BILL OF QUANTITY

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 38/90
38
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT VOLUME BOBOT (%)
SATUAN JUMLAH
I PEKERJAAN PERSIAPAN
1. Pengukuran ls 1.00 Rp 625,000 Rp 625,000 0.600
2. Pemasangan Bowplank ttk 14.00 Rp 39,344 Rp 550,813 0.529
3. Bak Campur ls 1.00 Rp 375,000 Rp 375,000 0.360
SUB TOTAL Rp 1,550,813 1.489 ###
II PEKERJAAN TANAH & PASIR
1. Galian Tanah Pondasi m3 32.33 Rp 36,914 Rp 1,193,432 1.146
2. Urugan pasir bawah pondasi t = 5 cm m3 1.96 Rp 87,188 Rp 170,888 0.164
3. Urugan Pasir Bawah Lantai t=5 cm m3 2.11 Rp 87,188 Rp 183,966 0.177
4. Urugan Kembali Galian m3 10.74 Rp 23,125 Rp 248,363 0.238
SUB TOTAL Rp 1,796,647 1.725
III PEKERJAAN PONDASI
1. Pasangan Batu kosong t = 20 cm m3 5.71 Rp 259,613 Rp 1,482,387 1.423
2. Pas. Pondasi bt merah h.35 cm m2 1.24 Rp 93,976 Rp 116,502 0.112
3. Pas. Pondasi batu gunung 1:5 t = 60 cm m3 12.08 Rp 461,569 Rp 5,576,674 5.353
SUB TOTAL Rp 7,175,563 6.887
IV PEKERJAAN BETON
1. Beton Sloof 15/20 m3 1.94 Rp 3,636,920 Rp 7,037,441 6.755
2. kolom Praktis 10/15 m3 1.12 Rp 3,050,271 Rp 3,413,253 3.276
3. Ring balk 10/20 m3 1.63 Rp 3,050,271 Rp 4,965,841 4.766
4. beton rabat cartport t= 10cm m3 1.49 Rp 813,431 Rp 1,207,945 1.159
6. Plat meja dapur m3 0.10 Rp 2,927,106 Rp 281,002 0.270
7. Plat Teras m3 0.36 Rp 2,927,106 Rp 1,067,808 1.025
8. Plat jembatan carport + penutup drainase m3 0.22 Rp 2,927,106 Rp 643,963 0.618
9. Adi Bond ( Perekat Beton ) ltr 5.00 Rp 25,000 Rp 125,000 0.120
SUB TOTAL Rp 18,742,254 17.990
V PEKERJAAN PASANGAN DINDING
1. Pasangan Batu bata 1:5 m2 147.05 Rp 93,976 Rp 13,819,208 13.264
2. Pek. Pasangan batu bata Pagar m2 3.78 Rp 93,976 Rp 355,230 0.341
SUB TOTAL Rp 14,174,438 13.605
VI PEK.PLESTERAN & PROFIL PC
1. Plesteran 1:5 m2 201.52 Rp 30,573 Rp 6,161,105 5.914
2. Plesteran Transram 1:3 m3 30.10 Rp 48,279 Rp 1,453,183 1.395
3. Acian Plamur Aplus m2 201.52 Rp 13,063 Rp 2,632,355 2.527
4. List Tali Air 0.08 m 179.31 Rp 2,500 Rp 448,275 0.430
5. List Profil m3 0.24 Rp 2,927,106 Rp 706,721 0.678
SUB TOTAL Rp 11,401,638 10.944
VII PEK. KERAMIK LANTAI & DINDING
1. Pek. Lantai selapis batu bata m2 42.20 Rp 23,125 Rp 975,875 0.937
2. Keramik 20 x 25 wc m2 11.25 Rp 99,194 Rp 1,115,930 1.071
3. Keramik dapur 20 x 25 m2 3.05 Rp 99,194 Rp 302,442 0.290
4. Keramik Lantai 30 x 30 teras m2 4.80 Rp 100,413 Rp 481,980 0.463
5. Keramik Lantai 40 x 40 m2 33.75 Rp 99,194 Rp 3,347,789 3.213
6. Natt Keramik m2 52.85 Rp 1,250 Rp 66,061 0.063
SUB TOTAL Rp 6,290,077 6.038
VIII PEKERJAAN ATAP
1. Rangka Atap kanal C m' 78.60 Rp 43,750 Rp 3,438,750 3.301
2. Atap Genteng spandek 0.35 Gel Besar m2 56.60 Rp 60,125 Rp 3,403,075 3.266
3. Listplank 30 Woodplank m' 30.10 Rp 37,500 Rp 1,128,750 1.083
SUB TOTAL Rp 7,970,575 7.651
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT VOLUME BOBOT (%)
SATUAN JUMLAH
IX PEKERJAAN PLAFON
1. Rangka Plafon Hollow 2/4 m2 61.35 Rp 31,875 Rp 1,955,531 1.877
2. Plafon Gypsum t=9mm & Calcyboard t=4mm m2 61.35 Rp 47,188 Rp 2,894,953 2.779
3. List Profil Gypsum int 9 cm m 42.00 Rp 25,000 Rp 1,050,000 1.008
4. List Profilkayu ext 3 cm m 25.15 Rp 18,750 Rp 471,563 0.453
SUB TOTAL Rp 6,372,047 6.116
X PEK. , PINTU, JENDELA & PINTU VINYL
1. Pintu HDF Pabrikasi pcs 4.00 Rp 625,000 Rp 2,500,000 2.400
2. Kusen Pintu + Ventilasi bh 4.00 Rp 875,000 Rp 3,500,000 3.359
3. Pintu Vinyl KM/WC unit 1.00 Rp 284,375 Rp 284,375 0.273
4. Jendela Almunium PC. White + Engsel + Grendel ls 1.00 Rp 4,143,750 Rp 4,143,750 3.977 ###
SUB TOTAL Rp 10,428,125 10.009 ###
XI PEKERJAAN PENGECATAN
1. Duco Pintu Kayu w/ Avian 2x m2 23.81 Rp 84,375 Rp 2,008,547 1.928
2. Pengecatan Listplank w/ Mowilex 2x m2 9.03 Rp 36,563 Rp 330,159 0.317
3. Pengecatan tembok luar w/ MOWILEX Ext+Alkali m2 84.00 Rp 30,506 Rp 2,562,529 2.460
4. Pengecatan tembok Dalam w/ Mowilex Int 2x m2 117.52 Rp 11,611 Rp 1,364,466 1.310
5. Pengecatan Plafon w/ ARIES 2x m2 12.27 Rp 11,611 Rp 142,461 0.137
SUB TOTAL Rp 6,408,162 6.151
XII PEKERJAAN PENGGANTUNG & PENGUNCI
1. Kunci Tanam w/ SES (Pintu Utama) bh 1.00 Rp 385,000 Rp 385,000 0.370
2. kunci Tanam (Pintu Kamar) bh 3.00 Rp 275,000 Rp 825,000 0.792
3. Engsel Pintu psg 6.00 Rp 31,708 Rp 190,245 0.183
SUB TOTAL Rp 1,400,245 1.344
XIII PEKERJAAN INSTALASI LISTRIK
1. Instalasi Listrik Lengkap Kabel, & Acc ttk 20.00 Rp 165,000 Rp 3,300,000 3.168
2. Amatur/Fitting downlight bh 8.00 Rp 30,030 Rp 240,240 0.231
3. Lampu Teras Depan w/ Panasonic bh 1.00 Rp 220,000 Rp 220,000 0.211
4. Stop Kontak w/ Panasonic bh 5.00 Rp 15,015 Rp 75,075 0.072
5. Saklar Tunggal w/ Panasonic bh 3.00 Rp 15,015 Rp 45,045 0.043
6. Saklar Ganda w/ Panasonic bh 3.00 Rp 23,881 Rp 71,643 0.069
7. Saklar Telephone w/ Panasonic + Kabel bh 1.00 Rp 51,766 Rp 51,766 0.050
8. Saklar Televisi w/ Panasonic + Kabel bh 1.00 Rp 55,341 Rp 55,341 0.053
9. Lampu Spiral Eclat 20W bh 7.00 Rp 40,040 Rp 280,280 0.269
10. MCB 6A w. Merlin Gerin bh 4.00 Rp 53,625 Rp 214,500 0.206
SUB TOTAL Rp 4,553,890 4.371
XIV PEKERJAAN INSTALASI AIR BERSIH
1. Pipa PVC 3/4" m 20.50 Rp 8,250 Rp 169,125 0.162
2. Kran air dia. 1/2" bh 2.00 Rp 71,500 Rp 143,000 0.137
3. Kitchen zink dan Sal. Pembuang set 1.00 Rp 288,750 Rp 288,750 0.277
4. Kran air leher angsa set 1.00 Rp 143,000 Rp 143,000 0.137
5. Shower Set set 1.00 Rp 214,500 Rp 214,500 0.206
SUB TOTAL Rp 958,375 0.920
XV PEKERJAAN SAL. PEMBUANG
1. Kloset duduk bh 1.00 Rp 825,000 Rp 825,000 0.792
2. Floor drain bh 1.00 Rp 21,450 Rp 21,450 0.021
3. Saluran tertutup PVC dia. 3" m' 44.45 Rp 21,849 Rp 971,201 0.932
4. Bak kontrol 30 x 30 m' 1.00 Rp 55,000 Rp 55,000 0.053
SUB TOTAL Rp 1,872,651 1.797
XVI PEKERJAAN SEPTICTANK
1. Gorong-gorong + Penutup bh 7.00 Rp 96,250 Rp 673,750 0.647
2. Pipa peresapan PVC dia 3" + ijuk m 2.50 Rp 18,590 Rp 46,475 0.045
SUB TOTAL Rp 720,225 0.691
XVII PEKERJAAN SERBA SERBI
1. Water Proofing m2 6.77 Rp 47,190 Rp 319,476 0.307
2. Pek Pintu pagar m2 3.75 Rp 385,000 Rp 1,443,750 1.386
3. Taman dalam+ Pembersihan m2 13.25 Rp 16,500 Rp 218,625 0.210
4. Pek penutup saluran+taman luar+manhole ls 1.00 Rp 385,000 Rp 385,000 0.370
SUB TOTAL Rp 2,366,851 2.272
TOTAL COST Rp 104,182,577 100 %
DIBULATKAN Rp 104,500,000
COST / M2 Rp 2,750,000
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

BILL OF QUANTITY

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 52/105
52
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT VOLUME BOBOT (%)
SATUAN JUMLAH
I PEKERJAAN PERSIAPAN
1. Pengukuran ls 1.00 Rp 625,000 Rp 625,000 0.438
2. Pemasangan Bowplank ttk 16.00 Rp 39,344 Rp 629,500 0.441
3. Bak Campur ls 1.00 Rp 375,000 Rp 375,000 0.263
SUB TOTAL Rp 1,629,500 1.142
II PEKERJAAN TANAH & PASIR
1. Galian Tanah Pondasi m3 46.34 Rp 36,914 Rp 1,710,509 1.199 ###
2. Urugan pasir bawah pondasi t = 5 cm m3 3.86 Rp 87,188 Rp 336,675 0.236 ###
3. Urugan Pasir Bawah Lantai t=5 cm m3 2.60 Rp 87,188 Rp 226,688 0.159 ###
4. Urugan Kembali Galian m3 25.74 Rp 23,125 Rp 595,315 0.417 ###
SUB TOTAL Rp 2,869,186 2.011
III PEKERJAAN PONDASI ###
1. Pasangan Batu kosong t = 20 cm m3 9.27 Rp 259,613 Rp 2,405,985 1.686
2. Pas. Pondasi bt merah h.35 cm m2 5.74 Rp 93,976 Rp 539,424 0.378
3. Pas. Pondasi batu gunung 1:5 t = 60 cm m3 19.69 Rp 461,531 Rp 9,089,235 6.370
SUB TOTAL Rp 12,034,643 8.434
IV PEKERJAAN BETON ###
1. Beton Sloof 15/20 m3 2.32 Rp 3,636,920 Rp 8,426,380 5.905
2. kolom Praktis 10/15 m3 1.28 Rp 3,050,270 Rp 3,916,547 2.745
3. Ring balk 10/20 m3 1.96 Rp 3,050,270 Rp 5,992,560 4.200
4. beton rabat cartport t= 10cm m3 2.01 Rp 813,431 Rp 1,634,997 1.146
5. List Profil m3 0.61 Rp 2,927,331 Rp 1,795,742 410.455
6. Plat meja dapur m3 0.20 Rp 2,927,331 Rp 573,757 0.402
7. Plat Talang Air m3 0.18 Rp 2,927,331 Rp 526,920 0.369
8. Plat jembatan carport+penutup got m3 0.39 Rp 2,927,331 Rp 1,141,659 0.800
9. Adi Bond ( Perekat Beton ) ltr 5.00 Rp 25,000 Rp 125,000 50.314
SUB TOTAL Rp 24,133,562 16.913 ###
V PEKERJAAN PASANGAN DINDING
1. Pasangan Batu bata 1:5 m2 232.59 Rp 93,976 Rp 21,857,936 15.318
2. Pek. Pasangan batu bata Pagar m2 4.35 Rp 93,976 Rp 408,797 0.286
SUB TOTAL Rp 22,266,733 15.605 ###
VI PEK.PLESTERAN & PROFIL PC
1. Plesteran 1:5 m2 240.23 Rp 30,573 Rp 7,344,432 5.147
2. Plesteran Transram 1:3 m3 59.83 Rp 48,278 Rp 2,888,443 2.024
3. Acian Plamur Aplus m2 300.06 Rp 13,063 Rp 3,919,534 2.747
4. List Tali Air 0.08 m 159.86 Rp 3,125 Rp 499,563 201.082
SUB TOTAL Rp 14,651,971 10.268
VII PEK. KERAMIK LANTAI & DINDING
1. Pek. Lantai selapis batu bata m2 52.00 Rp 23,125 Rp 1,202,500 0.843
2. Keramik 20x25 wc m2 20.50 Rp 99,231 Rp 2,034,241 1.426
3. Keramik dapur 20 x 25 m2 3.19 Rp 99,231 Rp 316,052 0.221
4. Keramik Lantai 30 x 30 teras m2 8.90 Rp 100,819 Rp 897,287 0.629
5. Keramik Lantai 40 x 40 polos m2 44.50 Rp 130,700 Rp 5,816,150 4.076
6. Natt Keramik m2 77.09 Rp 1,875 Rp 144,534 8.810
SUB TOTAL Rp 10,410,763 7.296
VIII PEKERJAAN ATAP
1. Rangka Atap kanal C m' 81.75 Rp 43,750 Rp 3,576,563 2.507 ###
2. Atap Genteng spandek 0.35 Gel Besar m2 67.75 Rp 60,125 Rp 4,073,469 2.855
3. Listplank 30 Woodplank m' 29.00 Rp 37,500 Rp 1,087,500 0.762
SUB TOTAL Rp 8,737,531 6.123
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT VOLUME BOBOT (%)
SATUAN JUMLAH
IX PEKERJAAN PLAFON
1. Rangka Plafon Hollow 2/4 m2 67.75 Rp 31,875 Rp 2,159,531 1.513
2. Plafon Gypsum t=9mm & Calcyboard t=4mm m2 67.75 Rp 47,188 Rp 3,196,953 2.240
3. List Profil Gypsum int 9 cm m 53.75 Rp 25,000 Rp 1,343,750 0.942
4. List Profil kayu ext 3 cm m 36.00 Rp 18,750 Rp 675,000 0.473
SUB TOTAL Rp 7,375,234 5.169
X PEK. , PINTU, JENDELA & PINTU VINYL
1. Pintu HDF Pabrikasi pcs 4.00 Rp 750,000 Rp 3,000,000 2.102
2. Kusen Pintu + Ventilasi bh 4.00 Rp 1,000,000 Rp 4,000,000 2.803
3. Pintu Vinyl KM/WC unit 1.00 Rp 284,375 Rp 284,375 0.199
4. Jendela Almunium PC.White + Engsel + Grendel ls 1.00 Rp 5,656,250 Rp 5,656,250 3.964
SUB TOTAL Rp 12,940,625 9.069
XI PEKERJAAN PENGECATAN
1. Duco Pintu Kayu w/ Avian 2x m2 36.27 Rp 84,375 Rp 3,060,281 2.145
2. Pengecatan Listplank w/Mowilex 2x m2 8.70 Rp 36,563 Rp 318,094 0.223
3. Pengecatan tembok luar w/ MOWILEX Ext+Alkali m2 101.00 Rp 34,666 Rp 3,501,291 2.454
4. Pengecatan tembok Dalam w/ Mowilex Int 2x m2 199.06 Rp 13,541 Rp 2,695,521 1.889
5. Pengecatan Plafon w/ ARIES 2x m2 67.75 Rp 13,541 Rp 917,420 0.643
SUB TOTAL Rp 10,492,607 7.353
XII PEKERJAAN PENGGANTUNG & PENGUNCI
1. Kunci Tanam w/ SES (Pintu Utama) bh 1.00 Rp 437,500 Rp 437,500 0.307
2. kunci Tanam (Pintu Kamar) bh 4.00 Rp 312,500 Rp 1,250,000 0.876
3. Engsel Pintu psg 8.00 Rp 36,031 Rp 288,250 0.202
SUB TOTAL Rp 1,975,750 1.385
XIII PEKERJAAN INSTALASI LISTRIK
1. Instalasi Listrik Lengkap Kabel, & Acc ttk 25.00 Rp 187,500 Rp 4,687,500 3.285
2. Amatur/Fitting downlight bh 9.00 Rp 34,125 Rp 307,125 0.215
3. Lampu Teras Depan w/ Panasonic bh 1.00 Rp 250,000 Rp 250,000 0.175
4. Stop Kontak w/ Panasonic bh 5.00 Rp 17,063 Rp 85,313 0.060
5. Saklar Tunggal w/ Panasonic bh 3.00 Rp 17,063 Rp 51,188 0.036
6. Saklar Ganda w/ Panasonic bh 3.00 Rp 27,138 Rp 81,413 0.057
7. Saklar Telephone w/ Panasonic + Kabel bh 1.00 Rp 58,825 Rp 58,825 0.041
8. Saklar Televisi w/ Panasonic + Kabel bh 1.00 Rp 62,888 Rp 62,888 0.044
9. Lampu Spiral Eclat 20W bh 7.00 Rp 45,500 Rp 318,500 0.223
10. MCB 6A w. Merlin Gerin bh 4.00 Rp 60,938 Rp 243,750 0.171
SUB TOTAL Rp 6,146,500 4.308
XIV PEKERJAAN INSTALASI AIR BERSIH
1. Pipa PVC 3/4" m 23.50 Rp 9,375 Rp 220,313 0.154 ###
2. Kran air dia. 1/2" bh 2.00 Rp 81,250 Rp 162,500 0.114
3. Kitchen zink dan Sal. Pembuang set 1.00 Rp 328,125 Rp 328,125 0.230
4. Kran air leher angsa set 1.00 Rp 162,500 Rp 162,500 0.114
5. Shower Set set 1.00 Rp 243,750 Rp 243,750 0.171
SUB TOTAL Rp 1,117,188 0.783
XV PEKERJAAN SAL. PEMBUANG
1. Kloset Jongkok set 1.00 Rp 1,625,000 Rp 1,625,000 1.139
2. Floor drain bh 1.00 Rp 24,375 Rp 24,375 0.017
3. Saluran tertutup PVC dia. 3" m' 37.75 Rp 21,125 Rp 797,469 0.559 ###
4. Bak kontrol 30 x 30 ls 1.00 Rp 62,500 Rp 62,500 0.044
SUB TOTAL Rp 2,509,344 1.759
XVI PEKERJAAN SEPTICTANK
1. Gorong-gorong + Penutup bh 6.00 Rp 109,375 Rp 656,250 0.460
2. Pipa peresapan PVC dia 3" + ijuk m 2.50 Rp 21,125 Rp 52,813 0.037
SUB TOTAL Rp 709,063 0.497 ###
XVII PEKERJAAN SERBA SERBI
1. Water Proofing m2 6.77 Rp 53,625 Rp 363,041 0.254
2. Pek Pintu pagar m2 3.75 Rp 437,500 Rp 1,640,625 1.150
3. Taman dalam+ Pembersihan m2 13.25 Rp 18,750 Rp 248,438 0.174
4. Pek penutup saluran+taman luar+manhole ls 1.00 Rp 437,500 Rp 437,500 0.307
SUB TOTAL Rp 2,689,604 1.885 ###
TOTAL COST Rp 142,689,803 100 %
DIBULATKAN Rp 143,000,000
COST / M2 Rp 2,750,000
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

