K3)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 279.99

RAB Page 13 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Bekisting Kualitas Beton Expose M2 13.25
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.37

II.3.2 PEKERJAAN BALOK


II.3.2.1 PEKERJAAN BALOK BI.1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,501.24
- Bekisting Kualitas Beton Expose M2 268.73
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 38.65

II.3.2.2 PEKERJAAN BALOK BI.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,494.73
- Bekisting Kualitas Beton Expose M2 107.65
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 15.23

II.3.2.3 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,635.48
- Bekisting Kualitas Beton Expose M2 63.99
- Beton Kualitas Beton Expose M3 7.90

II.3.2.4 PEKERJAAN BALOK BA.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 555.17
- Bekisting Kualitas Beton Expose M2 18.48
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.98

II.3.3 PEKERJAAN PLAT BETON BERTULANG


II.3.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 12,391.57
- Bekisting Kualitas Beton Expose M2 600.68

RAB Page 14 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 69.14

II.3.4 PEKERJAAN DINDING BETON


II.3.4.1 PEKERJAAN DINDING LIFT
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,004.51
- Bekisting Kualitas Beton Expose M2 137.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.40

II.3.4.2 PEKERJAAN SHEAR WALL


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 539.82
- Bekisting Kualitas Beton Expose M2 25.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.51

II.3.5 PEKERJAAN TANGGA


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,112.04
- Bekisting Kualitas Beton Expose M2 41.66
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 5.01

II.3.6 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 341.40

II.4 PEKERJAAN LANTAI 4 (EMPAT)


II.4.1 PEKERJAAN KOLOM
II.4.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,627.45
- Bekisting Kualitas Beton Expose M2 164.86
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 29.18

II.4.1.2 PEKERJAAN KOLOM TYPE 2 (K2)

RAB Page 15 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 8,298.22
- Bekisting Kualitas Beton Expose M2 176.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 27.36

II.4.2 PEKERJAAN BALOK


II.4.2.1 PEKERJAAN BALOK BI.1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 6,953.08
- Bekisting Kualitas Beton Expose M2 216.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 31.08

II.4.2.2 PEKERJAAN BALOK BI.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,494.73
- Bekisting Kualitas Beton Expose M2 107.65
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 15.23

II.4.2.3 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,249.36
- Bekisting Kualitas Beton Expose M2 48.84
- Beton Kualitas Beton Expose M3 6.03

II.3.2.4 PEKERJAAN BALOK BA.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 555.17
- Bekisting Kualitas Beton Expose M2 18.48
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.98

II.4.3 PEKERJAAN PLAT BETON BERTULANG

RAB Page 16 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
II.4.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 10,437.37
- Bekisting Kualitas Beton Expose M2 502.90
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 57.80

II.4.4 PEKERJAAN DINDING BETON


II.4.4.1 PEKERJAAN DINDING LIFT
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,004.51
- Bekisting Kualitas Beton Expose M2 137.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.40

II.4.4.2 PEKERJAAN SHEAR WALL


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 539.82
- Bekisting Kualitas Beton Expose M2 25.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.51

II.4.5 PEKERJAAN TANGGA


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,112.04
- Bekisting Kualitas Beton Expose M2 41.66
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 5.01

II.4.6 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 277.27

II.5 PEKERJAAN STRUKTUR LANTAI 5 (LIMA)


II.5.1 PEKERJAAN KOLOM
II.5.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 6,543.58
- Bekisting Kualitas Beton Expose M2 153.09

RAB Page 17 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 25.54

II.5.1.2 PEKERJAAN KOLOM TYPE 2 (K2)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 7,415.95
- Bekisting Kualitas Beton Expose M2 176.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 27.36

II.5.2 PEKERJAAN BALOK


II.5.2.1 PEKERJAAN BALOK BI.1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 6,953.08
- Bekisting Kualitas Beton Expose M2 218.42
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 31.42

II.5.2.2 PEKERJAAN BALOK BI.2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,136.30
- Bekisting Kualitas Beton Expose M2 93.49
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.23

II.5.2.3 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,249.36
- Bekisting Kualitas Beton Expose M2 48.84
- Beton Kualitas Beton Expose M3 6.03

II.5.3 PEKERJAAN PLAT BETON BERTULANG


II.5.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 12,353.79

RAB Page 18 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Bekisting Kualitas Beton Expose M2 621.70
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 72.20
- Waterproofing Membrane Coating Tebal 4mm M2 702.01
- Screeding M2 702.01

II.5.4 PEKERJAAN DINDING BETON


II.5.4.1 PEKERJAAN DINDING LIFT
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 3,004.51
- Bekisting Kualitas Beton Expose M2 137.64
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.40

II.5.4.2 PEKERJAAN SHEAR WALL


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 539.82
- Bekisting Kualitas Beton Expose M2 25.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 2.51

II.5.5 PEKERJAAN TANGGA


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,508.50
- Bekisting Kualitas Beton Expose M2 56.02
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 7.12

II.5.6 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 277.27

II.6 PEKERJAAN STRUKTUR LANTAI DACK


II.6.1 PEKERJAAN KOLOM
II.6.1.1 PEKERJAAN KOLOM TYPE 1 (K1)
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 248.93
- Bekisting Kualitas Beton Expose M2 7.68

RAB Page 19 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 0.51
- Angkur Kolom Baja Struktur Beserta Accessories Titik 8.00

II.6.1.2 PEKERJAAN KOLOM TYPE 2 (K2)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 6,240.25
- Bekisting Kualitas Beton Expose M2 130.75
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 20.30
- Angkur Balok Baja Struktur Beserta Accessories Titik 2.00

II.6.1.3 PEKERJAAN KOLOM TYPE 4 (K4)


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 81.59
- Bekisting Kualitas Beton Expose M2 4.08
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 0.30

II.6.2 PEKERJAAN BALOK


II.6.2.1 PEKERJAAN BALOK BI.2
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 214.04
- Bekisting Kualitas Beton Expose M2 6.36
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 0.90

II.6.2.2 PEKERJAAN BALOK BA.1


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,078.36
- Bekisting Kualitas Beton Expose M2 37.03
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 4.57

II.6.3 PEKERJAAN PLAT BETON BERTULANG


II.6.3.1 PEKERJAAN PLAT S1
- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 2,134.35

RAB Page 20 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E
- Bekisting Kualitas Beton Expose M2 128.40
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 13.57
- Pekerjaan Waterproofing Membrane Coating T.4mm + Aci Kasar M2 121.29
- Pekerjaan Screeding M2 121.29

II.6.3.2 PEKERJAAN PLAT S2


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,531.83
- Bekisting Kualitas Beton Expose M2 87.89
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 8.16
- Pekerjaan Waterproofing Membrane Coating T.4mm + Aci Kasar M2 87.05
- Pekerjaan Screeding M2 87.05

II.6.3.3 PEKERJAAN PLAT S3


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 1,274.88
- Bekisting Kualitas Beton Expose M2 36.36
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 7.56
- Pekerjaan Waterproofing Membrane Coating T.4mm + Aci Kasar M2 28.08
- Pekerjaan Screeding M2 28.08

II.6.3.4 PEKERJAAN TALANG AIR FRP T.5MM


- Rangka Talang + Kedudukan Beserta Accessories Baja Siku 50x50 + Pipa Pengaku D.2" M1 11.40
- Lisplank Plat Baja T.1,2 mm, Finish Cat Enamel M2 28.50
- Lapisan Permukaan Talang FRP t. 5mm M2 29.64

II.6.4 PEKERJAAN TANGGA RUANG MESIN LIFT


- Pembesian ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 243.17
- Bekisting Kualitas Beton Expose M2 9.50
- Beton F'c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,49 M3 1.19

RAB Page 21 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

II.6.5 PEKERJAAN TULANGAN STEK ARSITEKTUR ≥ D10 BJTD Fy 400 Mpa & < Ø10 BJTP Fy 240 MPa Kg 106.56

II.7 PEKERJAAN STRUKTUR ATAP


II.7.1 PEKERJAAN KOLOM
II.7.1.1 PEKERJAAN KOLOM BAJA TYPE 1 (K1)
- Baja Profil Honeycomb + Accesorries HC 300x100x5.5x8, Original Size WF 200x100x5.5x8 Kg 401.07
- Pengecatan Lapis Seng (Galbani) Secara Semprot Dengan Sistim 1 Lapis M2 15.04

II.7.2 PEKERJAAN BALOK


II.7.2.1 PEKERJAAN BALOK HC
- Baja Profil Honeycomb + Accesorries HC 300x100x5.5x8, Original Size WF 200x100x5.5x8 Kg 1,548.80
- Pengecatan Lapis Seng (Galbani) Secara Manual Dengan Sistim 3 Lapis M2 58.08

II.7.3 PEKERJAAN ATAP BELUM DIKERJAKAN PADA TAHAP INI


II.7.3.1 PEKERJAAN RANGKA KUDA-KUDA Cremona Pipa Hitam BSP Diameter 4 ", dan 3" M2 172.70
II.7.3.2 PEKERJAAN RANGKA LAPIS KEDAP AIR ATAP Pipa Hitam BSP Diameter 2 " M2 279.30
II.7.3.3 PEKERJAAN LAPIS KEDAP AIR ATAP BELUM DIKERJAKAN PADA TAHAP INI (alluminium foil double side fiM2 -
II.7.3.4 PEKERJAAN RANGKA ATAP BELUM DIKERJAKAN PADA TAHAP INI (Pipa Hitam BSP Diameter 1 M2 -
II.7.3.5 PEKERJAAN LAPIS PENUTUP ATAP BELUM DIKERJAKAN PADA TAHAP INI (Low Carbon Steel Panel TebM2 -
II.7.3.6 PEKERJAAN LESPLANK BELUM DIKERJAKAN PADA TAHAP INI (Plat Baja Tebal 1,2 mm Fini M2 -

II.7.3 PEKERJAAN SPARING INSTALASI PLUMBING


II.7.3.1 Pasang Roof Drain Outlet 100mm, Setara RFS01 Brass Bh 40.000
II.7.3.2 Pasang Sparing Instalasi Sparing Instalasi Plumbing, Gambar Titik Sparing Terlampir Ls 1.000

II.7.4 TRANSPORTASI VERTIKAL BANGUNAN BERTINGKAT Lihat Analisa Ls 1.000

RAB Page 22 of 202


NO. URAIAN PEKERJAAN KETERANGAN STN VOLUME

A B C D E

RAB Page 23 of 202


NA ANGGARAN BIAYA (R.A.B)

HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 2,813,187,601.97
Rp 134,616,095.10
Rp 13,205.50 Rp 13,066,842.25
Rp 59,346.54 Rp 9,198,713.70
Rp 325,884.01 Rp 58,636,309.97
Rp 1,500,000.00 Rp 3,000,000.00
Rp 1,408,728.59 Rp 50,714,229.18

Rp 2,178,520,000.00
Rp 2,545,000.00 Rp 2,178,520,000.00

RAB Page 24 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 429,300,905.79
Rp 13,176.30 Rp 429,300,905.79

Rp 47,816,793.32
Rp 13,205.50 Rp 858,357.50
Rp 59,346.54 Rp 1,958,435.82
Rp 20,000,000.00 Rp 20,000,000.00
Rp 25,000,000.00 Rp 25,000,000.00

Rp 22,150,244.20

Rp 58,616.25 Rp 1,465,406.25
Rp 19,538.75 Rp 214,926.25
Rp 188,047.75 Rp 5,415,775.20
Rp 142,246.50 Rp 512,087.40
Rp 48,427.50 Rp 1,394,712.00

Rp 359,673.60 Rp 1,798,368.00
Rp 726,640.20 Rp 6,539,761.80
Rp 890,593.94 Rp 4,809,207.30

Rp 14,331.30 Rp 783,563.55 Rp 783,563.55

RAB Page 25 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 1,456,758,540.50
Rp 41,584,571.77
Rp 10,410,000.00 Rp 10,410,000.00

Rp 1,500,000.00 Rp 3,000,000.00
Rp 1,408,728.59 Rp 28,174,571.77

Rp 209,066,851.52
Rp 13,176.30 Rp 120,093,232.57
Rp 250,933.10 Rp 49,850,369.65
Rp 1,018,834.62 Rp 39,123,249.30

Rp 196,684,849.67
Rp 13,176.30 Rp 113,002,014.13
Rp 250,933.10 Rp 51,406,154.87
Rp 1,018,834.62 Rp 32,276,680.67

Rp 8,848,332.67
Rp 13,176.30 Rp 3,875,675.41
Rp 250,933.10 Rp 3,505,535.41
Rp 1,018,834.62 Rp 1,467,121.85

Rp 218,251,576.03
Rp 13,176.30 Rp 112,030,130.61
Rp 255,635.60 Rp 67,515,918.32

RAB Page 26 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 1,018,834.62 Rp 38,705,527.11

Rp 89,083,616.99
Rp 13,176.30 Rp 46,047,593.43
Rp 255,635.60 Rp 27,519,172.34
Rp 1,018,834.62 Rp 15,516,851.22

Rp 45,956,482.47
Rp 13,176.30 Rp 21,549,566.95
Rp 255,635.60 Rp 16,358,122.04
Rp 1,018,834.62 Rp 8,048,793.48

Rp 13,992,423.08
Rp 13,176.30 Rp 7,327,601.18
Rp 255,635.60 Rp 4,667,906.06
Rp 1,018,834.62 Rp 1,996,915.85

Rp 397,310,867.62
Rp 13,176.30 Rp 163,422,819.86
Rp 271,953.00 Rp 163,476,387.36
Rp 1,018,834.62 Rp 70,411,660.39

Rp 86,383,621.26
Rp 13,176.30 Rp 41,834,473.10
Rp 204,208.40 Rp 29,969,624.78
Rp 1,018,834.62 Rp 14,579,523.37

RAB Page 27 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 15,629,209.63
Rp 13,176.30 Rp 7,487,166.11
Rp 204,208.40 Rp 5,431,943.44
Rp 1,018,834.62 Rp 2,710,100.08

Rp 29,594,567.79
Rp 13,176.30 Rp 14,652,567.09
Rp 236,141.13 Rp 9,837,639.27
Rp 1,018,834.62 Rp 5,104,361.43

Rp 35,825,116.79

Rp 13,176.30 Rp 4,809,215.91
Rp 204,208.40 Rp 8,219,388.10
Rp 1,018,834.62 Rp 3,290,835.81

Rp 13,176.30 Rp 4,996,846.35
Rp 271,953.00 Rp 5,912,258.22
Rp 1,018,834.62 Rp 2,384,073.00

Rp 208,739.59 Rp 4,498,338.08
Rp 49,940.33 Rp 1,076,214.11
Rp 221,408.55 Rp 442,817.10
Rp 39,026.02 Rp 195,130.10

RAB Page 28 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 31,154,533.66

Rp 13,176.30 Rp 4,090,844.31
Rp 204,208.40 Rp 6,889,991.42
Rp 1,018,834.62 Rp 2,801,795.20

Rp 13,176.30 Rp 4,405,626.00
Rp 271,953.00 Rp 5,284,046.79
Rp 1,018,834.62 Rp 2,129,364.35

Rp 208,739.59 Rp 3,966,052.13
Rp 49,940.33 Rp 948,866.27
Rp 221,408.55 Rp 442,817.10
Rp 39,026.02 Rp 195,130.10

Rp 33,252,850.02

Rp 13,176.30 Rp 4,774,298.73
Rp 204,208.40 Rp 8,041,726.79
Rp 1,018,834.62 Rp 3,270,459.12

Rp 13,176.30 Rp 4,424,072.81
Rp 271,953.00 Rp 5,120,874.99
Rp 1,018,834.62 Rp 2,047,857.58

Rp 208,739.59 Rp 3,982,751.30

RAB Page 29 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 49,940.33 Rp 952,861.50
Rp 221,408.55 Rp 442,817.10
Rp 39,026.02 Rp 195,130.10

Rp 13,176.30 Rp 4,139,069.55 Rp 4,139,069.55

Rp 1,288,339,371.75

Rp 198,697,579.04
Rp 13,176.30 Rp 114,249,677.50
Rp 250,933.10 Rp 47,280,814.70
Rp 1,018,834.62 Rp 37,167,086.84

Rp 186,909,508.58
Rp 13,176.30 Rp 107,486,285.28
Rp 250,933.10 Rp 48,756,301.33
Rp 1,018,834.62 Rp 30,666,921.98

Rp 8,409,897.84
Rp 13,176.30 Rp 3,689,230.84
Rp 250,933.10 Rp 3,324,863.58
Rp 1,018,834.62 Rp 1,395,803.43

Rp 218,213,321.40
Rp 13,176.30 Rp 112,014,846.11
Rp 255,635.60 Rp 67,503,136.54
Rp 1,018,834.62 Rp 38,695,338.76

RAB Page 30 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 89,083,616.99
Rp 13,176.30 Rp 46,047,593.43
Rp 255,635.60 Rp 27,519,172.34
Rp 1,018,834.62 Rp 15,516,851.22

Rp 45,956,482.47
Rp 13,176.30 Rp 21,549,566.95
Rp 255,635.60 Rp 16,358,122.04
Rp 1,018,834.62 Rp 8,048,793.48

Rp 13,992,423.08
Rp 13,176.30 Rp 7,327,601.18
Rp 255,635.60 Rp 4,667,906.06
Rp 1,018,834.62 Rp 1,996,915.85

Rp 396,844,000.19
Rp 13,176.30 Rp 163,248,892.77
Rp 271,953.00 Rp 163,275,142.14
Rp 1,018,834.62 Rp 70,319,965.28

Rp 81,347,938.14
Rp 13,176.30 Rp 39,588,310.09
Rp 204,208.40 Rp 28,107,244.18
Rp 1,018,834.62 Rp 13,652,383.87

RAB Page 31 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 14,791,649.13
Rp 13,176.30 Rp 7,112,827.57
Rp 204,208.40 Rp 5,121,546.67
Rp 1,018,834.62 Rp 2,557,274.89

Rp 29,594,567.79
Rp 13,176.30 Rp 14,652,567.09
Rp 236,141.13 Rp 9,837,639.27
Rp 1,018,834.62 Rp 5,104,361.43

Rp 13,176.30 Rp 4,498,387.11 Rp 4,498,387.11

Rp 1,289,375,978.15

Rp 184,776,251.29
Rp 13,176.30 Rp 113,677,826.30
Rp 250,933.10 Rp 41,368,830.87
Rp 1,018,834.62 Rp 29,729,594.13

Rp 199,696,971.12
Rp 13,176.30 Rp 120,273,747.81
Rp 250,933.10 Rp 48,756,301.33
Rp 1,018,834.62 Rp 30,666,921.98

Rp 8,409,897.84
Rp 13,176.30 Rp 3,689,230.84

RAB Page 32 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 250,933.10 Rp 3,324,863.58
Rp 1,018,834.62 Rp 1,395,803.43

Rp 220,089,758.85
Rp 13,176.30 Rp 112,014,846.11
Rp 255,635.60 Rp 68,696,954.79
Rp 1,018,834.62 Rp 39,377,957.95

Rp 89,083,616.99
Rp 13,176.30 Rp 46,047,593.43
Rp 255,635.60 Rp 27,519,172.34
Rp 1,018,834.62 Rp 15,516,851.22

Rp 45,956,482.47
Rp 13,176.30 Rp 21,549,566.95
Rp 255,635.60 Rp 16,358,122.04
Rp 1,018,834.62 Rp 8,048,793.48

Rp 14,056,522.13
Rp 13,176.30 Rp 7,315,083.70
Rp 255,635.60 Rp 4,724,145.89
Rp 1,018,834.62 Rp 2,017,292.54

Rp 397,073,935.31
Rp 13,176.30 Rp 163,274,981.83
Rp 271,953.00 Rp 163,356,728.04

RAB Page 33 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 1,018,834.62 Rp 70,442,225.43

Rp 81,347,938.14
Rp 13,176.30 Rp 39,588,310.09
Rp 204,208.40 Rp 28,107,244.18
Rp 1,018,834.62 Rp 13,652,383.87

Rp 14,791,649.13
Rp 13,176.30 Rp 7,112,827.57
Rp 204,208.40 Rp 5,121,546.67
Rp 1,018,834.62 Rp 2,557,274.89

Rp 29,594,567.79
Rp 13,176.30 Rp 14,652,567.09
Rp 236,141.13 Rp 9,837,639.27
Rp 1,018,834.62 Rp 5,104,361.43

Rp 13,176.30 Rp 4,498,387.11 Rp 4,498,387.11

Rp 1,145,633,245.05

Rp 184,776,251.29
Rp 13,176.30 Rp 113,677,826.30
Rp 250,933.10 Rp 41,368,830.87
Rp 1,018,834.62 Rp 29,729,594.13

Rp 181,539,932.61

RAB Page 34 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 13,176.30 Rp 109,339,794.69
Rp 250,933.10 Rp 44,324,822.78
Rp 1,018,834.62 Rp 27,875,315.13

Rp 178,518,953.59
Rp 13,176.30 Rp 91,615,833.24
Rp 255,635.60 Rp 55,237,740.45
Rp 1,018,834.62 Rp 31,665,379.90

Rp 89,083,616.99
Rp 13,176.30 Rp 46,047,593.43
Rp 255,635.60 Rp 27,519,172.34
Rp 1,018,834.62 Rp 15,516,851.22

Rp 35,090,751.37
Rp 13,176.30 Rp 16,461,935.92
Rp 255,635.60 Rp 12,485,242.70
Rp 1,018,834.62 Rp 6,143,572.74

Rp 14,056,522.13
Rp 13,176.30 Rp 7,315,083.70
Rp 255,635.60 Rp 4,724,145.89
Rp 1,018,834.62 Rp 2,017,292.54

RAB Page 35 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 333,179,670.72
Rp 13,176.30 Rp 137,525,866.14
Rp 271,953.00 Rp 136,765,163.70
Rp 1,018,834.62 Rp 58,888,640.87

Rp 81,347,938.14
Rp 13,176.30 Rp 39,588,310.09
Rp 204,208.40 Rp 28,107,244.18
Rp 1,018,834.62 Rp 13,652,383.87

Rp 14,791,649.13
Rp 13,176.30 Rp 7,112,827.57
Rp 204,208.40 Rp 5,121,546.67
Rp 1,018,834.62 Rp 2,557,274.89

Rp 29,594,567.79
Rp 13,176.30 Rp 14,652,567.09
Rp 236,141.13 Rp 9,837,639.27
Rp 1,018,834.62 Rp 5,104,361.43

