TENAGA KERJA
Semen ( PC ) Kg Rp 1,400.00
Plamur Kg Rp 35,000.00
Sirtu M3 Rp 200,000.00
ALAT
Cangkul Bh Rp 70,000
Gergaji Besi Bh Rp 55,000
Linggis bh Rp 150,000
Sendok Semen Bh Rp 25,000
Palu bh Rp 30,000
Sekop Bh Rp 55,000
Meteran 7.5 m bh Rp 30,000
Ember bh Rp 10,000
Meteran 100 m bh Rp 150,000
Kota : Bengkulu
Kecamatan : Sungai Serut
Kelurahan : Sukamerindu
BKM : Rindu Sarana
KSM
1 Pembersihan Lokasi
Pemasangan Bowplank
Galian Tanah
Bongkaran Beton
Pasangan Batukali
REKAPITULASI VOLUME
Bekisting
Beton K 175
Plesteran
Pembesian
REKAPITULASI VOLUME
Drill
Pemasangan Bowplank
Bongkaran Beton
Pasangan Batukali
Plesteran
Drill
Bongkaran Beton
Pasangan Batukali
Bekisting
Urugan Sirtu
Beton K 175
NO SKETSA GAMBAR URAIAN/ITEM PEKERJAAN
Beton Lantai
Beton Kuku
Plesteran
Drill
90 Pembersihan Lokasi
Pemasangan Bowplank
Galian Tanah
Bongkaran Beton
Pasangan Batukali
Bekisting
Pembesian
Beton K 175
Galian Tanah
Bongkaran Beton
Pasangan Batukali
Plesteran
Pemasangan Bowplank
Galian Tanah
Bongkaran Beton
Pasangan Batukali
Plesteran
Galian Tanah
Bongkaran Beton
Pasangan Batukali
Plesteran
Galian Tanah
Bongkaran Beton
Pasangan Batukali
Plesteran
Pemasangan Bowplank
Galian Tanah
Bongkaran Beton
NO SKETSA GAMBAR URAIAN/ITEM PEKERJAAN
Pasangan Batukali
Dinding
Lantai
Plesteran
Drill
No RAB :1
Jenis Kegiatan :
Volume :
Lokasi : RT 13
UKURAN
173.00 M2
15.10 M'
77.48 M3
22.88 M3
77.76 M3
5.28 M2
3.20 M3
354.50 M2
58.53 KG
UKURAN
109.00 M
79.00 M
M2
M2
M3
UKURAN
M3
M3
M2
6.60 M3
30.00 2.00 0.20 0.40 4.80
30.00 M
DAFTAR KUANTITAS PEKERJAAN
1 Pembersihan Lokasi M2
2 Pemasangan Bowplank M'
3 Galian Tanah M3
4 Bongkaran Beton M3
5 Pasangan Batukali M3
6 Bekisting M2
7 Beton K 175 M3
8 Plesteran M2
9 Pembesian KG
10 Drill M
Wahyudi Muslimin
Diverifikasi
DisiapkanOlehOleh: : BKM Rindu Sarana,
DIverifikasi Oleh,
KetuaFaskel,
UPL,
KSM/Panitia
Askot Infra Fasilitator Teknik Kelurahan Sukamerindu
(………………………..)
(………………………..)
Paryani, S.T. Deki Rahmad Jaya, S.T. A. Karim Idik
Askot Infra Fasilitator Teknik
:1
:
:
: RT 13
Volume / Kuantitas
173.00
15.10
77.48
22.88
77.76
5.28
3.20
354.50
58.53
109.00
Dibuat Oleh,
ti Perencanaan Partisipatif
Muslimin
A. Karim Idik
A. Karim Idik
DAFTAR ANALISA
PERATURAN MENTERI PUPR 28 - 2016.
