REKAPITULASI INDUK LAPORAN BOBOT PRESTASI

PROYEK : PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PEKERJAAN : PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
LOKASI : JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
MINGGU KE : 30 (DUA PULUH SEMBILAN)
PERIODE : 31 DESEMBER 2018 S/D 31 DESEMBER
JANGKA WAKTU PELAKSANAAN : 204 Hari
WAKTU YANG SUDAH BERJALAN : 204 Hari
SISA WAKTU PELAKSANAAN : 0 Hari
OWNER : MUSEUM NASIONAL
KONTRAKTOR : PT. INTRACO LESTARI
NO SURAT KONTRAK KERJA ( SPK ) : E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
NO URAIAN PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
bobot bobot bobot

A. PEKERJAAN PERSIAPAN 1.150% 1.104% 0.046% 1.150%


###
B. PEKERJAAN STRUKTUR 1.871% 1.807% 0.064% 1.871%
###
C. PEKERJAAN ARSITEKTUR 33.395% 29.896% 1.088% 30.984%
###
D. PEKERJAAN MEKANIKAL 33.718% 32.610% 0.503% 33.112%
###
E. PEKERJAAN ELEKTRIKAL 29.866% 29.329% 0.232% 29.561%
###

100.000% 94.746% 1.932% 96.678%


###

BOBOT PRESTASI RENCANA MINGGUAN 3.360%


BOBOT PRESTASI RENCANA KOMULATIP MINGGUAN 100.000%
BOBOT PRESTASI ACTUAL MINGGUAN 1.932%
BOBOT PRESTASI ACTUAL KOMULATIP MINGGUAN 96.678%
BOBOT PRESTASI MAJU MINGGUAN -1.428%
BOBOT PRESTASI MAJU KOMULATIP MINGGUAN -3.322%

JAKARTA,30 DESEMBER 2018

DISETUJUI OLEH : DIPERIKSA OLEH : DI AJUKAN OLEH :


PEMBERI TUGAS KONSULTAN MK KONTRAKTOR
MUSEUM NASIONAL PT. UNI TRICIPTA PT. INTRACO LESTARI

Dra. Sri Suharni, M.M. Ir. Wuryanto Yahmo, M.Sc. Ir. Didik Prasetyo
PEJABAT PEMBUAT KOMITMEN TEAM LEADER PROJECT MANAGER

Rekapitulasi Total Hal1/932


REKAPITULASI INDUK LAPORAN BOBOT PRESTASI

PROYEK : PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PEKERJAAN : PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
LOKASI : JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
MINGGU KE : 29 (DUA PULUH SEMBILAN)
PERIODE : 24 DESEMBER 2018 S/D 30 DESEMBER 2018
JANGKA WAKTU PELAKSANAAN : 204 Hari
WAKTU YANG SUDAH BERJALAN : 203 Hari
SISA WAKTU PELAKSANAAN : 1 Hari
OWNER : MUSEUM NASIONAL
KONTRAKTOR : PT. INTRACO LESTARI
NO SURAT KONTRAK KERJA ( SPK ) : E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
NO URAIAN PEKERJAAN BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
bobot bobot bobot

A. PEKERJAAN PERSIAPAN 1.150% 1.104% 0.046% 1.150%


B. PEKERJAAN STRUKTUR 1.871% 1.807% 0.064% 1.871%
C. PEKERJAAN ARSITEKTUR 33.395% 29.896% 1.088% 30.984%
D. PEKERJAAN MEKANIKAL 33.718% 32.610% 0.503% 33.112%
E. PEKERJAAN ELEKTRIKAL 29.866% 29.329% 0.232% 29.561%

100.000% 94.746% 1.932% 96.678%

BOBOT PRESTASI RENCANA MINGGUAN 3.360%


BOBOT PRESTASI RENCANA KOMULATIP MINGGUAN 99.780%
BOBOT PRESTASI ACTUAL MINGGUAN 1.932%
BOBOT PRESTASI ACTUAL KOMULATIP MINGGUAN 96.678%
BOBOT PRESTASI MAJU MINGGUAN -1.428%
BOBOT PRESTASI MAJU KOMULATIP MINGGUAN -3.102%

JAKARTA,30 DESEMBER 2018

DISETUJUI OLEH : DIPERIKSA OLEH : DI AJUKAN OLEH :


PEMBERI TUGAS KONSULTAN MK KONTRAKTOR
MUSEUM NASIONAL PT. UNI TRICIPTA PT. INTRACO LESTARI

Dra. Sri Suharni, M.M. Ir. Wuryanto Yahmo, M.Sc. Ir. Didik Prasetyo
PEJABAT PEMBUAT KOMITMEN TEAM LEADER PROJECT MANAGER

Rekapitulasi Total Hal2/932


LAPORAN BOBOT PRESTASI

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

<1> A PEKERJAAN PERSIAPAN

1 A.01 Kantor Direksi di Lapangan


Pembuatan Kantor Direksi / Konsultan Manajemen Konstruksi di lapangan termasuk
ruangan rapat berikut semua fasilitas yang diperlukan (Meja, Kursi, Toilet) termasuk
pemeliharaan selama pelaksanaan pekerjaan dan memindah - mindahkan dalam lokasi
pekerjaan bila ada perintah, dan membongkar setelah penyelesaian pekerjaan dan
memperbaiki / merapikan bekas lokasi.

Museum Nasional - Persiapan HAL 3/932


NO URAIAN PEKERJAAN
A.01a Sewa Kantor Direksi keet MK/Kontraktor ( 14,72 m x 5,62 m = 82,72 m2 )

Sewa Kantor Direksi / Konsultan Manajemen Konstruksi di lapangan berikut semua fasilitas
yang diperlukan (Meja, Kursi, Toilet) termasuk pemeliharaan selama pelaksanaan
pekerjaan dan memindah - mindahkan dalam lokasi pekerjaan bila ada perintah, dan
membongkar setelah penyelesaian pekerjaan dan memperbaiki / merapikan bekas lokasi.

Pembuatan Gudang ( 4 m x 5 m )

Pembuatan R.Meeting ( 5,4 m x 6 m )

A.01b Pekerjaan Pagar Proyek t=1,8 m Bahan Seng + Rangka kaso 5/7 + Banner Go Green

2 A.02 Papan Nama


Pemborong harus mengadakan pembuatan dan pemasangan papan nama proyek yang
menunjukkan Nama Proyek, Pemberi Tugas & Konsultan.Semua biaya perijinan dan
pembuatan berikut pembongkarannya menjadi tanggung jawab pemborong.

3 A.03 Pemadam Kebakaran,P3K,Peralatan Keselamatan Kerja


Pemborong wajib menyediakan peralatan P3K, peralatan pencegahan terhadap bahaya
kebakaran yang sesuai dengan ketentuan yang berlaku.Pemborong Wajib untuk menjaga
keselamatan pekerjanya dengan menyediakan, helm, safety shoes, safety belt, rumka
pemanjatan & peralatan lain yang dibutuhkan untuk keselamatan pekerja.

Mobilisasi dan Demobilisasi


4 A.04
Pengangkutan peralatan kerja, tenaga kerja dan segala sesuatu yang dibutuhkan di proyek
berikut pengembaliannya merupakan tanggung jawab pemborong.

Museum Nasional - Persiapan HAL 4/932


NO URAIAN PEKERJAAN

Peralatan kerja
5 A.05
Pengadaan alat angkut vertikal (alimax) 2 unit lengkap
a

Biaya Operasional Penggunaan Lift Service ( Tambah Daya PLN, Biaya Operator, Biaya
b Proteksi, Biaya Maintenance ) dan Sewa Alat angkut Material ( Hoist )

Pengadaan Sumber Air


6 A.06
Air untuk keperluan pekerjaan harus diadakan oleh pemborong dan apabila mungkin dapat
dari sumber yang sudah ada di setiap lokasi tersebut, tetapi Pemborong harus membuat
sambungan - sambungan sementara yang diperlukan.

7 A.07 Pengadaan Tenaga Listrik Kerja


Pengadaan pembangkit Tenaga Listrik sementara atau penerangan buatan yang
dipergunakan untuk pekerjaan, harus diadakan oleh pemborong termasuk pemasangan
Lampu, Panel, kabel - kabel dari meteraan, Semua biaya pemakaian daya selama
pelaksanaan proyek termasuk ijin - ijin menjadi tanggung jawab pemborong.

Sewa Genset kapasitas 100 KVA ( 1 Unit )


a
Penyambungan Daya + Penambahan Daya Listrik kerja 105 KVA + Pemakaian Bulanan / Ls

Instalasi Listrik kerja


b

8 A.08 Photo -Photo Kemajuan Pekerjaan


Pembuatan photo-photo berwarna atas kemajuan pekerjaan sebanyak 5 set dan
diserahkan pada Konsultan MK setiap bulan hingga masa penyerahan pertama. Setiap set
minimal terdiri dari 10 lembar sesuai keperluan / pengarahan Konsultan MK

TOTAL PERSIAPAN

Museum Nasional - Persiapan HAL 5/932


T PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 204 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Persiapan HAL 6/932


PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
0.15% 100.00% 0.15% 0.00% 0.00% 100.00%

0.01% 100.00% 0.01% 0.00% 0.00% 100.00%

0.02% 100.00% 0.02% 0.00% 0.00% 100.00%

0.06% 100.00% 0.06% 0.00% 0.00% 100.00%

0.00% 100.00% 0.00% 0.00% 0.00% 100.00%

0.15% 99.00% 0.15% 1.00% 0.00% 100.00%

0.13% 90.00% 0.12% 10.00% 0.01% 100.00%

Museum Nasional - Persiapan HAL 7/932


PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.09% 90.00% 0.09% 10.00% 0.01% 100.00%

0.02% 100.00% 0.02% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%


0.44% 95.00% 0.42% 5.00% 0.02% 100.00%
0.07% 100.00% 0.07% 0.00% 0.00% 100.00%

0.00% 90.00% 0.00% 10.00% 0.00% 100.00%

1.15% 1.10% 0.05%

Museum Nasional - Persiapan HAL 8/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%

Museum Nasional - Persiapan HAL 9/932


S/D MINGGU INI
0.15%

0.01%

0.02%

0.06%

0.00%

0.15%

0.13%

Museum Nasional - Persiapan HAL 10/932


S/D MINGGU INI

0.00%

0.09%

0.02%

0.00%
0.44%
0.07%

0.00%

1.15%

Museum Nasional - Persiapan HAL 11/932


REKAPITULASI RENCANA ANGGARAN BIAYA
PERLUASAN ROOM HOTEL TIRTA SANITA

URAIAN PEKERJAAN
NO
A. PEKERJAAN PERSIAPAN PELAKSANAAN
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH GALIAN DAN URUGAN

B. PEKERJAAN STRUKTUR & KONSTRUKSI


I. PEKERJAAN PONDASI
II. PEKERJAAN STRUKTUR BETON
III. PEKERJAAN DINDING BATA & PROFILAN

C PEKERJAAN ATAP & PLAFOND STANDAR


I. PEKERJAAN ATAP
II. PEKERJAAN PLAFOND

D. PEKERJAAN KUSEN , PINTU & JENDELA


I. PEKERJAAN KUSEN , PINTU, JENDELA ALUMUNIUM & KAYU

E. PEKERJAAN PENGGANTUNG & PENGUNCI

F. PEKERJAAN PENUTUP LANTAI & DINDING


I. PEKERJAAN PENUTUP LANTAI
II. PEKERJAAN FINISHING TOILET & KAMAR MANDI

G. PEKERJAAN PENUTUP FASADE BANGUNAN

H. PEKERJAAN PELAPISAN

I PEKERJAAN PLUMBING AIR KOTOR & AIR BERSIH


I. SISTEM AIR KOTOR & AIR BEKAS UTAMA
II. PEMIPAAN SISTEM AIR BERSIH
III. PEMIPAAN SISTEM AIR PANAS
IV PEMIPAAN SISTEM VENTS

J. PEKERJAAN INSTALASI LISTRIK


I. PANEL LISTRIK
II. KABEL FEEDER
III. RACK KABEL & GROUNDING
IV LAMPU PENERANGAN & ASESORIES

K. PEKERJAAN MATV

L. PEKERJAAN TELEPON

M. PEKERJAAN CCTV
N. PEKERJAAN FIRE ALARM SYSTEM

O. PEKERJAAN AIR CONDITIONER


I. INSTALASI PEMIPAAN
II. UNIT AC SPLIT & EXHAUSTFAN

P. PEKERJAAN PENGADAAN ALAT SANITAIR

Q. PEKERJAAN HYDRANT BANGUNAN


I. LANTAI DASAR
II. LANTAI 2
III. LANTAI 3
IV LANTAI 4

R. PENGADAAN UNIT ELEVATOR

RENCANA ANGGARAN BIAYA


PERLUASAN KAMAR HOTEL TIRTA SANITA
KUNINGAN JAWA BARAT

NO URAIAN PEKERJAAN

A. PEKERJAAN PERSIAPAN PELAKSANAAN


I. PEKERJAAN PERSIAPAN
1 Pembuatan Bedeng Pekerja & Direksi Keet
2 Pembuatan pagar keliling proyek
3 Pembuatan Gudang Matrial
4 Pembuatan MCK proyek
5 Pengadaan air bersih
6 Pengadaan Penerangan proyek dan listrik kerja
7 Pengadaan steger ( sewa )
8 Keamanan Proyek

II. PEKERJAAN TANAH GALIAN DAN URUGAN


NO URAIAN PEKERJAAN
1 Pekerjaan land clearing area bangunan
2 Pekerjaan Galian Pondasi
3 Pekerjaan Urugan dan perataan Peil bangunan

B. PEKERJAAN STRUKTUR & KONSTRUKSI


I. PEKERJAAN PONDASI
1 Pekerjaan Pondasi Beton setempat
2 Pekerjaan Pondasi Batu kali
3 Pekerjaan Sloof / Tie beam S1
4 Pekerjaan Sloof Dinding & sloof badan lantai
5 Cor beton wiremesh lantai kerja 10 cm

II. PEKERJAAN STRUKTUR BETON


II.1 STRUKTUR LANTAI DASAR
1 Kolom Struktur K 1 40 x 60
2 Kolom Struktur K 1' 30 x 60
3 Kolom Struktur KL1 25 x 50
4 Kolom Struktur K2 30 x 50
5 Kolom Struktur K3 30 x 40
6 Kolom Praktis 15 x 15
7 Struktur Beton Tangga

II.2 STRUKTUR LANTAI. 2


1 Kolom Struktur K2 30 x 50
2 Kolom Struktur KL 20 x 40
3 Kolom Struktur K3 30 x 40
4 Kolom Praktis 15 x 15
5 Balok Struktur B.1 - 30 x 70
6 Balok Struktur B.1' - 25 x 60
7 Balok Struktur B.2 - 25 x 50
8 Balok Struktur B.3 - 20 x 40
9 Balok Struktur B.5 - 15 x 35
10 Balok Struktur B.6 - 15 x 25
11 Balok Kantilever BK -20 - 50
12 Balok Janggutan BJ1 -12 x 50
13 Balok Janggutan BJ2 -12 x 30
14 Balok Topian Beton
15 Struktur Beton Tangga
16 Plat Lantai beton
17 Plat beton Topian Balkon

II.3 STRUKTUR LANTAI. 3


1 Kolom Struktur K2 30 x 50
2 Kolom Struktur KL 20 x 40
3 Kolom Struktur K3 30 x 40
4 Kolom Praktis 15 x 15
5 Balok Struktur B.1 - 30 x 70
6 Balok Struktur B.1' - 25 x 60
7 Balok Struktur B.2 - 25 x 50
8 Balok Struktur B.3 - 20 x 40
9 Balok Struktur B.5 - 15 x 35
NO URAIAN PEKERJAAN
10 Balok Struktur B.6 - 15 x 25
11 Balok Kantilever BK -20 - 50
12 Balok Janggutan BJ1 -12 x 50
13 Balok Janggutan BJ2 -12 x 30
14 Struktur Beton Tangga
15 Plat Lantai beton

II.4 STRUKTUR LANTAI. 4


1 Kolom Struktur K2 30 x 50
2 Kolom Struktur KL 20 x 40
3 Kolom Struktur K4 20 x 30
4 Kolom Struktur K5 15 x 25
5 Kolom Praktis 15 x 15
6 Balok Struktur B.1 - 30 x 70
7 Balok Struktur B.1' - 25 x 60
8 Balok Struktur B.2 - 25 x 50
9 Balok Struktur B.3 - 20 x 40
10 Balok Struktur B.5 - 15 x 35
11 Balok Struktur B.6 - 15 x 25
12 Balok Kantilever BK -20 - 50
13 Balok Janggutan BJ1 -12 x 50
14 Balok Janggutan BJ2 -12 x 30
15 Struktur Beton Tangga
16 Plat Lantai beton
17 Balok Topian Beton Balkon
18 Plat beton Topian Balkon

II.3 STRUKTUR LANTAI ATAP


1 Kolom Struktur K4 20 x 30
2 Kolom Struktur K5 15 x 25
3 Kolom Praktis 15 x 15
4 Balok Struktur B.1 - 30 x 70
5 Balok Struktur B.1' - 25 x 60
6 Balok Struktur B.2 - 25 x 50
7 Balok Struktur B.3 - 20 x 40
8 Balok Struktur B.4 - 15 x 45
9 Balok Struktur B.5 - 15 x 35
10 Ring Balok 15 /25
11 Plat Lantai beton

III. PEKERJAAN DINDING BATA & PROFILAN


III.1. LANTAI DASAR
1 Pasangan Dinding Bata Ringan
2 Plesteran Dinding
3 Acian Dinding
4 Plesteran Acian halus Topian Beton & Lisplang
5 Profilan & ban2an lisplang
6 Plesteran & Acian Opening Kusen Alumunium

III.2 LANTAI .2
1 Pasangan Dinding Bata Ringan
2 Plesteran Dinding
NO URAIAN PEKERJAAN
3 Acian Dinding
4 Plesteran & Acian Opening Kusen Alumunium

III.3 LANTAI .3
1 Pasangan Dinding Bata Ringan
2 Plesteran Dinding
3 Acian Dinding
4 Plesteran & Acian Opening Kusen Alumunium

III.4 LANTAI .4
1 Pasangan Dinding Bata Ringan
2 Plesteran Dinding
3 Acian Dinding
4 Plesteran & Acian Opening Kusen Alumunium

III.5 LANTAI ATAP


1 Pasangan Dinding Bata Ringan
2 Plesteran Dinding
3 Acian Dinding
4 Profilan & ban2an

C PEKERJAAN ATAP & PLAFOND STANDAR


I. PEKERJAAN ATAP
1 Rangka atap baja Ringan Zincalumn
2 Genteng Keramik natural Glazur
3 Nok Genteng
4 Nok Genteng 3 arah
5 Nok Genteng Ujung
6 List Plang Kayu Kamper + Finishing Politrur
7 Atap Pergola Bukaan koridor lt.bawah

II. PEKERJAAN PLAFOND


II..1 LANTAI DASAR
1 Plafond Gypsum 9 mm + Rangka Hollow
2 Drop Ceiling Plafond Gypsum
3 List Plafond Gypsum Besar 17 - 20 cm
4 Skoneng nat plafond

II.2 LANTAI 2
1 Plafond Gypsum 9 mm + Rangka Hollow
2 Drop Ceiling Plafond Gypsum
3 List Plafond Gypsum Besar 17 - 20 cm
4 Skoneng nat plafond

II.3 LANTAI 3
1 Plafond Gypsum 9 mm + Rangka Hollow
2 Drop Ceiling Plafond Gypsum
3 List Plafond Gypsum Besar 17 - 20 cm
NO URAIAN PEKERJAAN
4 Skoneng nat plafond

II.4 LANTAI 4
1 Plafond Gypsum 9 mm + Rangka Hollow
2 Drop Ceiling Plafond Gypsum
3 List Plafond Gypsum Besar 17 - 20 cm
4 Skoneng nat plafond

II.5 LANTAI ATAP


1 Plafond GRC 4 mm + rangka Hollow overstek atap
2 List plafond kayu

D. PEKERJAAN KUSEN , PINTU & JENDELA

1 TYPE AL.1 ( PINTU MASUK )


a. Kusen
b. Daun Pintu Kaca

2 TYPE AL.2 ( PINTU BALKON KAMAR )


a. Kusen
b. Daun Pintu Kaca Sliding Komplit Handle + rel

3 TYPE AL.3 ( JENDELA BOVEN STORAGE )


a. Kusen
b. Daun Jendela kaca alumunium

4 TYPE AL.4 ( JENDELA KACA MATI FASADE ENTRANCE )


a. Kusen
b. Kaca mati 8 mm

5 TYPE P1 ( PINTU KAMAR )


a. Kusen
b. Daun Pintu Semi Panel
c. Architrave kayu

6 TYPE P2 ( PINTU CONNECTING ) KAMAR


a. Kusen double skoneng
b. Daun Pintu Semi Panel
c. Architrave kayu

7 TYPE P3 GUDANG / STORAGE


a. Kusen
b. Daun Pintu Semi Panel
c. Architrave kayu

8 TYPE P4 ( BATH ROOM )


a. Kusen
b. Daun Pintu Semi Panel
c. Architrave kayu

9 PINTU KACA FRAMELESS SHOWER BATHROOM


NO URAIAN PEKERJAAN
a. Partisi dan Pintu kaca frameless komplit

E. PEKERJAAN PENGGANTUNG & PENGUNCI


1 Engsel Pintu 4 " stailess steel ball bearing
2 Lock Set Handle

3 Hotel Front Desk Check-In System

4 Handle + Body Kunci Connecting door


5 Handle + Body Kunci Storage
6 Handle + Body Kunci bathroom
7 Door Closer Pintu2
8 Door Stoper
9 Door Viewer
10 Slot Grendel rantai Kamar2
11 Floor Hinges Pintu2 Entrance
12 Handle + Body kunci card lock system pintu masuk

F. PEKERJAAN PENUTUP LANTAI & DINDING


I. PEKERJAAN PENUTUP LANTAI
I.1 LANTAI DASAR
1 Lantai Granit 60 x 60 cm
2 Lantai Marmer 80 x 80 cm ( Area Lobby )
3 Marmer Tangga Utama
4 Plint Marmer 12 x 40
5 Plint Granit Tile 12 x 60
6 Border Lantai Marmer L-50 cm
7 Keramik 33 x 66 cm ( Area Entrance )
8 Keramik 33 x 33 cm ( Teras kamar dan tangga service )
9 Plint keramik
10 Batu Andesit anak tangga entrance

I.2 LANTAI 2
1 Lantai Granit 60 x 60 cm
2 Lantai Marmer 80 x 80 cm ( Area Lobby )
3 Plint Marmer 12 x 40
4 Plint Granit Tile 12 x 60
5 Keramik 33 x 33 cm ( Teras kamar dan tangga service )
6 Plint keramik

I.3 LANTAI 3
1 Lantai Granit 60 x 60 cm
2 Lantai Marmer 80 x 80 cm ( Area Lobby )
3 Plint Marmer 12 x 40
4 Plint Granit Tile 12 x 60
5 Keramik 33 x 33 cm ( Teras kamar dan tangga service )
NO URAIAN PEKERJAAN
6 Plint keramik

I.4 LANTAI 4
1 Lantai Granit 60 x 60 cm
2 Lantai Marmer 80 x 80 cm ( Area Lobby )
3 Plint Marmer 12 x 40
4 Plint Granit Tile 12 x 60
5 Keramik 33 x 33 cm ( Teras kamar dan tangga service )
6 Plint keramik

I.5 LANTAI ATAP


1 Keramik 30 x 30 cm
2 Plint keramik

II . PEKERJAAN FINISHING TOILET & KAMAR MANDI


II.1 TOILET KAMAR TYPICAL ( LT. 1 , 2 ,3 & 4 )
1 Pasang Keramik Lantai 33,3 x 33,3 cm
2 Lantai Shower 90 x 120
3 Border lantai shower L-10 cm
4 Pasang Keramik Dinding 33,3 x 66
5 Pasang Keramik Dinding SHOWER 33,3 x 66
6 Meja Wastafel

G. PEKERJAAN PENUTUP FASADE BANGUNAN


1 Pasang batu alam dinding samping bangunan
2 Pasang Marmer Travertine Kolom Entrance bangunan
3 Pasang batu alam dinding Kolom treatment Koridor

H. PEKERJAAN PELAPISAN
1 Water Proofing Dag Beton atap, Kanopi dll
2 Water Proofing Lantai Kamar Mandi
3 Cat Dasar Alkali proof Eksterior
4 Cat Dasar Alkali proof Interior
5 Pengecatan Dinding Luar
6 Pengecatan Dinding Dalam
7 Pengecatan Plafond
8 Melamik kusen2
9 Politur List Plank Atap
10 Pengecatan karpus Genteng
11 Vernish Dinding & lantai batu alam

I. PEKERJAAN PLUMBING
I. SISTEM AIR KOTOR, AIR BEKAS UTAMA
I.1 SISTEM PENGOLAHAN AIR LIMBAH WC
1 BIO SEPTIC TANK kap. 3 m3
2 BIO SEPTIC TANK kap. 4 m3
NO URAIAN PEKERJAAN

3 BIO SEPTIC TANK kap. 2,1m3


4 RESAPAN

I.2 PEMIPAAN SISTEM AIR KOTOR, AIR BEKAS


A LANTAI DASAR
1 Pipa Air kotor dia 100 mm ( Raiser )
2 Pipa Air kotor dia 100 mm
3 Pipa Air kotor Bath room dia 100 mm
4 Pipa Air Bekas dia 100 mm ( Raiser )
5 Pipa Air Bekas dia 100 mm
6 Pipa Air Bekas Bath room dia 50 mm
7 Fitting dan accessories

B LANTAI 2
1 Pipa Air kotor dia 100 mm ( Raiser )

2 Pipa Air kotor Bath room dia 100 mm


3 Pipa Air Bekas dia 100 mm ( Raiser )
4 Pipa Air Bekas Bath room dia 50 mm
5 Fitting dan accessories

C LANTAI 3
1 Pipa Air kotor dia 100 mm ( Raiser )

2 Pipa Air kotor Bath room dia 100 mm


3 Pipa Air Bekas dia 100 mm ( Raiser )
4 Pipa Air Bekas Bath room dia 50 mm
5 Fitting dan accessories

D LANTAI 4
1 Pipa Air kotor dia 100 mm ( Raiser )

2 Pipa Air kotor Bath room dia 100 mm


3 Pipa Air Bekas dia 100 mm ( Raiser )
4 Pipa Air Bekas Bath room dia 50 mm
5 Fitting dan accessories

II. SISTEM AIR BERSIH


II.1 PENDISTRIBUSIAN & PEMIPAAN SISTEM AIR BERSIH UTAMA DI LT. DASAR
A. SISTEM PEMIPAAN DISTRIBUSI dari Ground Tank
1 Pipa Air Bersih dia 65 mm
NO URAIAN PEKERJAAN

2 Pipa Air Bersih dia 50 mm


3 Pipa Air Bersih dia 50 mm ( RISER )
4 Pipa Air Bersih dia 40 mm
5 Fitting dan accessories

B. ASSESORIES / VALVES
1 Gate Valve '- dia. 65 mm
2 Gate Valve '- dia. 50 mm
3 Gate Valve '- dia. 40 mm
4 Gate Valve '- dia. 25 mm
5 Check Valve '- dia. 50 mm
6 Y - Strainer '- dia. 65 mm
7 Flexible Joints '- dia. 65 mm
8 Flexible Joints '- dia. 50 mm
9 Pressure Gauge
10 Pressure Switch
11 Floating Valve '- dia. 50 mm

C. EQUIPMENT
1 Rumah konstruksi Ground Tank
2 Ground Tank kapasitas 5000 ltr GT.01
3 Booster Pump Ke Roof Tank

4 Pressure Tank

II.2 PENDISTRIBUSIAN & PEMIPAAN SISTEM AIR BERSIH UTAMA DI ROOF TOP
A. SISTEM PEMIPAAN
1 Pipa Air Bersih dia 50 mm ( RUANG POMPA )

2 Pipa Air Bersih dia 100 mm ( HEADER )


3 Fitting dan accessories

B. ASSESORIES / VALVES
1 Gate Valve '- dia. 50 mm
2 Y - Strainer '- dia. 50 mm
3 Flexible Joints '- dia. 50 mm
NO URAIAN PEKERJAAN

4 Floating Valve '- dia. 50 mm


5 Vent Cup

C. EQUIPMENT
1 Roof Tank kapasitas 2.200 ltr
2 Booster Pump Lt. Atap

II.3 SISTEM PEMIPAAN DISTRIBUSI AIR BERSIH


A. LANTAI DASAR
1 Pipa Air Bersih dia 50 mm ( Raiser )
2 Pipa Air Bersih dia 25 mm
3 Pipa Air Bersih dia 20 mm
4 Pipa Air Bersih dia 15 mm
5 Fitting dan accessories
6 Gate Valve 25 mm
7 Gate Valve 15 mm

B. LANTAI 2
1 Pipa Air Bersih dia 50 mm ( Raiser )
2 Pipa Air Bersih dia 25 mm
3 Pipa Air Bersih dia 20 mm
4 Pipa Air Bersih dia 15 mm
5 Fitting dan accessories
6 Gate Valve 25 mm
7 Gate Valve 15 mm

C. LANTAI 3
1 Pipa Air Bersih dia 50 mm ( Raiser )
2 Pipa Air Bersih dia 25 mm
3 Pipa Air Bersih dia 20 mm
4 Pipa Air Bersih dia 15 mm
5 Fitting dan accessories
6 Gate Valve 25 mm
7 Gate Valve 15 mm

D. LANTAI 4
1 Pipa Air Bersih dia 50 mm ( Raiser )
2 Pipa Air Bersih dia 25 mm
3 Pipa Air Bersih dia 20 mm
NO URAIAN PEKERJAAN

4 Pipa Air Bersih dia 15 mm


5 Fitting dan accessories
6 Gate Valve 25 mm
7 Gate Valve 15 mm

III. PEMIPAAN SISTEM AIR PANAS


III.1 LANTAI DASAR
1 Pipa Air Bersih dia 15 mm
2 Pipa Air Bersih dia 50 mm
3 Fitting dan accessories

III.2 LANTAI 2
1 Pipa Air Bersih dia 15 mm
2 Pipa Air Bersih dia 50 mm
3 Fitting dan accessories

III.3 LANTAI 3
1 Pipa Air Bersih dia 15 mm
2 Pipa Air Bersih dia 50 mm
3 Fitting dan accessories

III.4 LANTAI 4
1 Pipa Air Bersih dia 15 mm
2 Pipa Air Bersih dia 50 mm
3 Fitting dan accessories

III.5 PENDISTRIBUSIAN & PEMIPAAN SISTEM AIR PANAS UTAMA DI ROOF TOP
A. SISTEM PEMIPAAN
1 Pipa PPR PN - dia. 50 mm
2 Pipa PPR PN - dia. 100 mm ( HEADER )
3 Gate valve dia 50 mm
4 Check valve dia 50 mm
5 Strainer dia. 50 mm
6 Flexible joint dia 50 mm

B. EQUIPMENT
1 Pompa Sirkulasi Air panas

2 Panel kontrol pompa


NO URAIAN PEKERJAAN

3 Material bantu
4 Solahart kapasitas 300 ltr

IV. PEMIPAAN SISTEM VENTS


IV.1 LANTAI DASAR
1 Pipa Vent PVC D 80 mm ( Raiser )
2 Pipa PVC D dia 50 mm
3 Pipa PVC D dia 25 mm
4 Fitting dan accessories

IV.2 LANTAI 2
1 Pipa Vent PVC D 80 mm ( Raiser )
2 Pipa PVC D dia 50 mm
3 Pipa PVC D dia 25 mm
4 Fitting dan accessories

IV.3 LANTAI 3
1 Pipa Vent PVC D 80 mm ( Raiser )
2 Pipa PVC D dia 50 mm
3 Pipa PVC D dia 25 mm
4 Fitting dan accessories

IV.4 LANTAI 4
1 Pipa Vent PVC D 80 mm ( Raiser )
2 Pipa PVC D dia 50 mm
3 Pipa PVC D dia 25 mm
4 Fitting dan accessories

J. PEKERJAAN INSTALASI LISTRIK & PENERANGAN

I. PANEL LISTRIK
I.1 PANEL LISTRIK LT. DASAR
1 SDP HOTEL
2 DB.LP.D-ROOM HOTEL
3 PANEL ROOM HOTEL

I.2 PANEL LISTRIK LT. 2


1 DB.LP.2 -ROOM HOTEL
2 PANEL ROOM HOTEL

I.3 PANEL LISTRIK LT. 3


1 DB.LP.3 -ROOM HOTEL
2 PANEL ROOM HOTEL
NO URAIAN PEKERJAAN

I.4 PANEL LISTRIK LT. 4


1 DB.LP.4 -ROOM HOTEL
2 PANEL ROOM HOTEL

I.5 PANEL LISTRIK ROOF TOP


1 DB-POMPA.1 (BOOSTER PUMP)

II. KABEL FEEDER


II.1 KABEL FEEDER LT. DASAR
1 SDP ROOM HOTEL ke DB-LP.D-ROOM HOTEL
2 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.1
3 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.2
4 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.3
5 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.4
6 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.5
7 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.6
8 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.7
9 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.8
10 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.9
11 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.10
12 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.11
13 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.12
14 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.13
15 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.14

II.2 KABEL FEEDER LT. 2


1 SDP ROOM HOTEL ke DB-LP.2-ROOM HOTEL
2 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.15
3 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.16
4 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.17
5 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.18
6 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL. 19
7 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.20
8 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.21
9 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.22
10 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.23
11 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.24
12 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.25
13 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.26
14 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.27
15 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.28

II.3 KABEL FEEDER LT. 3


1 SDP ROOM HOTEL ke DB-LP.3-ROOM HOTEL
2 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.29
3 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.30
4 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.31
5 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.32
6 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL. 33
7 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.34
8 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.35
9 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.36
10 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.37
11 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.38
NO URAIAN PEKERJAAN
12 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.39
13 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.40
14 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.41
15 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.42

II.4 KABEL FEEDER LT. 4


1 SDP ROOM HOTEL ke DB-LP.4-ROOM HOTEL
2 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.43
3 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.44
4 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.45
5 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.46
6 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL. 47
7 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.48
8 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.49
9 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.50
10 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.51
11 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.52
12 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.53
13 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.54
14 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.55
15 DB-LP.D-ROOM HOTEL ke PANEL ROOM HOTEL.56

II.5 KABEL FEEDER ROOF TOP


1 SDP ke DB-POMPA.1 (AB BOOSTER PUMP) Prov Sum

III RACK KABEL & GROUNDING


Pengadaan dan pemasangan rack kabel lengkap dengan koneksi,
support, braket, fitting dan accessories lainnya.
1 Kabel Tray (Termasuk Riser)
.- 200 x 100
.- 100 x 100
2 Kabel Ladder
.- 400 x 100

3 Grounding Point SDP HOTEL


BC 70 mm²

IV LAMPU PENERANGAN & ASESORIES


IV.1 LANTAI DASAR
A. AREA LOBBY & KORIDOR
1 Down Light PLC 18 W
2 Downlight PLC18 w + Nicad Battery
3 Recessed Down Light 14 W
4 TL 1 x 36 Watt Balk Type TKO
5 Exit Lamp
6 Saklar Tunggal
7 Saklar Seri
8 Saklar Tukar
9 Stop Kontak

B. AREA KAMAR TYPICAL


1 Down Light PLC 18 W
2 Down Light c/w glass cover 2x ess 13 Watt
3 Wall Lamp 15 Watt
NO URAIAN PEKERJAAN
4 Saklar Seri
5 Stop Kontak
6 Stop Kontak WH
7 Stop Kontak AC

C. INSTALASI
1 Instalasi Titik lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan

IV.2 LANTAI 2
A. AREA LOBBY & KORIDOR
1 Down Light PLC 18 W
2 Downlight PLC18 w + Nicad Battery
3 TL 1 x 36 Watt Balk Type TKO
4 Exit Lamp
5 Saklar Seri
6 Saklar Tukar
7 Stop Kontak

B. AREA KAMAR TYPICAL


1 Down Light PLC 18 W
2 Down Light c/w glass cover 2x ess 13 Watt
3 Wall Lamp 15 Watt
4 Saklar Seri
5 Stop Kontak
6 Stop Kontak WH
7 Stop Kontak AC

C. INSTALASI
1 Instalasi Titik lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan

IV.3 LANTAI 3
A. AREA LOBBY & KORIDOR
1 Down Light PLC 18 W
2 Downlight PLC18 w + Nicad Battery
3 TL 1 x 36 Watt Balk Type TKO
4 Exit Lamp
5 Saklar Seri
6 Saklar Tukar
7 Stop Kontak

B. AREA KAMAR TYPICAL


1 Down Light PLC 18 W
2 Down Light c/w glass cover 2x ess 13 Watt
3 Wall Lamp 15 Watt
4 Saklar Seri
5 Stop Kontak
6 Stop Kontak WH
7 Stop Kontak AC

C. INSTALASI
1 Instalasi Titik lampu
NO URAIAN PEKERJAAN
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan

IV.4 LANTAI 4
A. AREA LOBBY & KORIDOR
1 Down Light PLC 18 W
2 Downlight PLC18 w + Nicad Battery
3 TL 1 x 36 Watt Balk Type TKO
4 Exit Lamp
5 Saklar Seri
6 Saklar Tukar
7 Stop Kontak

B. AREA KAMAR TYPICAL


1 Down Light PLC 18 W
2 Down Light c/w glass cover 2x ess 13 Watt
3 Wall Lamp 15 Watt
4 Saklar Seri
5 Stop Kontak
6 Stop Kontak WH
7 Stop Kontak AC

C. INSTALASI
1 Instalasi Titik lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan

IV.5 LANTAI ROOF TOP


1 Downlight PLC18 w + Nicad Battery
2 TL 1 x 36 Watt Balk Type TKO
3 Saklar Seri
4 Stop Kontak
5 Instalasi Titik lampu
6 Instalasi Stop Kontak

K. PEKERJAAN MATV

I. LANTAI DASAR
1 JBTV-Lt.Dasar
2 TV Set
3 2 Way Combiner (Passive Combiner)
4 Attenuator
5 Channel Amplifier Processor
6 Modulator
7 Power Supplay
8 Receiver & Modulator
9 Power Amplifier/Booster
10 Caracter Generator (CG)
11 VCD/DVD
12 Splitter 2 Way
13 Directional Coupler 2 Tap
14 Directional Coupler 4 Tap
15 Outlet TV
16 Instalasi JBTP-Lt.Dasar
NO URAIAN PEKERJAAN
17 Instalasi Directional Coupler
18 Instalasi Outlet TV

II. LANTAI 2
1 JBTV-Lt.2
2 Directional Coupler 2 Tap
3 Directional Coupler 4 Tap
4 Outlet TV
5 Instalasi JBTP-Lt.2
6 Instalasi Directional Coupler
7 Instalasi Outlet TV

III. LANTAI 3
1 JBTV-Lt.3
2 Directional Coupler 2 Tap
3 Directional Coupler 4 Tap
4 Outlet TV
5 Instalasi JBTP-Lt.3
6 Instalasi Directional Coupler
7 Instalasi Outlet TV

IV. LANTAI 4
1 JBTV-Lt.4
2 Directional Coupler 2 Tap
3 Directional Coupler 4 Tap
4 Outlet TV
5 Instalasi JBTP-Lt.4
6 Instalasi Directional Coupler
7 Instalasi Outlet TV

V. ROOF TOP
1 Parabola Antena Asiasat-3 12FT c/w Double LNB Rotate
2 UHF Antena
3 VHF Antena
4 Instalasi Parabola Antena Cakrawala
5 Instalasi UHF Antena
6 Instalasi VHF Antena
7 Grounding

L. PEKERJAAN TELEPON
I. LANTAI DASAR
1 MDF - TP
2 PABX 5 PTT, 70 EXT
3 Box Telkom
4 UPS,Back Up Battrey 1 Jam
5 JBTP - Lt.Dasar
6 Printer ( Prov Sum )
7 Outlet Telephone Direct ( Prov Sum )
8 Outlet Telephone Extension
9 Outlet Operator Consule ( Prov Sum )
10 Hadset Telephone
11 MDF-TP ke JBTP - Lt.Dasar
12 Instalasi Outlet Telepon
13 Grounding
14 Kabel Tray ukuran :
NO URAIAN PEKERJAAN

II. LANTAI 2
1 JBTP - Lt.2
2 Outlet Telephone Extension
3 Hadset Telephone
4 MDF-TP ke JBTP - Lt.2
5 Instalasi Outlet Telepon
6 Grounding
7 Kabel Tray ukuran :

III. LANTAI 3
1 JBTP - Lt.3
2 Outlet Telephone Extension
3 Hadset Telephone
4 MDF-TP ke JBTP - Lt.3
5 Instalasi Outlet Telepon
6 Grounding
7 Kabel Tray ukuran :

IV LANTAI 4
1 JBTP - Lt.4
2 Outlet Telephone Extension
3 Hadset Telephone
4 MDF-TP ke JBTP - Lt. 4
5 Instalasi Outlet Telepon
6 Grounding
7 Kabel Tray ukuran :

M. PEKERJAAN CCTV
I. LANTAI DASAR
1 Digital Multiplexer Recorder Hard Disk - Gb,
2 Vidio Security 12 Channel Switcher
3 Monitor 21 "
4 Keyboard Digital
5 Dome Camera Colour Narrow Angle
6 Instalasi Camera

II. LANTAI 2
1 Dome Camera Colour Narrow Angle
2 Instalasi Camera

III. LANTAI 3
1 Dome Camera Colour Narrow Angle
2 Instalasi Camera

IV LANTAI 4
1 Dome Camera Colour Narrow Angle
2 Instalasi Camera

N. PEKERJAAN FIRE ALARM SYSTEM


I. LANTAI DASAR
NO URAIAN PEKERJAAN
1 Konvensional MCPFA, Cap.20 Zone
2 Annunciator ( di R.Security)
3 JBFA-Lt.Dasar
4 Rate Of Rise Heat Detector
5 Manual Push Button
6 Alarm Bell
7 Flasher Lamp
8 Jack Intercom
9 End Of Line
10 Dari MCP-FA ke JBFA - Lt.Dasar

11 MCP-FA ke Annunciator (R.Security) Prov Sum

12 Instalasi Detector
13 Instalasi Manual Push Button
14 Instalasi Alarm Bell
15 Instalasi Flasher Lamp
16 Instalasi Jack Intercom
17 Grounding

II. LANTAI 2
1 JBFA-Lt.1
2 Rate Of Rise Heat Detector
3 Manual Push Button
4 Alarm Bell
5 Flasher Lamp
6 Jack Intercom
7 End Of Line
8 Dari MCP-FA ke JBFA - Lt.1
9 Instalasi Detector
10 Instalasi Manual Push Button
11 Instalasi Alarm Bell
12 Instalasi Flasher Lamp
13 Instalasi Jack Intercom
14 Grounding

III. LANTAI 3
1 JBFA-Lt.2
2 Rate Of Rise Heat Detector
3 Manual Push Button
4 Alarm Bell
5 Flasher Lamp
6 Jack Intercom
7 End Of Line
8 Dari MCP-FA ke JBFA - Lt.2
9 Instalasi Detector
10 Instalasi Manual Push Button
11 Instalasi Alarm Bell
12 Instalasi Flasher Lamp
13 Instalasi Jack Intercom
14 Grounding

IV LANTAI 4
NO URAIAN PEKERJAAN
1 JBFA-Lt.2
2 Rate Of Rise Heat Detector
3 Manual Push Button
4 Alarm Bell
5 Flasher Lamp
6 Jack Intercom
7 End Of Line
8 Dari MCP-FA ke JBFA - Lt.2
9 Instalasi Detector
10 Instalasi Manual Push Button
11 Instalasi Alarm Bell
12 Instalasi Flasher Lamp
13 Instalasi Jack Intercom
14 Grounding

O. PEKERJAAN VAC
I. LANTAI DASAR
A. INSTALASI PEMIPAAN AC SPLIT
1 Pipa Refrigerant - Return ∅ 3/8 / Supply ∅ 1/2
2 Fitting dan accessories
B. INSTALASI PEMIPAAN DRAIN AC
1 Pipa PVC D 20 mm
2 Pipa PVC D 80 mm
3 Fitting dan accessories
C. UNIT EQUIPMENT
1 AC split 1 PK
2 Exhaust Fan

II. LANTAI 2
A. INSTALASI PEMIPAAN AC SPLIT
1 Pipa Refrigerant - Return ∅ 3/8 / Supply ∅ 1/2
2 Fitting dan accessories
B. INSTALASI PEMIPAAN DRAIN AC
1 Pipa PVC D 20 mm
2 Pipa PVC D 80 mm
3 Fitting dan accessories
C. UNIT EQUIPMENT
1 AC split 1 PK
2 Exhaust Fan

III. LANTAI 3
A. INSTALASI PEMIPAAN AC SPLIT
1 Pipa Refrigerant - Return ∅ 3/8 / Supply ∅ 1/2
2 Fitting dan accessories
B. INSTALASI PEMIPAAN DRAIN AC
1 Pipa PVC D 20 mm
2 Pipa PVC D 80 mm
3 Fitting dan accessories
C. UNIT EQUIPMENT
1 AC split 1 PK
2 Exhaust Fan
NO URAIAN PEKERJAAN
IV. LANTAI 4
A. INSTALASI PEMIPAAN AC SPLIT
1 Pipa Refrigerant - Return ∅ 3/8 / Supply ∅ 1/2
2 Fitting dan accessories
B. INSTALASI PEMIPAAN DRAIN AC
1 Pipa PVC D 20 mm
2 Pipa PVC D 80 mm
3 Fitting dan accessories
C. UNIT EQUIPMENT
1 AC split 1 PK
2 Exhaust Fan

P. PENGADAAN ALAT SANITAIR


I. ALAT SANITAIR BATHROOM TYPICAL
1 Kloset Duduk
2 Washtafel Meja
3 Kran Shower
4 Bath spout
5 Shower Head
6 Washlet
7 Floor Drain Stainless
8 Toilet Paper holder
9 Towel Bar

Q. INSTALASI JARINGAN HYDRANT


I. LANTAI DASAR
I.1 EQUIPMENT
1 Indoor Hidrant Box
2 Portable Fire Extinguiser (PFE), KAP.7Kg

I.2 SYSTEM PEMIPAAN


1 Pipa Hydrant dia 100 mm
2 Pipa Hydrant dia 65 mm
3 Fitting - fitting & Material Bantu

I.3 VALVES & ACCESORIES


` Gate Valve dia 65 mm

II. LANTAI 2
II.1 EQUIPMENT
1 Indoor Hidrant Box
2 Portable Fire Extinguiser (PFE), KAP.7Kg

II.2 SYSTEM PEMIPAAN


1 Pipa Hydrant dia 100 mm + RISER
2 Pipa Hydrant dia 65 mm
3 Fitting - fitting & Material Bantu

II.3 VALVES & ACCESORIES


` Gate Valve dia 65 mm
NO URAIAN PEKERJAAN
III. LANTAI 3
III.1 EQUIPMENT
1 Indoor Hidrant Box
2 Portable Fire Extinguiser (PFE), KAP.7Kg

III.2 SYSTEM PEMIPAAN


1 Pipa Hydrant dia 100 mm + RISER
2 Pipa Hydrant dia 65 mm
3 Fitting - fitting & Material Bantu

III.3 VALVES & ACCESORIES


` Gate Valve dia 65 mm

IV. LANTAI 4
IV.1 EQUIPMENT
1 Indoor Hidrant Box
2 Portable Fire Extinguiser (PFE), KAP.7Kg

IV.2 SYSTEM PEMIPAAN


1 Pipa Hydrant dia 100 mm + RISER
2 Pipa Hydrant dia 65 mm
3 Fitting - fitting & Material Bantu

IV.3 VALVES & ACCESORIES


` Gate Valve dia 65 mm

R. PENGADAAN ELEVATOR
1 Passenger Elevator Merk "Pillar" Type : Vip-8(850)-CO60-6/6
* Kapasitas
* Speed
* Dimensi Cabin
* Opening
* Material

2 Biaya pemasangan 2 unit Passenger Elevator


ASI RENCANA ANGGARAN BIAYA
SAN ROOM HOTEL TIRTA SANITA

AIAN PEKERJAAN SUB TOTAL JUMLAH

294,540,000
220,000,000
74,540,000

3,655,466,981.25
461,602,500
2,216,358,281
977,506,200

704,125,000
258,225,000
445,900,000

1,261,795,000
AYU 1,261,795,000

304,375,000

1,431,260,000
1,104,780,000
326,480,000

295,500,000

645,600,180

870,183,400
136,941,000
418,770,800
284,595,600
29,876,000

556,627,000
104,700,000
68,226,000
99,670,000
284,031,000

234,552,000

166,489,000

109,810,000
90,950,000

304,214,000
73,214,000
231,000,000

568,400,000

100,415,000
25,655,000
24,625,000
24,625,000
25,510,000

265,000,000

TOTAL NILAI PEKERJAAN 11,859,302,561

HARGA PER M2 BANGUNAN 4,089,415

TOTAL LUAS BANGUNAN 2,900.00 M2


TOTAL VOLUME BETON 750.35 M3
KOEFISIEN BETON 0.26

RENCANA ANGGARAN BIAYA


PERLUASAN KAMAR HOTEL TIRTA SANITA
KUNINGAN JAWA BARAT

HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN

80.00 m2 850,000 68,000,000


200.00 m1 150,000 30,000,000
40.00 ls 500,000 20,000,000
2.00 unit 5,000,000 10,000,000
1.00 ls 4,500,000 4,500,000
1.00 ls 10,000,000 10,000,000
4.00 bln 15,000,000 60,000,000
7.00 bln 2,500,000 17,500,000
jumlah 220,000,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
1,600.00 m2 5,000 8,000,000
350.00 m3 60,000 21,000,000
607.20 m3 75,000 45,540,000
jumlah 74,540,000

150 x 150 Beton mutu K-300 71.50 m3 3,000,000 214,500,000


180.00 m3 550,000 99,000,000
25 x 40 Beton mutu K-300 31.30 m3 3,150,000 98,595,000
15 x 25 Beton mutu K-225 5.18 m3 2,900,000 15,007,500
69.00 m3 500,000 34,500,000
107.98 jumlah 461,602,500

mutu beton K-300 3.84 m3 3,500,000 13,440,000


2.88 m3 3,500,000 10,080,000
mutu beton K-300 2.80 m3 3,500,000 9,800,000
mutu beton K-300 31.20 m3 3,500,000 109,200,000
mutu beton K-300 1.44 m3 3,500,000 5,040,000
mutu beton K-250 9.48 m3 2,750,000 26,061,750
mutu beton K-300 7.20 m3 3,750,000 27,000,000
58.84
jumlah 200,621,750

mutu beton K-300 6.02 m3 3,500,000 21,078,750


mutu beton K-300 1.75 m3 3,500,000 6,132,000
mutu beton K-300 21.90 m3 3,500,000 76,650,000
mutu beton K-250 8.95 m3 2,750,000 24,613,875
mutu beton K-300 2.52 m3 3,500,000 8,820,000
mutu beton K-300 2.63 m3 3,500,000 9,187,500
mutu beton K-300 5.60 m3 3,500,000 19,600,000
mutu beton K-300 17.40 m3 3,500,000 60,900,000
mutu beton K-300 2.74 m3 3,500,000 9,581,250
mutu beton K-300 0.90 m3 3,000,000 2,700,000
2.52 m3 3,500,000 8,820,000
mutu beton K-500 2.40 m3 3,250,000 7,800,000
mutu beton K-300 2.52 m3 3,250,000 8,190,000
mutu beton K-500 4.66 m3 3,500,000 16,310,000
mutu beton K-300 7.20 m3 3,750,000 27,000,000
mutu beton K-300 84.72 m3 3,500,000 296,520,000
mutu beton K-300 10.20 m3 3,500,000 35,700,000
184.63 jumlah 639,603,375

mutu beton K-300 6.02 m3 3,500,000 21,078,750


mutu beton K-300 1.75 m3 3,500,000 6,132,000
mutu beton K-300 21.90 m3 3,500,000 76,650,000
mutu beton K-250 8.95 m3 2,750,000 24,613,875
mutu beton K-300 2.52 m3 3,500,000 8,820,000
mutu beton K-300 2.63 m3 3,500,000 9,187,500
mutu beton K-300 5.60 m3 3,500,000 19,600,000
mutu beton K-300 17.40 m3 3,500,000 60,900,000
mutu beton K-300 2.74 m3 3,500,000 9,581,250
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
mutu beton K-300 0.90 m3 3,000,000 2,700,000
2.52 m3 3,500,000 8,820,000
mutu beton K-500 2.40 m3 3,250,000 7,800,000
mutu beton K-300 2.52 m3 3,250,000 8,190,000
mutu beton K-300 7.20 m3 3,750,000 27,000,000
mutu beton K-300 83.64 m3 3,500,000 292,740,000
168.69 jumlah 583,813,375

mutu beton K-300 5.48 m3 3,500,000 19,162,500


mutu beton K-300 1.75 m3 3,500,000 6,132,000
mutu beton K-300 1.10 m3 3,500,000 3,832,500
mutu beton K-300 8.62 m3 3,250,000 28,025,156
mutu beton K-250 8.95 m3 2,750,000 24,613,875
mutu beton K-300 2.52 m3 3,500,000 8,820,000
mutu beton K-300 2.63 m3 3,500,000 9,187,500
mutu beton K-300 5.60 m3 3,500,000 19,600,000
mutu beton K-300 17.40 m3 3,500,000 60,900,000
mutu beton K-300 2.74 m3 3,500,000 9,581,250
mutu beton K-300 0.90 m3 3,000,000 2,700,000
2.52 m3 3,500,000 8,820,000
mutu beton K-500 2.40 m3 3,250,000 7,800,000
mutu beton K-300 2.52 m3 3,250,000 8,190,000
mutu beton K-300 3.60 m3 3,750,000 13,500,000
mutu beton K-300 83.64 m3 3,500,000 292,740,000
mutu beton K-500 3.78 m3 3,250,000 12,285,000
mutu beton K-300 7.98 m3 3,500,000 27,930,000
164.12 jumlah 563,819,781

mutu beton K-300 1.08 m3 3,500,000 3,780,000


mutu beton K-300 0.68 m3 3,500,000 2,362,500
mutu beton K-250 2.03 m3 2,750,000 5,568,750
mutu beton K-300 2.94 m3 3,500,000 10,290,000
mutu beton K-300 2.10 m3 3,500,000 7,350,000
mutu beton K-300 1.60 m3 3,500,000 5,600,000
mutu beton K-300 3.78 m3 3,500,000 13,230,000
mutu beton K-300 3.41 m3 3,500,000 11,943,750
mutu beton K-300 11.36 m3 3,500,000 39,768,750
mutu beton K-225 5.33 m3 3,250,000 17,306,250
mutu beton K-300 31.80 m3 3,500,000 111,300,000
66.10 jumlah 228,500,000

HEBEL 20 x 60 x 9 1,140.40 m2 95,000 108,338,000


MORTAR UTAMA 2,280.80 m2 30,000 68,424,000
MORTAR UTAMA 2,166.76 m2 30,000 65,002,800
22.40 m2 60,000 1,344,000
182.00 m2 60,000 10,920,000
156.00 m1 30,000 4,680,000
jumlah 258,708,800

HEBEL 20 x 60 x 9 1,028.40 m2 95,000 97,698,000


MORTAR UTAMA 2,056.80 m2 30,000 61,704,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
MORTAR UTAMA 1,953.96 m2 30,000 58,618,800
156.00 m1 30,000 4,680,000
jumlah 222,700,800

HEBEL 20 x 60 x 9 1,028.40 m2 95,000 97,698,000


MORTAR UTAMA 2,056.80 m2 30,000 61,704,000
MORTAR UTAMA 1,953.96 m2 30,000 58,618,800
156.00 m1 30,000 4,680,000
jumlah 222,700,800

HEBEL 20 x 60 x 9 1,028.40 m2 95,000 97,698,000


MORTAR UTAMA 2,056.80 m2 30,000 61,704,000
MORTAR UTAMA 1,953.96 m2 30,000 58,618,800
156.00 m1 30,000 4,680,000
jumlah 222,700,800

HEBEL 20 x 60 x 9 286.00 m2 65,000 18,590,000


MORTAR UTAMA 429.00 m2 25,000 10,725,000
MORTAR UTAMA 429.00 m2 20,000 8,580,000
160.00 m2 80,000 12,800,000
jumlah 50,695,000

ZINCALUMN ex BHP LYSAGHT 1,2 mm 450.00 m2 185,000 83,250,000


KANMURI type ESPANICA DOFF 450.00 m2 140,000 63,000,000
KANMURI type ESPANICA DOFF 70.00 m1 175,000 12,250,000
KANMURI type ESPANICA DOFF 2.00 bh 125,000 250,000
KANMURI type ESPANICA DOFF 5.00 bh 125,000 625,000
Kamper Samarinda Oven 150.00 m1 200,000 30,000,000
Rangka hollow 81.00 m2 850,000 68,850,000
jumlah 258,225,000

GYPSUM ex JAYA BOARD 710.00 m2 90,000 63,900,000


GYPSUM ex JAYA BOARD 180.00 m1 90,000 16,200,000
280.00 m1 30,000 8,400,000
365.00 m1 20,000 7,300,000
jumlah 95,800,000

GYPSUM ex JAYA BOARD 710.00 m2 90,000 63,900,000


GYPSUM ex JAYA BOARD 180.00 m1 90,000 16,200,000
280.00 m1 90,000 25,200,000
265.00 m1 20,000 5,300,000
jumlah 110,600,000

GYPSUM ex JAYA BOARD 710.00 m2 90,000 63,900,000


GYPSUM ex JAYA BOARD 180.00 m1 90,000 16,200,000
280.00 m1 90,000 25,200,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
265.00 m1 20,000 5,300,000
jumlah 110,600,000

GYPSUM ex JAYA BOARD 710.00 m2 90,000 63,900,000


GYPSUM ex JAYA BOARD 180.00 m1 90,000 16,200,000
280.00 m1 90,000 25,200,000
265.00 m1 20,000 5,300,000
jumlah 110,600,000

Hollow 0,6 mm, GRC board 120.00 m2 90,000 10,800,000


150.00 m1 50,000 7,500,000
jumlah 18,300,000

Alumunium 4" Powder Coating 40.00 m1 225,000 9,000,000


Alumunium 4" Powder Coating + kaca 6 mm 10.00 bh 3,500,000 35,000,000

Alumunium 4" Powder Coating 392.00 m1 275,000 107,800,000


Alumunium Powder Coating 56.00 set 6,500,000 364,000,000

Alumunium 3" Powder Coating 55.00 m1 225,000 12,375,000


Alumunium 3" Powder Coating 10.00 set 1,500,000 15,000,000

Alumunium 4" Powder Coating m1 -


kaca 8 mm ex asahi m2

Kamper samarinda Oven 6/15 56.00 bh 850,000 47,600,000


Kamper + Multipleks + HPL + duco 56.00 bh 1,750,000 98,000,000
List profil 10 cm kamper + duco 672.00 m1 45,000 30,240,000

Kamper samarinda Oven 6/15 12.00 bh 850,000 10,200,000


Kamper + Multipleks + HPL + duco 24.00 bh 1,750,000 42,000,000
List profil 10 cm kamper + duco 144.00 m1 45,000 6,480,000

Kamper samarinda Oven 6/15 9.00 bh 850,000 7,650,000


Kamper + Multipleks + HPL + duco 9.00 bh 1,750,000 15,750,000
List profil 10 cm kamper + duco 108.00 m1 45,000 4,860,000

Kamper samarinda Oven 6/15 56.00 bh 850,000 47,600,000


Kamper + Multipleks + HPL + duco 56.00 bh 1,750,000 98,000,000
List profil 10 cm kamper + duco 672.00 m1 45,000 30,240,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
kaca tempered 10 mm 56.00 set 5,000,000 280,000,000

jumlah 1,261,795,000

JJ 4" sus 304 3,5 mm 217.50 psg 150,000 32,625,000


HT 24 Mag. Stripe, Euro mortise 60/20, Satin 56.00 set 1,650,000 92,400,000
Chrome, Insert, Logo, Granada Hadle -
- HT24W Hotel Locking Mang Software 1.00 ls 19,000,000 19,000,000
- ED 22 Motorise Encoder -
- PP22 -
-Windows Distributor -
-Adaptor -
-
ex KEND 24.00 bh 450,000 10,800,000
ex KEND 9.00 bh 450,000 4,050,000
ex KEND 56.00 bh 450,000 25,200,000
ex KEND 65.00 bh 1,200,000 78,000,000
ex GMT 145.00 bh 40,000 5,800,000
ex KEND 56.00 bh 125,000 7,000,000
ex KEND 56.00 bh 125,000 7,000,000
ex KEND 6.00 set 2,500,000 15,000,000
HT 24 Mag. Stripe, Euro mortise 60/20, Satin 3.00 set 2,500,000 7,500,000
jumlah 304,375,000

ex Indogress / setara 720.30 m2 275,000 198,082,500


Marmer UJUNG PANDANG super 26.00 m2 850,000 22,100,000
Marmer DARK EMPRADOR china 24.00 m2 1,200,000 28,800,000
Marmer UJUNG PANDANG super 15.00 m1 90,000 1,350,000
ex Indogress / setara 332.00 m1 50,000 16,600,000
Marmer DARK EMPRADOR china 26.00 m1 750,000 19,500,000
ROMAN GRESS 47.00 m2 225,000 10,575,000
ROMAN GRESS 100.00 m2 185,000 18,500,000
ROMAN GRESS 178.00 m1 50,000 8,900,000
batu alam andesit 24.00 m2 250,000 6,000,000
jumlah 265,532,500

ex Indogress / setara 720.30 m2 275,000 198,082,500


Marmer UJUNG PANDANG super 26.00 m2 850,000 22,100,000
Marmer UJUNG PANDANG super 15.00 m1 90,000 1,350,000
ex Indogress / setara 332.00 m1 50,000 16,600,000
ROMAN GRESS 100.00 m2 185,000 18,500,000
ROMAN GRESS 178.00 m1 50,000 8,900,000
jumlah 265,532,500

ex Indogress / setara 720.30 m2 275,000 198,082,500


Marmer UJUNG PANDANG super 26.00 m2 850,000 22,100,000
Marmer UJUNG PANDANG super 15.00 m1 90,000 1,350,000
ex Indogress / setara 332.00 m1 50,000 16,600,000
ROMAN GRESS 100.00 m2 185,000 18,500,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
ROMAN GRESS 178.00 m1 50,000 8,900,000
jumlah 265,532,500

ex Indogress / setara 720.30 m2 275,000 198,082,500


Marmer UJUNG PANDANG super 26.00 m2 850,000 22,100,000
Marmer UJUNG PANDANG super 15.00 m1 90,000 1,350,000
ex Indogress / setara 332.00 m1 50,000 16,600,000
ROMAN GRESS 100.00 m2 185,000 18,500,000
ROMAN GRESS 178.00 m1 50,000 8,900,000
jumlah 265,532,500

ROMAN GRESS 225.00 m2 150,000 33,750,000


ROMAN GRESS 178.00 m1 50,000 8,900,000
jumlah 42,650,000

Roman G- 362216 " Veneto Mocha " 196.00 m2 135,000 26,460,000


Granit Bakar " 61.60 M2 500,000 30,800,000
Mozaik Keramik 252.00 m1 75,000 18,900,000
Roman 1,120.00 m2 175,000 196,000,000
Roman " Inserto " 224.00 bh 55,000 12,320,000
Marmer 56.00 unit 750,000 42,000,000
jumlah 326,480,000

Batu Andesit / paras bali 340.00 m2 375,000 127,500,000


Marmer travertin 30.00 m2 1,350,000 40,500,000
Batu Andesit / paras bali 340.00 m2 375,000 127,500,000
jumlah 295,500,000

Sika Grout 355.00 m2 75,000 26,625,000


Sika Grout + shell kote 280.00 m2 75,000 21,000,000
Dulux Alkali resisting primer 2,484.00 m2 25,000 62,100,000
Dulux Alkali resisting primer 5,376.28 m2 25,000 134,406,900
Dulux weathershield 2,484.00 m2 35,000 86,940,000
Dulux pentalite 5,376.28 m2 30,000 161,288,280
Danapaint 2,960.00 m2 25,000 74,000,000
Impra 814.00 m1 75,000 61,050,000
Ultran Politur P-03 150.00 m1 20,000 3,000,000
Mowilex Roof paint 70.00 m1 20,000 1,400,000
mowilex coating 394.00 m2 35,000 13,790,000
jumlah 645,600,180

dimensi 1600 x 2000 x 1280 2.00 set 8,250,000 16,500,000


dimensi 1600 x 2300 x 1280 3.00 set 10,350,000 31,050,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
dimensi 1600 x 2000 x 1280 1.00 set 5,775,000 5,775,000
resapan 1500 x 1500 x 1500 6.00 set 2,500,000 15,000,000
jumlah 68,325,000

pipa Air Kotor dan Pipa Air Bekas dengan 45.00 m1 80,000 3,600,000
PVC klass 10 kg/cm² 101.00 m1 80,000 8,080,000
14.50 m1 80,000 1,160,000
45.00 m1 80,000 3,600,000
50.00 m1 80,000 4,000,000
76.00 m1 36,500 2,774,000
1.00 ls 3,000,000 3,000,000
jumlah 26,214,000

pipa Air Kotor dan Pipa Air Bekas dengan 45.00 m1 80,000 3,600,000
PVC klass 10 kg/cm²

14.50 m1 80,000 1,160,000


45.00 m1 80,000 3,600,000
76.00 m1 36,500 2,774,000
1.00 ls 3,000,000 3,000,000
jumlah 14,134,000

pipa Air Kotor dan Pipa Air Bekas dengan 45.00 m1 80,000 3,600,000
PVC klass 10 kg/cm²

14.50 m1 80,000 1,160,000


45.00 m1 80,000 3,600,000
76.00 m1 36,500 2,774,000
1.00 ls 3,000,000 3,000,000
jumlah 14,134,000

pipa Air Kotor dan Pipa Air Bekas dengan 45.00 m1 80,000 3,600,000
PVC klass 10 kg/cm²

14.50 m1 80,000 1,160,000


45.00 m1 80,000 3,600,000
76.00 m1 36,500 2,774,000
1.00 ls 3,000,000 3,000,000
jumlah 14,134,000

TAMA DI LT. DASAR


Pengadaan dan pemasangan pipa PPR PN 10, sesuai spesifikasi,
pada penempatan tertentu mempergunakan sambungan solvent
cement, lengkap dengan hanger, support, klem dan accessories 2.00 m1 167,500 335,000
lainnya.
Pengadaan dan pemasangan pipa PPR PN 10, sesuai spesifikasi, HARGA
pada penempatan tertentu mempergunakan sambungan solvent
KETERANGAN VOL SAT. JUMLAH
cement, lengkap dengan hanger, support, klem dan accessories SAT. BAHAN
lainnya.
-
166.50 m1 121,600 20,246,400
5.00 m1 121,600 608,000
59.50 m1 78,600 4,676,700
1.00 ls 25,000,000 25,000,000
jumlah 50,866,100

4.00 bh 2,325,000 9,300,000


8.00 bh 605,500 4,844,000
1.00 bh 410,900 410,900
2.00 bh 234,700 469,400
4.00 bh 787,500 3,150,000
4.00 bh 2,425,000 9,700,000
4.00 bh 700,000 2,800,000
4.00 bh 501,900 2,007,600
5.00 bh 405,000 2,025,000
5.00 bh 577,000 2,885,000
2.00 bh 853,300 1,706,600
jumlah 39,298,500

Dinding bara plester aci + tutup beton 1.00 unit 20,000,000 20,000,000
type Fiber 2.00 unit 5,750,000 11,500,000
Vertical Multi Stage 2.00 unit 21,000,000 42,000,000
270 LPM, Head 4 Bar
5.5 kW
Duty/Stand By
kapasitas 200 ltr 1.00 bh 7,000,000 7,000,000
jumlah 80,500,000

TAMA DI ROOF TOP

Pengadaan dan pemasangan pipa GIP medium class BS. 1387,


sesuai spesifikasi, pada penempatan tertentu mempergunakan 173.00 m1 159,500 27,593,500
sambungan solvent cement, lengkap dengan hanger, support,
klem dan accessories lainnya.

