Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan Jembatan Komposit di 1 unit 14,139,750
RT.008/RW.003 (P=8m,L=3m, T=4m)
a Belanja Barang dan Jasa 4,900,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Asisten Tukang (3 Orang x 10 hari) 30 HOK 121,000 3,630,000
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan MCK (Toilet) di 1 unit 49,138,200
RT.024/RW.004
a Belanja Barang dan Jasa 12,831,000
- Upah Kepala Tukang (1 Orang x 21 hari) 21 HOK 127,000 2,667,000
- Upah Asisten Tukang (4 Orang x 21 hari) 84 HOK 121,000 10,164,000
15,811,000 -250
Material 1,406,250
Total Ttp 3,366,250
4,776,000 -14,184,000
Material 3,239,000
Total Ttp 3,366,000
15,016,900 2,343,875
Material 2,985,000
Total Ttp 3,366,000
1
14,139,750
15,811,250
#REF!
#REF!
288,269,440 #VALUE!
33,150,985.60 Pajak (11,5%)
8,648,083.20 SPJ (3%)
8,648,083.20 BTD (3%)
#VALUE! Belanja Net
30%
0.00 Peningkatan Kualitas Proses Perenca
0.00 Mendukung kegiatan ekonomi , BUM
BUMDesa
0
0.00 Peningkatan Kapasitas Kelompok Ma
67,605,600 #VALUE!
#REF! Jln & Jmbtn
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan Jembatan Komposit di 1 unit 16,812,750
RT.018/RW.006 (P=6m,L=3m, T=4m)
a Belanja Barang dan Jasa 4,930,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Asisten Tukang (3 Orang x 10 hari) 30 HOK 122,000 3,660,000
b Belanja Modal 11,882,750
- Semen PC 26 zak 97,000 2,522,000
- Pasir 5 m³ 127,300 636,500
- Batu Pecah 1-2 cm 1 m³ 635,200 635,200
- Besi Cor 8" 20 bt 89,300 1,786,000
- Papan Mal 10 kpg 21,000 210,000
- Reng Uk.5/3 - 4 m 2 ikat 50,000 100,000
- Paku 2 " 2 kg 27,100 54,200
- Paku 2½ 1 kg 27,100 27,100
- Paku 5 " (belian) 1 kg 23,350 23,350
- Baut 4 hun Pj.20 26 bt 9,900 257,400
- Kayu Belian Tidak Ketam Uk.8/8 - 4m 18 bt 296,000 5,328,000
- Kayu Cerucuk ø 6-8 - Pj. 4 m 20 bt 12,700 254,000
- Plastik Cor 0.5 kg 50,000 25,000
- Kawat Baja/Bendrat 1 kg 24,000 24,000
2. Pembangunan Jembatan Komposit di 1 unit 16,812,750
RT.022 / RW.006 (P=6m,L=3m, T=4m)
a Belanja Barang dan Jasa 4,930,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Asisten Tukang (3 Orang x 10 hari) 30 HOK 122,000 3,660,000
b Belanja Modal 11,882,750
- Semen PC 26 zak 97,000 2,522,000
- Pasir 5 m³ 127,300 636,500
- Batu Pecah 1-2 cm 1 m³ 635,200 635,200
- Besi Cor 8" 20 bt 89,300 1,786,000
- Papan Mal 10 kpg 21,000 210,000
- Reng Uk.5/3 - 4 m 2 ikat 50,000 100,000
- Paku 2 " 2 kg 27,100 54,200
- Paku 2½ 1 kg 27,100 27,100
- Paku 5 " (belian) 1 kg 23,350 23,350
- Baut 4 hun Pj.20 26 bt 9,900 257,400
- Kayu Belian Tidak Ketam Uk.8/8 - 4m 18 bt 296,000 5,328,000
- Kayu Cerucuk ø 6-8 - Pj. 4 m 20 bt 12,700 254,000
- Plastik Cor 0.5 kg 50,000 25,000
- Kawat Baja/Bendrat 1 kg 24,000 24,000
Jumlah (Rp) 33,625,500