A TENAGA
Pekerja L.01 OH 0.1000
Tukang kayu L.02 OH 0.1000
Kepala tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.0120
Paku 2”-3” Kg 0.0200
Kayu papan 3/20 m3 0.0070
JUMLAH HARGA BAHAN
Rp 100,000 Rp 10,000
Rp 140,000 Rp 14,000
Rp 150,000 Rp 1,500
Rp 150,000 Rp 750
Rp 26,250
Rp 4,000,000 Rp 48,000
Rp 20,000 Rp 400
Rp 4,000,000 Rp 28,000
Rp 76,400
Rp 78,750 Rp 6,101,550
Rp 100,000 Rp 75,000
Rp 150,000 Rp 3,750
Rp 78,750
Rp 414,000 Rp 9,472,320
Rp 100,000 Rp 360,000
Rp 150,000 Rp 54,000
Rp 414,000
Rp 927,300 Rp 72,106,848
Rp 100,000 Rp 150,000
Rp 140,000 Rp 105,000
Rp 150,000 Rp 11,250
Rp 150,000 Rp 11,250
Rp 277,500
Rp 225,000 Rp 270,000
Rp 1,400 Rp 282,800
Rp 200,000 Rp 97,000
Rp 649,800
Rp 354,850 Rp 1,873,608
Rp 100,000 Rp 66,000
Rp 140,000 Rp 46,200
Rp 150,000 Rp 4,950
Rp 150,000 Rp 4,950
Rp 122,100
Rp 3,000,000 Rp 120,000
Rp 20,000 Rp 8,000
Rp -
Rp 3,000,000 Rp 45,000
Rp 85,000 Rp 29,750
Rp 10,000 Rp 30,000
Rp 232,750
Rp 1,047,800 Rp 3,352,960
Rp 100,000 Rp 165,000
Rp 140,000 Rp 38,500
Rp 150,000 Rp 4,200
Rp 150,000 Rp 12,450
Rp 220,150
1400 Rp 456,400
150 Rp 114,000
250
Rp 257,250
Rp 827,650
Rp 70,986 Rp 25,164,679
Rp 100,000 Rp 30,000
Rp 140,000 Rp 21,000
Rp 150,000 Rp 2,250
Rp 150,000 Rp 2,250
Rp 55,500
1,400 Rp 10,886
200,000 Rp 4,600
Rp 15,486
Rp 130,067 Rp 7,612,353
Rp 100,000 Rp 7,000
Rp 140,000 Rp 9,800
Rp 150,000 Rp 1,050
Rp 150,000 Rp 600
Rp 18,450
Rp 10,273 Rp 107,867
Rp 25,000 Rp 3,750
Rp 111,617
Rp 6,900 Rp 1,193,700
Rp 100,000 Rp 6,000
Rp 150,000 Rp 900
Rp 6,900
DAFTAR KUANTITAS PEKERJAAN
Volume /
No. Uraian Pekerjaan Satuan Biaya
Kuantitas
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Muslimin
Wahyudi
PROGRAM KOTA TANPA KU
(KOTAKU)
RENCANA ANGGARAN BIAYA SWADAYA &
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
VOLUME KEBUTUHAN
NO. U RAIAN SATUAN TOTAL DARI
Jumlah Pembulatan SWADAYA
'(1) (2) (3) (4) (5)
1. A. TENAGA KERJA :
Pekerja HOK - - -
Tukang HOK - - -
Kepala Tukang HOK - - 10.00
Mandor HOK - - 53.00
3 C. A L A T :
1. Sewa Molen Hari 5.00 5.00 -
2. Gerobak Dorong Bh 3.00 3.00 3.00
3. Palu Godam Bh 4.00 4.00 4.00
4. Pahat Beton Bh 8.00 8.00 8.00
5. Ember Bh 5.00 5.00 5.00
6. Cangkul Bh 2.00 2.00 2.00
7. Sekop Bh 2.00 2.00 2.00
8. Benang Bh 1.00 1.00 1.00
- - - - -
VOLUME KEBUTUHAN
NO. U RAIAN SATUAN TOTAL DARI
Jumlah Pembulatan SWADAYA
'(1) (2) (3) (4) (5)
4 D. ADMINISTRASI :
1. Papan Nama Proyek Unit 1.00 - -
2. Administrasi dan Dokumentasi Unit 1.00 - -
5 Sub T
E. DANA TUNAI :
1 Uang
Sub
6 F. TANAH/TANAMAN :
1. Tanah Rp
2. Tanaman Rp
3. Aset Lainnya Rp
7
H. DANA LAIN-LAIN :
1. Konsumsi (The, Kopi, Gula Kue, dll)
Su
8
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
- 100,000.00 - -
- 140,000.00 - -
(10.00) 150,000.00 1,500,000.00 (1,500,000.00)
(53.00) 150,000.00 7,950,000 (7,950,000.00)
#REF! #REF!
Dibulatkan #REF! #REF!
-
#REF!
#REF!