2.00 m1 371,000 742,000


1.00 ls 9,000,000 9,000,000
jumlah 37,335,500

10.00 Bh 605,500 6,055,000


4.00 Bh 1,555,000 6,220,000
4.00 Bh 501,900 2,007,600
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
2.00 Bh 853,300 1,706,600
9.00 Bh -
jumlah 15,989,200

type Fiber 5.00 unit 5,000,000 25,000,000


Vertical Multi Stage 2.00 unit 24,500,000 49,000,000
@ 150 LPM, Head 2 Bar
5.5 kW
Duty/Stand By

jumlah 74,000,000

pipa PPR PN 10

35.00 m1 121,600 4,256,000


10.50 m1 30,750 322,875
13.00 m1 26,700 347,100
322.00 m1 22,700 7,309,400
1.00 ls 9,000,000 9,000,000
14.00 bh 150,000 2,100,000
28.00 bh 245,000 6,860,000
jumlah 30,195,375

35.00 m1 121,600 4,256,000


10.50 m1 30,750 322,875
13.00 m1 26,700 347,100
322.00 m1 22,700 7,309,400
1.00 ls 9,000,000 9,000,000
14.00 bh 150,000 2,100,000
28.00 bh 245,000 6,860,000
jumlah 30,195,375

35.00 m1 121,600 4,256,000


10.50 m1 30,750 322,875
13.00 m1 26,700 347,100
322.00 m1 22,700 7,309,400
1.00 ls 9,000,000 9,000,000
14.00 bh 150,000 2,100,000
28.00 bh 245,000 6,860,000
jumlah 30,195,375

35.00 m1 121,600 4,256,000


10.50 m1 30,750 322,875
13.00 m1 26,700 347,100
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
322.00 m1 22,700 7,309,400
1.00 ls 9,000,000 9,000,000
14.00 bh 150,000 2,100,000
28.00 bh 245,000 6,860,000
jumlah 30,195,375

Pengadaan dan pemasangan pipa PPR PN 20, sesuai spesifikasi, 35,500


171.50 m 6,088,250
pada penempatan tertentu mempergunakan sambungan solvent
58.00 m 170,000 9,860,000
cement, lengkap dengan hanger, support, klem dan accessories
lainnya. 1.00 Lot 12,000,000 12,000,000
jumlah 27,948,250

Pengadaan dan pemasangan pipa PPR PN 20, sesuai spesifikasi, 35,500


171.50 m 6,088,250
pada penempatan tertentu mempergunakan sambungan solvent
58.00 m 170,000 9,860,000
cement, lengkap dengan hanger, support, klem dan accessories
lainnya. 1.00 Lot 12,000,000 12,000,000
jumlah 27,948,250

Pengadaan dan pemasangan pipa PPR PN 20, sesuai spesifikasi, 35,500


171.50 m 6,088,250
pada penempatan tertentu mempergunakan sambungan solvent
58.00 m 170,000 9,860,000
cement, lengkap dengan hanger, support, klem dan accessories
lainnya. 1.00 Lot 12,000,000 12,000,000
jumlah 27,948,250

Pengadaan dan pemasangan pipa PPR PN 20, sesuai spesifikasi, 35,500


171.50 m 6,088,250
pada penempatan tertentu mempergunakan sambungan solvent
58.00 m 170,000 9,860,000
cement, lengkap dengan hanger, support, klem dan accessories
lainnya. 1.00 Lot 12,000,000 12,000,000
jumlah 27,948,250
AMA DI ROOF TOP

pipa PPR PN 20 120.00 m 170,000 20,400,000


pipa PPR PN 20 1.00 unit 3,500,000 3,500,000
10.00 bh 635,500 6,355,000
2.00 bh 1,405,000 2,810,000
2.00 bh 1,555,000 3,110,000
4.00 bh 531,900 2,127,600
jumlah 38,302,600

Kapasitas : 200 ltr / menit 2.00 unit 30,000,000 60,000,000


Head : 40 mtr
Daya : 2,2 Kw/3Ph/ 380 V / 50 Hz
Putaran : 2900 rpm
1.00 lot 8,300,000 8,300,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
1.00 lot 3,800,000 3,800,000
3.00 unit 40,800,000 122,400,000
jumlah 134,500,000

Pengadaan dan pemasangan Pipa Vent dengan PVC D , sesuai 45,100


45.00 m 2,029,500
dengan spesifikasi , pada penempatan tertentu mempergunakan 75.50 m 33,000 2,491,500
sambungan solvent cement, lengkap dengan hanger, support, 90.50 m 16,000 1,448,000
klem dan accessories lainnnya. 1.00 Lot 1,500,000 1,500,000
jumlah 7,469,000

Pengadaan dan pemasangan Pipa Vent dengan PVC D , sesuai 45,100


45.00 m 2,029,500
dengan spesifikasi , pada penempatan tertentu mempergunakan 75.50 m 33,000 2,491,500
sambungan solvent cement, lengkap dengan hanger, support, 90.50 m 16,000 1,448,000
klem dan accessories lainnnya. 1.00 Lot 1,500,000 1,500,000
jumlah 7,469,000

Pengadaan dan pemasangan Pipa Vent dengan PVC D , sesuai 45,100


45.00 m 2,029,500
dengan spesifikasi , pada penempatan tertentu mempergunakan 75.50 m 33,000 2,491,500
sambungan solvent cement, lengkap dengan hanger, support, 90.50 m 16,000 1,448,000
klem dan accessories lainnnya. 1.00 Lot 1,500,000 1,500,000
jumlah 7,469,000

Pengadaan dan pemasangan Pipa Vent dengan PVC D , sesuai 45,100


45.00 m 2,029,500
dengan spesifikasi , pada penempatan tertentu mempergunakan 75.50 m 33,000 2,491,500
sambungan solvent cement, lengkap dengan hanger, support, 90.50 m 16,000 1,448,000
klem dan accessories lainnnya. 1.00 Lot 1,500,000 1,500,000
jumlah 7,469,000

GAN

1.00 unit 17,500,000 17,500,000


1.00 unit 11,000,000 11,000,000
14.00 unit 700,000 9,800,000
-
-
1.00 unit 9,000,000 9,000,000
14.00 unit 700,000 9,800,000
-
-
1.00 unit 11,000,000 11,000,000
14.00 unit 700,000 9,800,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
-
-
1.00 unit 8,500,000 8,500,000
14.00 unit 700,000 9,800,000
-
-
1.00 unit 8,500,000 8,500,000
jumlah 104,700,000

NYY 4 x 35 mm2 + BC 16 mm2 5.00 m1 280,000 1,400,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 10.50 m1 19,000 199,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 17.00 m1 19,000 323,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 18.00 m1 19,000 342,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 24.50 m1 19,000 465,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 25.50 m1 19,000 484,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 39.50 m1 19,000 750,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 40.50 m1 19,000 769,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 47.00 m1 19,000 893,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 m1 19,000 912,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 54.50 m1 19,000 1,035,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 60.00 m1 19,000 1,140,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 59.00 m1 19,000 1,121,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 61.00 m1 19,000 1,159,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 62.00 m1 19,000 1,178,000
jumlah 12,173,000

NYY 4 x 35 mm2 + BC 16 mm2 10.00 m1 280,000 2,800,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 13.50 m1 19,000 256,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 18.50 m1 19,000 351,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 21.50 m1 19,000 408,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 25.50 m1 19,000 484,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 28.50 m1 19,000 541,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 41.50 m1 19,000 788,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 44.50 m1 19,000 845,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 49.50 m1 19,000 940,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 52.50 m1 19,000 997,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 57.50 m1 19,000 1,092,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 66.50 m1 19,000 1,263,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 63.00 m1 19,000 1,197,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 57.50 m1 19,000 1,092,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 63.00 m1 19,000 1,197,000
jumlah 14,257,000

NYY 4 x 35 mm2 + BC 16 mm2 20.00 m1 280,000 5,600,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 10.50 m1 19,000 199,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 17.00 m1 19,000 323,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 18.00 m1 19,000 342,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 24.50 m1 19,000 465,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 25.50 m1 19,000 484,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 39.50 m1 19,000 750,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 40.50 m1 19,000 769,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 47.00 m1 19,000 893,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 m1 19,000 912,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 54.50 m1 19,000 1,035,500
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
NYM 3 x 2,5 mm² in Conduit Ø20 mm 60.00 m1 19,000 1,140,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 59.00 m1 19,000 1,121,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 61.00 m1 19,000 1,159,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 62.00 m1 19,000 1,178,000
jumlah 16,373,000

NYY 4 x 35 mm2 + BC 16 mm2 20.00 m1 280,000 5,600,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 10.50 m1 19,000 199,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 17.00 m1 19,000 323,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 18.00 m1 19,000 342,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 24.50 m1 19,000 465,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 25.50 m1 19,000 484,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 39.50 m1 19,000 750,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 40.50 m1 19,000 769,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 47.00 m1 19,000 893,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 m1 19,000 912,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 54.50 m1 19,000 1,035,500
NYM 3 x 2,5 mm² in Conduit Ø20 mm 60.00 m1 19,000 1,140,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 59.00 m1 19,000 1,121,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 61.00 m1 19,000 1,159,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 62.00 m1 19,000 1,178,000
jumlah 16,373,000

NYFGBY 4 x 16 mm2 50.00 m1 181,000 9,050,000


jumlah 9,050,000

344.00 m1 225,000 77,400,000


70.00 m1 185,000 12,950,000
-
16.00 m1 395,000 6,320,000
-
1.00 ttk 3,000,000 3,000,000
jumlah 99,670,000

21.00 bh 205,000 4,305,000


5.00 bh 900,000 4,500,000
7.00 bh 370,000 2,590,000
3.00 bh 255,000 765,000
2.00 bh 920,000 1,840,000
1.00 bh 34,000 34,000
5.00 bh 38,000 190,000
1.00 bh 40,000 40,000
8.00 bh 38,000 304,000

42.00 bh 205,000 8,610,000


14.00 bh 345,000 4,830,000
BY INTERIOR 42.00 bh - -
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
42.00 bh 38,000 1,596,000
28.00 bh 38,000 1,064,000
bh -
14.00 bh 145,000 2,030,000

NYM 3 x 2,5 mm² in Conduit Ø20 mm 136.00 ttk 205,000 27,880,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 50.00 ttk 235,000 11,750,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 1.00 ttk 205,000 205,000
jumlah 72,533,000

22.00 bh 205,000 4,510,000


4.00 bh 900,000 3,600,000
2.00 bh 255,000 510,000
2.00 bh 920,000 1,840,000
4.00 bh 38,000 152,000
1.00 bh 40,000 40,000
6.00 bh 38,000 228,000

42.00 bh 205,000 8,610,000


14.00 bh 345,000 4,830,000
BY INTERIOR 42.00 bh - -
42.00 bh 38,000 1,596,000
28.00 bh 38,000 1,064,000
bh -
14.00 bh 145,000 2,030,000

NYM 3 x 2,5 mm² in Conduit Ø20 mm 132.00 ttk 205,000 27,060,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 ttk 235,000 11,280,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 1.00 ttk 205,000 205,000
jumlah 67,555,000

22.00 bh 205,000 4,510,000


4.00 bh 900,000 3,600,000
2.00 bh 255,000 510,000
2.00 bh 920,000 1,840,000
4.00 bh 38,000 152,000
1.00 bh 40,000 40,000
6.00 bh 38,000 228,000

42.00 bh 205,000 8,610,000


14.00 bh 345,000 4,830,000
BY INTERIOR 42.00 bh - -
42.00 bh 38,000 1,596,000
28.00 bh 38,000 1,064,000
bh -
14.00 bh 145,000 2,030,000

NYM 3 x 2,5 mm² in Conduit Ø20 mm 132.00 ttk 205,000 27,060,000


HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 ttk 235,000 11,280,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 1.00 ttk 205,000 205,000
jumlah 67,555,000

22.00 bh 205,000 4,510,000


4.00 bh 900,000 3,600,000
2.00 bh 255,000 510,000
2.00 bh 920,000 1,840,000
4.00 bh 38,000 152,000
1.00 bh 40,000 40,000
6.00 bh 38,000 228,000

42.00 bh 205,000 8,610,000


14.00 bh 345,000 4,830,000
BY INTERIOR 42.00 bh - -
42.00 bh 38,000 1,596,000
28.00 bh 38,000 1,064,000
bh -
14.00 bh 145,000 2,030,000

NYM 3 x 2,5 mm² in Conduit Ø20 mm 132.00 ttk 205,000 27,060,000


NYM 3 x 2,5 mm² in Conduit Ø20 mm 48.00 ttk 235,000 11,280,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 1.00 ttk 205,000 205,000
jumlah 67,555,000

3.00 bh 900,000 2,700,000


7.00 bh 255,000 1,785,000
3.00 bh 38,000 114,000
8.00 bh 38,000 304,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 10.00 ttk 205,000 2,050,000
NYM 3 x 2,5 mm² in Conduit Ø20 mm 8.00 ttk 235,000 1,880,000
jumlah 8,833,000

1.00 Unit 1,700,000 1,700,000


1.00 Unit 4,600,000 4,600,000
1.00 bh 1,850,000 1,850,000
1.00 bh 1,600,000 1,600,000
32.00 bh 1,900,000 60,800,000
10.00 bh 3,600,000 36,000,000
5.00 bh 780,000 3,900,000
7.00 bh 2,000,000 14,000,000
1.00 bh 7,050,000 7,050,000
1.00 bh 7,050,000 7,050,000
1.00 bh 4,600,000 4,600,000
1.00 bh 160,000 160,000
4.00 bh 160,000 640,000
2.00 bh 235,000 470,000
14.00 bh 52,000 728,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 8.00 m1 51,000 408,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 6.00 ttk 837,000 5,022,000
Coaxial Cable 5C/ RG-6 in PVC High Impact ø 3/4" 14.00 ttk 837,000 11,718,000
jumlah 162,296,000

1.00 Unit 350,000 350,000


4.00 bh 160,000 640,000
2.00 bh 235,000 470,000
14.00 bh 52,000 728,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 8.00 m1 51,000 408,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 6.00 ttk 837,000 5,022,000
Coaxial Cable 5C/ RG-6 in PVC High Impact ø 3/4" 14.00 ttk 837,000 11,718,000
jumlah 19,336,000

1.00 Unit 350,000 350,000


4.00 bh 160,000 640,000
2.00 bh 235,000 470,000
14.00 bh 52,000 728,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 8.00 m1 51,000 408,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 6.00 ttk 837,000 5,022,000
Coaxial Cable 5C/ RG-6 in PVC High Impact ø 3/4" 14.00 ttk 837,000 11,718,000
jumlah 19,336,000

1.00 Unit 350,000 350,000


4.00 bh 160,000 640,000
2.00 bh 235,000 470,000
14.00 bh 52,000 728,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 8.00 m1 51,000 408,000
Coaxial Cable 7C/ RG-11 in PVC High Impact ø 1" 6.00 ttk 837,000 5,022,000
Coaxial Cable 5C/ RG-6 in PVC High Impact ø 3/4" 14.00 ttk 837,000 11,718,000
jumlah 19,336,000

1.00 Unit 5,350,000 5,350,000


2.00 Unit 1,050,000 2,100,000
1.00 Unit 950,000 950,000
Coaxial Cable 7C/RG-11 dalam PVC High Impact ø 1" 1.00 ttk 837,000 837,000
Coaxial Cable 7C/RG-11 dalam PVC High Impact ø 1" 2.00 ttk 837,000 1,674,000
Coaxial Cable 7C/RG-11 dalam PVC High Impact ø 1" 1.00 ttk 837,000 837,000
1.00 Lot 2,500,000 2,500,000
jumlah 14,248,000

1.00 Unit 1,800,000 1,800,000


1.00 Unit 58,500,000 58,500,000
1.00 Unit 300,000 300,000
1.00 Unit 6,750,000 6,750,000
1.00 Unit 450,000 450,000
1.00 bh 2,600,000 2,600,000
1.00 bh 47,000 47,000
14.00 bh 47,000 658,000
1.00 bh 47,000 47,000
18.00 bh 160,000 2,880,000
ITC 10 x 2 x 0.6 mm2 12.50 m1 51,000 637,500
ITC 10 x 2 x 0.6 mm2 in PVC High Impact Ø 3/4 15.00 ttk 265,000 3,975,000
1.00 Lot 2,500,000 2,500,000
300 X 100 ( Termasuk Riser ) 70.00 m1 190,000 13,300,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
jumlah 94,444,500

1.00 Unit 450,000 450,000


14.00 bh 47,000 658,000
18.00 bh 160,000 2,880,000
ITC 10 x 2 x 0.6 mm2 15.50 m1 51,000 790,500
ITC 10 x 2 x 0.6 mm2 in PVC High Impact Ø 3/4 14.00 ttk 265,000 3,710,000
1.00 Lot 2,500,000 2,500,000
300 X 100 ( Termasuk Riser ) 70.00 m1 190,000 13,300,000
jumlah 24,288,500

1.00 Unit 450,000 450,000


14.00 bh 47,000 658,000
14.00 bh 160,000 2,240,000
ITC 10 x 2 x 0.6 mm2 18.50 m1 51,000 943,500
ITC 10 x 2 x 0.6 mm2 in PVC High Impact Ø 3/4 14.00 ttk 265,000 3,710,000
1.00 Lot 2,500,000 2,500,000
300 X 100 ( Termasuk Riser ) 70.00 m1 190,000 13,300,000
jumlah 23,801,500

1.00 Unit 450,000 450,000


14.00 bh 47,000 658,000
14.00 bh 160,000 2,240,000
ITC 10 x 2 x 0.6 mm2 21.50 m1 51,000 1,096,500
ITC 10 x 2 x 0.6 mm2 in PVC High Impact Ø 3/4 14.00 ttk 265,000 3,710,000
1.00 Lot 2,500,000 2,500,000
300 X 100 ( Termasuk Riser ) 70.00 m1 190,000 13,300,000
jumlah 23,954,500

1.00 bh 23,500,000 23,500,000


1.00 bh 9,250,000 9,250,000
2.00 bh 5,600,000 11,200,000
1.00 bh 18,500,000 18,500,000
2.00 bh 4,220,000 8,440,000
NYM 3 x 2.5 mm2 2.00 ttk 1,700,000 3,400,000
+ Coaxcial Cable RG-59 in PVC Hight Impact Ø3/4 jumlah 74,290,000

2.00 bh 4,220,000 8,440,000


NYM 3 x 2.5 mm2 2.00 ttk 1,700,000 3,400,000
+ Coaxcial Cable RG-59 in PVC Hight Impact Ø3/4 jumlah 11,840,000

2.00 bh 4,220,000 8,440,000


NYM 3 x 2.5 mm2 2.00 ttk 1,700,000 3,400,000
+ Coaxcial Cable RG-59 in PVC Hight Impact Ø3/4 jumlah 11,840,000

2.00 bh 4,220,000 8,440,000


NYM 3 x 2.5 mm2 2.00 ttk 1,700,000 3,400,000
+ Coaxcial Cable RG-59 in PVC Hight Impact Ø3/4 jumlah 11,840,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
1.00 unit 13,000,000 13,000,000
1.00 unit 7,500,000 7,500,000
1.00 unit 450,000 450,000
18.00 Buah 120,000 2,160,000
2.00 Buah 259,000 518,000
2.00 Buah 270,000 540,000
2.00 Buah 350,000 700,000
2.00 Buah -
2.00 Buah 6,000 12,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 12.50 m1 18,000 225,000
Di dalam PVC Conduit Ø 3/4" - -
- -
Kabel Power FRC 3 ( 1x1,5) mm2 100.00 m1 27,000 2,700,000
Kabel Kontrol Shielded Twisted 16 AWG 2 Pair - -
di dalam PVC Conduit Ø 3/4" - -
- -
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 29.00 Titik 195,000 5,655,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 3.00 Titik 435,000 1,305,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 3.00 Titik 435,000 1,305,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 3.00 Titik 435,000 1,305,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 3.00 Titik 435,000 1,305,000
1.00 Lot 2,500,000 2,500,000
jumlah 41,180,000

1.00 unit 450,000 450,000


17.00 Buah 120,000 2,040,000
2.00 Buah 259,000 518,000
2.00 Buah 270,000 540,000
2.00 Buah 350,000 700,000
2.00 Buah 375,000 750,000
2.00 Buah 6,000 12,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 15.50 m1 18,000 279,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 55.00 Titik 195,000 10,725,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
1.00 Lot 2,500,000 2,500,000
jumlah 21,994,000

1.00 unit 450,000 450,000


17.00 Buah 120,000 2,040,000
2.00 Buah 259,000 518,000
2.00 Buah 270,000 540,000
2.00 Buah 350,000 700,000
2.00 Buah -
2.00 Buah 6,000 12,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 18.50 m1 18,000 333,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 17.00 Titik 195,000 3,315,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
1.00 Lot 2,500,000 2,500,000
jumlah 13,888,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN
1.00 unit 450,000 450,000
17.00 Buah 120,000 2,040,000
2.00 Buah 259,000 518,000
2.00 Buah 270,000 540,000
2.00 Buah 350,000 700,000
2.00 Buah -
2.00 Buah 6,000 12,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 18.50 m1 18,000 333,000
NYA 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 17.00 Titik 195,000 3,315,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
NYMHY 2 x 1.5 mm2 di dalam PVC Conduit Ø 3/4" 2.00 Titik 435,000 870,000
1.00 Lot 2,500,000 2,500,000
jumlah 13,888,000

133.00 m1 90,000 11,970,000


1.00 Lot 1,000,000 1,000,000

83.50 m1 18,000 1,503,000


76.50 m1 37,000 2,830,500
1.00 Lot 1,000,000 1,000,000

ex Panasonic atau setara 14.00 unit 3,750,000 52,500,000


ex Panasonic atau setara 14.00 unit 375,000 5,250,000
jumlah 76,053,500

133.00 m1 90,000 11,970,000


1.00 Lot 1,000,000 1,000,000

83.50 m1 18,000 1,503,000


76.50 m1 37,000 2,830,500
1.00 Lot 1,000,000 1,000,000

ex Panasonic atau setara 14.00 unit 3,750,000 52,500,000


ex Panasonic atau setara 14.00 unit 375,000 5,250,000
jumlah 76,053,500

133.00 m1 90,000 11,970,000


1.00 Lot 1,000,000 1,000,000

83.50 m1 18,000 1,503,000


76.50 m1 37,000 2,830,500
1.00 Lot 1,000,000 1,000,000

ex Panasonic atau setara 14.00 unit 3,750,000 52,500,000


ex Panasonic atau setara 14.00 unit 375,000 5,250,000
jumlah 76,053,500
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN

133.00 m1 90,000 11,970,000


1.00 Lot 1,000,000 1,000,000

83.50 m1 18,000 1,503,000


76.50 m1 37,000 2,830,500
1.00 Lot 1,000,000 1,000,000

ex Panasonic atau setara 14.00 unit 3,750,000 52,500,000


ex Panasonic atau setara 14.00 unit 375,000 5,250,000
jumlah 76,053,500

TOTO CW 661 JT1-SW516 JP 56.00 bh 2,950,000 165,200,000


TOTO L565 / TX 101 LB 56.00 set 2,150,000 120,400,000
TOTO TX 404 SDN 56.00 set 1,250,000 70,000,000
Tebisa 56.00 bh 550,000 30,800,000
TOTO TX 488 S 56.00 bh 1,200,000 67,200,000
TOTO TGB 500 AZRN 56.00 bh 550,000 30,800,000
TX 1 BV1 112.00 bh 350,000 39,200,000
Stainless ex lokal 56.00 bh 250,000 14,000,000
Stainless ex lokal 56.00 bh 550,000 30,800,000
jumlah 568,400,000

2.00 bh 3,450,000 6,900,000


2.00 bh 900,000 1,800,000

34.00 m1 295,000 10,030,000


4.00 m1 150,000 600,000
1.00 lot 4,000,000 4,000,000

1.00 bh 2,325,000 2,325,000


jumlah 25,655,000

2.00 bh 3,450,000 6,900,000


2.00 bh 900,000 1,800,000

34.00 m1 295,000 10,030,000


4.00 m1 150,000 600,000
1.00 lot 2,970,000 2,970,000

1.00 bh 2,325,000 2,325,000


jumlah 24,625,000
HARGA
KETERANGAN VOL SAT. JUMLAH
SAT. BAHAN

2.00 bh 3,450,000 6,900,000


2.00 bh 900,000 1,800,000

34.00 m1 295,000 10,030,000


4.00 m1 150,000 600,000
1.00 lot 2,970,000 2,970,000

1.00 bh 2,325,000 2,325,000


jumlah 24,625,000

2.00 bh 3,450,000 6,900,000


2.00 bh 900,000 1,800,000

37.00 m1 295,000 10,915,000


4.00 m1 150,000 600,000
1.00 lot 2,970,000 2,970,000

1.00 bh 2,325,000 2,325,000


jumlah 25,510,000

1.00 unit 240,000,000 240,000,000


8 orang / 550 kg
60 mpm
1400 mm (W) x 1250 (D)
80 MM
Dinding kanan dan kiri-Stainless Steel Hairline
Dinding dalam / tengah-Stainless Steel Mirror
Pintu dalam-Stainless Steel Mirror
Pintu Luar / Hall Door-Stainless Steel Hairline
1.00 unit 25,000,000 25,000,000
jumlah 265,000,000
LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Museum Nasional - Pek.Struktur HAL 58/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

<2> PEKERJAAN STRUKTUR TAHAP 6 - 2018

Museum Nasional - Pek.Struktur HAL 59/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

II LANTAI BASEMENT 1

A Pekerjaan Tribun

1 Bobokan plat Beton bertulang

a Ukuran 80 x 80 cm 0.00%
b Ukuran 65 x 100 cm 0.00%
c Ukuran 80 x 120 cm 0.00%
2 Tanggul beton Mulut Manhole 15 x 15 cm 0.00%
3 Tutup Manhole dari plat besi rangka siku finish cat anti karat lengkap engsel, Gembok dll ukuran :

a Ukuran 80 x 80 cm 0.00%

Museum Nasional - Pek.Struktur HAL 60/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

b Ukuran 65 x 100 cm 0.00%


c Ukuran 80 x 120 cm 0.00%
4 Pekerjaan Plat Penutup Void diatas STP

a Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%


b Bekisting 0.00%
c Pembesian 0.00%
5 Pekerjaan Tribun

6 Pekerjaan Kolom

a Kolom WF 300 x 150 x 6,5 x 9 0.02%


b Chemset M 25 0.02%

Museum Nasional - Pek.Struktur HAL 61/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

c Base Plate tebal 12 mm 0.00%


d Plat Stiffener tebal 10 mm 0.00%
e Mur Baud HTB M 22 0.00%
f Grouting tebal 25 mm

- Ukuran 360 x 180 mm 0.00%


7 Pekerjaan Balok

a Balok WF 300 x 150 x 6,5 x 9 0.08%


b Balok WF 250 x 125 x 6 x 9 0.04%
c Balok WF 200 x 100 x 5,5 x 8 0.04%
d Chemset M 16 0.03%

Museum Nasional - Pek.Struktur HAL 62/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

e Base Plate tebal 12 mm 0.01%


f Plat Stiffener tebal 8 mm & Plat Simpul tebal 12 mm 0.00%
g Mur Baud HTB M 16 0.00%
h Mur Baud HTB M 19 0.00%
h Grouting tebal 25 mm

- Ukuran 600 x 200 mm 0.00%

Museum Nasional - Pek.Struktur HAL 63/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ukuran 390 x 150 mm 0.00%


- Ukuran 450 x 125 mm 0.00%
j Cat zinkcromate ex.kansai 0.01%
8 Pekerjaan Plat dan Trap Tangga & Tribun

a Besi Siku L 100 x 100 x 10 0.30%


b Metal Deck tebal 0,75 mm 0.07%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.06%
d Bekisting 0.04%
e Pembesian 0.05%
f Shear conector Ø 10 mm - 300 mm 0.01%

Museum Nasional - Pek.Struktur HAL 64/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

g Cat zinkcromate ex.kansai 0.01%


Sub Total A 0.79%

B Pekerjaan Lain - Lain


Inject lantai dan dinding area Lantai B2 dan B1 (Banyaknya lantai dan dinding
1 0.00%
yang bocor di area B1 dan B2 sehingga mengganggu pekerjaan finishing)
Peninggian lantai di ruang konservasi sederhana AS 9 (Elevasi ruangan turun
2 0.01%
-60 cm dari lantai GF)
Bobok beton di area loading dock (Ada bekas pondasi di depan ruang
3 0.00%
konservasi sederhana area Lantai GF)
Struktur tangga di area taman sunken sisi barat (belum ada anak tangga arera
4 0.11%
Lantai GF)
Struktur pot bungan di area taman sunken sisi barat (Belum ada pot bunga area
5 0.03%
Lantai GF)
6 Bongkar Dinding Pagar Kolom dan Besi Existing t=1,8m dan Pembersihan 0.03%

Museum Nasional - Pek.Struktur HAL 65/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total B 0.19%

C Pekerjaan Rangka Dudukan Curtain Wall


1 WF 350x175x7x11 0.16%
2 Baut HTB A-325 M-16 0.01%
3 Plat Sambung 8 mm - Rangka Curtain Wall 0.02%
4 Plat Sambung 10 mm - Rangka Curtain Wall 0.01%
5 Stifner 12 mm - Rangka Curtain Wall 0.00%
6 Cat zinkcromate ex.kansai 0.01%
7 Cat Finishing ex.jotun 0.01%
8 Bongkar Pasang Cover Kolom plate t=2mm 0.01%

Museum Nasional - Pek.Struktur HAL 66/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total C 0.24%

D Pekerjaan Struktur Entrance Gate C-A


1 Pekerjaan Gutter
a Galian Tanah 600mm x 600mm 0.00%
b Lantai kerja T=3cm 0.00%
c Bekisting Dinding+Tutup Gutter multiplek 0.01%
d Pembesian 0.01%
e Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
2 Pekerjaan Pondasi
a Galian 0.00%
b Lantai kerja t=3cm 0.00%

Museum Nasional - Pek.Struktur HAL 67/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

c Bekesting 0.00%
d Pembesian 0.00%
e Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
f Grouting 0.00%
3 Pekerjaan Lantai
a Beton Mutu FC'- 25 MPA ( K-300 ) 0.01%
4 Pekerjaan Struktur Baja
a H 200 x 200 x 8 x 12 0.04%
b WF 300x150x6.5x9 0.03%
c WF 200 X 100 X 5,5 X 8 0.03%
d Chemichal Ø 16 mm 0.00%
e Angkur 2x2 Ø16 0.00%

Museum Nasional - Pek.Struktur HAL 68/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

f Baut HTB A-325 M-16 0.00%


g Baut HTB A-325 M-19 0.00%
h Baut HTB A-325 M-22 0.00%
i Plate 10,12,16 mm 0.01%
j zinchromate 0.00%
5 Pekerjaan Atap & Talang Beton
a Metal Deck tebal 0,75 mm 0.01%
b Pembesian 0.00%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
d Cnp 125 x 50 x 20 x 3,2 0.01%
e Pekerjaan Reng Baja Ringan 0.01%
f Flasing Zink Allum Bjls T=0,30 0.00%

Museum Nasional - Pek.Struktur HAL 69/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

g zinchromate 0.00%
k Shear conector Ø 10 mm - 300 mm 0.00%
Sub Total D 0.20%

E Pekerjaan Balkon Lt.3


a WF 450X200X9X14 0.03%
b WF 350X175X7X11 0.03%
c WF 300X150X6,5X9 0.02%
d Baut HTB A-325 M-22 0.00%
e Plate 10,12,16 mm 0.01%
f Chemichal M 16 mm 0.01%
g zinchromate 0.00%

Museum Nasional - Pek.Struktur HAL 70/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

h Metal Deck tebal 0,75 mm 0.01%


i Wiremesh M8-1 Lapis 0.00%
j Beton Mutu FC'- 25 MPA ( K-300 ) 0.01%
k Shear conector Ø 10 mm - 300 mm 0.00%
l Cat Finish Jotun 0.00%
M Bekesting 0.00%
Sub Total E 0.12%

F Pekerjaan struktur Lantai dan lainnya


1 Pekerjaan Peninggian Lantai Existing Area Toilet basement 2 As 7'-8'/I'-K
a Urugan Puing 0.00%
b Wiremesh M8-1 Lapis 0.00%

Museum Nasional - Pek.Struktur HAL 71/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

c Beton Mutu FC'- 25 MPA ( K-300 ) 0.01%


Pekerjaan Pondasi Dudukan AHU 16 Unit ( 2700 x 1600 x 150 ) Lantai B1 s/d
2
Lantai 5

a Bekesting 0.01%
b Wiremesh M8-1 Lapis 0.01%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.02%
d Finish Floor Hardener 0.01%
3 Pekerjaan Void Existing J'-K/7'-8 & L-M/7'-8
a Bekesting 0.00%
b Wiremesh M8-2 Lapis 0.00%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
4 Pekerjaan Lantai Innercourt G-J'/1'-4

Museum Nasional - Pek.Struktur HAL 72/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

a Bobok Ram Beton Existing 0.01%


b Bekesting 0.00%
c Wiremesh M8-1 Lapis 0.01%
d Beton Mutu FC'- 25 MPA ( K-300 ) 0.01%
e Finish Floor Hardener 0.00%
5 Pekerjaan Top Plenter Box Area Taman
a Bekisting 0.01%
b Pembesian 0.01%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
6 Parapet tambahan 1-2/A
a Bekisting 0.01%
b Pembesian 0.00%

Museum Nasional - Pek.Struktur HAL 73/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%


7 Pekerjaan Lantai Sunken
a Beton Mutu FC'- 25 MPA ( K-300 )
- Area Sunken Sisi Timur Bawah Pintu Pivot 0.01%
- Area Sunken Sisi Barat Bawah Pintu Pivot 0.01%
b Floor Hardener 7kg/m2 0.01%
8 Pekerjaan Perkuatan Folding Door
a Kolom WF 200 x 100 x 5,5 x 8 0.01%
b Balok WF 200 x 100 x 5,5 x 8 0.01%
c Base Plate t=10 mm 0.00%
e Chemichal M 16 mm 0.01%
f Zinchromate 0.00%

Museum Nasional - Pek.Struktur HAL 74/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

g Cat Finish Jotun 0.00%


9 Pengecoran Lantai Basement 1
a Beton Mutu FC'- 25 MPA ( K-300 ) t= 5cm 0.05%
Selasar,Storage batu besar,R.Studi Koleksi Batu Besar,R.Studi Koleksi
Khusus Penelitian Luar,R.Studi Koleksi Logam Besar,Storage Logam
besar
b Wiremesh M4-1 Lapis 0.03%
10 Pekerjaan Sampit Basement 2
a Bekisting ( Dinidng + Tutup ) 0.01%
b Pembesian 0.00%
c Beton Mutu FC'- 25 MPA ( K-300 ) + Lantai 0.00%
d acian 0.00%
e Waterprofing coating 0.00%

Museum Nasional - Pek.Struktur HAL 75/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

f Pekerjaan Tangga Monyet pipa Ø2" L=400 mm 0.01%


11 Pekerjaan Pondasi R.Pompa
Ukuran ( 2300x900x250),(2300x850x250) & (400x400x250)
a Bekesting 0.00%
b Wiremesh M8-1 Lapis 0.00%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
d Acian 0.00%
12 Pekerjaan Pondasi R.LVDV MVDP
Ukuran ( 6200x1200x200)
a Bekesting 0.00%
b Wiremesh M8-1 Lapis 0.00%
c Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%

Museum Nasional - Pek.Struktur HAL 76/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

d Acian 0.00%
13 Pekerjaan Parapet Penahan Tanah + Sloof
a Bekesting Multiplek 0.00%
b Pembesian Ø10-150 2 Lapis 0.00%
c Pengecoran 0.00%
d Acian 0.00%
14 Pekerjaan Parapet Ramp (as 1-2/ A-B) dari Lt.BM 2
a Bekesting Multiplek 0.01%
b Pembesian Ø10-150 2 Lapis 0.00%
c Pengecoran 0.00%
d Acian 0.00%
15 Pekerjaan Finishing Samping Smoke Stop Lobby Sisi Utara + tangga

Museum Nasional - Pek.Struktur HAL 77/932


LAPORAN BOBOT PRESTA

PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

a Pengurukan Puing 0.00%


b Bekesting Multiplek 0.00%
c Wiremesh M6- 1 Lapis 0.00%
d Beton Mutu FC'- 25 MPA ( K-300 ) 0.00%
e Floor Hardener 7kg/m2 0.00%
Sub Total F 0.34%

TOTAL STRUKTUR 1.87%

Museum Nasional - Pek.Struktur HAL 78/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

Museum Nasional - Pek.Struktur HAL 79/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

Museum Nasional - Pek.Struktur HAL 80/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


mbok dll ukuran :

0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Struktur HAL 81/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 82/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.08% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 83/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 84/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.30% 0.00% 0.00% 100.00%

100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 85/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


0.79% 0.00%

92.00% 0.00% 0.00% 0.00% 92.00%

100.00% 0.01% 0.00% 0.00% 100.00%

96.00% 0.00% 4.00% 0.00% 100.00%

100.00% 0.11% 0.00% 0.00% 100.00%

95.00% 0.03% 5.00% 0.00% 100.00%

53.00% 0.02% 47.00% 0.02% 100.00%

Museum Nasional - Pek.Struktur HAL 86/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.17% 0.02%

100.00% 0.16% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 87/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.24% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 88/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 89/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 90/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.20% 0.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 91/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.12% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 92/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 93/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 94/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

78.00% 0.01% 22.00% 0.00% 100.00%


78.00% 0.01% 22.00% 0.00% 100.00%
78.00% 0.00% 22.00% 0.00% 100.00%
78.00% 0.00% 22.00% 0.00% 100.00%
78.00% 0.00% 22.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 95/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

78.00% 0.00% 22.00% 0.00% 100.00%

86.00% 0.05% 14.00% 0.01% 100.00%

86.00% 0.03% 14.00% 0.00% 100.00%

45.00% 0.00% 55.00% 0.00% 100.00%


45.00% 0.00% 55.00% 0.00% 100.00%
45.00% 0.00% 55.00% 0.00% 100.00%
45.00% 0.00% 55.00% 0.00% 100.00%
45.00% 0.00% 55.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 96/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

45.00% 0.00% 55.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 97/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00% 100.00% 0.01% 100.00%


0.00% 0.00% 100.00% 0.00% 100.00%
0.00% 0.00% 100.00% 0.00% 100.00%
0.00% 0.00% 100.00% 0.00% 100.00%

Museum Nasional - Pek.Struktur HAL 98/932


BOBOT PRESTASI

PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL


PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.00% 0.00% 100.00% 0.00% 100.00%


0.00% 0.00% 100.00% 0.00% 100.00%
0.00% 0.00% 100.00% 0.00% 100.00%
0.00% 0.00% 100.00% 0.00% 100.00%
0.00% 0.00% 100.00% 0.00% 100.00%
0.29% 0.05%

1.81% 0.06%

Museum Nasional - Pek.Struktur HAL 99/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

Museum Nasional - Pek.Struktur HAL 100/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

Museum Nasional - Pek.Struktur HAL 101/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.00%

0.00%

0.00%

Museum Nasional - Pek.Struktur HAL 102/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.00%

0.00%

0.00%

0.02%

0.02%

Museum Nasional - Pek.Struktur HAL 103/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.00%

0.00%

0.08%

0.04%

0.04%

0.03%

Museum Nasional - Pek.Struktur HAL 104/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.00%

0.00%
0.00%

0.00%

Museum Nasional - Pek.Struktur HAL 105/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.01%

0.30%

0.07%

0.06%

0.04%

0.05%

0.01%

Museum Nasional - Pek.Struktur HAL 106/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.79%

0.00%

0.01%

0.00%

0.11%

0.03%

0.03%

Museum Nasional - Pek.Struktur HAL 107/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.19%

0.16%
0.01%
0.02%
0.01%
0.00%
0.01%
0.01%
0.01%

Museum Nasional - Pek.Struktur HAL 108/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.24%

0.00%
0.00%
0.01%
0.01%
0.00%

0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 109/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%

0.01%

0.04%
0.03%
0.03%
0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 110/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.01%
0.00%

0.01%
0.00%
0.00%
0.01%
0.01%
0.00%

Museum Nasional - Pek.Struktur HAL 111/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.20%

0.03%
0.03%
0.02%
0.00%
0.01%
0.01%
0.00%

Museum Nasional - Pek.Struktur HAL 112/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.00%
0.01%
0.00%
0.00%
0.00%
0.12%

0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 113/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.01%
0.01%
0.02%
0.01%

0.00%
0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 114/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.00%
0.01%
0.01%
0.00%

0.01%
0.01%
0.00%

0.01%
0.00%

Museum Nasional - Pek.Struktur HAL 115/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.01%
0.01%
0.01%

0.01%
0.01%
0.00%
0.01%
0.00%

Museum Nasional - Pek.Struktur HAL 116/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.05%

0.03%

0.01%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 117/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 118/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%
0.00%
0.00%
0.00%

0.01%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Struktur HAL 119/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%
0.00%
0.34%

1.87%

Museum Nasional - Pek.Struktur HAL 120/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR TAHAP 6 - 2018

DAFTAR No. 2.1 - LANTAI BASEMENT -2

DAF. 2.1.1 PEK. PASANG DINDING DAN FINISHING

Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
1 adukan kering,kolom dan balok praktis, sesuai spesifikasi dan gambar
pada : :
Lantai Basement -2

Plesteran menggunakan adukan kering MU atau setara termasuk acian halus


2
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Lantai Basement -2

3 Pelapis dinding homogenous tile ex : ………. tipe Galaxy Stone Light Grey uk.
600x600mm,dengan adukan dry mortar ex. drymix/ mortar utama atau setara,
termasuk additive dan grouting naat, sesuai dengan gambar dan spesifikasi
pada (W2):

Museum Nasional - Pek.Arsitektur HAL 121/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO Pelapis dinding homogenous tile exURAIAN


: ……….PEKERJAAN
tipe Galaxy Stone Light Grey uk.
600x600mm,dengan adukan dry mortar ex. drymix/ mortar utama atau setara,
termasuk additive dan grouting naat, sesuai dengan gambar dan spesifikasi
pada (W2):
Public toilet

4 Pelapis dinding Homogeneous tile ex : …….. tipe Volcano Grey uk. 600x600
mm,dengan adukan dry mortar ex. drymix/ mortar utama atau setara,
termasuk additive dan grouting naat, sesuai dengan gambar dan spesifikasi
pada (W2A):
Ruang wudhu

5
Pelapis keramik polished ex …... tipe vivas bianco uk. 300x300 mm ,dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada (W3) :

Ruang sampah sementara

6
Pelapis dinding keramik ex : ……. tipe Osaka Grey uk. 300x300 mm,dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada (W3A):

Museum Nasional - Pek.Arsitektur HAL 122/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Pelapis dinding keramik ex : ……. tipe Osaka Grey uk. 300x300 mm,dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada (W3A):

Janitor

7 Cat interior ex : …….., warna twilight pada dinding, sesuai dengan gambar
dan spesifikasi, pada (W4):

Musholla

8 Pelapis dinding cat washbel setinggi 1,5 m dan cat interior dari tinggi 1,5 s.d
plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada
(W5):

Lantai Basement -2
Tangga darurat
Smike stop lobby
Ruang cleaner
Staff lobby
Back stage lobby

Museum Nasional - Pek.Arsitektur HAL 123/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lobby musholla
Finish expos Kolom / balok

9 Pelapis dinding cat oil setinggi 1,2 m dan cat interior dari tinggi 1,2 s.d plafond
ex ……. warna twilight , sesuai dengan gambar dan spesifikasi pada (W5A):

Lantai Basement -2
Storage
Ramp mobil
Dinding Area parkir mobil
Ruang istirahat sopir
Selasar
Back stage storage
Plesteran menggunakan adukan R.Biotek
kering MU atau setara termasuk
acian halus skonengan dan tali
air, Kawat ayam,
Calbon,Dinabolt , sesuai
spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 124/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Partisi kaca cubicle ex ……… tipe Black Tinted Glass berikut rangka,silent
10 dan hardware termasuk kelengkapannya, sesuai spesifikasi dan gambar
pada (W18)
Toilet pengunjung
Finishing Dinding Beton exposed cat emulsion ex ICI berikut perapihan skimcoat (C3) , term
alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :
- Ramp (as 1-2/ A-B) dari Lt.BM 2 ke Lt.Ground

- Ramp (as E-F/6-9) dari Lt.BM 2 ke Lt. Ground.


- Tangga (as A/1-1')
Plesteran menggunakan adukan kering MU atau setara Pada Retaining Wall
termasuk acian halus, sesuai spesifikasi dan gambar pada :
- Ramp (as 1-2/ A-B) dari Lt.BM 2 ke Lt.Ground
- Ramp (as E-F/6-9) dari Lt.BM 2 ke Lt. Ground.
- Dinding Retaining Wall As J-M,M / 1-9'
Pembersihan dinding Retaining Wall As J-M,M / 1-9'

Museum Nasional - Pek.Arsitektur HAL 125/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.1.2 PEKERJAAN PINTU JENDELA DAN KUNCI

A JENDELA KACA FRAMELESS


Dinding Kaca Clear Tempered tebal 10mm, frameless, termasuk siku penjepit,
sealant, Accesories sesuai spesifikasi dan gambar pada :
Type W-01, uk. 2270x2400 mm,
1
Back Stage Lobby
Type W-02, uk. 7770x2400 mm,
2
Back Stage Lobby
Type W-03, uk. 3670x2400 mm,
3
Back Stage Lobby
Type W-04, uk. 2760 x 2400
4
mm, Staff Lobby

B PINTU & JENDELA KACA FRAME ALUMINIUM & FRAMELESS


Clear Tempered tebal 10mm frame aluminium powder coating finish uk 1100 x
1
2350 dan jendela Kaca mati uk. 2 x 642,5 lebar x 2400 tinggi , termasuk Hard
mm, terdiri dari 2 Pintu- kaca tebal 10mm
Staff Lobby
frame aluminium powder coating
2 finish uk 1000 x 2050 dan Jendela Kaca mati uk. 2 x 662,5 lebar x 2400
tinggi, termasuk Hard -ware & Accesories sesuai
Back spesifikasi
Stage Lobby dan gambar pada

Museum Nasional - Pek.Arsitektur HAL 126/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

C PINTU BESI
dengan thermal insulation, fire rate 2jam , termasuk kusen Besi , ukuran
1 overall pintu 1250mm lebar x 2150 mm tinggi, finish cat powder coating
termasuk Hard ware, panicbar
- & Accesories
Tangga sesuai spesifikasi dan gambar
Kebakaran
Besi dengan thermal insulation, fire rate 2jam , termasuk kusen Besi , ukuran
2 overall pintu 1250mm lebar x 2150 mm tinggi, finish cat powder coating
termasuk Hard ware, panicbar
- & Accesories
Smokesesuai spesifikasi dan gambar
Stop Lobby

Besi , ukuran overall pintu 900 mm lebar x 2150 mm tinggi, finish cat powder
3
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Tempat Sampah sementara

Besi , ukuran overall pintu 900 mm lebar x 2100 mm tinggi, finish cat powder
4
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
Back Stage Storage, Cleaner Rm ,
-
ME.Rm

Besi , ukuran overall pintu 1800 mm lebar x 2100 mm tinggi, finish cat powder
5
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Storage

ukuran overall pintu 900 mm lebar x 2100 mm tinggi, finish cat powder
6
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar

Museum Nasional - Pek.Arsitektur HAL 127/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Back Stage Storage

D PINTUtype
Pintu ALUMUNIUM
(AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - - Janitor, Rg.M&E
Pintu type (AD-02) uk. 1000 x 2400 mm , 1 daun pintu Solid Alm door,
2 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Toilet Difabel

E PINTUKaca
Pintu KACA black tinted glass type (CD-01) , terdiri dari 1 daun pintu kaca
1 framless , ukuran overall pintu 700 mm lebar x 2045 mm tinggi, termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :
- Toilet

DAF. 2.1.3 PEKERJAAN FINISHING LANTAI

1
Homogeneous Tile ex: ….. type Soho Beige uk. 600x600 mm matt Grey (F2),
berikut adukan mortar, additiv, grouting nat termasuk alat alat bantu lainnya
dgn peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 128/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Staf Lobby
- Backstage Lobby
- Mushola
Homogeneous Tile natural dark grey uk. 600x600 mm ex: Valentino (F2), berikut adukan mo
additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan perlengkapan terpasang
spesifikasi
- dan gambar pada :
Staf Lobby
- Backstage Lobby
- Mushola
- Smoke Stop Lobby 1 (as C-D/7-8)
- Smoke Stop Lobby 3 (as G-G'/5-6)
- Smoke Stop Lobby 4 (as J-9)
- Tempat Wudhu

2 Homogeneous Tile ex: ……. type F2a, Homogeneous Tile Firenze bianco uk.
600x600 mm ex: Valentino, berikut adukan mortar, additiv, grouting nat
termasuk alat alat bantu lainnya dgn peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
- Smoke Stop Lobby 1 (as C-D/7-8)
- Smoke Stop Lobby 3 (as G-G'/5-6)
- Smoke Stop Lobby 4 (as J-9)
- Toilet Pengunjung

Museum Nasional - Pek.Arsitektur HAL 129/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- R.Cuci Tangan / R.Cermin


- Difable

3 Homogeneous Tile ex: ……. type Volcano Grey uk. 600x600 mm matt Grey
(F2C), berikut adukan mortar, additiv, grouting nat termasuk alat alat bantu
lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :
- Tempat Wudhu

4 Ceramic Tile ex: …... type F3, ceramic tile vivas bianco type in polished finish
uk. 300x300mm, berikut adukan mortar, additiv, grouting nat termasuk alat
alat bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi
dan gambar pada :
- Area 1 (as C-D/7')
- Janitor (2)
- R.Panel
- R.Sampah

5 Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan


gambar pada :

Museum Nasional - Pek.Arsitektur HAL 130/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan


gambar pada :

- Gallery Entrance Foyer

6 Screed adukan 1:2 dengan wiremesh M4 satu lapis finish Floor hardener
5kg/m2, sesuai spesifikasi dan gambar pada :

- Area Parkir + drive way (motorcycle, Car, Elf )


Pembersihan Bekas tanah,beton &
- Ciping Beton + Pembuangan Ke luar
proyek

Epochem + Epoxy

7 Cement Screed 5 cm,With Floor Hardener 7kg/m2 (F6), termasuk Naad anti
slip melintang dgn jarak 25 cm, sesuai spesifikasi dan gambar pada :

- Ramp (as 1-2/ A-B) dari Lt.BM 2 ke Lt.Ground


- Ramp (as E-F/6-9) dari Lt.BM 2 ke Lt. Ground.

Museum Nasional - Pek.Arsitektur HAL 131/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Bobokan Plat beton Existing Pada Ram Existing (as E

8 Cement Screed 3 cm, F6b, screed floor hardener 3g/m2, sesuai spesifikasi
dan gambar pada :

- Storage
- Ruang Istirahat sopir
- area 1 (as D/1)
- Ruang Cleaner
- Selasar + Foyer
- Drive Way (as B-c/ 4-9)
- Backstreet Storage
- Foyer (as F-H/4-6)
- Lobby Mushola
- Storage (as J-10)
- Sewage Treatmant Plant (as 1-6/A)

10 Treshold Homogeneous Tile ex: ……. type Galaxy Stone Black uk. 100x600
mm matt Grey (F14), berikut adukan mortar, additiv, grouting nat termasuk
alat alat bantu lainnya dgn peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 132/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Pertemuan 2 Ruang

11 Waterprofing Coating, sesuai spesifikasi dan gambar termasuk tegak pada


dinding setinggi 200 mm pada :
- Toilet Pengunjung

12 Skirting Homogeneous Tile ex: ……. type Soho Beige uk. 100x600 mm matt
Grey (S2), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
- Staf Lobby
- Backstage Lobby
- Mushola

13 Skirting Homogeneous Tile ex: …... type Galaxy Stone Black uk. 100x600 mm
matt Black (S2A), berikut adukan mortar, additiv, grouting nat termasuk alat
alat bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi
dan gambar pada :
- Smoke Stop Lobby 1 (as C-D/7-8)
- Smoke Stop Lobby 3 (as G-G'/5-6)
- Smoke Stop Lobby 4 (as J-9)

Museum Nasional - Pek.Arsitektur HAL 133/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

15 Peninggian Finishing Lantai : Cor Beton Tumbuk 1:3:5 , Tebal 10 cm


- As. B-F / 6-9 ,Staff Lobby, Tangga, Smoke Stop Lobb
- As. D-F / 6-9' , Foyer.
- As. B-D / 4-9 , Parkir Motor.
- As. A-B / 1-1' , Galery Entrance Foyer, Tangga.
- As. B-D / 1-5 , Storage, Rg.Cleaner, Rg.Istirahat Sup
- As. F'-H' / 2-7 , Back Stage Lobby, Tangga, Smoke S
- As. I-M / 7-9 , Toilet, Tangga, Smoke Stop Lobby.

