DKH Bamulo
DKH Bamulo
PAKET PEKERJAAN : Penggantian Jembatan Ake Menyesal, Jembatan Ake Gita II, Jembatan Ake Tafami,
Jembatan Ake Koli I/Torano dan Jembatan Ake Koli II/Peloko
NO. KONTRAK : HK.02.03/BL.IX/498679/PPK-H4/2015/PKT-06
KONTRAKTOR PELAKSANA : PT. TAMAEL GROUP
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 12 1,300,000 15,600,000
7 CRANE 10-15 TON E07 Unit 1 6,000,000 6,000,000
8 DUMP TRUCK 3.5 TON E08 Unit 6 2,200,000 13,200,000
9 DUMP TRUCK 10 TON E09 Unit 3 2,700,000 8,100,000
10 EXCAVATOR 80-140 HP E10 Unit 5 7,000,000 35,000,000
12 GENERATOR SET E12 Unit 5 545,000 2,725,000
20 CONCRETE VIBRATOR E20 Unit 5 1,300,000 6,500,000
29 TRAILER 20 TON E29 Unit 1 16,000,000 16,000,000
30 PILE DRIVER + HAMMER E30 Unit 1 12,000,000 12,000,000
31 CRANE ON TRACK 35 TON E31 Unit 1 5,500,000 5,500,000
32 WELDING SET E32 Unit 1 1,000,000 1,000,000
4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 1 150,000,000 150,000,000
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 10,000,000 10,000,000
Jumlah 480,065,000
AUNUROFIQ KEMHAY
Kuasa Direktur
RENCANA MOBILISASI 0
JENIS PEKERJAAN : Penggantian Jembatan Ake Menyesal, Jembatan Ake Gita II, Jembatan Ake Tafami,
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
a b
DIVISI 1. UMUM
1.2 Mobilisasi
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
1.8.(2) Jembatan Sementara
1.17 Pengamanan Lingkungan Hidup
1.21 Manajemen Mutu
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air
2.2.(1) Pasangan Batu dengan Mortar
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
a b
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Uraian
Pembayaran
a b
DIVISI 7. STRUKTUR
7.1 (4) Beton mutu tinggi fc’35 Mpa (K-400)
7.1 (5) a Beton mutu sedang fc’30 MPa (K-350) lantai jembatan
7.1 (6) Beton mutu sedang fc’25 Mpa (K-300) Struktur Bawah
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) Tiang Sandaran
7.1 (8) Beton mutu rendah fc’15 MPa (K-175) Trotoar
7.1 (9) Beton Siklop fc’15 Mpa (K-175)Isian Sumuran
7.1 (10) Beton mutu rendah fc’10 Mpa (K-125) Lantai Kerja
7.3 (1) Baja Tulangan U 24 Polos
7.3 (3) Baja Tulangan U 32 Ulir
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter 300 mm
7.9.(1) Pasangan Batu
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis
7.11.(6) Expansion Joint Tipe Baja Bersudut
7.12.(3) Perletakan Elastomerik Sintetis Ukuran …. mm x …. mm x …. mm
7.14.(1) Papan Nama Jembatan
7.15.(1) Pembongkaran Pasangan Batu
7.15.(2) Pembongkaran Beton
7.16.(2).a Pipa Drainase Baja diameter 75 mm
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Uraian
Pembayaran
a b
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
KUANTITAS DAN HARGA
1332
1332000000
Err:509
547,306,252
2,426,437,608
304,546,629
1,012,593,528
2,682,155,372
Satuan Prakiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
c d e f = (d x e)
15,950,058,670
311,470,812
Satuan Prakiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
c d e f = (d x e)
#REF!
0
0
Err:509
0
0
###
PAKET PEKERJAAN : Penggantian Jembatan Ake Menyesal, Jembatan Ake Gita II, Jembatan Ake Tafami,
Jembatan Ake Koli I/Torano dan Jembatan Ake Koli II/Peloko
NO. KONTRAK : HK.02.03/BL.IX/498679/PPK-H4/2015/PKT-06
KONTRAKTOR PELAKSANA : PT. TAMAEL GROUP
2.28
A Total Harga Konstruksi 480,065,000.00
B Pajak Pertambahan Nilai (PPN): 10% x A 48,006,500.00
C Total Harga + PPN = A + B 528,071,500.00
D Jumlah Total harga Dibulatkan 528,000,000.00
Terbilang : Empat Milyar Enam Ratus Tiga Puluh Sembilan Juta Lima Ratus Ribu Rupiah
AUNUROFIQ KEMHAY
Kuasa Direktur
DATA PERHITUNGAN VOLUME
JALAN : JALAN DOUJARA
Pekerjaan : Tim
TYPIKAL TALUD
KETERANGAN
Kiri
Jl. Doujara
1 2 3 4 5=2x4 6
00+000 -
25.00 - -
00+025 -
25.00 - -
00+050 16.21
50.00 12.20 609.93
00+100 8.19
50.00 10.15 507.28
00+150 12.11
50.00 14.23 711.30
00+200 16.35
50.00 13.01 650.53
00+250 9.67
50.00 6.30 315.00
00+300 2.93
50.00 7.31 365.55
00+350 11.70
50.00 6.49 324.50
00+400 1.28
50.00 11.13 556.70
00+450 20.98
50.00 19.91 995.38
00+500 18.83
50.00 20.66 1,032.75
00+550 22.48
50.00 18.84 942.23
00+600 15.21
50.00 12.49 624.58
00+650 9.77
50.00 12.93 646.63
00+700 16.09
50.00 11.24 562.05
00+750 6.39
50.00 3.20 159.75
00+800 -
50.00 - -
00+850 -
50.00 - -
00+900 -
50.00 - -
00+950 -
50.00 - -
01+000 -
sta. panjang luas luas rata2 volume ketera
1 2 3 4 5=2x4 6
01+000 -
50.00 - -
01+050 -
50.00 - -
01+100 -
50.00 - -
01+150 -
50.00 - -
01+200 -
50.00 - -
01+250 -
50.00 - -
01+300 -
50.00 - -
01+350 -
50.00 - -
01+400 -
50.00 - -
01+450 -
9,004.13
-
9,004.13
keterangan
6
keterangan
6
JADWAL MOBILISAS
Program : Pembangunan Jalan dan Jembatan
Kegiatan : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Nama Paket : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Prov./Kab./Kota : Maluku Utara / Tidore Kepulauan
J
No. Uraian Volume Satuan BULAN I BULAN II
1 2 3 4 5 6 7
1 Mobilisasi 1.00 Ls 0.333 0.333
2 Galian Biasa 7,069.23 M3
PERALATAN
Excavator 0.03 Jam 0.263 0.263 0.263 0.263 0.263
Dump Truck 0.16 Jam 1.686 1.686 1.686 1.686 1.686
3 Timbunan Biasa dari galian 361.40 M3
PERALATAN
Excavator 0.03 Jam
Dump Truck 0.56 Jam
4 Penyiapan Badan Jalan 5,700.00 M2
PERALATAN
Excavator 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
MOBILISASI PERALATAN
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
MUDARAMAN RIDWAN
Direktur
JADWAL MOBILISA
Program : Pembangunan Jalan dan Jembatan
Kegiatan : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Nama Paket : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Prov./Kab./Kota : Maluku Utara / Tidore Kepulauan
J
No. Uraian Volume Satuan BULAN I BULAN II
1 2 3 4 5 6 7
1 Mobilisasi 1.00 Ls 0.333 0.333
2 Galian Biasa 7,069.23 M3
TENAGA KERJA
Pekerja 0.05 Jam 0.527 0.527 0.527 0.527 0.527
Mandor 0.03 Jam 0.263 0.263 0.263 0.263 0.263
BAHAN
-
PERALATAN
Excavator 0.03 Jam 0.263 0.263 0.263 0.263 0.263
Dump Truck 0.16 Jam 1.686 1.686 1.686 1.686 1.686
3 Timbunan Biasa dari galian 361.40 M3
TENAGA KERJA
Pekerja 0.11 Jam
Mandor 0.03 Jam
BAHAN
-
PERALATAN
Excavator 0.03 Jam
Dump Truck 0.56 Jam
4 Penyiapan Badan Jalan 5,700.00 M2
TENAGA KERJA
Pekerja 0.02 Jam 0.142 0.142 0.142 0.142 0.142 0.142
Mandor 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
BAHAN
-
PERALATAN
Excavator 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
AL MOBILISASI BAHAN
0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
MUDARAMAN RIDWAN
Direktur
JADWAL MOBILISASI T
Program : Pembangunan Jalan dan Jembatan
Kegiatan : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Nama Paket : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Prov./Kab./Kota : Maluku Utara / Tidore Kepulauan
J
No. Uraian Volume Satuan BULAN I BULAN II
1 2 3 4 5 6 7
1 Mobilisasi 1.00 Ls 0.333 0.333
2 Galian Biasa 7,069.23 M3
TENAGA KERJA
Pekerja 0.05 Jam 0.527 0.527 0.527 0.527 0.527
Mandor 0.03 Jam 0.263 0.263 0.263 0.263 0.263
BAHAN
-
PERALATAN
Excavator 0.03 Jam 0.263 0.263 0.263 0.263 0.263
Dump Truck 0.16 Jam 1.686 1.686 1.686 1.686 1.686
3 Timbunan Biasa dari galian 361.40 M3
TENAGA KERJA
Pekerja 0.11 Jam
Mandor 0.03 Jam
BAHAN
-
PERALATAN
Excavator 0.03 Jam
Dump Truck 0.56 Jam
4 Penyiapan Badan Jalan 5,700.00 M2
TENAGA KERJA
Pekerja 0.02 Jam 0.142 0.142 0.142 0.142 0.142 0.142
Mandor 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
BAHAN
-
PERALATAN
Excavator 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
OBILISASI TENAGA KERJA
0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
MUDARAMAN RIDWAN
Direktur
REKAPITULASI JADWA
Program : Pembangunan Jalan dan Jembatan
Kegiatan : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Nama Paket : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Prov./Kab./Kota : Maluku Utara / Tidore Kepulauan
Jan
No. Uraian Volume Satuan BULAN I BULAN II
1 2 3 4 5 6 7
1 Mobilisasi 1.00 Ls 0.333 0.333
2 Galian Biasa 7,069.23 M3
TENAGA KERJA
Pekerja 0.05 Jam 0.527 0.527 0.527 0.527 0.527
Mandor 0.03 Jam 0.263 0.263 0.263 0.263 0.263
BAHAN
-
PERALATAN
Excavator 0.03 Jam 0.263 0.263 0.263 0.263 0.263
Dump Truck 0.16 Jam 1.686 1.686 1.686 1.686 1.686
3 Timbunan Biasa dari galian 361.40 M3
TENAGA KERJA
Pekerja 0.11 Jam
Mandor 0.03 Jam
BAHAN
-
PERALATAN
Excavator 0.03 Jam
Dump Truck 0.56 Jam
4 Penyiapan Badan Jalan 5,700.00 M2
TENAGA KERJA
Pekerja 0.02 Jam 0.142 0.142 0.142 0.142 0.142 0.142
Mandor 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
BAHAN
-
PERALATAN
Excavator 0.01 Jam 0.035 0.035 0.035 0.035 0.035 0.035
ASI JADWAL MOBILISASI
0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
MUDARAMAN RIDWAN
Direktur
TIME SCHEDULE PEKERJAAN
Program : Pembangunan Jalan dan Jembatan
Kegiatan : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Nama Paket : Pembangunan Jalan - Pembangunan Jalan Tosa - Mafututu
Prov./Kab./Kota : Maluku Utara / Tidore Kepulauan
No. Divisi Uraian Pekerjaan Jumlah Harga (Rp) Bobot (%) BULAN I BULAN II
1 2 3 4 5 6 7 8 9
DIVISI 1. UMUM
3.1.(1a) Galian Biasa 700,031,136.98 81.82 5.84 5.84 5.84 5.84 5.84 5.84 5.84
3.3.(1) Penyiapan Badan Jalan 25,082,118.47 2.93 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
Rencana (%) 0.99 1.16 6.02 6.02 6.02 6.02 6.02 6.02 6.02
Kumulatif Rencana Mingguan (%) - 0.99 2.15 8.16 14.18 20.20 26.21 32.23 38.25 44.26
ULE PEKERJAAN
82
10 11 12 13 14 15 16 17 18 19 20
100
0.99 90
80
70
60
40
20
6.02 6.02 6.02 6.02 8.06 8.06 8.06 2.22 2.22 2.05 0.99
50.28 56.30 62.31 68.33 76.39 84.46 92.52 94.74 96.96 99.01 100.00
MUDARAMAN RIDWAN
Direktur
###
R E KAPITU LAS I
DAFTAR KUANTITAS DAN HARGA (DKH)
No.
