NO ITE M P E K E R JAAN
I. PEKERJAAN PENDAHULUAN
1 Air Kerja
2 Listrik Kerja
3 Peralatan Keselamatan & Kesehatan Kerja ( K - 3 )
4 Tower Krane ( 1 unit )
Tower Crane : 1,9 ton - 45 m ( 1 Unit )
Genset 250 KVA ( 1 Unit ) + Bahan Bakar Solar
Pondasi Pile Cup 4,5 m x 4,5 m x 1,8 m (pondasi TC)
Operator TC
Pembantu operator
5 Universal Lift / Passengger ( 2 unit )
6 Mobilisasi & Demobilisasi Alat.
A. PEKERJAAN STRUKTUR
II. BANGUNAN FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
A. PEKERJAAN STRUKTUR
III. BANGUNAN ELEKTRIKAL FIK.
1 Pek. Bouwplank
2 Pek. Galian pondasi.
3 Pek. Urugan pasir bawah pondasi & Sloof t.= 5 cm
4 Pek. Lantai kerja bawah pondasi & Sloof t. 5 cm
5 Pek. Urugan pasir bawah lantai t. = 5 cm
6 Pek. Lantai kerja bawah lantai t. = 5 cm
7 Pek.buangan tanah sisa galian pondasi
8 Pek.Urugan tanah dalam bangunan
9 Pek. Urugan tanah kembali
10 Pek.Pondasi Type PD3. 1250x1250x300
Beton K.350 167.19
Besi ulir atas
Besi ulir bawah
Bekisting
11 Pek.Pondasi Batu Kali ( 1 Pc : 5 Psr ).
12 Pas.Batu Kosong t = 15 cm
13 Pek.Dinding Beton t 147.00
Beton K.350
Besi ulir
Bekisting
14 Pek.Pedestal K1. 250x250.
Beton K.350 324.50
Besi Sengkang.
Besi ulir
Bekisting
15 Balok TB1. 200x250
Beton K.350 333.03
Besi Sengkang.
Besi ulir
Bekisting
16 Kolom K1. 250x250 ( El.- s/d + )
Beton K.350 306.42
Besi Sengkang.
Besi ulir
Bekisting
17 Plat Lantai t = 10 cm ( El.- 0,050 )
Beton K.350 77.50
Besi ulir
Bekisting
18 Plat Lantai t = 12 cm ( El.+ 3.450 )
Beton K.350 84.91
Besi ulir
Bekisting
19 Balok G1. 250x250
Beton K.350 274.89
Besi Sengkang.
Besi ulir
Bekisting
20 Balok CG1. 200x250
Beton K.350 442.06
Besi Sengkang.
Besi ulir
Bekisting
A. PEKERJAAN STRUKTUR
B. PEKERJAAN ARSITEKTUR
II. BANGUNAN UTAMA (FAKULTAS ILMU KEOLAHRAGAAN) ( FIK )
V. PEKERJAAN PLAFOND
V. 8. Lantai 7 ( Elev. +25.50 m s/d +30.50 m )
KELILING BANGUNAN
1 Pek. Aluminium linier
2 Pek. Pas. Wall Angle (tepi plafond aluminium linier)
TRITISAN
1 Pek. Pas Gypsum board anti air tebal 9 mm + Rangka holo
2 Pek. Pas. Aluminium U 20 x 20 (tepi plafond gypsum)
IX PEKERJAAN FASAD
1 Pek. Ornamen kanopy
2 Pek. Pasang batu tempel hitam
PIT LIFT
As-1 s/d As-2
1 Pek. Waterproofing ( lantai dan dinding)
As-5 s/d As-6
2 Pek. Waterproofing ( lantai dan dinding)
As-9 s/d As-10
3 Pek. Waterproofing ( lantai dan dinding)
B. PEKERJAAN ARSITEKTUR
III. BANGUNAN ELEKTRIKAL FIK
TERAS
1 Pek. floor harderner
KELILING BANGUNAN
1 Pek. Rabat beton, t = 10 cm (Depan Teras)
DAK BETON
1 Pek. Waterproofing plat beton + screed + wiremess
V. PEKERJAAN PLAFOND
RUANGAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton )
KELILING BANGUNAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton )
VI PEKERJAAN PENGECATAN
RUANGAN
1 Pek. Cat dinding dalam (Cat interior)
2 Pek. Cat dinding luar (Cat eksterior)
KELILING BANGUNAN
1 Pek. Rabat beton keliling bangunan, t = 10 cm
GROUND TANK
1 Pek. Lantai Homogenius Tile uk. 30 cm x 30 cm
2 Pek. Dinding Homogeneus Tile uk. 25 cm x 40 cm
3 Pek. Waterproofing (lantai dan dinding)
4 Pek. Waterproofing (atap)
DAK BETON
1 Pek. Waterproofing plat beton + screed + wiremess
V. PEKERJAAN PLAFOND
R. POMPA
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton )
KELILING BANGUNAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton )
VI PEKERJAAN PENGECATAN
R. POMPA
1 Pek. Cat dinding dalam (Cat Interior/ beton)
KELILING BANGUNAN
1 Pek. Cat dinding luar (Cat Eksterior/ beton)
I PEKERJAAN ELECTRICAL
Power House
1 Panel MVMDP / Cubicle Konsumen
a. Incoming cubicle IM-SM6
b. Outgoing cubicle QM-SM6
2 Transformator, kapasitas 1000 kVA
3 Genset kapasitas 500 kVA,3Ø,50 Hz,380V, 1500 Rpm, Silent Type Prime Power
4 tak, pendinginan radiator -air cooling, silinder in-line, selenser,tangki solar harian 2000 liter
lengkap dengan ;
penyangga rubber mounting, 24 V electric stater, 24 V charging
generator,alternator, engine instrument panel,2x12 Volt lead acid
battery, electronic governor,isolasi klas H- IP 23, standard tool kit,
engine part catalogue, dan manual operation book.
- Hand Pump Solar
- Gear Pump kap 50 gpm, daya 1.5 kW dan
- Tangki bulanan 8.000 liter tebal plat 7 mm, lengkap gelas Penduga
instalasi solar pipa sch 40-1'', valve,coupling dan strainer
- Loading test dan comissioning test
5 Kabel Feeder
- Kabel dari Meter PLN ke MVMDP PLN N2XSEBY 3 X 95 mm2
- Kabel dari MVMDP PLN ke MVMDP Konsumen N2XSY 4x2x1cx95mm2
- Kabel dari MVMDP Konsumen ke Transformator N2XSY 4x2x1cx95mm2
- Kabel dari Transformator ke Panel LVMDP NYY 3(4x1cx300mm)
- Kabel dari LVMDP ke Panel Genset NYY 3(4x1x240mm)
6 Grounding System
Termasuk Sumuran Grounding, Konektor Grounding dan Material Bantu lainnya
- Grounding panel Cubicle Konsumen dan Body Trafo Kabel BC 120 mm2
- Grounding Netral Trafo Kabel BC 120 mm2
- Grounding Body Genset Kabel BC 120 mm2
- Grounding LVMDP Kabel BC 120 mm2
Lantai 1
1 Kabel Ladder ukuran 20 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
3 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 2
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 3
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 4
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 5
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 6
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 7
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai RL
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
Risser
1 Ladder ukuran 40 x 10 cm ( untuk elektrikal )
2 Ladder ukuran 30 x 10 cm ( untuk jalur elektronika )
Penerangan Luar
1 Lampu Sport Light 20W
2 Panel Kontrol Lampu
3 Instalasi Penerangan dengan kabel NYFGBY 3x2.5mm2 Include galian + material bantu
Lantai 1
1 TB-FA -1
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-BS ke TB-FA -1
Lantai 2
1 TB-FA -2
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-1 ke TB-FA -2
Lantai 3
1 TB-FA -3
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-2 ke TB-FA -3
Lantai 4
1 TB-FA -4
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-3 ke TB-FA -4
Lantai 5
1 TB-FA -5
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-4 ke TB-FA -5
Lantai 6
1 TB-FA -6
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-5 ke TB-FA -6
Lantai 7
1 TB-FA -7
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-6 ke TB-FA -7
2.A. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI SEMI BASEME
Instalasi Air Bekas, Air Kotor Toilet Lantai Basement
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
c. Pekerjaan Sumpit Air Kotor : PIT - AK - 01
d. Sewage Pump Air Kotor
e. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Fittings Pipa uPVC AW Class, 10 kg/cm2
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Pekerjaan Sumpit Air Hujan : PIT - AH - 01&02
c. Sewage Pump Air Hujan
d. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Fittings Pipa uPVC AW Class, 10 kg/cm2
2.B. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 1
Instalasi Air Bekas, Air Kotor Toilet Lantai -1
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.C. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 2
Instalasi Air Bekas, Air Kotor Toilet Lantai - 2
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.D. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 3.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 4.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.F. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 5.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.G. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 6.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 7.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm
~ Pipa dia. 50 mm
~ Pipa dia. 80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 80 mm
~ Floor clean out dia. 100 mm
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm
~ Pipa dia.80 mm
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Floor clean out dia. 100 mm
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm
~ Pipa dia. 65 mm
~ Pipa dia. 80 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI ATAP
1 Instalasi pipa air hujan Atap Bangunan
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.100 mm (4 ")
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2
b. Fixtures :
~ Roof. drain dia. 100 mm (4 ")
2.I. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - SITE
1 Instalasi Sewage Treatment Plant - 01 &2
a. Sewage Treatment Plant
b. Effluent Pump
c. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.40 mm (1 1/2 ") (effluent/discharge)
~ Fittings Pipa uPVC AW Class, 10 kg/cm2
2 Instalasi pipa air kotor
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 200 mm
~ Fittings Pipa uPVC AW Class, 10 kg/cm2
b. Bak Kontrol / Equalizing Chamber
c. Galian dan Urugan untuk jalur pipa
PEKERJAAN INFRASTRUKTUR
Bulan 1 Bulan
E R JAAN Bobot (%)
1 2 3 4 5
GAAN ( FIK )
kg/m3 0.36
0.44
0.63
kg/m3 0.09
0.25
0.07
kg/m3 0.10
0.29
0.07
kg/m3 0.00
0.01
0.05
kg/m3
0.19
0.15
0.03
0.30
0.19
kg/m3
0.06
0.04
0.01
0.07
0.06
kg/m3
0.07
0.06
0.01
0.12
0.10
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
El.- 0.050 & - 1.745
kg/m3 0.02
0.03
0.00
kg/m3 0.02
0.03
0.03
kg/m3 0.43
0.53
0.64
kg/m3 0.08
0.21
0.07
kg/m3 0.07
0.20
0.07
kg/m3 0.00
0.01
0.05
kg/m3
0.15
120.000 0.09
0.03
0.48
0.09
kg/m3
0.11
0.05
0.02
0.26
0.12
kg/m3
0.00
0.00
0.00
0.01
0.00
kg/m3
0.03
0.03
0.11
0.04
kg/m3
0.00
0.00
0.00
0.00
kg/m3
0.02
0.01
0.00
0.03
0.01
kg/m3
0.00
0.00
0.00
(0.00)
kg/m3
0.01
0.00
0.00
0.01
0.01
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.43
0.53
0.65
kg/m3 0.08
0.21
0.07
kg/m3 0.08
0.22
0.07
kg/m3
0.17
0.09
0.03
0.48
0.09
kg/m3
0.08
0.04
0.01
0.10
0.00
kg/m3
0.09
0.05
0.01
0.13
0.05
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.39
0.47
0.58
kg/m3 0.06
0.16
0.07
kg/m3 0.09
0.26
0.07
kg/m3
0.15
0.08
0.03
0.44
0.19
kg/m3
0.09
0.05
0.01
0.12
0.15
kg/m3
0.08
0.06
0.13
0.11
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.40
0.49
0.60
kg/m3 0.08
0.21
0.07
kg/m3 0.07
0.20
0.07
kg/m3
0.13
0.05
0.03
0.20
0.13
kg/m3
0.05
0.02
0.01
0.08
0.06
kg/m3
0.11
0.06
0.01
0.25
0.13
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.40
0.49
0.60
kg/m3 0.07
0.19
0.07
kg/m3 0.08
0.22
0.07
kg/m3
0.13
0.06
0.01
0.20
0.13
kg/m3
0.05
0.02
0.01
0.08
0.06
kg/m3
0.11
0.06
0.01
0.25
0.13
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.40
0.49
0.60
kg/m3 0.05
0.23
0.05
kg/m3 0.09
0.24
0.07
kg/m3
0.13
0.06
0.01
0.20
0.13
kg/m3
0.05
0.02
0.01
0.08
0.06
kg/m3
0.11
0.06
0.01
0.25
0.13
kg/m3
0.00
0.00
0.00
0.00
kg/m3 0.03
0.02
0.09
kg/m3 0.01
0.01
0.01
kg/m3 0.01
0.01
0.01
kg/m3 0.17
0.22
0.25
kg/m3 0.05
0.15
0.01
kg/m3 0.03
0.13
0.03
kg/m3 0.00
0.01
0.02
kg/m3
0.15
0.05
0.18
0.21
kg/m3
0.00
0.00
0.01
0.01
kg/m3
0.00
0.00
0.00
0.01
kg/m3 0.05
0.06
0.08
kg/m3 0.02
0.07
0.01
kg/m3 0.00
0.01
0.00
kg/m3
0.06
0.02
0.06
0.08
0.19
0.01
0.01
0.03
0.00
0.00
0.00
0.00
0.00
0.09
0.01
0.00
0.01
0.00
0.00
0.00
0.09
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.09
0.01
0.00
0.00
0.00
0.00
0.04
0.01
0.01
0.00
0.00
0.00
0.06
0.01
0.01
0.00
0.00
0.00
0.39
0.01
0.01
0.01
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
kg/m3 0.01
0.01
0.01
0.00
0.00
0.00
kg/m3
0.01
0.02
0.03
kg/m3 0.00
0.00
0.00
0.00
kg/m3 0.00
0.00
0.01
0.00
kg/m3 0.00
0.00
0.01
0.01
kg/m3 0.01
0.01
0.00
kg/m3 0.02
0.01
0.03
kg/m3 0.00
0.00
0.01
0.01
kg/m3 0.00
0.00
0.00
0.00
ANK ( FIK ).
0.01
0.04
0.00
0.01
0.02
0.01
kg/m3 0.09
0.11
0.01
kg/m3 0.11
0.11
0.03
0.12
kg/m3 0.03
0.04
0.05
kg/m3 0.01
0.00
0.01
0.01
kg/m3 0.00
0.00
0.01
0.01
kg/m3 0.00
0.00
0.00
0.00
kg/m3 0.00
0.00
0.00
0.00
OLAHRAGAAN) ( FIK )
±0.00 m )
0.45
0.39
0.02
0.16
0.22
0.19
0.03
0.09
0.33
0.29
0.03
0.13
0.26
0.23
0.05
0.11
0.27
0.23
0.06
0.10
0.25
0.21
0.04
0.10
0.25
0.22
0.03
0.10
0.20
0.17
0.03
0.08
0.36
0.31
0.03
0.13
0.16
0.14
0.03
0.07
0.42
0.36
0.03
0.16
0.14
0.13
0.03
0.06
0.36
0.31
0.03
0.14
0.16
0.14
0.03
0.07
0.49
0.42
0.01
0.18
0.18
0.15
0.04
0.08
0.04
0.03
0.00
0.01
0.17
0.15
0.02
0.07
±0.00 m )
0.09
0.09
0.01
0.04
0.15
0.07
0.01
0.07
0.11
0.08
0.01
0.06
0.11
0.07
0.01
0.16
0.11
0.08
0.01
0.00
0.11
0.09
0.01
0.05
0.11
0.08
0.02
0.05
0.13
0.08
0.01
0.06
0.10
0.04
0.00
LMUNIUM
ccessories) terpasang
±0.00 m )
0.03
0.01
0.04
0.06
0.00
0.01
0.00
0.02
0.02
0.01
0.03
0.06
0.03
0.02
0.05
0.05
0.01
0.02
0.04
0.00
0.01
0.00
0.03
0.01
0.01
0.01
0.03
0.13
0.01
0.27
0.04
0.01
0.03
0.00
0.00
0.01
0.00
0.01
0.01
0.01
0.03
0.27
0.02
0.24
0.01
0.01
0.07
0.01
0.03
0.05
0.00
0.01
0.00
0.01
0.01
0.01
0.03
0.20
0.09
0.02
0.14
0.50
0.06
0.30
0.15
0.15
0.07
0.01
0.03
0.05
0.00
0.01
0.00
0.01
0.01
0.01
0.03
0.19
0.02
0.11
0.04
0.07
0.01
0.03
0.05
0.00
0.01
0.00
0.01
0.01
0.03
0.20
0.11
0.04
0.05
0.07
0.01
0.03
0.05
0.00
0.01
0.00
0.01
0.01
0.02
0.01
0.03
0.17
0.00
0.09
0.03
0.03
0.01
0.03
0.05
0.00
0.01
0.00
0.03
0.05
0.05
0.03
0.15
0.02
0.01
±0.00 m )
0.00
0.00
0.19
0.06
0.01
0.05
0.54
0.01
0.35
0.02
±0.00 m )
0.06
0.05
0.04
0.04
0.05
0.06
0.05
0.06
0.00
0.26
0.45
0.00
0.00
0.00
0.01
0.01
0.00
0.01
0.00
0.00
ccessories) terpasang
0.13
0.00
0.00
0.00
0.02
0.00
0.00
0.01
0.00
0.04
D TANK FIK
0.00
0.00
0.00
0.00
0.00
0.00
ccessories) terpasang
0.03
0.00
0.00
0.02
0.12
0.04
0.01
0.04
0.00
0.00
0.00
0.00
0.07
0.08
0.04
0.17
0.53
0.43
Rpm, Silent Type Prime Power 1.89
n-line, selenser,tangki solar harian 2000 liter
, 24 V charging
12 Volt lead acid
standard tool kit,
0.00
0.03
kap gelas Penduga 0.07
an strainer
-
0.95
0.32
0.21
0.17
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
-
0.01
0.16
0.04
0.04
0.04
0.04
0.04
0.04
2 + BC 10 mm2 0.00
+ BC 25 mm2 0.01
+ BC 25 mm2 0.01
+ BC 25 mm2 0.01
+ BC 16 mm2 0.02
+ BC 25 mm2 0.02
+ BC 25 mm2 0.02
+ BC 25 mm2 0.03
+ BC 50 mm2 0.05
2 + BC 10 mm2 0.00
+ BC 16 mm2 0.00
+ BC 16 mm2 0.01
+ BC 16 mm2 0.01
+ BC 16 mm2 0.01
+ BC 16 mm2 0.01
+ BC 16 mm2 0.02
+ BC 35 mm2 0.03
0.06
0.04
0.04
0.06
0.05
0.06
0.04
0.06
0.04
0.06
0.04
0.06
0.04
0.06
0.04
0.06
0.04
0.02
0.04
0.03
0.02
0.02
.5mm2 Include galian + material bantu 0.04
accessories 0.07
-
-
0.05
0.02
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
TB-FA -BS & TB-FA - 7 0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
e TB-FA -1 0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
1.5 mm2 dalalm pipa conduit 20 mm2 0.03
mm2 dalalm pipa conduit 20 mm2 0.00
mm2 dalalm pipa conduit 20 mm2 0.00
,6 mm dalalm pipa conduit 20 mm2 0.00
dalalm pipa conduit 20 mm2 0.00
alm pipa conduit 20 mm2 0.00
MHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2 0.01
dalalm pipa conduit 20 mm2 0.00
0.00
GAAN (FIK)
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.01
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.01
0.00
0.00
NTAI - ATAP
0.20
0.00
0.00
0.00
0.13
0.01
0.00
pa ~ ground tank) 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.00
0.00
0.01
0.01
c/w Valve Cock 0.00
0.02
ccessories
0.00
-
0.02
0.01
0.01
0.00
0.00
0.02
0.02
0.01
0.02
0.00
1.06
0.01
0.00
pa ~ ground tank) 0.00
pa ~ roof tank) 0.00
0.01
0.01
0.06
0.01
0.01
0.03
0.02
0.02
0.02
c/w Valve Cock 0.00
0.02
0.01
0.00
0.00
0.01
c/w Valve Cock 0.00
0.01
0.00
0.13
0.01
0.00
pa ~ ground tank) 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.00
0.00
0.01
0.01
c/w Valve Cock 0.00
0.02
0.03
0.00
0.01
0.00
c/w Valve Cock 0.00
0.01
0.04
0.03
0.00
0.00
0.00
0.01
0.00
-
0.00
0.00
-
0.02
0.00
0.00
-
0.10
0.00
0.00
0.00
0.00
-
0.00
0.00
0.03
0.01
-
0.21
0.00
0.00
0.00
0.00
0.02
-
0.01
0.00
-
0.00
0.02
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.03
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
-
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
-
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
-
0.00
0.00
-
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
-
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.01
0.00
0.00
0.00
-
0.00
0.00
0.02
0.00
0.00
-
0.00
0.00
-
0.00
0.00
0.01
0.00
0.01
1.92
0.02
0.00
0.00
0.01
0.00
0.01
0.00
0.00
0.04
0.00
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.00
0.01
0.03
0.00
0.00
KARAN - LANTAI - 1
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
KARAN - LANTAI - 2
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.04
0.00
0.00
KARAN - LANTAI - 3
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
KARAN - LANTAI - 4
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
KARAN - LANTAI - 5
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
ow Switch, Test & Drain device 0.05
0.00
KARAN - LANTAI - 6
0.00
0.04
0.01
0.01
0.01
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
KARAN - LANTAI - 7
0.00
0.04
0.01
0.01
0.01
0.00
0.01
0.00
0.02
0.03
0.00
0.00
0.00
0.01
0.03
0.00
0.01
0.01
0.03
0.00
0.00
-
0.01
0.00
KARAN - SITE
m kebakaran dan instalasi pemadam kebakaran luar gedung,
beserta pengetesan sistem dan instalasi.
