I PEKERJAAN PERSIAPAN
Sub Jumlah I
Sub Jumlah II
3 : Penambahan Panjang Saluran Drainase Sekunder Blok D1 ; LA: 0,7. LB 151.00 M'
6 : Rehabilitasi Drainase Primer Blok D6 ; LA: 3,3. LB: 2,9. T: 1.5 3,500.00 M'
7,000,000.00 7,000,000.00
3,500,000.00 3,500,000.00
558,486.79 84,331,504.66
418,162.67 102,449,854.64
310,777.04 43,819,562.04
310,777.04 545,102,920.71
1,268,891.97 4,441,121,895.00
3 1 M3 Urugan Pasir
3.1 Bahan
1.20 M3 Pasir Urug @ Rp 139,800.00
3.2 Tenaga
0.30 Oh Pekerja @ Rp 44,000.00
0.01 Oh Mandor @ Rp 70,500.00
Jumlah
4 1 M3 Urugan Tanah
4.1 Bahan
1.20 M3 Tanah Urug @ Rp 72,200.00
4.2 Tenaga
0.33 Oh Pekerja @ Rp 44,000.00
0.01 Oh Mandor @ Rp 70,500.00
Jumlah
5 1 M3 Pemadatan Tanah
5.1 Tenaga
0.50 Oh Pekerja @ Rp 44,000.00
0.05 Oh Mandor @ Rp 70,500.00
Jumlah
6 1 M3 Urugan Sirtu
6.1 Bahan
1.20 M3 Sirtu alam @ Rp 253,000.00
6.2 Tenaga
0.250 Oh Pekerja @ Rp 44,000.00
0.025 Oh Mandor @ Rp 70,500.00
Jumlah
11.1 Bahan
371.0 Kg Semen Portland @ Rp 1,500.00
698.0 M3 Pasir Beton @ Rp 124.00
1047.0 M3 Koral Beton @ Rp 120.78
11.2 Tenaga
1.650 Oh Pekerja @ Rp 44,000.00
0.275 Oh Tukang Batu @ Rp 65,500.00
0.028 Oh Kepala Tukang @ Rp 70,500.00
0.083 Oh Mandor @ Rp 70,500.00
Jumlah
12 1 M Membuat Beton Bertulang Camp. 1 : 2 : 3 (150 kg Besi + Bekisting)
3
12.1 Bahan
0.20 M3 Kayu Terentang @ Rp 4,053,800.00
1.50 Kg Paku Biasa 2' - 5' @ Rp 31,100.00
0.40 Lt Minyak Bekisting @ Rp 10,400.00
157.50 Kg Besi Beton Polos @ Rp 11,500.00
2.25 Kg Kawat Beton @ Rp 26,200.00
336.00 Kg Semen Portland @ Rp 1,500.00
0.54 M3 Pasir Beton @ Rp 173,600.00
0.81 M3 Koral Beton @ Rp 120.78
12.2 Tenaga
5.30 Oh Pekerja @ Rp 44,000.00
0.275 Oh Tukang Batu @ Rp 65,500.00
1.30 Oh Tukang Kayu @ Rp 65,500.00
1.050 Oh Tukang Besi @ Rp 65,500.00
0.262 Oh Kepala Tukang @ Rp 70,500.00
0.265 Oh Mandor @ Rp 70,500.00
Jumlah
13 1 M1 Pekerjaan Pemasangan Gorong-Gorong
13.1 Bahan
1.0 M' Gorong-gorong Ø 30 Cm @ Rp 205,100.00
13.2 Tenaga
0.750 Oh Pekerja @ Rp 44,000.00
0.040 Oh Mandor @ Rp 70,500.00
Jumlah
Rp 26,400.00
Rp 1,410.00
Rp 27,810.00
Rp 22,704.00
Rp 3,525.00
Rp 26,229.00
Rp 167,760.00
Rp 13,200.00
Rp 705.00
Rp 181,665.00
Rp 86,640.00
Rp 14,520.00
Rp 705.00
Rp 101,865.00
Rp 22,000.00
Rp 3,525.00
Rp 25,525.00
Rp 303,600.00
Rp 11,000.00
Rp 1,762.50
Rp 316,362.50
Rp 190,960.00
Rp 303,000.00
Rp 84,196.00
Rp 66,000.00
Rp 39,300.00
Rp 4,230.00
Rp 5,287.50
Rp 692,973.50
Rp 11,664.00
Rp 3,298.40
Rp 8,800.00
Rp 9,825.00
Rp 1,057.50
Rp 705.00
Rp 35,349.90
Rp 190,960.00
Rp 303,000.00
Rp 84,196.00
Rp 66,000.00
Rp 39,300.00
Rp 4,230.00
Rp 5,287.50
Rp 692,973.50
Rp 345,000.00
Rp 110,732.00
Rp 124,038.78
Rp 52,800.00
Rp 13,100.00
Rp 1,410.00
Rp 4,230.00
Rp 651,310.78
Rp 556,500.00
Rp 86,552.00
Rp 126,454.33
Rp 72,600.00
Rp 18,012.50
Rp 1,974.00
Rp 5,851.50
Rp 867,944.33
Rp 810,760.00
Rp 46,650.00
Rp 4,160.00
Rp 1,811,250.00
Rp 58,950.00
Rp 504,000.00
Rp 93,744.00
Rp 97.83
Rp 233,200.00
Rp 18,012.50
Rp 85,150.00
Rp 68,775.00
Rp 18,471.00
Rp 18,682.50
Rp 3,771,902.83
Rp 205,100.00
Rp 33,000.00
Rp 2,820.00
Rp 240,920.00
Rp 327,000.00
Rp 90,272.00
Rp 189,138.00
Rp 72,600.00
Rp 16,375.00
Rp 1,762.50
Rp 5,640.00
Rp 702,787.50
12 1 M2 PAS. PAVING BLOK K 225, T= 6 CM
Bahan
45.0000 Bh Paving Blok K225, T = 6 Cm Rp 2,900.00 130,500.00
0.2000 M3 Pasir Urug Rp 139,800.00 27,960.00
Tenaga
0.1350 Oh Tukang Batu Rp 65,500.00 8,842.50
0.0135 Oh Kepala tukang batu Rp 70,500.00 951.75
0.7200 Oh Pekerja Rp 44,000.00 31,680.00
0.0360 Oh Mandor Rp 70,500.00 2,538.00
Jumlah Rp. 202,472.25
1 Pekerja OH Rp 44,000
2 Tukang OH Rp 65,500
3 Kepala Tukang OH Rp 70,500
4 Mandor OH Rp 70,500
DAFTAR ANALISA SATUAN PERMETER
PPK. : Pengembangan Kawasan Permukiman Perkotaan Sulawesi Selatan
Kota : Pare-Pare
Lokasi : Kawasan Soreang
Pekerjaan : Penambahan Panjang Saluran Drainase Sekunder Blok D1 ; LA: 0,7. LB: 0,5