Anda di halaman 1dari 57

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL SUMBER DAYA AIR


BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
SATKER OPERASI DAN PEMELIHARAAN SDA PEMALI JUANA
Alamat : Jl. Brigjend. S. Sudiarto, No. 375 Telp. (024) 6720516
Fax. (024) 6720516, Semarang

DISKUSI LAPORAN AKHIR


STUDY EARLY WARNING SISTEM BANJIR

PT. ADIGUNA MITRA TERPERCAYA CONSULTANTS


Penyedia Jasa Konsultansi : Studi, Survey, Investigasi, Kelayakan, Design, Supervisi, Manajemen, dan Pelatihan
Kantor / Studio : Griya Taman Asri A 420 / A 320 Donoharjo, Ngaglik, Sleman,

Telp./Fax (0274) 869816, E-mail:amt_consutants@yahoo.co.id


BAB 1 PENDAHULUAN

BAB 2 GAMBARAN UMUM


LOKASI

BAB 3 INVENTARISASI DATA

SUSUNAN
BAB 4 METODOLOGI

LAPORAN BAB 5 ANALISIS HIDROLOGI

BAB 6 ANALISIS HIDROLIKA

BAB 7 PETA RAWAN BANJIR

BAB 8 SOP EWS BANJIR


POS HIDROLOGI
SISTEM SUNGAI
SEMARANG BARAT
EARLY WARNING SYSTEM
420000.000000 425000.000000 430000.000000 435000.000000 440000.000000 445000.000000

PETA TITIK KONTROL BANJIR


SISTEM SUNGAI SEMARANG BARAT EXISTING
.000000

9235000.000000
Lokasi Titik Kontrol Banjir di Sistem Sungai
Semarang Barat
.000000

9230000.000000
BD. PLUMBON Lokasi Rawan
Bd. Plumbon
BD. SIMONGAN
Titik Kontrol Nama Sungai
"
h Bd. Simongan Banjir
"
h
Bd. Plumbon Ds. Mangunharjo Plumbon
.000000

9225000.000000
Bd. Simongan Tanah Mas BKB

Bangunan Prasarana Pengendalian


Semarang
Banjir di Sistem Sungai Semarang Barat
.000000

9220000.000000
Barat

Jenis Bangunan Nama Fungsi


Mengalirkan debit
.000000

9215000.000000
Banjir Kanal
Floodway banjir 50 tahunan (790
Barat
m3/det)
Waduk Jatibarang Pengendalian Banjir
Saluran
.000000

9210000.000000
K.Semarang,
drainase Drainase perkotaan
k. Baru, k. Asin
perkotaan
Banger,
Polder Drainase perkotaan
Semarang
.000000

9205000.000000

Stasiun Semarang
Drainase perkotaan
pompa Tengah
INSET :

Komplek Tanah
Mas, K.Semarang, k. Drainase perkotaan
420000.000000 425000.000000 430000.000000 435000.000000 440000.000000 445000.000000
Baru, pompa Kartini
LEGENDA :

²
"
h Titik Kontrol Banjir Batas_Kabupaten
Pintu banjir Drainase kota Drainase perkotaan
Batas_WS_Jratunseluna

Sungai
Sistem Sungai SKALA : KEMENTERIAN PEKERJAAN UMUM
Semarang Barat DAN PERUMAHAN RAKYAT
0 70 140 280 420 560
Kilometers DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
Sumber: BBWS Pemali Juana, 2017
POS HIDROLOGI
SISTEM SUNGAI
DOLOK PENGGARON
EARLY WARNING SYSTEM EXISTING
430000.000000 435000.000000 440000.000000 445000.000000 450000.000000 455000.000000

PETA TITIK KONTROL


SISTEM SUNGAI DOLOK PENGGARON

.000000

9240000.000000
9240000
Lokasi Titik Kontrol Banjir di Sistem

.000000

9235000.000000
9235000
Sungai Dolok Penggaron _
^
Genuk

_ Trimulya
^

.000000

9230000.000000
Lokasi Rawan

9230000
Titik Kontrol Nama Sungai _
^
Banjir Sawah Besar

Kel. Genuk,
Penggaron

.000000

9225000.000000
Bd. Trimulyo,

9225000
Pucanggading Kel. Sawah
BKT, Babon BD. PC.GADING
Bd. Pucang Gading
Besar "
h
Bd. Kebon

.000000

9220000.000000
Penggaron BD.Banjir
KB. Kebun
BATURBatur

9220000
Bd. Pengendali
Batur "
h
Dolok Penggaron
.000000

9215000.000000
9215000

.000000

9210000.000000
9210000

INSET :

