Anda di halaman 1dari 153

ADA FIX

x v Cover

1 v Peta Blora

2 v Peta Kecamatan

3 v Peta Lokasi

4 v Site Eksisting

5 v Renc. Tahapan Pekerjaan

6 v Denah

7 v Denah Dinding Atas

8 v Tampak Atas

9 v Tampak Depan

10 v Tampak Samping

11 v Tampak Belakang

12 v Potongan 1

13 v Potongan 2

14 v Potongan 3

15 v Potongan 4

16 v Potongan 5

17 v Potongan 6

18 v Potongan 7

19 v Potongan 8

20 v Renc. Pondasi Bt Belah

21 v Renc. Pondasi Foot Plat

22 v Renc. Sloof & Kolom

23 v Renc. Kolom Atas

24 v Renc. Balok Latei

25 v Renc. Ring Balk

26 v Renc. Balok Plat Atap

27 v Renc. Balok Plat Atap 2

28 v Renc. Balok Plat Atap 3

29 v Recn. Plat Atap

30 v Recn. Plat Atap 2

31 v Recn. Plat Atap 3

32 v Renc. Rangka Atap Kayu

33 v Renc. Plafond

34 v Renc. Plafond 2
35 v Renc. Kusen

36 v Renc. Kusen 2

37 v Renc. Sanitasi

38 v Renc. Listrik

39 v Renc. Pola Lantai

40 v Detail Pondasi Batu Belah 39 X Renc. Vegetasi

41 v Detail Pondasi Foot Plat

42 v Detail Balok-balok

43 v Detail Balok Atap

44 v Detail Kuda-kuda Kayu

45 v Detail Kuda-kuda Kayu 2

46 v Detail Kusen

47 v Detail Kusen 2

48 v Detail Kusen 2

49 v Detail Sanitasi

50 v Detail Pagar

51 v Detail Balok Melintang & Detail Batu Tempel


CV. TIARA SINERGI
KONSULTAN TEKNIK
Desa Gersi RT. 02, RW. 02, Kecamatan Jepon, Kabupaten Blora
HP : 081 325 657 254

HARGA PERKIRAAN SENDIRI (HPS)


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG KANTOR
UPT WILAYAH II NGAWEN
SUMBER DANA : APBD KABUPATEN BLORA
TAHUNG ANGGARAN : 2019