BILL OF QUANTITY
PROYEK : Pembangunan Perumahan Grand Aroepala
LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 64/112.5
64
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT UP VOLUME VOLUME
SATUAN
I PEKERJAAN PERSIAPAN
1. Pengukuran ls 1.39 1.00 1.00 Rp 500,000
2. Pemasangan Bowplank ttk 1.39 18.00 18.00 Rp 31,475
3. Bak Campur ls 1.39 1.00 1.00 Rp 300,000
SUB TOTAL
II PEKERJAAN TANAH & PASIR 1.39
1. Galian Tanah Pondasi m3 1.39 54.06 54.06 Rp 29,531
2. Urugan pasir bawah pondasi t = 5 cm m3 1.39 2.58 2.58 Rp 69,750
3. Urugan Pasir Bawah Lantai t=5 cm m3 1.39 3.53 3.53 Rp 69,750
4. Urugan Kembali Galian m3 1.39 18.02 18.02 Rp 18,500
SUB TOTAL
III PEKERJAAN PONDASI 1.39
1. Pasangan Batu kosong t = 20 cm m3 1.39 10.28 10.28 Rp 207,690
2. Pas. Pondasi bt merah h.35 cm m2 1.39 1.65 1.65 Rp 75,181
3. Pas. Pondasi batu gunung 1:5 t = 60 cm m3 1.39 16.36 20.41 Rp 369,255
SUB TOTAL
IV PEKERJAAN BETON 1.39
1. Beton Sloof 15/20 m3 1.39 2.37 2.37 Rp 2,909,536
2. kolom Praktis 10/15 m3 1.39 2.49 2.49 Rp 2,440,217
3. Ring balk 10/20 m3 1.39 2.72 2.72 Rp 2,440,217
4. plat beton teras m3 1.39 0.60 0.60 Rp 2,341,685
5. beton rabat cartport t= 10cm m3 1.39 1.55 1.55 Rp 650,745
6. List Profil m3 1.39 0.29 0.29 Rp 2,341,685
7. Talang beton m3 1.39 0.26 0.28 Rp 2,341,685
8. Plat meja dapur m3 1.39 0.18 0.20 Rp 2,341,685
9. Plat jembatan carport m3 1.39 0.35 0.39 Rp 2,341,685
10. Adi Bond ( Perekat Beton ) ltr 1.39 5.00 5.00 Rp 20,000
SUB TOTAL
V PEKERJAAN PASANGAN DINDING 1.39
1. Pasangan Batu bata 1:5 m2 1.39 273.10 273.10 Rp 75,181
2. Pek. Pasangan batu bata Pagar m2 1.39 5.22 5.74 Rp 75,181
SUB TOTAL
VI PEK.PLESTERAN & PROFIL PC 1.39
1. Plesteran 1:5 m2 1.39 316.85 316.85 Rp 24,459
2. Plesteran Transram 1:3 m3 1.39 63.37 63.37 Rp 38,623
3. Acian Plamur Aplus m2 1.39 380.22 380.22 Rp 10,450
4. List Tali Air 0.08 m 1.39 254.43 254.43 Rp 2,500
SUB TOTAL
VII PEK. KERAMIK LANTAI & DINDING 1.39
1. Pek. Lantai selapis batu bata m2 1.39 70.27 70.27 Rp 18,500
2. Keramik 20 x 25 wc m2 1.39 20.61 20.61 Rp 79,355
3. Keramik dapur 20 x 25 m2 1.39 8.78 8.78 Rp 79,355
4. Keramik Lantai 30 x 30 teras m2 1.39 8.01 8.01 Rp 80,330
5. Keramik Lantai 50 x 50 m2 1.39 62.26 62.26 Rp 79,355
6. Natt Keramik m2 1.39 99.66 99.66 Rp 1,500
SUB TOTAL
VIII PEKERJAAN ATAP 1.39
1. Rangka Atap kanal C m' 1.39 108.54 108.54 Rp 35,000
2. Atap Genteng spandek 0.35 Gel Besar m2 1.39 83.79 83.79 Rp 48,100
3. Listplank 30 Woodplank m' 1.39 24.05 24.05 Rp 30,000
SUB TOTAL
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT
SATUAN
IX PEKERJAAN PLAFON
1. Rangka Plafon Hollow 2/4 m2 1.39 82.34 82.34 Rp 25,500
2. Plafon Gypsum t=9mm & Calcyboard t=4mm m2 1.39 82.34 82.34 Rp 37,750
3. List Profil Gypsum int 9 cm m 1.39 63.61 63.61 Rp 20,000
4. List Profilkayu ext 3 cm m 1.39 43.23 43.23 Rp 15,000
SUB TOTAL
X PEK. , PINTU, JENDELA & PINTU VINYL
1. Pintu HDF Pabrikasi pcs 1.39 5.00 5.00 Rp 600,000
2. Kusen Pintu + Ventilasi bh 1.39 5.00 5.00 Rp 800,000
3. Pintu Vinyl KM/WC unit 1.39 2.00 2.00 Rp 227,500
4. Jendela Almunium PC. White + Engsel + Grendel ls 1.39 1.00 1.00 Rp 5,000,000
SUB TOTAL
XI PEKERJAAN PENGECATAN
1. Duco Pintu Kayu w/ Avian 2x m2 1.39 40.53 40.53 Rp 67,500
2. Pengecatan Listplank w/Mowilex 2x m2 1.39 7.22 7.22 Rp 29,250
3. Pengecatan tembok luar w/ MOWILEX Ext+Alkali m2 1.39 151.26 151.26 Rp 27,733
4. Pengecatan tembok Dalam w/ Mowilex Int 2x m2 1.39 228.96 228.96 Rp 10,833
5. Pengecatan Plafon w/ ARIES 2x m2 1.39 82.34 82.34 Rp 10,833
SUB TOTAL
XII PEKERJAAN PENGGANTUNG & PENGUNCI
1. Kunci Tanam w/ SES (Pintu Utama) bh 1.39 1.00 1.00 Rp 350,000
2. kunci Tanam (Pintu Kamar) bh 1.39 5.00 5.00 Rp 250,000
3. Engsel Pintu psg 1.39 10.00 10.00 Rp 28,825
SUB TOTAL
XIII PEKERJAAN INSTALASI LISTRIK
1. Instalasi Listrik Lengkap Kabel, & Acc ttk 1.39 28.00 28.00 Rp 150,000
2. Amatur/Fitting downlight bh 1.39 13.00 13.00 Rp 27,300
3. Lampu Teras Depan w/ Panasonic bh 1.39 1.00 2.00 Rp 200,000
4. Stop Kontak w/ Panasonic bh 1.39 5.00 5.00 Rp 13,650
5. Saklar Tunggal w/ Panasonic bh 1.39 3.00 3.00 Rp 13,650
6. Saklar Ganda w/ Panasonic bh 1.39 3.00 3.00 Rp 21,710
7. Saklar Telephone w/ Panasonic + Kabel bh 1.39 1.00 1.00 Rp 47,060
8. Saklar Televisi w/ Panasonic + Kabel bh 1.39 1.00 1.00 Rp 50,310
9. Lampu Spiral Eclat 20W bh 1.39 7.00 7.00 Rp 36,400
10. MCB 6A w. Merlin Gerin bh 1.39 4.00 4.00 Rp 48,750
SUB TOTAL
XIV PEKERJAAN INSTALASI AIR BERSIH
1. Pipa PVC 3/4" m 1.39 35.00 35.00 Rp 7,500
2. Kran air dia. 1/2" bh 1.39 3.00 3.00 Rp 65,000
3. Kitchen zink dan Sal. Pembuang set 1.39 1.00 1.00 Rp 262,500
4. Kran air leher angsa set 1.39 1.00 1.00 Rp 183,300
5. Kran Westafle set 1.39 1.00 1.00 Rp 169,000
6. Westafle set 1.39 1.00 1.00 Rp 650,000
7. Shower Set set 1.39 1.00 1.00 Rp 195,000
8. Jet Washer Set set 1.39 1.00 1.00 Rp 117,000
SUB TOTAL
XV PEKERJAAN SAL. PEMBUANG
1. Kloset Duduk bh 1.39 2.00 2.00 Rp 1,200,000
2. Floor drain bh 1.39 2.00 2.00 Rp 19,500
3. Saluran tertutup PVC dia. 3" m' 1.39 37.48 37.48 Rp 19,863
4. Bak kontrol 30 x 30 m' 1.39 2.00 2.00 Rp 50,000
SUB TOTAL
XVI PEKERJAAN SEPTICTANK
1. Gorong-gorong + Penutup bh 1.39 6.00 6.00 Rp 87,500
2. Pipa peresapan PVC dia 3" + ijuk m 1.39 3.00 3.00 Rp 16,900
SUB TOTAL
XVII PEKERJAAN SERBA SERBI
1. Water Proofing m2 1.39 10.88 10.88 Rp 42,900
2. Pek Pintu pagar m2 1.39 3.52 3.52 Rp 350,000
3. Taman dalam+ Pembersihan m2 1.39 15.82 15.82 Rp 15,000
4. Pek penutup saluran+taman luar+manhole ls 1.39 1.00 1.00 Rp 350,000
SUB TOTAL

TOTAL COST
DIBULATKAN
COST / M2
OPERTINDO
TRACTOR • SUPPLIER
11) 497111 / 5611956

HARGA (Rp.) Jumlah Kebutuhan Material Pembangunan 1 Unit Rumah T


BOBOT (%)
SATUAN JUMLAH
Material Kayu (m³) :
Rp 695,000 Rp 695,000 0.363 1.00 1. Balok ( Kayu Kelas III )
Rp 43,750 Rp 566,550 0.296 18.00
Rp 417,000 Rp 300,000 0.157 1.00
SUB TOTAL Rp 1,561,550 0.816 2. Papan ( Kayu Kelas III )

Rp 41,048 Rp 2,219,079 1.160 54.06


Rp 96,953 Rp 250,137 0.131 2.58 3. Multipleks 9 mm
Rp 96,953 Rp 342,339 0.179 3.53
Rp 25,715 Rp 463,384 0.242 18.02
SUB TOTAL Rp 3,274,940 1.712 4. Bambu

Rp 288,689 Rp 2,966,281 1.551 10.28 Material Batu :


Rp 104,502 Rp 172,545 0.090 1.65 1. Batu Kali
Rp 513,264 Rp 10,473,161 5.475 16.36
SUB TOTAL Rp 13,611,987 7.116 664.56 316.32
545.02 2. Batu Merah
Rp 4,044,256 Rp 9,582,459 5.009 2.37 15.80 236.94
Rp 3,391,901 Rp 8,447,869 4.416 2.49 24.91 305.51 3. Batu Kerikil (Cipping)
Rp 3,391,901 Rp 9,236,486 4.829 2.72 27.23 244.80
Rp 3,254,942 Rp 1,937,342 1.013 0.49 6.12 787.26
Rp 904,536 Rp 1,397,508 0.731 1.55 Material Pasir (m³) :
Rp 3,254,942 Rp 937,423 29.517 0.29 3.60 1. Pasir Urug
Rp 3,254,942 Rp 915,303 0.478 0.26 1.83
Rp 3,254,942 Rp 653,072 0.341 0.18 2.28
Rp 3,254,942 Rp 1,253,153 0.655 0.35 0.35 2. Pasir Pasangan
Rp 27,800 Rp 139,000 42.141
SUB TOTAL Rp 34,499,614 18.035 10.69 82.11

Rp 104,502 Rp 28,538,862 14.919 273.10 3. Pasir Beton


Rp 104,502 Rp 600,048 0.314 5.22
SUB TOTAL Rp 29,138,910 15.233 278.32
Material Semen (zak) :
Rp 33,997 Rp 10,772,030 5.631 316.85 1. Semen Portland
Rp 53,686 Rp 3,402,052 1.778 63.37
Rp 14,526 Rp 5,522,868 2.887 380.22
Rp 3,475 Rp 884,144 27.840 254.43 2. Acian Plamur Aplus
SUB TOTAL Rp 20,581,094 10.759
3. Semen Natt
Rp 25,715 Rp 1,806,993 0.945 70.27
Rp 110,303 Rp 2,273,354 1.188 20.61 29.39 Material Besi (btg) :
Rp 110,303 Rp 967,913 0.506 8.78 1. Besi Begel ø 6
Rp 111,659 Rp 894,386 0.468 8.01
Rp 110,303 Rp 6,867,493 3.590 62.26 2. Besi ø 8
Rp 2,085 Rp 207,781 62.993 99.66
SUB TOTAL Rp 13,017,920 6.805 3. Besi ø 10

Rp 48,650 Rp 5,280,471 2.760 108.54 Material Keramik (dos) :