430000.000000 435000.000000 440000.000000 445000.000000 450000.000000 455000.000000

LEGENDA :

²
"
h Titik Kontrol Banjir _
^ Lokasi Rawan Banjir

Batas_Kabupaten

Batas WS Jratunseluna

Sungai SKALA : KEMENTERIAN PEKERJAAN UMUM


0 70 140 280 420 560
DAN PERUMAHAN RAKYAT
Sistem Sungai Dolok Penggaron Kilometers DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
EARLY WARNING SYSTEM EXISTING
Bangunan Prasarana Pengendalian Banjir di Sistem
Sungai Dolok Penggaron

Jenis Bangunan Nama Fungsi Keterangan

Mengalirkan debit banjir kota


Banjir Kanal
Semarang, sungai2 kecil, k.
Timur (BKT)
Penggaron & k. Dolok

Mengalirkan debit banjir


Dombo Sayung k.Penggaron 200 m3/dt dari total
442 m3/dt
Floodway
Mengalirkan debit banjir dari
Kebon Batur k.Dolok masuk BKT sebesar 50
m3/dt.

Mengalirkan debit banjir sebesar Belum


Dolok
320 m3/dt (Q25) dilaksanakan

Rencana aliran ke BKT


Membagi banjir dari k.Penggaron ditutup setelah
Bendung Pucanggading
& k. Dolok ke BKT dan k. Babon floodway Dolok
dilaksanakan

Dam Pengendali Membagi Banjir dari Kali


Dolok -Penggaron
Banjir Pengaron Ke Sungai Dolok

Sumber: BBWS Pemali Juana, 2017


POS HIDROLOGI
SISTEM SUNGAI
JRAGUNG TUNTANG
EARLY WARNING SYSTEM EXISTING

Bangunan Prasarana Pengendalian


Banjir di Sistem Sungai Jragung Tuntang

Jenis Bangunan Nama Fungsi Keterangan

Pengendali banjir S.
Waduk Rawapening Waduk alam
Tuntang (bd.Jelok)

Melimpaskan banjir di Daerah retensi


Spillway Ngroto di s. Tuntang ds.Ngroto ke daerah banjir sudah
retensi banjir menjadi pemukiman

Sistem pengendalian
Sistem drainase KB 1, KB 15 dll
banjir
Bendung Guntur Pengatur banjir
Wonokerto Pengatur banjir
Bendung Jajar Pengatur banjir
Karet Kumpulan Pengatur banjir
Bolang Pengatur banjir

Dam Pengendali Membagi Banjir


Ploso
Banjir Sungai Jragung
Sumber: BBWS Pemali Juana, 2017
EARLY WARNING SYSTEM
420000.000000 440000.000000 460000.000000

EXISTING
PETA TITIK KONTROL BANJIR
SISTEM SUNGAI JRAGUNG TUNTANG

Lokasi Titik Kontrol Banjir di

.000000

9240000.000000
9240000
Sistem Sungai Jragung Tuntang
Lokasi Rawan
Titik Kontrol Nama Sungai Guntur
Banjir _
^
Karangawes Jragung
Bd. Jragung
KB 1, KB 15, Karangawen
Guntur Kemiri

.000000

9220000.000000
_
^
Cabean BD. JRAGUNG ^
_

9220000
BD. GLAPAN
Papanrejo
_ Ngroto
^
Ds. Papanrejo, " _
^
Bd. Glapan Tuntang h
Ds. Buyaran Bd. Jragung "
h
Bd. Glapan

Jragung Tuntang
Lokasi Monitoring Pengamatan
Banjir di Sistem Sungai Jragung

.000000

9200000.000000
9200000
Tuntang
N
LOKASI SIAGA 3 SIAGA 2 SIAGA 1
O
Elevasi air di muka Elevasi air di muka Elevasi air di muka
bendung mencapai bendung mencapai bendung mencapai
.000000

9180000.000000
INSET :

1 Bd. Glapan ± 17.70 m waking ±17.90 m waking ±19.00 m waking


9180000

tanggul ± 2.50 - tanggul ± 1.70 m - tanggul ± 0.40 m -


±1.80 m ± 0.90 m ± 0.00 m
Tanggul
Waking tanggul Waking tanggul
420000.000000 440000.000000 460000.000000

Sungai Waking tanggul


2 1.50 m 1.00 m LEGENDA :
daerah 0.60 m – 0.00 m

²
– 1.00 m – 0.60 m "
h Titik Kontrol Banjir Batas_Kabupaten
banjir)
_ Daerah Rawan Banjir
^ Batas WS Jratunseluna

