A. SEWA TANAH M2 - - -
C FASILITAS KANTOR
1 Base Camp M2
2 Kantor M2 - - -
3 Barak M2
4 Bengkel M2
5 Gudang dll M2
E. LAIN - LAIN
1 Pengukuran & As-Built Drawings Set 1.00 ### 25,000,000.00
2 Dokumentasi Proyek Ls 1.00 4,500,000.00 4,500,000.00
3 Papan Nama Proyek Ls 1.00 1,000,000.00 1,000,000.00
4 Pembersihan Akhir Ls
TOTAL BIAYA MOBILISASI DIBULATKAN 30,500,000.00
DIBULATKAN 30,500,000.00
Note : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over head dan laba s
seluruh pajak dan bea (kecuali PPN), dan pengeluaran lainnya.
### ###
JENIS PEKERJAAN : MOBILISASI
HARGA
No. JENIS ALAT SATUAN VOLUME SATUAN
(Rp.)
B. PERALATAN
MOBILISASI
6,500,000.00
6,500,000.00
6,500,000.00
6,500,000.00
6,500,000.00
6,500,000.00
6,500,000.00
6,500,000.00
52,000,000.00
13,000,000.00
65,000,000.00
JENIS PEKERJAAN : Cement Trated Base (CTB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HA
I ASUMSI
II URUTAN KERJA
Semen FF 13.00 %
2 ALAT
2a WHEEL LOADER E15
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.85
Faktor efesiensi alat Fa 0.83
Waktu siklus :
- waktu muat T1 0.45 menit
Ts1 0.45 menit
3 TENAGA
Produksi menentukan : Q4 103.23 m3/jam
Produksi CTB/ hari = Tk x Q4 Qt 825.85 m3
Kebutuhan tenaga : P 8.00 orang
M 1.00 orang
KETERANGAN
asumsi sesuaikan
dengan spek
padat
URAIAN ANALISA HARGA SATUAN
KETERANGAN
URAIAN ANALISA HARGA SATUAN
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK : ………………………………………………………………….
No. PAKET KONTRAK :
NAMA PAKET : ………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………………………….
ITEM PEMBAYARAN NO. : ………………………………………………………………….
JENIS PEKERJAAN : Cement Trated Base (CTB)
SATUAN PEMBAYARAN : M3
I TENAGA
II BAHAN
1 Agregat Kg 66.0
3 Semen M3 0.0820
III PERALATAN
1 WHEEL LOADER Jam 0.0085
2 DUMP TRUCK Jam 0.0221
3 MOTOR GRADER Jam 0.0269
#REF! #REF!
-
488.89 32,266.67 850.00 (361.11) 850.00 -
4,737.50 (4,737.50) 5,587.50 850.00
#REF! #REF! 106,000.00 #REF! 106,000.00 -
111,000.00 ### 111,000.00 -
#REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
361.11
5,587.50
#REF!
111,000.00
#REF!
#REF!
###
393,750.00
77,161.14
140,000.00
#REF!
#REF!
787,500.00
150,000.00
2,000.00
DAFTAR
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
KETERANGAN ( Rp.)
( Rp.)
