Anda di halaman 1dari 18

DAFTAR ISI

NO. JUDUL GAMBAR SKALA


001 DAFTAR ISI NTS NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
002 PETA SITUASI 1:750 (TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
003 POTONGAN 1 1:100 LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
004 POTONGAN 2 1:100
005 POTONGAN 3 1:100
006 POTONGAN 4 1:100
KEPALA SUKU DINAS SUMBER DAYA AIR
007 POTONGAN 5 1:100 KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

008 POTONGAN 6 DAN 7 1:100


009 POTONGAN 8 DAN 9 1:100
010 POTONGAN 10 1:100 ______________________
NIP.
011 POTONGAN 11 1:100
012 POTONGAN 12 1:100 KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
013 POTONGAN 13 1:100 AIR BERSIH DAN AIR LIMBAH

014 DETAIL TYPICAL TANGGUL 1:100


015 PENULANGAN TYPICAL TANGGUL 1:50
016 DENAH SALURAN OUTLET 1:100 _____________________
NIP.
017 POTONGAN A, B, C & D SALURAN OUTLET 1:100

PENANGGGUNG DIPERIKSA DIGAMBAR


JAWAB

DAFTAR ISI NTS

001
1 2 3 5 6

2 8 0 9 4 3 3
46 19 21 29 30 91 90
3. 2. 2. 3. 3. 3. 2.
4
71
2.

36 5 0 8 9 7
4 26 42 48 23 40 60
7
3. 2. 2. 3. 3. 3. 2.
9
53 8
2. 62
2.
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
9 TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
2 7
5 86 31
2
07 31
3
84
6
3. 2. 3. 3. 2.

KEPALA SUKU DINAS SUMBER DAYA AIR


KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

10

4 4 2 7 2
55 44
3
42 .60
5
91 01 71 90
7 52 3.
3 3. 3. 3 2. 3. 2. 2. ______________________
2. NIP.

KEPALA SEKSI PERENCANAAN SISTEM


4
64 PENGENDALIAN BANJIR, AIR BAKU,
3. AIR BERSIH DAN AIR LIMBAH

11

2 4 4 9 6 5
64 3.32 07 65 76 39
3. 3. 2. 2. 3. _____________________
NIP.

12

2
80
1 41 98
9
48
6
26
5
47 2. 2.
9
2. 2. 3.
3.

13
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB

3 55 7 6 0 5
56 7 20 78 62 43 56
3
3. 2. 3. 2. 2. 2. 2.

PETA SITUASI 1:750

- PETA SITUASI
- SKALA 1:750

002
5.00

4.00

3.00

2.00

1.00

POT.1 0.00

Timbunan :
-1.00

Galian :
-2.00

POT. 8
DATUM -3.00

NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT


DI WILAYAH JAKARTA BARAT
JARAK 20 50 (TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
2.902

3.436
JAKARTA BARAT
PEIL EXISTING

KEPALA SUKU DINAS SUMBER DAYA AIR


KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

5.00
______________________
NIP.

4.00
KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
3.00

2.00

_____________________
NIP.
1.00

POT.1 0.00

Timbunan :
-1.00

Galian :
-2.00
POT. 10

DATUM -3.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB

JARAK 50 15
3.444

3.249

3.127
PEIL EXISTING

- CROSS SECTION 1
- SKALA 1:100 CROSS SECTION 1 1:100

003
5.00

4.00

3.00

2.00

1.00

POT.2 0.00

Timbunan :
-1.00

Galian :
-2.00

POT. 10

POT. 11
POT. 7

POT. 8

POT. 9
DATUM -3.00

NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT


JARAK 20 25 25 25 25 DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
2.198

2.265

3.586

3.423

3.324
LOKASI : WADUK DAAN MOGOT
PEIL EXISTING JAKARTA BARAT

KEPALA SUKU DINAS SUMBER DAYA AIR


4.00 4.00 KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)
1.00 2.00 0.70 0.30 3.00 RENCANA WADUK 3.00 0.30 0.70 2.00 1.00

5.00
______________________
TOP RENCANA WADUK MUKA TANAH EKSISTING TOP RENCANA WADUK
NIP.
4.00 ElV. +3.50 ElV. +3.50
GALIAN
KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
3.00 AIR BERSIH DAN AIR LIMBAH
1 1
1 1