0.01
0.04
0.34
0.04
0.03
0.03
0.01
0.14
0.11
0.08
0.03
0.00
0.07
0.03
0.01
0.04
0.01
0.32
0.11
0.19
0.17
0.00
0.02
0.01
0.00
0.00
0.01
0.01
0.03
0.02
0.02
0.00
0.01
0.08
0.27
0.16
0.01
0.11
0.01
0.11
0.16
0.00
0.00
0.00
NIK/EXHAUST FAN
ucting tanpa isolasi,
m dan instalasi.
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.01
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.00
r Grille, Damper, Kabel & Kontrol, dan access 0.00
0.16
0.01
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.16
0.01
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.13
0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021
0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105
0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175
0.0316 0.0316 0.0316 0.0316 0.0316 0.0316 0.0316 0.0316 0.0316 0.0316
0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105 0.0105
0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114
0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091 0.0091
0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371
0.2245
0.2665
0.0070
0.0824
0.3407
0.0898
0.0330
0.1225
0.0675
0.0512
0.0643
0.0822
0.0173
0.0290
0.0240
0.0092
0.0155
0.0024
0.0086
0.0057
0.0480
0.1797 0.1797
0.2209 0.2209
0.3129 0.3129
0.0473 0.0473
0.1239 0.1239
0.0344 0.0344
0.0521 0.0521
0.1431 0.1431
0.0369 0.0369
0.0022 0.0022
0.0061 0.0061
0.0246 0.0246
0.0943 0.0943
0.0738 0.0738
0.0137 0.0137
0.1524 0.1524
0.0963 0.0963
0.0311 0.0311
0.0190 0.0190
0.0029 0.0029
0.0332 0.0332
0.0318 0.0318
0.0357 0.0357
0.0309 0.0309
0.0057 0.0057
0.0578 0.0578
0.0486 0.0486
0.0003 0.0003
0.0004 0.0004
0.0004 0.0004
0.0005 0.0005
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0116 0.0116
0.0152 0.0152
0.0017 0.0017
0.0119 0.0119
0.0137 0.0137
0.0152 0.0152
0.2136 0.2136
0.2626 0.2626
0.3193 0.3193
0.0387 0.0387
0.1063 0.1063
0.0344 0.0344
0.0355 0.0355
0.1023 0.1023
0.0369 0.0369
0.0016 0.0016
0.0048 0.0048
0.0246 0.0246
0.0767 0.0767
0.0437 0.0437
0.0138 0.0138
0.2385 0.2385
0.0448 0.0448
0.0573 0.0573
0.0272 0.0272
0.0106 0.0106
0.1290 0.1290
0.0586 0.0586
0.0020 0.0020
0.0009 0.0009
0.0003 0.0003
0.0046 0.0046
0.0020 0.0020
0.0146 0.0146
0.0131 0.0131
0.0541 0.0541
0.0199 0.0199
0.0006 0.0006
0.0008 0.0008
0.0008 0.0008
0.0011 0.0011
0.0078 0.0078
0.0031 0.0031
0.0006 0.0006
0.0168 0.0168
0.0064 0.0064
0.0008 0.0008
0.0004 0.0004
0.0005 0.0005
0.0000 0.0000
0.0036 0.0036
0.0014 0.0014
0.0005 0.0005
0.0060 0.0060
0.0037 0.0037
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.2168 0.2168
0.2666 0.2666
0.3241 0.3241
0.0382 0.0382
0.1052 0.1052
0.0344 0.0344
0.0386 0.0386
0.1114 0.1114
0.0369 0.0369
0.0861 0.0861
0.0437 0.0437
0.0138 0.0138
0.2385 0.2385
0.0448 0.0448
0.0396 0.0396
0.0200 0.0200
0.0036 0.0036
0.0525 0.0525
0.0003 0.0003
0.0467 0.0467
0.0239 0.0239
0.0064 0.0064
0.0645 0.0645
0.0234 0.0234
0.0006 0.0006
0.0007 0.0007
0.0008 0.0008
0.0011 0.0011
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.1929 0.1929
0.2372 0.2372
0.2886 0.2886
0.0287 0.0287
0.0789 0.0789
0.0344 0.0344
0.0456 0.0456
0.1317 0.1317
0.0369 0.0369
0.0742 0.0742
0.0376 0.0376
0.0128 0.0128
0.2208 0.2208
0.0973 0.0973
0.0431 0.0431
0.0232 0.0232
0.0038 0.0038
0.0588 0.0588
0.0767 0.0767
0.0387 0.0387
0.0278 0.0278
0.0645 0.0645
0.0527 0.0527
0.0006 0.0006
0.0008 0.0008
0.0008 0.0008
0.0013 0.0013
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.1999
0.2459
0.2990
0.0382 0.0382
0.1052 0.1052
0.0344 0.0344
0.0351 0.0351
0.1013 0.1013
0.0369 0.0369
0.0647
0.0238
0.0128
0.0982
0.0661
0.0228
0.0119
0.0038
0.0385
0.0311
0.0545
0.0302
0.0064
0.1274
0.0636
0.0006
0.0007
0.0008
0.0011
0.0149
0.0098
0.0464
0.0031
0.0042
0.0042
0.0031
0.0042
0.0042
0.0018
0.0063
0.0005
0.0015
0.0010
0.0031
0.0005
0.0009
0.0037
0.0086
0.0075
0.0080
0.0033
0.0028
0.0007
0.0073 0.0073
0.0117 0.0117
0.0152 0.0152
0.0005 0.0005
0.0004 0.0004
0.0013 0.0013
0.0015 0.0015
0.0018 0.0018
0.0019 0.0019
0.0047 0.0047
0.0023 0.0023
0.0016 0.0016
0.0015 0.0015
0.0039 0.0039
0.0051 0.0051
0.0049 0.0049
0.0041 0.0041
0.0005 0.0005
0.0077 0.0077
0.0071 0.0071
0.0139 0.0139
0.0023 0.0023
0.0021 0.0021
0.0047 0.0047
0.0037 0.0037
0.0003 0.0003
0.0003 0.0003
0.0012 0.0012
0.0007 0.0007
0.0055
0.0436
0.0024
0.0071
0.0156
0.0059
0.0026
0.0020
0.0058
0.0070
0.2228 0.2228
0.1932 0.1932
0.0107 0.0107
0.0817 0.0817
0.1089 0.1089
0.0944 0.0944
0.0164 0.0164
0.0444 0.0444
0.1671 0.1671
0.1449 0.1449
0.0168 0.0168
0.0648 0.0648
0.1306 0.1306
0.1132 0.1132
0.0258 0.0258
0.0557 0.0557
0.1333 0.1333
0.1156 0.1156
0.0312 0.0312
0.0512 0.0512
0.1237 0.1237
0.1073 0.1073
0.0190 0.0190
0.0506 0.0506
0.1270 0.1270
0.1102 0.1102
0.0126 0.0126
0.0492 0.0492
0.0991 0.0991
0.0860 0.0860
0.0171 0.0171
0.0413 0.0413
0.1778
0.0793
0.0471 0.0471
0.0465 0.0465
0.0028 0.0028
0.0202 0.0202
0.0740 0.0740
0.0351 0.0351
0.0033 0.0033
0.0356 0.0356
0.0538 0.0538
0.0394 0.0394
0.0047 0.0047
0.0280 0.0280
0.0538 0.0538
0.0333 0.0333
0.0028 0.0028
0.0795 0.0795
0.0538
0.0399
0.0028
0.0010
0.0155 0.0155
0.0069 0.0069
0.0187 0.0187
0.0308 0.0308
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0104 0.0104
0.0104 0.0104
0.0040 0.0040
0.0173 0.0173
0.0286 0.0286
0.0171 0.0171
0.0120 0.0120
0.0241 0.0241
0.0241 0.0241
0.0069 0.0069
0.0094 0.0094
0.0185 0.0185
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0160 0.0160
0.0035 0.0035
0.0035 0.0035
0.0038 0.0038
0.0173 0.0173
0.0643 0.0643
0.0071 0.0071
0.1365 0.1365
0.0216 0.0216
0.0069 0.0069
0.0140 0.0140
0.0021 0.0021
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0035 0.0035
0.0035 0.0035
0.0038 0.0038
0.0173 0.0173
0.1358 0.1358
0.0094 0.0094
0.1204 0.1204
0.0057 0.0057
0.0067 0.0067
0.0347
0.0069
0.0140
0.0246
0.0022
0.0029
0.0016
0.0035
0.0035
0.0038
0.0173
0.1001
0.0456
0.0114
0.0695
0.2503
0.0282
0.1498
0.0735
0.0735
0.0002 0.0002
0.0002 0.0002
0.0293 0.0293
0.0232 0.0232
0.0184 0.0184
0.0176
0.0013 0.0013
0.0015
0.0072 0.0072
0.0063
0.0013
0.0030
0.0017 0.0017
0.0012 0.0012
0.0018 0.0018
0.0002 0.0002
0.0005 0.0005
0.0105 0.0105
0.0176
0.1686
0.5332
0.4320
0.2358 0.2358 0.2358 0.2358 0.2358 0.2358 0.2358
0.0009
0.0318
0.0653
0.0000
0.9547
0.3203
0.2150
0.0024
0.0063
0.0006
0.1865
0.2972
0.0126
0.0126
0.0126
0.0126
0.0843 0.0843
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0190 0.0190
0.0200 0.0200
0.0000 0.0000
0.0074 0.0074
0.0811 0.0811
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.0179 0.0179
0.3390 0.3390
0.1344 0.1344
0.0135 0.0135
0.0073 0.0073
0.0007 0.0007
0.0017 0.0017
0.0044 0.0044
0.0055 0.0055
0.0069 0.0069
0.0084 0.0084
0.0098 0.0098
0.0113 0.0113
0.0127 0.0127
0.0263 0.0263
0.0017 0.0017
0.0023 0.0023
0.0037 0.0037
0.0037 0.0037
0.0056 0.0056
0.0052 0.0052
0.0076 0.0076
0.0171 0.0171
0.0031 0.0031
0.0053 0.0053
0.0053 0.0053
0.0015 0.0015
0.0009 0.0009
0.0299 0.0299
0.0208 0.0208
0.0208 0.0208
0.0321 0.0321
0.0261 0.0261
0.0299 0.0299
0.0208 0.0208
0.0299 0.0299
0.0208 0.0208
0.0299 0.0299
0.0208 0.0208
0.0299 0.0299
0.0208 0.0208
0.0299
0.0208
0.0299
0.0208
0.0203
0.0163
0.0357
0.1644
0.0263
0.0064
0.0150
0.0074
0.0015
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0274
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0045
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0052
0.0007
0.0008
0.0004
0.0007
0.0012
0.0015
0.0034
0.0028
0.0015
0.0050
0.0004
0.0010
0.0004
0.0007
0.0029
0.0015
0.0034
0.0034
0.0015
0.0069
0.0006
0.0028
0.0004
0.0007
0.0004
0.0015
0.0034
0.0024
0.0015
0.0047
0.0004
0.0010
0.0004
0.0007
0.0046
0.0015
0.0034
0.0024
0.0015
0.0098
0.0244
0.0042
1.0580
0.0116
0.0010
0.0005
0.0050
0.0052
0.0051
0.0626
0.0051
0.0084
0.0291
0.0238
0.0194
0.0238
0.0013
0.0169
0.0090
0.0011
0.0017
0.0085
0.0004
0.0065
0.0040
0.1286
0.0116
0.0025
0.0005
0.0026
0.0025
0.0003
0.0008
0.0002
0.0034
0.0162
0.0034
0.0034
0.0053
0.0108
0.0013
0.0211
0.0290
0.0032
0.0056
0.0021
0.0009
0.0057
0.0379
0.0277
0.0012
0.0041
0.0006
0.0109
0.0016
0.0000
0.0030
0.0013
0.0000
0.0178
0.0034
0.0030
0.0000
0.1048
0.0002
0.0009
0.0002
0.0027
0.0000
0.0010
0.0002
0.0318
0.0063
0.0000
0.2097
0.0003
0.0022
0.0004
0.0024
0.0159
0.0000
0.0000
0.0068
0.0028
0.0000
0.0015
0.0211
0.0105
0.0010
0.0031
0.0015
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0107
0.0022
0.0030
0.0024
0.0000
0.0016
0.0006
0.0269
0.0022
1.9178
0.0221
0.0006
0.0002
0.0138
0.0022
0.0126
0.0019
0.0002
0.0406
0.0038
0.0074
0.0150
0.0194
0.0287
0.0023
0.0042
0.0042
0.0137
0.0331
0.0016
0.0038
0.0095
0.0297
0.0031
0.0031
0.0510
0.0018
0.0002
0.0384
0.0105
0.0074
0.0150
0.0194
0.0278
0.0016
0.0042
0.0042
0.0137
0.0331
0.0044
0.0105
0.0095
0.0310
0.0031
0.0031
0.0510
0.0018
0.0002
0.0384
0.0076
0.0074
0.0150
0.0194
0.0284
0.0016
0.0042
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0351
0.0031
0.0031
0.0510
0.0018
0.7482
1.2750
0.1496
0.0016
0.0017
0.0124
0.0115
0.0334
0.0167
0.0211
0.0014
0.0129
0.0828
0.2650
0.1610
0.0129
0.1060
0.0064
0.1054
0.1610
0.0013
0.0013
0.0022
0.0086
0.0032
0.0116
0.0032
0.0024
0.0008
0.0086
0.0032
0.0048
0.0015
0.0048
0.0015
0.0013
0.0002
0.0030
0.0008
0.0086
0.0032
0.0024
0.0008
0.0086
0.0025
0.0013
0.0003
0.0048
0.0015
0.0013
0.0002
0.0030
0.0008
0.0086
0.0025
0.0086
0.0032
0.0024
0.0008
0.0086
0.0008
0.0048
0.0015
0.0013
0.0002
0.0048
0.0015
0.0086
0.0032
0.0024
0.0008
0.0086
0.0025
0.0048
0.0015
0.0048
0.0015
0.0013
0.0002
0.0030
0.0030
0.0086
0.0025
3.54 2.65 3.58 7.01 7.96 6.88 4.74 4.04 4.19 4.22
17.60 20.26 23.84 30.85 38.81 45.70 50.43 54.48 58.66 62.88
an 4 Bulan 5 Bulan 6
16 17 18 19 20 21 22 23 24
0.0647
0.0238
0.0128
0.0982
0.0661
0.0228
0.0119
0.0038
0.0385
0.0311
0.0545
0.0302
0.0064
0.1274
0.0636
0.0006
0.0007
0.0008
0.0011
0.0149
0.0098
0.0464
0.0031
0.0042
0.0042
0.0031
0.0042
0.0042
0.1999 0.1999
0.2459 0.2459
0.2990 0.2990
0.0350 0.0350
0.0965 0.0965
0.0344 0.0344
0.0386 0.0386
0.1114 0.1114
0.0369 0.0369
0.0647 0.0647
0.0314 0.0314
0.0064 0.0064
0.0982 0.0982
0.0661 0.0661
0.0228 0.0228
0.0119 0.0119
0.0038 0.0038
0.0385 0.0385
0.0311 0.0311
0.0545 0.0545
0.0311 0.0311
0.0046 0.0046
0.1271 0.1271
0.0636 0.0636
0.0006 0.0006
0.0007 0.0007
0.0008 0.0008
0.0011 0.0011
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.1997 0.1997
0.2455 0.2455
0.2985 0.2985
0.0244 0.0244
0.1159 0.1159
0.0246 0.0246
0.0439 0.0439
0.1219 0.1219
0.0369 0.0369
0.0647 0.0647
0.0314 0.0314
0.0064 0.0064
0.0982 0.0982
0.0661 0.0661
0.0228 0.0228
0.0119 0.0119
0.0038 0.0038
0.0385 0.0385
0.0311 0.0311
0.0545 0.0545
0.0302 0.0302
0.0064 0.0064
0.1271 0.1271
0.0636 0.0636
0.0006 0.0006
0.0007 0.0007
0.0008 0.0008
0.0011 0.0011
0.0149 0.0149
0.0098 0.0098
0.0464 0.0464
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0031 0.0031
0.0042 0.0042
0.0042 0.0042
0.0833 0.0833
0.1118 0.1118
0.1273 0.1273
0.0251 0.0251
0.0737 0.0737
0.0039 0.0039
0.0146 0.0146
0.0670 0.0670
0.0136 0.0136
0.0014 0.0014
0.0063 0.0063
0.0102 0.0102
0.0761 0.0761
0.0255 0.0255
0.0898 0.0898
0.1036 0.1036
0.0018 0.0018
0.0007 0.0007
0.0027 0.0027
0.0031 0.0031
0.0012 0.0012
0.0012 0.0012
0.0014 0.0014
0.0030 0.0030
0.0239 0.0239
0.0320 0.0320
0.0389 0.0389
0.0122 0.0122
0.0358 0.0358
0.0039 0.0039
0.0011 0.0011
0.0058 0.0058
0.0023 0.0023
0.0302 0.0302
0.0101 0.0101
0.0311 0.0311
0.0412 0.0412
0.0536 0.0536
0.0537 0.0537
0.0126 0.0126
0.0623 0.0623
0.0135 0.0135
0.0211 0.0211
0.0241 0.0241
0.0026
0.0020
0.0058
0.0070
0.0023 0.0023
0.0017 0.0017
0.0046 0.0046
0.0049 0.0049
0.0003 0.0003
0.0003 0.0003
0.0009 0.0009
0.0009 0.0009
0.0002 0.0002
0.0002 0.0002
0.0006 0.0006
0.0005 0.0005
0.1778
0.1541 0.1541
0.0126 0.0126
0.0668 0.0668
0.0793
0.0688 0.0688
0.0171 0.0171
0.0344 0.0344
0.2100 0.2100
0.1821 0.1821
0.0126 0.0126
0.0780 0.0780
0.0721 0.0721
0.0626 0.0626
0.0174 0.0174
0.0320 0.0320
0.1800 0.1800
0.1561 0.1561
0.0126 0.0126
0.0676 0.0676
0.0824 0.0824
0.0714 0.0714
0.0174 0.0174
0.0356 0.0356
0.2443 0.2443
0.2118 0.2118
0.0070 0.0070
0.0876 0.0876
0.0876 0.0876
0.0759 0.0759
0.0209 0.0209
0.0388 0.0388
0.0176 0.0176
0.0153 0.0153
0.0007 0.0007
0.0064 0.0064
0.0866 0.0866
0.0751 0.0751
0.0090 0.0090
0.0337 0.0337
0.0538
0.0399
0.0028
0.0010
0.0538 0.0538
0.0438 0.0438
0.0028 0.0028
0.0268 0.0268
0.0538 0.0538
0.0406 0.0406
0.0088 0.0088
0.0264 0.0264
0.0673 0.0673
0.0416 0.0416
0.0028 0.0028
0.0282 0.0282
0.0504 0.0504
0.0176 0.0176
0.0009 0.0009
0.0347
0.0069
0.0140
0.0246
0.0022
0.0029
0.0016
0.0035
0.0035
0.0038
0.0173
0.1001
0.0456
0.0114
0.0695
0.2503
0.0282
0.1498
0.0735
0.0735
0.0347 0.0347
0.0069 0.0069
0.0140 0.0140
0.0246 0.0246
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0035 0.0035
0.0035 0.0035
0.0038 0.0038
0.0173 0.0173
0.0929 0.0929
0.0097 0.0097
0.0526 0.0526
0.0186 0.0186
0.0347 0.0347
0.0046 0.0046
0.0140 0.0140
0.0246 0.0246
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0035 0.0035
0.0035 0.0035
0.0173 0.0173
0.1001 0.1001
0.0526 0.0526
0.0186 0.0186
0.0249 0.0249
0.0347 0.0347
0.0069 0.0069
0.0140 0.0140
0.0246 0.0246
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0035 0.0035
0.0035 0.0035
0.0120 0.0120
0.0038 0.0038
0.0173 0.0173
0.0858 0.0858
0.0023 0.0023
0.0461 0.0461
0.0153 0.0153
0.0154 0.0154
0.0069 0.0069
0.0164 0.0164
0.0267 0.0267
0.0022 0.0022
0.0029 0.0029
0.0016 0.0016
0.0152 0.0152
0.0259 0.0259
0.0263 0.0263
0.0164 0.0164
0.0728 0.0728
0.0086 0.0086
0.0053 0.0053
0.0947 0.0947
0.0304 0.0304
0.0026 0.0026
0.0263 0.0263
0.0177 0.0177
0.0341 0.0341
0.0176
0.0240 0.0240
0.0280 0.0280
0.0243 0.0243
0.0315 0.0315
0.0023 0.0023
0.1321 0.1321
0.2248 0.2248
0.0015
0.0013 0.0013
0.0063
0.0013
0.0030
0.0639 0.0639
0.0022 0.0022
0.0008 0.0008
0.0030 0.0030
0.0022 0.0022
0.0176
0.0004 0.0004
0.0004 0.0004
0.0007 0.0007
0.0004 0.0004
0.0003 0.0003
0.0012 0.0012
0.0160 0.0160
0.0015 0.0015
0.0009 0.0009
0.0091 0.0091
0.0605 0.0605
0.0193 0.0193
0.0035 0.0035
0.0199 0.0199
0.0022 0.0022
0.0009 0.0009
0.0007 0.0007
0.0017 0.0017
0.0361 0.0361