1. Pekerja L01 Jam 15,714.29 Jam kerja
HP Cp A W B C D
1 2 3 4 6 7 8 9 10
1. ASPHALT MIXING PLANT 150.0 50.0 T/Jam 10.0 1,500.0 3,500,000,000 350,000,000 0.22251
2. ASPHALT FINISHER 47.0 6.0 Ton 6.0 2,000.0 700,000,000 70,000,000 0.28591
3. ASPHALT SPRAYER 15.0 800.0 Liter 5.0 2,000.0 110,000,000 11,000,000 0.31978
4. BULLDOZER 100-150 HP 140.0 - 5.0 2,000.0 1,500,000,000 150,000,000 0.31978
5. COMPRESSOR 4000-6500 L\M 80.0 - 5.0 2,000.0 150,000,000 15,000,000 0.31978
6. CONCRETE MIXER 0.3-0.6 M3 15.0 500.0 Liter 4.0 2,000.0 55,000,000 5,500,000 0.37174
7. DUMP TRUCK 3-4 M3 100.0 6.0 Ton 5.0 2,000.0 200,000,000 20,000,000 0.31978
8. DUMP TRUCK 125.0 8.0 Ton 5.0 2,000.0 275,000,000 27,500,000 0.31978
9. EXCAVATOR 80-140 HP 80.0 0.8 M3 5.0 2,000.0 1,000,000,000 100,000,000 0.31978
10. FLAT BED TRUCK 3-4 M3 100.0 4.0 M3 5.0 2,000.0 500,000,000 50,000,000 0.31978
11. GENERATOR SET 175.0 125.0 KVA 5.0 2,000.0 340,000,000 34,000,000 0.31978
12. MOTOR GRADER >100 HP 125.0 - 5.0 2,000.0 860,000,000 86,000,000 0.31978
13. WHEEL LOADER 1.0-1.6 M3 105.0 1.5 M3 5.0 2,000.0 1,000,000,000 100,000,000 0.31978
14. THREE WHEEL ROLLER 6-8 T 55.0 8.0 Ton 5.0 2,000.0 700,000,000 70,000,000 0.31978
15. TANDEM ROLLER 6-8 T. 50.0 8.0 Ton 5.0 2,000.0 780,000,000 78,000,000 0.31978
16. TIRE ROLLER 8-10 T. 60.0 10.0 Ton 5.0 1,800.0 750,000,000 75,000,000 0.31978
17. VIBRATORY ROLLER 5-8 T. 75.0 7.0 Ton 4.0 2,000.0 675,000,000 67,500,000 0.37174
18. CONCRETE VIBRATOR 10.0 - 4.0 1,000.0 23,000,000 2,300,000 0.37174
19. STONE CRUSHER 120.0 50.0 T/Jam 5.0 2,000.0 1,500,000,000 150,000,000 0.31978
20. WATER PUMP 70-100 mm 6.0 - 2.0 2,000.0 13,500,000 1,350,000 0.63872
21. WATER TANKER 3000-4500 L. 100.0 4,000.0 Liter 5.0 2,000.0 210,000,000 21,000,000 0.31978
22. JACK HAMMER 3.0 - 5.0 1,000.0 65,000,000 6,500,000 0.31978
23 CHAIN SAW 2.0 4.0 500.00 17,500,000 1,750,000 0.37174
KETERANGAN :
1. Tingkat Suku Bunga = 18.0 % per-tahun
2. Upah Operator / Sopir / Mekanik = 25,714 Rupiah per-orang/jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik = 32,143 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 11,217 Rupiah per-liter
5. Harga Bahan Bakar Solar = 13,243 Rupiah per-liter
6. Minyak Pelumas = 46,030 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
ALISA BIAYA SEWA PERALATAN PER JAM KERJA
467,280.75 4,666.67 471,947.41 0.1500 0.0150 401,532.19 0.1500 350,000.00 25,714.29 32,142.86
90,061.69 700.00 90,761.69 0.1500 0.0150 125,813.42 0.1500 52,500.00 25,714.29 32,142.86
15,829.00 110.00 15,939.00 0.1500 0.0150 40,153.22 0.1500 8,250.00 25,714.29 32,142.86
215,850.04 1,500.00 217,350.04 0.1500 0.0150 374,763.38 0.1500 112,500.00 25,714.29 32,142.86
21,585.00 150.00 21,735.00 0.1500 0.0150 214,150.50 0.1500 11,250.00 25,714.29 32,142.86
9,200.53 55.00 9,255.53 0.1500 0.0150 40,153.22 0.1500 4,125.00 25,714.29 32,142.86