3.00
3.00

2.00

RENCANA DASAR WADUK _____________________


1.00 ElV. +0.50 NIP.

POT.2 0.00

Timbunan :
-1.00

Galian :
-2.00
POT. 12

DATUM -3.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB
JARAK 15
2.801

PEIL EXISTING

- CROSS SECTION 2
- SKALA 1:100 CROSS SECTION 2 1:100

004
5.00

4.00

3.00

2.00

1.00

POT.3 0.00

Timbunan :
-1.00

Galian :
-2.00

POT. 10

POT. 11
POT. 7

POT. 8

POT. 9
DATUM -3.00

NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT


JARAK 20 25 25 25 DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
2.210

2.420

2.312

2.914

3.074
LOKASI : WADUK DAAN MOGOT
PEIL EXISTING JAKARTA BARAT

KEPALA SUKU DINAS SUMBER DAYA AIR


4.00 4.00 KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)
1.00 2.00 0.70 0.30 3.00 RENCANA WADUK 3.00 0.30 0.70 2.00 1.00

5.00
MUKA TANAH EKSISTING ______________________
NIP.
TOP RENCANA WADUK GALIAN TOP RENCANA WADUK
4.00 ElV. +3.50 ElV. +3.50
KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
3.00 AIR BERSIH DAN AIR LIMBAH
1 1
1 1
3.00

3.00
2.00

RENCANA DASAR WADUK _____________________


1.00 ElV. +0.50 NIP.

POT.3 0.00

Timbunan :
-1.00

Galian :
-2.00
POT. 11

POT. 13

DATUM -3.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB

JARAK 25
3.074

3.207

PEIL EXISTING

- CROSS SECTION 3
- SKALA 1:100 CROSS SECTION 3 1:100

005
4.00
1.00 2.00 0.70 0.30 3.00

5.00

BARAT TOP RENCANA WADUK


4.00 ElV. +3.50

3.00
1
1

3.00
2.00

1.00

POT.4 0.00

Timbunan :
-1.00
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
Galian : DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
-2.00

POT. 10

POT. 11
TAHUN ANGGARAN : 2018

POT. 9
DATUM -3.00 LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT

JARAK 13 13 25 25 22.7

KEPALA SUKU DINAS SUMBER DAYA AIR


3.444

2.717
3.355

2.914

3.012
KOTA ADMINISTRASI JAKARTA BARAT
PEIL EXISTING SELAKU KUASA PENGGUNA ANGGARAN (KPA)

4.00
______________________
RENCANA WADUK 3.00 0.30 0.70 2.00 1.00 NIP.

KEPALA SEKSI PERENCANAAN SISTEM


5.00 PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

4.00 TOP RENCANA WADUK


ElV. +3.50

3.00 _____________________
1 NIP.
1

3.00
2.00

1.00 RENCANA DASAR WADUK


ElV. +0.50

POT.4 0.00

Timbunan :
-1.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB
Galian :
-2.00

DATUM -3.00

JARAK
2.902

3.793

PEIL EXISTING
CROSS SECTION 4 1:100

- CROSS SECTION 4
- SKALA 1:100 006
4.00
1.00 2.00 0.70 0.30 3.00

5.00

TOP RENCANA WADUK


4.00 ElV. +3.50
BARAT

3.00
1
1

3.00
2.00

1.00

POT.5 0.00

Timbunan :
-1.00

Galian : NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT


-2.00 DI WILAYAH JAKARTA BARAT

POT. 10
POT. 8
(TAHAP 1, PEK.GALIAN TIMBUNAN)
POT. 7

POT. 9
DATUM -3.00 TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
JARAK 20 25 25 25
3.304

3.239

3.313

2.717
PEIL EXISTING KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

4.00
______________________
RENCANA WADUK 3.00 0.30 0.70 2.00 1.00 NIP.

KEPALA SEKSI PERENCANAAN SISTEM


5.00 PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

MUKA TANAH EKSISTING TOP RENCANA WADUK


4.00 ElV. +3.50
GALIAN

3.00 _____________________
1 NIP.
1
3.00

2.00

RENCANA DASAR WADUK


1.00 ElV. +0.50

POT.5 0.00

Timbunan :
-1.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB
Galian :
-2.00
POT. 11

POT. 12
DATUM -3.00

JARAK 25 15
2.766

2.486
PEIL EXISTING
CROSS SECTION 5 1:100

- CROSS SECTION 5
- SKALA 1:100
007
5.00

4.00

3.00

2.00

1.00

POT.6 0.00

Timbunan :
-1.00

Galian :
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
-2.00 DI WILAYAH JAKARTA BARAT

POT. 13
POT. 10

POT. 11

POT. 12
POT. 7

POT. 8

POT. 9
(TAHAP 1, PEK.GALIAN TIMBUNAN)
DATUM -3.00 TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
JARAK 20 25 25 25 25 15