0.0380 0.0380
0.0193 0.0193
0.2358
0.0299
0.0208
0.0299
0.0208
0.0092 0.0092
0.0180 0.0180
0.0140 0.0140
0.0724
0.0000
0.0000
0.0506
0.0192
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0007
0.0013
0.0459
0.0031
0.0032
0.0032
0.0014
0.0034
0.0015
0.0013
0.0088
0.0301
0.0016
0.0016
0.0014
0.0016
0.0032
0.0118
0.0008
0.0047
0.0004
0.0010
0.0004
0.0007
0.0046
0.0015
0.0034
0.0024
0.0015
0.0047
0.0004
0.0010
0.0004
0.0007
0.0072
0.0019
0.0034
0.0024
0.0015
0.0055
0.0017
0.0010
0.0042
0.0003
0.0008
0.0072
0.0019
0.0017
0.0054
0.0024
0.0015
0.0052
0.0007
0.0008
0.0004
0.0007
0.0072
0.0020
0.0017
0.0054
0.0024
0.0015
0.2023
0.0003
0.0012
0.0004
0.1286
0.0116
0.0025
0.0005
0.0026
0.0023
0.0003
0.0008
0.0002
0.0034
0.0162
0.0034
0.0034
0.0053
0.0108
0.0013
0.0211
0.0045
0.0000
0.0215
0.0063
0.0073
0.0015
0.0034
0.0156
0.0238
0.0049
0.0030
0.0016
0.0000
0.0030
0.0006
0.0003
0.0016
0.0044
0.0017
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0125
0.0022
0.0030
0.0024
0.0000
0.0012
0.0006
0.0196
0.0022
0.0027
0.0022
0.0006
0.0000
0.0022
0.0022
0.0013
0.0012
0.0036
0.0017
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0098
0.0016
0.0030
0.0024
0.0000
0.0012
0.0006
0.0240
0.0022
0.0018
0.0000
0.0004
0.0018
0.0000
0.0004
0.0012
0.0036
0.0017
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0098
0.0022
0.0030
0.0024
0.0000
0.0012
0.0004
0.0196
0.0022
0.0018
0.0000
0.0004
0.0018
0.0000
0.0004
0.0012
0.0036
0.0017
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0098
0.0006
0.0030
0.0024
0.0000
0.0012
0.0004
0.0196
0.0022
0.0018
0.0000
0.0004
0.0018
0.0000
0.0004
0.0012
0.0088
0.0073
0.0082
0.0016
0.0032
0.0030
0.0010
0.0000
0.0098
0.0011
0.0030
0.0024
0.0000
0.0012
0.0004
0.0196
0.0022
0.0018
0.0000
0.0004
0.0018
0.0000
0.0004
0.0003
0.0014
0.0037
0.0017
0.0044
0.0016
0.0005
0.0022
0.0010
0.0000
0.0098
0.0011
0.0030
0.0024
0.0000
0.0012
0.0004
0.0196
0.0034
0.0018
0.0000
0.0004
0.0018
0.0000
0.0005
0.0003
0.0076
0.0013
0.0137
0.0002
0.0406
0.0076
0.0074
0.0150
0.0194
0.0288
0.0018
0.0043
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0316
0.0031
0.0031
0.0510
0.0018
0.0002
0.0406
0.0076
0.0074
0.0150
0.0194
0.0276
0.0018
0.0043
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0294
0.0031
0.0031
0.0510
0.0018
0.0002
0.0406
0.0076
0.0074
0.0150
0.0194
0.0289
0.0018
0.0043
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0326
0.0031
0.0031
0.0510
0.0018
0.0002
0.0406
0.0076
0.0074
0.0150
0.0194
0.0289
0.0018
0.0043
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0326
0.0031
0.0031
0.0510
0.0018
0.0002
0.0412
0.0076
0.0074
0.0150
0.0013
0.0065
0.0009
0.0194
0.0281
0.0018
0.0043
0.0042
0.0137
0.0331
0.0032
0.0076
0.0095
0.0272
0.0031
0.0031
0.0000
0.0065
0.0009
0.0510
0.0018
0.0104
0.0353
0.3369
0.0422
0.0333
0.0282
0.0066
0.1380
0.1060
0.0805
0.0297
0.0030
0.0738
0.0348
0.0149
0.0353
0.0095
0.3180
0.1060
0.1909
0.1699
0.0018
0.0211
0.0094
0.0086
0.0032
0.0024
0.0008
0.0086
0.0032
0.0048
0.0015
0.0048
0.0015
0.0086
0.0032
0.0024
0.0008
0.0086
0.0032
0.0048
0.0015
0.0048
0.0015
0.0086
0.0032
0.0024
0.0008
0.0086
0.0032
0.0048
0.0015
0.0048
0.0015
0.0086
0.0032
0.0116
0.0032
0.0024
0.0008
0.0086
0.0025
0.0086
0.0025
0.0048
0.0015
0.1596
0.0055
0.0043
0.0057
0.0057
0.0081
0.0083
0.0129
0.0034
0.0031
0.1596
0.0055
0.0043
0.0057
0.0057
0.0081
0.0083
0.0129
0.0034
0.0031
Barang
I. Material Langsung (Bahan Baku) Rp 40,696,982,441.23 Rp 40,696,982,441.23 100.00
II. Peralatan (Barang Jadi)
A. Sub Total Barang Rp 40,696,982,441.23 Rp - Rp 40,696,982,441.23 100.00
Jasa
III. Manajemen Proyek dan Perekasaan 17,441,563,903.39 Rp 17,441,563,903.39 100.00
IV. Alat Kerja / Fasilitas kerja
V. Konstruksi dan Fabrikasi
VI. Jasa Umum
B. SubTotal Jasa 17,441,563,903.39 Rp - Rp 17,441,563,903.39 100.00
= 100%
Ir. Herman Dwi Haryanto
General Manager
UNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
TKDN
Gabungan
(7)
Prosentase dari
No. Mata Harga Total
Jenis Pekerjaan
Pembayaran Mata Pembayaran
KETERANGAN
by Arsitek
5 Batu Alam Andesit - Batu andesit ( ukuran sesuai dok gambar DED)
2 Kusen & Daun Pintu Besi - Daun Pintu Besi type Duralux
- pintu besi kedap suara
- lapisan dalam rockwoll
- ukuran kusen besi sesuai gambar
- kusen besi lengkap dgn ambang&bumper
- tebal daun pintu = 40 mm, frame = 2 mm
- tebal plate = 1.5 mm
V PEKERJAAN KACA
1 Kaca Type sesuai gambar DED
- pintu kaca frameless min tebal 12 mm (tinted)
- type stopsol tebal 8 mm
- type tempered tebal 12 mm
- type panasap tebal 8 mm
- Dinding kaca frameless, tebal sesuai dok DED.
(Type dapat ditentukan kemudian)
2 Kaca cermin - jenis float glass
- tebal min 6 mm,110 x 135 cm bevel
- frame Alumunium
X PEKERJAAN RAILING
1 Railing Stainlessteel
- Pipa Railing Stainless
- Hand railing Stainless
Type dan bentuk sesuai dok gambar DED
2 Railing Besi Hitam - Tiang Railing : Hot Deep Galvanis
- Sesuai pada dok. gambar DED
XI PEKERJAAN ATAP
1 Atap Metal Zinc Alumunium - System Flex-Lok ,
- ketebalan 0,55 mm BMT
Insulasi atap zinc Alum - Alumunium foil, thermal insulation, mineral wool
STC 35 (minimal), density 48 kg/m3, ketebalan
thickness 50 mm,
gording 120 cm ( sesuai gambar struktur)
2 Atap Beton - Material Beton harus sesuai spesifikasi pada
RKS struktur,dilapis waterprofing finished kawat
ayam dan screed 3cm kemiringan 1,5 - 2 %.
- diberi apisan bonding agent
3 Atap Genteng Metal - material dasar : acrylic overglaze, stone chip,
acrylic base coat, epoxy primer, zinc coating,
steel base, epoxy primer,
'high temperature seal coat,
- panjang total 900 mm, lebar 410 mm
- type Minimalis Allure, Grade Saphire 0,40 TCT
Insulasi genteng metal - Insulasi Buble
Doubel side aluminium
MEREK / PRODUK
Hebel
Mortar Utama
MU
Surfatron
Surfatron
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Roman
Alexindo
Duraframe (Prometama)
Jayaboard
Kalsiboard
Jayaboard
Alexindo
Alexindo
GE Silicones
Bostinco
Teakwood jati
Kamper
Propan Impra
Nippe ( Duco)
Jaya Board
Prometama
Dekson, Dorma
Sandei, Kenari djaya
Asahimas
Asahimas
Alexindo
GE Silicones
Sevent
Alexindo
Panellux
Alexindo
Catylac
Mowilex Weathercoat
ICI Dulux
ICI Dulux
Propan (Impra)
Nippe, Propan
Alexindo
Greenlam
Crea, Sincol
Wood Colour, ex. Armstrong
Interface,deso
Hilon
Smartruss
Conblock Internusa
Conblock Internusa
Kualitas 1
sesuai gambar DED
OUTLINE TECHNICAL SPECIFICATION
EQUIPMENT DAN MANUFACTURER
I. PEKERJAAN MEKANIKAL
NO. MATERIAL SPESIFICATION
I. Instalasi Air Bersih.
1. Pipa Air Bersih (luar gedung)
a. Pipa Air Bersih luar Material : Galvanis Steel Pipe
gedung Class : Medium
Standard : SNI 0039-87/BS, 1387-67
b. Fittings Material : Malleable Cast Iron
Working Pressure :
3. Valve-valve
a. Gate Valve / Globe - Diameter < 50 mm
Valve Material : Bronze
Check Valve / Y- Connection : Screwed
Strainer Working Pressure, min : 10 kg/cm2
Standard : JIS 10 K
- Diameter > 65 mm
Material : Malleable Cast Iron
Connection : Flanged
Working Pressure, min : 10 kg/cm2
Standard : JIS 10 K, Class 125
b. Check Valve Material : Cast Iron
(anti Water Working Pressure : 10 kg/cm2
Hammer) End Connection : Flanged
Standard : PN 16
c. Floating Valve - Diameter < 65 mm
Material : Brass & Copper
End Connection : BSPT Thread
Working Pressure, min : 4 kg/cm2
- Diameter > 80 mm
Material : Brass & Copper
End Connection : Flanged, JIS 10 K
Working Pressure, min : 4 kg/cm2
d.. Foot Valve (with Material : Cast Iron, Galvanized Steel
Strainer) & Working Pressure, min : 10 kg/cm2
Basket Strainer Connection : Flanged
Standard : PN 10
4. Flow Meter Type : Magnetic Drive
Working Pressure, min : 10 kg/cm2
5. Flexible Joint Type : Double Sphere
Material : Rubber
Working Pressure, min : 10 kg/cm2
6. Pressure Gauge & Material: Casing Chrome Plated St.
Compound Gauge Size : 100 mm
Range Pressure : 0 - 10 kg/cm2
7. Water Tank Type: Panel System.
Material: Fiberglass.
Panel Size : As Schedule
Product by: Moulding Injection System.
8. Water Filter
a. Sand Filter Type: Top Flow
Material: Mild Steel, Epoxy lining
Kapasitas : as Schedule
Presseure Test : as Schedule
Working Pressure : as Schedule
Filter Media : Silica Sand
Kap. Media : as manufacturer std
b.. Carbon Filter Type: Top Flow
Material: Mild Steel, Epoxy Lining
Kapasitas : as Schedule
Presseure Test : as Schedule
Working Pressure : as Schedule
Filter Media Activated Carbon
Kap. Media : as manufacturer std
II. Instalasi Air Bekas / Kotor / Hujan.
1. Pipes :
a. Sewage Water & Material : U PVC
Storm Water Pipes Class : VP
Working Pressure : 10 kg/cm2
Standard : SNI 06-0084-2002
b. Venting Pipes Material : U PVC
Class : D
Working Pressure : 5 kg/cm2
Standard : SNI 06-0084-2002
2. Fittings Material : U PVC
Standard : SNI 06-0135-1989
3. Sewage Treatment Type : As Scheduled on DWG
Plant
4. Refrigerant Pipe
Isolation
BRAND / MANUFACTURE
- BAKRIE
- HE
- WAVIN
- WAVIN
- KITAZAWA
- KITAZAWA
- YUTA
- SOCLA
- MEINECKE
- TOZEN
- NAGANO
- PENTAIR
- PENTAIR
- WAVIN
- WAVIN
- ARON KASEY
- BIOSEPTIC
WATERINDO
ABADI PRODUCT
- BAKRIE
- RICON
- KITAZAWA
- KITAZAWA
- KITAZAWA
- SOCLA
- KITAZAWA
- YOSHITAKE
- SOCLA
- YOSHITAKE
- NAGANO
- YAMATO
- APPRON
- APPRON
- APPRON
- APPRON
- PROTECTOR
- EBARA
- EBARA
- GRUNDFOS
- TERAL
- EBARA
- FAIRBANK MORSE
- FAIRBANK MORSE
- GRUNDFOS
- CUTTLER HAMMER
- DAIKIN
- KRUEGER
- ARMAFLEX
- KEMBLA
- OTIS
OUTLINE SPESIFIKASI
PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN DAN
GEDUNG ASRAMA UNIVERSITAS NEGERI MALANG
12 Control Relay
15 Control Fuse 4A
18 Cable Mark
6 Pipa Solar
2 Annunciator
3 Alarm Bell
4 Red Lamp
7 Jack Telephone
PEKERJAAN JARINGAN
1 Fiber Optic Cable Multimode 4 cor 50 um
2 UTP Cable Category 6
3 Patch Panel UTP 24 port UTP Cat. 6
4 Patch Panel FO 12 port
5 Patch Cord UTP dan FO Panjang 1,5 – 2 meter
6 Passive Optical Splitter (POS)
7 Optical Network Unit (ONU)
8 Optical Line Terminal (OLT)
9 Rack Cabinet 19” type wall mounted dan free standing
IP TELEPON
1 IP PABX Kapasitas: 50 CO Trunk dan 250 user
Lengkap dengan software
2 PESAWAT TELPON Digital berbasis IP
3 PESAWAT TELEPON ANALOG Standard
IP CCTV
1 CCTV IP Camera
2 Server CCTV Lengkap dengan software CCTV
OUTLINE SPESIFIKASI
N PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN DAN
GEDUNG ASRAMA UNIVERSITAS NEGERI MALANG
Merk/Produk
ABB
Trafindo
ABB
ABB
DEEP SEA
ASCO
Local Produk
ABB
GAE
GAE
GAE
GAE
ABB
Axle
Omron
Schneider
GAE
GAE
Skabelindo
Fujikura
Ega
3M
Panasonic
Panasonic
Panasonic
SCHWABE
Panasonic
Panasonic
Panasonic
None
None
Schwabe
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
None
None
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Panasonic
Menvier
Clipsal
LPI Guardian
Kabel Metal
Spindo
Perkins
Stamford Power
ABB
Kabel Metal
Nihon Spindle
Spindo
Lokal
- Notifier
- Notifier
- Notifier
- Notifier
- Notifier
- Notifier
Kabel Metal
Ega
TOA
TOA
TOA
TOA
TOA
TOA
TOA
TOA
TOA
TOA
Kabel Metal
Fuji kura
Ega
Three stars
Belden
Belden
Belden
Belden
Belden
Raisecom
Raisecom
Raisecom
HP
Clipsal
Ega
3M
Panasonic
Panasoonic
Panasonic
Bosch, Samsung
SUN
DAFTAR BARANG YANG DI IMPOR
TOTAL HARGA
YANG DI IMPOR
OLAHRAGAAN ( FIK )
NG YANG DIIMPOR
L HARGA -
MARK UP
UPAH : 100.00% 1.00% 101.00% Silahkan di mark up sendiri !!!!!!
MATERIAL : 100.00% 1.90% 101.90%
FAKTOR ALAT : 100.00% 0.00% 100.00%
FAKTOR SIPIL : 100.00% 0.00% 100.00%
FAKTOR M & E : 100.00% 2.00% 102.00%
FAKTOR LIFT : 100.00% 0.00% 100.00%
Overhead & Profit : 0.00% 0.00%
Overhead & Profit : 0.00% 0.00%
Nilai HPS (OE) : 67,962,951,500.00
Rencana Penawaran : 63,952,400,000.00 berdasarkan Finalisasi dipasang angkanya te
Realisasi Penawaran : 63,952,400,000.00 diusahakan mendekati Rencana Penawaran
94.10% dari HPS
-
di mark up sendiri !!!!!! 2.00% 0.00%
5.00% 0.00%
0.00% 0.00%
0.00% 0.00%
5.70% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
III. PROFIT
1. Overhead ( KP+Wilayah ) 0.00%
2. Profit Margin 4.00%
3. M/C : Kantor Pusat 0.00%
4. Bunga Bank non Operasional 0.00%
5. PPN Tak Tertagih 0.00%
6. Resiko : Kenaikan harga dasar 0.00%
K3 0.00%
Sosial 0.00%
7.. PPH Final 3.00%
Sub Total III 7.00%
TOTAL ( II + III ) 11.70%
IV. GRAND TOTAL = ( I + II + III ) 100.00%
atau PENAWARAN 1 x (I)
(1 - (Total II+III (%)))
Grand Total
PPN 10 %
PENAWARAN = (GRAND TOTAL +PPN)
Dibulatkan 94.10%
Pagu
Dibuat oleh :
Rachmad Djauhari
Kabag Pemasaran
Rp. 53,097,251,772.45
Rp. -
1,760,899,148.00
Rp. 51,336,352,624.46
Rp. -
Rp. 51,336,352,624.46
Rp. 581,385,646.94
Rp. 1,744,156,940.81
Rp. 116,277,129.39
Rp. -
Rp. 116,277,129.39
Rp. 174,415,694.08
Rp. -
Rp. -
Rp. -
Rp. 2,732,512,540.60
Rp. 54,068,865,165.06
Rp. -
Rp. 2,325,542,587.74
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. 1,744,156,940.81
Rp. 4,069,699,528.55
Rp. 6,802,212,069.15
Rp. 58,138,564,693.61
Rp 58,138,564,693.61
58,138,564,693.61
Rp. 5,813,856,469.36
Rp. 63,952,421,162.97
Rp. 63,952,400,000.00
67,962,951,500.00
Mengetahui :
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
PERINCIAN PEKERJAAN
( BILL OF QUANTITY )
PEKERJ
AAN : PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
NO ITE M PE K E R JAAN
GRAND REKAPITULASI
I. PEKERJAAN PENDAHULUAN
JUMLAH HARGA
TE M PE K E R JAAN
( Rp. )
2,052,842,144.50
54,898,828,525.69
27,689,554,135.23
13,117,452,433.08
8,135,646,248.38
5,956,175,709.00
318,161,768.90
168,707,951.08
149,453,817.82
790,692,773.99
508,608,535.68
282,084,238.31
78,021,131.54
78,021,131.54
-
TOTAL. I : 58,138,546,344.62
PPN 10 % : 5,813,854,634.46
TOTAL. II : 63,952,400,979.08
D I B U LATKAN : 63,952,400,000.00
Sembilan Ratus Lima Puluh Dua Juta Empat Ratus Ribu Rupiah
NO ITE M PE K E R JAAN
C. PEKERJAAN MEKANIKAL
D. PEKERJAAN ELEKTRIKAL
C. PEKERJAAN MEKANIKAL
D. PEKERJAAN ELEKTRIKAL
V. PEKERJAAN SIPIL
JUMLAH HARGA
( Rp. )
54,898,828,525.69
54,898,828,525.69
318,161,768.90
318,161,768.90
790,692,773.99
790,692,773.99
78,021,131.54
78,021,131.54
2,052,842,144.50
2,052,842,144.50
PERINCIAN PEKERJAAN
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN
LOKASI : MALANG , JAWA - TIMUR.