Rp 66,859 Rp 5,601,781 2.928 83.79 1. Keramik 20 x 25 wc
Rp 41,700 Rp 1,002,885 0.524 24.05
SUB TOTAL Rp 11,885,137 6.213
2. Keramik 30 x 30 Teras

HARGA (Rp.)
BOBOT (%)
SATUAN JUMLAH 3. Keramik 50 x 50

Rp 35,445 Rp 2,918,364 1.526 82.34


Rp 52,473 Rp 4,320,323 2.259 82.34 Material Atap :
Rp 27,800 Rp 1,768,358 0.924 63.61 1. Besi Canal C
Rp 20,850 Rp 901,346 0.471 43.23
SUB TOTAL Rp 9,908,391 5.180
2. Atap Genteng spandek 0.35 Gel Besar
Rp 834,000 Rp 4,170,000 2.172 5.00
Rp 1,112,000 Rp 5,560,000 2.896 5.00
Rp 316,225 Rp 632,450 0.329 2.00 3. Listplank 30 Woodplank
Rp 6,950,000 Rp 6,950,000 3.620 1.00
SUB TOTAL Rp 17,312,450 9.050
Material Plafon :
Rp 93,825 Rp 3,802,727 1.981 40.53 1. Besi Hollow 2/4
Rp 40,658 Rp 293,344 0.153 7.22
Rp 38,549 Rp 5,830,748 3.037 151.26
Rp 15,058 Rp 3,447,692 1.796 228.96 2. Plafon Gypsum & Calcyboard
Rp 15,058 Rp 1,239,790 0.646 82.34
SUB TOTAL Rp 14,614,301 7.640
3. List Profil Gypsum
Rp 486,500 Rp 486,500 0.253 1.00
Rp 347,500 Rp 1,737,500 0.905 5.00
Rp 40,067 Rp 400,668 0.209 10.00 4. List Profil Kayu
SUB TOTAL Rp 2,624,668 1.372

Rp 208,500 Rp 5,838,000 3.041 28.00 5. List Tali Air 0.08


Rp 37,947 Rp 493,311 0.257 13.00
Rp 278,000 Rp 556,000 0.290 1.00
Rp 18,974 Rp 94,868 0.049 5.00 Material Pintu & Jendela :
Rp 18,974 Rp 56,921 0.030 3.00 1. Daun Pintu HDF
Rp 30,177 Rp 90,531 0.047 3.00 2. Kusen Pintu + Ventilasi
Rp 65,413 Rp 65,413 0.034 1.00 3. Pintu Vinyl KM/WC
Rp 69,931 Rp 69,931 0.036 1.00 4. Jendela Almunium ( 1 set )
Rp 50,596 Rp 354,172 0.184 7.00 Material Cat :
Rp 67,763 Rp 271,050 0.141 4.00 1. Cat Avian
SUB TOTAL Rp 7,890,196 4.125

Rp 10,425 Rp 364,875 0.191 35.00 2. Cat Mowilex Ext


Rp 90,350 Rp 271,050 0.142 3.00
Rp 364,875 Rp 364,875 0.191 1.00
Rp 254,787 Rp 254,787 0.133 1.00 3. Cat Mowilex Int
Rp 234,910 Rp 234,910 0.123 1.00
Rp 903,500 Rp 903,500 0.472 1.00
Rp 271,050 Rp 271,050 0.142 1.00 4. Cat Aries
Rp 162,630 Rp 162,630 0.085 1.00
SUB TOTAL Rp 2,827,677 1.478
Material Pengunci &:
Rp 1,668,000 Rp 3,336,000 1.744 2.00 1. Kunci Tanam w/SES (Pintu Utama)
Rp 27,105 Rp 54,210 0.028 2.00 2. Kunci (Pintu Kamar)
Rp 27,610 Rp 1,034,807 0.541 37.48 3. Engsel Pintu
Rp 69,500 Rp 139,000 0.073 2.00
SUB TOTAL Rp 4,564,017 2.386 Material M & E :
1. Instalasi Listrik Lengkap Kabel
Rp 121,625 Rp 729,750 0.381 6.00 2. Amatur/Fitting downlight
Rp 23,491 Rp 70,473 0.037 3.00 3. Lampu Teras Depan w/ Panasonic
SUB TOTAL Rp 800,223 0.418 4. Stop Kontak w/ Panasonic
5. Saklar Tunggal w/ Panasonic
Rp 59,631 Rp 648,785 0.339 10.88 6. Saklar Ganda w/ Panasonic
Rp 486,500 Rp 1,710,729 0.894 3.52 7. Saklar Telephone w/ Panasonic + Kab
Rp 20,850 Rp 329,847 0.172 15.82 8. Saklar Televisi w/ Panasonic + Kabel
Rp 486,500 Rp 486,500 0.254 1.00 9. Lampu Spiral Eclat 20W
SUB TOTAL Rp 3,175,861 1.660 10. MCB 6A w. Merlin Gerin
11. Pipa Intalasi Listrik 1/4"
Rp 191,288,934 100 % 12. Titik Nyala
Rp 192,000,000 Material Instalasi Air Bersih :
Rp 3,000,000 1. Pipa PVC 3/4"
Pembangunan 1 Unit Rumah Type 64/112.5
Harga Material Total Harga

( Kayu Kelas III ) : 0.216 + 1.23164 = 1.4476 m³


= 1.45 m³
= 1 m³ x Rp 1,200,000.00 = Rp 1,200,000.00
( Kayu Kelas III ) : 0.126 + 3.69491 = 2.8657 m³
= 2.87 m³
= 2 m³ x Rp 1,200,000.00 = Rp 2,400,000.00
pleks 9 mm : 9.7200 + 4.46 = 14.176 m²
= 4.96 lbr
= 5 lbr x Rp 105,000.00 = Rp 525,000.00
: 30 + = 30 btg
= 30 btg x Rp 18,000.00 = Rp 540,000.00

: 12.33 + 19.626 = 31.956 m³


= 8 reet
= 8 reet x Rp 345,000.00 = Rp 2,760,000.00
: 29501.39 + 7623.64 = 37125 Buah
= 37200 Buah x Rp 350.00 = Rp 13,020,000.00
Kerikil (Cipping) : 6.117 + 0 = 6.1168 m³
= 1.53 reet
= 2 reet x Rp 750,000.00 = Rp 1,500,000.00

: 1.115 + 4.2372 = 5.3518 m³


= 1.34 reet
= 1 reet x Rp 335,000.00 = Rp 335,000.00
: 21.484 + 22.8131 = 44.297 m³

= 11.07 reet
= 11 reet x Rp 345,000.00 = Rp 3,795,000.00
: 5.81 + 0 = 5.8067 m³
= 1.45 reet
= 2 reet x Rp 350,000.00 = Rp 700,000.00

: 7639.99 + 2140.63 = 9780.6 Kg


= 244.52 Zak
= 245 Zak x Rp 41,000.00 = Rp 10,045,000.00
Plamur Aplus : 190.1094 + 0 = 190.11 Kg
4.75274 = 5 Zak x Rp 95,000.00 = Rp 475,000.00
: 9.9655 + 0 = 9.9655 Kg
= 10 Bks x Rp 12,000.00 = Rp 120,000.00

: 787.26 + 0 = 787.26 mˈ
77 btg x Rp 22,000.00 = Rp 1,694,000.00
: 664.56 + 101.88 = 766.44 mˈ
183 btg x Rp 45,000.00 = Rp 8,235,000.00
: 861.34 + 111.38 = 972.72 mˈ
43 btg x Rp 59,000.00 = Rp 2,537,000.00

mik 20 x 25 wc : 20.61 + 8.78 = 29.385 m²


588 buah 29.39
30 dos x Rp 45,000.00 = Rp 1,350,000.00
mik 30 x 30 Teras : 8.01 + 0.00 = 8.01 m²
89 buah 8.90
9 dos x Rp 54,000.00 = Rp 486,000.00
mik 50 x 50 : 62.26 + 0.00 = 62.26 m²
249 buah 62.26
63 dos x Rp 72,000.00 = Rp 4,536,000.00

: 108.54 + 0 = 108.54 mˈ
27.14 btg
28 btg x Rp 150,000.00 = Rp 4,200,000.00
Genteng spandek 0.35 Gel Besar : 83.79 + = 83.785 m² x
= 129.87 m²
= 130 m² x Rp 45,000.00 = Rp 5,850,000.00
ank 30 Woodplank : 24.05 + = 24.05 mˈ
= 6.013 btg
= 7 btg x Rp 23,000.00 = Rp 161,000.00

Hollow 2/4 : 82.34 + 0 = 82.335 mˈ


102.9 btg x
103 btg x Rp 20,000.00 = Rp 2,060,000.00
Gypsum & Calcyboard : 82.34 + = 82.335 mˈ
= 27.66 lbr
= 28 lbr x Rp 53,000.00 = Rp 1,484,000.00
ofil Gypsum : 63.61 + = 63.61 mˈ
= 15.90 btg
= 16 btg x Rp 18,500.00 = Rp 296,000.00
ofil Kayu : 43.23 + = 43.23 mˈ
= 10.81 btg
= 11 btg x Rp 12,500.00 = Rp 137,500.00
ali Air 0.08 : 254.43 + = 254.43 mˈ
= 42.41 btg
= 43 btg x Rp 12,500.00 = Rp 537,500.00

Pintu HDF : 5.00 + 0 = 5 buah x Rp 450,000.00 = Rp 2,250,000.00


Pintu + Ventilasi : 5.00 + = 5 buah x Rp 600,000.00 = Rp 3,000,000.00
Vinyl KM/WC : 2.00 + = 2 buah x Rp 175,000.00 = Rp 350,000.00
a Almunium ( 1 set ) : 1.00 + = 1 buah x Rp 3,750,000.00 = Rp 3,750,000.00

: 40.53 + 0= 40.53 kg
11.6 ltr
12 klg x Rp 45,000.00 = Rp 540,000.00
owilex Ext : 7.22 + 151.26 = 158.47 kg
12.7 kg
13 Klg x Rp 175,000.00 = Rp 2,275,000.00
owilex Int : 228.96 + 0.00 = 228.96 kg
18.3 kg
19 Klg x Rp 185,000.00 = Rp 3,515,000.00
: 82.34 + 0.00 = 82.335 kg
2.1 kg
2 pail x Rp 120,000.00 = Rp 240,000.00

Tanam w/SES (Pintu Utama) : 1.00 + 0 = 1 buah x Rp 262,500.00 = Rp 262,500.00


(Pintu Kamar) : 5.00 + 0 = 5 buah x Rp 187,500.00 = Rp 937,500.00
: 10.00 + 0 = 10 set x Rp 22,500.00 = Rp 225,000.00

si Listrik Lengkap Kabel : 1.00 + 0 = 1 buah x Rp 350,000.00 = Rp 350,000.00


r/Fitting downlight : 13.00 + 0 = 13 buah x Rp 21,000.00 = Rp 273,000.00
u Teras Depan w/ Panasonic : 1.00 + 0 = 1 buah x Rp 125,000.00 = Rp 125,000.00
Kontak w/ Panasonic : 5.00 + 0 = 5 buah x Rp 10,500.00 = Rp 52,500.00
Tunggal w/ Panasonic : 3.00 + 0 = 3 buah x Rp 10,500.00 = Rp 31,500.00
Ganda w/ Panasonic : 3.00 + 0 = 3 buah x Rp 16,700.00 = Rp 50,100.00
Telephone w/ Panasonic + Kabel : 1.00 + 0 = 1 buah x Rp 36,200.00 = Rp 36,200.00
Televisi w/ Panasonic + Kabel : 1.00 + 0 = 1 buah x Rp 38,750.00 = Rp 38,750.00
u Spiral Eclat 20W : 7.00 + 0 = 7 buah x Rp 28,000.00 = Rp 196,000.00
B 6A w. Merlin Gerin : 4.00 + 0 = 4 buah x Rp 11,000.00 = Rp 44,000.00
Intalasi Listrik 1/4" : 14.00 + 0 = 14 btg x Rp 12,000.00 = Rp 168,000.00
: 28.00 + 0 = 28 ls x Rp 125,000.00 = Rp 3,500,000.00

: 35.00 + 0= 35 mˈ
ANALISA BIAYA KONSTRUKSI SNI

I. PEKERJAAN PERSIAPAN
1. Pekerjaan Pembongkaran
1 m3 Bongkaran Dinding Tembok Bata Merah/Beton Bertulang
6.667 Oh Pekerja @ Rp. 30,000.00 = Rp. 200,010.00
0.033 Oh Mandor @ Rp. - = Rp. -

Jadi Untuk 1 m3 Bongkaran Dinding Tembok Bata Merah/Beton Bertulang


= Rp. 200,010.00

2. Pekerjaan Pembersihan Lapangan


1 m2 Membersihkan Lapangan dan Peralatan
0.1 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.05 Oh Mandor @ Rp. 75,000.00 = Rp. 3,750.00

Jadi Untuk 1 m2 Membersihkan Lapangan dan Peralatan = Rp. 8,750.00

3. Pemasangan Bouwplank
1 m' Pengukuran dan Pemasangan Bouwplank
0.012 m3 Kayu Kelas III (balok) @ Rp. 1,200,000.00 = Rp. 14,400.00
0.02 kg Paku Biasa @ Rp. 15,000.00 = Rp. 300.00
0.007 m3 Kayu Kelas III (papan) @ Rp. 1,200,000.00 = Rp. 8,400.00
0.1 Oh Tukang Kayu @ Rp. 45,000.00 = Rp. 4,500.00
0.1 Oh Pekerja @ Rp. 30,000.00 = Rp. 3,000.00
0.01 Oh Kepala Tukang @ Rp. 50,000.00 = Rp. 500.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 m' Pengukuran dan Pemasangan Bouwplank = Rp. 31,475.00


II. PEKERJAAN DASAR
1. Pekerjaan Galian Tanah Pondasi
1 m3 Galian Tanah Keras Sedalam 1 Meter
0.75 Oh Pekerja @ Rp. 50,000.00 = Rp. 37,500.00
0.025 Oh Mandor @ Rp. 75,000.00 = Rp. 1,875.00

Jadi Untuk 1 m3 Galian Tanah Keras Sedalam 1 Meter = Rp. 39,375.00

2. Pekerjaan Urugan Kembali


1 m3 Urugan Kembali
0.25 Oh Pekerja @ Rp. 50,000.00 = Rp. 12,500.00
0.08 Oh Mandor @ Rp. 75,000.00 = Rp. 6,000.00

Jadi Untuk 1 m3 Urugan Kembali = Rp. 18,500.00

3. Pekerjaan Urugan Pasir


1 m3 Urugan Pasir
1.2 m3 Pasir Urug @ Rp. 45,000.00 = Rp. 54,000.00
0.3 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m3 Urugan Pasir = Rp. 69,750.00

4. Pekerjaan Pasangan Batu Kosong


1 m3 Pasang Pondasi Batu Kosong
1.200 m3 Batu Belah 10 - 15 cm @ Rp. 100,000.00 = Rp. 120,000.00
0.432 m3 Pasir Urug @ Rp. 45,000.00 = Rp. 19,440.00
0.39 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 29,250.00
0.039 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,925.00
0.78 Oh Pekerja @ Rp. 50,000.00 = Rp. 39,000.00
0.039 Oh Mandor @ Rp. 75,000.00 = Rp. 2,925.00

Jadi Untuk 1 m3 Pasang Pondasi Batu Kosong = Rp. 213,540.00


5. Pekerjaan Pasangan Pondasi Batu Kali 1 : 5
1 m3 Pasangan Batu Kali, 1 Pc : 5 Ps
1.200 m³ Batu Belah 10 - 15 cm @ Rp. 100,000.00 = Rp. 120,000.00
87.000 Kg Semen Portland @ Rp. 1,075.00 = Rp. 93,525.00
0.544 m³ Pasir Pasangan @ Rp. 45,000.00 = Rp. 24,480.00
0.750 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 56,250.00
0.075 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 5,625.00
1.500 Oh Pekerja @ Rp. 50,000.00 = Rp. 75,000.00
0.075 Oh Mandor @ Rp. 75,000.00 = Rp. 5,625.00

Jadi Untuk 1 m3 Pasangan Batu Kali, 1 Pc : 5 Ps = Rp. 380,505.00

6. Pekerjaan Timbunan Tanah Bawah Lantai


1 m3 Urugan Kembali
0.192 Oh Pekerja @ Rp. 50,000.00 = Rp. 9,600.00
0.019 Oh Mandor @ Rp. 75,000.00 = Rp. 1,425.00

1 m3 Pemadatan Tanah
0.5 Oh Pekerja @ Rp. 50,000.00 = Rp. 25,000.00
0.05 Oh Mandor @ Rp. 75,000.00 = Rp. 3,750.00