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan MCK (Toilet) di 1 unit 49,138,200
RT.024/RW.004
a Belanja Barang dan Jasa 12,831,000
- Upah Kepala Tukang (1 Orang x 21 hari) 21 HOK 127,000 2,667,000
- Upah Asisten Tukang (4 Orang x 21 hari) 84 HOK 121,000 10,164,000
b Belanja Modal 36,307,200
- Semen PC 40 zak 96,100 3,844,000
- Pasir 20 m³ 127,300 2,546,000
- Batu Pecah 1-2 cm 2 m³ 635,200 1,270,400
- Besi Cor 8" 50 bt 89,300 4,465,000
- Bataco 20 x 40 x 7 cm (press) 201 bh 3,000 603,000
- Keramik Dinding Uk. 20 x 25 cm 15 ktk 97,500 1,462,500
- Keramik Dinding Uk. 20 x 20 cm 15 ktk 81,200 1,218,000
- Seng Gelombang Bjls 30 30 lbr 88,300 2,649,000
- Seng Plat Bjls 30 2 lbr 88,300 176,600
- Pintu Plastik untuk WC 2 bh 403,100 806,200
- Kloset Jongkok 2 bh 270,500 541,000
- Kran Air Uk. ½" 5 bh 56,500 282,500
- Pipa Paralon Dia Uk. ½" 10 btg 21,800 218,000
- Asbes 10 lbr 69,200 692,000
- Paku Campur 1"-5" 5 kg 27,100 135,500
- Paku Seng 2 kg 31,600 63,200
- Paku Asbes 2 kg 37,800 75,600
- Papan Klas II Uk. 2/20 - 4 m 8 kpg 127,000 1,016,000
- Papan Perabung 8 kpg 127,000 1,016,000
- Papan Mal 75 kpg 21,000 1,575,000
- Reng Uk.5/3 - 4 m 2 ikat 50,000 100,000
- Paku 2 " 5 kg 27,100 135,500
- Paku 2½ 3 kg 27,100 81,300
- Paku 5 " 3 kg 27,100 81,300
- Kayu Belian Uk.7/7 - 4 m 10 bt 265,000 2,650,000
- Papan Belian Uk. 1,5/18 - 4 m 25 kpg 180,000 4,500,000
- Kayu Klas II Uk.7/7 - 4 m 10 bt 98,000 980,000
- Kayu Klas II Uk.5/7 - 4 m 20 bt 98,000 1,960,000
- Kayu Klas II Uk.4/6 - 4 m 10 bt 53,000 530,000
- Kayu Cerucuk ø 6-8 - Pj. 4 m 48 bt 12,700 609,600
- Kawat Baja/Bendrat 1 kg 24,000 24,000
Jumlah (Rp) 49,138,200
49,151,608 13,408
63,408
31,704
1
nan Jembatan Komposit di RT.018/RW.006 (P=6m,L=3m, T=4m)
nan Jembatan Komposit di RT.022 / RW.006 (P=6m,L=3m, T=4m)
0.00 Peningkatan Kapasitas Kelompok Masyarakat :
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
Penimbunan Tanah Merah Di Rt.024/ Rw .
1. 7,119,000
004 Dusun Melati
Belanja Barang dan Jasa 1,479,000
- Upah Kepala Tukang (1 Orang x 1 hari) 3 HOK 127,000 381,000
- Upah Tukang (3 Orang x 3 hari) 9 HOK 122,000 1,098,000
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan Jembatan Gorong-gorong di 3 unit 15,983,800
RT.003/RW.001 (3 parit)
a Belanja Barang dan Jasa 2,400,000
- Konsumsi Gotong royong (10 org x 4 hari) 40 HOK 60,000 2,400,000
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan MCK (Toilet) di 1 unit 49,138,200
RT.024/RW.004
a Belanja Barang dan Jasa 12,831,000
- Upah Kepala Tukang (1 Orang x 21 hari) 21 HOK 127,000 2,667,000
- Upah Asisten Tukang (4 Orang x 21 hari) 84 HOK 121,000 10,164,000
15,016,900 6,428,500
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF!