NO I T E M PE K E R JAAN
REKAPITULASI
A. PEKERJAAN STRUKTUR
13,405,910.10
264,937,923.40
6,178,845,543.26
5,088,299,805.95
1,090,545,737.31
20,535,665,601.21
2,531,014,160.42
2,512,027,779.85
2,590,268,510.36
2,392,685,016.74
2,425,063,772.75
2,237,193,798.16
2,239,127,228.31
2,256,821,777.13
1,026,575,809.52
324,887,747.98
696,699,157.26
NGUNAN FAKULTAS ILMU KEOLAHRAGAAN ( FIK ) : 27,689,554,135.23
168,707,951.08
3,351,477.52
45,090,361.84
460,166,696.32
A. PEKERJAAN STRUKTUR
324,887,747.98
20,535,665,601.21
5,743.76 20,000.00 114,875,200.00
414.12 20,000.00 8,282,400.00
293.36 20,000.00 5,867,200.00
853.20 20,000.00 17,064,000.00
192.00 5,604.40 1,076,045.52
24.00 5,604.40 134,505.69
124.44 20,000.00 2,488,832.00
8.00 112,088.08 896,704.60
48.00 19,870.16 953,767.62
A. PEKERJAAN STRUKTUR
1 Pek. Bouwplank m1
2 Pek. Galian pondasi. m3
3 Pek. Urugan pasir bawah pondasi & Sloof t.= 5 cm m3
4 Pek. Lantai kerja bawah pondasi & Sloof t. 5 cm m3
5 Pek. Urugan pasir bawah lantai t. = 5 cm m3
6 Pek. Lantai kerja bawah lantai t. = 5 cm m3
7 Pek.buangan tanah sisa galian pondasi m3
8 Pek.Urugan tanah dalam bangunan m3
9 Pek. Urugan tanah kembali m3
10 Pek.Pondasi Type PD3. 1250x1250x300
Beton K.350 167.19 kg/m3 m3
Besi ulir atas kg
Besi ulir bawah kg
Bekisting m2
11 Pek.Pondasi Batu Kali ( 1 Pc : 5 Psr ). m3
12 Pas.Batu Kosong t = 15 cm m3
13 Pek.Dinding Beton t = 20 cm. 147.00 kg/m3
Beton K.350 m3
Besi ulir kg
Bekisting m2
14 Pek.Pedestal K1. 250x250.
Beton K.350 324.50 kg/m3 m3
Besi Sengkang. kg
Besi ulir kg
Bekisting m2
15 Balok TB1. 200x250
Beton K.350 333.03 kg/m3 m3
Besi Sengkang. kg
Besi ulir kg
Bekisting m2
16 Kolom K1. 250x250 ( El.- s/d + )
Beton K.350 306.42 kg/m3 m3
Besi Sengkang. kg
Besi ulir kg
Bekisting m2
17 Plat Lantai t = 10 cm ( El.- 0,050 )
Beton K.350 77.50 kg/m3 m3
Besi ulir kg
Bekisting m2
18 Plat Lantai t = 12 cm ( El.+ 3.450 )
Beton K.350 84.91 kg/m3 m3
Besi ulir kg
Bekisting m2
19 Balok G1. 250x250
Beton K.350 274.89 kg/m3 m3
Besi Sengkang. kg
Besi ulir kg
Bekisting m2
20 Balok CG1. 200x250
Beton K.350 442.06 kg/m3 m3
Besi Sengkang. kg
Besi ulir kg
Bekisting m2
SUB TOTAL. III.BANGUNAN ELEKTRIKAL FIK. :
NA ANGGARAN BIAYA
NEERING ESTIMATE )
LTAS ILMU KEOLAHRAGAAN ( FIK )
NO I T E M P E K E R JAAN SAT.
A. PEKERJAAN STRUKTUR
460,166,696.32
508,608,535.68
DAFTAR HARGA SATUAN PEKERJAAN
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
NO URAIAN PE K E R JAAN
I. A PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan Gudang Semen dan Alat-alat
4 Pembuatan Kantor Sementara dengan lantai perkerasan
5 Pembuatan Rumah Jaga/Konstruksi Kayu
6 Membersihkan Lapangan dan Perataan
7 Pembuatan Bedeng Pekerja.
B. PEKERJAAN TANAH
1 Penggalian Tanah Biasa sedalam 1 meter
2 Penggalian Tanah Biasa sedalam 2 meter
3 Pembuangan tanah sejauh 30 meter
4 Urugan Kembali ex galian Pondasi
5 Pemadatan Tanah ( Per 20 cm ).
6 Urugan Pasir
7 Urugan Sirtu
C. PEKERJAAN PONDASI
D. PEKERJAAN DINDING
1 Pas. Batu merah ( 5x11x22 ) cm 1 batu camp. 1 pc : 4 ps
2 Pas. Batu merah ( 5x11x22 ) 1/2 batu camp. 1 pc : 4 ps
3 Pas. Batu merah ( 5x11x22 )1/2 batu camp. 1 pc : 5 ps
E. PEKERJAAN PLESTERAN
1 Plesteran 1 pc : 2 ps, tebal 15 mm
2 Plesteran 1 pc : 5 ps, tebal 15 mm
3 Plesteran Beton 1 pc : 2 ps, tebal 15 mm
4 Pemasangan 1 m2 Acian.
G. PEKERJAAN BETON
1 Pek. Membuat 1 m3 Lantai Kerja Beton mutu Fc = 7,4 Mpa slump ( 3.6 ) Cm,w/c = 0,87.
2 Pek.Beton Readymix K.350 Slump 12 cm
3 Pek. Pemasangan 1 m' PVC Waterstop lebar 200 mm.
4 Pek. Pembesian dengan besi ulir atau Polos.
5 Pek. Membuat 1 m1 Ring Balok Beton Bertulang ( 10 x 15 ) cm.
6 Pek. Pasangan bekisting untuk pondasi
7 Pek. Pasangan bekisting untuk sloof
8 Pek. Pasangan bekisting untuk kolom
9 Pek. Pasangan bekisting untuk balok
10 Pek. Pasangan bekisting untuk lantai
11 Pek. Pasangan bekisting untuk tangga
12 Pek. Pasangan bekisting untuk Dinding.
13 Pek.Kolom Praktis ( 11 x 11 ) cm
DAERAH MALANG
JUMLAH HARGA
SAT.
( Rp. )
m1 281,027.79
m1 62,064.40
m2 834,675.33
m2 1,136,354.55
m2 1,057,715.83
m2 13,130.00
m2 967,190.13
m3 63,125.00
m3 77,265.00
m3 27,674.00
m3 45,450.00
m3 45,450.00
m3 208,666.85
m3 200,517.07
m3 620,851.13
m3 594,377.96
m3 384,005.99
m3 185,642.11
m2 104,860.79
m2 103,136.67
m2 54,614.73
m2 49,913.15
m2 54,576.15
m2 30,306.86
m2 56,410.59
m3 618,649.96
m3 982,720.10
m1 95,325.88
kg 10,683.96
m1 70,500.00
m2 118,100.00
m2 123,800.00
m2 197,400.00
m2 200,800.00
m2 202,400.00
m2 185,800.00
m2 204,900.00
m3 67,553.86
kg 20,000.00
kg 20,000.00
kg 20,000.00
bh 112,088.08
unit 29,041.00
unit 19,870.16
kg 20,000.00
unit 7,642.37
unit 5,604.40
unit 5,604.40
ANALISA HARG
KONSTRUKSI BANGUN
A PEKERJAAN PERSIAPAN
B. PEKERJAAN TANAH
1 Penggalian Tanah Biasa sedalam 1 meter
Tenaga :
0.7500 oh Pekerja
0.0250 oh Mandor
6 Urugan Pasir
Tenaga :
0.3000 oh Pekerja
0.0100 oh Mandor
Material :
1.2000 m3 Pasir urug
7 Urugan Sirtu
Tenaga :
0.2500 oh Pekerja
0.0250 oh Mandor
Material :
1.2000 m3 Sirtu
C. PEKERJAAN PONDASI
D. PEKERJAAN DINDING
1 Pas. Batu merah ( 5x11x22 ) cm 1 batu camp. 1 pc : 4 ps
Tenaga :
0.2000 oh Tukang batu
0.0200 oh Kepala Tukang Batu
0.6000 oh Pekerja
0.0300 oh Mandor
Material :
140.0000 bh Batu Bata merah.
26.5500 kg Semen Gresik / 40 Kg
0.0930 m3 Pasir pasang
E. PEKERJAAN PLESTERAN
4 Pemasangan 1 m2 Acian.
Tenaga :
0.1000 oh Tukang batu
0.0100 oh Kepala Tukang Batu
0.2000 oh Pekerja
0.0100 oh Mandor
Material :
3.2500 kg Semen Gresik / 40 Kg
G. PEKERJAAN BETON
1 Pek. Membuat 1 m3 Lantai Kerja Beton mutu Fc = 7,4 Mpa slump ( 3.6 ) Cm,w/c = 0
Tenaga :
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang Batu
1.2000 oh Pekerja
0.0600 oh Mandor
Material :
200.0000 Ltr Air
893.0000 kg Pasir beton
1,027.0000 kg Koral Beton
230.0000 kg Semen Gresik / 40 Kg
13 Pek.Kolom Praktis ( 11 x 11 ) cm
Tenaga :
0.0200 oh Tukang Batu
0.0200 oh Tukang Kayu
0.0200 oh Tukang Besi
0.0060 oh Kepala Tukang Batu
0.1800 oh Pekerja
0.0090 oh Mandor
Material :
0.0020 m3 Kayu Klas III
0.4500 kg Kawat beton
3.0000 kg Besi beton polos
0.0100 kg Paku Segala ukuran ( Rata - Rata )
4.0000 kg Semen Gresik / 40 Kg
0.0060 m3 Pasir beton
0.0090 m3 Koral Beton
2 Pek.Canal C.125X50X20X3,2
Tenaga :
- 1.2000 oh Tukang Besi
- 2.4000 oh - Pekerja
- 1.2000 oh Kepala Tukang Besi
- 0.6000 oh - Mandor
Material :
- 110.0000 kg - Canal C.125x50x20x3,2.
- 110.0000 kg - Pek.Pengecatan.
- 15.0000 btg - Kawat Las.AW.SE.6013.
3 Pek.besi L.70X70X7
Tenaga :
- 1.2000 oh Tukang Besi
- 2.4000 oh Pekerja
- 1.2000 oh Kepala Tukang Besi
- 0.6000 oh Mandor
Material :
- 110.0000 kg - Besi L.70x70x7.
- 110.0000 kg - Pek.Pengecatan.
- 15.0000 btg - Kawat Las.AW.SE.6013.
ISA HARGA SATUAN PEKERJAAN
RUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
m1 Permen 28-2016.
26,493.55 26,493.55 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
178,321.94 178,321.94 -
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70
50,439.63 50,439.63 -
53,328.00
m1 Permen 28-2016.
m1 Permen 28-2016.
26,493.55 26,493.55 -
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
178,321.94 178,321.94 -
- -
69,290.81 69,290.81 -
259,368.00
m2 Permen 28-2016.
26,493.55 26,493.55 -
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
12,431.59 12,431.59 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
157,942.29 157,942.29 -
178,321.94 178,321.94 -
713.29 713.29 -
122,277.90 122,277.90 -
183,416.85 183,416.85 -
99,350.79 99,350.79 -
80,092.02 80,092.02 -
69,290.81 69,290.81 -
456,520.00
m2 Permen 28-2016.
26,493.55 26,493.55 -
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
69,290.81 69,290.81 -
228,260.00
m2 Permen 28-2016.
26,493.55 26,493.55 -
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
178,321.94 178,321.94 -
65,316.78 65,316.78 -
69,290.81 69,290.81 -
275,730.00
m3 Permen 28-2016.
m3 Permen 28-2016.
m3 Permen 28-2016.
80,800.00 80,800.00 26,664.00
101,000.00 101,000.00 1,010.00
27,674.00
m3 Permen 28-2016.
m3 Permen 28-2016.
m3 Permen 28-2016.
152,847.38 152,847.38 -
25,250.00
m3 Permen 28-2016.
m3 Permen 28-2016.
178,321.94 178,321.94 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
142,031.25
m3 Permen 28-2016.
178,321.94 178,321.94 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
142,031.25
m3 Permen 28-2016.
80,800.00 80,800.00 63,024.00
85,850.00 85,850.00 33,481.50
90,900.00 90,900.00 3,545.10
101,000.00 101,000.00 3,939.00
178,321.94 178,321.94 -
152,847.38 152,847.38 -
103,989.60
m3 Permen 28-2016.
713.29 713.29
22.42 22.42 -
157,942.29 157,942.29 -
70,498.00
m2 Permen 28-2016.
713.29 713.29 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
35,249.00
m2 Permen 28-2016.
713.29 713.29 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
35,249.00
m2 Permen 28-2016.
1,120.88 1,120.88 -
157,942.29 157,942.29 -
39,996.00
m2 Permen 28-2016.
m2
1,120.88 1,120.88 -
157,942.29 157,942.29 -
41,309.00
m2 Permen 28-2016.
1,120.88 1,120.88 -
26,664.00
m2
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
30,279.80
m3 Permen 28-2016.
50.95 50.95 -
112.82 112.82 -
124.54 124.54 -
1,120.88 1,120.88 -
122,008.00
m3 Permen 28-2016.
854,095.85 854,095.85 -
128,624.25
m1 Permen 28-2016.
81,518.60 81,518.60 -
9,731.35
kg Permen 28-2016.
8,935.46 8,935.46 -
17,322.70 17,322.70 -
13,172.42
Harga P
m1 Permen 28-2016.
2,296,786.56 2,296,786.56 -
5,094.91 5,094.91 -
8,935.46 8,935.46 -
17,322.70 17,322.70 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
168,132.11 168,132.11 -
17,322.70 17,322.70 -
37,011.45
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
5,094.91 5,094.91 -
17,322.70 17,322.70 -
69,326.40
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
5,094.91 5,094.91 -
69,326.40
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
2,296,786.56 2,296,786.56 -
90,281.85 90,281.85 -
26,493.55 26,493.55 -
5,094.91 5,094.91 -
87,991.20
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
2,296,786.56 2,296,786.56 -
90,281.85 90,281.85 -
5,094.91 5,094.91 -
26,493.55 26,493.55 -
87,991.20
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
2,296,786.56 2,296,786.56 -
90,281.85 90,281.85 -
5,094.91 5,094.91 -
26,493.55 26,493.55 -
39,996.00
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
2,296,786.56 2,296,786.56 -
90,281.85 90,281.85 -
5,094.91 5,094.91 -
26,493.55 26,493.55 -
87,991.20
m2 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
2,296,786.56 2,296,786.56 -
90,281.85 90,281.85 -
5,094.91 5,094.91 -
26,493.55 26,493.55 -
87,991.20
m1 Permen 28-2016.
2,296,786.56 2,296,786.56 -
17,322.70 17,322.70 -
8,935.46 8,935.46 -
17,322.70 17,322.70 -
1,120.88 1,120.88 -
157,942.29 157,942.29 -
178,321.94 178,321.94 -
21,149.40
kg Permen 28-2016.