Uraian Pekerjaan
Divisi
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Pekerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan Minor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
Tidore, 27 Mei
Penawar,
CV. BAMULO
MUDARAMAN R
Direktur
R E KAPITU LAS I
TAR KUANTITAS DAN HARGA (DKH)
25,355,000.00
-
830,258,999.34
-
-
-
-
-
46,823,726.74
-
902,437,726.08
90,243,772.61
992,681,498.69
992,681,498.00
AN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT
DELAPAN RUPIAH
MUDARAMAN RIDWAN
Direktur
DAFTAR KUANTITAS DAN HARGA (DKH
a b c d
DIVISI 1. UMUM
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
a b c d
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3
3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M3
3.3.(1) Penyiapan Badan Jalan M2 5,700.00
3.4.(1) Pembersihan dan Pengupasan Lahan M2
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah
3.4.(3) Pemotongan Pohon Pilihan diameter 30 – 50 cm buah
3.4.(4) Pemotongan Pohon Pilihan diameter 50 – 75 cm buah
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah
3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2
3.5.(2a) Geotekstil Separator Kelas 1 M2
3.5.(2b) Geotekstil Separator Kelas 2 M2
3.5.(2c) Geotekstil Separator Kelas 3 M2
3.5.(3) Geotekstil Stabilisator (Kelas 1) M2
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Prakiraan
Uraian Pekerjaan Satuan
Pembayaran Kuantitas
a b c d
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
a b c d
6.3(3a) Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton
6.3(3b) Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senja Ton
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton
6.3.(4b) Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi Ton
6.3(5a) Laston Lapis Aus (AC-WC) Ton
6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton
6.3(5c) Laston Lapis Aus Perata (AC-WC(L)) Ton
6.3(5d) Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Ton
6.3(6a) Laston Lapis Antara (AC-BC) Ton
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton
6.3(6c) Laston Lapis Antara Perata (AC-BC(L) Ton
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton
6.3(7a) Laston Lapis Pondasi (AC-Base) Ton
6.3(7b) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton
6.3(7c) Laston Lapis Pondasi Perata (AC-Base(L)) Ton
6.3(7d) Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) Ton
6.3.(8) Bahan anti pengelupasan Kg
6.5.(1) Campuran Aspal Dingin untuk Pelapisan M3
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 -
6.6.(2) Lapis Pondasi/Perata Penetrasi Macadam M3
SKh. 6.3.a (1a) Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) (Asbuton Pra Campur M2
SKh. 6.3.a (2a) Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) (Asbuton M3
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton mutu tinggi fc’50 Mpa (K-600) M3
7.1 (2) Beton mutu tinggi fc’45 Mpa (K-500) M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa (K-450) dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa (K-450) perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa (K-400) M3
7.1 (5) a Beton mutu sedang fc’30 MPa (K-350) lantai jembatan M3
7.1 (5) b Beton mutu sedang fc’30 MPa (K-350) untuk ……… M3
7.1 (6) Beton mutu sedang fc’25 Mpa (K-300) Struktur Bawah M3
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) M3 -
No. Mata Prakiraan
Uraian Pekerjaan Satuan
Pembayaran Kuantitas
a b c d
7.1 (7) b Beton mutu sedang fc’20 MPa (K-250) yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa (K-175) Trotoar M3
7.1 (8) Beton Mutu Rendah fc’15 Mpa (K-175) Rabat M3
7.1 (10) Beton mutu rendah fc’10 Mpa (K-125) Lantai Kerja M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 30 meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 30 meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……me Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar …… Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga ( Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga ( Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah m3
7.2.(11).a Penyediaan balok gelagar Tee Beam bentang 60 m Buah
7.2.(11).b Pemasangan balok gelagar Tee Beam bentang 60 m Buah
7.2.(12).a Penyediaan panel full deph slab Buah
7.2.(12).b Pemasangan panel full deph slab Buah
7.3 (1) Baja Tulangan U 24 Polos Kg -
a b c d
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1) Pemasangan jembatan Rangka Baja Kg
7.5 (2) Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4) Dinding Turap Baja M2
7.6 (5) Dinding Turap Beton M2
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. m M1
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 M1
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … M1
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... M1
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm M1
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm M1
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 m M1
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm M1
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm M1
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 M1
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter …… M1
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 m M1
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. M1
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 M1
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. M1
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. m M1
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 45 M1
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter ….. M1
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1
No. Mata Prakiraan
Uraian Pekerjaan Satuan
Pembayaran Kuantitas
a b c d
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) M1
di Tempat Yang Berair.
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bo M1
di Tempat Yang Berair.
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 m buah
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24) Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... denga buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... deng buah
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... denga buah
Cara Beban Siklik
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... denga buah
Cara Beban Bertahap
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diamete buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing buah
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter 300 mm M1
7.9.(1) Pasangan Batu M3 -
a b c d
7.14.(1) Papan Nama Jembatan buah
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4) Pembongkaran Bangunan Gedung M2
7.15.(5) Pembongkaran Rangka Baja M2
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Unit
7.16.(2).a Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a Pipa Drainase PVC diameter …. mm M'
7.16.(4) Pipa Penyalur PVC M'
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
a b c d
8.4.(2) Marka Jalan Bukan Termoplastik M2 -
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah -
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah -
8.4.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah -
8.4.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah -
8.4.(5) Patok Pengarah Buah -
8.4.(6a) Patok Kilometer Buah -
8.4.(6b) Patok Hektometer Buah -
8.4.(7) Rel Pengaman M1 -
8.4.(8) Paku Jalan Buah -
8.4.(9) Mata Kucing Buah -
8.4.(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 -
8.4.(10b) Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1 -
8.4.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1 -
8.4.(10d) Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 c M1 -
8.4.(10e) Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 c M1 -
8.4.(10f) Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah -
8.4.(10g) Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah -
8.4.(10h) Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar) Buah -
8.4.(10i) Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar) Buah -
8.4.(11) Kerb yang digunakan kembali M1 -
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2 -
8.4.(13) Beton Pemisah Jalur (Concrete Barrier) Buah -
8.4.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah -
8.4.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah -
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Wat Buah -
8.4.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah -
8.4.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Wat Buah -
8.4.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah -
8.4.(20) Pagar Pemisah Pedestrian Carbon Steel M' -
8.4.(21) Pagar Pemisah Pedestrian Galvanised M' -
8.4.(22) Pagar Pemisah Pedestrian Carbon Steel M' -
8.4.(23) Pagar Pemisah Pedestrian Galvanisasi M' -
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2 -
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M 2
-
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2 -
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Prakiraan
Uraian Pekerjaan Satuan
Pembayaran Kuantitas
a b c d
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
e f = (d x e)
25,355,000 25,355,000.00
25,355,000.00
99,025.09 700,031,136.98
286,181.87 -
211,649.93 -
253,420.45 -
967,921.65 -
970,938.36 -
303,950.06 -
1,538,615.65 -
248,887.42 -
303,637.96 -
541,634.33 -
290,940.08 105,145,743.89
751,627.31 -
324,140.20 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
912,804.25 -
912,804.25 -
4,400.37 25,082,118.47
451,522.53 -
11,720,963.54 -
298,824.85 -
454,547.46 -
936,383.96 -
5,611.90 -
5,611.90 -
5,611.90 -
5,611.90 -
5,611.90 -
830,258,999.34
1,075,500.71 -
810,585.84 -
898,367.64 -
2,588,227.85 -
573,761.00 -
16,429.28 -
24,966.03 -
20,766.11 -
21,864.33 -
3,125,602.81 -
2,412,440.67 -
2,993,394.79 -
2,388,422.50 -
78,000.00 -
2,614,732.12 -
3,417,168.92 -
1,675,022.98 -
-
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
922,013.26 -
801,519.24 -
821,781.99 -
709,232.38 -
1,059,243.94 -
2,614,732.12 -
3,417,168.92 -
1,675,022.98 -
2,677,814.06 -
530,334.88 -
399,078.98 -
401,080.07 -
12,565.49 -
15,771.06 -
21,864.33 -
9,424.85 -
15,512.16 -
31,336.21 -
49,126.02 -
22,849.09 -
878.40 -
44,204.16 -
57,555.40 -
56,684.21 -
45,000.00 -
6,728,996.77 -
6,024,701.58 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
5,154,771.10 -
5,129,868.79 -
3,999,264.33 -
3,974,362.01 -
3,289,688.61 -
2,439,750.56 -
3,289,688.61 -
2,512,932.04 -
3,125,602.81 -
2,412,440.67 -
3,125,602.81 -
2,412,440.67 -
2,993,394.79 -
2,388,422.50 -
2,993,394.79 -
2,388,422.50 -
78,000.00 -
3,363,101.49 -
2,575,089.32 -
3,614,659.39 -
161,357.89 -
3,985,567.26 -
-
4,337,102.77 -
-
-
4,574,553.24 -
4,077,900.79 -
-
3,407,863.76 -
2,725,201.25 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
-
2,265,307.27 -
2,265,307.27 -
2,164,462.81 -
17,250,000.00 -
23,000,000.00 -
758,128,412.05 -
0.00 -
0.00 -
56,916,328.15 -
17,250,000.00 -
0.00 -
1,463,534.42 -
1,463,534.42 -
-
-
360,230.56 -
0.00 -
0.00 -
1,993,595.16 -
-
-
-
-
29,965.41 -
36,043.16 -
36,043.16 -
25,802.48 -
40,660.41 -
105,437.03 -
33,993.58 -
33,993.58 -
471.08 -
1,108.60 -
1,108.60 -
1,108.60 -
-
-
-
-
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
-
-
-
-
1,310.91 -
812.17 -
72,958.26 -
91,527.68 -
92,513.39 -
38,751.65 -
916,558.55 -
91,527.68 -
85,325.89 -
204,408.51 -
204,408.51 -
238,461.48 -
-
-
-
-
1,245,928.25 -
-
-
-
182,231.00 -
60,743.67 -
60,743.67 -
-
-
-
-
424,195.70 -
-
-
-
3,918,241.97 -
6,086,583.82 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
5,779.73 -
-
27,568.29 -
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
1,491,400.22 -
1,523,635.24 -
877,000.78 -
885,809.06 -
-
-
-
-
-
-
-
-
411,799.82 -
-
-
-
-
-
1,500,000.00 -
-
43,832.25 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
3,157,687.97 -
512,011.99 -
959,973.87 -
473,310.60 -
176,558.69 -
596,933.22 -
357,161.85 -
181,530.84 -
364,976.22 -
-
-
140,309.00 -
-
-
-
-
915,013.22 -
801,576.25 -
686,115.21 -
911,887.98 -
8,118,558.40 -
2,295,471.14 -
3,291,071.93 -
3,091,832.70 -
24,325.85 -
-
16,227.94 -
23,524.56 -
15,997.94 -
15,307.94 -
400,061.34 -
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
243,086.34 -
1,133,380.13 -
1,337,677.11 -
1,179,955.13 -
1,428,930.13 -
267,149.78 -
984,699.10 -
433,522.67 -
937,303.08 -
253,361.51 -
299,361.51 -
290,524.88 -
324,585.72 -
340,588.93 -
403,921.19 -
487,630.30 -
144,915.36 -
1,589,862.85 -
-
-
112,148.22 -
130,992.95 -
-
-
-
-
-
-
-
-
-
-
-
196,092.12 -
411,268.75 -
82,646.67 -
-
Harga Satuan (Rp) Jumlah Harga-Harga (Rp)
e f = (d x e)
20,679.46 -
16,572.32 -
18,215.18 -
477,793.13 46,823,726.74
-
631,318.08 -
-
555,748.94 -
884,224.93 -
880,141.93 -
Err:511 Err:511
813,365.58 -
762,192.97 -
829,694.26 -
542,713.94 -
551,808.78 -
57,456.72 -
609,272.56 -
340,554.50 -
115,898.20 -
63,180.19 -
73,631.16 -
46,823,726.74
31,790,774.49 -
16,433,548.17 -
42,973,697.29 -
JADWAL WAKTU PELAKSANAAN
WAKTU
JUMLAH HARGA
NO. BOBOT
URAIAN PEKERJAAN PENAWARAN
DIVISI (%)
(Rupiah)
1
DIVISI 1. UMUM
1.2 Mobilisasi 25,355,000.00 3.38 1.69
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air - - -
2.2.(1) Pasangan Batu dengan Mortar - -
DIVISI 7. STRUKTUR
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) - -
7.1 (8) Beton Mutu Rendah fc’15 Mpa (K-175) Rabat - -
7.3 (1) Baja Tulangan U 24 Polos - -
7.9.(1) Pasangan Batu - -
1 BULAN
KET.