5 #REF!
6 #REF!
7 #REF!
9 #REF!
10 #REF!
11 #REF!
#REF!
49,151,608 13,408
63,408
31,704
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RT.003
RT.004
RT.005
RT.005
288,269,440 #VALUE!
33,150,985.60 Pajak (11,5%)
8,648,083.20 SPJ (3%)
8,648,083.20 BTD (3%)
#VALUE! Belanja Net
30%
0.00 Peningkatan Kualitas Proses Peren
0.00 Mendukung kegiatan ekonomi , B
0.00 Peningkatan Kapasitas Kelompok
67,605,600 #VALUE!
#REF! Jln & Jmbtn
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan MCK (Toilet) Desa Sungai 20 unit 139,477,900
Itik
a Belanja Barang dan Jasa 22,260,000
- Upah Kepala Tukang (1 Orang x 60 hari) 60 HOK 127,000 7,620,000
- Upah Asisten Tukang (2 Orang x 60 hari) 120 HOK 122,000 14,640,000
- Honor TPK 1,050,000
- Ketua 1 Paket 400,000 400,000
- Sekretaris 1 Paket 350,000 350,000
- Anggota 1 Paket 300,000 300,000
- Honor PPHK 450,000
- Ketua 1 Paket 200,000 200,000
- Sekretaris 1 Paket 150,000 150,000
- Anggota 1 Paket 100,000 100,000
- Jasa Konsultan 1 Paket 4,062,400 4,062,400
49,151,608
22,260,000
5,562,400
16,697,600
50
20 1,000
(90,276,292)
(45,138,146)
4
5
6
7
9
10
11
(90,326,292)
-7,112
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
Pembangunan Rabat beton Jl. Beringin Rt 005 Rw. 002
1. Dusun Mawar Uk.3m x 400 m x 20 cm) 131,805,300
J
l
.
P 277.78 13.33 20.00 1
###
e
r 63,578,800
PA0
d 0.01 1,847,235.00
KA0
a
n 5 31.25 1.50 2.25 5.64 6.204
a 8 56.94 2.73 4.10 1
U 520.83
### 25.00 37.50 5.64 6.204
k
.
2
61,727,000.00 3.00
m
1,851,810.00
x 13,267,000.00
3,407,000.00
2 9,860,000.00
0
0
m
1
0
c
m
n 4 #REF! #REF!
ahteraan 5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
p 11 #REF! #REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan Gedung PAUD Ulil Al Baab
uk. (Luas : 94 m) 193,697,082
a. Belanja Barang dan Jasa 39,715,000
- Upah Kepala Tukang (1 org x 65 hari)
65 HOK 127,000 8,255,000
- Upah Asisten Tukang (4 org x 65 hari)
260 HOK 121,000 31,460,000
iv Pekerjaan Lantai -
1 Pemasangan Lantai Keramik uk 60x60cm
Polished (setaraf Decogress) 0 M2 0 -
2 Pemasangan Lantai keramik 40x40cm
Polished (setaraf Indogress) 0 M2 0 -
3 Pemasangan Lantai keramik 30x30cm
Unpolished (setaraf Indogress) 0 M2 0 -
4 Pemasangan Dinding Keramik 20x20cm
0 M2 0 -
10 26 260
3 16 48
4 8 32
1 16 16
3 2 6
102
16 4 64
16
IV. HARGA SATUAN UPAH
A. UPAH
1 Mandor Lapangan L 061
2 Mekanik L 071
3 Mekanik Pembantu L 072
4 Kepala Tukang L 073
5 Tukang L 079
6 Operator Terlatih *) L 081
7 Operator Kurang Terlatih *) L 082
8 Pembantu Operator L 083
9 Supir Material / Truck L 091
10 Supir Personil L 092
11 Pembantu Supir / Kernet L 099
12 Buruh Lapangan Tak Terlatih L 101
13 Buruh Lapangan Agak Terlatih L 103
14 Buruh Lapangan Terlatih L 106
15 Penjaga Api -
16 Penjaga Malam -
17 Pengawas -
18 Pengatur -
