VOLUME

NO URAIAN/GAMBAR SATUAN PERHITUNGAN


I PEKERJAAN PERSIAPAN
Perbersihan lahan Luas = panjang x lebar
= 20 x 15
= 300 m²

1 m²

Keliling = 2 (panjang+lebar)
2 Pekerjaan pemasangan bowplank m¹ = 2 (20+15)
= 70 m¹
Keliling = 2 (panjang+lebar)
3 Pekerjaan pagar darurat m² = 2 (20+15)
= 70 m²
4 Pekerjaan listrik dan air sementara Ls V= 1
II PEKERJAAN TANAH
Pek.Galian tanah pondasi setempat V= panjang x lebar x tinggi
= 0,8 x 0,8 x 2
= 1,28 m³

1 m³

Pek.Galian tanah pondasi menerus V1 = Luas penampang galian x jml.panjang


pondasi
= 0,455 x 113
= 51,415 m³

V2 = Luas penampang galian x jml.panjang


pondasi
= 0,3 x 5
2 m³ = 1,5 m³

Total = 51,415 + 1,5


= 52,915 m³
DAFTAR RINCIAN RENCANA ANGGARAN BIAYA
No Uraian Pekerjaan Sat. Volume Harga Satuan Jumlah

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 300 9,750.00 2,925,000.00

2 Pek. pemasangan bouwplank + 70 123,213.00 8,624,910.00


pengukuran m¹
3 Pek .Pagar Darurat m² 70 561,057.00 39,273,990.00
50,823,900.00
II PEKERJAAN TANAH

1 Pek. Galian tanah biasa pondasi 1.28 39,875.00 51,040.00


setempat 2 meter m³
2 Pek. Galian tanah biasa pondasi 51.42 49,275.00 2,533,474.13
menerus 1,5 meter m³
3 Pek. Urugan pasir pondasi setempat m³ 0.032 177,950.00 5,694.40
4 Pek. Urugan tanah pondasi setempat m³ 1.10 168,350.00 185,185.00
5 Pek. Urugan pasir pondasi menerus m³ 5.85 177,950.00 1,041,452.38
6 Pek. Urugan tanah pondasi menerus m³ 13.23 168,350.00 2,227,060.06
7 Pek. Urugan tanah dipadatkan m³ 97.50 29,750.00 2,900,625.00
8 Pek. Urugan pasir dibawah lantai m³ 19.80 177,950.00 3,523,410.00
12,467,940.96
III PEKERJAAN PONDASI
1 Pek.Rabatan plat lantai kerja m³ 0.032 812,446.30 25,998.28
2 Pek. Pondasi batu kali 1 : 4 m³ 45.87 666,690.00 30,581,070.30
3 Pek. Pasangan batu kosong m³ 23.60 351,897.00 8,304,769.20
4 Pek. Pasangan bata 1 : 5 lantai satu m² 323.75 557,839.00 180,600,376.25
5 Pek. Plesteran 1 : 5 lantai satu m² 647.50 40,225.00 26,045,687.50
6 Pek.Acian lantai satu m² 647.50 13,898.75 8,999,440.63
7 Pek.Rabatan lantai satu m³ 9.90 652,542.57 6,460,171.46
8 Pek. Pasangan bata 1 : 5 lantai dua m² 501.21 557,839.00 279,596,047.14
9 Pek. Plesteran 1 : 5 lantai dua m² 1,002.42 40,225.00 40,322,344.50
10 Pek.Acian lantai dua m² 1,002.42 13,898.75 13,932,384.98
594,868,290.23
IV PEKERJAAN BETON
1 Pek. Rabat lantai kerja K 225
a Pengecoran m³ 0.48 812,446.30 389,974.22
2 Pek.Pondasi telapak K = 300
a Pengecoran m³ 4.20 865,678.18 3,635,848.36
b Pembesian kg 8,701.41 11,708.85 101,883,477.95
3 Pek. Sloof 30 x 15 K 225
a Begesting m² 73.60 176,378.00 12,981,420.80
b Pengecoran m³ 9.20 812,446.30 7,474,505.97
c Pembesian kg 1,964.39 11,708.85 23,000,691.64
4 Pek Kolom 30x30 K 225
a Begesting m² 72 153,189.67 11,029,656.00
b Pengecoran m³ 5.37 812,446.30 4,365,273.98
c Pembesian kg 773.65 11,708.85 9,058,515.51
5 Pek. Balok induk 30x60 K 225
a Begesting m² 100.50 155,774.67 15,655,354.00
b Pengecoran m³ 15.48 812,446.30 12,576,668.75
c Pembesian kg 2,004.13 11,708.85 23,466,055.93
6 Pek. Balok anak 25x40 K 225
a Begesting m² 15.75 155,774.67 2,453,451.00
b Pengecoran m³ 1.00 812,446.30 812,446.30
c Pembesian kg 905.16 11,708.85 10,598,360.90
7 Pek. Kolom 25x25 K 225
a Begesting m² 53.25 153,189.67 8,157,349.75
b Pengecoran m³ 3.33 812,446.30 2,703,922.85
c Pembesian kg 1,348.56 11,708.85 15,790,076.74
8 Pek. Kolom 20x20 K 225
a Begesting m² 9.90 153,189.67 1,516,577.70
b Pengecoran m³ 0.37 812,446.30 301,620.69
c Pembesian kg 206.68 11,708.85 2,419,963.75
9 Pek. Kolom praktis 15x15
a Begesting m² 185.56 153,189.67 28,426,180.93
b Pengecoran m³ 0.97 812,446.30 784,213.79
c Pembesian kg 1,375.89 11,708.85 16,110,037.69
10 Pek. Ring balok 15x20 K225
a Begesting m² 45.10 155,774.67 7,025,437.47
b Pengecoran m³ 3.30 812,446.30 2,681,072.80
c Pembesian kg 895.66 11,708.85 10,487,124.28
11 Pek. Plat lantai 12 cm K 225
a Begesting m² 192.00 855,569.00 164,269,248.00
b Pengecoran m³ 23.64 812,446.30 19,206,230.57
c Pembesian kg 637.92 11,708.85 7,469,323.98
12 Pek. Plat tangga 5 cm K 225
a Begesting m² 22.40 432,041.50 9,677,729.60
b Pengecoran m³ 89.00 812,446.30 72,307,720.84
c Pembesian kg 189.25 11,708.85 2,215,930.48
610,931,463.21
V PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen pintu P1 1 buah m³ 0.60 11,173,925.00 6,682,007.15
2 Pek. Daun pintu P1 1 buah m³ 3.96 687,400.00 2,720,608.22
3 Pek. Kusen pintu P2 11 buah m³ 5.50 11,173,925.00 61,456,587.50
4 Pek. Daun pintu P2 11 buah m³ 1.85 687,400.00 1,270,315.20
5 Pek. Kusen pintu P4 2 buah m³ 2.39 11,173,925.00 26,710,150.32
6 Pek. Daun pintu P4 2 buah m³ 1.38 687,400.00 945,312.48
7 Pek. Kusen jendela J1 3 buah m³ 1.14 11,173,925.00 12,738,274.50
8 Pek. Daun jendela J1 3 buah m³ 0.36 477,870.00 173,753.53
9 Pek. Kusen jendela J2 6 buah m³ 4.33 11,173,925.00 48,383,095.25
10 Pek. Daun jendela J2 6 buah m³ 0.73 477,870.00 347,507.06
11 Pek. Kusen jendela J3 1 buah m³ 0.49 11,173,925.00 5,475,223.25
12 Pek. Daun jendela J3 1 buah m³ 0.42 477,870.00 199,558.51
13 Pek. Kusen jendela J4 6 buah m³ 3.39 11,173,925.00 37,893,014.46
14 Pek. Daun jendela J4 6 buah m³ 2.72 477,870.00 1,300,570.99
15 Pek. Kusen ventilasi 4 buah m³ 0.91 11,173,925.00 10,168,271.75
16 Pek. Daun ventasi 4 buah m³ 0.60 477,870.00 289,015.78
216,753,265.95
VI PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Keramik lantai 60x60 lantai satu m² 104.00 224,745.00 23,373,480.00
2 Pek. Keramik lantai 20x20 lantai satu m² 9.75 161,297.00 1,572,000.56

3 Pek. Keramik tegel plin 10x30 lantai 30.38 65,086.56 1,977,004.26


satu m²
4 Pek. Keramik lantai 60x60 lantai dua m² 143.00 224,745.00 32,138,535.00
5 Pek. Keramik lantai 20x20 lantai dua m² 6.00 161,297.00 967,782.00
Pek. Keramik tegel plin 10x30 lantai
6 dua m² 48.12 65,086.56 3,132,049.88

63,160,851.70
VII PEKERJAAN PLAFOND
Pek. Pasangan plafond gypsum rangka
1 hollo m² 171.25 162,355.00 27,803,293.75
2 Gypsum Board m² 180.00 97,607.80 17,569,404.00
3 Pek. List plafond m' 148.50 37,968.00 5,638,248.00
51,010,945.75
VIII PEKERJAAN ATAP
1 Pek. Genteng kodok karang pilang m² 126.64 70,204.00 8,890,634.56
2 Pek. Kuda - kuda kamper m³ 0.59 10,427,600.00 6,122,419.35
3 Pek. Usuk 5/7 m² 3.82 61,548.20 235,237.22
4 Pek. Reng m² 1.53 45,416.80 69,433.20
5 Pek. List plank m¹ 58 108,130.00 6,284,515.60
21,602,239.94
IX PEKERJAAN GANTUNGAN & KUNCI
1 Pek. Engsel pintu bh 34.00 74,496.00 2,532,864.00
2 Pek. Engsel jendela bh 24.00 63,327.50 1,519,860.00
3 Pek. Kunci slot bh 20.00 38,855.00 777,100.00
4 Pek. Grendel bh 26.00 21,534.00 559,884.00
5 Pek.Kait angin bh 52.00 59,696.00 3,104,192.00
8,493,900.00
X PEKERJAAN KACA
1 Pek.Kaca pintu bukaan dua m² 3.0192 147,096.00 444,112.24
2 Pek.Kaca jendela m² 5.8188 147,096.00 855,922.20
1,300,034.45
XI PEKERJAAN SANITASI
1 Pas. Bak mandi fiberglass bh 2.00 651,710.00 1,303,420.00
2 Pas. Wastafel bh 1.00 430,380.00 430,380.00
3 Pas. Kloset duduk bh 3.00 2,759,128.00 8,277,384.00
4 Pas. Bak cuci piring bh 1.00 594,000.00 594,000.00
5 Pas. Kran cuci piring bh 1.00 205,800.00 205,800.00
6 Pas. Kran wastafel bh 1.00 768,400.00 768,400.00
7 Pas. Kran bh 2.00 277,200.00 554,400.00
8 Pas. Bath tup bh 1.00 7,689,000.00 7,689,000.00
9 Pas. Pipa air bersih m¹ 26.00 34,067.75 885,761.50
10 Pas. Pipa air kotor m¹ 21.00 50,617.25 1,062,962.25
11 Pas. Pipa tinja m¹ 23.00 122,760.00 2,823,480.00
24,594,987.75
XII PEKERJAAN LISTRIK
1 Instalasi Titik Lampu ttk 36.00 175,000.00 6,300,000.00
2 Instalasi Stop Kontak ttk 14.00 187,500.00 2,625,000.00
3 Lampu LED 7 Watt bh 3.00 54,900.00 164,700.00
4 Lampu LED 15 Watt bh 31.00 76,900.00 2,383,900.00
5 Stop Kontak bh 14.00 38,500.00 539,000.00
6 Saklar Ganda bh 4.00 47,437.00 189,748.00
7 Saklar Tunggal bh 16.00 31,625.00 506,000.00
12,708,348.00
XIII PEKERJAAN RELING
1 Pas. Relling balkon depan m² 0.525 500,000.00 262,500.00
262,500.00
XIV PEKERJAAN PENGECATAN
1 Pek. Cat tembok luar m² 13.00 20,909.90 271,828.70
2 Pek. Cat tembok dalam m² 295.76 20,909.90 6,184,316.21
3 Pek. Cat plafond = cat dinding m² 132.80 20,909.90 2,776,834.72
4 Pek. Politur list plank m¹ 58.12 33,224.50 1,931,007.94
5 Pek. Politur kayu m² 30.59 33,224.50 1,016,243.36
12,180,230.93
XV PEKERJAAN STILE BALI
1 Pek.Batu alur marmer gigi kecil m² 6.32 150,000.00 948,600.00
2 Pek.Batu palimanan m² 44.25 125,500.00 5,553,989.95
3 Pek.Murda bh 1.00 172,922.00 172,922.00
6,675,511.95
TOTAL 1,687,834,411
DAFTAR ANALISA PEKERJAAN
TAHUN 2014
HARGA
NO URAIAN SATUAN
(Rp)
1 2 3
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
1.2500 btg Bambu Sedang 10,000.00
2.5000 kg Semen Portland 1,340.00
1.2000 lbr Seng gelombang 3" - 5" 82,500.00
0.0050 m3 Pasir Beton 131,000.00
0.0090 m3 Koral beton 152,000.00
0.0720 m3 Kayu Meranti Usuk 5/7 5,500,000.00
0.0600 kg Paku biasa 2" - 5" 15,400.00
0.4500 kg Meni Besi 16,000.00
0.2000 oh Tukang Kayu 82,000.00
0.4000 oh Pekerja 50,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0200 oh Mandor 95,000.00
Total :

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 5,500,000.00
0.0200 kg Paku Biasa 2" - 5" 15,400.00
0.0070 m3 Kayu Papan Meranti 3/20 6,050,000.00
0.1000 oh Tukang Kayu 82,000.00
0.1000 oh Pekerja 50,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m 99,000.00
0.1800 m3 Kayu Meranti 2,585,000.00
0.8500 kg Paku Biasa 2" - 5" 15,400.00
1.1000 kg Besi Strip 8,800.00
35.0000 kg Semen Portland 1,340.00
0.1500 m3 Pasir Pasang 152,000.00
0.1000 m3 Pasir Beton 131,000.00
0.1500 m3 Koral Beton 152,000.00
30.0000 bh Bata Merah 3,300.00
0.2500 lbr Seng Plat 55,000.00
2.0000 bh Jendela Nako 32,000.00
0.0800 m2 Kaca Polos 121,000.00
0.1500 bh Kunci Tanam 24,200.00
0.0600 lbr Plywood 4 mm 71,500.00
2.0000 oh Tukang Kayu 82,000.00
1.0000 oh Tukang Batu 76,000.00
2.0000 oh Pekerja 50,000.00
0.3000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 10,000.00
0.2100 m3 Kayu Meranti 2,585,000.00
0.3000 kg Paku Biasa 2" - 5" 15,400.00
10.5000 kg Semen Portland 1,340.00
0.0300 m3 Pasir Beton 131,000.00
0.0500 m3 Koral Beton 152,000.00
1.5000 lbr Seng gelombang BJLS 30 99,000.00
2.0000 oh Tukang Kayu 82,000.00
1.0000 oh Pekerja 50,000.00
0.2000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 10,000.00
0.2760 m3 Kayu Meranti 2,585,000.00
0.7000 kg Paku biasa 2" - 5" 15,400.00
1.5000 lbr Seng gelombang BJLS 28 99,000.00
1.5000 oh Tukang Kayu 82,000.00
1.0000 oh Pekerja 50,000.00
0.1500 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 50,000.00
0.0500 oh Mandor 95,000.00
Total :

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 10,000.00
0.1860 m3 Kayu Meranti 2,585,000.00
0.3000 kg Paku Biasa 2" - 5" 15,400.00
18.0000 kg Semen Portland 1,340.00
0.0300 m3 Pasir Beton 131,000.00
0.0500 m3 Koral Beton 152,000.00
1.5000 lbr Seng gelombang BJLS 28 99,000.00
1.3500 lbr Plywood 4 mm 71,500.00
2.0000 oh Tukang Kayu 82,000.00
1.0000 oh Pekerja 50,000.00
0.2000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :

7 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 2,585,000.00
0.0800 kg Paku Biasa 2" - 5" 15,400.00
1.0000 btg Kaso 5/7 84,700.00
0.3000 oh Tukang kayu 82,000.00
0.0015 oh Mandor 95,000.00
Total :

8 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 10,000.00
0.2500 kg Tali Ijuk 37,500.00
0.0170 oh Tukang Kayu 82,000.00
0.0020 oh Pekerja 50,000.00
0.2500 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00

9 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali 180,000.00
0.0900 m3 Batu Pecah 5 - 7 182,500.00
0.0100 m3 Pasir Pasang 152,000.00
1.0000 oh Pekerja 50,000.00
0.0500 oh Mandor 95,000.00
Total :

10 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 50,000.00
0.3330 oh Mandor 95,000.00
Total :

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 50,000.00
0.0330 oh Mandor 95,000.00
Total :

13 10 M3 MEMBONGKAR s.d.a DINDING TEMBOK YANG TIPIS TERHITUNG DENGAN MEMBERSIHKAN BATAS - BA
2.0000 oh Pekerja 50,000.00
0.1000 oh Mandor 95,000.00
Total :

14 10 M3 MEMBONGKAR LANTAI YANG LAMA BERIKUT PEKERJAAN MEMBERSIHKAN BATA-BATA ATAU LAIN - LA
1.0000 oh Pekerja 50,000.00
0.1000 oh Mandor 95,000.00
Total :

15 10 M3 MENGUPAS PLESTERAN YANG LAMA


0.5000 oh Pekerja 50,000.00
0.0250 oh Mandor 95,000.00
Total :
16 10 M3 MENURUNKAN ATAP GENTENG ATAU SIRAP JIKA GENTENG ATAU SIRAP DIPAKAI LAGI
0.2000 oh Pekerja 50,000.00
0.1000 oh Mandor 95,000.00
Total :
II PEKERJAAN TANAH (SNI 2835 : 2008)
1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
0.7500 oh Pekerja 50,000.00
0.0250 oh Mandor 95,000.00
Total :
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 50,000.00
0.0450 oh Mandor 95,000.00
Total :

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 50,000.00
0.0670 oh Mandor 95,000.00
Total :
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
1.0000 oh Pekerja 50,000.00
0.0320 oh Mandor 95,000.00
Total :

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 50,000.00
0.0600 oh Mandor 95,000.00
Total :
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER
1.2000 oh Pekerja 50,000.00
0.0450 oh Mandor 95,000.00
Total :

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 50,000.00
0.0050 oh Mandor 95,000.00
Total :

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 50,000.00
0.0100 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

17 10 M3 MENURUNKAN ATAP SENG


0.5000 oh Pekerja 50,000.00
0.1000 oh Mandor 95,000.00
Total :

18 10 M3 MENURUNKAN RANGKA ATAP DARI KAYU JIKA KAYU BONGKARAN DIPAKAI


0.2500 oh Tukang Kayu 82,000.00
0.0250 oh Kepala Tukang Kayu 88,000.00
0.0500 oh Pekerja 50,000.00
Total :

19 10 M3 MEMBONGKAR LANTAI 2 DARI KAYU, DINDING LUAR, LANTAI JEMBATAN (LAPISAN ATAU DARI BAWAH
0.6000 oh Tukang Kayu 82,000.00
0.0600 oh Kepala Tukang Kayu 88,000.00
2.0000 oh Pekerja 50,000.00
0.1000 oh Mandor 95,000.00
Total :

20 10 M3 MEMBONGKAR KAYU DARI BALOK LANTAI 2, KUDA - KUDA GELEGAR JEMBATAN DAN SEBAGAINYA (K
6.0000 oh Tukang Kayu 82,000.00
0.6000 oh Kepala Tukang Kayu 88,000.00
4.0000 oh Pekerja 50,000.00
0.2000 oh Mandor 95,000.00
Total :

21 1 M2 PEKERJAAN MENANAM RUMPUT


1.0000 m2 Tanaman Rumput 19,800.00
0.0500 oh Pekerja 50,000.00
0.0050 oh Mandor 95,000.00
Total :

22 1 M3 PENGANGKUTAN BAHAN KE LOKASI SEJAUH RATA - RATA 200M'


1.0000 oh Pekerja 50,000.00
Total :

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 50,000.00
0.0500 oh Mandor 95,000.00
Total :

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 135,000.00
0.3000 oh Pekerja 50,000.00
0.0100 oh Mandor 95,000.00
Total :

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 7,700.00
0.1500 oh Pekerja 50,000.00
0.0150 oh Mandor 95,000.00
Total :

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 100,800.00
0.2500 oh Pekerja 50,000.00
0.0250 oh Mandor 95,000.00
Total :

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 115,500.00
0.5000 oh Pekerja 50,000.00
0.0500 oh Mandor 95,000.00
Total :
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone 126,500.00
0.2500 oh Pekerja 50,000.00
0.0250 oh Mandor 95,000.00
Total :

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU BELAH CAMP. 1 PC : 3 PS
1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
202.0000 kg Semen Portland 1,375.00
0.4850 m3 Pasir Pasang 152,000.00
1.5000 oh Pekerja 50,000.00
0.7500 oh Tukang Batu 76,000.00
0.0750 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :
2 1 M3 BATU BELAH CAMP. 1 PC : 4 PS
1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
163.0000 kg Semen Portland 1,375.00
0.5200 m3 Pasir Pasang 152,000.00
1.5000 oh Pekerja 50,000.00
0.7500 oh Tukang Batu 76,000.00
0.0750 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :

2 1 M3 BATU BELAH CAMP. 1 PC : 5 PS


1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
136.0000 kg Semen Portland 1,375.00
0.5440 m3 Pasir Pasang 152,000.00
1.5000 oh Pekerja 50,000.00
0.7500 oh Tukang Batu 76,000.00
0.0750 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :
3 1 M3 BATU BELAH CAMP. 1 PC : 6 PS
1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
117.0000 kg Semen Portland 1,375.00
0.5610 m3 Pasir Pasang 152,000.00
1.5000 oh Pekerja 50,000.00
0.7500 oh Tukang Batu 76,000.00
0.0750 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :
4 1 M3 BATU BELAH CAMP. 1 PC : 8 PS
1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
91.0000 kg Semen Portland 1,375.00
0.5840 m3 Pasir Pasang 152,000.00
1.5000 oh Pekerja 50,000.00
0.7500 oh Tukang Batu 76,000.00
0.0750 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :
5 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
0.4800 m3 Batu Belah 15 cm / 20 cm 181,500.00
194.0000 kg Semen Portland 1,375.00
0.3120 m3 Pasir Beton 131,000.00
0.4680 m3 Koral Beton 152,000.00
126.0000 kg Besi Beton 10,000.00
1.8000 kg Kawat Beton 13,750.00
3.4000 oh Pekerja 50,000.00
0.8500 oh Tukang Batu 76,000.00
0.0850 oh Kepala Tukang 88,000.00
0.1700 oh Mandor 95,000.00

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

6 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Belah 15 cm / 20 cm 181,500.00
194.0000 kg Semen Portland 1,375.00
0.3120 m3 Pasir Beton 131,000.00
0.4680 m3 Koral Beton 152,000.00
2.4000 oh Pekerja 50,000.00
0.8000 oh Tukang Batu 76,000.00
0.0800 oh Kepala Tukang 88,000.00
0.1190 oh Mandor 95,000.00
Total :

7 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Belah 15 cm / 20 cm 181,500.00
0.4320 m3 Pasir Urug 135,000.00
0.7800 oh Pekerja 50,000.00
0.3900 oh Tukang Batu 76,000.00
0.0390 oh Kepala Tukang 88,000.00
0.0390 oh Mandor 95,000.00
Total :

SNI 03-3436-2002

8 1 M' PONDASI BORED PILE DIAMETER 30 CM


A. Pengeboran O 13/m' Bored pile
0.1550 Jam Crawler Crane Err:509
0.1550 Jam Mesin Bor 80,000.00
0.1800 oh Tukang Gali 76,000.00
0.0090 oh Mandor 95,000.00
1.0000 Ls Oli + Solar 46,750.00
0.2200 Alat Bantu 40,000.00
Total A :
B. Beton K-300, Bored Pile
0.0707 m3 Beton K-300 865,678.18
0.4250 oh Tukang batu 76,000.00
0.0210 oh Mandor 181,500.00
1.0000 Ls Pipa Tremi dan Casing pelindung 100,000.00
Total B :
C. Pembesian 6 O 13 Beugel O 8 Spiral
7.2936 Kg Besi O 13 10,000.00
1.5600 Kg Beugel Besi O8 10,000.00
Total C :
Total A + B + C :
IV PEKERJAAN DINDING (SNI 6897 : 2008)

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 3,300.00
32.9500 kg Semen Portland 1,375.00
0.0910 m3 Pasir Pasang 152,000.00
0.6000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0300 oh Mandor 95,000.00

1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
18.9500 kg Semen Portland 1,375.00
0.0380 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
14.3700 kg Semen Portland 1,375.00
0.0400 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
11.5000 kg Semen Portland 1,375.00
0.0430 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
9.6800 kg Semen Portland 1,375.00
0.0450 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 3,300.00
26.5500 kg Semen Portland 1,375.00
0.0930 m3 Pasir Pasang 152,000.00
0.6000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0300 oh Mandor 95,000.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 3,300.00
22.2000 kg Semen Portland 1,375.00
0.1020 m3 Pasir Pasang 152,000.00
0.6000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0300 oh Mandor 95,000.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 3,300.00
18.5000 kg Semen Portland 1,375.00
0.1220 m3 Pasir Pasang 152,000.00
0.6000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0300 oh Mandor 95,000.00

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
6.5000 kg Semen Portland 1,375.00
0.0500 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU
1.5000 m2 Bedeg/Bilik Bambu Kelas I 385,000.00
0.0140 m3 Kayu kamper usuk/reng 6,600,000.00
0.0120 kg Paku Biasa 15,400.00
0.0030 m3 List Kayu 2/4 6,600,000.00
0.1000 oh Pekerja 50,000.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0020 oh Mandor 95,000.00
Total :

SNI 03-2836-2002
16 1 M2 PASANGAN BATA GOSOK
60.0000 bh Bata Gosok 5,500.00
12.4400 kg Semen Portland 1,375.00
2.0000 oh Tukang Paras Bali 82,000.00
0.4000 oh Kepala Tukang Paras Bali 88,000.00
2.0000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.1000 oh Mandor 95,000.00
Total :
17 1 M2 PASANGAN PARAS SILAKARANG
22.0000 bh Bata Paras Silakarang 22,000.00
11.7500 kg Semen Portland 1,375.00
2.0000 oh Tukang Paras Bali 82,000.00
0.4000 oh Kepala Tukang Paras Bali 88,000.00
2.0000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.1000 oh Mandor 95,000.00
Total :
18 1 M2 PASANGAN PARAS KEROBOKAN
22.0000 bh Bata Paras Kerobokan 13,750.00
11.7500 kg Semen Portland 1,375.00
2.0000 oh Tukang Paras Bali 82,000.00
0.4000 oh Kepala Tukang Paras Bali 88,000.00
2.0000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.1000 oh Mandor 95,000.00
Total :