No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan


(Rp)
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank unit 1.00 Ls 500,000.00
2 Bongkaran (bangunan, pagar dan perkerasan halaman) unit 1.00 Ls 3,000,000.00
3 Pembersihan dan perataan lahan unit 1.00 Ls 1,000,000.00
4 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 20.00 A.2.2.1.2 714,927.51
(sisi depan)
Jumlah A
B PEKERJAAN GEDUNG
I PEKERJAAN TANAH
1 Gali tanah pondasi m3 19.52 A.2.3.1.1 60,087.50
2 Urug pasir bawah pondasi, t=10 cm m3 3.90 A.2.3.1.11 223,883.00
3 Urugan pasir bawah lantai, t=5 cm m3 8.16 A.2.3.1.11 223,883.00
4 Urug tanah kembali m3 2.60 A.2.3.1.9 14,391.67
5 Urugan tanah peninggian peil lantai m3 63.61 A.2.3.1.14 219,587.50
6 Sasrahan bata untuk lantai m2 163.11 A.4.4.1.11 46,215.79
Dihit.
Jumlah I
II PEKERJAAN PONDASI
1 Pemasangan Pondasi Batu Belah 1SP : 6 PP m3 19.47 A.3.2.1.4 817,994.43
2 Pek. Pondasi Footplat
3 a. Beton K225 m3 5.76 A.4.1.1.7 966,524.11
4 b. Bekisting m2 22.65 A.4.1.1.20.a 96,459.00
5 c. Pembesian kg 581.34 A.4.1.1.17.a 13,088.35
Jumlah II
III PEKERJAAN BETON
1 Pekerjaan Balok Sloof (dimensi bervariasi)
a. Beton K225 m3 5.60 A.4.1.1.7 966,524.11
b. Bekisting m2 21.27 A.4.1.1.21.a 99,759.00
c. Pembesian kg 799.72 A.4.1.1.17.a 13,088.35
2 Pek. Balok latei (0,15 m x 0,15 m)
a. Beton K225 m3 1.31 A.4.1.1.7 966,524.11
b. Bekisting m2 5.44 A.4.1.1.21.a 99,759.00
c. Pembesian kg 174.77 A.4.1.1.17.a 13,088.35
No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan
(Rp)
2 Pek. Balok Plat
a. Beton K225 m3 6.23 A.4.1.1.7 966,524.11
b. Bekisting m2 22.35 A.4.1.1.23.a 99,759.00
c. Pembesian kg 956.17 A.4.1.1.17.a 13,088.35
2 Pek. Ringbalk (0,15 m x 0,2 m)
a. Beton K225 m3 3.18 A.4.1.1.7 966,524.11
b. Bekisting m2 11.19 A.4.1.1.25.a 99,759.00
c. Pembesian kg 329.80 A.4.1.1.17.a 13,088.35
3 Pek. kolom beton K1 (0,25 m x 0,35 m)
a. Beton K225 m3 5.57 A.4.1.1.7 966,524.11
b. Bekisting m2 13.94 A.4.1.1.22.a 140,305.00
c. Pembesian kg 505.47 A.4.1.1.17.a 13,088.35
4 Pek. kolom beton K2 (0,2 m X 0,3 m)
a. Beton K225 m3 1.81 A.4.1.1.7 966,524.11
b. Bekisting m2 5.35 A.4.1.1.22.a 140,305.00
c. Pembesian kg 223.97 A.4.1.1.17.a 13,088.35
4 Pek. kolom beton K3 (o,15 m x 0,15 m)
a. Beton K225 m3 1.07 A.4.1.1.7 966,524.11
b. Bekisting m2 3.16 A.4.1.1.22.a 140,305.00
c. Pembesian kg 280.01 A.4.1.1.17.a 13,088.35
5 Pek. kolom beton K4 + balok(0,3 m x 0,5 m)
a. Beton K225 m3 2.10 A.4.1.1.7 966,524.11
b. Bekisting m2 6.20 A.4.1.1.22.a 140,305.00
c. Pembesian kg 107.31 A.4.1.1.17.a 13,088.35
No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan
(Rp)
6 Pek. Plat Atap tebal 10 cm
a. Beton K225 m3 14.33 A.4.1.1.7 966,524.11
b. Bekisting m2 29.29 A.4.1.1.24.a 184,460.83
c. Pembesian kg 1,099.06 A.4.1.1.17.a 13,088.35
Jumlah III
IV PEKERJAAN DINDING
1 Pas. Dinding 1/2 bata, 1:4 m2 11.25 A.4.4.1.9 95,548.09
2 Pas. Dinding 1/2 bata, 1:6 m2 278.82 A.4.4.1.11 92,431.57
3 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 22.50 A.4.4.2.4 54,794.52