BULAN KE- 1
4 MINGGU
2 3 4
100
1.69
90
80
-
- 70
60
50
14.00 45.70 25.00
40
30
-
20
-
- - 10
-
0
$ -
KONSULTAN PERENCANA
Err:509
$ -
$ -
DAFTAR USULAN PEKERJAAN YANG DISUB-KONTRAKKAN
Persentase Persentase
Dari Harga Dari Nama Sub-
No. Mata Total Mata Harga Penyedi Jasa
Jenis Pekerjaan
Pembayaran Pembayaran Penawaran
(jika diperlukan
(%) (%)
TOTAL (%)
0
0
Err:509
0
0
REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
Barang
Jasa
Catatan :
1. Nilai Gabungan Barang/Jasa, tidak termasuk keuntungan, overhead perusahaan dan pajak keluaran.
2. Biaya Komponen Dalam Negeri (KDN) adalah biaya material langsung (bahan baku), peralatan (barang jadi), Manajemen Proyek dan Perekayasaan, Alat Kerja /
Fasilitas Kerja, Konstruksi dan Fabrikasi, dan jasa lainnya dari dalam negeri.
794,145,198 - 0
% TKDN = = 97.56%
813,998,828
0
0
Err:509
0
0
MATA PEMBAYARAN UTAMA
No. Mata
NO. Jenis Pekerjaan
Pembayaran
0
0
Err:509
0
0
PEMBAYARAN UTAMA
Ket.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
C MOBILISASI LAINNYA
1 PEKERJAAN DARURAT 0 150,000,000 0
2 Perkuatan Jembatan Lama
3 Pengaturan Rambu Lalulintas Ls 0 350,000 0
4 Pembuatan Papan Nama Proyek Ls 1 500,000 500,000
5 Laporan Akhir dan Dokumentasi Ls 1 5,000,000 5,000,000
D LAIN-LAIN Set
1 Komunikasi Lapangan Lengkap ....
F JUMLAH 23,050,000
G BIAYA UMUM+KEUNTUNGAN = (10%xF) 2,305,000.00
H HARGA LUM SUM ( F+G) 25,355,000.00
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengujian lingkungan
(air, udara dan kebisingan)
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan :
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,556,000.00
190,000.00 760,000.00
200,000.00 800,000.00
220,000.00 880,000.00
210,000.00 840,000.00
203,000.00 812,000.00
190,000.00 760,000.00
13,800,000.00
430,000.00 1,720,000.00
720,000.00 2,880,000.00
9,816,000.00
10,000.00 40,000.00
40,000.00 160,000.00
55,000.00 220,000.00
55,000.00 220,000.00
150,000.00 600,000.00
80,000.00 320,000.00
200,000.00 800,000.00
128,000.00 512,000.00
90,000.00 360,000.00
10,000.00 40,000.00
38,172,000.00
ITEM PEMBAYARAN NO. : 1.8.
JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
120,000.00 1,200,000.00
125,000.00 87,500,000.00
345,000.00 3,450,000.00
95,000.00 950,000.00
75,000.00 900,000.00
450,000.00 1,800,000.00
140,000.00 1,400,000.00
140,000.00 1,400,000.00
12,000.00 8,400,000.00
9,000.00 2,700,000.00
1,500,000.00 7,500,000.00
0.00 -
2,000,000.00 20,000,000.00
3,000,000.00 15,000,000.00
152,200,000.00
ITEM PEMBAYARAN NO. : 1.21.
JENIS PEKERJAAN : Manajemen Mutu
SATUAN PEMBAYARAN : Lump Sum
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000,000.00 70,000,000.00
5,000,000.00 35,000,000.00
2,000,000.00 14,000,000.00
1,000,000.00 7,000,000.00
126,000,000.00
ITEM PEMBAYARAN NO. : 1.8 (2)
JENIS PEKERJAAN : Pemasangan & Pemeliharaan Jembatan Sementara
SATUAN PEMBAYARAN : Lump Sum
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
Analisa EI-6
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
70,276.78
8,769.36
79,046.13
404,003.52
100,933.10
32,208.87
537,145.49
101,306.75
9,576.16
20,000.00
130,882.91
747,074.54
74,707.45
821,781.99
ITEM PEMBAYARAN NO. : '5.1.(3)
JENIS PEKERJAAN : Lapis Pondasi Telford
SATUAN PEMBAYARAN : M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 4.00
5 Tebal rata2 Telfor t 0.150
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan - Agregat Fh1 1.05
As 0.00
9 Berat isi bahan :
- Agregat D1 1.42
1. BAHAN
1.a. Agregat Pokok = {(Ak/1000 : t M3) x Fh1} : D1 (M04) 0.9120
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04) 0.1725
1.c. Pasir Urug = {(Ap2/1000 : t M3) x Fh1} : D1 (M01d) 0.0690
1.d.
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1 0.45
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 4.8767
- Mandor = (Tk x M) / Qt (L03) 0.4877
SATUAN KETERANGAN
KM
M
Jam
-
Kg/M3
ton / M3
M3
M3
M3
M3
-
-
lihat tabel
V - Loading
M3
Jam
Lanjutan
SATUAN KETERANGAN
ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan 2 fase @ 6 lintas
M
-
M3
Jam
liter
-
liter/menit
liter
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
30.02
7.49
37.51
10,731.25
0.00
10,731.25
96.06
61.69
157.75
10,926.52
1,638.98
12,565.49
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 2 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
ITEM PEMBAYARAN NO. : 6.1 (1)(a)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter
1.15 KM
7.00 Jam
1.03 -
64 % terhadap volume
36 % terhadap volume
0.84 Kg / liter
0.80 Kg / liter
1.03 liter
0.5537 Kg.
0.3708 Liter
3.00 M
30.00 m/menit Asumsi
100 liter/menit Panduan
0.80 Sedang
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
Analisa EI-6
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
7,234.29
902.72
8,137.01
666,013.13
74,516.82
1,345,698.75
2,086,228.70
11,845.51
101,975.40
31,021.48
0.00
144,842.39
2,239,208.10
335,881.22
2,575,089.32
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal rata2 Lapen t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan - Agregat Fh1
Fator kehilangan - Aspal Fh2
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak
- Agregat Pengunci Ap1
- Agregat Penutup Ap2
- Aspal : - Paska Agregat Pokok As1
- Paska Agregat Pengunci As2
As
9 Berat isi bahan :
- Agregat D1
- Aspal D2
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2 x D1
Koefisien Alat / M3 = 1= 1 : Q2 (E09)
2.c. THREE WHEEL ROLLER (E16)
Kecepatan rata-rata alat v
Lebar efektif pemadatan b
Jumlah lintasan n
Lajur lintasan N
Lebar Overlap bo
Faktor Efisiensi alat Fa
Apabila N <= 1
Kap. Prod. / jam = (v x 1000) x b x t x Fa Q3
n
Apabila N > 1
Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q3
n
5.00 KM
0.080 M
7.00 Jam
1.05 -
1.01 -
1.42 ton / M3
1.03 ton / M3
1.1276 M3
0.1849 M3
0.1294 M3
69.44 Kg
1.50 KM/jam
1.20 M
6.00 lintasan
3.00
0.30 m lihat tabel
0.83 - V - Loading
39.84 M3
0.0251 jam
10.00 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
10.61 menit
15.00 menit
15.00 menit
10.00 menit
50.61 menit
6.68 M3
0.1497 Jam
2.50 Km / Jam
1.90 M
12.00 lintasan 2 fase @ 6 lintas
1.00
0.30 M
0.83 -
26.2833333333 M3
0.0000
0.0380 Jam
850.00 liter
0.80 -
55 liter/menit
2.64 liter
0.3788 Jam
Lump Sum
39.84 M3/Jam
278.88 M3
20.00 orang
2.00 orang
0.5020 Jam
0.0502 Jam
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume tanah (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman < 40 % Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 99,025.09 / M3
7.00 Jam
1.20 -
1.60 ton/m3 1.40 - 1.80
3.00 Km
0.93 M3
1.00 -
0.83
0.90 Faktor konversi
menit dihapus, masuk
1.320 menit dalam waktu siklus
0.100 menit disesuaikam
1.42 menit
39.14 M3/Jam
0.0256 Jam
3.50 ton
0.83 -
30.00 KM/Jam
40.00 KM/Jam
menit
3.35 menit
6.00 menit
4.50 menit
1.00 menit
14.85 menit
6.11 M3/Jam
0.1636 Jam
Lump Sump
39.14 M3/Jam
273.97 M3
2.00 orang
1.00 orang
0.0511 Jam
0.0256 Jam
Analisa EI-321
A. TENAGA
B. BAHAN
Retribusi
C. PERALATAN
1. Excavator (E15) Jam 0.0264 727,789.47 19,206.30
2. Dump Truck (E08) Jam 0.5579 415,472.29 231,789.34
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 0.00 0.00
5. Water tank truck (E23) Jam 0.0070 0.00 0.00
6 Alat Bantu Ls 1.0000 0.00 0.00
JUMLAH HARGA PERALATAN 250,995.63
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan (padat ke asli) Fv
6 Tebal hamparan padat t
7 Berat volume bahan (lepas) D
8 Retribusi bahan timbunan Ret
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Faktor Konversi asli ke padat Fv1
Waktu sklus Ts1
- Menggali, memuat T1
- Lain lain T2
Waktu Siklus = T1 x Fv Ts1
Kapasitas Prod./Jam = pa x Fa x 60 Q5
1000 x Wc
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
ITEM PEMBAYARAN NO. : 3.2.(1b)
JENIS PEKERJAAN : Timbunan Biasa Dari Galian
SATUAN PEMBAYARAN : M3
Rp. 290,940.08 / M3
7.00 Jam
1.11 -
0.15 M
1.60 Ton/M3
5000 Rp
8.70 Km
0.93 M3
1.00 -
0.83 -
0.90
1.00 menit
0.10 menit
1.10 menit
0.0264 Jam
3.50 Ton
0.83 -
1.25
20.00 KM/Jam
30.00 KM/Jam
3.12 menit
26.10 menit
17.40 menit
2.00 menit
48.62 menit
1.79 M3
0.5579 Jam
Analisa EI-321
50.00 M
0.30 M
0.80 -
4.00 Km / Jam
2 lintasan
1.00
2.6 M
0.75 menit
1.00 menit
1.75 menit
267.43 M3
0.0037 Jam
4.00 Km / Jam
1.48 M
8.00 lintasan
3.00
0.30 M
0.83 -
239.04 M3
0.0042 Jam
5.00 M3
0.07 M3
200.00 liter/menit
0.83
142.29 M3
0.0070 jam
Lump Sump
37.89 M3/Jam
265.25 M3
4.00 orang
1.00 orang
0.1056 Jam
0.0264 Jam
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0052 662,776.50 3,434.52
2. Vibro Roller (E19) jam 0.0000 479,833.72 0.00
2 Alat Bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk
7 Faktor pengembangan bahan Fk
8 Pengurugan kembali (backfill) untuk struktur Uk
Rp. 4,400.37 / M2
7.00 Jam
1.20 -
35.00 %/M3
0.93 M3
1.00 -
0.83 -
0.90 -
0.85 -
0.32 menit
0.29 menit
192.98 M3/Jam
0.0052 Jam
4.00 Km / jam
1.48 M
8.00 lintasan
3.00
0.30 M
0.83 -
1,593.60 M2
0.0006 Jam
Lump Sum
192.98 M3/Jam
1,350.83 M3
4.00 orang
1.00 orang
0.0207 Jam
0.0052 Jam
Berlanjut ke halaman berikut
URAIAN ANALISA HARGA SATUAN
Lanjutan
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
11,574.87
15,902.90
1,805.44
29,283.20
847,366.07
365,278.85
435,240.00
412,650.00
42,000.00
2,102,534.91
78,253.50
136,230.97
18,437.63
5,000.00
237,922.10
2,369,740.22
355,461.03
2,725,201.25
ITEM PEMBAYARAN NO. :7.1 (7) a
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa
SATUAN PEMBAYARAN :M3 URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.15
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 340
7 Ukuran Agregat Maksimum Ag 19
8 Perbandingan Air/Semen Maksimum Wcr 0.50
9 Perbandingan Camp. : Semen Sm 410.0
: Pasir Ps 670.0
: Agregat Kasar Kr 992.0
10 Berat Isi :
- Beton D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1500
1.e. Paku (M18) 1.2000
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.0040
- Pekerja = (Tk x P) : Qt (L01) 0.8032
Rp. 2,725,201.25 / M3
SATUAN KETERANGAN
KM
jam
Kg/M3
mm
-
Kg/M3 Berdasarkan
Kg/M3 JMF dari EE
Kg/M3
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
-
menit
menit
menit
menit
menit
M3
jam
M3
km/jam
km/jam
menit
menit
menit
menit
menit
SATUAN KETERANGAN
M3
jam
M3
M3
-
liter/menit
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa E
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
201,750.00
0.00
125,875.00
327,625.00
2,400,000.00
10,000.00
2,410,000.00
8,190.63
8,190.63
2,745,815.63
411,872.34
3,157,687.97
Analisa E
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
69,449.23
19,083.48
10,832.62
99,365.32
518,310.00
353,152.80
264,650.88
1,136,113.68
60,711.47
679.28
0.00
61,390.76
1,296,869.76
194,530.46
1,491,400.22
Analisa EI-71
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
42,031.25
18,479.17
10,489.58
71,000.00
275,000.00
275,000.00
0.00
11,586.80
500.00
12,086.80
358,086.80
53,713.02
411,799.82
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
HARGA
SATUAN KETERANGAN
( Rp.)
100,000.00
110,000.00
125,000.00
125,000.00
100,000.00
115,000.00
90,000.00
125,000.00
90,000.00
120,000.00
MUDARAMAN RIDWAN
Direktur
DAFTAR HARGA SATUAN BAHAN
MUDARAMAN RIDWAN
Direktur
TAR HARGA SATUAN BAHAN
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Quary
Borrow Pit/quarry
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
KETERANGAN
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
KETERANGAN
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
KETERANGAN
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
KETERANGAN
Analisa EI-2
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
435.61
135.89
571.51
0.00
5,008.67
70,900.58
0.00
75,909.25
76,480.76
11,472.11
87,952.87
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
57,874.35
19,083.48
7,221.74
84,179.58
478,440.00
323,054.55
251,142.90
1,052,637.45
40,474.32
0.00
40,474.32
1,177,291.34
176,593.70
1,353,885.04
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 727,789.47 6,182.73
2. Dump Truck (E08) jam 0.0645 415,472.29 26,777.30
3. Motor Grader (E13) jam 0.0043 765,340.81 3,259.94
4. Tandem Roller (E17) jam 0.0054 471,925.16 2,527.04
5. Water Tanker (E23) jam 0.0141 483,259.95 6,792.81
6. Alat Bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal lapis agregat padat t
6 Berat isi padat Bip
7 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Fraksi lolos Scalping Screen 0 - 5 mm St
9 Berat volume agregat (lepas) Bil
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2
Faktor kehilangan - Fraksi lolos Scalping Screen 0 - 5 mm Fh3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : Ts1
- Memuat dan lain-lain T1
Ts1
1.15 KM
0.15 M
1.81
7.00 jam
18.00 % Gradasi harus
18.00 % memenuhi
64.00 % Spesifikasi
1.51 ton/m3
1.05
1.05
1.05
1.2586 M3
1.50 M3
0.85 - lepas
0.83 - kondisi sedang
117.71 M3
0.0085 jam
3.50 ton
0.83 -
30.00 KM/jam
40.00 KM/jam
1.18 menit
2.30 menit
1.73 menit
1.00 menit
6.21 menit
15.52 M3
0.0645 jam
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt -
- Mandor = (Tk x M) : Qt -
50.00 M
2.40 M
0.83 -
4.00 KM/jam
6.00 lintasan 1 x pp
3.00
0.30 M
0.75 menit
1.00 menit
1.75 menit
234.77 M3
0.0043 jam
3.00 KM/jam
1.20 M
6.00 lintasan
3.00
0.30 m
0.83 -
186.75 M3
0.0054 jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 jam
Lump Sum
117.71 M3/jam
823.99 M3
7.00 orang
1.00 orang
0.0595 jam
0.0085 jam
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
34,508.42
7,585.86
4,306.07
46,400.35
720,000.00
720,000.00
144,248.93
172,766.59
-
317,015.52
1,083,415.87
162,512.38
1,245,928.25
ITEM PEMBAYARAN NO. : 7.6 (11).a
JENIS PEKERJAAN : Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran diameter 400 mm
SATUAN PEMBAYARAN : M1
URAIAN A
I. ASUMSI
1 Membeli Tiang Pancang jadi dari Pabrik dan diterima di
lokasi jembatan
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.15
4 Jam kerja efektif per-hari Tk 7.00
5 Ukuran tiang pancang sesuai kebutuhan (diameter) Uk 400.00
6 Panjang Tiang Pancang p 6.00
7 Jarak pabrik ke lokasi jembatan Ld2 2.00
1. BAHAN
Tiang Pancang Beton Prategang Pracetak Lengkap (M50) 6.00
Volume per meter is 0.13
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 6.00
Faktor efisiensi alat Fa 0.58
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00
- Lain-lain (bongkar dan muat) T3 120.00
Ts1 270.00
SATUAN KETERANGAN
KM
jam
mm
M
KM
M1
M3
batang
Km/Jam
Km/Jam
menit
menit
menit
menit
M'
Jam
batang
-
menit
menit
menit
M'
jam
Lumpsum
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 29.23
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 10.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.24
- Tukang = (Tk x Tb) : Qt (L02) 0.48
- Pekerja = (Tk x P) : Qt (L01) 2.39
Rp. 1,245,928.25 / M3
SATUAN KETERANGAN
M'
orang
orang
orang
jam
jam
jam
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
50,186.57
9,193.62
5,218.70
64,598.88
34,583.33
11,475.00
5,737.50
51,795.83
209,382.79
23,107.24
18,366.11
1,614.97
252,471.12
368,865.83
55,329.87
424,195.70
ITEM PEMBAYARAN NO. : 7.6 (17).a
JENIS PEKERJAAN : Pemancangan Tiang Pancang Beton Pratekan Pracetak Diameter 400 mm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Ukuran Tiang sesuai keperluan
3 Lokasi pekerjaan : di lokasi jembatan
4 Jam kerja efektif per-hari Tk 7
5 Panjang Tiang p 6
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
- Kawat Las (untuk menyambung tiang) 0.42
- Acetylene + Oxigen ( untuk memotong besi Tiang) 0.05
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 24.12
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 12.00
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.29
- Tukang = ( Tk x Tb ) : Qt (L02) 0.58
- Pekerja = ( Tk x P ) : Qt (L01) 3.48
SATUAN KETERANGAN
jam
M
Kg
Btl
Titik
-
menit
menit
menit
M1
Jam
Titik
-
menit
menit
M1
Jam
Titik
-
menit
menit
M1
Jam
Lumpsum
M'
orang
orang
orang
jam
jam
jam
SATUAN KETERANGAN
Analisa EI-716
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. :7.1 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu sedang fc’= 25 MPa (K-300) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
9,330.52
13,794.18
3,124.06
26,248.76
961,669.80
235,969.73
399,368.24
540,000.00
38,400.00
2,175,407.77
163,780.72
396,310.05
12,377.72
0.00
572,468.49
2,774,125.02
416,118.75
3,190,243.77
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Kadar Semen Minimum Ks
7 Ukuran Agregat Maksimum Ag
8 Perbandingan Air/Semen Maksimum Wcr
9 Perbandingan Camp. : Semen Sm
: Pasir Ps
: Agregat Kasar Kr
10 Berat Isi :
- Beton D1
- Semen D2
- Pasir D3
- Agregat Kasar D4
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12)
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a)
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03)
1.d. Kayu Perancah dan/atau Bekisting (M19)
1.e. Paku (M18)
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu, dll. T4
Ts
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
Rp. 3,190,243.77 / M3
11.89 KM
7.00 jam
350 Kg/M3
19 mm
0.45 -
456.0 Kg/M3 Berdasarkan
631.0 Kg/M3 JMF dari EE
992.0 Kg/M3
2.40 T/M3
1.25 T/M3
1.30 T/M3
1.40 T/M3
469.680 Kg
0.5097 M3 663
0.7440 M3 1,042
0.2000 M3
1.6000 Kg
600.00 liter
0.83 -
2.50 menit
2.50 menit
1.00 menit
1.00 menit
7.00 menit
4.269 M3/jam
0.2343 jam
5.00 M3
0.83
20.00 km/jam
30.00 km/jam
70.28 menit
35.67 menit
23.78 menit
5.00 menit
134.74 menit
1.85 M3
0.5411 jam
4.00 M3
0.19 M3
0.83 -
100.00 liter/menit
26.21 M3
0.0382 jam
29.88 M3
1.00 orang
5.00 orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
4.00 orang
0.2343 jam
1.1714 jam
0.9371 jam
Analisa EI-719
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. :7.1 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton Siklop fc’=15 MPa (K-175) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
152,986.26
15,078.25
17,074.38
185,138.90
670,638.15
232,604.08
485,924.87
135,000.00
9,600.00
1,533,767.09
116,526.36
12,377.72
57,518.39
0.00
186,422.47
1,905,328.46
285,799.27
2,191,127.73
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Kadar Semen Minimum Ks
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12)
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01)
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03)
1.e. Kayu Perancah (M19)
1.f Paku (M18)
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu, dll. T4
Ts
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
Rp. 2,191,127.7 / M3
11.89 KM
7.00 jam
300 Kg/M3 K-175
0.57 -
318.0 Kg/M3 Berdasarkan
622.0 Kg/M3 JMF dari EE
1,207.0 Kg/M3
2.40 T/M3
1.25 T/M3
1.30 T/M3
1.40 T/M3
327.540 Kg
0.5024 M3
0.9053 M3
0.0500 M3
0.4000 Kg
500.00 liter
0.83 -
11.00 menit
9.00 menit
6.00 menit
5.88 menit
31.88 menit
0.781 M3
1.2804 jam
4.00 M3
0.19 M3
0.83 -
100.00 liter/menit
26.21 M3
0.0382 jam
0.781 M3
1.2804 jam
5.47 M3
1.00 orang
1.00 orang
1 Tk = 20 m3 btn
2.00 orang
12.00 orang
1.2804 jam
1.2804 jam
15.3647 jam
Analisa EI-7110
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. :7.1 (10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 MPa (K-125) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
16.20
31,399,183.63
0.19
JUMLAH
HARGA
(Rp.)