2.563
2.846
3.913

3.407

2.902

3.395

3.265
PEIL EXISTING KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

- CROSS SECTION 6
- SKALA 1:100

______________________
NIP.

5.00
KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
4.00

3.00

_____________________
2.00 NIP.

1.00

POT.7 0.00

Timbunan :
-1.00

Galian :
PENANGGGUNG
-2.00 JAWAB
DIPERIKSA DIGAMBAR
POT. 2

POT. 4

POT. 5

POT. 6
POT. 3

DATUM -3.00

JARAK 22.4 20 25 25 25 9
3.462

2.198

3.299

3.304

3.913

2.003
2.210

PEIL EXISTING

CROSS SECTION 6 1:100


- CROSS SECTION 7 DAN 7
- SKALA 1:100

008
5.00

4.00

3.00

2.00

1.00

POT.8 0.00

Timbunan :
-1.00

Galian :
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
-2.00
DI WILAYAH JAKARTA BARAT

POT. 1

POT. 2

POT. 3

POT. 4

POT. 5

POT. 6
(TAHAP 1, PEK.GALIAN TIMBUNAN)
DATUM -3.00
TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
JARAK 12.5 20 25 25 25 16
3.436

2.265

3.407

2.607
2.420

3.488

3.239
PEIL EXISTING
KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

- CROSS SECTION 8
- SKALA 1:100

______________________
NIP.

5.00
KEPALA SEKSI PERENCANAAN SISTEM
PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
4.00

3.00

_____________________
NIP.
2.00

1.00

POT.9 0.00

Timbunan :
-1.00

Galian :
PENANGGGUNG DIPERIKSA DIGAMBAR
-2.00 JAWAB
POT. 2

POT. 3

POT. 4

POT. 5

POT. 6
DATUM -3.00

JARAK 20 25 25 25
3.586

2.312

3.077

3.313

2.846

PEIL EXISTING

CROSS SECTION 8 1:100


- CROSS SECTION 9 DAN 9
- SKALA 1:100

009
4.00
1.00 2.00 0.70 0.30 3.00

5.00

TOP RENCANA WADUK


4.00 ElV. +3.50

3.00
1
1

3.00
2.00

1.00

POT.10 0.00

Timbunan :
-1.00
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
Galian : (TAHAP 1, PEK.GALIAN TIMBUNAN)
-2.00 TAHUN ANGGARAN : 2018

POT. 2

POT. 3
LOKASI : WADUK DAAN MOGOT
DATUM -3.00
JAKARTA BARAT

JARAK 20 25 25

KEPALA SUKU DINAS SUMBER DAYA AIR


3.355

3.444

2.914
KOTA ADMINISTRASI JAKARTA BARAT
PEIL EXISTING SELAKU KUASA PENGGUNA ANGGARAN (KPA)

SALURAN OUTLET ______________________


NIP.
RENCANA WADUK 3.00 22.65

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
5.00

MUKA TANAH EKSISTING


4.00
GALIAN

_____________________
3.00 NIP.
1
1
3.00

2.00

RENCANA DASAR WADUK


1.00 ElV. +0.50

POT.10 0.00

Timbunan :
PENANGGGUNG
-1.00 JAWAB
DIPERIKSA DIGAMBAR

Galian :
-2.00
POT. 5

POT. 6
DATUM -3.00

JARAK
2.717

2.902
PEIL EXISTING CROSS SECTION 10 1:100

- CROSS SECTION 10
- SKALA 1:100
010
4.00
1.00 2.00 0.70 0.30 3.00

5.00

TOP RENCANA WADUK


4.00 ElV. +3.50

3.00
1
1

3.00
2.00

1.00

POT.11 0.00

Timbunan :
-1.00

Galian : NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT


-2.00 DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)

POT. 3
POT. 2
DATUM -3.00 TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
JARAK 8.3 20 25
3.642

3.324

3.074
PEIL EXISTING KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

4.00 ______________________
NIP.
RENCANA WADUK 3.00 0.30 0.70 2.00 1.00

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
5.00

MUKA TANAH EKSISTING TOP RENCANA WADUK


4.00 ElV. +3.50
GALIAN
_____________________
3.00 NIP.
1
1

3.00
2.00

RENCANA DASAR WADUK


1.00 ElV. +0.50

POT.11 0.00

Timbunan :
PENANGGGUNG DIPERIKSA
-1.00 JAWAB
DIGAMBAR

Galian :
-2.00
POT. 5

POT. 6
DATUM -3.00

JARAK 25

3.395
2.766

PEIL EXISTING CROSS SECTION 11 1:100

- CROSS SECTION 11
- SKALA 1:100
011
4.00
1.00 2.00 0.70 0.30 3.00

5.00

TOP RENCANA WADUK


4.00 ElV. +3.50

3.00
1
1

3.00
2.00

1.00

POT.12 0.00

Timbunan :
-1.00 NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
Galian : (TAHAP 1, PEK.GALIAN TIMBUNAN)
-2.00 TAHUN ANGGARAN : 2018