28,780.01 200.00 28,980.01 0.1500 0.0150 267,688.13 0.1500 15,000.00 25,714.29 32,142.86
39,572.51 275.00 39,847.51 0.1500 0.0150 334,610.16 0.1500 20,625.00 25,714.29 32,142.86
143,900.03 1,000.00 144,900.03 0.1500 0.0150 214,150.50 0.1500 75,000.00 25,714.29 32,142.86
71,950.01 500.00 72,450.01 0.1500 0.0150 267,688.13 0.1500 37,500.00 25,714.29 32,142.86
48,926.01 340.00 49,266.01 0.1500 0.0150 468,454.22 0.1500 25,500.00 25,714.29 32,142.86
123,754.02 860.00 124,614.02 0.1500 0.0150 334,610.16 0.1500 64,500.00 25,714.29 32,142.86
143,900.03 1,000.00 144,900.03 0.1500 0.0150 281,072.53 0.1500 75,000.00 25,714.29 32,142.86
100,730.02 700.00 101,430.02 0.1500 0.0150 147,228.47 0.1500 52,500.00 25,714.29 32,142.86
112,242.02 780.00 113,022.02 0.1500 0.0150 133,844.06 0.1500 58,500.00 25,714.29 32,142.86
119,916.69 833.33 120,750.02 0.1500 0.0150 160,612.88 0.1500 62,500.00 25,714.29 32,142.86
112,915.62 675.00 113,590.62 0.1500 0.0150 200,766.09 0.1500 50,625.00 25,714.29 32,142.86
7,694.99 46.00 7,740.99 0.1500 0.0150 26,768.81 0.1500 3,450.00 25,714.29 32,142.86
215,850.04 1,500.00 217,350.04 0.1500 0.0150 321,225.75 0.1500 112,500.00 25,714.29 64,285.71
3,880.20 13.50 3,893.70 0.1500 0.0150 16,061.29 0.1500 1,012.50 25,714.29 32,142.86
30,219.01 210.00 30,429.01 0.1500 0.0150 267,688.13 0.1500 15,750.00 25,714.29 32,142.86
18,707.00 130.00 18,837.00 0.1500 0.0150 7,118.92 0.1500 9,750.00 25,714.29 32,142.86
11,709.77 70.00 11,779.77 0.1500 0.0150 4,745.94 0.1500 5,250.00 25,714.29 0.00
BIAYA OPERASI PER JAM KERJA TOTAL
TOTAL BIAYA
BIAYA SEWA ALAT
OPERASI PER
/ JAM JAM KERJA
(Rp.) (Rp.) KET.
F+G+H+I E+J
J K L
21 22 23
809,389.33 1,281,336.74
236,170.56 326,932.25
106,260.36 122,199.36
545,120.52 762,470.56
283,257.64 304,992.65
102,135.36 111,390.89
340,545.27 369,525.27
413,092.30 452,939.81
347,007.64 491,907.67
363,045.27 435,495.28
551,811.36 601,077.37
456,967.30 581,581.32
413,929.67 558,829.70
257,585.61 359,015.63
250,201.21 363,223.23
280,970.02 401,720.04
309,248.24 422,838.86
88,075.96 95,816.95
523,725.75 741,075.79
74,930.93 78,824.63
341,295.27 371,724.27
74,726.06 93,563.06
35,710.23 47,490.00
RENCANA ANGGARAN BIAYA
A. PEKERJAAN PERSIAPAN
1 Pengukuran Awal dan Akhir M2 11,250.00
2 Pekerjaan mobilisasi dan demobilisasi Lot 1.00
3 Direksi keet M2 45.00
C. PEKERJAAN AKHIR
1 Dokumentasi Foto Ls 1.00
2 Pekerjaan Pembersihan akhir Ls 1.00
REKAPITULASI
N0 URAIAN
A. PEKERJAAN PERSIAPAN
C. PEKERJAAN AKHIR
Real Cost
PPn 10%
Jumlah
Dibulatkan
Terbilang :
"Sembilan Ratus Sembilan Puluh Sembilan Juta Rupiah"
Nduga, Desemb
SIMON NIRIGI, S
Nip. 1960 0507 199
RENCANA ANGGARAN BIAYA
1,501.69 16,893,996.43
30,500,000.00 30,500,000.00
1,418,489.29 63,832,017.86
111,226,014.29
23,192.37 164,286,619.27
253,280.80 624,775,339.55