Sungai
Sistem Sungai SKALA : KEMENTERIAN PEKERJAAN UMUM
Sumber: BBWS Pemali Juana, 2017 Jragung Tuntang
0 70 140 280 420 560
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
Kilometers
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
POS HIDROLOGI SISTEM SUNGAI SELUNA
EARLY WARNING SYSTEM
N
LOKASI SIAGA 3 SIAGA 2 SIAGA 1
O
Elevasi air waduk

EXISTING
Bendungan Elevasi air waduk Elevasi air waduk
1 mencapai ± 90.00 m
Kedungombo mencapai ± 90.00 m mencapai > 90.50 m
s/d 90.50 m
Elevasi air di muka Elevasi air di muka Elevasi air di muka
430000.000000 460000.000000 490000.000000 520000.000000 2 Bd. Sidorejo
550000 .000000
bendung mencapai ± bendung mencapai ± bendung mencapai >
39.70 m s/d 39.85 m 39.85 m s/d 40.20 m 40.20 m
PETA TITIK KONTROL BANJIR Elevasi air di muka Elevasi air di muka Elevasi air di muka
.000000

9300000.000000
3 Bd. Sedadi bendung mencapai ± bendung mencapai ± bendung mencapai >
SISTEM SUNGAI SELUNA
9300000

25.83 m s/d 26.40 m 26.40 m s/d 26.93 m 26.93 m


Elevasi air di muka KEMENTERIAN PEKERJAAN UMUM
Elevasi air di muka
DAN PERUMAHAN RAKYAT
Elevasi air di muka
4 Bd. Dumpil bendung mencapai ± DIREKTORAT
bendung mencapai
JENDERAL SUMBER DAYA±AIR bendung mencapai
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
48.00 m s/d 48.50 m 48.50 m s/d 49.00 m > 49.00 m
.000000

9280000.000000
Elevasi air di Elevasi air di
LEGENDA :
9280000

downstream bendung " h downstream bendung


Lokasi Pengamatan Banjir Elevasi air di muka
± 14.40 m s/d 15.25 m ± 15.25 m s/d 15.70 m bendung mencapai >
5 Bd. Klambu Batas_Kabupaten
waking tanggul 1.50 m waking tanggul 1.00 m 40.20 m (debit air
–1.00 m (debit air 400 – 0.60 m (debit air 500
Batas_WS_Jratunseluna
diatas 550 m3)
.000000

9260000.000000
s/d 500 m3) s/dSungai
550 m3)
9260000

Seluna  Pintu-pintu Juana


 Pintu-pintu Juana  Pintu-pintu Juana
buka s/d 0.20 m ;
tutup buka s/d 0.20 m
0.40 m
Seluna 6 Bd. Wilalung
 Pintu Wulan buka  Pintu Wulan buka
 Pintu Wulan buka
.000000

9240000.000000
penuh penuh
penuh
9240000

 Waking tanggul 1.50  Waking tanggul 1.00


PengendaliBD. WILALUNG
Banjir Wilalung  Waking tanggul 0.60
"
h m - 1.00 m m – 0.60 m
m – 0.00 m m
Pos Lusi Waking tanggul 6.00 m Waking tanggul 7.00 m Waking tanggul 8.00 m
BD.
Bd. Klambu KLAMBU 7
"
h Menduran – 6.99 m – 7.99 m –10.3 m
.000000

9220000.000000
Tanggul
Bd. Dumpil
9220000

Bd. Glapan "


h 8 Sungai Waking tanggul 1.50 m Waking tanggul 1.00 m Waking tanggul 0.60 m
"
h BD.
Bd. Sedadi SEDADI – 1.00 m – 0.60 m – 0.00 m
daerah banjir)
"
h
INSET :
BD.
Bd. Sidorejo SIDOREJO
.000000

9200000.000000
"
h
Bd. Kedung Ombo
9200000

"
h

BD. KD.OMBO

²
.000000

9180000.000000
9180000

SKALA :

0 125 250 500 750 1,000


Kilometers
430000.000000 460000.000000 490000.000000 520000.000000 550000.000000

Sumber: BBWS Pemali Juana, 2017


INVENTARISASI ANALISIS
MULAI
DATA HIDROLOGI

ANALISIS HUJAN ANALISIS


RENCANA DISTRIBUSI HUJAN

ANALISIS
HIDROLIKA 2D

PENGGAMBARAN
PETA BANJIR

PENYUSUNAN SOP
EWS

SELESAI
Hujan
rencana
420000.000000 440000.000000 460000.000000

Jungsemi
Bungo !
PETA POLYGON THIESSEN
!
Mijen Banaran
SISTEM SUNGAI JRAGUNG TUNTANG !