16 Peninggian Finishing Lantai : Cor Beton Tumbuk 1:3:5 , Tebal 15 cm


- Musholla dan Tempat Wudhu.
17 Peninggian Finishing Lantai : Cor Beton Tumbuk 1:3:5 , Tebal 20 cm
Musholla

Railing besi tinggi 1100mm, handrail pipa besi dia 2", balustrade pipa besi dia
1", alat - alat bantu lainnya seperti bracket - bracket, dynabolt angkur,
18 grouting dan fin cat sesuai gambar dan spesifikasi
Tangga (as A/1-1')

DAF. 2.1.4 PEKERJAAN FINISHING PLAFOND

1 Gypsum Board With Galvanis suspension system by......., 9 mm water Base


Paint, Paint by ....... warna putih berikut Shadowline Alumunium U chanel 15

Museum Nasional - Pek.Arsitektur HAL 134/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Paint, Paint by ....... warna putih berikut Shadowline Alumunium U chanel 15


mm (C1) termasuk alat bantu lainnya dengan peralatan perlengkapan
terpasang sesuai spesifikasi dan gambar pada :
- Staf Lobby
- Backstage Lobby

2 Calcium Cilicate board With Galvanis suspension system by ......, 6 mm water


Base Paint, Paint by ........ warna putih atau setara berikut Shadowline
Alumunium U chanel 15 mm (C2) termasuk alat bantu lainnya dengan
peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :
- Toilet Pengunjung

3 Plafond Finishing Beton exposed cat emulsion ex ICI, termasuk alat bantu
lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
- Tempat Wudhu
- Mushola
Staf Lobby
Backstage Lobby
Toilet Pengunjung

4 Cat interior Ex Jotun, warna twilight pada Beton Expose, sesuai dengan
gambar dan spesifikasi, pada (C3):
Basement 2

Museum Nasional - Pek.Arsitektur HAL 135/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.1.5 PEKERJAAN SANITAIR

A Toilet Publik
- Closet duduk ex…... type CW 421 J
- Wastafel ex….. type LW 951 CJ
- Wall hung lavatory ex…. type LW 236 CJ
- Jet washer ex. ….. type TX403 SMCRB
- Paper Holder ex …. type TX 703AESV1
- Grab bar ex ….. type
- lever handle sink tap ex….. type T23 BQ13N
- Robehook ex…... type TX 704 AJ
- Closet ex…...type CE 9 / TV150NWV12J
- Floor Drain …... type TX 1BV1

B T. Wudhu
- Kran ex. ….. type T23B13
- Floor Drain …... type TX 1BV1
C R.Janitor
- Kran ex. ….. type T23B13
- Floor Drain …... type TX 1BV1

Museum Nasional - Pek.Arsitektur HAL 136/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.1.6 PEKERJAAN LAIN - LAIN

A Area Toilet
1 Kaca cermin tebal 6 mm lengkap dengan backingdari multiplek tebal 9 mm
rangka hollow, berikut sealant, bracket, hardware dll termasuk alat bantu
lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar, pada :
Lantai Basement 2
- Toilet Publik + Toilet Publik ukuran : ( 700 mm x 120
- Toilet Difable ukuran : ( 500 mm x 1200 mm )

2
Meja Lavatory dari beton bertulang finish keramik Homogenous Tile termasuk
alat bantu lainnya dgn peralatan dan perlengkapan terpasang sesuai
spesifikasi dan gambar

- -Toilet Publik ukuran : ( 2400 mm x 600 mm )


- -Toilet Difable ukuran : ( 800 mm x 600 mm )

Museum Nasional - Pek.Arsitektur HAL 137/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

B Area Parkir dan Drive Way


Car Stopper precast concrete (WS) ukuran 600x100x150 mm termasuk Angkur
1
sesuai gambar dan spesifikasi pada :
- Area parkir & drive way

2 Cat Garis Parkir L=100 mm sesuai gambar dan spesifikasi pada ;


- Area parkir & drive way (provisional)
Canstein beton 600x100x150 (RC), terpasang sesuai gambar dan spesifikasi pada
3
;
- Area parkir & drive way
Rambu penunjuk arah jalan (traffic arrow) pada permukaan jalan, bahan modified
4 acrylic, traffic paint finish, tebal 300 micron, warna reflective putih sesuai dengan
gambar dan spesifikasi pada - parkir : Bentuk anak panah

5 Grill Penutup saluran dari grill besi lebar 400 mm terdiri dari besi siku 50x50x5 dan
plat strip 4/40 @50 pada gutter ramp :
- Ramp
Finishing Gutter Existing pada ram sersan Ramp As 1-2/A-B & As E-F/6-9
Corner guard T=1000 mm dari besi siku 50x50x5, termasuk Ø10 mm anchor bolt welded to s
6
difinish sesuai gambar dan spesifikasi pada :
- Area Parkir & Driveway
Tanggulan batu bata termasuk fin Homogenous Tile , tinggi 300 mm, sesuai gambar dan
7
Spesifikasi, pada :

Museum Nasional - Pek.Arsitektur HAL 138/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- T. Wudhu - Lantai Basement 2


Gutter 300 x 100 mm pada parkir, termasuk sloping cement mortar to drain (30 mm thk ), be
8
40.40.4 w/ op dan anchor bolt Ø 9 mm @ 500 mm, sesuai dengan gambar dan spesifikasi pa
- Parkir - Lantai basement 2
Penebalan dinding dari batu bata tebal 150 dibelakang closet duduk, termasuk finishing Topp
9 Dinding ex Homogenous Tile Uk. 300 x600mm (HT) Ex Niro granite, tinggi 1250 mm, terpasa
sesuai gambar dan spesifikasi,
- pada : Toilet Publik + Toilet Difable
10 Penambahan
Gypsum boardPartisi
tebalDinding
9mm 2 muka + rangka metalAS G-H,/6'-7,5'-6'
Stud + cat Interior ex Jotun atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi da
gambar pada :
A PEKERJAAN BONGKARAN DINDING

1
Pembongkaran Dinding Eksisting bata untuk menuju Akses ke Gedung B

AS = M/ 6-7 Bongkaran Dinding

DAFTAR No. 2.2 - LANTAI BASEMENT -1

Museum Nasional - Pek.Arsitektur HAL 139/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.2.1 PEK. PASANG DINDING DAN FINISHING

B PEK. PELAPIS DINDING

2 Pelapis dinding homogenous tile ex : ………. tipe Galaxy Stone Light Grey uk.
600x600mm,dengan adukan dry mortar ex. drymix/ mortar utama atau setara,
termasuk additive dan grouting naat, sesuai dengan gambar dan spesifikasi
pada (W2):

Lantai Basement -1
Toilet pria & wanita As A-B
Difable toilet
Toilet pria & wanita As J-K
Difable toilet As J-K
Toilet BackStage pria & wanita As F-G/7-8

3 Pelapis dinding keramik ex : ……. tipe Osaka Grey uk. 300x300 mm,dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada (W3A):

Museum Nasional - Pek.Arsitektur HAL 140/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lantai Basement -1
Janitor

4 Pelapis dinding W13, Plywood Fabric cladding berikut insulasi peredam suara
dan fire retardant, termasuk rangka, pemasangan, sesuai dengan gambar
dan spesifikasi pada :

Lantai Basement -1
Auditorium

Dindng Auditorium
Dinidng Parapet Auditorium GF
Plester + Aci

gypsum 15mm finish cat W4, Cat Interior Ex: Warna Twilight 1973 pada
5
dinding berikut rangka partisi termasuk kelengkapannya, sesuai spesifikasi
Lantai Basement -1
Storage batu As B-E

Museum Nasional - Pek.Arsitektur HAL 141/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Storage batu As G-E

7 Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
pada :

Lantai Basement -1
Pengecatan Kolom Lift Ex.Cat Dulux
8
Ambiance Metalic Copper
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
skonengan dan tali E4 sesuai spesifikasi :
R.panel
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
a adukan kering,kolom dan balok praktis, sesuai spesifikasi dan gambar
pada :Trap
: Tangga - auditorium
Gudang Auditorium
R.Introduction
R.Gudang Galeri ( Bawah Tribun )
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
b
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Trap Tangga - auditorium
Gudang Auditorium
R.Introduction
R.Gudang Galeri ( Bawah Tribun )

Museum Nasional - Pek.Arsitektur HAL 142/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Bungkus Kolom Bulat Uk.Struktur dia.80 cm Cat.Ex Jotun pada dinding sesuai
11
dengan gambar dan spesifikasi, keliling kolom
Kolom bulat di Lt.Basement-1 8 buah

DAF. 2.2.2 PEKERJAAN PINTU,JENDELA DAN KUNCI

A PINTU BESI
dengan thermal insulation, fire rate 2jam , termasuk kusen Besi , ukuran
1 overall pintu 1250mm lebar x 2150 mm tinggi, finish cat powder coating
termasuk Hard ware, panicbar
- & Accesories
Lantaisesuai spesifikasi
Basement -1 dan gambar

Besi , ukuran overall pintu 900 mm lebar x 2150 mm tinggi, finish cat powder
2
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- R.Sampah, R.PKL

Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
3
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Rg Utilitas M&E , Lantai Basement -1

Besi , ukuran overall pintu 1600 mm lebar x 2400 mm tinggi, finish cat powder
4
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Rg Panel LVDP, Lantai Basement -1

Museum Nasional - Pek.Arsitektur HAL 143/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Besi , ukuran overall pintu 3100 mm lebar x 2400 mm tinggi, finish cat powder
5
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Strorage Room

Automatic slidding door system, ukuran overall pintu 3000 mm lebar x 2600
5
mm tinggi,termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Rg. Study

Besi , ukuran overall pintu 550 mm lebar x 2100 mm tinggi, finish cat powder
7
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Pintu Shaft

Besi , ukuran overall pintu 2600 mm lebar x 2400 mm tinggi, finish cat powder
9
coating termasuk Hard ware , Auotomatic Door, Accesories sesuai spesifikasi
- Rg. Study
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
10 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - - Gudang Auditorium

B PINTU JENDELA ALUMINIUM


tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
1
ukuran overall 3130 mm lebar x 2400 mm tinggi, finish cat powder coating
- Ruang Tangga Service
tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
2
ukuran overall 3650 mm lebar x 2400 mm tinggi, finish cat powder coating
- Ruang Studi

Museum Nasional - Pek.Arsitektur HAL 144/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

C PINTU KAYU
900mm lebar x 2400mm tinggi finish vener jati termasuk kosen kayu
1
terpasang finish veneer, lengkap hardware dan accessories, sesuai
- Auditorium

D PINTUtype
Pintu ALUMUNIUM
(AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Janitor, Nursery, Rg.M&E, Gudang
-
Audotorium
Pintu type (AD-02) uk. 1000 x 2400 mm , 1 daun pintu Solid Alm door,
2 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Toilet Difabel
Pintu type (AD-03 uk. 1000 x 2400 mm , 1 daun pintu Solid Alm door,
3 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Tolet Backstage, Gudang
Pintu type (AD-04) uk. 800 x 2400 mm , 1 daun pintu Solid Alm door,
4 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Janitor
Pintu type (AD-05) uk. 1900 x 2400 mm , 1 daun pintu Solid Alm door,
5 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Bengkel Kerja

Museum Nasional - Pek.Arsitektur HAL 145/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

E PINTUKaca
Pintu KACA black tinted glass type (CD-01) , terdiri dari 1 daun pintu kaca
1 framless , ukuran overall pintu 700 mm lebar x 2045 mm tinggi, termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :
- Toilet

E PINTU ENTRANCE
Double Swing PivotSANKEN
Door, type (CD-02) terdiri dari 4 daun pintu finish
1 Cat,uk. overall pintu 14455 mm lebar x 4250+800mm tinggi, terpasang ,
lengkap hardware dan- accessories, sesuai
Pintuspesifikasi dan gambar
Entrance Sanken pada
sebelah :
Barat
Double Swing Pivot Door, type (CD-03) terdiri dari 4 daun pintu finish
2 Cat,uk. overall pintu 15910 mm lebar x 4250+800mm tinggi, terpasang ,
lengkap hardware dan- accessories, sesuai
Pintuspesifikasi dan gambar
Entrance Sanken pada
sebelah :
Timur

F PEKERJAAN PINTU
(AS = B/2-4) (as B/4-5) (as f'/3-4) (AS
L/9) (AS C-D/ 3)
1 Pek. Pintu
- Pintu Uk, 2500 x 1000 mm
- Pintu Uk, 2500 x 1000 mm
- Pintu Uk, 2500 x 1900 mm
Pintu Besi type (SD-03) terdiri dari 1 daun pintu Plat Besi , termasuk kusen Besi , ukuran ov
pintu 900 mm lebar x 2150 mm tinggi, finish cat powder coating termasuk Hard ware & Acce
sesuaiStorage
spesifikasi dan
Deket gambar
Ram & DepanpadaSto
( Storage Deket Ram )

Museum Nasional - Pek.Arsitektur HAL 146/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
Storage

2 Pek. Pembuatan Rolling Door


AS K-L/ 3 Rolling Door Uk, 3150 x 11000 mm
AS K-L/ 3 Rolling Door Uk, 2850 x 7170 mm
AS K-L/ 3 Bobokan Dinding untuk dudukan rell L=72 cm

DAF. 2.2.3 PEKERJAAN FINISHING LANTAI

1
Cement Screed 5 cm, With Floor Hardener 3kg/m2 by Semen Instan ( type
MU 700 ), sesuai spesifikasi dan gambar pada :

- Ramp As 7-9/G-I'
- R. ME All
R.Pompa

Museum Nasional - Pek.Arsitektur HAL 147/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pembuatan Sersan Ram / Tali Air 25mmx25mm + Finish spesifikasi dan gambar pada :
Ramp As 7-9/G-I'
Cement Screed 5cm, dengan wiremesh M4 satu lapis finish Floor hardener
5kg/m2, sesuai spesifikasi dan gambar pada :
R.Simpan Vitrin dan R.Bengkel Kerja

Cement Screed 3 cm,leveling lantai ecxisting depang panggung R.Audotorium

b Cement Screed 3 cm, F6b, screed floor hardener 3g/m2, sesuai spesifikasi dan gambar pad
R.Auditorium Depan Stage
R.AHU D/7'-8 + Tangga (as A/1-1)

3mm self-levelling Epoxy Coating ex Flowcrete MF (F4), sesuai spesifikasi


2
dan gambar pada :

- Storage batu + R Transisi

b Penguatan Struktur Beton Dengan Epoxy System dan Epocem Untuk Area Yang Lembab
Storage batu besar,R.Studi Koleksi Batu Besar,R.Studi Koleksi Khusus
Penelitian Luar,R.Studi Koleksi Logam Besar, Storage Logam Besar
c Pembuatan Gutter L=10 cm T=5 cm + Sulingan + Coring Ø1" dan Penutup ACP

Museum Nasional - Pek.Arsitektur HAL 148/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pemngecoran Area Storage batu + R Transisi Basement 1


a Beton Mutu FC'- 25 MPA ( K-300 ) t= 5cm
b Wiremesh M4-1 Lapis
Waterprofing coating , sesuai spesifikasi dan gambar termasuk pada dinding setinggi 200 mm
3
pada :
- Toilet Pria As 6-7/A-C
- Diffable Toilet As 6-7/A-C
- Toilet Wanita As 7-8/D-E
- Nursery As 7-8/D-E
- Toilet Pria As 8-9/I'-J'
- Toilet Wanita As 8-9/I'-J'
- Difable Toilet As 8"/I'
- Janitor As 6-7/A-C
- Janitor As 8/J
- R. Pompa As 1-7/Ao - A
- Toilet Backstage 6'-7'/F-G
Pelapis Lantai HT tipe AMAZON BLACK ukuran 800x800mm,dengan adukan dry mortar ex.
4 drymix/ mortar utama atau setara, termasuk additive dan grouting naat, sesuai dengan gamb
dan spesifikasi pada (F1):
- Prefunction, Koridor, Area Istirahat
- Galeri Temporer

Museum Nasional - Pek.Arsitektur HAL 149/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Hall Pengunjung
- Tangga Prefunction,
Pelapis Lantai HT tipe AMAZON BLACK ukuran 800x800mm + Nosing ,dengan adukan dry m
ex. drymix/ mortar utama atau setara, termasuk additive dan grouting naat, sesuai dengan g
dan spesifikasi pada (F1):
Tangga Prefunction,

Pelapis Lantai HT tipe ex ALLIA PB-LONDON LD03P GREY POLISHED (V8) 600 X 1200
MM,dengan adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive dan
grouting naat,
Area sesuaiHall
Istirahat, dengan gambar dan
Pengunjung, spesifikasi pada (F1A):
R.Pengantar
Prefunction Area
Hall Pengunjung

Homogeneous Tile tipe Galaxy Stone Black uk. 600x600 mm matt Black (F2A), berikut aduka
5 mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan perlengkapan
terpasang sesuai spesifikasi dan gambar pada
Toilet : As 6-7/A-C
Pria
Diffable Toilet As 6-7/A-C
Toilet Wanita As 7-8/D-E
Nursery As 7-8/D-E
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'

Museum Nasional - Pek.Arsitektur HAL 150/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Janitor As 6-7/A-C
Ruang keluar tangga putar ke Sunken Plaza
Janitor As 8/J
Toilet Backstage Pria & Wanita As 6'-7'/F-G
R.Persiapan As 6-6''/F-G
Homogeneous Tile ex: ……. type F2a, Homogeneous Tile Firenze bianco uk. 600x600 mm e
Valentino, berikut adukan mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn
peralatan
Toiletperlengkapan terpasang sesuai spesifikasi dan gambar pada :
Pria As 6-7/A-C
Diffable Toilet As 6-7/A-C
Toilet Wanita As 7-8/D-E
Nursery As 7-8/D-E
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Koridor As 8-9/I'-J'
Difable Toilet As 8"/I'
Janitor As 6-7/A-C
Ruang keluar tangga putar ke Sunken Plaza
Janitor As 8/J
Toilet Backstage Pria & Wanita As 6'-7'/F-G
R.Persiapan As 6-6''/F-G
Smoke Stop Lobby 1 C-D /7-7'
Smoke Stop Lobby 2 & Koridor 2 G-G'/5-6

Museum Nasional - Pek.Arsitektur HAL 151/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Smoke Stop
Homogeneous TileLobby
natural3 dark grey uk. 600x600 mm ex: Valentino (F2), berikut adukan mo
additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan perlengkapan terpasang
spesifikasi
Toiletdan gambarPria
Backstage pada & :Wanita As 6'-7'/F-G
Storage 1
storage 2
ME.Room / Utilitas

Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan mortar, additiv,
grouting nat termasuk alat alat bantu lainnya dgn peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada
R.Gudang Persiapan 6-7/E-F
GUDANG GALERY B1
R.PKL
R.SAMPAH

Skirting 100mm Allumunium or Stainless Steel Sheet, terpasang sesuai spesifikasi dan gamb
9
pada :
Sunken Plaza
Tangga Prefunction,

10
600x600 mm Carpet Tile ex Urban Retreat - Interface, pada Tribun, Tangga,
Stage,sesuai spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 152/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

600x600 mm Carpet Tile ex Urban Retreat - Interface, pada Tribun, Tangga,


Stage,sesuai spesifikasi dan gambar pada :

Audotorium + Stage
Skirting Homogeneous Tile ex: ……. type F2a, Homogeneous Tile Firenze
bianco uk. 100x600), berikut adukan mortar, additiv, grouting nat termasuk
alat alat bantu lainnya dgn peralatan perlengkapan terpasang sesuai
Koridor
spesifikasi danAsgambar
8-9/I'-J'pada :
R.Persiapan As 6-6''/F-G
Smoke Stop Lobby 1 C-D /7-7'
Smoke Stop Lobby 2 & Koridor 2 G-G'/5-6
Smoke Stop Lobby 3

Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada
R.Panel
Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
- R panel
- R.Sampah

Museum Nasional - Pek.Arsitektur HAL 153/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.2.4 PEKERJAAN FINISHING PLAFOND

1 Calcium Cilicate board tebal 9mm ex. Knauf + rangka Galvanized Suspention
System + cat type Majestic ex Jotun atau setara termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :
Toilet Pria As 6-7/A-C
Diffable Toilet As 6-7/A-C
Toilet Wanita As 7-8/D-E
Nursery As 7-8/D-E
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'
Janitor As 6-7/A-C
Janitor As 8/J
Backstage 6'-7'/F-G

3 Plafon Akustik Khusus dengan lapisan Insulasi + Rangka termasuk alat bantu
lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :

Museum Nasional - Pek.Arsitektur HAL 154/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Plafon Akustik Khusus dengan lapisan Insulasi + Rangka termasuk alat bantu
lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
AudItorium + Stage
R.Persiapan
4
Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :

Ruang keluar tangga putar ke Sunken Plaza


Prefunction, Koridor, Area Istirahat
Galeri Temporer
Hall Pengunjung
Public Hall,R.Introduction, Nursery & Janitor
R.PKL
R.Persiapan
Koridor Belakang Stage
Storage
R.Control
R.Studi Koleksi Khusus

Droop Celling Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi da
gambar pada :

Museum Nasional - Pek.Arsitektur HAL 155/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Droop Celling Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi da
gambar pada :
Hall Pengunjung
Public Hall,R.Introduction,
Pintu Masuk Gedung C As-2/K-M

5 Finishing Beton exposed cat emulsion ex ICI, termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :
R. Pompa As 1-7/Ao - A
R. ME All
Ramp As 7-9/G-I'
R. Panel
R.Me 1
R.Me 2
G.Persiapan
R. AHU
R. Storage

6 Shadowline termasuk alat bantu lainnya dengan peralatan perlengkapan


terpasang sesuai spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 156/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Toilet Pria As 6-7/A-C


Toilet Wanita As 7-8/D-E
Nursery As 2/A
Difable Toilet As A/1'-1"
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'
Mushollah Pria
Mushollah Wanita
Tempat Wudlu Pria
Tempat Wudlu Wanita
Koridor As 1-2/A-D
Temporary Galery
Storege Batu As 7-9/A-D
Storege Batu As 6-9/E-G
R. Studi Koleksi
R. Transisi
Public Hall
Hall Pengunjung
Prefunction
R.PKL

Museum Nasional - Pek.Arsitektur HAL 157/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

7
Ceiling Black Tinte Mirror + rangka, termasuk alat bantu lainnya dengan
peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai Ground
Lift Car

DAF. 2.2.5 PEKERJAAN SANITARY


1 Toilet Pria As 6-7/A-C
- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J
- Wastafel ex….. type LW 951 CJ
- Urinoir TOTO Type U57M
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Robehook ex TOTO type TX 704 AJ
- Sekat Urinoir TOTO type A 100
- Jet washer ex. ….. type TX403 SMCRB

2 Partisi Cubicle , sesuai gambar dan spesifikasi pada :

Museum Nasional - Pek.Arsitektur HAL 158/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Divider uk. 1500 x 1800 mm


- Frontal uk. 900 x 1800 mm

3 Toilet Wanita As 7-8/D-E


- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J
- Wastafel ex….. type LW 951 CJ
- Floor Drain TOTO type TX 1BV1
- Robehook ex TOTO type TX 704 AJ
- Paper Holder TOTO type TX 703 AN
- Jet washer ex. ….. type TX403 SMCRB

4 Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


- Divider uk. 1500 x 1800 mm
- Frontal uk. 900 x 2100 mm

5 Difable Toilet As A/1'-1"


- Closet duduk TOTO type CW 421 J
- Wastafel TOTO type LW 236 CJ
- Floor Drain TOTO type TX 1BV1
- Robehook ex TOTO type TX 704 AJ
- Paper Holder TOTO type TX 703 AN

Museum Nasional - Pek.Arsitektur HAL 159/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Grab bar ex ….. type

6 Toilet Pria As 8-9/I'-J'


- Closet duduk TOTO type CW 421 J
- Wastafel ex….. type LW 951 CJ
- Urinoir TOTO Type U57M
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Robehook ex TOTO type TX 704 AJ
- Sekat Urinoir TOTO type A 100

7 Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


- Divider uk. 1500 x 1800 mm
- Frontal uk. 900 x 2100 mm

8 Toilet Wanita As 8-9/I'-J'


- Closet duduk TOTO type CW 421 J
- Wastafel ex….. type LW 951 CJ
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Robehook ex…... type TX 704 AJ

Museum Nasional - Pek.Arsitektur HAL 160/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

9 Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


- Divider uk. 1500 x 1800 mm
- Frontal uk. 900 x 2100 mm

10 Difable Toilet As 8"/I'


- Closet duduk TOTO type CW 421 J
- Wastafel TOTO type LW 236 CJ
- Floor Drain TOTO type TX 1BV1
- Sekat Urinoir TOTO type A 100
- Robehook ex…... type TX 704 AJ

11 Toilet Unisex 8' /' I'


- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J
- Wastafel ex….. type LW 951 CJ
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Robehook ex…... type TX 704 AJ
- Jet washer ex. ….. type TX403 SMCRB
- Grab bar ex ….. type

R.Janitor

Museum Nasional - Pek.Arsitektur HAL 161/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Kran ex. ….. type T23B13


- Floor Drain …... type TX 1BV1

12 Toilet Backstage Wanita / pria


- Closet duduk TOTO type CW 421 J
- Wastafel ex….. type LW 951 CJ
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Soap Holder TOTO
- Robehook ex…... type TX 704 AJ
- Jet washer ex. ….. type TX403 SMCRB
- Shower Toto TX471SRSN

Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


13 - Frontal uk. 1100 x 2000 mm
Pintu Kaca black tinted glass type (CD-01) , terdiri dari 1 daun pintu kaca
framless , ukuran overall pintu 700 mm lebar x 2045 mm tinggi, termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :
Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Basement 1

- Coring Ø 2'
- Coring Ø 3'

Museum Nasional - Pek.Arsitektur HAL 162/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Coring Ø 4'
- Coring Ø 5'

DAF. 2.2.6 PEKERJAAN LAIN - LAIN

1 Railing besi tinggi 1100mm, handrail pipa besi dia 2", balustrade pipa besi dia
1", alat - alat bantu lainnya seperti bracket - bracket, dynabolt angkur,
grouting dan fin cat sesuai gambar dan spesifikasi
- Tangga ke Lobby Theater
2 Kaca cermin tebal 6 mm lengkap dengan backingdari multiplek tebal 9 mm
rangka hollow, berikut sealant, bracket, hardware dll termasuk alat bantu
lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar, pada :
-Toilet Pria As 6-7/A-C ukuran : ( 3600 mm x 1400 mm )
-Toilet Wanita As 7-8/D-E ukuran : ( 5097 mm x 1400 mm )
-Toilet Pria As 8-9/I'-J' ukuran : ( 1974 mm x 1400 mm )
-Toilet Wanita As 8-9/I'-J' ukuran : ( 2205 mm x 1400 mm )

Museum Nasional - Pek.Arsitektur HAL 163/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

-Toilet Unisex As 8/I' ukuran : ( 1700 mm x 1400 mm )


-Toilet Backstage As F-G/6-7' ukuran : ( 1600 mm x 1400 mm )
-Toilet Pria As 1-/A-B & Nursey ukuran : ( 700 mm x 1450 mm )
-Toilet Wanita As 1-/A-B ukuran : ( 700 mm x 1450 mm )
-Difable As 1-/A-B ukuran : ( 500 mm x 1270 mm )
-Toilet Backstage As F-G/6-7' ukuran : ( 700 mm x 1350 mm )
-Toilet Unisex As 8/I' ukuran : ( 1700 mm x 1400 mm )
-Difable As 1-/A-B ukuran : ( 500 mm x 1270 mm )

3 Meja Lavatory dari beton bertulang finish keramik Homogenous Tile termasuk
alat bantu lainnya dgn peralatan dan perlengkapan terpasang sesuai
spesifikasi dan gambar
-Toilet Pria As 1/A-B ukuran : ( 3600 mm x 600 mm )
-Toilet Wanita As 2/A-B ukuran : ( 5097 mm x 600 mm )
-Toilet Pria As 8-9/I'-J' ukuran : ( 1974 mm x 600 mm )
-Toilet Wanita As 8-9/I'-J' ukuran : ( 2205 mm x 600 mm )
-Toilet Unisex As 8/I' ukuran : ( 2400 mm x 600 mm )
-Toilet Backstage As F-G/6-7' ukuran : ( 1600 mm x 600mm )
-Bench As J/8' ukuran : ( 2350 mm x 450mm )
Grill tanggulan wudhu, removable 6x25mm stainless steel grating, termasuk
4
6x25mm stainless steel to support rating, sesuai gambar dan spesifikasi, pada :
- T. Wudhu - Lantai Basement 1

Museum Nasional - Pek.Arsitektur HAL 164/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Penebalan dinding dari batu bata tebal 150 dibelakang closet duduk, termasuk
8 finishing Topping + Dinding ex Homogenous Tile Uk. 300 x600mm (HT) Ex Niro
granite, tinggi 1250
-Toilet mm,Asterpasang
Pria 6-7/A-C sesuai gambar dan spesifikasi, pada :
-Toilet Wanita As 7-8/D-E
-Difable Toilet As A/1'-1"
-Toilet Pria As 8-9/I'-J'
-Toilet Wanita As 8-9/I'-J'
-Difable Toilet As 8"/I'
-Toilet Unisex 8/J'
Penebalan -Toilet
dindingBackstage F'/6-7'
dari batu bata tebal 150 pada urinoir, termasuk finishing
9 Topping + Dinding ex Homogenous Tile Uk. 300 x600mm (HT) Ex Niro granite,
tinggi Lantai
1250 mm, terpasang
Basement 1 sesuai gambar dan spesifikasi, pada :
-Toilet Pria As 1/A-B
-Toilet Pria As 8-9/I'-J'

10 Lanscape, sesuai gambar dan spesifikasi pada :


- Lantai Basement 1
Inner Court

11 Pemasangan Dinding GRC Cetak + Rangka Hollo R.Intoduction

A PEKERJAAN DINDING, LANTAI BASEMENT 1

Museum Nasional - Pek.Arsitektur HAL 165/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

1
Pekerjaan Dinding untuk R. Storage, ME Room, Dinding Depan Galeri Temporer,
(AS = B/2-4) (as B/4-5) (as f'/3-4) (AS
Pek. Pasang Dinding
L/9) (AS
Pasangan bata ringan ex hebel atau setara, C-D/
tebal 3) mm, termasuk
100
perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar Dinding
Pek. Pelapis
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
skonengan dan tali air, sesuai spesifikasi beserta pengecatan
PEKERJAAN PENGGESERAN KABEL TRAY dll dari posisi yang menghalangi
B
Skylight (lubang cahaya) LANTAI BASEMENT 1
AS A-B/ 1-4 Penggeseran Kabel Tray
C PEKERJAAN EKSTRA
Pekerjaan Plesteran
Pasangan bata dan Openingan
ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
1 a adukan kering,kolom dan balok praktis, sesuai spesifikasi dan gambar
pada- :SD14
: Area R.studi koleksi khusus penelitian luar 1
- SD09 Area R.studi koleksi khusus penelitian luar 2
- SD06 Area R.AHU
- SD03 R.PKL
- SD18 Koridor
- SD08 R.LVDV
- AD05 R.Koridor r.Vitrin
- GDW 03 R.Tangga Ke B2
- GDW 05 r.studi koleksi penelitian luar

Museum Nasional - Pek.Arsitektur HAL 166/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Janitor J/8'
- Shaf As 8/I'
- Perapihan Rolling Door
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
b
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Dinding Retaining Wall Area
- Public Hall , dinding menuju As M/5-8
gedung B
- SD14 Area R.studi koleksi khusus penelitian luar 1
- SD09 Area R.studi koleksi khusus penelitian luar 2
- SD06 Area R.AHU
- SD03 R.PKL
- SD18 Koridor
- SD08 R.LVDV
- AD05 R.Koridor r.Vitrin
- GDW 03 R.Tangga Ke B2
- GDW 05 r.studi koleksi penelitian luar
- Janitor J/8'
- Koridor Toilet As J/8'
- Shaf As 8/I'
- Perapihan Rolling Door
c Pembersihan dinding Retaining Wall ExiAs M/5-8

Museum Nasional - Pek.Arsitektur HAL 167/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

d Perapihan Plesteran t=10 cm menggunakan adukan kering MU atau setara termasuk acian h
- R. Simpan vitrin
- Selasar & lobi lift
- G.Persiapan
- R.Pre-fenction
- R.Pkl
- R.Introduktion
- R.Pompa
Finishing Openingan Pintu Bahan Mu menggunakan adukan kering MU atau setara termasu
d
acian halus skonengan dan tali air :
- AHU
- Smoke Stop Loby
- PKL
- R.LVDV
- Vitrin 1
- DIFABLE
- NURSEY
- Tangga Ke bawah lt 2 gdw 02
- AD05 R.Koridor r.Vitrin
- AD04 R.Janitor
- AD02 T.Difable

Museum Nasional - Pek.Arsitektur HAL 168/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- GDW 05 R.Penelitian luar


Pembuatan Tanggulan t=10x10 cm Ex.Kolom Praktis Finish Plester aci Untuk Ruang Pompa
Bongkar Pasang Pintu Besi Existing, 2 daun pintu Plat Besi, termasuk kusen
e
Besi dan Finishing Openingan :
- Auditorium,ME & R.LVDV
Bongkar Pasang Pintu Besi Existing, 1 daun pintu Plat Besi, termasuk kusen
Besi dan Finishing Openingan :
- Smoke stop lobby
f Bobokan Plat Lantai - Area Shaft 7'-8/I-J

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR

DAFTAR No. 2.3 - LANTAI GROUND & MEZZANINE

DAF. 2.3.1 PEK. PASANG DINDING DAN FINISHING

A PEK. PASANG DINDING


Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
1 adukan kering,kolom dan balok praktis, sesuai spesifikasi dan gambar
pada :Mezanine
:
Mezzanine - Parapet + Bekas Jendela,Shaft Pipa

Museum Nasional - Pek.Arsitektur HAL 169/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

B PEK. PELAPIS DINDING


Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
1
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Mezanine
Mezzanine - Parapet + Dinding Existing
Dinding Retaining Wall Area
Public Hall , dinding menuju As M/5-8
gedung B

2 Pelapis dinding homogenous tile ex : ………. tipe Galaxy Stone Light Grey uk.
600x600mm,dengan adukan dry mortar ex. drymix/ mortar utama atau setara,
termasuk additive dan grouting naat, sesuai dengan gambar dan spesifikasi
pada (W2):
Ground Floor
Toilet pria & wanita As J-K

3 Pelapis dinding keramik ex : ……. tipe Osaka Grey uk. 300x300 mm,dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada (W3A):
Lantai Mezanine

Museum Nasional - Pek.Arsitektur HAL 170/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Toilet pria & wanita As A-B

Ground Floor
Kitchen
Janitor
Black Tinte Mirror finish berikut backing playwood multiplek,rangka,siku,silent
4
termasuk kelengkapannya, sesuai spesifikasi dan gambar pada lift lobby:
Ground floor

5 Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
pada :

Ground floor
Mezanine

6 Cat Wheater sild ex ICI, atau setara, pada dinding, sesuai dengan gambar
dan spesifikasi, pada :

Ground floor

7 Dinding Panel GRC 9 mm ,dinding penutup area pipa dan ducting AC ,tinggi
180 cm finish Cat Exterior, rangka besi Hollow 40x40x2 mm, sesuai dengan
gambar dan spesifikasi pada :
Museum Nasional - Pek.Arsitektur HAL 171/932
LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Dinding Panel GRC 9 mm ,dinding penutup area pipa dan ducting AC ,tinggi
180 cm finish Cat Exterior, rangka besi Hollow 40x40x2 mm, sesuai dengan
gambar dan spesifikasi pada :
Dinding Sanken sisi Utara as. 3-4
- ( fasad Gedung B existing sisi
selatan), sesuai Gambar.

8
Bungkus Kolom Bulat uk.Struktur dia.80 cm, 'Cat Emulsion ex : ICI, pada
dinding, sesuai dengan gambar dan spesifikasi, keliling Kolom
- Kolom Bulat di Lt.Ground 12 buah

Finishing exposed kolom bulat


Kolom Bulat di Lt.Ground 10 buah
( skimcoat )

Finishing exposed Kolom Kotak Kolom & Balok Koridor,Mushola di


( skimcoat ) Lt.Mezzanine

Kolom Bulat
Cover GRC
Bungkus Kolom Bulat uk.Struktur dia.120 cm Bahan GRC Cetak + Rangka Hollo & Siku 12 b
Cat Emulsion ex : Jotun, pada dinding, sesuai dengan gambar dan spesifikasi
12 buah, pada :

Museum Nasional - Pek.Arsitektur HAL 172/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

9 Pembuatan dinding bata untuk coating AS B/2-4


Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi dan gambar beserta cat
10 Penambhan Dinding parapet setinggi 1. AS= B-E/6'
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
11 Penambahan dinding bata di pertemuan AS G'-H'// I'-J'/ 5' //3-5'
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
- Window Stool Bahan-ACP AS G'-H'// I'-J'/ 5' //3-5'
12 Penambahan dinding bata di parapet es AS H'-J / 5'-6
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada beserta cat

Museum Nasional - Pek.Arsitektur HAL 173/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Plesteran menggunakan adukan kering MU atau setara termasuk acian


-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
13 Penambahan dinding bata di dekat LIF AS I' / 7'
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
Penambahan dinding bata untuk cover
14 plumbing hingga ceiling + Gypsum AS I' / 9
UntukPasangan
ceiling bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
Penambahan dinding bata di atas
15 AS J' / 9-9'
pintu Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
- Pek.Bobokan Dinding AS J' / 9-9'
Penebalan dinding bata untuk
16 AS M / 4'-5' , AS M/ 7'-8
perapihan
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada

Museum Nasional - Pek.Arsitektur HAL 174/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Plesteran menggunakan adukan kering MU atau setara termasuk acian


-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
Penambhan Dinding parapet setinggi
17
1.1 meter
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi dan gambar beserta cat
Railling Parapet Plat Besi Finish
-
Duco
Penambahan Dinding Drof Of Khusus
As K-M/9'
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat, adukan
-
kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi

Pengecatan Kolom Lift Ex.Cat Dulux


8
Ambiance Metalic Copper
Pembongkaran dinding bata Eksisting
17 AS M /6'-7'
untuk akses menuju gedung B
- Pembongkaran dinding

Museum Nasional - Pek.Arsitektur HAL 175/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- dan tali air, sesuai spesifikasi dan gambar perapihan bongkaran beserta pengecatan b
bongkaran
Finishing Ruang panel
Plesteran menggunakan adukan kering MU atau setara termasuk acian
-
halus skonengan dan tali air, sesuai spesifikasi :
Pembongkaran dinding bata Eksisting AS D-D' /4'-5'
- Pembongkaran dinding - Sound Control
- Pembongkaran dinding Pemindahan Lobang pintu - Storage Kids Coner AS F/7'8
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
adukan kering,kolom dan balok praktis, sesuai spesifikasi dan gambar pada
Shaf As I/8
Perapihan AS D-D' /4'-5'
Parapet Melintang AS D-D' /4'-5'
Parapet Memanjang AS D-E /4'-5'
R.Control Room AS D-D' /4'-6'
Penutupan Lobang Storage Kids Coner AS F/7'8
Perapihan Rell Rolling Door AS K-L/4
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
skonengan dan tali air, sesuai spesifikasi
Shaf As I/8
Perapihan AS D-D' /4'-5'
Parapet Melintang AS D-D' /4'-5'
Parapet Memanjang AS D-E /4'-5'
R.Control Room AS D-D' /4'-6'

Museum Nasional - Pek.Arsitektur HAL 176/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Penutupan Lobang Storage Kids Coner AS F/7'8


Perapihan Rell Rolling Door AS K-L/4
Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
pada :

DAF. 2.3.2 PEKERJAAN PINTU,JENDELA DAN KUNCI

A PINTU BESI

Besi , ukuran overall pintu 900 mm lebar x 2150 mm tinggi, finish cat powder
1
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- R.Sampah

`
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
2
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Rg Utilitas M&E

`
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
3
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Ruang karantina

Museum Nasional - Pek.Arsitektur HAL 177/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

`
termasuk kusen Besi , ukuran overall pintu 1700 mm lebar x 2000 mm tinggi,
4
finish cat powder coating termasuk Hard ware & Accesories sesuai
- Rg Genset

Besi , ukuran overall pintu 550 mm lebar x 2100 mm tinggi, finish cat powder
10
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Pintu Shaft

Besi , ukuran overall pintu 500 mm lebar x 1450 mm tinggi, finish cat powder
11
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Pintu Shaft
Besi , ukuran overall pintu 1800 mm lebar x 2640 mm tinggi, finish cat powder
12
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Loading Area
Pintu Besi Folding Door type (SD-15) terdiri dari 9 daun pintu Plat Besi ,
termasuk kusen Besi , ukuran overall pintu 10682 mm lebar x 5100 mm tinggi,
13
finish cat Duco termasuk Hard ware & Accesories sesuai spesifikasi dan
gambar pada :

- Pintu Loding Dok

Museum Nasional - Pek.Arsitektur HAL 178/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pintu Besi type (SD-11) terdiri dari 2 daun pintu Plat Besi , termasuk kusen
Besi , ukuran overall pintu 2600 mm lebar x 2400 mm tinggi, finish cat powder
coating termasuk Hard ware , Auotomatic Door, Accesories sesuai spesifikasi
dan gambar pada :
- Rg. Karantina

Pek. Pembuatan Rolling Door ( 5440 x 7170 )

Pembobokan dinding L=72cm Untuk Dudukan Rell

B PINTU JENDELA ALUMINIUM


tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
1
ukuran overall 1660 mm lebar x 2400 mm tinggi, finish cat powder coating
- Terrace Lantai Mezanin
tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
2
ukuran overall 4040 mm lebar x 2400 mm tinggi, finish cat powder coating
- Prefunction Hall
tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
3
ukuran overall 10250 mm lebar x 2400 mm tinggi, finish cat powder coating
- Drop Off Khusus

Museum Nasional - Pek.Arsitektur HAL 179/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

C JENDELA ALUMINIUM
tempered 10 mm,Frame Alm , ukuran overall 10480 mm lebar x 1060 mm
1
tinggi, termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
Lighting Sound Control Room - Lt.Mezz.

D PINTUKaca
Pintu KACA black tinted glass type (CD-01) , terdiri dari 1 daun pintu kaca
1 framless , ukuran overall pintu 700 mm lebar x 2045 mm tinggi, termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :
- Toilet
- Toilet Mezzanine

E PINTU KAYU
wrap finish teak color, uk. overall pintu 2100mm lebar x 2400mm tinggi,
1
termasuk kosen kayu terpasang finish veneer, lengkap hardware dan
- Prefunction
900mm lebar x 2400mm tinggi finish vener jati termasuk kosen kayu
2
terpasang finish veneer, lengkap hardware dan accessories, sesuai
- Prefunction
900mm lebar x 2400mm tinggi finish vener jati termasuk kosen kayu
3
terpasang finish veneer, lengkap hardware dan accessories, sesuai
- Lt. Mezzanine

F PINTU ALUMUNIUM
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - - Rg. Teknis & ME

Museum Nasional - Pek.Arsitektur HAL 180/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pintu type (AD-02) uk. 1000 x 2400 mm , 1 daun pintu Solid Alm door,
2 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Toilet Difabel
Pintu type (AD-04) uk. 800 x 2400 mm , 1 daun pintu Solid Alm door,
4 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Janitor
Pintu type (AD-05) uk. 1900 x 2400 mm , 1 daun pintu Solid Alm door,
5 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : Berada di ruang pojok konservasi
-
sederhana dan storage kids corner
Pintu type (AD-07) uk. 1900 x 2400 mm , 1 daun pintu Solid Alm door,
6 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Rg.Karantina

DAF. 2.3.3 PEKERJAAN FINISHING LANTAI

1
Heavyduty Floor hardener F6, screed floor hardener 7g/m2, sesuai spesifikasi
dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 181/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Heavyduty Floor hardener F6, screed floor hardener 7g/m2, sesuai spesifikasi
dan gambar pada :

- Lantai Ground
R Karantina
Loading area
R Transisi Koleksi Temp
R.Ahu

2
Rough plestered concrete wall paint ex. Nova color (F15), sesuai spesifikasi
dan gambar pada :

- Lantai Ground
Ramp Plaza Sunken

Cat Dulux Ambiance Metalic Copper


- Lantai Ground
Parapet Luar & dalam Ramp Plaza Sunken

3
Homogenius tile amazone black 800x800mm (F1), sesuai spesifikasi dan
gambar pada :

Museum Nasional - Pek.Arsitektur HAL 182/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Homogenius tile amazone black 800x800mm (F1), sesuai spesifikasi dan
gambar pada :

- Lantai Ground
R Edukids Corner & Workshop

4 Waterprofing coating ex. ……., sika atau setara sesuai spesifikasi dan
gambar termasuk pada dinding setinggi 200 mm pada :
- Lantai Ground
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'
Janitor As 8/J

- Lantai Mezz
Toilet
Toilet As 6/F

5
Pelapis Lantai HT tipe AMAZON BLACK ukuran 800x800mm,dengan adukan
dry mortar ex. drymix/ mortar utama atau setara, termasuk additive dan
grouting naat, sesuai dengan gambar dan spesifikasi pada (F1):

Museum Nasional - Pek.Arsitektur HAL 183/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN
Pelapis Lantai HT tipe AMAZON BLACK PEKERJAAN
ukuran 800x800mm,dengan adukan
dry mortar ex. drymix/ mortar utama atau setara, termasuk additive dan
grouting naat, sesuai dengan gambar dan spesifikasi pada (F1):

- Lantai Ground
Temporary Galery
Ruang Discovery & Lobby Lift
Drop off Khusus
Peninggian Screed t=7 cm/10 cm Ruang Discovery & Lobby Lift
Peninggian Screed t= 5 cm Prefunction
Homogeneous Tile natural dark grey uk. 600x600 mm ex: Valentino (F2),
6 berikut adukan mortar, additiv, grouting nat termasuk alat alat bantu lainnya
dgn peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :
- Lantai Ground
Staff Lobby / Smoke stop lobby
Homogeneous Tile natural dark grey uk. 600x600 mm ex: Valentino (F2),
6 berikut adukan mortar, additiv, grouting nat termasuk alat alat bantu lainnya
dgn peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :
- Lantai Ground
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'

7
Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 184/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN
Keramik tile osaka grey in matt finish PEKERJAAN
uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai Ground
Lighting & Sound Controll Room
R Engineer
R Kontrol
Janitor As 8/J
R.Panel
Preparation Room
Storage Edukids Corner
R Teknisi
G.Teknisi
FCC
Tempat Sampah
- Lantai Mezz
R CCTV
R Security
R Locker
Toilet
Koridor Mezz
Tangga ke Lt Mezz
Toilet As 6/F
Mushola

Museum Nasional - Pek.Arsitektur HAL 185/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

R.Data Center
R.Kontrol
Peninggian Screed t=10 cm Mushola

8 Steel Plate, 100 mm Height, Semi Gloss Powder Coating black (S1),dengan
adukan dry mortar ex. drymix/ mortar utama atau setara, termasuk additive
dan grouting naat, sesuai dengan gambar dan spesifikasi pada :
- Lantai Ground
Ruang Discovery & Lobby Lift

9 Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
- Lantai Ground
Lighting & Sound Controll Room
R Engineer
R Kontrol
Preparation Room
Storage Edukids Corner
R Teknisi

Museum Nasional - Pek.Arsitektur HAL 186/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

G.Teknisi
FCC
Tempat Sampah

R.Panel
- Lantai Mezz
R CCTV
R Security
R Locker
Koridor Mezz
Tangga ke Lt Mezz
Mushola
R.Data Center
R.Kontrol

10 Skirting 100mm Allumunium or Stainless Steel Sheet, terpasang sesuai


spesifikasi dan gambar pada :
- Lantai Ground
R Edukids Corner & Workshop
Temporary Galary

Museum Nasional - Pek.Arsitektur HAL 187/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

11 Homogenius Tile Galaxy Stone Black Type In Matte Finish ex. Valentino 100 x
600mm (S2), terpasang sesuai spesifikasi dan gambar pada :
- Lantai Ground
Staff Lobby / Smoke stop lobby
Koridor Toilet

12 20 mm U-Channel, Udes As skirting/shadow line of wall, terpasang sesuai


spesifikasi dan gambar pada :
- Lantai Ground
R Karantina
R Transisi Koleksi Temp
13 Penebalan Lantai untuk mengcover tray listrik ME yang melintang di lantai
AS I-I'/ 8' Cover Lantai

Penambahan Trap Tangga (anak tangga) dari cor beton dan finish Batu Alam
14
di Amphitheater Eksisting sisi kiri dan kanan
AS 1"-1' // 1'-4' Penambahan Trap Tangga

Bobokan Lantai Andesit Existing Lebar 30 cm

Museum Nasional - Pek.Arsitektur HAL 188/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.3.4 PEKERJAAN FINISHING PLAFOND

1 Calcium Cilicate board tebal 9mm ex. Knauf + rangka Galvanized Suspention
System + cat type Majestic ex Jotun atau setara termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :
- Lantai Ground
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'
Janitor As 8/J

- Lantai Mezzanine
Toilet Mezz
Janitor
3
Plafon Akustik dengan lapisan Insulasi + Rangka termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gambar
pada :

- Lantai Ground
Auditorium

Museum Nasional - Pek.Arsitektur HAL 189/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Lantai Mezzanine
Auditorium

4 Gypsum board tebal 9mm + rangka (C1) metal furing + cat AEP ex ICI atau
setara termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
Temporary Galery
Pre-Function
Ruang Discovery & Lobby Lift
koridor Auditorium

- Lantai Mezzanine
R CCTV
R Security
R Locker
Koridor Mezz
Tangga ke Lt Mezz
R.Kontrol
R.Data Center
Mushola

Museum Nasional - Pek.Arsitektur HAL 190/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Droop Celling Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi da
gambar pada :
Hall Pengunjung
Pre-Function

5 Ceiling Black Tinte Mirror + rangka, termasuk alat bantu lainnya dengan
peralatan perlengkapan terpasang sesuai spesifikasi dan gambar pada :
- Lantai Ground
Lift Car Pengunjung

6 Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat


(C3) , termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
- Lantai Ground
R Edukids Corner & Workshop
R. Genset
Ramp As 7-9/G-I'
R ME As 8'/I'-J
R. AHU All
R. Panel

Museum Nasional - Pek.Arsitektur HAL 191/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Loading Dook & R.Karantina


Pojok Koservasi Sederhana

- Lantai Ground
Staff Lobby / Smoke stop lobby
Lighting & Sound Controll Room
R Engineer
R Kontrol

7
Shadowline termasuk alat bantu lainnya dengan peralatan perlengkapan
terpasang sesuai spesifikasi dan gambar pada :

- Lantai Ground
R Karantina
R Transisi Koleksi Temp
Kitchen
Staff Lobby / Smoke stop lobby
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Difable Toilet As 8"/I'

Museum Nasional - Pek.Arsitektur HAL 192/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lighting & Sound Controll Room


R Engineer
R Kontrol
Regrestrasi Area
Edukids Storage
Ruang Discovery & Lobby Lift
Temporary Galery
AS C'- M/9'-10' Area Pedestarian
Finishing Cat ex.Dulux Ambiance Metalic Copper
Celling Bawah Ram Sunken

8 Pembuatan Celling dari GRC bentuk Kot


AS A-b/2-5'
Area Plaza
9 Pembuatan Celling dari GRC + PAH + AS C'- M/9'-10'
Area Pedestarian
10 Pembuatan Ramp Cor Beton finish FloAS D-E/9-9'
Loading area

Museum Nasional - Pek.Arsitektur HAL 193/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.3.5 PEKERJAAN SANITARY

Lantai Ground

1 Toilet Pria As 8-9/I'-J'


- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J
- Wastafel ex….. type LW 951 CJ
- Urinoir TOTO Type U57M
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Robehook ex…... type TX 704 AJ
- Sekat Urinoir TOTO type A 100
- Jet washer ex. ….. type TX403 SMCRB

2 Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


- Divider uk. 1500 x 1800 mm
- Frontal uk. 900 x 2100 mm

3 Toilet Wanita As 8-9/I'-J'


- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J

Museum Nasional - Pek.Arsitektur HAL 194/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Wastafel ex….. type LW 951 CJ


- Floor Drain TOTO type TX 1BV1
- Robehook ex…... type TX 704 AJ
- Paper Holder TOTO type TX 703 AN
- Jet washer ex. ….. type TX403 SMCRB

4 Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :


- Divider uk. 1500 x 1800 mm
- Frontal uk. 900 x 2100 mm

5 Difable Toilet As 8"/I'


- Closet duduk TOTO type CW 421 J
- Wastafel TOTO type LW 236 CJ
- Floor Drain TOTO type TX 1BV1
- Robehook ex…... type TX 704 AJ
- Paper Holder TOTO type TX 703 AN
- Jet washer ex. ….. type TX403 SMCRB

R.Janitor
- Kran ex. ….. type T23B13
- Floor Drain …... type TX 1BV1

Museum Nasional - Pek.Arsitektur HAL 195/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

6 Lantai Mezz
Partisi Cubicle ex. Matrix, sesuai gambar dan spesifikasi pada :
Divider uk. 2000 x 1930 mm
Divider uk. 2000 x 1735 mm
Frontal uk. 2000 x 1332 mm
- Closet duduk TOTO type CW 421 J
- Closet ex…...type CE 9 / TV150NWV12J
- Wastafel ex….. type LW 951 CJ
- Urinoir TOTO Type UW 350 HTJ1M
- Urinoir TOTO Type U57M
- Floor Drain TOTO type TX 1BV1
- Paper Holder TOTO type TX 703 AN
- Sekat Urinoir TOTO type A 100
- Robe hook ex…... type TX 704 AJ
- Shower Toto TX471SRSN
- Kran ex. ….. type T23B13
- Grill Ambalan Stainnlees Steel Pipa Ø 1/4' L=200mm

7 Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Lantai GF & Mezzanine
- Coring Ø 2'
- Coring Ø 3'
- Coring Ø 5'

Museum Nasional - Pek.Arsitektur HAL 196/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.3.6 PEKERJAAN LAIN LAIN

3 Kaca cermin tebal 6 mm lengkap dengan backingdari multiplek tebal 9 mm


rangka hollow, berikut sealant, bracket, hardware dll termasuk alat bantu
lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar, pada :
Lantai Ground
-Toilet Pria As 8-9/I'-J' ukuran : ( 1974 mm x 1400 mm )
-Toilet Wanita As 8-9/I'-J' ukuran : ( 2205 mm x 1400 mm )
Lantai Mezzanine
-Toilet As 7'/E'-F' ukuran : ( 3710 mm x 1400 mm )

4
Meja Lavatory dari beton bertulang finish keramik Homogenous Tile termasuk
alat bantu lainnya dgn peralatan dan perlengkapan terpasang sesuai
spesifikasi dan gambar

Lantai Ground
-Toilet Pria As 8-9/I'-J' ukuran : ( 1974 mm x 600 mm )
-Toilet Wanita As 8-9/I'-J' ukuran : ( 2205 mm x 600 mm )

Museum Nasional - Pek.Arsitektur HAL 197/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lantai Mezzanine
-Toilet As 7'/E'-F' ukuran : ( 3710 mm x 600 mm )
Penebalan dinding dari batu bata tebal 150 dibelakang closet duduk, termasuk
5 finishing Topping + Dinding ex Homogenous Tile Uk. 300 x600mm (HT) Ex Niro
granite, tinggi
Lantai 1250 mm, terpasang sesuai gambar dan spesifikasi, pada :
Ground
-Toilet Pria As 8-9/I'-J'
-Toilet Wanita As 8-9/I'-J'
-Difable Toilet As 8"/I'
Lantai Mezzanine
Penebalan -Toilet
dindingAs 7'/E'-F'
dari batu bata tebal 150 pada urinoir, termasuk finishing
6 Topping + Dinding ex Homogenous Tile Uk. 300 x600mm (HT) Ex Niro granite,
tinggi Lantai
1250 mm, terpasang sesuai gambar dan spesifikasi, pada :
Ground
-Toilet Pria As 8-9/I'-J'
Lantai Mezzanine
-Toilet As 7'/E'-F'

7 Finishing area THEATER sesuai gambar dan spesifikasi, pada :


-Panggung dan Kelengkapan Theater

8 Penambahan Rover GRC di atas pintu Lift hingga ceiling dan pemindahan panel listrik lift ke
AS A-b/2-5' Area Khusus Drop Off
9 Penambahan Caping GRC Di Bagian bawah Fasad

Museum Nasional - Pek.Arsitektur HAL 198/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

AS B'- C' /6'-9' Assembly point


10 Pembuatan Kolam untuk Menampung Air Dari Pipa Drainase
. AS A /7 kolam
11 Pembuatan Tangga Dari Baja
. AS C-D /8 Tangga Baja
12 Pemindahan Outdoor Ac 6 unit ke bagianbelakang gedung A lengkap, beserta cover grill
. - biaya pemindahan
- Cover Grill
PEKERJAAN FINISHING EKSTRA
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
1
skonengan dan tali air, sesuai spesifikasi
AD04 R.SHAP
AD04 Loby Mezzanine
Parapet Ram sersan AS C-D /6-7

Finishing Openingan Pintu Bahan Mu menggunakan adukan kering MU atau setara termasu
2
acian halus skonengan dan tali air :
AD05 R.Pojok koservasi sederhana
AD07 R.storage kids coner
AD04 R.SHAP
AD04 Loby Mezzanine
As 9-9/ K-L
3 Perapihan Plesteran t=10 cm menggunakan adukan kering MU atau setara termasuk acian h

Museum Nasional - Pek.Arsitektur HAL 199/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

ahu
temporary galery
area Luar sisi utara 9 -9'/D-I
BONGKAR PASANG PINTU BESI
Bongkar Pasang Pintu Besi Existing, 1 daun pintu Plat Besi, termasuk kusen
1
Besi dan Finishing Openingan :
- Smoke stop lobby
Bongkar Pasang Pintu Besi Existing, 2 daun pintu Alluminium, termasuk
2
kusen Solid Alluminium dan Finishing Openingan :
- Storage kids Coner
4 Bobokan Plat Lantai - Area Shaft 7'-8/I-J

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR


DAFTAR No. 2.4 - Lantai -2

DAF. 2.4.1 PEK. PASANG DINDING DAN FINISHING


B PEK. PELAPIS DINDING
Penebalan dinding bata untuk
1 AS setara,
Pasangan bata ringan ex hebel atau M / 4'-5'tebal
, AS 100
M/ 8-9'
mm, termasuk
perapihan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar pada
Museum Nasional - Pek.Arsitektur HAL 200/932
LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan menggunakan
Plesteran tali air, sesuai spesifikasi dan gambar:
adukan kering MU atau setara termasuk acian halus
2
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Ruang panel
R.AHU

Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
3 pada :
AS M /4'-5', AS M/8-9'
4 Pelapis dinding cat washbel setinggi 1,5 m dan cat interior dari tinggi 1,5 s.d
plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada
(W5):
Ruang Panel
5 - Window Stool Bahan-ACP AS G'-H'// I'-J'/ 5' //3-5' & D/6'-7
Finishing Openingan Pintu Bahan Mu menggunakan adukan kering MU atau
6
setara termasuk acian halus skonengan dan tali air :
SD-06 AHU
SD-19 J'/8

E PINTU BESI
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
1
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
R.Ahu

Museum Nasional - Pek.Arsitektur HAL 201/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
R.Ahu

F PINTU ALUMUNIUM
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - - Rg. Panel
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
2 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada
Pintu :type (AD-05) uk.- 1900 x 2400 mm
R.Rapat
, 2 daun pintu Solid Alm door,
3 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - R.Karantina Buku

DAF. 2.3.3 PEKERJAAN FINISHING LANTAI

1
Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

R.Panel

Museum Nasional - Pek.Arsitektur HAL 202/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

2 Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
R.Panel

3 Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan gambar pada :
R.AHU

DAF. 2.3.4 PEKERJAAN FINISHING PLAFOND

1 Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat


(C3) , termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
R. Panel
2 Penambahan Balok Bahan GRC,Rangka Hollo Finishing Cat Ex.Jotun
As.K-L/3

DAF. 2.3.5 PEKERJAAN SANITARY

Museum Nasional - Pek.Arsitektur HAL 203/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

1 Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Lantai 2
- Coring Ø 2'
- Coring Ø 3'
- Coring Ø 5'

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR


DAFTAR No. 2.5 - Lantai -3

DAF. 2.5.1 PEK. PASANG DINDING DAN FINISHING


B PEK. PELAPIS DINDING

1 Pemasangan Dinding Parapet Balkon AS K-L / AS 1'-4'


- Pembongkaran dindingex hebel atau setara, tebal 100 mm, termasuk
Pasangan bata ringan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan Openingan
Finishing tali air, sesuai spesifikasi
Pintu SD-06 AHU dan Bahan
gambarMu
: menggunakan adukan
kering MU atau setara termasuk acian halus skonengan dan tali air :

Museum Nasional - Pek.Arsitektur HAL 204/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Penebalan dinding bata untuk


2 ASmm,
Pasangan bata ringan ex hebel atau setara, tebal 100 M / 4'-5' , AS M/ 8-9'
termasuk
perapihan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar:
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus
3
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Ruang panel

Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
4 pada :
AS K-L/AS/1'-4' & 'AS M / 4'-5' , AS M/ 8-9'
5 Pelapis dinding cat washbel setinggi 1,5 m dan cat interior dari tinggi 1,5 s.d
plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada
(W5):
Ruang Panel
6 - Window Stool Bahan-ACP AS G'-H'// I'-J'/ 5' //3-5' & D/6'-7
7 Penambahan LIST ACP Window lengkap
AS C"-F'/2'- LIS ACP
AS C-D'/6'- LIS ACP

E PINTU BESI

Museum Nasional - Pek.Arsitektur HAL 205/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
1
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
R.Ahu
F PINTU ALUMUNIUM
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - - Rg. Panel

DAF. 3.5.3 PEKERJAAN FINISHING LANTAI

1
Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

R.Panel

2 Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
R.Panel

Museum Nasional - Pek.Arsitektur HAL 206/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

3 Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan gambar pada :
R.AHU

DAF. 3.5.4 PEKERJAAN FINISHING PLAFOND

1 Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat


(C3) , termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
R. Panel
2 Gypsum board tebal 9mm + rangka (C1) metal furing + cat AEP ex ICI atau
setara termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
Balkon
3 Plafon GRC Kotak
Plafon GRC Kotak Lt.3

4 Penambahan Balok Bahan GRC,Rangka Hollo Finishing Cat Ex.Jotun


As.K-L/3

DAF. 3.5.5 PEKERJAAN SANITARY

Museum Nasional - Pek.Arsitektur HAL 207/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

1 Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Lantai 3
- Coring Ø 2'
- Coring Ø 3'
- Coring Ø 4'
- Coring Ø 5'

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR

DAFTAR No. 2.6 - Lantai -4

DAF. 2.6.1 PEK. PASANG DINDING DAN FINISHING

PEK. PELAPIS DINDING


Pasangan bata ringan ex hebel
Penebalan dindingtebal
atau setara, bata 100
untuk
mm,
1 AS M / 4'-5' , AS M/ 8-9'
perapihan
termasuk
Plesteran perekat, adukan
menggunakan adukan
-
kering,kolom
kering MU ataudan baloktermasuk
setara praktis,
- sesuai spesifikasi dan gambar
acian halus skonengan dan
Plesteran menggunakan adukan kering tali MU atau setara termasuk acian halus
2 pada
air,skonengan
sesuai spesifikasi
dan tali air, sesuai spesifikasi dan gambar pada :
Ruang panel

Museum Nasional - Pek.Arsitektur HAL 208/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

R.AHU
Finishing Openingan Pintu SD-06 AHU Bahan Mu menggunakan adukan
kering MU atau setara termasuk acian halus skonengan dan tali air :

Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
3 pada :
AS M / 4'-5' , AS M/ 8-9'
4 Pelapis dinding cat washbel setinggi 1,5 m dan cat interior dari tinggi 1,5 s.d
plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada
(W5):
Ruang Panel

5 - Window Stool Bahan-ACP AS G'-H'// I'-J'/ 5' //3-5' & D/6'-7

E PINTU BESI
Pintu Besi type (SD-06) terdiri dari 2 daun pintu Plat Besi , termasuk kusen
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
1
coating
Pintu termasuk
Besi Hard ware
type (SD-12) terdiri&dari
Accesories
2 daun sesuai
pintu spesifikasi
Plat dan gambar
Besi , termasuk kusen
pada : R.Ahu
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
2
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
pada : R.Ahu

F PINTU ALUMUNIUM

Museum Nasional - Pek.Arsitektur HAL 209/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada :- Rg. Panel

DAF. 2.6.3 Pekerjaan Finishing Lantai


1
Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

R.Panel
2 Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
R.Panel
3 Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan gambar pada :
R.AHU

1 DAF. 2.6.4 Pekerjaan Plafond lantai 4

Calcium Cilicate board tebal 6mm ex. Knauf + rangka Galvanized Suspention System
type Majestic ex Jotun atau setara termasuk alat bantu lainnya dengan pe
Museum Nasional - perlengkapan
Pek.Arsitektur terpasang HAL
sesuai spesifikasi dan gambar pada :
210/932
LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Calcium Cilicate board tebal 6mm ex. Knauf + rangka Galvanized Suspention System
type Majestic ex Jotun atau setara termasuk alat bantu lainnya dengan pe
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai 4
Toilet Pria As 6-6'/F-F'
Toilet Wanita As 6-6'/F-F'
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Nursing As 9/I'
Difable Toilet As 8"/I'
Tempat Wudhu
Toilet As 6/F
Janitor As I'/9
Janitor As F/6'
Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara termasu
bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gamba
pada :
- Lantai 4
Lobby Area Gudang Koleksi Logam
Koridor R. Studi+ R. Rapat
R. Studi + R. Rapat