Rp 13,176.30 Rp 3,653,391.31 Rp 3,653,391.31

Rp 1,340,987,328.51

Rp 150,656,524.84
Rp 13,176.30 Rp 86,220,140.44
Rp 250,933.10 Rp 38,415,348.28

RAB Page 36 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 1,018,834.62 Rp 26,021,036.12

Rp 169,914,882.82
Rp 13,176.30 Rp 97,714,744.91
Rp 250,933.10 Rp 44,324,822.78
Rp 1,018,834.62 Rp 27,875,315.13

Rp 179,463,544.66
Rp 13,176.30 Rp 91,615,833.24
Rp 255,635.60 Rp 55,835,927.75
Rp 1,018,834.62 Rp 32,011,783.67

Rp 78,703,368.24
Rp 13,176.30 Rp 41,324,814.01
Rp 255,635.60 Rp 23,899,372.24
Rp 1,018,834.62 Rp 13,479,181.99

Rp 35,090,751.37
Rp 13,176.30 Rp 16,461,935.92
Rp 255,635.60 Rp 12,485,242.70
Rp 1,018,834.62 Rp 6,143,572.74

Rp 587,006,108.70
Rp 13,176.30 Rp 162,777,181.41

RAB Page 37 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 271,953.00 Rp 169,073,180.10
Rp 1,018,834.62 Rp 73,559,859.36
Rp 208,739.59 Rp 146,537,276.77
Rp 49,940.33 Rp 35,058,611.06

Rp 81,347,938.14
Rp 13,176.30 Rp 39,588,310.09
Rp 204,208.40 Rp 28,107,244.18
Rp 1,018,834.62 Rp 13,652,383.87

Rp 14,791,649.13
Rp 13,176.30 Rp 7,112,827.57
Rp 204,208.40 Rp 5,121,546.67
Rp 1,018,834.62 Rp 2,557,274.89

Rp 40,359,169.30
Rp 13,176.30 Rp 19,876,441.01
Rp 236,141.13 Rp 13,228,625.82
Rp 1,018,834.62 Rp 7,254,102.47

Rp 13,176.30 Rp 3,653,391.31 Rp 3,653,391.31

Rp 442,299,254.12

Rp 7,046,746.98
Rp 13,176.30 Rp 3,279,975.11
Rp 250,933.10 Rp 1,927,166.21

RAB Page 38 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 1,018,834.62 Rp 519,605.65
Rp 165,000.00 Rp 1,320,000.00

Rp 136,045,220.43
Rp 13,176.30 Rp 82,223,374.87
Rp 250,933.10 Rp 32,809,502.83
Rp 1,018,834.62 Rp 20,682,342.73
Rp 165,000.00 Rp 330,000.00

Rp 2,404,511.34
Rp 13,176.30 Rp 1,075,053.91
Rp 250,933.10 Rp 1,023,807.05
Rp 1,018,834.62 Rp 305,650.39

Rp 5,363,047.75
Rp 13,176.30 Rp 2,820,254.18
Rp 255,635.60 Rp 1,625,842.42
Rp 1,018,834.62 Rp 916,951.16

Rp 28,331,049.94
Rp 13,176.30 Rp 14,208,789.48
Rp 255,635.60 Rp 9,466,186.27
Rp 1,018,834.62 Rp 4,656,074.20

Rp 108,242,463.20
Rp 13,176.30 Rp 28,122,825.23

RAB Page 39 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G


Rp 271,953.00 Rp 34,918,765.20
Rp 1,018,834.62 Rp 13,825,585.76
Rp 208,739.59 Rp 25,318,024.39
Rp 49,940.33 Rp 6,057,262.63

Rp 74,917,570.30
Rp 13,176.30 Rp 20,183,843.97
Rp 271,953.00 Rp 23,901,949.17
Rp 1,018,834.62 Rp 8,313,690.48
Rp 208,739.59 Rp 18,170,780.96
Rp 49,940.33 Rp 4,347,305.73

Rp 41,652,527.80
Rp 13,176.30 Rp 16,798,194.97
Rp 271,953.00 Rp 9,888,211.08
Rp 1,018,834.62 Rp 7,702,389.71
Rp 208,739.59 Rp 5,861,407.57
Rp 49,940.33 Rp 1,402,324.47

Rp 30,232,216.84
Rp 837,865.33 Rp 9,551,664.71
Rp 291,436.79 Rp 8,305,948.46
Rp 417,496.75 Rp 12,374,603.67

Rp 6,659,833.54
Rp 13,176.30 Rp 3,204,079.66
Rp 236,141.13 Rp 2,243,340.69
Rp 1,018,834.62 Rp 1,212,413.19

RAB Page 40 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

Rp 13,176.30 Rp 1,404,066.00 Rp 1,404,066.00

Rp 378,876,109.43

Rp 22,346,553.44
Rp 48,538.60 Rp 19,467,376.30
Rp 191,434.65 Rp 2,879,177.14

Rp 86,295,108.15
Rp 48,538.60 Rp 75,176,583.68
Rp 191,434.65 Rp 11,118,524.47

Rp 120,075,535.64
Rp 488,745.14 Rp 84,406,286.25
Rp 127,709.45 Rp 35,669,249.39
Rp 109,462.50 Rp -
Rp 263,280.42 Rp -
Rp 604,889.76 Rp -
Rp 291,436.79 Rp -

Rp 32,691,096.35
Rp 309,408.55 Rp 12,376,342.00
Rp 20,314,754.35 Rp 20,314,754.35

Rp 117,467,815.85 Rp 117,467,815.85 Rp 117,467,815.85

RAB Page 41 of 202


HARGA SATUAN JUMLAH HARGA JUMLAH SUB. HARGA SUB TOTAL

F G=EXF G H = SUB JUMLAH G

TOTAL FISIK (NON PPN) Rp 10,155,457,429.48

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur

RAB Page 42 of 202


TIME SCHEDULLE
KEGIATAN : PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBAR
PEKERJAAN : PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)
LOKASI : KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG
TAHUN : 2015

Bulan Ke - 1 Bulan Ke - 2 Bulan Ke - 3 Bulan Ke - 4


NO. URAIAN PEKERJAAN BIAYA BOBOT Minggu Ke - Minggu Ke - Minggu Ke - Minggu Ke -
1 2 3 4 5 6 7 8 9 10 11 12 13 14

I PEKERJAAN STRUKTUR BAWAH


I.1 PEKERJAAN PONDASI KSLL Rp 2,813,187,601.97 27.70% 3.08% 3.08% 3.08% 3.08% 3.08% 3.08% 3.08% 3.08% 3.08%

II PEKERJAAN STRUKTUR ATAS


II.1 PEKERJAAN STRUKTUR LANTAI 1 (SATU) Rp 1,456,758,540.50 14.34% 2.05% 2.05% 2.05% 2.05% 2.05% 2.05% 2.05%
II.2 PEKERJAAN LANTAI 2 (DUA) Rp 1,288,339,371.75 12.69% 1.81% 1.81% 1.81% 1.81%
II.3 PEKERJAAN LANTAI 3 (TIGA) Rp 1,289,375,978.15 12.70% 1.81%
II.4 PEKERJAAN LANTAI 4 (EMPAT) Rp 1,145,633,245.05 11.28%
II.5 PEKERJAAN STRUKTUR LANTAI 5 (LIMA) Rp 1,340,987,328.51 13.20%
II.6 PEKERJAAN STRUKTUR LANTAI DACK Rp 442,299,254.12 4.36%
II.7 PEKERJAAN STRUKTUR ATAP Rp 378,876,109.43 3.73%

JUMLAH TOTAL (Tanpa PPN) Rp 10,155,457,429.48 100%


BOBOT RENCANA 3.08% 3.08% 3.08% 3.08% 3.08% 3.08% 5.13% 5.13% 5.13% 2.05% 3.86% 3.86% 3.86% 3.63%
BOBOT KOMULATIF Rp - 3.1% 6.2% 9.2% 12.3% 15.4% 18.5% 23.6% 28.7% 33.8% 35.9% 39.8% 43.6% 47.5% 51.1%
BOBOT REALISASI
BOBOT REALISASI KOMULATIF
IME SCHEDULLE

Bulan Ke - 4 Bulan Ke - 5 Bulan Ke - 6 Bulan Ke - 7


Minggu Ke - Minggu Ke - Minggu Ke - Minggu Ke - Persentase
15 16 17 18 19 20 21 22 23 24 25 26 27 28

100
%
090
%
080
%
070
%
060
1.81% 1.81% 1.81% %
050
1.81% 1.81% 1.81% 1.81% 1.81% 1.81% %
040
1.88% 1.88% 1.88% 1.88% 1.88% 1.88% %
030
2.20% 2.20% 2.20% 2.20% 2.20% 2.20% %
020
1.09% 1.09% 1.09% 1.09% %
010
1.87% 1.87% %
000
%

3.63% 3.63% 3.63% 3.69% 3.69% 3.69% 4.08% 4.08% 4.08% 3.29% 3.29% 3.29% 2.95% 1.87%
54.7% 58.4% 62.0% 65.7% 69.4% 73.1% 77.1% 81.2% 85.3% 88.6% 91.9% 95.2% 98.1% 100.0%

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur
URAIAN PERHITUNGAN VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBAR


PEKERJAAN : PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)
LOKASI : KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG
TAHUN : 2015

NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Err:509 Err:509
II PEKERJAAN STRUKTUR ATAS 14
II.1 ### PEKERJAAN STRUKTUR LANTAI 1 (SATU) 15
II.1.1 ###
### PEKERJAAN KOLOM 16
II.1.1.1 ###
###
### PEKERJAAN KOLOM TYPE 1 (K1) 17
- ######
###
### Pembesian 18
- ######
###
### Bekisting 19
Jumlah Kolom 16.0000 bh 20
Panjang Dimensi 3.2000 m' 21
Tinggi Bekisting 1 Kolom 3.8800 m' 22
- ###
###
###
### Beton 23
Jumlah Kolom 16.0000 bh 24
Area Dimensi 0.6000 m2 25
Tinggi 1 kolom 4.0000 m' 26
###
###
###
### 27
II.1.1.2 ###
###
### PEKERJAAN KOLOM TYPE 2 (K2) 28
- ### ###
###
### Pembesian 29
- ### ###
###
### Bekisting 30
Jumlah Kolom 22.0000 bh 31
Panjang Dimensi 2.4000 m' 32
Tinggi Bekisting 1 Kolom 3.8800 m' 33
- ###
###
###
### Beton 34
Jumlah Kolom 22.0000 bh 35
Area Dimensi 0.3600 m2 36
Tinggi 1 kolom 4.0000 m' 37
###
###
###
### 38
II.1.1.3 ###
###
### PEKERJAAN KOLOM TYPE 3 (K3) 39
- ### ###
###
### Pembesian 40
- ### ###
###
### Bekisting 41
Jumlah Kolom 2.0000 bh 42
Panjang Dimensi 1.8000 m' 43
Tinggi Bekisting 1 Kolom 3.8800 m' 44

perhitungan volume
46 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


- ###
###
###
### Beton 45
Jumlah Kolom 2.0000 bh 46
Area Dimensi 0.1800 m2 47
Tinggi 1 kolom 4.0000 m' 48
II.1.2 EPEKERJAAN BALOK 49
II.1.2.1 ### PEKERJAAN BALOK BI.1 50
- ###
### Pembesian 51
- ###
### Bekisting 52
Panjang Balok 180.9000 m' 53
Lebar Bekisting 1.4600 m' 54
- ###
### Beton 55
Panjang Balok 180.9000 m' 56
Area Dimensi 0.2100 m2 57
Penambahan panjang untuk Tulangan 28.0000 m' 58
K1 25.6000 m 59
K2 2.4000 m 60
K3 - m 61
II.1.2.2 ### PEKERJAAN BALOK BI.2 62
- ###
### Pembesian 63
- ###
### Bekisting 64
Panjang Balok 101.5600 m' 65
Lebar Bekisting 1.0600 m' 66
- ###
### Beton 67
Panjang Balok 101.5600 m' 68
Area Dimensi 0.1500 m2 69
Penambahan panjang untuk Tulangan 30.0000 m' 70
K1 4.8000 m 71
K2 24.0000 m 72
BI 1.2000 m 73
II.1.2.3 PEKERJAAN BALOK BA.1 74
- ### Pembesian 75
- ### Bekisting 76
Panjang Balok 79.0000 m' 77
Lebar Bekisting 0.8100 m' 78
- ### Beton 79
Panjang Balok 79.0000 m' 80
Area Dimensi 0.1000 m2 81
Penambahan panjang untuk Tulangan 4.8000 m' 82
BI.1 4.8000 M' 83
II.1.2.4 PEKERJAAN BALOK BA.2 84

perhitungan volume
47 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


- ### Pembesian 85
- ### Bekisting 86
Panjang Balok 32.6000 m' 87
Lebar Bekisting 0.5600 m' 88
- ### Beton 89
Panjang Balok 32.6000 m' 90
Area Dimensi 0.0600 m2 91
Penambahan panjang untuk Tulangan 5.0000 m' 92
ba.1 5.0000 M' 93
94
II.1.3 PEKERJAAN PLAT BETON BERTULANG 95
II.1.3.1 ### PEKERJAAN PLAT S1 96
- ###
### Pembesian 97
Luas Pembesian Plat 704.7979 m2 98
Berat Pembesian 17.5977 Kg/m2 99
- ###
### Bekisting 100
Penambahan luasan di tepi plat sisi luar 25.2098 m2 101
- ###
### Beton 102
Tebal Plat 0.1200 m' 103
Luasan untuk beton 575.9099 m2 104
luasan posisi balok 111.0080 m2 105
luasan posisi kolom 17.8800 m2 106
luasan seluruhnya 750.2236 m2 107
Pengurangan Luas Posisi Shaft 4.7175 m2 108
Pengurangan Luas Tangga & Lift 40.7082 m2 109
Luasan untuk Pembesian 704.7979 m2 110
111
II.1.4 PEKERJAAN DINDING BETON 112
II.1.4.1 ### PEKERJAAN DINDING LIFT Jumlah 3 113
- ###
### Pembesian 114
Berat Tulangan 28.4114 kg/m2 115
Luasan 37.2500 m2 116
Luas Seluruhnya 40.0000 m2 117
Pengurangan Luas Concrete Opening 2.7500 m2 118
- ###
### Bekisting 119
Lebar 7.6000 m 120
Tinggi 3.5000 m 121
Jumlah Sisi 2.0000 sisi 122
Pengurangan Luas Untuk Concrete Opening 4.2800 m2 123
- ###
### Beton 124

perhitungan volume
48 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Lebar 7.6000 m 125
Tinggi 3.5000 m 126
Tebal 0.2000 m 127
Pengurangan Luas Volume Untuk Concrete Opening 0.5500 m3 128
###
###
### 129
II.1.4.2 ### PEKERJAAN SHEAR WALL Jumlah SW 1 130
- ###
### Pembesian 131
Berat Tulangan 28.4114 kg/m2 132
Luasan 20.0000 m2 133
Luas Seluruhnya 20.0000 m2 134
- ###
### Bekisting 135
Lebar 3.8000 m 136
Tinggi 3.5000 m 137
Jumlah Sisi 2.0000 sisi 138
- ###
### Beton 139
Lebar 3.8000 m 140
Tinggi 3.5000 m 141
Tebal 0.2000 m 142
143
II.1.5 PEKERJAAN TANGGA Jumlah 2 144
- Pembesian 145
Tulangan D16-125 146
Diameter 1.6000 cm 147
Panjang 9.9200 m' 148
Jumlah 22.0000 Bh 149
Berat 344.4351 kg 150
Tulangan D12-200 151
Diameter 1.2000 cm 152
Panjang 1.2000 m' 153
Jumlah 102.0000 Bh 154
Berat 108.6618 kg 155
Tulangan 1D10 156
Diameter 1.0000 cm 157
Panjang 1.2000 m' 158
Jumlah 21.0000 Bh 159
Berat 15.5358 kg 160
Tulangan D10-150 161
Diameter 1.0000 cm 162
Panjang 0.7500 m' 163
Jumlah 189.0000 Bh 164

perhitungan volume
49 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Berat 87.3889 kg 165
- Bekisting 166
Bekisting Plat Anak Tangga 10.9500 m2 167
Panjang 7.3000 m 168
Lebar 1.2000 m 169
Luas Bagian Tepi Plat 2.1900 m2 170
Bekisting Borders 3.8970 m2 171
Panjang 2.4000 m 172
Lebar 1.3100 m 173
Luas Bagian Tepi Plat 0.7530 m2 174
Bekisting Anak Tangga 5.9850 m2 175
Jumlah Anak Tangga 21.0000 bh 176
Luasan 1 Anak Tangga 0.2280 m2 177
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 178
- Beton 179
Beton Plat Anak Tangga 1.3140 m3 180
Tebal 0.1500 m 181
Lebar 1.2000 m 182
Panjang 7.3000 m 183
Beton Borders 0.4716 m3 184
Tebal 0.1500 m 185
Lebar 1.3100 m 186
Panjang 2.4000 m 187
Beton Anak Tangga 0.7182 m3 188
Jumlah Anak Tangga 21.0000 bh 189
Panjang 1 Anak Tangga 1.2000 m 190
Area Dimensi 1 Anak Tangga 0.0285 m2 191
192
II.1.6 PEKERJAAN STRUKTUR ENTRANCE 193
II.1.6.1 ### PEKERJAAN ENTRANCE (E) 194
II.1.6.1a ###
### PEKERJAAN BADAN TEBAL 20CM 195
- ###
### Pembesian 196
Luas 16.1646 m2 197
Berat Per m2 22.5798 kg 198
- ###
### Bekisting Dinding 199
Jumlah Sisi 2.0000 200
Luas Bagian Tepi 7.9223 m2 201
- ###
### Beton 202
Luasan 16.1646 m2 203
Tebal 0.2000 m' 204

perhitungan volume
50 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


II.1.6.1b ### PEKERJAAN PLAT S2 TEBAL 10 CM 205
- ###
### Pembesian 206
Luas Pembesian Plat 21.5500 m2 207
Berat Pembesian 17.5977 Kg/m2 208
- ###
### Bekisting Plat 209
Penambahan luasan di tepi plat sisi luar 2.2300 m2 210
- ###
### Beton 211
Tebal Plat 0.1200 m' 212
Luasan untuk beton 19.5100 m2 213
luasan posisi balok 0.4000 m2 214
luasan posisi kolom 1.6400 m2 215
luasan seluruhnya 21.5500 m2 216
Pengurangan Luas Posisi Shaft - m2 217
Pengurangan Luas Tangga & Lift - m2 218
Luasan untuk Pembesian 21.5500 m2 219
II.1.6.1c ### PEKERJAAN WATERPROOFING 220
II.1.6.1d ### PEKERJAAN SCREEDING 221
II.1.6.1e ### PASANG ROOF DRAIN 222
II.1.6.1f ### PASANG INSTALASI AIR HUJAN 223
###
###
### 224
II.1.6.2 ### PEKERJAAN ENTRANCE (E1) 225
II.1.6.2a ###
### PEKERJAAN BADAN TEBAL 20CM 226
- ###
### Pembesian 227
Luas 13.7498 m2 228
Berat Per m2 22.5798 kg 229
- ###
### Bekisting Dinding 230
Jumlah Sisi 2.0000 231
Luas Bagian Tepi 6.2401 m2 232
- ###
### Beton 233
Luasan 13.7498 m2 234
Tebal 0.2000 m' 235
II.1.6.2b ### PEKERJAAN PLAT S2 TEBAL 10 CM 236
- ###
### Pembesian 237
Luas Pembesian Plat 19.0000 m2 238
Berat Pembesian 17.5977 Kg/m2 239
- ###
### Bekisting Plat 240
Penambahan luasan di tepi plat sisi luar 2.0050 m2 241
- ###
### Beton 242
Tebal Plat 0.1200 m' 243
Luasan untuk beton 17.4200 m2 244

perhitungan volume
51 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


luasan posisi balok 0.5200 m2 245
luasan posisi kolom 1.0600 m2 246
luasan seluruhnya 19.0000 m2 247
Pengurangan Luas Posisi Shaft - m2 248
Pengurangan Luas Tangga & Lift - m2 249
Luasan untuk Pembesian 19.0000 m2 250
###
###
### 251
II.1.6.2c ### PEKERJAAN WATERPROOFING 252
II.1.6.2d ### PEKERJAAN SCREEDING 253
II.1.6.2e ### PASANG ROOF DRAIN 254
II.1.6.2f ### PASANG INSTALASI AIR HUJAN 255
###
###
### 256
II.1.6.3 ### PEKERJAAN ENTRANCE (E2) 257
II.1.6.3a ###
### PEKERJAAN BADAN TEBAL 20CM 258
- ###
### Pembesian 259
Luas 16.0470 m2 260
Berat Per m2 22.5798 kg 261
- ###
### Bekisting Dinding 262
Jumlah Sisi 2.0000 263
Luas Bagian Tepi 7.2876 m2 264
- ###
### Beton 265
Luasan 16.0470 m2 266
Tebal 0.2000 m' 267
II.1.6.3b ### PEKERJAAN PLAT S2 TEBAL 10 CM 268
- ###
### Pembesian 269
Luas Pembesian Plat 19.0800 m2 270
Berat Pembesian 17.5977 Kg/m2 271
- ###
### Bekisting Plat 272
Penambahan luasan di tepi plat sisi luar 2.0500 m2 273
- ###
### Beton 274
Tebal Plat 0.1200 m' 275
Luasan untuk beton 16.7800 m2 276
luasan posisi balok 2.3000 m2 277
luasan posisi kolom - m2 278
luasan seluruhnya 19.0800 m2 279
Pengurangan Luas Posisi Shaft - m2 280
Pengurangan Luas Tangga & Lift - m2 281
Luasan untuk Pembesian 19.0800 m2 282
###
###
### 283
II.1.6.3c ### PEKERJAAN WATERPROOFING 284