Gajah I
.000000

9240000.000000
!
9240000

!
Maritim SMG

SimonganKalisari
!! !
Brumbung
Distribusi Hujan
Pucang Gading
!
.000000

9220000.000000
!
9220000

Kepoh
! !
Kramat

Ungaran
!

Jragung Tuntang
100%
.000000

9200000.000000

90%
9200000

Rawa Pening Klimatologi


!

80%
Model Hec-HMS
Komulatif Hujan (%)

70%
.000000

9180000.000000

INSET :
9180000

60%
420000.000000 440000.000000 460000.000000

LEGENDA :
50%
²
Batas_Kabupaten

Batas WS Jratunseluna

40%
Sungai
SKALA : KEMENTERIAN PEKERJAAN UMUM
Sistem Sungai Jragung Tuntang DAN PERUMAHAN RAKYAT
0 70 140 280 420 560
Kilometers DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA

30%

20%

10%

0%
0% 20% 40% 60% 80% 100%
Komulatif Waktu (%)
PEMBUATAN TERRAIN
 DEM + DATA ANALISIS HIDROLIKA
PENGUKURAN SUNGAI MODEL HEC-RAS 2D
INPUT
HYDROGRAPH
DEBIT + PASUT

RUNNING MODEL
PENGGAMBARAN PETA
100%

90%

80%
PENENTUAN SOP EWS
70%
Komulatif Hujan (%)

60%
Distribusi Hujan Rencana 50th
50% 60.00
40%
54.21
50.00
30%
40.00 35.59 36.94

Hujan (mm)
20%
30.00
10%

0% 20.00
0% 20% 40% 60% 80% 100%
10.00
8.26
Komulatif Waktu (%)
0.00
Distribusi hujan 1 2 3 4
sistem sungai Dolok Penggaron Jam Ke

Hujan rencana sesuai Distribusi Hujan Rencana 100th


70.00
Siaga hijau dengan kala ulang desain 57.42
60.00
saluran
50.00
37.70 39.13
Hujan (mm)

Siaga Hujan rencana diatas kala 40.00

kuning ulang siaga hijau 30.00

20.00
Siaga 8.75
Hujan rencana diatas kala 10.00
merah ulang siaga kuning 0.00
1 2 Jam Ke 3 4
SISTEM SUNGAI
SEMARANG BARAT

100%

90%

80%

70%

60%

50%
Komulatif Hujan

40%

30%

20%

10%

0%
0% 20% 40% 60% 80% 100%
Komulatif Waktu

Debit Berbagai Kala Ulang (m3/dt)


Sungai
2th 5th 10th 20th 50th 100th
Plumbon (Bd.
83.10 126.50 152.90 176.40 232.50 222.30
Plumbon)
Bringin (Pertemuan
113.70 172.00 207.50 238.90 313.60 300.00
2 anak sungai)
Silandak (Rel KA) 50.80 78.30 95.20 110.20 127.50 139.50
Siangker (Rel KA) 18.80 28.60 34.50 39.70 45.80 50.00
BKB (Bd. Simongan) 374.40 576.90 702.10 814.80 1100.00 1047.00
KALIBRASI MODEL HEC-HMS SISTEM SUNGAI SEMARANG BARAT

8-10 NOPEMBER 2009 KALIBRASI MODEL


800
700 1. MENGGUNAKAN DATA JAM-
600 JAMAN AWLR PANJANGAN
DAN STA HUJAN KLIMATOLOGI
Debit m3/dt

500
400
SEMARANG
300
200
2. KALIBRASI DILAKUKAN UNTUK
100
0
DATA TAHUN 2009,
DIVERIFIKASI DATA TAHUN

17:00
07:00
09:00
11:00
13:00
15:00
17:00
19:00
21:00
23:00
01:00
03:00
05:00
07:00
09:00
11:00
13:00
15:00

19:00
21:00
23:00
01:00
03:00
05:00
2006
27-28 JANUARI 2006
140

120 hms
pengukuran
100
Debit m3/dt

80

60

40

20

0
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00:00
Waktu
430000.000000 435000.000000 440000.000000 445000.000000 450000.000000 455000.000000
SISTEM SUNGAI DOLOK PENGGARON
PETA POLYGON THIESSEN
SISTEM SUNGAI DOLOK PENGGARON
.000000

9240000.000000
9240000

.000000

9235000.000000
9235000

Maritim SMG
!
.000000

9230000.000000
9230000

Kalisari
100%
Simongan
!! Brumbung
! 90%
.000000

9225000.000000
9225000

80%
Pucang Gading
!

