LEMBAR ASISTENSI

TUGAS PROPULSI KAPAL


Nama :
Stambuk :
Dosen Pemeriksa :
No Detail Tugas Tanggal Paraf Ket

2 April
1 Perhitungan Tahanan (5 poin)
2019

Perhitungan kebutuhan power motor (10 2 April


2
poin) 2019

9 April
3 Pemilihan Daun Propeller (10 poin)
2019

16 April
4 Perhitungan resiko kavitasi (10 poin)
2019

Perhitungan geometri propeller: (15 poin)


- Dimensi daun propeller
- Face & Back 23 April
5
- Expanded area 2019
- Projected & developed Area
- Side view area
Penggambaran: (20 poin)
- Face & Back
30 April –
6 - Expanded area 07 Mei
- Projected & developed Area 2019
- Side view area
Penetapan pemilihan motor induk, gearbox, 14 Mei
7
dan tipe propeller (brosur) (5 poin) 2019

Perhitungan Engine Matching Propeller (25 21-28 Mei


8
poin) 2019