Dibuat Oleh,,
Diperiksa Oleh, Tim Inti Perencanaan
Unit Pengelola Lingkungan Partisipatif
Wahyudi Muslimin
PROGRAM KOTA TANPA KUMUH
( KOTAKU )
No.R.A.B ###
Jenis Kegiatan ###
Volume ###
Lokasi ###
DAFTAR ANALISA
Tenaga
Pekerja Oh 0.100
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Tenaga
Pekerja Hari 0.500
Mandor Hari 0.050
Tenaga
Pekerja Oh 0.300
Mandor Oh 0.010
Tenaga
Pekerja Oh 0.780
Tukang Oh 0.390
Kepala Tukang Oh 0.039
Mandor Oh 0.039
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 1.500
Tukang Oh 0.750
Kepala Tukang Oh 0.075
Mandor Oh 0.075
Tenaga
Pekerja Oh 1.200
Tukang Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.060
SNI.2008.B.6.7 1 M3 BETON mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan
Semen Portland Kg 371.0000
Pasir Pasang M3 0.4986
Kerikil Beton M3 0.7221
Air Ltr 200.000
Tenaga
Pekerja Oh 1.6500
Tukang Oh 0.2750
Kepala Tukang Oh 0.0280
Mandor Oh 0.0830
Tenaga
Pekerja Oh 0.007
Tukang Oh 0.007
Kepala Tukang Oh 0.0007
Mandor Oh 0.0004
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.520
Tukang Oh 0.260
Kepala Tukang Oh 0.026
Mandor Oh 0.026
Tenaga
Pekerja Oh 0.520
Tukang Oh 0.260
Kepala Tukang Oh 0.026
Mandor Oh 0.026
Tenaga
Pekerja Oh 0.660
Tukang Oh 0.330
Kepala Tukang Oh 0.033
Mandor Oh 0.033
Tenaga
Pekerja Oh 0.320
Tukang Oh 0.330
Kepala Tukang Oh 0.033
Mandor Oh 0.033
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.660
Tukang Oh 0.330
Kepala Tukang Oh 0.033
Mandor Oh 0.006
Pembesian Kg 155.03
Begisting M2 10.00
Tenaga
Pekerja Oh 0.300
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.015
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.300
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.015
Tenaga
Pekerja Oh 0.300
Tukang Oh 0.150
Kepala Tukang Oh 0.015
Mandor Oh 0.010
Tenaga
Pekerja Oh 0.300
Tukang Oh 0.150
Kepala Tukang Oh 0.015
Mandor Oh 0.015
Tenaga
Pekerja Oh 0.400
Tukang Oh 0.200
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.400
Tukang Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.022
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.200
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.010
Tenaga
Pekerja Oh 6.000
Tukang Oh 18.000
Kepala Tukang Oh 1.800
Mandor Oh 0.300
Tenaga
Pekerja Oh 1.000
Tukang Oh 3.000
Kepala Tukang Oh 0.300
Mandor Oh 0.050
Tenaga
Pekerja Oh 1.000
Tukang Oh 3.000
Kepala Tukang Oh 0.300
NO ANALISA SAT VOLUME
Mandor Oh 0.050
Tenaga
Pekerja Oh 0.150
Tukang Oh 0.300
Kepala Tukang Oh 0.030
Mandor Oh 0.075
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.100
Tukang Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.005
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00075
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00075
Tenaga
Pekerja Oh 0.100
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.050
Tukang Oh 0.050
Kepala Tukang Oh 0.005
Mandor Oh 0.003
NO ANALISA SAT VOLUME
SNI.7395.2008 PEKERJAAN LANTAI
SNI.2008.LT.6.35 1 M2 PASANG LANTAI KERAMIK UKURAN 30 X 30 CM
Bahan
Keramik 30 x 30 cm Bh 11.8700
Semen portland Kg 10.0000
Pasir pasang M3 0.0450
Semen warna Kg 1.5000
Tenaga
Pekerja Oh 0.7000
Tukang Oh 0.3500
Kepala Tukang Oh 0.0350
Mandor Oh 0.0350
Tenaga
Pekerja Oh 0.2700
Tukang Oh 0.1350
Kepala Tukang Oh 0.0140
Mandor Oh 0.0140
Tenaga
Pekerja Oh 0.0900
Tukang Oh 0.4500
Kepala Tukang Oh 0.0450
Mandor Oh 0.0450
Tenaga
Pekerja Oh 0.700
Tukang Oh 0.350
Kepala Tukang Oh 0.035
Mandor Oh 0.035
NO ANALISA SAT VOLUME
SNI.2002 PEKERJAAN KUNCI DAN PENGGANTUNGAN
SNI.2002.KC.1 1 BH PASANG KUNCI TANAM 2 SLAG
Kunci Pintu setara Bahan
Yalle Kunci Tanam Slag Besar Bh 1.0000
Tenaga
Pekerja Oh 0.0100
Tukang Oh 0.5000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00075
Tenaga
Pekerja Oh 0.0200
Tukang Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.00100
Tenaga
Pekerja Oh 0.0100
Tukang Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0005