Catatan : *)
*) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat
misal : Bulldozer, Grader, Whell, Loader, Asphalt Finisher, dll
*) Operator yang mengoperasikan peralatan untuk melayani pekerjaan yang agak ringan
misal : Stell Wheeled Roller, Stamper, Concrete Mixer / Mesin Pengaduk Beton dll
B. BAHAN PENGISI
B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu Pecah 10-15 cm M³
4 Batu Pecah 5-7 cm M³
5 Batu Pecah 3-5 cm M³
6 Batu Pecah 2-3 cm M³
7 Batu Pecah 1-2 cm M³
8 Batu Pecah 1-1 cm M³
9 Batu Pecah 0,5 cm M³
10 Stone Dust M³
11 Aspal Kg
12 Pasir Kasar M³
13 Pasir Halus M³
14 Semen PC Zak
15 Tanah Timbunan M³
16 Paving Block Bh
17 Bataco 15 x 30 x 7 cm Bh
18 Bataco 20 x 40 x 7 cm ( Press ) Bh
19 Kerawang ( Roster ) 18 x 18 cm Bh
20 Kerawang Press ( Roster ) 30 x 30 cm Bh
21 Keramik 20 x 20 cm Kotak
22 Keramik 25 x 25 cm Kotak
23 Keramik 30 x 30 cm Kotak
24 Keramik 30 x 30 cm Unpolished Kotak
25 Keramik 30 x 30 cm Artistik Kotak
26 Keramik 40 x 40 cm (Biasa) Kotak
27 Keramik 40 x 40 cm Polished (Setaraf Decogress) Kotak
28 Keramik 40 x 40 cm Unpolished (Setaraf Decogress) Kotak
29 Keramik 60 x 60 cm Polished (Setaraf Indogress) Kotak
30 Keramik 60 x 60 cm Unpolished (Setaraf Indogress) Kotak
31 Marmer M²
32 Wood Flooring M²
33 List Keramik WC Uk. 8 x 20 cm Bh
34 Plint Kayu Uk. 2 x 10 cm Bh
35 Keramik Dinding 20 x 20 cm Kotak
36 Keramik Dinding 20 x 25 cm Kotak
37 Keramik Dinding 25 x 40 cm Kotak
38 Floor Hardener Kg
39 Beton Ready Mix B 0 M³
40 Beton Ready Mix 125 M³
41 Beton Ready Mix 175 M³
42 Beton Ready Mix 225 M³
43 Beton Ready Mix 250 M³
44 Beton Ready Mix 300 M³
45 Karung Goni Curing Beton ( 0.7 m² ) Lembar
46 Tiang Pancang (Mini Pile / Ready Mix) Uk. Π 20 x 20, K 400 - 450, d besi 13 mm M
47 Tiang Pancang (Mini Pile / Ready Mix) Uk. Π 25 x 25, K 400 - 450, d besi 13 mm M
48 Tiang Pancang (Mini Pile / Ready Mix) Uk. Δ 28 x 28 x 28, K 400 - 450, d besi 13 mm M
49 Tiang Pancang (Mini Pile / Ready Mix) Uk. Δ 32 x 32 x 32, K 400 - 450, d besi 13 mm M
50 Papan Turap Uk. 15/60 - 4,5,6 m - K 400 M
51 Sewa Pompa Ready Mix (Min. 100 m³) Hari
52 Bahan Plastik Cor Beton M²
53 Geotextile Stabilisator 150 / 150 kN (Woven) M²
54 Geotextile Separator (Non Woven) M²
C. BAHAN KAYU
1 Amplas Lbr
2 Minyak Cat Kg
3 Cat Kilat Kg
4 Plamur Kg
5 Cat Dasar Kg
6 Cat Tembok Kg
7 Cat Tembok Type Weather Shield Kg
8 Cat Seng Kg
9 Dempul Kg
10 Plitur Kg
11 Thiner Ltr
12 Thiner ND Ltr
13 Melamic Ltr
14 Vernis Ltr
15 Meni Kg
16 Semen Warna Kg
17 Lem Kayu Kg
18 Sealent Tube
19 Soda Api Kg
20 Ter / Residu Ltr
21 Kuas 4" Bh
22 Road Line Paint ( Cat Marka ) Ltr
25 Water Proofing M²
F. BAHAN PENGANTUNG
G. BAHAN ATAP
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12 mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3 mm M²
