Hitungan Box
Hitungan Box
BA
LOKASI
URAIAN PANJANG U
STA
1 BC 2 X 2 SINGLE 20 M 04+100 7
2 BC 3 X 4 TRIPLE 20 M 04+700 24
3 BC 2 X 3 SINGLE 20 M 05+340 10
5 BC 2 X 2 SINGLE 20 M 06+190 7
Diketahui Oleh : Diketahui Oleh : Diketahui Oleh : Periksa Oleh : Periksa Oleh :
Pejabat Pelaksana Teknis Kegiatan ( PPTK ) Pengawas Teknis Pengawas Teknis Konsultan Pengawas Konsultan Pengaw
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM CV. TIKA KREATIF DESAIN CV. TIKA KREATIF DES
KABUPATEN LAMANDAU KABUPATEN LAMANDAU KABUPATEN LAMANDAU KONSULTAN KONSULTAN
DENI APRILA, ST DWI SUGIYANTO, A.Md RIDUWAN BILL MILNER, ST PRIS OKTONADI, S
NIP. 19810407 201101 2 001 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspector
SI PERHITUNGAN VOLUME
BAJA TULANGAN
U 24 (POLOS)
KG
7,326.43
24,565.70
10,863.92
8,409.08
7,326.43
58,491.55
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 6.9 10.5 0.10 x 6.90 = 0.69 m2
T
L Volume Beton =
V=AxP
0.69 x 10.50 = 7.25 m3
Panjang box = 10.50 m
SUB TOTAL I
:Mengetahui :Diketahui :Diketahui :Diperiksa
PPTK Peningkatan Jalan Pengawas Teknis Pengawas Teknis Konsultan Supervisi Kontra
Dinas Pekerjaan Umum Dinas Pekerjaan Umum Dinas Pekerjaan Umum CV. KOTAWARINGIN MITRATAMA CV. CIT
Dan Penataan Ruang Dan Penataan Ruang Dan Penataan Ruang CONSULTANT
Kabupaten Lamandau Kabupaten Lamandau Kabupaten Lamandau
DENI APRILA, ST DWI SUGIYANTO, A.Md EDI WIDODO BOBY ADRIANSYAH, ST JAC
NIP. 19810407 201101 2 001 NIP. 19790822 201001 1 013 NIP. 19811206 200701 1 004 Inspector Si
P DATA QUANTITY
Volume
(M3)
7.25
7.25
:Dibuat
Kontraktor Pelaksana
CV. CITRA ABADI JAYA
JACOBUS SAPU
Site Manager
BACK UP DATA QUANTITY
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN GELIGIR-SIMPANG SUNGKUP (DAU)
LOKASI : KECAMATAN BULIK TIMUR
KONTRAKTOR : PT. SANGGA BUANA MULTI KARYA
ITEM PEKERJAAN : BETON MUTU RENDAH FC'=10 Mpa
SATUAN : M3
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.47 15.3 0.10 x 1.47 = 0.15
T
L Volume Beton =
V=AxP
0.15 x 15.30 = 2.25
Panjang Lantai Kerja 15.30 m
SUB TOTAL I
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO,P., ST R
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 2.25
2.25
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.35 9.2 0.10 x 1.35 = 0.14
T
L Volume Beton =
V=AxP
0.14 x 9.16 = 1.24
Panjang Lantai Kerja 9.2 m
SUB TOTAL I
0.3 1
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I, ST
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 1.24
1.24
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN GELIGIR-SIMPANG SUNGKUP (DAU)
LOKASI : KECAMATAN BULIK TIMUR
KONTRAKTOR : PT. SANGGA BUANA MULTI KARYA
ITEM PEKERJAAN : BETON MUTU RENDAH FC'=10 Mpa
SATUAN : M3
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.47 15.3 0.10 x 1.47 = 0.15
T
L Volume Beton =
V=AxP
0.15 x 15.33 = 2.25
Panjang Lantai Kerja 15.33 m
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO,P., ST
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 2.25
2.25
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.45 15.2 0.10 x 1.45 = 0.15
T
L Volume Beton =
V=AxP
0.15 x 15.20 = 2.20
Panjang Lantai Kerja 15.20 m
SUB TOTAL IV