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00075
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00015
Tenaga
Pekerja Oh 0.0150
Tukang Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.00050
Tenaga
Pekerja Oh 1.000
Tukang Oh 1.500
Kepala Tukang Oh 1.000
Mandor Oh 0.150
Tenaga
Pekerja Oh 1.200
Tukang Oh 0.750
Kepala Tukang Oh 0.070
NO ANALISA SAT VOLUME
Mandor Oh 0.110
Tenaga
Pekerja Oh 6.000
Tukang Oh 3.000
Kepala Tukang Oh 0.300
Mandor Oh 0.300
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.010
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Tenaga
Pekerja Oh 0.010
Tukang Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Tenaga
Pekerja Oh 1.000
Tukang Oh 1.500
Kepala Tukang Oh 1.500
Mandor Oh 0.160
Tenaga
Pekerja Oh 0.020
Tukang Oh 0.063
Kepala Tukang Oh 0.0063
Mandor Oh 0.0025
NO ANALISA SAT VOLUME
Tenaga
Pekerja Oh 0.020
Tukang Oh 0.063
Kepala Tukang Oh 0.0063
Mandor Oh 0.0025
NO ANALISA SAT VOLUME
SNI.2002 PEKERJAAN PENGECATAN
SNI.2002.CAT.1 1 M2 PENGECATAN BIDANG KAYU BARU 3 LAPIS
Bahan
Cat Meny Kg 0.200
Dempul Dempul Kayu Kg 0.150
Cat Bee Brand Cat Dasar Kg 0.170
Cat Bee Brand Cat Penutup 2 x Kg 0.260
Tenaga
Pekerja Oh 0.0700
Tukang Oh 0.0090
Kepala Tukang Oh 0.0060
Mandor Oh 0.0025
Tenaga
Pekerja Oh 0.020
Tukang Oh 0.063
Kepala Tukang Oh 0.0063
Mandor Oh 0.0025
SNI.2002.CAT.3
Cat Tembok setara 1 M2 PENGECATAN PLAFOOND PLYWOOD BARU
Cat TembokIsisetara
Metrolite 5 Kg Bahan
Metrolite
Cat TembokIsisetara
5 Kg Cat Dasar Kg 0.100
Metrolite Isi 5 Kg Cat Penutup 2 x Kg 0.260
Tenaga
Pekerja Oh 0.020
Tukang Oh 0.063
Kepala Tukang Oh 0.0063
Mandor Oh 0.0025
DAFTAR ANALISA
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
37,018.00
2,500,000.00 15,000.00
22,000.00 440.00
8,000.00 28.00
15,468.00
80,000.00 8,000.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 650.00
21,550.00
Jumlah 37,018.00
63,250.00
80,000.00 60,000.00
130,000.00 3,250.00
Jumlah 63,250.00
21,083.33
80,000.00 20,000.00
130,000.00 1,083.33
Jumlah 21,083.33
134,700.00
73,500.00 88,200.00
88,200.00
80,000.00 40,000.00
130,000.00 6,500.00
46,500.00
Jumlah 134,700.00
181,300.00
130,000.00 156,000.00
156,000.00
80,000.00 24,000.00
130,000.00 1,300.00
25,300.00
Jumlah 181,300.00
401,940.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
190,000.00 228,000.00
130,000.00 56,160.00
284,160.00
80,000.00 62,400.00
115,000.00 44,850.00
140,000.00 5,460.00
130,000.00 5,070.00
117,780.00
Jumlah 401,940.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
10,328,100.00
190,000.00 228,000.00
60,000.00 9,780,000.00
180,000.00 93,600.00
10,101,600.00
80,000.00 120,000.00
115,000.00 86,250.00
140,000.00 10,500.00
130,000.00 9,750.00
226,500.00
Jumlah 10,328,100.00
60,000.00 13,800,000.00
180,000.00 114,814.29
190,000.00 134,572.41
200.00 40,000.00
14,089,386.70
80,000.00 96,000.00
115,000.00 23,000.00
140,000.00 2,800.00
130,000.00 7,800.00
129,600.00
Jumlah 14,218,986.70
c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
60,000.00 22,260,000.00
180,000.00 89,742.86
190,000.00 137,193.10
200.00 40,000.00
22,526,935.96
80,000.00 132,000.00
115,000.00 31,625.00
140,000.00 3,920.00
130,000.00 10,790.00
178,335.00
Jumlah 22,705,270.96
15,000.00 15,750.00
20,000.00 300.00
16,050.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
80,000.00 560.00
115,000.00 805.00
140,000.00 98.00
130,000.00 52.00
1,515.00
Jumlah 17,565.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
2,500,000.00 100,000.00
22,000.00 6,600.00
7,250.00 725.00
107,325.00
80,000.00 41,600.00
115,000.00 29,900.00
140,000.00 3,640.00
130,000.00 3,380.00
78,520.00
Jumlah 185,845.00
2,500,000.00 112,500.00
22,000.00 6,600.00
7,250.00 725.00
119,825.00
80,000.00 41,600.00
115,000.00 29,900.00
140,000.00 3,640.00
130,000.00 3,380.00
78,520.00
Jumlah 198,345.00
2,500,000.00 100,000.00
22,000.00 8,800.00
7,250.00 1,450.00