perhitungan volume
52 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


II.1.6.3d ### PEKERJAAN SCREEDING 285
II.1.6.3e ### PASANG ROOF DRAIN 286
II.1.6.3f ### PASANG INSTALASI AIR HUJAN 287
288
II.2 PEKERJAAN LANTAI 2 (DUA) 289
II.2.1 ### PEKERJAAN KOLOM 290
II.1.1.1 ###
### PEKERJAAN KOLOM TYPE 1 (K1) 291
- ######
### Pembesian 292
- ######
### Bekisting 293
Jumlah Kolom 16.0000 bh 294
Panjang Dimensi 3.2000 m' 295
Tinggi Bekisting 1 Kolom 3.6800 m' 296
- ###
###
### Beton 297
Jumlah Kolom 16.0000 bh 298
Area Dimensi 0.6000 m2 299
Tinggi 1 kolom 3.8000 m' 300
###
###
###
### 301
II.2.1.2 ###
### PEKERJAAN KOLOM TYPE 2 (K2) 302
- ### ###
### Pembesian 303
- ### ###
### Bekisting 304
Jumlah Kolom 22.0000 bh 305
Panjang Dimensi 2.4000 m' 306
Tinggi Bekisting 1 Kolom 3.6800 m' 307
- ###
###
### Beton 308
Jumlah Kolom 22.0000 bh 309
Area Dimensi 0.3600 m2 310
Tinggi 1 kolom 3.8000 m' 311
###
### 312
II.2.1.3 ###
### PEKERJAAN KOLOM TYPE 3 (K3) 313
- ### ###
### Pembesian 314
- ### ###
### Bekisting 315
Jumlah Kolom 2.0000 bh 316
Panjang Dimensi 1.8000 m' 317
Tinggi Bekisting 1 Kolom 3.6800 m' 318
- ###
###
### Beton 319
Jumlah Kolom 2.0000 bh 320
Area Dimensi 0.1800 m2 321
Tinggi 1 kolom 3.8000 m' 322
###
###
###
### 323
II.2.2 PEKERJAAN BALOK 324

perhitungan volume
53 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


II.2.2.1 ### PEKERJAAN BALOK BI.1 325
- ###
### Pembesian 326
- ###
### Bekisting 327
Panjang Balok 180.8600 m' 328
Lebar Bekisting 1.4600 m' 329
- ###
### Beton 330
Panjang Balok 180.8600 m' 331
Area Dimensi 0.2100 m2 332
Penambahan panjang untuk Tulangan 28.0000 m' 333
K1 25.6000 m 334
K2 2.4000 m 335
K3 - m 336
II.2.2.2 ### PEKERJAAN BALOK BI.2 337
- ###
### Pembesian 338
- ###
### Bekisting 339
Panjang Balok 101.5600 m' 340
Lebar Bekisting 1.0600 m' 341
- ###
### Beton 342
Panjang Balok 101.5600 m' 343
Area Dimensi 0.1500 m2 344
Penambahan panjang untuk Tulangan 30.0000 m' 345
K1 4.8000 m 346
K2 24.0000 m 347
BI 1.2000 m 348
II.2.2.3 ### PEKERJAAN BALOK BA.1 349
- ###
### Pembesian 350
- ###
### Bekisting 351
Panjang Balok 79.0000 m' 352
Lebar Bekisting 0.8100 m' 353
- ###
### Beton 354
Panjang Balok 79.0000 m' 355
Area Dimensi 0.1000 m2 356
Penambahan panjang untuk Tulangan 4.8000 m' 357
ba.1 4.8000 M' 358
II.2.2.4 PEKERJAAN BALOK BA.2 359
- ### Pembesian 360
- ### Bekisting 361
Panjang Balok 32.6000 m' 362
Lebar Bekisting 0.5600 m' 363
- ### Beton 364

perhitungan volume
54 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Panjang Balok 32.6000 m' 365
Area Dimensi 0.0600 m2 366
Penambahan panjang untuk Tulangan 5.0000 m' 367
ba.1 5.0000 M' 368
369
II.2.3 PEKERJAAN PLAT BETON BERTULANG 370
II.2.3.1 ### PEKERJAAN PLAT S1 371
- ###
### Pembesian 372
Luas Pembesian Plat 704.0479 m2 373
Berat Pembesian 17.5977 Kg/m2 374
- ###
### Bekisting 375
Penambahan luasan di tepi plat sisi luar 25.2098 m2 376
- ###
### Beton 377
Tebal Plat 0.1200 m' 378
Luasan untuk beton 575.1719 m2 379
luasan posisi balok 110.9960 m2 380
luasan posisi kolom 17.8800 m2 381
luasan seluruhnya 749.3236 m2 382
Pengurangan Luas Posisi Shaft 4.5675 m2 383
Pengurangan Luas Tangga & Lift 40.7082 m2 384
Luasan untuk Pembesian 704.0479 m2 385
386
II.2.4 PEKERJAAN DINDING BETON 387
II.2.4.1 ### PEKERJAAN DINDING LIFT Jumlah 3 388
- ###
### Pembesian 389
Berat Tulangan 28.4114 kg/m2 390
Luasan 35.2500 m2 391
Luas Seluruhnya 38.0000 m2 392
Pengurangan Luas Concrete Opening 2.7500 m2 393
- ###
### Bekisting 394
Lebar 7.6000 m 395
Tinggi 3.3000 m 396
Jumlah Sisi 2.0000 sisi 397
Pengurangan Luas Untuk Concrete Opening 4.2800 m2 398
- ###
### Beton 399
Lebar 7.6000 m 400
Tinggi 3.3000 m 401
Tebal 0.2000 m 402
Pengurangan Luas Volume Untuk Concrete Opening 0.5500 m3 403
###
###
### 404

perhitungan volume
55 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


II.2.4.2 ### PEKERJAAN SHEAR WALL Jumlah SW 1 405
- ###
### Pembesian 406
Berat Tulangan 28.4114 kg/m2 407
Luasan 19.0000 m2 408
Luas Seluruhnya 19.0000 m2 409
- ###
### Bekisting 410
Lebar 3.8000 m 411
Tinggi 3.3000 m 412
Jumlah Sisi 2.0000 sisi 413
- ###
### Beton 414
Lebar 3.8000 m 415
Tinggi 3.3000 m 416
Tebal 0.2000 m 417
418
II.2.5 PEKERJAAN TANGGA Jumlah 2 419
- ###
### Pembesian 420
Tulangan D16-125 421
Diameter 1.6000 cm 422
Panjang 9.9200 m' 423
Jumlah 22.0000 Bh 424
Berat 344.4351 kg 425
Tulangan D12-200 426
Diameter 1.2000 cm 427
Panjang 1.2000 m' 428
Jumlah 102.0000 Bh 429
Berat 108.6618 kg 430
Tulangan 1D10 431
Diameter 1.0000 cm 432
Panjang 1.2000 m' 433
Jumlah 21.0000 Bh 434
Berat 15.5358 kg 435
Tulangan D10-150 436
Diameter 1.0000 cm 437
Panjang 0.7500 m' 438
Jumlah 189.0000 Bh 439
Berat 87.3889 kg 440
- ###
### Bekisting 441
Bekisting Plat Anak Tangga 10.9500 m2 442
Panjang 7.3000 m 443
Lebar 1.2000 m 444

perhitungan volume
56 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Luas Bagian Tepi Plat 2.1900 m2 445
Bekisting Borders 3.8970 m2 446
Panjang 2.4000 m 447
Lebar 1.3100 m 448
Luas Bagian Tepi Plat 0.7530 m2 449
Bekisting Anak Tangga 5.9850 m2 450
Jumlah Anak Tangga 21.0000 bh 451
Luasan 1 Anak Tangga 0.2280 m2 452
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 453
- ###
### Beton 454
Beton Plat Anak Tangga 1.3140 m3 455
Tebal 0.1500 m 456
Lebar 1.2000 m 457
Panjang 7.3000 m 458
Beton Borders 0.4716 m3 459
Tebal 0.1500 m 460
Lebar 1.3100 m 461
Panjang 2.4000 m 462
Beton Anak Tangga 0.7182 m3 463
Jumlah Anak Tangga 21.0000 bh 464
Panjang 1 Anak Tangga 1.2000 m 465
Area Dimensi 1 Anak Tangga 0.0285 m2 466
467
II.3 PEKERJAAN LANTAI 3 (TIGA) 468
II.3.1 ### PEKERJAAN KOLOM 469
II.3.1.1 ###
### PEKERJAAN KOLOM TYPE 1 (K1) 470
- ######
### Pembesian 471
- ######
### Bekisting 472
Jumlah Kolom 16.0000 bh 473
Panjang Dimensi 2.8000 m' 474
Tinggi Bekisting 1 Kolom 3.6800 m' 475
- ###
###
### Beton 476
Jumlah Kolom 16.0000 bh 477
Area Dimensi 0.4800 m2 478
Tinggi 1 kolom 3.8000 m' 479
480
II.3.1.2 ###
### PEKERJAAN KOLOM TYPE 2 (K2) 481
- ### ###
### Pembesian 482
- ### ###
### Bekisting 483
Jumlah Kolom 22.0000 bh 484

perhitungan volume
57 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Panjang Dimensi 2.4000 m' 485
Tinggi Bekisting 1 Kolom 3.6800 m' 486
- ###
###
### Beton 487
Jumlah Kolom 22.0000 bh 488
Area Dimensi 0.3600 m2 489
Tinggi 1 kolom 3.8000 m' 490
###
###
###
### 491
II.3.1.3 ###
### PEKERJAAN KOLOM TYPE 3 (K3) 492
- ### ###
### Pembesian 493
- ### ###
### Bekisting 494
Jumlah Kolom 2.0000 bh 495
Panjang Dimensi 1.8000 m' 496
Tinggi Bekisting 1 Kolom 3.6800 m' 497
- ###
###
### Beton 498
Jumlah Kolom 2.0000 bh 499
Area Dimensi 0.1800 m2 500
Tinggi 1 kolom 3.8000 m' 501
###
###
###
### 502
II.3.2 PEKERJAAN BALOK 503
II.3.2.1 ### PEKERJAAN BALOK BI.1 504
- ###
### Pembesian 505
- ###
### Bekisting 506
Panjang Balok 184.0600 m' 507
Lebar Bekisting 1.4600 m' 508
- ###
### Beton 509
Panjang Balok 184.0600 m' 510
Area Dimensi 0.2100 m2 511
Penambahan panjang untuk Tulangan 24.8000 m' 512
K1 22.4000 m 513
K2 2.4000 m 514
K3 - m 515
###
###
### 516
II.3.2.2 ### PEKERJAAN BALOK BI.2 517
- ###
### Pembesian 518
- ###
### Bekisting 519
Panjang Balok 101.5600 m' 520
Lebar Bekisting 1.0600 m' 521
- ###
### Beton 522
Panjang Balok 101.5600 m' 523
Area Dimensi 0.1500 m2 524

perhitungan volume
58 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Penambahan panjang untuk Tulangan 30.0000 m' 525
K1 4.8000 m 526
K2 24.0000 m 527
BI 1.2000 m 528
###
###
### 529
II.3.2.3 ### PEKERJAAN BALOK BA.1 530
- ###
### Pembesian 531
- ###
### Bekisting 532
Panjang Balok 79.0000 m' 533
Lebar Bekisting 0.8100 m' 534
- ###
### Beton 535
Panjang Balok 79.0000 m' 536
Area Dimensi 0.1000 m2 537
Penambahan panjang untuk Tulangan 4.8000 m' 538
BA.1 4.8000 M' 539
II.3.2.4 PEKERJAAN BALOK BA.2 540
- ### Pembesian 541
- ### Bekisting 542
Panjang Balok 33.0000 m' 543
Lebar Bekisting 0.5600 m' 544
- ### Beton 545
Panjang Balok 33.0000 m' 546
Area Dimensi 0.0600 m2 547
Penambahan panjang untuk Tulangan 4.5000 m' 548
BA.1 4.5000 M' 549
550
II.3.3 PEKERJAAN PLAT BETON BERTULANG 551
II.3.3.1 ### PEKERJAAN PLAT S1 552
- ###
### Pembesian 553
Luas Pembesian Plat 704.1604 m2 554
Berat Pembesian 17.5977 Kg/m2 555
- ###
### Bekisting 556
Penambahan luasan di tepi plat sisi luar 24.5138 m2 557
- ###
### Beton 558
Tebal Plat 0.1200 m' 559
Luasan untuk beton 576.1644 m2 560
luasan posisi balok 112.0360 m2 561
luasan posisi kolom 15.9600 m2 562
luasan seluruhnya 749.3236 m2 563
Pengurangan Luas Posisi Shaft 4.4550 m2 564

perhitungan volume
59 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Pengurangan Luas Tangga & Lift 40.7082 m2 565
Luasan untuk Pembesian 704.1604 m2 566
567
II.3.4 PEKERJAAN DINDING BETON 568
II.3.4.1 ### PEKERJAAN DINDING LIFT Jumlah 3 569
- ###
### Pembesian 570
Berat Tulangan 28.4114 kg/m2 571
Luasan 35.2500 m2 572
Luas Seluruhnya 38.0000 m2 573
Pengurangan Luas Concrete Opening 2.7500 m2 574
- ###
### Bekisting 575
Lebar 7.6000 m 576
Tinggi 3.3000 m 577
Jumlah Sisi 2.0000 sisi 578
Pengurangan Luas Untuk Concrete Opening 4.2800 m2 579
- ###
### Beton 580
Lebar 7.6000 m 581
Tinggi 3.3000 m 582
Tebal 0.2000 m 583
Pengurangan Luas Volume Untuk Concrete Opening 0.5500 m3 584
###
###
### 585
II.3.4.2 ### PEKERJAAN SHEAR WALL Jumlah SW 1 586
- ###
### Pembesian 587
Berat Tulangan 28.4114 kg/m2 588
Luasan 19.0000 m2 589
Luas Seluruhnya 19.0000 m2 590
- ###
### Bekisting 591
Lebar 3.8000 m 592
Tinggi 3.3000 m 593
Jumlah Sisi 2.0000 sisi 594
- ###
### Beton 595
Lebar 3.8000 m 596
Tinggi 3.3000 m 597
Tebal 0.2000 m 598
599
II.3.5 PEKERJAAN TANGGA Jumlah 2 600
- ###
### Pembesian 601
Tulangan D16-125 602
Diameter 1.6000 cm 603
Panjang 9.9200 m' 604

perhitungan volume
60 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Jumlah 22.0000 Bh 605
Berat 344.4351 kg 606
Tulangan D12-200 607
Diameter 1.2000 cm 608
Panjang 1.2000 m' 609
Jumlah 102.0000 Bh 610
Berat 108.6618 kg 611
Tulangan 1D10 612
Diameter 1.0000 cm 613
Panjang 1.2000 m' 614
Jumlah 21.0000 Bh 615
Berat 15.5358 kg 616
Tulangan D10-150 617
Diameter 1.0000 cm 618
Panjang 0.7500 m' 619
Jumlah 189.0000 Bh 620
Berat 87.3889 kg 621
- ###
### Bekisting 622
Bekisting Plat Anak Tangga 10.9500 m2 623
Panjang 7.3000 m 624
Lebar 1.2000 m 625
Luas Bagian Tepi Plat 2.1900 m2 626
Bekisting Borders 3.8970 m2 627
Panjang 2.4000 m 628
Lebar 1.3100 m 629
Luas Bagian Tepi Plat 0.7530 m2 630
Bekisting Anak Tangga 5.9850 m2 631
Jumlah Anak Tangga 21.0000 bh 632
Luasan 1 Anak Tangga 0.2280 m2 633
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 634
- ###
### Beton 635
Beton Plat Anak Tangga 1.3140 m3 636
Tebal 0.1500 m 637
Lebar 1.2000 m 638
Panjang 7.3000 m 639
Beton Borders 0.4716 m3 640
Tebal 0.1500 m 641
Lebar 1.3100 m 642
Panjang 2.4000 m 643
Beton Anak Tangga 0.7182 m3 644

perhitungan volume
61 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Jumlah Anak Tangga 21.0000 bh 645
Panjang 1 Anak Tangga 1.2000 m 646
Area Dimensi 1 Anak Tangga 0.0285 m2 647
648
II.4 PEKERJAAN LANTAI 4 (EMPAT) 649
II.4.1 ### PEKERJAAN KOLOM 650
II.4.1.1 ###
### PEKERJAAN KOLOM TYPE 1 (K1) 651
- ######
### Pembesian 652
- ######
### Bekisting 653
Jumlah Kolom 16.0000 bh 654
Panjang Dimensi 2.8000 m' 655
Tinggi Bekisting 1 Kolom 3.6800 m' 656
- ###
###
### Beton 657
Jumlah Kolom 16.0000 bh 658
Area Dimensi 0.4800 m2 659
Tinggi 1 kolom 3.8000 m' 660
###
###
###
### 661
II.4.1.2 ###
### PEKERJAAN KOLOM TYPE 2 (K2) 662
- ### ###
### Pembesian 663
- ### ###
### Bekisting 664
Jumlah Kolom 20.0000 bh 665
Panjang Dimensi 2.4000 m' 666
Tinggi Bekisting 1 Kolom 3.6800 m' 667
- ###
###
### Beton 668
Jumlah Kolom 20.0000 bh 669
Area Dimensi 0.3600 m2 670
Tinggi 1 kolom 3.8000 m' 671
###
###
###
### 672
II.4.2 ### PEKERJAAN BALOK 673
II.4.2.1 ### PEKERJAAN BALOK BI.1 674
- ###
### Pembesian 675
- ###
### Bekisting 676
Panjang Balok 148.0000 m' 677
Lebar Bekisting 1.4600 m' 678
- ###
### Beton 679
Panjang Balok 148.0000 m' 680
Area Dimensi 0.2100 m2 681
Penambahan panjang untuk Tulangan 22.4000 m' 682
K1 22.4000 m 683
II.4.2.2 ### PEKERJAAN BALOK BI.2 684

perhitungan volume
62 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


- ###
### Pembesian 685
- ###
### Bekisting 686
Panjang Balok 101.5600 m' 687
Lebar Bekisting 1.0600 m' 688
- ###
### Beton 689
Panjang Balok 101.5600 m' 690
Area Dimensi 0.1500 m2 691
Penambahan panjang untuk Tulangan 30.0000 m' 692
K1 6.0000 m 693
K2 24.0000 m 694
II.4.2.3 ### PEKERJAAN BALOK BA.1 695
- ###
### Pembesian 696
- ###
### Bekisting 697
Panjang Balok 60.3000 m' 698
Lebar Bekisting 0.8100 m' 699
- ###
### Beton 700
Panjang Balok 60.3000 m' 701
Area Dimensi 0.1000 m2 702
Penambahan panjang untuk Tulangan 3.6000 m' 703
BI 3.6000 M' 704
II.3.2.4 PEKERJAAN BALOK BA.2 705
- ### Pembesian 706
- ### Bekisting 707
Panjang Balok 33.0000 m' 708
Lebar Bekisting 0.5600 m' 709
- ### Beton 710
Panjang Balok 33.0000 m' 711
Area Dimensi 0.0600 m2 712
Penambahan panjang untuk Tulangan 4.5000 m' 713
BA 4.5000 M' 714
715
II.4.3 PEKERJAAN PLAT BETON BERTULANG 716
II.4.3.1 ### PEKERJAAN PLAT S1 717
- ###
### Pembesian 718
Luas Pembesian Plat 593.1118 m2 719
Berat Pembesian 17.5977 Kg/m2 720
- ###
### Bekisting 721
Penambahan luasan di tepi plat sisi luar 21.2159 m2 722
- ###
### Beton 723
Tebal Plat 0.1200 m' 724

perhitungan volume
63 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Luasan untuk beton 481.6888 m2 725
luasan posisi balok 96.5430 m2 726
luasan posisi kolom 14.8800 m2 727
luasan seluruhnya 638.2750 m2 728
Pengurangan Luas Posisi Shaft 4.4550 m2 729
Pengurangan Luas Tangga & Lift 40.7082 m2 730
Luasan untuk Pembesian 593.1118 m2 731
732
II.4.4 PEKERJAAN DINDING BETON 733
II.4.4.1 ### PEKERJAAN DINDING LIFT Jumlah 3 734
- ###
### Pembesian 735
Berat Tulangan 28.4114 kg/m2 736
Luasan 35.2500 m2 737
Luas Seluruhnya 38.0000 m2 738
Pengurangan Luas Concrete Opening 2.7500 m2 739
- ###
### Bekisting 740
Lebar 7.6000 m 741
Tinggi 3.3000 m 742
Jumlah Sisi 2.0000 sisi 743
Pengurangan Luas Untuk Concrete Opening 4.2800 m2 744
- ###
### Beton 745
Lebar 7.6000 m 746
Tinggi 3.3000 m 747
Tebal 0.2000 m 748
Pengurangan Luas Volume Untuk Concrete Opening 0.5500 m3 749
###
###
### 750
II.4.4.2 ### PEKERJAAN SHEAR WALL Jumlah SW 1 751
- ###
### Pembesian 752
Berat Tulangan 28.4114 kg/m2 753
Luasan 19.0000 m2 754
Luas Seluruhnya 19.0000 m2 755
- ###
### Bekisting 756
Lebar 3.8000 m 757
Tinggi 3.3000 m 758
Jumlah Sisi 2.0000 sisi 759
- ###
### Beton 760
Lebar 3.8000 m 761
Tinggi 3.3000 m 762
Tebal 0.2000 m 763
764

perhitungan volume
64 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


II.4.5 PEKERJAAN TANGGA Jumlah 2 765
- ###
### Pembesian 766
Tulangan D16-125 767
Diameter 1.6000 cm 768
Panjang 9.9200 m' 769
Jumlah 22.0000 Bh 770
Berat 344.4351 kg 771
Tulangan D12-200 772
Diameter 1.2000 cm 773
Panjang 1.2000 m' 774
Jumlah 102.0000 Bh 775
Berat 108.6618 kg 776
Tulangan 1D10 777
Diameter 1.0000 cm 778
Panjang 1.2000 m' 779
Jumlah 21.0000 Bh 780
Berat 15.5358 kg 781
Tulangan D10-150 782
Diameter 1.0000 cm 783
Panjang 0.7500 m' 784
Jumlah 189.0000 Bh 785
Berat 87.3889 kg 786
- ###
### Bekisting 787
Bekisting Plat Anak Tangga 10.9500 m2 788
Panjang 7.3000 m 789
Lebar 1.2000 m 790
Luas Bagian Tepi Plat 2.1900 m2 791
Bekisting Borders 3.8970 m2 792
Panjang 2.4000 m 793
Lebar 1.3100 m 794
Luas Bagian Tepi Plat 0.7530 m2 795
Bekisting Anak Tangga 5.9850 m2 796
Jumlah Anak Tangga 21.0000 bh 797
Luasan 1 Anak Tangga 0.2280 m2 798
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 799
- ###
### Beton 800
Beton Plat Anak Tangga 1.3140 m3 801
Tebal 0.1500 m 802
Lebar 1.2000 m 803
Panjang 7.3000 m 804