4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 2,200.00
8.3200 kg Semen Portland 1,375.00
0.0490 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
5 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 3 ps
12.5000 bh Batako Lubang 2,750.00
15.1600 kg Semen Portland 1,375.00
0.3640 m3 Pasir Pasang 152,000.00
0.2800 kg Besi Beton 8 mm 10,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 4 ps
12.5000 bh Batako 2,750.00
12.1300 kg Semen Portland 1,375.00
0.3880 m3 Pasir Pasang 152,000.00
0.2800 kg Besi Beton 8 mm 10,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
6 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps
30.0000 bh Roster Keramik 38,500.00
14.0000 kg Semen Portland 1,375.00
0.0320 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 1,375.00
0.0160 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,375.00
0.0200 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM
7.7760 kg Semen Portland 1,375.00
0.0230 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
6.2400 kg Semen Portland 1,375.00
0.0240 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
4 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
5.1840 kg Semen Portland 1,375.00
0.0260 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
5 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM
4.4160 kg Semen Portland 1,375.00
0.0270 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

6 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,375.00
0.0290 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
7 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
13.6320 kg Semen Portland 1,375.00
0.0270 m3 Pasir Pasang 152,000.00
0.4000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0220 oh Mandor 95,000.00
Total :
8 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
10.3680 kg Semen Portland 1,375.00
0.0310 m3 Pasir Pasang 152,000.00
0.2600 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
8.3200 kg Semen Portland 1,375.00
0.0320 m3 Pasir Pasang 152,000.00
0.4000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0220 oh Mandor 95,000.00
Total :
9 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,375.00
0.0350 m3 Pasir Pasang 152,000.00
0.4000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0220 oh Mandor 95,000.00
Total :
10 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM
5.8880 kg Semen Portland 1,375.00
0.0360 m3 Pasir Pasang 152,000.00
0.4000 oh Pekerja 50,000.00
0.2000 oh Tukang Batu 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0220 oh Mandor 95,000.00
Total :
11 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM
0.5000 kg Semen Portland 1,375.00
0.0130 m3 Pasir Pasang 152,000.00
0.0800 oh Pekerja 50,000.00
0.4000 oh Tukang Batu 76,000.00
0.0400 oh Kepala Tukang 88,000.00
0.0040 oh Mandor 95,000.00
Total :
12 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,375.00
0.0060 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
15 1 M2 PLESTERAN GRANIT 1 PC : 2 GRANIT, TEBAL 10 MM
10.0000 kg Semen Portland 1,375.00
15.0000 m3 Batu Granit -
0.3000 oh Pekerja 50,000.00
0.1000 oh Tukang Batu 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
16 1 M2 PLESTERAN TERASO 1 PC : 2 BATU TERASO, TEBAL 10 MM
10.0000 kg Semen Portland 1,375.00
15.0000 m3 Batu Teraso -
0.4500 oh Pekerja 50,000.00
0.2250 oh Tukang Batu 76,000.00
0.0230 oh Kepala Tukang 88,000.00
0.0230 oh Mandor 95,000.00
Total :
13 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland 1,375.00
0.1500 oh Pekerja 50,000.00
0.0750 oh Tukang Batu 76,000.00
0.0080 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
14 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')
1.6000 kg Semen Portland 1,375.00
0.0700 oh Pekerja 50,000.00
0.0350 oh Tukang Batu 76,000.00
0.0040 oh Kepala Tukang 88,000.00
0.0040 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

15 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS


6.3400 kg Semen Portland 1,375.00
0.0120 m3 Pasir Pasang 152,000.00
0.3000 oh Pekerja 50,000.00
0.1500 oh Tukang Batu 76,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :
16 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,375.00
0.2000 oh Pekerja 50,000.00
0.1000 oh Tukang Labur/Cat 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
1.1000 m3 Balok Kayu Kamper 8,030,000.00
1.2500 Kg Paku 10 Cm 27,500.00
1.0000 Kg Lem Kayu 16,500.00
7.0000 oh Pekerja 50,000.00
21.0000 oh Tukang Kayu 82,000.00
2.1000 oh Kepala Tukang 88,000.00
0.3500 oh Mandor 95,000.00
Total :
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing 5,280,000.00
1.2500 Kg Paku 10 Cm 27,500.00
1.0000 Kg Lem Kayu 16,500.00
6.0000 oh Pekerja 50,000.00
18.0000 oh Tukang Kayu 82,000.00
1.8000 oh Kepala Tukang 88,000.00
0.3000 oh Mandor 95,000.00
Total :
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
0.0400 m3 Papan Kayu Kamper 8,800,000.00
0.0500 Kg Paku 5-7 Cm 27,500.00
0.3500 oh Pekerja 50,000.00
1.0500 oh Tukang Kayu 82,000.00
0.1050 oh Kepala Tukang 88,000.00
0.0180 oh Mandor 95,000.00
Total :
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
0.0400 m3 Papan Kayu Kruing 5,830,000.00
0.0500 Kg Paku 5-7 Cm 27,500.00
0.3500 oh Pekerja 50,000.00
1.0500 oh Tukang Kayu 82,000.00
0.1050 oh Kepala Tukang 88,000.00
0.0180 oh Mandor 95,000.00
Total :

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II


0.0400 m3 Papan Kayu Kamper 8,800,000.00
0.5000 Kg Lem Kayu 16,500.00
1.0000 oh Pekerja 50,000.00
3.0000 oh Tukang Kayu 82,000.00
0.3000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper 8,800,000.00
0.3000 Kg Lem Kayu 16,500.00
0.8000 oh Pekerja 50,000.00
2.4000 oh Tukang Kayu 82,000.00
0.2400 oh Kepala Tukang 88,000.00
0.0400 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper 8,800,000.00
0.5000 Kg Lem Kayu 16,500.00
1.0000 oh Pekerja 50,000.00
3.0000 oh Tukang Kayu 82,000.00
0.3000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 8,800,000.00
0.0300 Kg Paku 1-2,5 Cm 27,500.00
0.5000 Kg Lem Kayu 16,500.00
1.0000 Lbr Plywood 4 mm 71,500.00
0.7000 oh Pekerja 50,000.00
2.1000 oh Tukang Kayu 82,000.00
0.2100 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 8,800,000.00
0.0300 Kg Paku 1-2,5 Cm 27,500.00
0.5000 Kg Lem Kayu 16,500.00
1.0000 Lbr Plywood 4 mm 71,500.00
0.8000 oh Pekerja 50,000.00
2.4000 oh Tukang Kayu 82,000.00
0.2400 oh Kepala Tukang 88,000.00
0.0400 oh Mandor 95,000.00
Total :

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper 8,800,000.00
0.1500 Kg Paku 1-2,5 Cm 27,500.00
0.6700 oh Pekerja 50,000.00
2.0000 oh Tukang Kayu 82,000.00
0.2000 oh Kepala Tukang 88,000.00
0.3350 oh Mandor 95,000.00
Total :
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS
0.0256 m3 Papan Kayu I
Kamper 8,800,000.00
0.0300 Kg Paku 1-2,5 Cm 27,500.00
0.3000 Kg Lem Kayu 16,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 77,000.00
0.8000 oh Pekerja 50,000.00
2.4000 oh Tukang Kayu 82,000.00
0.2400 oh Kepala Tukang 88,000.00
0.0400 oh Mandor 95,000.00
MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA Total :
12 EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 8,800,000.00
0.0300 Kg Paku 1-2,5 Cm 27,500.00
0.8000 Kg Lem Kayu 16,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 77,000.00
0.5000 Lbr Formika 77,000.00
0.8500 oh Pekerja 50,000.00
2.5500 oh Tukang Kayu 82,000.00
0.2550 oh Kepala Tukang 88,000.00
0.0430 oh Mandor 95,000.00
Total :
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU
KELAS I,II,III
1.1000Bentang
m3 6 Balok
M' Kayu Kamper 8,030,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,800.00
5.6000 Kg Paku 12 Cm 27,500.00
4.0000 oh Pekerja 50,000.00
12.0000 oh Tukang Kayu 82,000.00
1.2000 oh Kepala Tukang 88,000.00
0.2000 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
1.2000 m3 Balok Kayu Kamper 8,030,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,800.00
5.6000 Kg Paku 12 Cm 27,500.00
6.7000 oh Pekerja 50,000.00
20.1000 oh Tukang Kayu 82,000.00
2.0100 oh Kepala Tukang 88,000.00
0.3350 oh Mandor 95,000.00
Total :
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
1.1000 m3 Balok Kayu Kamper 8,030,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,800.00
3.0000 Kg Paku 12 Cm 27,500.00
2.4000 oh Pekerja 50,000.00
7.2000 oh Tukang Kayu 82,000.00
0.7200 oh Kepala Tukang 88,000.00
0.1200 oh Mandor 95,000.00
Total :
16 MEMASANG 1 M2 RANGKA ATAP / USUK RENG GENTENG KERAMIK, KAYU KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 5,500,000.00
0.0036 m3 Reng ( 2 x 3 ) Cm 6,600,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 27,500.00
0.1000 oh Pekerja 50,000.00
0.1000 oh Tukang Kayu 82,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 5,500,000.00
0.0072 m3 Reng ( 2 x 3 ) Cm 6,600,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 27,500.00
0.1000 oh Pekerja 50,000.00
0.1000 oh Tukang Kayu 82,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
0.1650 m3 Balok Kayu Kamper 8,030,000.00
0.2000 Kg Paku 5 Cm dan 10 Cm 27,500.00
0.1200 oh Pekerja 50,000.00
0.1200 oh Tukang Kayu 82,000.00
0.0120 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 5,500,000.00
0.2000 Kg Paku 7 Cm dan 10 Cm 27,500.00
0.1500 oh Pekerja 50,000.00
0.3000 oh Tukang Kayu 82,000.00
0.0300 oh Kepala Tukang 88,000.00
0.0750 oh Mandor 95,000.00
Total :
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 5,500,000.00
0.2500 Kg Paku 7 Cm dan 10 Cm 27,500.00
0.2000 oh Pekerja 50,000.00
0.3000 oh Tukang Kayu 82,000.00
0.0300 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II
0.0108 m3 Papan Kayu Kamper 8,800,000.00
0.1000 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.1000 oh Pekerja 50,000.00
0.2000 oh Tukang Kayu 82,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II


0.0110 m3 Papan Kayu Kamper 8,800,000.00
0.0500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.1000 oh Pekerja 50,000.00
0.2000 oh Tukang Kayu 82,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
0.0280 m3 Balok Kayu Kamper 8,030,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.1500 oh Pekerja 50,000.00
0.4500 oh Tukang Kayu 82,000.00
0.0450 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,030,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 77,000.00
0.5600 Kg Lem Kayu 16,500.00
0.1500 oh Pekerja 50,000.00
0.4500 oh Tukang Kayu 82,000.00
0.0450 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,030,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 71,500.00
0.5600 Kg Lem Kayu 16,500.00
0.2000 oh Pekerja 50,000.00
0.6000 oh Tukang Kayu 82,000.00
0.0600 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO
1.5000 Btg Rangka Holo 25,300.00
0.1500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 77,000.00
0.5600 Kg Lem Kayu 16,500.00
0.1500 oh Pekerja 50,000.00
0.4500 oh Tukang Kayu 82,000.00
0.0450 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO
1.5000 Btg Rangka Holo 25,300.00
0.1500 Kg Paku 5 Cm dan 7 Cm 27,500.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 71,500.00
0.5600 Kg Lem Kayu 16,500.00
0.2000 oh Pekerja 50,000.00
0.6000 oh Tukang Kayu 82,000.00
0.0600 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :
28 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I
0.0070 m3 Papan Kayu Kamper 8,800,000.00
0.1000 Kg Paku 5 Cm dan 10 Cm 27,500.00
0.1500 Kg Paku Skrup 10 cm 27,500.00
0.6000 oh Pekerja 50,000.00
1.8000 oh Tukang Kayu 82,000.00
0.1800 oh Kepala Tukang 88,000.00
0.0300 oh Mandor 95,000.00
Total :
29 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240)
CM 0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 71,500.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 27,500.00
0.0250 oh Pekerja 50,000.00
0.0750 oh Tukang Kayu 82,000.00
0.0080 oh Kepala Tukang 88,000.00
0.0010 oh Mandor 95,000.00
Total :

SNI 03-2836-2002
28 1 M2 PASANGAN USUK GENTENG KAYU KAMPER
0.0140 M3 Kayu Kamper 6,600,000.00
0.1500 kg Paku 27,500.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang Kayu 88,000.00
0.0500 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :
29 1 M2 PASANGAN RENG GENTENG KAYU KAMPER
0.0040 M3 Kayu Kamper 6,600,000.00
0.1000 kg Paku 27,500.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang Kayu 88,000.00
0.0500 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :
30 1 M2 PASANGAN USUK EKSPOSE DENGAN PLAFOND PLAYWOOD
0.0140 M3 Kayu Kamper 6,600,000.00
0.1500 kg Paku 27,500.00
0.3900 Lbr Playwood 115,500.00
0.4000 oh Tukang Kayu 82,000.00
0.0400 oh Kepala Tukang Kayu 88,000.00
0.2700 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0135 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
247.0000 kg Semen Portland 1,375.00
0.6207 m3 Pasir Beton 131,000.00
0.7400 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00

2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
276.0000 kg Semen Portland 1,375.00
0.5914 m3 Pasir Beton 131,000.00
0.7496 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,375.00
0.5707 m3 Pasir Beton 131,000.00
0.7533 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,375.00
0.5429 m3 Pasir Beton 131,000.00
0.7622 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
352.0000 kg Semen Portland 1,375.00
0.5221 m3 Pasir Beton 131,000.00
0.7637 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,375.00
0.4986 m3 Pasir Beton 131,000.00
0.7756 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,375.00
0.4943 m3 Pasir Beton 131,000.00
0.7696 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :

8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,375.00
0.4886 m3 Pasir Beton 131,000.00
0.7600 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
413.0000 kg Semen Portland 1,375.00
0.4864 m3 Pasir Beton 131,000.00
0.7563 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
1.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
0.0280 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,375.00
0.4786 m3 Pasir Beton 131,000.00
0.7452 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
2.1000 oh Pekerja 50,000.00
0.3500 oh Tukang Batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.1050 oh Mandor 95,000.00
Total :
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,375.00
0.4764 m3 Pasir Beton 131,000.00
0.7407 m3 Koral Beton 152,000.00
215.0000 lt Air 25.00
2.1000 oh Pekerja 50,000.00
0.3500 oh Tukang Batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.1050 oh Mandor 95,000.00
Total :

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 10,000.00
0.1500 kg Kawat Beton 13,750.00
0.0700 oh Pekerja 50,000.00
0.0700 oh Tukang Besi 79,000.00
0.0070 oh Kepala Tukang 88,000.00
0.0040 oh Mandor 95,000.00
Total :
Total Untuk 1 Kg :
13 1 M2 PASANG BEKISTING UNTUK PONDASI
0.0400 m3 Kayu Kelas III 2,585,000.00
0.3000 kg Paku Biasa 5' - 10' 15,400.00
0.1000 ltr Minyak Bekisting 33,550.00
0.5200 oh Pekerja 50,000.00
0.2600 oh Tukang Kayu 82,000.00
0.0260 oh Kepala Tukang 88,000.00
0.0260 oh Mandor 95,000.00
Total :

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0450 m3 Kayu Kelas III 2,585,000.00
0.3000 kg Paku Biasa 5' - 10' 15,400.00
0.1000 ltr Minyak Bekisting 33,550.00
0.5200 oh Pekerja 50,000.00
0.2600 oh Tukang Kayu 82,000.00
0.0260 oh Kepala Tukang 88,000.00
0.0260 oh Mandor 95,000.00
Total :
15 1 M2 PASANG BEKISTING UNTUK KOLOM
0.0400 m3 Kayu Kelas III 2,585,000.00
0.4000 kg Paku Biasa 5' - 12' 15,400.00
0.2000 ltr Minyak Bekisting 33,550.00
0.0150 m3 Kayu Usuk 4/6 2,585,000.00
0.3500 lbr Plywood 9 mm 115,500.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 99,000.00
0.6600 oh Pekerja 50,000.00
0.3300 oh Tukang Kayu 82,000.00
0.0330 oh Kepala Tukang 88,000.00
0.0330 oh Mandor 95,000.00
Total :
21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
0.2000 m3 Kayu Kelas III 2,585,000.00
1.5000 kg Paku Biasa 5' - 12' 15,400.00
0.4000 ltr Minyak Bekisting 33,550.00
157.5000 kg Besi Beton 10,000.00
2.2500 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
5.3000 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.3000 oh Tukang Kayu 82,000.00
1.0500 oh Tukang Besi 79,000.00
0.2620 oh Kepala Tukang 88,000.00
0.2650 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 2,585,000.00
2.0000 kg Paku Biasa 5' - 12' 15,400.00
0.6000 ltr Minyak Bekisting 33,550.00
210.0000 kg Besi Beton 10,000.00
3.0000 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
5.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.5600 oh Tukang Kayu 82,000.00
1.4000 oh Tukang Besi 79,000.00
0.3230 oh Kepala Tukang 88,000.00
0.2830 oh Mandor 95,000.00
Total :
23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING
0.4000 m3 Kayu Kelas III 2,585,000.00
4.0000 kg Paku Biasa 5' - 12' 15,400.00
2.0000 ltr Minyak Bekisting 33,550.00
315.0000 kg Besi Beton 10,000.00
4.5000 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
0.1500 m3 Kayu Kelas II balok 5,280,000.00
3.5000 lbr Plywood 9 mm 115,500.00
20.0000 btg Dolken Kayu 8" /4 m 99,000.00
7.0500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.6500 oh Tukang Kayu 82,000.00
2.1000 oh Tukang Besi 79,000.00
0.4030 oh Kepala Tukang 88,000.00
0.3530 oh Mandor 95,000.00
Total :
24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
0.3200 m3 Kayu Kelas III 2,585,000.00
3.2000 kg Paku Biasa 5' - 12' 15,400.00
1.6000 ltr Minyak Bekisting 33,550.00
210.0000 kg Besi Beton 10,000.00
3.0000 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
0.1400 m3 Kayu Kelas II balok 5,280,000.00
2.8000 lbr Plywood 9 mm 115,500.00
16.0000 btg Dolken Kayu 8" /4 m 99,000.00
6.3500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.6500 oh Tukang Kayu 82,000.00
1.4000 oh Tukang Besi 79,000.00
0.3330 oh Kepala Tukang 88,000.00
0.3180 oh Mandor 95,000.00
Total :
25 1 M3 MEMBUAT PLAT LANTAI BETON BERTULANG (150 KG BESI + BEKISTING
0.3200 m3 Kayu Kelas III 2,585,000.00
3.2000 kg Paku Biasa 5' - 12' 15,400.00
1.6000 ltr Minyak Bekisting 33,550.00
157.5000 kg Besi Beton 10,000.00
2.2500 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
0.1200 m3 Kayu Kelas II balok 5,280,000.00
2.8000 lbr Plywood 9 mm 115,500.00
32.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.3000 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.3000 oh Tukang Kayu 82,000.00
1.0500 oh Tukang Besi 79,000.00
0.2650 oh Kepala Tukang 88,000.00
0.2650 oh Mandor 95,000.00

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)


0.2400 m3 Kayu Kelas III 2,585,000.00
3.2000 kg Paku Biasa 5' - 12' 15,400.00
1.6000 ltr Minyak Bekisting 33,550.00
157.5000 kg Besi Beton 10,000.00
2.2500 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
0.1600 m3 Kayu Kelas II balok 5,280,000.00
2.8000 lbr Plywood 9 mm 115,500.00
24.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.3000 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.3000 oh Tukang Kayu 82,000.00
1.0500 oh Tukang Besi 79,000.00
0.2620 oh Kepala Tukang 88,000.00
0.2650 oh Mandor 95,000.00

27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)


0.2500 m3 Kayu Kelas III 2,585,000.00
3.0000 kg Paku Biasa 5' - 12' 15,400.00
1.2000 ltr Minyak Bekisting 33,550.00
210.0000 kg Besi Beton 10,000.00
3.0000 kg Kawat Beton 13,750.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 131,000.00
0.8100 m3 Koral Beton 152,000.00
0.1050 m3 Kayu Kelas II balok 5,280,000.00
2.5000 lbr Plywood 9 mm 115,500.00
14.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.6500 oh Pekerja 50,000.00
0.2750 oh Tukang Batu 76,000.00
1.5600 oh Tukang Kayu 82,000.00
1.4000 oh Tukang Besi 79,000.00
0.3230 oh Kepala Tukang 88,000.00
0.2830 oh Mandor 95,000.00

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 2,585,000.00
0.4000 kg Paku Biasa 5' - 12' 15,400.00
0.2000 ltr Minyak Bekisting 33,550.00
0.0180 m3 Kayu Usuk 4/6 2,585,000.00
0.3500 lbr Plywood 9 mm 115,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 50,000.00
0.3300 oh Tukang Kayu 82,000.00
0.0330 oh Kepala Tukang 88,000.00
0.0330 oh Mandor 95,000.00
Total :

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 2,585,000.00
0.4000 kg Paku Biasa 5' - 12' 15,400.00
0.2000 ltr Minyak Bekisting 33,550.00
0.0150 m3 Kayu Usuk 4/6 2,585,000.00
0.3500 lbr Plywood 9 mm 115,500.00
6.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 50,000.00
0.3300 oh Tukang Kayu 82,000.00
0.0330 oh Kepala Tukang 88,000.00
0.0330 oh Mandor 95,000.00
Total :
18 1 M2 PASANG BEKISTING UNTUK DINDING
0.0300 M3 Kayu Kelas III 2,585,000.00
0.4000 Kg Paku Biasa 5' - 12' 15,400.00
0.2000 Ltr Minyak Bekisting 33,550.00
0.0200 M3 Kayu Usuk 4/6 2,585,000.00
0.3500 Lbr Plywood 9 mm 115,500.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 99,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00
0.6600 Oh Pekerja 50,000.00
0.3300 Oh Tukang Kayu 82,000.00
0.0330 Oh Kepala Tukang 88,000.00
0.0330 Oh Mandor 95,000.00

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 2,585,000.00
0.4000 kg Paku Biasa 5' - 12' 15,400.00
0.1500 ltr Minyak Bekisting 33,550.00
0.0150 m3 Kayu Usuk 4/6 2,585,000.00
0.3500 lbr Plywood 9 mm 115,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 50,000.00
0.3300 oh Tukang Kayu 82,000.00
0.0330 oh Kepala Tukang 88,000.00
0.0330 oh Mandor 95,000.00
Total :
20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
0.0264 m3 Kayu Kelas III (Papan) 2,585,000.00
0.6000 kg Paku Biasa 5' - 12' 15,400.00
0.5000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.1500 oh Pekerja 50,000.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
0.0020 m3 Kayu Kelas III 2,585,000.00
0.0100 kg Paku Biasa 5' - 12' 15,400.00
3.0000 kg Besi Beton 10,000.00
0.0450 kg Kawat Beton 13,750.00
4.0000 kg Semen Portland 1,340.00
0.0060 m3 Pasir Beton 131,000.00
0.0090 m3 Koral Beton 152,000.00
0.1800 oh Pekerja 50,000.00
0.0200 oh Tukang Batu 76,000.00
0.0200 oh Tukang Kayu 82,000.00
0.0200 oh Tukang Besi 79,000.00
0.0060 oh Kepala Tukang 88,000.00
0.0090 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
NO URAIAN
(Rp)
1 2 3

SNI 03-2836-2002
30 MEMBUAT 1 M³ BETON TUMBUK (1 PC : 3 PS : 5 KR)
218.0000 kg Semen Portland 1,340.00
0.5200 m3 Pasir Beton 131,000.00
0.8700 m3 Koral Beton 152,000.00
1.6500 oh Pekerja 50,000.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0800 oh Mandor 95,000.00
Total :
31 MEMBUAT 1 M³ BETON CAMPURAN (1 PC : 2 PS : 3 KR)
232.0000 kg Semen Portland 1,340.00
0.5200 m3 Pasir Beton 131,000.00
0.7800 m3 Koral Beton 152,000.00
1.6500 oh Pekerja 50,000.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0800 oh Mandor 95,000.00
Total :
32 MEMBUAT 1 M³ BETON BERTULANG CAMPURAN (1 PC : 1,5 PS : 2,5 KR)
386.0000 kg Semen Portland 1,340.00
0.4700 m3 Pasir Beton 131,000.00
0.7800 m3 Koral Beton 152,000.00
1.6500 oh Pekerja 50,000.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0800 oh Mandor 95,000.00
Total :
33 MEMBUAT 1 M3 TIANG PANCANG PRESTRESSED BETON
440.0000 Kg Semen Portland 1,340.00
0.5000 m3 Pasir Beton 131,000.00
0.8000 m3 Koral Beton 152,000.00
2.4600 Gln Rapidrant -
0.2000 oh Pekerja 50,000.00
0.0750 oh Tukang Batu 76,000.00
0.0075 oh Kepala Tukang 88,000.00
0.0200 oh Mandor 95,000.00
Total :
33 MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 50 CM
1.0000 Bj Buis Beton 1/2 Diameter 50 cm 82,500.00
0.1200 Kg Semen 1,340.00
0.0130 m3 Pasir Pasangan 152,000.00
0.2000 oh Pekerja 50,000.00
0.0750 oh Tukang Batu 76,000.00
0.0075 oh Kepala Tukang 88,000.00
0.0200 oh Mandor 95,000.00
Total :
34 MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 25 CM
1.0000 Bj Buis Beton 1/2 Diameter 25 cm 47,000.00
0.1200 Kg Semen 1,340.00
0.0130 m3 Pasir Pasangan 152,000.00
0.2000 oh Pekerja 50,000.00
0.0750 oh Tukang Batu 76,000.00
0.0075 oh Kepala Tukang 88,000.00
0.0200 oh Mandor 95,000.00
Total :
22 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)
0.0030 m3 Kayu Kelas III 2,585,000.00
0.0200 kg Paku Biasa 5' - 12' 15,400.00
3.6000 kg Besi Beton 10,000.00
0.0500 kg Kawat Beton 13,750.00
5.5000 kg Semen Portland 1,340.00
0.0090 m3 Pasir Beton 131,000.00
0.0150 m3 Koral Beton 152,000.00
0.2970 oh Pekerja 50,000.00
0.0330 oh Tukang Batu 76,000.00
0.0330 oh Tukang Kayu 82,000.00
0.0330 oh Tukang Besi 79,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0150 oh Mandor 95,000.00
Total :

SNI 03-3436-2002

23 1 M2 PERANCAH / STEGER (MENGGUNAKAN BURUH)


0.5769 Ls Dolken Kayu 8" - 10"/4m 99,000.00
0.0179 m3 Kayu Perancah 2,585,000.00
1.0000 Kg Paku 15,400.00
0.1795 oh Pekerja Tidak Terlatih 50,000.00
0.0769 oh Pekerja Terlatih 60,000.00
0.1026 oh Tukang kayu 82,000.00
0.0256 oh Mandor 95,000.00
Total :
24 1 M3 COR BETON BASEMENT
- M2 Bekisting
150.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

25 1 M3 COR BETON PONDASI


2.000 M2 Bekisting ( 3 X Pakai) 54,484.33
110.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

26 1 M3 COR BETON DINDING


5.000 M2 Bekisting ( 3 X Pakai) 184,548.00
150.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

27 1 M3 COR SLOOF
4.000 M2 Bekisting ( 3 X Pakai) 58,792.67
200.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :
28 1 M3 COR BETON LANTAI
7.000 M2 Bekisting ( 2 X Pakai) 427,784.50
1.000 M2 Pekerjaan Steger 143,218.80
100.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :
29 1 M3 COR BETON KOLOM
6.667 M2 Bekisting ( 3 X Pakai) 153,189.67
200.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