2,500,000.00 37,500.00
137,500.00 48,125.00
18,000.00 36,000.00
231,875.00
80,000.00 52,800.00
115,000.00 37,950.00
140,000.00 4,662.00
130,000.00 4,329.00
99,741.00
Jumlah 331,616.00
2,500,000.00 100,000.00
22,000.00 8,800.00
7,250.00 1,450.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
2,500,000.00 45,000.00
137,500.00 48,125.00
18,000.00 36,000.00
239,375.00
80,000.00 25,600.00
115,000.00 37,950.00
140,000.00 4,662.00
130,000.00 4,329.00
72,541.00
Jumlah 311,916.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
2,500,000.00 100,000.00
22,000.00 8,800.00
7,250.00 1,450.00
2,500,000.00 37,500.00
137,500.00 48,125.00
18,000.00 108,000.00
303,875.00
80,000.00 52,800.00
115,000.00 37,950.00
140,000.00 4,620.00
130,000.00 780.00
96,150.00
Jumlah 400,025.00
26,585,101.16
22,705,270.96 22,705,270.96
17,565.00 2,021,380.20
185,845.00 1,858,450.00
Jumlah 26,585,101.16
26,989,447.46
22,705,270.96 22,705,270.96
17,565.00 2,425,726.50
185,845.00 1,858,450.00
Jumlah 26,989,447.46
26,666,891.26
22,705,270.96 22,705,270.96
17,565.00 1,978,170.30
198,345.00 1,983,450.00
Jumlah 26,666,891.26
26,989,447.46
22,705,270.96 22,705,270.96
17,565.00 2,425,726.50
185,845.00 1,858,450.00
Jumlah 26,989,447.46
26,581,525.36
22,705,270.96 22,705,270.96
17,565.00 1,892,804.40
198,345.00 1,983,450.00
Jumlah 26,581,525.36
29,371,603.41
22,705,270.96 22,705,270.96
17,565.00 3,350,172.45
331,616.00 3,316,160.00
Jumlah 29,371,603.41
28,591,717.41
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
22,705,270.96 22,705,270.96
17,565.00 2,570,286.45
331,616.00 3,316,160.00
Jumlah 28,591,717.41
28,115,003.31
22,705,270.96 22,705,270.96
17,565.00 2,093,572.35
331,616.00 3,316,160.00
Jumlah 28,115,003.31
28,545,872.76
22,705,270.96 22,705,270.96
17,565.00 2,524,441.80
331,616.00 3,316,160.00
Jumlah 28,545,872.76
27,855,568.26
22,705,270.96 22,705,270.96
17,565.00 1,834,137.30
331,616.00 3,316,160.00
Jumlah 27,855,568.26
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
27,543,086.91
22,705,270.96 22,705,270.96
17,565.00 1,521,655.95
331,616.00 3,316,160.00
Jumlah 27,543,086.91
27,158,764.71
22,705,270.96 22,705,270.96
17,565.00 1,137,333.75
331,616.00 3,316,160.00
Jumlah 27,158,764.71
27,813,763.56
22,705,270.96 22,705,270.96
17,565.00 1,792,332.60
331,616.00 3,316,160.00
Jumlah 27,813,763.56
27,951,121.86
22,705,270.96 22,705,270.96
17,565.00 1,929,690.90
331,616.00 3,316,160.00
Jumlah 27,951,121.86
26,474,783.61
22,705,270.96 22,705,270.96
17,565.00 453,352.65
331,616.00 3,316,160.00
Jumlah 26,474,783.61
27,254,845.26
22,705,270.96 22,705,270.96
17,565.00 1,233,414.30
331,616.00 3,316,160.00
Jumlah 27,254,845.26
26,474,783.61
22,705,270.96 22,705,270.96
17,565.00 453,352.65
331,616.00 3,316,160.00
Jumlah 26,474,783.61
28,083,641.26
22,705,270.96 22,705,270.96
17,565.00 2,259,210.30
311,916.00 3,119,160.00
Jumlah 28,083,641.26
27,802,601.26
22,705,270.96 22,705,270.96
17,565.00 1,978,170.30
311,916.00 3,119,160.00
Jumlah 27,802,601.26
28,547,532.91
22,705,270.96 22,705,270.96
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
17,565.00 2,723,101.95
311,916.00 3,119,160.00
Jumlah 28,547,532.91
30,288,927.01
22,705,270.96 22,705,270.96
17,565.00 4,464,496.05
311,916.00 3,119,160.00
Jumlah 30,288,927.01
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
28,624,467.61
22,705,270.96 22,705,270.96
17,565.00 2,800,036.65
311,916.00 3,119,160.00
Jumlah 28,624,467.61
28,264,736.41
22,705,270.96 22,705,270.96
17,565.00 2,440,305.45
311,916.00 3,119,160.00
Jumlah 28,264,736.41
28,295,123.86
22,705,270.96 22,705,270.96
17,565.00 2,470,692.90
311,916.00 3,119,160.00
Jumlah 28,295,123.86
27,699,494.71
22,705,270.96 22,705,270.96
17,565.00 1,875,063.75
311,916.00 3,119,160.00
Jumlah 27,699,494.71
30,179,526.66
22,705,270.96 22,705,270.96
17,565.00 3,474,005.70
400,025.00 4,000,250.00
Jumlah 30,179,526.66
