JUMLAH HARGA
NO URAIAN
(Rp)
PEMOTONGAN
1. SCF + PPH 79,500,000
2. PROFIT CAHAYA 200,000,000
BUDGET PENGERJAAN 1,220,500,000.00
REKAPITULASI
KANIKAL, ELEKTRIKAL & PLUMBING
MP (DIREKSI KEET & FASILITAS)
JUMLAH HARGA
(Rp)
a Rupiah
PEMOTONGAN
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
INSTALASI LISTRIK
3 PANEL SITE
Panel Utama KAWASAN unit 1.00
Panel COS Manual Genset X PLN unit 1.00
Panel Distribusi - 1 unit 1.00
Panel Distribusi - 2 unit 1.00
Panel PJU unit 1.00
4 KABEL POWER
METER PLN -> P. UTAMA , NYFGBY 4 x 35 mm2 m 20.00
P. GENSET -> P. UTAMA , NYFGBY 4 x 35 mm2 m 12.00
P. UTAMA - > P. DIST-1 , NYFGBY 4 x 35 mm2 m 25.00
P. UTAMA - > P. DIST-1 , NYFGBY 4 x 16 mm2 m 65.00
P. UTAMA - > P. PJU , NYFGBY 4 x 10 mm2 m 50.00
6 PJU KAWASAN
Lampu Jalan type LED 100 Watt Tiang Tinggi 6 meter bh 15.00
Instalasi Penerangan lampu jalan titik 10.00
Lampu tempat parkir TKO LED 18 watt bh 10.00
Instalasi Penerangan lampu jalan titik 35.00
7 PENANGKAL PETIR
Head Splitzen R.100 set 1.00
Tiang Penagkal Petir t. 9 mtr bh 1.00
Kabel NYY 70 mm2 mtr 12.00
Grounding set 1.00
C INSTALASI PLUMBING
AIR BERSIH
1 Pekerjaan Sumur
Pengeboran Sumur dalam 50 meter ls 1.00
Pipa Cashing PVC dia. 100mm m' 50.00
Pipa Supply PVC dia. 40 mm m' 40.00
Valve, Fitting, & Mat Bantu ls 1.00
Perapihan Muka Sumur ls 1.00
Pompa Deepwell kap. 6m3/jam unit 1.00
Panel Kontrol, Kabel Kontrol ls 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
50,673,373.06 50,673,373.06
8,511,955.43 8,511,955.43
8,511,955.43 8,511,955.43
8,511,955.43 8,511,955.43
6,107,328.02 91,609,920.30
1,259,769.40 12,597,694.03
287,278.50 2,872,784.96
1,166,137.89 40,814,826.28
-
-
8,469,395.65 8,469,395.65 KURN
6,256,287.24 6,256,287.24
215,352.47 2,584,229.67
8,171,477.21 8,171,477.21
366,157,765.22
44,262,168.23 44,262,168.23
176,027.24 8,801,361.91
45,283.60 1,811,344.12
885,243.36 885,243.36
1,106,554.21 1,106,554.21
-
16,045,035.98 16,045,035.98 Franklin
4,511,336.38 4,511,336.38
-
-
2,766,385.51 11,065,542.06 Pinguin
70,234,765.92 70,234,765.92
387,680.88 45,358,662.85
136,686.53 14,762,145.01
103,582.76 3,728,979.34
6,894,683.90 6,894,683.90
204,286.93 817,147.72
-
-
57,370.58 8,605,586.94 RUCIKA/PRALON
2,298,227.97 2,298,227.97 ONDA
63,839.67 9,575,949.86
229,035,083.19
595,192,848.41
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
KANTOR DIREKSI
B INSTALASI LISTRIK
PANEL POWER
1 P.DIREKSI unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 6 mm2 dari P.DIST-1 Ke P.DIREKSI m' 25.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 25.00
2 Instalasi Stop Kontak Biasa Ttk 42.00
3 Instalasi Stop Kontak AC Ttk 10.00
4 Instalasi Titik EF Ttk 2.00
5 Material Bantu, dll LS 1.00
INSTALASI AC
1 Pipa refrigerant + isolasi uk. 1/4"+1/2" m' 36.00
2 Refrigerant Liquid R-410 kg 2.00
3 Pipa PVC 1/2"+ isolasi ( drain ) m' 57.00
4 Pipa PVC 3/4"+ isolasi ( drain ) m' 27.00
6 Support AC set 15.00
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
7 Material Bantu, dll Ls 1.00
C INSTALASI PLUMBING
AIR BERSIH
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
AIR BEKAS & AIR KOTOR
3 BIOTEK
Septik Tank type Bio kap. 1500 ltr bh 1.00
Pekerjaan Tanam Biotek bh 1.00
Resapan lengkap ijuk d.1000 x t.2000 bh 1.00
5 SANITARI
Closed Jongkok bh
Closed Duduk bh 2.00
Wastafel + Kran Wastafel bh 2.00
Stop Kran + flexible bh 2.00