12,431.59 12,431.59 -
10,574.70
kg
12,431.59 12,431.59 -
29,041.00 29,041.00 -
3,260.74 3,260.74 -
466,620.00
kg
12,431.59 12,431.59 -
29,041.00 29,041.00 -
3,260.74 3,260.74 -
466,620.00
AN
HAN
JUMLAH HARGA
BAHAN JUMLAH
6 7
- 32,320.00
- 17,170.00
- 1,818.00
- 2,020.00
33,116.93 33,116.93
5,604.40 5,604.40
789.71 789.71
1,604.90 1,604.90
165,368.63 165,368.63
1,039.36 1,039.36
20,175.85 20,175.85
227,699.79 281,027.79
-
Total : 281,027.79
- 8,080.00
- 8,585.00
- 909.00
- 505.00
27,561.44 27,561.44
346.45 346.45
16,077.51 16,077.51
43,985.40 62,064.40
-
Total : 62,064.40
- 80,800.00
- 171,700.00
- 1,818.00
- 5,050.00
45,039.03 45,039.03
482,325.18 482,325.18
5,196.81 5,196.81
11,769.25 11,769.25
4,738.27 4,738.27
8,916.10 8,916.10
- -
17,322.70 17,322.70
575,307.33 834,675.33
-
Total : 834,675.33
- 161,600.00
- 171,700.00
- 90,900.00
- 27,270.00
- 5,050.00
33,116.93 33,116.93
413,421.58 413,421.58
1,385.82 1,385.82
13,674.75 13,674.75
39,230.83 39,230.83
23,691.34 23,691.34
15,794.23 15,794.23
26,748.29 26,748.29
21,398.63 21,398.63
30,569.48 30,569.48
36,683.37 36,683.37
7,948.06 7,948.06
12,013.80 12,013.80
4,157.45 4,157.45
679,834.55 1,136,354.55
-
Total : 1,136,354.55
- 80,800.00
- 128,775.00
- 13,635.00
- 5,050.00
79,480.64 79,480.64
633,913.09 633,913.09
12,125.89 12,125.89
103,936.22 103,936.22
829,455.83 1,057,715.83
-
Total : 1,057,715.83
- 8,080.00
- 5,050.00
- 13,130.00
-
Total : 13,130.00
- 80,800.00
- 171,700.00
- 18,180.00
- 5,050.00
33,116.93 33,116.93
427,202.30 427,202.30
5,196.81 5,196.81
20,175.85 20,175.85
4,738.27 4,738.27
8,916.10 8,916.10
88,177.65 88,177.65
103,936.22 103,936.22
691,460.13 967,190.13
-
Total : 967,190.13
- 60,600.00
- 2,525.00
- 63,125.00
-
Total : 63,125.00
- 72,720.00
- 4,545.00
- 77,265.00
-
Total : 77,265.00
- 26,664.00
- 1,010.00
- 27,674.00
-
Total : 27,674.00
- 40,400.00
- 5,050.00
- 45,450.00
-
Total : 45,450.00
- 40,400.00
- 5,050.00
- 45,450.00
-
Total : 45,450.00
- 24,240.00
- 1,010.00
183,416.85 183,416.85
183,416.85 208,666.85
-
Total : 208,666.85
- 20,200.00
- 2,525.00
177,792.07 177,792.07
177,792.07 200,517.07
-
Total : 200,517.07
- 121,200.00
- 6,438.75
- 6,817.50
- 7,575.00
213,986.33 213,986.33
182,703.56 182,703.56
82,129.99 82,129.99
478,819.88 620,851.13
-
Total : 620,851.13
- 121,200.00
- 6,438.75
- 6,817.50
- 7,575.00
213,986.33 213,986.33
152,439.78 152,439.78
85,920.60 85,920.60
452,346.71 594,377.96
-
Total : 594,377.96
- 63,024.00
- 33,481.50
- 3,545.10
- 3,939.00
213,986.33 213,986.33
66,030.07 66,030.07
280,016.39 384,005.99
-
Total : 384,005.99
- 17,170.00
- 1,818.00
- 48,480.00
- 3,030.00
99,860.29 99,860.29
595.19 595.19
14,688.63 14,688.63
115,144.11 185,642.11
-
Total : 185,642.11
- 8,585.00
- 909.00
- 24,240.00
- 1,515.00
49,930.14 49,930.14
12,890.13 12,890.13
6,791.52 6,791.52
69,611.79 104,860.79
-
Total : 104,860.79
- 8,585.00
- 909.00
- 24,240.00
- 1,515.00
49,930.14 49,930.14
10,850.13 10,850.13
7,107.40 7,107.40
67,887.67 103,136.67
-
Total : 103,136.67
- 12,877.50
- 1,363.50
- 24,240.00
- 1,515.00
11,459.88 11,459.88
3,158.85 3,158.85
14,618.73 54,614.73
-
Total : 54,614.73
- 12,877.50
- 1,363.50
- 24,240.00
- 1,515.00
5,810.65 5,810.65
4,106.50 4,106.50
9,917.15 49,913.15
-
Total : 49,913.15
- 17,170.00
- 1,818.00
- 21,008.00
- 1,313.00
10,424.19 10,424.19
2,842.96 2,842.96
13,267.15 54,576.15
-
Total : 54,576.15
- 8,585.00
- 909.00
- 16,160.00
- 1,010.00
3,642.86 3,642.86
3,642.86 30,306.86
-
Total : 30,306.86
- 18,887.00
- 1,999.80
- 8,888.00
- 505.00
25,264.65 25,264.65
866.14 866.14
26,130.79 56,410.59
-
Total : 56,410.59
- 17,170.00
- 1,818.00
- 96,960.00
- 6,060.00
10,189.83 10,189.83
100,744.62 100,744.62
127,904.95 127,904.95
257,802.57 257,802.57
496,641.96 618,649.96
-
Total : 618,649.96
- 23,608.75
- 2,545.20
- 53,328.00
- 8,383.00
40,759.30
854,095.85 854,095.85
854,095.85 982,720.10
-
Total : 982,720.10
- 3,004.75
- 363.60
- 5,656.00
- 707.00
85,594.53 85,594.53
85,594.53 95,325.88
-
Total : 95,325.88
- 1,201.90
- 254.52
- 11,312.00
- 404.00
91,588.44 91,588.44
2,078.72 2,078.72
93,667.16 106,839.58
-
106,839.58
Harga Per kg : 10,683.96
Total : 10,683.96
- 2,833.05
- 2,833.05
- 2,833.05
- 2,999.70
- 23,997.60
- 1,515.00
6,890.36 6,890.36
- -
32,167.65 32,167.65
866.14 866.14
6,164.84 6,164.84
1,421.48 1,421.48
2,521.98 2,521.98
346.45 346.45
50,378.90 87,390.35
Total : 87,390.35
11/2 x pakai : 70,597.38
Dibulatkan : 70,500.00
- 22,321.00
- 2,363.40
- 42,016.00
- 2,626.00
91,871.46 91,871.46
509.49 509.49
5,196.81 5,196.81
97,577.76 97,577.76
Total : 97,577.76
2 x pakai : 118,115.28
Dibulatkan : 118,100.00
130,900.00
- 22,321.00
- 2,363.40
- 42,016.00
- 2,626.00
103,355.39 103,355.39
5,196.81 5,196.81
509.49 509.49
109,061.70 109,061.70
Total : 109,061.70
2 x pakai : 123,857.25
Dibulatkan : 123,800.00
- 28,330.50
- 2,999.70
- 53,328.00
- 3,333.00
91,871.46 91,871.46
6,929.08 6,929.08
34,451.80 34,451.80
31,598.65 31,598.65
52,987.09 52,987.09
1,018.98 1,018.98
218,857.06 218,857.06
Total : 218,857.06
2 x pakai : 197,419.73
Dibulatkan : 197,400.00
- 28,330.50
- 2,999.70
- 53,328.00
- 3,333.00
91,871.46 91,871.46
6,929.08 6,929.08
41,342.16 41,342.16
31,598.65 31,598.65
1,018.98 1,018.98
52,987.09 52,987.09
225,747.42 225,747.42
Total : 225,747.42
2 x pakai : 200,864.91
Dibulatkan : 200,800.00
- 28,330.50
- 2,999.70
- 5,332.80
- 3,333.00
91,871.46 91,871.46
6,929.08 6,929.08
34,451.80 34,451.80
31,598.65 31,598.65
1,018.98 1,018.98
158,961.27 158,961.27
324,831.24 324,831.24
Total : 324,831.24
2 x pakai : 202,411.62
Dibulatkan : 202,400.00
- 28,330.50
- 2,999.70
- 53,328.00
- 3,333.00
68,903.60 68,903.60
6,929.08 6,929.08
34,451.80 34,451.80
31,598.65 31,598.65
764.24 764.24
52,987.09 52,987.09
195,634.45 195,634.45
Total : 195,634.45
2 x pakai : 185,808.43
Dibulatkan : 185,800.00
- 28,330.50
- 2,999.70
- 53,328.00
- 3,333.00
68,903.60 68,903.60
6,929.08 6,929.08
45,935.73 45,935.73
31,598.65 31,598.65
1,018.98 1,018.98
79,480.64 79,480.64
233,866.67 233,866.67
Total : 233,866.67
2 x pakai : 204,924.54
Dibulatkan : 204,900.00
- 1,717.00
- 1,717.00
- 1,717.00
- 545.40
- 14,544.00
- 909.00
4,593.57 4,593.57
7,795.22 7,795.22
26,806.37 26,806.37
173.23 173.23
4,483.52 4,483.52
947.65 947.65
1,604.90 1,604.90
46,404.46 67,553.86
-
Total : 67,553.86
- 5,151.00
- 545.40
- 4,848.00
- 30.30
14,296.32 14,296.32
14,296.32 24,871.02
-
Total : 24,871.02
- 103,020.00
- 193,920.00
- 109,080.00
- 60,600.00
1,367,474.52 1,367,474.52
3,194,510.14 3,194,510.14
48,911.16 48,911.16
4,610,895.81 5,077,515.81
-
Total : 5,077,515.81
Harga per kg : 50,775.16
- 103,020.00
- 193,920.00
- 109,080.00
- 60,600.00
1,367,474.52 1,367,474.52
3,194,510.14 3,194,510.14
48,911.16 48,911.16
4,610,895.81 5,077,515.81
-
Total : 5,077,515.81
Harga per kg : 50,775.16
DAFTAR STANDARNISASI HARGA PERALATAN & UPAH
KOTA MALANG DAN MATERIAL.
PRIODE : DES.2017
PERALATAN :
PERALATAN :
1 BULDOSER 110 HP 1.00 jam
PEKERJA :
MATERIAL :
BATU :
1 Batu Bata merah Press Mesin 1.00 bh 713.29
2 batu pecah (3-5 Cm) 1.00 m 3
178,321.94
3 batu pecah (2-3 Cm) 1.00 m3 178,321.94
4 batu pecah (1-2 Cm) 1.00 m3 178,321.94
5 Batu pecah 1/3 1.00 m3 178,321.94
6 Batu Belah 1.00 m3 178,321.94
7 Koral Beton 1.00 m3 178,321.94
8 Sirtu 1.00 m3 148,160.06
9 Batu belah 15/20 1.00 m3 178,321.94
10 Batu pecah 5/7 1.00 178,321.94
11 Kerikil 1.00 m3 168,132.11
PASIR :
1 Pasir Urug 1.00 m3 152,847.38
2 Pasir Pasang 1.00 m3 157,942.29
3 Pasir Cor / Pasir beton 1.00 m3 188,511.76
4 Kerikil 1.00 m3 168,132.11
5 Air 1.00 Ltr 50.95
6 Minyak Bekisting 1.00 Ltr 5,094.91
BEKISTING :
1 Minyak bekesting 1.00 Ltr 5,094.91
2 Kayu bekesting 1.00 m 3
1,987,015.88
3 Schafolding 1.00 15,284.74
4 Plywood t. 9 mm 1.00 Lbr 90,281.85
CAT :
1 Cat Kayu Emco 1.00 kg 39,332.72
2 Dempul/Plamur 1.00 kg 6,929.08
3 Minyak cat 1.00 kg 14,775.25
4 Kertas gosok / ampelas 1.00 lbr 8,661.35
5 Minyak cat 1.00 kg 14,775.25
6 Meni besi 1.00 kg 50,439.63
7 Plamur tembok 1.00 kg 6,929.08
8 Sabun 1.00 bh 3,056.95
9 Cat dasar 1.00 kg 32,974.27
10 Cat penutup 1.00 kg 32,974.27
11 Dempul kayu 1.00 kg 6,929.08
12 Kuas 1.00 bh 18,341.69
13 Perekat 1.00 kg 1,120.88
14 Pengecatan Konst.Baja 1.00 kg 29,041.00
15 Cat penutup 1.00 kg 32,974.27
SEMEN :
1 Semen Gresik / 40 Kg 1.00 kg 1,120.88
2 Semen Putih Tiga Roda / 40 Kg 1.00 kg 1,120.88
BESI DAN KAWAT.
1 Tulangan Besi Beton Ulir 1.00 Kg 8,935.46
2 Tulangan Besi Beton Polos 1.00 Kg 8,935.46
3 Kawat Beton 1.00 Kg 17,322.70
4 Paku Segala ukuran ( Rata - Rata ) 1.00 Kg 17,322.70
5 Plat Besi Strip 1.00 Kg 12,431.59
6 Besi Canal U ( Channel ) 1.00 Kg 12,431.59
7 Besi Plat Hitam Segala Ukuran 1.00 Kg 12,431.59
8 Baja Siku 1.00 Kg 12,431.59
9 Bordes Plat 1.00 Kg 12,431.59
10 Baja WF 1.00 Kg 12,431.59
11 Kawat Duri 10 kg ( P.60 m ) 1.00 Roll 336,264.23
12 Wire Mesh M-8 1.00 m2 49,870.84
13 Besi strip 1.00 Kg 12,431.59
14 Paku Payung 1.00 Kg 17,322.70
15 Paku Anti Karat 1.00 Kg 17,322.70
16 Paku triplek 1.00 Kg 17,322.70
17 Paku Biasa 1/2" 1.00 Kg 17,322.70
18 Kawat Las.AW.SE.6013. 1.00 Btg 3,260.74
19 Besi strip 2x3 1.00 m1 6,793.22
20 Paku skrup 3,5" 1.00 kg 17,322.70
KAYU.
1 Dolken kayu dia. 8 - 400 cm 1.00 btg 26,493.55
2 Kayu meranti 5/7 MB 1.00 m3 2,296,786.56
3 Papan kayu meranti 3/30 MB 1.00 m3 2,296,786.56
4 Kayu ulin 10/10-400 1.00 m3 2,296,786.56
5 Kayu Bangkirai 1.00 m3 2,296,786.56
6 Papan Kayu Bangkirai 1.00 m3 2,296,786.56
7 List kayu profil 1.00 m 1
128,391.80
8 Balok 8/15 & 6/15 ( Kayu borneo ) 1.00 m1 127,372.81
9 Kayu Profil 1.00 m 1
128,391.80
10 Papan Ulin 1.00 m 3
2,502,621.02
11 Kayu Ulin 1.00 m3 2,296,786.56
12 kayu borneo balok 1.00 m3 2,296,786.56
13 Papan Cor 2/20 1.00 m3 2,502,621.02
14 Papan 3/30 x 4m Kamper Samarinda Oven 1.00 m3 2,502,621.02
15 Balok 6/12x 4 m Kamper Medan 1.00 m3 2,502,621.02
16 Papan 3/30 x 4m Kamper Medan 1.00 m3 2,502,621.02
17 Balok 6/12x 4 m Bangkirai 1.00 m3 2,502,621.02
18 Papan 3/30 x 4m Bangkirai 1.00 m3 2,502,621.02
19 Plywood t = 4 mm 1.00 Lbr 65,316.78
ATAP.
1 Seng gelombang bjls 30 1.00 lbr 69,290.81
2 Seng plat 1.00 lbr 122,277.90
3 Asbes Gelombang 1.00 lbr 40,351.71
4 Nok genteng metal 1.00 bh 11,718.30
5 Seng plat bjls 28 1.00 lbr 64,195.90
LAIN - LAIN.
1 Bak teraso 1.00 bh 1,375,626.38
2 Kunci tanam 1.00 bh 80,092.02
3 Door closer 1.00 bh 280,220.19
4 Rel pintu dorong 1.00 bh 203,796.50
5 Door stop 1.00 bh 30,569.48
6 Kait angin 1.00 bh 35,338.31
7 Engsel pintu 1.00 bh 91,708.43
8 Kunci Slot 1.00 bh 80,092.02
9 Waterstop lebar 150 mm 1.00 m1 127,372.81
10 Lem Vinyl 1.00 kg 8,559.45
11 Paku payung 1.00 m2 15,284.74
12 Kain Sintetis 1.00 m 2
17,220.80
13 Waterproofing ( Ekogum - Betek ) 1.00 m 2
114,126.04
14 Self aditive membrane 1.00 m2 69,800.30
15 Clementitious ( bahan additive ) 1.00 m 2
152,847.38
16 Papan Nama Proyek ( Uk.1 x 2 m ) + Pondasi 1.00 bh 1,528,473.75
PIPA.
1 Seal tape 1.00 set 3,260.74
2 Pisher 1.00 bh 9,068.94
KACA.
1 Jendela nako 1.00 bh 183,416.85
2 Kaca polos 1.00 m2 99,350.79
3 Kaca bening t = 3 mm 1.00 m 2
91,708.43
4 Kaca bening t = 5 mm 1.00 m2 99,350.79
5 Kaca bening t = 8 mm 1.00 m 2
152,847.38
DAFTAR STANDARNISASI HARGA PERALATAN & UPAH KODE :
DAN MATERIAL.
PRIODE : DES.2017
80,800.00
85,850.00
90,900.00
85,850.00
90,900.00
85,850.00
90,900.00
85,850.00
90,900.00
85,850.00
101,000.00
90,900.00
713.29
178,321.94
178,321.94
178,321.94
178,321.94
178,321.94
178,321.94
148,160.06
178,321.94
178,321.94
168,132.11
152,847.38
157,942.29
157,942.29
168,132.11
50.95
5,094.91
5,094.91
1,987,015.88
15,284.74
90,281.85
39,332.72
6,929.08
14,775.25
8,661.35
14,775.25
50,439.63
6,929.08
3,056.95
32,974.27
32,974.27
6,929.08
18,341.69
1,120.88
29,041.00
32,974.27
1,120.88
1,120.88
8,935.46
8,935.46
17,322.70
17,322.70
12,431.59
12,431.59
12,431.59
12,431.59
12,431.59
12,431.59
5,604.40
49,870.84
12,431.59
17,322.70
17,322.70
17,322.70
17,322.70
3,260.74
6,793.22
17,322.70
26,493.55
2,296,786.56
2,296,786.56
2,296,786.56
2,296,786.56
2,296,786.56
128,391.80
127,372.81
128,391.80
2,502,621.02
2,296,786.56
2,296,786.56
2,502,621.02
2,502,621.02
2,502,621.02
2,502,621.02
2,502,621.02
2,502,621.02
65,316.78
69,290.81
122,277.90
40,351.71
11,718.30
64,195.90
854,095.85
40,759.30
1,375,626.38
80,092.02
280,220.19
203,796.50
30,569.48
35,338.31
91,708.43
80,092.02
127,372.81
8,559.45
15,284.74
17,220.80
114,126.04
69,800.30
152,847.38
1,528,473.75
3,260.74
9,068.94
183,416.85
99,350.79
91,708.43
99,350.79
152,847.38
PERINCIAN PEKERJAAN
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
I. PEKERJAAN PENDAHULUAN
1 Air Kerja ls
2 Listrik Kerja ls
3 Peralatan Keselamatan & Kesehatan Kerja ( K - 3 ) ls
4 Tower Krane ( 1 unit )
Tower Crane : 1,9 ton - 45 m ( 1 Unit ) bln
Genset 250 KVA ( 1 Unit ) + Bahan Bakar Solar bln
Pondasi Pile Cup 4,5 m x 4,5 m x 1,8 m (pondasi TC) unit
Operator TC bln
Pembantu operator bln
5 Universal Lift / Passengger ( 2 unit ) bln
6 Mobilisasi & Demobilisasi Alat. ls
TOTAL - I. PEKERJAAN PEND
RINCIAN PEKERJAAN
BILL OF QUANTITY )
NG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
R E KAPITU LAS I
PEKERJAAN INFRASTRUKTUR (SITE DEVELOPMENT/SIPIL)
78,021,131.54
78,021,131.54
RENCANA ANGGARAN BIAYA
( ENGINEERING ESTIMATE )
PEKERJA : PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
LOKASI : MALANG , JAWA - TIMUR.
LINGKUP P
No. URAIAN PEKERJAAN VOLUME SAT.