5 Kaca Polos, t = 8 mm M²
6 Kaca Buram, t = 5 mm M²
I. BAHAN PENUTUP
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t = 9 mm Lbr
4 Multiplek t = 12 mm Lbr
5 Polywood 4' x 8' x 4 mm Lbr
6 Panel GRC 120 x 240 x 40 Lbr
7 Gypsum Board t = 9 mm Lbr
9 HPL Lbr
10 Wall Paper M²
J. BAHAN SANITASI
N. TANAMAN HIAS
Catatan :
*) Harga Satuan Upah dan Bahan Sudah Termasuk PPN 10 %,Keuntungan dan Over Head
*) Untuk Harga Satuan Bahan, belum termasuk biaya melansir Bahan ke titik pekerjaaan lokasi tertentu
*) Pembagian Wilayah berdasarkan harga di lokasi Ibukota Kecamatan dan Pusat Pemerintahan Desa
A SATUAN UPAH DAN BAHAN 2017
30,000.00
37,500.00
45,000.00
45,000.00
45,000.00
3,000.00
52,500.00
37,500.00
37,500.00
6,000.00
6,000.00
7,500.00
9,000.00
9,000.00
9,000.00
9,000.00
4,500.00
4,500.00
4,500.00
3,500.00
4,500.00
7,500.00
6,000.00
75,000.00
22,500.00
22,500.00
22,500.00
37,500.00
187,500.00
2,250,000.00
375,000.00
30,000.00
90,000.00
22,500.00
60,000.00
75,000.00
22,500.00
75,000.00
112,500.00
225,000.00
30,000.00
112,500.00
375,000.00
37,500.00
15,000.00
22,500.00
30,000.00
67,500.00
15,000.00
75,000.00
375,000.00
675,000.00
Mengetahui
Plt. Kepala Dinas Pekerjaan Umun dan Penataan Ruang
Kabupaten Kubu Raya
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Keterangan
Catatan :
Wilayah I :
Kecamatan Sungai Raya dan Sungai Kakap,
Termasuk :
Kecamatan Sungai Ambawang :
- Desa Kuala Ambawang
- Desa Jawa Tengah
- Desa Mega Timur
- Desa Sungai Malaya
- Desa Ampera Raya
Kecamatan Kuala Mandor B :
- Desa Kuala Mandor A
Wilayah II :
Kecamatan Kuala Mandor B, Rasau Jaya
dan Sungai Ambawang Termasuk :
Kecamatan Sungai Raya :
- Desa Mekar Sari
- Desa Tebang Kacang
- Desa Sungai Asam
- Desa Madu Sari
- Desa Ambangah
Kecamatan Sungai Kakap :
- Desa Punggur Besar
- Desa Punggur Kecil
- Desa Sungai Kupah
- Desa Punggur Kapuas
Wilayah III :
Kecamatan Kubu, Teluk Pakedai
dan Terentang Termasuk :
Kecamatan Sungai Raya :
- Desa Sungai Bulan
- Desa Kali Bandung
Kecamatan Sungai Kakap :
- Desa Tanjung Saleh
Kecamatan Sungai Ambawang :
- Desa Bengkarek
- Desa Pasak Piang
Kecamatan Kuala Mandor B :
- Desa Kubu Padi
- Desa Retok
- Desa Sungai Enau
Wilayah IV :
Kecamatan Batu Ampar, Termasuk :
Kecamatan Sungai Raya :
- Desa Pulau Limbung
- Desa Gunung Tamang
- Desa Muara Baru
Kecamatan Sungai Ambawang :
- Desa Teluk Bakung
Kecamatan Teluk Pakedai :
- Desa Kuala Karang
- Desa Sungai Nibung
Kecamatan Terentang :
- Desa Dungun
- Desa Permata
- Desa Betuah
Kecamatan Kubu :
- Desa Mengkalang Jambu
- Desa Mengkalang Guntung
- Desa Sepakat Baru
Kecamatan Kakap :
- Desa Sepok Laut
ahui
mun dan Penataan Ruang
ubu Raya
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
Penimbunan Tanah Merah Di Rt.001/ Rw .