30 1 M3 COR BETON BALOK


6.250 M2 Bekisting ( 3 X Pakai) 155,774.67
300.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

31 1 M3 COR BETON TANGGA


10.500 M2 Bekisting ( 3 X Pakai) 144,013.83
150.000 Kg Besi Beton 11,708.85
1.000 M3 Beton K300 865,678.18
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 4,500.00
0.1500 oh Pekerja 50,000.00
0.0750 oh Tukang Kayu 82,000.00
0.0075 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
25.0000 bh Genteng Plentong Dicat 2,400.00
0.1500 oh Pekerja 50,000.00
0.0750 oh Tukang Kayu 82,000.00
0.0075 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
5.0000 bh Bubungan Plentong 14,000.00
8.0000 kg Semen Portland 1,340.00
0.0320 m3 Pasir Pasang 152,000.00
0.4000 oh Pekerja 50,000.00
0.2000 oh Tukang Kayu 82,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0020 oh Mandor 95,000.00
Total :
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 42,000.00
0.1200 kg Paku Pancing 60 x 230 27,500.00
0.1400 oh Pekerja 50,000.00
0.0700 oh Tukang Kayu 82,000.00
0.0070 oh Kepala Tukang Kayu 88,000.00
0.0070 oh Mandor 95,000.00
Total :
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
2.4000 lbr Bubungan Stel Gelombang 49,500.00
6.0000 kg Paku Skrup 3,5" 27,500.00
0.0840 oh Pekerja 50,000.00
0.1250 oh Tukang Kayu 82,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0040 oh Mandor 95,000.00
Total :
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 7,700.00
0.2000 kg Paku Biasa 1/2" - 1" 27,500.00
0.1660 oh Pekerja 50,000.00
0.2500 oh Tukang Kayu 82,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :
7 1 M2 PEKERJAAN ATAP NOK SIRAP
0.4000 lbr Seng plat 3" x 6" BJLS 28 55,000.00
0.0600 kg Paku biasa 1/2" - 1" 27,500.00
0.0500 kg Paku biasa 2" - 5" 15,400.00
0.0040 m3 Kayu papan 3 cm 8,800,000.00
0.1250 oh Pekerja 50,000.00
0.2500 oh Tukang kayu 82,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1
6.5000 lbr Alang - alang 13,750.00
0.5000 glg Tali pengikat 16,500.00
0.2000 oh Pekerja 50,000.00
0.0050 oh Mandor 95,000.00
Total :
8 1 M2 PEKERJAAN ATAP SENG GELOMBANG
0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 99,000.00
0.0200 kg Paku Biasa 1/2" - 1" 27,500.00
0.1200 oh Pekerja 50,000.00
0.0600 oh Tukang Kayu 82,000.00
0.0060 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
9 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL
1.0500 m2 Aluminium Foil 203,500.00
0.1500 oh Pekerja 50,000.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0080 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

13 1 M' PKERJAAN TALANG PATAHAN ATAP


0.5000 Lbr Seng Plat 44,000.00
0.0150 kg Paku 27,500.00
0.0190 M3 Kayu Papan Kruing 5,830,000.00
0.4000 oh Tukang Kayu 82,000.00
0.0250 oh Kepala Tukang Kayu 88,000.00
0.0400 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0013 oh Mandor 95,000.00
Total :
13 1 M' PASANGAN LIST PLAFOND
1.0500 M List Kayu Profit 33,000.00
0.0100 kg Paku 27,500.00
0.0210 oh Tukang Kayu 82,000.00
0.0020 oh Kepala Tukang Kayu 88,000.00
0.0210 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0010 oh Mandor 95,000.00
Total :
14 1 M2 PASANGAN KREPYAK JARO
0.0225 M3 Kayu Kamper Papan 8,800,000.00
2.2500 oh Tukang Kayu 82,000.00
0.2250 oh Kepala Tukang Kayu 88,000.00
0.7500 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0375 oh Mandor 95,000.00
Total :
10 1 M1 PASANG NOK SENG GELOMBANG
0.3000 lbr Seng Plat 3" x 6" BJLS 28 55,000.00
0.0400 kg Paku biasa 1/2" - 1" 27,500.00
0.1500 oh Pekerja 50,000.00
0.0700 oh Tukang Kayu 82,000.00
0.0080 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
11 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU
1.0000 BH Murda / Puntal Paras 275,000.00
0.0130 kg Semen 1,340.00
0.0500 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :

IX PEKERJAAN PLAFOND / LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
1.1000 lbr Asbes semen 16,500.00
0.0100 kg Paku Biasa 1/2" - 1" 27,500.00
0.0300 oh Pekerja 50,000.00
0.0700 oh Tukang Kayu 82,000.00
0.0070 oh Kepala Tukang 88,000.00
0.0040 oh Mandor 95,000.00
Total :
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM
0.3750 lbr TRIPLEKS 71,500.00
0.0300 kg Paku Biasa 1/2" - 1" 27,500.00
0.1000 oh Pekerja 50,000.00
0.1000 oh Tukang Kayu 82,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING
0.0150 m3 Kayu Papan 8,800,000.00
0.0100 kg Paku Biasa 1/2" - 1" 27,500.00
0.8000 oh Pekerja 50,000.00
0.8000 oh Tukang Kayu 82,000.00
0.0800 oh Kepala Tukang 88,000.00
0.0400 oh Mandor 95,000.00
Total :
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL
1.0500 m1 List Kayu Profil 4/5 cm 33,000.00
0.1000 kg Paku list 27,500.00
0.0500 oh Pekerja 50,000.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0030 oh Mandor 95,000.00
Total :
5 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM
3.6000 m1 Profil Aluminium "T" 181,500.00
0.1500 kg Kawat Diameter 4 mm 23,000.00
1.0500 m1 Ramset 12,000.00
1.5000 Lembr Akustik 60 cm x 120 cm 45,100.00
0.5000 oh Pekerja 50,000.00
0.5000 oh Tukang Besi 79,000.00
0.0500 oh Kepala Tukang 88,000.00
0.0250 oh Mandor 95,000.00
Total :
SNI 03-2836-2002
6 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA
0.0120 m3 Kamper Usuk 4/6 cm 5,170,000.00
0.0600 kg Paku Biasa 2" - 5" 27,500.00
1.1000 lbr Asbes 16,500.00
0.1800 oh Pekerja 50,000.00
0.3200 oh Tukang Kayu 82,000.00
0.0320 oh Kepala Tukang 88,000.00
0.0090 oh Mandor 95,000.00
Total :
7 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
0.1100 kg Paku Sekrup 22,000.00
0.3640 lbr Gypsum Board (120x240x9) 62,700.00

0.1000 oh Pekerja 50,000.00


0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
8 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM
0.1100 kg Paku Kalsiboard 27,500.00
0.3640 lbr Kalsiboard 4.5 mm 62,700.00
0.1000 oh Pekerja 50,000.00
0.0500 oh Tukang Kayu 82,000.00
0.0050 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

7 1 M2 PLAFOND GYPSUM, RANGKA KAYU


0.364 Lbr Gypsum Board (120x240x9) 62,700.00
0.023 M3 Kayu Kruing Usuk 5,170,000.00
0.260 Kg Paku Kalsiboard 27,500.00
0.300 OH Pekerja 50,000.00
0.350 OH Tukang Kayu 82,000.00
0.035 OH Kepala Tukang Kayu 88,000.00
0.0150 OH Mandor 95,000.00
Total :
8 1 M2 PLAFOND GYPSUM, RANGKA HOLO
0.364 Lbr Gypsum Board (120x240x9) 62,700.00
1.500 Btg Rangka Holo 25,300.00
0.110 Kg Paku Kalsiboard 33,000.00
0.300 OH Pekerja 50,000.00
0.350 OH Tukang Kayu 82,000.00
0.035 OH Kepala Tukang Kayu 88,000.00
0.0150 oh Mandor 95,000.00
Total :
9 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU
0.340 Lbr Kalsiboard (4,5 x 1220 x 2420) mm 93,500.00
0.023 M3 Kayu Kruing Usuk 5,170,000.00
0.260 Kg Paku Kalsiboard 27,500.00
0.300 OH Pekerja 50,000.00
0.350 OH Tukang Kayu 82,000.00
0.035 OH Kepala Tukang Kayu 88,000.00
0.0150 OH Mandor 95,000.00
Total :
10 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO
0.340 Lbr Kalsiboard (4,5 x 1220 x 2420) mm 93,500.00
1.500 Btg Rangka Holo 25,300.00
0.110 Kg Paku Kalsiboard 33,000.00
0.300 OH Pekerja 50,000.00
0.350 OH Tukang Kayu 82,000.00
0.035 OH Kepala Tukang Kayu 88,000.00
0.0150 oh Mandor 95,000.00
Total :
X PEKERJAAN SANITASI ( SNI 2002 )
1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 2,354,000.00
6% x harga kloset Perlengkapan
3.3000 oh Pekerja 50,000.00
1.1000 oh Tukang batu 76,000.00
0.0010 oh Kepala Tukang 88,000.00
0.1600 oh Mandor 95,000.00
Total :
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
1.0000 bh Kloset jongkok porselen 159,500.00
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 152,000.00
1.0000 oh Pekerja 50,000.00
1.5000 oh Tukang batu 76,000.00
1.5000 oh Kepala Tukang 88,000.00
0.1600 oh Mandor 95,000.00
Total :
3 MEMASANG 1 BUAH URINOIR
1.0000 bh Urinoir 2,376,000.00
30% x harga Urin Perlengkapan
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 152,000.00
1.0000 oh Pekerja 50,000.00
1.0000 oh Tukang batu 76,000.00
0.1000 oh Kepala Tukang 88,000.00
0.1000 oh Mandor 95,000.00
Total :
4 MEMASANG 1 BUAH WASHTAFEL KIA
1.0000 bh Washtafel 203,500.00
12% x harga wast Perlengkapan
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 152,000.00
1.2000 oh Pekerja 50,000.00
1.4500 oh Tukang batu 76,000.00
0.1500 oh Kepala Tukang 88,000.00
0.1000 oh Mandor 95,000.00
Total :
HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

5 1 M2 PASANG LANTAI UBIN TERALUX UKURAN (40 X 40) CM


6.6300 bh Ubin Teralux Kerang 132,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
6 1 M2 PASANG LANTAI UBIN TERALUX UKURAN (30 X 30) CM
11.8700 bh Ubin Teralux Kerang 132,000.00
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.2600 oh Pekerja 50,000.00
0.1300 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
7 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (60 X 60) CM
3.1000 bh Ubin Teralux Marmer 132,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 253,000.00
18% x harga wast Perlengkapan
1.8000 oh Pekerja 50,000.00
2.7000 oh Tukang batu 76,000.00
0.5400 oh Kepala Tukang 88,000.00
0.1100 oh Mandor 95,000.00
Total :
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
1.2000 m1 Pipa galvanis 193,600.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 50,000.00
0.0900 oh Tukang Pipa 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0270 oh Mandor 95,000.00
Total :
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
1.2000 M' Pipa galvanis 627,000.00
35% x harga pipa Perlengkapan
0.1080 Oh Pekerja 50,000.00
0.1800 Oh Tukang Pipa 76,000.00
0.0180 Oh Kepala Tukang 88,000.00
0.0054 Oh Mandor 95,000.00
Total :
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
1.2000 m1 Pipa PVC 17,425.00
35% x harga pipa Perlengkapan
0.0360 oh Pekerja 50,000.00
0.0600 oh Tukang Pipa 76,000.00
0.0060 oh Kepala Tukang 88,000.00
0.0018 oh Mandor 95,000.00
Total :
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
1.2000 m1 Pipa PVC 25,825.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 50,000.00
0.0900 oh Tukang Pipa 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0027 oh Mandor 95,000.00
Total :
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"
1.2000 m1 Pipa PVC 68,950.00
35% x harga pipa Perlengkapan
0.0810 oh Pekerja 50,000.00
0.1350 oh Tukang Pipa 76,000.00
0.0135 oh Kepala Tukang 88,000.00
0.0041 oh Mandor 95,000.00
Total :
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"
1.0000 bh Kran air 22,000.00
0.0250 bh Seal tape 3,300.00
0.0100 oh Pekerja 50,000.00
0.1000 oh Tukang Pipa 76,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 14,000.00
0.0060 oh Pekerja 50,000.00
0.0600 oh Tukang besi 79,000.00
0.0060 oh Kepala Tukang 88,000.00
0.0003 oh Mandor 95,000.00
Total :
2 1 KG MEMASANG RANGKA KUDA - KUDA BAJA IWF
1.1500 kg Besi Baja IWF 38,500.00
0.0060 oh Pekerja 76,000.00
0.0600 oh Tukang besi 55,000.00
0.0060 oh Kepala Tukang 76,000.00
0.0003 oh Mandor 100,000.00
Total :
3 MENGERJAKAN 100 KG PEKERJAAN PERAKITAN
1.0000 lt Solar 13,200.00
0.1000 lt Minyak Pelumas 33,550.00
0.1000 oh Pekerja 76,000.00
0.1000 oh Tukang besi 55,000.00
0.0010 oh Kepala Tukang 76,000.00
0.0050 oh Mandor 100,000.00
0.8000 Jam Sewa Alat -
Total :
4 1M2 MEMBUAT PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU
15.0000 Kg Besi Siku L 30,30,3 53,900.00
32.8000 kg Besi Plat Baja Err:509
0.0500 kg Kawat Las 71,500.00
1.0500 oh Pekerja 50,000.00
1.0500 oh Tukang Las Biasa 79,000.00
0.1050 oh Kepala Tukang 88,000.00
0.0520 oh Mandor 95,000.00
Total :
5 1 M2 PASANG ROLLING DOOR BESI
1.0000 m2 Pintu gulung besi -
0.2000 oh Pekerja 50,000.00
0.2000 oh Tukang besi 79,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0010 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

3 1 M2 PASANG ROLLING DOOR ALLUMINIUM


1.0000 m2 Rolling Door Alluminium 236,500.00
1.0000 oh Pekerja 50,000.00
1.0000 oh Tukang Aluminium 76,000.00
0.1000 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :
4 1 M2 PASANG KUSEN PINTU ALLUMINIUM
1.1000 m Profil Aluminium 10,500.00
2.0000 bh Sekruf fixer 440.00
0.0600 Tube Sealant 22,000.00
0.0430 oh Pekerja 50,000.00
0.0430 oh Tukang Alumium 76,000.00
0.0043 oh Kepala Tukang 88,000.00
0.0021 oh Mandor 95,000.00
Total :
5 1 M2 PASANG PINTU KACA RANGKA ALLUMINIUM
4.4000 m Pintu Aluminium 10,500.00
4.5000 m Profil Kaca 8,250.00
0.2700 Tube Sealant 22,000.00
0.0850 oh Pekerja 50,000.00
0.0850 oh Tukang Alumium 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

6 1 M2 PASANG VENETIONS BLINDS DAN VERTICAL BLINDS


1.0000 m2 Venetions Blinds dan Vertical Blinds (Tirai) -
0.3500 oh Pekerja 50,000.00
0.3500 oh Tukang Alumium 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0180 oh Mandor 95,000.00
Total :
6 1 M2 PASANG TERALI BESI STRIP (2 x 3 ) mm
6.1770 kg Besi strip 20,000.00
27.0800 cm Pengelasan 12,000.00
1.6700 oh Pekerja 50,000.00
1.6700 oh Tukang Las 76,000.00
0.1670 oh Kepala Tukang 88,000.00
0.0830 oh Mandor 95,000.00
Total :
7 1 M2 KAWAT NYAMUK
1.1000 m2 Kawat Nyamuk 22,000.00
11.1100 cm Pengelasan 12,000.00
1.7160 kg Baja Strip (0,2 x 2) cm 20,000.00
0.1000 oh Pekerja 50,000.00
0.1000 oh Tukang Besi 79,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
8 1 M2 PASANG JENDELA NAKO & TRALIS
1.1000 m2 Rangka + Kaca Nako 32,000.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 27,500.00
7.0000 m' Besi strip 8,800.00
0.2000 oh Pekerja 50,000.00
0.2000 oh Tukang besi 79,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0010 oh Mandor 95,000.00
Total :
9 1 M1 PASANG TALANG DATAR, SENG BJLS 28
1.0500 lbr Seng plat 55,000.00
0.0150 kg Paku biasa 0,5" - 1" 27,500.00
0.0190 m3 Kayu papan kelas II/III 8,800,000.00
0.2000 oh Pekerja 50,000.00
0.4000 oh Tukang besi 79,000.00
0.0250 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :
XII PEKERJAAN KUNCI DAN KACA (SNI 2002)
1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 100,000.00
0.0100 oh Pekerja 50,000.00
0.5000 oh Tukang besi 79,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
2 1 PS PASANG ENGSEL PINTU
1.0000 ps Engsel pintu 60,500.00
0.0150 oh Pekerja 50,000.00
0.1500 oh Tukang besi 79,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0008 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

4 1 M PASANG PLINT UBIN TERALUX UKURAN (10 X 40) CM


2.6500 bh Plint Ubin Teralux Kerang 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
5 1 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 60) CM
1.7000 bh Plint Ubin Teralux Marmer 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
6 1 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 40) CM
2.6500 bh Ubin Teralux Marmer 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
7 1 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 30) CM
3.5300 bh Ubin Teralux Marmer 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

15 1 M PASANG PLINT UBIN TERALUX UKURAN (10 X 30) CM


3.5300 bh Plint Ubin Teralux Kerang 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

5 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


5.3000 bh Keramik 30 x 30 cm 120,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.0250 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :

11 1 M1 PASANG PLIN KERAMIK 10 X 20 CM


5.3000 bh Plint Keramik 10 x 20 cm 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.0250 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
1.0000 ps Engsel jendela 54,000.00
0.0100 oh Pekerja 50,000.00
0.1000 oh Tukang besi 79,000.00
0.0100 oh Kepala Tukang 88,000.00
0.0005 oh Mandor 95,000.00
Total :
4 1 Bh Pasang Grendel Jendela
1.0000 Bh Grendel 15,500.00
0.0100 Oh Pekerja 40,000.00
0.1000 Oh Tukang besi 50,000.00
0.0100 Oh Kepala tukang 60,000.00
0.0005 Oh Mandor 68,000.00
Total :
5 1 BH PASANG KAIT ANGIN
1.0000 ps Kait angin 45,700.00
0.0150 oh Pekerja 50,000.00
0.1500 oh Tukang besi 79,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0008 oh Mandor 95,000.00
Total :
6 1 BH PASANG KUNCI SLOT
1.0000 bh Kunci slot 20,200.00
0.0200 oh Pekerja 50,000.00
0.2000 oh Tukang besi 79,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0010 oh Mandor 95,000.00
Total :
7 1 M2 PASANG KACA, TEBAL 3 - 5 MM
1.1000 bh Kaca 121,000.00
0.0150 oh Pekerja 50,000.00
0.1500 oh Tukang besi 79,000.00
0.0150 oh Kepala Tukang 88,000.00
0.0008 oh Mandor 95,000.00
Total :
XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)
1 1 M2 PASANG LANTAI UBIN TERASO UKURAN (40 X 40) CM
6.6300 bh Ubin Teraso 132,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
2 1 M2 PASANG LANTAI UBIN TERASO UKURAN (30 X 30) CM
11.8700 bh Ubin Teraso 132,000.00
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.2600 oh Pekerja 50,000.00
0.1300 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
1 1 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM
6.6300 bh Ubin Granit 242,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
1 1 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM
0.6250 bh Ubin Granit 242,000.00
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.2600 oh Pekerja 50,000.00
0.1300 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
2 1 M PASANG PLINT UBIN GRANIT UKURAN (10 X 40) CM
2.6500 bh Plint Ubin Granit 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
8 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (40 X 40) CM
6.6300 bh Ubin Teralux Marmer 132,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
9 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (30 X 30) CM
11.8700 bh Ubin Teralux Marmer 132,000.00
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.2600 oh Pekerja 50,000.00
0.1300 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
10 1 M PASANG PLINT UBIN TERASO UKURAN (10 X 30) CM
6.6300 bh Plint Ubin Teraso 132,000.00
9.8000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.3000 kg Semen warna/semen grouting 11,000.00
0.2500 oh Pekerja 50,000.00
0.1250 oh Tukang batu 76,000.00
0.0130 oh Kepala Tukang 88,000.00
0.0130 oh Mandor 95,000.00
Total :
11 1 M PASANG PLINT UBIN TERASO UKURAN (10 X 40) CM
2.6500 bh Plint Ubin Teraso 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
3 1 M PASANG PLINT UBIN GRANIT UKURAN (10 X 30) CM
3.5300 bh Plint Ubin Granit 132,000.00
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 152,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 50,000.00
0.0900 oh Tukang batu 76,000.00
0.0090 oh Kepala Tukang 88,000.00
0.0050 oh Mandor 95,000.00
Total :
2 1 M2 PASANG LANTAI KERAMIK 60 X 60 CM
1.0000 m2 Keramik 60 x 60 cm 120,000.00
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 50,000.00
0.3500 oh Tukang batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :
3 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 2,064.00
10.4000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
1.6200 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 50,000.00
0.3500 oh Tukang batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :
4 1 M2 PASANG LANTAI MARMER 100 X 100 CM
1.0600 bh Marmer 165,000.00
8.1900 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 152,000.00
0.6500 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 50,000.00
0.3500 oh Tukang batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

5 1 M2 PASANG DINDING KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 2,064.00
9.3000 kg Semen Portland 1,340.00
0.0180 m3 Pasir Pasang 152,000.00
1.9400 kg Semen warna/semen grouting 11,000.00
0.9000 oh Pekerja 50,000.00
0.4500 oh Tukang batu 76,000.00
0.0450 oh Kepala Tukang 88,000.00
0.0450 oh Mandor 95,000.00
Total :
6 1 M2 PASANG DINDING MARMER 100 X 100 CM
1.0600 bh Marmer 165,000.00
3.0030 bh Paku 12 cm 27,500.00
12.4400 kg Semen Portland 1,340.00
0.0250 m3 Pasir Pasang 152,000.00
0.6500 kg Semen warna/semen grouting 11,000.00
1.3000 oh Pekerja 50,000.00
0.6500 oh Tukang batu 76,000.00
0.0650 oh Kepala Tukang 88,000.00
0.0650 oh Mandor 95,000.00
Total :
7 1 M1 PASANG PLIN KAYU 2 X 10 CM
0.0030 m3 Papan Kayu Kelas II 8,800,000.00
0.0500 kg Paku sekrup 3,5' 27,500.00
0.1200 oh Pekerja 50,000.00
0.1200 oh Tukang kayu 82,000.00
0.0120 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
7 1 M2 PASANG DINDING BATA PELAPIS UKURAN (3 X 7 X 24)
63.0000 bh Bata Pelapis Dinding 5,500.00
12.4400 kg Semen Portland 1,340.00
0.0250 m3 Pasir Pasang 152,000.00
2.7500 kg Semen warna/semen grouting 11,000.00
1.0000 oh Pekerja 50,000.00
0.5000 oh Tukang batu 76,000.00
0.0500 oh Kepala Tukang 88,000.00
0.0500 oh Mandor 95,000.00
Total :
8 1 M2 PASANG DINDING BATU PARAS (30 X 15)
22.0000 bh Batu Paras 16,500.00
11.7500 kg Semen Portland 1,340.00
0.0350 m3 Pasir Pasang 152,000.00
0.7000 oh Pekerja 50,000.00
0.3500 oh Tukang batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :
9 1 M2 PASANG DINDING BATU CANDI HITAM
1.1000 m2 Batu Candi Hitam (20 x 20 x 3 Cm) 99,000.00
11.7500 kg Semen Portland 1,340.00
0.0350 m3 Pasir Pasang 152,000.00
0.7000 oh Pekerja 50,000.00
0.3500 oh Tukang batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.0350 oh Mandor 95,000.00
Total :
SNI 03-2836-2002
10 1 M2 PASANGAN TEGEL DAN SPESI
0.0230 m2 Pasir Pasangan 152,000.00
1.4400 Kg Semen 1,340.00
1.0000 M2 Tegel 30 x30 TB PC 71,500.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang Batu 88,000.00
0.5000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :
11 1 M2 PASANGAN TEGEL WARNA KUNING DENGAN SPESI
0.0230 m2 Pasir Pasangan 152,000.00
1.4400 Kg Semen 1,340.00
1.0000 M2 Tegel 30 x30 TB PC 71,500.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang Batu 88,000.00
0.5000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

10 1 M2 PASANG WALL PAPER, LEBAR 50 CM


2.2000 m Wall Paper Err:509
0.2500 kg Lem -
0.3500 oh Pekerja 50,000.00
0.1750 oh Tukang 76,000.00
0.0170 oh Kepala Tukang 88,000.00
0.0020 oh Mandor 95,000.00
Total :

12 1 M2 PASANGAN TEGEL WARNA MERAH DENGAN SPESI


0.0230 m2 Pasir Pasangan 152,000.00
1.4400 Kg Semen 1,340.00
1.0000 M2 Tegel 30 x30 TB PC 71,500.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang Batu 88,000.00
0.5000 oh Pekerja / Pekerja Tak Terlatih 50,000.00
0.0250 oh Mandor 95,000.00
Total :
XIV PEKERJAAN PENGECATAN (SNI 2002)
1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 17,000.00
0.1500 kg Dempul 43,000.00
0.1700 kg Cat dasar 49,500.00
0.2600 kg Cat Penutup 2x 38,500.00
0.0700 oh Pekerja 50,000.00
0.0090 oh Tukang cat 76,000.00
0.0060 oh Kepala Tukang 88,000.00
0.0025 oh Mandor 95,000.00
Total :
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
0.1500 kg Vernis 39,000.00
0.0500 kg Dempul 43,000.00
0.1000 lbr Amplas 5,500.00
0.0100 bh Kuas 5,500.00
0.1600 oh Pekerja 50,000.00
0.1600 oh Tukang cat 76,000.00
0.0160 oh Kepala Tukang 88,000.00
0.0025 oh Mandor 95,000.00
Total :
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 8,000.00
0.1000 kg Cat dasar 49,500.00
0.2600 kg Cat Penutup 2x 33,000.00
0.0200 oh Pekerja 50,000.00
0.0630 oh Tukang cat 76,000.00
0.0063 oh Kepala Tukang 88,000.00
0.0025 oh Mandor 95,000.00
Total :
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1200 kg Cat dasar 49,500.00
0.1800 kg Cat Penutup 2x 33,000.00
0.0280 oh Pekerja 50,000.00
0.0420 oh Tukang cat 76,000.00
0.0042 oh Kepala Tukang 88,000.00
0.0025 oh Mandor 95,000.00
Total :
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
0.1000 kg Meni besi 16,000.00
0.0100 lbr Kuas 5,500.00
0.0200 oh Pekerja 50,000.00
0.2000 oh Tukang cat 76,000.00
0.0200 oh Kepala Tukang 88,000.00
0.0100 oh Mandor 95,000.00
Total :
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI
0.3000 kg Cat besi 77,000.00
0.0060 oh Pekerja 50,000.00
0.0600 oh Tukang cat 76,000.00
0.0120 oh Kepala Tukang 88,000.00
0.0060 oh Mandor 95,000.00
Total :
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR
0.1500 ltr Politur 29,000.00
0.3720 ltr Politur Jadi 39,000.00
2.0000 lbr Amplas 5,500.00
- oh Pekerja 50,000.00
0.0600 oh Tukang cat 76,000.00
0.0160 oh Kepala Tukang 88,000.00
0.0025 oh Mandor 95,000.00