29,246,649.51
22,705,270.96 22,705,270.96
17,565.00 2,541,128.55
400,025.00 4,000,250.00
29,881,975.56
22,705,270.96 22,705,270.96
17,565.00 3,176,454.60
400,025.00 4,000,250.00
Jumlah 29,881,975.56
Jumlah 29,246,649.51
29,529,094.71
22,705,270.96 22,705,270.96
17,565.00 2,823,573.75
400,025.00 4,000,250.00
Jumlah 29,529,094.71
1,235,190.00
750.00 52,500.00
60,000.00 1,137,000.00
180,000.00 6,840.00
1,196,340.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
80,000.00 24,000.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 1,950.00
38,850.00
Jumlah 1,235,190.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
789,090.00
750.00 52,500.00
60,000.00 690,000.00
180,000.00 7,740.00
750,240.00
80,000.00 24,000.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 1,950.00
38,850.00
Jumlah 789,090.00
661,690.00
60,000.00 613,440.00
180,000.00 3,600.00
617,040.00
80,000.00 24,000.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 1,300.00
44,650.00
Jumlah 661,690.00
424,020.00
60,000.00 374,400.00
180,000.00 4,320.00
378,720.00
80,000.00 24,000.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 1,950.00
45,300.00
Jumlah 424,020.00
883,440.00
60,000.00 817,920.00
180,000.00 4,860.00
822,780.00
80,000.00 32,000.00
115,000.00 23,000.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
140,000.00 2,800.00
130,000.00 2,860.00
60,660.00
Jumlah 883,440.00
565,620.00
60,000.00 499,200.00
180,000.00 5,760.00
504,960.00
80,000.00 32,000.00
115,000.00 23,000.00
140,000.00 2,800.00
130,000.00 2,860.00
60,660.00
Jumlah 565,620.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
225,200.00
60,000.00 195,000.00
195,000.00
80,000.00 16,000.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 1,300.00
30,200.00
Jumlah 225,200.00
7,563,500.00
3,900,000.00 4,680,000.00
22,000.00 27,500.00
15,000.00 15,000.00
4,722,500.00
80,000.00 480,000.00
115,000.00 2,070,000.00
140,000.00 252,000.00
130,000.00 39,000.00
2,841,000.00
Jumlah 7,563,500.00
637,000.00
3,900,000.00 156,000.00
15,000.00 7,500.00
163,500.00
80,000.00 80,000.00
115,000.00 345,000.00
140,000.00 42,000.00
130,000.00 6,500.00
473,500.00
Jumlah 637,000.00
697,500.00
3,900,000.00 156,000.00
15,000.00 7,500.00
55,000.00 60,500.00
224,000.00
80,000.00 80,000.00
115,000.00 345,000.00
140,000.00 42,000.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
130,000.00 6,500.00
473,500.00
Jumlah 697,500.00
58,856.00
3,900,000.00 6,006.00
22,000.00 4,400.00
10,406.00
80,000.00
115,000.00 34,500.00
140,000.00 4,200.00
130,000.00 9,750.00
48,450.00
Jumlah 58,856.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
78,770.00
3,900,000.00 42,120.00
22,000.00 2,200.00
44,320.00
80,000.00 8,000.00
115,000.00 23,000.00
140,000.00 2,800.00
130,000.00 650.00
34,450.00
Jumlah 78,770.00
158,147.50
125,000.00 137,500.00
137,500.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 97.50
20,647.50
Jumlah 158,147.50
188,947.50
153,000.00 168,300.00
168,300.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 97.50
20,647.50
Jumlah 188,947.50
39,831.25
46,750.00 17,531.25
25,000.00 750.00
18,281.25
80,000.00 8,000.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 650.00
21,550.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
Jumlah 39,831.25
19,240.00
8,000.00 8,400.00
8,400.00
80,000.00 4,000.00
115,000.00 5,750.00
140,000.00 700.00
130,000.00 390.00
10,840.00
Jumlah 19,240.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
794,833.45
6,435.00 76,383.45
60,000.00 600,000.00
180,000.00 8,100.00
3,100.00 4,650.00
689,133.45
80,000.00 56,000.00
115,000.00 40,250.00
140,000.00 4,900.00
130,000.00 4,550.00
105,700.00
Jumlah 794,833.45
811,705.00
2,860.00 75,790.00
60,000.00 682,800.00
180,000.00 7,560.00
3,100.00 4,650.00
770,800.00
80,000.00 21,600.00
115,000.00 15,525.00
140,000.00 1,960.00
130,000.00 1,820.00
40,905.00
Jumlah 811,705.00