789,061,958.82
3,000,000.00 3,000,000.00
5,000,000.00 5,000,000.00
8,000,000.00
REKAPITULASI
Rp. 111,226,014.29
Rp. 789,061,958.82
Rp. 8,000,000.00
Rp. 908,287,973.10
Rp. 90,828,797.31
Rp. 999,116,770.41
Rp. 999,000,000.00
A. PEKERJAAN PERSIAPAN
1 Pengukuran Awal dan Akhir M2 6,300.00
2 Pekerjaan mobilisasi dan demobilisasi Lot 1.00
3 Direksi keet M2 45.00
D. PEKERJAAN AKHIR
1 Dokumentasi Foto Ls 1.00
2 Pekerjaan Pembersihan akhir LS 1.00
3 Asbuild Drawaing LS 1.00
REKAPITULASI
N0 URAIAN
A. PEKERJAAN PERSIAPAN
D. PEKERJAAN AKHIR
Real Cost
PPn 10%
Jumlah
Dibulatkan
Timika, Nov
#REF! #REF!
30,000,000.00 30,000,000.00
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Err:509 Err:509
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
3,000,000.00 3,000,000.00
4,000,000.00 4,000,000.00
6,000,000.00 6,000,000.00
13,000,000.00
REKAPITULASI
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. 13,000,000.00
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 8.00
5 Faktor pengembangan bahan Fk 1.20
6 Tebal hamparan padat t 0.15
2. ALAT
2.a. WHELL LOADER
Kapasitas Bucket V 1.50
Faktor Bucket Fb 0.90
Faktor Efisiensi Alat Fa 0.85
Waktu sklus Ts1
- Muat T1 0.50
- Lain-lain T2 0.50
Ts1 1.00
Koefisienalat / M3 = 1 : Q1 0.0174
3. TENAGA
Produksi menentukan : WHELL LOADER Q1 57.38
Produksi Galian / hari = Tk x Q1 Qt 459.00
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt 0.0697
- Mandor = (Tk x M) : Qt 0.0174
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
-
M
Km
M3 Quarry
M3
-
-
menit
menit
menit
menit
M3
Jam
M3
-
KM/Jam
KM/Jam
menit
menit
menit
menit
Bersambung
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN KETERANGAN
M3
Jam
M
M
-
Km / Jam
lintasan
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
M3
M3
kali
- Baik
M3
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
HARGA PERKIRAAN SENDIRI
A. PEKERJAAN PERSIAPAN
1 Pengukuran sebelum dan sesudah termasuk design profil M2 30,000.00
2 Pekerjaan mobilisasi dan demobilisasi Lot 1.00
3 Land Clearing (mekanik) M2 30,000.00
4 Direksi keet M2 45.00
REKAPITULASI
N0 URAIAN
A. PEKERJAAN PERSIAPAN
Real Cost
PPn 10%
Jumlah
Dibulatkan
Timika, Nov
JOHANNES RETT
Nip. 19621019
RGA PERKIRAAN SENDIRI
#REF! #REF!
30,000,000.00 30,000,000.00
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
REKAPITULASI
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
A. PEKERJAAN PERSIAPAN
1 Pengukuran sebelum dan sesudah termasuk design profil M2 8,950.00
2 Pekerjaan mobilisasi dan demobilisasi Lot 1.00
4 Direksi keet M2 45.00
REKAPITULASI
A. PEKERJAAN PERSIAPAN
#REF! #REF!
65,000,000.00 65,000,000.00
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
REKAPITULASI
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
Rp. #REF!
DAFTAR HARGA SATUAN UPAH KERJA
-
UPAH/HARI UPAH/JAM
NO URAIAN KODE
(Rp) (Rp)