1. 10,413,000
001 Dusun Mawar
Belanja Barang dan Jasa 1,972,000
- Upah Kepala Tukang (1 Orang x4 hari) 4 HOK 127,000 508,000
- Upah Tukang (4 Orang x 3 hari) 12 HOK 122,000 1,464,000
Pembangunan Rabat beton Jl. Proklamasi (Poros 36) Jl. Cilacap-Jl. Randu
150
Agung -Jl. Makmur) Uk. 2m x 750m x 10 cm)
Pembangunan Rabat beton Jl. Budi Karya (Poros 24) Jl. Cilacap-Jl. Randu
100
Agung -Jl. Makmur)
Pembangunan RabatUk. 2mJl.
Beton x 750m x 12
Sekolah cm)
(Jl. Pendidikan-Jl. Damai) Uk. 1m
25
x 250m x 10 cm)
Lanjutan Rabat Beton Jl. Candramidi Uk. 2m x 200 m x 12 cm 40
SEMEN BATU PASIR PAPAN KAYU
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
NO URAIAN VOLUME SATUAN
(Rp)
1 2 3 4
Pembangunan Rabat beton Jl. Proklamasi (Poros 36) Jl.
1.
Randu Agung -Jl. Makmur-Jl. Damai-Jl. Pendidikan ) Uk. 2m
x 750m Barang
Belanja x 10 cm)
dan Jasa
- Upah Kepala Tukang (1 Orang x 30 hari) 30 HOK 132,000
- Upah Tukang (3 Orang x 30 hari) 90 HOK 125,000
- Honor TPK
- Ketua 1 Paket 400,000
- Sekretaris 1 Paket 350,000
- Anggota 1 Paket 300,000
- Honor PPHK
- Ketua 1 Paket 200,000
- Sekretaris 1 Paket 150,000
- Anggota 1 Paket 100,000
- Jasa Konsultan 1 Paket 5,420,000
- Sewa Jasa Molen 30 Hari 145,000
Belanja Modal
- Semen PC 260 Zak 97,000
- Pasir 50 M3 150,000
- Batu Pecah 2-3 cm 22 M3 550,000.00
- Papan Mal Kelas III 40 m3 13,700.00
- Kayu Reng 10 Btg 13,700
- Paku Campuran 4 Kg 28,000
- Tambang Nilon 1 Gulung 45,000
- Plastik Cor 2 Gulung 240,000
- Sekop 2 Buah 200,000
- Cangkul 2 Buah 200,000
- Arco 2 Buah 500,000
- Pengky 2 Buah 100,000
- Solar 30 Liter 7,000
Belanja Modal
- Semen PC 200 Zak 90,000
- Pasir 40 M3 150,000
- Batu Pecah 2-3 cm 20 M3 580,000
- Papan Mal Kelas III 40 m3 13,700
- Kayu Reng 10 Btg 13,700
- Paku Campuran 2 Kg 28,000
- Tambang Nilon 1 Gulung 45,000
- Plastik Cor 2 Gulung 240,000
- Pengky 2 Buah 100,000
- Solar 20 Liter 8,000
Belanja Modal
- Semen PC 198 Zak 90,000
- Pasir 25 M3 150,000
- Batu Pecah 2-3 cm 30 M3 580,000
- Papan Mal Kelas III 1 M3 2,200,000
- Kayu Campuran/Semperan 1 M3 400,000
- Paku Campuran 10 Kg 28,000
- Tambang Nilon 2 Gulung 45,000
- Plastik Cor 3 Gulung 240,000
- Sekop 1 Buah 200,000
- Cangkul 1 Buah 200,000
- Arco 1 Buah 500,000
- Pengky 1 Buah 100,000
- Solar 15 Liter 5,150
Jumlah (Rp)
JUMLAH
(Rp)
74,832,000
26,480,000
3,960,000
11,250,000
1,050,000
400,000
350,000
300,000
450,000
200,000
150,000
100,000
5,420,000
4,350,000 #REF!