POT. 2

POT. 3
LOKASI : WADUK DAAN MOGOT
DATUM -3.00 JAKARTA BARAT

JARAK 18.7 20 25

KEPALA SUKU DINAS SUMBER DAYA AIR


KOTA ADMINISTRASI JAKARTA BARAT
3.472

2.801

2.941
SELAKU KUASA PENGGUNA ANGGARAN (KPA)
PEIL EXISTING

4.00 ______________________
NIP.
RENCANA WADUK 3.00 0.30 0.70 2.00 1.00

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH
5.00

MUKA TANAH EKSISTING


TOP RENCANA WADUK
4.00 ElV. +3.50
GALIAN

_____________________
3.00 NIP.
1
1
3.00

2.00

RENCANA DASAR WADUK


1.00 ElV. +0.50

POT.12 0.00

Timbunan :
PENANGGGUNG
-1.00 JAWAB
DIPERIKSA DIGAMBAR

Galian :
-2.00

POT. 5

POT. 6
DATUM -3.00

JARAK 25

2.486

3.265
PEIL EXISTING CROSS SECTION 12 1:100

- CROSS SECTION 12
- SKALA 1:100
012
4.00
1.00 2.00 0.70 0.30 3.00

5.00

TOP RENCANA WADUK


4.00 ElV. +3.50

3.00
1
1

3.00
2.00

1.00

POT.13 0.00

Timbunan :
-1.00

Galian :
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
-2.00 DI WILAYAH JAKARTA BARAT

POT. 3
POT. 2
(TAHAP 1, PEK.GALIAN TIMBUNAN)
DATUM -3.00 TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
JARAK 27.2 20 25
3.563

2.755

3.207
PEIL EXISTING
KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

4.00
______________________
RENCANA WADUK 3.00 0.30 0.70 2.00 1.00 NIP.

KEPALA SEKSI PERENCANAAN SISTEM


5.00 PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

MUKA TANAH EKSISTING


TOP RENCANA WADUK
4.00 GALIAN ElV. +3.50

3.00 _____________________
1 NIP.
1

3.00
2.00

RENCANA DASAR WADUK


1.00 ElV. +0.50

POT.13 0.00

Timbunan :
-1.00
PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB
Galian :
-2.00

POT. 6
POT. 4

DATUM -3.00

JARAK 25

2.563
2.786

PEIL EXISTING
CROSS SECTION 13 1:100

- CROSS SECTION 13
- SKALA 1:100
013
4.00
3.00 0.30 0.70 2.00 1.00

A B
GUARD RAIL

1.00
RENCANA TANGGUL
DASAR WADUK 1:1 TOP RENCANA WADUK ElV. +3.50

0.30
+0.50 +3.50

0.50
0.50
0.00
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT

0.50
(TAHAP 1, PEK.GALIAN TIMBUNAN)

3.00
KEMIRINGAN 1:1 KEMIRINGAN 1:1 MUKA TANAH EKSISTING
TAHUN ANGGARAN : 2018

1.00
LOKASI : WADUK DAAN MOGOT
DASAR TANGGUL JAKARTA BARAT
ElV. +0.50

0.50
0.30
KEPALA SUKU DINAS SUMBER DAYA AIR
0.60 2.40 0.60 2.40 0.60 KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

3.00 3.00

- TAMPAK DEPAN
- DENAH TYPICAL TANGGUL - Skala 1 : 100
______________________
- Skala 1 : 100 NIP.