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO,P., ST
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 2.20
2.20
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.4 9.2 0.10 x 1.40 = 0.14
T
L Volume Beton =
V=AxP
0.14 x 9.20 = 1.29
Panjang Lantai Kerja 9.2 m
SUB TOTAL IV
0.3 1
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I, ST
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 1.29
1.29
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN KUJAN - BATU KOTAM
LOKASI : KECAMATAN BULIK
KONTRAKTOR : CV. KARYA BERSAUDARA
ITEM PEKERJAAN : BETON MUTU RENDAH FC'=10 Mpa
SATUAN : M3
1 LANTAI KERJA
Luas Penampang =
P A=TxL
0.10 2.5 9.2 0.10 x 2.50 = 0.25
T
L Volume Beton =
V=AxP
0.25 x 9.20 = 2.30
Panjang Lantai Kerja 9.2 m
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I, ST
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 2.30
2.30
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN BERUTA-BAYAT-FUYUSAN (DAU)
LOKASI : KECAMATAN LAMANDAU
KONTRAKTOR : PT. SERASI MANDIRI PERKASA
ITEM PEKERJAAN : BETON MUTU RENDAH FC'=10 Mpa
SATUAN : M3
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 1.4 9.2 0.10 x 1.40 = 0.14
T
L Volume Beton =
V=AxP
0.14 x 9.20 = 1.29
Panjang Lantai Kerja 9.2 m
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I, ST
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspector
P DATA QUANTITY
Volume
Perhitungan
(M3)
m2
m3 1.29
1.29
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.21 1.47 16.1 V= T x L x P
T V = 0.21 x 1.47 x 16.10 = 4.97 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 4.97 = 9.94 m3
3 Siku Dalam
H L P Volume =
H 0.18 0.18 16.1 V= H x L x P
V = 0.18 x 0.18 x 16.10 = 0.26 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.26 = 1.04 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
1.96 1.41 0.26 V= H x L x t
V = 1.96 x 1.41 x 0.26 = 0.72 m3
L SAYAP 2
1.96 1.47 0.24 V= H x L x t
V = 1.96 x 1.47 x 0.24 = 0.69 m3
SAYAP 3
1.96 1.44 0.24 V= H x L x t
V = 1.96 x 1.44 x 0.24 = 0.68 m3
SAYAP 4
1.96 1.41 0.24 V= H x L x t
V = 1.96 x 1.41 x 0.24 = 0.66 m3
jumlah 4 sisi
Sub Total I
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspector
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN GELIGIR-SIMPANG SUNGKUP (DAU)
LOKASI : KECAMATAN BULIK TIMUR
KONTRAKTOR : PT. SANGGA BUANA MULTI KARYA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.22 0.3 0.28 1.43 V1 = (0,20 + 0,30) /2 x 0.28
H1 V1 = 0.104104
T2 H2 P
0.30 0.3 1.43 V2 = T2 x H2 x P
V2 = 0.3 x 0.30 x 1.43
V2 = 0.1287
H2 V= V1 + V2 = 0.10 + 0.13 =
6 Koker
T T H P Volume =
0.40 0.75 1.47 V= T x H x P
H V= 0.40 x 0.75 x 1.47 =
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMB
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
CK UP DATA QUANTITY
Volume
Perhitungan
(M3)
11.11
9.94
1.04
2.75
b Total I 24.84
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
x P
x 1.43
0.23
x P
x 1.43
0.25
0.48
0.44 m3
0.88 m3 0.88
b. Total II 1.36
0 Mpa BOX CULVERT 1X1,5X16,1 STA 0+150 26.20
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.26 1.39 9.96 V= T x L x P
T V = 0.26 x 1.39 x 9.96 = 3.60 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 3.60 = 7.20 m3
3 Siku Dalam