48,352,000
25,220,000
7,500,000
12,100,000
548,000 1.12
137,000 187.5
112,000
45,000
480,000
400,000
400,000
1,000,000
200,000
210,000
58,286,000
21,060,000
3,960,000
11,250,000
1,050,000
400,000
350,000
300,000
450,000
200,000
150,000
100,000
4,350,000
37,226,000
18,000,000
6,000,000
11,600,000
548,000
137,000
56,000
45,000
480,000
200,000
160,000
53,592,250 48
9,855,000
1,980,000
5,625,000
2,250,000
43,737,250
17,820,000
3,750,000
17,400,000
2,200,000
400,000
280,000
90,000
720,000
200,000
200,000
500,000
100,000
77,250
186,710,250
18 Maret 2017
a Kegiatan
n dan Pelaksanaan
MANA .S.Pd
Pembangunan Rabat beton Jl. Proklamasi (Poros 36) Jl. Cilacap-Jl. Randu
Agung -Jl. Makmur) Uk. 2m x 750m x 10 cm)
Pembangunan Rabat beton Jl. Budi Karya (Poros 24) Jl. Cilacap-Jl. Randu
Agung -Jl. Makmur)
Pembangunan RabatUk. 2mJl.
Beton x 750m x 12
Sekolah cm)
(Jl. Pendidikan-Jl. Damai) Uk. 1m
x 250m x 10 cm)
Lanjutan Rabat Beton Jl. Candramidi Uk. 2m x 200 m x 12 cm
Pembangunan Rabat Beton Jl. Perdana Uk. 2m x 200m x 10 cm
PAPAN MAL
KAYU
UKURAN SEMEN BATU PASIR PAPAN KAYU
0.0112 0.01
0.0096
4.5 31.25 1.50 2.25 5.64 6.204
8.2 56.94 2.73 4.10 1
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
Penimbunan Sirtu Di Rt. 011 Rw.004 Dusun
1. 26,030,000
Melati
Belanja Barang dan Jasa 4,930,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Tukang (3 Orang x 10 hari) 30 HOK 122,000 3,660,000
Pembangunan Rabat beton Jl. Proklamasi (Poros 36) Jl. Cilacap-Jl. Randu
150
Agung -Jl. Makmur) Uk. 2m x 750m x 10 cm)
Pembangunan Rabat beton Jl. Budi Karya (Poros 24) Jl. Cilacap-Jl. Randu
100
Agung -Jl. Makmur)
Pembangunan RabatUk. 2mJl.
