NPM : 1715051020
Tugas Well Logging
TUGAS-5
--------------------------------------------------------------------------------------------------------------------
Diketahui untuk Sumur A
Pertanyaan
1. Tentukan nilai Rw dan Sw pada Sumur B menggunakan metode Hingle Plot. Ambil
12 titik. Diketahui f = 1,1 gr/cc, a=1.
1
LLS (ohm-m)
m
LLD (ohm-m)
2
91%
83%
3
Jawaban:
∅𝑚 𝑥𝑅𝑡𝑥𝑆𝑤 2
𝑅𝑊 =
𝑎
Sw 100%
0.3252.15 𝑥1𝑥12
𝑅𝑤 =
1
= 0.089237876
≈ 0.089
Sw 91%
0.3252.15 𝑥1.2𝑥0.912
𝑅𝑤 =
1
= 0.088677462
≈ 0.089
Sw 83%
0.3252.15 𝑥1.4𝑥0.832
𝑅𝑤 =
1
=0.086066362
≈0.086
4
Tugas 6 (NPM Genap)
Sebelum dikoreksi
RLLS = 5
RLLD = 65
Rxo = 0.80
5
Setelah Dikoreksi
-Pengukuran Permukaan
Rm = 0.13
RLLS/RM = 5/0.13 = 38.461
RLLD/RM = 65/0.13 = 500
RLLScor/RLLS = 1.998
RLLDcor/RLLD= 0.8993
RLLScor = (1.998)( 38.461) = 76.84
RLLDcor = (0.8993)( 500) = 449.65
6
7