H L P Volume =
H 0.16 0.16 9.96 V= H x L x P
V = 0.16 x 0.16 x 9.96 = 0.13 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.13 = 0.51 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
1.32 2.36 0.22 V= H x L x t
V = 1.32 x 2.36 x 0.22 = 0.69 m3
L SAYAP 2
1.32 2.4 0.2 V= H x L x t
V = 1.32 x 2.40 x 0.20 = 0.63 m3
SAYAP 3
1.32 2.38 0.2 V= H x L x t
V = 1.32 x 2.38 x 0.20 = 0.63 m3
SAYAP 4
1.32 2.4 0.2 V= H x L x t
V = 1.32 x 2.40 x 0.20 = 0.63 m3
jumlah 4 sisi
Sub Total I
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN BERUTA-BAYAT-FUYUSAN (DAU)
LOKASI : KECAMATAN LAMANDAU
KONTRAKTOR : PT. SERASI MANDIRI PERKASA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.26 0.41 0.27 1.35 V1 = (0,20 + 0,30) /2 x 0.27
H1 V1 = 0.1221075
T2 H2 P
0.41 0.4 1.35 V2 = T2 x H2 x P
V2 = 0.41 x 0.40 x 1.35
V2 = 0.2214
H2 V= V1 + V2 = 0.12 + 0.22 =
6 Koker
T T H P Volume =
0.40 0.70 1.39 V= T x H x P
H V= 0.40 x 0.70 x 1.39 =
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
ACK UP DATA QUANTITY
Volume
Perhitungan
(M3)
3.39
7.20
0.51
2.58
ub Total I 13.68
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
PERHITUNGAN STA
Volume
Perhitungan
(M3)
x P
x 1.35
0.34
x P
x 1.37
0.32
0.66
0.39 m3
0.78 m3 0.78
b. Total II 1.44
=20 Mpa BOX CULVERT 1X1X10 (STA. 6+215) 15.11
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.21 1.45 16.13 V= T x L x P
T V = 0.21 x 1.45 x 16.13 = 4.91 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 4.91 = 9.82 m3
3 Siku Dalam
H L P Volume =
H 0.18 0.18 16.13 V= H x L x P
V = 0.18 x 0.18 x 16.13 = 0.26 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.26 = 1.05 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
1.92 1.44 0.2 V= H x L x t
V = 1.92 x 1.44 x 0.20 = 0.55 m3
L SAYAP 2
1.92 1.45 0.22 V= H x L x t
V = 1.92 x 1.45 x 0.22 = 0.61 m3
SAYAP 3
1.92 1.43 0.23 V= H x L x t
V = 1.92 x 1.43 x 0.23 = 0.63 m3
SAYAP 4
1.92 1.41 0.2 V= H x L x t
V = 1.92 x 1.41 x 0.20 = 0.54 m3
jumlah 4 sisi
Sub Total I
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN GELIGIR-SIMPANG SUNGKUP (DAU)
LOKASI : KECAMATAN BULIK TIMUR
KONTRAKTOR : PT. SANGGA BUANA MULTI KARYA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.20 0.3 0.25 1.42 V1 = (0,20 + 0,30) /2 x 0.25
H1 V1 = 0.08875
T2 H2 P
0.30 0.35 1.42 V2 = T2 x H2 x P
V2 = 0.3 x 0.35 x 1.42
V2 = 0.1491
H2 V= V1 + V2 = 0.09 + 0.15 =
6 Koker
T T H P Volume =
0.40 0.75 1.45 V= T x H x P
H V= 0.40 x 0.75 x 1.45 =
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
CK UP DATA QUANTITY
Volume
Perhitungan
(M3)
10.16
9.82
1.05
2.34
b Total I 23.37
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
x P
x 1.42
0.24
x P
x 1.43
0.23
0.47
0.44 m3
0.87 m3 0.87
b. Total II 1.34
Mpa BOX CULVERT 1X1,5X16,13 (STA. 0+821) 24.71
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.21 1.45 16 V= T x L x P
T V = 0.21 x 1.45 x 16.00 = 4.87 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 4.87 = 9.74 m3
3 Siku Dalam
H L P Volume =
H 0.18 0.18 16 V= H x L x P
V = 0.18 x 0.18 x 16.00 = 0.26 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.26 = 1.04 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
1.92 1.42 0.21 V= H x L x t