Jadi Untuk 1 m3 pekerjaan Timbunan Bawah Lantai = Rp. 39,775.00

7. Pekerjaan Timbunan Pasir Bawah Lantai


1 m3 Urugan Pasir
1.1 m3 Pasir Urug @ Rp. 45,000.00 = Rp. 49,500.00
0.3 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m3 Urugan Pasir = Rp. 65,250.00

8 Pondasi Batu Bata Trassram 1 : 2


1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps
100 bh Batu Merah 5x11x22 @ Rp. 350.00 = Rp. 35,000.00
18.95 Kg Semen Portland @ Rp. 1,075.00 = Rp. 20,371.25
0.038 m³ Pasir Pasangan @ Rp. 45,000.00 = Rp. 1,710.00
0.1 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.32 Oh Pekerja @ Rp. 50,000.00 = Rp. 16,000.00
0.015 Oh Mandor @ Rp. 75,000.00 = Rp. 1,125.00

Jadi Untuk 1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps = Rp. 82,456.25
III. PEKERJAAN BETON
1 Kg Pembesian dengan Besi Polos atau Besi Ulir
1.05 kg Besi Beton @ Rp. 8,500.00 = Rp. 8,925.00
0.015 kg Kawat Beton @ Rp. 15,000.00 = Rp. 225.00
0.007 Oh Pekerja @ Rp. 50,000.00 = Rp. 350.00
0.007 Oh Tukang Besi @ Rp. 75,000.00 = Rp. 525.00
0.0007 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 52.50
0.0004 Oh Mandor @ Rp. 75,000.00 = Rp. 30.00

Jadi Untuk 1 Kg Pembesian dengan Besi Polos atau Besi Ulir = Rp. 10,107.50

1 m3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr k175


326 Kg Semen Portland @ Rp. 1,075.00 = Rp. 350,450.00
0.542857 kg Pasir Beton @ Rp. 45,000.00 = Rp. 24,428.57
0.571667 kg Kerikil Pecah Tersaring @ Rp. 250,000.00 = Rp. 142,916.67
215 l Air @ Rp. 100.00 = Rp. 21,500.00
1.65 Oh Pekerja @ Rp. 50,000.00 = Rp. 82,500.00
0.275 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 20,625.00
0.028 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,100.00
0.083 Oh Mandor @ Rp. 75,000.00 = Rp. 6,225.00

Jadi Untuk 1 m3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr = Rp. 650,745.24

1 m3 Beton Tumbuk 1 : 3 : 5
218 kg Semen Portland @ Rp. 1,075.00 = Rp. 234,350.00
0.52 m3 Pasir Beton @ Rp. 45,000.00 = Rp. 23,400.00
0.87 m3 Kerikil Pecah Tersaring @ Rp. 250,000.00 = Rp. 217,500.00
0.9 kg Semen Warna @ Rp. 2,000.00 = Rp. 1,800.00
1.65 Oh Pekerja @ Rp. 50,000.00 = Rp. 82,500.00
0.25 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 18,750.00
0.025 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,875.00
0.08 Oh Mandor @ Rp. 75,000.00 = Rp. 6,000.00

Jadi Untuk 1 m3 Beton Tumbuk 1 : 3 : 5 = Rp. 586,175.00


1 m2 Pasang Bekisting Untuk Pondasi
0.04 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 24,000.00
0.3 Kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 4,500.00
0.1 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 450.00
0.3 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.26 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 19,500.00
0.026 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,950.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 m2 Pasang Bekisting Untuk Pondasi = Rp. 65,775.00

1 m2 Pasang Bekisting Untuk Sloof


0.045 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 27,000.00
0.3 Kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 4,500.00
0.1 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 450.00
0.52 Oh Pekerja @ Rp. 50,000.00 = Rp. 26,000.00
0.26 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 19,500.00
0.026 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,950.00
0.026 Oh Mandor @ Rp. 75,000.00 = Rp. 1,950.00

Jadi Untuk 1 m2 Pasang Bekisting Untuk Sloof = Rp. 81,350.00

1 m2 Pasang Bekisting untuk Kolom


0.040 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 24,000.00
0.4 kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 6,000.00
0.2 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 900.00
0.015 m3 Balok Kayu Kelas III @ Rp. 1,200,000.00 = Rp. 18,000.00
0.66 Oh Pekerja @ Rp. 50,000.00 = Rp. 33,000.00
0.33 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.033 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,475.00
0.033 Oh Mandor @ Rp. 75,000.00 = Rp. 2,475.00

Jadi Untuk 1 m2 Pasang Bekisting untuk Kolom = Rp. 111,600.00


1 m2 Pasang Bekisting untuk Balok
0.040 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 24,000.00
0.4 kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 6,000.00
0.2 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 900.00
0.018 m3 Balok Kayu Kelas III @ Rp. 1,200,000.00 = Rp. 21,600.00
0.66 Oh Pekerja @ Rp. 50,000.00 = Rp. 33,000.00
0.33 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.033 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,475.00
0.033 Oh Mandor @ Rp. 75,000.00 = Rp. 2,475.00

Jadi Untuk 1 m2 Pasang Bekisting untuk Balok = Rp. 115,200.00

1 m2 Pasang Bekisting untuk Lantai


0.040 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 24,000.00
0.4 kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 6,000.00
0.2 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 900.00
0.015 m3 Balok Kayu Kelas III @ Rp. 1,200,000.00 = Rp. 18,000.00
0.35 Lbr Multipleks 9 mm @ Rp. 105,000.00 = Rp. 36,750.00
6 Btg Bambu Perancah @ Rp. 11,000.00 = Rp. 66,000.00
0.32 Oh Pekerja @ Rp. 50,000.00 = Rp. 16,000.00
0.33 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.033 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,475.00
0.006 Oh Mandor @ Rp. 75,000.00 = Rp. 450.00

Jadi Untuk 1 m2 Pasang Bekisting untuk Lantai = Rp. 195,325.00

1. 1 m3 Pekerjaan Pondasi Poer


110 kg Pekerjaan Pembesian @ Rp. 10,107.50 = Rp. 1,111,825.00
4 m2 Pemasangan Bekisting @ Rp. 65,775.00 = Rp. 263,100.00
1 m3 Beton Bertulang 1 Pc : 2@ Rp. 650,745.24 = Rp. 650,745.24

Jadi Untuk 1 m3 Pekerjaan Pondasi Poer = Rp. 2,025,670.24

2. 1 m3 Pekerjaan Sloef 15x20


143 kg Pekerjaan Pembesian @ Rp. 10,107.50 = Rp. 1,445,372.50
13.332 m2 Pemasangan Bekisting @ Rp. 81,350.00 = Rp. 1,084,558.20
1 m3 Beton Bertulang 1 Pc : 2@ Rp. 650,745.24 = Rp. 650,745.24

Jadi Untuk 1 m3 Pekerjaan Sloef 15x20 = Rp. 3,180,675.94


3. 1 m3 Pekerjaan Kolom (15 x 15)
143.92 kg Pekerjaan Pembesian @ Rp. 10,107.50 = Rp. 1,454,671.40
4 m2 Pemasangan Bekisting @ Rp. 111,600.00 = Rp. 446,400.00
1 m3 Beton Bertulang 1 Pc : 2@ Rp. 650,745.24 = Rp. 650,745.24

Jadi Untuk 1 m3 Pekerjaan Kolom (15 x 15) = Rp. 2,551,816.64

1 m3 Pekerjaan Kolom (40 x 40)


110.25 kg Pekerjaan Pembesian @ Rp. 10,107.50 = Rp. 1,114,351.88
14 m2 Pemasangan Bekisting @ Rp. 111,600.00 = Rp. 1,562,400.00
1 m3 Beton Bertulang 1 Pc : 2@ Rp. 650,745.24 = Rp. 650,745.24

Jadi Untuk 1 m3 Pekerjaan Kolom (40 x 40) = Rp. 3,327,497.11

4. 1 m3 Pekerjaan Plat Lantai


63.768 kg Pekerjaan Pembesian @ Rp. 10,107.50 = Rp. 644,535.06
7.143 m2 Pemasangan Bekisting @ Rp. 195,325.00 = Rp. 1,395,206.48
1 m3 Beton Bertulang 1 Pc : 2@ Rp. 650,745.24 = Rp. 650,745.24

Jadi Untuk 1 m3 Pekerjaan Plat Lantai = Rp. 2,690,486.77

IV. PEKERJAAN TANGGA


1. Pekerjaan Tangga Beton Bertulang
1 m3 Membuat Tangga Beton Bertulang
0.250 m3 Kayu Kelas III @ Rp. 600,000.00 = Rp. 150,000.00
3 kg Paku Biasa 2" - 5" @ Rp. 15,000.00 = Rp. 45,000.00
1.2 Lt Minyak Bekisting @ Rp. 4,500.00 = Rp. 5,400.00
200 Kg Besi Beton @ Rp. 8,500.00 = Rp. 1,700,000.00
3 Kg Kawat Beton @ Rp. 15,000.00 = Rp. 45,000.00
323 Kg Semen Portland @ Rp. 1,075.00 = Rp. 347,225.00
0.52 m3 Pasir Beton @ Rp. 45,000.00 = Rp. 23,400.00
0.78 m3 Kerikil Pecah Tersaring @ Rp. 250,000.00 = Rp. 195,000.00
0.105 m3 Balok Kayu Kelas III @ Rp. 1,200,000.00 = Rp. 126,000.00
2.5 Lbr Multipleks 9 mm @ Rp. 105,000.00 = Rp. 262,500.00
14 Btg Bambu Perancah @ Rp. 11,000.00 = Rp. 154,000.00
5.6 Oh Pekerja @ Rp. 50,000.00 = Rp. 280,000.00
0.35 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 26,250.00
2.3 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 172,500.00
1.4 Oh Tukang Besi @ Rp. 75,000.00 = Rp. 105,000.00
0.405 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 30,375.00
0.202 Oh Mandor @ Rp. 75,000.00 = Rp. 15,150.00

Jadi Untuk 1 m3 Membuat Tangga Beton Bertulang = Rp. 3,682,800.00


2. Konstruksi Tiang Penahan
1 m3 Balok Kayu Kelas I
1.1 m3 Kayu Kelas I (Balok) @ Rp. 4,500,000.00 = Rp. 4,950,000.00
15 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.00
0.8 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 12,000.00
12 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 900,000.00
1.2 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 90,000.00
4 Oh Pekerja @ Rp. 50,000.00 = Rp. 200,000.00
0.2 Oh Mandor @ Rp. 75,000.00 = Rp. 15,000.00

Jadi Untuk 1 m3 Balok Kayu Kelas I = Rp. 6,467,000.00

3. Konstruksi Rangka Penahan Kayu Kelas I


1 m2 Pasang Rangka Tiang Penahan
0.012 m3 Kayu Kelas I (Balok) @ Rp. 4,500,000.00 = Rp. 54,000.00
0.1 Kg Paku Biasa @ Rp. 20,000.00 = Rp. 2,000.00
0.25 Oh Tukang Kayu @ Rp. 15,000.00 = Rp. 3,750.00
0.025 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,875.00
0.15 Oh Pekerja @ Rp. 75,000.00 = Rp. 11,250.00
0.075 Oh Mandor @ Rp. 50,000.00 = Rp. 3,750.00

Jadi Untuk 1 m2 Pasang Rangka Tiang Penahan = Rp. 76,625.00

V. PEKERJAAN DINDING
1. Pasangan Batu Bata Trassram 1 : 2
1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps
110 bh Batu Merah 5x11x22 @ Rp. 350.00 = Rp. 38,500.00
18.95 Kg Semen Portland @ Rp. 1,075.00 = Rp. 20,371.25
0.038 m³ Pasir Pasangan @ Rp. 115,000.00 = Rp. 4,370.00
0.1 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.32 Oh Pekerja @ Rp. 50,000.00 = Rp. 16,000.00
0.015 Oh Mandor @ Rp. 75,000.00 = Rp. 1,125.00

Jadi Untuk 1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps = Rp. 88,616.25
2. Pasangan Batu Bata Biasa 1 : 4
1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps
106 bh Batu Merah 5x11x22 @ Rp. 350.00 = Rp. 37,100.00
9.7 Kg Semen Portland @ Rp. 1,075.00 = Rp. 10,406.00
0.045 m³ Pasir Pasangan @ Rp. 115,000.00 = Rp. 5,175.00
0.1 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.30 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.015 Oh Mandor @ Rp. 75,000.00 = Rp. 1,125.00

Jadi Untuk 1 m2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps = Rp. 77,056.00
75,181.00
3. Pekerjaan Plesteran Trassram 1 : 2
1 m2 Plesteran 1 Pc : 2 Ps Tebal 15 mm
7.78 Kg Semen Portland @ Rp. 1,075.00 = Rp. 8,359.20
0.23 m3 Pasir Pasangan @ Rp. 115,000.00 = Rp. 26,450.00
0.15 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 11,250.00
0.015 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,125.00
0.2 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m2 Plesteran 1 Pc : 2 Ps Tebal 15 mm = Rp. 57,934.20

4. Pekerjaan Plesteran
1 m2 Plesteran 1 Pc : 4 Ps Tebal 15 mm
5.2 Kg Semen Portland @ Rp. 1,075.00 = Rp. 5,572.80
0.026 m3 Pasir Pasangan @ Rp. 115,000.00 = Rp. 2,990.00
0.15 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 11,250.00
0.015 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,125.00
0.3 Oh Pekerja @ Rp. 50,000.00 = Rp. 15,000.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m2 Plesteran 1 Pc : 4 Ps Tebal 15 mm = Rp. 36,687.80

VI. PEKERJAAN KUSEN,PINTU DAN JENDELA


1 m3 Pasang Kusen Pintu dan Jendela Kayu Kelas I
1.1 m3 Kayu Kelas I (balok) @ Rp. 4,500,000.00 = Rp. 4,950,000.00
20 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 1,500,000.00
2 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 150,000.00
6 Oh Pekerja @ Rp. 50,000.00 = Rp. 300,000.00
0.3 Oh Mandor @ Rp. 75,000.00 = Rp. 22,500.00

Jadi Untuk 1 m3 Pasang Kusen Pintu dan Jendela Kayu Kelas I = Rp. 6,922,500.00
1 m2 Pasang Pintu Panel Kayu Kelas I
0.04 m3 Kayu Kelas I (Papan) @ Rp. 4,500,000.00 = Rp. 180,000.00
2.5 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 187,500.00
0.25 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 18,750.00
1 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
0.05 Oh Mandor @ Rp. 75,000.00 = Rp. 3,750.00

Jadi Untuk 1 m2 Pasang Pintu Panel Kayu Kelas I = Rp. 440,000.00

1 m2 Pasang Jalusi Mati Kusen Kayu Kelas I


0.06 m3 Kayu Kelas I (Papan) @ Rp. 4,500,000.00 = Rp. 270,000.00
0.15 kg Paku Biasa @ Rp. 15,000.00 = Rp. 2,250.00
2 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 150,000.00
0.2 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 15,000.00
0.5 Oh Pekerja @ Rp. 50,000.00 = Rp. 25,000.00
0.025 Oh Mandor @ Rp. 75,000.00 = Rp. 1,875.00

Jadi Untuk 1 m2 Pasang Jalusi Mati Kusen Kayu Kelas I = Rp. 464,125.00

1 Buah Pasang Kunci Tanam Biasa


1 bh Kunci Tanam Biasa @ Rp. 60,000.00 = Rp. 60,000.00
0.5 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 37,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.01 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.05 Oh Mandor @ Rp. 75,000.00 = Rp. 3,750.00

Jadi Untuk 1 Buah Pasang Kunci Tanam Biasa = Rp. 102,500.00

1 Buah Pasang Kunci Tanam Antik


1 bh Kunci Tanam Antik @ Rp. 185,000.00 = Rp. 185,000.00
0.6 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 45,000.00
0.06 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 4,500.00
0.06 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.003 Oh Mandor @ Rp. 75,000.00 = Rp. 225.00

Jadi Untuk 1 Buah Pasang Kunci Tanam Antik = Rp. 237,725.00


1 Buah Pasang Engsel Pintu
1 bh Engsel Pintu @ Rp. 17,500.00 = Rp. 17,500.00
0.15 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 11,250.00
0.015 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,125.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.00075 Oh Mandor @ Rp. 75,000.00 = Rp. 56.25

Jadi Untuk 1 Buah Pasang Engsel Pintu = Rp. 30,681.25

1 Buah Pasang Engsel Jendela


1 bh Engsel Pintu @ Rp. 8,500.00 = Rp. 8,500.00
0.1 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.01 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.0005 Oh Mandor @ Rp. 75,000.00 = Rp. 37.50