712,941.20
3,575.00 75,790.00
60,000.00 558,000.00
180,000.00 3,240.00
3,100.00 4,811.20
641,841.20
80,000.00 7,200.00
115,000.00 51,750.00
140,000.00 6,300.00
130,000.00 5,850.00
71,100.00
Jumlah 712,941.20
1,008,950.00
174,500.00 191,950.00
60,000.00 705,000.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
180,000.00 6,300.00
903,250.00
80,000.00 56,000.00
115,000.00 40,250.00
140,000.00 4,900.00
130,000.00 4,550.00
105,700.00
Jumlah 1,008,950.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
180,350.00
120,000.00 120,000.00
120,000.00
80,000.00 800.00
115,000.00 57,500.00
140,000.00 1,400.00
130,000.00 650.00
60,350.00
Jumlah 180,350.00
39,147.50
18,500.00 18,500.00
18,500.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 97.50
20,647.50
Jumlah 39,147.50
44,030.00
16,500.00 16,500.00
16,500.00
80,000.00 1,600.00
115,000.00 23,000.00
140,000.00 2,800.00
130,000.00 130.00
27,530.00
Jumlah 44,030.00
30,265.00
16,500.00 16,500.00
16,500.00
80,000.00 800.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 65.00
13,765.00
Jumlah 30,265.00
37,147.50
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
16,500.00 16,500.00
16,500.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 97.50
20,647.50
Jumlah 37,147.50
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
26,069.50
5,500.00 5,500.00
5,500.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 19.50
20,569.50
Jumlah 26,069.50
26,115.00
5,500.00 5,500.00
5,500.00
80,000.00 1,200.00
115,000.00 17,250.00
140,000.00 2,100.00
130,000.00 65.00
20,615.00
Jumlah 26,115.00
1,023,800.00
250,000.00 250,000.00
60,000.00 360,000.00
180,000.00 1,800.00
611,800.00
80,000.00 80,000.00
115,000.00 172,500.00
140,000.00 140,000.00
130,000.00 19,500.00
412,000.00
Jumlah 1,023,800.00
988,150.00
375,000.00 375,000.00
375,000.00 45,000.00
60,000.00 360,000.00
180,000.00 1,800.00
781,800.00
80,000.00 96,000.00
115,000.00 86,250.00
140,000.00 9,800.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
130,000.00 14,300.00
206,350.00
Jumlah 988,150.00
8,679,054.00
750.00 189,000.00
60,000.00 7,200,000.00
180,000.00 54,000.00
2,860.00 311,454.00
3,100.00 18,600.00
7,773,054.00
80,000.00 480,000.00
115,000.00 345,000.00
140,000.00 42,000.00
130,000.00 39,000.00
906,000.00
Jumlah 8,679,054.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
29,350.00
15,000.00 15,000.00
15,000.00
80,000.00 800.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 650.00
14,350.00
Jumlah 29,350.00
31,850.00
10,000.00 10,000.00
7,500.00 7,500.00
17,500.00
80,000.00 800.00
115,000.00 11,500.00
140,000.00 1,400.00
130,000.00 650.00
14,350.00
Jumlah 31,850.00
1,075,100.00
230,000.00 230,000.00
60,000.00 360,000.00
180,000.00 1,800.00
591,800.00
80,000.00 80,000.00
115,000.00 172,500.00
140,000.00 210,000.00
130,000.00 20,800.00
483,300.00
Jumlah 1,075,100.00
33,332.00
1,600.00 1,680.00
180,000.00 21,600.00
23,280.00
80,000.00 1,600.00
115,000.00 7,245.00
140,000.00 882.00
130,000.00 325.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
10,052.00
Jumlah 33,332.00
173,402.00
135,000.00 141,750.00
180,000.00 21,600.00
163,350.00
80,000.00 1,600.00
115,000.00 7,245.00
140,000.00 882.00
130,000.00 325.00
10,052.00
Jumlah 173,402.00
HARGA SATUAN JUMLAH
( Rp ) ( Rp )
40,950.00
25,000.00 5,000.00
30,000.00 4,500.00
55,000.00 9,350.00
55,000.00 14,300.00
33,150.00
80,000.00 5,600.00
115,000.00 1,035.00
140,000.00 840.00
130,000.00 325.00
7,800.00
Jumlah 40,950.00
18,452.00
30,000.00 3,000.00
15,000.00 1,500.00
15,000.00 3,900.00
8,400.00
80,000.00 1,600.00
115,000.00 7,245.00
140,000.00 882.00
130,000.00 325.00
10,052.00
Jumlah 18,452.00
15,452.00
15,000.00 1,500.00
15,000.00 3,900.00
5,400.00
80,000.00 1,600.00
115,000.00 7,245.00
140,000.00 882.00
130,000.00 325.00
10,052.00
Jumlah 15,452.00
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Penataan Lingkungan Pemukiman Berbasis Komunitas