4 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 580.13 A.4.4.2.6 52,888.77
5 Pekerjaan Dinding Krawang GRC m2 - Ls 800,000.00
6 Pemasangan Dinding Keramik 20x20 cm, m2 18.75 A.4.4.3.50 221,756.04
7 Acian m2 583.88 A.4.4.2.27 30,896.25
Jumlah IV
V PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 Kusen pintu & jendela aluminium m' 187.19 A.4.2.1.11 101,413.40
2 Pemasangan 1 m2 jendela kaca rangka allumunium m2 6.48 dihitung 04 633,699.00
3 Pemasangan 1 m2 pintu kaca rangka allumunium m2 10.20 dihitung 05 664,884.00
4 Pemasangan 1 m2 pintu kaca tempered rangka m2 - dihitung 06 960,124.00
allumunium
5 Pemasangan Venetions Blinds & Vertical Blinds m2 20.20 A.4.2.1.14 167,205.50
6 Pembuatan & Pemasangan Kosen Pintu & Jendela m3 0.10 A.4.6.1.1 10,587,324.00
Kayu Jati
7 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati m2 9.50 A.4.6.1.5 819,691.40
8 Pemasangan Kunci Tanam Biasa unit 5.00 A.4.6.2.2 187,412.50
9 Pintu Kamar Mandi unit 2.00 Ls 300,000.00
10 Pemasangan Kunci Selot unit 16.00 A.4.6.2.11 27,703.50
11 Pemasangan Kaca tebal 5 mm unit 44.625 A.4.6.2.17 136,832.30
12 Pemasangan Engsel Pintu unit 16.00 A.4.6.2.5 32,332.30
13 Pemasangan Engsel Jendela Kupu-kupu unit 26.00 A.4.6.2.6 29,801.75
14 Pemasangan Kait Angin unit 13.00 A.4.6.2.9 23,105.50
Jumlah V
VI PEKERJAAN KAYU RANGKA ATAP
1 Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu m3 0.73 A.4.6.1.14.A 10,776,111.50
Jati
2 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai m3 0.67 A.4.6.1.15.A 10,727,491.50
kayu jati
3 Pemasangan Rangka Atap Genteng Plentong Kayu Jati m2 142.99 A.4.6.1.17.B 149,296.44
Jumlah VI
VII PEKERJAAN LANGIT-LANGIT
1 Memasang Langit-langit Gypsu Board, tebal 9 mm + m2 103.74 A.4.5.1.7a 115,316.85
rangka besi hollow
Jumlah VII
VII PEKERJAAN PENUTUP ATAP
1 Pemasangan Atap Genteng Plentong Kecil m2 142.99 A.4.5.2.1 55,349.25
2 1 M' Pemasangan Lisplank GRC Woodplank 2/20 m2 44.80 dihitung 15 75,680.00
3 Pekerjaan waterproofing atap beton epoxy coating 500 m2 143.31 Ls 100,000.00
micron
4 Pemasangan Genteng Bubung Plentong m 27.28 A.4.5.2.4 125,901.16
Jumlah VII
VIII PEKERJAAN CAT
No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan
(Rp)
1 Pengecatan Dinding + Plafon m2 687.62 A.4.7.1.10 40,513.55
2 Pengecatan Kayu (Lisplang) m2 26.88 A.4.7.1.4 45,804.00
Jumlah VIII
IX PEKERJAAN BATU ALAM PENUTUP DINDING
1 Pemasangan Dinding Batu Paros / Batu Tempel Hitam m2 13.98 A.4.4.3.58 257,210.80
Jumlah IX
X PEKERJAAN LISTRIK
1 Pemasangan panel MDP 50x70x25 bh 1.00 dihitung 07 6,971,250.00
2 Pek. Instalasi titik stop kontak Air Conditioner set 5.00 Ls 270,000.00
3 Pasang Stop Kontak AC (Air Conditioner) set 5.00 Ls 174,766.00
4 Pengadaan dan Pemasangan AC (Air Conditioner) 1/2 set 5.00 Ls 3,150,000.00
5 PK
Pemasangan Instalasi titik cahaya bh 16.00 dihitung 08 209,055.00
6 Pemasangan Instalasi stop kontak bh 7.00 dihitung 09 197,230.00
7 1 Titik Pemasangan Lampu Downligh + SL 25 watt bh 9.00 dihitung 10 148,500.00