Beton x 750m x 12
Sekolah cm)
(Jl. Pendidikan-Jl. Damai) Uk. 1m
25
x 250m x 10 cm)
Lanjutan Rabat Beton Jl. Candramidi Uk. 2m x 200 m x 12 cm 40
SEMEN BATU PASIR PAPAN KAYU
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan MCK (Toilet) PAUD 1 unit 10,003,100
Permata Bunda
a Belanja Barang dan Jasa 1,482,000
- Upah Kepala Tukang (1 Orang x 6 hari) 6 HOK 127,000 762,000
- Upah Asisten Tukang (1 Orang x 6 hari) 6 HOK 120,000 720,000
50
20 1,000
39,170,508
19,585,254
3,083
4 #REF!
5 #REF!
6 #REF!
9 #REF!
10 #REF!
11 #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Penerangan Jalan Desa 85 unit 39,000,000
7,470,000
3,810,000
3,660,000
37990000
21,545,000
21,545,000
6,500,000
1,275,000
1,020,000
7,650,000
4
5
6
7
9
10
11
10,151,608
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
DESA SUNGAI ITIK KECAMATAN SUNGAI KAKAP
TAHUN ANGGARAN 2017
1. Bidang : Pelaksanaan Pembangunan Desa
: Pembangunan, Pemanfaatan dan
2. Kegiatan Pemeliharaan infrastruktur dan
Lingkungan Desa
3. Waktu Pelaksanaan : Mei - Desember 2017
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
Pemeliharaan Jl Rabat Beton Ampera Laur
1. 15,565,600
Rt.025 Dusun Melati
Belanja Barang dan Jasa 6,150,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Tukang (4 Orang x 10 hari) 40 HOK 122,000 4,880,000
Belanja Modal 9,415,600
- Semen PC 40 Zak 97,000 3,880,000
- Pasir 5 M3 150,000 750,000
- Batu Pecah 2-3 cm 5 M3 550,000.00 2,750,000
- Papan Mal Kelas III 20 m3 13,700.00 274,000
- Kayu Reng 8 Btg 13,700 109,600
- Paku Campuran 4 Kg 28,000 112,000
- Sekop 2 Buah 200,000 400,000
- Cangkul 2 Buah 200,000 400,000
- Arco 1 Buah 500,000 500,000
- Pengky 2 Buah 100,000 200,000
- Solar 5 Liter 8,000 40,000
Sewa Molen 10 Hari 145,000 1,450,000
Pemeliharaan Jl Rabat Beton Rt.009 Rw.......
3 15,565,600
Cik Minah Dusun Melati
Belanja Barang dan Jasa 6,150,000
- Upah Kepala Tukang (1 Orang x 10 hari) 10 HOK 127,000 1,270,000
- Upah Tukang (4 Orang x 10 hari) 40 HOK 122,000 4,880,000
Belanja Modal 9,415,600
- Semen PC 40 Zak 97,000 3,880,000
- Pasir 5 M3 150,000 750,000
- Batu Pecah 2-3 cm 5 M3 550,000.00 2,750,000
- Papan Mal Kelas III 20 m3 13,700.00 274,000
- Kayu Reng 8 Btg 13,700 109,600
- Paku Campuran 4 Kg 28,000 112,000
- Sekop 2 Buah 200,000 400,000
- Cangkul 2 Buah 200,000 400,000
- Arco 1 Buah 500,000 500,000
- Pengky 2 Buah 100,000 200,000
- Solar 5 Liter 8,000 40,000
Sewa Molen 10 Hari 145,000 1,450,000
Jumlah (Rp) 31,131,200
Rincian Pendanaan :
HARGA
JUMLAH
NO URAIAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5
1. Pembangunan Air Hujan ( PAH ) 1 unit 8,718,400
a Belanja Barang dan Jasa 1,235,000
- Upah Kepala Tukang (1 Orang x 5 hari) 5 HOK 127,000 635,000
- Upah Asisten Tukang (1 Orang x 5 hari) 5 HOK 120,000 600,000
873,896,200
8,794,600
76,200
20 #VALUE!
20
4 #REF!
5 #REF!
6 #REF!
9 #REF!
10 #REF!
11 #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!