Total :

HARGA
NO URAIAN SATUAN
(Rp)
1 2 3

8 1 M2 PEKERJAAN POLITURAN MELAMIN


0.4000 ltr Wood Filer 57,200.00
0.5000 ltr Sending 5,500.00
0.5000 ltr Politur Muda 29,000.00
5.0000 lbr Amplas 33,000.00
0.0600 oh Tukang Politur 82,000.00
0.0160 oh Kepala Tukang 88,000.00
0.0030 oh Mandor 95,000.00

Total :

XV PEKERJAAN LANDSCAPE
1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225 65,000.00
0.1000 m3 Pasir Urug 135,000.00
0.2500 oh Tukang Batu 76,000.00
0.0250 oh Kepala Tukang 88,000.00
0.5000 oh Pekerja 50,000.00
0.0250 oh Mandor 95,000.00
Total :
2 Paving 10 x 20 cm tebal 6 cm K350 75,000.00
3 Paving 10 x 20 cm tebal 8 cm K225 75,000.00
4 Paving 10 x 20 cm tebal 8 cm K350 82,500.00
5 Paving 10 x 20 cm tebal 8 cm K425 90,200.00
6 Paving 20 x 20 cm tebal 6 cm K350 75,000.00
7 Paving 20 x 20 cm tebal 8 cm K225 75,000.00
8 Paving 20 x 20 cm tebal 8 cm K350 82,500.00
9 Paving 20 x 20 cm tebal 8 cm K425 90,200.00
10 Paving 20 x 20 cm tebal 10 cm K225 88,000.00
11 Paving 20 x 20 cm tebal 10 cm K350 96,800.00
12 Paving 20 x 20 cm tebal 10 cm K425 95,700.00
13 Paving Tiga Berlian tebal 6 cm K225 62,700.00

14 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 64,900.00
0.0690 m3 Pasir Urug 135,000.00
0.5000 oh Tukang Batu 76,000.00
0.0500 oh Kepala Tukang 88,000.00
1.0000 oh Pekerja 50,000.00
0.0500 oh Mandor 95,000.00
Total :
15 1 M2 PASANGAN KORAL SIKAT
1.6500 zak Koral Sikat 60,500.00
9.2800 Kg Semen 1,300.00
0.0180 m3 Pasir pasang 152,000.00
0.0350 oh Tukang Batu 76,000.00
0.6200 oh Kepala Tukang 88,000.00
0.3500 oh Pekerja 50,000.00
0.0300 oh Mandor 95,000.00
Total :
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 24,200.00
0.4500 zak Semen 50 Kg 1,300.00
0.0023 m3 Pasir Pasang 152,000.00
0.3500 oh Tukang Batu 76,000.00
0.0350 oh Kepala Tukang 88,000.00
0.9500 oh Pekerja 50,000.00
0.0950 oh Mandor 95,000.00
Total :
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 64,900.00
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 24,200.00

19 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 77,000.00
0.0710 kg Thiner 23,000.00
0.0300 oh Tukang Cat 76,000.00
0.0030 oh Kep. Tukang 88,000.00
0.1500 oh Pekerja 50,000.00
0.0150 oh Mandor 95,000.00
Total :

XVI PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 7,500.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 6,800.00
15.0000 bj Klem clipsal 20 mm hitam 660.00
3.0000 bj Sock clipsal 20 mm hitam 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,600.00
1.0000 ttk Biaya pasang 25,000.00
Total :
2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 7,500.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 6,800.00
15.0000 bj Klem clipsal 20 mm hitam 660.00
4.0000 bj Sock clipsal 20 mm hitam 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,600.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 2,500.00
1.0000 ttk Biaya pasang 25,000.00
Total :
3 1 TITIK INSTALASI TELEPHONE
25.0000 m1 Kabel telephone 4,600.00
8.0000 bt Pipa Clipsal 20 mm putih 12,000.00
1.0000 bh Tee dos clipsal 20 mm putih 6,800.00
25.0000 bj Klem clipsal 20 mm putih 660.00
5.0000 bj Sock clipsal 20 mm putih 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,600.00
1.0000 ttk Biaya pasang 25,000.00
Total :
4 1 TITIK INSTALASI MATV
20.0000 m1 Coaxial cable 5C-75 ohm commscof 16,000.00
6.0000 bt Pipa Clipsal 20 mm putih 12,000.00
2.0000 bh Tee dos clipsal 20 mm putih 6,800.00
20.0000 bj Klem clipsal 20 mm putih 660.00
6.0000 bj Sock clipsal 20 mm putih 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,600.00
1.0000 ttk Biaya pasang 25,000.00
Total :

Denpasar, 3 Februari 2014

Kepala Dinas Tata Ruang dan Perum


EKERJAAN
4
HARGA HARGA HARGA
UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

12,500.00
3,350.00
99,000.00
655.00
1,368.00
396,000.00
924.00
7,200.00
16,400.00
20,000.00
1,760.00
1,900.00
40,060.00 520,997.00 561,057.00

66,000.00
308.00
42,350.00
8,200.00
5,000.00
880.00
475.00
14,555.00 108,658.00 123,213.00

123,750.00
465,300.00
13,090.00
9,680.00
46,900.00
22,800.00
13,100.00
22,800.00
99,000.00
13,750.00
64,000.00
9,680.00
3,630.00
4,290.00
164,000.00
76,000.00
100,000.00
26,400.00
4,750.00
371,150.00 911,770.00 1,282,920.00

17,000.00
542,850.00
4,620.00
14,070.00
3,930.00
7,600.00
148,500.00
164,000.00
50,000.00
17,600.00
4,750.00
236,350.00 738,570.00 974,920.00

30,000.00
713,460.00
10,780.00
148,500.00
123,000.00
50,000.00
13,200.00
4,750.00
190,950.00 902,740.00 1,093,690.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

5,000.00
4,750.00
9,750.00 9,750.00

12,500.00
480,810.00
4,620.00
24,120.00
3,930.00
7,600.00
148,500.00
96,525.00
164,000.00
50,000.00
17,600.00
4,750.00
236,350.00 778,605.00 1,014,955.00

93,060.00
1,232.00
84,700.00
24,600.00
142.50
24,742.50 178,992.00 203,734.50

10,000.00
9,375.00
1,394.00
100.00
22,000.00
1,235.00
24,729.00 19,375.00 44,104.00

27,000.00
16,425.00
1,520.00
50,000.00
4,750.00
54,750.00 44,945.00 99,695.00

333,350.00
31,635.00
364,985.00 364,985.00

333,350.00
3,135.00
336,485.00 336,485.00

GAN MEMBERSIHKAN BATAS - BATASNYA


100,000.00
9,500.00
109,500.00 109,500.00

HKAN BATA-BATA ATAU LAIN - LAIN YANG DIBONGKAR


50,000.00
9,500.00
59,500.00 59,500.00

25,000.00
2,375.00
27,375.00 27,375.00
AP DIPAKAI LAGI
10,000.00
9,500.00
19,500.00 19,500.00

37,500.00
2,375.00
39,875.00 39,875.00

45,000.00
4,275.00
49,275.00 49,275.00

52,500.00
6,365.00
58,865.00 58,865.00

50,000.00
3,040.00
53,040.00 53,040.00

75,000.00
5,700.00
80,700.00 80,700.00

60,000.00
4,275.00
64,275.00 64,275.00

2,500.00
475.00
2,975.00 2,975.00

16,500.00
950.00
17,450.00 17,450.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
25,000.00
9,500.00
34,500.00 34,500.00

20,500.00
2,200.00
2,500.00
25,200.00 25,200.00

AN (LAPISAN ATAU DARI BAWAH DIHITUNG TERPISAH)


49,200.00
5,280.00
100,000.00
9,500.00
109,500.00 109,500.00

JEMBATAN DAN SEBAGAINYA (KAYU DIPAKAI LAGI)


492,000.00
52,800.00
200,000.00
19,000.00
219,000.00 219,000.00

19,800.00
2,500.00
475.00
2,975.00 2,975.00

50,000.00
50,000.00 50,000.00

an

25,000.00
4,750.00
29,750.00 29,750.00

162,000.00
15,000.00
950.00
15,950.00 162,000.00 177,950.00

46,200.00
7,500.00
1,425.00
8,925.00 46,200.00 55,125.00

120,960.00
12,500.00
2,375.00
14,875.00 120,960.00 135,835.00

138,600.00
25,000.00
4,750.00
29,750.00 138,600.00 168,350.00

151,800.00
12,500.00
2,375.00
14,875.00 151,800.00 166,675.00

217,800.00
277,750.00
73,720.00
75,000.00
57,000.00
6,600.00
7,125.00
145,725.00 569,270.00 714,995.00

217,800.00
224,125.00
79,040.00
75,000.00
57,000.00
6,600.00
7,125.00
145,725.00 520,965.00 666,690.00

217,800.00
187,000.00
82,688.00
75,000.00
57,000.00
6,600.00
7,125.00
145,725.00 487,488.00 633,213.00

217,800.00
160,875.00
85,272.00
75,000.00
57,000.00
6,600.00
7,125.00
145,725.00 463,947.00 609,672.00

217,800.00
125,125.00
88,768.00
75,000.00
57,000.00
6,600.00
7,125.00
145,725.00 431,693.00 577,418.00

87,120.00
266,750.00
40,872.00
71,136.00
1,260,000.00
24,750.00
170,000.00
64,600.00
7,480.00
16,150.00
258,230.00 1,750,628.00 2,008,858.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

81,675.00
266,750.00
40,872.00
71,136.00
120,000.00
60,800.00
7,040.00
11,305.00
199,145.00 460,433.00 659,578.00

217,800.00
58,320.00
39,000.00
29,640.00
3,432.00
3,705.00
75,777.00 276,120.00 351,897.00

Err:509
12,400.00
13,680.00
855.00
46,750.00
8,800.00
61,285.00 21,200.00 82,485.00

61,203.45
32,300.00
3,811.50
100,000.00
36,111.50 161,203.45 197,314.95

72,936.00
15,600.00
- 88,536.00 88,536.00
97,396.50 270,939.45 368,335.95

49,810.00 533,972.50 583,782.50

462,000.00
45,306.25
13,832.00
30,000.00
15,200.00
1,760.00
2,850.00
49,810.00 521,138.25 570,948.25

154,000.00
26,056.25
5,776.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 185,832.25 210,737.25

154,000.00
19,758.75
6,080.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 179,838.75 204,743.75

154,000.00
15,812.50
6,536.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 176,348.50 201,253.50

154,000.00
13,310.00
6,840.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 174,150.00 199,055.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

462,000.00
36,506.25
14,136.00
30,000.00
15,200.00
1,760.00
2,850.00
49,810.00 512,642.25 562,452.25

462,000.00
30,525.00
15,504.00
30,000.00
15,200.00
1,760.00
2,850.00
49,810.00 508,029.00 557,839.00

462,000.00
25,437.50
18,544.00
30,000.00
15,200.00
1,760.00
2,850.00
49,810.00 505,981.50 555,791.50

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

154,000.00
8,937.50
7,600.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 170,537.50 195,442.50

577,500.00
92,400.00
184.80
19,800.00
5,000.00
4,100.00
440.00
190.00
9,730.00 689,884.80 699,614.80

330,000.00
17,105.00
164,000.00
35,200.00
100,000.00
9,500.00
144,700.00 347,105.00 491,805.00

484,000.00
16,156.25
164,000.00
35,200.00
100,000.00
9,500.00
308,700.00 500,156.25 808,856.25

302,500.00
16,156.25
164,000.00
35,200.00
100,000.00
9,500.00
308,700.00 318,656.25 627,356.25

154,000.00
11,440.00
7,448.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 172,888.00 197,793.00
i 1 pc : 3 ps
34,375.00
20,845.00
55,328.00
2,800.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 113,348.00 138,253.00

34,375.00
16,678.75
58,976.00
2,800.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 112,829.75 137,734.75

1,155,000.00
19,250.00
4,864.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 1,179,114.00 1,204,019.00

21,318.00
2,432.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 23,750.00 52,895.00
14,058.00
3,040.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 17,098.00 46,243.00

10,692.00
3,496.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 14,188.00 43,333.00

8,580.00
3,648.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 12,228.00 41,373.00

7,128.00
3,952.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 11,080.00 40,225.00

6,072.00
4,104.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 10,176.00 39,321.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

4,752.00
4,408.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 9,160.00 38,305.00

18,744.00
4,104.00
20,000.00
15,200.00
1,760.00
2,090.00
39,050.00 22,848.00 61,898.00

14,256.00
4,712.00
13,000.00
15,200.00
1,760.00
1,235.00
31,195.00 18,968.00 50,163.00

11,440.00
4,864.00
20,000.00
15,200.00
1,760.00
2,090.00
39,050.00 16,304.00 55,354.00

9,504.00
5,320.00
20,000.00
15,200.00
1,760.00
2,090.00
39,050.00 14,824.00 53,874.00

8,096.00
5,472.00
20,000.00
15,200.00
1,760.00
2,090.00
39,050.00 13,568.00 52,618.00

687.50
1,976.00
4,000.00
30,400.00
3,520.00
380.00
38,300.00 2,663.50 40,963.50
5,940.00
912.00
15,000.00
7,600.00
880.00
1,425.00
24,905.00 6,852.00 31,757.00

13,750.00
-
15,000.00
7,600.00
880.00
1,425.00
24,905.00 13,750.00 38,655.00

13,750.00
-
22,500.00
17,100.00
2,024.00
2,185.00
43,809.00 13,750.00 57,559.00

4,273.50
7,500.00
5,700.00
704.00
760.00
14,664.00 4,273.50 18,937.50

2,200.00
3,500.00
2,660.00
352.00
380.00
6,892.00 2,200.00 9,092.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

8,717.50
1,824.00
15,000.00
11,400.00
1,320.00
1,425.00
29,145.00 10,541.50 39,686.50

4,468.75
10,000.00
7,600.00
880.00
950.00
9,430.00 4,468.75 13,898.75

8,833,000.00
34,375.00
16,500.00
350,000.00
1,722,000.00
184,800.00
33,250.00
2,290,050.00 8,883,875.00 11,173,925.00

6,336,000.00
34,375.00
16,500.00
300,000.00
1,476,000.00
158,400.00
28,500.00
1,962,900.00 6,386,875.00 8,349,775.00

352,000.00
1,375.00
17,500.00
86,100.00
9,240.00
1,710.00
114,550.00 353,375.00 467,925.00

233,200.00
1,375.00
17,500.00
86,100.00
9,240.00
1,710.00
114,550.00 234,575.00 349,125.00

352,000.00
8,250.00
50,000.00
246,000.00
26,400.00
4,750.00
327,150.00 360,250.00 687,400.00

211,200.00
4,950.00
40,000.00
196,800.00
21,120.00
3,800.00
261,720.00 216,150.00 477,870.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

563,200.00
8,250.00
50,000.00
246,000.00
26,400.00
4,750.00
327,150.00 571,450.00 898,600.00
U KELAS II (Lebar Sampai 90 Cm)
220,000.00
825.00
8,250.00
71,500.00
35,000.00
172,200.00
18,480.00
3,325.00
229,005.00 300,575.00 529,580.00

225,280.00
825.00
8,250.00
71,500.00
40,000.00
196,800.00
21,120.00
3,800.00
261,720.00 305,855.00 567,575.00

528,000.00
4,125.00
33,500.00
164,000.00
17,600.00
31,825.00
246,925.00 532,125.00 779,050.00

225,280.00
825.00
4,950.00
77,000.00
40,000.00
196,800.00
21,120.00
3,800.00
261,720.00 308,055.00 569,775.00

220,000.00
825.00
13,200.00
77,000.00
38,500.00
42,500.00
209,100.00
22,440.00
4,085.00
278,125.00 349,525.00 627,650.00

8,833,000.00
132,000.00
154,000.00
200,000.00
984,000.00
105,600.00
19,000.00
1,308,600.00 9,119,000.00 10,427,600.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
9,636,000.00
132,000.00
154,000.00
335,000.00
1,648,200.00
176,880.00
31,825.00
2,191,905.00 9,922,000.00 12,113,905.00

8,833,000.00
132,000.00
82,500.00
120,000.00
590,400.00
63,360.00
11,400.00
785,160.00 9,047,500.00 9,832,660.00

77,000.00
23,760.00
6,875.00
5,000.00
8,200.00
880.00
475.00
14,555.00 107,635.00 122,190.00

77,000.00
47,520.00
6,875.00
5,000.00
8,200.00
880.00
475.00
14,555.00 131,395.00 145,950.00

1,324,950.00
5,500.00
6,000.00
9,840.00
1,056.00
570.00
17,466.00 1,330,450.00 1,347,916.00

84,700.00
5,500.00
7,500.00
24,600.00
2,640.00
7,125.00
41,865.00 90,200.00 132,065.00

89,650.00
6,875.00
10,000.00
24,600.00
2,640.00
950.00
38,190.00 96,525.00 134,715.00

95,040.00
2,750.00
5,000.00
16,400.00
1,760.00
475.00
23,635.00 97,790.00 121,425.00

96,800.00
1,375.00
5,000.00
16,400.00
1,760.00
475.00
23,635.00 98,175.00 121,810.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

224,840.00
4,125.00
7,500.00
36,900.00
3,960.00
760.00
49,120.00 228,965.00 278,085.00
KA KAYU KELAS II
224,840.00
4,125.00
66,220.00
9,240.00
7,500.00
36,900.00
3,960.00
760.00
49,120.00 304,425.00 353,545.00
A KAYU KELAS II
224,840.00
4,125.00
61,490.00
9,240.00
10,000.00
49,200.00
5,280.00
950.00
65,430.00 299,695.00 365,125.00

37,950.00
4,125.00
66,220.00
9,240.00
7,500.00
36,900.00
3,960.00
760.00
49,120.00 117,535.00 166,655.00

37,950.00
4,125.00
61,490.00
9,240.00
10,000.00
49,200.00
5,280.00
950.00
65,430.00 112,805.00 178,235.00

61,600.00
2,750.00
4,125.00
30,000.00
147,600.00
15,840.00
2,850.00
196,290.00 68,475.00 264,765.00

28,600.00
1,375.00
1,250.00
6,150.00
704.00
95.00
8,199.00 29,975.00 38,174.00

92,400.00
4,125.00
4,100.00
440.00
2,500.00
2,375.00
5,315.00 96,525.00 101,840.00

26,400.00
2,750.00
4,100.00
440.00
2,500.00
2,375.00
9,415.00 29,150.00 38,565.00

92,400.00
4,125.00
45,045.00
32,800.00
3,520.00
13,500.00
1,282.50
51,102.50 141,570.00 192,672.50

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

339,625.00 869 0.6207143


81,313.57 999 0.74
112,480.00
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 538,793.57 652,542.57

379,500.00
77,477.14
113,943.70
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 576,295.85 690,044.85

411,125.00
74,763.57
114,506.67
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 605,770.24 719,519.24

448,250.00
71,114.29
115,857.78
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 640,597.06 754,346.06

484,000.00
68,400.71
116,082.96
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 673,858.68 787,607.68

510,125.00
65,312.86
117,884.44
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 698,697.30 812,446.30

528,000.00
64,751.43
116,983.70
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 715,110.13 828,859.13
558,250.00
64,002.86
115,520.00
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 743,147.86 856,896.86

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

567,875.00
63,722.14
114,957.04
5,375.00
82,500.00
20,900.00
2,464.00
7,885.00
113,749.00 751,929.18 865,678.18

603,625.00
62,692.86
113,268.15
5,375.00
105,000.00
26,600.00
3,080.00
9,975.00
144,655.00 784,961.01 929,616.01

616,000.00
62,412.14
112,592.59
5,375.00
105,000.00
26,600.00
3,080.00
9,975.00
144,655.00 796,379.74 941,034.74
105,000.00
2,062.50
3,500.00
5,530.00
616.00
380.00 0.01
10,026.00 107,062.50 117,088.50
11,708.85

103,400.00
4,620.00
3,355.00
26,000.00
21,320.00
2,288.00
2,470.00
52,078.00 111,375.00 163,453.00

116,325.00
4,620.00
3,355.00
26,000.00
21,320.00
2,288.00
2,470.00
52,078.00 124,300.00 176,378.00

103,400.00
6,160.00
6,710.00
38,775.00
40,425.00
198,000.00
33,000.00
27,060.00
2,904.00
3,135.00
66,099.00 393,470.00 459,569.00

517,000.00
23,100.00
13,420.00
1,575,000.00
30,937.50
450,240.00
70,740.00
123,120.00
265,000.00
20,900.00
106,600.00
82,950.00
23,056.00
25,175.00
523,681.00 2,803,557.50 3,327,238.50

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

697,950.00
30,800.00
20,130.00
2,100,000.00
41,250.00
450,240.00
70,740.00
123,120.00
282,500.00
20,900.00
127,920.00
110,600.00
28,424.00
26,885.00
597,229.00 3,534,230.00 4,131,459.00

1,034,000.00
61,600.00
67,100.00
3,150,000.00
61,875.00
450,240.00
70,740.00
123,120.00
792,000.00
404,250.00
1,980,000.00
352,500.00
20,900.00
135,300.00
165,900.00
35,464.00
33,535.00
743,599.00 8,194,925.00 8,938,524.00

827,200.00
49,280.00
53,680.00
2,100,000.00
41,250.00
450,240.00
70,740.00
123,120.00
739,200.00
323,400.00
1,584,000.00
317,500.00
20,900.00
135,300.00
110,600.00
29,304.00
30,210.00
643,814.00 6,362,110.00 7,005,924.00

827,200.00
49,280.00
53,680.00
1,575,000.00
30,937.50
450,240.00
70,740.00
123,120.00
633,600.00
323,400.00
3,168,000.00
265,000.00
20,900.00
106,600.00
82,950.00
23,320.00
25,175.00
523,945.00 7,305,197.50 7,829,142.50

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

620,400.00
49,280.00
53,680.00
1,575,000.00
30,937.50
450,240.00
70,740.00
123,120.00
844,800.00
323,400.00
2,376,000.00
265,000.00
20,900.00
106,600.00
82,950.00
23,056.00
25,175.00
523,681.00 6,517,597.50 7,041,278.50

646,250.00
46,200.00
40,260.00
2,100,000.00
41,250.00
450,240.00
70,740.00
123,120.00
554,400.00
288,750.00
1,386,000.00
282,500.00
20,900.00
127,920.00
110,600.00
28,424.00
26,885.00
597,229.00 5,747,210.00 6,344,439.00

103,400.00
6,160.00
6,710.00
46,530.00
40,425.00
198,000.00
33,000.00
27,060.00
2,904.00
3,135.00
66,099.00 401,225.00 467,324.00

103,400.00
6,160.00
6,710.00
38,775.00
40,425.00
594,000.00
33,000.00
27,060.00
2,904.00
3,135.00
66,099.00 789,470.00 855,569.00

77,550.00
6,160.00
6,710.00
51,700.00
40,425.00
297,000.00
8,000.00
33,000.00
27,060.00
2,904.00
3,135.00
66,099.00 487,545.00 553,644.00

77,550.00
6,160.00
5,032.50
38,775.00
40,425.00
198,000.00
33,000.00
27,060.00
2,904.00
3,135.00
66,099.00 365,942.50 432,041.50

68,244.00
9,240.00
49,500.00
7,500.00
4,100.00
440.00
760.00
12,800.00 126,984.00 139,784.00

5,170.00
154.00
30,000.00
618.75
5,360.00
786.00
1,368.00
9,000.00
1,520.00
1,640.00
1,580.00
528.00
855.00
15,123.00 43,456.75 58,579.75

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

292,120.00
68,120.00
132,240.00
82,500.00
19,000.00
2,200.00
7,600.00
111,300.00 492,480.00 603,780.00

310,880.00
68,120.00
118,560.00
82,500.00
19,000.00
2,200.00
7,600.00
111,300.00 497,560.00 608,860.00

517,240.00
61,570.00
118,560.00
82,500.00
19,000.00
2,200.00
7,600.00
111,300.00 697,370.00 808,670.00

589,600.00
65,500.00 0.12
121,600.00
-
10,000.00
5,700.00
660.00
1,900.00
18,260.00 776,700.00 794,960.00

82,500.00
160.80 0.12
1,976.00
10,000.00
5,700.00
660.00
1,900.00
18,260.00 84,636.80 102,896.80

47,000.00
160.80
1,976.00
10,000.00
5,700.00
660.00
1,900.00
18,260.00 49,136.80 67,396.80

7,755.00
308.00
36,000.00
687.50
7,370.00
1,179.00
2,280.00
14,850.00
2,508.00
2,706.00
2,607.00
880.00
1,425.00
24,976.00 55,579.50 80,555.50

57,113.10
46,271.50
15,400.00
8,975.00
4,614.00
8,413.20
2,432.00
24,434.20 118,784.60 143,218.80

-
1,756,327.50
865,678.18
- 2,622,005.68 2,622,005.68

108,968.67
1,287,973.50
865,678.18
- 2,262,620.35 2,262,620.35

922,740.00
1,756,327.50
865,678.18
- 3,544,745.68 3,544,745.68

235,170.67
2,341,770.00
865,678.18
- 3,442,618.85 3,442,618.85

2,994,491.50
143,218.80
1,170,885.00
865,678.18
- 5,174,273.48 5,174,273.48

1,021,315.51
2,341,770.00
865,678.18
- 4,228,763.69 4,228,763.69

973,591.67
3,512,655.00
865,678.18
- 5,351,924.85 5,351,924.85

1,512,145.25
1,756,327.50
865,678.18
- 4,134,150.93 4,134,150.93

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

112,500.00
7,500.00
6,150.00
660.00
760.00
15,070.00 112,500.00 127,570.00

60,000.00
7,500.00
6,150.00
660.00
760.00
15,070.00 60,000.00 75,070.00

70,000.00
10,720.00
4,864.00
20,000.00
16,400.00
1,760.00
190.00
38,350.00 85,584.00 123,934.00

31,500.00
3,300.00
7,000.00
5,740.00
616.00
665.00
14,021.00 34,800.00 48,821.00

118,800.00
165,000.00
4,200.00
10,250.00
1,144.00
380.00
15,974.00 283,800.00 299,774.00

462,000.00
5,500.00
8,300.00
20,500.00
2,200.00
760.00
31,760.00 467,500.00 499,260.00

22,000.00
1,650.00
770.00
35,200.00
6,250.00
20,500.00
2,200.00
570.00
29,520.00 59,620.00 89,140.00

89,375.00
8,250.00
10,000.00
475.00
10,475.00 97,625.00 108,100.00

69,300.00
550.00
6,000.00
4,920.00
528.00
570.00
12,018.00 69,850.00 81,868.00

213,675.00
7,500.00
4,100.00
440.00
760.00
12,800.00 213,675.00 226,475.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

22,000.00
412.50
110,770.00
32,800.00
2,200.00
2,000.00
123.50
37,123.50 133,182.50 170,306.00

34,650.00
275.00
1,722.00
176.00
1,050.00
95.00
3,043.00 34,925.00 37,968.00

198,000.00
184,500.00
19,800.00
37,500.00
3,562.50
3,562.50 198,000.00 201,562.50