81,575.42
16,080.07
9,104.41
106,759.90
636,895.35
236,717.65
485,924.87
135,000.00
9,600.00
1,504,137.87
62,134.25
12,377.72
0.00
74,511.98
1,685,409.75
252,811.46
1,938,221.21
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Kadar Semen Minimum Ks
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12)
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a)
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03)
1.e. Kayu Perancah (M19)
1.f Paku (M18)
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu, dll. T4
Ts
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
Rp. 1,938,221.2 / M3
11.89 KM
7.00 jam
250 Kg/M3
0.60 -
302.0 Kg/M3 Berdasarkan
633.0 Kg/M3 JMF dari EE
1,207.0 Kg/M3
2.40 T/M3
1.25 T/M3
1.30 T/M3
1.40 T/M3
311.060 Kg
0.5113 M3
0.9053 M3 Agregat Kasar
0.0500 M3
0.4000 Kg
500.00 liter
0.83 -
8.00 menit
4.00 menit
2.00 menit
3.00 menit
17.00 menit
1.465 M3
0.6827 jam
4.00 M3
0.19 M3
0.83 -
100.00 liter/menit
26.21 M3
0.0382 jam
10.25 M3
1.00 orang
2.00 orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
12.00 orang
0.6827 jam
1.3655 jam
8.1928 jam
Analisa EI-721d
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : 7.2 (1).c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Unit Pra TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN
5.00
3,302,904,585.56
19.95
JUMLAH
HARGA
(Rp.)
0.00
290,000,000.00
13,018,974.15
20,426,328.07
11,878,200.00
24,000,000.00
359,323,502.22
0.00
359,323,502.22
53,898,525.33
413,222,027.55
olume dan/atau ukuran
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk
3 Tinggi PC I Girder H
4 Bentang PC I Girder L
5 Menggunakan beton K500
6 Komponen baja tulangan
7 Faktor kehilangan bahan
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2
Faktor Efisiensi alat Fa
Waktu siklus
- Waktu memuat dan membongkar T1
- dan lain-lain ( termasuk mengatur dan menggeser) T2
Ts2
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
ITEM PEMBAYARAN NO. : 7.2 (1).c
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Unit Pracetak Gelagar Tipe I Bentang 30 meter
SATUAN PEMBAYARAN : Buah
7.00 jam
0.00 M
0.00 M
250 kg/m3
1.10
1.0000 M3 tinggi 90
621.08 kg tabel
1,238.15 kg tabel
12.00 Buah analisa tabel
480.00 M
30.00 menit
15.00 menit
45.00 menit
1.11 Bh/jam
0.9036 jam
1.00 Buah
0.83 -
30.00 menit
15.00 menit
45.00 menit
1.11 Bh/jam
0.9036 jam
7.00 Buah
1.00 orang
2.00 orang
8.00 orang
1.00 jam
2.00 jam
8.00 jam
Analisa EI-721a
tak Gelagar Tipe I Bentang 30 meter
URAIAN ANALISA HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan 4 Wilayah 2 Maluku Utara
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.8032 506,890.52
2 Crane 2 (E31) 0.7028 506,890.52
3 Alat Bantu LS 1.0000 359,323.50
4 alat stressing 1.0000 35,000,000.00
7.00
234,473,417.03
1.42
JUMLAH
HARGA
(Rp.)
115,285.71
31,678.57
17,982.14
164,946.43
13,204,800.00
13,204,800.00
407,140.98
356,248.35
359,323.50
35,000,000.00
36,122,712.83
49,492,459.26
7,423,868.89
56,916,328.15
olume dan/atau ukuran
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk
3 Tinggi PC I Girder H
4 Bentang PC I Girder L
5 Menggunakan beton K500
6 Komponen baja tulangan
7 Faktor kehilangan bahan
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2
Faktor Efisiensi alat Fa
Waktu siklus
- Waktu memuat dan membongkar T1
- dan lain-lain ( termasuk mengatur dan menggeser) T2
Ts2
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
ITEM PEMBAYARAN NO. : 7.2 (2).c
JENIS PEKERJAAN : Pemasangan Unit Pracetak Gelagar Tipe I Bentang 30 meter
SATUAN PEMBAYARAN : Buah
7.00 jam
1.25 M
30.00 M
250.00 kg/m3
1.10
4.80 M3
25.00 menit
15.00 menit
40.00 menit
1.25 Bh/jam
0.8032 jam
1.00 Buah
0.83 -
20.00 menit
15.00 menit
35.00 menit
1.42 Bh/jam
0.7028 jam
7.00 Buah
1.00 orang
2.00 orang
8.00 orang
1.00 jam
2.00 jam
8.00 jam
Analisa EI-721a
tang 30 meter
URAIAN ANALISA HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : Beton Diafragma K350 (fc’ 30 MPa) termasu PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : 7.2.(10) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : m3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
30.00
350,487,049.91
2.12
JUMLAH
HARGA
(Rp.)
202,378.05
29,919.43
33,880.30
266,177.77
3,147,423.62
3,063,027.00
134,441.98
2,514,862.80
412,855.69
9,272,611.09
612,270.73
7,985.33
620,256.06
10,159,044.92
1,523,856.74
11,682,901.66
olume dan/atau ukuran
I. ASUMSI
1 PC Diafragma dicetak di lokasi proyek K 350
2 Lokasi pekerjaan : di setiap jembatan
3 Bahan diterima di lokasi jembatan
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan 1.1
6 Ukuran (1 Pias) (2.6240 x 0.15)
7 tulangan
1. BAHAN
- Pracetak PC Diafragma bentang K 350
- tulangan ulir U32
Baja Prategang
Anchorage diafragma
Ducting diafragma
2. ALAT
2.a CRANE (E07)
Kapasitas V2
Faktor Efisiensi alat Fa
Waktu siklus
- Waktu memuat dan membongkar T1
- dan lain-lain ( termasuk mengatur dan menggeser) T2
Ts2
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M
- Tukang Tb
- Pekerja P
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
7.00 jam
1.10
0.3936 M3
150 kg/m3
1.0000 m3
150.0000 kg
6.4136 kg
2.5407 bh
8.2571 m
1.00 Buah
0.83 -
30.00 menit
15.00 menit
45.00 menit
1.11 Bh/jam
0.9036 jam
Lumpsum
2.76 M3
1.00 orang
1.00 orang
8.00 orang
2.5407 jam
2.5407 jam
20.3252 jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 24 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
2,514.27
56,487,556.92
0.34
JUMLAH
HARGA
(Rp.)
1,045.49
412.17
466.74
1,924.39
17,568.38
43.57
17,611.94
0.00
0.00
19,536.33
2,930.45
22,466.78
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Faktor Kehilangan Besi Tulangan Fh
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a)
1.b. Kawat beton (M14)
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt
dibutuhkan tenaga : - Mandor M
- Tukang Tb
- Pekerja P
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03)
- Tukang = ( Tb x Tk ) : Qt (L02)
- Pekerja = ( P x Tk ) : Qt (L01)
11.89 KM
7.00 jam
1.10 -
1.1000 Kg
0.0025 Kg
Ls
200.00 Kg
1.00 orang
1.00 orang
3.00 orang
0.0350 jam
0.0350 jam
0.1050 jam
Analisa EI-733
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : 7.3 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 32 Ulir TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
62,673.55
1,471,775,948.07
8.89
JUMLAH
HARGA
(Rp.)
