NO ITEM PEKERJAAN SATUAN VOLUME

A B C D
PEKERJAAN ARSITEKTUR & PLUMBING UNIT
IV
PABRIK B3
C Pekerjaan Pelapis Lantai & Dinding
3.1 Lantai 1
Keramik lantai 300 X 300 Graniti Smoke G 337403, ex.
b
Roman ( K1 )
Keramik lantai 300 X 300 Graniti Smoke G 337403, ex.
c
Roman ( K1 )
Keramik lantai 200 X 200 Universal Blue G 227703 anti
d
selip, ex. Roman ( K2 )
Keramik dinding 200 X 330 warna putih, ex. Platinum
e
( K3 )
Keramik dinding 200 X 330 warna putih, ex. Platinum
f
( K3 )
JUMLAH HARGA PEKERJAAN PELAPIS LANTAI DAN DINDING ( LANTAI 1 )
3.2 Lantai 2
Keramik lantai 300 X 300 Graniti Smoke G 337403, ex.
b
Roman ( K1 )
Keramik lantai 300 X 300 Graniti Smoke G 337403, ex.
c
Roman ( K1 )
Keramik lantai 200 X 200 Universal Blue G 227703 anti
d
selip, ex. Roman ( K2 )
Keramik dinding 200 X 330 warna putih, ex. Platinum
e
( K3 )
Keramik dinding 200 X 330 warna putih, ex. Platinum
f
( K3 )
JUMLAH HARGA PEKERJAAN PELAPIS LANTAI DAN DINDING ( LANTAI 2 )
JUMLAH TOTAL HARGA PEKERJAAN PELAPIS LANTAI & DINDING ( LANTAI 1 DAN 2 )
HARGA SATUAN Rp. JUMLAH HARGA Rp.

E F

LANTAI DAN DINDING ( LANTAI 1 ) Rp -

LANTAI DAN DINDING ( LANTAI 2 ) Rp -


TAI & DINDING ( LANTAI 1 DAN 2 ) Rp -
NO ITEM PEKERJAAN SATUAN VOLUME

C Pekerjaan Konstruksi Baja


6 Pekerjaan Tangga baja TA2 (4 unit)
a UNP 200x70x7x10
b L 50x50x5
c Plat t=10mm
d Plat bordes t=4mm
e Angkur Ø 16mm fischer / hilti
f Chemset Ø 16mm fischer / hilti
g Baut Ø 16mm HTB A.325
h Zincromate + Cat finish baja
JUMLAH PEKERJAAN TANGGA BAJA

7 Pekerjaan Tangga baja TA3 (1 unit)


a UNP 200x70x7x10
b L 50x50x5
c Plat t=10mm
d Plat bordes t=4mm
e Angkur Ø 16mm fischer / hilti
f Zincromate + Cat finish baja
JUMLAH PEKERJAAN TANGGA BAJA TA

8 Pekerjaan Struktur Rangka Lift


a Angkur Ø 16mm ex. Fischer
b Plat t=10mm
c Plat t=8mm
d Grouting ex. Sika
e IWF 200x100x5.5x8
f UNP 150x75x6.5x10
g L 50x50x5
h L 60x60x6
i Baut Ø 16 mm
j Baut Ø 13 mm
k Zincromate + Cat finish baja
JUMLAH PEKERJAAN STRUKTUR RA

9 Pekerjaan Struktur Rangka Clading


a Kolom IWF 150x75x5x7
b Gording C 150x50x20x2,3
c Baut gording
d Zincromate + Cat finish baja
JUMLAH PEKERJAAN STRUKTUR RANGKA

F Pekerjaan Tampak, Atap & Finishing


10 Clading uPVC Roofing ID 860 Opaque + roof seal
Clading uPVC Roofing ID 860 Opaque + roof seal + rangka
11
siku ( area kanopi as A / 6 - 14 )
14.00 Besi siku / corner guard L50.50.5 loading dock dicat besi
15.00 Besi siku 50.50.5 trap tangga area as 1 & 14 / D - E ( TA1 )

16.00 Besi siku 50.50.5 trap tangga area as 1 & 14 / F - G ( TA1 )

17.00 Railing besi Ø 1,25" & Ø 2", area loading dock 1 & 2 ( RA1 )

Pintu railing besi Ø 1,25" & Ø 2", area loading dock 1 & 2
18.00
( RA2 )
Railing besi Ø 1,25" & Ø 2", area balkon 1 as A / 6 - 7 ( RB1
19.00
& RB2 )
Railing besi Ø 1,25" & Ø 2", area balkon 2 as A / 11 - 12
20.00
( RB1 & RB2 )
Pintu railing besi Ø 1,25" & Ø 2", area balkon 1 as A / 6 - 7
21.00
( RB3 )
Pintu railing besi Ø 1,25" & Ø 2", area balkon 2 as A / 11 - 12
22.00
( RB3 )
Railling besi Ø 1" & Ø 2", area tangga as 1 & 14 / D - E
23.00
( TA1 )
Railling besi Ø 1" & Ø 2", area tangga as 1 & 14 / F - G
24.00
( TA1 )
Railling besi Ø 1" & Ø 2", area tangga as 1 - 2 / C - D
25.00
( TA2.1 )
Railling besi Ø 1" & Ø 2", area tangga as 1 - 2 / G - H
26.00
( TA2.2 )
Railling besi Ø 1" & Ø 2", area tangga as 13 - 14 / C - D
27.00
( TA2.3 )
Railling besi Ø 1" & Ø 2", area tangga as 13 - 14 / G - H
28.00
( TA2.4 )

29.00 Railling besi Ø 1" & Ø 2", area tangga as A / 6 - 8 ( TA3 )

JUMLAH TOTAL HARGA PEKERJAAN TANPAK ATAS DAN


HARGA SATUAN (Rp.)
JUMLAH HARGA Rp.
MATERIAL JASA

UMLAH PEKERJAAN TANGGA BAJA TA2 (4 unit) Rp -

MLAH PEKERJAAN TANGGA BAJA TA3 ( 1 UNIT) Rp -


UMLAH PEKERJAAN STRUKTUR RANGKA LIFT Rp -

H PEKERJAAN STRUKTUR RANGKA CLAUDING Rp -


RGA PEKERJAAN TANPAK ATAS DAN FINISHING Rp -