16,500.00
1,100.00
7,500.00
5,740.00
704.00
570.00
14,514.00 17,600.00 32,114.00

275,000.00
17.42
2,500.00
2,375.00
4,875.00 275,017.42 279,892.42

18,150.00
275.00
1,500.00
5,740.00
616.00
380.00
8,236.00 18,425.00 26,661.00

26,812.50
825.00
5,000.00
8,200.00
880.00
475.00
14,555.00 27,637.50 42,192.50

132,000.00
275.00
40,000.00
65,600.00
7,040.00
3,800.00
116,440.00 132,275.00 248,715.00

34,650.00
2,750.00
2,500.00
4,100.00
440.00
285.00
7,325.00 37,400.00 44,725.00

653,400.00
3,450.00
12,600.00
67,650.00
25,000.00
39,500.00
4,400.00
2,375.00
71,275.00 737,100.00 808,375.00

62,040.00
1,650.00
18,150.00
9,000.00
26,240.00
2,816.00
855.00
38,911.00 81,840.00 120,751.00

2,420.00
22,822.80

5,000.00
4,100.00
440.00
475.00
10,015.00 25,242.80 35,257.80

3,025.00
22,822.80
5,000.00
4,100.00
440.00
475.00
10,015.00 25,847.80 35,862.80

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

22,822.80
118,910.00
7,150.00
15,000.00
28,700.00
3,080.00
1,425.00
4,505.00 148,882.80 153,387.80

22,822.80
37,950.00
3,630.00 0.3472222
15,000.00
28,700.00
3,080.00
1,425.00
33,205.00 64,402.80 97,607.80

31,790.00
118,910.00
7,150.00
15,000.00
28,700.00
3,080.00
1,425.00
4,505.00 157,850.00 162,355.00

31,790.00
37,950.00
3,630.00
15,000.00
28,700.00
3,080.00
1,425.00
33,205.00 73,370.00 106,575.00

0.0338707
2,354,000.00
141,240.00
165,000.00
83,600.00
88.00
15,200.00
263,888.00 2,495,240.00 2,759,128.00

159,500.00
8,040.00
1,520.00
50,000.00
114,000.00
132,000.00
15,200.00
311,200.00 169,060.00 480,260.00

2,376,000.00
712,800.00
8,040.00
1,520.00
50,000.00
76,000.00
8,800.00
9,500.00
144,300.00 3,098,360.00 3,242,660.00

203,500.00
24,420.00
8,040.00
1,520.00
60,000.00
110,200.00
13,200.00
9,500.00
192,900.00 237,480.00 430,380.00
HARGA HARGA HARGA
UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

875,160.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 909,432.00 933,811.00

1,566,840.00
13,400.00
6,840.00
16,500.00
13,000.00
9,880.00
1,144.00
1,235.00
25,259.00 1,603,580.00 1,628,839.00

409,200.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 443,472.00 467,851.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

253,000.00
45,540.00
90,000.00
205,200.00
47,520.00
10,450.00
353,170.00 298,540.00 651,710.00

232,320.00
67,760.00
2,700.00
6,840.00
792.00
2,565.00
12,897.00 300,080.00 312,977.00

752,400.00
219,450.00
5,400.00
13,680.00
1,584.00
513.00
21,177.00 971,850.00 993,027.00

20,910.00
6,098.75
1,800.00
4,560.00
528.00
171.00
7,059.00 27,008.75 34,067.75

30,990.00
9,038.75
2,700.00
6,840.00
792.00
256.50
10,588.50 40,028.75 50,617.25

82,740.00
24,132.50
4,050.00
10,260.00
1,188.00
389.50
15,887.50 106,872.50 122,760.00

22,000.00
82.50
500.00
7,600.00
880.00
475.00
9,455.00 22,082.50 31,537.50

16,100.00
300.00
4,740.00
528.00
28.50
5,596.50 16,100.00 21,696.50

44,275.00
456.00
3,300.00
456.00
30.00
4,242.00 44,275.00 48,517.00

13,200.00
3,355.00
7,600.00
5,500.00
76.00
500.00
-
13,676.00 16,555.00 30,231.00

808,500.00
Err:509
3,575.00
52,500.00
82,950.00
9,240.00
4,940.00
149,630.00 Err:509 Err:509

-
10,000.00
15,800.00
1,760.00
95.00
27,655.00 - 27,655.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

236,500.00
50,000.00
76,000.00
8,800.00
4,750.00
139,550.00 236,500.00 376,050.00
11,550.00
880.00
1,320.00
2,150.00
3,268.00
378.40
199.50
5,995.90 13,750.00 19,745.90

46,200.00
37,125.00
5,940.00
4,250.00
6,460.00
792.00
475.00
11,977.00 89,265.00 101,242.00

-
17,500.00
26,600.00
3,080.00
1,710.00
48,890.00 - 48,890.00

123,540.00
324,960.00
83,500.00
126,920.00
14,696.00
7,885.00
233,001.00 448,500.00 681,501.00

24,200.00
133,320.00
34,320.00
5,000.00
7,900.00
880.00
475.00
14,255.00 191,840.00 206,095.00

35,200.00
275,000.00
61,600.00
10,000.00
15,800.00
1,760.00
95.00
27,655.00 371,800.00 399,455.00
57,750.00
412.50
167,200.00
10,000.00
31,600.00
2,200.00
950.00
44,750.00 225,362.50 270,112.50

100,000.00
500.00
39,500.00
880.00
475.00
41,355.00 100,000.00 141,355.00

60,500.00
750.00
11,850.00
1,320.00
76.00
13,996.00 60,500.00 74,496.00

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

349,800.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 352,883.60 365,490.60

224,400.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 227,483.60 240,090.60
349,800.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 352,883.60 365,490.60

465,960.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 469,043.60 481,650.60

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

465,960.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 469,043.60 481,650.60

636,000.00
1,527.60
456.00
275.00
4,500.00
6,840.00
792.00
475.00
12,607.00 638,258.60 650,865.60

699,600.00
1,527.60
456.00
275.00
4,500.00
6,840.00
792.00
475.00
12,607.00 701,858.60 714,465.60

54,000.00
500.00
7,900.00
880.00
47.50
9,327.50 54,000.00 63,327.50

15,500.00
400.00
5,000.00
600.00
34.00
6,034.00 15,500.00 21,534.00

45,700.00
750.00
11,850.00
1,320.00
76.00
13,996.00 45,700.00 59,696.00

20,200.00
1,000.00
15,800.00
1,760.00
95.00
18,655.00 20,200.00 38,855.00

133,100.00
750.00
11,850.00
1,320.00
76.00
13,996.00 133,100.00 147,096.00

875,160.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 909,432.00 933,811.00
1,566,840.00
13,400.00
6,840.00
16,500.00
13,000.00
9,880.00
1,144.00
1,235.00
25,259.00 1,603,580.00 1,628,839.00

1,604,460.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 1,638,732.00 1,663,111.00

151,250.00
13,400.00
6,840.00
16,500.00
13,000.00
9,880.00
1,144.00
1,235.00
25,259.00 187,990.00 213,249.00

349,800.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 352,883.60 365,490.60

875,160.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 909,432.00 933,811.00

1,566,840.00
13,400.00
6,840.00
16,500.00
13,000.00
9,880.00
1,144.00
1,235.00
25,259.00 1,603,580.00 1,628,839.00

875,160.00
13,132.00
6,840.00
14,300.00
12,500.00
9,500.00
1,144.00
1,235.00
24,379.00 909,432.00 933,811.00

349,800.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 352,883.60 365,490.60

465,960.00
1,527.60
456.00
1,100.00
4,500.00
6,840.00
792.00
475.00
12,607.00 469,043.60 481,650.60

120,000.00 0.36
13,400.00 2.7777778
6,840.00
16,500.00
35,000.00
26,600.00
3,080.00
3,325.00
68,005.00 156,740.00 224,745.00

54,696.00
13,936.00
6,840.00
17,820.00
35,000.00
26,600.00
3,080.00
3,325.00
68,005.00 93,292.00 161,297.00

174,900.00
10,974.60
6,840.00
7,150.00
35,000.00
26,600.00
3,080.00
3,325.00
68,005.00 199,864.60 267,869.60

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

54,696.00
12,462.00
2,736.00
21,340.00
45,000.00
34,200.00
3,960.00
4,275.00
87,435.00 91,234.00 178,669.00

174,900.00

16,669.60
3,800.00
7,150.00
65,000.00
49,400.00
5,720.00
6,175.00
126,295.00 202,519.60 328,814.60

26,400.00
1,375.00
6,000.00
9,840.00
1,056.00
570.00
17,466.00 27,775.00 45,241.00
346,500.00
16,669.60
3,800.00
30,250.00
50,000.00
38,000.00
4,400.00
4,750.00
97,150.00 397,219.60 494,369.60

363,000.00
15,745.00
5,320.00
35,000.00
26,600.00
3,080.00
3,325.00
68,005.00 384,065.00 452,070.00

108,900.00
15,745.00
5,320.00
35,000.00
26,600.00
3,080.00
3,325.00
68,005.00 129,965.00 197,970.00

3,496.00
1,929.60
71,500.00
19,000.00
2,200.00
25,000.00
2,375.00
27,375.00 76,925.60 104,300.60

3,496.00
1,929.60
71,500.00
19,000.00
2,200.00
25,000.00
2,375.00
48,575.00 76,925.60 125,500.60

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

Err:509
-
17,500.00
13,300.00
1,496.00
190.00
32,486.00 Err:509 Err:509

3,496.00
1,929.60
71,500.00
19,000.00
2,200.00
25,000.00
2,375.00
48,575.00 76,925.60 125,500.60

R, 2 LAPIS CAT PENUTUP)


3,400.00
6,450.00
8,415.00
10,010.00
3,500.00
684.00
528.00
237.50
4,949.50 28,275.00 33,224.50

5,850.00
2,150.00
550.00
55.00
8,000.00
12,160.00
1,408.00
237.50
21,805.50 8,605.00 30,410.50
LAPIS CAT PENUTUP)
800.00
4,950.00
8,580.00
1,000.00
4,788.00
554.40
237.50
6,579.90 14,330.00 20,909.90

5,940.00
5,940.00
1,400.00
3,192.00
369.60
237.50
5,199.10 11,880.00 17,079.10

1,600.00
55.00
1,000.00
15,200.00
1,760.00
950.00
18,910.00 1,655.00 20,565.00

23,100.00
300.00
4,560.00
1,056.00
570.00
6,486.00 23,100.00 29,586.00

4,350.00
14,508.00
11,000.00
-
4,560.00
1,408.00
237.50

6,205.50 29,858.00 36,063.50

HARGA HARGA HARGA


UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

22,880.00
2,750.00
14,500.00
165,000.00
4,920.00
1,408.00
285.00

6,613.00 179,500.00 186,113.00


65,000.00
13,500.00
19,000.00
2,200.00
25,000.00
2,375.00
48,575.00 78,500.00 127,075.00
48,575.00 88,500.00 137,075.00
48,575.00 88,500.00 137,075.00
48,575.00 96,000.00 144,575.00
48,575.00 103,700.00 152,275.00
48,575.00 88,500.00 137,075.00
48,575.00 88,500.00 137,075.00
48,575.00 96,000.00 144,575.00
48,575.00 103,700.00 152,275.00
48,575.00 101,500.00 150,075.00
48,575.00 110,300.00 158,875.00
48,575.00 109,200.00 157,775.00
48,575.00 76,200.00 124,775.00

64,900.00
9,315.00
38,000.00
4,400.00
50,000.00
4,750.00
97,150.00 74,215.00 171,365.00

99,825.00
12,064.00
2,736.00
2,660.00
54,560.00
17,500.00
2,850.00
77,570.00 114,625.00 192,195.00

24,200.00
585.00
349.60
26,600.00
3,080.00
47,500.00
9,025.00
86,205.00 25,134.60 111,339.60
86,205.00 79,700.00 165,905.00
86,205.00 39,000.00 125,205.00

21,868.00
1,633.00
2,280.00
264.00
7,500.00
1,425.00
11,469.00 23,501.00 34,970.00

60,000.00
36,000.00
13,600.00
9,900.00
36,000.00
6,600.00
25,000.00
25,000.00 162,100.00 187,100.00

75,000.00
36,000.00
6,800.00
9,900.00
48,000.00
6,600.00
2,500.00
25,000.00 25,000.00
25,000.00 209,800.00 234,800.00

115,000.00
96,000.00
6,800.00
16,500.00
60,000.00
6,600.00
25,000.00
25,000.00 300,900.00 325,900.00

320,000.00
72,000.00
13,600.00
13,200.00
72,000.00
6,600.00
25,000.00
25,000.00 497,400.00 522,400.00

Denpasar, 3 Februari 2014

Kepala Dinas Tata Ruang dan Perumahan


Kota Denpasar
Ir. I Made Kusuma Diputra, MT
Pembina Utama Muda
NIP. 19581230 198610 1 002
14
0.2827433
0.394584
1.5619241
7.2936393
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
NO URAIAN PEKERJAAN HARGA
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Rp 2,925,000.00
2 Pek. pemasangan bouwplank + pengukuran Rp 8,624,910.00
3 Pek .Pagar Darurat Rp 39,273,990.00
II PEKERJAAN TANAH
1 Pek. Galian tanah biasa pondasi setempat 2 meter Rp 51,040.00
2 Pek. Galian tanah biasa pondasi menerus 1,5 meter Rp 2,533,474.13
3 Pek. Urugan pasir pondasi setempat Rp 5,694.40
4 Pek. Urugan tanah pondasi setempat Rp 185,185.00
5 Pek. Urugan pasir pondasi menerus Rp 1,041,452.38
6 Pek. Urugan tanah pondasi menerus Rp 2,227,060.06
7 Pek. Urugan tanah dipadatkan Rp 2,900,625.00
8 Pek. Urugan pasir dibawah lantai Rp 3,523,410.00
III PEKERJAAN PONDASI
1 Pek.Rabatan plat lantai kerja Rp 25,998.28
2 Pek. Pondasi batu kali 1 : 4 Rp 30,581,070.30
3 Pek. Pasangan batu kosong Rp 8,304,769.20
4 Pek. Pasangan bata 1 : 5 lantai satu Rp 180,600,376.25
5 Pek. Plesteran 1 : 5 lantai satu Rp 26,045,687.50
6 Pek.Acian lantai satu Rp 8,999,440.63
7 Pek.Rabatan lantai satu Rp 6,460,171.46
8 Pek. Pasangan bata 1 : 5 lantai dua Rp 279,596,047.14
9 Pek. Plesteran 1 : 5 lantai dua Rp 40,322,344.50
10 Pek.Acian lantai dua Rp 13,932,384.98
IV PEKERJAAN BETON
1 Pek. Rabat lantai kerja K 225
a Pengecoran Rp 389,974.22
2 Pek.Pondasi telapak K 300
a Pengecoran Rp 3,635,848.36
b Pembesian Rp 101,883,477.95
3 Pek. Sloof 30 x 15 K 225
a Begesting Rp 11,029,656.00
b Pengecoran Rp 7,474,505.97
c Pembesian Rp 23,000,691.64
4 Pek Kolom 30x30 K 225
a Begesting Rp 11,029,656.00
b Pengecoran Rp 4,365,273.98
c Pembesian Rp 9,058,515.51
5 Pek. Balok induk 30x60 K 225
a Begesting Rp 15,655,354.00
b Pengecoran Rp 12,576,668.75
c Pembesian Rp 23,466,055.93
6 Pek. Balok anak 25x40 K 225
a Begesting Rp 2,453,451.00
b Pengecoran Rp 812,446.30
c Pembesian Rp 10,598,360.90
7 Pek. Kolom 25x25 K 225
a Begesting Rp 8,157,349.75
b Pengecoran Rp 2,703,922.85
c Pembesian Rp 15,790,076.74
8 Pek. Kolom 20x20 K 225
a Begesting Rp 1,516,577.70
b Pengecoran Rp 301,620.69
c Pembesian Rp 2,419,963.75
9 Pek. Kolom praktis 15x15
a Begesting Rp 28,426,180.93
b Pengecoran Rp 784,213.79
c Pembesian Rp 16,110,037.69
10 Pek. Ring balok 15x20 K225
a Begesting Rp 7,025,437.47
b Pengecoran Rp 2,681,072.80
c Pembesian Rp 10,487,124.28
11 Pek. Plat lantai 12 cm K 225
a Begesting Rp 164,269,248.00
b Pengecoran Rp 19,206,230.57
c Pembesian Rp 7,469,323.98
12 Pek. Plat tangga 5 cm K 225
a Begesting Rp 9,677,729.60
b Pengecoran Rp 72,307,720.84
c Pembesian Rp 2,215,930.48
V PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen pintu P1 1 buah Rp 6,682,007.15
2 Pek. Daun pintu P1 1 buah Rp 2,720,608.22
3 Pek. Kusen pintu P2 11 buah Rp 61,456,587.50
4 Pek. Daun pintu P2 11 buah Rp 1,270,315.20
5 Pek. Kusen pintu P4 2 buah Rp 26,710,150.32
6 Pek. Daun pintu P4 2 buah Rp 945,312.48
7 Pek. Kusen jendela J1 3 buah Rp 12,738,274.50
8 Pek. Daun jendela J1 3 buah Rp 173,753.53
9 Pek. Kusen jendela J2 6 buah Rp 48,383,095.25
10 Pek. Daun jendela J2 6 buah Rp 347,507.06
11 Pek. Kusen jendela J3 1 buah Rp 5,475,223.25
12 Pek. Daun jendela J3 1 buah Rp 199,558.51
13 Pek. Kusen jendela J4 6 buah Rp 37,893,014.46
14 Pek. Daun jendela J4 6 buah Rp 1,300,570.99
15 Pek. Kusen ventilasi 4 buah Rp 10,168,271.75
16 Pek. Daun ventasi 4 buah Rp 289,015.78
VI PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Keramik lantai 60x60 lantai satu Rp 23,373,480.00
2 Pek. Keramik lantai 20x20 lantai satu Rp 1,572,000.56
3 Pek. Keramik tegel plin 10x30 lantai satu Rp 1,977,004.26
4 Pek. Keramik lantai 60x60 lantai dua Rp 32,138,535.00
5 Pek. Keramik lantai 20x20 lantai dua Rp 967,782.00
6 Pek. Keramik tegel plin 10x30 lantai dua Rp 3,132,049.88
VII PEKERJAAN PLAFOND
1 Pek. Pasangan plafond gypsum rangka hollo Rp 27,803,293.75
2 Pek.Penetup plafond Gypsum Rp 17,569,404.00
3 Pek. List plafond Rp 5,638,248.00
VIII PEKERJAAN ATAP
1 Pek. Genteng kodok karang pilang Rp
2 Pek. Kuda - kuda kamper Rp 6,122,419.35
3 Pek. Usuk 5/7 Rp 235,237.22
4 Pek. Reng Rp 69,433.20
5 Pek. List plank Rp 6,284,515.60
IX PEKERJAAN GANTUNGAN & KUNCI
1 Pek. Engsel pintu Rp 2,532,864.00
2 Pek. Engsel jendela Rp 1,519,860.00
3 Pek. Kunci slot Rp 777,100.00
4 Pek. Grendel Rp 559,884.00
X PEKERJAAN KACA
1 Pek.Kaca pintu bukaan dua Rp 444,112.24
2 Pek.Kaca jendela Rp 855,922.20
XI PEKERJAAN SANITASI
1 Pas. Bak mandi fiberglass Rp 1,303,420.00
2 Pas. Wastafel Rp 430,380.00
3 Pas. Kloset duduk Rp 8,277,384.00
4 Pas. Bak cuci piring Rp 594,000.00
5 Pas. Kran cuci piring Rp 205,800.00
6 Pas. Kran wastafel Rp 768,400.00
7 Pas. Kran Rp 554,400.00
8 Pas. Bath tup Rp 7,689,000.00
9 Pas. Pipa air bersih Rp 885,761.50
10 Pas. Pipa air kotor Rp 1,062,962.25
11 Pas. Pipa tinja Rp 2,823,480.00
XII PEKERJAAN LISTRIK
1 Instalasi Titik Lampu Rp 6,300,000.00
2 Instalasi Stop Kontak Rp 2,625,000.00
3 Lampu LED 7 Watt Rp 54,900.00
4 Lampu LED 15 Watt Rp 76,900.00
5 Stop Kontak Rp 539,000.00
6 Saklar Ganda Rp 189,748.00
7 Saklar Tunggal Rp 506,000.00
XIII PEKERJAAN RELING
1 Pas. Relling balkon depan Rp 262,500.00
XIV PEKERJAAN PENGECATAN
1 Pek. Cat tembok luar Rp 271,828.70
2 Pek. Cat tembok dalam Rp 6,184,316.21
3 Pek. Cat plafond = cat dinding Rp 2,776,834.72
4 Pek. Politur list plank Rp 1,931,007.94
5 Pek. Politur kayu Rp 1,016,243.36
XV PEKERJAAN STILE BALI
1 Pek.Batu alur marmer gigi kecil Rp 948,600.00
2 Pek.Batu palimanan Rp 5,553,989.95
3 Pek.Murda Rp 172,922.00
REKAPITULASI RENCANA ANGGARAN BIAYA
NO URAIAN JUMLAH
I PEKERJAAN PERSIAPAN Rp 50,823,900.00
II PEKERJAAN TANAH Rp 12,467,940.96
III PEKERJAAN PONDASI Rp 594,868,290.23
IV PEKERJAAN BETON Rp 610,931,463.21
V PEKERJAAN PINTU DAN JENDELA Rp 216,753,265.95
VI PEKERJAAN LANTAI DAN DINDING KERAMIK Rp 63,160,851.70
VII PEKERJAAN PLAFOND Rp 51,010,945.75
VIII PEKERJAAN ATAP Rp 21,602,239.94
IX PEKERJAAN GANTUNGAN & KUNCI Rp 8,493,900.00
X PEKERJAAN KACA Rp 1,300,034.45
XI PEKERJAAN SANITASI Rp 24,594,987.75
XII PEKERJAAN LISTRIK Rp 12,708,348.00
XIII PEKERJAAN RELING Rp 262,500.00
XIV PEKERJAAN PENGECATAN Rp 12,180,230.93
XV PEKERJAAN STILE BALI Rp 6,675,512
REAL COST Rp 1,687,834,410.82
DAFTAR HARGA SATUAN UPAH
NO NAMA BARANG SATUAN HARGA
1 Mandor Hari Rp 95,000.00
2 Kepala Tukang Besi Hari Rp 88,000.00
3 Kepala Tukang Batu Hari Rp 88,000.00
4 Kepala Tukang Pipa Hari Rp 88,000.00
5 Kepala Tukang Kayu Hari Rp 88,000.00
6 Kepala Tukang Cat Hari Rp 88,000.00
7 Kepala Tukang Paras Bali Hari Rp 88,000.00
8 Tukang Batu Hari Rp 76,000.00
9 Tukang Besi Hari Rp 79,000.00
10 Tukang Kayu Hari Rp 82,000.00
11 Tukang Cat Hari Rp 76,000.00
12 Pekerja Hari Rp 50,000.00
14 Pekerja / Pekerja tak terlatih Hari Rp 50,000.00
15 Tukang Listrik Hari Rp 76,000.00
16 Tukang Pipa/ Tukang Ledeng Hari Rp 76,000.00
17 Tukang Las Hari Rp 76,000.00
HARGA SATUAN BAHAN TAHUN 2014
NO NAMA BARANG SATUAN HARGA
I BATU
1 Batu belah 15 cm / 20 cm m³ Rp 181,500.00
2 Bata merah bj Rp 3,300.00
3 Koral beton m³ Rp 152,000.00
4 Pasir pasang m³ Rp 152,000.00
5 Pasir beton m³ Rp 131,000.00
6 Pasir urug m³ Rp 58,320.00
7 Tanah urug m³ Rp 115,500.00
8 Batu alur marmer gigi kecil m³ Rp 140,000.00
9 Batu palimanan m³ Rp 103,000.00
II BESI
1 Buegel besi O 8 Kg Rp 10,000.00
2 Besi beton (polos/ulir) Kg Rp 10,000.00
3 Kawat beton Kg Rp 13,750.00
4 Kawat Ayak 5 X 5 cm m² Rp 22,000.00
5 Pagar hotdip galvanised T.150 diameter 7 mm m¹ Rp 191,000.00
6 Meni besi kg Rp 7,200.00
7 Besi strip tebal 5 cm kg Rp 8,800.00
III KACA
1 Kaca 5 mm bening bh Rp 121,000.00
2 Kaca 3 mm bening bh Rp 93,500.00
IV KAYU
1 Kayu usuk meranti 5/7 m³ Rp 66,000.00
2 Kayu papan meranti 2/30 m³ Rp 42,350.00
3 Kayu kelas III m³ Rp 2,585,000.00
4 Kayu usuk 4/6 m³ Rp 2,585,000.00
5 Dolken kayu 8"-10"/4 m btg Rp 99,000.00
6 Papan kayu kamper m³ Rp 8,800,000.00
7 Lem kayu kg Rp 16,500.00
8 Balok kayu kamper m³ Rp 8,030,000.00
9 Kayu kruing usuk/reng m³ Rp 5,170,000.00
10 List kayu profit m¹ Rp 33,000.00
V KERAMIK
1 Keramik 60 x 60 cm Asia Tile m² Rp 120,000.00
2 Keramik 20 x 20 cm Asia Tile anti slipe m² Rp 2,064.00
3 Keramik 30 x 30 cm Asia tile m² Rp 120,000.00
VI KUNCI DAN PENGGANTUNG
1 Engsel pintu Dekson Iron ps Rp 60,500.00
2 Engsel jendela Kupu-kupu ps Rp 54,000.00
3 Kunci slot bh Rp 20,200.00
4 Grendel Dekson 30 cm bh Rp 15,500.00
5 Kait angin biasa bh Rp 45,700.00
VII PAKU
1 Paku biasa 2"-5" kg Rp 308.00
2 Paku biasa 5"-10" kg Rp 15,400.00
3 Paku biasa 5"-12" kg Rp 15,400.00
4 Paku 10 cm kg Rp 27,500.00
5 Paku 12 cm kg Rp 27,500.00
6 Paku kalsoboard kg Rp 27,500.00
VIII BAMBU
1 Bambu sedang btg Rp 12,500.00
IX ATAP
1 Genteng bambe karang pilang bj Rp 4,800.00
2 Bumbungan segitiga karang pilang bj Rp 16,500.00
X SANITAIR
1 Bak mandi fiberglass bh Rp 253,000.00
2 Wastafel KIA bh Rp 203,500.00
3 Kloset duduk TOTO Type CW 660J / SW 660J COMPLIT bh 2,354,000.00
WARNA Rp
4 Bak cuci piring Aluminium bh Rp 187,000.00
5 Kran cuci piring TOTO T 23 B13V7NB bh Rp 172,500.00
6 Kran wastafel TOTO T 205 MC bh Rp 181,500.00
7 Kran TOTO T 26 - 13 bh Rp 205,800.00
8 Bath tup bh Rp
9 Pipa air bersih PVC TYPE AW f 0,5" - 1,5" m¹ Rp 17,425.00
10 Pipa air kotor PVC TYPE AW f 2" m¹ Rp 25,825.00
11 Pipa tinja PIPA PVC TYPE AW f 3" - 4" m¹ Rp 68,950.00
XI FINISHING
1 Plywood 9 mm lmr Rp. 115,500.00
XII BAHAN LISTRIK
1 Figthing lampu bh Rp. 50,000.00
2 Instalasi listrik dalam gedung titik Rp 209,000.00
3 Kabel NYM 4mm m¹ Rp 23,000.00
4 Kabel NYY 2 x 2,5 mm m¹ Rp 14,000.00
5 Kabel telephone m¹ Rp 4,600.00
6 Klem clipsal 20 mm bj Rp 660.00
7 Lampu LED 7 Watt bh Rp 32,400.00
Lampu LED 10 Watt bh Rp 98,900.00
9 Pegangan kabel pc Rp 715,00
10 Pipa clipsal 20 mm btg Rp 11,500.00
11 Saklar ganda bh Rp 31,600.00
12 Saklar tunggal bh Rp 19,200.00
13 Stop kontak bh Rp 76,900.00
XIII LAIN-LAIN
1 Air ltr Rp 25.00
2 Minyak bekisting ltr Rp 33,550.00
3 Semen portland kg Rp 1,375.00
4 Semen warna/semen grouting kg Rp 11,000.00
5 Seng gelombang 3"-5" lmb Rp 99,000.00
6 Kalsiboard (4,5 x 1220 x 2420) mm lbr Rp 93,500.00
7 Cangkul bh Rp 60,500.00
8 Ember bh Rp 14,605.00
9 Helm proyek bh Rp 61,180.00
Januari
No Uraian Pekerjaan Bobot
1
1-8
I Pekerjaan Persiapan
1 Pekerjaan Pembersihan Lokasi 0.17 0.17
2 Pekerjaan Pasangan Bowplank 0.51 0.51
3 Pekerjaan Pasangan Pagar Garurat (seng) 2.33 2.33
II Pekerjaan Tanah
1 Pekerjaan Galian Tanah Pondasi Setempat 0.003 0.003
2 Pekerjaan Galian Tanah Pondasi Menerus 0.15 0.08
3 Urugan Pasir Pondasi Setempat 0.0003
4 Urugan Tanah Pondasi Setempat 0.01
5 Urugan Pasir Pondasi menerus 0.06
6 Urugan Tanah Dipadatkan 0.17
7 Urugan Pasir Dibawah Lantai 0.38
III Pekerjaan Pondasi
1 Pekerjaan Rabat Plat Lantai kerja 0.02
2 Pekerjaan Pasangan Batu Kali 1:4 1.81
3 Pekerjaan Pasangan Batu Kosong 0.49
4 Pasangan Batu Bata 1:5 lantai 1 10.50
5 Pekerjaan Plesteran 1:5 lantai satu 1.54
6 Pekerjaan Acian lantai satu 0.53
7 Pekerjaan Rabatan Lantai Satu 0.38
8 Pekerjaan Batu Bata 1: 5 lantai 2 16.57
9 Pekerjaan Plesteran 1:5 lantai dua 2.39
10 Pekerjaan Acian lantai dua 0.83
IV Pekerjaan Beton
1 Pekerjaan Pondasi Telapak
Pembesian 6.04
Pengecoran 0.22
2 Pekerjaan Sloof 30x15
Pembesian 1.36
Begesting 0.77
Pengecoran 0.44
3 Pekerjaan Kolom 30x30
Pembesian 0.54
Begesting 0.65
Pengecoran 0.26
4 Balok Induk 30x60
Pembesian 1.39
Begesting 0.15
Pengecoran 0.75
5 Balok Anak 25x40
Pembesian 0.63
Begesting 0.15
Pengecoran 0.05
6 Pekerjaan Kolom 25x25
Pembesian 0.94
Begesting 0.48
Pengecoran 0.16
7 Pekerjaan Kolom 20x20
Pembesian 0.14
Begesting 0.09
Pengecoran 0.02
8 Pekerjaan Kolom Praktis 15x15
Pembesian 0.95
Begesting 1.68
Pengecoran 0.05
9 Pekerjaan Ring 15x20
Pembesian 0.62
Begesting 0.42
Pengecoran 0.16
10 Pekerjaan beton plat lantai tebal 12 cm
Pembesian 0.44
Begesting 9.73
Pengecoran 1.14
11 Pekerjaan Beton Plat tangga tebal 5 cm
Pembesian 0.13
Begesting 0.57
Pengecoran 4.28
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu 12.81
VI Pekerjaan Lantai dan Keramik
1 Pekerjaan Pasangan Keramik 60x60 3.29
2 Pekerjaan Pasangan Keramik 20x20 0.31
3 Pekerjaan Pasangan Tegel Plin 10x60 0.30
VII Pekerjaan Plafond
1 Pekerjaan Rangka Plafond Hollo Galvalum 1.65
2 Pekerjaan Penutup Plafond Gypsum 1.04
3 Pekerjaan List Plafond Profil 0.33
VIII Pekerjaan Atap
1 Pekerjaan Kuda-Kuda 0.36
2 Pekerjaan Rangka Atap 0.02
3 Pekerjaan Genteng 0.53
4 Pekerjaan List Plank 0.37
IX Pekerjaan Kunci dan Gantungan
1 Pekerjaan Engsel Pintu 0.15
2 Pekerjaan Engsel Jendela 0.09
3 Pekerjaan Kunci slot 0.05
4 Pekerjaan Grendel 0.03
5 Pekerjaan Kait Angin 0.18
X Pekerjaan Kaca
1 Pekerjaan Kaca Pintu Bukaan Dua 0.10
2 Pekerjaan Kaca Jendela 0.85
XI Pekerjaan Sanitasi
1 Pas. Bak mandi fiberglass 0.08
2 Pas. Wastafel 0.03
3 Pas. Kloset duduk 0.49
4 Pas. Bak cuci piring 0.04
5 Pas. Kran cuci piring 0.01
5 Pas. Kran wastafel 0.05
6 Pas. Kran 0.03
7 Pas. Bath tup 0.46
8 Pas. Pipa air bersih 0.05
9 Pas. Pipa air kotor 0.06
10 Pas. Pipa tinja 0.17
XII Pekerjaan Listrik
1 Instalasi Titik Lampu 0.37
2 Instalasi Stop Kontak 0.16
3 Lampu LED 7 Watt 0.01
4 Lampu LED 15 Watt 0.14
5 Stop Kontak 0.03
6 Saklar Ganda 0.01
7 Saklar Tunggal 0.03
XIII Pekerjaan Relling
1 Pekerjaan Reling Balkon Galvanis 0.02
XIV Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Tembok Luar 0.02
2 Pekerjaan Pengecatan Tembok Dalam 0.43
3 Pekerjaan Pengecatan Plafond 0.16
4 Pekerjaan Politur Kayu 0.06
XV Pekerjaan Stile Bali
1 Pekerjaan Batu Alam Jenis Alur Marmer Gigi Kecil 0.06
2 Pekerjaan Batu Alam Jenis Bali Palimanan 0.33
3 Pekerjaan Murda 0.01
Jumlah 100.00
Rencana Mingguan 3.09
Rencana Kemajuan Pekerjaan Komulatif Rencana Mingguan 3.09
Realisasi Mingguan
Realisasi Kemajuan Pekerjaan Komulatif Realisasi Mingguan
WAKTU PELAKSANAAN
Januari Pebruari Maret
2 3 4 5 6 7 8 9 10 11
9-16 17-23 24-31 1-7 8-14 15-21 22-28 1-8 9-16 17-23