Jadi Untuk 1 Buah Pasang Engsel Jendela = Rp. 17,287.50

1 Buah Pasang Pegangan Pintu


1 bh Door Holder @ Rp. 150,000.00 = Rp. 150,000.00
0.5 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 37,500.00
0.05 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 3,750.00
0.05 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,500.00
0.0025 Oh Mandor @ Rp. 75,000.00 = Rp. 187.50

Jadi Untuk 1 Buah Pasang Pegangan Pintu = Rp. 193,937.50

1 m2 Pasang Kaca Tebal 3 mm


1.1 bh Kaca 3 mm @ Rp. 85,000.00 = Rp. 93,500.00
0.15 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 11,250.00
0.015 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,125.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.00075 Oh Mandor @ Rp. 75,000.00 = Rp. 56.25

Jadi Untuk 1 m2 Pasang Kaca Tebal 3 mm = Rp. 106,681.25

1 m2 Pasang Kaca Tebal 5 mm


1.1 bh Kaca 5 mm @ Rp. 90,000.00 = Rp. 99,000.00
0.15 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 11,250.00
0.015 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,125.00
0.015 Oh Pekerja @ Rp. 50,000.00 = Rp. 750.00
0.00075 Oh Mandor @ Rp. 75,000.00 = Rp. 56.25

Jadi Untuk 1 m2 Pasang Kaca Tebal 5 mm = Rp. 112,181.25

VII. PEKERJAAN KAYU DAN ATAP


1 m3 Pasang Kuda-Kuda Kayu Kelas I
1.1 m3 Kayu Kelas II (Balok) @ Rp. 2,300,000.00 = Rp. 2,530,000.00
15 Kg Besi Strep @ Rp. 20,000.00 = Rp. 300,000.00
0.8 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 12,000.00
12 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 900,000.00
1.2 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 90,000.00
4 Oh Pekerja @ Rp. 50,000.00 = Rp. 200,000.00
0.2 Oh Mandor @ Rp. 75,000.00 = Rp. 15,000.00

Jadi Untuk 1 m3 Pasang Kuda-Kuda Kayu Kelas I = Rp. 4,047,000.00

1 m2 Pasang Kaso + Reng Genteng Kayu Kelas I


0.014 m3 Kayu Kelas II (Balok) @ Rp. 2,300,000.00 = Rp. 32,200.00
0.15 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 2,250.00
0.1 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.1 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 m2 Pasang Kaso + Reng Genteng Kayu Kelas I = Rp. 48,075.00

1 m2 Pasang Atap Genteng Beton


11 bh Genteng Keramik @ Rp. 5,500.00 = Rp. 60,500.00
0.03 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 450.00
0.1 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.2 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m2 Pasang Atap Genteng Beton = Rp. 79,950.00


1 m' Pasang Bubungan Genteng Beton
3.5 bh Nok Genteng Beton @ Rp. 13,500.00 = Rp. 47,250.00
0.05 Kg Paku Biasa @ Rp. 15,000.00 = Rp. 750.00
0.216 Kg Semen Portland @ Rp. 1,075.00 = Rp. 232.20
0.032 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 1,440.00
0.02 Kg Semen Warna @ Rp. 7,500.00 = Rp. 150.00
0.2 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 15,000.00
0.02 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,500.00
0.4 Oh Pekerja @ Rp. 50,000.00 = Rp. 20,000.00
0.02 Oh Mandor @ Rp. 75,000.00 = Rp. 1,500.00

Jadi Untuk 1 m' Pasang Bubungan Genteng Beton = Rp. 87,822.20

1 m² Memasang Karet Lapisan Atap


- 0.045 kg Paku Biasa @ Rp. 15,000.00 = Rp. 675.00
1.170 m² Karet Pelapis Atap @ Rp. 9,000.00 = Rp. 10,530.00
- 0.100 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 7,500.00
0.010 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.200 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.010 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m² Memasang Karet Lapisan Atap = Rp. 30,205.00

1 m' Pasang Listplang ukuran (3 x 20) cm Kelas I


0.0072 m3 Kayu Kelas I @ Rp. 4,500,000.00 = Rp. 32,400.00
0.05 Kg Paku biasa 2"-5" @ Rp. 15,000.00 = Rp. 750.00
0.1 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.2 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 15,000.00
0.02 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,500.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 m' Pasang Listplang ukuran (3 x 20) cm Kelas I = Rp. 55,025.00

VIII. PEKERJAAN PLAFOND


1 m2 Pasang rangka langit-langit (60 x 60)cm, kayu kelas II
0.023 m3 Kayu Kelas II @ Rp. 1,900,000.00 = Rp. 43,700.00
0.15 kg Paku biasa 2"-5" @ Rp. 15,000.00 = Rp. 2,250.00
0.2 Oh Pekerja @ Rp. 50,000.00 = Rp. 10,000.00
0.3 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 22,500.00
0.03 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 2,250.00
0.01 Oh Mandor @ Rp. 75,000.00 = Rp. 750.00

Jadi Untuk 1 m2 Pasang rangka langit-langit (60 x 60)cm, kayu kelas II = Rp. 81,450.00

1 m2 Plafon Triplek , tebal 4 mm


0.0357 lbr Triplek 122 x 244 x 6 m @ Rp. 52,000.00 = Rp. 1,856.40
0.03 kg Paku @ Rp. 15,000.00 = Rp. 450.00
0.07 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,500.00
0.1 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.0035 Oh Mandor @ Rp. 75,000.00 = Rp. 262.50

Jadi Untuk 1 m2 Plafon Triplek , tebal 4 mm = Rp. 14,318.90

1 m2 Plafon Gypsum Board Tebal 9 mm


0.364 lbr Gypsum Board @ Rp. 55,000.00 = Rp. 20,020.00
0.11 kg Paku Sekrup @ Rp. 15,000.00 = Rp. 1,650.00
0.1 Oh Pekerja @ Rp. 50,000.00 = Rp. 5,000.00
0.05 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 3,750.00
0.005 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 375.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 m2 Plafon Gypsum Board Tebal 9 mm = Rp. 31,170.00

1 m' List Plafon Kayu Profil


1.05 m' List Kayu Profil @ Rp. 7,000.00 = Rp. 7,350.00
0.021 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,050.00
0.021 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 1,575.00
0.002 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 150.00
0.001 Oh Mandor @ Rp. 75,000.00 = Rp. 75.00

Jadi Untuk 1 m' List Plafon Kayu Profil = Rp. 10,200.00

1 m' List Plafon Gypsum Profil


1.05 m' List gypsum Profil @ Rp. 15,000.00 = Rp. 15,750.00
0.021 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,050.00
0.021 Oh Tukang Kayu @ Rp. 75,000.00 = Rp. 1,575.00
0.002 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 150.00
0.001 Oh Mandor @ Rp. 75,000.00 = Rp. 75.00
Jadi Untuk 1 m' List Plafon Gypsum Profil = Rp. 18,600.00
IX. PEKERJAAN KERAMIK
1 m2 Pasang Lantai Keramik 30 x 30 cm 54000/dos
11 Bh Ubin Keramik 30 x 30 c @ Rp. 4,909.09 = Rp. 54,000.00
1 Kg Semen Portland @ Rp. 1,075.00 = Rp. 1,075.00
0.0215 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 967.50
0.26 Oh Pekerja @ Rp. 50,000.00 = Rp. 13,000.00
0.125 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 9,375.00
0.0125 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 937.50
0.013 Oh Mandor @ Rp. 75,000.00 = Rp. 975.00

Jadi Untuk 1 m2 Pasang Lantai Keramik 30 x 30 cm = Rp. 80,330.00

1 m2 Pasang Lantai Keramik 50 x 50 cm, Warna 72000/dos


6 Bh Ubin Keramik 40 x 40 c @ Rp. 12,000.00 = Rp. 72,000.00
1 Kg Semen Portland @ Rp. 1,075.00 = Rp. 1,075.00
0.023 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 1,035.00
0.9 kg Semen Warna @ Rp. 7,500.00 = Rp. 6,750.00
0.25 Oh Pekerja @ Rp. 50,000.00 = Rp. 12,500.00
0.12 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 9,000.00
0.012 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 900.00
0.125 Oh Mandor @ Rp. 75,000.00 = Rp. 9,375.00

Jadi Untuk 1 m2 Pasang Lantai Keramik 50 x 50 cm, Warna = Rp. 112,635.00

1 m2 Pasang Lantai Keramik 20 x 25cm 45000/dos


25 Bh Ubin Keramik 20 x 20 @ Rp. 1,800.00 = Rp. 45,000.00
1 Kg Semen Portland @ Rp. 1,075.00 = Rp. 1,075.00
0.023 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 1,035.00
0.9 kg Semen Warna @ Rp. 7,500.00 = Rp. 6,750.00
0.27 Oh Pekerja @ Rp. 50,000.00 = Rp. 13,500.00
0.13 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 9,750.00
0.013 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 975.00
0.0135 Oh Mandor @ Rp. 75,000.00 = Rp. 1,012.50

Jadi Untuk 1 m2 Pasang Lantai Keramik 20 x 25cm = Rp. 79,097.50


1 m2 Pasang Lantai Keramik 20 x 25cm
20 Bh Ubin Keramik 20 x 25 @ Rp. 2,250.00 = Rp. 45,000.00
1 Kg Semen Portland @ Rp. 1,075.00 = Rp. 1,075.00
0.023 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 1,035.00
0.9 kg Semen Warna @ Rp. 7,500.00 = Rp. 6,750.00
0.27 Oh Pekerja @ Rp. 50,000.00 = Rp. 13,500.00
0.13 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 9,750.00
0.013 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 975.00
0.0135 Oh Mandor @ Rp. 75,000.00 = Rp. 1,012.50

Jadi Untuk 1 m2 Pasang Lantai Keramik 20 x 25cm = Rp. 79,097.50


1 m' Pasang Plin Ubin Pc Ukuran 15 x 25 cm
1.666 Bh Plint Ubin 15 x 25 cm @ Rp. 3,600.00 = Rp. 5,997.60
1.56 Kg Semen Portland @ Rp. 1,075.00 = Rp. 1,677.00
0.004 m3 Pasir Pasangan @ Rp. 45,000.00 = Rp. 180.00
0.06 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.03 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 2,250.00
0.003 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 225.00
0.003 Oh Mandor @ Rp. 75,000.00 = Rp. 225.00

Jadi Untuk 1 m' Pasang Plin Ubin Pc Ukuran 15 x 25 cm = Rp. 13,554.60

X. PEKERJAAN M & E
1 Titik Mengerjakan Lampu Pijar
1.000 bh fitting @ Rp. 12,000.00 = Rp. 12,000.00
1.000 bh Bohlam Pijar 40 Watt @ Rp. 3,000.00 = Rp. 3,000.00
0.600 roll Kabel NYM 3 x 2,5 mm @ Rp. 450,000.00 = Rp. 270,000.00
0.250 dos Sadel Plastik @ Rp. 6,000.00 = Rp. 1,500.00
0.075 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,750.00
0.850 Oh Tukang Listrik @ Rp. 35,000.00 = Rp. 29,750.00

Jadi Untuk 1 Titik Mengerjakan Lampu Pijar = Rp. 320,000.00

1 Titik Mengerjakan Stop Kontak dan Saklar


1.000 bh Stop Kontak dan Saklar @ Rp. 12,000.00 = Rp. 12,000.00
0.060 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,000.00
0.003 Oh Tukang Listrik @ Rp. 35,000.00 = Rp. 105.00

Jadi Untuk 1 Titik Mengerjakan Stop Kontak dan Saklar = Rp. 15,105.00
XI. PEKERJAAN PENGECATAN
1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) dengan Cat Mutu Baik
0.1 Kg Plamur @ Rp. 4,000.00 = Rp. 400.00
0.1 Kg Cat Dasar @ Rp. 15,000.00 = Rp. 1,500.00
0.26 Kg Cat Penutup @ Rp. 16,000.00 = Rp. 4,160.00
0.02 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,000.00
0.063 Oh Tukang Cat @ Rp. 45,000.00 = Rp. 2,835.00
0.0063 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 472.50
0.0025 Oh Mandor @ Rp. 75,000.00 = Rp. 187.50

Jadi Untuk 1 m2 Pengecatan Tembok Baru = Rp. 10,555.00

1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) dengan Cat Mutu Baik
0.2 Kg Cat Meni @ Rp. 15,000.00 = Rp. 3,000.00
0.15 Kg Plamur @ Rp. 4,000.00 = Rp. 600.00
0.17 Kg Meni @ Rp. 15,000.00 = Rp. 2,550.00
0.26 Kg Cat Penutup @ Rp. 60,000.00 = Rp. 15,600.00
0.07 Oh Pekerja @ Rp. 50,000.00 = Rp. 3,500.00
0.009 Oh Tukang Cat @ Rp. 45,000.00 = Rp. 405.00
0.006 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 450.00
0.0025 Oh Mandor @ Rp. 75,000.00 = Rp. 187.50

Jadi Untuk 1 m2 Pengecatan Bidang Kayu Baru = Rp. 26,292.50

XII. PEK. SANITASI & PEMBUANGAN

1 m' Memasang Instalasi Air Bersih


1.2 m' Pipa PVC 3/4" @ Rp. 18,500.00 = Rp. 22,200.00
35 % Perlengkapan @ Rp. 6,475.00 = Rp. 6,475.00
0.036 Oh Pekerja @ Rp. 50,000.00 = Rp. 1,800.00
0.06 Oh Tukang Pipa @ Rp. 45,000.00 = Rp. 2,700.00
0.006 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 450.00
0.0018 Oh Mandor @ Rp. 75,000.00 = Rp. 135.00

Jadi Untuk 1 m' Memasang Instalasi Air Bersih = Rp. 33,760.00


1 m' Memasang Instalasi Air Kotor 2"
1.2 m' Pipa PVC 2" @ Rp. 35,000.00 = Rp. 42,000.00
35 % Perlengkapan @ Rp. 12,250.00 = Rp. 12,250.00
0.054 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,700.00
0.09 Oh Tukang Pipa @ Rp. 45,000.00 = Rp. 4,050.00
0.009 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 675.00
0.0027 Oh Mandor @ Rp. 75,000.00 = Rp. 202.50

Jadi Untuk 1 m' Memasang Instalasi Air Kotor 2" = Rp. 61,877.50

1 m' Memasang Instalasi Air Kotor 3"


1.2 m' Pipa PVC 3" @ Rp. 50,000.00 = Rp. 60,000.00
35 % Perlengkapan @ Rp. 17,500.00 = Rp. 17,500.00
0.081 Oh Pekerja @ Rp. 50,000.00 = Rp. 4,050.00
0.135 Oh Tukang Pipa @ Rp. 45,000.00 = Rp. 6,075.00
0.0135 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 1,012.50
0.0041 Oh Mandor @ Rp. 75,000.00 = Rp. 307.50

Jadi Untuk 1 m' Memasang Instalasi Air Kotor 3" = Rp. 88,945.00

1 m' Memasang Instalasi Air Hujan 2"


1.2 m' Pipa PVC 2" @ Rp. 35,000.00 = Rp. 42,000.00
35 % Perlengkapan @ Rp. 12,250.00 = Rp. 12,250.00
0.054 Oh Pekerja @ Rp. 50,000.00 = Rp. 2,700.00
0.09 Oh Tukang Pipa @ Rp. 45,000.00 = Rp. 4,050.00
0.009 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 675.00
0.0027 Oh Mandor @ Rp. 75,000.00 = Rp. 202.50

Jadi Untuk 1 m' Memasang Instalasi Air Hujan 2" = Rp. 61,877.50

1 bh Memasang Closet Duduk


1 bh Closed Duduk @ Rp. 1,200,000.00 = Rp. 1,200,000.00
6% Perlengkapan @ Rp. 72,000.00 = Rp. 72,000.00
3.3 Oh Pekerja @ Rp. 50,000.00 = Rp. 165,000.00
1.1 Oh Tukang Batu @ Rp. 45,000.00 = Rp. 49,500.00
0.001 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 75.00
0.16 Oh Mandor @ Rp. 75,000.00 = Rp. 12,000.00

Jadi Untuk 1 bh Memasang Closet Duduk = Rp. 1,498,575.00


1 bh Memasang Closet Jongkok
1 bh Closed Jongkok @ Rp. 180,000.00 = Rp. 180,000.00
6 Kg Semen Portland @ Rp. 1,075.00 = Rp. 6,450.00
0.01 m³ Pasir Pasangan @ Rp. 45,000.00 = Rp. 450.00
1 Oh Pekerja @ Rp. 50,000.00 = Rp. 50,000.00
1.5 Oh Tukang Batu @ Rp. 75,000.00 = Rp. 112,500.00
1.5 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 112,500.00
0.16 Oh Mandor @ Rp. 75,000.00 = Rp. 12,000.00