PEKERJAAN INFRASTRUKTUR
8,806.99 78,021,131.54
78,021,131.54
78,021,131.54
RENCANA ANGGARAN BIAYA
( ENGINEERING ESTIMATE )
PEKERJAAN : BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PEMBANGUNAN PEMBANGUNAN GEDUNG
FAKULTAS ILMU KEOLAHRAGAAN DAN ASRAMA MAHASISWA UNIVERSITAS NEGERI MALANG (UM)
LOKASI : JALAN SEMARANG 5 , MALANG 65145
NO ITE M PE K E R JAAN
R E KAPIT U LAS I
B. PEKERJAAN ARSITEKTUR
JUMLAH HARGA
M PE K E R JAAN
( Rp )
13,117,452,433.08
149,453,817.82
282,084,238.31
NO ITE M PE K E R JAAN
R E KAPIT U LAS I
B. PEKERJAAN ARSITEKTUR
V. PEKERJAAN PLAFOND
V. 1. Lantai SEMI BASEMEN ( Elev. -3.50 m s/d ±0.00 m )
V. 2. Lantai 1 ( Elev. ±0.00 m s/d +5.50 m )
V. 3. Lantai 2 ( Elev. +5.50 m s/d +9.50 m )
V. 4. Lantai 3 ( Elev. +9.50 m s/d +13.50 m )
V. 5. Lantai 4 ( Elev. +13.50 m s/d +17.50 m )
V. 6. Lantai 5 ( Elev. +17.50 m s/d +21.50 m )
V. 7. Lantai 6 ( Elev. +21.50 m s/d +25.50 m )
V. 8. Lantai 7 ( Elev. +25.50 m s/d +30.50 m )
V. 9. Lantai RL ( Elev. +30.50 m s/d Atap )
IX PEKERJAAN FASAD
X PEKERJAAN LAIN-LAIN
V. PEKERJAAN PLAFOND
VI PEKERJAAN PENGECATAN
V. PEKERJAAN PLAFOND
VI PEKERJAAN PENGECATAN
6,757,280,105.06
934,705,609.56
869,688,028.47
764,402,959.65
656,372,407.08
739,239,668.24
806,934,375.24
753,830,877.24
936,446,860.54
295,659,319.05
1,359,272,295.11
141,209,348.37
179,182,784.31
152,367,845.41
204,909,715.71
118,042,152.78
154,002,903.36
156,838,840.55
169,242,983.21
83,475,721.41
3,517,169,522.59
215,631,380.09
439,343,687.06
406,212,491.09
1,109,588,783.53
349,423,782.65
368,972,522.75
334,424,244.09
276,743,847.33
16,828,784.00
115,083,722.62
471,998.74
-
-
-
-
-
-
-
114,611,723.88
134,426,107.14
-
-
-
-
-
-
-
39,917,376.43
94,508,730.71
557,215,477.30
557,215,477.30
-
-
-
-
-
-
-
-
-
240,265,376.89
35,473,930.42
28,126,743.67
22,226,429.36
21,355,369.73
29,008,677.94
33,879,434.57
29,345,792.15
38,069,981.72
2,779,017.32
431,835,259.92
4,904,566.45
3,522,977.06
77,315,385.00
15,726,856.53
3,657,608.38
6,385,087.98
21,352,739.56
2,348,711.65
1,737,277.92
19,328,846.25
138,891,644.77
3,814,516.86
2,992,106.16
112,971,134.70
IV. BANGUNAN RUANG POMPA DAN GROUND TANK FIK : 282,084,238.31
RENCANA ANGGARAN BIAYA
( ENGINEERING ESTIMATE )
B. PEKERJAAN ARSITEKTUR
Sub Total - II. 1. Lantai SEMI BASEMEN ( Elev. -3.50 m s/d ±0.00 m ) :
Sub Total - III. 1. Lantai SEMI BASEMEN ( Elev. -3.50 m s/d ±0.00 m ) :
V. PEKERJAAN PLAFOND
TRITISAN
1 Pek. Pas Gypsum board anti air tebal 9 mm + Rangka holo m2
2 Pek. Pas. Aluminium U 20 x 20 (tepi plafond gypsum) m¹
IX PEKERJAAN FASAD
1 Pek. Ornamen kanopy m2
2 Pek. Pasang batu tempel hitam m2
PIT LIFT
As-1 s/d As-2
1 Pek. Waterproofing ( lantai dan dinding) m2
As-5 s/d As-6
2 Pek. Waterproofing ( lantai dan dinding) m2
As-9 s/d As-10
3 Pek. Waterproofing ( lantai dan dinding) m2
934,705,609.56
869,688,028.47
764,402,959.65
656,372,407.08
1,232.98 174,433.44 215,072,942.85
2,465.96 75,635.77 186,514,783.39
201.60 75,635.77 15,248,171.23
2,667.56 30,293.28 80,809,142.00
739,239,668.24
806,934,375.24
753,830,877.24
936,446,860.54
295,659,319.05
6,757,280,105.06
850.50 66,971.45 56,959,218.23
668.10 84,274.70 56,303,927.07
8.05 428,162.39 3,446,707.24
365.82 66,971.45 24,499,495.84
141,209,348.37
179,182,784.31
152,367,845.41
204,909,715.71
118,042,152.78
154,002,903.36
156,838,840.55
169,242,983.21
83,475,721.41
1,359,272,295.11
1.00 18,706,299.35 18,706,299.35
3.00 2,802,915.16 8,408,745.48
8.00 2,829,378.13 22,635,025.04
15.00 2,481,876.06 37,228,140.90
1.00 2,662,931.42 2,662,931.42
3.00 1,162,426.70 3,487,280.10
1.00 1,904,794.17 1,904,794.17
3.00 4,181,150.13 12,543,450.39
3.00 4,181,150.13 12,543,450.39
1.00 4,828,088.87 4,828,088.87
4.00 5,230,464.00 20,921,856.00
4.00 8,647,884.37 34,591,537.48
8.00 2,581,112.22 20,648,897.76
2.00 7,260,441.37 14,520,882.74
215,631,380.09
406,212,491.09
1,109,588,783.53
349,423,782.65
368,972,522.75
334,424,244.09
276,743,847.33
16,828,784.00
3,517,169,522.59
114,611,723.88
115,083,722.62
94,508,730.71
134,426,107.14
557,215,477.30
557,215,477.30
-
1,034.58 27,186.63 28,126,743.67
28,126,743.67
-
817.55 27,186.63 22,226,429.36
22,226,429.36
21,355,369.73
1,067.02 27,186.63 29,008,677.94
29,008,677.94
33,879,434.57
-
1,079.42 27,186.63 29,345,792.15
29,345,792.15
-
1,400.32 27,186.63 38,069,981.72
38,069,981.72
2,779,017.32
240,265,376.89
431,835,259.92
4,904,566.45
RENCANA ANGGARAN BIAYA
( ENGINEERING ESTIMATE )
B. PEKERJAAN ARSITEKTUR
TERAS
1 Pek. floor harderner m2
KELILING BANGUNAN
1 Pek. Rabat beton, t = 10 cm (Depan Teras) m2
DAK BETON
1 Pek. Waterproofing plat beton + screed + wiremess m2
V. PEKERJAAN PLAFOND
RUANGAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton ) m2
KELILING BANGUNAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton ) m2
VI PEKERJAAN PENGECATAN
RUANGAN
1 Pek. Cat dinding dalam (Cat interior) m2
2 Pek. Cat dinding luar (Cat eksterior) m2
21,493,163.31
3,522,977.06
77,315,385.00
46.83 47,386.31 2,219,100.90
15,726,856.53
3,657,608.38
6,385,087.98
B. PEKERJAAN ARSITEKTUR
KELILING BANGUNAN
1 Pek. Rabat beton keliling bangunan, t = 10 cm m2
GROUND TANK
1 Pek. Lantai Homogenius Tile uk. 30 cm x 30 cm m2
2 Pek. Dinding Homogeneus Tile uk. 25 cm x 40 cm m2
3 Pek. Waterproofing (lantai dan dinding) m2
4 Pek. Waterproofing (atap) m2
DAK BETON
1 Pek. Waterproofing plat beton + screed + wiremess m2
V. PEKERJAAN PLAFOND
R. POMPA
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton ) m2
KELILING BANGUNAN
1 Pek. Perapihan Beton fin. Cat ( bawah plat beton ) m2
VI PEKERJAAN PENGECATAN
R. POMPA
1 Pek. Cat dinding dalam (Cat Interior/ beton) m2
KELILING BANGUNAN
1 Pek. Cat dinding luar (Cat Eksterior/ beton) m2
TOTAL .VI ( PEKERJAAN PENGECATAN) :
2,348,711.65
1,737,277.92
138,891,644.77
3,814,516.86
112,971,134.70
DAFTAR HARGA SATUAN PEKERJAAN
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
PEKERJAAN : PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN DAN
UNIVERSITAS NEGERI MALANG (UM)
LOKASI : MALANG - JAWA TIMUR
1 Pek. Lantai kerja beton mutu f'c = 7.4 MPa, slump (3-6) cm, w/c = 0.87
2 Pek. beton mutu f'c = 14.5 MPa, slump (120±20) mm
3 Pek. Besi beton
4 Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
5 Membuat 1 m' ring balok beton bertulang (10 x 15) cm
6 Pek. Meja beton lap. Keramik
7 Pek. Pasangan Dinding Bata Ringan tebal 10 cm
8 Pek. Pasang dinding Roster, Camp 1SP : 4PP
9 Pek. Pasang batu tempel hitam
10 Pek. Plesteran bata ringan
11 Pek. Acian dinding bata ringan
12 Pek. Acian beton
13 Pek. Perapihan Beton fin. Cat
14 Pek. Pasang atap metal
15 Pek. Pasang nok metal
16 Pek. Pasang alumunium foil/ sisalation
17 Pek. Pas Gypsum board tebal 9 mm + Rangka holo
18 Pek. Pas Gypsum board anti air tebal 9 mm + Rangka holo
19 Pek. Pas. Aluminium U 20 x 20 (tepi plafond gypsum)
20 Pek. Aluminium linier
21 Pek. Pas. Wall Angle (tepi plafond aluminium linier)
22 Pek. Lantai Homogenius Tile uk. 60 cm x 60 cm
23 Pek. Lantai Homogenius Tile uk. 40 cm x 40 cm
24 Pek. Lantai keramik uk. 40 cm x 40 cm
25 Pek. Lantai keramik uk. 40 cm x 40 cm (Anti Slip)
26 Pek. Lantai Homogenius Tile uk. 30 cm x 30 cm
27 Pek. Dinding Homogeneus Tile uk. 25 cm x 40 cm
28 Pek. Waterproofing plat beton + screed + wiremess
29 Pek. Waterproofing
30 Pek. floor harderner
31 Pek. Cat dinding dalam
32 Pek. Cat dinding luar
33 Pek. Cat lisplank beton
34 Pek. Cat Plafond
35 Pek. Closet DuduK / Coupled Toilet
36 Pek. Pasang closet jongkok
37 Pek. Urinoir
38 Pek. Wastafel/ Counter Lavatory/ Lav. Faucet Comb
39 Pek. Pasang bak cuci piring stainles steel
40 Pek. floor drain
41 Pek. Kran Pantry
42 Pek. Kran dinding
43 Pek. Shower Spray with Stop Valve, Chrome
44 Pek. Jet Shower
45 Pek. Paper Holder
46 Pek Urinal Partition
47 Pek. Gantungan Baju (Double Robe Hook)
48 Pek. Pegangan Toilet Difabel
49 Pek. Pasang pipa SST Ø 50 mm
50 Pek. Pasang pipa BSP Ø 50 mm
51 Pek. Railling Tangga pipa SST + aksesoris
52 Pek. Railling tangga pipa SST Ø65 (Handel)
53 Pek. Railling tangga pipa BSP + aksesoris
54 Pek. Pas. Cermin (Dibevel)
ERJAAN
AN PERUMAHAN
JUMLAH HARGA
SAT.
( Rp. )
m3 546,294.84
m3 660,936.66
kg 11,108.39
m' 66,971.45
m' 84,274.70
m' 428,162.39
m2 174,433.44
m2 1,289,416.64
m2 220,721.10
m2 75,635.77
m2 30,293.28
m2 30,721.25
m2 51,277.28
m2 218,054.62
m' 62,213.93
m2 140,893.89
m2 119,570.95
m2 119,570.95
m' 129,724.72
m2 145,933.05
m' 16,311.97
m2 182,369.32
m2 176,260.01
m2 207,607.17
m2 207,607.17
m2 151,772.64
m2 201,046.00
m2 169,476.28
m2 53,496.58
m2 47,386.31
m2 20,556.02
m2 27,186.63
m2 27,186.63
m2 22,707.60
unit 2,936,514.57
Unit 1,934,150.39
unit 1,095,870.57
unit 1,935,059.83
bh 399,578.91
unit 138,287.88
unit 325,078.51
unit 376,435.23
unit 289,414.12
unit 141,559.76
unit 364,958.77
unit 155,241.98
unit 165,610.13
unit 560,440.38
m' 161,486.90
m' 161,486.90
m' 560,058.43
m' 195,399.15
m' 804,812.91
m2 274,226.18
DAFTAR HARGA UPAH & BAHAN
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAH
(SNI)
NO /
URAIAN PE K E R JAAN SAT.
KODE
BATU :
1 Bata Ringan 10 x 20 x 60 cm bh
2 Kerikil m3
3 Roster bh
4 Batu tempel hitam m2
PASIR :
1 Pasir urug m3
2 Pasir pasang m3
3 Pasir beton m3
SEMEN :
1 Semen Portland 1 Zak = 40 kg Zak
2 Semen Instan untuk Perekat Bata Ringan kg
3 Semen Instan untuk Plester Bata Ringan kg
4 Semen Instan untuk Acian Plesteran dan Beton kg
5 Semen Instan untuk Perekat Keramik Dinding kg
6 Semen Instan untuk Perekat Keramik Lantai kg
7 Semen Instan untuk Acian Plesteran kg
8 Semen Instan untuk Pengisi nat kg
KAYU :
1 Kayu Kelas III. m3
2 Dolken dia. 8 cm btg
3 Floor Harderner kg
4 Minyak bekisting Ltr
PAKU :
1 Paku - kg
2 Paku skrup gypsum kg
3 Dinabolt bh
4 Kawat beton kg
CAT DASAR :
2 Plamur Kg
3 Cat dinding interior Kg
4 Cat dinding eksterior (Weather Shield) Kg
5 Cat Penutup (besi) Kg
6 Cat Dasar (besi) Kg
7 Cat meni besi Kg
8 Pengencer kg
GYPSUM :
1 Gypsum board, tebal 9 mm lbr
2 Gypsum board, tebal 9 mm (anti air) lbr
2 Gypsum board, tebal 12 mm lbr
4 Alluminium linier m2
5 Rangka Alluminium linier m2
6 Cotton plaster bh
7 Compoun zak
KERAMIK :
1 Keramik Homogenius Tile 30 x 30 cm bh
2 Keramik lantai 40 x 40 cm bh
3 Keramik lantai (Anti Slip) 40 x 40 cm bh
4 Keramik dinding 25 x 40 cm bh
5 Keramik Homogenius Tile 60 x 60 cm bh
6 Keramik Homogenius Tile 40 x 40 cm bh
GENTENG :
1 Atap Metal m2
2 Flashing / Capping m'
3 Hilon Green Thermal (HGT) Double Aluminium m2
SANITAIR
1 Coupled Toilet (Complete set) unit
2 Counter Lavatory/ Lav. Faucet Comb. (Complete set) unit
3 Wall Hung Lavatory/ Lav. Faucet Comb. (Complete set) unit
4 Kloset jongkok bh
5 Urinoir (Complete set) unit
6 Bak cuci piring bh
7 Water drain bh
8 Kran air bh
9 Lever Handle Sink Tap unit
10 Floor Drain unit
11 Shower Spray with Stop Valve, Chrome unit
12 Paper Holder unit
13 Shower Spray with Tap & Hanger, Chrome unit
14 Urinal Partition with Screws unit
15 Jet Shower unit
16 Acrylic Handle Sink Tap with Swivel Spout unit
17 Gantungan Baju (Double Robe Hook) unit
18 Pegangan Toilet Difabel unit
LAIN-LAIN
1 Air Ltr
2 Seal tape bh
3 Kaca Cermin (Dibevel) m2
4 Aluminium U 20 x 20 m'
5 Plint Plat alumunium powder coating putih m'
6 Wall Angle m'
7 Waterproofing ( Ekogum - Betek ) m²
8 Self aditive membrane m²
9 Wire mess M6 (Uk. 2.10 x 5.40 m) lbr
10 Waterproofing coating m²
11 Waterproofing Membrane m²
81,608.00
86,708.50
86,708.50
86,708.50
86,708.50
86,708.50
91,809.00
91,809.00
91,809.00
91,809.00
102,010.00
9,680.33
117,182.99
49,532.74
100,267.88
155,748.80
160,940.43
192,090.19
44,835.23
1,681.32
2,114.39
1,895.31
1,681.32
1,681.32
1,681.32
1,681.32
2,190,812.38
26,493.55
5,094.91
5,094.91
9,105.07
117,182.99
106,993.16
63,176.92
106,993.16
106,993.16
63,176.92
17,651.53
17,651.53
2,547.46
17,651.53
7,060.61
32,974.27
53,353.92
33,600.21
33,600.21
51,397.10
14,775.25
64,195.90
64,195.90
69,290.81
66,233.86
66,233.86
7,132.88
43,306.76
4,126.88
15,814.61
15,814.61
7,132.88
25,678.36
11,086.53
188,511.76
22,927.11
117,182.99
2,554,589.13
1,691,510.95
1,691,510.95
1,685,397.06
906,283.04
163,037.20
203,796.50
114,126.04
285,315.10
127,372.81
249,650.71
331,780.70
249,650.71
141,129.08
101,796.35
336,671.82
150,554.66
509,491.25
25.47
3,260.74
234,365.98
114,635.53
22,927.11
6,623.39
71,328.78
69,800.30
317,922.54
53,496.58
114,126.04
137,562.64
73,876.23
122,277.90
137,562.64
468,731.95
458,542.13
407,593.00
99,860.29
7,642.37
433,067.56
430,239.89
428,991.63
56,044.04
66,233.86
61,138.95
63,176.92
15,182.84
163,037.20
188,511.76
229,271.06
116,164.01
234,365.98
95,784.36
116,164.01
173,227.03
147,752.46
152,847.38
129,410.78
127,372.81
66,233.86
56,044.04
791,749.40
172,208.04
163,037.20
127,372.81
667,433.54
132,467.73
270,030.36
133,486.71
182,397.87
426,953.67
917,084.25
50,949.13
1,268,633.21
112,088.08
56,044.04
173,227.03
129,920.27
116,164.01
203,796.50
275,125.28
228,863.47
499,301.43
ANALISA HARGA SATUAN PEKERJAAN
KONSTRUKSI BANGUNAN GEDUNG DAN PERU
(SNI)
PEKERJAAN : PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN DAN
UNIVERSITAS NEGERI MALANG (UM)
LOKASI : MALANG - JAWA TIMUR
HARGA SAT.
NO. KOEF. SAT. URAIAN
(Rp.)