perhitungan volume
65 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Beton Borders 0.4716 m3 805
Tebal 0.1500 m 806
Lebar 1.3100 m 807
Panjang 2.4000 m 808
Beton Anak Tangga 0.7182 m3 809
Jumlah Anak Tangga 21.0000 bh 810
Panjang 1 Anak Tangga 1.2000 m 811
Area Dimensi 1 Anak Tangga 0.0285 m2 812
813
II.5 PEKERJAAN STRUKTUR LANTAI 5 (LIMA) 814
II.5.1 ### PEKERJAAN KOLOM 815
II.5.1.1 ###
### PEKERJAAN KOLOM TYPE 1 (K1) 816
- ######
### Pembesian 817
- ######
### Bekisting 818
Jumlah Kolom 16.0000 bh 819
Panjang Dimensi 2.6000 m' 820
Tinggi Bekisting 1 Kolom 3.6800 m' 821
- ###
###
### Beton 822
Jumlah Kolom 16.0000 bh 823
Area Dimensi 0.4200 m2 824
Tinggi 1 kolom 3.8000 m' 825
###
###
### 826
II.5.1.2 ###
### PEKERJAAN KOLOM TYPE 2 (K2) 827
- ### ###
### Pembesian 828
- ### ###
### Bekisting 829
Jumlah Kolom 20.0000 bh 830
Panjang Dimensi 2.4000 m' 831
Tinggi Bekisting 1 Kolom 3.6800 m' 832
- ###
###
### Beton 833
Jumlah Kolom 20.0000 bh 834
Area Dimensi 0.3600 m2 835
Tinggi 1 kolom 3.8000 m' 836
837
II.5.2 PEKERJAAN BALOK 838
II.5.2.1 ### PEKERJAAN BALOK BI.1 839
- ###
### Pembesian 840
- ###
### Bekisting 841
Panjang Balok 149.6000 m' 842
Lebar Bekisting 1.4600 m' 843
- ###
### Beton 844

perhitungan volume
66 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Panjang Balok 149.6000 m' 845
Area Dimensi 0.2100 m2 846
Penambahan panjang untuk Tulangan 20.8000 m' 847
K1 20.8000 m 848
###
###
### 849
II.5.2.2 ### PEKERJAAN BALOK BI.2 850
- ###
### Pembesian 851
- ###
### Bekisting 852
Panjang Balok 88.2000 m' 853
Lebar Bekisting 1.0600 m' 854
- ###
### Beton 855
Panjang Balok 88.2000 m' 856
Area Dimensi 0.1500 m2 857
Penambahan panjang untuk Tulangan 30.0000 m' 858
K1 6.0000 m 859
K2 24.0000 m 860
###
###
### 861
II.5.2.3 ### PEKERJAAN BALOK BA.1 862
- ###
### Pembesian 863
- ###
### Bekisting 864
Panjang Balok 60.3000 m' 865
Lebar Bekisting 0.8100 m' 866
- ###
### Beton 867
Panjang Balok 60.3000 m' 868
Area Dimensi 0.1000 m2 869
Penambahan panjang untuk Tulangan 3.6000 m' 870
BI.1 3.6000 M' 871
###
###
### 872
II.5.3 PEKERJAAN PLAT BETON BERTULANG 873
II.5.3.1 ### PEKERJAAN PLAT S1 874
- ###
### Pembesian 875
Luas Pembesian Plat 702.0138 m2 876
Berat Pembesian 17.5977 Kg/m2 877
- ###
### Bekisting 878
Penambahan luasan di tepi plat sisi luar 20.0183 m2 879
- ###
### Beton 880
Tebal Plat 0.1200 m' 881
Luasan untuk beton 601.6788 m2 882
luasan posisi balok 86.4150 m2 883
luasan posisi kolom 13.9200 m2 884

perhitungan volume
67 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


luasan seluruhnya 718.8300 m2 885
Pengurangan Luas Posisi Shaft 1.2930 m2 886
Pengurangan Luas Tangga & Lift 15.5232 m2 887
Luasan untuk Pembesian 702.0138 m2 888
- Waterproofing 889
- Screeding 890
###
###
### 891
II.5.4 PEKERJAAN DINDING BETON 892
II.5.4.1 ### PEKERJAAN DINDING LIFT Jumlah 3 893
- ###
### Pembesian 894
Berat Tulangan 28.4114 kg/m2 895
Luasan 35.2500 m2 896
Luas Seluruhnya 38.0000 m2 897
Pengurangan Luas Concrete Opening 2.7500 m2 898
- ###
### Bekisting 899
Lebar 7.6000 m 900
Tinggi 3.3000 m 901
Jumlah Sisi 2.0000 sisi 902
Pengurangan Luas Untuk Concrete Opening 4.2800 m2 903
- ###
### Beton 904
Lebar 7.6000 m 905
Tinggi 3.3000 m 906
Tebal 0.2000 m 907
Pengurangan Luas Volume Untuk Concrete Opening 0.5500 m3 908
###
###
### 909
II.5.4.2 ### PEKERJAAN SHEAR WALL Jumlah SW 1 910
- ###
### Pembesian 911
Berat Tulangan 28.4114 kg/m2 912
Luasan 19.0000 m2 913
Luas Seluruhnya 19.0000 m2 914
- ###
### Bekisting 915
Lebar 3.8000 m 916
Tinggi 3.3000 m 917
Jumlah Sisi 2.0000 sisi 918
- ###
### Beton 919
Lebar 3.8000 m 920
Tinggi 3.3000 m 921
Tebal 0.2000 m 922
###
###
### 923
II.5.5 PEKERJAAN TANGGA 924

perhitungan volume
68 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


- ###
### Pembesian 925
- ###
### Bekisting 926
- ###
### Beton 927
928
Tangga 3 929
###
### Pembesian 930
Tulangan D16-125 931
Diameter 1.6000 cm 932
Panjang 11.4256 m' 933
Jumlah 26.0000 Bh 934
Berat 468.8408 kg 935
Tulangan D12-200 936
Diameter 1.2000 cm 937
Panjang 1.5000 m' 938
Jumlah 116.0000 Bh 939
Berat 154.4702 kg 940
Tulangan 1D10 941
Diameter 1.0000 cm 942
Panjang 1.5000 m' 943
Jumlah 20.0000 Bh 944
Berat 18.4950 kg 945
Tulangan D10-150 946
Diameter 1.0000 cm 947
Panjang 0.7500 m' 948
Jumlah 220.0000 Bh 949
Berat 101.7225 kg 950
###
### Bekisting 951
Bekisting Plat Anak Tangga 10.6481 m2 952
Panjang 5.9156 m 953
Lebar 1.5000 m 954
Luas Bagian Tepi Plat 1.7747 m2 955
Bekisting Borders 10.1225 m2 956
Panjang 5.5100 m 957
Lebar 1.6000 m 958
Luas Bagian Tepi Plat 1.3065 m2 959
Bekisting Anak Tangga 6.8400 m2 960
Jumlah Anak Tangga 20.0000 bh 961
Luasan 1 Anak Tangga 0.2850 m2 962
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 963
###
### Beton 964

perhitungan volume
69 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Beton Plat Anak Tangga 1.3310 m3 965
Tebal 0.1500 m 966
Lebar 1.5000 m 967
Panjang 5.9156 m 968
Beton Borders 1.3224 m3 969
Tebal 0.1500 m 970
Lebar 1.6000 m 971
Panjang 5.5100 m 972
Beton Anak Tangga 0.8550 m3 973
Jumlah Anak Tangga 20.0000 bh 974
Panjang 1 Anak Tangga 1.5000 m 975
Area Dimensi 1 Anak Tangga 0.0285 m2 976
977
Tangga 4 978
###
### Pembesian 979
Tulangan D16-125 980
Diameter 1.6000 cm 981
Panjang 11.9000 m' 982
Jumlah 26.0000 Bh 983
Berat 488.3075 kg 984
Tulangan D12-200 985
Diameter 1.2000 cm 986
Panjang 1.5000 m' 987
Jumlah 122.0000 Bh 988
Berat 162.4601 kg 989
Tulangan 1D10 990
Diameter 1.0000 cm 991
Panjang 1.5000 m' 992
Jumlah 19.0000 Bh 993
Berat 17.5703 kg 994
Tulangan D10-150 995
Diameter 1.0000 cm 996
Panjang 0.7500 m' 997
Jumlah 209.0000 Bh 998
Berat 96.6364 kg 999
###
### Bekisting 1000
Bekisting Plat Anak Tangga 11.7000 m2 1001
Panjang 6.5000 m 1002
Lebar 1.5000 m 1003
Luas Bagian Tepi Plat 1.9500 m2 1004

perhitungan volume
70 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Bekisting Borders 10.2150 m2 1005
Panjang 5.4000 m 1006
Lebar 1.6500 m 1007
Luas Bagian Tepi Plat 1.3050 m2 1008
Bekisting Anak Tangga 6.4980 m2 1009
Jumlah Anak Tangga 19.0000 bh 1010
Luasan 1 Anak Tangga 0.2850 m2 1011
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 1012
###
### Beton 1013
Beton Plat Anak Tangga 1.4625 m3 1014
Tebal 0.1500 m 1015
Lebar 1.5000 m 1016
Panjang 6.5000 m 1017
Beton Borders 1.3365 m3 1018
Tebal 0.1500 m 1019
Lebar 1.6500 m 1020
Panjang 5.4000 m 1021
Beton Anak Tangga 0.8123 m3 1022
Jumlah Anak Tangga 19.0000 bh 1023
Panjang 1 Anak Tangga 1.5000 m 1024
Area Dimensi 1 Anak Tangga 0.0285 m2 1025
1026
II.6 PEKERJAAN STRUKTUR LANTAI DACK 1027
II.6.1 ### PEKERJAAN KOLOM 1028
II.6.1.1 ###
### PEKERJAAN KOLOM TYPE 1 (K1) 1029
- ######
### Pembesian 1030
- ######
### Bekisting 1031
Jumlah Kolom 8.0000 bh 1032
Panjang Dimensi 1.2000 m' 1033
Tinggi Bekisting 1 Kolom 0.8000 m' 1034
- ###
###
### Beton 1035
Jumlah Kolom 8.0000 bh 1036
Area Dimensi 0.0800 m2 1037
Tinggi 1 kolom 0.8000 m' 1038
- ### ###
### Angkur Kolom Baja Struktur Beserta Accessories 1039
###
###
###
### 1040
II.6.1.2 ###
### PEKERJAAN KOLOM TYPE 2 (K2) 1041
- ### ###
### Pembesian 1042
- ### ###
### Bekisting 1043
- ### ###
### Beton 1044

perhitungan volume
71 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


1045
K2 Bagian A 1046
###
### - Pembesian 1047
###
### - Bekisting 1048
Jumlah Kolom 12.0000 bh 1049
Panjang Dimensi 2.4000 m' 1050
Tinggi Bekisting 1 Kolom 3.1800 m' 1051
###
### - Beton 1052
Jumlah Kolom 12.0000 bh 1053
Area Dimensi 0.3600 m2 1054
Tinggi 1 kolom 3.3000 m' 1055
K2 Bagian B 1056
###
### - Pembesian 1057
###
### - Bekisting 1058
Jumlah Kolom 4.0000 bh 1059
Panjang Dimensi 2.4000 m' 1060
Tinggi Bekisting 1 Kolom 4.0800 m' 1061
###
### - Beton 1062
Jumlah Kolom 4.0000 bh 1063
Area Dimensi 0.3600 m2 1064
Tinggi 1 kolom 4.2000 m' 1065
Angkur Balok Baja Struktur Beserta Accessories 1066
###
###
###
### 1067
II.6.1.3 ###
### PEKERJAAN KOLOM TYPE 4 (K4) 1068
- ### ###
### Pembesian 1069
- ### ###
### Bekisting 1070
Jumlah Kolom 6.0000 bh 1071
Panjang Dimensi 1.0000 m' 1072
Tinggi Bekisting 1 Kolom 0.6800 m' 1073
- ### ###
### Beton 1074
Jumlah Kolom 6.0000 bh 1075
Area Dimensi 0.0625 m2 1076
Tinggi 1 kolom 0.8000 m' 1077
1078
II.6.2 ### PEKERJAAN BALOK 1079
II.6.2.1 ###
### PEKERJAAN BALOK BI.2 1080
- ### ###
### Pembesian 1081
- ### ###
### Bekisting 1082
Panjang Balok 6.0000 m' 1083
Lebar Bekisting 1.0600 m' 1084

perhitungan volume
72 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


- ###
###
### Beton 1085
Panjang Balok 6.0000 m' 1086
Area Dimensi 0.1500 m2 1087
Penambahan panjang untuk Tulangan 1.2000 m' 1088
K1 1.2000 m 1089
###
###
###
### 1090
II.6.2.2 ###
### PEKERJAAN BALOK BA.1 1091
- ### ###
### Pembesian 1092
- ### ###
### Bekisting 1093
Panjang Balok 45.7200 m' 1094
Lebar Bekisting 0.8100 m' 1095
- ###
###
### Beton 1096
Panjang Balok 45.7200 m' 1097
Area Dimensi 0.1000 m2 1098
Penambahan panjang untuk Tulangan 9.2000 m' 1099
K2 7.2000 M' 1100
k4 2.0000 M' 1101
###
###
###
### 1102
II.6.3 ### PEKERJAAN PLAT BETON BERTULANG 1103
II.6.3.1 ###
### PEKERJAAN PLAT S1 1104
- ### ###
### Pembesian 1105
Luas Pembesian Plat 121.2858 m2 1106
Berat Pembesian 17.5977 Kg/m2 1107
- ### ###
### Bekisting 1108
Penambahan luasan di tepi plat sisi luar 15.3194 m2 1109
- ### ###
### Beton 1110
Tebal Plat 0.1200 m' 1111
Luasan untuk beton 113.0808 m2 1112
luasan posisi balok 7.8300 m2 1113
luasan posisi kolom 0.3750 m2 1114
luasan seluruhnya 121.2858 m2 1115
Pengurangan Luas Posisi Shaft - m2 1116
Pengurangan Luas Tangga & Lift - m2 1117
Luasan untuk Pembesian 121.2858 m2 1118
- ### ###
### Pekerjaan Waterproofing 1119
- ### ###
### Pekerjaan Screeding 1120
###
###
### 1121
II.6.3.2 ###
### PEKERJAAN PLAT S2 1122
- ### ###
### Pembesian 1123
Luas Pembesian Plat 87.0477 m2 1124

perhitungan volume
73 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Berat Pembesian 17.5977 Kg/m2 1125
- ###
###
### Bekisting 1126
Penambahan luasan di tepi plat sisi luar 6.2472 m2 1127
- ###
###
### Beton 1128
Tebal Plat 0.1000 m' 1129
Luasan untuk beton 81.6477 m2 1130
luasan posisi balok 5.4000 m2 1131
luasan posisi kolom - m2 1132
luasan seluruhnya 87.0477 m2 1133
Pengurangan Luas Posisi Shaft - m2 1134
Pengurangan Luas Tangga & Lift - m2 1135
Luasan untuk Pembesian 87.0477 m2 1136
- ###
###
### Pekerjaan Waterproofing 1137
- ###
###
### Pekerjaan Screeding 1138
###
###
###
### 1139
II.6.3.3 ###
### PEKERJAAN PLAT S3 1140
- ### ###
### Pembesian 1141
Luas Pembesian Plat 28.0800 m2 1142
Berat Pembesian 45.4016 Kg/m2 1143
- ###
###
### Bekisting 1144
Penambahan luasan di tepi plat sisi luar 11.1600 m2 1145
- ###
###
### Beton 1146
Tebal Plat 0.3000 m' 1147
Luasan untuk beton 25.2000 m2 1148
luasan posisi balok - m2 1149
luasan posisi kolom 2.8800 m2 1150
luasan seluruhnya 28.0800 m2 1151
Pengurangan Luas Posisi Shaft - m2 1152
Pengurangan Luas Tangga & Lift - m2 1153
Luasan untuk Pembesian 28.0800 m2 1154
- ###
###
### Pekerjaan Waterproofing 1155
- ###
###
### Pekerjaan Screeding 1156
###
###
###
### 1157
II.6.3.4###
### PEKERJAAN TALANG AIR FRP T.5MM 1158
- ######
### Rangka Talang + Kedudukan Beserta Accessories 1159
Panjang 11.4000 M' 1160
- ###
###
### Lisplank 1161
Panjang 11.4000 M' 1162
Lebar 2.5000 M' 1163
- ###
###
### Lapisan Permukaan Talang 1164

perhitungan volume
74 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Panjang 11.4000 m' 1165
Lebar FRP 2.6000 m' 1166
Err:509 1167
II.6.4 PEKERJAAN TANGGA RUANG MESIN LIFT 3.0000 Bh 1168
- ###
### Pembesian 1169
Tulangan D16-125 1170
Diameter 1.6000 cm 1171
Panjang 1.0000 m' 1172
Jumlah 26.0000 Bh 1173
Berat 41.0342 kg 1174
Tulangan D12-200 1175
Diameter 1.2000 cm 1176
Panjang 1.5000 m' 1177
Jumlah 12.0000 Bh 1178
Berat 15.9797 kg 1179
Tulangan 1D10 1180
Diameter 1.0000 cm 1181
Panjang 1.5000 m' 1182
Jumlah 4.0000 Bh 1183
Berat 3.6990 kg 1184
Tulangan D10-150 1185
Diameter 1.0000 cm 1186
Panjang 0.7500 m' 1187
Jumlah 44.0000 Bh 1188
Berat 20.3445 kg 1189
- ###
### Bekisting 1190
Bekisting Plat Anak Tangga 1.8000 m2 1191
Panjang 1.0000 m 1192
Lebar 1.5000 m 1193
Luas Bagian Tepi Plat 0.3000 m2 1194
Bekisting Borders - m2 1195
Panjang - m 1196
Lebar - m 1197
Luas Bagian Tepi Plat - m2 1198
Bekisting Anak Tangga 1.3680 m2 1199
Jumlah Anak Tangga 4.0000 bh 1200
Luasan 1 Anak Tangga 0.2850 m2 1201
Luasan Bagian Tepi 1 Anak Tangga 0.0570 m2 1202
- ###
### Beton 1203
Beton Plat Anak Tangga 0.2250 m3 1204

perhitungan volume
75 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Tebal 0.1500 m 1205
Lebar 1.5000 m 1206
Panjang 1.0000 m 1207
Beton Borders - m3 1208
Tebal - m 1209
Lebar - m 1210
Panjang - m 1211
Beton Anak Tangga 0.1710 m3 1212
Jumlah Anak Tangga 4.0000 bh 1213
Panjang 1 Anak Tangga 1.5000 m 1214
Area Dimensi 1 Anak Tangga 0.0285 m2 1215
1216
II.7 PEKERJAAN STRUKTUR ATAP 1217
II.7.1 ### PEKERJAAN KOLOM 1218
II.7.1.1 ###
### PEKERJAAN KOLOM BAJA TYPE 1 (K1) 1219
- ######
### Baja Profil Honeycomb + Accesorries 1220
Panjang 18.8000 M' 1221
Berat Per M' 21.3333 Kg 1222
- ###
###
### Pengecatan 1223
Panjang 18.8000 M' 1224
Lebar Permukaan 0.8000 M' 1225
1226
II.7.2 ### PEKERJAAN BALOK 1227
II.7.2.1 ###
### PEKERJAAN BALOK HC 1228
- ### ###
### Baja Profil Honeycomb + Accesorries 1229
Panjang 72.6000 M' 1230
Berat Per M' 21.3333 Kg 1231
- ###
###
### Pengecatan 1232
Panjang 72.6000 M' 1233
Lebar Permukaan 0.8000 M' 1234
II.7.3 ### PEKERJAAN SPARING INSTALASI PLUMBING 1251
II.7.3.1 ### Pasang Roof Drain 1252
Jumlah Titik 40.0000 bh 1253
II.7.3.2 ### Pasang Sparing Instalasi 1254
### 1255
II.7.4 TRANSPORTASI VERTIKAL BANGUNAN BERTINGKAT 1256
1257
Pekerjaan Tulangan Stek Arsitektur 1258
Lantai 1 1259
Diameter 0.8000 cm 1260

perhitungan volume
76 of 202
NO. URAIAN PEKERJAAN KODE

(N) (M) (O)


Panjang 1 Stek 0.6400 m 1261
Jumlah Stek 1 Titik 2.0000 bh 1262
Jumlah Titik Stek 622.0000 Bh 1263
Lantai 2 1264
Diameter 0.8000 cm 1265
Panjang 1 Stek 0.6400 m 1266
Jumlah Stek 1 Titik 2.0000 bh 1267
Jumlah Titik Stek 676.0000 Bh 1268
Lantai 3 1269
Diameter 0.8000 cm 1270
Panjang 1 Stek 0.6400 m 1271
Jumlah Stek 1 Titik 2.0000 bh 1272
Jumlah Titik Stek 676.0000 Bh 1273
Lantai 4 1274
Diameter 0.8000 cm 1275
Panjang 1 Stek 0.6400 m 1276
Jumlah Stek 1 Titik 2.0000 bh 1277
Jumlah Titik Stek 549.0000 Bh 1278
Lantai 5 1279
Diameter 0.8000 cm 1280
Panjang 1 Stek 0.6400 m 1281
Jumlah Stek 1 Titik 2.0000 bh 1282
Jumlah Titik Stek 549.0000 Bh 1283
Lantai Dack 1284
Diameter 0.8000 cm 1285
Panjang 1 Stek 0.6400 m 1286
Jumlah Stek 1 Titik 2.0000 bh 1287
Jumlah Titik Stek 211.0000 Bh 1288

PT. NATURAL SUM

perhitungan volume
77 of 202
ME PEKERJAAN

HAP I (STRUKTUR)

KETERANGAN NILAI SAT.

