Anda di halaman 1dari 4

PROYEK KANDANG AYAM TYPE - CLOSE HOUSE

LOKASI PROYEK DS. CIPEUTEUY - BANDUNGAN


BANDUNGAN SUKABUMI-, JAWA BARAT

NO DESCRIPTION QTY SATUAN

A PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 3,00 Lot
2 Barak Kerja 1,00 Lot
3 Listrik Kerja 1,00 Lot
4 Pengukuran & Bouplank 344,00 m2
Sub Total A
B PEKERJAAN TANAH
1 Galian Tanah Foot Plate @ 1000mm x 1000mm x 1000mm (85 titik) + urug 85 m3
2 Galian Tanah Foot Plate @ 800mm x 800mm x 1000mm (95 titik) + urug 60,8 m3
3 Galian Sloof @ 200mm x 300mm x (261 meter) + Urug 15,66 m3
4 Galian Drainase @ 60cm x 50cm (275 meter) + Urug 96,25 m3
Sub Total B
C PEKERJAAN BETON
1 Pondasi Setapak 800mm x 800mm x 1000mm (85 titik) K-175 20,4 m3
2 Pondasi Setapak 600mm x 600mm x 1000mm (95 titik) K-175 15,2 m3
3 Sloof Gantung @ 15cm x 25cm (561,6 meter) K-175 210,563 m3
4 Plate Lantai Bawah @ T 10cm K-225 (1566.4 m2) 156,64 m3
a. Plastik Cor
b. Wiremess M8 1 Layer
c. Trowel
d. Begisting
Sub Total C
D PEKERJAAN PASANGAN DINDING HEBEL
Pekerjaan Dinding Hebel + Plesteran + Acian 263 m2
a. Bata Hebel 100mm x 200mm x 600mm
b. MU - 380 @ 40kg Perekat T.3mm
c. MU - 301 @ 40kg Perekat T.15mm
d. MU - 200 @ 40kg Acian T.2mm
Sub Total D
E PEKERJAAN DRAINASE
Pekerjaan Pasangan Bata Merah + Plesteran + Acian 268 m1
Sub Total E
F PEKERJAAN KONTRUKSI BAJA
a. Baja IWF 200 x 100 x 5.5 x 8 15.528
b. Baja IWF 150 x 75 x 5 x7 12.146
c Plat Simpul 2.992
d. Ikatan Angin Rb @ 12mm 895
e. Clem Bakel @ 5/8 x 8inc 84
f. Stud Gordeng Rb @ 10mm 520
g. Angkur Baut @ 5/8 x 20cm 176
h. Baut Hitam @ 12mm x 2,5inc 1.800
i. Baut Hitam @ 10mm x 2,5inc 700
j. Baut Hitam @ 10mm x 2inc 400
k CNP 125, 50, 20,2 2.772
l Angku Baut @ 5/8 x 600mm 720

RENCANA ANGGARAN BIAYA (RAB) PER UNIT


PROYEK KANDANG AYAM TYPE - CLOSE HOUSE
LOKASI PROYEK DS. CIPEUTEUY - BANDUNGAN
BANDUNGAN SUKABUMI, JAWA BARAT

G PEKERJAAN DINDING KANDANG


a. Holo @40mm x 40mm t.2,5mm 6196,85 kg
b. Siku @30mm x 30mm t.3mm 708,76 kg
c. Plat Strip @4mm t.3mm 1526,04 kg
d. Kawat Harmonika @2mm - 20mm x 20mm H 1500mm 480 meter
e. Zeng Plesing Galvalum @Tiknes 0,35mm H 400mm 240 meter
f. Zeng Plesing Galvanum @Tiknes 0,35mm H600mm 240 meter
g. Sleef Drilling @5mm x 35mm 1800 pcs
Sub Total G
H PEKERJAAN DINDING GUDANG
a. CNP @ 100,40,20,t 3 154 kg
b. Holo 100 x 50 x 2,3 544 kg
c. Zeng Zingalum @ t. 0,30 80 m2
d. Sleef Drilling @ 5mm x 60mm 420 pcs
Sub Total H
I PEKERJAAN ATAP
a. Atap Sandwich Panel 1900 m2
b. CNP 125, 50, 20, 3.2 1941,6 m2
c. Sleef Drilling @ 5mm x 60mm 5400 pcs
d. Sleef Drilling @5mm x 2,5mm 1440 pcs
e. Zeng Zingalum @ t. 0,30 H 800mm 173 meter
Sub Total I
J PEKERJAAN PINTU (Kusen UNP 100/ Rangka Holo 40x40 t2,5/ palt 2mm)
a. Pintu Gudang @ L 2,4meter x T 3meter 2 set
b.Pintu Kandang @ L 1,2meter x 2meter 6 set
c. Pintu Kolingpat @ L 0,9meter x 1,8meter 4 set
K PEKERJAAN TANGGA 3 unit
a. UNP 150 x 73 x 6 x 7
b. Siku 50 x 50 x 5
c. Plat Bordes 3mm (Besi)
d. Relling Pipa 3/4 inc & Hand Relling + Tiang 1,5 inc
Sub Total K
L PEKERJAAN GANTUNGAN PAKAN
a. Holo 50 x 50 x 2 780 kg
b. Hunger 70mm dia 8mm 1681 pcs
Sub Total A s/d L
Jasa Kontruksi Kontraktor Pelaksana
Grand Total
TOTAL PRICE HOUSE (DOUBLE)
MATERIAL SUB TOTAL
PRICE MATERIAL PRICE