V = 1.92 x 1.42 x 0.21 = 0.57 m3
L SAYAP 2
1.92 1.42 0.21 V= H x L x t
V = 1.92 x 1.42 x 0.21 = 0.57 m3
SAYAP 3
1.92 1.43 0.21 V= H x L x t
V = 1.92 x 1.43 x 0.21 = 0.58 m3
SAYAP 4
1.92 1.42 0.21 V= H x L x t
V = 1.92 x 1.42 x 0.21 = 0.57 m3
jumlah 4 sisi
Sub Total I
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN GELIGIR-SIMPANG SUNGKUP (DAU)
LOKASI : KECAMATAN BULIK TIMUR
KONTRAKTOR : PT. SANGGA BUANA MULTI KARYA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.20 0.3 0.23 1.46 V1 = (0,20 + 0,30) /2 x 0.23
H1 V1 = 0.08395
T2 H2 P
0.30 0.3 1.46 V2 = T2 x H2 x P
V2 = 0.3 x 0.30 x 1.46
V2 = 0.1314
H2 V= V1 + V2 = 0.08 + 0.13 =
6 Koker
T T H P Volume =
0.40 0.75 1.45 V= T x H x P
H V= 0.40 x 0.75 x 1.45 =
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
DAVID MAKMUR, ST DWI SUGIYANTO, A.Md CHRISTIAN FERRY NEHEMIA BUDI, ST SUBUR RIMBO
NIP. 19820921 200903 1 005 NIP. 19790822 201001 1 013 NIP. 19780702 200604 1 017 Supervision Engineer Inspecto
CK UP DATA QUANTITY
Volume
Perhitungan
(M3)
10.56
9.74
1.04
2.29
b Total I 23.64
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
x P
x 1.46
0.22
x P
x 1.44
0.21
0.43
0.44 m3
0.87 m3 0.87
b. Total II 1.30
20 Mpa BOX CULVERT 1X1,5X16(STA. 1+013) 24.93
:Diperiksa :Dibuat
Konsultan Supervisi ,Kontraktor Pelaksana
CV. SUAN ANEKA DESIGN PT. SANGGA BUANA
MULTI KARYA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.26 1.39 10 V= T x L x P
T V = 0.26 x 1.39 x 10.00 = 3.61 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 3.61 = 7.23 m3
3 Siku Dalam
H L P Volume =
H 0.2 0.2 10 V= H x L x P
V = 0.20 x 0.20 x 10.00 = 0.20 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.20 = 0.80 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
2.4 2.4 0.2 V= H x L x t
V = 2.40 x 2.40 x 0.20 = 1.15 m3
L SAYAP 2
2.4 2.38 0.2 V= H x L x t
V = 2.40 x 2.38 x 0.20 = 1.14 m3
SAYAP 3
2.4 2.38 0.2 V= H x L x t
V = 2.40 x 2.38 x 0.20 = 1.14 m3
SAYAP 4
2.4 2.41 0.2 V= H x L x t
V = 2.40 x 2.41 x 0.20 = 1.16 m3
jumlah 4 sisi
Sub Total I
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I,
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspec
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN BERUTA-BAYAT-FUYUSAN (DAU)
LOKASI : KECAMATAN LAMANDAU
KONTRAKTOR : PT. SERASI MANDIRI PERKASA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.24 0.38 0.31 1.40 V1 = (0,20 + 0,30) /2 x 0.31
H1 V1 = 0.13454
T2 H2 P
0.38 0.39 1.40 V2 = T2 x H2 x P
V2 = 0.38 x 0.39 x 1.40
V2 = 0.20748
H2 V= V1 + V2 = 0.13 + 0.21 =
6 Koker
T T H P Volume =
0.40 0.70 1.39 V= T x H x P
H V= 0.40 x 0.70 x 1.39 =
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I,
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspec
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I,
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspec
CK UP DATA QUANTITY
Volume
Perhitungan
(M3)
8.00
7.23
0.80
4.59
b Total I 20.62
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
PERHITUNGAN STA
Volume
Perhitungan
(M3)
x P
x 1.40
0.34
x P
x 1.40
0.35
0.69
0.39 m3
0.78 m3 0.78
. Total II 1.47
20 Mpa BOX CULVERT 1X2X10 (STA. 6+770) 22.09
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