(PLPBK)
Pekerjaan : Jalan Pedestrian
Volume : 1019 M
Lokasi : Kelurahan Tunas Harapan
Kecamatan Curup Selatan
A PEKERJAAN PERSIAPAN
1 Papan nama kegiatan Ls 1.00 unit 250,000.00
2 Biaya P3K Ls 1.00 unit 200,000.00
3 Biaya administrasi/dokumentasi/Pelaporan Ls 1.00 unit 10,000,000.00
SUB TOTAL A
B JALAN PEDESTRIAN SEGMEN 1 PANJANG 220 M
I. PEKERJAAN TANAH DAN PASIR
1 Pas. Bowplank SNI.2002.PP.6.1 220.00 m' Err:504
2 Pek. Galian Tanah SNI.2008.T.6.1 250.51 m3 Err:504
3 Pek. Urugan Tanah Kembali SNI.2008.T.6.9 62.63 m3 Err:504
4 Pek. Urugan Pasir bawah Pondasi + Lantai SNI.2008.T.6.11 5.49 m3 Err:504
Sub Total Pekerjaan Tanah dan Pasir
II. PEKERJAAN PASANGAN
1 Pek. Beton Lantai Kerja K.100 SNI.2008.B.6.4 5.49 m3 Err:504
2 Pas. Pondasi Batu Kali SNI.2008.P.6.2 311.30 m3 Err:504
3 Pek. Beton Plat Beton 120x120 SNI.2008.B.6.P2 20.16 m3 Err:504
4 Pek. Beton Kolom 40/40 SNI.2008.B.6.KS6 22.85 m3 Err:504
5 Pek. Beton Balok 20/40 cm SNI.2008.B.6.BS3 42.37 m3 Err:504
6 Pek. Pelat Tebal 12 cm SNI.2008.B.6.PLT3 52.80 m3 Err:504
7 Pek. Kolom Struktur 120/40 cm SNI.2008.B.6.KS8 13.44 m3 Err:504
8 Pek. Kolom Struktur 20/40 cm SNI.2008.B.6.KS5 2.02 m3 Err:504
9 Pas. Batu bata 1:4 SNI.2008.D.6.9 26.88 m2 Err:504
10 Pek. Plasteran 1:4 SNI.2008.PL.6.4 53.76 m2 Err:504
11 Pek. Screed Lantai 15 mm SNI.2008.PL.6.4 418.00 m2 Err:504
12 Pek. Batu Terapi Ls 209.00 m2 35,000.00
13 Pek. Pergola Besi Ls 19.00 unit 7,271,515.00
14 Pek. Pagar Pinggir jalan pedestrian Ls 179.20 m 320,610.16
Sub Total Pekerjaan pasangan / Beton
III. PEKERJAAN PENGECATAN
1 Pek. Cat Kolom SNI.2002.CAT.2 95.20 m2 Err:504
Sub Total pekerjaan Pengecatan
SUB TOTAL B
C JALAN PEDESTRIAN SEGMEN 2 PANJANG 155 M
I. PEKERJAAN TANAH DAN PASIR
1 Pas. Bowplank SNI.2002.PP.6.1 155.00 m' Err:504
2 Pek. Galian Tanah SNI.2008.T.6.1 175.43 m3 Err:504
3 Pek. Urugan Tanah Kembali SNI.2008.T.6.9 43.86 m3 Err:504
4 Pek. Urugan Pasir bawah Pondasi + Lantai SNI.2008.T.6.11 3.82 m3 Err:504
Sub Total Pekerjaan Tanah dan Pasir
II. PEKERJAAN PASANGAN
1 Pek. Beton Lantai Kerja K.100 SNI.2008.B.6.4 3.82 m3 Err:504
2 Pas. Pondasi Batu Kali SNI.2008.P.6.2 219.33 m3 Err:504
3 Pek. Beton Plat Beton 120x120 SNI.2008.B.6.P2 14.04 m3 Err:504
4 Pek. Beton Kolom 40/40 SNI.2008.B.6.KS6 15.91 m3 Err:504
5 Pek. Beton Balok 20/40 cm SNI.2008.B.6.BS3 29.79 m3 Err:504
6 Pek. Pelat Tebal 12 cm SNI.2008.B.6.PLT3 37.20 m3 Err:504
7 Pek. Kolom Struktur 120/40 cm SNI.2008.B.6.KS8 9.12 m3 Err:504
8 Pek. Kolom Struktur 20/40 cm SNI.2008.B.6.KS5 1.37 m3 Err:504
9 Pas. Batu bata 1:4 SNI.2008.D.6.9 18.24 m2 Err:504
No. Uraian Pekerjaan Analisa Volume Harga Satuan (Rp)
10 Pek. Plasteran 1:4 SNI.2008.PL.6.4 36.48 m2 Err:504
11 Pek. Screed Lantai 15 mm SNI.2008.PL.6.4 294.50 m2 Err:504
12 Pek. Batu Terapi Ls 147.25 m2 35,000.00
13 Pek. Pergola Besi Ls 13.00 unit 7,271,515.00
14 Pek. Pagar Pinggir jalan pedestrian Ls 124.80 m 320,610.16
Sub Total Pekerjaan pasangan / Beton
III. PEKERJAAN PENGECATAN
1 Pek. Cat Kolom SNI.2002.CAT.2 58.14 m2 Err:504
Sub Total pekerjaan Pengecatan
SUB TOTAL C
Jumlah (Rp)
250,000.00
200,000.00
10,000,000.00
10,450,000.00
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
7,315,000.00
138,158,785.00
57,453,340.00
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Jumlah (Rp)
Err:504
Err:504
5,153,750.00
94,529,695.00
40,012,147.50
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
11,235,000.00
196,330,905.00
83,102,152.50
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
1,006,250.00
14,543,030.00
14,363,335.00
Jumlah (Rp)
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
630,000.00
14,543,030.00
10,259,525.00
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
22,050,000.00
12,600,000.00
#REF!
#REF!
#REF!
Jumlah (Rp)
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
1,500,000.00
1,500,000.00