sekelas Philips
8 1 Titik Pemasangan Lampu SL 25 watt sekelas Philips + bh 7.00 dihitung 145,750.00
9 fitting
Lampu Taman set 3.00 Ls 500,000.00
10 Pemasangan saklar ganda bh 6.00 dihitung 13 58,300.00
11 Pemasangan saklar tunggal bh 1.00 dihitung 14 55,000.00
Jumlah X
XI PEKERJAAN PENUTUP (PAS. KERAMIK)
1 Pemasangan Lantai Keramik 30 x 30 cm m2 163.11 A.4.4.3.35 174,126.25
Jumlah XI
No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan
(Rp)
XII
PEKERJAAN AIR BERSIH DAN SANITASI
1Memasang Closet Jongkok Porselen Unit 2.00 A.5.1.1.2 754,471.30
2Pas. Dinding 1/2 bata, 1:6 x 5 (Peninggian dudukan) m2 15.00 A.4.4.1.11 92,431.57
3Pemasangan 1 buah kran diameter 1/2" atau 1/4" bh 5.00 dihitung 19 65,518.75
4Pemasangan Floor Drain buah 2.00 A.5.1.1.14 21,972.50
5Pemasangan Pipa PVC tipe AW Ø ½" m' 6.50 A.5.1.1.25 19,030.00
6Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 m' 42.00 A.5.1.1.33 192,561.38
cm
7 Pekerjaan Sumur Resapan Air Kamar Mandi (galian + 2 unit 1.00 Ls 1,542,000.00
buis beton diameter 100cmx100cm + ijuk + batu
kosongan)
8 Pekerjaan Septic Tank
a. Galian m3 10.00 A.2.3.1.1 60,087.50
b. Tali ijuk unit 1.00 Ls 700,000.00
c. Batu kosongan m3 0.20 A.3.2.1.9 472,202.28
b. Beton Plat Dinding K225 tebal 10 cm m3 2.40 A.4.1.1.7 966,524.11
c. Bekisting Plat Dinding m2 5.24 A.4.1.1.24.a 184,460.83
d. Pembesian Plat Dinding kg 146.88 A.4.1.1.17.a 14,820.85
e. Pas. Bata m2 3.90 A.4.4.1.11 98,206.57
b. Beton Balok K225 (0,15 m x 0,2 m) m3 0.09 A.4.1.1.7 966,524.11
c. Bekisting Balok m2 0.66 A.4.1.1.24.a 184,460.83
d. Pembesian Balok kg 9.32 A.4.1.1.17.a 13,088.35
Jumlah XII
C PEKERJAAN PAGAR DAN HALAMAN
1 Pekerjaan Balok Sloof (0,15 m x 0,2 m)
a. Beton K225 m3 1.63 A.4.1.1.7 966,524.11
b. Bekisting m2 6.75 A.4.1.1.21.a 99,759.00
c. Pembesian kg 349.55 A.4.1.1.17.a 13,088.35
2 Pek. kolom beton K2 (0,15 m X 0,2 m)
a. Beton K225 m3 0.59 A.4.1.1.7 966,524.11
b. Bekisting m2 1.73 A.4.1.1.22.a 140,305.00
c. Pembesian kg 106.24 A.4.1.1.17.a 13,088.35
3 Pas. Dinding 1/2 bata, 1:6 m2 54.27 A.4.4.1.11 92,431.57
3 Pagar Hollow Galvanis m 15.90 dihitung 16 378,234.34
4 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 109.65 A.4.4.2.6 52,888.77
5 Acian m2 109.65 A.4.4.2.27 30,896.25
6 Pengecatan Dinding m2 109.65 A.4.7.1.10 40,513.55
7 Pemasangan Dinding Batu Paros / Batu Tempel Hitam m2 5.25 A.4.4.3.58 257,210.80
8 Pintu Pagar m2 6.88 Ls 800,000.00
9 Tanaman Hias
a. Beli dan Tanam Pohon Ketapang Kencana h=50cm pohon 2.00 LS 80,000.00
b. Beli dan Tanam Pohon Ketapang Laut h=50cm pohon 2.00 Ls 80,000.00
c. Beli dan Tanam Rumput Jepang m2 16.20 Ls 60,000.00
d. Beli dan Tanam Palem Merah pohon 5.00 Ls 100,000.00
e. Beli dan Tanam Tanaman Perdu set 1.00 Ls 208,000.00
10 1 m2 Pasang Paving Block Holland tebal 6 cm K.300 m2 167.00 dihit 1 135,811.50
Jumlah C
D PERIZINAN
1 Biaya Izin Mendirikan Bangunan unit 1.00 Ls 3,000,000.00
Jumlah D
No. Jenis Pekerjaan Sat. Volume Analisa Harga Satuan
(Rp)