0.08
0.0003
0.01
0.06
0.17
0.38

0.02
1.81
0.49
5.25 5.25
1.54
0.53
0.38

4.53 1.51
0.22

0.68 0.68
0.77
0.44

0.54
0.65
0.13 0.13

1.39
0.15
0.37 0.37

0.63
0.15
0.05
0.70 0.23
0.48
0.08 0.08

0.14
0.09

0.48 0.48
1.68
0.02

0.22 0.22
9.73
0.57

0.13
0.57
2.14

6.41

0.10
0.85
5.37 3.68 3.81 2.14 2.79 0.98 7.35 5.98 17.90 4.79
8.46 12.14 15.94 18.08 20.88 21.85 29.21 35.18 53.09 57.87
ELAKSANAAN
Maret April Mei
12 13 14 15 16 17 18 19 20
24-31 1-8 9-16 17-23 24-30 1-8 9-16 17-23 24-31

8.28 8.28
1.19 1.19
0.83
0.02

0.02

0.31 0.31
0.42
0.16

0.57

2.14

6.41

1.64 1.64
0.31
0.30

0.82 0.82
0.52 0.52
0.17 0.17

0.36
0.02
0.53
0.37

0.15
0.09
0.05
0.03
0.18
0.08
0.03
0.49
0.04
0.01
0.05
0.03
0.46
0.05
0.06
0.17

0.19 0.19
0.08 0.08
0.005 0.005
0.07 0.07
0.02 0.02
0.01 0.01
0.01 0.01

0.02

0.02
0.43
0.16
0.06

0.06
0.33
0.01

3.16 3.30 10.13 10.96 7.71 1.55 2.60 2.33 0.40


61.04 64.33 74.46 85.43 93.14 94.68 97.28 99.61 100.00
DINAS PEKERJAAN UMUM
PEMERINTAH KOTA DENPASAR
JL. Gatot Subroto VI/J. No. 22 Denpasar, Telp. 428424 - 428425

SHOP DRAWING

PROYEK : RUMAH TINGGAL LANTAI DUA KONTRAKTOR : PANDE KURNIAWAN


PEKERJAAN : PLAFOND NO. KONTRAK : 4040
PROYEK : TGL. KONTRAK : 27 MEI 2015
PERMINTAAN / IZIN KERJA KONSULTAN : Wiyadnya
NOMOR : 2

400 100 800

Usuk Plafond 4/6 Lis Plafond Giypsund

2 00
3 50

Plafond Giypsund
3 50

7 00
Pla fond Giypsund
2 00

Plafond Giypsund
2 00

3 50

Plafond G iypsund
1 50
2 50

2 50

Plafond Giypsund

500 508 385

Diperiksa/Disetujui, Tanggal : Diperiksa Oleh, Tanggal : Dibuat Oleh, Tanggal :


DINAS PU KONSULTAN SUPERVISI KONTRAKTOR
24 Mei 2015 24 Mei 2015 24 Mei 2015

NGURAH DARMA SUBAKTI PANDE KURNIAWAN


DIREKSI/ASSISTEN TEKNIS TEAM LEADER SITE MANAGER

Tembusan :
1. PrPejabat Pembuat Komitmen
2. Konsultan Supervisi
3. Arsip
DINAS PEKERJAAN UMUM
PEMERINTAH KOTA DENPASAR
JL. Gatot Subroto VI/J. No. 22 Denpasar, Telp. 428424 - 428425

CALCULATION SHEET

PROYEK : RUMAH TINGGAL LANTAI DUA KONTRAKTOR : PANDE KURNIAWAN


PEKERJAAN : PLAFOND NO. KONTRAK : 4040
PROYEK : TGL. KONTRAK : 27 MEI 2015
PERMINTAAN / IZIN KERJA KONSULTAN :
NOMOR : 3

No. Item URAIAN PEKERJAAN Lokasi / Station

1 Rangka Holo
2 Gypsum Board (120x240x9)
3 List Kayu Profit

PEKERJAAN PLAFOND Pekerjaan Gypsum Board Pekerjaan list Plafond

V = panjang x lebar v=pxl Panjang list plafond = 148,5 m'


V1 = 4 x 7 v = 12 x 15
= 28 m² v = 180 m²
V2 = 4 x 4
= 6 m²
V3 = 3 x 1,5
=4,5 m³
V4 = 3 x 2,5
= 7,5 m³
V5 = 4 x 1,5
= 6 m³
V6 = 7 x 2,5
= 17,5 m³
V7 = 5 x 1,5 x 0,01
= 7,5 m³
V8 = 3,5 x 3,5 x 0,01
= 12,25 m³
V9 = 8 x 9 x 0,01
= 72 m³
Total = 171,25 m³
Diperiksa/Disetujui, Tanggal : Diperiksa Oleh, Tanggal : Dibuat Oleh,
DINAS PU KONSULTAN SUPERVISI KONTRAKTOR
24 Mei 2015 24 Mei 2015
NGURAH DARMA SUBAKTI PANDE KURNIAWAN
DIREKSI/ASSISTEN TEKNIS TEAM LEADER SITE MANAGER

Tembusan :
1.Pejabat Pembuat Komitmen
2. Konsultan Supervisi
3. Arsip
8425

: PANDE KURNIAWAN

: 27 MEI 2015

Perkiraan
Kuantitas

171.25
180.00
148.50

aan list Plafond

st plafond = 148,5 m'

Dibuat Oleh, Tanggal :


KONTRAKTOR
24 Mei 2015
PANDE KURNIAWAN
SITE MANAGER
DINAS PEKERJAAN UMUM
PEMERINTAH KOTA DENPASAR
JL. Gatot Subroto VI/J. No. 22 Denpasar, Telp. 428424 - 428425

PERMOHONAN MULAI KERJA / REQUEST

PROYEK : RUMAH TINGGAL LANTAI DUA KONTRAKTOR : PANDE KURNIAWAN


PEKERJAAN : PLAFOND NO. KONTRAK : 4040
NOMOR : 1 TGL. KONTRAK : 27 MEI 2015
PERMINTAAN / IZIN KERJA KONSULTAN :
:

No. Item URAIAN PEKERJAAN Lokasi / Station

Rangka Holo
Gypsum Board (120x240x9)
List Kayu Profit

BAHAN - BAHAN PERALATAN DAN TENAGA KERJA


MATERIAL JUMLAH PERALATAN JUMLAH TENAGA KERJA

Rangka Holo 256.875 Palu 2 Pekerja


Gypsum Board (120x240x9) 65.52 Skapolding 4 Tukang Kayu
List Kayu Profit 155.925 Ember 2 Kepala Tukang Kayu
Paku Kalsiboard 19.8 Gergaji 1 Mandor
Paku 1.485 Siku 1
Meteran 2
Benang nilon 2

CATATAN DIREKSI :

CATATAN PENGAWAS :

Diperiksa/Disetujui, Tanggal : Diperiksa Oleh, Tanggal : Dibuat Oleh,


DINAS PU KONSULTAN SUPERVISI KONTRAKTOR
24 Mei 2015 24 Mei 2015
NGURAH DARMA SUBAKTI PANDE KURNIAWAN
DIREKSI/ASSISTEN TEKNIS TEAM LEADER SITE MANAGER

Tembusan :
1. Proje Pejabat Pembuat Komitmen
2. Konsultan Supervisi
3. Arsip
425

ST

: PANDE KURNIAWAN

: 27 MEI 2015

Perkiraan
Kuantitas

171.25
180
148.5

TENAGA KERJA JUMLAH

rja 2
ng Kayu 1
la Tukang Kayu 1
dor 1

Dibuat Oleh, Tanggal :


KONTRAKTOR
24 Mei 2015
PANDE KURNIAWAN
SITE MANAGER
No Uraian Pekerjaan

I Pekerjaan Persiapan
1 Pekerjaan Pembersihan Lokasi
2 Pekerjaan Pasangan Bowplank
3 Pekerjaan Pasangan Pagar Garurat (seng)
II Pekerjaan Tanah
1 Pekerjaan Galian Tanah Pondasi Setempat
2 Pekerjaan Galian Tanah Pondasi Menerus
3 Urugan Pasir Pondasi Setempat
4 Urugan Tanah Pondasi Setempat
5 Urugan Pasir Pondasi menerus
6 Urugan Tanah Dipadatkan
7 Urugan Pasir Dibawah Lantai
III Pekerjaan Pondasi
1 Pekerjaan Rabat Plat Lantai kerja
2 Pekerjaan Pasangan Batu Kali 1:4
3 Pekerjaan Pasangan Batu Kosong
4 Pasangan Batu Bata 1:5 lantai 1
5 Pekerjaan Plesteran 1:5 lantai satu
6 Pekerjaan Acian lantai satu
7 Pekerjaan Rabatan Lantai Satu
8 Pekerjaan Batu Bata 1: 5 lantai 2
9 Pekerjaan Plesteran 1:5 lantai dua
10 Pekerjaan Acian lantai dua
IV Pekerjaan Beton
1 Pekerjaan Pondasi Telapak
Pembesian
Pengecoran
2 Pekerjaan Sloof 30x15
Pembesian
Begesting
Pengecoran
3 Pekerjaan Kolom 30x30
Pembesian
Begesting
Pengecoran
4 Balok Induk 30x60
Pembesian
Begesting
Pengecoran
5 Balok Anak 25x40
Pembesian
Begesting
Pengecoran
6 Pekerjaan Kolom 25x25
Pembesian
Begesting
Pengecoran
7 Pekerjaan Kolom 20x20
Pembesian
Begesting
Pengecoran
8 Pekerjaan Kolom Praktis 15x15
Pembesian
Begesting
Pengecoran
9 Pekerjaan Ring 15x20
Pembesian
Begesting
Pengecoran
10 Pekerjaan beton plat lantai tebal 12 cm
Pembesian
Begesting
Pengecoran
11 Pekerjaan Beton Plat tangga tebal 5 cm
Pembesian
Begesting
Pengecoran
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu
VI Pekerjaan Lantai dan Keramik
1 Pekerjaan Pasangan Keramik 60x60
2 Pekerjaan Pasangan Keramik 20x20
3 Pekerjaan Pasangan Tegel Plin 10x60
VII Pekerjaan Plafond
1 Pekerjaan Rangka Plafond Hollo Galvalum
2 Pekerjaan Penutup Plafond Gypsum
3 Pekerjaan List Plafond Profil
VIII Pekerjaan Atap
1 Pekerjaan Kuda-Kuda
2 Pekerjaan Rangka Atap
3 Pekerjaan Genteng
4 Pekerjaan List Plank
IX Pekerjaan Kunci dan Gantungan
1 Pekerjaan Engsel Pintu
2 Pekerjaan Engsel Jendela
3 Pekerjaan Kunci slot
4 Pekerjaan Grendel
5 Pekerjaan Kait Angin
X Pekerjaan Kaca
1 Pekerjaan Kaca Pintu Bukaan Dua
2 Pekerjaan Kaca Jendela
XI Pekerjaan Sanitasi
1 Pas. Bak mandi fiberglass
2 Pas. Wastafel
3 Pas. Kloset duduk
4 Pas. Bak cuci piring
5 Pas. Kran cuci piring
5 Pas. Kran wastafel
6 Pas. Kran
7 Pas. Bath tup
8 Pas. Pipa air bersih
9 Pas. Pipa air kotor
10 Pas. Pipa tinja
XII Pekerjaan Listrik
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Lampu LED 7 Watt
4 Lampu LED 15 Watt
5 Stop Kontak
6 Saklar Ganda
7 Saklar Tunggal
XIII Pekerjaan Relling
1 Pekerjaan Reling Balkon Galvanis
XIV Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Tembok Luar
2 Pekerjaan Pengecatan Tembok Dalam
3 Pekerjaan Pengecatan Plafond
4 Pekerjaan Politur Kayu
XV Pekerjaan Stile Bali
1 Pekerjaan Batu Alam Jenis Alur Marmer Gigi Kecil
2 Pekerjaan Batu Alam Jenis Bali Palimanan
3 Pekerjaan Murda
Jumlah
Rencana Kemajuan Pekerjaan

Realisasi Kemajuan Pekerjaan


Bobot Januari Pebruari
1-8 9-16 17-23 24-31 1-7 8-14

0.17 0.17
0.51 0.51
2.33 2.33

0.003 0.003
0.15 0.08 0.08
0.0003 0.0003
0.01 0.01
0.06 0.06
0.17 0.17
0.38 0.38

0.02 0.02
1.81 1.81
0.49 0.49
10.30
1.54
0.53
0.38 0.38
16.57
2.39
0.83

6.04 4.53 1.51


0.22 0.22

1.36 0.68 0.68


0.77 0.77
0.44 0.44

0.54 0.54
0.65 0.65
0.26 0.13

1.39 1.35
0.15
0.75
0.63 0.63
0.15
0.05

0.94 0.70 0.23


0.48 0.48
0.16 0.08

0.14 0.14
0.09 0.09
0.02

0.95 0.48
1.68
0.05

0.62
0.42
0.16

0.44
9.73
1.14

0.13
0.57
4.28

12.81

3.29
0.31
0.30

1.65
1.04
0.33

0.36
0.02
0.53
0.37

0.15
0.09
0.05
0.03
0.18

0.10
1.05

0.08
0.03
0.49
0.04
0.01
0.05
0.03
0.46
0.05
0.06
0.17

0.37
0.16
0.01
0.14
0.03
0.01
0.03

0.02

0.02
0.43
0.16
0.06

0.06
0.33
0.01
100.00
Rencana Mingguan 3.09 5.37 3.68 3.81 2.14 2.75
Komulatif Rencana Mingguan 3.09 8.46 12.14 15.94 18.08 20.84
Realisasi Mingguan
Komulatif Realisasi Mingguan
WAKTU PELAKSANAAN
Pebruari Maret April
15-21 22-28 1-8 9-16 17-23 24-31 1-8 9-16 17-23 24-30

5.10 5.15
1.54
0.53

8.18 8.18
1.19 1.19
0.83

0.13

0.15
0.37 0.37
0.15
0.05

0.08

0.02

0.48
1.68
0.02 0.02

0.31 0.31
0.42
0.16

0.22 0.22
9.73
0.57 0.57

0.13
0.57
2.14 2.14

6.41 6.41

0.82
0.52
0.17

0.36
0.02
0.53
0.37

0.15
0.09
0.05
0.03
0.18

0.10
1.05

0.08
0.03
0.49
0.04
0.01
0.05
0.03
0.46
0.05
0.06
0.17

0.19
0.08
0.00
0.07
0.02
0.01
0.01

0.98 7.20 5.88 18.10 4.79 3.16 3.30 10.03 10.86 7.71
21.81 29.02 34.89 53.00 57.78 60.95 64.24 74.27 85.14 92.85
Mei
1-8 9-16 17-23 24-31
1.64 1.64
0.31
0.30

0.82
0.52
0.17
0.19
0.08
0.00
0.07
0.02
0.01
0.01

0.30

0.02
0.43
0.16
0.06

0.06
0.33
0.01

1.55 2.60 2.61 0.40


94.39 96.99 99.61 100.00
PROYEK : RUMAH TINGGAL LANTAI DUA
PEKERJAAN :
PERIODE KONTRAK :

Prestasi Kerja Ha
No Uraian Pekerjaan Satuan Volume
1 2 3
I Pekerjaan Persiapan
1 Pekerjaan Pembersihan Lokasi m² 300
2 Pekerjaan Pasangan Bowplank m¹ 0
3 Pekerjaan Pasangan Pagar Garurat (seng) m² 70
II Pekerjaan Tanah
1 Pekerjaan Galian Tanah Pondasi Setempat m³ 1.28
2 Pekerjaan Galian Tanah Pondasi Menerus m³ 51.42
3 Urugan Pasir Pondasi Setempat m³ 0.03
4 Urugan Tanah Pondasi Setempat m³ 1.10
5 Urugan Pasir Pondasi menerus m³ 5.85
6 Urugan Tanah Dipadatkan m³ 97.50 32.5
7 Urugan Pasir Dibawah Lantai m³ 19.80
III Pekerjaan Pondasi
1 Pekerjaan Rabat Plat Lantai kerja m³ 0.03
2 Pekerjaan Pasangan Batu Kali 1:4 m³ 45.87 9.174 9.174 9.174
3 Pekerjaan Pasangan Batu Kosong m³ 23.60
4 Pasangan Batu Bata 1:5 lantai 1 m² 323.75
5 Pekerjaan Plesteran 1:5 lantai satu m² 647.50
6 Pekerjaan Acian lantai satu m² 647.50
7 Pekerjaan Rabatan Lantai Satu m³ 9.90
8 Pekerjaan Batu Bata 1: 5 lantai 2 m² 501.21
9 Pekerjaan Plesteran 1:5 lantai dua m² 1002.42
10 Pekerjaan Acian lantai dua m² 1002.42
IV Pekerjaan Beton
1 Pekerjaan Pondasi Telapak
Pembesian kg 8701.41
Pengecoran m³ 4.20
2 Pekerjaan Sloof 30x15
Pembesian kg 1964.39
Begesting m² 73.60
Pengecoran m² 9.20 1.84
3 Pekerjaan Kolom 30x30
Pembesian kg 773.65 193.41 193.41 193.41
Begesting m² 72.00
Pengecoran m² 5.37
4 Balok Induk 30x60
Pembesian kg 2004.13
Begesting m² 100.50
Pengecoran m² 15.48
5 Balok Anak 25x40
Pembesian kg 1348.56
Begesting m² 15.75
Pengecoran m² 1.00
6 Pekerjaan Kolom 25x25
Pembesian kg 1348.56
Begesting m² 53.25
Pengecoran m² 3.33
7 Pekerjaan Kolom 20x20
Pembesian kg 206.68
Begesting m² 9.90
Pengecoran m² 0.37
8 Pekerjaan Kolom Praktis 15x15
Pembesian kg 1375.89
Begesting m² 185.56
Pengecoran m² 0.97
9 Pekerjaan Ring 15x20
Pembesian kg 895.66
Begesting m² 45.10
Pengecoran m² 3.30
10 Pekerjaan beton plat lantai tebal 12 cm
Pembesian kg 637.92
Begesting m² 192.00
Pengecoran m² 23.64
11 Pekerjaan Beton Plat tangga tebal 5 cm
Pembesian kg 189.25
Begesting m² 22.40
Pengecoran m² 89.00
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu m³ 30.77
VI Pekerjaan Lantai dan Keramik
1 Pekerjaan Pasangan Keramik 60x60 m² 247.00
2 Pekerjaan Pasangan Keramik 20x20 m² 15.75
3 Pekerjaan Pasangan Tegel Plin 10x30 m² 78.50
VII Pekerjaan Plafond
1 Pek. Rangka Plafond Hollo Galvalum lantai 1 m² 171.25
2 Pekerjaan Penutup Plafond Gypsum lantai 1 m² 180.00
3 Pekerjaan List Plafond Profil lantai 1 m' 148.50
VIII Pekerjaan Atap
1 Pekerjaan Kuda-Kuda m² 0.59
2 Pekerjaan Rangka Atap m³ 5.35
3 Pekerjaan Genteng m² 126.64
4 Pekerjaan List Plank m¹ 58.12
IX Pekerjaan Kunci dan Gantungan
1 Pekerjaan Engsel Pintu bh 34.00
2 Pekerjaan Engsel Jendela bh 24.00
3 Pekerjaan Kunci slot bh 20.00
4 Pekerjaan Grendel bh 26.00
5 Pekerjaan Kait Angin bh 52.00
X Pekerjaan Kaca
1 Pekerjaan Kaca Pintu Bukaan Dua m² 3.02
2 Pekerjaan Kaca Jendela m² 5.82
XI Pekerjaan Sanitasi
1 Pas. Bak mandi fiberglass bh 2.00
2 Pas. Wastafel bh 1.00
3 Pas. Kloset duduk bh 3.00
4 Pas. Bak cuci piring bh 1.00
5 Pas. Kran cuci piring bh 1.00
5 Pas. Kran wastafel bh 1.00
6 Pas. Kran bh 2.00
7 Pas. Bath tup bh 1.00
8 Pas. Pipa air bersih m¹ 26.00
9 Pas. Pipa air kotor m¹ 21.00
10 Pas. Pipa tinja m¹ 23.00
XII Pekerjaan Listrik
1 Instalasi Titik Lampu ttk 36.00
2 Instalasi Stop Kontak ttk 14.00
3 Lampu LED 7 Watt bh 3.00
4 Lampu LED 15 Watt bh 31.00
5 Stop Kontak bh 14.00
6 Saklar Ganda bh 4.00
7 Saklar Tunggal bh 16.00
XIII Pekerjaan Relling
1 Pekerjaan Reling Balkon Galvanis m² 0.53
XIV Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Tembok Luar m² 13.00
2 Pekerjaan Pengecatan Tembok Dalam m² 295.76
3 Pekerjaan Pengecatan Plafond m² 132.80
4 Pekerjaan Politur Kayu m² 30.59
XV Pekerjaan Stile Bali
1 Pek. Batu Alam Jenis Alur Marmer Gigi Kecil m² 6.32
2 Pekerjaan Batu Alam Jenis Bali Palimanan m² 44.25
3 Pekerjaan Murda bh 1.00
MINGGU :4
KONTRAK :