Komulatif Hujan (%)


Dolok Penggaron 70%
.000000

9220000.000000
9220000

60%
50%
.000000

9215000.000000
9215000

40%
30%
Ungaran
.000000

9210000.000000

!
9210000

INSET :
20%
10%
0%
.000000 .000000 .000000 .000000 .000000 .000000
430000 435000 440000 445000 450000 455000

LEGENDA :
0% 20% 40% 60% 80% 100%

²
Batas_Kabupaten

Batas WS Jratunseluna
Komulatif Waktu (%)
Sungai
Sistem Sungai SKALA : KEMENTERIAN PEKERJAAN UMUM
Dolok Penggaron DAN PERUMAHAN RAKYAT
0 70 140 280 420 560
Kilometers DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA

Debit Berbagai Kala Ulang (m3/dt)


NO Sungai
2th 5th 10th 20th 50th 100th

1 Penggaron 340.20 427.80 473.60 514.40 592.00 633.80

2 BKT 122.00 155.60 173.90 190.30 221.60 238.50


3 Babon 98.60 116.40 125.40 133.60 149.90 159.10

4 Dombo Sayung 132.40 125.60 144.70 156.20 179.30 192.00


5 Dolok 61.70 97.60 117.10 134.70 168.20 186.30
420000.000000 440000.000000 460000.000000 SISTEM SUNGAI JRAGUNG TUNTANG
Jungsemi
Bungo !
PETA POLYGON THIESSEN
!
Mijen Banaran
SISTEM SUNGAI JRAGUNG TUNTANG !

Gajah I
.000000

9240000.000000
!
9240000

100%
Maritim SMG
! 90%
SimonganKalisari Brumbung
!! !
80%
Pucang Gading
!
.000000

9220000.000000
!
9220000

KOMULTAIF HUJAN(%)
!
Kepoh
!
70%
Kramat

Ungaran 60%
!

Jragung Tuntang 50%


.000000

9200000.000000
9200000

Rawa Pening Klimatologi 40%


!

30%

20%
.000000

9180000.000000

INSET :
9180000

10%

420000.000000 440000.000000 460000.000000


0%
LEGENDA : 0% 20% 40% 60% 80% 100%

²
Batas_Kabupaten

Batas WS Jratunseluna

Sungai KOMULATIF WAKTU(%)


SKALA : KEMENTERIAN PEKERJAAN UMUM
Sistem Sungai Jragung Tuntang DAN PERUMAHAN RAKYAT
0 70 140 280 420 560
Kilometers DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA

Debit Berbagai Kala Ulang (m3/dt)


Sungai
2th 5th 10th 20th 50th 100th

Jragung (Bd. Jragung) 112.5 183.6 235.8 285.7 354.3 406.7

1182.
Glapan (Bd. Glapan) 331.7 537.1 688.1 832.5 1031.1
9

Rowosari 29.1 57.8 80.6 103.3 135.4 160.5


00.000000 460000.000000 490000.000000 520000.000000 550000.000000

PETA POLYGON THIESSEN

9300000.000000
SISTEM SUNGAI SELUNA

SISTEM SUNGAI SELUNA


KEMENTERIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA

9280000.000000
Tayu Wetan LEGENDA :
! Batas_Kabupaten

Batas_WS_Jratunseluna

Sungai
Trangkil
100%

9260000.000000
! Wedarijaksa Rembang
!
KaranggayamLangsePati ! Kaliori!
Bungo !!Cendono Dawe
!! Juana Jakenan
!
! ! ! Sumber
Jungsemi ! Kudus
!Mijen Banaran
!
! !
Sulang
!
90%
Gajah I Cabean

9240000.000000
! Mrayun
! Kayen Greneng Tempuran!
Maritim SMG
! ! ! 80%
! Seluna
onganKalisari Brumbung
!
! !
Pucang Gading Kedungwaru 70%

9220000.000000
! Wolo
! Wedoro
Kepoh !
!! !Purwodadi
! !Kramat
Ungaran Sedadi Pojok

KOMULTAIF HUJAN(%)
! ! Semen
!
! !
!
60% INSET :
Simo
!