1 Pek. Lantai kerja beton mutu f'c = 7.4 MPa, slump (3-6) cm, w/c = 0.87
A TENAGA
1.200 OH Pekerja 81,608.00
0.200 OH Tukang Batu 86,708.50
0.020 OH Kepala Tukang 91,809.00
0.060 OH Mandor 102,010.00
JUMLAH TENAGA KERJA :
B BAHAN
230.000 Kg Semen Portland 896.70
0.638 M3 Pasir beton 192,090.19
0.761 M3 Kerikil (Maks 30 mm) 117,182.99
200.000 Ltr Air 25.47
JUMLAH HARGA BAHAN :
C PERALATAN
JUMLAH HARGA ALAT :
D Jumlah (A+B+C)
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
24 Pek. Waterproofing 1 m2
A BAHAN DAN TENAGA
1.00 m² Waterproofing coating 53,496.58
JUMLAH HARGA BAHAN :
B PERALATAN
JUMLAH HARGA ALAT :
C Jumlah (A+B)
D Overhead & Profit (10%)
E Harga Satuan Pekerjaan (C+D)
1 m3 Permen PU.11-2016
97,929.60
17,341.70
1,836.18
6,120.60
123,228.08
206,242.06
122,553.54
89,176.25
5,094.91
423,066.76
0.00
546,294.84
0.00
546,294.84
m3 Permen PU.11-2016
134,653.20
23,844.84
2,570.65
8,466.83
169,535.52
292,325.70
104,304.97
89,293.44
5,477.03
491,401.14
0.00
660,936.66
0.00
660,936.66
Permen PU.11-2016
5,712.56
6,069.60
642.66
408.04
12,832.86
95,603.29
2,647.73
98,251.02
0.00
111,083.87
0.00
111,083.87
Per kg 11,108.39
Permen PU.11-2016
14,689.44
1,734.17
1,734.17
1,734.17
550.85
918.09
21,360.89
4,381.62
176.52
0.00
27,315.22
7,943.19
3,586.82
1,152.54
1,054.65
45,610.56
0.00
66,971.45
0.00
66,971.45
Permen PU.11-2016
24,237.58
2,861.38
2,861.38
2,861.38
918.09
1,530.15
35,269.96
6,572.44
353.03
0.00
32,778.27
882.58
4,931.88
1,728.81
1,757.74
49,004.75
0.00
84,274.70
0.00
84,274.70
1 m' ANALISA ASUMSI SENDIRI
337,098.81
91,063.58
428,162.39
0.00
428,162.39
Permen PU.11-2016
54,758.97
26,012.55
11,935.17
306.03
93,012.72
81,314.80
105.92
81,420.73
0.00
174,433.44
0.00
174,433.44
24,482.40
8,670.85
918.09
1,530.15
35,601.49
1,238,318.48
9,863.75
5,632.91
1,253,815.15
0.00
1,289,416.64
0.00
1,289,416.64
Permen PU.11-2016
57,125.60
30,347.98
3,213.32
3,570.35
94,257.24
110,294.67
10,536.28
5,632.91
126,463.86
0.00
220,721.10
0.00
220,721.10
24,482.40
13,006.28
1,377.14
1,530.15
40,395.96
35,239.81
35,239.81
0.00
75,635.77
0.00
75,635.77
16,321.60
8,670.85
918.09
1,020.10
26,930.64
3,362.64
3,362.64
0.00
30,293.28
0.00
30,293.28
16,321.60
8,670.85
918.09
1,020.10
26,930.64
3,790.61
3,790.61
0.00
30,721.25
0.00
30,721.25
30,721.25
20,556.02
51,277.28
0.00
51,277.28
57,125.60
30,347.98
3,213.32
3,570.35
94,257.24
79,602.91
8,406.61
102.56
88,112.08
0.00
182,369.32
0.00
182,369.32
73,503.69
8,406.61
92.47
82,002.77
0.00
176,260.01
0.00
176,260.01
57,125.60
30,347.98
3,213.32
3,570.35
94,257.24
104,850.85
8,406.61
92.47
113,349.93
0.00
207,607.17
0.00
207,607.17
57,125.60
30,347.98
3,213.32
3,570.35
94,257.24
104,850.85
8,406.61
92.47
113,349.93
0.00
207,607.17
0.00
207,607.17
57,125.60
30,347.98
3,213.32
3,570.35
94,257.24
48,986.06
8,406.61
122.74
57,515.40
0.00
151,772.64
0.00
151,772.64
73,447.20
39,018.83
4,131.41
4,590.45
121,187.88
71,328.78
8,406.61
122.74
79,858.12
0.00
201,046.00
0.00
201,046.00
114,126.04
28,035.50
27,314.74
169,476.28
0.00
169,476.28
0.00
169,476.28
53,496.58
53,496.58
0.00
53,496.58
0.00
53,496.58
Permen PU.11-2016
9,792.96
10,405.02
1,101.71
612.06
21,911.75
25,474.56
25,474.56
47,386.31
0.00
47,386.31
8,160.80
4,335.43
459.05
510.05
13,465.32
23,367.31
1,941.67
48,630.94
16,048.97
10,189.83
513.57
5,413.34
106,105.63
0.00
119,570.95
0.00
119,570.95
8,160.80
4,335.43
459.05
510.05
13,465.32
23,367.31
1,941.67
48,630.94
16,048.97
10,189.83
513.57
5,413.34
106,105.63
0.00
119,570.95
0.00
119,570.95
4,080.40
4,335.43
459.05
306.03
9,180.90
120,367.31
176.52
120,543.82
0.00
129,724.72
0.00
129,724.72
8,160.80
4,335.43
459.05
510.05
13,465.32
66,233.86
66,233.86
132,467.73
0.00
145,933.05
0.00
145,933.05
4,080.40
4,335.43
459.05
306.03
9,180.90
6,954.56
176.52
7,131.07
0.00
16,311.97
0.00
16,311.97
16,321.60
8,670.85
918.09
102.01
26,012.55
188,511.76
3,530.31
192,042.07
0.00
218,054.62
0.00
218,054.62
25,219.82
882.58
26,102.39
0.00
62,213.93
0.00
62,213.93
Permen PU.11-2013
12,241.20
4,335.43
459.05
816.08
17,851.75
123,042.14
123,042.14
0.00
140,893.89
0.00
140,893.89
1,224.12
13,006.28
1,377.14
816.08
16,423.61
257,802.57
257,802.57
0.00
274,226.18
0.00
274,226.18
Permen PU.11-2016
1,632.16
5,462.64
578.40
306.03
7,979.22
706.06
3,297.43
8,573.31
12,576.80
0.00
20,556.02
0.00
20,556.02
Permen PU.11-2016
1,632.16
5,462.64
578.40
306.03
7,979.22
5,335.39
13,872.02
19,207.41
0.00
27,186.63
0.00
27,186.63
1,632.16
5,462.64
578.40
306.03
7,979.22
3,297.43
11,870.74
15,168.17
0.00
23,147.39
0.00
22,707.60
5,712.56
780.38
550.85
306.03
7,349.82
10,279.42
5,712.04
8,736.05
443.26
25,170.77
0.00
32,520.59
0.00
32,520.59
269,306.40
95,379.35
918.09
16,321.60
381,925.44
2,554,589.13
2,554,589.13
0.00
2,936,514.57
0.00
2,936,514.57
Permen PU.11-2013
81,608.00
130,062.75
13,771.35
16,321.60
241,763.70
1,685,397.06
5,380.23
1,609.40
1,692,386.69
0.00
1,934,150.39
0.00
1,934,150.39
906,283.04
5,380.23
1,609.40
913,272.67
0.00
1,095,870.57
0.00
1,095,870.57
97,929.60
125,727.33
13,771.35
6,120.60
243,548.88
1,691,510.95
1,691,510.95
0.00
1,935,059.83
0.00
1,935,059.83
Permen PU.11-2013
2,448.24
26,012.55
2,754.27
1,530.15
32,745.21
163,037.20
203,796.50
366,833.70
0.00
399,578.91
0.00
399,578.91
Permen PU.11-2013
816.08
8,670.85
918.09
510.05
10,915.07
127,372.81
127,372.81
0.00
138,287.88
0.00
138,287.88
816.08
34,683.40
3,672.36
510.05
39,681.89
285,315.10
81.52
285,396.62
0.00
325,078.51
0.00
325,078.51
816.08
34,683.40
3,672.36
510.05
39,681.89
336,671.82
81.52
336,753.34
0.00
376,435.23
0.00
376,435.23
816.08
34,683.40
3,672.36
510.05
39,681.89
249,650.71
81.52
249,732.23
0.00
289,414.12
0.00
289,414.12
ANALISA ASUMSI SENDIRI
816.08
34,683.40
3,672.36
510.05
39,681.89
101,796.35
81.52
101,877.87
0.00
141,559.76
0.00
141,559.76
40,722.39
8,670.85
5,100.50
54,493.74
63,176.92
63,176.92
0.00
117,670.66
0.00
117,670.66
40,722.39
8,670.85
5,100.50
54,493.74
106993.1625
106,993.16
0.00
161,486.90
0.00
161,486.90
40,722.39
8,670.85
5,100.50
54,493.74
106,993.16
106,993.16
0.00
161,486.90
0.00
161,486.90
40,722.39
8,670.85
5,100.50
54,493.74
63,176.92
63,176.92
0.00
117,670.66
0.00
117,670.66
ANALISA HARGA SATUAN PEKERJ
KONSTRUKSI BANGUNAN GEDUNG DAN
(SNI)
PEKERJAAN : PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN D
UNIVERSITAS NEGERI MALANG (UM)
LOKASI : MALANG - JAWA TIMUR
NO /
URAIAN PE K E R JAAN
KODE
1 2
ANALISA KUSEN.
114,635.53
114,635.53
114,635.53
114,635.53
137,562.64
73,876.23
122,277.90
137,562.64
468,731.95
458,542.13
407,593.00
99,860.29
7,642.37
433,067.56
430,239.89
428,991.63
56,044.04
66,233.86
61,138.95
63,176.92
15,182.84
163,037.20
188,511.76
229,271.06
116,164.01
234,365.98
95,784.36
116,164.01
173,227.03
147,752.46
152,847.38
129,410.78
127,372.81
66,233.86
56,044.04
791,749.40
172,208.04
163,037.20
127,372.81
667,433.54
132,467.73
270,030.36
133,486.71
182,397.87
426,953.67
917,084.25
50,949.13
1,268,633.21
112,088.08
56,044.04
173,227.03
129,920.27
116,164.01
203,796.50
275,125.28
228,863.47
499,301.43
426,953.67 1,707,814.67
917,084.25 3,668,337.00
50,949.13 203,796.50
1,268,633.21 5,074,532.85
1,647,584.65 27,459,744.21 29,107,328.86
-
Total : 29,107,328.85
468,731.95 13,977,586.75
114,635.53 2,590,763.01
7,642.37 236,913.43
426,953.67 1,707,814.67
917,084.25 3,668,337.00
50,949.13 203,796.50
1,268,633.21 5,074,532.85
1,647,584.65 27,459,744.21 29,107,328.86
-
Total : 29,107,328.85
468,731.95 8,985,591.48
114,635.53 2,246,856.41
7,642.37 191,059.22
426,953.67 853,907.34
917,084.25 1,834,168.50
499,301.43 998,602.85
1,268,633.21 2,537,266.43
1,058,847.13 17,647,452.22 18,706,299.36
-
Total : 18,706,299.35
/ UNIT ANALISA ASUMSI SENDIRI
114,635.53 611,007.38
458,542.13 504,396.34
7,642.37 77,340.77
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 174,246.01
234,365.98 234,365.98
132,092.23 2,201,537.17 2,333,629.40
-
Total : 2,333,629.39
114,635.53 777,228.90
122,277.90 41,574.49
458,542.13 724,496.56
7,642.37 92,166.97
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 174,246.01
234,365.98 234,365.98
158,655.58 2,644,259.59 2,802,915.16
-
Total : 2,802,915.16
114,635.53 777,228.90
122,277.90 41,574.49
458,542.13 724,496.56
99,860.29 24,965.07
7,642.37 92,166.97
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 174,246.01
234,365.98 234,365.98
160,153.48 2,669,224.66 2,829,378.14
-
Total : 2,829,378.13
114,635.53 597,251.12
458,542.13 655,715.24
7,642.37 79,633.48
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 174,246.01
234,365.98 234,365.98
140,483.55 2,341,392.51 2,481,876.06
-
Total : 2,481,876.06
114,635.53 614,446.45
458,542.13 807,034.14
7,642.37 81,926.19
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 174,246.01
234,365.98 234,365.98
150,731.97 2,512,199.46 2,662,931.42
-
Total : 2,662,931.42
114,635.53 431,029.60
458,542.13 320,979.49
7,642.37 28,735.31
132,467.73 66,233.86
116,164.01 116,164.01
133,486.71 133,486.71
65,797.74 1,096,628.97 1,162,426.70
-
Total : 1,162,426.70
114,635.53 504,396.34
458,542.13 490,640.07
7,642.37 33,626.42
132,467.73 132,467.73
116,164.01 232,328.01
270,030.36 270,030.36
133,486.71 133,486.71
107,818.54 1,796,975.64 1,904,794.18
-
Total : 1,904,794.17
114,635.53 1,533,823.41
468,731.95 1,687,435.02
137,562.64 409,826.61
7,642.37 158,655.58
426,953.67 853,907.34
917,084.25 1,834,168.50
50,949.13 101,898.25
1,268,633.21 2,537,266.43
547,018.87 9,116,981.12 9,663,999.99
-
Total : 9,663,999.99
114,635.53 903,327.99
458,542.13 1,210,551.21
122,277.90 66,030.07
137,562.64 41,268.79
7,642.37 102,102.05
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 348,492.02
270,030.36 270,030.36
112,088.08 112,088.08
56,044.04 56,044.04
234,365.98 234,365.98
236,668.88 3,944,481.26 4,181,150.13
-
Total : 4,181,150.13
114,635.53 903,327.99
458,542.13 1,210,551.21
122,277.90 66,030.07
137,562.64 41,268.79
7,642.37 102,102.05
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 348,492.02
270,030.36 270,030.36
112,088.08 112,088.08
56,044.04 56,044.04
234,365.98 234,365.98
236,668.88 3,944,481.26 4,181,150.13
-
Total : 4,181,150.13
114,635.53 1,043,183.33
458,542.13 1,614,068.28
122,277.90 85,594.53
137,562.64 82,537.58
7,642.37 108,215.94
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 348,492.02
270,030.36 270,030.36
112,088.08 112,088.08
56,044.04 56,044.04
234,365.98 234,365.98
273,288.05 4,554,800.83 4,828,088.88
-
Total : 4,828,088.87
114,635.53 1,020,256.23
458,542.13 1,513,189.01
122,277.90 80,703.41
7,642.37 106,687.47
182,397.87 182,397.87
188,511.76 188,511.76
229,271.06 229,271.06
116,164.01 348,492.02
270,030.36 270,030.36
112,088.08 112,088.08
56,044.04 56,044.04
234,365.98 234,365.98
260,522.24 4,342,037.28 4,602,559.52
-
Total : 4,602,559.51
433,067.56 2,277,935.38
407,593.00 770,350.77
7,642.37 80,397.72
791,749.40 791,749.40
172,208.04 86,104.02
163,037.20 163,037.20
127,372.81 191,059.22
667,433.54 667,433.54
301,684.03 5,028,067.25 5,329,751.28
-
Total : 5,230,464.00
433,067.56 2,537,775.92
407,593.00 1,353,208.76
7,642.37 89,568.56
173,227.03 173,227.03
203,796.50 203,796.50
129,920.27 129,920.27
116,164.01 348,492.02
275,125.28 275,125.28
228,863.47 228,863.47
667,433.54 667,433.54
360,444.68 6,007,411.33 6,367,856.01
-
Total : 6,367,856.00
/ UNIT ANALISA ASUMSI SENDIRI
468,731.95 1,799,930.69
56,044.04 134,505.69
426,953.67 853,907.34
917,084.25 1,834,168.50
499,301.43 998,602.85
1,268,633.21 2,537,266.43
489,502.89 8,158,381.49 8,647,884.38
-
Total : 8,647,884.37
468,731.95 1,799,930.69
56,044.04 134,505.69
426,953.67 853,907.34
917,084.25 1,834,168.50
499,301.43 998,602.85
1,268,633.21 2,537,266.43
489,502.89 8,158,381.49 8,647,884.38
-
Total : 8,647,884.37
468,731.95 1,799,930.69
56,044.04 134,505.69
426,953.67 853,907.34
917,084.25 1,834,168.50
499,301.43 998,602.85
1,268,633.21 2,537,266.43
489,502.89 8,158,381.49 8,647,884.38
-
Total : 8,647,884.37
/ UNIT ANALISA ASUMSI SENDIRI
114,635.53 2,691,642.27
114,635.53 882,693.59
137,562.64 1,520,067.14
7,642.37 215,514.80
66,233.86 132,467.73
61,138.95 122,277.90
333,879.81 5,564,663.43 5,898,543.24
-
5,898,543.23
114,635.53 1,437,529.56
137,562.64 841,883.34
7,642.37 155,598.63
146,100.69 2,435,011.53 2,581,112.22
-
2,581,112.22
114,635.53 891,864.43
137,562.64 313,642.81
7,642.37 96,599.54
78,126.41 1,302,106.79 1,380,233.19
-
1,380,233.19
114,635.53 1,067,256.80
114,635.53 729,081.98
73,876.23 174,347.91
7,642.37 104,547.60
66,233.86 132,467.73
63,176.92 126,353.83
140,043.35 2,334,055.84 2,474,099.19
-
Total : 2,474,099.19
114,635.53 995,036.41
73,876.23 112,291.87
7,642.37 90,485.65
71,868.84 1,197,813.93 1,269,682.76
-
1,269,682.76
114,635.53 3,342,772.09
137,562.64 1,775,933.65
7,642.37 227,742.59
320,786.90 5,346,448.33 5,667,235.23
-
5,667,235.22
114,635.53 2,516,249.91
114,635.53 631,641.78
137,562.64 737,335.74
7,642.37 151,318.90
66,233.86 132,467.73
63,176.92 126,353.83
257,722.07 4,295,367.88 4,553,089.95
-
4,553,089.95
/ UNIT ANALISA ASUMSI SENDIRI
114,635.53 3,436,773.23
114,635.53 948,035.84
137,562.64 1,731,913.61
7,642.37 230,799.54
66,233.86 132,467.73
15,182.84 30,365.68
390,621.34 6,510,355.62 6,900,976.95
-
6,900,976.95
114,635.53 3,878,120.02
114,635.53 941,157.71
137,562.64 2,261,529.76
7,642.37 258,312.06
66,233.86 132,467.73
15,182.84 30,365.68
450,117.18 7,501,952.96 7,952,070.14
-
7,952,070.13
114,635.53 3,465,432.11
114,635.53 948,035.84
137,562.64 1,762,177.39
7,642.37 232,328.01
66,233.86 132,467.73
15,182.84 30,365.68
394,248.41 6,570,806.75 6,965,055.16
-
6,965,055.15
114,635.53 4,768,838.10
114,635.53 1,086,744.84
137,562.64 2,939,713.56
7,642.37 293,466.96
66,233.86 132,467.73
63,176.92 126,353.83
560,855.10 9,347,585.01 9,908,440.12
-
9,908,440.11
114,635.53 3,989,316.49
137,562.64 2,265,656.64
7,642.37 273,596.80
391,714.20 6,528,569.93 6,920,284.12
-
6,920,284.12
114,635.53 5,653,824.40
114,635.53 1,440,968.63
137,562.64 2,960,347.96
7,642.37 301,109.33
66,233.86 198,701.59
15,182.84 45,548.52
636,030.03 10,600,500.42 11,236,530.45
-
Total : 11,236,530.44
66,233.86 198,701.59
15,182.84 45,548.52
525,562.64 8,759,377.37 9,284,940.01
-
Total : 9,284,940.00
114,635.53 5,846,412.09
114,635.53 1,630,117.25
137,562.64 3,675,673.67
7,642.37 335,958.53
66,233.86 198,701.59
63,176.92 189,530.75
712,583.63 11,876,393.88 12,588,977.52
-
Total : 12,588,977.51
114,635.53 6,659,178.01
114,635.53 962,938.46
137,562.64 4,106,244.73
7,642.37 351,548.96
66,233.86 132,467.73
63,176.92 126,353.83
740,323.90 12,338,731.72 13,079,055.62
-
Total : 13,079,055.62
/ UNIT ANALISA ASUMSI SENDIRI
114,635.53 4,304,564.20
137,562.64 2,253,276.00
7,642.37 291,632.79
410,968.38 6,849,472.99 7,260,441.37
-
Total : 7,260,441.37
114,635.53 4,688,593.23
137,562.64 2,683,847.06
7,642.37 307,223.22
460,779.81 7,679,663.51 8,140,443.32
-
Total : 8,140,443.32
433,067.56 12,732,186.34
99,860.29 276,612.99
7,642.37 220,100.22
793,733.97 13,228,899.55 14,022,633.52
-
Total : 14,022,633.51
433,067.56 16,110,113.33
99,860.29 1,513,881.92
7,642.37 233,856.48
1,071,471.10 17,857,851.73 18,929,322.83
-
Total : 18,929,322.83
114,635.53 26,452,148.84
114,635.53 9,169,696.14
137,562.64 19,729,233.47
7,642.37 834,546.67
66,233.86 662,338.63
15,182.84 151,828.39
3,419,987.53 56,999,792.14 60,419,779.66
-
Total : 60,419,779.66
114,635.53 7,348,137.55
114,635.53 1,056,939.60
137,562.64 5,226,004.60
7,642.37 405,809.78
66,233.86 132,467.73
15,182.84 30,365.68
851,983.50 14,199,724.93 15,051,708.43
-
Total : 15,051,708.43
114,635.53 40,731,150.61
114,635.53 9,779,557.17
137,562.64 30,793,396.40
7,642.37 1,069,320.24
66,233.86 1,258,443.39
15,182.84 288,473.95
5,035,220.51 83,920,341.75 88,955,562.26
-
Total : 88,955,562.25
114,635.53 40,731,150.61
114,635.53 9,779,557.17
137,562.64 30,793,396.40
7,642.37 1,069,320.24
66,233.86 1,258,443.39
15,182.84 288,473.95
5,035,220.51 83,920,341.75 88,955,562.26
-
Total : 88,955,562.25
/ UNIT ANALISA ASUMSI SENDIRI
433,067.56 2,078,724.30
430,239.89 5,291,950.60
428,991.63 8,837,227.63
173,227.03 173,227.03
203,796.50 203,796.50
129,920.27 129,920.27
116,164.01 348,492.02
275,125.28 275,125.28
228,863.47 228,863.47
667,433.54 667,433.54
1,094,085.64 18,234,760.62 19,328,846.26
-
Total : 19,328,846.25
/ UNIT 29,107,328.85
/ UNIT 29,107,328.85
/ UNIT 18,706,299.35
/ UNIT 2,333,629.39
/ UNIT 2,802,915.16
/ UNIT 2,829,378.13
/ UNIT 2,481,876.06
/ UNIT 2,662,931.42
/ UNIT 1,162,426.70
/ UNIT 1,904,794.17
/ UNIT 9,663,999.99
/ UNIT 4,181,150.13
/ UNIT 4,181,150.13
/ UNIT 4,828,088.87
/ UNIT 4,602,559.51
/ UNIT 5,230,464.00
/ UNIT 6,367,856.00
/ UNIT 8,647,884.37
/ UNIT 8,647,884.37
/ UNIT 8,647,884.37
/ UNIT 5,898,543.23
/ UNIT 2,581,112.22
/ UNIT 1,380,233.19
/ UNIT 2,474,099.19
/ UNIT 1,269,682.76
/ UNIT 5,667,235.22
/ UNIT 4,553,089.95
/ UNIT 6,900,976.95
/ UNIT 7,952,070.13
/ UNIT 6,965,055.15
/ UNIT 9,908,440.11
/ UNIT 6,920,284.12
/ UNIT 11,236,530.44
/ UNIT 9,284,940.00
/ UNIT 12,588,977.51
/ UNIT 13,079,055.62
/ UNIT 7,260,441.37
/ UNIT 8,140,443.32
/ UNIT 14,022,633.51
/ UNIT 18,929,322.83
/ UNIT 34,180,011.23
/ UNIT 60,419,779.66
/ UNIT 15,051,708.43
/ UNIT 88,955,562.25
/ UNIT 88,955,562.25
/ UNIT 19,328,846.25
R
PROYEK : PERENCANAAN PEMBANGUNAN GEDUNG FAKU
LOKASI : JL. SEMARANG 5 MALANG - JAWA TIMUR
NO PEKER
R E KAPITU LAS I
PEKERJAAN MEKANIKAL
PEKERJAAAN
E KAPITU LAS I
EKERJAAN MEKANIKAL
TOTAL PEKER
ARAN BIAYA
ESTIMATE )
8,135,646,248.38
1,429,354,912.75
1,780,674,562.50
4,431,762,098.13
493,854,675.00
NO PEKERJAAN UNIT
2.A. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI SEMI BA
Instalasi Air Bekas, Air Kotor Toilet Lantai Basement
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
c. Pekerjaan Sumpit Air Kotor : PIT - AK - 01 unit
d. Sewage Pump Air Kotor set
Tipe : Sewage Submersible Pump, Semi Vortex
Kapasitas
Head total
Power / daya
Speed : 2.950 rpm
Sistem operasi : Paralel alternate operation, Automatic Floating Switch
e. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Fittings Pipa uPVC AW Class, 10 kg/cm 2
ls
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Pekerjaan Sumpit Air Hujan : PIT - AH - 01&02 unit
c. Sewage Pump Air Hujan set
Tipe : Sewage Submersible Pump, Semi Vortex
Kapasitas
Head total
Power / daya
Speed : 2.950 rpm
Sistem operasi : Paralel alternate operation, Automatic Floating Switch
d. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Fittings Pipa uPVC AW Class, 10 kg/cm2 ls
Instalasi Air Bekas, Air Kotor dari Lantai - 1
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Pipa dia. 125 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Pipa dia. 125 mm m
~ Pipa dia. 150 mm m
~ Pipa dia. 200 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Bak Kontrol / Equalizing Chamber unit
c. Galian dan Urugan untuk jalur pipa unit
INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI SEMI BASEMENT :
2.B. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 1
Instalasi Air Bekas, Air Kotor Toilet Lantai -1
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
5 Test & commissioning pekerjaan instalasi air bekas, air kotor & air hujan lot
. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 1 :
2.C. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 2
Instalasi Air Bekas, Air Kotor Toilet Lantai - 2
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
2.D. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 3.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 3. :
2.E. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 4.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 4. :
2.F. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 5.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 5. :
2.G. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 6.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 6. :
2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 7.