1,045.49
412.17
466.74
1,924.39
18,147.25
348.54
18,495.79
0.00
0.00
20,420.18
3,063.03
23,483.21
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Faktor Kehilangan Besi Tulangan Fh
1. BAHAN
1.a. Baja Tulangan (Ulir) D32 (M39b)
1.b. Kawat beton (M14)
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt
dibutuhkan tenaga : - Mandor M
- Tukang Tb
- Pekerja P
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03)
- Tukang = ( Tb x Tk ) : Qt (L02)
- Pekerja = ( P x Tk ) : Qt (L01)
11.89 KM
7.00 jam
1.10 -
1.1000 Kg
0.0200 Kg
Ls
200.00 Kg
1.00 orang
1.00 orang
3.00 orang
0.0350 jam
0.0350 jam
0.1050 jam
Analisa EI-748
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan Ake Tewe
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : 7.5 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Pengangkutan Bahan Jembatan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1.71
0.20
0.00
1.92
0.00
194.33
194.33
81.64
81.64
81.64
3,840.00
0.00
4,473.56
4,475.48
671.32
5,146.80
olume dan/atau ukuran
satu satuan pekerjaan
k dapat diubah kecuali
Kepada Peserta Lelang
I. ASUMSI
1 Pengangkutan Material dari Pabrik ke Pelabuhan (1)
dengan Trailer
2 Pengangkutan dari Pelabuhan (1) ke Pelabuhan (2)
dengan Kapal Laut
3 Jarak Pabrik ke Pelabuhan (1) Ld1
4 Jarak dari Pelabuhan (1) ke Pelabuhan (2) Lp
5 Jarak dari Pelabuhan (2) ke Lokasi Pekerjaan Ld2
1. BAHAN
Tidak ada pemakaian bahan
2. ALAT
Pengangkutan dari pabrik ke Pelabuhan 1
TRAILER ke 1 (E35)
Kapasitas angkut V1
Faktor Efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld1 : v1) x 60 menit T1
- Waktu tempuh kosong = (Ld1 : v2) x 60 menit T2
- Waktu bongkar, muat dan lain-lain T3
Ts1
TENAGA
Diperlukan untuk menurunkan material di pelabuhan/hari Qt1
Kebutuhan tenaga : - Mandor M
- Pekerja P
ITEM PEMBAYARAN NO. : 7.5 (2)
JENIS PEKERJAAN :Pengangkutan Bahan Jembatan
SATUAN PEMBAYARAN : Kg
TRAILER ke 2 (E35)
Kapasitas angkut V3
Faktor Efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld2 : v1) x 60 menit T6
- Waktu tempuh kosong = (Ld2 : v2) x 60 menit T7
- Waktu muat dan lain-lain T8
- Waktu bongkar dan lain-lain T9
Ts3
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Tambang
- Tackle
TENAGA
Diperlukan untuk memuat di pelabuhan ke truk Qt2
dan penurunan dari truk di lokasi pekerjaan Qt3
Kebutuhan tenaga : - Mandor M
- Pekerja P
Koefisien Tenaga / Kg :
- Mandor = ( M ) : (Qt2 + Qt3) (L03)
- Pekerja = ( P ) : (Qt2 + Qt3) (L01)
ITEM PEMBAYARAN NO. : 7.5 (2)
JENIS PEKERJAAN :Pengangkutan Bahan Jembatan
SATUAN PEMBAYARAN : Kg
Rp. 5,146.80 / Kg
25.0 KM
960.0 Millaut
25.0 KM
20.00 Ton
0.83 -
20.00 KM/jam
30.00 KM/jam
75.00 menit
50.00 menit
180.00 menit
305.00 menit
3,265.57 kg
0.0003 jam
15.00 ton
0.83 -
85.00 menit
5.00 menit
90.00 menit
8,300.00 kg
0.00012 jam
22,859 Kg
1.00 orang
10.00 orang
960.0 Millaut
75.00 menit
50.00 menit
90.00 menit
90.00 menit
305.00 menit
3,265.57 kg
0.0003 jam
15.00 ton
0.83 -
85.00 menit
5.00 menit
90.00 menit
8,300.00 kg
0.0001 jam
15.00 ton
0.83 -
85.00 menit
5.00 menit
90.00 menit
8,300.00 Ton
0.00012 jam
Lump Sump
58,100 Kg Crane 2
58,100 Kg Crane 3
2.00 orang 2 regu
20.00 orang 2 regu
0.0000 jam
0.0002 jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Penggantian Jembatan 4 Wilayah 2 Maluku Utara
0
PROP / KAB / KODYA : Maluku Utara / Tidore Kepulauan
ITEM PEMBAYARAN NO. : 7.2 (1).c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe I Bentang 3TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
1,354,607.14
221,750.00
143,857.14
1,720,214.29
252,000,000.00
13,018,974.15
21,729,477.66
12,636,000.00
24,000,000.00
323,384,451.81
8,709,067.81
11,321,788.15
1,547,326.00
1,521,178.58
1,521,178.58
309,355,200.00
161,692.23
334,137,431.34
659,242,097.43
98,886,314.61
758,128,412.05
ITEM PEMBAYARAN NO. : 7.2 (1).c
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe I Bentang 30 meter
SATUAN PEMBAYARAN : Buah URAIAN AN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 0.90
4 Bentang PC I Girder L 30.00
5 Menggunakan beton K500
6 Komponen baja tulangan 250.00
7 Faktor kehilangan bahan 1.10
8 Pengangkutan Material dari Pabrik ke Pelabuhan (1)
dengan Trailer, Jarak Pabrik ke Pelabuhan (1) Ld1 20.0
9 Pengangkutan dari Pelabuhan (1) ke Pelabuhan (2)
dengan Kapal Laut, Jarak dari Pelabuhan (1) ke Pelabuhan (2) Lp 960.0
10 Jarak dari Pelabuhan (2) ke Lokasi Pekerjaan Ld2 20
2. ALAT
Pengangkutan dari pabrik ke Pelabuhan 1
TRAILER ke 1 (E35)
Kapasitas angkut V1 0.33
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld1 : v1) x 60 menit T1 60.00
- Waktu tempuh kosong = (Ld1 : v2) x 60 menit T2 40.00
- Waktu bongkar, muat dan lain-lain T3 100.00
Ts1 200.00
TENAGA
Diperlukan untuk menurunkan material di pelabuhan/hari Qt1 1
Kebutuhan tenaga : - Mandor M 1.00
- Pekerja P 10.00
TRAILER ke 2 (E35)
Kapasitas angkut V3 0.33
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld2 : v1) x 60 menit T6 60.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 menit T7 40.00
- Waktu muat dan lain-lain T8 80.00
- Waktu bongkar dan lain-lain T9 80.00
Ts3 260.00
3. TENAGA
a) untuk Pengangkutan
Diperlukan untuk memuat di pelabuhan ke truk Qt2 1
dan penurunan dari truk di lokasi pekerjaan Qt3 1
Kebutuhan tenaga : - Mandor M 2.00
- Pekerja P 20.00
Koefisien Tenaga / Kg :
- Mandor = ( M ) : (Qt2 + Qt3) (L03) 1.0000
- Pekerja = ( P ) : (Qt2 + Qt3) (L01) 10.0000
b) Untuk Pengadaan
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 1.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 12.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 7.00
- Tukang = (Tk x Tb) : Qt (L02) 14.00
- Pekerja = (Tk x P) : Qt (L01) 84.00
ITEM PEMBAYARAN NO. : 7.2 (1).c
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe I Bentang 30 meter
SATUAN PEMBAYARAN : Buah URAIAN AN
SATUAN KETERANGAN
jam
M
M
kg/m3
KM
Mil laut
KM
M3 tinggi 90
kg tabel
kg tabel
Buah analisa tabel
M
asumsi :
kapasitas
bh 1 trailer = 10 m
-
KM/jam
KM/jam
menit
menit
menit
menit
bh
jam
bh asumsi :
- 1 gelagar pakai
1 crane
menit
menit
menit
bh
jam
bh gelagar
orang
orang
Mil laut
Analisa El-721c
SATUAN KETERANGAN
bh
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
bh
jam
bh
-
menit
menit
menit
bh
jam
bh
-
menit
menit
menit
bh
jam
Lump Sump
bh Crane 2
bh Crane 3
orang 2 regu
orang 2 regu
jam
jam
bh
orang
orang
orang
jam
jam
jam
Analisa El-721c
SATUAN KETERANGAN
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.17
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal Caison t 0.40
7 Kebutuhan baja tulangan Mb 150
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00
Kebutuhan tenaga tambahan :
- Pekerja P 9.00
- Tukang T 3.00
- Mandor M 1.00
SATUAN KETERANGAN
M
Km
Jam
M
Kg/M3
Spec.
M3
Kg
M3 Tambahan
Kg Tambahan
M'
orang
orang
orang
jam
jam
jam
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.2 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Beat ditaburkan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Glass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanju
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Spec.10.4.3(2)(d)
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Rp. 400,061.34 / M2
KETERANGAN
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.2 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 5.5 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 55.5 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 125.58 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0557 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2230 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4459 jam
Berlanju
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA SATUAN
KETERANGAN
ANALISA HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 3.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 40.00 Buah
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 26.67 menit
- Angkut V=30 Km/jam = Lef x V x 60 T2 6.00 menit
- Kembali V=50 Km/jam = Lef x V x 60 T3 3.60 menit
- Menurunkan = Rata-rata 2 menit/m T4 40.00 menit
- Lain-lain = geser, atur, tunggu dll T5 10.00 menit
Ts 86.27 menit
Berlanju
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Dimensi
lihat gambar
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 8.4.(10).(a)
JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountable)
SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA SATUAN
KETERANGAN
INFORMASI UMUM
No. U RAIAN I N F O R MAS I
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 1.15 Kilometer
Base Camp
30 Km 3 Km 1,3 Km
20 ....................................
21 ....................................
22 ....................................
N F O R MAS I
dan Jembatan
...............
( Leff = a + b )
meter
meter
riode Pelaksanaan)
###
###
0.00
###
###
0.00
###
###
###
Base Camp
1,3 Km
...........
............
.............
............
.............