Faucet bh 2.00
Jet Shower bh 2.00
Floor Drain bh 2.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
61,701,717.87
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
2,851,505.07 2,851,505.07
95,844,618.12
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
-
-
-
5,532,771.03 5,532,771.03 FIBER type bio
2,872,784.96 2,872,784.96
4,375,145.09 4,375,145.09
-
-
39,325.23 275,276.64 RUCIKA/PRALON
57,370.58 229,482.32 RUCIKA/PRALON
57,370.58 573,705.80 RUCIKA/PRALON
-
93,546.39 1,403,195.85 RUCIKA/PRALON
93,546.39 467,731.95 RUCIKA/PRALON
93,546.39 748,371.12 RUCIKA/PRALON
-
519,740.00 519,740.00 RUCIKA/PRALON
1,546,281.82 1,546,281.82 RUCIKA/PRALON
766,075.99 766,075.99
1,106,554.21 1,106,554.21
-
-
-
2,448,889.58 4,897,779.15 AMSTARD NEWTON CCST
2,319,933.45 4,639,866.90 AMSTARD MIZU 45
362,609.30 725,218.60 Onda
288,385.05 576,770.10 Onda
251,953.88 503,907.76 Onda
240,888.34 481,776.68 Onda
638,396.66 638,396.66
36,065,512.65
193,611,848.64
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
KANTOR KONTRAKTOR
B INSTALASI LISTRIK
PANEL POWER
1 P.KANTOR unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 6 mm2 dari P.DIST Ke P.KANTOR m' 60.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 24.00
2 Instalasi Stop Kontak Biasa Ttk 31.00
3 Instalasi Stop Kontak AC Ttk 8.00
4 Instalasi Titik EF Ttk 2.00
5 Material Bantu, dll LS 1.00
INSTALASI AC
1 Pipa refrigerant + isolasi uk. 1/4"+3/8" m' 6.00
2 Pipa refrigerant + isolasi uk. 1/4"+1/2" m' 60.00
3 Refrigerant Liquid R-410 kg 2.00
4 Pipa PVC 1/2"+ isolasi ( drain ) m' 24.00
6 Pipa PVC 1"+ isolasi ( drain ) m' 30.00
7 Support AC set 8.00
8 Material Bantu, dll Ls 1.00
C INSTALASI PLUMBING
AIR BERSIH
3 BIOTEK
Septik Tank type Bio kap. 1500 ltr bh 1.00
Pekerjaan Tanam Biotek bh 1.00
Resapan lengkap ijuk bh 1.00
5 SANITARI
Closed Jongkok bh
Closed Duduk bh 2.00
Wastafel + Kran Wastafel bh 2.00
Stop Kran + flexible bh 2.00
Faucet bh 3.00
Jet Shower bh 2.00
Floor Drain bh 2.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
53,303,567.28
72,095,070.80
43,004,969.43
168,403,607.52
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
RUANG LABORATORIUM
B INSTALASI LISTRIK
PANEL POWER
1 P.LABORATORIUM unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 4 mm2 dari P.DIST Ke P.LAB m' 46.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 9.00
2 Instalasi Stop Kontak Biasa Ttk 4.00
3 Instalasi Titik Stop Kontak AC Ttk -
4 Material Bantu, dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
15,387,742.78
15,387,742.78
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
MESS KARYAWAN
B INSTALASI LISTRIK
PANEL POWER
1 Kabel NYFGBY 4 x 6 mm2 dari P.DIST-2 Ke P.MESS HELPE m' 50.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 54.00
2 Instalasi Stop Kontak Biasa Ttk 120.00
3 Instalasi Titik Stop Kontak AC Ttk 10.00
4 Material Bantu, dll LS 1.00
C INSTALASI PLUMBING
AIR BERSIH
3 BIOTEK
Septik Tank type Bio kap. 6000 ltr bh 1.00
Septik Tank type Bio kap. 1000 ltr bh 1.00
Pekerjaan Tanam Biotek bh 1.00
Resapan lengkap ijuk bh 1.00
5 SANITARI
Closed Jongkok bh 8.00
Closed Duduk bh 4.00
Wastafel + Kran Wastafel bh 16.00
Stop Kran + flexible bh 24.00
Faucet bh 22.00
Shower bh 10.00
Floor Drain bh 24.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
158,175,114.14
273,461,889.65