Museum Nasional - Pek.Arsitektur HAL 211/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lobby Utama
R Security

Ceiling Black Tinte Mirror + rangka, termasuk alat bantu lainnya dengan peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai 4
Staff Lobby / Smoke stop lobby

Shadowline termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang


spesifikasi dan gambar pada :

- Lantai 4
Laboratorium + R Transisi Laboratorium
Lobby Area Laboratorium
R. Studi + R. Rapat
R. Kepala Lab.
Toilet Pria As 6-6'/F-F'
Toilet Wanita As 6-6'/F-F'
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Nursing As 9/I'

Museum Nasional - Pek.Arsitektur HAL 212/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Difable Toilet As 8"/I'


Mushollah
Tempat Wudhu
Staff Lobby / Smoke stop lobby

DAF. 2.6.4 Pekerjaan Plafond Expos


1 Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat
(C3) , termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
R.Panel

DAF. 2.6.5 PEKERJAAN SANITARY

1 Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Lantai 4
- Coring Ø 2'
- Coring Ø 3'
- Coring Ø 4'
- Coring Ø 5'

Museum Nasional - Pek.Arsitektur HAL 213/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR

DAFTAR No. 2.7 - Lantai -5

DAF. 2.7.1 PEK. PASANG DINDING DAN FINISHING

PEK. PELAPIS DINDING


Penebalan dinding bata untuk
1 Pasangan bata ringan ex hebel atau setara,AS tebal
M / 4'-5'
100, AS
mm,M/termasuk
8-9'
perapihan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan menggunakan
Plesteran tali air, sesuai spesifikasi
adukan kering MU atau setara termasuk acian halus
2
skonengan dan tali air, sesuai spesifikasi dan gambar pada :
Ruang panel

Finishing Openingan Pintu SD-06 AHU Bahan Mu menggunakan adukan


kering MU atau setara termasuk acian halus skonengan dan tali air :

Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
3 pada :
AS M / 4'-5' , AS M/ 8-9'
Pelapis dinding cat washbel setinggi 1,5 m dan cat interior dari tinggi 1,5 s.d
4 plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada

Museum Nasional - Pek.Arsitektur HAL 214/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

4 plafond ex ….. warna twilight , sesuai dengan gambar dan spesifikasi pada
(W5):
Ruang Panel

5 - Window Stool Bahan-ACP AS G'-H'// I'-J'/ 5' //3-5' & D/6'-7

E PINTU BESI
Pintu Besi type (SD-06) terdiri dari 2 daun pintu Plat Besi , termasuk kusen
Besi , ukuran overall pintu 1900 mm lebar x 2400 mm tinggi, finish cat powder
1
coating termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
pada : R.Ahu
F PINTU ALUMUNIUM
Pintu type (AD-01) uk. 900 x 2400 mm , 1 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada :- Rg. Panel

DAF. 2.6.3 Pekerjaan Finishing Lantai


4
Keramik tile osaka grey in matt finish uk.300x300mm (F3A), berikut adukan
mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

R.Panel

Museum Nasional - Pek.Arsitektur HAL 215/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

5 Ceramic Tile Osaka Grey Type In Grey Colour Matte finish Ex. Roman 100 x
300mm (S3), berikut adukan mortar, additiv, grouting nat termasuk alat alat
bantu lainnya dgn peralatan perlengkapan terpasang sesuai spesifikasi dan
gambar pada :
R.Panel

3 Cement Screed 5 cm With Floor Hardener 3kg/m2, sesuai spesifikasi dan gambar pada :
R.AHU

8 DAF. 2.5.4 Pekerjaan Plafond lantai 5

Calcium Cilicate board tebal 6mm ex. Knauf + rangka Galvanized Suspention System
type Majestic ex Jotun atau setara termasuk alat bantu lainnya dengan pe
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai 5
Toilet As 6/F
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Nursing As 9/I'

Museum Nasional - Pek.Arsitektur HAL 216/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Difable Toilet As 8"/I'


Toilet As 6/F
Janitor As I'/9
Janitor As F/6'

Gypsum board tebal 9mm + rangka metal furing + cat AEP ex ICI atau setara termasu
bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gamba
pada :

- Lantai 5
Lobby Area Gudang Koleksi Tekstil
Koridor R. Studi+ R. Rapat
Staff Lobby / Smoke stop lobby
R. Studi + R. Rapat
Lobby Utama
R Security
Ceiling Black HT tipe AMAZON BLACK termasuk alat bantu lainnya dengan peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada (C11) :

Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat , termasuk al
bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gamba
pada :

Museum Nasional - Pek.Arsitektur HAL 217/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN
Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat , termasuk al
bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi dan gamba
pada :

- Lantai 5
R ME As 8'/I'-J
R ME As 7-8'/I'-J
R. AHU

Shadowline termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang


spesifikasi dan gambar pada :

- Lantai 5
Gudang Koleksi Tekstil
R Transisi Koleksi Tekstil
Toilet As 6/F
Toilet Pria As 8-9/I'-J'
Toilet Wanita As 8-9/I'-J'
Nursing As 9/I'
Difable Toilet As 8"/I'
Lobby Area Gudang Koleksi Tekstil
R. Studi + R. Rapat
Koridor R. Studi+ R. Rapat
R Security

Museum Nasional - Pek.Arsitektur HAL 218/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Staff Lobby / Smoke stop lobby


DAF. 2.7.4 Pekerjaan Plafond expos
Finishing Beton exposed cat emulsion ex ICI berikut perapihan skimcoat
(C3) , termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada :
R. Panel

DAF. 2.6.5 PEKERJAAN SANITARY

1 Pekerjaan Coring Pipa Air Kotor, Air Bekas & FCO Area Toilet Lantai 5
- Coring Ø 2'
- Coring Ø 3'
- Coring Ø 4'
- Coring Ø 5'

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR

Museum Nasional - Pek.Arsitektur HAL 219/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAFTAR No. 2.8 - Lantai -6

DAF. 2.8.1 PEK. PASANG DINDING DAN FINISHING

PEK. PELAPIS DINDING


Insulasi envirospray untuk peredam dan dilapis kembali menggunakan
1 gypsum 15mm finish cat titanium Ex Doupont berikut rangka partisi
termasuk kelengkapannya, sesuai spesifikasi dan gambar pada :
Pada Dinding yang berbatasan deGudang Koleksi Textil
Pada Dinding yang berbatasan deGudang Koleksi Kertas
Lantai6

Black Tinte Mirror finish berikut backing playwood multiplek,rangka,siku,silent


2
termasuk kelengkapannya, sesuai spesifikasi dan gambar pada lift lobby:
Lantai 6

3 Cat Emulsion ex : ICI, pada dinding, sesuai dengan gambar dan spesifikasi,
pada :

Lantai 6
Ruang Pamer

Museum Nasional - Pek.Arsitektur HAL 220/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

4 Penambahan
Pasangan dinding bata diex
bata ringan kirihebel
& kanatau setara, tebal
AS100
D/ 6'-7
mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat
- Window stool- Bahan ACP
5 Penambahan
Pasangan dinding bata diex
bata ringan parapet es setara, tebal
hebel atau AS 100
H-I' /mm,
5'-6 termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat
6 Penambahan
Pasangan dinding bata diex
bata ringan dekat LIFatau setara, tebalAS
hebel 100I' /mm,
7' termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
Penambahan dinding bata di
dan tali air, sesuai spesifikasi dan gambar beserta cat
7 pertemuan Grc dan
Pasangan bataCurtain
ringan Wall AStebal
ex hebel atau setara, G'-H'//
100I'-J'/
mm,5' //3-5'
termasuk
Beserta Window Stool
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat
- Window stool- Bahan ACP
Penambahan dinding bata di parapet
8 Pasangan AS 100
E-F /mm,6'-7 termasuk
dinding eksistingbata ringan
200mm ex hebel atau setara, tebal
Tangga
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali
Penebalan air, sesuai
dinding spesifikasi dan gambar beserta cat
bata untuk
9 Pasangan bata ringan AS tebal
ex hebel atau setara, M / 4'-5'
100, ASmm,M/termasuk
8-9'
perapihan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat

Museum Nasional - Pek.Arsitektur HAL 221/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pembongkaran dinding bata Eksisting


10 AS M /6'-7'
untuk akses menuju gedung B
- Plesteran
Pembongkaran dinding adukan kering MU atau setara termasuk acian halus skoneng
menggunakan
- dan tali air, sesuai spesifikasi dan gambar perapihan bongkaran beserta pengecatan b
Penambahan
bongkaran Dinding bata setinggi
11 Pasangan AS H'-I /7'
1200mm, denganbata ringan
KACA ex hebel
visible Lab atau setara, tebal 100 mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan talidinding
Pembuatan air, sesuai
coverspesifikasi
untuk pipadan gambar beserta cat
12 Pasangan bata ringan ex hebel atau setara, tebalAS B mm,
100 /5' termasuk
plumbing
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat

Ruang Panel
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi : Ruang Panel

DAF. 2.8.2 Pekerjaan Pintu, Jendela dan Kunci

A PINTU BESI

Automatic door system, ukuran overall pintu 3000 mm lebar x 2600 mm


1
tinggi,termasuk Hard ware & Accesories sesuai spesifikasi dan gambar

Museum Nasional - Pek.Arsitektur HAL 222/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Gudang Koleksi Keramik & Teracota

Penambahan Kolom Praktis Uk.150x200 Bekesting,Pembesian dan Beton


Automatic slidding door system, ukuran overall pintu 3000 mm lebar x 2600
2
mm tinggi,termasuk Hard ware & Accesories sesuai spesifikasi dan gambar
- Gudang Koleksi Keramik & Teracota

Pintu KHUSUS type (GD03) terdiri dari 2 daun pintu plat stell finish powder
3 coating ukuran overall pintu 3000 mm lebar x 2600 mm tinggi,termasuk Hard
ware & Accesories sesuai spesifikasi dan gambar pada :
Pintu KHUSUS type (SL01) terdiri dari 2 daun pintu , door sliding steel
4 ex.tormax ukuran overall pintu 3000 mm lebar x 2600 mm tinggi,termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :

Penambahan Balok Praktis Uk.150x200 Bekesting,Pembesian dan Beton

B PINTU JENDELA ALUMINIUM


tempered 10 mm,Frame Alm ,dan jendela mati kaca tempered clear 10 mm ,
1
ukuran overall 3990 mm lebar x 2400 mm tinggi, finish cat powder coating
- Rg.Studi Khusus Peneliti Luar

Museum Nasional - Pek.Arsitektur HAL 223/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

C JENDELA ALUMINIUM
Perbaikan keliling tepi Jendela aluminium type (W-06) dengan panel GRC
1
Fasad, bahan Alumunium Composit Panel ,sesuai gambar pada :
Jendela Type W-06
Jendela aluminium type (W-08), terdiri kaca mati tempered clear 10
2 mm,Frame Alm , ukuran overall 3000 x 1500 mm tinggi, finish cat powder
coating termasuk Accesories
- sesuai spesifikasi
Rg.Visible dan gambar pada :
Storage

D PINTU KACA
Pintu Kaca black tinted glass type (CD-01) , terdiri dari 1 daun pintu kaca
1 framless , ukuran overall pintu 700 mm lebar x 2045 mm tinggi, termasuk
Hard ware & Accesories sesuai spesifikasi dan gambar pada :
- Toilet

E PINTU ALUMUNIUM
- Janitor
Pintu type (AD-05) uk. 1900 x 2400 mm , 2 daun pintu Solid Alm door,
1 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Area Koridor Storage
Pintu type (GD-02) uk. 900 x 2400 mm , 1 daun pintu Kaca frame Alm door,
5 termasuk kusen Alm, Hard ware & Accesories sesuai spesifikasi dan gambar
pada : - Rg. Rapat

Museum Nasional - Pek.Arsitektur HAL 224/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Rg. Rapat & R.Transisi Visable

DAF. 2.8.3 Pekerjaan Finishing Lantai

3mm self-levelling Epoxy Coating ex Flowcrete MF (F3), sesuai spesifikasi dan gamba
1 :
- Lantai 6
Gudang Koleksi Kertas
R Transisi Koleksi Kertas
R. Studi + R. Rapat
R. Studi Koleksi kertas & Tekstil
Lobby Area Gudang Koleksi kertas
R.Studi Koleksi Khusus & Peneliti Luar
R.Transisi Visble
Pekerjaan Finishing Lantai Vinyl Anti bakteri Ex.LG Hausys/AllRoad dan
Dinding 20 cm , sesuai spesifikasi dan gambar pada :
Gudang Koleksi Kertas
Gudang Koleksi Tekstil
R Transisi storage
R. Studi Koleksi kertas & Tekstil

Museum Nasional - Pek.Arsitektur HAL 225/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Lobby Area + Koridor


R.Studi Koleksi Khusus & Peneliti Luar

2 Homogeneous Tile tipe Galaxy Stone Black uk. 600x600 mm matt Black (F2A), berikut
adukan mortar, additiv, grouting nat termasuk alat alat bantu lainnya dgn peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

- Lantai 6
Lobby Area Gudang Koleksi Kertas
Koridor R. Studi+ R. Rapat

3 Skirting 100mm Allumunium or Stainless Steel Sheet, terpasang sesuai spesifikasi dan
gambar pada :

- Lantai 6
Gudang Koleksi Kertas
R Transisi Koleksi Kertas

Museum Nasional - Pek.Arsitektur HAL 226/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.8.4 Pekerjaan Plafond

Shadowline termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang


spesifikasi dan gambar pada :

- Lantai 6
Gudang Koleksi Kertas
R Transisi Koleksi Kertas
Lobby Area Gudang Koleksi Kertas

DAFTAR No. 2 - PEKERJAAN ARSITEKTUR

DAFTAR No. 2.9 - Lantai 7

Museum Nasional - Pek.Arsitektur HAL 227/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.9.1 PEK. PASANG DINDING DAN FINISHING

PEK. PELAPIS DINDING

1 Penambahan
Pasangan dinding bata diex
bata ringan kirihebel
& kanatau setara, tebal
AS100
D/ 6'-7
mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air, sesuai spesifikasi dan gambar beserta cat
- Window stool- Bahan ACP
Penebalan dinding bata untuk
2 Pasangan bata ringan ex hebel atau setara, AS tebal
M / 4'-5'
100, AS
mm,M/termasuk
8-9'
perapihan
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
- gambar pada
dan tali air,dinding
Pembongkaran sesuaibata
spesifikasi dan gambar beserta cat
Eksisting
3 AS M /6'-7'
untuk akses menuju gedung B
- Plesteran
Pembongkaran dinding adukan kering MU atau setara termasuk acian halus skoneng
menggunakan
- dan tali air, sesuai spesifikasi dan gambar perapihan bongkaran beserta pengecatan b
bongkaran
4 Penambahan
Gypsum boardPartisi
tebalDinding
9mm 2 muka + rangka metal AS H'-I,I-J
Stud + cat /5'-6'
Interior ex Jotun atau setara
termasuk alat bantu lainnya dengan peralatan perlengkapan terpasang sesuai spesifikasi da
gambar pada :

Museum Nasional - Pek.Arsitektur HAL 228/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAF. 2.9.2 Pekerjaan Pintu, Jendela dan Kunci

1 Pembuatan Partisi Kaca untuk R. Sekretariat lengkap beserta Frame dan Kaca
AS F--F' /7 KACA

2 Pembuatan Partisi Kaca untuk lengkap beserta Frame dan Kaca


AS C'/3-4' KACA
Pengadaan Fidding Partion Pada R.Rapat Sedang & Kecil sebagai dinding
3
pemisah lengkap beserta pengecatan
AS H /6'-7 KACA
Bongkar Pasang Pintu Besi Existing, 2 daun pintu Alluminium, termasuk
3
kusen Solid Alluminium dan Finishing Openingan :
Rg. Rapat

DAF. 2.9.3 Pekerjaan Finishing Lantai

1 Pekerjaan Finish Karpet Pada ruang Rapat Besar


AS E-F /2-5' Finish Karpet R. R$apat Besar
2 Pekerjaan Finish Karpet Pada R. Kepala Museum
AS F-F' /2-5 Finish Karpet R. Kepala Museum
3 Pekerjaan Finish Karpet Pada R. Rapat Sedang dan R.Rapat Kecil

Museum Nasional - Pek.Arsitektur HAL 229/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Finish Karpet R. Rapat Sedang dan


AS G-H' /6'-7
R.Rapat Kecil
4 Pekerjaan Finish Karpet Pada R. Rapat Sedang
AS I-J' /5'-6 Finish Karpet R. Rapat Sedang

DAF. 2.9.3 Pekerjaan Plafond

1 Pembuatan Celling gypsum lengkap rangka dan pengecatan


AS H'-I' /5'-6 Celling Gypsum
2 Pembuatan Celling gypsum lengkap rangka dan pengecatan
AS J'-L'/3-7 Celling Gypsum

Pembuatan Curtain Box

3 Pembuatan Celling gypsum lengkap rangka dan pengecatan

Museum Nasional - Pek.Arsitektur HAL 230/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

AS J'-M/7'-9' Celling Gypsum

DAF. 3.9.6 Pekerjaan Lain-lain

Pek. lain - lain

Lantai 7
1 Perapihan Janggutan Gypsum beserta pengecatan
AS I'-J/6 Perapihan Gypsum
2 Pembuatan Tanggulan untuk kaca beserta pengecatan
AS C'-I/9' Pembuatan Tanggulan
3 Penambahan LIST ACP lengkap beserta pengecatan
AS C'-D/6' LIS ACP
4 Penambahan LIST ACP lengkap beserta pengecatan
AS A"-G'/2 LIS ACP

Museum Nasional - Pek.Arsitektur HAL 231/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAFTAR No. 3 - PEKERJAAN ARSITEKTUR

DAFTAR No. 3.10 - Lantai -Atap

DAF. 3.10.1 PEK. PASANG DINDING DAN FINISHING

PEK. PELAPIS DINDING

1 Penambahan Capping GRC lengkap beserta Rangka dan pengecatan


AS J'-M/3-5' Capping GRC
2 Penambahan Capping GRC lengkap beserta Rangka dan pengecatan
AS A"-G'/.B-D//B'-D//2-6' Capping GRC
3 Penambahan Capping ACP lengkap beserta Rangka dan pengecatan
AS G'-J'//5' Capping ACP
4 Penambahan Capping ACP lengkap beserta Rangka dan pengecatan
AS B'-C'// C'-M//7-9'/9' Capping ACP

Museum Nasional - Pek.Arsitektur HAL 232/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

5 Penambahan Capping ACP lengkap beserta Rangka dan pengecatan


AS J'-M/3-5' Capping ACP
6 Pekerjaan bongkar Pasang pintu darurat Pada Lantai Atap mundur Sekitar 1000mm
Pekerjaan Bongkar Pintu uk. 900 x
AS I'-J'// 9-9'
2500
Pekerjaan Pasang Pintu uk. 900 x
2500

DAFTAR No. 3 - PEKERJAAN SUNKEN PLAZA

Catatan Harga

I Harga satuan sudah termasuk fitting, accessories, alat bantu, perlengkapan


dan peralatan yang diperlukan

II Harga satuan sudah termasuk pemasangan sparing-sparing sesuai gambar


dari konsultan terkait

Museum Nasional - Pek.Arsitektur HAL 233/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

III Setiap pekerjaan harus sesuai dengan petunjuk yang disyaratkan pabrik
pembuat

IV Harga satuan sudah termasuk pemotongan, pembersihan, perapihan,


pinggulan dan bahan yang terbuang (waste)

A AREA BARAT As
1 Talang air hujan, sisi kiri dan kanan at A-C/2
Talang air hujan, sisi kiri dan kanan
Penutup baja kantilever baja Ujung atap Sunken stainless steel
2 Atap, 3 sisi Bahan ACP termasuk 1-3
Rangka dll.
a Bongkar Pasang baja Canopy Baja C

3 Curtain wall + Gawangan + Pintu Utama D/1-3


Penambahan Curtain wall

a Bongkar Plafon Metal existing

c Pasang Plafon Metal

Museum Nasional - Pek.Arsitektur HAL 234/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pekerjaan Dinding Janggutan GRC


d 9mm + Rangka Hollo 40.40.1 Finish T/1
Cat
4 Paddymat
grill gutter, depan
bahan pintu masuk
plat strip Sunken
staenless D/1-3
5 steel uk. 20 x 3mm jarak 20mm, lebar D/1-3
grill
gutergutter,
200mm bahan plat strip uk. 30mm x
a 2mm jarak 20mm, lebar guter 260mm, D/1-3
finish Cat Semi Duco
Pekerjaan coring Ø 3" untuk lubang
b D/1-3
saluran
6 Railing Tangga masuk Sunken Bahan Pla C/1-3

Bongkar Pasang Curtain wall 6'-7/D

B AREA TIMUR As
1 Talang air hujan, sisi kiri dan kanan at A-C/2
Talang airbaja
Penutup hujan, sisi kiri baja
kantilever dan kanan
Ujung atap Sunken stainless steel
2 Atap, 3 sisi Bahan ACP termasuk
Area Tangga di belakang patung, 1-3
3 Rangkarangka
bahan dll. baja dan cor plat beton T/1-3
Bobokan beton
finising Batu Alamexisting (tanggulan
a beton) uk.45cmx45cm + bongkar T/1-3
Railling + Batu alam

Museum Nasional - Pek.Arsitektur HAL 235/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pembuatan Lubang + Pipa Besi Ø3"-


b, 750mm + Staenless steel

4 Railing Tangga masuk Sunken Bahan Pla T/1-3


5 Curtain wall, diatas pintu masuk Sunke T/1-3
6 Penutup atap selasar eksisting / tepi A T/1-3

Dudukan Acp bahan Siku 50.50.4mm + T/1-3


Covering outdoor AC gedung A +
7 bongkar triplek
Pekerjaan + pindah
Dinding outdoor
dan Atap panelAC 7
pc : 9mm Finish Cat termasuk
a, GRC T/1
rangka.
Penambahan dinding bata ruang storag T/1
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi dan gambar beserta cat
- Pekerjaan finishing cat dinding Ex.ICI sesuai dengan gambar dan spesifikasi :
b, Pekerjaan Pintu dan Jendela Alumuniu T/1
a Pintu ukuran 1000 x 2400mm, bahan GRC rangka Hollo 8cm x 4cm

Museum Nasional - Pek.Arsitektur HAL 236/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Grill louver siku 30.30.3mm + plat strip


b, 30.3mm - 30mm, Lebar 400mm, finish
cat Duco
Grill atap siku 40.40.3mm + plat strip
c
30.4mm - 30mm, finish cat Duco
Gawangan di atas Pintu Utama (Pivot
8 T/1-3
System), Lapis GRC Finish Cat
9 Paddymat
grill gutter, depan
bahan pintu masuk
plat strip Sunken
staenless T/1-3
10 steel uk. 20 x 3mm jarak 20mm, lebar T/1-3
grill
gutergutter,
200mm bahan plat strip uk. 30mm x
a 2mm jarak 20mm, lebar guter 260mm,
finish Cat Semi Duco
Pekerjaan coring Ø 3" untuk lubang
b T/1-3
saluran
11 Pekerjaan Peninggian Lantai R/1-3
a Bongkar Andesit existing
Screed t=5 cm + acian + Termasuk tali
b R/1-3
Air l=25adukan
Screed cm 1:2 dengan wiremesh M4 satu lapis + Termasuk Tali Air
c Pekerjaan Dinding dan Atap panel
25mm, sesuai spesifikasi dan gambar pada :
12 GRC 9mm Kolom
Pekerjaan Finish Buatan
Cat termasuk
dari panel T/1
13 rangka.(
GRC 9mm bawah
FinishCW
Cat) termasuk T/1-4
rangka.
C AREA UTARA As
1 Cover keliling pintu Auditorium- bata + P E-F/2
Cover
Penutup keliling
GRC pintu Auditorium
termasuk cat, bahan E-F/2
2 auditorium dengan lantai- bata + D-G'/2
shadowline (sebagai Plint lantai)

Museum Nasional - Pek.Arsitektur HAL 237/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk
a - perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
b, -
dan tali air, sesuai spesifikasi dan gambar beserta cat

c - Pekerjaan finishing cat dinding Ex.ICI sesuai dengan gambar dan spesifikasi :
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
d - dan tali air, sesuai spesifikasi dan gambar beserta cat ( di bawah pintu alluminium area
sunken sisi utara )
3 Pelandai
PerbaikanRamp ke innercourt
Gawangan di bawah ramp G'-J/2-3
4 di sambungan struktur Bahan GRC K/2-3
5 termasuk
Pembuatan Cat
PintuBoard
Plafond Gypsum Gawangan
FinishdiCat
bagian K/2-3
6 tekstur pada Pembuatan Pintu K/2-3
Gawangan di
Pembuatan bagiangypsum
Celling atas dan
lengkap rangka
Pengecatan Ex.Cat Dulux Ambiance
Metalic Copper
GRC, Bahan panel GRC finish cat dan
7 B-D/2-3
pintu utama, aci-nat u chanel penutup
Pengecatan Gawangan Ex.Cat Dulux
K-L/2-3
Ambiance Metalic Copper

8 Finishing lantai Area Samping Gedung B L-R / 2-3

Museum Nasional - Pek.Arsitektur HAL 238/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

a Pembersihan + pemadatan tanah + Uru L-R/2-3

b Screed T=5cm + Acian L-R/2-3

9 Penutup Atap Pada Dinding Gawangan L-M/1

D AREA SELATAN As
1 Penutup area belakang bench, Pas.Bata D-M/1
Urugan dibawah
Penutup plesteran
area belakang belakang
bench, Plat bench
2 GRC finish Cat
Bongkaran dan (bisa
Pasang Relokasi) D-M/1
3 dibuka,termasuk
Struktur balok bajarangka
Sunken
Gawangan menuju Gedung A, ke gedung K-L/1
4 A dan perapihan
Pas.Bata pekerjaan
ringan diplester finish Cat, K-L/1
Pasangan bata ringan ex
bentuk lengkung seperti sisi Utara hebel atau setara, tebal 100 mm, termasuk
a - perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
b -
dan tali air, sesuai spesifikasi dan gambar beserta cat
Pengecatan Ex.Cat Dulux
c -
Ambiance Metalic Copper

Museum Nasional - Pek.Arsitektur HAL 239/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

d Pembuatan Bak kontrol 100x100cm

e Pemasangan Atap Genteng K-L/1


Talang Tegak Pipa Air Hujan Ø4" +
f K-L/1
Floor Drain
Pembuatan Celling gypsum dan
g
lengkap rangka
Pengecatan Ex.Cat Dulux Ambiance
h
Metalic Copper
i Pembuatan Benc Sesuai existing K-L/1
Gawangan menuju Gedung A, Plat
5 Beton, bentuk lengkung seperti sisi K-L/1
A bentuk lengkung sebidang
Utara
6 finishing dinding K-L/1
gawangan ukuransamping area tribune
1000 x 2200mm,
7 dan tangga Sunken,
Pasangan batabahan
ringanGRC finishatau setara, tebal 100
ex hebel B-D/1
mm, termasuk
cata perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
b gambar pada
dan tali air, sesuai spesifikasi dan gambar
c Pekerjaan finishing cat dinding Ex.ICI sesuai dengan gambar dan spesifikasi :
8 Penambahan CW + Kolom + Balok B-C/1
a Pembersihan + pemadatan tanah + Uru L-R/2-3
b Screed T=5cm + Finish Acian L-R/2-3

E RAMP-KOLOM-BALKON As
1 Ramp Sunken - Railing ramp Plat Bes F-Q/1-2

Museum Nasional - Pek.Arsitektur HAL 240/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Ramp Sunken - Finishing lantai area


2 Barat, Timur dan Boder Lantai GF F-Q/1-3
a bahan HT ukuran 60 x 60cm
Penambahan Dinding Parapet t=8 cm sam F-Q/1-2
b Penambahan Dinding Parapet F-Q/1-2
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk perekat,
-
adukan kering,kolom
Plesteran menggunakandanadukan
balok praktis,
kering sesuai
MU atauspesifikasi dan gambar
setara termasuk acianpada
halus
-
skonengan dan tali air, sesuai spesifikasi dan gambar
a Penebalan Screed t=7 cm s/d 10 cm F-Q/1-3
Bordes Ramp Sunken & Selacas
Entrance gate C-A - Finishing lantai F-Q/1-3
HT ukuran
Ramp 80 X- Finishing
Sunken 80cM Amazon
lantaiBlack
area
Barat, Timur dan Boder Lantai GF
F-Q/1-3
bahan HT ukuran 80 X 80cM Amazon
Black + Nosing
Cement Screed 3 cm, F6b, screed floor hardener 3g/m2, sesuai spesifikasi dan gambar pad

d Pemasangan Safety Walk 3M F-Q/1-3

3 Ramp-Sepatu penutup kolom bordes H&O/1-2

- Bongkar Grc existing + rangka

Museum Nasional - Pek.Arsitektur HAL 241/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar pada
Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi dan gambar beserta cat
Perbaikan Dinding GRC Existing
-
Bawah Bordes Ram
4 Kolom-Pengecatan PAH D-R/1&2
5 Kolom-Akrilik lampu D-R/1&2
6 Balkon-finishing parapet & lantai K-L/2-4
7 Balkon-gawangan+pintu bahan Curtain K-L/3
tempered 10 mm,, ukuran overall 1890 mm lebar x 2100 mm tinggi, finish cat
a
powder coating termasuk Hard ware & Accesories sesuai spesifikasi dan
, - Balkon K-L/3

F SELASAR GEDUNG A As
- Bongkaran toilet eksisting M-N/1
- Finishing lantai & Drainase B-U/1
Sisi Selatan ( Dibawah Out Door & InDoor AC )
- Pembersihan + pemadatan tanah + Uru B-U/1
- Screed T=5cm + Finish Acian B-U/1

Museum Nasional - Pek.Arsitektur HAL 242/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

Sisi Utara (Selasar gedung-A)


- Pembersihan + pemadatan tanah + uru B-U/1
- Screed T=5cm B-U/1
- Pemasangan Andesit 40cmx40cm B-U/1
Dudukan ac Outdor Ac ( 'Beton Mutu FC'- 25 MPA ( K-300 ) + Pembesian - 1
-
lapis Uk.1,3x2,3m, t=20cm
- Penutup ac outdoor bahan GRC B-U/1
- Penutup ac outdoor bahan Plat t=1,2 m B-U/1
Grill atap siku 40.40.3mm + plat strip
- B-U/1
30.4mm - 30mm, finish cat Duco

G INNERCOURT As
- Cover keliling pintu tangga kebakaran D&F/3
- Bongkar Grc Roster Existing + Rangka D&F/3
c Cat lantai area Inner-Coat
H PEKERJAAN RAMP
Ramp Sunken Plat Bes tebal 3mm, Fini (AS D/1-2 ) (AS T/1-2)
Polishing Lantai Sunken Plaza AS D-T/1-2
Cat lantai area sunken plaza

Bongkar Lantai Andesit Existing


Screed t=5cm + Acian

Museum Nasional - Pek.Arsitektur HAL 243/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

DAFTAR No. 5 - PEKERJAAN LUAR

Catatan Harga

I Harga satuan sudah termasuk fitting, accessories, alat bantu, perlengkapan dan peralatan y
diperlukan

II
Harga satuan sudah termasuk pemasangan sparing-sparing sesuai gambar dari konsultan te

III Setiap pekerjaan harus sesuai dengan petunjuk yang disyaratkan pabrik
pembuat

Museum Nasional - Pek.Arsitektur HAL 244/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

IV Harga satuan sudah termasuk pemotongan, pembersihan, perapihan,


pinggulan dan bahan yang terbuang (waste)

PEKERJAAN LANTAI

A Asphal hotmix tebal 30mm termasuk


lapisan sub base sirtu tebal 400mm, sesuai
spesifikasi dan gambar pada :
- Lantai Ground
Drop off / Area parkir

B AREA UTARA AS
1 Pembuatan bak tanaman F'-K/10
2 Pembuatan Ramp F'-K/10
3 Pembuatan tangga F'-K/10
4 Railling pipa Ramp Difable area drop of K-L/10
5 Penambahan pipa air hujan + fin overst D-L/10

Museum Nasional - Pek.Arsitektur HAL 245/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

a Waterprofing Coating,termasuk tegak pada dinding setinggi 200 mm pada :


b Screed T=5cm + Acian D-L/10
c Finishing Lisplang expose Skimcoat D-L/10

C AREA BARAT AS
1 Pembuatan Finishing ramp bahan Andes A-C/8-10
2 Fin. cat PAH area pos satpam A/6-7
3 Pembuatan taman A/6-7
Pembuatan taman + Penambahan Tan A/6-7
4 Pembuatan Rigid Beton bertulang Area A/1'-7
5 Pembuatan bench A/1-1'
6 Penutup dinding toilet moveble B/1'
7 Pondasi Penutup dinding toilet moveble B/1'
8 Finishing Sersan Ramp mobil A-E/1-6
Pembuatan Gutter T=400 mm L=400 Cor Beton + Pembesian Depan Sersan barat 2 Unit
9 a Pembutan Ram
Cor Beton t=20 cm Mutu FC'- 25 MPA ( K-300 ) A-E/1-6
Wiremesh M8-1 Lapis A-E/1-6
Cor Beton t=20 Mutu FC'- 25 MPA ( K-300 ) B-F/6-9
Wiremesh M8-1 Lapis B-F/6-9
b Pemasangan Besi Siku 50.50.5 mm
A-E/1-6

Museum Nasional - Pek.Arsitektur HAL 246/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

B-F/6-9
10 Grill Penutup saluran dari grill besi lebar 400 mm terdiri dari besi siku 50x50x5 dan
plat strip 4/40 @50 pada gutter ramp :
- Ramp Atas

9 Perapihan Pembuatan Rigid Beton bert A-B/1


b Canstein beton 600x100x150 (RC), terpasang sesuai gambar dan spesifikasi pada ;
10 Pembuatan Bangunan Bin Center A/1
Pemasangan Andesit Area Taman Sunk A-C/1-3
b Pengupasan Lantai Beton Existing A-C/1-3
11 pemasangan Dinding khusus Ram + Ple A/1
Pasangan bata ringan ex hebel atau setara, tebal 100 mm, termasuk
- perekat, adukan kering,kolom dan balok praktis, sesuai spesifikasi dan
gambar
Plesteranpada
menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi dan gambar beserta cat
- Pemasangan Dinding Andesit 100x100
Cat Wheater sild ex ICI, atau setara, pada dinding, sesuai dengan gambar dan spesifik
d
pada :
Waterprofing coating

- Area Taman Sanken Plaza

Museum Nasional - Pek.Arsitektur HAL 247/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

- Cement Screed 5 cm, sesuai spesifikasi dan gambar pada :

Top Plenter Box

- Bekisting

- Pembesian

- Beton Mutu FC'- 25 MPA ( K-300 )

Parapet tambahan

- Bekisting

- Pembesian

- Beton Mutu FC'- 25 MPA ( K-300 )

Finishing lover ( 4 titik )

Plesteran menggunakan adukan kering MU atau setara termasuk acian halus skoneng
-
dan tali air, sesuai spesifikasi dan gambar beserta cat
Grill Lobang Skylight Bahan siku 40.40.3mm + plat strip 30.4mm -
-
30mm, finish cat Duco ( Penutup Bench Plaza 4 Titik )

Museum Nasional - Pek.Arsitektur HAL 248/932


LAPORAN BOBOT PRE

PROYEK
PEKERJAAN
LOKASI
MINGGU KE
PERIODE
JANGKA WAKTU PELAKSANAAN
WAKTU YANG SUDAH BERJALAN
SISA WAKTU PELAKSANAAN
OWNER
KONTRAKTOR
NO SURAT KONTRAK KERJA ( SPK )

NO URAIAN PEKERJAAN

D AREA SELATAN AS

AREA RUANG POMPA GWT


Cement Screed 5 cm With Floor
1 Hardener 3kg/m2, sesuai spesifikasi D-E/0
dan gambar pada :

Museum Nasional - Pek.Arsitektur HAL 249/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.21% 100.00% 0.21% 0.00%

0.21% 100.00% 0.21% 0.00%

Museum Nasional - Pek.Arsitektur HAL 250/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 98.00% 0.03% 0.00%

0.04% 98.00% 0.04% 2.00%

0.01% 91.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 251/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 95.00% 0.00% 1.00%

0.01% 91.00% 0.01% 3.00%

0.01% 91.00% 0.01% 2.00%


0.01% 91.00% 0.01% 2.00%
0.00% 91.00% 0.00% 2.00%
0.01% 91.00% 0.01% 2.00%
0.01% 91.00% 0.01% 2.00%

Museum Nasional - Pek.Arsitektur HAL 252/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.01% 91.00% 0.01% 2.00%

0.01% 91.00% 0.01% 3.00%


0.01% 31.00% 0.00% 49.00%
0.05% 84.00% 0.04% 9.00%
0.01% 84.00% 0.01% 9.00%
0.01% 84.00% 0.01% 9.00%
0.01% 91.00% 0.01% 2.00%
0.01% 38.00% 0.00% 42.00%

Museum Nasional - Pek.Arsitektur HAL 253/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02% 0.00% 0.00% 0.00%


an skimcoat (C3) , termasuk
spesifikasi dan gambar

0.02% 78.00% 0.01% 7.00%

0.02% 66.00% 0.01% 19.00%


0.00% 71.00% 0.00% 14.00%

0.04% 78.00% 0.03% 7.00%


0.00% 66.00% 0.00% 19.00%
0.03% 78.00% 0.02% 7.00%
0.00% 78.00% 0.00% 7.00%

Museum Nasional - Pek.Arsitektur HAL 254/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 82.00% 0.01% 3.00%


0.02%
82.00% 0.02% 3.00%
0.01% 82.00% 0.01% 3.00%
0.01%
82.00% 0.01% 0.00%

0.02% 82.00% 0.01% 0.00%

0.02% 82.00% 0.02% 0.00%

Museum Nasional - Pek.Arsitektur HAL 255/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.08% 92.00% 0.08% 3.00%

0.04% 92.00% 0.04% 3.00%

0.03% 92.00% 0.02% 3.00%

0.01%
92.00% 0.01% 3.00%

0.03% 92.00% 0.02% 3.00%

Museum Nasional - Pek.Arsitektur HAL 256/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.03% 92.00% 0.02% 3.00%

0.02% 82.00% 0.02% 2.00%

0.01% 82.00% 0.01% 2.00%

0.01% 22.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 257/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 81.00% 0.00% 3.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
F2), berikut adukan mortar,
erlengkapan terpasang sesuai
0.03% 98.00% 0.03% 0.00%
0.03% 98.00% 0.03% 0.00%
0.05% 98.00% 0.05% 0.00%
0.01% 98.00% 0.01% 0.00%
0.01% 98.00% 0.01% 0.00%
0.01% 98.00% 0.01% 0.00%
0.02% 98.00% 0.01% 0.00%

0.00% 95.00% 0.00% 0.00%


0.00% 98.00% 0.00% 0.00%
0.00% 99.00% 0.00% 0.00%
0.01% 98.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 258/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 85.00% 0.00% 9.00%


0.00% 85.00% 0.00% 9.00%
0.00% 83.00% 0.00% 9.00%
0.00% 83.00% 0.00% 9.00%

Museum Nasional - Pek.Arsitektur HAL 259/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 95.00% 0.01% 0.00%

orcycle, Car, Elf ) 1.85% 98.70% 1.83% 0.00%

0.06%
100.00% 0.06% 0.00%

M 2 ke Lt.Ground 0.10% 95.00% 0.09% 5.00%


M 2 ke Lt. Ground. 0.11% 34.00% 0.04% 58.00%

Museum Nasional - Pek.Arsitektur HAL 260/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
Pada Ram Existing (as E-F/6-9 0.00% 100.00% 0.00% 0.00%

0.02% 98.00% 0.02% 2.00%


0.01% 98.00% 0.01% 2.00%
0.00% 98.00% 0.00% 2.00%
0.01% 98.00% 0.01% 0.00%
0.12% 98.00% 0.12% 2.00%
0.02% 98.70% 0.02% 1.30%
0.01% 98.00% 0.01% 2.00%
0.03% 98.00% 0.03% 2.00%
0.04% 100.00% 0.04% 0.00%
0.00% 98.00% 0.00% 2.00%
0.02% 36.00% 0.01% 59.00%

Museum Nasional - Pek.Arsitektur HAL 261/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 0.00% 0.00% 0.00%

0.00% 98.00% 0.00% 2.00%

0.00% 93.00% 0.00% 0.00%


0.00% 94.00% 0.00% 0.00%
0.00% 99.00% 0.00% 1.00%

0.00% 92.00% 0.00% 0.00%


0.00% 94.00% 0.00% 1.00%
0.00% 94.00% 0.00% 1.00%

Museum Nasional - Pek.Arsitektur HAL 262/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

ngga, Smoke Stop Lobby, Selas 0.04% 97.00% 0.03% 3.00%


0.02% 98.00% 0.02% 2.00%
0.01% 98.00% 0.01% 2.00%
nce Foyer, Tangga. 0.00% 98.00% 0.00% 5.00%
Cleaner, Rg.Istirahat Supir. 0.05% 98.00% 0.05% 2.00%
Lobby, Tangga, Smoke Stop Lob 0.03% 98.00% 0.03% 2.00%
, Smoke Stop Lobby. 0.04% 100.00% 0.04% 0.00%

0.01% 100.00% 0.01% 0.00%

0.01% 100.00% 0.01% 0.00%

0.02% 97.00% 0.02% 3.00%

Museum Nasional - Pek.Arsitektur HAL 263/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 0.00% 0.00% 0.00%


0.01% 0.00% 0.00% 0.00%

0.01% 80.00% 0.01% 0.00%

0.01% 98.00% 0.01% 0.00%


0.01% 98.00% 0.01% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%

0.49% 72.00% 0.35% 6.00%

Museum Nasional - Pek.Arsitektur HAL 264/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 15.00% 0.00% 5.00%


0.02% 15.00% 0.00% 5.00%
LW 236 CJ 0.00% 15.00% 0.00% 5.00%
03 SMCRB 0.00% 15.00% 0.00% 5.00%
703AESV1 0.00% 15.00% 0.00% 5.00%
0.00% 15.00% 0.00% 5.00%
ype T23 BQ13N 0.00% 15.00% 0.00% 5.00%
0.00% 15.00% 0.00% 5.00%
150NWV12J 0.01% 15.00% 0.00% 5.00%
0.00% 15.00% 0.00% 5.00%

0.01% 15.00% 0.00% 5.00%


0.00% 15.00% 0.00% 5.00%

0.00% 15.00% 0.00% 5.00%


0.00% 15.00% 0.00% 5.00%

Museum Nasional - Pek.Arsitektur HAL 265/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

kuran : ( 700 mm x 1200 mm 0.00% 76.00% 0.00% 8.00%


mm x 1200 mm ) 0.00% 76.00% 0.00% 8.00%

mm x 600 mm ) 0.00% 97.00% 0.00% 3.00%


mm x 600 mm ) 0.00% 97.00% 0.00% 3.00%

Museum Nasional - Pek.Arsitektur HAL 266/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02% 30.00% 0.01% 15.00%

0.04% 0.00% 0.00% 0.00%

0.19% 96.00% 0.19% 0.00%

0.01% 15.00% 0.00% 0.00%

0.01% 90.00% 0.01% 0.00%


0.00% 65.00% 0.00% 16.00%
m anchor bolt welded to steel
0.07% 100.00% 0.07% 0.00%
sesuai gambar dan

Museum Nasional - Pek.Arsitektur HAL 267/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.01% 100.00% 0.01% 0.00%
o drain (30 mm thk ), besi siku
ambar dan spesifikasi pada :
0.24% 100.00% 0.24% 0.00%
termasuk finishing Topping +
tinggi 1250 mm, terpasang
0.01% 100.00% 0.01% 0.00%
r ex Jotun atau setara
ng sesuai spesifikasi dan 0.01% 48.00% 0.01% 25.00%

0.00% 0.00% 0.00% 0.00%

Sub Total 5.19% 4.64%


5.19%

Museum Nasional - Pek.Arsitektur HAL 268/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.08% 98.00% 0.08% 0.00%


0.01% 99.00% 0.01% 0.00%
0.07% 98.00% 0.07% 0.00%
0.01% 98.00% 0.01% 0.00%
a As F-G/7-8 0.04% 98.00% 0.04% 0.00%

Museum Nasional - Pek.Arsitektur HAL 269/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 98.00% 0.01% 0.00%

1.16% 96.00% 1.11% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%

0.40% 100.00% 0.40% 0.00%

Museum Nasional - Pek.Arsitektur HAL 270/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.34% 100.00% 0.34% 0.00%

0.43% 83.00% 0.35% 7.00%


0.03% 63.00% 0.02% 15.00%

0.01% 100.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 271/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 97.00% 0.01% 3.00%

0.02% 95.00% 0.02% 2.00%

0.03% 95.00% 0.02% 2.00%

0.05% 95.00% 0.05% 2.00%

0.02% 95.00% 0.02% 2.00%

Museum Nasional - Pek.Arsitektur HAL 272/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.12% 95.00% 0.12% 2.00%

0.19% 95.00% 0.18% 2.00%

0.02% 95.00% 0.02% 2.00%

0.00% 95.00% 0.00% 2.00%

0.01% 97.00% 0.01% 0.00%

0.02% 90.00% 0.02% 2.00%

0.02% 90.00% 0.02% 2.00%

Museum Nasional - Pek.Arsitektur HAL 273/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.04% 15.00% 0.01% 20.00%

0.02%
90.00% 0.02% 2.00%

0.02% 90.00% 0.01% 2.00%

0.02% 90.00% 0.02% 2.00%

0.01% 90.00% 0.01% 2.00%

0.03% 90.00% 0.02% 2.00%

Museum Nasional - Pek.Arsitektur HAL 274/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.13% 71.00% 0.09% 0.00%

0.28% 100.00% 0.28% 0.00%

0.31% 100.00% 0.31% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
kusen Besi , ukuran overall
masuk Hard ware & Accesories
0.04% 95.00% 0.04% 0.00%

Museum Nasional - Pek.Arsitektur HAL 275/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 95.00% 0.03% 0.00%

0.00% 0.00% 0.00% 0.00%


0.09% 100.00% 0.09% 0.00%
kan rell L=72 cm 0.00% 100.00% 0.00% 0.00%

0.01% 56.00% 0.01% 44.00%


0.01% 100.00% 0.01% 0.00%
0.07% 100.00% 0.07% 0.00%

Museum Nasional - Pek.Arsitektur HAL 276/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
dan gambar pada :
0.01% 0.00% 0.00% 0.00%

0.12% 100.00% 0.12% 0.00%

udotorium 0.00% 0.00% 0.00% 0.00%

sifikasi dan gambar pada


0.03% 100.00% 0.03% 0.00%
0.01% 100.00% 0.01% 0.00%

0.53% 100.00% 0.53% 34.00%

k Area Yang Lembab

0.05%
100.00% 0.05% 0.00%
nutup ACP 0.04% 100.00% 0.04% 0.00%

Museum Nasional - Pek.Arsitektur HAL 277/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
dinding setinggi 200 mm
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
n adukan dry mortar ex.
at, sesuai dengan gambar
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 278/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.00% 99.00% 0.00% 1.00%
ng ,dengan adukan dry mortar
g naat, sesuai dengan gambar
0.02% 98.00% 0.02% 0.00%

HED (V8) 600 X 1200


, termasuk additive dan
0.63% 99.00% 0.62% 0.00%
0.37% 99.00% 0.37% 0.00%
0.00% 99.00% 0.00% 0.00%

ack (F2A), berikut adukan


alatan perlengkapan
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 279/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 98.00% 0.00% 0.00%
e Sunken Plaza 0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
ta As 6'-7'/F-G 0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
anco uk. 600x600 mm ex:
alat bantu lainnya dgn
da : 0.03% 98.00% 0.03% 0.00%
0.00% 98.00% 0.00% 0.00%
0.02% 98.00% 0.02% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.01% 98.00% 0.01% 0.00%
0.03% 98.00% 0.03% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.02% 98.00% 0.02% 0.00%
0.02% 98.00% 0.02% 0.00%
0.01% 98.00% 0.01% 0.00%
0.02% 98.00% 0.02% 0.00%

Museum Nasional - Pek.Arsitektur HAL 280/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
(F2), berikut adukan mortar, 0.01% 98.00% 0.01% 0.00%
erlengkapan terpasang sesuai
0.01% 98.00% 0.01% 0.00%
0.03% 98.00% 0.03% 0.00%
0.00% 98.00% 0.00% 0.00%
0.01% 98.00% 0.01% 0.00%

adukan mortar, additiv,


apan terpasang sesuai

0.01% 96.00% 0.01% 2.00%


0.03% 99.00% 0.03% 0.00%
0.02% 98.00% 0.02% 0.00%
0.00% 98.00% 0.00% 0.00%
uai spesifikasi dan gambar
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 281/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.46% 35.00% 0.16% 0.00%

0.00% 79.00% 0.00% 2.00%


0.00% 79.00% 0.00% 2.00%
0.00% 79.00% 0.00% 2.00%
0.00% 79.00% 0.00% 2.00%
0.00% 79.00% 0.00% 2.00%

0.00% 98.00% 0.00% 0.00%

0.00% 98.00% 0.00% 0.00%


0.00% 98.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 282/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 96.00% 0.01% 0.00%


0.00% 96.00% 0.00% 0.00%
0.01% 96.00% 0.01% 0.00%
0.00% 96.00% 0.00% 0.00%
0.00% 96.00% 0.00% 0.00%
0.00% 96.00% 0.00% 0.00%
0.00% 96.00% 0.00% 0.00%
0.00% 96.00% 0.00% 0.00%
0.00% 96.00% 0.00% 0.00%
0.01% 96.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 283/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.32% 99.00% 0.32% 0.00%


0.00% 88.00% 0.00% 10.00%

e Sunken Plaza 0.00% 53.00% 0.00% 0.00%


0.12% 98.00% 0.12% 0.00%
0.00% 96.00% 0.00% 2.00%
0.00% 98.00% 0.00% 0.00%
ursery & Janitor 0.19% 99.00% 0.19% 0.00%
0.01% 98.00% 0.01% 0.00%
0.01% 86.00% 0.01% 12.00%
0.01% 86.00% 0.01% 12.00%
0.00% 86.00% 0.00% 12.00%
0.01% 86.00% 0.01% 12.00%
0.01% 86.00% 0.01% 12.00%

AEP ex ICI atau setara


ng sesuai spesifikasi dan

Museum Nasional - Pek.Arsitektur HAL 284/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 98.00% 0.00% 0.00%


0.01% 98.00% 0.01% 0.00%
0.00% 98.00% 0.00% 0.00%

0.04% 95.00% 0.04% 3.00%


0.02% 95.00% 0.02% 3.00%
0.02% 95.00% 0.02% 3.00%
0.00% 95.00% 0.00% 3.00%
0.00% 95.00% 0.00% 3.00%
0.01% 95.00% 0.00% 3.00%
0.00% 95.00% 0.00% 3.00%
0.01% 95.00% 0.01% 3.00%
0.00% 95.00% 0.00% 3.00%

Museum Nasional - Pek.Arsitektur HAL 285/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.02% 99.00% 0.02% 0.00%
0.00% 95.00% 0.00% 3.00%
0.00% 33.00% 0.00% 65.00%
0.00% 33.00% 0.00% 65.00%
0.00% 94.00% 0.00% 4.00%
0.01% 94.00% 0.01% 4.00%
0.00% 94.00% 0.00% 4.00%
0.00% 94.00% 0.00% 4.00%
0.00% 94.00% 0.00% 4.00%

Museum Nasional - Pek.Arsitektur HAL 286/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 0.00% 0.00% 0.00%

0.01% 15.00% 0.00% 15.00%


0.01% 15.00% 0.00% 15.00%
0.02% 15.00% 0.00% 15.00%
0.02% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 287/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.04% 0.00% 0.00% 0.00%
0.03% 0.00% 0.00% 0.00%

0.02% 15.00% 0.00% 15.00%


0.01% 15.00% 0.00% 15.00%
0.03% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.06% 0.00% 0.00% 0.00%


0.04% 0.00% 0.00% 0.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 288/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 15.00% 0.00% 15.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.01% 0.00% 0.00% 0.00%


0.02% 0.00% 0.00% 0.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 289/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 0.00% 0.00% 0.00%


0.02% 0.00% 0.00% 0.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.00% 15.00% 0.00% 15.00%


0.01% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 290/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.01% 15.00% 0.00% 15.00%


0.02% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.02% 15.00% 0.00% 15.00%

0.05% 0.00% 0.00% 0.00%

0.04%
0.00% 0.00% 0.00%

0.01% 100.00% 0.01% 0.00%


0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 291/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 95.00% 0.00% 0.00%


0.00% 95.00% 0.00% 0.00%
0.00% 95.00% 0.00% 0.00%
0.00% 95.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 292/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 95.00% 0.00% 0.00%
0.00% 95.00% 0.00% 0.00%
0.01% 95.00% 0.01% 45.00%
0.01% 95.00% 0.01% 45.00%
0.00% 95.00% 0.00% 45.00%
0.01% 95.00% 0.01% 45.00%
0.00% 95.00% 0.00% 45.00%
0.00% 95.00% 0.00% 45.00%

0.00% 96.00% 0.00% 2.00%


0.01% 96.00% 0.01% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%
0.00% 96.00% 0.00% 2.00%

0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 293/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 100.00% 0.01% 0.00%


0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01% 100.00% 0.01% 0.00%


0.00% 100.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.03% 97.00% 0.03% 3.00%

Museum Nasional - Pek.Arsitektur HAL 294/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 100.00% 0.03% 0.00%

0.03% 100.00% 0.03% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 295/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01%
100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 296/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
setara termasuk acian halus :
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
MU atau setara termasuk
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 297/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
aci Untuk Ruang Pompa 0.01% 100.00% 0.01% 0.00%

0.01% 100.00% 0.01% 0.00%

0.01% 100.00% 0.01% 0.00%


0.00% 100.00% 0.00% 0.00%

Sub Total 8.58% 7.44%


8.58%

0.03% 100.00% 0.03% 0.00%


0.00% 95.00% 0.00% 5.00%

Museum Nasional - Pek.Arsitektur HAL 298/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 100.00% 0.03% 0.00%


0.00% 90.00% 0.00% 10.00%

0.00%
98.00% 0.00% 2.00%

0.10% 98.00% 0.10% 2.00%

Museum Nasional - Pek.Arsitektur HAL 299/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.02% 98.00% 0.02% 2.00%

0.00% 0.00% 0.00% 0.00%


0.00% 98.00% 0.00% 2.00%

0.00% 0.00% 0.00% 0.00%

0.46% 82.00% 0.38% 13.00%


0.03% 82.00% 0.03% 13.00%

0.08% 85.00% 0.07% 10.00%

Museum Nasional - Pek.Arsitektur HAL 300/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.13%
98.00% 0.12% 2.00%

0.00% 47.00% 0.00% 0.00%

0.03%
100.00% 0.03% 0.00%

0.00%
96.00% 0.00% 4.00%

0.00% 91.00% 0.00% 0.00%


angka Hollo & Siku 12 buah 1.34% 100.00% 1.34% 0.00%
0.08% 96.00% 0.07% 4.00%

Museum Nasional - Pek.Arsitektur HAL 301/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

masuk perekat, adukan


0.01%
pada 100.00% 0.01% 0.00%
uk acian halus skonengan
0.01%
100.00% 0.01% 0.00%

masuk perekat, adukan


0.01%
pada 100.00% 0.01% 0.00%
0.01%
100.00% 0.01% 0.00%

masuk perekat, adukan


0.00%
pada 100.00% 0.00% 0.00%

0.00%
100.00% 0.00% 0.00%
0.02% 100.00% 0.02% 0.00%

masuk perekat, adukan


0.00%
pada beserta cat 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 302/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00%
100.00% 0.00% 0.00%

masuk perekat, adukan


0.00%
pada 100.00% 0.00% 0.00%

0.00%
100.00% 0.00% 0.00%

masuk perekat, adukan


0.00% 100.00% 0.00% 0.00%
pada
0.00%
100.00% 0.00% 0.00%

masuk perekat, adukan


0.01% 100.00% 0.01% 0.00%
pada
0.01%
100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%

masuk perekat, adukan


0.04% 100.00% 0.04% 0.00%
pada

Museum Nasional - Pek.Arsitektur HAL 303/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.02% 100.00% 0.02% 0.00%

masuk perekat, adukan


0.01% 100.00% 0.01% 0.00%
pada
0.01%
100.00% 0.01% 0.00%
0.03%
96.00% 0.02% 4.00%

masuk perekat, adukan


0.02%
pada 100.00% 0.02% 0.00%
0.01%
100.00% 0.01% 0.00%

0.03% 26.00% 0.01% 14.00%

0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 304/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI

uk acian halus skonengan % bobot %


n beserta pengecatan bekas 0.00% 100.00% 0.00% 0.00%

0.02% 100.00% 0.02% 0.00%


0.00% 100.00% 0.00% 0.00%
ds Coner AS F/7'8 0.00% 76.00% 0.00% 24.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00%
0.00% 30.00% 0.00% 70.00%
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00%

Museum Nasional - Pek.Arsitektur HAL 305/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 15.00% 0.00% 85.00%
0.00% 100.00% 0.00% 0.00%
0.02% 87.00% 0.02% 13.00%

0.01% 95.00% 0.01% 0.00%

0.03% 95.00% 0.03% 0.00%

0.00% 95.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 306/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 95.00% 0.00% 0.00%

0.01% 95.00% 0.01% 0.00%

0.01% 95.00% 0.00% 0.00%

0.00% 95.00% 0.00% 0.00%

0.28%
64.00% 0.18% 25.00%

Museum Nasional - Pek.Arsitektur HAL 307/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03%
95.00% 0.03% 0.00%

0.13%
100.00% 0.13% 0.00%

0.00%
100.00% 0.00% 0.00%

0.01% 93.00% 0.01% 3.00%

0.03% 93.00% 0.02% 3.00%

0.06% 93.00% 0.06% 3.00%

Museum Nasional - Pek.Arsitektur HAL 308/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

m - Lt.Mezz. 0.03% 93.00% 0.03% 3.00%

0.06% 49.00% 0.03% 0.00%


0.03% 49.00% 0.01% 0.00%

0.07% 35.00% 0.02% 35.00%

0.04% 35.00% 0.01% 35.00%

0.07% 35.00% 0.03% 35.00%

0.02% 92.00% 0.02% 4.00%

Museum Nasional - Pek.Arsitektur HAL 309/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 92.00% 0.01% 4.00%

0.01% 92.00% 0.01% 4.00%

0.03%
92.00% 0.03% 4.00%

0.03% 92.00% 0.03% 4.00%

Museum Nasional - Pek.Arsitektur HAL 310/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.10% 94.00% 0.09% 4.00%


0.04% 89.00% 0.03% 9.00%
0.00% 0.00% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00%

0.00% 100.00% 0.00% 0.00%

0.43%
95.00% 0.40% 0.00%

Museum Nasional - Pek.Arsitektur HAL 311/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.00% 96.00% 0.00% 4.00%


0.00% 96.00% 0.00% 4.00%

Museum Nasional - Pek.Arsitektur HAL 312/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.17% 100.00% 0.17% 0.00%


0.56% 100.00% 0.56% 0.00%
0.10% 100.00% 0.10% 0.00%
0.15% 100.00% 0.15% 0.00%
0.05% 100.00% 0.05% 0.00%

0.03% 98.00% 0.03% 0.00%

0.01% 98.00% 0.01% 0.00%


0.02% 98.00% 0.02% 0.00%
0.00% 98.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 313/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 98.00% 0.01% 2.00%


0.00% 98.00% 0.00% 2.00%
0.00% 98.00% 0.00% 2.00%
0.00% 97.00% 0.00% 3.00%
0.00% 100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%
0.02% 100.00% 0.02% 0.00%
0.01% 100.00% 0.01% 0.00%
0.01% 100.00% 0.01% 0.00%
0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01% 99.00% 0.01% 1.00%


0.01% 99.00% 0.01% 1.00%
0.01% 99.00% 0.01% 1.00%
0.01% 99.00% 0.01% 1.00%
0.02% 99.00% 0.02% 1.00%
0.00% 99.00% 0.00% 1.00%
0.00% 97.00% 0.00% 3.00%
0.01% 97.00% 0.01% 3.00%

Museum Nasional - Pek.Arsitektur HAL 314/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.01% 97.00% 0.01% 3.00%
0.01% 97.00% 0.01% 3.00%
0.07% 97.00% 0.07% 3.00%

0.03% 100.00% 0.03% 0.00%

0.00% 98.00% 0.00% 2.00%


0.00% 98.00% 0.00% 2.00%
0.00% 98.00% 0.00% 2.00%
0.00% 95.00% 0.00% 5.00%
0.00% 98.00% 0.00% 2.00%
0.00% 98.00% 0.00% 2.00%

Museum Nasional - Pek.Arsitektur HAL 315/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 98.00% 0.00% 2.00%
0.00% 98.00% 0.00% 2.00%
0.00% 98.00% 0.00% 2.00%

0.00% 100.00% 0.00% 0.00%

0.00% 96.00% 0.00% 4.00%


0.00% 96.00% 0.00% 4.00%
0.00% 96.00% 0.00% 4.00%
0.00% 96.00% 0.00% 4.00%
0.00% 96.00% 0.00% 4.00%
0.00% 97.00% 0.00% 3.00%
0.00% 97.00% 0.00% 3.00%
0.00% 97.00% 0.00% 3.00%

0.00% 92.00% 0.00% 0.00%


0.00% 92.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 316/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 92.00% 0.00% 8.00%


0.00% 92.00% 0.00% 8.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%

0.00% 33.00% 0.00% 0.00%

0.06% 100.00% 0.06% 0.00%

0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 317/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 92.00% 0.00% 6.00%


0.00% 92.00% 0.00% 6.00%
0.00% 92.00% 0.00% 6.00%
0.00% 92.00% 0.00% 6.00%

0.01% 92.00% 0.01% 6.00%


0.00% 92.00% 0.00% 6.00%

0.00% 95.00% 0.00% 3.00%

Museum Nasional - Pek.Arsitektur HAL 318/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02% 95.00% 0.02% 3.00%