Terbilang : Enam Ratus Tiga Puluh Sembilan Juta Lima Ratus Ribu Rupiah

Pejabat Pembuat K

BANAR SUHARJANT
NIP. 19750128 200
Kabupaten Blora

S)

UNAN GEDUNG KANTOR

Jumlah Harga TOTAL Biaya


(Rp) (Rp)

500,000.00
3,000,000.00
1,000,000.00
14,298,550.20

18,798,550.20

1,172,787.83
873,949.68
1,825,877.81
37,452.87
13,968,597.68
7,538,256.69

25,416,922.55

15,926,351.55

5,565,004.22
2,185,001.81
7,608,812.80
31,285,170.38

5,416,981.05
2,121,563.31
10,466,979.01

1,265,663.33
542,427.14
2,287,511.14
Jumlah Harga TOTAL Biaya
(Rp) (Rp)

6,018,352.35
2,229,293.87
12,514,645.08

3,070,937.07
1,116,115.89
4,316,586.78

5,378,706.70
1,955,160.01
6,615,768.27

1,751,341.70
750,575.01
2,931,371.57

1,032,972.65
442,702.56
3,664,901.60

2,029,700.64
869,871.70
1,404,510.84
Jumlah Harga TOTAL Biaya
(Rp) (Rp)

13,851,257.08
5,402,253.04
14,384,884.57
113,833,033.95

1,074,916.01
25,771,400.62
1,232,876.70
30,682,467.92
0.00
4,157,925.75
18,039,764.24
80,959,351.24

18,983,574.35
4,106,369.52
6,781,816.80
0.00

3,377,551.10
1,067,202.26

7,787,068.30
937,062.50
600,000.00
443,256.00
6,106,141.39
517,316.80
774,845.50
300,371.50
51,782,576.01

7,851,905.88

7,235,650.11

21,348,197.12
36,435,753.11

11,962,970.02

11,962,970.02

7,914,499.96
3,390,464.00
14,331,000.00

3,434,583.64
29,070,547.60
Jumlah Harga TOTAL Biaya
(Rp) (Rp)
27,858,008.28
1,231,211.52
29,089,219.80

3,594,520.93
3,594,520.93

6,971,250.00
1,350,000.00
873,830.00
15,750,000.00
3,344,880.00
1,380,610.00
1,336,500.00

1,020,250.00
1,500,000.00
349,800.00
55,000.00
33,932,120.00

28,401,732.64
28,401,732.64
Jumlah Harga TOTAL Biaya
(Rp) (Rp)

1,508,942.60
1,386,473.55
327,593.75
43,945.00
123,695.00
8,087,577.96

1,542,000.00

600,875.00
700,000.00
94,440.46
2,319,657.87
966,139.09
2,176,886.45
383,005.62
86,987.17
122,280.22
122,035.78
20,592,535.51

1,571,858.17
673,653.50
4,574,981.44

565,416.61
242,321.40
1,390,453.95
5,016,261.30
6,013,926.01
5,799,253.63
3,387,773.81
4,442,310.76
1,350,356.70
5,500,000.00

0.00
0.00
0.00
0.00
0.00
22,680,520.50
63,209,087.77

3,000,000.00
3,000,000.00
Jumlah 581,364,091.73
PPN 10% 58,136,409.17
Jumlah Harga TOTAL Biaya
(Rp) (Rp)
Jumlah Total 639,500,500.90
Dibulatkan 639,500,000.00
s Ribu Rupiah

Pejabat Pembuat Komitmen

BANAR SUHARJANTO, S.T., M.T.