3 Siku Dalam
H L P Volume =
H 0.15 0.10 10 V= H x L x P
V = 0.15 x 0.10 x 10.00 = 0.08 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.08 = 0.30 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
2.5 2.5 0.26 V= H x L x t
V = 2.50 x 2.50 x 0.26 = 1.63 m3
L SAYAP 2
2.5 2.49 0.24 V= H x L x t
V = 2.50 x 2.49 x 0.24 = 1.49 m3
SAYAP 3
2.5 2.53 0.24 V= H x L x t
V = 2.50 x 2.53 x 0.24 = 1.52 m3
SAYAP 4
2.5 2.46 0.22 V= H x L x t
V = 2.50 x 2.46 x 0.22 = 1.35 m3
jumlah 4 sisi
Sub Total I
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'I,
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspec
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN BERUTA-BAYAT-FUYUSAN (DAU)
LOKASI : KECAMATAN LAMANDAU
KONTRAKTOR : PT. SERASI MANDIRI PERKASA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.31 0.35 0.61 2.53 V1 = (0,20 + 0,30) /2 x 0.61
H1 V1 = 0.509289
T2 H2 P
0.35 0.39 2.53 V2 = T2 x H2 x P
V2 = 0.35 x 0.39 x 2.53
V2 = 0.345345
H2 V= V1 + V2 = 0.51 + 0.35 =
6 Koker
Koker Kiri
T T H P Volume =
0.40 1.00 2.50 V1 = 0.40 x 1.00 x 2.50 =
V2 = 0.40 x 1.00 x 2.50 =
H
Koker Kanan
P T H P V= V1 + V2
0.40 1.00 2.50
jumlah : 2
Sub. Total II
VOLUME BETON MUTU SEDANG FC'=20 Mpa BOX CULVERT 2X2X10 (STA. 7+275)
Volume
Perhitungan
(M3)
12.50
12.50
0.30
5.99
b Total I 31.29
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
PERHITUNGAN STA
Volume
Perhitungan
(M3)
x P
x 2.53
0.85
x P
x 2.53
0.84
1.69
1.00 m3
1.00 m3
2.00
. Total II 3.69
20 Mpa BOX CULVERT 2X2X10 (STA. 7+275) 34.98
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
BACK UP DATA QUANTITY
### ###
### ###
### : PEMBANGUNAN BOX CULVERT DI BINA BHAKTI
### ###
### ###
ITEM PEKERJAAN: BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P V= T x L x P
T V = 0.00 x 0.00 x 0.00 = - m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x - = - m3
3 Siku Dalam
H L P Volume =
H V= H x L x P
V= x x = m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 8 sisi Vtot= 8x = m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
V= H x L x t
V= x x = m3
L SAYAP 2
V= H x L x t
V= x x = m3
SAYAP 3
V= H x L x t
V= x x = m3
SAYAP 4
V= H x L x t
V= x x = m3
jumlah 4 sisi
Sub Total
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN NASIONAL-BINA BAKTI
LOKASI : KECAMATAN SEMATU JAYA KABUPATEN LAMANDAU
KONTRAKTOR : CV. CITRA ABADI JAYA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1 x
V1 = + /2 x x
H1 V1 =
T2 H2 P
V2 = T2 x H2 x P
V2 = x x
V2 =
H2 V= V1 + V2 = + =
6 Koker
T T H P Volume =
V= T x H x P
H V= x x =
Volume
Perhitungan
(M3)
Total -
RHITUNGAN STA
Volume
Perhitungan
(M3)
m3
m3
Total
E TOTAL -
BACK UP DATA QUANTITY
### ###
### ###
### : PEMBANGUNAN BOX CULVERT DI BINA BHAKTI
### ###
### ###
ITEM PEKERJAAN: BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P V= T x L x P
T V = 0.00 x 0.00 x 0.00 = - m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x - = - m3
3 Siku Dalam
H L P Volume =
H V= H x L x P
V= x x = m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 8 sisi Vtot= 8x = m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
V= H x L x t
V= x x = m3
L SAYAP 2
V= H x L x t
V= x x = m3