HARGA SATUAN BAHAN QUARRY
0.00
0.00
Err:509
0.00
0.00
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 3.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 450,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 3.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 358,100.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 3.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 607,200.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 727,789.47
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 14,410.71
9 Berat volume batu belah Bil 1.60 ton/m3
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 7,778.81 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 3.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 607,200.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 3.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 302,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 3.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 400,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 3.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 675,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 460,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 662,776.50
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 681,158.18
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M09 - Material Pilihan
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
9,795,868.85
492,285.42
81,896.72
801,284.10
296,134.35
100,781.05
721,473.27
415,472.29
681,158.18
662,776.50
548,972.24
568,283.81
765,340.81
707,274.42
727,789.47
449,838.91
471,925.16
529,802.22
479,833.72
51,646.03
1,126,835.13
54,939.29
483,259.95
133,976.11
49,962.37
64,027.10
1,620,978.02
367,770.59
669,315.05
185,782.23
506,890.52
147,663.54
683,913.64
49,636.04
722,852.63
1,848,428.88
317,741.80
6,898,312.18
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
7,750,911.13
649,191.66
461,083.04
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
626,385.90
779,404.86
1,047,867.27
700,069.52
650,869.52
159,720.00 T x Te1 x Te2 x Fa
658,721.61
829,975.84
583,758.14
606,486.69
245,337.03
144,171.04
32,825.54
32,825.54
252,992.03
304,752.45
46,144.83
46,347.21
228,524.07
215,893.69
46,391.80
280,313.82
47,705.53
MUDARAMAN RIDWAN
Direktur
DA F T A R P E R S O N I L
Pengalama
NO. Nama MA Posisi/Jabatan di Proyek ini Sertifikat Keahlian Kebangsaan Umur Pendidikan Terakhir
pada Jem
NA
GE
1 2 3 4 5 6 7 8
R
1 HENDRA WIJAYA FEBRIANTO, ST PE
PE Ahli Teknik Jembatan - Madya Indonesia 32 Tahun S-1 Teknik Sipil 7 Ta
LA
LA
2 AGUS SUMARSONO, ST PE
KS
KS Ahli Teknik Jembatan - Muda Indonesia 58 Tahun S-1 Teknik Sipil 10 Ta
QU
LA
AN
AN
ALI
3 DEWI ISNAENI, ST KS
QU
AA 1 Ahli Teknik Jembatan - Madya Indonesia 43 Tahun S-1 Teknik Sipil 7 Ta
TY
AN
4 LINGGA KENCANA OKTAVIANSYAH, ST AD
CO Ahli Teknik Jembatan - Muda Indonesia 29 Tahun S-1 Teknik Sipil 6 Ta
AMI2
TI
NT
TY
AH
5 DANIEL TRISTANTO, ST NI
RO Ahli Teknik Jembatan - Muda Indonesia 50 Tahun S-1 Teknik Sipil 10 Ta
CO
LI
ST
LK3
NT
6 M. FAHRI MUSA, ST RA Ahli Teknik Jembatan - Muda Indonesia 29 Tahun S-1 Teknik Sipil 4 Ta
RO
KO
SI
7 GILBERT ALEXANDER NIKIYULUW, ST LTE
NS Ahli K3 Konstruksi - Madya Indonesia 54 Tahun S-1 Teknik Sipil 20 Ta
TR
KN
UK
IK
SI 0
2 0
Err:509
0
0
PERSONIL
Pengalaman Minimal
pada Jembatan
8
7 Tahun
10 Tahun
7 Tahun
6 Tahun
10 Tahun
4 Tahun
20 Tahun
DAFTAR PERALATAN UTAMA
Jumlah
NO. Jenis Peralatan Kapasitas Peralatan
Minimal
1 2 3 4
1 Dump Truck 3 TON 8 Unit
2 Crane On Track 35 TON 1 Unit
3 Pile Driver + Hammer 2.5 TON 1 Unit
4 Generator Set 5 KVA 2 Unit
5 Excavator 80 HP 3 Unit
6 Contrete Mixer 0.3 M3 8 Unit
7 Vibrator Roller 5 TON 1 Unit
8 Alat Pemotong Besi - 3 Unit
9 Concrete Vibrator 5 HP 5 Unit
10 Water Tank 3000 Liter 8 Unit
11 Water Pump 70 mm 3 Unit
0
0
Err:509
0
0
PERALATAN UTAMA
Jumlah
Peralatan
Minimal
4
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 600,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 4,945,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 19,500,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 29,250,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 395,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 395,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,337,142,857 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,000,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 200,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR)
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 150,000,000 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 300,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,982.14 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,410.71 Rp./Jam
4. Bahan Bakar Bensin Mb 10,400.00 Liter
5. Bahan Bakar Solar Ms 12,300.00 Liter
6. Minyak Pelumas Mp 49,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BAR BENDER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 15,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BAR CUTTER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 15,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BREAKER
2. Tenaga Pw 80 HP
3. Kapasitas Cp 3 m3/jam
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 20,000,000 Rupiah
1.8
3
1200
12000000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 2000000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan JACK HIDROLIC
2. Tenaga Pw 3 HP
3. Kapasitas Cp 150 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 25,000,000 Rupiah
A URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS
2. Tenaga Pw 3.0 Hp
3. Kapasitas Cp 0.17 Ton
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 900 Jam
c. Harga Alat B 6,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER LEADER, 75 kw
2. Tenaga Pw 70 HP
3. Kapasitas Cp 75 kw
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 9600 Jam
c. Harga Alat B 150,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER
2. Tenaga Pw 10 Hp
3. Kapasitas Cp 0 0
4. Alat Baru a. Umur Ekonomis A 3 Tahun
b. Jam Kerja Dalam 1 Tahun W 800 Jam
c. Harga Alat B 200,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER, 2,5 Ton
2. Tenaga Pw 1 HP
3. Kapasitas Cp 2.5 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 8000 Jam
c. Harga Alat B 200,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 20000000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan WELDING MACHINE, 300 A
2. Tenaga Pw 5 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 10000 Jam
c. Harga Alat B 40,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10 % / Tahun
2. Upah Operator / Sopir U1 17982.1428571429 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14410.7142857143 Rp./Jam
4. Bahan Bakar Bensin Mb 10400 Liter
5. Bahan Bakar Solar Ms 12300 Liter
6. Minyak Pelumas Mp 49000 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.
E35
% / Tahun
KET.
E37
% / Tahun
KET.
E36
% / Tahun
KET.
E38
% / Tahun
KET.
E39
% / Tahun
KET.
E40
% / Tahun
KET.
E41
% / Tahun
KET.
E42
% / Tahun
KET.
E43
% / Tahun
KET.
E44
% / Tahun
KET.
E45
% / Tahun
KET.
E46
% / Tahun
KET.
E47
% / Tahun
KET.
E48
% / Tahun
KET.
E49
% / Tahun
KET.
E50
% / Tahun
KET.
E51
% / Tahun
KET.
E52
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
Bahan : Solar
Bahan : Bensin
500.00 500.00
Bahan : Baja U 24
I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1
- Pasir D2
- Batu Pecah D3
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1
- Sirtu Rp2
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3
- Wheel Loader Rp4
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1
- Wheel Loader Cp2
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1
- Wheel Loader Fa2
9 Faktor Kehilangan Material Fh
II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1)
Asumsi keseluruhannya menghasilkan ukuran (0 - 50)
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher)
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5)
- menghasilkan ukuran (5 - 3/8"=9,5mm)
- menghasilkan ukuran (3/8" - 3/4"=19mm)
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod
Lolos scalping screen (sreen1) LSc 1
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2
Biaya Produksi scalping Screen BPSc
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1
2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1
Lolos screen2 ukuran ( 0 - 5) LSc4
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2
Lolos screen2 ukuran ( 5 - 9,5) LSc5
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4
Secondary Crusher
Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) LSc2
Biaya Produksi per Fraksi = Hs 1 : 3 PF
Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Hs2
Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Hs3
Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Hs4
20.00 %
8.74 m3 72
80.00 %
38.96 m3
20.00 %
30.00 %
50.00 %
2.00 Jam
34.09 M3/Jam Batu pecah
40.38 M3/Jam
1.25 M3
5.00 menit
2.70 Jam
4,220,972.66 Rp./Jam
4,798,235.74 Rp.
60.00 Ton/Jam
20.00 %
80.00 %
20.00 %
844,194.53 Rp.
8.74 m3
48.00 Ton/Jam
80.00 %
3,798,875.40 Rp.
38.96 m3
20.00 %
7.79 m3
30.00 %
11.69 m3
50.00 %
19.48 m3
418,894.96 Rp
33.33 %
1,599,411.91 Rp.
575,857.86 Rp./M3
507,438.57 Rp./M3
452,703.14 Rp./M3
473,228.93
ITEM PEMBAYARAN NO. : 5.1 (1)
JENIS PEKERJAAN : Pengadaan Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 30.00 KM
5 Tebal lapis agregat padat t 0.12 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 144.50 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 1,011.50 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2907 jam
- Mandor = (Tk x M) : Qt (L03) 0.0415 jam
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Gradasi harus
memenuhi Spec.
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0069
2. Dump Truck (E08) jam 1.9209
(lepas) 3. Motor Grader (E13) jam 0.0053
kondisi sedang 4. Tandem Roller (E17) jam 0.0167
5. Water Tanker (E23) jam 0.0141
6. Alat Bantu Ls 1.0000
panduan 7.
Analisa EI-511
KETERANGAN
1 x pp
Lump Sum
Analisa EI-511
TANDAR UNTUK
ING-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
100,000.00 29,065.74
110,000.00 4,567.47
507,438.57 638,666.90
727,789.47 5,036.61
415,472.29 798,090.99
765,340.81 4,074.93
471,925.16 7,897.01
54,939.29 772.24
5,000.00 5,000.00
ALATAN ( A + B + C ) 1,493,171.88
149,317.19
1,642,489.07
ntuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
MILYAR 0 0 0
900000000 900 SEMBILAN RATU 100
JUTA 92000000 92 SEMBILAN PULU 200
600000 600 ENAM RATUS 300
RIBU 81000 81 DELAPAN PULUH 400
400 400 EMPAT RATUS 500
RUPIAH 98 98 SEMBILAN PULU 600
700
800
900
c
4 5 6 7
MILYAR SEMBILAN RATUS SEMBILAN PU MILYAR SEMBILAN RATUS MILYAR SEMBI MILYAR SEMBILAN
SEMBILAN RATUS SEMBILAN PU MILYAR SEMBILAN PULUH MILYAR SEMBI MILYAR SEMBILAN
SEMBILAN PULUH DUA JUTMILYAR ENAM MILYAR SEMBILAN
SEMBILAN RATUS SEMBILAMILYAR SEMBI MILYAR SEMBILAN
ENAM RATUS DEMILYAR DELAPAN
SEMBILAN PULU MILYAR ENAM RAT
SEMBILAN RATU MILYAR SEMBILAN
SEMBILAN RATU MILYAR SEMBILAN
DELAPAN PULUH S
ENAM RATUS DELA
SEMBILAN PULUH D
SEMBILAN PULUH
SEMBILAN RATUS J
SEMBILAN RATUS J
SEMBILAN RATUS S
SEMBILAN RATUS
AN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN PULUH DELAPAN R
0
SERATUS 1 SATU
DUA RATUS 2 DUA
TIGA RATUS 3 TIGA
EMPAT RATUS 4 EMPAT
LIMA RATUS 5 LIMA
ENAM RATUS 6 ENAM
TUJUH RATUS 7 TUJUH
DELAPAN RATUS 8 DELAPAN
SEMBILAN RATU 9 SEMBILAN
10 SEPULUH
11 SEBELAS
12 DUA BELAS
13 TIGA BELAS
14 EMPAT BELAS
15 LIMA BELAS
16 ENAM BELAS
17 TUJUH BELAS
18 DELAPAN BELAS
19 SEMBILAN BELAS
20 DUA PULUH
21 DUA PULUH SATU