(K) (Q) (S)

Lampiran Perhitungan Besi Kolom 9,114.3360 kg


=(M22*M21)*M20 198.6560 m2
=M24
=0.6+0.6+1+1
=M26-0.12
=(M26*M25)*M24 38.4000 m3
=16
=0.6*1
=4

Lampiran Perhitungan Besi Kolom 8,576.1562 kg


=(M33*M32)*M31 204.8640 m2
=M35
=0.6*4
=M37-0.12
=(M37*M36)*M35 31.6800 m3
=22
=0.6*0.6
=4

Lampiran Perhitungan Besi Kolom 294.1445 kg


=(M44*M43)*M42 13.9680 m2
=M46
=0.3+0.3+0.6+0.6
=M48-0.12

perhitungan volume
78 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=(M48*M47)*M46 1.4400 m3
=2
=0.3*0.6
=4

Lampiran Perhitungan Besi Balok 8,502.4012 Kg


=M53*M54 264.1140 M2
=M56
=0.3+((0.7-0.12)*2)
=M56*M57 37.9890 M3
=+((6.4+6.4+6.4)*4)+((6.4*1))+((8.95+0.7)*2)+((6+5+6)*4)+((5.2*2))
=0.3*0.7
=SUM(M59:M61)
=16*1.6
=2*1.2

Lampiran Perhitungan Besi Balok 3,494.7294 Kg


=M65*M66 107.6536 M2
=M68
=0.3+((0.5-0.12)*2)
=M68*M69 15.2340 M3
=+(2.4+4.4+2.55+2.4+1.4+1.4+1.28+2.4+2.4+5.4+5.4+1.28+2.4+2.4+1.4+1.4+2.4+2.55+4.4+2.4+2.4+4.4+2.55+2.4+1.4+1.4+2.4+2.4+5.4+5.4+2.4+2.4+1.4+1.4+2.4+2.55+4.4+2.4)
=0.3*0.5
=SUM(M71:M73)
=0.6*8
=+(0.6+0.6)*20
=0.3*4

Lampiran Perhitungan Besi Balok 1,635.4798 Kg


=M77*M78 63.9900 M2
=M80
=0.25+((0.4-0.12)*2)
=M80*M81 7.9000 M3
=+(6*2)+(6.7)+(6.7*9)
=0.25*0.4
=M83
=16*0.3

perhitungan volume
79 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


Lampiran Perhitungan Besi Balok 556.1247 Kg
=M87*M88 18.2560 M2
=M90
=0.2+((0.3-0.12)*2)
=M90*M91 1.9560 M3
=+(2.7*2)+(2.72*10)
=0.2*0.3
=M93
=0.25*20

=M98*M99 12,402.7868 Kg
=M110
Lampiran Perhitungan Plat
=M101+M104 601.1197 M2
=+((123.6826)+(14.8*2)+(9.3996*2)+(3.8*5)+(4.3)+(2.65*2))*0.12
=M103*M104 69.1092 M3
=0.12
=M107-(M106+M105+M108+M109)
=(0.3*(M68+M56))+((0.25*M80))+((0.2*M90))
=((M24*M25))+((M35*M36))+((M46*M47))
=749.3236
=+(0.7425*5)+(0.555)+(0.225*2)
=+(5.1744*2)+(12.5925*2)
=M107-(M108+M109)

=2
=(M115*M116)*N113 3,174.9773 Kg
Lampiran Perhitungan Besi Dinding
=M117-M118
=10*4
=2.5*1.1
=(((M120*M121)*M122)-M123)*N113 146.7600 M2
=M125
=M126
=2
=((2.5*1.1)*2)-((2.5*2)+1.1)*M127
=((M125*M126*M127)-M128)*N113 14.3100 M3

perhitungan volume
80 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=2.4+2.4+1.4+1.4
=4-0.5
=0.2
=+(1.1*2.5)*M127

=2
=(M132*M133)*N130 568.2286 Kg
Lampiran Perhitungan Besi Shear Wall
=M134
=5*4
=((M136*M137)*M138)*N130 26.6000 M2
=M140
=M141
=2
=((M140*M141)*M142)*N130 2.6600 M3
=2.4+1.4
=4-0.5
=0.2

=2
=(M150+M155+M160+M165)*N144 1,112.0432 Kg

=1.6
=M183+(M186*2)
=ROUND((M182/0.125)+1,0)*2
=0.6165*M147*M147*(M148*M149)

=1.2
=M182
=ROUND((M148/0.2)+1,0)*2
=0.6165*M152*M152*(M154*M153)

=1
=M190
=M189
=0.6165*M157*M157*(M158*M159)

=1
=0.75
=ROUND((M190/0.15)+1,0)*M189

perhitungan volume
81 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=0.6165*M162*M162*(M163*M164)
=(M167+M171+M175)*N144 41.6640 M2
=(M168*M169)+M170
=M183
=M182
=(2*M183)*M181
=(M172*M173)+M174
=M187
=M186
=(M186+M186+M187)*M185
=(M177+M178)*M176
=M189
=M190*0.19
=+(2*M191)
=(M180+M184+M188)*N144 5.0076 M3
=(M183*M182)*M181
=0.15
=1.2
=7.3
=(M187*M186)*M185
=M181
=1.31
=2.4
=(M190*M191)*M189
=21
=1.2
0.0285

=M197*M198 364.9930 Kg
=M203
Lampiran Perhitungan Besi Plat
=(M203*M200)+M201 40.2515 M2
=2
=+(35.6117+4)*0.2
=M203*M204 3.2329 M3
=15.3846+0.78
=0.2

perhitungan volume
82 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=M207*M208 379.2294 Kg
=M219
Lampiran Perhitungan Plat
=M210+M213 21.7400 M2
=22.3*0.1
=M212*M213 2.3412 M3
=0.12
=M216-(M215+M214+M217+M218)
=0.4
=1.64
=21.55

=M216-(M217+M218)
=M219 21.5500 M2
=Q220 21.5500 M2
=1 2.0000 Bh
=5 5.0000 M1

=M228*M229 310.4673 Kg
=M234
Lampiran Perhitungan Plat
=(M234*M231)+M232 33.7397 M2
=2
=+(27.9507+3.25)*0.2
=M234*M235 2.7500 M3
=12.4498+(0.4*3.25)
=0.2

=M238*M239 334.3554 Kg
=M250
Lampiran Perhitungan Plat
=M241+M244 19.4250 M2
=20.05*0.1
=M243*M244 2.0904 M3
=0.12
=M247-(M246+M245+M248+M249)

perhitungan volume
83 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=0.52
=1.06
=19

=M247-(M248+M249)

=M250 19.0000 M2
=M250 19.0000 M2
=1 2.0000 Bh
=5 5.0000 M1

=M260*M261 362.3376 Kg
=M266
Lampiran Perhitungan Plat
=(M266*M263)+M264 39.3816 M2
=2
=+(32.1378+4.3)*0.2
=M266*M267 3.2094 M3
=14.66+(0.6935*2)
0.2

=M270*M271 335.7632 Kg
=M282
='A.V.Besi Balok'!S90
=M273+M276 18.8300 M2
=20.5*0.1
=M275*M276 2.0136 M3
=0.12
=M279-(M278+M277+M280+M281)
=2.3

=19.08

=M279-(M280+M281)

=M282 19.0800 M2

perhitungan volume
84 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=M282 19.0800 M2
=1 2.0000 Bh
=5 5.0000 M1

Lampiran Perhitungan Besi Kolom 8,670.8506 Kg


=(M296*M295)*M294 188.4160 M2
=M298
=1+1+0.6+0.6
=M300-0.12
=(M300*M299)*M298 36.4800 M3
=16
=1*0.6
=3.8

Lampiran Perhitungan Besi Kolom 8,157.5477 Kg


=(M307*M306)*M305 194.3040 M2
=M309
=0.6*4
'=M311-0.12
=(M311*M310)*M309 30.0960 M3
=22
=0.6*0.6
=3.8

Lampiran Perhitungan Besi Kolom 279.9946 Kg


=(M318*M317)*M316 13.2480 M2
=M320
=0.3+0.3+0.6+0.6
=M322-0.12
=(M322*M321)*M320 1.3680 M3
=2
=0.3*0.6
=3.8

perhitungan volume
85 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

Lampiran Perhitungan Besi Balok 8,501.2414 Kg


264.0556 M2
=M328*M329
=0.3+((0.7-0.12)*2)
=M331*M332 37.9806 M3
=+((6.4+6.4+6.4)*4)+((6+6+5)*4)+((5.2)*2)+((6.4)*1)+((8.93+0.7)*2)
=0.3*0.7
=SUM(M334:M336)
=+(1+0.6)*16
=+(0.6+0.6)*2

Lampiran perhitungan Besi Balok 3,494.7294 Kg


=M340*M341 107.6536 M2
=M343
=0.3+((0.5-0.12)*2)
=M343*M344 15.2340 M3
=+(2.4+4.4+2.55+2.4+1.4+1.4+2.4+2.4+5.4+5.4+2.4+2.4+1.4+1.4+2.55+2.4+4.4+2.4+2.4+4.4+2.4+2.55+1.4+1.4+1.28+2.4+2.4+5.4+5.4+1.28+2.4+2.4+1.4+1.4+2.4+2.55+4.4+2.4)
=0.3*0.5
=SUM(M346:M348)
=0.6*8
=+(0.6+0.6)*20
=0.3*4

Lampiran Perhitungan Besi Balok 1,635.4798 Kg


=M352*M353 63.9900 M2
=M355
=0.25+((0.4-0.12)*2)
=M355*M356 7.9000 M3
=+(6*2)+(6.7*10)
=0.25*0.4
=M358
=0.3*16

Lampiran Perhitungan Besi Balok 556.1247 Kg


=M362*M363 18.2560 M2
=M365
=0.2+((0.3-0.12)*2)
=M365*M366 1.9560 M3

perhitungan volume
86 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=+(2.7*2)+(2.72*10)
=0.2*0.3
=M368
=0.25*20

=M373*M374 12,389.5885 Kg
=M385
Lampiran Perhitungan Besi Plat
=M376+M379 600.3817 M2
=+((123.6826)+(9.3996*2)+(14.8*2)+(3.8*5)+(4.3*1)+(2.65*2))*0.12
=M378*M379 69.0206 M3
=0.12
=M382-(M381+M380+M383+M384)
=(0.3*(M343+M331))+((0.25*M355))+((0.2*M365))
=((M298*M299))+((M309*M310))+((M320*M321))
=749.3236
=+(0.7125*5)+(0.555*1)+(0.225*2)
=+(5.1744*2)+(12.5925*2)
=M382-(M383+M384)

=2
=(M390*M391)*N388 3,004.5087 Kg
Lampiran Perhitungan Besi Dinding
=M392-M393
=10*3.8
=2.5*1.1
=(((M395*M396)*M397)-M398)*N388 137.6400 M2
=M400
=M401
=2
=((2.5*1.1)*2)-((2.5*2)+1.1)*M402
=((M400*M401*M402)-M403)*N388 13.3980 M3
=2.4+2.4+1.4+1.4
=3.8-0.5
0.2
=+(1.1*2.5)*M402

perhitungan volume
87 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


2
=(M407*M408)*N405 539.8172 Kg
Lampiran Perhitungan Besi Shear Wall
=M409
=5*3.8
=((M411*M412)*M413)*N405 25.0800 M2
=M415
=M416
=2
=((M415*M416)*M417)*N405 2.5080 M3
=2.4+1.4
=2.4+1.4
=0.2

=2
=(M425+M430+M435+M440)*N419 1,112.0432 Kg

=1.6
=M458+(M461*2)
=ROUND((M457/0.125)+1,0)*2
=0.6165*M422*M422*(M423*M424)

=1.2
=M457
=ROUND((M423/0.2)+1,0)*2
=0.6165*M427*M427*(M429*M428)

=1
=M465
=M464
=0.6165*M432*M432*(M433*M434)

=1
=0.75
=ROUND((M465/0.15)+1,0)*M464
=0.6165*M437*M437*(M438*M439)
=(M442+M446+M450)*N419 41.6640 M2
=(M443*M444)+M445
=M458
=M457

perhitungan volume
88 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=(2*M458)*M456
=(M447*M448)+M449
=M462
=M461
=(M461+M461+M462)*M460
=(M452+M453)*M451
=M464
=M465*0.19
=+(2*M466)

5.0076 M3
=(M458*M457)*M456
=0.15
=1.2
=7.3
=(M462*M461)*M460
=M456
=1.31
=2.4
=(M465*M466)*M464
=21
=1.2
=0.0285

Lampiran perhitungan besi Kolom 8,627.4490 Kg


=(M475*M474)*M473 164.8640 M2
=M477
=0.6+0.6+0.8+0.8
=M479-0.12
=(M479*M478)*M477 29.1840 M3
=16
=0.8*0.6
=3.8

Lampiran perhitungan Besi Kolom 9,128.0422 Kg


=(M486*M485)*M484 194.3040 M2
=M488

perhitungan volume
89 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=0.6*4
=M490-0.12
=(M490*M489)*M488 30.0960 M3
=22
=0.6*0.6
=3.8

Lampiran Perhitungan Besi Kolom 279.9946 Kg


=(M497*M496)*M495 13.2480 M2
=M499
=0.3+0.3+0.6+0.6
=M501-0.12
=(M501*M500)*M499 1.3680 M3
=2
=0.3*0.6
=3.8

Lampiran Perhitungan besil Balok 8,501.2414 Kg


=M507*M508 268.7276 M2
=M510
=0.3+((0.7-0.12)*2)
=M510*M511 38.6526 M3
=((6.4+6.4+6.4)*4)+((6.2+5.4+6.2)*4)+((8.93+0.7)*2)+((6.4)*1)+((5.2)*2)
=0.3*0.7
=SUM(M513:M515)
=+(0.6+0.8)*16
=+(0.6+0.6)*2

Lampiran Perhitungan Besi Balok 3,494.7294 Kg


=M520*M521 107.6536 M2
=M523
=0.3+((0.5-0.12)*2)
=M523*M524 15.2340 M3
=+((2.4)*16)+(4.4*4)+(2.55*4)+(1.28*2)+(1.4*8)+(5.4*4)
=0.3*0.5

perhitungan volume
90 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=SUM(M526:M528)
=+(0.6)*8
=+(0.6+0.6)*20
=0.3*4

Lampiran Perhitungan Besi Balok 1,635.4798 Kg


=M533*M534 63.9900 M2
=M536
=0.25+((0.4-0.12)*2)
=M536*M537 7.9000 M3
=+(6*2)+(6.7*10)
=0.25*0.4
=M539
=0.3*16

Lampiran Perhitungan Besi Balok 555.1676 Kg


=M543*M544 18.4800 M2
=M546
=0.2+((0.3-0.12)*2)
'=M546*M547 1.9800 M3
'=+(2.75*12)
=0.2*0.3
=M549
=0.25*18

=M554*M555 12,391.5683 Kg
=M566
Lampiran perhitungan Besi Plat
=M557+M560 600.6782 M2
=+((123.6826)+(9.3996*2)+(14.8*2)+(3.8*6))*0.12
=M559*M560 69.1397 M3
=0.12
=M563-(M562+M561+M564+M565)
=(0.3*(M523+M510))+((0.25*M536))+((0.2*M546))
=((M477*M478))+((M488*M489))+((M499*M500))
=749.3236
=+((0.7425*6))

perhitungan volume
91 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=+(5.1744*2)+(12.5925*2)
=M563-(M564+M565)

=2
=(M571*M572)*N569 3,004.5087 Kg
Lampiran Perhitungan Besi Dinding
=M573-M574
=10*3.8
=2.5*1.1
=(((M576*M577)*M578)-M579)*N569 137.6400 M2
=M581
=M582
=2
=((2.5*1.1)*2)-((2.5*2)+1.1)*M583
=((M581*M582*M583)-M584)*N569 13.3980 M3
=2.4+2.4+1.4+1.4
=3.8-0.5
=0.2
=+(1.1*2.5)*M583

=2
=(M588*M589)*N586 539.8172 Kg
Lampiran Perhitungan Besi Shear Wall
=M590

=((M592*M593)*M594)*N586 25.0800 M2
=M596
=M597
=2
=((M596*M597)*M598)*N586 2.5080 M3
=2.4+1.4
=3.8-0.5
=0.2

=2
=(M606+M611+M616+M621)*N600 1,112.0432 Kg

1.6
=M639+(M642*2)

perhitungan volume
92 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=ROUND((M638/0.125)+1,0)*2
=0.6165*M603*M603*(M604*M605)

=1.2
=M638
=ROUND((M604/0.2)+1,0)*2
=0.6165*M608*M608*(M610*M609)

=1
=M646
=M645
=0.6165*M613*M613*(M614*M615)

=1
=0.75
==ROUND((M646/0.15)+1,0)*M645
=0.6165*M618*M618*(M619*M620)
=(M623+M627+M631)*N600 41.6640 M2
=(M624*M625)+M626
=M639
=M638
=(2*M639)*M637
=(M628*M629)+M630
=M643
=M642
=(M642+M642+M643)*M641
=(M633+M634)*M632
=M645
=M646*0.19
=+(2*M647)
=(M636+M640+M644)*N600 5.0076 M3
=(M639*M638)*M637
=0.15
=1.2
=7.3
=(M643*M642)*M641
=M637
=1.31
=2.4
=(M646*M647)*M645

perhitungan volume
93 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=21
=1.2
=0.0285

Lampiran Perhitungan Besi Kolom 8,627.4490 Kg


=(M656*M655)*M654 164.8640 M2
=M658
=0.6+0.6+0.8+0.8
=M660-0.12
=(M660*M659)*M658 29.1840 M3
=16
=0.8*0.6
=3.8

Lampiran Perhitungan Besi Kolom 8,298.2202 Kg


=(M667*M666)*M665 176.6400 M2
=M669
=0.6*4
=M671-0.12
=(M671*M670)*M669 27.3600 M3
=20
=0.6*0.6
=3.8

Lampiran Perhitungan Besi Balok 6,953.0808 Kg


=M677*M678 216.0800 M2
=M680
=0.3+((0.7-0.12)*2)
=M680*M681 31.0800 M3
=+((6.4+6.4+6.4)*4)+((6.2+5.4+6.2)*4)
=0.3*0.7
=M683
=+(0.6+0.8)*16

perhitungan volume
94 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


Lampiran perhitungan Besi Balok 3,494.7294 Kg
=M687*M688 107.6536 M2
=M690
=0.3+((0.5-0.12)*2)
=M690*M691 15.2340 M3
=+(2.4*16)+(4.4*4)+(2.55*4)+(1.4*8)+(1.28*2)+(5.4*4)
=0.3*0.5
=SUM(M693:M694)
=+(0.6*8)+(0.3*4)
=+(0.6+0.6)*20

Lampiran perhitungan Besi Balok 1,249.3619 Kg


=M698*M699 48.8430 M2
=M701
=0.25+((0.4-0.12)*2)
=M701*M702 6.0300 M3
=+(6.7*9)
=0.25*0.4
=M704
=0.3*12

Lampiran perhitungan Besi Balok 555.1676 Kg


=M708*M709 18.4800 M2
=M711
=0.2+((0.3-0.12)*2)
=M711*M712 1.9800 M3
=+(2.75*12)
=0.2*0.3
=M714
=0.25*18

=M719*M720 10,437.3739 Kg
=M731
Lampiran Perhitungan Besi Plat
=M722+M725 502.9047 M2
=+((119)+(9.3996*2)+(14.8*2))*0.12
=M724*M725 57.8027 M3
=0.12

perhitungan volume
95 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=M728-(M727+M726+M729+M730)
=(0.3*(M690+M680))+((0.25*M701))+((0.2*M711))
=((M658*M659))+((M669*M670))
=638.275
=((0.7425*6))
=+(5.1744*2)+(12.5925*2)
=M728-(M729+M730)

=2
=(M736*M737)*N734 3,004.5087 Kg
Lampiran perhitungan Besi Dinding
=M738-M739
=10*3.8
=2.5*1.1
=(((M741*M742)*M743)-M744)*N734 137.6400 M2
=M746
=M747
=2
=((2.5*1.1)*2)-((2.5*2)+1.1)*M748
=((M746*M747*M748)-M749)*N734 13.3980 M3
=2.4+2.4+1.4+1.4
=3.8-0.5
=0.2
=+(1.1*2.5)*M748

=2
==(M753*M754)*N751 539.8172 Kg
Lampiran Perhitungan Besi Shear wall
=M755
=5*3.8
=((M757*M758)*M759)*N751 25.0800 M2
=M761
=M762
=2
=((M761*M762)*M763)*N751 2.5080 M3
=2.4+1.4
=3.8-0.5
=0.2

perhitungan volume
96 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=2
=(M771+M776+M781+M786)*N765 1,112.0432 Kg

=1.6
=M804+(M807*2)
=ROUND((M803/0.125)+1,0)*2
=0.6165*M768*M768*(M769*M770)

=1.2
=M803
=ROUND((M769/0.2)+1,0)*2
=0.6165*M773*M773*(M775*M774)

=1
=M811
=M810
=0.6165*M778*M778*(M779*M780)

=1
=0.75
=ROUND((M811/0.15)+1,0)*M810
=0.6165*M783*M783*(M784*M785)
=(M788+M792+M796)*N765 41.6640 M2
=(M789*M790)+M791
=M804
=M803
=(2*M804)*M802
=(M793*M794)+M795
=M808
=M807
=(M807+M807+M808)*M806
=(M798+M799)*M797
=M810
=M811*0.19
=+(2*M812)
=(M801+M805+M809)*N765 5.0076 M3
=(M804*M803)*M802
0.15
=1.2
=7.3

perhitungan volume
97 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=(M808*M807)*M806
=M802
=1.31
=2.4
=(M811*M812)*M810
=21
=1.2
=0.0285

Lamiran Perhitungan Kolom 6,543.5803 Kg


=(M821*M820)*M819 153.0880 M2
=M823
=0.6+0.6+0.7+0.7
=M825-0.12
=(M825*M824)*M823 25.5360 M3
=16
=0.6*0.7
=3.8

Lampiran Perhitungan besi Kolom 7,415.9525 Kg


=(M832*M831)*M830 176.6400 M2
=M834
=0.6*4
=M836-0.12
=(M836*M835)*M834 27.3600 M3
=20
=0.6*0.6
=3.8

Lampiran perhitungan Besi Balok 6,953.0808 Kg


=M842*M843 218.4160 M2
=M845
=0.3+((0.7-0.12)*2)
=M845*M846 31.4160 M3

perhitungan volume
98 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=+((6.4+6.4+6.4)*4)+((6.3+5.6+6.3)*4)
=0.3*0.7
=M848
=+(0.7+0.6)*16