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

4.00
4.00
0.30 0.70 2.00 1.00
0.30 0.70 2.00 1.00
_____________________
GUARD RAIL NIP.
GUARD RAIL
MUKA TANAH EKSISTING
MUKA TANAH EKSISTING
0.30

GALIAN

0.30
RENCANA TANGGUL GALIAN RENCANA TANGGUL
ElV. +3.50
ElV. +3.50
1:1
1:1
0.50 0.50 0.50 0.50 0.50

0.50 0.50 0.50 0.50 0.50


1
1
1
3.00

3.00
PENANGGGUNG DIPERIKSA DIGAMBAR
DASAR TANGGUL JAWAB
DASAR TANGGUL
ElV. +0.50
ElV. +0.50
1.00

1.00
0.80
0.80

- POTONGAN A - POTONGAN B
- Skala 1 : 100 - Skala 1 : 100
DETAIL TYPICAL 1:100
TANGGUL

013
0.30 3.00

4D13
0.30
1
1

0.30
3.00

4D13

0.40
5D13
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018

0.30
4D13
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT
4D13
0.70

5D13 0.15 0.30 0.15

0.60
0.30

KEPALA SUKU DINAS SUMBER DAYA AIR


KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)
0.30

0.60
- DETAIL PONDASI
- Skala 1 : 20
- DETAIL PENULANGAN
- ______________________
Skala 1 : 50 NIP.

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

_____________________
NIP.

4D13 4D13
0.30

0.30

PENANGGGUNG DIPERIKSA DIGAMBAR


JAWAB

0.30
0.30

- DETAIL KOLOM - DETAIL BALOK - ISOMETRI PONDASI


- Skala 1 : 10 - Skala 1 : 10 - NTS

DETAIL PENULANGAN 1:10


TANGGUL

015
+3.50
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
D C (TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT

KEPALA SUKU DINAS SUMBER DAYA AIR


KOTA ADMINISTRASI JAKARTA BARAT
SELAKU KUASA PENGGUNA ANGGARAN (KPA)

+2.50

+0.50 B ______________________
NIP.

KEPALA SEKSI PERENCANAAN SISTEM


PENGENDALIAN BANJIR, AIR BAKU,
AIR BERSIH DAN AIR LIMBAH

_____________________
+3.50 NIP.

PENANGGGUNG DIPERIKSA DIGAMBAR


JAWAB

- DENAH SALURAN OUTLET


- Skala 1 : 100

DENAH SALURAN 1:100


OUTLET

016
22.65
1.00 2.00

KONSTRUKSI BATU KALI


KONSTRUKSI BATU KALI 0.70 ELV. +3.50 1PC:3PS
PLAT BETON T=12 cm
ElV. +2.80

1.00

1.00
ElV. +2.50
SLOOP 0.001

PASIR URUG T=5cm

2.00
LANTAI KERJA T=5cm
DASAR WADUK
ElV. +0.50

1.00
- POTONGAN A
- Skala 1 : 100
0.80
NAMA KEGIATAN : PEMBANGUNAN WADUK DAAN MOGOT
DI WILAYAH JAKARTA BARAT
(TAHAP 1, PEK.GALIAN TIMBUNAN)
TAHUN ANGGARAN : 2018
LOKASI : WADUK DAAN MOGOT
JAKARTA BARAT

22.65
1.00 2.00
KEPALA SUKU DINAS SUMBER DAYA AIR
KOTA ADMINISTRASI JAKARTA BARAT
KONSTRUKSI BATU KALI SELAKU KUASA PENGGUNA ANGGARAN (KPA)
PINTU AIR
KONSTRUKSI BATU KALI 0.70 ELV. +3.50 1PC:3PS
PLAT BETON T=12 cm
1.00

1.00
ElV. +2.50
SLOOP 0.001
______________________
NIP.

PASIR URUG T=5cm


2.00

LANTAI KERJA T=5cm


KEPALA SEKSI PERENCANAAN SISTEM
DASAR WADUK PENGENDALIAN BANJIR, AIR BAKU,
ElV. +0.50 AIR BERSIH DAN AIR LIMBAH
1.00

- POTONGAN B
- Skala 1 : 100

0.80 _____________________
NIP.

5.70

0.30 5.10 0.30

4.10 0.50 0.50

5.70

0.30 5.10 0.30


PENANGGGUNG DIPERIKSA DIGAMBAR
JAWAB

ElV. +3.50 ElV. +3.50

TANAH ASLI
TANAH ASLI
ElV. +2.80
1.00

1.00

ElV. +2.50 ElV. +2.50

0.30
MERCU
KONSTRUKSI BATU KALI
0.20

0.20
1PC:3PS KONSTRUKSI BATU KALI
0.50

0.50

1PC:3PS

0.60 5.10 0.60 0.60 5.10 0.60


POTONGAN A, B, C & D 1:100
6.30 6.30 SALURAN OUTLET
PASIR URUG T=5cm
PASIR URUG T=5cm
LANTAI KERJA T=5cm
LANTAI KERJA T=5cm

- POTONGAN C
- Skala 1 : 75 - POTONGAN D
- Skala 1 : 75
017