Anda di halaman 1dari 2

PT PEMBANGKITAN JAWA BALI SERVICES

SIAP - INTEGRATED MANAGEMEN SYSTEM


PLTU TIDORE 2 X 7 MW
UNIT BISNIS JASA O&M
PLTU TIDORE 2 X 7 MW LAPORAN GANGGUAN UNIT

LAPORAN GANGGUAN UNIT 2


(Unsynchrone Indikasi MFT Boiler Level Steam Drum Low-Low)
23 September 2017

No Description Nama Tanda Tangan

1 Disiapkan oleh Munirul Ichwan

2 Diperiksa oleh Zais Ariyono

Tidore, 23 September 2017


Mengetahui,
Pjs Manager Unit PLTU Tidore

(DOLIKESUMA MAHAPUTRA H)

PERENCANAAN & PENGENDALIAN OPERASI


PLTU TIDORE 2X7 MW
2017

I. PLTU TIDORE
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP - INTEGRATED MANAGEMEN SYSTEM
PLTU TIDORE 2 X 7 MW
UNIT BISNIS JASA O&M
PLTU TIDORE 2 X 7 MW LAPORAN GANGGUAN UNIT

1. Unit :2
2. Daya Terpasang : 7 MW
3. Merk / Type : Shandong
4. Tahun Operasi :-

II. KEJADIAN GANGGUAN


1. Hari, tanggal gangguan : Kamis, 23 September 2017
2. Pukul : 01:37 WIT
3. Jenis Gangguan : Gangguan Internal
4. Indikasi proteksi yang : Boiler MFT level steam drum low-low.
bekerja

III. KRONOLOGI GANGGUAN


Normal Operasi
Beban : 5,439 MW
01:36
Frek : 50,34 Hz
Travel Servo : 43,04 mm
 Servo motor close ke 0,818 mm
 Pressure Main Oile Pump : 8,9 bar
01:37:24
 Level steam drum : 11,97 mm
 Pressure Mainsteam naik dari 44 ke 49 bar
01:37:31  Pressure BFP turun ke 55 bar
01:37:38 MFT Boiler level drum low low pada level steam drum : -190 mm
1:37:38 Auto-Unsynchrone dari beban 5,785 MW.

IV. TINDAKAN MENGATASI GANGGUAN


 Dilakukan pengamanan pada boiler, turbin, generator (BTG)

 Dilakukan inspeksi pada level switch steam drum low-low.

V. ANALISA PENYEBAB GANGGUAN


- Indikasi ubnormal travel servo motor dan level switch steam drum low-low.

VI. AKIBAT YANG DITIMBULKAN


- Unit 2 Unsynchrone pada beban 5,785 MW

VII. LAMPIRAN

Anda mungkin juga menyukai