NIP. 19750128 200312 1 002
DAFTAR HAR GA SAT UAN PE K E R JAAN

NO. KODE URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m
2 A.2.3.1.9 Pengurugan Kembali
3 A.2.3.1.11 Urugan Pasir
4 A.2.3.1.14 Mengurug Sirtu Padat

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
2 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
3 A.4.4.1.11 Dihit. Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/4 Bata Camp. 1SP : 6PP

V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
2 A.4.4.2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
3 A.4.4.2.27 Pemasangan Acian

VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.5 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati
2 A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
3 A.4.6.1.14.A Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu Jati
4 A.4.6.1.15.a Pemasangan konstruksi Gording, Kayu Bengkirai
5 A.4.6.1.17.B Pemasangan Rangka Atap Genteng Plentong Kayu Jati

VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON


NO. KODE URAIAN PEKERJAAN

1 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
2 A.4.1.1.17.a Pembesian dg Besi Polos
3 A.4.1.1.20.a Memasang Bekisting untuk Pondasi 3x pakai
4 A.4.1.1.21.a Memasang Bekisting untuk Sloof 3x pakai
5 A.4.1.1.22.a Memasang Bekisting untuk Kolom 3x pakai
6 A.4.1.1.23.a Memasang Bekisting untuk Balok 3x pakai
7 A.4.1.1.24.a Memasang Bekisting untuk Lantai 3X Pakai
8 A.4.1.1.25.a Memasang Bekisting untuk Dinding 3x pakai

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 Pemasangan Atap Genteng Plentong Kecil
2 A.4.5.2.4 Pemasangan Genteng Bubung Plentong

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7a Memasang Langit-langit Gypsu Board, tebal 9 mm + rangka besi hollow

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.2 Memasang Closet Jongkok Porselen
2 A.5.1.1.14 Pemasangan Floor Drain
3 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"

4 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium
2 dihitung 04 Pemasangan 1 m2 jendela kaca rangka allumunium
3 dihitung 05 Pemasangan 1 m2 pintu kaca rangka allumunium
4 dihitung 06 Pemasangan 1 m2 pintu kaca tempered rangka allumunium
5 A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa
2 A.4.6.2.5 Pemasangan Engsel Pintu
3 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu
4 A.4.6.2.9 Pemasangan Kait Angin
NO. KODE URAIAN PEKERJAAN

5 A.4.6.2.11 Pemasangan Kunci Selot


6 A.4.6.2.17 Pemasangan Kaca tebal 5 mm

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm
2 A.4.4.3.50 Pemasangan Dinding Keramik 20x20 cm,
3 A.4.4.3.58 Pemasangan Dinding Batu Paros / Batu Tempel Hitam
4 dihit 1 1 m2 Pasang Paving Block Holland tebal 6 cm K.300

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN & KELISTIRKAN


1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
2 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
3 dihitung 07 1 Unit Pemasangan panel MDP 50x70x25
4 dihitung 08 1 Titik Pemasangan Instalasi titik cahaya
5 dihitung 09 1 Titik Pemasangan Instalasi stop kontak
6 dihitung 10 1 Titik Pemasangan Lampu Downligh + SL 25 watt philips
7 dihitung 1 Titik Pemasangan Lampu SL 25 watt philips
8 dihitung 13 1 Titik Pemasangan saklar ganda
9 dihitung 14 1 Titik Pemasangan saklar tunggal
10 dihitung 15 1 M' Pemasangan Lisplank GRC Woodplank 2/20
11 dihitung 16 1 M2 pemasangan railling hollow
15 dihitung 19 Pemasangan 1 buah kran diameter 1/2" atau 1/4"