SAYAP 3
V= H x L x t
V= x x = m3
SAYAP 4
V= H x L x t
V= x x = m3
jumlah 4 sisi
Sub Total
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN NASIONAL-BINA BAKTI
LOKASI : KECAMATAN SEMATU JAYA KABUPATEN LAMANDAU
KONTRAKTOR : CV. CITRA ABADI JAYA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1 x
V1 = + /2 x x
H1 V1 =
T2 H2 P
V2 = T2 x H2 x P
V2 = x x
V2 =
H2 V= V1 + V2 = + =
6 Koker
T T H P Volume =
V= T x H x P
H V= x x =
Volume
Perhitungan
(M3)
Total -
RHITUNGAN STA
Volume
Perhitungan
(M3)
m3
m3
Total
E TOTAL -
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d e
TRIPLE BOX CULVERT (3X4X3 )20M STA 4+700
A ø 19 - 20 72 72 190 34
B ø 19 - 20 72 72 190 34
C ø 16 - 20 213
D ø 19 - 20 80 102 24 34
E ø 10 - 20 79
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d e
F ø 10 - 20 24 454
G
ø 10 - 20 2000
H ø 12 - 18 1014 24
J ø 12 - 20 354 24
K ø 16 - 20 117 189 34
Panjang Jumlah Total Berat Total
Dimensi ( Cm )
Pot. Pot. Panjang Satuan Berat
f ( cm ) ( Buah ) (m) ( Kg/m' ) ( Kg )
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 2.52 20.0 0.10 x 2.52 = 0.25 m2
T
L Volume Beton =
V=AxP
0.25 x 20.00 = 5.04 m3
Panjang box = 20 m
VOLUME TOTAL
TUNGAN VOLUME
Volume
(M3)
5.04
5.04
REKAPITULASI VOLUME
T L P Volume =
P 0.26 2.5 20 V= T x L x P
T V = 0.26 x 2.50 x 20.00 = 13.00 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 13.00 = 26.00 m3
3 Siku Dalam
H L P Volume =
H 0.26 0.26 20 V= H x L x P
V = 0.26 x 0.26 x 20.00 = 1.35 m3
P
L jumlah 4 sisi (2 atas 2 bawah)
jumlah : 4 sisi Vtot= 2x 1.35 = 2.70 m3
4 Dinding Sayap
t
H L t Volume =
H 3 3 0.25 V= H x L x t
V = 3.00 x 3.00 x 0.25 = 2.25 m3
L
jumlah : 4 sisi Vtot= 4x 2.25 = 9.00 m3
Sub Total
DIMENSI Vo
NO BENTUK Perhitungan
(m) (m) (m) (m) (
5 Kerb
Volume
t1 P t1 t2 H1 P V1 = (t1 + t2) /2 x H1 x P
0.20 0.3 0.3 2.50 V1 = (0,20 + 0,30) /2 x 0.30 x 2.50
H1 V1 = 0.1875
T2 H2 P
0.30 0.2 2.50 V2 = T2 x H2 x P
V2 = 0.3 x 0.20 x 2.50
H2 V2 = 0.15
T T H P Volume =
0.40 1.00 2.50 V= T x H x P
H V= 0.40 x 1.00 x 2.50 = 1.00 m3
Volume
(M3)
26.00
26.00
2.70
9.00
63.704
Volume
(M3)
0.68
2.00
2.68
66.38
REKAPITULASI VOLUM
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d
SINGLE BOX CULVERT (2X 2,5 )20M STA 5+800
1 Lantai dan Dinding Box
a
d
A c ø 19 - 40 48 61 133 28
b
d
B
ø 19 - 40 48 61 133 28
a
C
e b ø 12 - 20 246 20
D ø 12 - 20 296 20
e
b
E e a e ø 10 - 20 2000
tulangan bagi
a
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
a ( Cm ) a b c d
F ø 10 - 20 68
2 A Sayap
a
A1 ø 12 - 18
e b
a
B
B1 b ø 12 - 18
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d
3 A Kerb
a
ø 10 - 20 15 60 33 34
b
d
e
B
e e
ø 10 - 10 850
a
4 A Koker
a
ø 10 - 20 36 92
e
b
B
e e
a
8 ø 10 246
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d
Diketahui Oleh : Diketahui Oleh : Diketahui Oleh : Periksa Ole
Pejabat Pelaksana Teknis Kegiatan ( PPTK ) Pengawas Teknis Pengawas Teknis Konsultan Pen
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM CV. TIKA KREATIF
KABUPATEN LAMANDAU KABUPATEN LAMANDAU KABUPATEN LAMANDAU KONSULTA
68 0.888 936.00
72 1.578 908.00
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 2.56 20.0 0.10 x 2.56 = 0.26 m2
T