Lampiran perhitungan Besi Balok 3,136.3007 Kg


=M853*M854 93.4920 M2
=M856
=0.3+((0.5-0.12)*2)
=M856*M857 13.2300 M3
=+(2.4*16)+(4.4*4)+(2.55*4)+(1.4*8)+(5.4*2)
=0.3*0.5
=SUM(M859:M860)
=+(0.6*8)+(0.3*4)
=+(0.6+0.6)*20

Lampiran perhitungan Besi Balok 1,249.3619 Kg


=M865*M866 48.8430 M2
=M868
=0.25+((0.4-0.12)*2)
=M868*M869 6.0300 M3
=+(6.7+6.7+6.7)*3
=0.25*0.4
=M871
=0.3*12

=M876*M877 12,353.7931 Kg
=M888
Analisa Pekerjaan Balok
=M879+M882 621.6971 M2
=+((128.8)+(9.3996*2)+(4.91*2))*0.12
=M881*M882 72.2015 M3
=0.12
=M885-(M884+M883+M886+M887)
=(0.3*(M856+M845))+((0.25*M868))
=((M823*M824))+((M834*M835))

perhitungan volume
99 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=718.83
=+(0.6465*2)
=+(5.1744*2)
=M885-(M886+M887)
=M888 702.0138 M2
=Q889 702.0138 M2

=2
=(M895*M896)*N893 3,004.5087 Kg
Analisa Pekerjaan balok
=M897-M898
=10*3.8
=2.5*1.1
=(((M900*M901)*M902)-M903)*N893 137.6400 M2
=M905
=M906
=2
=((2.5*1.1)*2)-(((2.5*2)+1.1)*M907)
=((M905*M906*M907)-M908)*N893 13.3980 M3
=2.4+2.4+1.4+1.4
=3.8-0.5
=0.2
=+(1.1*2.5)*M907

=2
=(M912*M913)*N910 539.8172 Kg

=((M916*M917)*M918)*N910 25.0800 M2

=((M920*M921)*M922)*N910 2.5080 M3

perhitungan volume
100 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=Q930+Q979 1,508.5027 Kg
=Q951+Q1000 56.0236 M2
=Q964+Q1013 7.1197 M3

=(M935+M940+M945+M950) 743.5286 Kg

=(M952+M956+M960) 27.6106 M2

=(M965+M969+M973) 3.5084 M3

perhitungan volume
101 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=(M984+M989+M994+M999) 764.9742 Kg

=(M1001+M1005+M1009) 28.4130 M2

perhitungan volume
102 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=(M1014+M1018+M1022) 3.6113 M3

Lampiran Pekerjaan Besi Kolom 248.9334 Kg


=(M1034*M1033)*M1032 7.6800 M2

=(M1038*M1037)*M1036 0.5120 M3

=M1036 8.0000 Titik

=Q1047+Q1057 6,240.2457 Kg
=Q1048+Q1058 130.7520 M2
=Q1052+Q1062 20.3040 M3

perhitungan volume
103 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

Lampiran Perhitungan Besi Kolom 4,426.7880 Kg


=(M1051*M1050)*M1049 91.5840 M2

=(M1055*M1054)*M1053 14.2560 M3

Lampiran perhitungan Besi Kolom 1,813.4577 Kg


=(M1061*M1060)*M1059 39.1680 M2

=(M1065*M1064)*M1063 6.0480 M3

=2 2.0000 Titik

Lampiran perhitungan Besi Kolom 81.5863 Kg


=(M1073*M1072)*M1071 4.0800 M2

=(M1077*M1076)*M1075 0.3000 M3

Lampiran perhitungan Besi Balok 214.0411 Kg


=M1083*M1084 6.3600 M2

perhitungan volume
104 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=M1086*M1087 0.9000 M3

Lampiran Perhitungan Besi Balok 1,078.3620 Kg


=M1094*M1095 37.0332 M2

=M1097*M1098 4.5720 M3

=M1106*M1107 2,134.3451 Kg

=M1109+M1112 128.4002 M2

=M1111*M1112 13.5697 M3

=M1118 121.2858 M2
=Q1119 121.2858 M2

=M1124*M1125 1,531.8350 Kg

perhitungan volume
105 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=M1127+M1130 87.8949 M2

=M1129*M1130 8.1648 M3

=M1136 87.0477 M2
=Q1137 87.0477 m2

=M1142*M1143 1,274.8779 Kg

=M1145+M1148 36.3600 M2

=M1147*M1148 7.5600 M3

=M1154 28.0800 M2
=Q1155 28.0800 m2

=M1160 11.4000 M1

=M1163*M1162 28.5000 M2

=M1165*M1166 29.6400 M2

perhitungan volume
106 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=(M1174+M1179+M1184+M1189) 243.1723 Kg

=(M1191+M1195+M1199) 9.5040 M2

=(M1204+M1208+M1212) 1.1880 M3

perhitungan volume
107 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)

=M1221*M1222 401.0667 Kg

=M1224*M1225 15.0400 M2

=M1230*M1231 1,548.8000 Kg

=M1233*M1234 58.0800 M2

=M1253 40.0000 Bh

1.0000 Ls

1.0000 Ls

='((0.6165*M1260*M1260)*((M1261*M1262)*M1263)) 314.1329 kg
=0.8

perhitungan volume
108 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


=40*(M1260/100)
=2
=ROUND((4/0.45)*70,0)
=((0.6165*M1265*M1265)*((M1266*M1267)*M1268)) 341.4049 kg
=M1260
=M1261
=M1262
=ROUND((3.8/0.45)*80,0)
=((0.6165*M1270*M1270)*((M1271*M1272)*M1273))c 341.4049 kg
=M1265
=M1266
=M1267
=ROUND((3.8/0.45)*80,0)
=((0.6165*M1275*M1275)*((M1276*M1277)*M1278)) 277.2652 kg
=M1270
=M1271
=M1272
=ROUND((3.8/0.45)*65,0)
=((0.6165*M1280*M1280)*((M1281*M1282)*M1283)) 277.2652 kg
=M1275
=M1276
=M1277
=ROUND((3.8/0.45)*65,0)
=((0.6165*M1285*M1285)*((M1286*M1287)*M1288)) 106.5628 kg
=M1280
=M1281
=M1282
=ROUND((3.8/0.45)*25,0)

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA

perhitungan volume
109 of 202
KETERANGAN NILAI SAT.

(K) (Q) (S)


Direktur

perhitungan volume
110 of 202
LAMPIRAN PERHITUNGAN TULANGAN KOLOM
Elevasi Nama Simbol Tinggi Panjang Panjang Total Jumlah Jumlah Diameter Berat Tul. Diameter Panjang Spasi Spasi
(m) Lantai (m) overlap Kait Panjang Tulangan Kolom Tul.Pokok Pokok Sengkang Kait Tumpuan Lapangan
a b c d e g i j k l m n o p q

FS.+4.00 Lt. 1 K1 4.00 - - 4.00 32.00 16.00 2.50 7,891.20 1.00 0.08 0.15 0.20
FS.+4.00 Lt. 1 K2 4.00 - - 4.00 28.00 22.00 2.20 7,352.23 1.00 0.08 0.15 0.20
FS.+4.00 Lt. 1 K3 4.00 - - 4.00 18.00 2.00 1.60 227.27 1.00 0.08 0.15 0.20

FS.+7.80 Lt. 2 K1 3.80 - - 3.80 32.00 16.00 2.50 7,496.64 1.00 0.08 0.15 0.20
FS.+7.80 Lt. 2 K2 3.80 - - 3.80 28.00 22.00 2.20 6,984.62 1.00 0.08 0.15 0.20
FS.+7.80 Lt. 2 K3 3.80 - - 3.80 18.00 2.00 1.60 215.90 1.00 0.08 0.15 0.20

FS.+11.60 Lt. 3 K1 3.80 0.50 0.10 4.40 28.00 16.00 2.50 7,595.28 1.00 0.08 0.15 0.20
FS.+11.60 Lt. 3 K2 3.80 0.44 0.09 4.33 28.00 22.00 2.20 7,955.11 1.00 0.08 0.15 0.20
FS.+11.60 Lt. 3 K3 3.80 - - 3.80 18.00 2.00 1.60 215.90 1.00 0.08 0.15 0.20

FS.+15.40 Lt. 4 K1 3.80 0.50 0.10 4.40 28.00 16.00 2.50 7,595.28 1.00 0.08 0.15 0.20
FS.+15.40 Lt. 4 K2 3.80 0.44 0.09 4.33 28.00 20.00 2.20 7,231.92 1.00 0.08 0.15 0.20

FS.+19.20 Lt. 5 K1 3.80 - - 3.80 24.00 16.00 2.50 5,622.48 1.00 0.08 0.15 0.20
FS.+19.20 Lt. 5 K2 3.80 - - 3.80 28.00 20.00 2.20 6,349.65 1.00 0.08 0.15 0.20

FS.+19.20 Lt. Dack K1A 0.80 0.50 0.20 1.50 4.00 8.00 2.50 184.95 1.00 0.08 0.15 0.15
FS.+19.20 Lt. Dack K1A 0.80 0.52 0.10 1.42 2.00 8.00 1.30 23.74 - - 0.15 0.15
FS.+22.50 Lt. Dack K2A 3.30 0.44 0.18 3.92 28.00 12.00 2.20 3,926.09 1.00 0.08 0.20 0.20
FS.+23.40 Lt. Dack K2B 4.20 0.44 0.18 4.82 28.00 4.00 2.20 1,609.47 1.00 0.08 0.20 0.20
FS.+20.00 Lt. Dack K4 0.80 0.64 0.13 1.57 4.00 6.00 1.60 59.39 1.00 0.08 0.15 0.15

lampiran perhitungan volume


N sengkang Panjang Berat Berat
(bh) 1 Sengkang Sengkang Total
r s t u

25.00 4.88 1,223.14 9,114.34


24.00 3.68 1,223.93 8,576.16
24.00 2.18 66.88 294.14

24.00 4.88 1,174.21 8,670.85


23.00 3.68 1,172.93 8,157.55
23.00 2.18 64.09 279.99

24.00 4.28 1,032.17 8,627.45


23.00 3.68 1,172.93 9,128.04
23.00 2.18 64.09 279.99

24.00 4.28 1,032.17 8,627.45


23.00 3.68 1,066.30 8,298.22

23.00 3.98 921.10 6,543.58


23.00 3.68 1,066.30 7,415.95

6.00 1.28 40.25 225.20


6.00 - 23.74
18.00 3.68 500.70 4,426.79
22.00 3.68 203.99 1,813.46
6.00 0.92 22.19 81.59

lampiran perhitungan volume


LAMPIRAN PERHITUNGAN VOLUME TULANGAN PLAT

Hitungan Tulangan Plat Lantai Dack (S2) Per 12 Meter Hitungan Tulangan Dinding Pit Lift Per 12 Met
Tul. D10 Tul. D16 ARAH X
Diamater Tulangan 1 cm Diamater Tulangan
Bentang 12 m Bentang
Jarak Tulangan 0.15 m Jarak Tulangan
Jumlah tulangan 2 lapis 162 Bh Jumlah tulangan 2 lapis
Panjang 1 Tulangan 12.4 meter Panjang 1 Tulangan
Berat Tulangan 2 lapis 1238.4252 Kg Berat Tulangan 2 lapis

Tul D.10 Tul D.16 ARAH Z


Diamater Tulangan 1 cm Diamater Tulangan
Bentang 12 m Bentang
Jarak Tulangan 0.15 m Jarak Tulangan
Jumlah tulangan 2 lapis 162 Bh Jumlah tulangan 2 lapis
Panjang 1 Tulangan 12.4 meter Panjang 1 Tulangan
Berat Tulangan 2 lapis 1238.4252 Kg Berat Tulangan 2 lapis

Tulangan Cakar ayam Tulangan Pengapit Arah X


Panjang 1 Cakar 1m Panjang 1 Tul.
diameter 0.8 cm diameter
jarak per 1m jarak
jumlah 145 bh jumlah
Berat 57.2112 Kg Berat
Jumlah Pengali Tul Pengapit Arah Z
Total Berat Tulangan Per 12 M x 12 M 2534.0616 Kg jarak per
Berat Tulangan per M2 17.59765 Kg jumlah

Total Berat Tulangan Per


Berat Tulangan per M2

Hitungan Tulangan Plat Lantai Dack (S3) Per 12 Meter Hitungan Tulangan Dinding Shear Wall Per 12 M
Tul. D16 Tul. D16 ARAH X
Diamater Tulangan 1.6 cm Diamater Tulangan
Bentang 12 m Bentang
Jarak Tulangan 0.15 m Jarak Tulangan
Jumlah tulangan 2 lapis 162 Bh Jumlah tulangan 2 lapis
Panjang 1 Tulangan 12.64 meter Panjang 1 Tulangan
Berat Tulangan 2 lapis 3231.730483 Kg Berat Tulangan 2 lapis

Tul D.16 Tul D.16 ARAH Z


Diamater Tulangan 1.6 cm Diamater Tulangan
Bentang 12 m Bentang
Jarak Tulangan 0.15 m Jarak Tulangan
Jumlah tulangan 2 lapis 162 Bh Jumlah tulangan 2 lapis
Panjang 1 Tulangan 12.64 meter Panjang 1 Tulangan
Berat Tulangan 2 lapis 3231.730483 Kg Berat Tulangan 2 lapis

Tulangan Cakar ayam Tulangan Pengapit Arah X


Panjang 1 Cakar 1.3 m Panjang 1 Tul.
diameter 0.8 cm diameter
jarak per 1m jarak
jumlah 145 bh jumlah

lampiran perhitungan volume


Berat 74.37456 Kg Berat
Jumlah Pengali Tul Pengapit Arah Z
Total Berat Tulangan Per 12 M x 12 M 6537.835526 Kg jarak per
Berat Tulangan per M2 45.4016356 Kg jumlah

Total Berat Tulangan Per


Berat Tulangan per M2

lampiran perhitungan volume


GAN PLAT

n Tulangan Dinding Pit Lift Per 12 Meter

1.6 cm
12 m
0.25 m
98 Bh
12.64 meter
1954.997453 Kg

1.6 cm
12 m
0.25 m
98 Bh
12.64 meter
1954.997453 Kg

gan Pengapit Arah X


0.24 m
1 cm
0.5 m
1225 bh
181.251 Kg
h Pengali Tul Pengapit Arah Z
0.25 m
49 bh

4091.245906 Kg
28.4114299 Kg

Tulangan Dinding Shear Wall Per 12 Meter

1.6 cm
12 m
0.25 m
98 Bh
12.64 meter
1954.997453 Kg

1.6 cm
12 m
0.25 m
98 Bh
12.64 meter
1954.997453 Kg

gan Pengapit Arah X


0.24 m
1 cm
0.5 m
1225 bh

lampiran perhitungan volume


181.251 Kg
h Pengali Tul Pengapit Arah Z
0.25 m
49 bh

4091.245906 Kg
28.4114299 Kg

lampiran perhitungan volume


DAFTAR
HARGA SATUAN PEKERJAAN

KODE URAIAN PEKERJAAN

A PEKERJAAN TANAH (SNI 2835-2008)


A.1 MENGGALI TANAH BIASA SEDALAM 1 METER
A.10 MENGURUG KEMBALI TANAH GALIAN
A.11 MEMADATKAN TANAH (PER 20 CM)
A.12 MENGURUG PASIR URUG
A.16 MENGURUG SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN

B PEKERJAAN PONDASI (SNI 2836-2008)


B.2 MEMASANG PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP
B.9 MEMASANG BATU KOSONG (AANSTAMPING)

C PEKERJAAN BETON (SNI 7396-2008)


C.7 MEMBUAT BETON MUTU F'C = 19,3 MPa (K 225), SLUMP (12 ± 2) CM, W/C = 0,58
C.10 MEMBUAT BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
C.17 PEMBESIAN
C.22 MEMASANG BEKISTING UNTUK KOLOM
C.23 MEMASANG BEKISTING UNTUK BALOK
C.24 MEMASANG BEKISTING UNTUK LANTAI
C.25 MEMASANG BEKISTING UNTUK DINDING
C.26 MEMASANG BEKISTING UNTUK TANGGA
E.28 MEMASANG 1 M2 LAPIS WATERPROOFING MEMBRANE COATING TEBAL 4MM
E.29 MEMASANG 1 M2 SCREEDING

I PEKERJAAN BESI DAN ALUMINIUM (SNI 7393-2008)


I.22 PEKERJAAN 1 M' RANGKA TALANG BAJA SIKU 50.50
I.23 PEKERJAAN 1 M2 LESPLANK TALANG AIR PLAT BAJA T.1,2MM
I.24 PEKERJAAN 1 M2 FRP t.5mm
I.25 MEMASANG 1 KG BAJA HONEYCOMB
I.26 MEMASANG 1 M2 KUDA-KUDA PIPA BSP 4" DAN 3 "
I.27 MEMASANG 1 M2 RANGKA LAPIS KEDAP AIR BSP 2"
I.28 MEMASANG 1 M2 RANGKA ATAP BSP 1.5"
I.29 MEMASANG 1 M2 LAPIS PENUTUP ATAP CARBON STEEL PANEL T. 1,2 MM FINISH CAT ENAMEL
I.30 MAN POWER BANGUNAN 5 LANTAI BERDASARKAN PERMEN 45 TAHUN 2007

J PEKERJAAN PERSIAPAN (SNI DT-03-2835-2002)


J.3 MEMBUAT PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M
J.5 PEKERJAAN PENGUKURAN DAN PEMASANGAN BOUPLANK
J.6 MEMBUAT KANTOR SEMENTARA DENGAN LANTAI PLESTERAN
J.9 MEMBERSIHKAN LAPANGAN DAN PEMERATAAN

K PEKERJAAN SANITASI (SNI 2002)


K.28 MEMASANG PIPA PVC TIPE AW DIAMETER 2 INCH
K.37 Memasang 1 bh Roof Drain Drain 2"
K.38 Memasang 1 bh Roof Drain Drain 4"

daftar harga satuan pekerjaan


117 OF 202
KODE URAIAN PEKERJAAN

N PEKERJAAN PENGECATAN (SNI 2002)


N.27 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA MANUAL SISTEM 3 LAPIS CAT KONVENSIONAL

Padang, Ap

Konsultan Pe
PT. NATURAL SUMATE

Ir. CHANDRA
Direkt

daftar harga satuan pekerjaan


118 OF 202
DAFTAR
SATUAN PEKERJAAN

SAT HARGA SATUAN KET.

M3 Rp 58,616.25
M3 Rp 19,538.75
M3 Rp 48,427.50
M3 Rp 142,246.50
M3 Rp 188,047.75

M3 Rp 723,412.80
M3 Rp 359,673.60

M3 Rp 883,248.14
M3 Rp 1,018,834.62
Kg Rp 13,176.30
M2 Rp 250,933.10
M2 Rp 255,635.60
M2 Rp 271,953.00
M2 Rp 204,208.40
M2 Rp 236,141.13
M2 Rp 208,739.59
M2 Rp 49,940.33

Kg Rp 837,865.33
Kg Rp 291,436.79
M2 Rp 417,496.75
Kg Rp 48,538.60
M2 Rp 488,745.14
M2 Rp 127,709.45
M2 Rp 263,280.42
M2 Rp 604,889.76
Ls Rp 117,467,815.85

M1 Rp 325,834.51
M1 Rp 59,346.54
M2 Rp 1,408,035.59
M2 Rp 13,205.50

M1 Rp 39,026.02
Buah Rp 221,408.55
Buah Rp 309,408.55

daftar harga satuan pekerjaan


119 OF 202
SAT HARGA SATUAN KET.

M2 Rp 191,434.65

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur

daftar harga satuan pekerjaan


120 OF 202
-

DAFTAR ANALISA
HARGA SATUAN PEKERJAAN

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
A PEKERJAAN TANAH SNI 2835-2008
A.1 MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER
Upah :
0.750 OH Pekerja Rp 67,550 Rp 50,663
0.025 OH Mandor Rp 105,000 Rp 2,625
Rp 53,288
Overhead + Fee ( Max. 10 % )
Jumlah
A.9 MENGURUG KEMBALI 1 M3 GALIAN
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjan galian
Rp 53,288 Rp 17,763
Overhead + Fee ( Max. 10 % )
Jumlah

A.10 MEMADATKAN 1 M3 TANAH (PER 20 CM)


Upah :
0.500 OH Pekerja Rp 67,550 Rp 33,775
0.050 OH Mandor Rp 105,000 Rp 5,250
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 44,025
Overhead + Fee ( Max. 10 % )
Jumlah