1 Instalasi pipa air bekas :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 40 mm m
~ Pipa dia. 50 mm m
~ Pipa dia. 80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 80 mm pcs
~ Floor clean out dia. 100 mm pcs
2 Instalasi pipa air kotor :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.50 mm m
~ Pipa dia.80 mm m
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Floor clean out dia. 100 mm pcs
3 Instalasi pipa ventilasi
a. Pipa uPVC D Class,
~ Pipa dia. 50 mm m
~ Pipa dia. 65 mm m
~ Pipa dia. 80 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
4 Instalasi air hujan :
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 100 mm m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI - 7. :
2.H. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI ATAP
1 Instalasi pipa air hujan Atap Bangunan
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.100 mm (4 ") m
~ Fitting & aksesoris pipa uPVC AW class, 10 kg/cm2 ls
b. Fixtures :
~ Roof. drain dia. 100 mm (4 ") pcs
PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - LANTAI ATAP :
2.I. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - SITE
1 Instalasi Sewage Treatment Plant - 01 &2
a. Sewage Treatment Plant unit
Type : Bio-Filter, Aerob & Anaerob, Chlorination
Material : Fiberglass
Kapasitas : 120 m3/hari
Kode : STP - 01 & STP - 02
lengkap dengan Blower, Pompa efluent, instalasi pipa, Panel Kontrol, instalasi kabel dan acc
b. Effluent Pump set
Tipe : Sewage Submersible Pump
Kapasitas : 2 m3/hour
Head total : 12 m
Power / daya : 500 W / 220 V / 1 ph / 50 Hz
Speed : 2.950 rpm
Sistem operasi : Paralel alternate operation, Automatic Floating Switch
c. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia.40 mm (1 1/2 ") (effluent/discharge) m
~ Fittings Pipa uPVC AW Class, 10 kg/cm 2
ls
2 Instalasi pipa air kotor
a. Pipa uPVC AW Class, 10 kg/cm2 :
~ Pipa dia. 200 mm m
~ Fittings Pipa uPVC AW Class, 10 kg/cm2 ls
b. Bak Kontrol / Equalizing Chamber unit
c. Galian dan Urugan untuk jalur pipa unit
- 2.I. PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN - SITE :
JUMLAH - 2, PEKERJAAN INSTALASI AIR BEKAS, AIR KOTOR DAN AIR HUJAN :
alasi pipa air bersih dalam dan luar gedung berikut fixtures,
a beserta pengetesan sistem dan instalasi.
10,915,606.50
12,155,403.75
14,163,465.00
12,410,276.25
12,410,276.25
14,205,476.25
20,385,834.75
16,894,081.50
285,514,256.25
47,350,312.50
39,526,912.50
37,091,662.50
36,135,412.50
47,454,862.50
37,577,756.25
13,625,925.00
1,192,631,175.00
1,780,674,562.50
-
-
1.00 95,837.50 95,837.50
68.00 341,487.50 23,221,150.00
11.00 578,000.00 6,358,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
175,294,310.00
-
-
1.00 95,837.50 95,837.50
68.00 341,487.50 23,221,150.00
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
282.90 60,775.00 17,193,247.50
12.00 80,431.25 965,175.00
26.00 96,687.50 2,513,875.00
20.00 128,137.50 2,562,750.00
43.00 192,312.50 8,269,437.50
82.00 244,375.00 20,038,750.00
8.00 244,375.00 1,955,000.00
8.00 578,000.00 4,624,000.00
1.00 5,737,500.00 5,737,500.00
173,974,472.50
-
-
1.00 95,837.50 95,837.50
72.00 341,487.50 24,587,100.00
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
173,672,796.88
-
-
1.00 95,837.50 95,837.50
72.00 341,487.50 24,587,100.00
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
171,604,746.88
-
-
1.00 95,837.50 95,837.50
72.00 341,487.50 24,587,100.00
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
174,337,709.38
-
-
1.00 95,837.50 95,837.50
72.00 341,487.50 24,587,100.00
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
174,337,709.38
-
-
1.00 95,837.50 95,837.50
73.00 341,487.50 24,928,587.50
8.00 578,000.00 4,624,000.00
1.00 4,462,500.00 4,462,500.00
-
2.00 4,526,250.00 9,052,500.00
2.00 408,000.00 816,000.00
2.00 1,976,250.00 3,952,500.00
2.00 267,750.00 535,500.00
2.00 5,865,000.00 11,730,000.00
-
-
-
-
-
-
-
180,703,359.38
1,930,348,725.00
4,431,762,098.13
36,031,500.00
30,587,250.00
34,731,000.00
262,021,425.00
493,854,675.00
RENCANA ANGGARAN BIAYA
( ENGGENNERING ESTIMATE )
I PEKERJAAN ELECTRICAL
II PEKERJAAN ELECTRONIC
5,212,402,725.00
743,772,984.00
5,956,175,709.00
RENCANA ANGGARAN BIAYA
( ENGGENNERING ESTIMATE )
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
LOKASI : MALANG , JAWA - TIMUR.
No Uraian Pekerjaan
I PEKERJAAN
-Harga ELECTRICAL
satuan pekerjaan sudah termasuk pengadaan material dan pemasangan peralatan
dan alat-alat bantu yang diperlukan hingga pekerjaan yang dinyatakan tercapai dengan baik.
Pekerjaan harus
-Harga sudah dilaksanakan
termasuk sesuaitest
biaya untuk dengan gambar dan spesifikasi teknik.
comissioning
Power House
1 Panel MVMDP / Cubicle Konsumen
a. Incoming cubicle IM-SM6
IM - SM 6 type Cubicle lengkap dengan
- Switch Cubicle (LBS-SF6) 24kV, 16kA, 630A
- Voltage Indicators 3 Pcs & Heater 50 W, 220 VAC 1 unit
- Busbar 630A 3 unit
- CIT Manual Operating Mechanism
3 Genset kapasitas 500 kVA,3Ø,50 Hz,380V, 1500 Rpm, Silent Type Prime Power
4 tak, pendinginan radiator -air cooling, silinder in-line, selenser,tangki solar harian 2000 liter
lengkap dengan ;
penyangga rubber mounting, 24 V electric stater, 24 V charging
generator,alternator, engine instrument panel,2x12 Volt lead acid
battery, electronic governor,isolasi klas H- IP 23, standard tool kit,
engine part catalogue, dan manual operation book.
- Hand Pump Solar
- Gear Pump kap 50 gpm, daya 1.5 kW dan
- Tangki bulanan 8.000 liter tebal plat 7 mm, lengkap gelas Penduga
instalasi solar pipa sch 40-1'', valve,coupling dan strainer
- Loading test dan comissioning test
5 Kabel Feeder
- Kabel dari Meter PLN ke MVMDP PLN N2XSEBY 3 X 95 mm2
- Kabel dari MVMDP PLN ke MVMDP Konsumen N2XSY 4x2x1cx95mm2
- Kabel dari MVMDP Konsumen ke Transformator N2XSY 4x2x1cx95mm2
- Kabel dari Transformator ke Panel LVMDP NYY 3(4x1cx300mm)
- Kabel dari LVMDP ke Panel Genset NYY 3(4x1x240mm)
6 Grounding System
Termasuk Sumuran Grounding, Konektor Grounding dan Material Bantu lainnya
- Grounding panel Cubicle Konsumen dan Body Trafo Kabel BC 120 mm2
- Grounding Netral Trafo Kabel BC 120 mm2
- Grounding Body Genset Kabel BC 120 mm2
- Grounding LVMDP Kabel BC 120 mm2
Jumlah
Sub Total Pekerjaan Instalasi Tegangan Menengah
Lantai 1
1 Kabel Ladder ukuran 20 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
3 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 2
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 3
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 4
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 5
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 6
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai 7
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
2 Kabel Tray ukuran 20 x 10 cm ( untuk jalur elektronika )
Lantai RL
1 Kabel Tray ukuran 30 x 10 cm ( untuk jalur elektrikal )
Risser
1 Ladder ukuran 40 x 10 cm ( untuk elektrikal )
2 Ladder ukuran 30 x 10 cm ( untuk jalur elektronika )
unit - -
m 15 95,625 1,434,375
m 15 255,000 3,825,000
m 15 25,500 382,500
m 15 7,522,500 112,837,500
m 30 5,992,500 179,775,000
3,116,705,625
3,116,705,625
bh 1 102,000,000 102,000,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 22,950,000 22,950,000
bh 1 24,225,000 24,225,000
bh 2,550,000 -
bh masuk lingkup thp.2
bh masuk lingkup thp.2
bh 1 8,925,000 8,925,000
bh 1 98,175,000 98,175,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 21,675,000 21,675,000
bh 1 9,562,500 9,562,500
634,312,500
m 78 5,259,375 410,231,250
m 78 2,084,625 162,600,750
m 20 816,000 16,320,000
m 20 439,875 8,797,500
m 20 44,625 892,500
m 15 133,875 2,008,125
m 12 439,875 5,278,500
m 15 439,875 6,598,125
m 19 439,875 8,357,625
m 23 439,875 10,117,125
m 27 439,875 11,876,625
m 31 439,875 13,636,125
m 35 439,875 15,395,625
m 39 816,000 31,824,000
m 15 133,875 2,008,125
m 12 233,325 2,799,900
m 15 297,075 4,456,125
m 19 233,325 4,433,175
m 23 297,075 6,832,725
m 27 233,325 6,299,775
m 31 297,075 9,209,325
m 35 592,875 20,750,625
m 16 233,325 3,733,200
m 48 133,875 6,426,000
m 48 133,875 6,426,000
m 16 114,750 1,836,000
m 20 54,825 1,096,500
780,241,350
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 79 318,750 25,181,250
m 87 446,250 38,823,750
m 99 318,750 31,556,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 81 446,250 36,146,250
m 79 318,750 25,181,250
m 25 446,250 11,156,250
m 38 573,750 21,802,500
m 38 446,250 16,957,500
574,770,000
bh 26 471,750 12,265,500
bh 1 9,881,250 9,881,250
m' 212 102,000 21,624,000
43,770,750
43,770,750
1 bh 30,600,000 30,600,000
70 m' 165,750 11,602,500
1 ttk 6,375,000 6,375,000
1 ls 12,750,000 12,750,000
1 ls 1,275,000 1,275,000
62,602,500
5,212,402,725
RENCANA ANGGARAN BIAYA
( ENGGENNERING ESTIMATE )
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN ( FIK )
LOKASI : MALANG , JAWA - TIMUR.
No Uraian Pekerjaan
- Harga satuan pekerjaan sudah termasuk pengadaan material dan pemasangan peralatan
dan alat-alat bantu yang diperlukan hingga pekerjaan yang dinyatakan tercapai dengan baik.
Pekerjaan harus dilaksanakan sesuai dengan gambar dan spesifikasi teknik.
- Harga sudah termasuk biaya untuk test comissioning
Lantai 1
1 TB-FA -1
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-BS ke TB-FA -1
Jumlah
Lantai 2
1 TB-FA -2
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-1 ke TB-FA -2
Jumlah
Lantai 3
1 TB-FA -3
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-2 ke TB-FA -3
Jumlah
Lantai 4
1 TB-FA -4
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-3 ke TB-FA -4
Jumlah
Lantai 5
1 TB-FA -5
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-4 ke TB-FA -5
Jumlah
Lantai 6
1 TB-FA -6
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-5 ke TB-FA -6
Jumlah
Lantai 7
1 TB-FA -7
2 Rite Of Rise Detector
3 Fixed Heat Detector
4 Smoke Detector
5 Horn Strobe Addressable
6 Manual Break Glass
7 Fire Fighting Telephone
8 Indicator Lamp
9 End of Line
10 Indicator Lamp - di Pintu Kamar
11 Instalasi Detector Fire Alarm Kabel NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
12 Instalasi Horn Strobe Addressable FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
13 Instalasi Manual Break Glass Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
14 Instalasi Fire Fighting Telephone Kabel ITC 2 x 0,6 mm dalalm pipa conduit 20 mm2
15 Instalasi Indicator Lamp Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
16 Instalasi End of Line Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
17 Instalasi ke Indicator Lamp - di Pintu Kamar NYMHY 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
18 Instalasi ke Flow Switch Kabel FRC 2 x 1.5 mm2 dalalm pipa conduit 20 mm2
19 Kabel NYMHY 3x1p x 1,5 mm2 dari TB-FA-6 ke TB-FA -7
Jumlah
Sub Total Pekerjaan Fire Alarm
743,772,984.00
ANALISA HARGA ELECTRICAL
#REF! #REF!
LOKASI : UNIVERSITAS NEGERI MALANG
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
- -
- -
-
-
-
- -
-
-
24,045.00
24,045.00
- -
120,225.00 18,033.75
6,011.25 6,011.25
-
- -
- -
- -
- -
24,045.00
-
24,045.00
24,045.00
- -
120,225.00 18,033.75
6,011.25 6,011.25
-
- -
- -
- -
- -
24,045.00
-
24,045.00
24,045.00
- -
120,225.00 18,033.75
6,011.25 6,011.25
-
- -
- -
- -
- -
24,045.00
-
24,045.00
24,045.00
- -
- -
120,225.00 18,033.75
6,011.25 6,011.25
-
- -
- -
- -
- -
24,045.00
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
+ Nicad Battrey -
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
- -
- -
- -
- -
-
-
+ Nicad Battrey -
-
- -
-
- -
- -
- -
- -
-
-
-
-
- -
-
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
-
DAFTAR UPAH DAN BAHAN
### ###
LOKASI : UNIVERSITAS NEGERI MALANG
UPAH
1 Mandor hr
2 Kepala Tukang hr
3 Tukang Listrik, Pipa hr
4 Pekerja hr
BAHAN
Kabel
1 Kabel NYM 2x1.5mm2 m'
2 Kabel NYM 3x2.5mm2 m'
3 Kabel NYY 4 x 4 mm2 m'
4 Kabel NYY 4 x 6 mm2 m'
5 Kabel NYY 4 x 10 mm2 m'
6 Kabel NYY 4 x 16 mm2 m'
6 Kabel NYY 4 x 25 mm2 m'
7 Kabel NYY 4 x 35 mm2 m'
8 Kabel NYY 4 x 50 mm2 m'
9 Kabel NYY 4 x 70 mm2 m'
10 Kabel NYY 4 x 95 mm2 m'
11 Kabel NYY 4 x 120 mm2 m'
12 Kabel NYY 4 x 150 mm2 m'
13 Kabel NYY 4 x 185 mm2 m'
14 Kabel NYY 4 x 240 mm2 m'
15 Kabel NYY 4 x 300 mm2 m'
16 Kabel NYFGBY 3x2.5mm2 m'
17 Kabel NYFGBY 3x4 mm2 m'
18 Kabel NYFGBY 4x4 mm2 m'
19 Kabel NYFGBY 4x120 mm2 m'
20 Kabel NYA 1 x 1,5 mm2 m'
21 Kabel NYA 1 x 2,5 mm2 m'
22 Kabel NYA 1 x 70 mm2 m'
23 Kabel BC 4 mm2 m'
24 Kabel BC 6 mm2 m'
25 Kabel BC 10 mm2 m'
26 Kabel BC 16 mm2 m'
24 Kabel BC 25 mm2 m'
25 Kabel BC 35 mm2 m'
26 Kabel BC 50 mm2 m'
27 Kabel BC 70 mm2 m'
26 Kabel BC 95 mm2 m'
27 Kabel BC 120 mm2 m'
28 Kabel BC 150 mm2 m'
27 Kabel BC 185 mm2 m'
28 Kabel BC 300 mm2 m'
27 Kabel NYMHY 2x1.5 mm2 m'
28 Kabel NYMHY 3x2.5 mm2 m'
Lampu
1 Lampu Down Light LED 12 Watt, TKO bh
2 Lampu Down Light LED 7 Watt TKO bh
3 Lampu TL LED 1x20 Watt, TKO bh
4 Lampu TL LED 2x20 Watt, TKO bh
5 Lampu Strip LED 9 W/M' roll
6 Trafo 24V DC 120 Watt bh
7 Lampu GMS LED 10 Watt bh
8 Lampu Emergency Down Light LED 12 Watt + Nicad Battrey bh
9 Lampu Exit LED 10 Watt + Nicad Battrey bh
10 Lampu Down Light LED 12 Watt, TKI bh
11 Lampu Down Light LED 7 Watt bh
12 Lampu TL LED 1x20 Watt, TKI bh
13 Lampu TL LED 2x20 Watt, TKI bh
14 Lampu Baret LED 18 Watt bh
15 Lampu Emergency Down Light LED 12 Watt + Nicad Battrey bh
16 Lampu Sport Light 20W bh
MCB / MCCB
1 MCB 10A 1P 6kA bh
2 MCB 16A 1P 6kA bh
3 MCB 6A 3P 6kA bh
4 MCB 10A 3P 6kA bh
5 MCB 16A 3P 6kA bh
6 MCB 20A 3P 6kA bh
7 MCB 25A 3P 6kA bh
8 MCB 32A 3P 6kA bh
9 MCB 40A 3P 6kA bh
10 MCB 50A 3P 10kA bh
11 MCB 63A 3P 10kA bh
12 MCB 80A 3P 10kA bh
13 MCB 100A 3P 10kA bh
14 MCB 125A 3P 18kA bh
15 MCB 160A 3P 18kA bh
16 MCCB 200A 3P 25kA bh
16 MCCB 35A 3P 25kA bh
17 MCCB 50A 3P 25kA bh
18 MCCB 100A 3P 25kA bh
19 MCCB 80A 3P 25kA bh
20 MCCB 125A 3P 25kA bh
21 MCCB 160A 3P 25kA bh
22 MCCB 500A 3P 36kA bh
21 ACB 1000A 4P 50kA bh
22 ACB 2000A 4P 65kA bh
TRAFO
1 Trafo 1000 KVA bh
PANEL BOX
1 Ukuran 60cm x 40cm x 25cmm, Wall Mounted bh
2 Ukuran 80cm x 60cm x 30cmm, Wall Mounted bh
3 Bushbar sisir standart 80A 3P+N bh
4 MCB 10A 3P 6kA bh
5 Amphere Meter Digital 1P bh
6 Volt Meter Digital 3P bh
7 Frequensi Meter Digital bh
8 Pilot Lamp bh
Pipa condoite 20mm bh
T-Dust, Flexible dll bh
Fuse 2 A bh
Meter Panel bh
AMF/ATS bh
HARGA