0.00% 93.00% 0.00% 5.00%


0.07% 78.00% 0.05% 20.00%
0.19% 98.00% 0.18% 0.00%
0.00% 90.00% 0.00% 8.00%

0.01% 89.00% 0.01% 9.00%


0.01% 89.00% 0.01% 9.00%
0.00% 89.00% 0.00% 9.00%
0.02% 89.00% 0.01% 9.00%
0.00% 89.00% 0.00% 9.00%
0.01% 89.00% 0.01% 9.00%
0.01% 89.00% 0.01% 9.00%
0.00% 89.00% 0.00% 9.00%

Museum Nasional - Pek.Arsitektur HAL 319/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
AEP ex ICI atau setara
ng sesuai spesifikasi dan

0.00% 93.00% 0.00% 5.00%


0.05% 47.00% 0.02% 34.00%

0.00% 0.00% 0.00% 0.00%

0.03% 99.00% 0.03% 0.00%


0.05% 92.00% 0.05% 7.00%
0.00% 97.00% 0.00% 2.00%
0.00% 96.00% 0.00% 3.00%
0.02% 96.00% 0.02% 3.00%
0.00% 97.00% 0.00% 2.00%

Museum Nasional - Pek.Arsitektur HAL 320/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.06% 99.00% 0.06% 0.00%
0.00% 95.00% 0.00% 4.00%

0.00% 76.00% 0.00% 22.00%


0.00% 76.00% 0.00% 22.00%
0.00% 76.00% 0.00% 22.00%
0.00% 76.00% 0.00% 22.00%

0.00% 90.00% 0.00% 10.00%


0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%

Museum Nasional - Pek.Arsitektur HAL 321/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.00% 90.00% 0.00% 10.00%
0.01% 93.00% 0.00% 7.00%
0.00% 93.00% 0.00% 7.00%
0.00% 100.00% 0.00% 0.00%

0.16%
79.00% 0.13% 7.00%

0.20% 100.00% 0.20% 7.00%

0.15% 100.00% 0.15% 0.00%

0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 322/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 15.00% 0.00% 15.00%


0.01% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.01% 0.00% 0.00% 0.00%


0.02% 0.00% 0.00% 0.00%

0.00% 15.00% 0.00% 15.00%


0.01% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 323/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.01% 0.00% 0.00% 0.00%


0.02% 0.00% 0.00% 0.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%

0.00% 15.00% 0.00% 15.00%


0.00% 15.00% 0.00% 15.00%

Museum Nasional - Pek.Arsitektur HAL 324/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 0.00% 0.00% 0.00%


0.01% 0.00% 0.00% 0.00%
0.01% 0.00% 0.00% 0.00%
0.01% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.02% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.01% 15.00% 0.00% 15.00%
0.00% 15.00% 0.00% 15.00%
0.00% 0.00% 0.00% 0.00%

GF & Mezzanine
0.01% 100.00% 0.01% 0.00%
0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 325/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 39.00% 0.00% 56.00%


0.00% 39.00% 0.00% 56.00%

0.00% 39.00% 0.00% 56.00%

0.00% 96.00% 0.00% 2.00%


0.00% 96.00% 0.00% 2.00%

Museum Nasional - Pek.Arsitektur HAL 326/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 96.00% 0.00% 2.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

0.19% 77.00% 0.15% 14.00%

dahan panel listrik lift ke dalamnya


0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 327/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.02% 98.00% 0.02% 0.00%

0.01% 0.00% 0.00% 0.00%

0.14% 100.00% 0.14% 0.00%


p, beserta cover grill
0.00% 100.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

MU atau setara termasuk


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
setara termasuk acian halus :

Museum Nasional - Pek.Arsitektur HAL 328/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%

Sub Total 7.54% 6.69%


7.54%

0.03% 100.00% 0.03% 0.00%

Museum Nasional - Pek.Arsitektur HAL 329/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%

0.01% 100.00% 0.01% 0.00%


0.00% 100.00% 0.00% 0.00%

0.01% 95.00% 0.01% 3.00%

0.01% 95.00% 0.01% 3.00%


0.01% 100.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%

0.03% 90.00% 0.02% 2.00%

Museum Nasional - Pek.Arsitektur HAL 330/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 90.00% 0.02% 2.00%

0.01% 98.00% 0.01% 0.00%

0.01% 80.00% 0.01% 0.00%

0.01% 80.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 331/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%

i dan gambar pada :


0.02% 100.00% 0.02% 0.00%

0.00% 93.00% 0.00% 7.00%

0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 332/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Sub Total 0.21% 0.20%


0.21%

0.00% 100.00% 0.00% 0.00%


0.01% 100.00% 0.01% 0.00%
uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 333/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
, AS M/ 8-9'
0.03% 100.00% 0.03% 0.00%
uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%

0.01% 100.00% 0.01% 0.00%

0.01% 82.00% 0.01% 8.00%

0.01% 82.00% 0.01% 8.00%


0.01% 100.00% 0.01% 0.00%

0.12% 98.00% 0.12% 2.00%


0.03% 98.00% 0.03% 2.00%

Museum Nasional - Pek.Arsitektur HAL 334/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03% 92.00% 0.03% 2.00%

0.01% 98.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 335/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

i dan gambar pada :


0.01% 100.00% 0.01% 0.00%

0.00% 81.00% 0.00% 13.00%

0.02% 100.00% 0.02% 0.00%

0.04% 100.00% 0.04% 10.00%

0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 336/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 100.00% 0.01% 0.00%


0.01% 100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Sub Total 0.39% 0.38%


0.39%

0.03% 100.00% 0.03% 0.00%


0.01% 100.00% 0.01% 0.00%

0.01% 95.00% 0.01% 5.00%

Museum Nasional - Pek.Arsitektur HAL 337/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01% 75.00% 0.00% 13.00%

0.01% 75.00% 0.01% 13.00%

0.01% 100.00% 0.01% 0.00%

0.03% 92.00% 0.03% 3.00%

0.03% 92.00% 0.03% 3.00%

Museum Nasional - Pek.Arsitektur HAL 338/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 98.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


i dan gambar pada :
0.02% 100.00% 0.02% 0.00%

ized Suspention System + cat


u lainnya dengan peralatan
Museum Nasional - Pek.Arsitektur HAL 339/932
APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 94.00% 0.00% 2.00%


0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
0.00% 94.00% 0.00% 2.00%
ICI atau setara termasuk alat
ai spesifikasi dan gambar

0.03% 96.00% 0.03% 0.00%


0.01% 96.00% 0.01% 0.00%
0.01% 96.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 340/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.13% 96.00% 0.12% 0.00%
0.00% 96.00% 0.00% 0.00%

ya dengan peralatan

0.00% 96.00% 0.00% 0.00%

erlengkapan terpasang sesuai

0.02% 95.00% 0.02% 1.00%


0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%

Museum Nasional - Pek.Arsitektur HAL 341/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%
0.00% 95.00% 0.00% 1.00%

0.00% 88.00% 0.00% 12.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Sub Total 0.42% 0.40%


0.42%

Museum Nasional - Pek.Arsitektur HAL 342/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02% 100.00% 0.02% 0.00%


uk acian halus skonengan
0.02% 100.00% 0.02% 0.00%

0.01% 87.00% 0.01% 13.00%

0.00% 100.00% 0.00% 0.00%

0.01% 86.00% 0.00% 9.00%

Museum Nasional - Pek.Arsitektur HAL 343/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 86.00% 0.01% 9.00%

0.01% 100.00% 0.01% 0.00%

0.05% 90.00% 0.05% 5.00%

0.01% 98.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 344/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%

i dan gambar pada :


0.02% 100.00% 0.00% 0.00%

ized Suspention System + cat


u lainnya dengan peralatan

0.00% 97.00% 0.00% 1.00%


0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%

Museum Nasional - Pek.Arsitektur HAL 345/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%

ICI atau setara termasuk alat


ai spesifikasi dan gambar

0.03% 97.00% 0.03% 1.00%


0.01% 97.00% 0.01% 1.00%
0.00% 97.00% 0.00% 1.00%
0.01% 97.00% 0.01% 1.00%
0.13% 97.00% 0.12% 1.00%
0.00% 97.00% 0.00% 1.00%
innya dengan peralatan
C11) :

skimcoat , termasuk alat


ai spesifikasi dan gambar

Museum Nasional - Pek.Arsitektur HAL 346/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

erlengkapan terpasang sesuai

0.01% 97.00% 0.01% 1.00%


0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%
0.00% 97.00% 0.00% 1.00%

Museum Nasional - Pek.Arsitektur HAL 347/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 97.00% 0.00% 1.00%

0.00% 0.00% 0.00% 90.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Sub Total 0.41% 0.37%


0.41%

Museum Nasional - Pek.Arsitektur HAL 348/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.38% 100.00% 0.38% 0.00%


0.17% 100.00% 0.17% 0.00%

0.00% 0.00% 0.00% 0.00%

0.17% 46.00% 0.08% 29.00%


0.00% 46.00% 0.00% 29.00%

Museum Nasional - Pek.Arsitektur HAL 349/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%

0.02% 100.00% 0.02% 0.00%


uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 350/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

uk acian halus skonengan 0.00% 88.00% 0.00% 12.00%


n beserta pengecatan bekas 0.00% 86.00% 0.00% 14.00%

0.00% 100.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 100.00% 0.00% 0.00%

0.00% 90.00% 0.00% 0.00%


uk acian halus skonengan
0.00% 90.00% 0.00% 0.00%

uk acian halus skonengan


0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 351/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.27% 83.00% 0.22% 8.00%

0.00% 100.00% 0.00% 0.00%

0.00% 83.00% 0.00% 8.00%

0.38%
83.00% 0.31% 8.00%

0.19%
83.00% 0.16% 8.00%

0.00% 100.00% 0.00% 0.00%

0.00% 80.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 352/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 80.00% 0.00% 0.00%

0.01% 80.00% 0.01% 3.00%

0.00% 22.00% 0.00% 0.00%

0.00% 80.00% 0.00% 0.00%

0.00% 80.00% 0.00% 0.00%

0.00% 80.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 353/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 90.00% 0.00% 5.00%

i spesifikasi dan gambar pada

0.00% 98.00% 0.00% 0.00%


0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%
0.00% 98.00% 0.00% 0.00%

0.10% 100.00% 0.10% 0.00%


0.17% 100.00% 0.17% 0.00%
0.05% 100.00% 0.05% 0.00%
0.03% 100.00% 0.03% 0.00%

Museum Nasional - Pek.Arsitektur HAL 354/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.09% 100.00% 0.09% 0.00%
0.01% 100.00% 0.01% 0.00%

matt Black (F2A), berikut


nnya dgn peralatan

0.00% 98.00% 0.00% 0.00%


0.00% 98.00% 0.00% 0.00%

g sesuai spesifikasi dan

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 355/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

erlengkapan terpasang sesuai

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

Sub Total 2.09% 1.86%


2.09%

Museum Nasional - Pek.Arsitektur HAL 356/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 0.00% 0.00% 49.00%


uk acian halus skonengan
0.00% 0.00% 0.00% 34.00%
0.00% 100.00% 0.00% 0.00%

0.02% 100.00% 0.02% 0.00%


uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%

uk acian halus skonengan 0.00% 91.00% 0.00% 9.00%


n beserta pengecatan bekas 0.00% 89.00% 0.00% 11.00%

r ex Jotun atau setara


ng sesuai spesifikasi dan 0.01% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 357/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

dan Kaca
0.02% 98.00% 0.02% 0.00%

0.02% 98.00% 0.02% 0.00%

0.05% 49.00% 0.02% 51.00%

0.01% 100.00% 0.01% 0.00%

0.12% 100.00% 0.12% 0.00%

0.07% 100.00% 0.07% 0.00%

Museum Nasional - Pek.Arsitektur HAL 358/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.06%
100.00% 0.06% 0.00%

0.05% 100.00% 0.05% 0.00%

0.01% 10.00% 0.00% 25.00%

0.05% 10.00% 0.00% 25.00%

0.01%
0.00% 0.00% 27.00%

Museum Nasional - Pek.Arsitektur HAL 359/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.03% 10.00% 0.00% 25.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.03% 100.00% 0.03% 0.00%

0.11% 100.00% 0.11% 0.00%

Museum Nasional - Pek.Arsitektur HAL 360/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
Sub Total 0.67% 0.55%
0.67%

0.00% 100.00% 0.00% 0.00%

0.15% 100.00% 0.15% 0.00%

0.09% 100.00% 0.09% 0.00%

0.28% 100.00% 0.28% 0.00%

Museum Nasional - Pek.Arsitektur HAL 361/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.23% 100.00% 0.23% 0.00%


Sekitar 1000mm
0.00%
100.00% 0.00% 0.00%
0.00%
0.00% 0.00% 0.00%

Sub Total 0.76% 0.76%


0.76%

Museum Nasional - Pek.Arsitektur HAL 362/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%


0.07% 100.00% 0.07% 0.00%
0.19% 100.00% 0.19% 0.00%

0.00%
100.00% 0.00% 0.00%
0.77% 100.00% 0.77% 0.00%
0.04% 100.00% 0.04% 0.00%

0.01%
100.00% 0.01% 0.00%

0.01%
100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 363/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03%
100.00% 0.03% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.01%
100.00% 0.01% 0.00%

0.00%
100.00% 0.00% 0.00%
0.04% 100.00% 0.04% 0.00%

0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.19% 100.00% 0.19% 0.00%
0.19% 100.00% 0.19% 0.00%
0.01%
100.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 364/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02%
100.00% 0.02% 0.00%
0.03% 100.00% 0.03% 0.00%
0.55% 100.00% 0.55% 0.00%
0.16% 100.00% 0.16% 0.00%

0.00%
100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00%
uk acian halus skonengan
0.03% 100.00% 0.03% 0.00%
dan spesifikasi : 0.02% 100.00% 0.02% 0.00%
0.00% 100.00% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00%

Museum Nasional - Pek.Arsitektur HAL 365/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01% 100.00% 0.01% 0.00%


0.06% 100.00% 0.06% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01%
100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 0.00%

0.01% 100.00% 0.01% 0.00%


0.00% 100.00% 0.00% 0.00%
0.07% 100.00% 0.07% 0.00%
0.08% 100.00% 0.08% 0.00%
0.06% 100.00% 0.06% 0.00%

0.00% 100.00% 0.00% 0.00%


0.02% 100.00% 0.02% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 366/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00%
100.00% 0.00% 0.00%
uk acian halus skonengan
0.00%
100.00% 0.00% 0.00%
dan spesifikasi : 0.00%
100.00% 0.00% 0.00%
uk acian halus skonengan
ah pintu alluminium area 0.00%
100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%
0.01% 100.00% 0.01% 0.00%
0.08% 100.00% 0.08% 0.00%
0.00% 100.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%
0.04% 100.00% 0.04% 0.00%
0.11% 100.00% 0.11% 0.00%

0.10%
80.00% 0.08% 5.00%

Museum Nasional - Pek.Arsitektur HAL 367/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.01%
100.00% 0.01% 0.00%

0.05%
100.00% 0.05% 0.00%

0.00%
100.00% 0.00% 0.00%

0.05% 100.00% 0.05% 0.00%


0.00% 100.00% 0.00% 0.00%
0.11% 100.00% 0.11% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.05%
100.00% 0.05% 0.00%
uk acian halus skonengan
0.03%
100.00% 0.03% 0.00%
0.09% 80.00% 0.07% 5.00%

Museum Nasional - Pek.Arsitektur HAL 368/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.01% 3.00% 0.00% 87.00%
0.02% 100.00% 0.02% 0.00%
0.00% 100.00% 0.00% 0.00%
0.02% 100.00% 0.02% 0.00%
0.05% 80.00% 0.04% 5.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.03% 100.00% 0.03% 0.00%
0.00% 0.00% 0.00% 0.00%
0.01% 100.00% 0.01% 0.00%
uk acian halus skonengan
0.01% 100.00% 0.01% 0.00%
dan spesifikasi : 0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.21% 100.00% 0.21% 0.00%

Museum Nasional - Pek.Arsitektur HAL 369/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.02% 86.00% 0.02% 14.00%


0.02% 86.00% 0.02% 14.00%

0.06% 100.00% 0.06% 0.00%


0.12%
100.00% 0.12% 0.00%

0.18%
100.00% 0.18% 0.00%

sifikasi dan gambar pada : 0.00%


100.00% 0.00% 0.00%

0.04%
0.00% 0.00% 16.00%
0.00% 0.00% 0.00% 0.00%

0.00%
100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 370/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.03%
100.00% 0.03% 0.00%
uk acian halus skonengan
0.01%
100.00% 0.01% 0.00%

0.03%
100.00% 0.03% 0.00%
0.01% 100.00% 0.01% 0.00%
0.02% 100.00% 0.02% 0.00%
0.00% 100.00% 0.00% 0.00%
0.09% 100.00% 0.09% 0.00%

0.02% 100.00% 0.02% 0.00%

0.02% 100.00% 0.02% 0.00%


0.00% 100.00% 0.00% 0.00%

0.01% 100.00% 0.01% 0.00%


0.05% 100.00% 0.05% 0.00%

Museum Nasional - Pek.Arsitektur HAL 371/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 100.00% 0.00% 0.00%


0.03% 100.00% 0.03% 0.00%
0.08% 100.00% 0.08% 0.00%

0.01%
100.00% 0.01% 0.00%
0.00% 100.00% 0.00% 4.00%
0.16% 100.00% 0.16% 0.00%
0.05% 100.00% 0.05% 0.00%

0.03% 100.00% 0.03% 0.00%


0.00% 100.00% 0.00% 0.00%
0.04% 86.00% 0.03% 4.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.55% 95.00% 0.53% 0.00%
0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 372/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

Sub Total 5.63% 5.49%


5.63%

gkapan dan peralatan yang

gambar dari konsultan terkait

Museum Nasional - Pek.Arsitektur HAL 373/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 374/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
pada : 0.01% 0.00% 0.00% 0.00%
0.06% 0.00% 0.00% 0.00%
0.01% 95.00% 0.01% 4.00%

0.04% 30.00% 0.01% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 40.00% 0.00% 0.00%
0.11% 0.00% 0.00% 0.00%
0.16% 30.00% 0.05% 0.00%
0.01% 100.00% 0.01% 0.00%
0.04% 100.00% 0.04% 0.00%
0.04% 97.00% 0.04% 0.00%
0.10% 65.00% 0.06% 20.00%
n Sersan barat 2 Unit 0.01% 78.00% 0.00% 20.00%

0.00% 98.00% 0.00% 0.00%


0.00% 98.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 375/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 0.00% 0.00% 0.00%

0.01% 0.00% 0.00% 0.00%

0.24% 94.00% 0.23% 0.00%


pesifikasi pada ; 0.02% 77.00% 0.02% 12.00%
0.17% 100.00% 0.17% 0.00%
0.22% 100.00% 0.22% 0.00%
0.00% 100.00% 0.00% 0.00%

0.07% 100.00% 0.07% 0.00%


uk acian halus skonengan
0.04% 100.00% 0.04% 0.00%
0.09% 100.00% 0.09% 0.00%
gan gambar dan spesifikasi,
0.02% 63.00% 0.01% 12.00%

0.01% 97.00% 0.01% 0.00%

Museum Nasional - Pek.Arsitektur HAL 376/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %
0.00% 81.00% 0.00% 4.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

0.00% 100.00% 0.00% 0.00%


0.00% 100.00% 0.00% 0.00%
0.00% 100.00% 0.00% 0.00%

uk acian halus skonengan


0.00%
100.00% 0.00% 0.00%

0.00%
100.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 377/932


APORAN BOBOT PRESTASI

: PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASION


: PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTR
: JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
: 29 (DUA PULUH SEMBILAN)
: 24 DESEMBER 2018 S/D 30 DESEMBER 2018
: 210 Hari
: 203 Hari
: 1 Hari
: MUSEUM NASIONAL
: PT. INTRACO LESTARI
: E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
BOBOT MINGGU LALU MINGGU INI
% bobot %

0.02% 100.00% 0.02% 0.00%


Sub Total 1.50% 1.11%
1.50%

TOTAL ARSITEK 33.39% 29.90%

Museum Nasional - Pek.Arsitektur HAL 378/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.21%

0.00% 100.00% 0.21%

Museum Nasional - Pek.Arsitektur HAL 379/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.03%

0.00% 100.00% 0.04%

0.00% 91.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 380/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 96.00% 0.00%

0.00% 94.00% 0.01%

0.00% 93.00% 0.01%


0.00% 93.00% 0.01%
0.00% 93.00% 0.00%
0.00% 93.00% 0.01%
0.00% 93.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 381/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 93.00% 0.01%

0.00% 94.00% 0.01%


0.00% 80.00% 0.01%
0.00% 93.00% 0.05%
0.00% 93.00% 0.01%
0.00% 93.00% 0.01%
0.00% 93.00% 0.01%
0.00% 80.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 382/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%

0.00% 85.00% 0.01%

0.00% 85.00% 0.01%


0.00% 85.00% 0.00%

0.00% 85.00% 0.03%


0.00% 85.00% 0.00%
0.00% 85.00% 0.03%
0.00% 85.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 383/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 85.00% 0.01%

0.00% 85.00% 0.02%


0.00% 85.00% 0.01%

0.00% 82.00% 0.01%

0.00% 82.00% 0.01%

0.00% 82.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 384/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.08%

0.00% 95.00% 0.04%

0.00% 95.00% 0.02%

0.00% 95.00% 0.01%

0.00% 95.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 385/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 95.00% 0.02%

0.00% 84.00% 0.02%

0.00% 84.00% 0.01%

0.00% 22.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 386/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 84.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 98.00% 0.03%


0.00% 98.00% 0.03%
0.00% 98.00% 0.05%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%

0.00% 95.00% 0.00%


0.00% 98.00% 0.00%
0.00% 99.00% 0.00%
0.00% 98.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 387/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 100.00% 0.00%

0.00% 94.00% 0.00%


0.00% 94.00% 0.00%
0.00% 92.00% 0.00%
0.00% 92.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 388/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.01%

0.00% 98.70% 1.83%

0.00% 100.00% 0.06%

0.00% 100.00% 0.10%


0.06% 92.00% 0.10%

Museum Nasional - Pek.Arsitektur HAL 389/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%

0.00% 100.00% 0.02%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 98.00% 0.01%
0.00% 100.00% 0.12%
0.00% 100.00% 0.02%
0.00% 100.00% 0.01%
0.00% 100.00% 0.03%
0.00% 100.00% 0.04%
0.00% 100.00% 0.00%
0.01% 95.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 390/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 0.00% 0.00%

0.00% 100.00% 0.00%

0.00% 93.00% 0.00%


0.00% 94.00% 0.00%
0.00% 100.00% 0.00%

0.00% 92.00% 0.00%


0.00% 95.00% 0.00%
0.00% 95.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 391/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.04%


0.00% 100.00% 0.02%
0.00% 100.00% 0.01%
0.00% 103.00% 0.00%
0.00% 100.00% 0.05%
0.00% 100.00% 0.03%
0.00% 100.00% 0.04%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 392/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 80.00% 0.01%

0.00% 98.00% 0.01%


0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.03% 78.00% 0.38%

Museum Nasional - Pek.Arsitektur HAL 393/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 20.00% 0.00%


0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%
0.00% 20.00% 0.00%

0.00% 20.00% 0.00%


0.00% 20.00% 0.00%

0.00% 20.00% 0.00%


0.00% 20.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 394/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 84.00% 0.00%


0.00% 84.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 395/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 45.00% 0.01%

0.00% 0.00% 0.00%

0.00% 96.00% 0.19%

0.00% 15.00% 0.00%

0.00% 90.00% 0.01%


0.00% 81.00% 0.00%

0.00% 100.00% 0.07%

Museum Nasional - Pek.Arsitektur HAL 396/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.01%

0.00% 100.00% 0.24%

0.00% 100.00% 0.01%

0.00% 73.00% 0.01%

0.00% 0.00% 0.00%

0.17% 4.81%

Museum Nasional - Pek.Arsitektur HAL 397/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.08%


0.00% 99.00% 0.01%
0.00% 98.00% 0.07%
0.00% 98.00% 0.01%
0.00% 98.00% 0.04%

Museum Nasional - Pek.Arsitektur HAL 398/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.01%

0.00% 96.00% 1.11%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.40%

Museum Nasional - Pek.Arsitektur HAL 399/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.34%

0.03% 90.00% 0.38%


0.00% 78.00% 0.02%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 400/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%

0.00% 97.00% 0.02%

0.00% 97.00% 0.02%

0.00% 97.00% 0.05%

0.00% 97.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 401/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 97.00% 0.12%

0.00% 97.00% 0.18%

0.00% 97.00% 0.02%

0.00% 97.00% 0.00%

0.00% 97.00% 0.01%

0.00% 92.00% 0.02%

0.00% 92.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 402/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.01% 35.00% 0.01%

0.00% 92.00% 0.02%

0.00% 92.00% 0.01%

0.00% 92.00% 0.02%

0.00% 92.00% 0.01%

0.00% 92.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 403/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 71.00% 0.09%

0.00% 100.00% 0.28%

0.00% 100.00% 0.31%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 95.00% 0.04%

Museum Nasional - Pek.Arsitektur HAL 404/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.03%

0.00% 0.00% 0.00%


0.00% 100.00% 0.09%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%
0.00% 100.00% 0.07%

Museum Nasional - Pek.Arsitektur HAL 405/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%

0.00% 100.00% 0.12%

0.00% 0.00% 0.00%

0.00% 100.00% 0.03%


0.00% 100.00% 0.01%

0.18% 134.00% 0.71%

0.00% 100.00% 0.05%


0.00% 100.00% 0.04%

Museum Nasional - Pek.Arsitektur HAL 406/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 407/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 98.00% 0.02%

0.00% 99.00% 0.62%


0.00% 99.00% 0.37%
0.00% 99.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 408/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 98.00% 0.03%


0.00% 98.00% 0.00%
0.00% 98.00% 0.02%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.03%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.02%
0.00% 98.00% 0.02%
0.00% 98.00% 0.01%
0.00% 98.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 409/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.01%

0.00% 98.00% 0.01%


0.00% 98.00% 0.03%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%

0.00% 98.00% 0.01%


0.00% 99.00% 0.03%
0.00% 98.00% 0.02%
0.00% 98.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 410/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 35.00% 0.16%

0.00% 81.00% 0.00%


0.00% 81.00% 0.00%
0.00% 81.00% 0.00%
0.00% 81.00% 0.00%
0.00% 81.00% 0.00%

0.00% 98.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 411/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 96.00% 0.01%


0.00% 96.00% 0.00%
0.00% 96.00% 0.01%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 412/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 99.00% 0.32%


0.00% 98.00% 0.00%

0.00% 53.00% 0.00%


0.00% 98.00% 0.12%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 99.00% 0.19%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 413/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.00%


0.00% 98.00% 0.01%
0.00% 98.00% 0.00%

0.00% 98.00% 0.04%


0.00% 98.00% 0.02%
0.00% 98.00% 0.02%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 414/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 99.00% 0.02%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 415/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.01%
0.00% 30.00% 0.01%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 416/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.01%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 417/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 30.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 418/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 419/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.01%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 420/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.01%

0.00% 0.00% 0.00%

0.00% 95.00% 0.00%


0.00% 95.00% 0.00%
0.00% 95.00% 0.00%
0.00% 95.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 421/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 95.00% 0.00%
0.00% 95.00% 0.00%
0.00% 140.00% 0.01%
0.00% 140.00% 0.01%
0.00% 140.00% 0.00%
0.00% 140.00% 0.01%
0.00% 140.00% 0.00%
0.00% 140.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 422/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%

0.00% 0.00% 0.00%

0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 423/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.03%

0.00% 100.00% 0.03%

0.00% 0.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 424/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 425/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 426/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%

0.30% 7.74%

0.00% 100.00% 0.03%


0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 427/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.03%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.10%

Museum Nasional - Pek.Arsitektur HAL 428/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.02%

0.00% 0.00% 0.00%


0.00% 100.00% 0.00%

0.00% 0.00% 0.00%

0.06% 95.00% 0.44%


0.00% 95.00% 0.03%

0.01% 95.00% 0.08%

Museum Nasional - Pek.Arsitektur HAL 429/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.13%

0.00% 47.00% 0.00%

0.00% 100.00% 0.03%

0.00% 100.00% 0.00%

0.00% 91.00% 0.00%


0.00% 100.00% 1.34%
0.00% 100.00% 0.08%

Museum Nasional - Pek.Arsitektur HAL 430/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.02%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 431/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%

0.00% 100.00% 0.04%

Museum Nasional - Pek.Arsitektur HAL 432/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.02%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 100.00% 0.03%

0.00% 100.00% 0.02%

0.00% 100.00% 0.01%

0.00% 40.00% 0.01%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 433/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%

0.00% 100.00% 0.02%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.03%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 434/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.02%

0.00% 95.00% 0.01%

0.00% 95.00% 0.03%

0.00% 95.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 435/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.00%

0.00% 95.00% 0.01%

0.00% 95.00% 0.00%

0.00% 95.00% 0.00%

0.07% 89.00% 0.25%

Museum Nasional - Pek.Arsitektur HAL 436/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.03%

0.00% 100.00% 0.13%

0.00% 100.00% 0.00%

0.00% 96.00% 0.01%

0.00% 96.00% 0.02%

0.00% 96.00% 0.06%

Museum Nasional - Pek.Arsitektur HAL 437/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 96.00% 0.03%

0.00% 49.00% 0.03%


0.00% 49.00% 0.01%

0.02% 70.00% 0.05%

0.01% 70.00% 0.03%

0.03% 70.00% 0.05%

0.00% 96.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 438/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 96.00% 0.01%

0.00% 96.00% 0.01%

0.00% 96.00% 0.03%

0.00% 96.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 439/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.10%


0.00% 98.00% 0.04%
0.00% 0.00% 0.00%
0.00% 100.00% 0.04%

0.00% 100.00% 0.00%

0.00% 95.00% 0.40%

Museum Nasional - Pek.Arsitektur HAL 440/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 441/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.17%


0.00% 100.00% 0.56%
0.00% 100.00% 0.10%
0.00% 100.00% 0.15%
0.00% 100.00% 0.05%

0.00% 98.00% 0.03%

0.00% 98.00% 0.01%


0.00% 98.00% 0.02%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 442/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.01%
0.00% 100.00% 0.02%
0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.02%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 443/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.07%

0.00% 100.00% 0.03%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 444/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 92.00% 0.00%


0.00% 92.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 445/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 33.00% 0.00%

0.00% 100.00% 0.06%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 446/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 98.00% 0.01%


0.00% 98.00% 0.00%

0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 447/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.02%

0.00% 98.00% 0.00%


0.01% 98.00% 0.07%
0.00% 98.00% 0.18%
0.00% 98.00% 0.00%

0.00% 98.00% 0.01%


0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.02%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.01%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 448/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.00%


0.02% 81.00% 0.04%

0.00% 0.00% 0.00%

0.00% 99.00% 0.03%


0.00% 99.00% 0.05%
0.00% 99.00% 0.00%
0.00% 99.00% 0.00%
0.00% 99.00% 0.02%
0.00% 99.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 449/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 99.00% 0.06%
0.00% 99.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 450/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.01% 86.00% 0.14%

0.01% 107.00% 0.21%

0.00% 100.00% 0.15%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 451/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 452/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%

0.00% 30.00% 0.00%


0.00% 30.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 453/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.01%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 30.00% 0.00%
0.00% 0.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 454/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.00%


0.00% 95.00% 0.00%

0.00% 95.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 455/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.03% 91.00% 0.18%

0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 456/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.02%

0.00% 0.00% 0.00%

0.00% 100.00% 0.14%

0.00% 100.00% 0.00%


0.00% 0.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 457/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.37% 7.07%

0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 458/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.01%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%

0.00% 98.00% 0.01%

0.00% 98.00% 0.01%


0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 92.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 459/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 92.00% 0.03%

0.00% 98.00% 0.01%

0.00% 80.00% 0.01%

0.00% 80.00% 0.01%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 460/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%

0.00% 100.00% 0.02%

0.00% 100.00% 0.00%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 461/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 0.20%

0.00% 100.00% 0.00%


0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 462/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.03%


0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

0.00% 90.00% 0.01%

0.00% 90.00% 0.01%


0.00% 100.00% 0.01%

0.00% 100.00% 0.12%


0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 463/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 94.00% 0.03%

0.00% 98.00% 0.01%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 464/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%

0.00% 94.00% 0.00%

0.00% 100.00% 0.02%

0.00% 110.00% 0.04%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 465/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%


0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.01% 0.39%

0.00% 100.00% 0.03%


0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 466/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 88.00% 0.01%

0.00% 88.00% 0.01%

0.00% 100.00% 0.01%

0.00% 95.00% 0.03%

0.00% 95.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 467/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.01%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.02%

Museum Nasional - Pek.Arsitektur HAL 468/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 96.00% 0.00%


0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%

0.00% 96.00% 0.03%


0.00% 96.00% 0.01%
0.00% 96.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 469/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 96.00% 0.12%
0.00% 96.00% 0.00%

0.00% 96.00% 0.00%

0.00% 96.00% 0.02%


0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 470/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%
0.00% 96.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.01% 0.40%

Museum Nasional - Pek.Arsitektur HAL 471/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.02%


0.00% 100.00% 0.02%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%

0.00% 95.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 472/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.01%

0.00% 100.00% 0.01%

0.00% 95.00% 0.05%

0.00% 98.00% 0.01%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 473/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 474/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 98.00% 0.03%


0.00% 98.00% 0.01%
0.00% 98.00% 0.00%
0.00% 98.00% 0.01%
0.00% 98.00% 0.12%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 475/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 98.00% 0.01%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 476/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 98.00% 0.00%

0.00% 90.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.01% 0.38%

Museum Nasional - Pek.Arsitektur HAL 477/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.38%


0.00% 100.00% 0.17%

0.00% 0.00% 0.00%

0.05% 75.00% 0.13%


0.00% 75.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 478/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.02%


0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 479/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 90.00% 0.00%


0.00% 90.00% 0.00%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 480/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.02% 91.00% 0.24%

0.00% 100.00% 0.00%

0.00% 91.00% 0.00%

0.03% 91.00% 0.34%

0.02% 91.00% 0.17%

0.00% 100.00% 0.00%

0.00% 80.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 481/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 80.00% 0.00%

0.00% 83.00% 0.01%

0.00% 22.00% 0.00%

0.00% 80.00% 0.00%

0.00% 80.00% 0.00%

0.00% 80.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 482/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 95.00% 0.00%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%
0.00% 98.00% 0.00%

0.00% 100.00% 0.10%


0.00% 100.00% 0.17%
0.00% 100.00% 0.05%
0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 483/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.09%
0.00% 100.00% 0.01%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 484/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.12% 1.97%

Museum Nasional - Pek.Arsitektur HAL 485/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 49.00% 0.00%


0.00% 34.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.02%


0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 486/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 98.00% 0.02%

0.00% 98.00% 0.02%

0.02% 100.00% 0.05%

0.00% 100.00% 0.01%

0.00% 100.00% 0.12%

0.00% 100.00% 0.07%

Museum Nasional - Pek.Arsitektur HAL 487/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.06%

0.00% 100.00% 0.05%

0.00% 35.00% 0.00%

0.01% 35.00% 0.02%

0.00% 27.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 488/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.01% 35.00% 0.01%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 100.00% 0.03%

0.00% 100.00% 0.11%

Museum Nasional - Pek.Arsitektur HAL 489/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.05% 0.60%

0.00% 100.00% 0.00%

0.00% 100.00% 0.15%

0.00% 100.00% 0.09%

0.00% 100.00% 0.28%

Museum Nasional - Pek.Arsitektur HAL 490/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.23%

0.00% 100.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.76%

Museum Nasional - Pek.Arsitektur HAL 491/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.07%
0.00% 100.00% 0.19%

0.00% 100.00% 0.00%


0.00% 100.00% 0.77%
0.00% 100.00% 0.04%

0.00% 100.00% 0.01%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 492/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.03%


0.00% 0.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%

0.00% 100.00% 0.00%


0.00% 100.00% 0.04%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.19%
0.00% 100.00% 0.19%

0.00% 100.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 493/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.02%


0.00% 100.00% 0.03%
0.00% 100.00% 0.55%
0.00% 100.00% 0.16%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.03%

0.00% 100.00% 0.03%

0.00% 100.00% 0.02%


0.00% 100.00% 0.00%

0.00% 100.00% 0.03%

Museum Nasional - Pek.Arsitektur HAL 494/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%

0.00% 100.00% 0.06%


0.00% 100.00% 0.00%
0.00% 0.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.00%
0.00% 100.00% 0.07%
0.00% 100.00% 0.08%
0.00% 100.00% 0.06%

0.00% 100.00% 0.00%


0.00% 100.00% 0.02%
0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 495/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%


0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.08%
0.00% 100.00% 0.00%

0.00% 100.00% 0.01%

0.00% 100.00% 0.04%


0.00% 100.00% 0.11%

0.01% 85.00% 0.09%

Museum Nasional - Pek.Arsitektur HAL 496/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.01%

0.00% 100.00% 0.05%

0.00% 100.00% 0.00%

0.00% 100.00% 0.05%


0.00% 100.00% 0.00%
0.00% 100.00% 0.11%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.05%

0.00% 100.00% 0.03%

0.00% 85.00% 0.08%

Museum Nasional - Pek.Arsitektur HAL 497/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.01% 90.00% 0.01%

0.00% 100.00% 0.02%


0.00% 100.00% 0.00%

0.00% 100.00% 0.02%

0.00% 85.00% 0.04%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%
0.00% 100.00% 0.03%
0.00% 0.00% 0.00%
0.00% 100.00% 0.01%
0.00% 100.00% 0.01%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.21%

Museum Nasional - Pek.Arsitektur HAL 498/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 100.00% 0.00%
0.00% 100.00% 0.00%

0.00% 100.00% 0.02%


0.00% 100.00% 0.02%

0.00% 100.00% 0.06%

0.00% 100.00% 0.12%

0.00% 100.00% 0.18%

0.00% 100.00% 0.00%

0.01% 16.00% 0.01%


0.00% 0.00% 0.00%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 499/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.03%

0.00% 100.00% 0.01%

0.00% 100.00% 0.03%


0.00% 100.00% 0.01%
0.00% 100.00% 0.02%
0.00% 100.00% 0.00%
0.00% 100.00% 0.09%

0.00% 100.00% 0.02%

0.00% 100.00% 0.02%


0.00% 100.00% 0.00%

0.00% 100.00% 0.01%


0.00% 100.00% 0.05%

Museum Nasional - Pek.Arsitektur HAL 500/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.00%


0.00% 100.00% 0.03%
0.00% 100.00% 0.08%

0.00% 100.00% 0.01%


0.00% 104.00% 0.00%
0.00% 100.00% 0.16%
0.00% 100.00% 0.05%

0.00% 100.00% 0.03%


0.00% 100.00% 0.00%
0.00% 90.00% 0.04%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 95.00% 0.53%

0.00% 100.00% 0.00%


0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 501/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.03% 5.52%

Museum Nasional - Pek.Arsitektur HAL 502/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 503/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 99.00% 0.01%

0.00% 30.00% 0.01%


0.00% 0.00% 0.00%
0.00% 40.00% 0.00%
0.00% 0.00% 0.00%
0.00% 30.00% 0.05%
0.00% 100.00% 0.01%
0.00% 100.00% 0.04%
0.00% 97.00% 0.04%
0.02% 85.00% 0.08%
0.00% 98.00% 0.01%

0.00% 98.00% 0.00%


0.00% 98.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 504/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 94.00% 0.23%


0.00% 89.00% 0.02%
0.00% 100.00% 0.17%
0.00% 100.00% 0.22%
0.00% 100.00% 0.00%

0.00% 100.00% 0.07%

0.00% 100.00% 0.04%

0.00% 100.00% 0.09%

0.00% 75.00% 0.01%

0.00% 97.00% 0.01%

Museum Nasional - Pek.Arsitektur HAL 505/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 85.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

Museum Nasional - Pek.Arsitektur HAL 506/932


ENTRANCE MUSEUM NASIONAL
, MEKANIKAL DAN ELEKTRIKAL
RTA PUSAT
PULUH SEMBILAN)

ESTASI PEKERJAAN
MINGGU INI S/D MINGGU INI
bobot % bobot

0.00% 100.00% 0.02%


0.03% 1.14%

1.09% 30.98%

Museum Nasional - Pek.Arsitektur HAL 507/932


PERHITUNGAN PEMBESIAN POND

Jumlah pondasi
NO Item Pekerjaan
BH

PEKERJAAN STRUKTURAL

1 Pekerjaan Pondasi Beton setempat (P2) #REF!

2 Pekerjaan Pondasi Beton setempat (P1') #REF!


TUNGAN PEMBESIAN PONDASI SETEMPAT

Volume Dia. Jarak Catatan Panjang Besi/Pile Cap Total Besi


m3 mm m m kg Kg

#REF! 13.00 0.15 tulangan atas 47.26 51.70 #REF!


19.00 0.15 tulangan bawah 49.37 115.37

#REF! 13.00 0.15 tulangan atas 97.90 107.10 #REF!


19.00 0.15 tulangan bawah 101.29 236.69
bekisting
m2

#REF!

#REF!
sengkang sengkang sengkang sengkang sengkang sengkang sengkang sengkang sengkang
volume p/m3
No Item Pekerjaan (1/2L) -70 (1/2L) -100 (1/2L) -125 (1/2L) -150 (L/0.1) -100 (L/0.2) -200 (1/2L) -200 (1/4L) -200 (1/4L) -150

m3 bh bh bh bh bh bh bh bh bh

Lantai 2
Balok Struktur B.2 - 25 x 50 #REF! 5.56 28.78
Balok Struktur B.3 - 20 x 40 #REF! 12.50 63.50
Balok Struktur B.5 - 15 x 35 #REF! 11.11 56.56
Balok Kantilever BK -20 - 50 #REF! 16.67 84.33
#REF! 10.00 51.00
Lantai 3
Balok Struktur B.1 - 30 x 70 #REF! 4.76 24.81
Balok Struktur B.2 - 25 x 50 #REF! 5.56 28.78
Balok Struktur B.3 - 20 x 40 #REF! 12.50 63.50
Balok Struktur B.5 - 15 x 35 #REF! 11.11 56.56
Balok Kantilever BK -20 - 50 #REF! 16.67 84.33
#REF! 10.00 51.00
Lantai 4
Balok Struktur B.1 - 30 x 70 #REF! 4.76 24.81
Balok Struktur B.2 - 25 x 50 #REF! 5.56 28.78
Balok Struktur B.3 - 20 x 40 #REF! 12.50 63.50
Balok Struktur B.5 - 15 x 35 #REF! 11.11 56.56
Balok Kantilever BK -20 - 50 #REF! 16.67 84.33
#REF! 10.00 51.00
Lantai atap
Balok Struktur B.1 - 30 x 70 #REF! 4.76 24.81
Balok Struktur B.2 - 25 x 50 #REF! 5.56 28.78
Balok Struktur B.3 - 20 x 40 #REF! 12.50 63.50
Ring Balok 15 /25 #REF! 26.67 191.48
S1 250x400 tie beam #REF! 10.00 34.33 35.33
Panjang Panjang total
sengkang sengkang sengkang sengkang sengkang total sengkang total sengkang total sengkang total sengkang total sengkang total sengkang total sengkang
sengkang
(1/4L) -125 (1/4L) -100 (1/4L) -70 (1/2L) -100 (1/2L) -125 (1/2L) -150 (1/2L) -200 (L/0.1) -100 (1/4L) -200 (1/4L) -150
tumpuan lapangan (1/2L) -70

bh bh bh m m m m m m m m m m

29.78 1.72 1.72 49.50


64.50 1.10 1.10 69.60
57.56 1.40 1.40 78.95
85.33 0.90 0.90 75.56
52.00 1.30 1.30 66.10

25.81 1.96 1.96 48.63


29.78 1.72 1.72 49.50
64.50 1.10 1.10 69.60
57.56 1.40 1.40 78.95
85.33 0.90 0.90 75.56
52.00 1.30 1.30 66.10

25.81 1.92 1.92 47.63


29.78 1.72 1.72 49.50
64.50 1.10 1.10 69.60
57.56 1.40 1.40 78.95
85.33 0.90 0.90 75.56
52.00 1.30 1.30 66.10

25.81 1.92 1.92 47.63


29.78 1.72 1.72 49.50
64.50 1.10 1.10 69.60
192.48 0.70 0.70 133.27
1.20 1.20 41.06 42.26
besi D
total sengkang total sengkang total sengkang total d 8 total d 10 total d total d batang besi D 22 besi D 19 besi D 16 besi D 13 besi D 12 besi D 10 batang
25
(1/4L) -125. (1/4L) -100 (1/4L) -70 12 13 utama utama utama utama utama utama utama Tumpuan
utama

m m m kg kg kg kg m bh bh bh bh bh bh bh m

51.22 65.195697 5.56 6.00 2.00 4.44


70.69 58.1196 12.50 5.00 2.00 10.00
80.35 65.9957 11.11 12.00
76.46 62.9806 16.67 7.00
67.39 55.3025 10.00 7.00

50.59 64.223271 4.76 5.00 2.00 4.29


51.22 65.195697 5.56 6.00 2.00 4.44
70.69 58.1196 12.50 5.00 2.00 10.00
80.35 65.9957 11.11 12.00
76.46 62.9806 16.67 7.00
67.39 55.3025 10.00 7.00

49.55 62.912592 4.76 5.00 2.00 3.81


51.22 65.195697 5.56 6.00 2.00 4.44
70.69 58.1196 12.50 5.00 2.00 10.00
80.35 65.9957 11.11 12.00
76.46 62.9806 16.67 7.00
67.39 55.3025 10.00 7.00

49.55 62.912592 4.76 5.00 2.00 3.81


51.22 65.195697 5.56 6.00 2.00 4.44
70.69 58.1196 12.50 5.00 2.00 10.00
133.96 110.711 26.67 4.00
34.519 10.00 6.00
PERHITUNGAN PEMBESIAN BALOK DAN SLOOF

besi D 25 besi D 22 besi D 19 besi D 16 besi D 13 batang besi D 25 besi D 22 besi D 19 besi D 16 besi D 12 besi D 22 besi D 22 besi D 19 besi D 19 besi D 13 besi D 13
tumpuan tumpuan tumpuan tumpuan tumpuan Lapangan lapangan lapangan lapangan lapangan lapangan penyalur penyalur penyalur penyalur penyalur penyalur

bh bh bh bh bh m bh bh bh bh bh bh m bh m bh m

2.00 5.00 2.00


1.00

3.00 4.29 2.00


2.00 5.00 2.00
1.00

3.00 4.29 2.00


2.00 5.00 2.00
1.00

3.00 4.29 2.00


2.00 5.00 2.00
1.00
total berat total berat D total berat D total berat D total berat D total berat D total berat D total berat D total berat D 22 total berat D total berat D total berat D total berat D
D 25 22 utama 19 utama 16 utama 13 utama 12 utama 10 utama 25 tumpuan tumpuan 19 tumpuan 16 tumpuan 13 tumpuan 25 lapangan
utama

kg kg kg kg kg kg kg kg kg kg kg kg kg

55.24 10.36 14.73


68.37 16.18 10.94
86.31
193.33
116.00

55.64 10.42 30.05


55.24 10.36 14.73
68.37 16.18 10.94
86.31
193.33
116.00

55.64 10.42 26.71


55.24 10.36 14.73
68.37 16.18 10.94
86.31
193.33
116.00

55.64 10.42 26.71


55.24 10.36 14.73
68.37 16.18 10.94
69.05
99.43
total berat D total berat D total berat D total berat D total berat D total berat D jumlah d 8 jumlah d 10 jumlah d 12 jumlah d 13 jumlah d 16 jumlah d 19 jumlah d 22
22 lapangan 19 lapangan 16 lapangan 22 penyalur 19 penyalur 13 penyalur

kg kg kg kg kg kg kg kg kg kg kg kg kg

16.57 #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

20.03 #REF! #REF! #REF!


16.57 #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

20.03 #REF! #REF! #REF!


16.57 #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

20.03 #REF! #REF! #REF!


16.57 #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
jumlah d 22 jumlah d 19 jumlah d 13 total berat
jumlah d 25 jumlah d 12 penyalur penyalur penyalur besi

kg kg kg kg kg kg

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
sengkang sengkang (l/,2) sengkang (1/2L) sengkang (1/2L) sengkang sengkang sengkang sengkang sengkang
volume p/m3
No Item Pekerjaan (l/,125) -125 -200 -100 -150 (1/2L) -200 (1/4L) -200 (1/4L) -150 (1/4L) -100 (1/4L) -75

m3 m bh bh bh bh bh bh bh bh bh

Lantai 1
Kolom Struktur K 1 40 x 60 #REF! 4.17 14.89 22.83
Kolom Struktur KL1 25 x 50 #REF! 3.70 13.35 20.52
Kolom Struktur K2 30 x 50 #REF! 5.56 19.52 29.78
Kolom Struktur K3 30 x 40 #REF! 6.67 23.22 35.33
Kolom Struktur KL 2 20 x 40 #REF! 8.33 28.78 43.67

Lantai 2
Kolom Struktur KL1 25 x 50 #REF! 3.70 13.35 20.52
Kolom Struktur K2 30 x 50 #REF! 5.56 19.52 29.78
Kolom Struktur K3 30 x 40 #REF! 6.67 23.22 35.33
Kolom Struktur KL 2 20 x 40 #REF! 8.33 28.78 43.67

Lantai 3
Kolom Struktur K2 30 x 50 #REF! 5.56 19.52 29.78
Kolom Struktur KL 2 20 x 40 #REF! 8.33 28.78 43.67
Kolom Struktur K3 30 x 40 #REF! 6.67 23.22 35.33
Kolom Struktur KL1 25 x 50 #REF! 3.70 13.35 20.52

Lantai 4
Kolom Struktur K2 30 x 50 #REF! 5.56 19.52 29.78
Kolom Struktur KL 2 20 x 40 #REF! 8.33 28.78 43.67
Kolom Struktur K4 20 x 30 #REF! 41.67 105.17 106.17
Kolom Struktur KL1 25 x 50 #REF! 3.70 13.35 20.52
Kolom Struktur K3 30 x 40 #REF! 6.67 23.22 35.33

Lantai atap
Kolom Praktis 15 x 15 #REF! 69.44 174.61 175.61
Panjang total
Panjang sengkang total sengkang total sengkang total sengkang (1/2L) total sengkang (1/2L) total sengkang (1/4L) total sengkang total sengkang total sengkang
sengkang sengkang total d 6 total d 8 total d 10
tumpuan (l/,2) -200 (1/2L) -200 -150 -100 -200 (1/4L) -150 (1/4L) -100 (1/2L) -200
lapangan (l/,125) -125
m m m m m m m m m m m kg kg kg

1.92 1.92 28.59 43.84 46.88


3.44 3.44 45.91 70.58 75.41
1.72 1.72 33.57 51.22 54.89
1.52 1.52 35.30 53.71 57.61
2.24 2.24 64.46 97.81 105.05

3.44 3.44 45.91 70.58 75.41


1.72 1.72 33.57 51.22 54.89
1.52 1.52 35.30 53.71 57.61
2.24 2.24 64.46 97.81 105.05

1.72 1.72 33.57 51.22 54.89


2.24 2.24 64.46 97.81 105.05
1.52 1.52 35.30 53.71 57.61
3.44 3.44 45.91 70.58 75.41

1.72 1.72 33.57 51.22 54.89


2.24 2.24 64.46 97.81 105.05
1.10 1.10 115.68 116.78 96.31
3.44 3.44 45.91 70.58 75.41
1.52 1.52 35.30 53.71 57.61

0.39 0.39 68.45 68.84 31.99


PERHITUNGAN PEMBESIAN KOLOM

batang jumlah besi D 22 besi D 16 besi D 13 besi D 12 besi D 10 besi D 8 besi D 8 besi D 10 besi D 16 besi D 19 besi D 22 total berat D 22
total d 12 total d 13 besi D 19 utama
utama kolom utama utama utama utama utama Penyalur Penyalur Penyalur Penyalur Penyalur Penyalur utama

kg kg m bh bh bh bh bh bh bh m m m m m m kg

4.17 #REF! 16.00 #REF!


3.70 #REF! 20.00 #REF!
5.56 #REF! 14.00 #REF!
6.67 #REF! 12.00 #REF!
8.33 #REF! 12.00 #REF!

3.70 #REF! 20.00 #REF!


5.56 #REF! 14.00 #REF!
6.67 #REF! 12.00 #REF!
8.33 #REF! 12.00 #REF!

5.56 #REF! 14.00 #REF!


8.33 #REF! 12.00 #REF!
6.67 #REF! 12.00 #REF!
3.70 #REF! 20.00 #REF!

5.56 #REF! 14.00 #REF!


8.33 #REF! 12.00 #REF!
41.67 #REF! 4.00 #REF!
3.70 #REF! 20.00 #REF!
6.67 #REF! 12.00 #REF!

69.44 #REF! 4.00 #REF!


total berat D 8 total berat D 10 total berat D 16 total berat D 19 total berat D 22 total berat D 22 total berat D 19 total berat D 16 total berat D 13 total berat D 12 total berat D 10 jumlah
jumlah d 6 jumlah d 10
penyalur penyalur penyalur penyalur penyalur utama utama utama utama utama utama d8

kg kg kg kg kg kg kg kg kg kg kg kg kg kg

#REF! 110.48 #REF!


#REF! 122.75 #REF!
#REF! 128.89 #REF!
#REF! 132.57 #REF!
#REF! 165.72 #REF!

#REF! 122.75 #REF!


#REF! 128.89 #REF!
#REF! 132.57 #REF!
#REF! 165.72 #REF!

#REF! 128.89 #REF!


#REF! 165.72 #REF!
#REF! 132.57 #REF!
#REF! 122.75 #REF!

#REF! 128.89 #REF!


#REF! 165.72 #REF!
#REF! 155.36 #REF!
#REF! 122.75 #REF!
#REF! 132.57 #REF!

#REF! 179.81 #REF! #REF!


jumlah d jumlah d 16 jumlah d
jumlah d 19 jumlah d 22 total berat besi
13 12

kg kg kg kg kg kg

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF!
LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

<4A> PEKERJAAN INSTALASI AIR CONDITIONING

I LANTAI BASEMENT 2

A DUCTING

1 Ducting Supply & Return

Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.04%


2 Ducting Exhaus & Fresh Air

Tanpa isolasi lengkap dengan hanger, dll.