A.11 MENGURUG 1 M3 PASIR URUG


Upah :
0.300 OH Pekerja Rp 67,550 Rp 20,265
0.010 OH Mandor Rp 105,000 Rp 1,050
Bahan :
1.200 m3 Pasir Urug Rp 90,000 Rp 108,000
Rp 21,315 Rp 108,000
Overhead + Fee ( Max. 10 % )
Jumlah
A.15 MENGURUG 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN
Upah :
0.250 OH Pekerja Rp 67,550 Rp 16,888
0.025 OH Mandor Rp 105,000 Rp 2,625
Bahan :
1.200 m3 Sirtu Rp 126,200 Rp 151,440
Rp 19,513 Rp 151,440
Overhead + Fee ( Max. 10 % )
Jumlah
B.2 MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP
Upah :
1.500 OH Pekerja Rp 67,550 Rp 101,325
0.750 OH Tukang batu Rp 90,300 Rp 67,725
0.075 OH Kepala Tukang Rp 105,000 Rp 7,875
0.075 OH Mandor Rp 105,000 Rp 7,875

sni analisa harga satuan


121 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
Bahan :
1.200 m3 Batu Belah 15 cm/20 cm Rp 160,000 Rp 192,000
163.000 kg PC Rp 1,240 Rp 202,120
0.520 m3 Pasir Pasang Rp 151,400 Rp 78,728
Rp 184,800 Rp 472,848
Overhead + Fee ( Max. 10 % )
Jumlah
B.9 MEMASANG 1 M3 BATU KOSONG (ANSTAMPANG)
Upah :
0.780 OH Pekerja Rp 67,550 Rp 52,689
0.390 OH Tukang batu Rp 90,300 Rp 35,217
0.039 OH Kepala Tukang Rp 105,000 Rp 4,095
0.039 OH Mandor Rp 105,000 Rp 4,095
Bahan :
1.200 m3 Batu Belah 15 cm/20 cm Rp 160,000 Rp 192,000
0.432 m3 Pasir Urug Rp 90,000 Rp 38,880
Rp 96,096 Rp 230,880
Overhead + Fee ( Max. 10 % )
Jumlah
C.7 MEMBUAT 1 M3 BETON MUTU F'C = 19,3 MPa (K 225), SLUMP (12 ± 2) CM, W/C = 0,58
Upah :
1.650 OH Pekerja Rp 67,550 Rp 111,458
0.275 OH Tukang Batu Rp 90,300 Rp 24,833
0.028 OH Kepala Tukang Rp 105,000 Rp 2,940
0.083 OH Mandor Rp 105,000 Rp 8,715
Bahan :
371.000 kg PC Rp 1,240 Rp 460,040
698 kg PB Rp 112 Rp 78,425
1047 kg KR (Maksimum 30 mm) (split) Rp 111 Rp 115,984
215 Liter Air Rp 3 Rp 559
Rp 147,945 Rp 655,008
Overhead + Fee ( Max. 10 % )
Jumlah
C.10 MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
Upah :
1.650 OH Pekerja Rp 67,550 Rp 111,458
0.275 OH Tukang Batu Rp 90,300 Rp 24,833
0.028 OH Kepala Tukang Rp 105,000 Rp 2,940
0.083 OH Mandor Rp 105,000 Rp 8,715
Bahan :
413.000 kg PC Rp 1,240 Rp 512,120
681 Kg PB Rp 112 Rp 76,515
1021 Kg KR batu pecah 2/3 (Maksimum 30 mm) Rp 185 Rp 189,074
215 Liter Air Rp 3 Rp 559
Rp 147,945 Rp 778,268
Overhead + Fee ( Max. 10 % )
Jumlah
C.17 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR
Upah :
0.0070 OH Pekerja Rp 67,550 Rp 473
0.0070 OH Tukang Besi Rp 90,300 Rp 632
0.0007 OH Kepala Tukang Rp 105,000 Rp 74
0.0004 OH Mandor Rp 105,000 Rp 42

sni analisa harga satuan


122 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
Bahan :
1.0500 kg Besi Beton (Polos/Ulir) Rp 10,000 Rp 10,500
0.0150 kg Kawat Beton Rp 17,200 Rp 258
Rp 1,220 Rp 10,758
Overhead + Fee ( Max. 10 % )
Jumlah
C.22 MEMASANG 1 M2 BEKISTING UNTUK KOLOM
Upah :
0.660 OH Pekerja Rp 67,550 Rp 44,583
0.330 OH Tukang Kayu Rp 90,300 Rp 29,799
0.033 OH Kepala Tukang Rp 105,000 Rp 3,465
0.033 OH Mandor Rp 105,000 Rp 3,465
Bahan :
0.040 m3 Kayu Kelas III Rp 2,603,200 Rp 104,128
0.400 kg Paku 5 cm - 12 cm Rp 16,400 Rp 6,560
0.200 Liter Minyak Bekisting Rp 17,250 Rp 3,450
0.015 m3 Balok Kayu Kelas II Rp 2,850,000 Rp 42,750
0.350 Lbr Plywood Tebal 9 mm Rp 247,800 Rp 86,730
2.000 Batang Dolken Kayu Galam, Ø (8-10) cm, panjang Rp 25,000 Rp 50,000
0.500 Bahan 2 kali Pakai Rp 81,312 Rp 146,809
Overhead + Fee ( Max. 10 % )
Jumlah

C.23 MEMASANG 1 M2 BEKISTING UNTUK BALOK


Upah :
0.660 OH Pekerja Rp 67,550 Rp 44,583
0.330 OH Tukang Kayu Rp 90,300 Rp 29,799
0.033 OH Kepala Tukang Rp 105,000 Rp 3,465
0.033 OH Mandor Rp 105,000 Rp 3,465
Bahan :
0.040 m3 Kayu Kelas III Rp 2,603,200 Rp 104,128
0.400 kg Paku 5 cm - 12 cm Rp 16,400 Rp 6,560
0.200 Liter Minyak Bekisting Rp 17,250 Rp 3,450
0.018 m3 Balok Kayu Kelas II Rp 2,850,000 Rp 51,300
0.350 Lbr Plywood Tebal 9 mm Rp 247,800 Rp 86,730
2.000 Batang Dolken Kayu Galam, Ø (8-10) cm, panjang Rp 25,000 Rp 50,000
0.500 Bahan 2 kali Pakai Rp 81,312 Rp 151,084
Overhead + Fee ( Max. 10 % )
Jumlah

C.24 MEMASANG 1 M2 BEKISTING UNTUK LANTAI


Upah :
0.660 OH Pekerja Rp 67,550 Rp 44,583
0.330 OH Tukang Kayu Rp 90,300 Rp 29,799
0.033 OH Kepala Tukang Rp 105,000 Rp 3,465
0.033 OH Mandor Rp 105,000 Rp 3,465
Bahan :
0.030 m3 Kayu Kelas III Rp 2,603,200 Rp 78,096
0.400 kg Paku 5 cm - 12 cm Rp 16,400 Rp 6,560
0.200 Liter Minyak Bekisting Rp 17,250 Rp 3,450
0.020 m3 Balok Kayu Kelas II Rp 2,850,000 Rp 57,000
0.350 Lbr Plywood Tebal 9 mm Rp 247,800 Rp 86,730
4.000 Batang Dolken Kayu Galam, Ø (8-10) cm, panjang Rp 25,000 Rp 100,000

sni analisa harga satuan


123 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
0.500 Bahan 2 kali Pakai Rp 81,312 Rp 165,918
Overhead + Fee ( Max. 10 % )
Jumlah

C.25 MEMASANG 1 M2 BEKISTING UNTUK DINDING


Upah :
0.660 OH Pekerja Rp 67,550 Rp 44,583
0.330 OH Tukang Kayu Rp 90,300 Rp 29,799
0.033 OH Kepala Tukang Rp 105,000 Rp 3,465
0.033 OH Mandor Rp 105,000 Rp 3,465
Bahan :
0.030 m3 Kayu Kelas III Rp 2,603,200 Rp 78,096
0.400 kg Paku 5 cm - 12 cm Rp 16,400 Rp 6,560
0.200 Liter Minyak Bekisting Rp 17,250 Rp 3,450
0.020 m3 Balok Kayu Kelas II Rp 2,850,000 Rp 57,000
0.350 Lbr Plywood Tebal 9 mm Rp 247,800 Rp 86,730
3.000 Batang Dolken Kayu Galam, Ø (8-10) cm, panjang Rp 25,000 Rp 75,000
4.000 Buah Formite/penjaga Jarak Bekisting/Spacer Rp 1,540 Rp 6,160
0.333 Bahan 3 kali Pakai Rp 81,312 Rp 104,332
Overhead + Fee ( Max. 10 % )
Jumlah

C.26 MEMASANG 1 M2 BEKISTING UNTUK TANGGA


Upah :
0.660 OH Pekerja Rp 67,550 Rp 44,583
0.330 OH Tukang Kayu Rp 90,300 Rp 29,799
0.033 OH Kepala Tukang Rp 105,000 Rp 3,465
0.033 OH Mandor Rp 105,000 Rp 3,465
Bahan :
0.030 m3 Kayu Kelas III Rp 2,603,200 Rp 78,096
0.400 kg Paku 5 cm - 12 cm Rp 16,400 Rp 6,560
0.150 Liter Minyak Bekisting Rp 17,250 Rp 2,588
0.015 m3 Balok Kayu Kelas II Rp 2,850,000 Rp 42,750
0.350 Lbr Plywood Tebal 9 mm Rp 247,800 Rp 86,730
2.000 Batang Dolken Kayu Galam, Ø (8-10) cm, panjang Rp 25,000 Rp 50,000
0.500 Bahan 2 kali Pakai Rp 81,312 Rp 133,362
Overhead + Fee ( Max. 10 % )
Jumlah
E.28 MEMASANG 1 M2 LAPIS WATERPROOFING MEMBRANE COATING TEBAL 4MM
Upah :
0.500 OH Pekerja Rp 67,550 Rp 10,133
0.375 OH Tukang Rp 90,300 Rp 33,863
0.038 OH Kepala Tukang Rp 105,000 Rp 3,938
0.025 OH Mandor Rp 105,000 Rp 2,625
Bahan :
10.224 Kg PC Rp 1,240 Rp 12,678
0.020 m3 Pasir Pasang Rp 151,400 Rp 3,028
1.500 m2 Membrane Rp 75,000 Rp 112,500
0.400 Ltr Prime Coat Rp 15,000 Rp 6,000
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 50,558 Rp 139,206
Overhead + Fee ( Max. 10 % )
Jumlah

sni analisa harga satuan


124 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN

E.29 MEMASANG 1 M2 SCREEDING


Upah :
0.150 OH Pekerja Rp 67,550 Rp 10,133
0.100 OH Tukang batu Rp 90,300 Rp 9,030
0.010 OH Kepala Tukang Rp 105,000 Rp 1,050
0.008 OH Mandor Rp 105,000 Rp 840
Bahan :
13.800 kg PC Rp 1,240 Rp 17,112
0.046 M3 Pasir Beton Rp 157,300 Rp 7,236

Rp 21,053 Rp 24,348
Overhead + Fee ( Max. 10 % )
Jumlah

I PEKERJAAN BESI DAN ALUMINIUM SNI 7393-2008


I.22 PEKERJAAN 1 M' RANGKA TALANG BAJA SIKU 50.50
Upah :
0.675 OH Pekerja Rp 67,550 Rp 45,596
0.675 OH Tukang Besi Rp 90,300 Rp 60,953
0.081 OH Kepala Tukang Rp 105,000 Rp 8,505
0.041 OH Mandor Rp 105,000 Rp 4,253
Bahan :
27.810 Kg Baja Siku Rp 13,500 Rp 375,435
3.925 Kg Kawat Las Rp 46,000 Rp 180,550
3.140 Kg Meni Besi Rp 25,925 Rp 81,405
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 119,306 Rp 642,390
Overhead + Fee ( Max. 10 % )
Jumlah
I.23 PEKERJAAN 1 M2 LESPLANK TALANG AIR PLAT BAJA T.1,2MM
Upah :
0.494 OH Pekerja Rp 67,550 Rp 33,370
0.049 OH Tukang Besi Rp 90,300 Rp 4,461
0.004 OH Kepala Tukang Rp 105,000 Rp 420
0.003 OH Mandor Rp 105,000 Rp 315
Bahan :
9.891 Kg Plat Baja T.1,2 mm Rp 14,200 Rp 140,452
0.175 Liter Cat enamel 2 Lapis Rp 85,000 Rp 14,912
0.989 Kg Kawat Las Rp 46,000 Rp 45,499
0.791 Kg Meni Besi Rp 25,925 Rp 20,514
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 38,566 Rp 226,377
Overhead + Fee ( Max. 10 % )
Jumlah

I.24 PEKERJAAN 1 M2 FRP t.5mm


Upah :
0.030 OH Pekerja Rp 67,550 Rp 2,027
0.070 OH Tukang Rp 90,300 Rp 6,321
0.007 OH Kepala Tukang Rp 105,000 Rp 735
0.002 OH Mandor Rp 105,000 Rp 210
Bahan :

sni analisa harga satuan


125 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
1.050 M2 FRP t.5mm Rp 325,000 Rp 341,250
12.000 bh Sekrup Rp 2,000 Rp 24,000
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 9,293 Rp 370,250
Overhead + Fee ( Max. 10 % )
Jumlah
I.25 MEMASANG 1 KG BAJA HONEYCOMB
Upah :
0.120 OH Pekerja Rp 67,550 Rp 8,106
0.120 OH Tukang Las Rp 90,300 Rp 10,836
0.012 OH Kepala Tukang Rp 105,000 Rp 1,260
0.006 OH Mandor Rp 105,000 Rp 630
Bahan & Alat :
1.150 kg Besi Baja Original IWF Rp 14,000 Rp 16,100
0.040 kg Kawat Las Listrik Rp 46,000 Rp 1,840
0.030 Liter Solar Rp 11,000 Rp 330
0.004 Liter Minyak Pelumas Rp 6,000 Rp 24
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 20,832 Rp 23,294
Overhead + Fee ( Max. 10 % )
Jumlah

I.26 MEMASANG 1 M2 KUDA-KUDA PIPA BSP 4" DAN 3 "


Upah :
0.496 OH Pekerja Rp 67,550 Rp 33,505
0.496 OH Tukang Las Rp 90,300 Rp 44,789
0.050 OH Kepala Tukang Rp 105,000 Rp 5,208
0.050 OH Mandor Rp 105,000 Rp 5,208
Bahan & Alat :
2.250 M' Pipa BSP 4" Schedule Rp 75,533 Rp 169,950
2.500 M' Pipa BSP 3" Medium B Rp 57,542 Rp 143,854
0.800 Kg Kawat Las Rp 46,000 Rp 36,800
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 88,710 Rp 355,604
Overhead + Fee ( Max. 10 % )
Jumlah

I.27 MEMASANG 1 M2 RANGKA LAPIS KEDAP AIR BSP 2"


Upah :
0.070 OH Pekerja Rp 67,550 Rp 4,729
0.070 OH Tukang Las Rp 90,300 Rp 6,321
0.010 OH Kepala Tukang Rp 105,000 Rp 1,050
0.010 OH Mandor Rp 105,000 Rp 1,050
Bahan & Alat :
2.200 M' Pipa BSP 2" Rp 38,250 Rp 84,150
0.300 Kg Kawat Las Rp 46,000 Rp 13,800
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 13,150 Rp 102,950
Overhead + Fee ( Max. 10 % )
Jumlah
I.28 MEMASANG 1 M2 RANGKA ATAP BSP 1.5"
Upah :
0.250 OH Pekerja Rp 67,550 Rp 16,888

sni analisa harga satuan


126 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
0.250 OH Tukang Las Rp 90,300 Rp 22,575
0.020 OH Kepala Tukang Rp 105,000 Rp 2,100
0.020 OH Mandor Rp 105,000 Rp 2,100
Bahan & Alat :
4.400 M' Pipa BSP 1.5" Hitam Rp 30,792 Rp 135,483
1.200 Kg Kawat Las Rp 46,000 Rp 55,200
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 43,663 Rp 195,683
Overhead + Fee ( Max. 10 % )
Jumlah
I.29 MEMASANG 1 M2 LAPIS PENUTUP ATAP CARBON STEEL PANEL T. 1,2 MM FINISH CAT ENAMEL
Upah :
0.150 OH Pekerja Rp 67,550 Rp 10,133
0.050 OH Tukang Rp 90,300 Rp 4,515
0.050 OH Kepala Tukang Rp 105,000 Rp 5,250
0.008 OH Mandor Rp 105,000 Rp 840
Bahan & Alat :
1.050 M2 Carbon Steel Panel T. 1,2mm Rp 485,000 Rp 509,250
0.175 Liter Cat enamel 2 Lapis Rp 85,000 Rp 14,912
1.000 Ls Alat Bantu Rp 5,000 Rp 5,000
Rp 20,738 Rp 529,162
Overhead + Fee ( Max. 10 % )
Jumlah
I.30 MAN POWER BANGUNAN 5 LANTAI BERDASARKAN PERMEN 45 TAHUN 2007
faktor pengali:
Lantai 2 0.09
48,683.326 Kg Upah Pembesian 1,220 5,347,401
1,654.689 M2 Upah Bekisting (rata-Rata) 81,312 12,109,146
220.949 M3 Upah Beton 147,945 2,941,945
Lantai 3 0.12
49,611.441 Kg Upah Pembesian 1,220 7,265,794
1,636.329 M2 Upah Bekisting (rata-Rata) 81,312 15,966,386
214.468 M3 Upah Beton 147,945 3,807,535
Lantai 4 0.135
44,549.022 Kg Upah Pembesian 1,220 7,339,930
1,439.849 M2 Upah Bekisting (rata-Rata) 81,312 15,805,398
189.584 M3 Upah Beton 147,945 3,786,486
Lantai 5+dac 0.162
55,892.954 Kg Upah Pembesian 1,220 11,050,758
1,969.480 M2 Upah Bekisting (rata-Rata) 81,312 25,943,062
254.682 M3 Upah Beton 147,945 6,103,976
Jumlah
J.5 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK
Upah :
0.005 OH Mandor Rp 105,000 Rp 525
0.010 OH Kepala Tukang Rp 105,000 Rp 1,050
0.100 OH Tukang Kayu Rp 90,300 Rp 9,030
0.100 OH Pekerja Rp 67,550 Rp 6,755
Bahan :
0.012 M3 Kayu 5/7 (kayu klas. IV) Rp 1,908,600 Rp 22,903
0.020 Kg Paku Biasa 2"-5" Rp 16,400 Rp 328
0.007 M3 Kayu Papan 3/20 (klas IV) Rp 1,908,600 Rp 13,360
Rp 17,360 Rp 36,591

sni analisa harga satuan


127 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
Overhead + Fee ( Max. 10 % )
Jumlah
K.28 Memasang 1 m Pipa PVC tipe AW Diameter 2''
Upah :
0.054 OH Pekerja Rp 67,550 Rp 3,648
0.090 OH Tukang Batu Rp 90,300 Rp 8,127
0.009 OH Kepala Tukang Rp 105,000 Rp 945
0.0027 OH Mandor Rp 105,000 Rp 284
Bahan :
1.200 m Pipa PVC Rp 14,500 Rp 17,400
0.350 ls Perlengkapan + Fitting ( 35% ) Rp 14,500 Rp 5,075
Rp 13,003 Rp 22,475
Overhead + Fee ( Max. 10 % )
Jumlah
K.37 Memasang 1 bh Roof Drain Drain 2"
Upah :
0.010 OH Pekerja Rp 67,550 Rp 676
0.100 OH Tukang Batu Rp 90,300 Rp 9,030
0.010 OH Kepala Tukang Rp 105,000 Rp 1,050
0.005 OH Mandor Rp 105,000 Rp 525
Bahan :
1.000 bh Roof Drain Rp 190,000 Rp 190,000
Rp 11,281 Rp 190,000
Overhead + Fee ( Max. 10 % )
Jumlah

K.38 Memasang 1 bh Roof Drain Drain 4"


Upah :
0.010 OH Pekerja Rp 67,550 Rp 676
0.100 OH Tukang Batu Rp 90,300 Rp 9,030
0.010 OH Kepala Tukang Rp 105,000 Rp 1,050
0.005 OH Mandor Rp 105,000 Rp 525
Bahan :
1.000 bh Roof Drain Rp 270,000 Rp 270,000
Rp 11,281 Rp 270,000
Overhead + Fee ( Max. 10 % )
Jumlah
N.27 1 M 2 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA MANUAL SISTEM 3 LAPIS CAT KONVENS
DENGAN T 200 MM
Upah :
0.5000 OH pekerja Rp 67,550 Rp 33,775
0.8000 OH tukang cat Rp 90,300 Rp 72,240
0.3000 OH kepala tukang Rp 105,000 Rp 31,500
0.2000 OH mandor Rp 105,000 Rp 21,000
Bahan :
0.1100 kg cat dasar Rp 23,900 Rp 2,629
0.1700 kg cat antara Rp 51,550 Rp 8,764
0.0800 kg cat penutup Rp 51,550 Rp 4,124
158,515.00 Rp 15,517
Overhead + Fee ( Max. 10 % )
Jumlah

sni analisa harga satuan


128 OF 202
-

HARGA HARGA
KODE KOEFISIEN SATUAN UPAN/BAHAN/ALAT BANTU HARGA UPAH
SATUAN BAHAN
Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur

sni analisa harga satuan


129 OF 202
-

DAFTAR ANALISA
HARGA SATUAN PEKERJAAN

JUMLAH
HARGA

Rp 53,288
Rp 5,329
Rp 58,616

Rp 17,763
Rp 1,776
Rp 19,539

Rp 44,025
Rp 4,403
Rp 48,428

Rp 129,315
Rp 12,932
Rp 142,247

Rp 170,953
Rp 17,095
Rp 188,048

sni analisa harga satuan


130 OF 202
-

JUMLAH
HARGA

Rp 657,648
Rp 65,765
Rp 723,413

Rp 326,976
Rp 32,698
Rp 359,674

Rp 802,953
Rp 80,295
Rp 883,248

Rp 926,213
Rp 92,621
Rp 1,018,835

sni analisa harga satuan


131 OF 202
-

JUMLAH
HARGA

Rp 11,978
Rp 1,198
Rp 13,176

Rp 228,121
Rp 22,812
Rp 250,933

Rp 232,396
Rp 23,240
Rp 255,636

sni analisa harga satuan


132 OF 202
-

JUMLAH
HARGA
Rp 247,230
Rp 24,723
Rp 271,953

Rp 185,644
Rp 18,564
Rp 204,208

Rp 214,674
Rp 21,467
Rp 236,141

Rp 189,763
Rp 18,976
Rp 208,740

sni analisa harga satuan


133 OF 202
-

JUMLAH
HARGA

Rp 45,400
Rp 4,540
Rp 49,940

Rp 761,696
Rp 76,170
Rp 837,865

Rp 264,943
Rp 26,494
Rp 291,437

sni analisa harga satuan


134 OF 202
-

JUMLAH
HARGA

Rp 379,543
Rp 37,954
Rp 417,497

Rp 44,126
Rp 4,413
Rp 48,539

Rp 444,314
Rp 44,431
Rp 488,745

Rp 116,100
Rp 11,610
Rp 127,709

sni analisa harga satuan


135 OF 202
-

JUMLAH
HARGA

Rp 239,346
Rp 23,935
Rp 263,280

Rp 549,900
Rp 54,990
Rp 604,890

Rp117,467,816

Rp 53,951

sni analisa harga satuan


136 OF 202
-

JUMLAH
HARGA
Rp 5,395
Rp 59,347

Rp 35,478
Rp 3,548
Rp 39,026

Rp 201,281
Rp 20,128
Rp 221,409

Rp 281,281
Rp 28,128
Rp 309,409
APIS SENG (GALBANI) SECARA MANUAL SISTEM 3 LAPIS CAT KONVENSIONAL

174,032
Rp 17,403
Rp 191,435

sni analisa harga satuan


137 OF 202
DAFTAR
HARGA SATUAN UPAH
HARGA SATUAN
No. JENIS UPAH SATUAN KETERANGAN
Rp.

1 Pelaksana hari
2 Mandor hari 105,000.00
3 Kepala Tukang Kayu hari 105,000.00
4 Kepala Tukang Batu hari 105,000.00
5 Kepala Tukang Besi hari 105,000.00
6 Kepala Tukang Cat hari 105,000.00
7 Tukang Kayu hari 90,300.00
8 Tukang Besi hari 90,300.00
9 Tukang Batu hari 90,300.00
10 Tukang Cat hari 90,300.00
11 Tukang Listrik hari 90,300.00
12 Pekerja hari 67,550.00
13 Penjaga Malam hari 67,550.00

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur

satuan dasar upah


138 OF 202
DAFTAR
HARGA SATUAN BAHAN

URAIAN SATUAN HARGA SATUAN (Rp) KET.