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
MESS HELPER
B INSTALASI LISTRIK
PANEL POWER
1 P.MESS HELPER unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 6 mm2 dari P.DIST-2 Ke P.MESS HELPE m' 25.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 15.00
2 Instalasi Stop Kontak Biasa Ttk 28.00
3 Instalasi Titik Stop Kontak AC Ttk 2.00
4 Material Bantu, dll LS 1.00
C INSTALASI PLUMBING
AIR BERSIH
3 BIOTEK
Septik Tank type Bio kap. 2000 ltr bh 1.00
Pekerjaan Tanam Biotek bh 1.00
Resapan lengkap ijuk bh 1.00
5 SANITARI
Closed Jongkok bh 3.00
Closed Duduk bh
Wastafel + Kran Wastafel bh 5.00
Stop Kran + flexible bh 5.00
Faucet bh 5.00
Shower bh 2.00
Floor Drain bh 6.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
50,705,718.49
88,508,759.58
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
RUANG COMMON
B INSTALASI LISTRIK
PANEL POWER
1 P. COMMON unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 4 mm2 dari P.DIST-2 Ke COMMON m' 45.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 13.00
2 Instalasi Stop Kontak Biasa Ttk 6.00
3 Instalasi Titik Stop Kontak AC Ttk
4 Material Bantu, dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
20,563,096.80
20,563,096.80
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
RUANG GUDANG
B INSTALASI LISTRIK
PANEL POWER
1 P.GUDANG unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 4 mm2 dari P.DIST Ke P.LAB m' 98.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 9.00
2 Instalasi Stop Kontak Biasa Ttk 3.00
3 Instalasi Titik Stop Kontak AC Ttk
4 Material Bantu, dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
15,211,545.31
15,211,545.31
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
B INSTALASI LISTRIK
PANEL POWER
1 P.MUSHALLA unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 4 mm2 dari P.DIST-2 Ke P.MUSHALLA m' 55.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 14.00
2 Instalasi Stop Kontak Biasa Ttk 5.00
3 Instalasi Stop Kontak AC Ttk 4.00
4 Instalasi Titik EF Ttk 2.00
5 Material Bantu, dll LS 1.00
INSTALASI AC
1 Pipa refrigerant + isolasi uk. 1/4"+1/2" m' 30.00
3 Refrigerant Liquid R-410 kg 0.50
4 Pipa PVC 1/2"+ isolasi ( drain ) m' 12.00
8 Support AC set 4.00
9 Material Bantu, dll Ls 1.00
TOTAL PEKERJAAN AIR CONDITIONING
C INSTALASI PLUMBING
AIR BERSIH
5 SANITARI
Closed Jongkok bh
Closed Duduk bh 2.00
Wastafel + Kran Wastafel bh 2.00
Stop Kran + flexible bh 2.00
Faucet bh 3.00
Jet Shower bh 2.00
Floor Drain bh 4.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
37,690,768.40
94,545,523.49
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Mekanikal, Elektrikal & Plumbing Base Camp (Direksi Keet & Fasilitas)
Lokasi : Ruas Bengkulu - Taba Penanjung
a b c d
RUANG KANTIN
B INSTALASI LISTRIK
PANEL POWER
1 P. KANTIN unit 1.00
PANEL POWER
1 Kabel NYFGBY 4 x 4 mm2 dari P.DIST-2 Ke P.KANTIN m' 60.00
2 Pekerjaan galian kabel dan grounding LS 1.00
INSTALASI TITIK
1 Instalasi Penerangan Ttk 14.00
2 Instalasi Stop Kontak Biasa Ttk 7.00
3 Instalasi Titik Stop Kontak AC Ttk
4 Material Bantu, dll LS 1.00
C INSTALASI PLUMBING
AIR BERSIH
5 SANITARI
Wastafel + Kran Wastafel bh 3.00
Stop Kran + flexible bh 3.00
Material Bantu, Lem, sealtape dll LS 1.00
HARGA
SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
e f = (d x e)
13,802,646.44
35,114,710.21