Prestasi Kerja Harian Total Prestasi


4 5 6 7 dalam Minggu
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.5 32.5 97.50
0.00
0.00
0.00
9.174 9.174 45.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.84 1.84 1.84 1.84 9.20
0.00
193.41 773.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
192.65 192.65 385.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PRAKTEK KERJA LAPANGAN TH. 2002
JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI BALI

LA P O R A N H A R I A N 1

PROYEK : RUMAH TINGGAL LT 2

LOKASI : SINGARAJA
HARI / TANGGAL : 9 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Pekerjaan Galian Tanah Pondasi Menerus 13 m³ Meteran


Cangkul
Linggis
Argo
Sekop

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai
PAGI SORE
08.00 17.00
Cerah Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR
LA P O R A N H A R I A N 2

PROYEK : Rumah Tinggal Lt 2

LOKASI : Singaraja
HARI / TANGGAL : 10 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Pekerjaan Galian Tanah Pondasi Menerus 12.71 m³ Meteran


Cangkul
Linggis
Argo
Sekop

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai
PAGI SORE
08.00 17.00
Gerimis Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR
LA P O R A N H A R I A N 3

PROYEK : Rumah Tinggal Lt 2

LOKASI : Singaraja
HARI / TANGGAL : 11 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Urugan Pasir Pondasi Setempat 0.03 m³ Sekop


2 Urugan Pasir Pondasi menerus 1 m³

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai
PAGI SORE
08.00 17.00
Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR
LA P O R A N H A R I A N 4

PROYEK : Rumah Tinggal Lt 2

LOKASI : Singaraja
HARI / TANGGAL : 12 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Urugan Pasir Pondasi menerus 4.85 m³

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai

08.00 17.00 Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR

LA P O R A N H A R I A N 5
PROYEK : Rumah Tinggal Lt 2

LOKASI : Singaraja
HARI / TANGGAL : 13 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Rabatan Plat Lantai Kerja 0.03 m³ Sekop


Cetok
Ember
Ompreng Besar

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai

08.00 17.00 Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR

LA P O R A N H A R I A N 6
PROYEK : Rumah Tinggal Lt 2

LOKASI : Singaraja
HARI / TANGGAL : 14 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Pekerjaan Pondasi Telapak Pemotong Besi


a. Pembesian 3000 Kg Meteran
Bending
Palu

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai

08.00 17.00 Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR

LA P O R A N H A R I A N 7

PROYEK : Rumah Tinggal Lt 2


LOKASI : Singaraja
HARI / TANGGAL : 15 Januari 2016

PERALATAN
NO. URAIAN PEKERJAAN VOLUME SAT
Jenis Alat

1 Rabatan Plat Lantai Kerja 2800.94 m³ Pemotong Besi


Meteran
Bending
Palu

Jam Kerja KETERANGAN :


Keadaan Cuaca
Mulai Selesai

08.00 17.00 Cerah

DIKETAHUI OLEH, DIPERIKSA OLEH,


KONSULTAN
PT. JAYA KARYA

(___________________) ( )
PENGAWAS LAPANGAN INSPECTOR

PENGAWAS LAPANGAN INSPECTOR


N HAR IAN 1

PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

4 Bh - - - Pekerja 12 Org
6 Bh Mandor 1 Org
2 Bh
2 Bh
2 Bh

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (____________ARIF WISMAYA _______)


PECTOR KEPALA PELAKSANA
N HAR IAN 2

PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

4 Pasir 12 m³ Pekerja 11 Org


6 Mandor 1 Org
2
2
2

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (_____________ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA
N HAR IAN 3

PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

11 Bh Pekerja 12 Org
Mandor 1 Org

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (_____________ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA
N HAR IAN 4

PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

Semen 3 zak Pekerja 2 Org


Kerikil 3 m³ Mandor 1 Org
Pasir 2 m³

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (_____________ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA

N HAR IAN 5
PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

1 Bh Besi D8 5 Ljr Pekerja 1 Org


1 Bh Besi D12 5 Ljr Mandor 1 Org
1 Bh Besi D10 2 Ljr Tukang Batu 1 Org
1 Bh Kepala Tukang 1 Org

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (_______ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA

N HAR IAN 6
PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

10 Bh Besi D8 8 Ljr Pekerja 21 Org


8 Bh Besi D12 5 Ljr Mandor 1 Org
11 Bh Tukang Besi 21 Org
6 Bh Kepala Tukang 2 Org

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (_____________ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA

N HAR IAN 7
PERALATAN BAHAN MASUK TENAGA KERJA

Jumlah SAT Jenis Bahan Volume SAT Jenis Tenaga Jumlah SAT

10 Bh Besi D8 5 Ljr Pekerja 20 Org


8 Bh Besi D12 5 Ljr Mandor 1 Org
11 Bh Besi D10 2 Ljr Tukang Besi 20 Org
6 Bh Kepala Tukang 2 Org

KETERANGAN :

KSA OLEH, DIBUAT OLEH,


SULTAN KONTRAKTOR
YA KARYA PT. WISYANTI

) (______ARIF WISMAYA ______)


PECTOR KEPALA PELAKSANA

PECTOR KEPALA PELAKSANA


Pemotong besi
-

Meteran
-

Bending
-

Palu
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA
NO. KONTRAK : 1315124040
TANGGAL : 15 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan


No Jenis Bahan Jumlah Jumlah yang
Keahlian Jumlah Jenis Jumlah yang yang ditolak
didatangkan diterima

1 Pekerja 5 Molen 1

2 Tukang Kayu 2 Sekop 4

3 Tukang Batu 1 Ember 6

4 Tukang Besi 1 Grobak 2

5 Kepala Tukang 2 Cetok 1


6 Mandor 1 Meteran 7
Pemotong besi 3
Gem 3
Drum air 1
Ompreng besar 5
Pembengkok besi 3
Paku 5 - 9 10
Minyak Begesting 1
Lem Kayu 1
Waterpass 2
Pensil 7
Amplas 5
Penyerutan Kayu 2
Palu Kayu 7
Gergaji 4
Pahat 4
Jumlah 12 79 Keadaan Cuaca
Pekerjaan dimulai pd jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH
Pengawas Lapangan Konsultan Supervisi

(Widya Adnyana) ( Saputra) ( Pande Kurni


NIP: - Inspektor PELAKSAN
MINGGU KE : 10
HARI : SENIN
TANGGAL : 15 MARET 2015

Pelaksanaan yang
dilaksanakan pada Volume
hari ini

Pengecoran Kolom 0.07 m²


Praktis
Pembesian Plat
Lantai 45.57 kg

Begesting Plat 3.20 m²


Tangga

Pekerjaan
Kusen,Daun,Pentilas 3.85 m³
i Pintu dan Jendela

DIBUAT OLEH
CV./PT.

( Pande Kurniawan)
PELAKSANA
LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : SENIN
TANGGAL : 17 MARET 2015 TANGGAL : 17 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 5 Molen 1 Plesteran Lantai Satu


2 Tukang Batu 2 Sekop 6 Pengecoran Plat Lantai
3 Kepala Tukang 2 Ember 10 Pengecoran Plat Tangga
4 Mandor 1 Grobak 4
Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2
Jumlah Keadaan Cuaca
Pekerjaan dimulai pada jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA

LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : SELASA
TANGGAL : 18 MARET 2015 TANGGAL : 18 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Pelaksanaan yang
No dilaksanakan pada hari ini
Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 5 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 2 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pada jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA

LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : RABU
TANGGAL : 19 MARET 2015 TANGGAL : 19 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 9 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 5 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pd jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA

LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : KAMIS
TANGGAL : 20 MARET 2015 TANGGAL : 20 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 9 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 5 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pd jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA

LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : JUMAT
TANGGAL : 21 MARET 2015 TANGGAL : 21 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Jenis
No Bahan Jumlah Jumlah Pelaksanaan yang
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 9 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 5 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pd jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA
LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : SABTU
TANGGAL : 22 MARET 2015 TANGGAL : 22 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 9 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 5 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pd ja : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA

LAPORAN HARIAN
PEKERJAAN : RUMAH TINGGAL LANTAI DUA
LOKASI : SINGARAJA MINGGU KE : 11
NO. KONTRAK : 1315124040 HARI : MINGGU
TANGGAL : 23 MARET 2015 TANGGAL : 23 MARET 2015

Tenaga Kerja Peralatan Bahan-bahan

No Pelaksanaan yang
dilaksanakan pada hari ini
Jenis
Bahan Jumlah Jumlah Pelaksanaan yang
No
Keahlian Jumlah Jenis Jumlah yang yang yang dilaksanakan pada hari ini
didatangka diterima ditolak
n

1 Pekerja 9 Molen 1 Plesteran Lantai Satu


2 Tukang Cat/Labu 2 Sekop 6 Acian Lantai Satu
2 Tukang Batu 5 Ember 10 Pengecoran Plat Lantai
3 Kepala Tukang 2 Grobak 4 Pengecoran Plat Tangga
4 Mandor 1 Cetok 5
Meteran 5
Drum air 1
Skapolding 10
Waterpass 2

Jumlah Keadaan Cuaca


Pekerjaan dimulai pd jam : 8.00 WITA
Pagi Sore
Sampai dengan jam : 17.00 WITA
Sebagian waktu dari jam :
Sampai dengan jam : Terang Terang
Tidak-Dapat bekerja karena :
DIPERIKSA OLEH DIBUAT OLEH
Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana) ( Saputra) ( Pande Kurniawan)


NIP: - Inspektor PELAKSANA
17 MARET 2015

Volume

92.50 m²
1.69 m²
6.36 m²

ande Kurniawan)
PELAKSANA

18 MARET 2015

Volume
Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²

ande Kurniawan)
PELAKSANA

19 MARET 2015

Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²
ande Kurniawan)
PELAKSANA

20 MARET 2015

Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²
ande Kurniawan)
PELAKSANA

21 MARET 2015

Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²

ande Kurniawan)
PELAKSANA
22 MARET 2015

Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²

ande Kurniawan)
PELAKSANA

23 MARET 2015

Volume
Volume

92.50 m²
107.92 m²
1.69 m²
6.36 m²

ande Kurniawan)
PELAKSANA
LAPORAN MINGGUAN :4
PEKERJAAN : REMBANGUNAN RUMAH TINGGAL LANTAI DUA
NO KONTRAK : 1315124040

TOTAL VOLUME YANG TELAH


NILAI
VOLUME DILAKSANAKAN
ITEM NO. URAIAN PEKERJAAN SATUAN
TARGET BOBOT MINGGU
(%) LALU
I Pekerjaan Persiapan
1 Pekerjaan Pembersihan Lokasi m² 300 0.17 0.17
2 Pekerjaan Pasangan Bowplank m¹ 70 0.51 0.51
3 Pekerjaan Pasangan Pagar Garurat (seng) m² 70 2.33 2.33
II Pekerjaan Tanah
1 Pekerjaan Galian Tanah Pondasi Setempat m³ 1.28 0.003 0.003
2 Pekerjaan Galian Tanah Pondasi Menerus m³ 51.42 0.15 0.15
3 Urugan Pasir Pondasi Setempat m³ 0.03 0.0003 0.0003
4 Urugan Tanah Pondasi Setempat m³ 1.10 0.01 0.01
5 Urugan Pasir Pondasi menerus m³ 5.85 0.06 0.06
6 Urugan Tanah Dipadatkan m³ 97.50 0.17 0.00
7 Urugan Pasir Dibawah Lantai m³ 19.80 0.38
III Pekerjaan Pondasi
1 Pekerjaan Rabat Plat Lantai kerja m³ 0.03 0.02 0.02
2 Pekerjaan Pasangan Batu Kali 1:4 m³ 45.87 1.81 0.00
3 Pekerjaan Pasangan Batu Kosong m³ 23.60 0.49 0.49
4 Pasangan Batu Bata 1:5 lantai 1 m² 323.75 10.50 0.00
5 Pekerjaan Plesteran 1:5 lantai satu m² 647.50 1.54 0.00
6 Pekerjaan Acian lantai satu m² 647.50 0.53 0.00
7 Pekerjaan Rabatan Lantai Satu m³ 9.90 0.38 0.00
8 Pekerjaan Batu Bata 1: 5 lantai 2 m² 501.21 16.57 0.00
9 Pekerjaan Plesteran 1:5 lantai dua m² 1002.42 2.39 0.00
10 Pekerjaan Acian lantai dua m² 1002.42 0.83 0.00
IV Pekerjaan Beton
1 Pekerjaan Pondasi Telapak
Pembesian kg 8701.41 6.04 6.04
Pengecoran m³ 4.20 0.22 0.22
2 Pekerjaan Sloof 30x15
Pembesian kg 1964.39 1.36 1.36
Begesting m² 73.60 0.77 0.77
Pengecoran m² 9.20 0.44 0.00
3 Pekerjaan Kolom 30x30
Pembesian kg 773.65 0.54 0.00
Begesting m² 72.00 0.65 0.00
Pengecoran m² 5.37 0.26 0.00
4 Balok Induk 30x60
Pembesian kg 2004.13 1.39 0.00
Begesting m² 100.50 0.15 0.00
Pengecoran m² 15.48 0.75 0.00
5 Balok Anak 25x40
Pembesian kg 1348.56 0.63 0.00
Begesting m² 15.75 0.15 0.00
Pengecoran m² 1.00 0.05 0.00
6 Pekerjaan Kolom 25x25
Pembesian kg 1348.56 0.94 0.00
Begesting m² 53.25 0.48 0.00
Pengecoran m² 3.33 0.16 0.00
7 Pekerjaan Kolom 20x20
Pembesian kg 206.68 0.14 0.00
Begesting m² 9.90 0.09 0.00
Pengecoran m² 0.37 0.02 0.00
8 Pekerjaan Kolom Praktis 15x15
Pembesian kg 1375.89 0.95 0.00
Begesting m² 185.56 1.68 0.00
Pengecoran m² 0.97 0.05 0.00
9 Pekerjaan Ring 15x20
Pembesian kg 895.66 0.62 0.00
Begesting m² 45.10 0.42 0.00
Pengecoran m² 3.30 0.16 0.00
10 Pekerjaan beton plat lantai tebal 12 cm
Pembesian kg 637.92 0.44 0.00
Begesting m² 192.00 9.73 0.00
Pengecoran m² 23.64 1.14 0.00
11 Pekerjaan Beton Plat tangga tebal 5 cm
Pembesian kg 189.25 0.13 0.00
Begesting m² 22.40 0.57 0.00
Pengecoran m² 89.00 4.28 0.00
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu m³ 30.77 12.81 0.00
VI Pekerjaan Lantai dan Keramik
1 Pekerjaan Pasangan Keramik 60x60 m² 247.00 3.29 0.00
2 Pekerjaan Pasangan Keramik 20x20 m² 15.75 0.31 0.00
3 Pekerjaan Pasangan Tegel Plin 10x60 m² 78.50 0.30 0.00
VII Pekerjaan Plafond
1 Pekerjaan Rangka Plafond Hollo Galvalum m² 171.25 1.65 0.00
2 Pekerjaan Penutup Plafond Gypsum m² 180.00 1.04 0.00
3 Pekerjaan List Plafond Profil m' 148.50 0.33 0.00
VIII Pekerjaan Atap
1 Pekerjaan Kuda-Kuda m² 0.59 0.36 0.00
2 Pekerjaan Rangka Atap m³ 5.35 0.02 0.00
3 Pekerjaan Genteng m² 126.64 0.53 0.00
4 Pekerjaan List Plank m¹ 58.12 0.37 0.00
IX Pekerjaan Kunci dan Gantungan
1 Pekerjaan Engsel Pintu bh 34.00 0.15 0.00
2 Pekerjaan Engsel Jendela bh 24.00 0.09 0.00
3 Pekerjaan Kunci slot bh 20.00 0.05 0.00
4 Pekerjaan Grendel bh 26.00 0.03 0.00
5 Pekerjaan Kait Angin bh 52.00 0.18 0.00
X Pekerjaan Kaca
1 Pekerjaan Kaca Pintu Bukaan Dua m² 3.02 0.10 0.00
2 Pekerjaan Kaca Jendela m² 5.82 0.85 0.00
XI Pekerjaan Sanitasi
1 Pas. Bak mandi fiberglass bh 2.00 0.08 0.00
2 Pas. Wastafel bh 1.00 0.03 0.00
3 Pas. Kloset duduk bh 3.00 0.49 0.00
4 Pas. Bak cuci piring bh 1.00 0.04 0.00
5 Pas. Kran cuci piring bh 1.00 0.01 0.00
5 Pas. Kran wastafel bh 1.00 0.05 0.00
6 Pas. Kran bh 2.00 0.03 0.00
7 Pas. Bath tup bh 1.00 0.46 0.00
8 Pas. Pipa air bersih m¹ 26.00 0.05 0.00
9 Pas. Pipa air kotor m¹ 21.00 0.06 0.00
10 Pas. Pipa tinja m¹ 23.00 0.17 0.00
XII Pekerjaan Listrik
1 Instalasi Titik Lampu ttk 36.00 0.37 0.00
2 Instalasi Stop Kontak ttk 14.00 0.16 0.00
3 Lampu LED 7 Watt bh 3.00 0.01 0.00
4 Lampu LED 15 Watt bh 31.00 0.14 0.00
5 Stop Kontak bh 14.00 0.03 0.00
6 Saklar Ganda bh 4.00 0.01 0.00
7 Saklar Tunggal bh 16.00 0.03 0.00
XIII Pekerjaan Relling
1 Pekerjaan Reling Balkon Galvanis m² 0.53 0.02 0.00
XIV Pekerjaan Pengecatan 0.00
1 Pekerjaan Pengecatan Tembok Luar m² 13.00 0.02 0.00
2 Pekerjaan Pengecatan Tembok Dalam m² 295.76 0.43 0.00
3 Pekerjaan Pengecatan Plafond m² 132.80 0.16 0.00
4 Pekerjaan Politur Kayu m² 30.59 0.06 0.00
XV Pekerjaan Stile Bali
1 Pekerjaan Batu Alam Jenis Alur Marmer Gi m² 6.32 0.06 0.00
2 Pekerjaan Batu Alam Jenis Bali Palimanan m² 44.25 0.33 0.00
3 Pekerjaan Murda bh 1.00 0.01 0.00
SUB TOTAL
TOTAL SAMPAI DENGAN MINGGU LALU (%)
TOTAL MINGGU INI (%)
TOTAL SAMPAI DENGAN MINGGU INI (%)

DIKETAHUI OLEH, DISETUJUI OLEH,


(I Wayan Supartini) (Yogi Mardika)
PIMPRO ASS. TEKNIK
TINGGAL LANTAI DUA MINGGU KE : 4 (24-31 Januari 2015)
KONTRAKTOR : Pande Kurniawan

VOLUME YANG TELAH PROSENTASE PROSENTASE


DILAKSANAKAN
PENYELESAIAN BOBOT KEMAJUAN
KETERANGAN
MINGGU SAMPAI DENGAN TERHADAP TARGET PELAKSANAAN
INI MINGGU INI (%) (%)

0.00 0.17 100 0.17


0.00 0.51 100 0.51
0.00 2.33 100 2.33

0.00 0.00 100 0.00


0.00 0.15 100 0.15
0.0000 0.00 100 0.00
0.00 0.01 100 0.01
0.00 0.06 100 0.06
0.17 0.17 100 0.17
0.00 0.00 0 0.00

0.00 0.02 100 0.02


1.81 1.81 100 1.81
0.00 0.49 100 0.49
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 6.04 100 6.04


0.00 0.22 100 0.22

0.00 1.36 100 1.36


0.00 0.77 100 0.77
0.44 0.44 100 0.44

0.54 0.54 100 0.54


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.70 0.70 75 0.70


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.14 0.14 100 0.14


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
0.00 0.00 0 0.00

0.00 0.00 0 0.00


0.00 0.00 0 0.00
0.00 0.00 0 0.00
15.94
LU (%) 12.14
3.81
NI (%) 15.94

DIPERIKSA OLEH, DIBUAT OLEH,


KONSULTAN KONTRAKTOR
(I Made Bengkot) (Pande Kurniawan)
SITE ENGINEER SITE MANAGER
LAPORAN BULAN :5
PEKERJAAN : REMBANGUNAN RUMAH TINGGAL LANTAI DUA
NO KONTRAK : 1315124040

TOTAL VOLUME YANG TELAH


VOLUME NILAI DILAKSANAKAN
ITEM
URAIAN PEKERJAAN SATUAN
NO. TARGET BOBOT BULAN BULAN SAMPAI DENGAN
(%) LALU INI BULAN INI
I Pekerjaan Persiapan
1 Pekerjaan Pembersihan Lokasi m² 300 0.17 0.17 0.00 0.17
2 Pekerjaan Pasangan Bowplank m¹ 70 0.51 0.51 0.00 0.51
3 Pekerjaan Pasangan Pagar Garurat (seng) m² 70 2.33 2.33 0.00 2.33
II Pekerjaan Tanah
1 Pekerjaan Galian Tanah Pondasi Setempat m³ 1.28 0.003 0.003 0.00 0.00
2 Pekerjaan Galian Tanah Pondasi Menerus m³ 51.42 0.15 0.15 0.00 0.15
3 Urugan Pasir Pondasi Setempat m³ 0.03 0.0003 0.0003 0.00 0.00
4 Urugan Tanah Pondasi Setempat m³ 1.10 0.01 0.01 0.00 0.01
5 Urugan Pasir Pondasi menerus m³ 5.85 0.06 0.06 0.00 0.06
6 Urugan Tanah Dipadatkan m³ 97.50 0.17 0.17 0.00 0.17
7 Urugan Pasir Dibawah Lantai m³ 19.80 0.38 0.38 0.00 0.38
III Pekerjaan Pondasi
1 Pekerjaan Rabat Plat Lantai kerja m³ 0.03 0.02 0.02 0.00 0.02
2 Pekerjaan Pasangan Batu Kali 1:4 m³ 45.87 1.81 1.81 0.00 1.81
3 Pekerjaan Pasangan Batu Kosong m³ 23.60 0.49 0.49 0.00 0.49
4 Pasangan Batu Bata 1:5 lantai 1 m² 323.75 10.50 10.50 0.00 10.50
5 Pekerjaan Plesteran 1:5 lantai satu m² 647.50 1.54 1.54 0.00 1.54
6 Pekerjaan Acian lantai satu m² 647.50 0.53 0.53 0.00 0.53
7 Pekerjaan Rabatan Lantai Satu m³ 9.90 0.38 0.38 0.00 0.38
8 Pekerjaan Batu Bata 1: 5 lantai 2 m² 501.21 16.57 16.57 0.00 16.57
9 Pekerjaan Plesteran 1:5 lantai dua m² 1002.42 2.39 2.39 0.00 2.39
10 Pekerjaan Acian lantai dua m² 1002.42 0.83 0.83 0.00 0.83
IV Pekerjaan Beton
1 Pekerjaan Pondasi Telapak
Pembesian kg 8701.41 6.04 6.04 0.00 6.04
Pengecoran m³ 4.20 0.22 0.22 0.00 0.22
2 Pekerjaan Sloof 30x15
Pembesian kg 1964.39 1.36 1.36 0.00 1.36
Begesting m² 73.60 0.77 0.77 0.00 0.77
Pengecoran m² 9.20 0.44 0.44 0.00 0.44
3 Pekerjaan Kolom 30x30
Pembesian kg 773.65 0.54 0.54 0.00 0.54
Begesting m² 72.00 0.65 0.65 0.00 0.65
Pengecoran m² 5.37 0.26 0.26 0.00 0.26
4 Balok Induk 30x60
Pembesian kg 2004.13 1.39 1.39 0.00 1.39
Begesting m² 100.50 0.15 0.15 0.00 0.15
Pengecoran m² 15.48 0.75 0.75 0.00 0.75
5 Balok Anak 25x40
Pembesian kg 1348.56 0.63 0.63 0.00 0.63
Begesting m² 15.75 0.15 0.15 0.00 0.15
Pengecoran m² 1.00 0.05 0.05 0.00 0.05
6 Pekerjaan Kolom 25x25
Pembesian kg 1348.56 0.94 0.94 0.00 0.94
Begesting m² 53.25 0.48 0.48 0.00 0.48
Pengecoran m² 3.33 0.16 0.16 0.00 0.16
7 Pekerjaan Kolom 20x20
Pembesian kg 206.68 0.14 0.14 0.00 0.14
Begesting m² 9.90 0.09 0.09 0.00 0.09
Pengecoran m² 0.37 0.02 0.02 0.00 0.02
8 Pekerjaan Kolom Praktis 15x15
Pembesian kg 1375.89 0.95 0.95 0.00 0.95
Begesting m² 185.56 1.68 1.68 0.00 1.68
Pengecoran m² 0.97 0.05 0.05 0.00 0.05
9 Pekerjaan Ring 15x20
Pembesian kg 895.66 0.62 0.31 0.31 0.62
Begesting m² 45.10 0.42 0.42 0.00 0.42
Pengecoran m² 3.30 0.16 0.16 0.00 0.16
10 Pekerjaan beton plat lantai tebal 12 cm
Pembesian kg 637.92 0.44 0.44 0.00 0.44
Begesting m² 192.00 9.73 9.73 0.00 9.73
Pengecoran m² 23.64 1.14 1.14 0.00 1.14
11 Pekerjaan Beton Plat tangga tebal 5 cm
Pembesian kg 189.25 0.13 0.13 0.00 0.13
Begesting m² 22.40 0.57 0.57 0.00 0.57
Pengecoran m² 89.00 4.28 4.28 0.00 4.28
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu m³ 30.77 12.81 12.81 0.00 12.81
VI Pekerjaan Lantai dan Keramik 0.00
1 Pekerjaan Pasangan Keramik 60x60 m² 247.00 3.29 0.00 3.29 3.29
2 Pekerjaan Pasangan Keramik 20x20 m² 15.75 0.31 0.00 0.31 0.31
3 Pekerjaan Pasangan Tegel Plin 10x60 m² 78.50 0.30 0.00 0.30 0.30
VII Pekerjaan Plafond
1 Pekerjaan Rangka Plafond Hollo Galvalum m² 171.25 1.65 0.82 0.82 1.65
2 Pekerjaan Penutup Plafond Gypsum m² 180.00 1.04 0.52 0.52 1.04
3 Pekerjaan List Plafond Profil m' 148.50 0.33 0.17 0.17 0.33
VIII Pekerjaan Atap
1 Pekerjaan Kuda-Kuda m² 0.59 0.36 0.36 0.00 0.36
2 Pekerjaan Rangka Atap m³ 5.35 0.02 0.02 0.00 0.02
3 Pekerjaan Genteng m² 126.64 0.53 0.53 0.00 0.53
4 Pekerjaan List Plank m¹ 58.12 0.37 0.37 0.00 0.37
IX Pekerjaan Kunci dan Gantungan
1 Pekerjaan Engsel Pintu bh 34.00 0.15 0.15 0.00 0.15
2 Pekerjaan Engsel Jendela bh 24.00 0.09 0.09 0.00 0.09
3 Pekerjaan Kunci slot bh 20.00 0.05 0.05 0.00 0.05
4 Pekerjaan Grendel bh 26.00 0.03 0.03 0.00 0.03
5 Pekerjaan Kait Angin bh 52.00 0.18 0.18 0.00 0.18
X Pekerjaan Kaca
1 Pekerjaan Kaca Pintu Bukaan Dua m² 3.02 0.10 0.10 0.00 0.10
2 Pekerjaan Kaca Jendela m² 5.82 0.85 0.85 0.00 0.85
XI Pekerjaan Sanitasi
1 Pas. Bak mandi fiberglass bh 2.00 0.08 0.08 0.00 0.08
2 Pas. Wastafel bh 1.00 0.03 0.03 0.00 0.03
3 Pas. Kloset duduk bh 3.00 0.49 0.49 0.00 0.49
4 Pas. Bak cuci piring bh 1.00 0.04 0.04 0.00 0.04
5 Pas. Kran cuci piring bh 1.00 0.01 0.01 0.00 0.01
5 Pas. Kran wastafel bh 1.00 0.05 0.05 0.00 0.05
6 Pas. Kran bh 2.00 0.03 0.03 0.00 0.03
7 Pas. Bath tup bh 1.00 0.46 0.46 0.00 0.46
8 Pas. Pipa air bersih m¹ 26.00 0.05 0.05 0.00 0.05
9 Pas. Pipa air kotor m¹ 21.00 0.06 0.06 0.00 0.06
10 Pas. Pipa tinja m¹ 23.00 0.17 0.17 0.00 0.17
XII Pekerjaan Listrik
1 Instalasi Titik Lampu ttk 36.00 0.37 0.19 0.19 0.37
2 Instalasi Stop Kontak ttk 14.00 0.16 0.08 0.08 0.16
3 Lampu LED 7 Watt bh 3.00 0.01 0.005 0.005 0.01
4 Lampu LED 15 Watt bh 31.00 0.14 0.07 0.07 0.14
5 Stop Kontak bh 14.00 0.03 0.00 0.03 0.03
6 Saklar Ganda bh 4.00 0.01 0.00 0.01 0.01
7 Saklar Tunggal bh 16.00 0.03 0.00 0.03 0.03
XIII Pekerjaan Relling
1 Pekerjaan Reling Balkon Galvanis m² 0.53 0.02 0.00 0.02 0.02
XIV Pekerjaan Pengecatan 0.00 0.00
1 Pekerjaan Pengecatan Tembok Luar m² 13.00 0.02 0.00 0.02 0.02
2 Pekerjaan Pengecatan Tembok Dalam m² 295.76 0.43 0.00 0.43 0.43
3 Pekerjaan Pengecatan Plafond m² 132.80 0.16 0.00 0.16 0.16
4 Pekerjaan Politur Kayu m² 30.59 0.06 0.00 0.06 0.06
XV Pekerjaan Stile Bali
1 Pekerjaan Batu Alam Jenis Alur Marmer Gi m² 6.32 0.06 0.00 0.06 0.06
2 Pekerjaan Batu Alam Jenis Bali Palimanan m² 44.25 0.33 0.00 0.33 0.33
3 Pekerjaan Murda bh 1.00 0.01 0.00 0.01 0.01
SUB TOTAL
TOTAL SAMPAI DENGAN BULAN LALU (%)
TOTAL BULAN INI (%)
TOTAL SAMPAI DENGAN BULAN INI (%)