22 DUA PULUH DUA
23 DUA PULUH TIGA
24 DUA PULUH EMPAT
25 DUA PULUH LIMA
26 DUA PULUH ENAM
27 DUA PULUH TUJUH
28 DUA PULUH DELAPAN
29 DUA PULUH SEMBILAN
30 TIGA PULUH
31 TIGA PULUH SATU
32 TIGA PULUH DUA
33 TIGA PULUH TIGA
34 TIGA PULUH EMPAT
35 TIGA PULUH LIMA
36 TIGA PULUH ENAM
37 TIGA PULUH TUJUH
38 TIGA PULUH DELAPAN
39 TIGA PULUH SEMBILAN
40 EMPAT PULUH
41 EMPAT PULUH SATU
42 EMPAT PULUH DUA
43 EMPAT PULUH TIGA
44 EMPAT PULUH EMPAT
45 EMPAT PULUH LIMA
46 EMPAT PULUH ENAM
47 EMPAT PULUH TUJUH
48 EMPAT PULUH DELAPAN
49 EMPAT PULUH SEMBILAN
50 LIMA PULUH
51 LIMA PULUH SATU
52 LIMA PULUH DUA
53 LIMA PULUH TIGA
54 LIMA PULUH EMPAT
55 LIMA PULUH LIMA
56 LIMA PULUH ENAM
57 LIMA PULUH TUJUH
58 LIMA PULUH DELAPAN
59 LIMA PULUH SEMBILAN
60 ENAM PULUH
61 ENAM PULUH SATU
62 ENAM PULUH DUA
63 ENAM PULUH TIGA
64 ENAM PULUH EMPAT
65 ENAM PULUH LIMA
66 ENAM PULUH ENAM
67 ENAM PULUH TUJUH
68 ENAM PULUH DELAPAN
69 ENAM PULUH SEMBILAN
70 TUJUH PULUH
71 TUJUH PULUH SATU
72 TUJUH PULUH DUA
73 TUJUH PULUH TIGA
74 TUJUH PULUH EMPAT
75 TUJUH PULUH LIMA
76 TUJUH PULUH ENAM
77 TUJUH PULUH TUJUH
78 TUJUH PULUH DELAPAN
79 TUJUH PULUH SEMBILAN
80 DELAPAN PULUH
81 DELAPAN PULUH SATU
82 DELAPAN PULUH DUA
83 DELAPAN PULUH TIGA
84 DELAPAN PULUH EMPAT
85 DELAPAN PULUH LIMA
86 DELAPAN PULUH ENAM
87 DELAPAN PULUH TUJUH
88 DELAPAN PULUH DELAPAN
89 DELAPAN PULUH SEMBILAN
90 SEMBILAN PULUH
91 SEMBILAN PULUH SATU
92 SEMBILAN PULUH DUA
93 SEMBILAN PULUH TIGA
94 SEMBILAN PULUH EMPAT
95 SEMBILAN PULUH LIMA
96 SEMBILAN PULUH ENAM
97 SEMBILAN PULUH TUJUH
98 SEMBILAN PULUH DELAPAN
99 SEMBILAN PULUH SEMBILAN
8 9 10
MILYAR SEMBI MILYAR S MILYAR S MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU RUP
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU SEM
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMP
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMP
MILYAR EMPAT MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA RUPIAH
MILYAR DELAPA MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA SEMBILAN PULUH DELA
MILYAR ENAM MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA EMPAT RATUS RUPIAH
MILYAR ENAM MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA EMPAT RATUS SEMBILA
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU
MILYAR SEMBIL MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU
MILYAR SEMBI MILYAR SEMBILAN MILYAR SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU
LEBIH BAGUS TI MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA RUPIAH
DELAPAN PULUHMILYAR EMPAT RAT MILYAR SEMBILAN RATUS JUTA SEMBILAN PULUH DELAPAN RUPIAH
ENAM RATUS RI MILYAR DELAPAN P MILYAR SEMBILAN RATUS JUTA EMPAT RATUS RUPIAH
ENAM RATUS DEMILYAR DELAPAN P MILYAR SEMBILAN RATUS JUTA EMPAT RATUS SEMBILAN PULUH DELAPAN RU
SEMBILAN PULU MILYAR ENAM RATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN PULU MILYAR ENAM RATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU SEMBILAN PULUH
SEMBILAN PULU MILYAR ENAM RATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS RU
SEMBILAN PULU MILYAR ENAM RATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS SE
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS RIBU RUPIAH
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS RIBU SEMBILAN PULUH DELAPAN
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS RIBU EMPAT RATUS RUPIAH
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS RIBU EMPAT RATUS SEMBILAN P
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU RUP
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU SEM
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMP
SEMBILAN RATU MILYAR SEMBILAN MILYAR SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMP
BUSYETTT !!!!! LEB MILYAR RUPIAH
LEBIH BAGUS TIDUR MILYAR SEMBILAN PULUH DELAPAN RUPIAH
DELAPAN PULUH SATMILYAR EMPAT RATUS RUPIAH
DELAPAN PULUH SATMILYAR EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
ENAM RATUS RIBU S MILYAR DELAPAN PULUH SATU RIBU RUPIAH
ENAM RATUS RIBU E MILYAR DELAPAN PULUH SATU RIBU SEMBILAN PULUH DELAPAN RUPIAH
ENAM RATUS DELAPAMILYAR DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIAH
ENAM RATUS DELAPAMILYAR DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN PULUH DELAPA
SEMBILAN PULUH DUMILYAR ENAM RATUS RIBU RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS RIBU SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS RIBU EMPAT RATUS RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS RIBU EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS DELAPAN PULUH SATU RIBU SEMBILAN PULUH DELAPAN
SEMBILAN PULUH DUMILYAR ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIAH
SEMBILAN PULUH DUMILYAR ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN PU
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA RUPIAH
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA EMPAT RATUS RUPIAH
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA EMPAT RATUS SEMBILAN PULUH DELAPAN
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU SEMBILAN P
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EMPAT RATU
SEMBILAN RATUS JU MILYAR SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EMPAT RATU
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU RUPIAH
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU SEMBILAN PULUH DEL
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATUS RUPIAH
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATUS SEMBIL
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU
SEMBILAN RATUS SE MILYAR SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU
OW, BISA BIKIN RAB TO ?!!?!!!?
BUSYETTT !!!!! LEBIH BAIK BUAT BELI KOREK KUPING, KALO KURANG LOE TAM
GILE BENER !!! BUAT APAAN TUH DUIT SEGITU, NGAK ONGKOS BUAT BAPIKIR
LEBIH BAGUS TIDUR JOO !!! KALO MO URISIN DUIT CUMA SEGITU !!!
DELAPAN PULUH SATU RIBU RUPIAH DELAPAN PULUH SATU RIBU RUPIAH
DELAPAN PULUH SATU RIBU SEMBILAN PDELAPAN PULUH SATU RIBU SEMBILA
DELAPAN PULUH SATU RIBU EMPAT RATUDELAPAN PULUH SATU RIBU EMPAT R
DELAPAN PULUH SATU RIBU EMPAT RATUDELAPAN PULUH SATU RIBU EMPAT R
ENAM RATUS RIBU RUPIAH ENAM RATUS RIBU RUPIAH
ENAM RATUS RIBU SEMBILAN PULUH DELENAM RATUS RIBU SEMBILAN PULUH
ENAM RATUS RIBU EMPAT RATUS RUPIAHENAM RATUS RIBU EMPAT RATUS RUP
ENAM RATUS RIBU EMPAT RATUS SEMBILENAM RATUS RIBU EMPAT RATUS SEM
ENAM RATUS DELAPAN PULUH SATU RIBUENAM RATUS DELAPAN PULUH SATU
ENAM RATUS DELAPAN PULUH SATU RIBUENAM RATUS DELAPAN PULUH SATU
ENAM RATUS DELAPAN PULUH SATU RIBUENAM RATUS DELAPAN PULUH SATU
ENAM RATUS DELAPAN PULUH SATU RIBUENAM RATUS DELAPAN PULUH SATU
SEMBILAN PULUH DUA JUTA RUPIAH
SEMBILAN PULUH DUA JUTA SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN PULUH DUA JUTA EMPAT RATUS RUPIAH
SEMBILAN PULUH DUA JUTA EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU SEMBILAN PULUH DE
SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIA
SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBI
SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU RUPIAH
SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU SEMBILAN PULUH DELAPAN RU
SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATUS RUPIAH
SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATUS SEMBILAN PULU
SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU SEMBIL
SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT
SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT
SEMBILAN RATUS JUTA RUPIAH
SEMBILAN RATUS JUTA SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN RATUS JUTA EMPAT RATUS RUPIAH
SEMBILAN RATUS JUTA EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU SEMBILAN PULUH DELAPA
SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIAH
SEMBILAN RATUS JUTA DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN P
SEMBILAN RATUS JUTA ENAM RATUS RIBU RUPIAH
SEMBILAN RATUS JUTA ENAM RATUS RIBU SEMBILAN PULUH DELAPAN RUPIAH
SEMBILAN RATUS JUTA ENAM RATUS RIBU EMPAT RATUS RUPIAH
SEMBILAN RATUS JUTA ENAM RATUS RIBU EMPAT RATUS SEMBILAN PULUH DE
SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU RUPIAH
SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU SEMBILAN P
SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATU
SEMBILAN RATUS JUTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATU
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA RUPIAH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA SEMBILAN PULUH DELAPAN RU
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA EMPAT RATUS RUPIAH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA EMPAT RATUS SEMBILAN PULUH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU RU
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU SE
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EM
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA DELAPAN PULUH SATU RIBU EM
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU RUPIAH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU SEMBILAN P
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATU
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS RIBU EMPAT RATU
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA ENAM RATUS DELAPAN PULUH
EMBILAN PULUH DELAPAN RUPIAH
UTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIAH
UTA ENAM RATUS DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
UTA ENAM RATUS DELAPAN PULUH SATU RIBU RUPIAH
UTA ENAM RATUS DELAPAN PULUH SATU RIBU SEMBILAN PULUH DELAPAN RUPIAH
UTA ENAM RATUS RIBU RUPIAH
UTA ENAM RATUS RIBU SEMBILAN PULUH DELAPAN RUPIAH
UTA ENAM RATUS RIBU EMPAT RATUS RUPIAH
UTA ENAM RATUS RIBU EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
UTA RUPIAH
UTA SEMBILAN PULUH DELAPAN RUPIAH
UTA EMPAT RATUS RUPIAH
UTA EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
UTA DELAPAN PULUH SATU RIBU RUPIAH
UTA DELAPAN PULUH SATU RIBU SEMBILAN PULUH DELAPAN RUPIAH
UTA DELAPAN PULUH SATU RIBU EMPAT RATUS RUPIAH
UTA DELAPAN PULUH SATU RIBU EMPAT RATUS SEMBILAN PULUH DELAPAN RUPIAH
DELAPAN RUPIAH
APAN RUPIAH
APAN RUPIAH
DIMENSI
LUAS VOLUME
No STA
c a b (M) (M)
panjang lebar tebal
Awal Akhir
1 0+000 - 0+050 50.00 3.50 0.20 175.00 35.00
0+050 - 0+100 50.00 3.50 0.20 175.00 35.00
0+100 - 0+150 50.00 3.50 0.20 175.00 35.00
0+150 - 0+200 50.00 3.50 0.20 175.00 35.00
0+200 - 0+250 50.00 3.50 0.20 175.00 35.00
0+250 - 0+300 50.00 3.50 0.20 175.00 35.00
0+300 - 0+350 50.00 3.50 0.20 175.00 35.00
0+350 - 0+380 30.00 3.50 0.20 105.00 21.00
0+380 - 0+380 - 3.50 0.20 - -
0+380 - 0+380 - 3.50 0.20 - -
Total Volume 266.00
0+380
Hal : 1
KETERANGAN
(30,780,998.69)
DAFTAR TULANGAN
Pekerjaan :
Lokasi Pekerjaan :
Kontraktor :
Konsultan Supervisi :
Ruas :
JUMLAH PANJAN
Dia Panjang Jumlah
STR No. D 10 D 13
mm m batang m m
P PLAT BETON
E 1 16 7.00 14.00
M 2 13 3.50 28.00 98.00
B DOWEL
E 1 13 0.60 23.33 14.00
S
I
A
N
8
10
MLAH PANJANG 12
D 16 D 19 13
m m 14
16
98.00 24 18
24 19
24 20
20 22
20 24
25
32
98.00 -
1.58 2.23
154.67 -
14,730.90
besi staff m
6 0.006165 0.22194 0.22194
DIMENSI
LUAS VOLUME
No STA
c a b (M) (M)
panjang lebar tebal
Awal Akhir
1 0+000 - 0+050 50.00 3.50 0.05 175.00 8.75
0+050 - 0+100 50.00 3.50 0.05 175.00 8.75
0+100 - 0+150 50.00 3.50 0.05 175.00 8.75
0+150 - 0+200 50.00 3.50 0.05 175.00 8.75
0+200 - 0+250 50.00 3.50 0.05 175.00 8.75
0+250 - 0+300 50.00 3.50 0.05 175.00 8.75
0+300 - 0+350 50.00 3.50 0.05 175.00 8.75
0+350 - 0+380 30.00 3.50 0.05 105.00 5.25
0+380 - 0+380 - 3.50 0.05 - -
0+380 - 0+380 - 3.50 0.05 - -
Total Volume 66.50
0+380
Hal : 1
KETERANGAN
(30,780,998.69)