9200000.000000
Rawa Pening Klimatologi
! 50%

40%
²
9180000.000000
SKALA :

30% 0 125 250 500 750 1,000


Kilometers
00.000000 460000.000000 490000.000000 520000.000000 550000.000000

20%

10%

0%
0% 20% 40% 60% 80% 100%
KOMULATIF WAKTU(%)

5th 10th 20th 50th 100th

Serang 481.4 635.4 818.5 1122 1397.1

Wulan 536.4 701.8 899.1 1224.1 1519.3

Juana 351.6 488.7 655.9 924.2 1180.3


MODEL HEC-RAS 2D

SISTEM SUNGAI JRAGUNG TUNTANG SISTEM SUNGAI SELUNA

1. Sungai Jragung, mulai dari Bendung 1. Sungai Lusi, mulai dari hulu sampai
Jragung sampai dengan muara. Data dengan Pintu Air Wilalung.
yang digunakan data desain sungai
2. Sungai Juana, mulai dari Pintu Air
2. Sungai Tuntang, mulai dari Bendung Wilalung sampai dengan muara.
Glapan sampai dengan muara.
3. Sungai Wulan, mulai dari Pintu Air
Wilalung sampai dengan muara.
MODEL HEC-RAS
SISTEM SUNGAI SEMARANG BARAT SISTEM SUNGAI DOLOK PENGGARON

1. Sungai Plumbon, mulai dari Bendung Plumbon 1. Banjir KanaL Timur, mulai dari Bendung
sampai dengan muara Pucanggading sampai dengan muara. Untuk
Banjir Kanal Timur digunakan data gambar
2. Sungai Bringin, mulai dari pertemuan Sungai
desain dikarenakan saat ini normalisasi
Bringin dengan Jalan Tol Semarang-Batang
sungai sedang dilaksanakan.
sampai dengan muara
2. Sungai Babon, mulai dari Bendung
3. Sungai Silandak
Pucanggading sampai dengan muara.
4. Sungai Siangker
3. Sungai Dombo Sayung, mulai dari Bendung
5. Banjir Kanal Barat, mulai dari Tugu Suharto Pucanggading sampai dengan muara.
dampai dengan muara
4. Sungai Penggaron

5. Sungai Dolok, mulai dari Bendung Barang


sampai dengan muara.
BD. WILALUNG

BD. BD. KLAMBU


PLUMBON
AWLR
BRINGIN BD. GLAPAN
BD. PC.GADING
BD. KEBONBATUR
BD. JRAGUNG
BD. WILALUNG

BD. BD. KLAMBU


PLUMBON
AWLR
BRINGIN BD. GLAPAN
BD. PC.GADING
BD. KEBONBATUR
BD. JRAGUNG
BD. WILALUNG

BD. BD. KLAMBU


PLUMBON
AWLR
BRINGIN BD. GLAPAN
BD. PC.GADING Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
BD. KEBONBATUR
BD. JRAGUNG
Jl. Raya
Plumbon Bd. Plumbon 30 menit
mangkang
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
BKB Bd. Simongan Tanah Mas 30 menit
BD. WILALUNG

BD. BD. KLAMBU


PLUMBON
AWLR
BRINGIN BD. GLAPAN
BD. PC.GADING Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
BD. KEBONBATUR
BD. JRAGUNG
Jl. Raya
Plumbon Bd. Plumbon 30 menit
mangkang
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
BKB Bd. Simongan Tanah Mas 30 menit
BD. WILALUNG

BD. BD. KLAMBU


PLUMBON
AWLR
BRINGIN BD. GLAPAN
BD. PC.GADING
BD. KEBONBATUR Lokasi Rawan
BD. JRAGUNG Sungai Titik Kontrol Waktu Rambat
Banjir/Titik Kontrol
BKT Bd. Pucanggading Sawah Besar 2 jam
Karangroto,
Babon Bd. Pucanggading 4 jam
Sayung
Dombo
Bd. Pucanggading Sayung 3 jam
Sayung
Dolok Bd. Kebonbatur Tambakroto 1 jam
Stasiun OPERATOR /
Pengamat Hujan PENJAGA ALAT

BBWS PEMALI
JUANA

Data Elevasi /
Tampungan Waduk

Stasiun
PUSDATARU
Pengamat Aliran
WALIKOTA/BUPATI
BPBD
RAMIL
CAMAT
Pusat Pengendali/ LURAH
Analisis Data

Keterangan
Daerah Rawan = komunikasi data
Genangan
Banjir = penyampaian
peringatan dini