DIKETAHUI OLEH, DISETUJUI OLEH, DIPERIKSA OLEH,


KONSULTAN
(I Wayan Kepuh) (Santara) (I Made Suastini)
PIMPRO ASS. TEKNIK SITE ENGINEER
BULAN KE : 5 (1-31 Mei 2015)
KONTRAKTOR : Pande Kurniawan

PROSENTASE PROSENTASE
PENYELESAIAN BOBOT KEMAJUAN
KET.
TERHADAP TARGET PELAKSANAAN
(%) (%)

100 0.17
100 0.51
100 2.33
3.01
100 0.00
100 0.15
100 0.00
100 0.01
100 0.06
100 0.17
100 0.38
0.78
100 0.02
100 1.81
100 0.49
100 10.50
100 1.54
100 0.53
100 0.38
100 16.57
100 2.39
100 0.83
35.07

100 6.04
100 0.22

100 1.36
100 0.77
100 0.44

100 0.54
100 0.65
100 0.26

100 1.39
100 0.15
100 0.75

100 0.63
100 0.15
100 0.05

100 0.94
100 0.48
100 0.16

100 0.14
100 0.09
100 0.02

100 0.95
100 1.68
100 0.05

100 0.62
100 0.42
100 0.16

100 0.44
100 9.73
100 1.14

100 0.13
100 0.57
100 4.28
35.39
100 12.81
12.81
100 3.29
100 0.31
100 0.30
3.90
100 1.65
100 1.04
100 0.33
3.02
100 0.36
100 0.02
100 0.53
100 0.37
1.28
100 0.15
100 0.09
100 0.05
100 0.03
100 0.18
0.50
100 0.10
100 0.85
0.95
100 0.08
100 0.03
100 0.49
100 0.04
100 0.01
100 0.05
100 0.03
100 0.46
100 0.05
100 0.06
100 0.17
1.46
100 0.37
100 0.16
100 0.01
100 0.14
100 0.03
100 0.01
100 0.03
0.75
100 0.02
0.02
100 0.02
100 0.43
100 0.16
100 0.06
0.67
100 0.06
100 0.33
100 0.01 0.40
100.00
92.79
7.22
100.00

RIKSA OLEH, DIBUAT OLEH,


KONTRAKTOR
ade Suastini) (Pande Kurniawan)
SITE MANAGER
CONTRAC CHANGE ORDER (CCO)
Kontrak Asli CCO Pekerjaan Tambah
No Uraian Pekerjaan Satuan Harga Satuan
Volume Jumlah Harga Volume Jumlah Harga Volume

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 9,750.00 300.00 2,925,000.00 310.00 3,022,500.00 10.00
2 Pek. pemasangan bouwplank + pengukuran m¹ 123,213.00 70.00 8,624,910.00 70.00 8,624,910.00
3 Pek .Pagar Darurat m² 561,057.00 70.00 39,273,990.00 70.00 39,273,990.00

II PEKERJAAN TANAH
1 Pekerjaan Galian Tanah Pondasi Setempat m³ 39,875.00 1.28 51,040.00 2.00 79,750.00 0.72
2 Pekerjaan Galian Tanah Pondasi Menerus m³ 49,275.00 51.42 2,533,474.13 50.00 2,463,750.00
3 Urugan Pasir Pondasi Setempat m³ 177,950.00 0.03 5,694.40 0.03 5,338.50
4 Urugan Tanah Pondasi Setempat m³ 168,350.00 1.10 185,185.00 1.00 168,350.00
5 Urugan Pasir Pondasi menerus m³ 177,950.00 5.85 1,041,452.38 5.50 978,725.00
7 Pek. Urugan tanah dipadatkan m³ 29,750.00 97.50 2,900,625.00 98.00 2,915,500.00 0.50
8 Pek. Urugan pasir dibawah lantai m³ 177,950.00 19.80 3,523,410.00 19.90 3,541,205.00 0.10

III PEKERJAAN PONDASI


1 Pek.Rabatan plat lantai kerja m³ 812,446.30 0.03 25,998.28 0.03 24,373.39
2 Pek. Pondasi batu kali 1 : 4 m³ 666,690.00 45.87 30,581,070.30 46.00 30,667,740.00 0.13
3 Pek. Pasangan batu kosong m³ 351,897.00 23.60 8,304,769.20 23.50 8,269,579.50
4 Pek. Pasangan bata 1 : 5 lantai satu m² 557,839.00 323.75 180,600,376.25 320.50 178,787,399.50
5 Pek. Plesteran 1 : 5 lantai satu m² 40,225.00 647.50 26,045,687.50 647.00 26,025,575.00
6 Pek.Acian lantai satu m² 13,898.75 647.50 8,999,440.63 647.00 8,992,491.25
7 Pek.Rabatan lantai satu m³ 652,542.57 9.90 6,460,171.46 9.50 6,199,154.43
8 Pek. Pasangan bata 1 : 5 lantai dua m² 557,839.00 501.21 279,596,047.14 507.32 283,002,881.48 6.11
9 Pek. Plesteran 1 : 5 lantai dua m² 40,225.00 1002.42 40,322,344.50 1010.00 40,627,250.00 7.58
10 Pek.Acian lantai dua m² 13,898.75 1002.42 13,932,384.98 1010.00 14,037,737.50 7.58

IV PEKERJAAN BETON
2 Pek.Pondasi telapak K = 300
a Pengecoran m³ 865,678.18 4.20 3,635,848.36 4.20 3,635,848.36
b Pembesian kg 11,708.85 8701.41 101,883,477.95 8702.00 101,890,412.70 0.59
3 Pek. Sloof 30 x 15 K 225 0.00
a Begesting m² 176,378.00 73.60 12,981,420.80 74.00 13,051,972.00 0.40
b Pengecoran m³ 812,446.30 9.20 7,474,505.97 9.50 7,718,239.87 0.30
c Pembesian kg 11,708.85 1964.39 23,000,691.64 1954.00 22,879,092.90
4 Pek Kolom 30x30 K 225 0.00
a Begesting m² 153,189.67 72.00 11,029,656.00 70.00 10,723,276.67
b Pengecoran m³ 812,446.30 5.37 4,365,273.98 5.00 4,062,231.51
c Pembesian kg 11,708.85 773.65 9,058,515.51 773.50 9,056,795.48
5 Pek. Balok induk 30x60 K 225 0.00
a Begesting m² 155,774.67 100.50 15,655,354.00 100.20 15,608,621.60
b Pengecoran m³ 812,446.30 15.48 12,576,668.75 15.72 12,771,655.86 0.24
c Pembesian kg 11,708.85 2004.13 23,466,055.93 2007.20 23,502,003.72 3.07
6 Pek. Balok anak 25x40 K 225 0.00
a Begesting m² 155,774.67 15.75 2,453,451.00 15.30 2,383,352.40
b Pengecoran m³ 812,446.30 1.00 812,446.30 1.20 974,935.56 0.20
c Pembesian kg 11,708.85 905.16 10,598,360.90 900.10 10,539,135.89
7 Pek. Kolom 25x25 K 225 0.00
a Begesting m² 153,189.67 53.25 8,157,349.75 52.00 7,965,862.67
b Pengecoran m³ 812,446.30 3.33 2,703,922.85 3.54 2,876,059.91 0.21
c Pembesian kg 11,708.85 1348.56 15,790,076.74 1349.10 15,796,409.54 0.54
8 Pek. Kolom 20x20 K 225 0.00
a Begesting m² 153,189.67 9.90 1,516,577.70 9.62 1,473,684.59
b Pengecoran m³ 812,446.30 0.37 301,620.69 0.42 341,227.45 0.05
c Pembesian kg 11,708.85 206.68 2,419,963.75 206.68 2,419,963.75
9 Pek. Kolom praktis 15x15 0.00
a Begesting m² 153,189.67 185.56 28,426,180.93 187.20 28,677,105.60 1.64
b Pengecoran m³ 812,446.30 0.97 784,213.79 0.97 784,213.79
c Pembesian kg 11,708.85 1375.89 16,110,037.69 1375.89 16,110,037.69
10 Pek. Ring balok 15x20 K225 0.00
a Begesting m² 155,774.67 45.10 7,025,437.47 45.10 7,025,437.47
b Pengecoran m³ 812,446.30 3.30 2,681,072.80 3.10 2,518,583.53
c Pembesian kg 11,708.85 895.66 10,487,124.28 890.10 10,422,047.39
11 Pek. Plat lantai 12 cm K 225 0.00
a Begesting m² 855,569.00 192.00 164,269,248.00 192.30 164,525,918.70 0.30
b Pengecoran m³ 812,446.30 23.64 19,206,230.57 23.64 19,206,230.57
c Pembesian kg 11,708.85 637.92 7,469,323.98 621.30 7,274,708.51
12 Pek. Plat tangga 5 cm K 225 0.00 0.00
a Begesting m² 432,041.50 22.40 9,677,729.60 22.40 9,677,729.60
b Pengecoran m³ 812,446.30 89.00 72,307,720.84 89.00 72,307,720.84
c Pembesian kg 11,708.85 189.25 2,215,930.48 189.25 2,215,930.48
0.00
V PEKERJAAN PINTU DAN JENDELA 0.00
1 Pek. Kusen pintu P1 1 buah m³ 11,173,925.00 0.60 6,682,007.15 0.60 6,682,007.15
2 Pek. Daun pintu P1 1 buah m³ 687,400.00 3.96 2,720,608.22 3.96 2,720,608.22
3 Pek. Kusen pintu P2 11 buah m³ 11,173,925.00 5.50 61,456,587.50 5.50 61,456,587.50
4 Pek. Daun pintu P2 11 buah m³ 687,400.00 1.85 1,270,315.20 1.85 1,270,315.20
5 Pek. Kusen pintu P4 2 buah m³ 11,173,925.00 2.39 26,710,150.32 2.39 26,710,150.32
6 Pek. Daun pintu P4 2 buah m³ 687,400.00 1.38 945,312.48 1.38 945,312.48
7 Pek. Kusen jendela J1 3 buah m³ 11,173,925.00 1.14 12,738,274.50 1.14 12,738,274.50
8 Pek. Daun jendela J1 3 buah m³ 477,870.00 0.36 173,753.53 0.36 173,753.53
9 Pek. Kusen jendela J2 6 buah m³ 11,173,925.00 4.33 48,383,095.25 4.33 48,383,095.25
10 Pek. Daun jendela J2 6 buah m³ 477,870.00 0.73 347,507.06 0.73 347,507.06
11 Pek. Kusen jendela J3 1 buah m³ 11,173,925.00 0.49 5,475,223.25 0.49 5,475,223.25
12 Pek. Daun jendela J3 1 buah m³ 477,870.00 0.42 199,558.51 0.42 199,558.51
13 Pek. Kusen jendela J4 6 buah m³ 11,173,925.00 3.39 37,893,014.46 3.39 37,893,014.46
14 Pek. Daun jendela J4 6 buah m³ 477,870.00 2.72 1,300,570.99 2.72 1,300,570.99
15 Pek. Kusen ventilasi 4 buah m³ 11,173,925.00 0.91 10,168,271.75 0.91 10,168,271.75
16 Pek. Daun ventasi 4 buah m³ 477,870.00 0.60 289,015.78 0.60 289,015.78

VI PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pek. Keramik lantai 60x60 lantai satu m² 224,745.00 104.00 23,373,480.00 104.00 23,373,480.00
2 Pek. Keramik lantai 20x20 lantai satu m² 161,297.00 9.75 1,572,000.56 162.30 26,178,503.10 152.55
3 Pek. Keramik tegel plin 10x30 lantai satu m² 65,086.56 30.38 1,977,004.26 62.30 4,054,892.69 31.93
4 Pek. Keramik lantai 60x60 lantai dua m² 224,745.00 143.00 32,138,535.00 210.30 47,263,873.50 67.30
5 Pek. Keramik lantai 20x20 lantai dua m² 161,297.00 6.00 967,782.00 6.00 967,782.00
6 Pek. Keramik tegel plin 10x30 lantai dua m² 65,086.56 48.12 3,132,049.88 48.12 3,132,049.88

VII PEKERJAAN PLAFOND


1 Pek. Pasangan plafond gypsum rangka hollo m² 162,355.00 171.25 27,803,293.75 165.30 26,837,281.50
2 Gypsum Board m² 97,607.80 180.00 17,569,404.00 180.00 17,569,404.00
3 Pek. List plafond m' 37,968.00 148.50 5,638,248.00 35.20 1,336,473.60

VIII PEKERJAAN ATAP


1 Pek. Genteng kodok karang pilang m² 70,204.00 126.64 8,890,634.56 126.64 8,890,634.56
2 Pek. Kuda - kuda kamper m³ 10,427,600.00 0.59 6,122,419.35 0.87 9,072,012.00 0.28
3 Pek. Usuk 5/7 m² 61,548.20 3.82 235,237.22 3.97 244,346.35 0.15
4 Pek. Reng m² 45,416.80 1.53 69,433.20 1.53 69,433.20
5 Pek. List plank m¹ 108,130.00 58.12 6,284,515.60 58.12 6,284,515.60

IX PEKERJAAN GANTUNGAN & KUNCI


1 Pek. Engsel pintu bh 74,496.00 34.00 2,532,864.00 34.00 2,532,864.00
2 Pek. Engsel jendela bh 63,327.50 24.00 1,519,860.00 24.00 1,519,860.00
3 Pek. Kunci slot bh 38,855.00 20.00 777,100.00 20.00 777,100.00
4 Pek. Grendel bh 21,534.00 26.00 559,884.00 26.00 559,884.00
5 Pek.Kait angin bh 59,696.00 52.00 3,104,192.00 52.00 3,104,192.00

X PEKERJAAN KACA
1 Pek.Kaca pintu bukaan dua m² 147,096.00 3.02 444,112.24 3.02 444,112.24
2 Pek.Kaca jendela m² 147,096.00 5.82 855,922.20 5.82 855,922.20

XI PEKERJAAN SANITASI
1 Pas. Bak mandi fiberglass bh 651,710.00 2.00 1,303,420.00 2.00 1,303,420.00
2 Pas. Wastafel bh 430,380.00 1.00 430,380.00 1.00 430,380.00
3 Pas. Kloset duduk bh 2,759,128.00 3.00 8,277,384.00 3.00 8,277,384.00
4 Pas. Bak cuci piring bh 594,000.00 1.00 594,000.00 1.00 594,000.00
5 Pas. Kran cuci piring bh 205,800.00 1.00 205,800.00 1.00 205,800.00
6 Pas. Kran wastafel bh 768,400.00 1.00 768,400.00 1.00 768,400.00
7 Pas. Kran bh 277,200.00 2.00 554,400.00 2.00 554,400.00
8 Pas. Bath tup bh 7,689,000.00 1.00 7,689,000.00 1.00 7,689,000.00
9 Pas. Pipa air bersih m¹ 34,067.75 26.00 885,761.50 26.00 885,761.50
10 Pas. Pipa air kotor m¹ 50,617.25 21.00 1,062,962.25 21.00 1,062,962.25
11 Pas. Pipa tinja m¹ 122,760.00 23.00 2,823,480.00 23.00 2,823,480.00

XII PEKERJAAN LISTRIK


1 Instalasi Titik Lampu ttk 175,000.00 36.00 6,300,000.00 36.00 6,300,000.00
2 Instalasi Stop Kontak ttk 187,500.00 14.00 2,625,000.00 14.30 2,681,250.00 0.30
3 Lampu LED 7 Watt bh 54,900.00 3.00 164,700.00 3.40 186,660.00 0.40
4 Lampu LED 15 Watt bh 76,900.00 31.00 2,383,900.00 31.00 2,383,900.00
5 Stop Kontak bh 38,500.00 14.00 539,000.00 14.00 539,000.00
6 Saklar Ganda bh 47,437.00 4.00 189,748.00 4.00 189,748.00
7 Saklar Tunggal bh 31,625.00 16.00 506,000.00 16.00 506,000.00

XIII PEKERJAAN RELING


1 Pas. Relling balkon depan m² 500,000.00 0.53 262,500.00 0.53 262,500.00

XIV PEKERJAAN PENGECATAN


1 Pek. Cat tembok luar m² 20,909.90 13.00 271,828.70 13.00 271,828.70
2 Pek. Cat tembok dalam m² 20,909.90 295.76 6,184,316.21 295.76 6,184,316.21
3 Pek. Cat plafond = cat dinding m² 20,909.90 132.80 2,776,834.72 132.80 2,776,834.72
4 Pek. Politur list plank m¹ 33,224.50 58.12 1,931,007.94 58.12 1,931,007.94
5 Pek. Politur kayu m² 33,224.50 30.59 1,016,243.36 30.59 1,016,243.36

XV PEKERJAAN STILE BALI


1 Pek.Batu alur marmer gigi kecil m² 150,000.00 6.32 948,600.00 6.32 948,600.00
2 Pek.Batu palimanan m² 125,500.00 44.25 5,553,989.95 46.30 5,810,650.00 2.05
3 Pek.Murda bh 172,922.00 1.00 172,922.00 1.30 224,798.60 0.30
Real Cost 1,685,217,376.53 1,726,754,854.77
PPN 10% 168,521,737.65 172,675,485.48
Jumlah 1,853,739,114.19 1,899,430,340.25
Dibulatkan 1,853,739,114.00 1,899,430,340.00
Pekerjaan Tambah Pekerjaan Kurang
Jumlah Harga Volume Jumlah Harga

97,500.00

28,710.00
1.42 69,724.13

14,875.00
17,795.00

86,669.70
0.10 35,189.70
3.25 1,812,976.75
0.50 20,112.50
0.50 6,949.38
0.40 261,017.03
3,406,834.34
304,905.50
105,352.53
6,934.75

70,551.20
243,733.89
10.39 121,598.74

2.00 306,379.33
0.37 303,042.47
0.15 1,720.03

0.30 46,732.40
194,987.11
35,947.79

0.45 70,098.60
162,489.26
5.06 59,225.01

1.25 191,487.08
172,137.06
6,332.79

0.28 42,893.11
39,606.76

250,924.67
0.20 162,489.26
5.56 65,076.90

16.62 194,615.47
24,606,502.54
2,077,888.43
97500

5.95 966,012.25

113.30 4,301,774.40

2,949,592.65
9,109.13
56,250.00
21,960.00

256,660.05
51,876.60
35,373,626.74 9,039,114.54
3,537,362.67 903,911.45
38,910,989.41 9,943,025.99
38,910,989.00 9,943,025.00
MONTHLY CERTIFICATE

PROPINSI : Bali
Kota : SINGARAJA
PROYEK : PEMBANGUNAN RUMAH TINGGAL LANTAI DUA
KONTRAKTOR
: PANDE KURNIAWAN

SUMMARY
NOMOR
KONTRAK AMANDEMEN
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) % (Rp.)
YARAN
I PEKERJAAN PERSIAPAN 50,823,900.00 3.01 50,921,400.00
II PEKERJAAN TANAH 12,467,940.96 0.74 10,152,618.50
III PEKERJAAN PONDASI 594,868,290.23 35.24 594,868,290.23
IV PEKERJAAN BETON 610,931,463.21 36.20 610,416,446.56
V PEKERJAAN PINTU DAN JENDELA 216,753,265.95 12.84 216,753,265.95
VI PEKERJAAN LANTAI DAN DINDING KE 63,160,851.70 3.74 104,970,581.17
VII PEKERJAAN PLAFOND 51,010,945.75 3.02 45,743,159.10
VIII PEKERJAAN ATAP 21,602,239.94 1.28 24,560,941.72
IX PEKERJAAN GANTUNGAN & KUNCI 8,493,900.00 0.50 8,493,900.00
X PEKERJAAN KACA 1,300,034.45 0.08 1,300,034.45
XI PEKERJAAN SANITASI 24,594,987.75 1.46 24,594,987.75
XII PEKERJAAN LISTRIK 12,708,348.00 0.75 12,786,558.00
XIII PEKERJAAN RELING 262,500.00 0.02 262,500.00
XIV PEKERJAAN PENGECATAN 12,180,230.93 0.72 12,180,230.93
XV PEKERJAAN STILE BALI 6,675,511.95 0.40 6,984,048.60
1,687,834,410.82 100.00 1,724,988,962.95
PPN 10 % 168,783,441.08 172,498,896.29
TOTAL 1,856,617,851.903 1,897,487,859.24
DIBULATKAN 1,856,617,000.000 1,897,487,000.00

1. TOTAL KEMAJUAN FISIK 1,856,690,636.819


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 1,856,690,636.819


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 1,856,690,636.819
5. NILAI MONTHLY CERTIFICATE BULAN INI 0.000

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 0.000
6.2 PENGEMBALIAN JAMINAN PEMELIHARAAN (5%) 92,834,531.841
6.3 JUMLAH PENGURANGAN 0.000

7. JUMLAH PEMBAYARAN MC BULAN INI 92,834,531.841


PEMBAYARAN BAP INI (Termasuk PPN) 84,395,028.946
8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 8,439,502.895
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 75,955,526.052
DIBULATKAN 75,955,000.000
TERBILANG : Tujuh Puluh Lima Juta Sembilan Ratus Lima Puluh Lima Ribu

DISETUJUI : DIAJUKAN :
PEMIMPIN PROYEK : KONTRAKTOR

(Luh Rai) (Pande Kurniawan)


DIREKTUR
TE

M. C. NO : 06

TANGGAL : 30 JUNI 2015


KONSULTAN : I Komang Suparsa

AMANDEMEN KEMAJUAN

% (Rp.) %

2.95 50,823,900.000 3.011


0.59 13,177,642.357 0.781
34.49 591,856,597.349 35.066
35.39 597,339,585.985 35.391
12.57 216,246,915.630 12.812
6.09 65,861,386.759 3.902
2.65 51,010,945.750 3.022
1.42 21,602,239.938 1.280
0.49 8,493,900.000 0.503
0.08 15,984,193.822 0.947
1.43 24,594,987.750 1.457
0.74 12,708,348.000 0.753
0.02 262,500.000 0.016
0.71 11,261,923.636 0.667
0.40 6,675,511.950 0.396
100.00 1,687,900,578.927 100.00
168,790,057.893
1,856,690,636.819
1,856,690,000.000

1,856,690,636.819
0.000 KEMAJUAN (%)
- S/D BULAN LALU 100.00
1,856,690,636.819 - BULAN INI 0.00
1,856,690,636.819 - S/D AKHIR BULAN INI 100.00
0.000

0.000
92,834,531.841 PEMBAYARAN (Rp)
0.000
- S/D BULAN LALU 1,252,344,234.644
92,834,531.841 - BULAN INI 75,955,526.052
84,395,028.946 - S/D AKHIR BULAN INI 1,328,299,760.696
8,439,502.895
75,955,526.052
5,000.000
Ratus Lima Puluh Lima Ribu Rupiah

DIAJUKAN :
KONTRAKTOR

(Pande Kurniawan)
DIREKTUR
LAPORAN CUACA
:Rumah Tinggal Lantai Dua
PROYEK
LOKASI :Singaraja Terang
NO. KONTRAK :1315124 Keterangan : Hujan
BULAN KE- : 03 Mendung
TANGGAL : 1 - 31 Maret 2015

TANGGAL
No . Jam
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
1 08.00 - 09.00
2 09.00 - 10.00
3 10.00 - 11.00
4 11.00 - 12.00
5 12.00 - 13.00
6 13.00 - 14.00
7 14.00 - 15.00
8 15.00 - 16.00
9 16.00 - 17.00

DIPERIKSA OLEH DIBUAT OLEH


Pengawas Lapangan Konsultan Supervisi CV./PT.

(Widya Adnyana ) (Suparsa) (Pande Kurniawan)


30 31