L Volume Beton =
V=AxP
0.26 x 20.00 = 5.12 m3
Panjang box = 20 m
VOLUME TOTAL
TUNGAN VOLUME
Volume
(M3)
5.12
5.12
REKAPITULASI VOLUME
DIMENSI Vo
NO BENTUK Perhitungan
(m) (m) (m) (
T L P Volume =
P 0.3 2.6 20 V= T x L x P
T V = 0.30 x 2.60 x 20.00 = 15.60 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 15.60 = 31.20 m3
3 Siku Dalam
H L P Volume =
H 0.3 0.3 20 V= H x L x P
V = 0.30 x 0.30 x 20.00 = 1.80 m3
P
L jumlah 4 sisi (2 atas 2 bawah)
jumlah : 4 sisi Vtot= 2x 1.80 = 3.60 m3
4 Dinding Sayap
t
H L t Volume =
H 3 3.6 0.3 V= H x L x t
V = 3.00 x 3.60 x 0.30 = 3.24 m3
L jumlah 2 sisi
jumlah : 2 sisi
t Vtot= 4x 3.24 = 12.96 m3
P
P H t Volume =
3.56 3.28 0.3 V= P x P x t x 0.5
H V = 2.25 x 3.28 x 0.30 x 0.5 = 1.107
jumlah sisi
Vtot= 2x 1.11 = 2.21 m3
t
P P H t Volume =
3.56 3.28 0.3 V= P x P x t x 0.5
H V = 2.25 x 3.28 x 0.30 x 0.5 = 1.107
jumlah 2 sisi
Vtot= 2x 1.11 = 2.21 m3
Sub Total
NO. MATA PEMB. : 7.1.(7)a
ITEM PEKERJAAN : BETON MUTU SEDANG DENGAN FC'=20 Mpa
SATUAN : M3 Halaman : 2
PERHITUNGAN STA
DIMENSI Vo
NO BENTUK Perhitungan
(m) (m) (m) (m) (
5 Kerb
Volume
t1 P t1 t2 H1 P V1 = (t1 + t2) /2 x H1 x P
0.20 0.3 0.3 2.58 V1 = (0,20 + 0,30) /2 x 0.30 x 2.58
V1 = 0.1935
H1
T2 H2 P
0.30 0.2 2.58 V2 = T2 x H2 x P
V2 = 0.3 x 0.20 x 2.58
V2 = 0.1548
H2
V= V1 + V2 = 0.19 + 0.15 = 0.35
6 Koker
T T H P Volume =
0.40 1.00 2.60 V= T x H x P
H V= 0.40 x 1.00 x 2.60 = 1.04 m3
Volume
(M3)
36.00
31.20
3.60
12.96
83.76
ERHITUNGAN STA
Volume
(M3)
0.70
2.08
2.78
86.54
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d
SINGLE BOX CULVERT (2X 3 )20M STA 5+340
1 Lantai dan Dinding Box
a
d
A c ø 19 - 40 48 73 136 31
b
d
B
ø 19 - 40 48 73 136 31
a
C
e b ø 12 - 20 250 22
D ø 12 - 20 350 22
e
b
E e a e ø 10 - 20 2000
tulangan bagi
a
F ø 10 - 20 73
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d
2 A Sayap
a
A1 ø 12 - 18
e b
B a
B1 b
ø 12 - 18
Panjang Jumlah Total Berat Total
Dimensi ( Cm )
Pot. Pot. Panjang Satuan Berat
e f ( cm ) ( Buah ) (m) ( Kg/m' ) ( Kg )
1 LANTAI KERJA
P Luas Penampang =
A=TxL
0.10 2.5 20.0 0.10 x 2.50 = 0.25 m2
T
L Volume Beton =
V=AxP
0.25 x 20.00 = 5.00 m3
Panjang box = 20 m
VOLUME TOTAL
ITUNGAN VOLUME
Volume
(M3)
5.00
5.00
REKAPITULASI VOLUME
DIMENSI Vo
NO BENTUK Perhitungan
(m) (m) (m) (
T L P Volume =
P 0.25 2.5 20 V= T x L x P
T V = 0.25 x 2.50 x 20.00 = 12.50 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 12.50 = 25.00 m3
3 Siku Dalam
H L P Volume =
H 0.25 0.25 20 V= H x L x P
V = 0.25 x 0.25 x 20.00 = 1.25 m3
P
L jumlah 4 sisi (2 atas 2 bawah)
jumlah : 4 sisi Vtot= 2x 1.25 = 2.50 m3
4 Dinding Sayap
t
H L t Volume =
H 2.5 2.5 0.25 V= H x L x t
V = 2.50 x 2.50 x 0.25 = 1.56 m3
L jumlah 2 sisi
jumlah : 2 sisi
Vtot= 4x 1.56 = 6.25 m3
t
P P H t Volume =
2.5 2.25 0.25 V= P x P x t x 0.5
H V = 2.25 x 2.25 x 0.25 x 0.5 = 0.633
jumlah 2 sisi
Vtot= 2x 0.63 = 1.27 m3
t
P P H t Volume =
2.5 2.25 0.25 V= P x P x t x 0.5
H V = 2.25 x 2.25 x 0.25 x 0.5 = 0.633
jumlah 2 sisi
Vtot= 2x 0.63 = 1.27 m3
Sub Total
NO. MATA PEMB. : 7.1.(7)a
ITEM PEKERJAAN : BETON MUTU SEDANG DENGAN FC'=20 Mpa
SATUAN : M3 Halaman : 2
PERHITUNGAN STA
DIMENSI Vo
NO BENTUK Perhitungan
(m) (m) (m) (m) (