Alat Bantu Ls 5,000.00


Air m3 2,600.00

Batu Pecah 15/20 cm / kali bulat utuh m3 160,000.00


Batu Pecah 3/4 ( Split ) m3 250,000.00
Batu Pecah 2/3 ( Split ) m3 250,000.00
Batu Pecah 1/2 ( Split ) m3 250,000.00
Besi Beton Polos/Ulir kg 10,000.00
Besi Baja IWF kg 14,000.00
Besi Siku L 50.50.5mm kg 13,500.00
Besi Plat Baja T=1,2 (1.22 x 2.44) kg 14,200.00

Cat Minyak ( Setara Avian ) kg 51,550.00


Cat Enamel (Setara Seic Auto Synthetic Super Glose Warna Exclusive) Liter 85,000.00
Cat Kayu Dasar kg 23,900.00

Elektroda / Kawat las RB 2,6 mm kg 46,000.00

Panel Datar FRP t. 5mm M2 325,000.00

Kerikil Beton m3 149,549.02


Kayu Kelas II : - Papan m3 2,860,000.00
: - Balok m3 2,850,000.00
Kayu Kelas III : - Papan m3 2,603,200.00
(merantih) : - Balok m3 2,169,700.00
Kayu Kelas IV : - Papan m3 2,052,700.00
(bekisting) : - Balok m3 1,908,600.00
Kayu Diameter 8cm-4m (dolken) Btg 25,000.00
Kawat Beton kg 17,200.00

Low Carbon Steel Panel t. 1,2 mm M2 485,000.00

Minyak Pelumas Ltr 6,000.00


Menie Besi kg 25,925.00
Minyak Bekisting Ltr 17,250.00
Water proofing Sheet setara Posroc M2 75,000.00

Pasir Pasang m3 151,400.00


Pasir Beton m3 157,300.00
Pasir Urug m3 90,000.00

satuan dasar bahan


139 of 202
URAIAN SATUAN HARGA SATUAN (Rp) KET.

Plywood Tebal 9 mm Lbr 247,800.00


Paku Biasa kg 16,400.00
Prime Coat Ltr 15,000.00
Pipa PVC AW Dia 2" biasa T = 4 m' 14,500.00
Pipa besi BSP f 4" Schedule -6m btg 453,200.00 ###
Pipa besi BSP f 3" Medium B -6m btg 345,250.00 ###
Pipa besi BSP f 2" putih standar BOS -6m btg 229,500.00 ###
Pipa besi BSP f 1 1/2" hitam -6m btg 184,750.00 ###

Roof Drain Outlet 4" (1000mm) Setara (RFS01 Brass) Bh 270,000.00


Roof Drain Outlet 2" (50mm) Setara (RFS01 Brass) Bh 190,000.00

Sirtu m3 126,200.00
Semen Portland (PC) (50 Kg) Kg 1,240.00
Skrup Fixer bh 2,000.00
Solar Ltr 11,000.00

Padang, April 2015

Konsultan Perencana
PT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYA


Direktur

satuan dasar bahan


140 of 202
KAPASITAS 15 ORANG
O. PEKERJAAN SEPTICTANK

O.1 SEPTITANK BATA T x P x L x ( 1.25 x 2 x 0.94) O.3

1 Galian tanah = 7.47 m3 x 58,616.25 = 437,741.00

2 Pas bata 1/2 campuran spesi 1:2 = 11.03 m2 x 128,888.32 = 1,421,315.95

3 Plasteran 1:2 = 22.06 m2 x 49,924.34 = 1,101,081.23

4 Urugan Pasir = 0.42 m3 x 142,246.50 = 59,504.56

5 Beton tumbuk k=100 = 0.44 m3 x 668,077.26 = 292,430.78

6 Plat vertikal ( pembagi ) (V) = 0.08 m3 x 5,875,641.43 = 441,848.24

tul melintang Ø 8 = 6.00 m


tul memanjang Ø 8 = 6.00 m

7 Plat penutup (V) = 0.22 m3 x 5,875,641.43 = 1,310,973.12

ul melintang Ø 8 = 19.80 m
tul memanjang Ø 8 = 24.00 m

8 Pipa Ø 4" = 5.04 m x 119,498.56 = 602,272.72

9 Pipa Hava ( Galvanis Ø 1.5" ) = 1.00 m x 108,742.04 = 108,742.04

Harga Total (T1) = 5,775,909.62

O.2 PERESAPAN T x LA x LB x PA x PB ( 1.25 x 1.2 x 0.8 x 3.5 x 3 ) 0.4

1 Batu kali = 0.68 m3 x 160,000.00 = 109,091.84

2 Kerikil timbun = 0.67 m3 x 126,250.00 = 84,810.96

3 Pasir urug = 0.46 m3 x 90,000.00 = 41,107.59

4 Tanah = 1.00 m3 x 105,777.78 = 105,830.67

5 Ijuk = 19.09 kg x 12,000.00 = 229,112.40

6 Menggali kedalaman 1.25 = 4.06 m3 x 58,616.25 = 238,128.52

Harga Total (T2) = 808,081.98

HARGA TOTAL SEPTITANK DAN PERESAPAN = 6,583,991.59


KAPASITAS 15 ORANG

SEPTITANK BETON T x P x L x ( 1.25 x 2 x 0.94)

1 Galian tanah = 7.47 m3 x 58,616.25 = 437,741.00

2 Dinding Plat beton (V) = 1.10 m2 x 5,875,641.43 = 6,479,363.58

3 Plasteran 1:2 = 0.00 m2 x 49,924.34 = -

4 Urugan Pasir = 0.42 m3 x 142,246.50 = 59,504.56

5 Beton tumbuk = 0.44 m3 x 668,077.26 = 292,430.78

6 Plat vertikal ( pembagi ) (V) = 0.08 m3 x 5,875,641.43 = 441,848.24

tul melintang Ø 8 = 6.00 m


tul memanjang Ø 8 = 6.00 m

7 Plat penutup (V) = 0.22 m3 x 5,875,641.43 = 1,310,973.12

ul melintang Ø 8 = 19.80 m
tul memanjang Ø 8 = 24.00 m

8 Pipa Ø 4" = 5.04 m x 119,498.56 = 602,272.72

9 Pipa Hava ( Galvanis Ø 1.5" ) = 1.00 m x 108,742.04 = 108,742.04

Harga Total (T1) = 9,732,876.02

PERESAPAN T x LA x LB x PA x PB ( 1.25 x 1.2 x 0.8 x 3.5 x 3 )

1 Batu kali = 0.68 m3 x 160,000.00 = 109,091.84

2 Kerikil timbun = 0.67 m3 x 126,250.00 = 84,810.96

3 Pasir urug = 0.46 m3 x 90,000.00 = 41,107.59

4 Tanah = 1.00 m3 x 105,777.78 = 105,830.67

5 Ijuk = 19.09 kg x 12,000.00 = 229,112.40

6 Menggali kedalaman 1.25 = 4.06 m3 x 58,616.25 = 238,128.52

Harga Total (T2) = 808,081.98

HARGA TOTAL SEPTITANK DAN PERESAPAN = 10,540,958.00


KAPASITAS 50 ORANG

A SEPTITANK BATA T x P x L x ( 1.50 x 2.00 x 1.25) A

1 Galian tanah = 16.88 m3 x 58,616.25 = 444,246.52

2 Pas bata campuran spesi 1:2 = 27.36 m2 x 128,888.32 = 3,526,384.44

3 Plasteran 1:2 = 54.72 m2 x 49,924.34 = 2,731,859.67

4 Pasir Urugan = 1.22 m3 x 142,246.50 = 173,540.73

5 Beton tumbuk = 1.24 m3 x 668,077.26 = 828,415.80

6 Plat vertikal ( pembagi ) (V) = 0.16 m3 x 5,875,641.43 = 940,102.63

tul melintang Ø 8 = 12.00 m


tul memanjang Ø 8 = 12.00 m

7 Plat penutup (V) = 0.46 m3 x 5,875,641.43 = 2,702,795.06

ul melintang Ø 8 = 57.60 m
tul memanjang Ø 8 = 48.00 m

8 Pipa Ø 4" = 12.08 m x 119,498.56 = 1,443,542.54

9 Pipa Hava ( Galvanis Ø 1.5" ) = 2.00 m x 108,742.04 = 217,484.08

Harga Total (T1) = 13,008,371.46

B PERESAPAN T x LA x LB x PA x PB ( 1.25 x 1.2 x 0.8 x 3.5 x 3 ) B

1 Batu kali = 1.36 m3 x 160,000.00 = 218,183.68

2 Kerikil timbun = 1.34 m3 x 126,250.00 = 169,621.93

3 Pasir urug = 0.91 m3 x 90,000.00 = 82,215.18

4 Tanah = 2.00 m3 x 105,777.78 = 211,661.34

5 Ijuk = 38.19 kg x 12,000.00 = 458,224.80

6 Menggali kedalaman 1.25 = 8.13 m3 x 58,616.25 = 476,257.03

Harga Total (T2) = 1,616,163.95

HARGA TOTAL SEPTITANK DAN PERESAPAN = 14,624,535.42


KAPASITAS 50 ORANG

SEPTITANK BETON T x P x L x ( 1.25 x 3 x 1)

1 Galian tanah = 10.18 m3 x 58,616.25 = 596,479.66

2 Dinding Plat beton (V) = 1.37 m2 x 5,875,641.43 = 8,036,408.56

3 Plasteran 1:2 = 0.00 m2 x 49,924.34 = -

4 Pasir Urugan = 1.22 m3 x 142,246.50 = 173,540.73

5 Beton tumbuk = 1.24 m3 x 668,077.26 = 828,415.80

6 Plat vertikal ( pembagi ) (V) = 0.16 m3 x 5,875,641.43 = 940,102.63

tul melintang Ø 8 = 12.00 m


tul memanjang Ø 8 = 12.00 m

7 Plat penutup (V) = 0.46 m3 x 5,875,641.43 = 2,702,795.06

ul melintang Ø 8 = 57.60 m
tul memanjang Ø 8 = 48.00 m

8 Pipa Ø 4" = 12.08 m x 119,498.56 = 1,443,542.54

9 Pipa Hava ( Galvanis Ø 1.5" ) = 2.00 m x 108,742.04 = 217,484.08

Harga Total (T1) = 14,938,769.06

PERESAPAN T x LA x LB x PA x PB ( 1.25 x 1.2 x 0.8 x 3.5 x 3 )

1 Batu kali = 1.36 m3 x 160,000.00 = 218,183.68

2 Kerikil timbun = 1.34 m3 x 126,250.00 = 169,621.93

3 Pasir urug = 0.91 m3 x 90,000.00 = 82,215.18

4 Tanah = 2.00 m3 x 105,777.78 = 211,661.34

5 Ijuk = 38.19 kg x 12,000.00 = 458,224.80

6 Menggali kedalaman 1.25 = 8.13 m3 x 58,616.25 = 476,257.03

Harga Total (T2) = 1,616,163.95

HARGA TOTAL SEPTITANK DAN PERESAPAN = 16,554,933.02


Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-350 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032 8,571.43


2. Tukang (L02) jam 1.8072 10,000.00
3. Mandor (L03) jam 0.1004 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Semen (M12) Kg 469.6800 1,140.00


2. Pasir Beton (M01a) M3 0.5145 110,000.00
3. Agregat Kasar (M03) M3 0.7440 221,224.80
4. Kayu Perancah (M19) M3 0.4000
5. Paku (M18) Kg 3.2000

JUMLAH HARGA BAHAN

C. PERALATAN

1. Pan. Mixer E43 jam 0.1004 621,420.86


2. Truk Mixer E49 jam 0.5025 598,987.44
3. Water Tanker E23 jam 0.0382 230,259.97
4. Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-300 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032 9,650.00


2. Tukang (L02) jam 1.1044 12,900.00
3. Mandor (L03) jam 0.1004 15,000.00

JUMLAH HARGA TENAGA


B. BAHAN

1. Semen (M12) Kg 469.6800 1,240.00


2. Pasir beton (M01a) M3 0.5097 157,300.00
3. Agregat Kasar (M03) M3 0.7440 149,549.02

JUMLAH HARGA BAHAN

C. PERALATAN

1. Con Pan Mixer (E43) jam 0.1004 621,420.86


2. Truck Mixer (E49) jam 0.5025 598,987.44
3. Water Tanker (E23) jam 0.0382 230,259.97
4. Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-250 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.8032 8,571.43


2. Tukang (L02) jam 1.1044 10,000.00
3. Mandor (L03) jam 0.0000 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Semen (M12) Kg 422.3000 1,140.00


2. Pasir beton (M01a) M3 0.5412 110,000.00
3. Agregat Kasar (M03) M3 0.7440 221,224.80
4. Kayu Perancah (M19) M3 0.2000
5. Paku (M18) Kg 1.6000

JUMLAH HARGA BAHAN

C. PERALATAN

1. Con Pan. Mixer E43 jam 0.1004 621,420.86


2. Truck Mixer E49 jam 0.5025 598,987.44
3. Water Tanker E23 jam 0.0382 230,259.97
4. Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-175 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.3655 8,571.43


2. Tukang (L02) jam 1.3655 10,000.00
3. Mandor (L03) jam 0.6827 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Semen (M12) Kg 327.5400 1,140.00


2. Pasir beton (M01a) M3 0.5024 110,000.00
3. Agregat Kasar (M03) M3 0.9053 221,224.80
4. Kayu Perancah (M19) M3 0.1000
5. Paku (M18) Kg 0.8000

JUMLAH HARGA BAHAN

C. PERALATAN

1. Conc. Mixer E06 jam 0.6827 158,113.64


2. Water Tanker E23 jam 0.0382 230,259.97
3. Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.1 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K125 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.3655 8,571.43


2. Tukang (L02) jam 1.3655 10,000.00
3. Mandor (L03) jam 0.6827 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Semen (M12) Kg 311.0600 1,140.00


2. Pasir beton (M01a) M3 0.5113 110,000.00
3. Agregat Kasar (M03) M3 0.9053 221,224.80
4 Kayu Perancah (M19) M3 0.0500
5 Paku (M18) Kg 0.4000

JUMLAH HARGA BAHAN

C. PERALATAN

1. Conc. Mixer E06 jam 0.6827 158,113.64


2. Water Tanker E23 jam 0.0382 230,259.97
3. Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (a) Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 16 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA


B. BAHAN

1. Beton K500 M3 4.2500 1,289,773.78


2 Kabel prategang kg 283.9200 60,000.00
3 Tulangan baja (M39b) kg 566.0100 11,000.00
4 Anchorage kg 6.0000 642,000.00
5 Ducting M 96.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (b) Bentang 25 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 25 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Beton K500 M3 6.6406 1,289,773.78


2 Kabel prategang kg 443.6250 60,000.00
3 Tulangan baja (M39b) kg 884.3906 11,000.00
4 Anchorage kg 9.0000 642,000.00
5 Ducting M 225.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (c) Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 35 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA


B. BAHAN

1. Beton K500 M3 9.2969 1,289,773.78


2 Kabel prategang kg 621.0750 60,000.00
3 Tulangan baja (M39b) kg 1,238.1469 11,000.00
4 Anchorage kg 12.0000 642,000.00
5 Ducting M 420.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I (d) Bentang ....... meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 0 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 8,571.43


2. Tukang (L02) jam 0.0000 10,000.00
3. Mandor (L03) jam 0.0000 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Beton K500 M3 0.0000 1,289,773.78


2 Kabel prategang kg 0.0000 60,000.00
3 Tulangan baja (M39b) kg 0.0000 11,000.00
4 Anchorage kg 0.0000 642,000.00
5 Ducting M 0.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (a) Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 16 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA


B. BAHAN

1. Beton K500 M3 4.2500 1,289,773.78


2 Kabel prategang kg 283.9200 60,000.00
3 Tulangan baja (M39b) kg 566.0100 11,000.00
4 Anchorage kg 6.0000 642,000.00
5 Ducting M 96.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (b) Bentang 25 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 25 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Beton K500 M3 6.6406 1,289,773.78


2 Kabel prategang kg 443.6250 60,000.00
3 Tulangan baja (M39b) kg 884.3906 11,000.00
4 Anchorage kg 9.0000 642,000.00
5 Ducting M 225.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (c) Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 35 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 18.0000 8,571.43


2. Tukang (L02) jam 5.0000 10,000.00
3. Mandor (L03) jam 1.0000 10,714.29

JUMLAH HARGA TENAGA


B. BAHAN

1. Beton K500 M3 9.2969 1,289,773.78


2 Kabel prategang kg 621.0750 60,000.00
3 Tulangan baja (M39b) kg 1,238.1469 11,000.00
4 Anchorage kg 12.0000 642,000.00
5 Ducting M 420.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Kota Sawahlunto
ITEM PEMBAYARAN NO. : 7.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U (d) Bentang ....... meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 0 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH

NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 8,571.43


2. Tukang (L02) jam 0.0000 10,000.00
3. Mandor (L03) jam 0.0000 10,714.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Beton K500 M3 0.0000 1,289,773.78


2 Kabel prategang kg 0.0000 60,000.00
3 Tulangan baja (M39b) kg 0.0000 11,000.00
4 Anchorage kg 0.0000 642,000.00
5 Ducting M 0.0000 55,250.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Crane 1 (E31) 0.9036 431,976.61
2 Crane 2 (E31) 0.9036 431,976.61
3 Alat Bantu LS 1.0000 500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-713

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

6,884.68
18,072.29
1,075.73

26,032.70

535,435.20
56,595.00
164,591.25
0.00
0.00

756,621.45

62,391.65
300,986.33
8,785.02
500.00

372,663.00

1,155,317.15
115,531.72
1,270,848.87
Analisa EI-714

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

7,751.00
14,246.99
1,506.02

23,504.02
582,403.20
80,168.55
111,264.47

773,836.22

62,391.65
300,986.33
8,785.02
500.00

372,663.00

1,170,003.24
117,000.32
1,287,003.56
Analisa EI-715

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)

6,884.68
11,044.18
0.00

17,928.86

481,422.00
59,526.92
164,591.25
0.00
0.00

705,540.17

62,391.65
300,986.33
8,785.02
500.00

372,663.00

1,096,132.03
109,613.20
1,205,745.24
Analisa EI-716

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

11,703.96
13,654.62
7,314.97

32,673.55

373,395.60
55,262.31
200,263.75
0.00
0.00

628,921.65

107,949.07
8,785.02
500.00

117,234.09

778,829.30
77,882.93
856,712.23
Analisa EI-718

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)

11,703.96
13,654.62
7,314.97

32,673.55

354,608.40
56,239.62
200,263.75
0.00
0.00

611,111.76

107,949.07
8,785.02
500.00

117,234.09

761,019.41
76,101.94
837,121.35
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00
5,481,538.58
17,035,200.00
6,226,110.00
3,852,000.00
5,304,000.00

37,898,848.58

390,340.31
390,340.31
500.00

781,180.62

38,895,029.20
3,889,502.92
42,784,532.12
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00

8,564,904.04
26,617,500.00
9,728,296.88
5,778,000.00
12,431,250.00

63,119,950.91

390,340.31
390,340.31
500.00

781,180.62

64,116,131.53
6,411,613.15
70,527,744.68
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00
11,990,865.65
37,264,500.00
13,619,615.63
7,704,000.00
23,205,000.00

93,783,981.28

390,340.31
390,340.31
500.00

781,180.62

94,780,161.89
9,478,016.19
104,258,178.08
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH

HARGA

(Rp.)

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

390,340.31
390,340.31
500.00

781,180.62

781,180.62
78,118.06
859,298.68
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00
5,481,538.58
17,035,200.00
6,226,110.00
3,852,000.00
5,304,000.00

37,898,848.58

390,340.31
390,340.31
500.00

781,180.62

38,895,029.20
3,889,502.92
42,784,532.12
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00

8,564,904.04
26,617,500.00
9,728,296.88
5,778,000.00
12,431,250.00

63,119,950.91

390,340.31
390,340.31
500.00

781,180.62

64,116,131.53
6,411,613.15
70,527,744.68
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH

HARGA

(Rp.)

154,285.71
50,000.00
10,714.29

215,000.00
11,990,865.65
37,264,500.00
13,619,615.63
7,704,000.00
23,205,000.00

93,783,981.28

390,340.31
390,340.31
500.00

781,180.62

94,780,161.89
9,478,016.19
104,258,178.08
Analisa EI-721

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN
JUMLAH

HARGA

(Rp.)

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

390,340.31
390,340.31
500.00

781,180.62

781,180.62
78,118.06
859,298.68
Rp 11,171,000,000.00
Terbilang : Sebelas Milyar Seratus Tujuh Puluh Satu Juta Rupiah

Milyar 11 Err:508
ratusan 171 1 SERATUS
Juta 71 70 1
puluhan TUJUH PULUH
satuan SATU
JUTA
ratusan 0 0
Ribu 0 0 0
puluhan
satuan

ratusan 0 0
Satu 0 0 0
puluhan
satuan
LUAS BANGUNAN HARGA SATUAN JUMLAH HARGA
NO URAIAN
(M2) (Rp./M2) (Rp.)
1 PEKERJAAN PONDASI KSLL GEDUNG BLOCK A 848.66 3,646,344.07 3,094,506,362.16

2 PEKERJAAN PONDASI KSLL GEDUNG BLOCK C 848.66 3,646,344.07 3,094,506,362.16

JUMLAH TOTAL 6,189,012,724.33

Catatan: Harga Satuan Termasuk Pekerjaan :


1. Pembersihan Lapangan
2. Pekerjaan Pemasangan Bowplank
3. Pagar Keliling Sementara
4. Stek Setinggi (H/2)+Tinggi Rip Konstruksi (Stek Kolom, Tangga, Pit Lift, Shear Wall)
5. Konstruksi Plank Nama Proyek
6. Direksi Keet (Kantor Sementara)