Pejabat Pembu

BANAR SUHARJA
NIP. 19750128 2
AR GA SAT UAN PE K E R JAAN

HARGA SATUAN PEKERJAAN


SAT
(Rp)

m' 714,927.51

m3 60,087.50
m3 14,391.67
m3 223,883.00
m3 219,587.50

m3 817,994.43
m3 472,202.28

m2 95,548.09
m2 92,431.57
m2 46,215.79

m2 54,794.52
m2 52,888.77
m2 30,896.25

m2 819,691.40
m2 652,170.75
m3 10,776,111.50
m3 13,367,469.50
m2 149,296.44
HARGA SATUAN PEKERJAAN
SAT
(Rp)
m3 1,125,911.34
Kg 13,088.35
m2 96,459.00
m2 99,759.00
m2 140,305.00
m2 142,285.00
m2 184,460.83
m2 214,493.77

m2 55,349.25
m' 125,901.16

m2 115,316.85

Unit 754,471.30
buah 21,972.50
m' 19,030.00
m' 192,561.38

m' 101,413.40
m' 633,699.00
m' 664,884.00
m' 960,124.00
m2 167,205.50

Buah 187,412.50
Buah 32,332.30
Buah 29,801.75
Buah 23,105.50
HARGA SATUAN PEKERJAAN
SAT
(Rp)
Buah 27,703.50
m2 136,832.30

m2 174,126.25
m2 221,756.04
m2 257,210.80
m2 135,811.50

m2 45,804.00
m2 40,513.55
bh 6,971,250.00
bh 209,055.00
bh 197,230.00
bh 148,500.00
bh 145,750.00
bh 58,300.00
bh 55,000.00
m1 75,680.00
m2 378,234.34
bh 65,518.75

Pejabat Pembuat Komitmen

BANAR SUHARJANTO, S.T., M.T.


NIP. 19750128 200312 1 002
CV. TIARA SINERGI
KONSULTAN TEKNIK
Desa Gersi RT. 02, RW. 02, Kecamatan Jepon, Kabupaten Blora
HP : 081 325 657 254

REKAPITULASI HARGA PERKIRAAN SENDIRI


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG KANTOR
UPT WILAYAH II NGAWEN
SUMBER DANA : APBD KABUPATEN BLORA
TAHUNG ANGGARAN : 2019

No.
Jenis Pekerjaan
A PEKERJAAN PERSIAPAN
Jumlah A
B PEKERJAAN GEDUNG
I PEKERJAAN TANAH
Jumlah I
II PEKERJAAN PONDASI
Jumlah II
III PEKERJAAN BETON
Jumlah III
IV PEKERJAAN DINDING
Jumlah IV
V PEKERJAAN KUSEN, DAUN PINTU & JENDELA
Jumlah V
VI PEKERJAAN KAYU RANGKA ATAP
Jumlah VI
VII PEKERJAAN LANGIT-LANGIT
Jumlah VII
VII PEKERJAAN PENUTUP ATAP
Jumlah VII
VIII PEKERJAAN CAT
Jumlah VIII
IX PEKERJAAN BATU ALAM PENUTUP DINDING
Jumlah IX
X PEKERJAAN LISTRIK
Jumlah X
XI PEKERJAAN PENUTUP (PAS. KERAMIK)
Jumlah XI
XII PEKERJAAN AIR BERSIH DAN SANITASI
Jumlah XII
C PEKERJAAN PAGAR DAN HALAMAN
Jumlah C
D PERIZINAN
Jumlah D
No.
Jenis Pekerjaan

Terbilang : Enam Ratus Tiga Puluh Sembilan Juta Lima Ratus Ribu Rupiah

Pejabat Pembuat K

BANAR SUHARJANT
NIP. 19750128 200
, Kabupaten Blora

ENDIRI

UNAN GEDUNG KANTOR

TOTAL Biaya
(Rp)

18,798,550.20

25,416,922.55

31,285,170.38

113,833,033.95

80,959,351.24

51,782,576.01

36,435,753.11

11,962,970.02

29,070,547.60

29,089,219.80

3,594,520.93

33,932,120.00

28,401,732.64

20,592,535.51

63,209,087.77

3,000,000.00
Jumlah 581,364,091.73
TOTAL Biaya
(Rp)
PPN 10% 58,136,409.17
Jumlah Total 639,500,500.90
Dibulatkan 639,500,000.00
s Ribu Rupiah

Pejabat Pembuat Komitmen

BANAR SUHARJANTO, S.T., M.T.