Skema Sistem Peringatan Dini Banjir


Data TMA dan hujan realtime bisa diakses secara
langsung di web BBWS Pemali Juana
Kapasitas S.
Plumbon : kala OPERATOR /
ulang 5th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : 72 mm
 PUSDATARU
B0DRI KUTO,
Hujan : 117 mm PROV. JATENG
 WALIKOTA
SEMARANG
Hujan : 131 mm
 BPBD KOTA
SEMARANG
 RAMIL
 CAMAT
Sungai Titik Kontrol
Lokasi Rawan Waktu  LURAH
Banjir/Titik Kontrol Rambat

Jl. Raya
Plumbon Bd. Plumbon 30 menit
mangkang
Kapasitas S.
Bringin: kala ulang OPERATOR /
5th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : GAMBAR NANTI PUSDATARU

Hujan :
DIGANTI B0DRI KUTO,
PROV. JATENG
MASIH DICARI WALIKOTA
SEMARANG
Hujan :
KAPASITAS SUNGAI
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S. BKB:
kala ulang 50th OPERATOR /
PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : 147
mm  PUSDATARU
B0DRI KUTO,
Hujan : 158
mm PROV. JATENG
 WALIKOTA
Hujan > 158 SEMARANG
mm  BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S. BKT:
kala ulang 50th OPERATOR /
PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : 55 mm
 PUSDATARU
B0DRI KUTO,
Hujan : 58 mm PROV. JATENG
 WALIKOTA
SEMARANG
Hujan > 58 mm
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S. BKT:
kala ulang … OPERATOR /
PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : …mm GAMBAR NANTI PUSDATARU

Hujan : … mm
DIGANTI B0DRI KUTO,
PROV. JATENG
MASIH DICARI WALIKOTA
SEMARANG
Hujan > …mm
KAPASITAS SUNGAI
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S.
Jragung: kala OPERATOR /
ulang 50th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : 43 mm
 PUSDATARU
B0DRI KUTO,
Hujan : 48 mm PROV. JATENG
 WALIKOTA
SEMARANG
Hujan > 48 mm
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S.
Tuntang: kala OPERATOR /
ulang 50th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : … mm GAMBAR NANTI PUSDATARU

Hujan : ….mm
DIGANTI B0DRI KUTO,
PROV. JATENG
MASIH DICARI WALIKOTA
SEMARANG
Hujan ….mm
KAPASITAS SUNGAI
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S.
Wulan: kala ulang OPERATOR /
50th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : 25mm GAMBAR NANTI PUSDATARU

Hujan : 30 mm
DIGANTI B0DRI KUTO,
PROV. JATENG
HASILNYA KECIL
 WALIKOTA
SEMARANG
Hujan >30 mm
HUJANNYA?  BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
Kapasitas S.
Juana: kala ulang OPERATOR /
….th PENJAGA ALAT

BBWS PEMALI
AWLR BRINGIN JUANA
(RENCANA)

Hujan : …mm GAMBAR NANTI PUSDATARU

Hujan : … mm
DIGANTI B0DRI KUTO,
PROV. JATENG
MASIH DICARI WALIKOTA
SEMARANG
Hujan …mm
KAPASITAS SUNGAI
 BPBD KOTA
SEMARANG
 RAMIL
Lokasi Rawan Waktu
Sungai Titik Kontrol
Banjir/Titik Kontrol Rambat
 CAMAT
 LURAH
AWLR Bringin
(rencana di Jl. Raya
Bringin 2 jam
pertemuan 2 mangkang
sungai)
OPERATOR

MELAPORKAN TERJADI
MASALAH

TIM PIKET BANJIR PEMANTAUAN


BBWS PEMALI JUANA LAPANGAN

ALUR KOMUNIKASI
DARURAT BANJIR
PEMBERITAHUAN KE
PUSDATARU
INSTANSI TERKAIT

WALIKOTA/BUPATI

BPBD

RAMIL

CAMAT TERKAIT

PENINGKATAN
PEMANTAUAN LURAH TERKAIT

TMA AWAS PEMBUATAN FORM A

MENETAPKAN KONDISI DARURAT


PENGIRIMAN BAHAN
& MEMUTUSKAN UNTUK
BANJIRAN
MELAKSANAKAN PENGUNGSIAN
Alur Informasi
PUSDATARU PROP. JATENG BBWS PEMALI JUANA
Jl. Imam Bonjol No. 1 F Semarang,
Jl. Brigjen S.Sudiarto No.375,
50141
Semarang, Jawa Tengah, (024)
024 – 3519186, 3519904 6723070
024 – 3562293 (Posko Aju) Nomor Posko - (024) 6720516

