Master Talud
Master Talud
30
LAMPUNG SELATAN
KECAMATAN
KETAPANG
DESA
PAS.BATU KALI
PEMATANG PASIR
60 JENIS PRASARANA
GALIAN TANAH
LOKASI
JUDUL GAMBAR
TALUD ( TPT )
30
Digambar Oleh
10
60
GAMBAR TAMPAK
TALUD Diperiksa dan Disetujui oleh :
Lembar…..Dari…..Lembar
LOKASI
JUDUL GAMBAR
TALUD ( TPT )
Digambar Oleh
TOTAL KEBUTUHAN :
PEMBULATAN
BATU BELAH = 138.6 M3 139.00 M3
PASIR = 61.5 M3 62.00 M3
SEMEN = 384.0 SAK 384.00 SAK
TUKANG = 78.3 HOK 78.00 HOK
PEKERJA = 185.3 HOK 185.00 HOK
RENCANA ANGGARAN BIAYA
#REF!
#REF!
Rincian Pendanaan :
HARGA
NO. URAIAN VOLUME SATUAN (Rp) JUMLAH (Rp) PAJAK (Rp)
PPN 10 %
1 BELANJA BARANG DAN JASA 18,690,000 -
Oprasional Penunjang Kegiatan
Pelaksanaan Kegiatan
Upah Pekerja 185 HOK 65,000 12,025,000 -
Upah Tukang 78.00 HOK 80,000 6,240,000 -
Kotak aduk 2.00 Bh 150,000 300,000
Ember 20.00 Bh 5,000 100,000
Benang 5.00 roll 5,000 25,000
(_______________________________) - (_______________________
TOTAL (Rp)
18,690,000
12,025,000
6,240,000 0.0431
300,000
100,000
25,000
83,751,894
25,344,000
13,605,900
44,801,994
102,441,894
………………..,Februari 2016
Pelaksana Kegiatan,
_______________________)
DAFTAR HARGA SATUAN UPAH/BAHAN/ALAT
PROPINSI : LAMPUNG KECAMATAN : KETAPANG
KABUPATEN : LAMPUNG SELATAN DESA : ………………
STANDART
NO U RAIAN SATUAN KABUPATEN KETERANGAN
LAMSEL
I UPAH
1. Tukang/kepala kelompok HOK 80,000.00
2. Pekerja HOK 65,000.00
II BAHAN
1 Batu Belah M3 293,015
2 Batu Pecah 5/7 M3 358,600
3 Batu Pecah 3/5 M 3
353,200
4 Batu Pecah 2/3 M 3
387,600
5 Batu Pecah 1/2 M 3
396,500
6 Screening M 3
340,800
7 Abu Batu M 3
379,300
8 Pasir M 3
199,500
9 Semen Zak 60,000
10 Aspal Drum 1,860,000
11 Kayu Bakar M3 179,000
12 Buis Beton dia 80 Cm BH 493,500
III ALAT
1 Cangkul Buah 55,000.00
2 Palu Kecil Buah 30,000.00
3 Tali Tambang Gulung 7,500.00
4 Sendok Semen Buah 25,000.00
5 Troli Unit 350,000.00
6 Sekop Buah 50,000.00
7 Penggaruk Buah 30,000.00
8 Perata Buah 30,000.00
9 Ember Buah 5,000.00
10 Selang Waterpas m' 5,000.00
11 Kuas Buah 15,000.00
12 Kotak Aduk Buah 150,000.00
13 Benang Roll 5,000.00
14 Pengki Buah 30,000.00
15 Kuas Buah 10,000.00
16 Papan Bekisting m3 2,100,000.00
17 Paku Kg 15,500.00
18 Pengki Unit 30,000.00
19 Meteran 50 M rol 75,000.00
20 Meteran 5 m bh 15,000.00
21 Palu Godam bh 60,000.00
22 Mobilisasi Walles ls 2,000,000.00
23 Sewa Wales hr 1,500,000.00
24 Papan Informasi Buah 150,000.00
25 Batu Prasasti Buah 600,000.00
26 Papan Proyek 60/80 Buah 300,000.00