Bahan D: - BJLS 50 0.05%


- BJLS 60 0.19%
- BJLS 70 0.47%
- BJLS 80 1.16%

Sub Total 1.92%

B DIFFUSER DAN GRILLE


1 Supply Air Diffuser
Bahan : Aluminium

Museum Nasional - Pek. Mekanikal HAL 530/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran : 40 x 40 cm 0.01%
2 Return Air Grille
Bahan : Aluminium
Ukuran : 40 x 40 cm 0.00%
3 Exhaust Air Grille
Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
: 40 x 40 cm 0.01%
: 90 x 40 cm 0.03%
: 25 x 25 cm 0.00%
4 Fresh Air Grille
Bahan : Aluminium
: 90 x 40 cm 0.04%
: 255 x 55 cm 0.00%
: 25 x 25 cm 0.00%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 60 x 40 cm 0.00%
: 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 15 x 15 cm 0.00%
: 20 x 15 cm 0.00%
: 20 x 20 cm 0.00%
Sub Total 0.09%

Museum Nasional - Pek. Mekanikal HAL 531/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

C PIPA DRAIN

1 Pipa drain
Lengkap dengan fitting
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 1" + isolasi 0.00%

Sub Total 0.00%

D LISTRIK DAN KONTROL

Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.15%


- NYY 3 x 4mm² 0.03%
- NYY 3 x 2,5 mm2 0.00%

Sub Total 0.19%

Sub Total

II LANTAI BASEMENT 1

A PERALATAN UTAMA

1 AC Double Split Lengkap dgn pipa refrigerant & 2 outdoor Unit


Type : ceiling Consealed Duct
Merk :
Kapasita: 16 TR / 192.000 BTU / H 1.29%
2 Fan

Museum Nasional - Pek. Mekanikal HAL 532/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Type : Axial
Merk :
: 9.000 CFM / SP 0,8 WG 0.04%
: 6.500 CFM / SP 0,8 WG 0.03%
: 6.000 CFM / SP 0,8 WG 0.03%
: 4.500 CFM / SP 0,8 WG 0.03%
: 1.100 CFM / SP 0,8 WG 0.02%
: 700 CFM / SP 0,8 WG 0.01%
: 600 CFM / SP 0,8 WG 0.01%
: 300 CFM / SP 0,8 WG 0.01%
: 500 CFM / SP 0,8 WG 0.02%
3 Fan
Type : Ceiling
Merk :
Kapasitas
: 250 CFM / SP 0,5 WG 0.01%

Sub TotalPERALATAN UTAMA 1.49%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.74%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.04%
- BJLS 60 0.16%
- BJLS 70 0.04%
- BJLS 80 0.10%

Museum Nasional - Pek. Mekanikal HAL 533/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

3 Flexible Duct Ø 20 cm 0.07%

C LISTRIK DAN KONTROL


1 Kabel P:
Kabel P- NYY 4 x 10mm² 0.00%
- NYY 3 x 2.5 mm2 0.03%
- NYY 4X16 mm2 0.05%

Sub TotalDUCTING 1.24%

C DIFFUSER DAN GRILLE

1 Supply Air Diffuser


Bahan : Aluminium
Ukuran : Type Ball Jet 0.00%
: Ø 40cm Type Round 0.13%
2 Exhaust Air Grille
Bahan : Aluminium
Ukuran - 20 x 20 cm 0.00%
- 45 x 25 cm 0.00%
- 45 x 30 cm 0.00%
- 50 x 50 cm 0.01%
- 60 x 60 cm 0.00%
- 70 x 70 cm 0.00%
- 65 x 35 cm 0.00%
- 120 x 50 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 534/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- 120 x 60 cm 0.00%
- 115 x 55 cm 0.00%
- 25 x 25 cm 0.01%
3 Return Air Grille
Bahan : Aluminium
Ukuran : Ø 40cm Type Round 0.03%
- 50 x 50 cm 0.00%
4 Fresh Air Grile
Bahan : Aluminium
Ukuran : 50 x 45 cm 0.00%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 45 x 40 cm 0.00%
120 x 40 cm 0.00%
50 x 30 cm 0.00%
60 x 50 cm 0.00%
160 x 50 cm 0.01%
45 x 25 cm 0.00%
45 x 30 cm 0.00%
20 x 20 cm 0.00%
20 x 15 cm 0.00%
85 x 32 cm 0.00%
100 x 40 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 535/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotalDIFFUSER DAN GRILLE 0.24%

D PIPA DRAIN

1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 2" 0.01%
Penambahan Isolasi Pipa Drain 0.03%
floor draØ 2" 0.00%
Sub TotalPIPA DRAIN 0.04%

E LISTRIK DAN KONTROL

1 Kabel P:
- NYY 4 x 4 mm2 + NYY 3 x 4 mm2 0.18%
- NYY 4 x 4 mm2 0.02%
- NYY 3 x 4 mm² 0.00%
- NYY 3 x 2.5 mm² 0.02%
2 Breaker MCCB (kabel power perubahan di elektrikal)
- MCCB 3ph Kap 40 A 0.00%

F SISTEM PIPING AHU EXISTING


1 Automatic Air Venting Ø 1" 0.00%
2 Ball Valve Ø 1/2" 0.00%

Panel P-AC.B1
- Pengadaan Panel PAC-B1 u/ menunjang 8 Unit AC VRV sanken 0.31%

Museum Nasional - Pek. Mekanikal HAL 536/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotalLISTRIK DAN KONTROL 0.52%

Sub TotLANTAI BASEMENT 1

III LANTAI GROUND & MEZZANINE

A PERALATAN UTAMA

1 Air Handling Unit (AHU)


Merk :
Kapasita: 30 TR / 360.000 BTU/H 0.17%
: 24,5 TR / 294.000 BTU/H 0.15%
: 10 TR / 120.000 BTU/H 0.08%
: 6 TR / 72.000 BTU/H 0.07%
2 Room Termostat 0.01%
3 Fan
Type : Axial
Merk :
Kapasitas
: 12.000 CFM / SP 0,8 WG 0.04%
: 4.500 CFM / SP 0,8 WG 0.03%
: 1.800 CFM / SP 1,2 WG 0.02%
: 700 CFM / SP 0,8 WG 0.01%
: 600 CFM / SP 0,8 WG 0.01%
4 Fan
Type : Ceiling
Merk :
Kapasita: 600 CFM / SP 0,5 WG 0.01%
: 400 CFM / SP 0,5 WG 0.01%

Museum Nasional - Pek. Mekanikal HAL 537/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

: 250 CFM / SP 0,5 WG 0.01%


5 Fan
Type : Hanging Propeller
Merk :
Kapasita: 1.000 CFM 0.02%
Peredam Suara
Type : Sound Attenuator
Kapasit : 12.000 cfm. 0.01%

Sub TotalPERALATAN UTAMA 0.64%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.82%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.03%
- BJLS 60 0.09%
- BJLS 70 0.03%
3 Flexible Duct Ø 20 cm 0.04%

Sub TotalDUCTING 1.02%

C DIFFUSER DAN GRILLE

1 Supply Air Diffuser


Bahan : Aluminium

Museum Nasional - Pek. Mekanikal HAL 538/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran : 40 x 40 cm 0.01%
: Ø 40cm Type Round 0.14%
2 Exhaust Air Grille
Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
30 x 30 cm 0.00%
40 x 25 cm 0.00%
40 x 30 cm 0.00%
75 x 75 cm 0.01%
125 x 50 cm 0.00%
25 x 25 cm 0.01%
125 x 40 cm ( Louvre ) 0.00%
20 x 20 cm ( Louvre ) 0.00%
3 Return Air Grille
Bahan : Aluminium
Ukuran : 50 x 50 cm 0.00%
: Ø 40cm Type Round 0.03%
4 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
5 Volume Damper
Bahan : Aluminium
Ukuran : 35 x 20 cm 0.00%
25 x 25 cm 0.00%
100 x 50 cm 0.00%
40 x 25 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 539/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

50 x 30 cm 0.00%
25 x 15 cm 0.00%
20 x 20 cm 0.00%
40 x 30 cm 0.00%
165 x 45 cm 0.00%
Fresh Air Grile
Bahan : Aluminium
Ukuran : 40 x 25 cm ( Louvre ) 0.00%
75 x 50 cm ( Louvre ) 0.00%

Sub TotalDIFFUSER DAN GRILLE 0.22%

D PIPA DRAIN

1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 2" 0.00%
Penambahan Isolasi Pipa Drain 0.01%
floor draØ 2" 0.00%
Sub TotalPIPA DRAIN 0.01%

E LISTRIK DAN KONTROL

1 Panel P-AC.GF c/w VSD 0.09%


Penambaha Accessories Komponen Sistem BAS 0.02%
2 Panel P-AC.MZ 0.03%
Penambaha Accessories Komponen Sistem BAS 0.02%

Museum Nasional - Pek. Mekanikal HAL 540/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

3 Kabel P:
Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.01%
- NYY 4 x 4mm² + 3 x 4 mm2 0.09%
- NYY 3 x 4 mm2 0.00%
- NYY 3 x 2.5 mm2 0.03%
- NYY 3 x 2.5 mm2 ( dari panel vac ke motorized valve ) 0.01%
- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat ahu) 0.00%

SISTEM PIPING AHU 3 UNIT


Black Steel pipe Sch. 40 Ø 3" 0.00%
Isolasi Pipa BS 3" 0.00%
Thermometer AHU 0.00%
Automatic Air Venting Ø 1" 0.00%
Pressure Gauge 0.00%
Rubber Flexible joint 3" 0.00%
Ball Valve Ø 1/2" 0.00%
Elbow BS Ø 3" 0.00%
Flange BS Ø 3" 0.00%
Pipa PVC AW Ø 1 1/4" 0.00%
Accesories & material bantu 0.00%

Sub TotalLISTRIK DAN KONTROL 0.32%

Museum Nasional - Pek. Mekanikal HAL 541/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

ADD PEKERJAAN PENAMBAHAN INSTALASI UNTUK


PINDAH OUTDOOR AC 7 UNIT
1 Instalasi Pipa Refrigeran dengan Insulation
- Pipa Liquid dia. 12,7 mm 0.02%
- Pipa Liquid dia. 28,6 mm 0.09%
2 Instalasi Kabel Power
- NYY 4 x 6 mm2 0.02%
- NYY 3 x 2,5 mm2 0.01%
3 Instalasi Kabel Kontrol
- NYM 3 x 2,5 mm2 0.00%
-
4 Seng BJLS
- dia 80" 0.04%
5 Penambahan Dudukan support pipa dan kabel
- dudukan/support 0.02%
6 Materal Bantu Flasing dan Test Tekan 0.00%
7 Cover Grill 0.06%

ADD PEKERJAAN INSTAL AC VRV SANKEN 3 UNIT

1 Instalasi Pipa Refrigeran dengan Insulation


'- Pipa Liquid dia. 12,7 mm 0.01%
'- Pipa Liquid dia. 28,6 mm 0.05%
2 Instalasi Kabel Power
- NYY 4 x 16mm2 0.14%
- NYY 4 x 4 mm2 + NYY 3 x 4 mm2 0.00%
5 Penambahan Dudukan support pipa dan kabel

Museum Nasional - Pek. Mekanikal HAL 542/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- dudukan/support 0.00%
3 Materal Bantu Flasing dan Test Tekan 0.00%
Sub TotalInstalasi AC 0.00

Sub TotLANTAI GROUND & MEZZANINE

IV LANTAI 2

A PERALATAN UTAMA

1 Air Handling Unit (AHU)


Merk :
Kapasita: 40 TR / 480.000 BTU / H 0.22%
: 35 TR / 420.000 BTU / H 0.40%
2 Room Termostat 0.01%
3 Fan
Type : Axial
Merk :
Kapasita: 600 CFM / SP 0,8 WG 0.01%
: 500 CFM / SP 0,8 WG 0.01%
: 350 CFM / SP 0,8 WG 0.01%

4 Fan
Type : Ceiling
Merk :
kapasita: 250 CFM / SP 0,5 WG 0.01%

Museum Nasional - Pek. Mekanikal HAL 543/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotalPERALATAN UTAMA 0.67%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.97%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.03%
- BJLS 60 0.03%
3 Flexible Duct Ø 20 cm 0.05%
Sub TotalDUCTING 1.07%

C DIFFUSER DAN GRILLE

1 Supply Air Diffuser


Bahan : Aluminium
Ukuran : 40 x 40 cm 0.06%
: Ø 40cm Type Round 0.07%
2 Supply Air Diffuser type Slot
Bahan : Aluminium
Ukuran : 120 x 15 cm 0.01%

3 Exhaust Air Grille


Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
Ukuran : - 25 x 25 cm 0.01%
4 Return Air Grille

Museum Nasional - Pek. Mekanikal HAL 544/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Bahan : Aluminium
Ukuran : 50 x 50 cm 0.02%
: Ø 40cm Type Round 0.03%
- 120 x 15 cm Return air diffuser type slot 0.00%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 45 x 30 cm 0.00%
55 x 55 cm 0.00%
50 x 30 cm 0.00%
20 x 15 cm 0.00%
20 x 20 cm 0.00%
60 x 65 cm 0.00%
80 x 50 cm 0.00%
115 x 50 cm 0.00%
130 x 50 cm 0.00%
Sub TotalDIFFUSER DAN GRILLE 0.22%

D PIPA DRAIN
1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 1" 0.00%
floor draØ 2" 0.00%
Sub TotalPIPA DRAIN 0.00%

Museum Nasional - Pek. Mekanikal HAL 545/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

E LISTRIK DAN KONTROL

1 Panel P-AC.2 c/w VSD 0.09%


Penambaha Accessories Komponen Sistem BAS 0.03%
2 Kabel P:
Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.06%
- NYY 3 x 2.5 mm2 0.01%
- NYY 3 x 2.5 mm2 ( dari panel vac ke motorized valve ) 0.01%
- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat ahu) 0.00%

SISTEM PIPING AHU 3 UNIT


Black Steel pipe Sch. 40 Ø 3" 0.00%
Isolasi Pipa BS 3" 0.00%
Thermometer AHU 0.00%
Air Venting Ø 1" 0.00%
Pressure Gauge 0.00%
Rubber Flexible joint 3" 0.00%
Ball Valve Ø 1/2" 0.00%
Elbow BS Ø 3" 0.00%
Flange BS Ø 3" 0.00%
Pipa PVC AW Ø 1 1/4" 0.00%
Accesories & material bantu 0.00%

Sub TotalLISTRIK DAN KONTROL 0.19%

Museum Nasional - Pek. Mekanikal HAL 546/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotLANTAI 2

V LANTAI 3

A PERALATAN UTAMA

1 Air Handling Unit (AHU)


Merk :
Kapasita: 35 TR / 420.000 BTU / H 0.20%
2 Fan Coil Unit (FCU)
Type : Ceilling Mounted Duct
Merk :
Kapasitas
: 10 TR / 120.000 BTU/H 0.12%
: 9 TR / 108.000 BTU/H 0.11%
: 7 TR / 84.000 BTU/H 0.05%
: 6 TR / 72.000 BTU/H 0.04%
: 5 TR / 60.000 BTU/H 0.09%
: 4 TR / 48.000 BTU/H 0.08%
: 3,5 TR / 42.000 BTU/H 0.02%
: 3 TR / 36.000 BTU/H 0.02%
: 2,5 TR / 30.000 BTU/H 0.05%
: 2 TR / 24.000 BTU/H 0.02%
: 1,5 TR / 18.000 BTU/H 0.02%
: 1 TR / 12.000 BTU/H 0.05%
3 Room Termostat 0.06%
4 Fan
Type : Axial
Merk :

Museum Nasional - Pek. Mekanikal HAL 547/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Kapasitas
: 600 CFM / SP 0,8 WG 0.01%
: 500 CFM / SP 0,8 WG 0.02%
: 400 CFM / SP 0,8 WG 0.03%
: 350 CFM / SP 0,8 WG 0.01%
: 250 CFM / SP 0,8 WG 0.01%
: 150 CFM / SP 0,8 WG 0.02%
: 100 CFM / SP 0,8 WG 0.01%

5 Fan
Type : Ceiling
Merk :
Kapasitas
: 250 CFM / SP 0,5 WG 0.01%

Sub TotalPERALATAN UTAMA 1.03%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.88%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.12%
- BJLS 60 0.08%
3 Flexible Duct Ø 20 cm 0.03%
Sub TotalDUCTING 1.11%

C DIFFUSER DAN GRILLE

Museum Nasional - Pek. Mekanikal HAL 548/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Supply Air Diffuser


Bahan : Aluminium
Ukuran : 40 x 40 cm 0.08%
: Ø 40cm Type Round 0.07%
2 Supply Air Diffuser type Slot
Bahan : Aluminium
Ukuran : 120 x 15 cm 0.01%

3 Exhaust Air Grille


Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
25 x 20 cm 0.01%
30 x 25 cm 0.00%
35 x 25 cm 0.00%
25 x 25 cm 0.00%
4 Return Air Grille
Bahan : Aluminium
Ukuran : 50 x 50 cm 0.01%
60 x 60 cm 0.01%
120 x 15 cm 0.00%
: Ø 40cm Type Round 0.02%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 45 x 30 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 549/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

: 60 x 30 cm 0.00%
20 x 30 cm 0.00%
Sub TotalDIFFUSER DAN GRILLE 0.21%

D PIPA DRAIN

1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 1" 0.00%

Pipa Drain
Lengkap dengan fitting Dan Isolasi
Bahan : Pipa PVC kelas AW
: - Ø 3" 0.02%
: - Ø 2" 0.01%
: - Ø 2 1/4" 0.01%
: - Ø 1" 0.02%

floor draØ 2" 0.00%


Sub TotalPIPA DRAIN 0.06%

E LISTRIK DAN KONTROL

1 Panel P-AC.3A c/w VSD 0.09%


Penambaha Accessories Komponen Sistem BAS 0.03%
2 Panel P-AC.3B c/w VSD 0.09%

Museum Nasional - Pek. Mekanikal HAL 550/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Penambaha Accessories Komponen Sistem BAS 0.03%


3 Kabel P:
Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.01%
- NYY 4 x 4mm² + 3 x 4 mm2 0.10%
- NYY 3 x 4 mm2 0.06%
- NYY 3 x 2.5 mm2 0.07%
- NYY 3 x 2.5 mm2 ( dari panel vac ke motorized valve ) 0.10%
- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat AHU) 0.00%
- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat FCU) 0.01%

Relokasi Accesoris FCU dan Pemipaan 0.13%

SISTEM PIPING AHU 3 UNIT


Black Steel pipe Sch. 40 Ø 3" 0.00%
Jacketing Pipa BS 3" 0.00%
Thermometer AHU 0.00%
Air Venting Ø 1" 0.00%
Pressure Gauge 0.00%
Rubber Flexible joint 3" 0.00%
Ball Valve Ø 1/2" 0.00%
Elbow BS Ø 3" 0.00%
Flange BS Ø 3" 0.00%
Pipa PVC AW Ø 1 1/4" 0.00%
Accesories & material bantu 0.00%

SISTEM PIPING FCU 12 UNIT

Museum Nasional - Pek. Mekanikal HAL 551/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Black Steel pipe Sch. 40 Ø 2" 0.02%


Isolasi Pipa BS 2" 0.01%
Black Steel pipe Sch. 40 Ø 1 1/2" 0.02%
Isolasi Pipa BS 1 1/2" 0.01%
Black Steel pipe Sch. 40 Ø 1 1/4" 0.02%
Isolasi Pipa BS 1 1/4" 0.02%
Black Steel pipe Sch. 40 Ø 1" 0.01%
Isolasi Pipa BS 1" 0.01%
Thermometer FCU 0.00%
Pressure Gauge 0.00%
Fleksible Joint Ø 1 1/2" 0.00%
Strainer Ø 1 1/2" 0.00%
Two Way Valve Ø 1 1/2" 0.00%
Gate Valve Ø 1 1/2" 0.00%
Gate Valve Ø 1 1/2" Drat 0.00%
Elbow BS Ø 2" 0.01%
Elbow BS Ø 1 1/2" 0.00%
Elbow BS Ø 1 1/4" 0.01%
Elbow BS Ø 1" 0.00%
Tee BS Ø 1 1/2" Drat 0.00%

Sub TotalLISTRIK DAN KONTROL 0.86%

Sub TotLANTAI 3

VI LANTAI 4

Museum Nasional - Pek. Mekanikal HAL 552/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

A PERALATAN UTAMA

1 Air Handling Unit (AHU)


Merk :
Kapasita: 40 TR / 480.000 BTU / H 0.22%
: 35 TR / 420.000 BTU / H 0.40%
2 Room Termostat 0.01%
3 Fan
Type : Axial
Merk :
Kapasita: 600 CFM / SP 0,8 WG 0.01%
: 500 CFM / SP 0,8 WG 0.01%
: 350 CFM / SP 0,8 WG 0.01%

4 Fan
Type : Ceiling
Merk :
kapasita: 250 CFM / SP 0,5 WG 0.01%

Sub TotalPERALATAN UTAMA 0.67%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 1.10%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.03%

Museum Nasional - Pek. Mekanikal HAL 553/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- BJLS 60 0.02%
3 Flexible Duct Ø 20 cm 0.02%
Sub TotalDUCTING 1.17%

C DIFFUSER DAN GRILLE

1 Supply Air Diffuser


Bahan : Aluminium
Ukuran : 40 x 40 cm 0.06%
: Ø 40cm Type Round 0.05%
2 Supply Air Diffuser type Slot
Bahan : Aluminium
Ukuran : 120 x 15 cm 0.01%

3 Exhaust Air Grille


Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
30 x 25 cm 0.00%
35 x 25 cm 0.00%
25 x 25 cm 0.00%
4 Return Air Grille
Bahan : Aluminium
Ukuran : 50 x 50 cm 0.02%
120 x 15 cm 0.00%
: Ø 40cm Type Round 0.02%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 554/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 45 x 30 cm 0.00%
: 50 x 30 cm 0.00%
: 55 x 55 cm 0.00%
20 x 15 cm 0.00%
20 x 20 cm 0.00%
80 x 50 cm 0.00%
115 x 50 cm 0.00%
130 x 50 cm 0.00%

Sub TotalDIFFUSER DAN GRILLE 0.19%

D PIPA DRAIN

1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 1" 0.00%
floor draØ 2" 0.00%
Sub TotalPIPA DRAIN 0.00%

E LISTRIK DAN KONTROL

1 Panel P-AC.4 c/w VSD 0.09%


Penambaha Accessories Komponen Sistem BAS 0.03%
2 Kabel P:

Museum Nasional - Pek. Mekanikal HAL 555/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.06%


- NYY 3 x 2.5 mm2 0.01%
- NYY 3 x 2.5 mm2 ( dari panel vac ke motorized valve ) 0.01%
- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat AHU) 0.00%

SISTEM PIPING AHU 3 UNIT


Black Steel pipe Sch. 40 Ø 3" 0.00%
Jacketing Pipa BS 3" 0.00%
Thermometer AHU 0.00%
Air Venting Ø 1" 0.00%
Pressure Gauge 0.00%
Rubber Flexible joint 3" 0.00%
Ball Valve Ø 1/2" 0.00%
Elbow BS Ø 3" 0.00%
Flange BS Ø 3" 0.00%
Pipa PVC AW Ø 1 1/4" 0.00%
Accesories & material bantu 0.00%

Sub TotalLISTRIK DAN KONTROL 0.19%

Sub TotLANTAI 4

VII LANTAI 5

A PERALATAN UTAMA

1 Air Handling Unit (AHU)

Museum Nasional - Pek. Mekanikal HAL 556/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Merk :
Kapasita: 40 TR / 480.000 BTU / H 0.22%
: 35 TR / 420.000 BTU / H 0.40%
2 Room Termostat 0.01%
3 Fan
Type : Axial
Merk :
Kapasita: 600 CFM / SP 0,8 WG 0.01%
: 500 CFM / SP 0,8 WG 0.01%
: 350 CFM / SP 0,8 WG 0.01%

4 Fan
Type : Ceiling
Merk :
kapasita: 250 CFM / SP 0,5 WG 0.01%

Sub TotalPERALATAN UTAMA 0.67%

B DUCTING

1 Ducting Supply & Return


Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 1.11%
2 Ducting Exhaus dan Fresh Air
Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 50 0.03%
- BJLS 60 0.02%
3 Flexible Duct Ø 20 cm 0.02%

Museum Nasional - Pek. Mekanikal HAL 557/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotalDUCTING 1.18%

C DIFFUSER DAN GRILLE

1 Supply Air Diffuser


Bahan : Aluminium
Ukuran : 40 x 40 cm 0.06%
: Ø 40cm Type Round 0.07%
2 Supply Air Diffuser type Slot
Bahan : Aluminium
Ukuran : 120 x 15 cm 0.01%
3 Exhaust Air Grille
Bahan : Aluminium
Ukuran : 20 x 20 cm 0.00%
30 x 25 cm 0.00%
25 x 25 cm 0.01%
4 Return Air Grille
Bahan : Aluminium
Ukuran : 50 x 50 cm 0.02%
120 x 15 cm 0.00%
: Ø 40cm Type Round 0.02%
5 Supply Air Grille + VD
Bahan : Aluminium
Ukuran : 50 x 40 cm 0.00%
: 30 x 30 cm 0.00%
6 Volume Damper
Bahan : Aluminium
Ukuran : 45 x 30 cm 0.00%

Museum Nasional - Pek. Mekanikal HAL 558/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

: 50 x 30 cm 0.00%
: 55 x 55 cm 0.00%
20 x 15 cm 0.00%
20 x 20 cm 0.00%
100 x 35 cm 0.00%
125 x 35 cm 0.00%
145 x 40 cm 0.00%
185 x 35 cm 0.00%
Sub TotalDIFFUSER DAN GRILLE 0.21%

D PIPA DRAIN

1 Pipa Drain
Lengkap dengan fitting tanpa isolasi
Bahan : Pipa PVC kelas AW
Ukuran : - Ø 1" 0.00%
floor draØ 2" 0.00%

Sub TotalPIPA DRAIN 0.00%

E LISTRIK DAN KONTROL

1 Panel P-AC.5 c/w VSD 0.09%


Penambaha Accessories Komponen Sistem BAS 0.03%
2 Kabel P:
Kabel P- NYY 4 x 6mm² + 3 x 6 mm2 0.06%
- NYY 3 x 2.5 mm2 0.01%
- NYY 3 x 2.5 mm2 ( dari panel vac ke motorized valve ) 0.01%

Museum Nasional - Pek. Mekanikal HAL 559/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- NYFHY 3 x 1.5 mm2 (dri motorized valve ke thermostat AHU) 0.00%


SISTEM PIPING AHU 3 UNIT
Black Steel pipe Sch. 40 Ø 3" 0.00%
Jacketing Pipa BS 3" 0.00%
Thermometer AHU 0.00%
Air Venting Ø 1" 0.00%
Pressure Gauge 0.00%
Rubber Flexible joint 3" 0.00%
Ball Valve Ø 1/2" 0.00%
Elbow BS Ø 3" 0.00%
Flange BS Ø 3" 0.00%
Pipa PVC AW Ø 1 1/4" 0.00%
Accesories & material bantu 0.00%

Sub TotalLISTRIK DAN KONTROL 0.19%

Sub TotLANTAI 5

VIII LANTAI 7

A DUCTING
Ducting Supply & Return
Bahan Polyisocyanurate/PIR tebal 20 mm density 52 kg/m3 0.01%

1 Ducting Exhaus dan Fresh Air


Tanpa isolasi lengkap dengan hanger, dll.
Bahan D - BJLS 70 0.05%

Museum Nasional - Pek. Mekanikal HAL 560/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

B LISTRIK DAN KONTROL


1 Panel Pembagi dari TOB 0.05%

DIFFUSER AND GRILLE


Bahan : Aliminium
Ukuran : 100 x 100 cm 0.01%

Sub TotLANTAI 7 0.12%

IX LANTAI ATAP

A LISTRIK DAN KONTROL


Kabel Power dari LVMDP ke Panel Chiller
- NYY 8 x 240 mm2 2.68%

Sub TotLANTAI ATAP 2.68%

X TESTING & COMMISSIONING 0.00%


Test running unit AHU dan FCU tidak terkait unit terpasang tahap NK 0.01%
Sub TotTESTING & COMMISSIONING 0.01%
Sub Total
<4B> PEKERJAAN INSTALASI PLUMBING

I PEKERJAAN INSTALASI PEMIPAAN AIR BERSIH

Museum Nasional - Pek. Mekanikal HAL 561/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

A PEMIPAAN TOILET PRIA & WANITA , R WUDHU & PANTRY LANTAI


BASEMENT-2 S/D LANTAI 5.
(dihitung mulai stop kran pada pipa tegak dalam shaft s/d titik kran di setiap
toilet)

A1 LANTAI BASEMENT 2

1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 1" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%

2 Perlengkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 1 1/2" 0.00%
- Ø 1 1/4" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%

Sub TotalLANTAI BASEMENT 2 0.02%

A2 LANTAI BASEMENT-1

Museum Nasional - Pek. Mekanikal HAL 562/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 2 1/2" 0.01%
- Ø 2" 0.00%
- Ø 1 1/2" 0.00%
- Ø 1 1/4" 0.00%
- Ø 1" 0.01%
- Ø ¾" 0.00%
- Ø ½" 0.01%
Pipa Air Panas
PPR-PN 20, lengkap dengan material bantu seal tape, pengecatan, hanger, clamps, dll.

- Ø ¾" 0.00%
- Ø ½" 0.00%

Perlen
2
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 2 1/2" 0.00%
- Ø 2" 0.00%
- Ø 1 1/2" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%

Museum Nasional - Pek. Mekanikal HAL 563/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Electric Water Heater Kap: 30 liter 0.02%

Sub TotalLANTAI BASEMENT-1 0.06%

A3 LANTAI 1 & MEZZANINE

1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%
2 Pipa Air Panas
PPR-PN 20, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø ¾" 0.00%
- Ø ½" 0.00%
3 Fittings
Elbows 90°, Elbows 45°, T-Y 90°, Long R-T-Y 90°, Long R-W-T-Y 90°, Y
45°, Socket, Socket Drat dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops. 0.00%

Perlen
4
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 1½" 0.00%
- Ø 1¼" 0.00%

Museum Nasional - Pek. Mekanikal HAL 564/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 1" 0.00%
- Ø ¾" 0.00%
5 Electric Water Heater Kap: 30 liter 0.02%
Sub TotalLANTAI 1 & MEZZANINE 0.04%

A4 LANTAI 2

1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 2" 0.01%
- Ø 1½" 0.01%
- Ø 1¼" 0.00%
- Ø 1" 0.01%
- Ø ¾" 0.00%
- Ø ½" 0.01%
2 Fittings
Elbows 90°, Elbows 45°, T-Y 90°, Long R-T-Y 90°, Long R-W-T-Y 90°, Y
45°, Socket, Socket Drat dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops. 0.01%

Perlen
3
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 11/2" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%

Museum Nasional - Pek. Mekanikal HAL 565/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotalLANTAI 2 0.06%

A5 LANTAI 3
1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 2" 0.01%
- Ø 1½" 0.02%
- Ø 1¼" 0.00%
- Ø 1" 0.01%
- Ø ¾" 0.01%
- Ø ½" 0.01%
2 Fittings
Elbows 90°, Elbows 45°, T-Y 90°, Long R-T-Y 90°, Long R-W-T-Y 90°, Y
45°, Socket, Socket Drat dalam, Socket Drat Luar, Reducing Socket, Siphon
0.01%
dan Dops.
Perlen
3
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 11/2" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.01%
- Ø ¾" 0.00%
- Ø ½" 0.00%

Sub TotalLANTAI 3 0.08%

Museum Nasional - Pek. Mekanikal HAL 566/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

A6 LANTAI 4
1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 1½" 0.00%
- Ø 1¼" 0.01%
- Ø 1" 0.01%
- Ø ¾" 0.00%
- Ø ½" 0.01%
2 Fittings
Elbows 90°, Elbows 45°, T-Y 90°, Long R-T-Y 90°, Long R-W-T-Y 90°, Y
45°, Socket, Socket Drat dalam, Socket Drat Luar, Reducing Socket, Siphon
0.01%
dan Dops.
Perlen
3
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 11/2" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%

Sub TotalLANTAI 4 0.04%

A7 LANTAI 5

1 Pipa
PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.

Museum Nasional - Pek. Mekanikal HAL 567/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

PPR-PN 10, lengkap dengan material bantu seal tape, pengecatan, hanger,
clamps, dll.
- Ø 1½" 0.00%
- Ø 1¼" 0.01%
- Ø 1" 0.01%
- Ø ¾" 0.00%
- Ø ½" 0.01%
2 Fittings
Elbows 90°, Elbows 45°, T-Y 90°, Long R-T-Y 90°, Long R-W-T-Y 90°, Y
45°, Socket, Socket Drat dalam, Socket Drat Luar, Reducing Socket, Siphon
0.01%
dan Dops.
Perlen
3
gkapan
Gate Valve, Screwed Bronze, kuningan (10 kg/cm2)
- Ø 11/2" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
- Ø ¾" 0.00%
- Ø ½" 0.00%

Sub TotalLANTAI 5 0.04%

PEMIPAAN TOILET PRIA & WANITA , R WUDHU & PANTRY


SUB TOTAL
LANTAI BASEMENT-2 S/D LANTAI 5.

TOTAL PEKERJAAN INSTALASI PEMIPAAN AIR BERSIH

II PEKERJAAN INSTALASI PEMIPAAN AIR KOTOR, AIR KOTORAN DAN


VENT.

Museum Nasional - Pek. Mekanikal HAL 568/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

A PEMIPAAN TOILET PRIA & WANITA , R WUDHU & PANTRY LANTAI


BASEMENT 2 S/D LANTAI 5.

dihitung mulai dari toilet s/d cabangan pipa tegak dalam shaft bangunan)

A1 LANTAI BASEMENT-2

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 2" 0.00%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
- Ø 4" 0.01%
- Ø 3" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.00%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%
- Floor clean out Ø 2" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 4" 0.00%
Sub TotalLANTAI BASEMENT-2 0.03%

Museum Nasional - Pek. Mekanikal HAL 569/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

A2 LANTAI BASEMENT-1

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 2" 0.00%
- Ø 1½" 0.01%
- Ø 1¼" 0.00%
- Ø 4" 0.02%
- Ø 3" 0.01%
1.a Penambahan Drain Area Sanken
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 2½" 0.00%
- Ø 3" 0.00%
1.b Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.01%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
1.c Perlengkapan
- Floor Drain Ø 2" 0.00%

2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.00%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.

Museum Nasional - Pek. Mekanikal HAL 570/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º,
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor Drain Ø 2" 0.02%
- Floor clean out Ø 2" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 4" 0.01%
- Roof Drain Ø 4" (Area Inner Court Basement 1) 0.00%

Sub TotalLANTAI BASEMENT-1 0.10%

A3 LANTAI 1 & MEZZANINE

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 6" 0.02%
- Ø 4" 0.03%
- Ø 3" 0.01%
- Ø 2" 0.01%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.02%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%

Museum Nasional - Pek. Mekanikal HAL 571/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Floor Drain Ø 4" 0.00%


- Floor clean out Ø 4" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 2" 0.00%
- Floor clean out Ø 6" 0.01%
Sub TotalLANTAI 1 & MEZZANINE 0.12%

LANTA
A4
I2

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 4" 0.01%
- Ø 3" 0.00%
- Ø 2" 0.01%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.00%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%
- Floor clean out Ø 4" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 2" 0.00%

Museum Nasional - Pek. Mekanikal HAL 572/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Floor clean out Ø 6" 0.00%


Sub TotalLANTAI 2 0.05%

LANTA
A5
I3

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 4" 0.01%
- Ø 3" 0.01%
- Ø 2" 0.01%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.01%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%
- Floor clean out Ø 4" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 2" 0.00%

Sub TotalLANTAI 3 0.06%

Museum Nasional - Pek. Mekanikal HAL 573/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

LANTA
A6
I4

1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.
- Ø 4" 0.01%
- Ø 3" 0.00%
- Ø 2" 0.01%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.01%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%
- Floor clean out Ø 4" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 2" 0.00%

Sub TotalLANTAI 4 0.05%

LANTA
A7
I5
1 Pipa
PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,
pengecatan, hanger, clamps, dll.

Museum Nasional - Pek. Mekanikal HAL 574/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

PVC kelas 10 kg/cm2, lengkap dengan material bantu, solvent cement,


pengecatan, hanger, clamps, dll.
- Ø 4" 0.01%
- Ø 3" 0.00%
- Ø 2" 0.01%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
2 Fittings
PVC T-S joint injection moulded, kelas air buangan.
Elbows 90º, elbow 45º, T-Y 90º, Long R-T-Y 90º, Long R-W-T-Y 90º, Y 45º, 0.01%
Socket, Socket Drat Dalam, Socket Drat Luar, Reducing Socket, Siphon
dan Dops.
3 Perlengkapan
- Floor drain Ø 2" 0.01%
- Floor clean out Ø 4" 0.00%
- Floor clean out Ø 3" 0.00%
- Floor clean out Ø 2" 0.00%
Sub TotalLANTAI 5 0.05%

PEMIPAAN TOILET PRIA & WANITA , R WUDHU & PANTRY


Sub Total
LANTAI BASEMENT 2 S/D LANTAI 5.

PEKERJAAN INSTALASI PEMIPAAN AIR KOTOR, AIR


TOTAL
KOTORAN DAN VENT.

I PEKERJAAN POMPA SUMPIT


1 Pompa Sumpit Sewage c/w QDC 0.00%
Type : Submersible
Kapasit : 275 ltr / menit

Museum Nasional - Pek. Mekanikal HAL 575/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Head : 15 m
2 Pompa Sumpit Sewage c/w QDC 0.18%
Type : Submersible
Kapasit : 150 ltr / menit
Head : 15 m
3 Panel kontrol pompa sumpit 0.05%
Gate Valve Ø 2" 0.01%
Check Valve Ø 2" 0.01%
Pemipaan dipompa 0.03%

TOTAL PEKERJAAN POMPA SUMPIT 0.22%

<4C> PEKERJAAN INSTALASI FIRE HYDRANT

I PEKERJAAN INSTALASI PEMIPAAN

A LANTAI BASEMENT 2

1 Pipa
Black Steel pipe (Schedule 40) :
- Black Steel pipe Sch. 40 Ø 2½" 0.14%
2 Fittings
Welded joint, flanged & screwed 0.02%
3 Perlengkapan
a Gate Valve flanged cast iron (16 kg/cm2)
- Ø 21/2" 0.02%

Museum Nasional - Pek. Mekanikal HAL 576/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub TotLANTAI BASEMENT 2 0.18%

B PEMIPAAN TEGAK S/D R.POMPA

1 Pipa
Black Steel pipe (Schedule 40) :
- Black Steel pipe Sch. 40 Ø 6" (Pipa Tegak) 0.03%
- Black Steel pipe Sch. 40 Ø 6" (Pipa Ke Ruang Pompa) 0.31%
- Black Steel pipe Sch. 40 Ø 4" (Pipa Tegak) 0.03%
- Black Steel pipe Sch. 40 Ø 1" 0.00%
- Black Steel pipe Sch. 40 Ø ¾" 0.00%
2 Fittings
Welded Joint , flanged & Screwed 0.17%
3 Perlengkapan
a Gate Valve flanged cast iron (16 kg/cm2)
- Ø 6" 0.02%
b Gate Valve Screwed bronze atau kuningan (16 kg/cm2)
- Ø 1" 0.01%
c Three way valve katup 3 arah screwed bronze atau kuningan (16 kg/cm2)
Ø ¾" 0.00%
d Automatic air release valve Ø 1" + gate valve Ø 1" 0.06%
e Pressure gauge / manometer 0.01%

Sub TotPEMIPAAN TEGAK S/D R.POMPA 0.65%

C PEMIPAAN LUAR BANGUNAN

Museum Nasional - Pek. Mekanikal HAL 577/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Pipa
Black steel pipe (Schedule 40) :
- Black steel pipe Sch. 40 Ø 4" 0.34%
2 Fittings
Welded joint, flanged & screwed 0.07%
3 Perlengkapan
a Stop kran flanged cast iron (16 kg/cm2)
- Ø 4" 0.06%
b Galian pipa c/w pasir urug, bata pelindung, dll. 0.01%
Sub TotPEMIPAAN LUAR BANGUNAN 0.48%

TOTAL PEKERJAAN INSTALASI PEMIPAAN

II PEKERJAAN PERALATAN HYDRANT

A FIRE HYDRANT BOX


Fire hydrant box (pintu modifikasi dengan kaca)
Terdiri d: Kabinet
Bahan : Steel plated T = 2 mm
Warna : Merah, lengkap dengan tulisan
"FIRE HYDRANT" & lubang pipa Ø 1½" ( sesuai
gambar rencana )
( sesuai gambar rencana )
lengkap dengan :
- Hose Ø 1½"
* Panjang = 100 ft - 30 m (min)
* Bahan = cotton polyester rubber lined

Museum Nasional - Pek. Mekanikal HAL 578/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

* Angle valve Ø 1½" dan Ø 2½"


- Rack
- Pondasi batu bata

A1 LANTAI BASEMENT 2

1 Indoor type tanpa landing valve (Type HB) 0.08%


uk. 120 x 110 x 18 cm (sesuai gambar detail)
2 Landing Valve Ø 2½" 0.02%

Sub TotFIRE HYDRANT BOX 0.10%

B LUAR BANGUNAN

1 Fire hydrant box (pintu modifikasi kaca) 0.05%


dipasang dekat pillar hydrant
Bahan : Steel plated tebal 2 mm
Type : Outdoor type (95 x 66 x 20 cm)
Terdiri d: Kabinet
Warna : Merah, lengkap dengan tulisan " FIRE
HYDRANT" & lubang pipa Ø 1½"
(sesuai gambar rencana)
Lengkap dengan
* Hose Ø 2½"
* Fire hose Ø 2½" x 20 m
* Rack
* Pondasi batu bata
2 Fire brigade connection S.7.A 0.07%

Museum Nasional - Pek. Mekanikal HAL 579/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Bahan : Cast Iron


Type : Siemesse/two way pillar type,
hydrant pillar short type
Ukuran : 100A x65Ax65A.
lengkap dengan :
- Coupling Ø 2½" yg sesuai standard Dinas Kebakaran
- Check valve
- Pondasi batu bata
3 Fire Hydrant Pillar H - 14 AP (tapping dari PAM) 0.01%
Bahan : Cast Iron
Type : Two way pillar type, hydrant pillar
short type.
Ukuran : 100A x65Ax65A.
lengkap dengan :
- Coupling Ø 2½" yg sesuai standard Dinas Kebakaran
- Check valve
- Pondasi batu bata
4 Fire Hydrant Pillar H - 13 AP (supply dari pompa) 0.05%
Bahan : Cast Iron
Type : Siamesse / Two way pillar type, hydrant
pillar short type.
Ukuran : 100A x65Ax65A.
lengkap dengan :
- Coupling Ø 2½" yg sesuai standard Dinas Kebakaran
- Check valve
- Pondasi batu bata
Sub TotLUAR BANGUNAN 0.17%

Museum Nasional - Pek. Mekanikal HAL 580/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

TOTAL PEKERJAAN PERALATAN HYDRANT

III PEKERJAAN POMPA PEMADAM KEBAKARAN

1 Pipa
Black Steel pipe (Sch. 40) lengkap dengan material bantu al. Seal tape
pengelasan, pengecetan, hanger, clamps, blok beton untuk dudukan pipa,
dll.
- Ø 10" (header) 0.02%
- Ø 8" 0.00%
- Ø 6" 0.06%
- Ø 2" 0.00%
- Ø ½" 0.00%
2 Fittings

Welded Joint dan Screwed elbows, reducing tee, reducing socket, tee,
socket, hanger, double nipple, plugs.
0.02%
3 Perlengkapan
a Gate Valve Flanged cast iron 16 kg/cm2
- Ø 6" 0.09%
- Ø 2" 0.01%
b Gate Valve screwed bronze atau kuningan 16 Kg/cm2
- Ø ½" 0.01%
c Globe valve screwed bronze atau kuningan 16 Kg/cm2
- Ø ½" 0.00%
d Three way valve 1 katup 3 arah screwed bronze atau kuningan
12 Kg/c - Ø ½" 0.00%
e Check Valve flanged cast iron 16 kg/cm2 (anti water hamer)

Museum Nasional - Pek. Mekanikal HAL 581/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 6" 0.04%
- Ø 2" 0.00%
f Check valve screwed bronze 16 Kg/cm2
- Ø ½" 0.00%
g Flexible Joint flanged 16 kg/cm2
- Ø 8" 0.00%
- Ø 6" 0.02%
- Ø 2" 0.00%
h Y Strainer flanged cast iron 16 kg/cm2
- Ø 6" 0.03%
- Ø 2" 0.00%
i Foot valve + saringan flanged stainless steel
- Ø 6" 0.02%
- Ø 2" 0.00%
j Pressure gauge pada pipa tekan pompa 0.00%
k Vacuum gauge pada pipa hisap pompa 0.00%
l Pressure switch pada pipa tekan pompa 0.02%
m Flow meter Ø 6" 0.02%
n Safety valve Ø 6" 0.12%
o Pressure Reducing Valve ( PRV ) Ø 6" 0.39%
Pressure Reducing Valve ( PRV ) Ø 4" 0.07%

Gate Valve Flaged Cast Iron ( 16Kg/cm2)


- Ø 6" 0.41%
- Ø 4" 0.02%
Y Strainer Flanged Cast Iron (16K/cm2)
- Ø 6" 0.01%

Museum Nasional - Pek. Mekanikal HAL 582/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 4" 0.00%

4 Pompa - Pompa
a Main Fire Pump 0.00%
Type : Vertical Turbine (NFPA - 20)
Kapasit : 170 m3/jam (750 US GPM)
Total he: 135 m
Putaran: 2950 rpm
Power :
Merk :
Lengkap dengan sistem kontrolnya NFPA - 20
b Fire Pump Cadangan 0.00%
Type : Vertical Turbine (NFPA - 20)
Kapasit : 170 m3/jam (750 US GPM)
Total he: 135 m
Putaran: 2950 rpm
Power :
Merk :
Lengkap: - Diesel Enginee
- Silincer
- Exhaust system c/w air filter
- Daily tank, kap. 6 jam operasi
- Automatic battery charger
- Sistem kontrol NFPA - 20
c Jockey pump 0.14%
Type : Vertical Multi Stage
Kapasit : 2,3 m3/jam (10 US GPM)
Total he: 145 m

Museum Nasional - Pek. Mekanikal HAL 583/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Putaran: 2900 rpm


Power :
Merk :
Lengkap dengan sistem kontrolnya. NFPA - 20

2 Pompa - Pompa
a Main Fire Pump 1.34%
Type : Horizontal Split Case (NFPA - 20)
Kapasit : 170 m3/jam (750 US GPM)
Total he: 135 m
Putaran: 2950 rpm
Power :
Merk :
Lengkap dengan sistem kontrolnya NFPA - 20
b Fire Pump Cadangan 1.65%
Type : Horizontal Split Case (NFPA - 20)
Kapasit : 170 m3/jam (750 US GPM)
Total he: 135 m
Putaran: 2950 rpm
Power :
Merk :
Lengkap: - Diesel Enginee
- Silincer
- Exhaust system c/w air filter
- Daily tank, kap. 6 jam operasi
- Automatic battery charger
- Sistem kontrol NFPA - 20

Museum Nasional - Pek. Mekanikal HAL 584/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

d Panel Power pompa lengkap dengan pengabelan dari pompa ke panel, 0.06%
termasuk automatic electrode water level control untuk pompa pemadan
kebakaran.
e Pondasi pompa beton bertulang, c/w peredam getaran 0.01%
TOTAL PEKERJAAN POMPA PEMADAM KEBAKARAN 4.59%

IV PEKERJAAN FIRE EXTINGUISHER & GAS HALOTRON

A LANTAI BASEMENT 2

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.02%


Sub TotLANTAI BASEMENT 2 0.02%

B LANTAI BASEMENT 1

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.03%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.01%
3 Fire Extinguisher FOAM kapasitas 25 kg + trolly 0.07%
Sub TotLANTAI BASEMENT 1 0.10%

C LANTAI 1 & MEZZANINE

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.03%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.00%
3 Fire Extinguisher FOAM kapasitas 25 kg + trolly 0.09%
4 Gas Halotron Kap: 5 kg 0.03%
Sub TotLANTAI 1 & MEZZANINE 0.16%

Museum Nasional - Pek. Mekanikal HAL 585/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

D LANTAI 2

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.02%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.01%
3 Gas Halotron Kap: 5 kg 0.03%
Sub TotLANTAI 2 0.06%

E LANTAI 3

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.04%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.01%
Sub TotLANTAI 3 0.05%

F LANTAI 4

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.03%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.01%
Sub TotLANTAI 4 0.03%

LANTA
G
I5

1 Fire Extinguisher chemical dry powder kap. 3 kg 0.04%


2 Fire Extinguisher chemical dry powder kap. 5 kg 0.01%
Sub TotLANTAI 5 0.04%

Museum Nasional - Pek. Mekanikal HAL 586/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

TOTAL PEKERJAAN FIRE EXTINGUISHER & GAS HALOTRON

V PEKERJAAN TESTING

1 Testing instalasi fire hydrant dan pembilasan 0.00%

Testing system yang disaksikan oleh Dinas Pemadam Kebakaran Pemda


2
Setempat dan mendapat sertifikat
0.00%
TOTAL PEKERJAAN TESTING 0.00%
<4D> PEKERJAAN INSTALASI FIRE SPRINKLER

I
PEKERJAAN INSTALASI PEMIPAAN DISTRIBUSI FIRE SPRINKLER

A LANTAI BASEMENT 2

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu , seal tape,
pengelasan, pengecetan, hanger, clamps, Sparing, dll.
- Ø 4" 0.10%
- Ø 3" 0.14%
- Ø 21/2" 0.05%
- Ø 2" 0.07%
- Ø 1½" 0.04%
- Ø 1¼" 0.03%
- Ø 1" 0.17%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs.

Museum Nasional - Pek. Mekanikal HAL 587/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.12%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.00%
- Upright Ø 15 mm 0.09%
c Flow switch 0.01%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari :
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI BASEMENT 2 0.86%

B LANTAI BASEMENT 1

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecetan, hanger, clamps, sparing, dll
- Ø 4" 0.12%
- Ø 3" 0.04%
- Ø 2½" 0.04%
- Ø 2" 0.03%

Museum Nasional - Pek. Mekanikal HAL 588/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 1½" 0.02%
- Ø 1¼" 0.02%
- Ø 1" 0.10%
2 Fittings

Welded joint dan Screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs.
0.08%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.03%
- Upright Ø 15 mm 0.02%
- Wall Ø 15 mm 0.00%
c Flow switch 0.01%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI BASEMENT 1 0.55%

C LANTAI 1 & MEZZANINE

Museum Nasional - Pek. Mekanikal HAL 589/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 4" 0.14%
- Ø 3" 0.02%
- Ø 2½" 0.02%
- Ø 2" 0.05%
- Ø 1½" 0.02%
- Ø 1¼" 0.02%
- Ø 1" 0.09%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.07%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.04%
- Upright Ø 15 mm 0.03%
- Wall Ø 15 mm 0.00%
c Flow switch 0.01%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah

Museum Nasional - Pek. Mekanikal HAL 590/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI 1 & MEZZANINE 0.54%

D LANTAI 2

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 4" 0.09%
- Ø 3" 0.02%
- Ø 2½" 0.04%
- Ø 2" 0.07%
- Ø 1½" 0.03%
- Ø 1¼" 0.02%
- Ø 1" 0.11%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.08%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.04%
- Upright Ø 15 mm 0.04%
- Wall Ø 15 mm 0.00%
c Flow switch 0.01%

Museum Nasional - Pek. Mekanikal HAL 591/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

d Pressure gauge 0.00%


e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI 2 0.58%

E LANTAI 3

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 4" 0.00%
- Ø 3" 0.00%
- Ø 2½" 0.00%
- Ø 2" 0.00%
- Ø 1½" 0.00%
- Ø 1¼" 0.00%
- Ø 1" 0.00%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.00%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.00%

Museum Nasional - Pek. Mekanikal HAL 592/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 1" (screwed) 0.00%


b Sprinkler head
- Pendant Ø 15 mm 0.00%
- Upright Ø 15 mm 0.00%
- Wall Ø 15 mm 0.00%
c Flow switch 0.00%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.00%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI 3 0.00%

F LANTAI 4

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 4" 0.09%
- Ø 3" 0.02%
- Ø 2½" 0.01%
- Ø 2" 0.03%
- Ø 1½" 0.03%
- Ø 1¼" 0.02%
- Ø 1" 0.07%

Museum Nasional - Pek. Mekanikal HAL 593/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.06%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.03%
- Upright Ø 15 mm 0.03%
- Wall Ø 15 mm 0.00%
c Flow switch 0.01%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI 4 0.44%

G LANTAI 5

1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 4" 0.08%

Museum Nasional - Pek. Mekanikal HAL 594/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

- Ø 3" 0.03%
- Ø 2½" 0.03%
- Ø 2" 0.05%
- Ø 1½" 0.03%
- Ø 1¼" 0.02%
- Ø 1" 0.10%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.07%
3 Perlengkapan
a Gate valve (16 kg/cm2) :
- Ø 4" (flanged) 0.01%
- Ø 1" (screwed) 0.00%
b Sprinkler head
- Pendant Ø 15 mm 0.04%
- Upright Ø 15 mm 0.04%
- Wall Ø 15 mm 0.00%
c Flow switch 0.01%
d Pressure gauge 0.00%
e Accessories untuk penyempurnaan system (BCV) terdiri dari:
- Sectional drain valve Ø 2" = 1 buah
- Test valve Ø 2" = 1 buah 0.02%
- Sight glass Ø 2" = 1 buah
- Union + orifice = 1 buah
(dipasang pada setiap lantai sesuai gambar detail)

Sub Total LANTAI 5 0.54%

Museum Nasional - Pek. Mekanikal HAL 595/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

H LANTAI 7
1 Pipa
Black Steel Pipe (Sch.40) lengkap dengan material bantu, seal tape,
pengelasan, pengecatan, hanger, clamps, sparing, dll.
- Ø 2" 0.07%
- Ø 1½" 0.04%
- Ø 1" 0.10%
2 Fittings
Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, plugs. 0.02%
3 Perlengkapan
a Sprinkler head
- Pendant Ø 15 mm 0.24%
- Upright Ø 15 mm 0.25%

Sub Total LANTAI 7 0.72%

PEKERJAAN INSTALASI PEMIPAAN DISTRIBUSI FIRE


TOTAL
SPRINKLER

II PEKERJAAN INSTALASI PEMIPAAN TEGAK DALAM SHAFT s/d R.


POMPA

(dihitung mulai setelah stop kran pada pipa tekan pompa atau PRV s/d
automatic air release valve pada ujung pipa tegak dalam shaft lantai atap)

1 Pipa
Black steel pipe (sch. 40)

Museum Nasional - Pek. Mekanikal HAL 596/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

lengkap dengan material bantu, seal tape, pengelasan, pengecatan,


hanger, clamps, sparing, dll.
- Ø 6" (pipa tegak) 0.14%
- Ø 6" ke R.Pompa 0.09%
- Ø 3" (pipa drain) 0.04%
- Ø 1" 0.00%
- Ø ¾" 0.00%
2 Fittings

Welded joint dan screwed elbows, reducing tee, reducing socket, tee,
socket, flanged, double nipple, watermour, dops/plugs.
0.10%
3 Perlengkapan
a Main control valve c/w accessories
- Ø 6" 0.18%
b Automatic air release valve Ø 1" 0.02%
c Pressure gauge / manometer 0.00%
d Gate valve flanged cast iron (16 kg/cm2)
- Ø 6" 0.05%
- Ø 1" 0.00%
e Three Way Valve Ø 1" 0.01%
f Sprinkler head cadangan
- Pendant Ø 15 mm 0.00%
- Upright Ø 15 mm 0.00%
g Box sprinkler, u/ penyimpanan sprinkler head cadangan 0.00%
4 Pressure reducing valve Ø 6" 0.10%
PEKERJAAN INSTALASI PEMIPAAN TEGAK DALAM
TOTAL 0.73%
SHAFT s/d R. POMPA

Museum Nasional - Pek. Mekanikal HAL 597/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

III PEKERJAAN TESTING


1 Testing instalasi type Sprinkler dan pembilasan 0.00%
2 Testing system yang disaksikan oleh Dinas Pemadam Kebakaran Pemda 0.00%
Setempat dan mendapatkan sertifikat
TOTAL PEKERJAAN TESTING 0.00%

<4E> PEKERJAAN PENYAMBUNGAN PDAM

1 Pekerjaan Penyambungan PDAM 0.00%

TOTAL PEKERJAAN PENYAMBUNGAN PDAM 0.00%

TOTAL MEKANIKAL 33.72%

Museum Nasional - Pek. Mekanikal HAL 598/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.19% 0.00% 0.00% 100.00%

100.00% 0.47% 0.00% 0.00% 100.00%


100.00% 1.16% 0.00% 0.00% 100.00%

1.92% 0.00%

Museum Nasional - Pek. Mekanikal HAL 599/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.09% 0.00%

Museum Nasional - Pek. Mekanikal HAL 600/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.15% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.19% 0.00%

90.00% 1.16% 0.00% 0.00% 90.00%

Museum Nasional - Pek. Mekanikal HAL 601/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

1.36% 0.00%

100.00% 0.74% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.16% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 602/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%

1.24% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.13% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 603/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 604/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.24% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.04% 0.00%

100.00% 0.18% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

93.00% 0.00% 0.00% 0.00% 93.00%


93.00% 0.00% 0.00% 0.00% 93.00%

36.00% 0.11% 0.00% 0.00% 36.00%

Museum Nasional - Pek. Mekanikal HAL 605/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.32% 0.00%

100.00% 0.17% 0.00% 0.00% 100.00%


100.00% 0.15% 0.00% 0.00% 100.00%
100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 606/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

0.64% 0.00%

100.00% 0.82% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

1.02% 0.00%

Museum Nasional - Pek. Mekanikal HAL 607/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.14% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 608/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

0.22% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.01% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 609/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.32% 0.00%

Museum Nasional - Pek. Mekanikal HAL 610/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.14% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 611/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.00 0.00

100.00% 0.22% 0.00% 0.00% 100.00%


100.00% 0.40% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 612/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.67% 0.00%

100.00% 0.97% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
1.07% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 613/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.22% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.00% 0.00%

Museum Nasional - Pek. Mekanikal HAL 614/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.19% 0.00%

Museum Nasional - Pek. Mekanikal HAL 615/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.20% 0.00% 0.00% 100.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.11% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 616/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

1.03% 0.00%

100.00% 0.88% 0.00% 0.00% 100.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
1.11% 0.00%

Museum Nasional - Pek. Mekanikal HAL 617/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.08% 0.00% 0.00% 100.00%


100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 618/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.21% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


0.06% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.09% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 619/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.10% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.13% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek. Mekanikal HAL 620/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
65.00% 0.00% 0.00% 0.00% 65.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.86% 0.00%

Museum Nasional - Pek. Mekanikal HAL 621/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.22% 0.00% 0.00% 100.00%


100.00% 0.40% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

0.67% 0.00%

100.00% 1.10% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 622/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
1.17% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 623/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.19% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.00% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 624/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.19% 0.00%

Museum Nasional - Pek. Mekanikal HAL 625/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.22% 0.00% 0.00% 100.00%


100.00% 0.40% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

0.67% 0.00%

100.00% 1.11% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 626/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

1.18% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 627/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.21% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 628/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.19% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 629/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.05% 0.00% 0.00% 100.00%

90.00% 0.01% 10.00% 0.00% 100.00%

0.12% 0.00%

100.00% 2.68% 0.00% 0.00% 100.00%

2.68% 0.00%

50.00% 0.00% 0.00% 0.00% 50.00%


50.00% 0.00% 0.00% 0.00% 50.00%
0.00% 0.00%

Museum Nasional - Pek. Mekanikal HAL 630/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.02% 0.00%

Museum Nasional - Pek. Mekanikal HAL 631/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 632/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

92.00% 0.01% 0.00% 0.00% 92.00%

0.06% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 633/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
0.04% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 634/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.06% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.08% 0.00%

Museum Nasional - Pek. Mekanikal HAL 635/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.04% 0.00%

Museum Nasional - Pek. Mekanikal HAL 636/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.04% 0.00%

Museum Nasional - Pek. Mekanikal HAL 637/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.03% 0.00%

Museum Nasional - Pek. Mekanikal HAL 638/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 639/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.10% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 640/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
0.12% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 641/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


0.05% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.06% 0.00%

Museum Nasional - Pek. Mekanikal HAL 642/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.05% 0.00%

Museum Nasional - Pek. Mekanikal HAL 643/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.05% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek. Mekanikal HAL 644/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.18% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%

0.22% 0.00%

100.00% 0.14% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 645/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.18% 0.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.31% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.17% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

0.65% 0.00%

Museum Nasional - Pek. Mekanikal HAL 646/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.34% 0.00% 0.00% 100.00%

100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
0.48% 0.00%

Museum Nasional - Pek. Mekanikal HAL 647/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.08% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.10% 0.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.07% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 648/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

0.17% 0.00%

Museum Nasional - Pek. Mekanikal HAL 649/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 650/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.12% 0.00% 0.00% 100.00%
100.00% 0.39% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.41% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 651/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

96.00% 0.00% 0.00% 0.00% 96.00%

96.00% 0.00% 0.00% 0.00% 96.00%

100.00% 0.14% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 652/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

98.00% 1.32% 0.00% 0.00% 98.00%

98.00% 1.61% 0.00% 0.00% 98.00%

Museum Nasional - Pek. Mekanikal HAL 653/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


4.53% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%


0.02% 0.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
0.10% 0.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
0.16% 0.00%

Museum Nasional - Pek. Mekanikal HAL 654/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
0.06% 0.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
0.05% 0.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
0.03% 0.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
0.04% 0.00%

Museum Nasional - Pek. Mekanikal HAL 655/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

50.00% 0.00% 0.00% 0.00% 50.00%

50.00% 0.00% 0.00% 0.00% 50.00%


0.00% 0.00%

100.00% 0.10% 0.00% 0.00% 100.00%


100.00% 0.14% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.17% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 656/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.12% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.86% 0.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 657/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%

100.00% 0.08% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.55% 0.00%

Museum Nasional - Pek. Mekanikal HAL 658/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.14% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 659/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.54% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.11% 0.00% 0.00% 100.00%

100.00% 0.08% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 660/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.58% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek. Mekanikal HAL 661/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 662/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.44% 0.00%

100.00% 0.08% 0.00% 0.00% 100.00%

Museum Nasional - Pek. Mekanikal HAL 663/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.03% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%

100.00% 0.07% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.54% 0.00%

Museum Nasional - Pek. Mekanikal HAL 664/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

0.00% 0.00% 66.00% 0.04% 66.00%


0.00% 0.00% 67.00% 0.03% 67.00%
0.00% 0.00% 67.00% 0.07% 67.00%

0.00% 0.00% 72.00% 0.02% 72.00%

0.00% 0.00% 72.00% 0.17% 72.00%


0.00% 0.00% 71.00% 0.18% 71.00%

0.00% 0.50%

Museum Nasional - Pek. Mekanikal HAL 665/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

100.00% 0.14% 0.00% 0.00% 100.00%


100.00% 0.09% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.10% 0.00% 0.00% 100.00%

100.00% 0.18% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%
0.73% 0.00%

Museum Nasional - Pek. Mekanikal HAL 666/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI

% bobot % bobot %

50.00% 0.00% 0.00% 0.00% 50.00%


50.00% 0.00% 0.00% 0.00% 50.00%

0.00% 0.00%

50.00% 0.00% 0.00% 0.00% 50.00%

0.00% 0.00%

32.61% 0.50%

Museum Nasional - Pek. Mekanikal HAL 667/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.04%

0.05%

0.19%

0.47%
1.16%

1.92%

Museum Nasional - Pek. Mekanikal HAL 668/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.00%

0.00%
0.01%
0.03%
0.00%

0.04%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.09%

Museum Nasional - Pek. Mekanikal HAL 669/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.15%
0.03%
0.00%

0.19%

1.16%

Museum Nasional - Pek. Mekanikal HAL 670/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.04%
0.03%
0.03%
0.03%
0.02%
0.01%
0.01%
0.01%
0.02%

0.01%

1.36%

0.74%

0.04%
0.16%
0.04%
0.10%

Museum Nasional - Pek. Mekanikal HAL 671/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.07%

0.00%
0.03%
0.05%

1.24%

0.00%
0.13%

0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 672/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.01%

0.03%
0.00%

0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 673/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.24%

0.01%
0.03%
0.00%
0.04%

0.18%
0.02%
0.00%
0.02%

0.00%

0.00%
0.00%

0.11%

Museum Nasional - Pek. Mekanikal HAL 674/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.32%

0.17%
0.15%
0.08%
0.07%
0.01%

0.04%
0.03%
0.02%
0.01%
0.01%

0.01%
0.01%

Museum Nasional - Pek. Mekanikal HAL 675/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.02%

0.01%

0.64%

0.82%

0.03%
0.09%
0.03%
0.04%

1.02%

Museum Nasional - Pek. Mekanikal HAL 676/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.14%

0.00%
0.00%
0.00%
0.00%
0.01%
0.00%
0.01%
0.00%
0.00%

0.00%
0.03%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 677/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%

0.22%

0.00%
0.01%
0.00%
0.01%

0.09%
0.02%
0.03%
0.02%

Museum Nasional - Pek. Mekanikal HAL 678/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.09%
0.00%
0.03%
0.01%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.32%

Museum Nasional - Pek. Mekanikal HAL 679/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.09%

0.02%
0.01%

0.00%

0.04%

0.02%
0.00%
0.06%

0.01%
0.05%

0.14%
0.00%

Museum Nasional - Pek. Mekanikal HAL 680/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00

0.22%
0.40%
0.01%

0.01%
0.01%
0.01%

0.01%

Museum Nasional - Pek. Mekanikal HAL 681/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.67%

0.97%

0.03%
0.03%
0.05%
1.07%

0.06%
0.07%

0.01%

0.00%
0.01%

Museum Nasional - Pek. Mekanikal HAL 682/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.03%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.22%

0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 683/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.09%
0.03%

0.06%
0.01%
0.01%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.19%

Museum Nasional - Pek. Mekanikal HAL 684/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.20%

0.12%
0.11%
0.05%
0.04%
0.09%
0.08%
0.02%
0.02%
0.05%
0.02%
0.02%
0.05%
0.06%

Museum Nasional - Pek. Mekanikal HAL 685/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.02%
0.03%
0.01%
0.01%
0.02%
0.01%

0.01%

1.03%

0.88%

0.12%
0.08%
0.03%
1.11%

Museum Nasional - Pek. Mekanikal HAL 686/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.08%
0.07%

0.01%

0.00%
0.01%
0.00%
0.00%
0.00%

0.01%
0.01%
0.00%
0.02%

0.00%
0.00%

0.00%

Museum Nasional - Pek. Mekanikal HAL 687/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.21%

0.00%

0.02%
0.01%
0.01%
0.02%

0.00%
0.06%

0.09%
0.03%
0.09%

Museum Nasional - Pek. Mekanikal HAL 688/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.03%

0.01%
0.10%
0.06%
0.07%
0.10%
0.00%
0.01%

0.13%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 689/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.01%
0.02%
0.01%
0.02%
0.02%
0.01%
0.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%
0.00%
0.01%
0.00%
0.00%

0.86%

Museum Nasional - Pek. Mekanikal HAL 690/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.22%
0.40%
0.01%

0.01%
0.01%
0.01%

0.01%

0.67%

1.10%

0.03%

Museum Nasional - Pek. Mekanikal HAL 691/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.02%
1.17%

0.06%
0.05%

0.01%

0.00%
0.00%
0.00%
0.00%

0.02%
0.00%
0.02%

0.00%

Museum Nasional - Pek. Mekanikal HAL 692/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.19%

0.00%
0.00%
0.00%

0.09%
0.03%

Museum Nasional - Pek. Mekanikal HAL 693/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.06%
0.01%
0.01%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.19%

Museum Nasional - Pek. Mekanikal HAL 694/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.22%
0.40%
0.01%

0.01%
0.01%
0.01%

0.01%

0.67%

1.11%

0.03%
0.02%
0.02%

Museum Nasional - Pek. Mekanikal HAL 695/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

1.18%

0.06%
0.07%

0.01%

0.00%
0.00%
0.01%

0.02%
0.00%
0.02%

0.00%
0.00%

0.00%

Museum Nasional - Pek. Mekanikal HAL 696/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.21%

0.00%
0.00%

0.00%

0.09%
0.03%

0.06%
0.01%
0.01%

Museum Nasional - Pek. Mekanikal HAL 697/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.19%

0.01%

0.05%

Museum Nasional - Pek. Mekanikal HAL 698/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.05%

0.01%

0.12%

2.68%

2.68%

0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 699/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.02%

Museum Nasional - Pek. Mekanikal HAL 700/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.01%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 701/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.06%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%

0.00%

0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 702/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.02%
0.04%

0.01%
0.01%
0.00%
0.01%
0.00%
0.01%

0.01%

0.00%
0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 703/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.06%

0.01%
0.02%
0.00%
0.01%
0.01%
0.01%

0.01%

0.00%
0.00%
0.01%
0.00%
0.00%

0.08%

Museum Nasional - Pek. Mekanikal HAL 704/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.01%
0.01%
0.00%
0.01%

0.01%

0.00%
0.00%
0.00%
0.00%
0.00%

0.04%

Museum Nasional - Pek. Mekanikal HAL 705/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.01%
0.01%
0.00%
0.01%

0.01%

0.00%
0.00%
0.00%
0.00%
0.00%

0.04%

Museum Nasional - Pek. Mekanikal HAL 706/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.01%
0.00%

0.00%

0.01%
0.00%
0.00%
0.00%
0.03%

Museum Nasional - Pek. Mekanikal HAL 707/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.01%
0.00%
0.02%
0.01%

0.00%
0.00%

0.01%

0.00%

0.00%

Museum Nasional - Pek. Mekanikal HAL 708/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.00%
0.00%
0.01%
0.00%

0.10%

0.02%
0.03%
0.01%
0.01%
0.00%
0.00%

0.02%

0.01%

Museum Nasional - Pek. Mekanikal HAL 709/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%
0.00%
0.00%
0.01%
0.12%

0.01%
0.00%
0.01%
0.00%
0.00%

0.00%

0.01%
0.00%
0.00%
0.00%

Museum Nasional - Pek. Mekanikal HAL 710/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.05%