Twitter : @bpbdjateng Twitter : @bbwspemalijuana

Email : bpbd_jateng@yahoo.com
Email : sekretariat@bbwspemalijuana
poskoaju.bpbdjateng@gmail.com
.com
Web: http://www.bpbdjateng.info

Frekuensi radio berada pada


frekuensi :
154,650 Mhz (Repeater)
143.780 Mhz (wilayah seluna) dan
149.420 Mhz (wilayah jragung
tuntang)
Alur Informasi
PUSDATARU PROP. JATENG PUSDATARU SELUNA
Jl. Imam Bonjol No. 1 F Semarang,
Jl. Brigjen S.Sudiarto No.375,
50141
Semarang, Jawa Tengah, (024)
024 – 3519186, 3519904 6723070
024 – 3562293 (Posko Aju) Nomor Posko - (024) 6720516

Twitter : @bpbdjateng Twitter : @bbwspemalijuana

Email : bpbd_jateng@yahoo.com
Email : sekretariat@bbwspemalijuana
poskoaju.bpbdjateng@gmail.com
.com
Web: http://www.bpbdjateng.info

Frekuensi radio berada pada


frekuensi :
154,650 Mhz (Repeater)
143.780 Mhz (wilayah seluna) dan
149.420 Mhz (wilayah jragung
tuntang)
Alur Informasi
BPBD JATENG PUSDATARU SELUNA
Jl. Imam Bonjol No. 1 F Semarang,
Jl. Brigjen S.Sudiarto No.375,
50141
Semarang, Jawa Tengah, (024)
024 – 3519186, 3519904 6723070
024 – 3562293 (Posko Aju) Nomor Posko - (024) 6720516

Twitter : @bpbdjateng Twitter : @bbwspemalijuana

Email : bpbd_jateng@yahoo.com
Email : sekretariat@bbwspemalijuana
poskoaju.bpbdjateng@gmail.com
.com
Web: http://www.bpbdjateng.info

Frekuensi radio berada pada


frekuensi :
154,650 Mhz (Repeater)
143.780 Mhz (wilayah seluna) dan
149.420 Mhz (wilayah jragung
tuntang)
PROSES EVAKUASI

PROSES 1. PENGELOLA – PEMKOT


PEMBERITAHUAN
2. PEMKOT - MASYARAKAT

1. LOKASI
PROSES
2. ARAH PERGERAKAN
PENGUMPULAN
3. JUMLAH PENDUDUK
4. WAKTU TIBA BANJIR

PROSES 1. RUTE
PEMINDAHAN 2. ALAT TRANSPORTASI

1. KEBUTUHAN RUANG
PENGUNGSIAN
2. AIR BERSIH
DI LOKASI
3. MAKANAN
PENGUNGSIAN
4. OBAT-OBATAN
PETA LOKASI EVAKU
SISTEM SUNGAI SEMARAN
PETA LOKASI EVAKUASI
Kaliwungu

430000.000000

PETA LOKASI EVAKUASI


SISTEM SUNGAI SEMARANG BARAT KEMENTERIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR

SD MANGKANG WETAN 1
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA

SD MANGKANG KULON 2MUSHOLA


LEGENDA :
"
)
Kaliwungu "
))"
" )
Tugu
Batas_Kabupaten

SD MANGKANG WETAN 2
Sungai

SMA MANGKANG KULON 1 "


)
jalan
Tugu
"
) Kedalaman Banjir (m) :

SD MANGUNHARJO ) 2
" 0 - 0.5 m "
KANTOR DESA
"
)SD N 02 ) )
" 0.5 - 1 m

"
MASJID AL MUHAJIRIN )MI MUHAMMADIYAH
) Jl. Dondong Wonosari"
"
) "
) 1 - 1.5 m

"
)
SMP DONDONG MANGKANGSDN WONOSARI 01 > 1.5 m

SD MANGKANG WETAN 1
Tugu MUSHOLA
"
)
"
) "
) Semarang Utara
" )SD MANGKANG WETAN 3
"
)SD N"02" MASJID BAITUSSALAM
)"
" )")"
)KANTOR "
)
)DESA
)") "
"
MI MUHAMMADIYAH
)MASJID BAITUSSALAM
)

MUSHOLA DAN LAHAN KOSONG Semarang Barat


"
)
Semarang Tengah INSET :

Ngaliyan Semarang Selatan

Mijen
Gajahmungkur
Ngaliyan
SKALA :

0 125 250
²
500 750 1,000
Kilometers
430000.000000
PETA LOKASI EVAKUASI
PETA LOKASI EVAKUASI
PETA LOKASI EVAKUASI

Anda mungkin juga menyukai