5 Kerb
Volume
t1 P t1 t2 H1 P V1 = (t1 + t2) /2 x H1 x P
0.20 0.3 0.3 2.46 V1 = (0,20 + 0,30) /2 x 0.30 x 2.46
V1 = 0.1845
H1
T2 H2 P
0.30 0.2 2.46 V2 = T2 x H2 x P
V2 = 0.3 x 0.20 x 2.46
V2 = 0.1476
H2
V= V1 + V2 = 0.18 + 0.15 = 0.33
6 Koker
T T H P Volume =
0.40 1.00 2.50 V= T x H x P
H V= 0.40 x 1.00 x 2.50 = 1.00 m3
Volume
(M3)
20.00
25.00
2.50
6.25
53.75
ERHITUNGAN STA
Volume
(M3)
0.66
2.00
2.66
56.41
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d e f
SINGLE BOX CULVERT (2X 2 )20M STA 6+190
1 Lantai dan Dinding Box
a
d
A c ø 19 - 40 48 48 132 27
b
d
B
ø 19 - 40 48 48 132 27
a
C
e b ø 12 - 20 244 19 5
D ø 12 - 20 244 19 5
e
b
E e a e ø 10 - 20 2000 20
tulangan bagi
F ø 10 - 20 65
ITEM PEKERJAAN : BAJA TULANGAN U24 POLOS
NO.ITEM PEMBAYARAN : 7.3 (1)
SATUAN PEMBAYARAN : KG
Diameter
Dimensi ( Cm )
N0 Type Sketsa Jarak
( Cm ) a b c d e f
2 A Sayap
a
A1 ø 12 - 18
e b
Panjang Jumlah Total Berat Total
Pot. Pot. Panjang Satuan Berat
( cm ) ( Buah ) (m) ( Kg/m' ) ( Kg )
56 0.888 668.00
BACK UP DATA QUANTITY
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m)
T L P Volume =
P 0.26 1.39 10 V= T x L x P
T V = 0.26 x 1.39 x 10.00 = 3.61 m3
L
jumlah : 2 sisi jumlah 2 sisi atas bawah
Vtot= 2x 3.61 = 7.23 m3
3 Siku Dalam
H L P Volume =
H 0.16 0.16 10 V= H x L x P
V = 0.16 x 0.16 x 10.00 = 0.13 m3
P
L jumlah 8 sisi (2 atas 2 bawah) Double
jumlah : 4 sisi Vtot= 4x 0.13 = 0.51 m3
4 Dinding Sayap
t
H L t Volume =
H SAYAP 1
1.4 2.3 0.21 V= H x L x t
V = 1.40 x 2.30 x 0.21 = 0.68 m3
L SAYAP 2
1.4 3 0.2 V= H x L x t
V = 1.40 x 3.00 x 0.20 = 0.84 m3
SAYAP 3
1.4 5.1 0.21 V= H x L x t
V = 1.40 x 5.10 x 0.21 = 1.50 m3
V= H x L x t
V = 0.00 x 0.00 x 0.00 = 0.00 m3
jumlah 4 sisi
Sub Total I
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
PROGRAM : PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN
KEGIATAN : PENINGKATAN JALAN
PEKERJAAN : PENINGKATAN JALAN BERUTA-BAYAT-FUYUSAN (DAU)
LOKASI : KECAMATAN LAMANDAU
KONTRAKTOR : PT. SERASI MANDIRI PERKASA
ITEM PEKERJAAN : BETON MUTU SEDANG FC'=20 Mpa
SATUAN : M3
PERHITUNGAN STA
DIMENSI
NO BENTUK Perhitungan
(m) (m) (m) (m)
5 Kerb
t1 P Kerb kiri Volume
t1 t2 H1 P V1 = (t1 + t2) /2 x H1
0.21 0.3 0.25 1.44 V1 = (0,20 + 0,30) /2 x 0.25
H1 V1 = 0.0918
T2 H2 P
0.30 0.32 1.44 V2 = T2 x H2 x P
V2 = 0.3 x 0.32 x 1.44
V2 = 0.13824
H2 V= V1 + V2 = 0.09 + 0.14 =
6 Koker
T T H P Volume =
0.40 0.75 1.39 V= T x H x P
H V= 0.40 x 0.75 x 1.39 =
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
.ADPATI GEMADA, ST., M.T DWI SUGIYANTO, A.Md RIDUWAN RIFAI RAHMAN, ST MARI'
NIP. 19820417 200903 1 006 NIP. 19790822 201001 1 013 NIP. 19730529 200502 1 001 Supervision Engineer Inspe
ACK UP DATA QUANTITY
Volume
Perhitungan
(M3)
4.00
7.23
0.51
3.02
ub Total I 14.76
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
PERHITUNGAN STA
Volume
Perhitungan
(M3)
x P
x 1.44
0.23
x P
x 1.46
0.34
0.57
0.42 m3
0.83 m3 0.83
b. Total II 1.40
=20 Mpa BOX CULVERT 1X1X10 (STA 10+947) 16.16
:Diperiksa :Dibuat
Konsultan Supervisi Kontraktor Pelaksana
CV. SUAN ANEKA PT. SERASI MANDIRI
DESIGN PERKASA
MARI'I, ST MUHADI, ST
Inspector Site Manager
MARI'I, ST MUHADI, ST
Inspector Site Manager