0.01%
0.01%
0.01%
0.00%
0.00%

0.01%

0.01%
0.00%
0.00%
0.00%

0.06%

Museum Nasional - Pek. Mekanikal HAL 711/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.00%
0.01%
0.00%
0.00%

0.01%

0.01%
0.00%
0.00%
0.00%

0.05%

Museum Nasional - Pek. Mekanikal HAL 712/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%
0.00%
0.01%
0.00%
0.00%

0.01%

0.01%
0.00%
0.00%
0.00%
0.05%

0.00%

Museum Nasional - Pek. Mekanikal HAL 713/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.18%

0.05%
0.01%
0.01%
0.03%

0.22%

0.14%

0.02%

0.02%

Museum Nasional - Pek. Mekanikal HAL 714/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.18%

0.03%
0.31%
0.03%
0.00%
0.00%

0.17%

0.02%

0.01%

0.00%
0.06%
0.01%

0.65%

Museum Nasional - Pek. Mekanikal HAL 715/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.34%

0.07%

0.06%
0.01%
0.48%

Museum Nasional - Pek. Mekanikal HAL 716/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.08%

0.02%

0.10%

0.05%

0.07%

Museum Nasional - Pek. Mekanikal HAL 717/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.01%

0.05%

0.17%

Museum Nasional - Pek. Mekanikal HAL 718/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.00%
0.06%
0.00%
0.00%

0.02%

0.09%
0.01%

0.01%

0.00%

0.00%

Museum Nasional - Pek. Mekanikal HAL 719/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.04%
0.00%

0.00%

0.00%
0.02%
0.00%

0.03%
0.00%

0.02%
0.00%
0.00%
0.00%
0.02%
0.02%
0.12%
0.39%
0.07%

0.41%
0.02%

0.01%

Museum Nasional - Pek. Mekanikal HAL 720/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%

0.00%

0.14%

Museum Nasional - Pek. Mekanikal HAL 721/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

1.32%

1.61%

Museum Nasional - Pek. Mekanikal HAL 722/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.06%

0.01%
4.53%

0.02%
0.02%

0.03%
0.01%
0.07%
0.10%

0.03%
0.00%
0.09%
0.03%
0.16%

Museum Nasional - Pek. Mekanikal HAL 723/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.01%
0.03%
0.06%

0.04%
0.01%
0.05%

0.03%
0.01%
0.03%

0.04%
0.01%
0.04%

Museum Nasional - Pek. Mekanikal HAL 724/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%
0.00%

0.10%
0.14%
0.05%
0.07%
0.04%
0.03%
0.17%

Museum Nasional - Pek. Mekanikal HAL 725/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.12%

0.01%
0.00%

0.00%
0.09%
0.01%
0.00%

0.02%

0.86%

0.12%
0.04%
0.04%
0.03%

Museum Nasional - Pek. Mekanikal HAL 726/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.02%
0.02%
0.10%

0.08%

0.01%
0.00%

0.03%
0.02%
0.00%
0.01%
0.00%

0.02%

0.55%

Museum Nasional - Pek. Mekanikal HAL 727/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.14%
0.02%
0.02%
0.05%
0.02%
0.02%
0.09%

0.07%

0.01%
0.00%

0.04%
0.03%
0.00%
0.01%
0.00%

0.02%

Museum Nasional - Pek. Mekanikal HAL 728/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.54%

0.09%
0.02%
0.04%
0.07%
0.03%
0.02%
0.11%

0.08%

0.01%
0.00%

0.04%
0.04%
0.00%
0.01%

Museum Nasional - Pek. Mekanikal HAL 729/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.02%

0.58%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%

Museum Nasional - Pek. Mekanikal HAL 730/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%

0.09%
0.02%
0.01%
0.03%
0.03%
0.02%
0.07%

Museum Nasional - Pek. Mekanikal HAL 731/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.06%

0.01%
0.00%

0.03%
0.03%
0.00%
0.01%
0.00%

0.02%

0.44%

0.08%

Museum Nasional - Pek. Mekanikal HAL 732/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.03%
0.03%
0.05%
0.03%
0.02%
0.10%

0.07%

0.01%
0.00%

0.04%
0.04%
0.00%
0.01%
0.00%

0.02%

0.54%

Museum Nasional - Pek. Mekanikal HAL 733/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.04%
0.03%
0.07%

0.02%

0.17%
0.18%

0.50%

Museum Nasional - Pek. Mekanikal HAL 734/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.14%
0.09%
0.04%
0.00%
0.00%

0.10%

0.18%
0.02%
0.00%

0.05%
0.00%
0.01%

0.00%
0.00%
0.00%
0.10%
0.73%

Museum Nasional - Pek. Mekanikal HAL 735/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI

bobot

0.00%
0.00%

0.00%

0.00%

0.00%

33.11%

Museum Nasional - Pek. Mekanikal HAL 736/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

<5A> PEKERJAAN INSTALASI LISTRIK

I LANTAI GROUND FLOOR & MEZZANINE

a INSTALASI

1 Instalasi Penerangan 0.24%


2 Instalasi Stop Kontak 16A / 1P 0.00%

Pemindahan Lampu Sorot Area Sanken


Instalasi titik Lampu Sorot NYY 2 x 3,5 mm 0.01%

Penambahan Lampu Downlight LED area Gate C-A Sanken


Armature Lampu
- Downlight LED BULB 14 Watt 0.00%
Saklar
- Saklar Tunggal 0.00%
Inatalasi Titik Lampu
- Instalasi titik Lampu Sorot NYY 2 x 3,5 mm 0.00%

Sub Total 0.25%

b ARMATURE LAMPU

1 TL Balok isi TL 1 x 36 W 0.01%


2 TL Balok isi TL 1 x 36 W c/w nicad baterre 0.03%
3 TL Bracket isi TL 1 x 36 W c/w nicad baterre 0.03%
4 Lampu Exit 2 x 8 W / cw nicad baterre 0.02%
5 TL Balok isi TL 2 x 36 W 0.02%

Museum Nasional - Pek.Elektrikal HAL 737/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

6 TL Balok isi TL 2 x 36 W c/w nicad baterre 0.03%


7 TL Armature 2 x 36 W 0.02%
8 TL Armature 2 x 36 W c/w nicad baterre 0.02%
9 Down Light HPS, 100 W 0.01%
10 Down Light isi Halogen Dichroic 50W / 12V 0.00%
11 Down Light isi PLC 1 x 13 W 0.01%
12 Down Light isi PLC 1 x 13 W c/w nicad baterre 0.01%
13 TL Armature 2 x 36 W c/w mirror louvre 0.00%
14 TL Armature 2 x 36 W c/w mirror louvre + nicad baterre 0.00%
15 Down Light PLC 2 x 13 W 0.11%
16 Down Light PLC 2 x 13 W c/w nicad baterre 0.07%
17 Baret Deluxe PL 11 Watt 0.00%

LANTAI B1 & MEZZANINE


PENYEMPURNAAN ARMATURE TAHAP V

Bongkar Pasang Armatur Lampu Existing Tahap Lalu


Terkait Akan dipasang Plafon +- 1 Meter Termasuk Kabel NYM 3x2,5m2
=+ Flexible + Tee Dos + Las Dop + Tes dan Support Lampu

Ruang Studi Koreksi Peneliti Luar


Pekerjaan Bongkar Pasang Armature lampu TL 2x36W, TKI Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

TL 2X36W TKI 0.00%


TL 2X36W TKI + Nicad Batttery 0.00%

Ruang Pameran Temporery


Pekerjaan Bongkar Pasang Armature lampu TL 2x36W, TKI Lengkap Penambahan Kabel

Museum Nasional - Pek.Elektrikal HAL 738/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

TL 2X36W TKI 0.00%


TL 2X36W TKI + Nicad Batttery 0.00%

Ruang Persiapan & Backstage


Pekerjaan Bongkar Pasang Armature lampu Down Light, Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

Down Light PLC- 2 x 13w 0.00%


Down Light PLC- 2 x 13w + Nicad Battery 0.00%
Down Light PLC- 1x 13w 0.00%
Down Light PLC- 1x 13w + Nicad Battery 0.00%

Ruang Introductin
Pekerjaan Bongkar Pasang Armature lampu Down Light, Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

Down Light PLC- 1 x 13w 0.01%


Down Light PLC- 1 x 13w + Nicad Battery 0.00%

Ruang Public Hall


Pekerjaan Bongkar Pasang Armature lampu Down Light, Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

Down Light PLC- 1 x 13w 0.01%


Down Light PLC- 1 x 13w + Nicad Battery 0.00%

Ruang Lobby Lift dan Toilet

Museum Nasional - Pek.Elektrikal HAL 739/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Pekerjaan Bongkar Pasang Armature lampu Down Light, Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

Down Light PLC- 2 x 13w 0.00%


Down Light PLC- 2 x 13w + Nicad Battery 0.00%
Down Light PLC- 1 x 13w 0.00%
Down Light PLC- 1 x 13w + Nicad Battery 0.00%
Down Light Halogen 50 w/12 0.00%

Ruang Lobby Lift dan Toilet Difable (Pria dan Wanita


Pekerjaan Bongkar Pasang Armature lampu Down Light, Lengkap Penambahan Kabel
NYM 3x2,5m2 + Flexible + Tee dos + Las dop + Ties & support lampu

Down Light PLC- 2 x 13w 0.00%


Down Light PLC- 2 x 13w + Nicad Battery 0.00%
Down Light PLC- 1 x 13w 0.00%
Down Light PLC- 1 x 13w + Nicad Battery 0.00%
Down Light Halogen 50 w/12 0.00%

LANTAI GROUND FLOOR & MEZZANINE


PEKERJAAN RUANG AUDITORIUM

Pemasangan armatur Lampu dan Instalasi


Armature Lampu
Downlight Halogen 2 x 70W 0.23%
Lampu Tangga Audience 0.31%

Instalasi Penerangan
Instalasi Penerangan 0.08%

Museum Nasional - Pek.Elektrikal HAL 740/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

SWITCH
- Saklar Serie 8 Gang 0.00%
- Saklar Tunggal 0.00%
- Saklar Seri 0.00%
- Dimmer 300W 0.00%

LANTAI B1
BONGKAR PASANG OUTLET DINDING KARENA PELAPISAN DINDING GYPSUM TAHAP V

Bongkar Pasang Outlet Existing Tahap Lalu


Termasuk Kabel NYM 3x2,5m2

Outlet Dinding
- Stopk Kontak 0.00%
- Saklar Seri 0.00%

LANTAI 6
BONGKAR PASANG OUTLET DINDING KARENA PELAPISAN DINDING GYPSUM TAHAP V

Bongkar Pasang Outlet Existing Tahap Lalu


Termasuk Kabel NYM 3x2,5m2

Outlet Dinding
- Stopk Kontak 0.00%
- Saklar Seri 0.00%
- Pengadaan Baru Armature Stop Kontak 0.00%
- Pengadaan Baru Saklar Seri 0.00%

Museum Nasional - Pek.Elektrikal HAL 741/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

LANTAI 7
BONGKAR PASANG LAMPU DOWN LIGHT EXIXTING TAHAP V

Bongkar Pasang Outlet Existing Tahap Lalu


Termasuk Kabel NYM 3x2,5m2
- Down Light Halogen 50 watt - 220 Volt 0.00%
- Stopk Kontak 0.00%

LANTAI B1
INSTALASI POWER ROLLING D0OR (PEK. SIPIL/ARSITEK)
TTermasuk Kabel NYM 3 x 2,5m2 / 1Ph
= + Flexible + Tee Dos + Las Dop + Tes

- Instalasi Power Rolling Door 0.05%

LANTAI GROUND FLOOR


INSTALASI POWER ROLLING D0OR (PEK. SIPIL/ARSITEK)
TTermasuk Kabel NYM 4 x 2,5m2 / 3Ph
= + Flexible + Tee Dos + Las Dop + Tes

- Instalasi Power Rolling Door 0.05%

Sub Total 1.16%

c PANEL LISTRIK

1 Panel - GF 0.09%
- Penyempurnaan Komponen di Panel Untuk BAS 0.06%

Museum Nasional - Pek.Elektrikal HAL 742/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Panel - Aud 0.03%


3 Panel - CR 0.04%
4 kWH Meter 0.00%

Sub Total 0.23%

d SWITCH

1 Saklar Tunggal 0.00%


2 Saklar Serie 0.00%
3 Grid Switch 8 Gang 0.00%
4 Grid Switch 26 Gang 0.00%
5 Stop kontak 16A / 1P 0.00%

Sub Total 0.01%

Sub Total

II LANTAI 2

a INSTALASI

1 Instalasi Penerangan 0.23%


2 Instalasi Stop Kontak 16A / 1P 0.00%
3 Instalasi Stop Kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.23%

Museum Nasional - Pek.Elektrikal HAL 743/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

b ARMATURE LAMPU

1 TL Balok isi TL 1 x 36 W 0.00%


2 TL Balok isi TL 1 x 36 W c/w nicad baterre 0.00%
3 TL Armature 2 x 36 W c/w mirror louvre 0.00%
4 TL Armature 2 x 36 W c/w mirror louvre + nicad baterre 0.00%
5 Lampu Exit 2 x 8 W / cw nicad baterre 0.00%
6 TL Armature 2 x 36 W 0.00%
7 TL Armature 2 x 36 W c/w nicad baterre 0.00%
8 TL Bracket isi TL 1 x 36 W c/w nicad baterre 0.00%
9 TL Balok isi TL 2 x 36 W 0.00%
10 TL Balok isi TL 2 x 36 W c/w nicad baterre 0.00%
11 Down Light isi Halogen Dichroic 50W / 12V 0.00%
12 Down Light isi PLC 1 x 13 W 0.00%
13 Down Light isi PLC 1 x 13 W c/w nicad baterre 0.00%
14 Down Light PLC 2 x 13 W 0.00%
15 Down Light PLC 2 x 13 W c/w nicad baterre 0.00%

Sub Total 0.00%

c PANEL LISTRIK

1 Panel - 2 0.06%
- Penyempurnaan Komponen di Panel Untuk BAS 0.04%
2 kWH Meter 0.00%

Sub Total 0.10%

d SWITCH

Museum Nasional - Pek.Elektrikal HAL 744/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Saklar Tunggal 0.00%


2 Saklar Serie 0.00%
3 Grid Switch 26 Gang 0.00%
4 Grid Switch 14 Gang 0.00%
5 Grid Switch 6 Gang 0.00%
6 Stop kontak 16A / 1P 0.00%
7 Stop kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.00%

e UNDER FLOOR DUCT

1 Under Floor Duct 2 Compartment uk. 150 x 25 mm 0.00%


2 Outlet Box / Box Service tanpa stop kontak 0.00%

Sub Total 0.00%

Sub Total

III LANTAI 3

a INSTALASI

1 Instalasi Penerangan 0.27%


2 Instalasi Stop Kontak 16A / 1P 0.00%
3 Instalasi Stop Kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.27%

Museum Nasional - Pek.Elektrikal HAL 745/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

b ARMATURE LAMPU

1 TL Balok isi TL 1 x 36 W 0.00%


2 TL Balok isi TL 1 x 36 W c/w nicad baterre 0.00%
3 TL Bracket isi TL 1 x 36 W c/w nicad baterre 0.00%
4 TL Armature 2 x 36 W c/w mirror louvre 0.00%
5 TL Armature 2 x 36 W c/w mirror louvre + nicad baterre 0.00%
6 Lampu Exit 2 x 8 W / cw nicad baterre 0.00%
7 TL Balok isi TL 2 x 36 W 0.00%
8 TL Balok isi TL 2 x 36 W c/w nicad baterre 0.00%
9 Down Light isi Halogen Dichroic 50W / 12V 0.00%
10 Down Light isi PLC 1 x 13 W 0.00%
11 Down Light isi PLC 1 x 13 W c/w nicad baterre 0.00%
12 TL Armature 2 x 36 W 0.00%
13 TL Armature 2 x 36 W c/w nicad baterre 0.00%
14 Down Light PLC 2 x 13 W 0.00%
15 Down Light PLC 2 x 13 W c/w nicad baterre 0.00%

Sub Total 0.00%

c PANEL LISTRIK

1 Panel - 3 0.09%
- Penyempurnaan Komponen di Panel Untuk BAS 0.06%
2 Panel -PP.Lab-1 0.04%
- Penyempurnaan Komponen di Panel Untuk BAS 0.03%
3 Panel -PP.Lab-2 0.05%
- Penyempurnaan Komponen di Panel Untuk BAS 0.03%

Museum Nasional - Pek.Elektrikal HAL 746/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

4 Panel - Lab-1 0.02%


5 Panel - Lab-2 0.02%
6 Panel - Lab-3 0.02%
7 Panel - Lab-4 0.02%
8 Panel - Lab-5 0.03%
9 Panel - Lab-6 0.02%
10 Panel - Lab-7 0.02%
11 Panel - Lab-8 0.02%
12 Panel - Lab-9 0.02%
13 kWH Meter 0.00%

Sub Total 0.52%

d SWITCH

1 Saklar Tunggal 0.00%


2 Saklar Serie 0.00%
3 Grid Switch 20 Gang 0.00%
4 Grid Switch 4 Gang 0.00%
5 Grid Switch 2 Gang 0.00%
6 Stop kontak 16A / 1P 0.00%
7 Stop kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.00%

e UNDER FLOOR DUCT

1 Under Floor Duct 2 Compartment uk. 150 x 25 mm 0.00%


2 Outlet Box / Box Service tanpa stop kontak 0.00%

Museum Nasional - Pek.Elektrikal HAL 747/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total 0.00%

Sub Total

IV LANTAI 4

a INSTALASI

1 Instalasi Penerangan 0.22%


2 Instalasi Stop Kontak 16A / 1P 0.00%
3 Instalasi Stop Kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.22%

b ARMATURE LAMPU

1 TL Balok isi TL 1 x 36 W 0.01%


2 TL Balok isi TL 1 x 36 W c/w nicad baterre 0.01%
3 TL Balok isi TL 2 x 36 W 0.00%
4 TL Balok isi TL 2 x 36 W c/w nicad baterre 0.00%
5 TL Bracket isi TL 1 x 36 W c/w nicad baterre 0.02%
6 TL Armature 2 x 36 W 0.08%
7 TL Armature 2 x 36 W c/w nicad baterre 0.07%
8 Lampu Exit 2 x 8 W / cw nicad baterre 0.03%
9 TL Armature 2 x 36 W c/w mirror louvre 0.01%
10 TL Armature 2 x 36 W c/w mirror louvre + nicad baterre 0.01%
11 Down Light isi Halogen Dichroic 50W / 12V 0.01%
12 Down Light isi PLC 1 x 13 W 0.01%
13 Down Light isi PLC 1 x 13 W c/w nicad baterre 0.02%

Museum Nasional - Pek.Elektrikal HAL 748/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

14 Down Light PLC 2 x 13 W 0.10%


15 Down Light PLC 2 x 13 W c/w nicad baterre 0.07%

Sub Total 0.44%

c PANEL LISTRIK

1 Panel - 4 0.08%
- Penyempurnaan Komponen di Panel Untuk BAS 0.05%
2 kWH Meter 0.00%

Sub Total 0.13%

d SWITCH

1 Saklar Tunggal 0.00%


2 Saklar Serie 0.00%
3 Grid Switch 22 Gang 0.00%
4 Grid Switch 16 Gang 0.00%
5 Grid Switch 14 Gang 0.00%
6 Grid Switch 6 Gang 0.00%
7 Stop kontak 16A / 1P 0.00%
8 Stop kontak 16A / 1P (Pada Floor Duct) 0.01%

Sub Total 0.01%

e UNDER FLOOR DUCT

1 Under Floor Duct 2 Compartment uk. 150 x 25 mm 0.00%

Museum Nasional - Pek.Elektrikal HAL 749/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Outlet Box / Box Service tanpa stop kontak 0.00%

Sub Total 0.01%

Sub Total

V LANTAI 5

a INSTALASI

1 Instalasi Penerangan 0.22%


2 Instalasi Stop Kontak 16A / 1P 0.00%
3 Instalasi Stop Kontak 16A / 1P (Pada Floor Duct) 0.00%

Sub Total 0.22%

b ARMATURE LAMPU

1 TL Balok isi TL 1 x 36 W 0.01%


2 TL Balok isi TL 1 x 36 W c/w nicad baterre 0.01%
3 TL Balok isi TL 2 x 36 W 0.00%
4 TL Balok isi TL 2 x 36 W c/w nicad baterre 0.00%
5 TL Bracket isi TL 1 x 36 W c/w nicad baterre 0.02%
6 TL Armature 2 x 36 W 0.08%
7 TL Armature 2 x 36 W c/w nicad baterre 0.07%
8 Lampu Exit 2 x 8 W / cw nicad baterre 0.03%
9 TL Armature 2 x 36 W c/w mirror louvre 0.01%
10 TL Armature 2 x 36 W c/w mirror louvre + nicad baterre 0.01%
11 Down Light isi Halogen Dichroic 50W / 12V 0.01%

Museum Nasional - Pek.Elektrikal HAL 750/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

12 Down Light isi PLC 1 x 13 W 0.01%


13 Down Light isi PLC 1 x 13 W c/w nicad baterre 0.02%
14 Down Light PLC 2 x 13 W 0.10%
15 Down Light PLC 2 x 13 W c/w nicad baterre 0.07%

Sub Total 0.45%

c PANEL LISTRIK

1 Panel - 5 0.08%
- Penyempurnaan Komponen di Panel Untuk BAS 0.01%
2 kWH Meter 0.00%

Sub Total 0.09%

d SWITCH

1 Saklar Tunggal 0.00%


2 Saklar Serie 0.00%
3 Grid Switch 20 Gang 0.00%
4 Grid Switch 16 Gang 0.00%
5 Grid Switch 14 Gang 0.00%
6 Grid Switch 6 Gang 0.00%
7 Stop kontak 16A / 1P 0.00%
8 Stop kontak 16A / 1P (Pada Floor Duct) 0.01%

Sub Total 0.01%

e UNDER FLOOR DUCT

Museum Nasional - Pek.Elektrikal HAL 751/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Under Floor Duct 2 Compartment uk. 150 x 25 mm 0.00%


2 Outlet Box / Box Service tanpa stop kontak 0.00%

Sub Total 0.01%

Sub Total

VI LANTAI 7

a PANEL LISTRIK

1 Panel - OF 1 0.06%
2 Panel - OF 2 0.05%

Sub Total 0.10%

Sub Total

VII KABEL TRAY UNTUK ARUS KUAT

C LANTAI GROUND FLOOR & MEZZANINE

1 Straight
Ukuran 20 x 10 cm 0.06%
Ukuran 30 x 10 cm 0.07%
Ukuran 50 x 10 cm 0.03%
2 Elbow
Ukuran 50 x 10 cm 0.00%

Museum Nasional - Pek.Elektrikal HAL 752/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.01%
4 Reducer
Ukuran 50 x 10 cm 0.00%
5 Cross
Ukuran 30 x 10 cm 0.00%
0.00%
Sub Total 0.18%

D LANTAI 2

1 Straight
Ukuran 20 x 10 cm 0.10%
Ukuran 30 x 10 cm 0.02%
Ukuran 40 x 10 cm 0.03%
Ukuran 50 x 10 cm 0.04%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 40 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%

Museum Nasional - Pek.Elektrikal HAL 753/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total 0.20%

E LANTAI 3

1 Straight
Ukuran 20 x 10 cm 0.14%
Ukuran 30 x 10 cm 0.03%
Ukuran 40 x 10 cm 0.04%
Ukuran 50 x 10 cm 0.04%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 40 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.01%
4 Reducer
Ukuran 50 x 10 cm 0.00%

Sub Total 0.28%

F LANTAI 4

1 Straight
Ukuran 20 x 10 cm 0.11%
Ukuran 30 x 10 cm 0.02%
Ukuran 40 x 10 cm 0.02%
Ukuran 50 x 10 cm 0.04%

Museum Nasional - Pek.Elektrikal HAL 754/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%
Ukuran 40 x 10 cm 0.00%
5 Cross
Ukuran 30 x 10 cm 0.00%

Sub Total 0.21%

G LANTAI 5

1 Straight
Ukuran 20 x 10 cm 0.11%
Ukuran 30 x 10 cm 0.02%
Ukuran 40 x 10 cm 0.02%
Ukuran 50 x 10 cm 0.04%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%

Museum Nasional - Pek.Elektrikal HAL 755/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

4 Reducer
Ukuran 50 x 10 cm 0.00%
Ukuran 40 x 10 cm 0.00%
5 Cross
Ukuran 30 x 10 cm 0.00%

Sub Total 0.21%

J KABEL TRAY PADA SHAFT ARUS KUAT

1 Ukuran 50 x 10 cm 0.02%

Sub Total 0.02%

Sub Total

VIII KABEL TRAY UNTUK ARUS LEMAH

C LANTAI GROUND FLOOR & MEZZANINE

1 Straight
Ukuran 20 x 10 cm 0.07%
Ukuran 30 x 10 cm 0.07%
Ukuran 50 x 10 cm 0.08%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%

Museum Nasional - Pek.Elektrikal HAL 756/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran 30 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%
5 Cross
Ukuran 20 x 10 cm 0.00%

Sub Total 0.23%

D LANTAI 2

1 Straight
Ukuran 20 x 10 cm 0.11%
Ukuran 30 x 10 cm 0.02%
Ukuran 40 x 10 cm 0.04%
Ukuran 50 x 10 cm 0.06%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 40 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%

Sub Total 0.25%

E LANTAI 3

Museum Nasional - Pek.Elektrikal HAL 757/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Straight
Ukuran 20 x 10 cm 0.14%
Ukuran 30 x 10 cm 0.04%
Ukuran 40 x 10 cm 0.05%
Ukuran 50 x 10 cm 0.06%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 40 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.01%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%

Sub Total 0.33%

F LANTAI 4

1 Straight
Ukuran 20 x 10 cm 0.12%
Ukuran 30 x 10 cm 0.03%
Ukuran 40 x 10 cm 0.03%
Ukuran 50 x 10 cm 0.06%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee

Museum Nasional - Pek.Elektrikal HAL 758/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran 50 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%
Ukuran 40 x 10 cm 0.00%
5 Cross
Ukuran 30 x 10 cm 0.00%

Sub Total 0.25%

G LANTAI 5

1 Straight
Ukuran 20 x 10 cm 0.12%
Ukuran 30 x 10 cm 0.03%
Ukuran 40 x 10 cm 0.03%
Ukuran 50 x 10 cm 0.06%
2 Elbow
Ukuran 50 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
3 Tee
Ukuran 50 x 10 cm 0.01%
Ukuran 30 x 10 cm 0.00%
Ukuran 20 x 10 cm 0.00%
4 Reducer
Ukuran 50 x 10 cm 0.00%
Ukuran 40 x 10 cm 0.00%
5 Cross

Museum Nasional - Pek.Elektrikal HAL 759/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Ukuran 30 x 10 cm 0.00%

Sub Total 0.25%

J KABEL TRAY PADA SHAFT ARUS KUAT

1 Ukuran 50 x 10 cm 0.02%

Sub Total 0.02%

Sub Total

IX PANEL LVMDP

1 Panel LVMDP- 15, 16 ,17 1.46%


2 Panel LVMDP- 18 & 19 1.61%
3 Panel LVMDP- 20 1.61%
4 Panel UPS 0.04%
- Penyempurnaan Komponen di Panel Untuk BAS 0.02%
5 UPS 10 kVA 0.08%
6 Panel TK.1 0.03%
- Penyempurnaan Komponen di Panel Untuk BAS 0.02%
7 Panel TK.2 0.03%
8 Panel TK.3 0.03%
9 Panel LVMDP- (COOLING TOWER) 0.00%
10 Panel LVMDP- COUPLER 0.13%
Panel Fire 0.06%
Sub Total 5.09%

X KABEL FEEDER

Museum Nasional - Pek.Elektrikal HAL 760/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Busduct Copper 4000A dari Trafo ke Panel LVMDP


Feeder 0.94%
WTI Busduct 4000 A 3P/4W/CU/IP68 Straight Feeder
Flanged End 0.09%
WTI Busduct 4000 A 3P/4W/CU/IP68 Flange End
Elbow 0.10%
WTI Busduct 4000 A 3P/4W/CU/IP68 Flatwise Elbows
WTI Busduct 4000 A 3P/4W/CU/IP68 Edgewise Elbows
Flexible Link 0.04%
WTI Busduct 4000 A 3P/4W/CU/IP68 Flexibel bar
Horizontal Hanger 0.01%
WTI Busduct 4000 A 3P/4W/CU/IP68 Horizontal Hanger
WTI Busduct 4000 A 3P/4W/CU/IP68 Horizontal Fixing Bracket 0.01%
WTI Busduct 4000 A 3P/4W/CU/IP68 Connection Bar 0.12%
WTI Busduct 4000 A 3P/4W/CU/IP68 Vertical hanger 0.01%
WTI Busduct 4000 A 3P/4W/CU/IP68 Joint 0.04%
2 Busduct Copper 2000A dari LVMDP ke Riser
Feeder 3.17%
WTI Busduct 2000 A 3P/4W/CU/IP68 Straight Feeder
Flanged End 0.04%
WTI Busduct 2000 A 3P/4W/CU/IP68 Flange End
Elbow 0.09%
WTI Busduct 2000 A 3P/4W/CU/IP68 Flatwise Elbows
WTI Busduct 2000 A 3P/4W/CU/IP68 Edgewise Elbows
Tebow 0.02%
WTI Busduct 2000 A 3P/4W/CU/IP68 Flatwise Tee Elbows
Flexible Link 0.00%
Tecobar Cast Resin Busduct cooper 2000 A 3P4W, IP 68 Flexibel bar
Horizontal Hanger 0.02%

Museum Nasional - Pek.Elektrikal HAL 761/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Horizontal Hanger 0.01%


WTI Busduct 2000 A 3P/4W/CU/IP68 Horizontal Hanger
WTI Busduct 4000 A 3P/4W/CU/IP68 Horizontal Fixing Bracket
Vertical Hanger 0.01%
WTI Busduct 2000 A 3P/4W/CU/IP68 Spring hanger 0.01%
WTI Busduct 2000 A 3P/4W/CU/IP68 Vertical hanger
WTI Busduct 2000 A 3P/4W/CU/IP68 Spring hanger 0.01%
End Closure 0.01%
WTI Busduct 2000 A 3P/4W/CU/IP68 Joint 0.20%
3 Busduct Copper 4.000 A dari PCG 2 ke Panel LVMDP
Feeder 2.00%
WTI Busduct 4000 A 3P/4W/CU/IP68 Straight Feeder
Flanged End 0.09%
WTI Busduct 4000 A 3P/4W/CU/IP68 Flange End
Elbow 0.31%
Elbow 0.06%
WTI Busduct 4000 A 3P/4W/CU/IP68 Flatwise Elbows
WTI Busduct 4000 A 3P/4W/CU/IP68 Edgewise Elbows
Flexible Link 0.00%
WTI Cast Resin Busduct cooper 4000 A 3P4W, IP 68 Connextion bar
WTI Cast Resin Busduct cooper 4000 A 3P4W, IP 68 Flexibel bar
Horizontal Hanger 0.01%
Horizontal Hanger 0.00%
WTI Busduct 4000 A 3P/4W/CU/IP68 Horizontal Hanger
WTI Busduct 4000 A 3P/4W/CU/IP68 Horizontal Fixing Bracket
Vertical Hanger 0.01%
Vertical Hanger 0.02%
WTI Busduct 4000 A 3P/4W/CU/IP68 Vertical hanger
WTI Busduct 4000 A 3P/4W/CU/IP68 Vertical Spring hanger 0.00%

Museum Nasional - Pek.Elektrikal HAL 762/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

WTI Busduct 4000 A 3P/4W/CU/IP68 Joint 0.13%


4 Busduct Copper 1.600 A dari PCG 3 ke Panel LVMDP
Feeder 0.00%
Flanged End 0.00%
Elbow 0.00%
Flexible Link 0.00%
Horizontal Hanger 0.00%
Vertical Hanger 0.00%
5 Kabel Coupler NYY 40 x (1x400mm) dari LVMDP 15 ke LVMDP 16 0.00%
Kabel Coupler NYY 24 x (1x400mm) dari LVMDP 15 ke LVMDP 17 0.35%
Tap Off Box 200A 3P (With TECO MCCB)
6 Tap Off Box 200 A 0.03%
Tap Off Box 160A 3P (With TECO MCCB)
7 Tap Off Box 160 A 0.05%
Tap Off Box 100A 3P (With TECO MCCB)
8 Tap Off Box 100 A 0.16%
Tap Off Box 300A 3P (With TECO MCCB)
9 Tap Off Box 300 A 0.09%
Tap Off Box 40A 3P (With TECO MCCB)
10 Tap Off Box 40 A 0.02%
Tap Off Box 32A 3P (With TECO MCCB)
11 Tap Off Box 32 A 0.04%
Tap Off Box 500A 3P (With TECO MCCB)
12 Tap Off Box 500 A 0.05%
Tap Off Box 500A 3P (With TECO MCCB)
Tap Off Box 400 A 0.05%
Tap Off Box 500A 3P (With TECO MCCB)
Tap Off Box 250 A 0.03%
Tap Off Box 500A 3P (With TECO MCCB)

Museum Nasional - Pek.Elektrikal HAL 763/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Tap Off Box 125 A 0.02%

Plug in Hole (TOB 500A) 0.01%


Plug in Hole (TOB 400A) 0.01%
Plug in Hole (TOB 300A) 0.02%
Plug in Hole (TOB 250A) 0.01%
Plug in Hole (TOB 200A) 0.01%
Plug in Hole (TOB 160A) 0.02%
Plug in Hole (TOB 125A) 0.01%
Plug in Hole (TOB 100A) 0.01%
Plug in Hole (TOB 40A) 0.01%
Plug in Hole (TOB 32A) 0.02%

13 NYY 4 x 10 mm2 dari Panel LVMDP 7 ke UPS 0.02%


14 NYY 4 x 10 mm2 dari Panel LVMDP 7 ke COS 32 A 0.02%
15 NYY 4 x 10 mm2 dari COS ke Panel P-UPS 0.00%
16 NYY 4 x 120 mm2 dari Tap Off Box ke Panel P-GF 0.00%
NYY 4 x 150 mm2 dari Tap Off Box ke Panel P-GF 0.03%
17 NYY 5 x 6 mm2 dari Panel P-GF ke Panel P-Aud 0.01%
18 NYY 4 x 35 mm2 dari Panel P-GF ke Panel P-CR 0.00%
NYY 4 x 35 mm2 + BC 25mm dari Panel P-GF ke Panel P-CR 0.04%
19 FRC 4 x 10 mm2 dari Panel LVMDP 14 ke Panel P-TK.1 0.02%
20 FRC 5 x 4 mm2 dari Panel P-TK.1 ke Panel P-TK.2 0.03%
21 FRC 5 x 4 mm2 dari Panel P-TK.1 ke Panel P-TK.3 0.03%
22 FRC 4 x 185 mm2 dari Panel LVMDP 14 ke Panel P-Pompa Fire 0.00%
23 NYY 5 x 6 mm2 dari Tap Off Box ke Panel P-PH 0.00%
NYY 5 x 10 mm2 dari Tap Off Box ke Panel P-PH 0.01%
24 NYY 4 x 120 mm2 dari Tap Off Box ke Panel P-2 0.00%

Museum Nasional - Pek.Elektrikal HAL 764/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

NYY 4 x 95 mm2 dari Tap Off Box ke Panel P-2 0.02%


25 NYY 4 x 150 mm2 dari Tap Off Box ke Panel P-3 0.00%
NYY 4 x 185 mm2 dari Tap Off Box ke Panel P-3 0.00%
26 NYY 4 x 35 mm2 dari Panel P-3 ke Panel PP Lab.1 0.00%
NYY 4 x 25mm2 dari Panel P-3 ke Panel PP Lab.1 0.03%
27 NYY 4 x 35 mm2 dari Panel P-3 ke Panel PP Lab.2 0.00%
Dari Panel PP-Lab.1
NYY 5 x 6 mm2 dari PP. Lab 1 ke P. Lab.1 0.00%
NYY 5 x 6 mm2 dari PP. Lab 1 ke P. Lab.2 0.00%
NYY 5 x 6 mm2 dari PP. Lab 1 ke P. Lab.3 0.01%
NYY 5 x 6 mm2 dari PP. Lab 1 ke P. Lab.4 0.01%
Dari Panel PP-Lab.2
NYY 4 x 50 mm2 dari Panel P-3 ke Panel PP Lab.2 0.04%
NYY 5 x 6 mm2 dari PP. Lab 2 ke P. Lab.5 0.01%
NYY 5 x 6 mm2 dari PP. Lab 2 ke P. Lab.6 0.00%
NYY 5 x 6 mm2 dari PP. Lab 2 ke P. Lab.7 0.00%
NYY 5 x 6 mm2 dari PP. Lab 2 ke P. Lab.8 0.00%
NYY 5 x 6 mm2 dari PP. Lab 2 ke P. Lab.9 0.00%
28 NYY 4 x 50 mm2 dari Tap Off Box ke Panel P-4 0.00%
NYY 4 x 70 mm2 dari Tap Off Box ke Panel P-4 0.02%
29 NYY 4 x 50 mm2 dari Tap Off Box ke Panel P-5 0.00%
NYY 4 x 70 mm2 dari Tap Off Box ke Panel P-5 0.01%
30 NYY 4 x 300 mm2 dari Tap Off Box ke Panel P-7 0.00%
NYY 8 (1 x 120 mm2) mm2 dari Tap Off Box ke Panel P-7 0.04%
31 NYY 4 x 35 mm2 dari Panel P-7 ke Panel Of.1 0.00%
NYY 4 x 50 mm2 dari Panel P-7 ke Panel Of.1 0.03%
32 NYY 4 x 35 mm2 dari Panel P-7 ke Panel Of.2 0.04%
33 NYY 4 x 10 mm2 dari Panel P-7 ke Panel P-Inverter 0.01%
34 NYY 4 x 150 mm2 dari Tap Off Box ke Panel P-Cooling Tower 0.00%

Museum Nasional - Pek.Elektrikal HAL 765/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-5 0.00%


NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-4 0.00%
NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-3B 0.00%
NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-3A 0.00%
NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-2 0.00%
NYY 4 x 10 mm2 dari Panel Tap Box ke Panel PAC-MZ 0.01%
NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-GF 0.00%
NYY 4 x 240 mm2 dari Panel Tap Box ke Panel PAC- B1 0.00%
NYY 4 x 35 mm2 dari Panel Tap Box ke Panel PAC-B2 0.00%

Terminal ToB 200 Ke Panle P-AC 3A dan 3B 0.03%


Terminal ToB 200 Ke Panle P-AC 2A dan 2B 0.03%
Kabel dari TOB 200A ke Terminal Box
- Kabel NYY 4x95 mm2 0.01%
- Kabel NYY 4x70 mm2 0.01%

35 Kabel Power AC :
- Dari LVMDP Ke Ruang Panel NYY 4 x 240 mm2 0.00%

Sub Total 9.20%

XI KABEL KONTROL

1 NYY 4 x 2.5 mm2 dari PKG ke Panel LVMDP 0.00%


2 Kabel Interphone Lift dari ruang mesin lift ke ruang kontrol 0.01%
3 Kabel Alarm dari ruang mesin lift ke ruang kontrol 0.01%

Sub Total 0.02%

Museum Nasional - Pek.Elektrikal HAL 766/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

XII PENANGKAL PETIR

1 Bak kontrol uk. 40x40x40 cm, pasangan bata + plester aci, tutup plat beton 0.00%
bertulang, dll.
2 Pentanahan (copper rod Ø 1", tahanan 5 ohm) 0.00%
3 Material bantu 0.00%

Sub Total 0.00%

XIII GROUNDING & RING SYSTEM

1 Kabel BC 50 mm2 0.00%


2 Kabel BC 70 mm2 0.00%
3 Pipa UPVC kelas AW Ø 2" 0.00%
Bak kontrol uk. 40x40x40 cm, pasangan bata + plester aci, tutup plat beton 0.00%
4
bertulang, dll. 0.00%
5 Pentanahan (copper rod Ø 1", tahanan 5 ohm) 0.00%
6 Terminal box (PEB) 0.00%
7 Fuse arester 0.00%

Sub Total 0.00%

XIV TESTING & COMMISSIONING 0.01%

Sub Total 0.01%

<5B> PEKERJAAN INSTALASI SOUND SYSTEM

Museum Nasional - Pek.Elektrikal HAL 767/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

LANTAI B1 & MEZZANINE


PENYEMPURNAAN ARMATURE TAHAP V

Bongkar Pasang Armatur Celling Speaker Existing Tahap Lalu


Terkait Akan dipasang Plafon +- 1 Meter Termasuk Kabel NYA 2 x 1½ m2 dan FRC 2 x 1½ m2
=+ Flexible + Tee Dos + Las Dop + Tes dan Support Lampu

Bongkar Pasang Ceilling Speaker 0.01%


Instalasi Ceilling Speaker 0.10%

LANTAI B1
BONGKAR PASANG OUTLET DINDING KARENA PELAPISAN DINDING GYPSUM TAHAP V

Bongkar Pasang Outlet Existing Tahap Lalu


Termasuk Kabel NYA 2 x 1,5m2

Outlet Dinding
- Volume Control 0.00%

I LANTAI GROUND FLOOR & MEZZANINE

1 Instalasi loud speaker dengan kabel NYA 2 x 1½ mm2 0.02%


2 Instalasi loud speaker dengan kabel FRC 2 x 1½ mm2 0.11%
3 Ceiling speaker 3 W 0.01%
4 Ceiling speaker 3 W emergency 0.01%
5 Coulumn Speaker 6 W Emergency 0.01%
6 Horn Speaker 15 W emergency 0.00%
7 Attenuator 0.00%
8 Junction box 0.00%

Museum Nasional - Pek.Elektrikal HAL 768/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total 0.27%

II LANTAI 2

1 Instalasi loud speaker dengan kabel NYA 2 x 1½ mm2 0.00%


2 Instalasi loud speaker dengan kabel FRC 2 x 1½ mm2 0.00%
3 Ceiling speaker 3 W 0.00%
4 Ceiling speaker 3 W emergency 0.00%
5 Coulumn Speaker 6 W Emergency 0.00%
6 Attenuator 0.00%
7 Junction box 0.00%

Sub Total 0.00%

III LANTAI 3

1 Instalasi loud speaker dengan kabel NYA 2 x 1½ mm2 0.00%


2 Instalasi loud speaker dengan kabel FRC 2 x 1½ mm2 0.00%
3 Ceiling speaker 3 W 0.00%
4 Ceiling speaker 3 W emergency 0.00%
5 Coulumn Speaker 6 W Emergency 0.00%
6 Attenuator 0.00%
7 Junction box 0.00%

Sub Total 0.00%

IV LANTAI 4

1 Instalasi loud speaker dengan kabel NYA 2 x 1½ mm2 0.02%

Museum Nasional - Pek.Elektrikal HAL 769/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Instalasi loud speaker dengan kabel FRC 2 x 1½ mm2 0.08%


3 Ceiling speaker 3 W 0.01%
4 Ceiling speaker 3 W emergency 0.01%
5 Coulumn Speaker 6 W Emergency 0.00%
6 Attenuator 0.01%
7 Junction box 0.00%

Sub Total 0.13%


LANTAI 6
BONGKAR PASANG OUTLET DINDING KARENA PELAPISAN DINDING GYPSUM TAHAP V

Bongkar Pasang Outlet Existing Tahap Lalu


Termasuk Kabel NYA 2 x 1,5m2

Outlet Dinding
- Volume Control 0.00%

V LANTAI 5

1 Instalasi loud speaker dengan kabel NYA 2 x 1½ mm2 0.02%


2 Instalasi loud speaker dengan kabel FRC 2 x 1½ mm2 0.08%
3 Ceiling speaker 3 W 0.01%
4 Ceiling speaker 3 W emergency 0.01%
5 Coulumn Speaker 6 W Emergency 0.00%
6 Attenuator 0.01%
7 Junction box 0.00%

Sub Total 0.13%

Museum Nasional - Pek.Elektrikal HAL 770/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

VI PERALATAN UTAMA PUBLIC ADDRESS

1 Power Amplifier 240 W 0.00%


2 Mixer 0.00%
3 Equalizer 0.00%
4 DVD Player 0.00%
5 Radio tuner 0.00%
6 Antena AM/FM 0.00%
7 Junction Panel c/w Speaker Selector 0.00%
8 Emergency control panel 0.00%
9 Emergency microphone 0.00%
10 Paging microphone 0.00%
11 Kabel penghubung peralatan utama 0.00%
12 Rack kabinet 0.00%
13 Grounding System c/w Surge Arrester 0.00%

Sub Total 0.00%

VII PERALATAN UTAMA CAR CALLING

1 Mixer Amplifier 180 W 0.00%


2 Speaker Selector 0.00%
3 Paging microphone 0.00%
4 Kabel Penghubung Peralatan utama 0.00%
5 Rack Kabinet 0.00%
6 Grounding System c/w Surge Arrester 0.00%

Sub Total 0.00%

Museum Nasional - Pek.Elektrikal HAL 771/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

VIII KABEL PENGHUBUNG


FRC 2 x 1½ mm² dari Sentral Sound System ke :

1 Junction Box Lantai Basement 2 0.01%


2 Junction Box Lantai Basement 2 Emergency 0.01%
3 Junction Box Lantai Basement 1 0.01%
4 Junction Box Lantai Ground Floor 0.01%
5 Junction Box Lantai 2 0.01%
6 Junction Box Lantai 3 0.01%
7 Junction Box Lantai 4 0.01%
8 Junction Box Lantai 5 0.01%

Sub Total 0.08%

IX TESTING & COMMISSIONING 0.01%

Sub Total 0.01%

<5C> PEKERJAAN INSTALASI FIRE ALARM ( TYPE ADDRESSABLE )

LANTAI B1 & MEZZANINE


PENYEMPURNAAN ARMATURE TAHAP V

Bongkar Pasang Armatur Detektor Fire Alarm Existing Tahap Lalu


Terkait Akan dipasang Plafon +- 1 Meter Termasuk Kabel FRC 2 x 1½ m2
=+ Flexible + Tee Dos + Las Dop + Tes dan Support Lampu

Museum Nasional - Pek.Elektrikal HAL 772/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Bongkar Pasang Detektor 0.01%


Instalasi Detektor FRC 2 x 1,5mm2 0.06%

I LANTAI GROUND FLOOR & MEZZANINE

a INSTALASI
( FRC 2 x 1,5 mm2 + pipa Conduit UPVC Ø ¾" )

1 Detector 0.12%
2 Manual call point 0.01%
3 Alarm bell 0.01%
4 Lampu indicator 0.01%
5 Jack telepon 0.01%
6 Transmitter 0.01%
7 Tamper Switch 0.00%
8 Fire Damper for smoke extract 0.00%
9 Kabel Penghubung dari Panel Kontrol ke Panel Kontrol 0.00%

Sub Total 0.24%

b PERALATAN

1 Smoke detector 0.11%


2 Heat detector type fixed ROR 0.02%
3 Manual call Point 0.00%
4 Alarm Bell 0.01%
5 Lampu Indicator 0.00%
6 End of line resistance 0.00%
7 Transmitter 0.03%
8 Tamper Switch 0.00%

Museum Nasional - Pek.Elektrikal HAL 773/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

9 Control Module 0.00%


10 Panel Kontrol Fire Alarm 0.00%

Sub Total 0.19%

Sub Total

II LANTAI 2

a INSTALASI
( FRC 2 x 1,5 mm2 + pipa Conduit UPVC Ø ¾" )

1 Detector 0.00%
2 Manual call point 0.00%
3 Alarm bell 0.00%
4 Lampu indicator 0.00%
5 Jack telepon 0.00%
6 Transmitter 0.00%
7 Tamper Switch 0.00%
8 Fire Damper for smoke extract 0.00%
9 Kabel Penghubung dari Panel Kontrol ke Panel Kontrol 0.00%

Sub Total 0.00%

b PERALATAN

1 Smoke detector 0.00%


2 Manual call Point 0.00%
3 Alarm Bell 0.00%

Museum Nasional - Pek.Elektrikal HAL 774/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

4 Lampu Indicator 0.00%


5 End of line resistance 0.00%
6 Transmitter 0.00%
7 Tamper Switch 0.00%
8 Control Module 0.00%
9 Panel Kontrol Fire Alarm 0.00%

Sub Total 0.00%

Sub Total

III LANTAI 3

a INSTALASI
( FRC 2 x 1,5 mm2 + pipa Conduit UPVC Ø ¾" )

1 Detector 0.00%
2 Manual call point 0.00%
3 Alarm bell 0.00%
4 Lampu indicator 0.00%
5 Jack telepon 0.00%
6 Transmitter 0.00%
7 Tamper Switch 0.00%
8 Fire Damper for smoke extract 0.00%
9 Kabel Penghubung dari Panel Kontrol ke Panel Kontrol 0.00%

Sub Total 0.00%

b PERALATAN

Museum Nasional - Pek.Elektrikal HAL 775/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Smoke detector 0.00%


2 Manual call Point 0.00%
3 Alarm Bell 0.00%
4 Lampu Indicator 0.00%
5 End of line resistance 0.00%
6 Transmitter 0.00%
7 Tamper Switch 0.00%
8 Control Module 0.00%
9 Panel Kontrol Fire Alarm 0.00%

Sub Total 0.00%

Sub Total

IV LANTAI 4

a INSTALASI
( FRC 2 x 1,5 mm2 + pipa Conduit UPVC Ø ¾" )

1 Detector 0.11%
2 Manual call point 0.01%
3 Alarm bell 0.01%
4 Lampu indicator 0.01%
5 Jack telepon 0.01%
6 Transmitter 0.01%
7 Tamper Switch 0.00%
8 Fire Damper for smoke extract 0.00%
9 Kabel Penghubung dari Panel Kontrol ke Panel Kontrol 0.00%

Museum Nasional - Pek.Elektrikal HAL 776/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total 0.15%

b PERALATAN

1 Smoke detector 0.12%


2 Manual call Point 0.00%
3 Alarm Bell 0.01%
4 Lampu Indicator 0.00%
5 End of line resistance 0.00%
6 Transmitter 0.03%
7 Tamper Switch 0.00%
8 Control Module 0.00%
9 Panel Kontrol Fire Alarm 0.00%

Sub Total 0.17%

Sub Total

V LANTAI 5

a INSTALASI
( FRC 2 x 1,5 mm2 + pipa Conduit UPVC Ø ¾" )

1 Detector 0.11%
2 Manual call point 0.01%
3 Alarm bell 0.01%
4 Lampu indicator 0.01%
5 Jack telepon 0.01%
6 Transmitter 0.01%
7 Tamper Switch 0.00%

Museum Nasional - Pek.Elektrikal HAL 777/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

8 Fire Damper for smoke extract 0.00%


9 Kabel Penghubung dari Panel Kontrol ke Panel Kontrol 0.00%

Sub Total 0.15%

b PERALATAN

1 Smoke detector 0.12%


2 Manual call Point 0.00%
3 Alarm Bell 0.01%
4 Lampu Indicator 0.00%
5 End of line resistance 0.00%
6 Transmitter 0.03%
7 Tamper Switch 0.00%
8 Control Module 0.00%
9 Panel Kontrol Fire Alarm 0.00%

Sub Total 0.17%

Sub Total

VI PERALATAN UTAMA FIRE ALARM

1 Master Control Fire Alarm 0.00%


Type : Addressable
Kapasit :
Lengkap - Nicad battere
- Fuse arrester
- Input module

Museum Nasional - Pek.Elektrikal HAL 778/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

2 Annunciator 0.00%
3 Kabel penghubung dari :
* Central Fire Alarm ke Sistem Tata Suara 0.00%
* Central Fire Alarm ke Panel Kontrol Pompa 0.00%
* Central Fire Alarm ke Panel Kontrol Lift 0.00%
* Central Fire Alarm ke Security system 0.00%
* Central Fire Alarm ke PABX Telepon 0.00%
* Central Fire Alarm ke Panel Kontrol AC 0.00%
* Central Fire Alarm ke DPK 0.00%

Sub Total 0.00%

VII GROUNDING SYSTEM c/w SURGE ARRESTER 0.00%

Sub Total 0.00%

VIII TESTING DAN IJIN DPK 0.00%

Sub Total 0.00%


<5D> PEKERJAAN INSTALASI SECURITY SYSTEM
LANTAI B1 & MEZZANINE
PENYEMPURNAAN ARMATURE TAHAP V

Bongkar Pasang Armatur CCTV Existing Tahap Lalu


Terkait Akan dipasang Plafon +- 1 Meter Termasuk UTP Cat 6
=+ Flexible + Tee Dos + Las Dop + Tes dan Support Lampu

Bongkar Pasang CCTV 0.00%


Instalasi CCTV UTP Cat 6 0.01%

Museum Nasional - Pek.Elektrikal HAL 779/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

I LANTAI GROUND FLOOR & MEZZANINE

1 IP Fixed Bullet Camera NTI-50022-A3S 0.12%


2 IP PTZ Camera 30xZoom c/w PoW Adapter NDP-50022-Z30 0.15%
3 Instalasi IP Camera, Kabel UTP Cat 6 Dalam conduit 0.02%
Instalasi Power CCTV kabel NYA 2 x 1.5 dalam pipa conduit 20mm 0.01%
Instalasi Stop Kontak 0.00%
Stop Kontak 0.00%

Sub Total 0.32%

II LANTAI 2

1 Switch Hub 16 Port PoE c/w Wall Mount Rack WS-2960L-16TS-LL 0.00%
2 IP Fixed Bullet Camera NTI-50022-A3S 0.00%
3 IP PTZ Camera 30xZoom c/w PoW Adapter NDP-50022-Z30 0.00%
4 Instalasi IP Camera, Kabel UTP Cat 6 Dalam conduit 0.00%

Sub Total 0.00%

III LANTAI 3

1 Switch Hub 16 Port PoE c/w Wall Mount Rack WS-2960L-16TS-LL 0.00%
2 IP PTZ Camera 30xZoom c/w PoW Adapter NDP-50022-Z30 0.00%
3 Instalasi IP Camera, Kabel UTP Cat 6 Dalam conduit 0.00%

Sub Total 0.00%

IV LANTAI 4

Museum Nasional - Pek.Elektrikal HAL 780/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Switch Hub 16 Port PoE c/w Wall Mount Rack WS-2960L-16TS-LL 0.06%
2 IP PTZ Camera 30xZoom c/w PoW Adapter NDP-50022-Z30 0.15%
3 Instalasi IP Camera, Kabel UTP Cat 6 Dalam conduit 0.01%
Instalasi Power CCTV kabel NYA 2 x 1.5 dalam pipa conduit 20mm 0.00%
Sub Total 0.22%

V LANTAI 5

1 Switch Hub 16 Port PoE c/w Wall Mount Rack WS-2960L-16TS-LL 0.06%
2 IP PTZ Camera 30xZoom c/w PoW Adapter NDP-50022-Z30 0.15%
3 Instalasi IP Camera, Kabel UTP Cat 6 Dalam conduit 0.01%
Instalasi Power CCTV kabel NYA 2 x 1.5 dalam pipa conduit 20mm 0.00%
Sub Total 0.22%

VI PERALATAN UTAMA CCTV

Server for Video Management System (VMS) dan Video Recording


1 0.30%
Management (VRM) Proliant 380 HG9
2 Network IP Storage Kap 4x4TB DIP-6183-4HD 0.40%
Software Video Management System, Kap 8 Ch IP Camera, 1 Keyboard
3 0.22%
Digital dan 2 Workstation MBV-BPRO-80
4 Upgrade IP License Camera (Per 1 Camera) MBV-XCHAN-80 0.06%
5 PC Workstation c/w Monitor 32" Z-440 0.21%
6 Keyboard PTZ KBD-UXF 0.06%
7 Rack Cabinet System dan Meja Peralatan 0.04%
8 UPS Kap 3KVA Back Up Battery 30 Menit SRT-3000XLI 0.10%
9 Switch Hub 24 Port, 10/100/1000Mbps (PoE) WS-2960X-24PS-L 0.10%
10 Instalasi Peralatan utama 0.02%

Sub Total 1.51%

Museum Nasional - Pek.Elektrikal HAL 781/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

VII KABEL PENGHUBUNG

1 Instalasi Feeder (antar Switch hub), kabel UTP cat 6 dalam Conduit 0.00%

Sub Total 0.00%

VIII TESTING COMMISSIONING 0.03%

Sub Total 0.03%

<5E> PEKERJAAN INSTALASI TELEPON

I LANTAI GROUND FLOOR & MEZZANINE

1 Instalasi extension, indoor Cable 2 x 2 x 0,6 mm 0.00%


2 Socket Outlet Wall Type 0.00%
3 IDF-GF, 10 Pairs 0.00%

Sub Total 0.00%

II LANTAI 2

1 Instalasi extension, indoor Cable 2 x 2 x 0,6 mm 0.00%


2 Socket Outlet Wall Type 0.00%
3 Socket Outlet Floor Type 0.00%
4 IDF-2, 20 Pairs 0.00%

Sub Total 0.00%

III LANTAI 3

Museum Nasional - Pek.Elektrikal HAL 782/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Instalasi extension, indoor Cable 2 x 2 x 0,6 mm 0.00%


2 Socket Outlet Wall Type 0.00%
3 Socket Outlet Floor Type 0.00%
4 IDF-3, 20 Pairs 0.00%

Sub Total 0.00%

IV LANTAI 4

1 Instalasi extension, indoor Cable 2 x 2 x 0,6 mm 0.00%


2 Socket Outlet Wall Type 0.00%
3 IDF-4, 10 Pairs 0.00%

Sub Total 0.00%

V LANTAI 5

1 Instalasi extension, indoor Cable 2 x 2 x 0,6 mm 0.00%


2 Socket Outlet Wall Type 0.00%
3 IDF-5, 10 Pairs 0.00%

Sub Total 0.00%

VI KABEL FEEDER LINE

1 Indoor Cable 10 x 2 x 0,6 mm, dari MDF Gedung ke IDF lt. Gf 0.00%
2 Indoor Cable 20 x 2 x 0,6 mm, dari MDF Gedung ke IDF lt. 2 0.00%
3 Indoor Cable 20 x 2 x 0,6 mm, dari MDF Gedung ke IDF lt. 3 0.00%
4 Indoor Cable 10 x 2 x 0,6 mm, dari MDF Gedung ke IDF lt. 4 0.00%

Museum Nasional - Pek.Elektrikal HAL 783/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

5 Indoor Cable 10 x 2 x 0,6 mm, dari MDF Gedung ke IDF lt. 5 0.00%

Sub Total 0.01%

VII PERALATAN UTAMA

1 PABX ka: Frame : 20 PTT/ 100 ext 0.43%


c/w: * Attendant Console
* Collor Monitor 19"
* Collor Printer
2 MDF Gedung Kapasitas 250 pairs 0.03%
3 UPS 15 kVA 0.22%
4 Pesawat telepon standart 0.01%
5 Pesawat telepon Digital c/w display 0.02%
6 Grounding System 0.00%

Sub Total 0.71%

VIII TESTING & PERIJINAN 0.02%

Sub Total 0.02%

<5F> PEKERJAAN INSTALASI DATA

I LANTAI GROUND FLOOR & MEZZANINE

1 Instalasi data,kabel UTP category 6e + pipa conduit UPVC Ø ¾" 0.01%


2 Outlet Wall type Cat.6e (1 Gang) 0.00%
3 PATCH Panel 0.00%

Museum Nasional - Pek.Elektrikal HAL 784/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Sub Total 0.01%

II LANTAI 2

1 Instalasi data,kabel UTP category 6e + pipa conduit UPVC Ø ¾" 0.00%


2 Outlet Wall type Cat.6e (1 Gang) 0.00%
3 Outlet floor type Cat.6e (1 Gang) 0.00%
4 PATCH Panel 0.00%

Sub Total 0.00%

III LANTAI 3

1 Instalasi data,kabel UTP category 6e + pipa conduit UPVC Ø ¾" 0.00%


2 Outlet Wall type Cat.6e (1 Gang) 0.00%
3 Outlet floor type Cat.6e (1 Gang) 0.00%
4 PATCH Panel 0.00%

Sub Total 0.00%

IV LANTAI 4

1 Instalasi data,kabel UTP category 6e + pipa conduit UPVC Ø ¾" 0.02%


2 Outlet Wall type Cat.6e (1 Gang) 0.00%
3 Outlet floor type Cat.6e (1 Gang) 0.00%
4 PATCH Panel 0.00%

Sub Total 0.02%

V LANTAI 5

Museum Nasional - Pek.Elektrikal HAL 785/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

Museum Nasional - Pek.Elektrikal HAL 786/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Instalasi data,kabel UTP category 6e + pipa conduit UPVC Ø ¾" 0.02%


2 Outlet Wall type Cat.6e (1 Gang) 0.00%
3 Outlet floor type Cat.6e (1 Gang) 0.00%
4 PATCH Panel 0.00%

Sub Total 0.02%

VI KABEL PENGHUBUNG
UTP Category 6 dari PATCH Panel ke :

* PATCH Panel lantai Ground Floor 0.00%


* PATCH Panel lantai 2 0.00%
* PATCH Panel lantai 3 0.00%
* PATCH Panel lantai 4 0.00%
* PATCH Panel lantai 5 0.00%

Sub Total 0.01%

VII MAIN PATCH PANEL 0.02%

Sub Total 0.02%

VIII TESTING INSTALASI 0.01%

Sub Total 0.01%

<5J> PEKERJAAN BUILDING AUTOMATION SYSTEM

I CONTROL ROOM

Museum Nasional - Pek.Elektrikal HAL 787/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

1 Control Panel
-60x40x20 0.00%

2 M5-ADSLA5U-O
-ADS new project software forup to 5 concurrent Users 0.05%

3 MS-NAE451L-2
-One BACnet MS/TP (RS-.185) rrunki an additionalRS,2l2-C
senal port for oprional extomal nodem,
suppon for up lo 50 BACnel MS/TP devices on the rurt. (N2
Bus and LONWORKS® field ttuDk are not supported.)
0.07%

MS-NIE290-0E

- Support one 3rd Party Trunk (RS-232 or Ethernet TCP/IP the Number of
Divice depands protocol
0.12%
4 UPS
-UPS 3000vA / 2100w.230v 0.02%

5 DESKTOP PC
- desktop pc+ Monitor20" LED +.lntelCore i7 6700T.4GB
DDR3. 1TB NDD ' DVD1RW ' VGA NVIDIA GeForce GT730
4GB . WiFi . Bluetooth . Win 10 Profesional 64bit 0.05%
Sub Total 0.32%