Jadi Untuk 1 bh Memasang Closet Jongkok = Rp. 473,900.00

1 bh Pembuatan Septic Tank (uk. 1 x 2 m²)


6.616 m³ Galian tanah @ Rp. 39,375.00 = Rp. 260,505.00
0.720 m³ Pas. Batu Bata (bahan) @ Rp. 88,616.25 = Rp. 63,803.70
0.975 m' Pipa Saluran D ø 4" (P @ Rp. 12,500.00 = Rp. 12,187.50
0.250 m' Pipa Saluran D ø 1/2" @ Rp. 3,750.00 = Rp. 937.50
1.000 bh Pipa Hawa T @ Rp. 15,000.00 = Rp. 15,000.00
0.400 m³ Cor Beton (bahan) @ Rp. 650,745.24 = Rp. 260,298.10
1.000 ikat Ijuk @ Rp. 40,000.00 = Rp. 40,000.00
0.100 m³ Kerikil @ Rp. 50,000.00 = Rp. 5,000.00
Ls Upah Kerja @ Rp. 100,000.00 = Rp. 100,000.00

Jadi Untuk 1 bh Pembuatan Septic Tank (uk. 1 x 2 m²) = Rp. 757,731.80

1 m' Pembuatan Saluran Keliling Bangunan


1.000 m' 1/2 Gorong-gorong D 2@ Rp. 75,000.00 = Rp. 75,000.00
0.275 m³ Galian Tanah @ Rp. 39,375.00 = Rp. 10,828.13
0.100 m³ Urugan Pasir @ Rp. 69,750.00 = Rp. 6,975.00
0.500 m2
Pasangan Batu Batu Tr@ Rp. 18,000.00 = Rp. 9,000.00
0.800 m2 Pekerjaan Plesteran @ Rp. 57,934.20 = Rp. 46,347.36

Jadi Untuk 1 m' Pembuatan Saluran Keliling Bangunan = Rp. 148,150.49

1 Bh Kran Diameter 3/4"


1 Bh Kran Air @ Rp. 25,000.00 = Rp. 25,000.00
0.025 Bh Seal Tape @ Rp. 3,000.00 = Rp. 75.00
0.01 Oh Pekerja @ Rp. 50,000.00 = Rp. 500.00
0.1 Oh Tukang Pipa @ Rp. 75,000.00 = Rp. 7,500.00
0.01 Oh Kepala Tukang @ Rp. 75,000.00 = Rp. 750.00
0.005 Oh Mandor @ Rp. 75,000.00 = Rp. 375.00

Jadi Untuk 1 Bh Kran Diameter 3/4" = Rp. 34,200.00


PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

REKAPITULASI ANGGARAN BIAYA


PROYEK : Pembangunan Perumahan Grand Aroepala
LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 38/90
64
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN
( RP ) (%)
I PEKERJAAN PERSIAPAN Rp 1,550,813 1.489
II PEKERJAAN TANAH & PASIR Rp 1,796,647 1.725
III PEKERJAAN PONDASI Rp 7,175,563 6.887
IV PEKERJAAN BETON Rp 18,742,254 17.990
V PEKERJAAN PASANGAN DINDING Rp 14,174,438 13.605
VI PEK.PLESTERAN & PROFIL PC Rp 11,401,638 10.944
VII PEK. KERAMIK LANTAI & DINDING Rp 6,290,077 6.038
VIII PEKERJAAN ATAP Rp 7,970,575 7.651
IX PEKERJAAN PLAFON Rp 6,372,047 6.116
X PEK. , PINTU, JENDELA & PINTU VINYL Rp 10,428,125 10.009
XI PEKERJAAN PENGECATAN Rp 6,408,162 6.151
XII PEKERJAAN PENGGANTUNG & PENGUNCI Rp 1,400,245 1.344
XIII PEKERJAAN INSTALASI LISTRIK Rp 4,553,890 4.371
XIV PEKERJAAN INSTALASI AIR BERSIH Rp 958,375 0.920
XV PEKERJAAN SAL. PEMBUANG Rp 1,872,651 1.797
XVI PEKERJAAN SEPTICTANK Rp 720,225 0.691
XVII PEKERJAAN SERBA SERBI Rp 2,366,851 2.272
JUMLAH BIAYA KONSTRUKSI Rp 104,182,577 100.00
DIBULATKAN Rp 104,500,000
COST / M² Rp 2,750,000

TERBILANG :

SERATUS EMPAT JUTA LIMA RATUS RIBU RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR


RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

REKAPITULASI ANGGARAN BIAYA


PROYEK : Pembangunan Perumahan Grand Aroepala
LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 52/105
64
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN
( RP ) (%)
I PEKERJAAN PERSIAPAN Rp 1,629,500 1.142
II PEKERJAAN TANAH & PASIR Rp 2,869,186 2.011
III PEKERJAAN PONDASI Rp 12,034,643 8.434
IV PEKERJAAN BETON Rp 24,133,562 16.913
V PEKERJAAN PASANGAN DINDING Rp 22,266,733 15.605
VI PEK.PLESTERAN & PROFIL PC Rp 14,651,971 10.268
VII PEK. KERAMIK LANTAI & DINDING Rp 10,410,763 7.296
VIII PEKERJAAN ATAP Rp 8,737,531 6.123
IX PEKERJAAN PLAFON Rp 7,375,234 5.169
X PEK. , PINTU, JENDELA & PINTU VINYL Rp 12,940,625 9.069
XI PEKERJAAN PENGECATAN Rp 10,492,607 7.353
XII PEKERJAAN PENGGANTUNG & PENGUNCI Rp 1,975,750 1.385
XIII PEKERJAAN INSTALASI LISTRIK Rp 6,146,500 4.308
XIV PEKERJAAN INSTALASI AIR BERSIH Rp 1,117,188 0.783
XV PEKERJAAN SAL. PEMBUANG Rp 2,509,344 1.759
XVI PEKERJAAN SEPTICTANK Rp 709,063 0.497
XVII PEKERJAAN SERBA SERBI Rp 2,689,604 1.885
JUMLAH BIAYA KONSTRUKSI Rp 142,689,803 100.00
DIBULATKAN Rp 143,000,000
COST / M² Rp 2,750,000

TERBILANG :

SERATUS EMPAT PULUH TIGA JUTA RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR


RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

REKAPITULASI ANGGARAN BIAYA


PROYEK : Pembangunan Perumahan Grand Aroepala
B
LOKASI : Jl. Tamangapa Raya, Makassar
O
PEKERJAAN : Cluster Latinoz, Type 64/112.5 B
64 O
R
JUMLAH HARGA BOBOT T
E
NO JENIS PEKERJAAN
( RP ) (%) K
(A
I PEKERJAAN PERSIAPAN Rp 1,561,550 0.816 %
P
)
II PEKERJAAN TANAH & PASIR Rp 3,274,940 1.712
III PEKERJAAN PONDASI Rp 13,611,987 7.116
IV PEKERJAAN BETON Rp 34,499,614 18.035
V PEKERJAAN PASANGAN DINDING Rp 29,138,910 15.233
VI PEK.PLESTERAN & PROFIL PC Rp 20,581,094 10.759
VII PEK. KERAMIK LANTAI & DINDING Rp 13,017,920 6.805
VIII PEKERJAAN ATAP Rp 11,885,137 6.213
IX PEKERJAAN PLAFON Rp 9,908,391 5.180
X PEK. , PINTU, JENDELA & PINTU VINYL Rp 17,312,450 9.050
XI PEKERJAAN PENGECATAN Rp 14,614,301 7.640
XII PEKERJAAN PENGGANTUNG & PENGUNCI Rp 2,624,668 1.372
XIII PEKERJAAN INSTALASI LISTRIK Rp 7,890,196 4.125
XIV PEKERJAAN INSTALASI AIR BERSIH Rp 2,827,677 1.478
XV PEKERJAAN SAL. PEMBUANG Rp 4,564,017 2.386
XVI PEKERJAAN SEPTICTANK Rp 800,223 0.418
XVII PEKERJAAN SERBA SERBI Rp 3,175,861 1.660
JUMLAH BIAYA KONSTRUKSI Rp 191,288,934 100.00
DIBULATKAN Rp 192,000,000
COST / M² Rp 3,000,000

TERBILANG :

SERATUS SEMBILAN PULUH DUA JUTA RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR


RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

RENCANA ANGGARAN PELAKSANAAN PROYEK

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 38/90
64
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
I MATERIAL KAYU
1 Balok ( Kayu Kelas III ) m³ 1 Rp 1,200,000.00 Rp 1,200,000.00
2 Papan ( Kayu Kelas III ) m³ 1 Rp 1,200,000.00 Rp 1,200,000.00
3 Multipleks 9 mm lbr 2 Rp 105,000.00 Rp 210,000.00
4 Bambu btg 20 Rp 18,000.00 Rp 360,000.00
SUB TOTAL Rp 2,970,000.00
II MATERIAL BATU
1 Batu Kali reet 5 Rp 345,000.00 Rp 1,725,000.00
2 Batu Merah buah 21000 Rp 350.00 Rp 7,350,000.00
3 Kerikil ( Chipping ) reet 1 Rp 750,000.00 Rp 750,000.00
SUB TOTAL Rp 9,825,000.00
III MATERIAL PASIR
1 Pasir Urug reet 1 Rp 335,000.00 Rp 335,000.00
2 Pasir Pasangan reet 6 Rp 345,000.00 Rp 2,070,000.00
3 Pasir Beton reet 1 Rp 350,000.00 Rp 350,000.00
SUB TOTAL Rp 2,755,000.00
IV MATERIAL SEMEN
1 Semen Portland zak 154 Rp 41,000.00 Rp 6,314,000.00
2 Semen Putih + Plamir Aplus zak 3 Rp 95,000.00 Rp 285,000.00
3 Semen Natt bks 5 Rp 12,000.00 Rp 60,000.00
SUB TOTAL Rp 6,659,000.00
V MATERIAL BESI
1 Besi ø 6 btg 51 Rp 22,000.00 Rp 1,122,000.00
2 Besi ø 8 btg 103 Rp 45,000.00 Rp 4,635,000.00
3 Besi ø 10 btg 34 Rp 59,000.00 Rp 2,006,000.00
SUB TOTAL Rp 7,763,000.00
VI MATERIAL KERAMIK
1 Keramik 20 x 25 dos 15 Rp 45,000.00 Rp 675,000.00
2 Keramik 30 x 30 dos 6 Rp 54,000.00 Rp 324,000.00
3 Keramik 40 x 40 dos 39 Rp 52,000.00 Rp 2,028,000.00
SUB TOTAL Rp 3,027,000.00
VII MATERIAL ATAP
1 Besi Kanal C btg 20 Rp 150,000.00 Rp 3,000,000.00
2 Atap Spandek 0.35 Gel. Besar m² 88 Rp 45,000.00 Rp 3,960,000.00
3 Listplank 30 Woodplank lbr 8 Rp 23,000.00 Rp 184,000.00
SUB TOTAL Rp 7,144,000.00
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
VIII MATERIAL PLAFON
1 Besi Hollow 2/4 btg 77 Rp 20,000.00 Rp 1,540,000.00
2 Plafon Gypsum & Calcyboard lbr 21 Rp 53,000.00 Rp 1,113,000.00
3 List Profil Gypsum btg 11 Rp 18,500.00 Rp 203,500.00
4 List Profil Kayu btg 7 Rp 12,500.00 Rp 87,500.00
5 List Tali Air 0.08 btg 30 Rp 12,500.00 Rp 375,000.00
SUB TOTAL Rp 3,319,000.00
IX MATERIAL PINTU & JENDELA
1 Daun Pintu HDF buah 4 Rp 450,000.00 Rp 1,800,000.00
2 Kusen Pintu + Ventilasi buah 4 Rp 600,000.00 Rp 2,400,000.00
3 Pintu Vinyl KM / WC buah 1 Rp 175,000.00 Rp 175,000.00
4 Jendela Alminium ( 1 Set ) buah 1 Rp 2,500,000.00 Rp 2,500,000.00
SUB TOTAL Rp 6,875,000.00
X MATERIAL PENGUNCI
1 Kunci Tanam w/SES ( Pintu Utama ) set 1 Rp 262,500.00 Rp 262,500.00
2 Kunci ( Pintu Kamar ) set 3 Rp 187,500.00 Rp 562,500.00
3 Engsel Pintu psg 6 Rp 22,500.00 Rp 135,000.00
SUB TOTAL Rp 960,000.00
XI MATERIAL CAT
1 Cat Avian klg 7 Rp 45,000.00 Rp 315,000.00
2 Cat Mowilex ( Ext ) klg 8 Rp 175,000.00 Rp 1,400,000.00
3 Cat Mowilex ( Int ) klg 10 Rp 185,000.00 Rp 1,850,000.00
4 Cat Aries pail 1 Rp 120,000.00 Rp 120,000.00
SUB TOTAL Rp 3,685,000.00
XIII PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik Lengkap Kabel roll 1 Rp 350,000.00 Rp 350,000.00
2 Amatur/Fitting downlight buah 8 Rp 21,000.00 Rp 168,000.00
3 Lampu Teras Depan w/ Panasonic buah 1 Rp 125,000.00 Rp 125,000.00
4 Stop Kontak w/ Panasonic buah 5 Rp 10,500.00 Rp 52,500.00
5 Saklar Tunggal w/ Panasonic buah 3 Rp 10,500.00 Rp 31,500.00
6 Saklar Ganda w/ Panasonic buah 3 Rp 16,700.00 Rp 50,100.00
7 Saklar Telephone w/ Panasonic + Kabel buah 1 Rp 36,200.00 Rp 36,200.00
8 Saklar Televisi w/ Panasonic + Kabel buah 1 Rp 38,750.00 Rp 38,750.00
9 Lampu Spiral Eclat 20W buah 7 Rp 28,000.00 Rp 196,000.00
10 MCB 6A w. Merlin Gerin buah 4 Rp 11,000.00 Rp 44,000.00
11 Pipa Intalasi Listrik 1/4" btg 8 Rp 12,000.00 Rp 96,000.00
12 Titik Nyala ls 20 Rp 125,000.00 Rp 2,500,000.00
SUB TOTAL Rp 3,688,050.00
XIV PEKERJAAN INSTALASI AIR BERSIH
1 Pipa PVC 3/4" btg 6 Rp 25,000.00 Rp 150,000.00
2 Kran air dia. 1/2" buah 2 Rp 35,000.00 Rp 70,000.00
3 Kitchen zink dan Sal. Pembuang set 1 Rp 175,000.00 Rp 175,000.00
4 Kran air leher angsa set 1 Rp 100,000.00 Rp 100,000.00
5 Shower Set set 1 Rp 150,000.00 Rp 150,000.00
SUB TOTAL Rp 645,000.00
XV PEKERJAAN SAL. PEMBUANG & SEPTICTANK
1 Kloset duduk buah 1 Rp 750,000.00 Rp 750,000.00
2 Floor drain buah 1 Rp 16,250.00 Rp 16,250.00
3 Saluran tertutup PVC dia. 3" btg 12 Rp 52,000.00 Rp 624,000.00
4 Bak kontrol 30 x 30 ls 1 Rp 50,000.00 Rp 50,000.00
5 Gorong-gorong + Penutup buah 7 Rp 65,000.00 Rp 455,000.00
SUB TOTAL Rp 1,895,250.00
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
XVII PEKERJAAN SERBA SERBI
1 Water Proofing m² 6.77 Rp 33,000.00 Rp 223,410.00
2 Pek Pintu pagar ls 1 Rp 975,000.00 Rp 975,000.00
3 Taman dalam+ Pembersihan ls 1 Rp 200,000.00 Rp 200,000.00
4 Pek penutup saluran+taman luar+manhole ls 1 Rp 262,500.00 Rp 262,500.00
5 Paku 2"-5" kg 5 Rp 15,000.00 Rp 75,000.00
6 Kawat Beton kg 11 Rp 20,000.00 Rp 220,000.00
7 Adi Bond ( Perekat Beton ) ltr 5 Rp 20,000.00 Rp 100,000.00
8 Material Pelengkap ( Sambungan pipa, Lem, ls 1 Rp 350,000.00 Rp 350,000.00
Amplas, Kuas, DLL. )
SUB TOTAL Rp 2,405,910.00
JUMLAH BIAYA MATERIAL Rp 63,616,210.00
BORONGAN UPAH KERJA Rp 550.000,00/meter Rp 20,900,000.00
JUMLAH BIAYA PEKERJAAN Rp 84,516,210.00
DIBULATKAN Rp 84,517,000.00

TERBILANG :
DELAPAN PULUH EMPAT JUTA LIMA RATUS TUJUH BELAS RIBU RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR

RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.


PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

RENCANA ANGGARAN PELAKSANAAN PROYEK

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 52/105
64
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL
MATERIAL
I MATERIAL KAYU
1 Balok ( Kayu Kelas III ) m³ 1 Rp 1,200,000.00
2 Papan ( Kayu Kelas III ) m³ 2 Rp 1,200,000.00
3 Multipleks 9 mm lbr 4 Rp 105,000.00
4 Bambu btg 25 Rp 18,000.00
SUB TOTAL
II MATERIAL BATU
1 Batu Kali reet 9 Rp 345,000.00
2 Batu Merah buah 31300 Rp 350.00
3 Kerikil ( Chipping ) reet 1 Rp 750,000.00
SUB TOTAL
III MATERIAL PASIR
1 Pasir Urug reet 1 Rp 335,000.00
2 Pasir Pasangan reet 10 Rp 345,000.00
3 Pasir Beton reet 1 Rp 350,000.00
SUB TOTAL
IV MATERIAL SEMEN
1 Semen Portland zak 237 Rp 41,000.00
2 Semen Putih + Plamir Aplus zak 4 Rp 95,000.00
3 Semen Natt bks 7 Rp 12,000.00
SUB TOTAL
V MATERIAL BESI
1 Besi ø 6 btg 57 Rp 22,000.00
2 Besi ø 8 btg 112 Rp 45,000.00
3 Besi ø 10 btg 38 Rp 59,000.00
SUB TOTAL
VI MATERIAL KERAMIK
1 Keramik 20 x 25 dos 24 Rp 45,000.00
2 Keramik 30 x 30 dos 10 Rp 54,000.00
3 Keramik 40 x 40 dos 45 Rp 52,000.00
SUB TOTAL
VII MATERIAL ATAP
1 Besi Kanal C btg 21 Rp 150,000.00
2 Atap Spandek 0.35 Gel. Besar m² 106 Rp 45,000.00
3 Listplank 30 Woodplank lbr 8 Rp 23,000.00
SUB TOTAL
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL
MATERIAL
VIII MATERIAL PLAFON
1 Besi Hollow 2/4 btg 85 Rp 20,000.00
2 Plafon Gypsum & Calcyboard lbr 23 Rp 53,000.00
3 List Profil Gypsum btg 14 Rp 18,500.00
4 List Profil Kayu btg 10 Rp 12,500.00
5 List Tali Air 0.08 btg 27 Rp 12,500.00
SUB TOTAL
IX MATERIAL PINTU & JENDELA
1 Daun Pintu HDF buah 4 Rp 450,000.00
2 Kusen Pintu + Ventilasi buah 4 Rp 600,000.00
3 Pintu Vinyl KM / WC buah 1 Rp 175,000.00
4 Jendela Alminium ( 1 Set ) buah 1 Rp 3,400,000.00
SUB TOTAL
X MATERIAL PENGUNCI
1 Kunci Tanam w/SES ( Pintu Utama ) set 1 Rp 262,500.00
2 Kunci ( Pintu Kamar ) set 4 Rp 187,500.00
3 Engsel Pintu psg 8 Rp 22,500.00
SUB TOTAL
XI MATERIAL CAT
1 Cat Avian klg 10 Rp 45,000.00
2 Cat Mowilex ( Ext ) klg 9 Rp 175,000.00
3 Cat Mowilex ( Int ) klg 16 Rp 185,000.00
4 Cat Aries pail 2 Rp 120,000.00
SUB TOTAL
XIII PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik Lengkap Kabel roll 1 Rp 350,000.00
2 Amatur/Fitting downlight buah 9 Rp 21,000.00
3 Lampu Teras Depan w/ Panasonic buah 1 Rp 125,000.00
4 Stop Kontak w/ Panasonic buah 5 Rp 10,500.00
5 Saklar Tunggal w/ Panasonic buah 3 Rp 10,500.00
6 Saklar Ganda w/ Panasonic buah 3 Rp 16,700.00
7 Saklar Telephone w/ Panasonic + Kabel buah 1 Rp 36,200.00
8 Saklar Televisi w/ Panasonic + Kabel buah 1 Rp 38,750.00
9 Lampu Spiral Eclat 20W buah 7 Rp 28,000.00
10 MCB 6A w. Merlin Gerin buah 4 Rp 11,000.00
11 Pipa Intalasi Listrik 1/4" btg 10 Rp 12,000.00
12 Titik Nyala ls 24 Rp 125,000.00
SUB TOTAL
XIV PEKERJAAN INSTALASI AIR BERSIH
1 Pipa PVC 3/4" btg 6 Rp 25,000.00
2 Kran air dia. 1/2" buah 2 Rp 35,000.00
3 Kitchen zink dan Sal. Pembuang set 1 Rp 175,000.00
4 Kran air leher angsa set 1 Rp 100,000.00
5 Shower Set set 1 Rp 150,000.00
SUB TOTAL
XV PEKERJAAN SAL. PEMBUANG & SEPTICTANK
1 Kloset duduk buah 1 Rp 1,200,000.00
2 Floor drain buah 1 Rp 16,250.00
3 Saluran tertutup PVC dia. 3" btg 11 Rp 52,000.00
4 Bak kontrol 30 x 30 ls 1 Rp 50,000.00
5 Gorong-gorong + Penutup buah 7 Rp 65,000.00
SUB TOTAL
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL
MATERIAL
XVII PEKERJAAN SERBA SERBI
1 Water Proofing m² 6.77 Rp 33,000.00
2 Pek Pintu pagar ls 1 Rp 975,000.00
3 Taman dalam+ Pembersihan ls 1 Rp 200,000.00
4 Pek penutup saluran+taman luar+manhole ls 1 Rp 262,500.00
5 Paku 2"-5" kg 7 Rp 15,000.00
6 Kawat Beton kg 9 Rp 20,000.00
7 Adi Bond ( Perekat Beton ) ltr 5 Rp 20,000.00
8 Material Pelengkap ( Sambungan pipa, Lem, ls 1 Rp 700,000.00
Amplas, Kuas, DLL. )
SUB TOTAL
JUMLAH BIAYA MATERIAL
BORONGAN UPAH KERJA Rp 550.000,00/meter
JUMLAH
DIBULATKAN

TERBILANG :
SERATUS SEPULUH JUTA DELAPAN RATUS EMPAT PULUH TUJUH RIBU RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR

RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.


RTINDO
TOR • SUPPLIER
1 / 5611956

ROYEK

JUMLAH

Rp 1,200,000.00
Rp 2,400,000.00
Rp 420,000.00
Rp 450,000.00
Rp 4,470,000.00

Rp 3,105,000.00
Rp 10,955,000.00
Rp 750,000.00
Rp 14,810,000.00

Rp 335,000.00
Rp 3,450,000.00
Rp 350,000.00
Rp 4,135,000.00

Rp 9,717,000.00
Rp 380,000.00
Rp 84,000.00
Rp 10,181,000.00

Rp 1,254,000.00
Rp 5,040,000.00
Rp 2,242,000.00
Rp 8,536,000.00

Rp 1,080,000.00
Rp 540,000.00
Rp 2,340,000.00
Rp 3,960,000.00

Rp 3,150,000.00
Rp 4,770,000.00
Rp 184,000.00
Rp 8,104,000.00
JUMLAH

Rp 1,700,000.00
Rp 1,219,000.00
Rp 259,000.00
Rp 125,000.00
Rp 337,500.00
Rp 3,640,500.00

Rp 1,800,000.00
Rp 2,400,000.00
Rp 175,000.00
Rp 3,400,000.00
Rp 7,775,000.00

Rp 262,500.00
Rp 750,000.00
Rp 180,000.00
Rp 1,192,500.00

Rp 450,000.00
Rp 1,575,000.00
Rp 2,960,000.00
Rp 240,000.00
Rp 5,225,000.00

Rp 350,000.00
Rp 189,000.00
Rp 125,000.00
Rp 52,500.00
Rp 31,500.00
Rp 50,100.00
Rp 36,200.00
Rp 38,750.00
Rp 196,000.00
Rp 44,000.00
Rp 120,000.00
Rp 3,000,000.00
Rp 4,233,050.00

Rp 150,000.00
Rp 70,000.00
Rp 175,000.00
Rp 100,000.00
Rp 150,000.00
Rp 645,000.00

Rp 1,200,000.00
Rp 16,250.00
Rp 572,000.00
Rp 50,000.00
Rp 455,000.00
Rp 2,293,250.00
JUMLAH

Rp 223,410.00
Rp 975,000.00
Rp 200,000.00
Rp 262,500.00
Rp 105,000.00
Rp 180,000.00
Rp 100,000.00
Rp 1,000,000.00

Rp 3,045,910.00
Rp 82,246,210.00
Rp 28,600,000.00
Rp 110,846,210.00
Rp 110,847,000.00

UJUH RIBU RUPIAH

REKTUR

ATAMA SAID, S.T.


PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

RENCANA ANGGARAN PELAKSANAAN PROYEK

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz, Type 64/112.5
64
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
I MATERIAL KAYU
1 Balok ( Kayu Kelas III ) m³ 1 Rp 1,200,000.00 Rp 1,200,000.00
2 Papan ( Kayu Kelas III ) m³ 2 Rp 1,200,000.00 Rp 2,400,000.00
3 Multipleks 9 mm lbr 5 Rp 105,000.00 Rp 525,000.00
4 Bambu btg 30 Rp 18,000.00 Rp 540,000.00
SUB TOTAL Rp 4,665,000.00
II MATERIAL BATU
1 Batu Kali reet 8 Rp 345,000.00 Rp 2,760,000.00
2 Batu Merah buah 37200 Rp 350.00 Rp 13,020,000.00
3 Kerikil ( Chipping ) reet 2 Rp 750,000.00 Rp 1,500,000.00
SUB TOTAL Rp 17,280,000.00
III MATERIAL PASIR
1 Pasir Urug reet 1 Rp 335,000.00 Rp 335,000.00
2 Pasir Pasangan reet 11 Rp 345,000.00 Rp 3,795,000.00
3 Pasir Beton reet 2 Rp 350,000.00 Rp 700,000.00
SUB TOTAL Rp 4,830,000.00
IV MATERIAL SEMEN
1 Semen Portland zak 245 Rp 41,000.00 Rp 10,045,000.00
2 Semen Putih + Plamir Aplus zak 5 Rp 95,000.00 Rp 475,000.00
3 Semen Natt bks 10 Rp 12,000.00 Rp 120,000.00
SUB TOTAL Rp 10,640,000.00
V MATERIAL BESI
1 Besi ø 6 btg 77 Rp 22,000.00 Rp 1,694,000.00
2 Besi ø 8 btg 183 Rp 45,000.00 Rp 8,235,000.00
3 Besi ø 10 btg 43 Rp 59,000.00 Rp 2,537,000.00
SUB TOTAL Rp 12,466,000.00
VI MATERIAL KERAMIK
1 Keramik 20 x 25 dos 30 Rp 45,000.00 Rp 1,350,000.00
2 Keramik 30 x 30 dos 9 Rp 54,000.00 Rp 486,000.00
3 Keramik 50 x 50 dos 63 Rp 72,000.00 Rp 4,536,000.00
SUB TOTAL Rp 6,372,000.00
VII MATERIAL ATAP
1 Besi Kanal C btg 28 Rp 150,000.00 Rp 4,200,000.00
2 Atap Spandek 0.35 Gel. Besar m² 130 Rp 45,000.00 Rp 5,850,000.00
3 Listplank 30 Woodplank lbr 7 Rp 23,000.00 Rp 161,000.00
SUB TOTAL Rp 10,211,000.00
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
VIII MATERIAL PLAFON
1 Besi Hollow 2/4 btg 103 Rp 20,000.00 Rp 2,060,000.00
2 Plafon Gypsum & Calcyboard lbr 28 Rp 53,000.00 Rp 1,484,000.00
3 List Profil Gypsum btg 16 Rp 18,500.00 Rp 296,000.00
4 List Profil Kayu btg 11 Rp 12,500.00 Rp 137,500.00
5 List Tali Air 0.08 btg 43 Rp 12,500.00 Rp 537,500.00
SUB TOTAL Rp 4,515,000.00
IX MATERIAL PINTU & JENDELA
1 Daun Pintu HDF buah 5 Rp 450,000.00 Rp 2,250,000.00
2 Kusen Pintu + Ventilasi buah 5 Rp 600,000.00 Rp 3,000,000.00
3 Pintu Vinyl KM / WC buah 2 Rp 175,000.00 Rp 350,000.00
4 Jendela Alminium ( 1 Set ) buah 1 Rp 3,750,000.00 Rp 3,750,000.00
SUB TOTAL Rp 9,350,000.00
X MATERIAL PENGUNCI
1 Kunci Tanam w/SES ( Pintu Utama ) set 1 Rp 262,500.00 Rp 262,500.00
2 Kunci ( Pintu Kamar ) set 5 Rp 187,500.00 Rp 937,500.00
3 Engsel Pintu psg 10 Rp 22,500.00 Rp 225,000.00
SUB TOTAL Rp 1,425,000.00
XI MATERIAL CAT
1 Cat Avian klg 12 Rp 45,000.00 Rp 540,000.00
2 Cat Mowilex ( Ext ) klg 13 Rp 175,000.00 Rp 2,275,000.00
3 Cat Mowilex ( Int ) klg 19 Rp 185,000.00 Rp 3,515,000.00
4 Cat Aries pail 2 Rp 120,000.00 Rp 240,000.00
SUB TOTAL Rp 6,570,000.00
XIII PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik Lengkap Kabel roll 1 Rp 350,000.00 Rp 350,000.00
2 Amatur/Fitting downlight buah 13 Rp 21,000.00 Rp 273,000.00
3 Lampu Teras Depan w/ Panasonic buah 1 Rp 125,000.00 Rp 125,000.00
4 Stop Kontak w/ Panasonic buah 5 Rp 10,500.00 Rp 52,500.00
5 Saklar Tunggal w/ Panasonic buah 3 Rp 10,500.00 Rp 31,500.00
6 Saklar Ganda w/ Panasonic buah 3 Rp 16,700.00 Rp 50,100.00
7 Saklar Telephone w/ Panasonic + Kabel buah 1 Rp 36,200.00 Rp 36,200.00
8 Saklar Televisi w/ Panasonic + Kabel buah 1 Rp 38,750.00 Rp 38,750.00
9 Lampu Spiral Eclat 20W buah 7 Rp 28,000.00 Rp 196,000.00
10 MCB 6A w. Merlin Gerin buah 4 Rp 11,000.00 Rp 44,000.00
11 Pipa Intalasi Listrik 1/4" btg 14 Rp 12,000.00 Rp 168,000.00
12 Titik Nyala ls 28 Rp 125,000.00 Rp 3,500,000.00
SUB TOTAL Rp 4,865,050.00
XIV PEKERJAAN INSTALASI AIR BERSIH
1 Pipa PVC 3/4" btg 9 Rp 25,000.00 Rp 225,000.00
2 Kran air dia. 1/2" buah 3 Rp 35,000.00 Rp 105,000.00
3 Kitchen zink dan Sal. Pembuang set 1 Rp 175,000.00 Rp 175,000.00
4 Kran air leher angsa set 1 Rp 100,000.00 Rp 100,000.00
5 Shower Set set 1 Rp 150,000.00 Rp 150,000.00
6 Kran Westafle buah 1 Rp 130,000.00 Rp 130,000.00
7 Jet Washer Set set 1 Rp 90,000.00 Rp 90,000.00
8 Westafle set 1 Rp 500,000.00 Rp 500,000.00
SUB TOTAL Rp 1,475,000.00
HARGA
NO URAIAN / JENIS MATERIAL SAT VOL JUMLAH
MATERIAL
XV PEKERJAAN SAL. PEMBUANG & SEPTICTANK
1 Kloset duduk buah 2 Rp 1,200,000.00 Rp 2,400,000.00
2 Floor drain buah 2 Rp 16,250.00 Rp 32,500.00
3 Saluran tertutup PVC dia. 3" btg 11 Rp 52,000.00 Rp 572,000.00
4 Bak kontrol 30 x 30 ls 2 Rp 50,000.00 Rp 100,000.00
5 Gorong-gorong + Penutup buah 7 Rp 65,000.00 Rp 455,000.00
SUB TOTAL Rp 3,559,500.00
XVII PEKERJAAN SERBA SERBI
1 Water Proofing m² 10.88 Rp 33,000.00 Rp 359,040.00
2 Pek Pintu pagar ls 1 Rp 975,000.00 Rp 975,000.00
3 Taman dalam+ Pembersihan ls 1 Rp 200,000.00 Rp 200,000.00
4 Pek penutup saluran+taman luar+manhole ls 1 Rp 262,500.00 Rp 262,500.00
5 Paku 2"-5" kg 9 Rp 15,000.00 Rp 135,000.00
6 Kawat Beton kg 11 Rp 20,000.00 Rp 220,000.00
7 Adi Bond ( Perekat Beton ) ltr 5 Rp 20,000.00 Rp 100,000.00
8 Material Pelengkap ( Sambungan pipa, Lem, ls 1 Rp 700,000.00 Rp 1,500,000.00
Amplas, Kuas, DLL. )
SUB TOTAL Rp 3,751,540.00
JUMLAH BIAYA MATERIAL Rp 101,975,090.00
BORONGAN UPAH KERJA Rp 550.000,00/meter Rp 35,200,000.00
JUMLAH BIAYA PEKERJAAN Rp 137,175,090.00
DIBULATKAN Rp 137,176,000.00

TERBILANG :
SERATUS TIGA PULUH TUJUH JUTA SERATUS TUJUH PULUH ENAM RIBU RUPIAH

MENGETAHUI :

GENERAL MANAGER DIREKTUR

RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.


PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

DAFTAR HARGA UPAH & BAHAN

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Rumah Tinggal Cluster Latinoz

NO ITEM SATUAN HARGA

I. U PA H
1 Pekerja Oh Rp 50,000
2 Tukang batu Oh Rp 75,000
3 Tukang kayu Oh Rp 75,000
4 Tukang besi Oh Rp 75,000
5 Tukang cat Oh Rp 75,000
6 Tukang pipa Oh Rp 75,000
7 Kepala tukang Oh Rp 75,000

64
NO ITEM SATUAN HARGA

II BAHAN
Material Kayu
1 Balok ( Kayu Kelas III ) M³ Rp 1,200,000
2 Papan ( Kayu Kelas III ) M³ Rp 1,200,000
3 Multipleks 9 mm Lbr Rp 105,000
4 Bambu Btg Rp 18,000
Material Batu
5 Batu Kali Reet Rp 345,000
6 Batu Merah Biji Rp 350
7 Batu Kerikil ( Chipping ) Reet Rp 750,000
Material Pasir
8 Pasir Urug Reet Rp 335,000
9 Pasir Pasangan Reet Rp 345,000
10 Pasir Beton Reet Rp 350,000
Material Semen
11 Semen Bosowa Sak Rp 42,000
12 Semen Tiga Roda Sak Rp 42,000
13 Semen Tonasa Sak Rp 43,000
14 Plamur Amplus Zak Rp 100,000
15 Semen Nat Putih Bks Rp 12,000
Material Besi
16 Besi 10 ( ø 9.2 - ø 9.6 ) Btg Rp 52,000
17 Besi 8 ( ø 7.2 - ø 7.6 ) Btg Rp 45,000
18 Besi 6 ( ø 4.2 - ø 4.6 ) Btg Rp 22,000
19 Besi Hollow 2x4 Btg Rp 20,000
20 Besi Canal C Btg Rp 150,000
Material Keramik
21 Keramik WC ( 20 x 25 ) Syney Brown_Impresso Dos Rp 51,500
22 Keramik WC ( 20 x 20 ) Regatta Ivory_Picasso Dos Rp 47,000
23 Keramik ( 40 x 40 ) Victoria Grey_Impresso Dos Rp 48,500
24 Keramik ( 30 x 30 ) Rocky Blanco Impresso Dos Rp 52,000
Material Atap + Plafon
25 Atap Spandek 0.35 Gel. Besar M² Rp 51,500
26 Gypsum Jaya Board 9 mm Lbr Rp 52,500
27 Calsiboard Jaya Board 4 mm Lbr Rp 53,000
28 List Profil Gypsum Btg Rp 18,500
29 List Profil Kayu Btg Rp 12,500
30 Sekrup Gypsum Dos Rp 55,000
31 Plaster Gypsum Roll Rp 15,000
Material Pintu & Jendela
32 Daun Pintu HDF ( Excellent Door ) Kg Rp 500,000
33 Kusen Pintu + Ventilasi Roll Rp 700,000
34 Pintu Vinyl WC Dos Rp 175,000
35 Jendela Alminium + Engsel + Grendel Type 38 Rp 3,315,000
36 Jendela Alminium + Engsel + Grendel Type 52 Set Rp 4,525,000
37 Jendela Alminium + Engsel + Grendel Type 64 Set Rp 5,000,000
38 Handle Pintu ( Kunci Pintu + Body_Muller ) Set Rp 175,000
39 Engsel Pintu ( MAB ) Psg Rp 35,000
40 Kunci Tanam ( MAB ) Set Rp 350,000
Material Cat
41 Vinilex ( Putih Bersih ) Gln Rp 105,000
42 Avian S.W Klg Rp 45,000
43 Dempul Autolux 1,4 KG Klg Rp 38,000
44 Dempul Autolux 4 Kg Pail Rp 90,000
45 Dempul Yoko Klg Rp 18,000
46 Cat Mowilex ( Putih Bersih ) Gln Rp 120,000
47 Dulux Ws Brilliant White Gln Rp 270,000
48 Nippe 2000 Sw Klg Rp 60,000
49 No Drop Gln Rp 150,000
50 Thinner Super Ltr Rp 13,000
Material Instalasi Listrik
51 Saklar Seri Panasonic Buah Rp 16,700
52 Saklar Tunggal Panasonic Buah Rp 10,500
53 Stop Arde Panasonic Buah Rp 10,500
54 Stop Tlp Panasonic Buah Rp 36,200
55 Stop Tv Panasonic Buah Rp 38,750
56 Downlight 5" Silver Bh Rp 21,000
57 Box Panel 25x25 Sw Bh Rp 112,000
58 Conector Bh Rp 6,500
59 Dorabos 5/8 Bh Rp 15,000
60 Hyo 2x2,5 Mm Mtr Rp 5,000
61 Isolasi Htm 5.1500 Roll Rp 8,000
62 Mcb 6a ( Merlin Gerlin/Scheider ) Bh Rp 37,500
63 Servis Clamp Bh Rp 2,500
64 Spiral 20w Eclat Bh Rp 28,000
65 Kabel Eternik Mtr Rp 4,000
Material Instalasi Air
66 Closet Duduk Orin Set Rp 1,050,000
67 Westafle Set Rp 500,000
68 Kitchen Zink Set Rp 175,000
69 Shower Set ( Onda_SW 12 ) Set Rp 150,000
70 Jet Washer Putih ( Onda ) Set Rp 90,000
71 Kran Air Westafle ( F34PJ_Onda ) Buah Rp 130,000
72 Kran Air Leher Angsa ( H88 PJ_Onda ) Buah Rp 100,000
73 Mesin Shimizu Ps 130 Bh Rp 480,000
74 Knee 3" Buah Rp 7,500
75 Knee 3/4 Bh Rp 2,500
76 Kran Air Biasa 0,5 Bh Rp 10,000
77 Kuas 4" Eterna Bh Rp 36,000
78 Lem Fox Bks Rp 14,000
79 Lem Pipa Klg Rp 35,000
80 Pipa 3/4 Lucky Btg Rp 20,000
81 Pipa3" Lucky Bh Rp 52,000
82 Sambungan Pipa 3/4 T Bh Rp 3,000
83 Sambungan T 3/4 Bh Rp 2,500
84 Sok Drag Dalam 1-3/4" Bh Rp 8,000
85 L 1/2 " Biji Rp 2,000
86 L 3" Buah Rp 7,000
87 L 3/4" Buah Rp 2,000
88 Ldd Kuningan 3/4 Buah Rp 7,500
89 Kran Air Tembok ( Onda_F800Y ) Buah Rp 35,000
90 Floor Drain Buah Rp 17,000
Material Pelengkap
91 List Tali Air 0.08 Btg Rp 15,000
92 Adhi Bond ( Perekat Beton ) Ltr Rp 20,000
93 Sekrup 6x1 Dos Rp 50,000
94 Pemotong Tehel Euro Buah Rp 60,000
95 Serat Fiber Buah Rp 10,000
96 Skopan Buah Rp 50,000
97 Tangki Premier 1 M3 Buah Rp 1,000,000
98 Amplas 240 Mtr Rp 8,000
99 Kuas Roll Buah Rp 22,000
100 Cornice Zak Rp 65,000
101 Cup Bh Rp 5,000
102 K.D.D Roll Rp 7,000
103 Kawat Beton Kg Rp 15,000
104 Kawat Beton 20 Kg Roll Rp 300,000
105 Paku 10" Dos Rp 240,000
106 Paku 5 Cm Kg Rp 15,000
107 Paku 5" Dos Rp 240,000
108 Paku 7 Cm Kg Rp 15,000
109 Paku Beton 5 Cm Dos Rp 12,000
110 Plester Dico Roll Rp 7,000
111 Kuas 3" Buah Rp 10,000
112 Kuas 4" Bh Rp 13,000
113 Metal Stut Buah Rp 41,000
114 Uranner Buah Rp 25,000
115 Alkali Vinilex Gln Rp 130,000
116 Amplas 120 Roll Rp 300,000
117 Amplas 120 M Rp 8,000
118 Gerobak Arco Merah Buah Rp 360,000
119 Gurinda Maktek Buah Rp 300,000
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

PEKERJAAN FASUM & FASOS

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz
38
HARGA (Rp.)
NO URAIAN PEKERJAAN SAT VOLUME VOLUME
SATUAN JUMLAH
I PEKERJAAN PERSIAPAN
1. Pengukuran ls 1.00 1.00 Rp 100,000 Rp 100,000
2. Pemasangan Bowplank ls 14.00 1.00 Rp 200,000 Rp 200,000
3. Bak Campur ls 1.00 1.00 Rp 300,000 Rp 300,000
SUB TOTAL Rp 600,000
II PEKERJAAN TANAH & PASIR
1. Galian Tanah Pondasi (Per Unit) m3 2.96 2.96 Rp 29,531 Rp 87,339
2. Urugan pasir bawah pondasi t = 5 cm m3 0.23 0.23 Rp 69,750 Rp 15,868
SUB TOTAL Rp 103,207
III PEKERJAAN PONDASI
1. Pas. Pondasi batu gunung 1:5 t = 60 cm m3 0.80 0.80 Rp 369,255 Rp 294,481
SUB TOTAL Rp 294,481
IV PEKERJAAN BETON
1. Plat jembatan carport + penutup drainase m3 0.49 0.49 Rp 2,341,685 Rp 1,147,426
SUB TOTAL Rp 1,147,426

TOTAL COST Rp 2,145,113


COST / M2 Rp 306,445
DIBULATKAN / M2 Rp 307,000
NDO
PPLIER
56

BOBOT (%)

4.662
9.324
13.985
27.971

4.072
0.740 Rp 468,536
4.811

13.728
13.728

53.490
53.490 0.20 0.20 Rp 2,341,685 Rp 468,337

100 %
21.833
PT. PATIARASE PROPERTINDO
DEVELOPER • REAL ESTATE • CONTRACTOR • SUPPLIER
GRAND AROEPALA Blok A No. 7 Telp. (0411) 497111 / 5611956

RENCANA ANGGARAN PROYEK

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz
38

NO URAIAN PEKERJAAN SATUAN VOLUME BIAYA KONSTRUKSI JUMLAH BOBOT (%)

I PEKERJAAN KONSTRUKSI RUMAH


1. Cluster Latinoz, Type 38/90 Unit 51 Rp 104,500,000.00 Rp 5,329,500,000.00 30.590
2. Cluster Latinoz, Type 52/105 Unit 44 Rp 143,000,000.00 Rp 6,292,000,000.00 36.114
3. Cluster Latinoz, Type 64/112.5 Unit 28 Rp 192,000,000.00 Rp 5,376,000,000.00 30.857
SUB TOTAL Rp 16,997,500,000.00
II PEKERJAAN FASILITAS UMUM ( FASUM )
1. Jalan Paving Blok m² 2.96 Rp 1.00 Rp 2.96 0.000
2. Drainase m³ 0.23 Rp 1.00 Rp 0.23 0.000
3. Jembatan ( Plat Duekker ) m³ 0.23 Rp 1.00 Rp 0.23 0.000
4. Taman Ls 1.00 Rp 75,000,000.00 Rp 75,000,000.00 0.430
5. Pagar m² 0.23 Rp 1.00 Rp 0.23 0.000
Rp 75,000,003.64
III PEKERJAAN Fasilitas Sosial ( FASOS )
1. Lapangan Futsal, Basket Ball, & Badminton Unit 1 Rp 350,000,000.00 Rp 350,000,000.00 2.009
0.000
Rp 350,000,000.00

TOTAL COST Rp 17,422,500,004


100 %
COST 100 %
DIBULATKAN
PT. PATIARASE PROPE
DEVELOPER • REAL ESTATE • CONTRAC
GRAND AROEPALA Blok A No. 7 Telp. (0411) 4971

RENCANA ANGGARAN PR

PROYEK : Pembangunan Perumahan Grand Aroepala


LOKASI : Jl. Tamangapa Raya, Makassar
PEKERJAAN : Cluster Latinoz
38
BIAYA BOBOT JUNI JULI AGUSTUS SEPTEMBER OKTOBER
NO URAIAN PEKERJAAN SATUAN VOLUME JUMLAH
KONSTRUKSI (%) III IV I II III IV I II III IV I II III IV I II III
I PEKERJAAN KONSTRUKSI RUMAH
1. Cluster Latinoz, Type 38/90 Unit 2 Rp 87,400,000.00 Rp 174,800,000.00 2.270
1. Cluster Latinoz, Type 52/105 Unit 18 Rp 119,600,000.00 Rp 2,152,800,000.00 27.954 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553 1.553
SUB TOTAL Rp 2,327,600,000.00
II PEKERJAAN PONDASI KOMPLEKS
1. Pondasi Batu Kali mˈ 164.64 Rp 388,000.00 Rp 63,880,320.00 0.829 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104
2. Pondasi Batu Kali Setengah mˈ 9.30 Rp 168,666.67 Rp 1,568,600.00 0.020 0.01 0.01
3. Pondasi Semi Poer m³ 33.00 Rp 1,024,000.00 Rp 33,792,000.00 0.439 0.11 0.11 0.11 0.11
SUB TOTAL Rp 99,240,920.00
III PEKERJAAN TIMBUNAN
1. Penimbunan Lokasi Reet 18000.00 Rp 180,000.00 Rp 3,240,000,000.00 42.071 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315
SUB TOTAL Rp 3,240,000,000.00
IV PEKERJAAN JALAN
1. Hamparan Sirtu 15 cm m³ 3175.97 Rp 265,000.00 Rp 841,632,315.00 10.929
2. Hamparan Pasir 10 cm m³ 688.08 Rp 458,399.00 Rp 315,415,183.92 4.096
3. Pemasangan Paving Blok m² 9.60 Rp 2,927,331.00 Rp 28,102,377.60 0.365
4. Pemasangan Cainstein mˈ 1.00 Rp 75,000,000.00 Rp 75,000,000.00 0.974
5. Pekerjaan Jembatan m³ 249.20 Rp 468,536.00 Rp 116,758,234.13 1.516
SUB TOTAL Rp 1,376,908,110.65
V PEKERJAAN DRAINASE
1. Galian Drainase mˈ 1.00 Rp 127,500,000.00 Rp 127,500,000.00 1.656
2. Pasangan Batu Kali mˈ 1.00 Rp 272,500,000.00 Rp 272,500,000.00 3.538
3. Plesteran m² 51.00 Rp 2,500,000.00 Rp 127,500,000.00 1.656
4. Pekerjaan Plat Deukker m³ 52.00 Rp 2,500,001.00 Rp 130,000,052.00 1.688
SUB TOTAL Rp 657,500,052.00
TOTAL Rp 7,701,249,082.65 100 %
KEMAJUAN PEKERJAAN DALAM MINGGUAN % 2.971 2.971 2.971 2.971 2.971 2.971 2.971 2.971 2.878 2.878 2.977 2.977 2.977 2.977 2.868 2.868 2.868
KEMAJUAN PEKERJAAN DALAM BULANAN % 5.943 17.828 29.527 41.437 52.908

GENERAL MANAGER DIREKTUR


RIO MUHAMMAD, S.T., M.M. REZZA PRATAMA SAID, S.T.
PERTINDO
RACTOR • SUPPLIER
497111 / 5611956

PROYEK

ER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI


KET
IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
% 100
0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
1.553 90%

80 %

70 %

1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 1.315 60 %

50 %

40 %

% 30

% 20

% 10

%0

2.868 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 1.457 0.142 0.142 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
58.734 64.560 70.387 73.583 73.583 73.583 73.583 73.583