Museum Nasional - Pek.Elektrikal HAL 788/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

II DDC point list (41.65, AO=0j Dl=254; DO= L2O)

1 DDC Panel
-120x80x30 0.06%

2 MS-FEC2611-0
- 17 Poirt Field Equipment Controllerwirh 6 Ut,2 AO,2 Bi,3 BO
And 4 CO 2/ VAC. FC and SA Bus Support 0.18%

MS-IOM4711-0

- 17 Point IOM with 6UI, 2BI, 3BO, 2AO, 4CO, 240VAC and SA Bus Support
0.05%

3 MS-IOM2721-0
- 10-Point IOM with 8 UI 2AO FC Bus, and SA Bus Support 0.28%

4 MS-IOM3721-0
- 16-Point IOM with 16 BI, FC Bus, and SA Bus Support 0.16%

5 MS-IOM3721-0
- 16-Point IOM with 8 BI 8 BO FC Bus, and SA Bus Support 0.00%
MS-IOM3731-0
- 16-Point IOM with 8 BI 8 BO FC Bus, and SA Bus Support 0.29%

6 OMRON
- Realy 24 volt 0.14%

7 DP2500-R8
diff erential pressure transmitters 0.07%

Museum Nasional - Pek.Elektrikal HAL 789/932


LAPORAN BOBOT PRESTA
PROYEK :
PEKERJAAN :
LOKASI :
MINGGU KE :
PERIODE :
JANGKA WAKTU PELAKSANAAN :
WAKTU YANG SUDAH BERJALAN :
SISA WAKTU PELAKSANAAN :
OWNER :
KONTRAKTOR :
NO SURAT KONTRAK KERJA ( SPK ) :

NO URAIAN PEKERJAAN BOBOT

TE-6311M-1
Duct Temperatur Sensor 0.16%

TE-6311M-2
6 Inchi well Temperatur Sensor 0.16%

TE-6300W-101
6 Inch (152 mm) Brass Well 0.18%

Sub Total 1.72%

III DDC point list (41.65, AO=0j Dl=254; DO= L2O)

1 Installation
Labour & Material for tnstallation 1.06%
Labour for Instalation Sensor untuk AHU 0.03%
2 Program BMS, G Ul, integrasi dengan BAS gedung lama 0.56%
3 Tes Comm, Training 0.06%
Tambahan Progream untuk sensor 0.08%
Sub Total 1.80%

PEKERJAAN BUILDING AUTOMATION SYSTEM

TOTAL ELEKTRIKAL 29.87%

Museum Nasional - Pek.Elektrikal HAL 790/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.24% 0.00% 0.00% 100.00%


0.00% 0.00% 0.00% 0.00% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


0.00%
0.25% 0.00%

70.00% 0.01% 17.00% 0.00% 87.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 791/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.03% 0.00% 0.00% 100.00%
70.00% 0.01% 17.00% 0.00% 87.00%
70.00% 0.01% 17.00% 0.00% 87.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.11% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

mbahan Kabel

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

mbahan Kabel

Museum Nasional - Pek.Elektrikal HAL 792/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 793/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.23% 0.00% 0.00% 100.00%


100.00% 0.31% 0.00% 0.00% 100.00%

100.00% 0.08% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 794/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

GYPSUM TAHAP V

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

GYPSUM TAHAP V

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 795/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

1.14% 0.01%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.06% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 796/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.23% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.01% 0.00%

100.00% 0.23% 0.00% 0.00% 100.00%


0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.23% 0.00%

Museum Nasional - Pek.Elektrikal HAL 797/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.10% 0.00%

Museum Nasional - Pek.Elektrikal HAL 798/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
40.00% 0.00% 0.00% 0.00% 40.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.27% 0.00% 0.00% 100.00%


0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.27% 0.00%

Museum Nasional - Pek.Elektrikal HAL 799/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.09% 0.00% 0.00% 100.00%


100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 800/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.52% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 801/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 0.00%

100.00% 0.22% 0.00% 0.00% 100.00%


0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.22% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 802/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.10% 0.00% 0.00% 100.00%
100.00% 0.07% 0.00% 0.00% 100.00%

0.44% 0.00%

100.00% 0.08% 0.00% 0.00% 100.00%


100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.13% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

0.01% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 803/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%

0.01% 0.00%

100.00% 0.22% 0.00% 0.00% 100.00%


0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.22% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
0.00% 0.00% 87.00% 0.07% 87.00%
100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 804/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
0.00% 0.00% 87.00% 0.09% 87.00%
0.00% 0.00% 87.00% 0.06% 87.00%

0.19% 0.22%

100.00% 0.08% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.09% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
35.00% 0.00% 0.00% 0.00% 35.00%
100.00% 0.01% 0.00% 0.00% 100.00%

0.01% 0.00%

Museum Nasional - Pek.Elektrikal HAL 805/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.01% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.05% 0.00% 0.00% 100.00%

0.10% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 806/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
0.18% 0.00%

100.00% 0.10% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 807/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.20% 0.00%

100.00% 0.14% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.28% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 808/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.21% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 809/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.21% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.02% 0.00%

100.00% 0.07% 0.00% 0.00% 100.00%


100.00% 0.07% 0.00% 0.00% 100.00%
100.00% 0.08% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 810/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.23% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.25% 0.00%

Museum Nasional - Pek.Elektrikal HAL 811/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.14% 0.00% 0.00% 100.00%


100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.05% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.33% 0.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 812/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.25% 0.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 813/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%

0.25% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.02% 0.00%

100.00% 1.46% 0.00% 0.00% 100.00%


100.00% 1.61% 0.00% 0.00% 100.00%
100.00% 1.61% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.13% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%
5.09% 0.00%

Museum Nasional - Pek.Elektrikal HAL 814/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.94% 0.00% 0.00% 100.00%

100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.10% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.12% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 3.17% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 815/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.20% 0.00% 0.00% 100.00%

100.00% 2.00% 0.00% 0.00% 100.00%

100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.31% 0.00% 0.00% 100.00%


100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 816/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.13% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.35% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.16% 0.00% 0.00% 100.00%

100.00% 0.09% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.05% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 817/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
48.00% 0.00% 0.00% 0.00% 48.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 818/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

100.00% 0.04% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 819/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.01% 1.00% 0.00% 87.00%
86.00% 0.00% 1.00% 0.00% 87.00%
86.00% 0.00% 0.00% 0.00% 86.00%
86.00% 0.00% 1.00% 0.00% 87.00%

85.00% 0.03% 2.00% 0.00% 87.00%


85.00% 0.03% 2.00% 0.00% 87.00%

85.00% 0.01% 2.00% 0.00% 87.00%


85.00% 0.01% 2.00% 0.00% 87.00%

100.00% 0.00% 0.00% 0.00% 100.00%

9.18% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

0.02% 0.00%

Museum Nasional - Pek.Elektrikal HAL 820/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

82.00% 0.00% 0.00% 0.00% 82.00%

82.00% 0.00% 0.00% 0.00% 82.00%


82.00% 0.00% 0.00% 0.00% 82.00%

0.00% 0.00%

93.00% 0.00% 0.00% 0.00% 93.00%


93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%
93.00% 0.00% 0.00% 0.00% 93.00%

0.00% 0.00%

50.00% 0.01% 0.00% 0.00% 50.00%

0.01% 0.00%

Museum Nasional - Pek.Elektrikal HAL 821/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

an FRC 2 x 1½ m2

85.00% 0.01% 2.00% 0.00% 87.00%


85.00% 0.08% 2.00% 0.00% 87.00%

GYPSUM TAHAP V

85.00% 0.00% 2.00% 0.00% 87.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.11% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 822/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.26% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 823/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.13% 0.00%

GYPSUM TAHAP V

100.00% 0.00% 0.00% 0.00% 100.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.08% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.13% 0.00%

Museum Nasional - Pek.Elektrikal HAL 824/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 825/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%

0.08% 0.00%

50.00% 0.01% 0.00% 0.00% 50.00%

0.01% 0.00%

Museum Nasional - Pek.Elektrikal HAL 826/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.06% 0.00% 0.00% 100.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.24% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 827/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.19% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 828/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 829/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 830/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.15% 0.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.17% 0.00%

100.00% 0.11% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 831/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.15% 0.00%

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.03% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.17% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 832/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

50.00% 0.00% 0.00% 0.00% 50.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.01% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 833/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.12% 0.00% 0.00% 100.00%


100.00% 0.15% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.32% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 834/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.15% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.22% 0.00%

100.00% 0.06% 0.00% 0.00% 100.00%


100.00% 0.15% 0.00% 0.00% 100.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
0.22% 0.00%

100.00% 0.30% 0.00% 0.00% 100.00%


100.00% 0.40% 0.00% 0.00% 100.00%
100.00% 0.22% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.21% 0.00% 0.00% 100.00%
100.00% 0.06% 0.00% 0.00% 100.00%
100.00% 0.04% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%
100.00% 0.10% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%

1.51% 0.00%

Museum Nasional - Pek.Elektrikal HAL 835/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

50.00% 0.02% 0.00% 0.00% 50.00%

0.02% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 836/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.00% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 837/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.00% 0.00% 0.00% 100.00%

0.01% 0.00%

100.00% 0.43% 0.00% 0.00% 100.00%

100.00% 0.03% 0.00% 0.00% 100.00%


96.00% 0.22% 0.00% 0.00% 96.00%
100.00% 0.01% 0.00% 0.00% 100.00%
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.71% 0.00%

50.00% 0.01% 0.00% 0.00% 50.00%

0.01% 0.00%

100.00% 0.01% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

Museum Nasional - Pek.Elektrikal HAL 838/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
0.01% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.02% 0.00%

Museum Nasional - Pek.Elektrikal HAL 839/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

Museum Nasional - Pek.Elektrikal HAL 840/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %
100.00% 0.02% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.02% 0.00%

100.00% 0.00% 0.00% 0.00% 100.00%


100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%
100.00% 0.00% 0.00% 0.00% 100.00%

0.01% 0.00%

100.00% 0.02% 0.00% 0.00% 100.00%

0.02% 0.00%

50.00% 0.00% 0.00% 0.00% 50.00%

0.00% 0.00%

Museum Nasional - Pek.Elektrikal HAL 841/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

95.00% 0.00% 0.00% 0.00% 95.00%

95.00% 0.05% 0.00% 0.00% 95.00%

99.00% 0.07% 0.00% 0.00% 99.00%

95.00% 0.12% 0.00% 0.00% 95.00%

95.00% 0.02% 0.00% 0.00% 95.00%

95.00% 0.05% 0.00% 0.00% 95.00%


0.31% 0.00%

Museum Nasional - Pek.Elektrikal HAL 842/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

95.00% 0.05% 0.00% 0.00% 95.00%

95.00% 0.17% 0.00% 0.00% 95.00%

95.00% 0.05% 0.00% 0.00% 95.00%

95.00% 0.27% 0.00% 0.00% 95.00%

95.00% 0.15% 0.00% 0.00% 95.00%

95.00% 0.00% 0.00% 0.00% 95.00%

95.00% 0.28% 0.00% 0.00% 95.00%

95.00% 0.13% 0.00% 0.00% 95.00%

95.00% 0.06% 0.00% 0.00% 95.00%

Museum Nasional - Pek.Elektrikal HAL 843/932


N BOBOT PRESTASI
PEMBANGUNAN GEDUNG C DAN ENTRANCE MUSEUM NASIONAL
PERSIAPAN, STRUKTUR, ARSITEK, MEKANIKAL DAN ELEKTRIKAL
JL. MERDEKA BARAT N0.12 - JAKARTA PUSAT
29 (DUA PULUH SEMBILAN)
24 DESEMBER 2018 S/D 30 DESEMBER 2018
210 Hari
203 Hari
1 Hari
MUSEUM NASIONAL
PT. INTRACO LESTARI
E7 - 004/ SP/ PPK2/ 2018

PRESTASI PEKERJAAN
MINGGU LALU MINGGU INI S/D MINGGU INI
% bobot % bobot %

95.00% 0.15% 0.00% 0.00% 95.00%

95.00% 0.15% 0.00% 0.00% 95.00%

95.00% 0.17% 0.00% 0.00% 95.00%

1.63% 0.00%

95.00% 1.01% 0.00% 0.00% 95.00%


95.00% 0.03% 0.00% 0.00% 95.00%
95.00% 0.53% 0.00% 0.00% 95.00%
95.00% 0.05% 0.00% 0.00% 95.00%
95.00% 0.08% 0.00% 0.00% 95.00%
1.71% 0.00%

29.33% 0.23%

Museum Nasional - Pek.Elektrikal HAL 844/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.24%
0.00%

0.01%

0.00%

0.00%

0.00%

0.25%

0.01%
0.03%
0.03%
0.02%
0.02%

Museum Nasional - Pek.Elektrikal HAL 845/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.03%
0.02%
0.02%
0.01%
0.00%
0.01%
0.01%
0.00%
0.00%
0.11%
0.07%
0.00%

0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 846/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.01%
0.00%

0.01%
0.00%

Museum Nasional - Pek.Elektrikal HAL 847/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.23%
0.31%

0.08%

Museum Nasional - Pek.Elektrikal HAL 848/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 849/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%

0.05%

0.05%

1.15%

0.09%
0.06%

Museum Nasional - Pek.Elektrikal HAL 850/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.03%
0.04%
0.00%

0.23%

0.00%
0.00%
0.00%
0.00%
0.00%

0.01%

0.23%
0.00%
0.00%

0.23%

Museum Nasional - Pek.Elektrikal HAL 851/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.06%
0.04%
0.00%

0.10%

Museum Nasional - Pek.Elektrikal HAL 852/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%

0.00%

0.27%
0.00%
0.00%

0.27%

Museum Nasional - Pek.Elektrikal HAL 853/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.09%
0.06%
0.04%
0.03%
0.05%
0.03%

Museum Nasional - Pek.Elektrikal HAL 854/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.02%
0.02%
0.02%
0.02%
0.03%
0.02%
0.02%
0.02%
0.02%
0.00%

0.52%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 855/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%

0.22%
0.00%
0.00%

0.22%

0.01%
0.01%
0.00%
0.00%
0.02%
0.08%
0.07%
0.03%
0.01%
0.01%
0.01%
0.01%
0.02%

Museum Nasional - Pek.Elektrikal HAL 856/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.10%
0.07%

0.44%

0.08%
0.05%
0.00%

0.13%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%

0.01%

0.00%

Museum Nasional - Pek.Elektrikal HAL 857/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.01%

0.22%
0.00%
0.00%

0.22%

0.01%
0.01%
0.00%
0.00%
0.02%
0.07%
0.07%
0.03%
0.01%
0.01%
0.01%

Museum Nasional - Pek.Elektrikal HAL 858/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.01%
0.02%
0.09%
0.06%

0.41%

0.08%
0.01%
0.00%

0.09%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%

0.01%

Museum Nasional - Pek.Elektrikal HAL 859/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%

0.01%

0.06%
0.05%

0.10%

0.06%
0.07%
0.03%

0.00%

Museum Nasional - Pek.Elektrikal HAL 860/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.01%
0.01%

0.00%

0.00%
0.00%
0.18%

0.10%
0.02%
0.03%
0.04%

0.00%
0.00%

0.01%
0.01%
0.00%
0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 861/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.20%

0.14%
0.03%
0.04%
0.04%

0.00%
0.00%

0.01%
0.01%
0.00%
0.01%

0.00%

0.28%

0.11%
0.02%
0.02%
0.04%

Museum Nasional - Pek.Elektrikal HAL 862/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%

0.01%
0.00%
0.00%

0.00%
0.00%

0.00%

0.21%

0.11%
0.02%
0.02%
0.04%

0.00%
0.00%

0.01%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 863/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%

0.00%

0.21%

0.02%

0.02%

0.07%
0.07%
0.08%

0.00%
0.00%

0.01%

Museum Nasional - Pek.Elektrikal HAL 864/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.00%

0.00%

0.23%

0.11%
0.02%
0.04%
0.06%

0.00%
0.00%

0.01%
0.01%
0.00%
0.00%

0.00%

0.25%

Museum Nasional - Pek.Elektrikal HAL 865/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.14%
0.04%
0.05%
0.06%

0.00%
0.00%

0.01%
0.01%
0.01%
0.00%

0.00%

0.33%

0.12%
0.03%
0.03%
0.06%

0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 866/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.01%
0.00%
0.00%

0.00%
0.00%

0.00%

0.25%

0.12%
0.03%
0.03%
0.06%

0.00%
0.00%

0.01%
0.00%
0.00%

0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 867/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.25%

0.02%

0.02%

1.46%
1.61%
1.61%
0.04%
0.02%
0.08%
0.03%
0.02%
0.03%
0.03%
0.00%
0.13%
0.06%
5.09%

Museum Nasional - Pek.Elektrikal HAL 868/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.94%

0.09%

0.10%

0.04%

0.01%

0.01%
0.12%
0.01%
0.04%

3.17%

0.04%

0.09%

0.02%

0.00%

0.02%

Museum Nasional - Pek.Elektrikal HAL 869/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.01%

0.01%
0.01%

0.01%
0.01%
0.20%

2.00%

0.09%

0.31%
0.06%

0.00%

0.01%
0.00%

0.01%
0.02%

0.00%

Museum Nasional - Pek.Elektrikal HAL 870/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.13%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.35%

0.03%

0.05%

0.16%

0.09%

0.02%

0.04%

0.05%

0.05%

0.03%

Museum Nasional - Pek.Elektrikal HAL 871/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.02%

0.01%
0.01%
0.02%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%

0.02%
0.02%
0.00%
0.00%
0.03%
0.01%
0.00%
0.04%
0.02%
0.03%
0.03%
0.00%
0.00%
0.01%
0.00%

Museum Nasional - Pek.Elektrikal HAL 872/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.02%
0.00%
0.00%
0.00%
0.03%
0.00%

0.00%
0.00%
0.01%
0.01%

0.04%
0.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.02%
0.00%
0.01%
0.00%
0.04%
0.00%
0.03%
0.04%
0.01%
0.00%

Museum Nasional - Pek.Elektrikal HAL 873/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%

0.03%
0.03%

0.01%
0.01%

0.00%

9.18%

0.00%
0.01%
0.01%

0.02%

Museum Nasional - Pek.Elektrikal HAL 874/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%

0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.01%

0.01%

Museum Nasional - Pek.Elektrikal HAL 875/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.01%
0.08%

0.00%

0.02%
0.11%
0.01%
0.01%
0.01%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 876/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.26%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.02%

Museum Nasional - Pek.Elektrikal HAL 877/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.08%
0.01%
0.01%
0.00%
0.01%
0.00%

0.13%

0.00%

0.02%
0.08%
0.01%
0.01%
0.00%
0.01%
0.00%

0.13%

Museum Nasional - Pek.Elektrikal HAL 878/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 879/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%

0.08%

0.01%

0.01%

Museum Nasional - Pek.Elektrikal HAL 880/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.01%
0.06%

0.12%
0.01%
0.01%
0.01%
0.01%
0.01%
0.00%
0.00%
0.00%

0.24%

0.11%
0.02%
0.00%
0.01%
0.00%
0.00%
0.03%
0.00%

Museum Nasional - Pek.Elektrikal HAL 881/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%

0.19%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 882/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 883/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.11%
0.01%
0.01%
0.01%
0.01%
0.01%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 884/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.15%

0.12%
0.00%
0.01%
0.00%
0.00%
0.03%
0.00%
0.00%
0.00%

0.17%

0.11%
0.01%
0.01%
0.01%
0.01%
0.01%
0.00%

Museum Nasional - Pek.Elektrikal HAL 885/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%
0.00%

0.15%

0.12%
0.00%
0.01%
0.00%
0.00%
0.03%
0.00%
0.00%
0.00%

0.17%

0.00%

Museum Nasional - Pek.Elektrikal HAL 886/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.01%

Museum Nasional - Pek.Elektrikal HAL 887/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.12%
0.15%
0.02%
0.01%
0.00%
0.00%

0.32%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 888/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.06%
0.15%
0.01%
0.00%
0.22%

0.06%
0.15%
0.01%
0.00%
0.22%

0.30%
0.40%
0.22%
0.06%
0.21%
0.06%
0.04%
0.10%
0.10%
0.02%

1.51%

Museum Nasional - Pek.Elektrikal HAL 889/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%

0.00%

0.02%

0.02%

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 890/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 891/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.00%

0.01%

0.43%

0.03%
0.22%
0.01%
0.02%
0.00%

0.71%

0.01%

0.01%

0.01%
0.00%
0.00%

Museum Nasional - Pek.Elektrikal HAL 892/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.01%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

0.02%
0.00%
0.00%
0.00%

0.02%

Museum Nasional - Pek.Elektrikal HAL 893/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

Museum Nasional - Pek.Elektrikal HAL 894/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot
0.02%
0.00%
0.00%
0.00%

0.02%

0.00%
0.00%
0.00%
0.00%
0.00%

0.01%

0.02%

0.02%

0.00%

0.00%

Museum Nasional - Pek.Elektrikal HAL 895/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.00%

0.05%

0.07%

0.12%

0.02%

0.05%
0.31%

Museum Nasional - Pek.Elektrikal HAL 896/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.05%

0.17%

0.05%

0.27%

0.15%

0.00%

0.28%

0.13%

0.06%

Museum Nasional - Pek.Elektrikal HAL 897/932


M NASIONAL
ELEKTRIKAL

S/D MINGGU INI


bobot

0.15%

0.15%

0.17%

1.63%

1.01%
0.03%
0.53%
0.05%
0.08%
1.71%

29.56%

Museum Nasional - Pek.Elektrikal HAL 898/932


SCHEDULE PROJECT ADDENDUM
Nama Proyek : PROJECT MUSEUIM NASIONAL INDONESIA TAHAP 6 TAHUN 2018
Alamat Proyek : Jl. Merdeka Barat No. 12 Jakarta Pusat

BOBOT BOBOT CCO


No. URAIAN PEKERJAAN
AWAL (%) (%) Jun-18 Jul-18
MG 1 MG 2 MG 3 MG-4 MG-5 MG-6
07/6-17/6 18/6-24/7 25/6-01/7 2/7-8/7 9/7-15/7 16/7-22/7

1 PERSIAPAN
A - Kantor Direksi di Lapangan 0.143% 0.000%
- Direksi Keet MK 0.147%
- Gudang 0.024% 0.012% 0.005% 0.000% 0.000%
- R.Meeting 0.033% 0.019% 0.001% 0.001% 0.001%
- Pekerjaan Pagar Proyek 0.075% 0.063% 0.002% 0.002% 0.002%
B - Papan Nama 0.003% 0.003% 0.003%
C - Pemadam Kebakaaran, P3K, Peralatan Keselamatan Kerja 0.152% 0.152% 0.005% 0.005% 0.005%
D - Mobilisasi dan Demobilisasi 0.133% 0.133% 0.004% 0.004% 0.004%
E - Peralatan Kerja 0.293% 0.095% 0.005% 0.005% 0.005%
F - Pengadaan Sumber Air 0.021% 0.021% 0.005% 0.005% 0.000%
- Penyambungan Listrik Kerja 104 KVA 0.467% 0.437% 0.005% 0.005% 0.005%
G - Instalasi Listrik Kerja 0.065% 0.066% 0.002% 0.002% 0.002%
H - Photo -Photo Kemajuan Pekerjaan 0.003% 0.003% 0.000% 0.000%

2 PEKERJAAN STRUKTUR
A Basament
-Pekerjaan Tribun 0.871% 0.931%
B Pekerjaan Lain-Lain 0.677% 0.678% 0.005% 0.026%
C Pekerjaan Rangka Dudukan Curtain Wall 0.226% 0.237% 0.005% 0.028%
D Pekerjaan Struktur Entrance Gate C-A 0.203% 0.195% 0.005% 0.025%
E Pekerjaan Balkon Lt.3 0.112% 0.119% 0.005% 0.014%
F Pekerjaan struktur Lantai dan lainnya 0.126%

3 PEKERJAAN ARSITEKTUR
A Lantai Basement Dua
- Pekerjaan Dinding dan Finishing 0.708% 0.635% 0.015% 0.015% 0.032%
- Pekerjaan Pintu, Jendela dan Kunci 0.350% 0.351%
- Pekerjaan Finishing Lantai 2.749% 2.753%
- Pekerjaan Plafond 0.043% 0.046%
- Pekerjaan Sanitair 0.058% 0.058%
- Pekerjaan Railing tangga dan lain-lain 0.619% 0.647%
B Lantai Basement Satu
- Pekerjaan Dinding dan Finishing 2.401% 2.452%
- Pekerjaan Pintu, Jendela dan Kunci 1.551% 1.526%
- Pekerjaan Finishing Lantai 2.202% 2.492%
- Pekerjaan Plafond 0.744% 0.817%
- Pekerjaan Sanitair 0.562% 0.603%
- Pekerjaan Railing tangga dan lain-lain 0.202% 0.202%
C Lantai Ground Floor dan Mezzanine
- Pekerjaan Dinding dan Finishing 1.342% 1.694%
- Pekerjaan Pintu, Jendela dan Kunci 1.318% 0.992%
- Pekerjaan Finishing Lantai 2.005% 1.822%
- Pekerjaan Plafond 0.868% 1.293%
- Pekerjaan Sanitair 0.220% 0.292%
- Pekerjaan Railing tangga dan lain-lain 0.748% 0.693%
Lantai 2
- Pekerjaan Dinding dan Finishing 0.067%
- Pekerjaan Pintu Almunium 0.007%
- Pekerjaan Finishing Lantai 0.003%
- Pekerjaan Plafond 0.001%
- Pekerjaan Sanitair 0.010%
Lantai 3
- Pekerjaan Dinding dan Finishing 0.082%
- Pekerjaan Pintu Almunium 0.007%
- Pekerjaan Finishing Lantai 0.003%
- Pekerjaan Plafond 0.057%
- Pekerjaan Sanitair 0.018%
D Lantai 4
- Pekerjaan Dinding dan Finishing 1.856% 0.067%
- Pekerjaan Pintu Almunium 0.007%
- Pekerjaan Finishing Lantai 0.411% 0.003%
- Pekerjaan Plafond 0.248% 0.232%
- Pekerjaan Sanitair 0.013%
E Lantai 5
- Pekerjaan Dinding dan Finishing 1.854% 0.071%
- Pekerjaan Pintu Almunium 0.007%
- Pekerjaan Finishing Lantai 0.003%
- Pekerjaan Plafond 0.237% 0.234%
- Pekerjaan Sanitair 0.013%
F Lantai 6
- Pekerjaan Dinding dan Finishing 0.723% 0.830%
- Pekerjaan Pintu, Jendela dan Kunci 0.973% 0.974%
- Pekerjaan Finishing Lantai 1.056% 1.057%
- Pekerjaan Plafond 0.000% 0.000%
G Lantai 7
- Pekerjaan Dinding dan Finishing 0.041% 0.041%
- Pekerjaan Pintu, Jendela dan Kunci 0.079% 0.079%
- Pekerjaan Finishing Lantai 0.298% 0.299%
- Pekerjaan Plafond 0.096% 0.097%
- Pekerjaan Railing tangga dan lain-lain 0.038% 0.149%
H Lantai Atap
-Pekerjaan Dinding dan Finishing 1.488% 1.095%
I Pekerjaan Sunken Plaza 5.053% 5.485% 0.009% 0.009% 0.009%
J Pekerjaan Luar 1.564% 1.795%

4 PEKERJAAN MEKANIKAL
- Pekerjaan Instalasi Air Conditioning 21.230% 22.421% 0.023% 0.352%
- Pekerjaan Instalasi Plumbing 0.730% 0.995% 0.005% 0.030%
- Pekerjaan Instalasi Fire Hydrand 7.013% 6.243% 0.005% 0.108%
- Pekerjaan Instalasi Fire Sprinkler 3.858% 4.443% 0.005% 0.239%
- Pekerjaan Penyambungan PDAM 0.126% 0.000%
5 PEKERJAAN ELEKTRIKAL
- Pekerjaan Instalasi Listrik 21.470% 22.912% 0.010% 0.239%
- Pekerjaan Instalasi Sound System 0.569% 0.569%
- Pekerjaan Instalasi Fire Alarm 1.038% 1.040%
- Pekerjaan Instalasi Securyti System 2.262% 2.265%
- Pekerjaan Instalasi Telepon 0.763% 0.764%
- Pekerjaan Instalasi Data 0.106% 0.106%
- Pekerjaan Building Automatic System 2.628% 2.632%

Checklist and hand over 100% 100%

RENCANA FISIK PERMINGGU 2 0.00% 0.00% 0.00% 0.06% 0.12% 1.13%


AKUMULATIF RENCANAn 2 0.00% 0.00% 0.00% 0.06% 0.18% 1.31%
REALISASI FISIK PERMINGGU 0.00% 0.00% 0.00% 0.06% 0.12% 1.12%
AKUMULATIF REALISASI 0.00% 0.00% 0.00% 0.06% 0.18% 1.31%
DEVIASI 0.00% 0.00% 0.00% 0.00% 0.00% -0.01%
AKUMULATIF DEVIASI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

DISETUJU
PEMBERI T
MUSEUM NA

Dra. Sri Suha


PEJABAT PEMBUA
PEMBERI TUGAS

MUSEUM NASIONAL

Aug-18 Sep-18 Oct-18


MG-7 MG-8 MG-9 MG-10 MG-11 MG-12 MG-13 MG-14 MG-15 MG-16 MG-17 MG-18 MG-19
23/7-29/7 30/7-05/8 6/8-12/8 13/8-19/8 20/8-26/8 27/8-2/9 3/9-9/9 10/9-16/9 17/9-23/9 24/9-30/9 1/10-7/10 8/10-14/10 15/10-21/10

0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.002% 0.002% 0.002% 0.012% 0.012% 0.012% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%

0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
0.005% 0.005% 0.005% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.005% 0.005% 0.005% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.034% 0.037% 0.014% 0.173% 0.165% 0.172% 0.166% 0.169%


0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
0.028% 0.028% 0.028% 0.024% 0.024% 0.024% 0.047%
0.025% 0.025% 0.025% 0.017% 0.017% 0.017% 0.037%
0.014% 0.014% 0.014% 0.012% 0.012% 0.012% 0.021%
0.025% 0.025% 0.025% 0.025% 0.025%

0.032% 0.032% 0.032% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027%
0.058% 0.031% 0.034% 0.005% 0.016% 0.002% 0.019%
0.081% 0.079% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.223%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034%

0.081% 0.081% 0.079% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.429%
0.079% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.380%
0.081% 0.080% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.441%
0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.130%
0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.104%
0.005% 0.016% 0.002% 0.045%

0.103% 0.103% 0.103% 0.079% 0.057% 0.209% 0.209% 0.209% 0.209% 0.209% 0.202%
0.103% 0.079% 0.057% 0.155% 0.155% 0.155% 0.155% 0.133%
0.103% 0.103% 0.103% 0.079% 0.057% 0.259% 0.259% 0.259% 0.600%
0.103% 0.103% 0.079% 0.057% 0.179% 0.179% 0.179% 0.179% 0.179% 0.055%
0.103% 0.079% 0.057% 0.015% 0.015% 0.015% 0.008%
0.103% 0.049% 0.118% 0.095% 0.095% 0.095% 0.095% 0.043%

0.017%

0.016%

0.083% 0.083% 0.083% 0.083% 0.083% 0.083%


0.097% 0.097% 0.097% 0.097% 0.097% 0.097%
0.106% 0.106% 0.106% 0.106% 0.106% 0.106%

0.010% 0.010% 0.010%


0.020% 0.020% 0.020%
0.075% 0.075% 0.075%
0.024% 0.024% 0.024%
0.037% 0.037% 0.037%
0.137% 0.137% 0.137%
0.009% 0.009% 0.103% 0.103% 0.103% 0.079% 0.58% 0.58% 0.58% 0.58% 0.58% 0.58% 0.58%
0.019% 0.103% 0.103% 0.103% 0.079% 0.057% 0.208% 0.208% 0.208% 0.208% 0.208% 0.290%

0.351% 0.351% 0.751% 1.062% 0.648% 1.333% 0.853% 0.813% 0.886% 1.285% 0.510% 0.533% 0.224%
0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030%
0.109% 0.108% 0.222% 0.206% 0.206% 0.079% 0.057% 0.031% 0.034% 0.005% 0.016% 0.012% 0.041%
0.239% 0.238% 0.342% 0.342% 0.342% 0.164% 0.057% 0.031% 0.034% 0.005% 0.028% 0.094% 0.070%

0.239% 0.238% 0.323% 0.323% 0.323% 0.323% 0.574% 0.043% 0.056% 0.116% 0.150% 1.155% 0.220%
0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047%
0.109% 0.109% 0.222% 0.318% 0.318% 0.079% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.052%
0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035%
0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
0.109% 0.109% 0.361% 0.361% 0.109% 0.109% 0.057% 0.031% 0.034% 0.005% 0.016% 0.002% 0.089%

1.46% 1.47% 2.93% 3.51% 3.41% 3.41% 3.52% 3.66% 3.77% 3.90% 3.93% 4.20% 4.49%
2.76% 4.24% 7.16% 10.67% 14.08% 17.49% 21.01% 24.67% 28.44% 32.34% 36.26% 40.47% 44.96%
1.46% 1.47% 2.93% 3.51% 3.10% 2.61% 4.68% 4.00% 4.34% 3.16% 2.52% 5.52% 4.85%
2.76% 4.24% 7.16% 10.67% 13.77% 16.38% 21.06% 25.06% 29.40% 32.57% 35.05% 40.60% 45.45%
0.00% 0.00% 0.00% 0.00% -0.31% -0.80% 1.16% 0.34% 0.57% -0.73% -1.41% 1.32% 0.36%
0.00% 0.00% 0.00% 0.00% -0.31% -1.11% 0.04% 0.39% 0.96% 0.23% -1.21% 0.13% 0.49%

DISETUJUI OLEH DIPERIKSA OLEH


PEMBERI TUGAS KONSULTAN MK
MUSEUM NASIONAL PT. UNI TRI CIPTA

Dra. Sri Suharni, M.M. Ir. Wuryanto Yahmo, M.Sc.


PEJABAT PEMBUAT KOMITMEN TEAM LEADER
KONSULTAN MK KONTRAKTOR PELAKSANA

L PT. UNI TRI CIPTA PT. INTRACO LESTARI

Oct-18 Nov-18 Dec-18


KONTROL BOBOT
MG-20 MG-21 MG-22 MG-23 MG-24 MG-25 MG-26 MG-27 MG-28 MG-29 MG-30
22/10-28/10 29/10-4/11 5/11-11/11 12/11-18/11 19/11-25/11 26/11-2/12 3/12-9/12 10/12-16/12 17/12-23/12 24/12-30/12 31-Dec

97,03%
100%
0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.004% 0.004%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.002% 0.001% 0.001%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%

0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.025% 0.005% 0.005%
0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.021% 0.004% 0.004%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.053% 0.001% 0.001%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.004% 0.000% 0.000%
0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.096% 0.016% 0.016%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.016% 0.002% 0.002%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.100%

0.027% 0.027% 0.027% 0.027% 0.027% 0.007% 0.007% 0.007% 0.007% 0.038%
0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019%
0.222% 0.222% 0.222% 0.222% 0.222% 0.222% 0.222% 0.222% 0.222% 0.226%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034%

0.429% 0.429% 0.429% 0.349%


0.380% 0.380% 0.162%
0.441% 0.441% 0.441% 0.422%
0.130% 0.130% 0.130% 0.153%
0.104% 0.104% 0.145%
0.045% 0.045% 0.046%

0.017% 0.017% 0.017%


0.002% 0.002% 0.002%
0.002% 0.002%
0.000% 0.000% 50%
0.003% 0.003% 0.003%

0.020% 0.020% 0.020% 0.020%


0.002% 0.002% 0.002%
0.002% 0.002%
0.028% 0.028%
0.009% 0.009%

0.022% 0.022% 0.022%


0.004% 0.004%
0.002% 0.002%
0.100% 0.100% 0.016%
0.004% 0.004% 0.004%

0.024% 0.024% 0.024%


0.004% 0.004%
0.002% 0.002%
0.100% 0.045% 0.045% 0.045%
0.004% 0.004% 0.004%

0.083% 0.083% 0.083% 0.083%


0.097% 0.097% 0.097% 0.097%
0.106% 0.106% 0.106% 0.106%

0.010%
0.020%
0.075%
0.024%
0.037%
0.137% 0.237% 0.137% 0.137% 0.037%
0.96%

0.358% 0.400% 1.030% 1.140% 1.845% 1.715% 1.451% 1.451% 2.960% 0.094%
0.030% 0.030% 0.030% 0.030% 0.085% 0.085% 0.085% 0.085% 0.085% 0.020%
0.041% 0.743% 0.743% 0.743% 1.000% 1.500% 0.041% 0.041% 0.041% 0.110%
0.062% 0.215% 0.215% 0.215% 0.215% 0.215% 0.215% 0.215% 0.323% 0.323%

0.525% 0.070% 0.530% 1.847% 2.252% 2.488% 3.623% 3.623% 3.178% 0.445%
0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.013% 0.013%
0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.024% 0.024%
0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.445%
0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.018% 0.018%
0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.002% 0.002%
0.089% 0.089% 0.089% 0.089% 0.089% 0.089% 0.089% 0.089% 0.089% 0.445% 0%

4.87% 4.41% 5.14% 6.08% 6.17% 6.61% 6.02% 6.02% 7.40% 2.30% 0.03%
49.83% 54.24% 59.38% 65.47% 71.63% 78.24% 84.26% 90.27% 97.67% 99.97% 100.00%
2.59% 5.08% 3.85% 5.98% 7.06% 8.21% 6.91% 4.72% 4.92% 1.97%
48.04% 53.13% 56.97% 62.96% 70.03% 78.25% 85.16% 89.88% 94.75% 96.71%
-2.28% 0.67% -1.30% -0.10% 0.90% 1.61% 0.89% -1.30% -2.48% -0.33%
-1.78% -1.11% -2.41% -2.50% -1.60% 0.01% 0.91% -0.39% -2.93% -3.25%

DIBUAT OLEH
KONTRAKTOR
PT INTRACO LESTARI

Ir. Didik Prasetyo


PROJECT MANAGER
SCHEDULE PROJECT ADDENDUM
Nama Proyek : PROJECT MUSEUIM NASIONAL INDONESIA TAHAP 6 TAHUN 2018
Alamat Proyek : Jl. Merdeka Barat No. 12 Jakarta Pusat

BOBOT
No. URAIAN PEKERJAAN
AWAL (%)

1 PERSIAPAN
A - Kantor Direksi di Lapangan 0.143%
- Direksi Keet MK
- Gudang 0.024%
- R.Meeting 0.033%
- Pekerjaan Pagar Proyek 0.075%
B - Papan Nama 0.003%
C - Pemadam Kebakaaran, P3K, Peralatan Keselamatan Kerja 0.152%
D - Mobilisasi dan Demobilisasi 0.133%
E - Peralatan Kerja 0.293%
F - Pengadaan Sumber Air 0.021%
- Penyambungan Listrik Kerja 104 KVA 0.467%
G - Instalasi Listrik Kerja 0.065%
H - Photo -Photo Kemajuan Pekerjaan 0.003%

2 PEKERJAAN STRUKTUR
A Basament
-Pekerjaan Tribun 0.871%
B Pekerjaan Lain-Lain 0.677%
C Pekerjaan Rangka Dudukan Curtain Wall 0.226%
D Pekerjaan Struktur Entrance Gate C-A 0.203%
E Pekerjaan Balkon Lt.3 0.112%
F Pekerjaan struktur Lantai dan lainnya

3 PEKERJAAN ARSITEKTUR
A Lantai Basement Dua
- Pekerjaan Dinding dan Finishing 0.708%
- Pekerjaan Pintu, Jendela dan Kunci 0.350%
- Pekerjaan Finishing Lantai 2.749%
- Pekerjaan Plafond 0.043%
- Pekerjaan Sanitair 0.058%
- Pekerjaan Railing tangga dan lain-lain 0.619%
B Lantai Basement Satu
- Pekerjaan Dinding dan Finishing 2.401%
- Pekerjaan Pintu, Jendela dan Kunci 1.551%
- Pekerjaan Finishing Lantai 2.202%
- Pekerjaan Plafond 0.744%
- Pekerjaan Sanitair 0.562%
- Pekerjaan Railing tangga dan lain-lain 0.202%
C Lantai Ground Floor dan Mezzanine
- Pekerjaan Dinding dan Finishing 1.342%
- Pekerjaan Pintu, Jendela dan Kunci 1.318%
- Pekerjaan Finishing Lantai 2.005%
- Pekerjaan Plafond 0.868%
- Pekerjaan Sanitair 0.220%
- Pekerjaan Railing tangga dan lain-lain 0.748%
Lantai 2
- Pekerjaan Dinding dan Finishing
- Pekerjaan Pintu Almunium
- Pekerjaan Finishing Lantai
- Pekerjaan Plafond
- Pekerjaan Sanitair
Lantai 3
- Pekerjaan Dinding dan Finishing
- Pekerjaan Pintu Almunium
- Pekerjaan Finishing Lantai
- Pekerjaan Plafond
- Pekerjaan Sanitair
D Lantai 4
- Pekerjaan Dinding dan Finishing 1.856%
- Pekerjaan Pintu Almunium
- Pekerjaan Finishing Lantai 0.411%
- Pekerjaan Plafond 0.248%
- Pekerjaan Sanitair
E Lantai 5
- Pekerjaan Dinding dan Finishing 1.854%
- Pekerjaan Pintu Almunium
- Pekerjaan Finishing Lantai
- Pekerjaan Plafond 0.237%
- Pekerjaan Sanitair
F Lantai 6
- Pekerjaan Dinding dan Finishing 0.723%
- Pekerjaan Pintu, Jendela dan Kunci 0.973%
- Pekerjaan Finishing Lantai 1.056%
- Pekerjaan Plafond 0.000%
G Lantai 7
- Pekerjaan Dinding dan Finishing 0.041%
- Pekerjaan Pintu, Jendela dan Kunci 0.079%
- Pekerjaan Finishing Lantai 0.298%
- Pekerjaan Plafond 0.096%
- Pekerjaan Railing tangga dan lain-lain 0.038%
H Lantai Atap
-Pekerjaan Dinding dan Finishing 1.488%
I Pekerjaan Sunken Plaza 5.053%
J Pekerjaan Luar 1.564%

4 PEKERJAAN MEKANIKAL
- Pekerjaan Instalasi Air Conditioning 21.230%
- Pekerjaan Instalasi Plumbing 0.730%
- Pekerjaan Instalasi Fire Hydrand 7.013%
- Pekerjaan Instalasi Fire Sprinkler 3.858%
- Pekerjaan Penyambungan PDAM 0.126%
5 PEKERJAAN ELEKTRIKAL
- Pekerjaan Instalasi Listrik 21.470%
- Pekerjaan Instalasi Sound System 0.569%
- Pekerjaan Instalasi Fire Alarm 1.038%
- Pekerjaan Instalasi Securyti System 2.262%
- Pekerjaan Instalasi Telepon 0.763%
- Pekerjaan Instalasi Data 0.106%
- Pekerjaan Building Automatic System 2.628%

Checklist and hand over 100%

RENCANA FISIK PERMINGGU 2


AKUMULATIF RENCANAn 2
REALISASI FISIK PERMINGGU
AKUMULATIF REALISASI
DEVIASI
AKUMULATIF DEVIASI

RENCANA FISIK PERMINGGU 1


AKUMULATIF RENCANA 1
ESIA TAHAP 6 TAHUN 2018

BOBOT CCO
(%) Jun-18 Jul-18
MG 1 MG 2 MG 3 MG-4
07/6-17/6 18/6-24/7 25/6-01/7 2/7-8/7

0.000%
0.147%
0.012% 0.005%
0.019% 0.001%
0.063% 0.002%
0.003% 0.003%
0.152% 0.005%
0.133% 0.004%
0.095% 0.005%
0.021% 0.005%
0.437% 0.005%
0.066% 0.002%
0.003%

0.931%
0.678%
0.237%
0.195%
0.119%
0.126%

0.635% 0.015%
0.351%
2.753%
0.046%
0.058%
0.647%

2.452%
1.526%
2.492%
0.817%
0.603%
0.202%

1.694%
0.992%
1.822%
1.293%
0.292%
0.693%

0.067%
0.007%
0.003%
0.001%
0.010%

0.082%
0.007%
0.003%
0.057%
0.018%

0.067%
0.007%
0.003%
0.232%
0.013%

0.071%
0.007%
0.003%
0.234%
0.013%

0.830%
0.974%
1.057%
0.000%

0.041%
0.079%
0.299%
0.097%
0.149%
1.095%
5.485% 0.009%
1.795%

22.421%
0.995%
6.243%
4.443%
0.000%

22.912%
0.569%
1.040%
2.265%
0.764%
0.106%
2.632%

100%

0.00% 0.00% 0.00% 0.06%


0.00% 0.00% 0.00% 0.06%
0.00% 0.00% 0.00% 0.06%
0.00% 0.00% 0.00% 0.06%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.000% 0.000% 0.04% 0.50%


0.000% 0.000% 0.04% 0.54%
0.08%
0.12%
0.20%
0.40%
0.80%
1.60%
3.20%
6.40%
12.80%
25.60%
Jul-18 Aug-18
MG-5 MG-6 MG-7 MG-8 MG-9 MG-10
9/7-15/7 16/7-22/7 23/7-29/7 30/7-05/8 6/8-12/8 13/8-19/8

0.007%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.002% 0.002% 0.002% 0.002% 0.002% 0.012%

0.005% 0.005% 0.005% 0.005% 0.005% 0.005%


0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
0.005% 0.005% 0.005% 0.005% 0.005% 0.001%
0.005% 0.000% 0.000% 0.000% 0.000% 0.000%
0.005% 0.005% 0.005% 0.005% 0.005% 0.016%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.005% 0.026% 0.026% 0.026% 0.026% 0.026%


0.005% 0.028% 0.028% 0.028% 0.028% 0.024%
0.005% 0.025% 0.025% 0.025% 0.025% 0.017%
0.005% 0.014% 0.014% 0.014% 0.014% 0.012%

0.015% 0.032% 0.032% 0.032% 0.032% 0.027%


0.081%

0.103% 0.103%

0.103% 0.103%
0.103%
0.009% 0.009% 0.009% 0.009% 0.103% 0.103%
0.019% 0.103% 0.103%

0.023% 0.352% 0.351% 0.351% 0.751% 1.062%


0.005% 0.030% 0.030% 0.030% 0.030% 0.030%
0.005% 0.108% 0.109% 0.108% 0.222% 0.206%
0.005% 0.239% 0.239% 0.238% 0.342% 0.342%

0.010% 0.239% 0.239% 0.238% 0.323% 0.323%


0.026% 0.026% 0.026% 0.026%
0.047% 0.047% 0.047% 0.047%
0.109% 0.109% 0.222% 0.318%
0.035% 0.035% 0.035% 0.035%
0.005% 0.005% 0.005% 0.005%
0.109% 0.109% 0.361% 0.361%

0.12% 1.13% 1.46% 1.47% 2.93% 3.51%


0.18% 1.31% 2.76% 4.24% 7.16% 10.67%
0.12% 1.12% 1.46% 1.47% 2.93% 3.51%
0.18% 1.31% 2.76% 4.24% 7.16% 10.67%
0.00% -0.01% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

DISETUJUI OLEH
PEMBERI TUGAS
MUSEUM NASIONAL

Dra. Sri Suharni, M.M.


PEJABAT PEMBUAT KOMITMEN
-3.57%
10.67%

1.52% 2.49% 3.15% 3.24% 3.30% 3.78%


2.06% 4.55% 7.70% 10.94% 14.24% 18.02%
PEMB

MUSEU

ug-18 Sep-18
MG-11 MG-12 MG-13 MG-14 MG-15 MG-16
20/8-26/8 27/8-2/9 3/9-9/9 10/9-16/9 17/9-23/9 24/9-30/9

0.007% 0.007% 0.007% 0.007% 0.007% 0.007%


0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.012% 0.012% 0.001% 0.001% 0.001% 0.001%

0.005% 0.005% 0.005% 0.005% 0.005% 0.005%


0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.016% 0.016% 0.016% 0.016% 0.016% 0.016%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.034% 0.037% 0.014% 0.173% 0.165% 0.172%


0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
0.024% 0.024% 0.047%
0.017% 0.017% 0.037%
0.012% 0.012% 0.021%
0.025% 0.025% 0.025% 0.025% 0.025%

0.027% 0.027% 0.027% 0.027% 0.027% 0.027%


0.058% 0.031% 0.034% 0.005%
0.081% 0.079% 0.057% 0.031% 0.034% 0.005%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.034% 0.034% 0.034% 0.034% 0.034% 0.034%

0.081% 0.079% 0.057% 0.031% 0.034% 0.005%


0.079% 0.057% 0.031% 0.034% 0.005%
0.081% 0.080% 0.057% 0.031% 0.034% 0.005%
0.057% 0.031% 0.034% 0.005%
0.057% 0.031% 0.034% 0.005%
0.005%

0.103% 0.079% 0.057% 0.209% 0.209% 0.209%


0.103% 0.079% 0.057% 0.155% 0.155% 0.155%
0.103% 0.079% 0.057% 0.259% 0.259% 0.259%
0.103% 0.079% 0.057% 0.179% 0.179% 0.179%
0.103% 0.079% 0.057% 0.015% 0.015% 0.015%
0.103% 0.049% 0.118% 0.095% 0.095% 0.095%

0.083% 0.083% 0.083%


0.097% 0.097% 0.097%
0.106% 0.106% 0.106%
0.103% 0.079% 0.58% 0.58% 0.58% 0.58%
0.103% 0.079% 0.057% 0.208% 0.208% 0.208%

0.648% 1.333% 0.853% 0.813% 0.886% 1.285%


0.030% 0.030% 0.030% 0.030% 0.030% 0.030%
0.206% 0.079% 0.057% 0.031% 0.034% 0.005%
0.342% 0.164% 0.057% 0.031% 0.034% 0.005%

0.323% 0.323% 0.574% 0.043% 0.056% 0.116%


0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
0.047% 0.047% 0.047% 0.047% 0.047% 0.047%
0.318% 0.079% 0.057% 0.031% 0.034% 0.005%
0.035% 0.035% 0.035% 0.035% 0.035% 0.035%
0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
0.109% 0.109% 0.057% 0.031% 0.034% 0.005%

3.41% 3.41% 3.52% 3.66% 3.77% 3.90%


14.08% 17.49% 21.01% 24.67% 28.44% 32.34%
3.10% 2.61% 4.68% 4.00% 4.34% 3.16%
13.77% 16.38% 21.06% 25.06% 29.40% 32.57%
-0.31% -0.80% 1.16% 0.34% 0.57% -0.73%
-0.31% -1.11% 0.04% 0.39% 0.96% 0.23%

DIPERIKSA OLEH
KONSULTAN MK
PT. UNI TRI CIPTA

Ir. Wuryanto Yahmo, M.Sc.


TEAM LEADER
3.41% 3.41% 3.52% 3.66% 3.77% 3.89%
14.07% 17.49% 21.01% 24.67% 28.44% 32.33%

4.41% 4.79% 4.79% 4.66% 4.66% 4.66%


22.43% 27.22% 32.01% 36.67% 41.33% 45.99%
PEMBERI TUGAS

MUSEUM NASIONAL

Oct-18 Nov-18
MG-17 MG-18 MG-19 MG-20 MG-21 MG-22
1/10-7/10 8/10-14/10 15/10-21/10 22/10-28/10 29/10-4/11 5/11-11/11

0.007% 0.007% 0.007% 0.007% 0.007% 0.007%


0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%

0.005% 0.005% 0.005% 0.005% 0.005% 0.005%


0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.016% 0.016% 0.016% 0.016% 0.016% 0.016%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.166% 0.169%
0.026% 0.026% 0.026% 0.026% 0.026% 0.026%

0.027% 0.027% 0.027% 0.027% 0.027% 0.027%


0.016% 0.002% 0.019% 0.019% 0.019% 0.019%
0.016% 0.002% 0.223% 0.222% 0.222% 0.222%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.034% 0.034% 0.034% 0.034% 0.034% 0.034%

0.016% 0.002% 0.429% 0.429% 0.429% 0.429%


0.016% 0.002% 0.380% 0.380% 0.380% 0.162%
0.016% 0.002% 0.441% 0.441% 0.441% 0.441%
0.016% 0.002% 0.130% 0.130% 0.130% 0.130%
0.016% 0.002% 0.104% 0.104% 0.104% 0.145%
0.016% 0.002% 0.045% 0.045% 0.045% 0.046%

0.209% 0.209% 0.202%


0.155% 0.133%
0.600%
0.179% 0.179% 0.055%
0.008%
0.095% 0.043%

0.017% 0.017% 0.017% 0.017%


0.002% 0.002% 0.002%
0.002% 0.002%
0.000% 0.000%
0.003% 0.003% 0.003%

0.020% 0.020%
0.002%
0.002%
0.028%

0.022% 0.022% 0.022%


0.004% 0.004%
0.002% 0.002%
0.016% 0.100% 0.100% 0.016%
0.004% 0.004% 0.004%

0.024%

0.100% 0.045%
0.004%

0.083% 0.083% 0.083% 0.083% 0.083% 0.083%


0.097% 0.097% 0.097% 0.097% 0.097% 0.097%
0.106% 0.106% 0.106% 0.106% 0.106% 0.106%

0.010% 0.010% 0.010% 0.010%


0.020% 0.020% 0.020% 0.020%
0.075% 0.075% 0.075% 0.075%
0.024% 0.024% 0.024% 0.024%
0.037% 0.037% 0.037% 0.037%
0.137% 0.137% 0.137% 0.137% 0.237% 0.137%
0.58% 0.58% 0.58% 0.96%
0.208% 0.208% 0.290%

0.510% 0.533% 0.224% 0.358% 0.400% 1.030%


0.030% 0.030% 0.030% 0.030% 0.030% 0.030%
0.016% 0.012% 0.041% 0.041% 0.743% 0.743%
0.028% 0.094% 0.070% 0.062% 0.215% 0.215%

0.150% 1.155% 0.220% 0.525% 0.070% 0.530%


0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
0.047% 0.047% 0.047% 0.047% 0.047% 0.047%
0.016% 0.002% 0.052% 0.052% 0.052% 0.052%
0.035% 0.035% 0.035% 0.035% 0.035% 0.035%
0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
0.016% 0.002% 0.089% 0.089% 0.089% 0.089%

3.93% 4.20% 4.49% 4.87% 4.41% 5.14%


36.26% 40.47% 44.96% 49.83% 54.24% 59.38%
2.52% 5.52% 4.85% 2.59% 5.08% 3.85%
35.05% 40.60% 45.45% 48.04% 53.13% 56.97%
-1.41% 1.32% 0.36% -2.28% 0.67% -1.30%
-1.21% 0.13% 0.49% -1.78% -1.11% -2.41%

LEH
MK
IPTA

mo, M.Sc.
DER
3.93% 4.20% 4.30% 4.50% 4.55% 5.02%
36.26% 40.46% 44.77% 49.27% 53.83% 58.84%

4.08% 4.39% 4.25% 3.83% 4.50% 4.50%


50.07% 54.46% 58.71% 62.54% 67.04% 71.54%
KONSULTAN MK KO

PT. UNI TRI CIPTA

Nov-18 Dec-18
MG-23 MG-24 MG-25 BOBOT CCO II MG-26 MG-27
12/11-18/11 19/11-25/11 26/11-2/12 (%) 3/12-9/12 10/12-16/12

0.000%
0.007% 0.007% 0.007% 0.147% 0.007% 0.007%
0.000% 0.000% 0.000% 0.012% 0.000% 0.000%
0.001% 0.001% 0.001% 0.019% 0.001% 0.001%
0.001% 0.001% 0.001% 0.063% 0.001% 0.001%
0.003%
0.005% 0.005% 0.005% 0.152% 0.005% 0.005%
0.004% 0.004% 0.004% 0.133% 0.004% 0.004%
0.001% 0.001% 0.001% 0.095% 0.001% 0.001%
0.000% 0.000% 0.000% 0.021% 0.000% 0.000%
0.016% 0.016% 0.016% 0.437% 0.016% 0.016%
0.002% 0.002% 0.002% 0.066% 0.002% 0.002%
0.000% 0.000% 0.000% 0.003% 0.000% 0.000%

0.791%
0.026% 0.026% 0.026% 0.190% 0.026% 0.026%
0.237%
0.195%
0.116%
0.340%

0.027% 0.027% 0.007% 0.801% 0.007% 0.007%


0.019% 0.019% 0.019% 0.351% 0.019% 0.019%
0.222% 0.222% 0.222% 2.835% 0.222% 0.222%
0.002% 0.002% 0.002% 0.537% 0.002% 0.002%
0.003% 0.003% 0.003% 0.058% 0.003% 0.003%
0.034% 0.034% 0.034% 0.606% 0.034% 0.034%

0.349% 2.637% 0.062% 0.062%


1.526% 0.000% 0.000%
0.422% 2.702% 0.070% 0.070%
0.153% 0.862% 0.015% 0.015%
0.606% 0.001% 0.001%
0.245% 0.014% 0.014%

2.708% 0.338%
0.992% 0.000%
2.047% 0.075%
1.122% -0.057%
0.264% -0.009%
0.407% -0.095%

0.081% 0.005%
0.062% 0.018%
0.023% 0.007%
0.016% 0.005%
0.010% 0.000%

0.020% 0.020% 0.250% 0.056%


0.002% 0.002% 0.034% 0.009%
0.002% 0.016% 0.004%
0.028% 0.072% 0.005%
0.009% 0.009% 0.018% 0.000%

0.081% 0.005%
0.062% 0.018%
0.023% 0.007%
0.239% 0.002%
0.013% 0.000%

0.024% 0.024% 0.083% 0.004%


0.004% 0.004% 0.062% 0.018%
0.002% 0.002% 0.023% 0.007%
0.045% 0.045% 0.227% -0.002%
0.004% 0.004% 0.013% 0.000%

0.083% 0.789% -0.014%


0.097% 0.979% 0.002%
0.106% 0.457% -0.200%
0.000% 0.000%

0.046% 0.002%
0.089% 0.003%
0.299% 0.000%
0.097% 0.000%
0.141%
0.137% 0.037% 0.763% -0.111%
5.628% 0.047%
1.394% -0.134%

1.140% 1.845% 1.715% 21.095% 1.451% 1.451%


0.030% 0.085% 0.085% 1.035% 0.085% 0.085%
0.743% 1.000% 1.500% 6.646% 0.041% 0.041%
0.215% 0.215% 0.215% 4.942% 0.215% 0.215%
0.000%

1.847% 2.252% 2.488% 21.175% 3.623% 3.623%


0.026% 0.026% 0.026% 0.624% 0.026% 0.026%
0.047% 0.047% 0.047% 1.084% 0.047% 0.047%
0.052% 0.052% 0.052% 2.293% 0.052% 0.052%
0.035% 0.035% 0.035% 0.753% 0.035% 0.035%
0.005% 0.005% 0.005% 0.099% 0.005% 0.005%
0.089% 0.089% 0.089% 3.838% 0.089% 0.089%

100.00%

6.08% 6.17% 6.61% 6.18% 6.19%


65.47% 71.63% 78.24% 84.42% 90.61%
5.98% 7.06% 8.21% 8.21% 6.91% 4.72%
62.96% 70.03% 78.25% 78.25% 85.16% 89.88%
-0.10% 0.90% 1.61% 0.73% -1.47%
-2.50% -1.60% 0.01% 0.75% -0.73%

DIBUAT OLEH
KONTRAKTOR
PT INTRACO LESTARI

Ir. Didik Prasetyo


PROJECT MANAGER
5.55% 6.01% 6.44% 6.77% 6.77%
64.39% 70.40% 76.84% 83.61% 90.39%

4.50% 4.42% 4.45% 4.45% 4.45%


76.04% 80.46% 84.91% 89.36% 93.81%
KONTRAKTOR PELAKSANA

PT. INTRACO LESTARI

Dec-18
KONTROL BOBOT
MG-28 MG-29 MG-30
17/12-23/12 24/12-30/12 31-Dec

96,71%
100%
0.007% 0.004% 0.004%
0.000% 0.000%
0.002% 0.001% 0.001%
0.001% 0.001%
0.000%
0.025% 0.005% 0.005%
0.021% 0.004% 0.004%
0.053% 0.001% 0.001%
0.004% 0.000% 0.000%
0.096% 0.016% 0.016%
0.016% 0.002% 0.002%
0.000% 0.000% 0.000%

-0.140%
-0.129% -0.129% -0.129%
0.000%
0.001%
-0.003%
0.072% 0.072% 0.072%

0.007% 0.204%
0.019% 0.019%
0.222% 0.309%
0.002% 0.248% 0.245%
0.003% 0.003%
0.034% -0.006%

0.062%
0.000%
0.070%
0.015%
0.001%
0.014%

0.338% 0.338%
0.000% 0.000%
0.075% 0.075%
-0.057% -0.057%
-0.009% -0.009%
-0.095% -0.095%

0.005% 0.005%
0.018% 0.018%
0.007% 0.007%
0.005% 0.005% 50%
0.000% 0.000%

0.056% 0.056%
0.009% 0.009%
0.004% 0.004%
0.005% 0.005%
0.000% 0.000%

0.005% 0.005%
0.018% 0.018%
0.007% 0.007%
0.002% 0.002%
0.000% 0.000%

0.004% 0.004%
0.018% 0.018%
0.007% 0.007%
-0.002% -0.002%
0.000% 0.000%

-0.014% -0.014%
0.002% 0.002%
-0.200% -0.200%
0.000% 0.000%

0.002% 0.002%
0.003% 0.003%
0.000% 0.000%
0.000% 0.000%
-0.008%
-0.111% -0.111%
0.047% 0.047%
-0.134% -0.134%

2.297% -0.569%
0.125% 0.020%
0.444% 0.110%
0.822% 0.323%

1.441% 0.445%
0.013% 0.068%
0.024% 0.069%
0.052% 0.474%
0.018% 0.007%
0.002% -0.005%
0.089% 1.652% 0%

5.81% 3.36% 0.22%


96.42% 99.78% 100.00%
4.92% 1.97%
94.75% 96.71%
-0.89% -1.39%
-1.67% -3.07%

5.62% 3.775% 0.0022139072


96.01% 99.781% 1.0000255145

4.310% 1.860% 0.04%


98.120% 99.980% 100%