NIP. 19750128 200312 1 002
DAFTAR UPAH PEKERJA

HARGA
NO. JENIS PEKERJA SATUAN
(Rp)
1 Pekerja Hr 70,000

2 Mandor Hr 85,000

3 Tukang Listrik Hr 80,000

4 Tukang Kayu Hr 80,000

5 Kep Tukang Kayu Hr 85,000

6 Tukang Batu Hr 80,000

7 Kep Tukang Batu Hr 85,000

8 Tukang Besi Hr 80,000

9 Kep Tukang Besi Hr 85,000

10 Tukang Cat Hr 80,000

11 Kep Tukang Cat Hr 85,000

12 Tukang Plitur Hr 80,000

13 Tukang Jalan Hr 80,000

14 Tukang Gali Hr 80,000

15 Tukang masak aspal Hr 80,000

16 Tukang Leideng Hr 80,000

20 Penjaga Malam Hr 70,000

21 Sopir Hr 80,000

22 Pembantu Sopir Hr 70,000

23 Operator Hr 90,000

24 Pembantu Operator Alat Berat Hr 75,000

25 Mekanik/Teknisi Alat Berat Hr 80,000

26 Juru Ukur Hr 75,000


DAFTAR UPAH PEKERJA

KET.
DAFTAR ANALISA PE K E R JAAN

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

I A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m
A TENAGA
L.01 0.75 OH Pekerja
L.04 0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%)
F Harga Satuan Pekerjaan (D+E)

Overhead & Profit (contah 10%)


2 A.2.3.1.9 1 m3 Pengurugan Kembali
Pengurugan Kembali di hitung dari 1/3 kali koefisien Pek
A TENAGA
L.01 0.50 OH Pekerja
L.04 0.050 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%)
F Harga Satuan Pekerjaan (D+E)

4 A.2.3.1.11 1 m3 Urugan Pasir


A TENAGA
L.01 0.30 OH Pekerja
L.04 0.01 OH Mandor
B BAHAN
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

1.2 m3 Pasir Urug


C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%)
F Harga Satuan Pekerjaan (D+E)

5 A.2.3.1.14 1 m3 Mengurug Sirtu Padat


A TENAGA
0.25 OH Pekerja
0.025 OH Mandor
B BAHAN
1.2 m3 Sirtu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%)
F Harga Satuan Pekerjaan (D+E)
ANALISA PE K E R JAAN

HARGA BAHAN/UPAH JUMLAH


URAIAN PAKERJAAN
Rp Rp

60,087.50
54,625.00
70,000.00 52,500.00
85,000.00 2,125.00

54,625.00
10% 5,462.50
60,087.50

14,391.67
mbali di hitung dari 1/3 kali koefisien Pekerjaan galian
39,250.00
70,000.00 35,000.00
85,000.00 4,250.00

39,250.00
10% 3,925.00
43,175.00

223,883.00
21,850.00
70,000.00 21,000.00
85,000.00 850.00
181,680.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp
151,400.00 181,680.00

203,530.00
10% 20,353.00
223,883.00

219,587.50
19,625.00
70,000.00 17,500.00
85,000.00 2,125.00
180,000.00
150,000.00 180,000.00

199,625.00
10% 19,962.50
219,587.50
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


4 A.3.2.1.4 1 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PP
A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah
117 Kg Portland Sement
0.561 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

9 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping


A Tenaga
L.01 0.78 OH Pekerja
L.02 0.39 OH Tukang Batu
L.03 0.039 OH Kepala Tukang
L.04 0.039 OH Mandor
B Bahan
1.2 m3 Batu Belah
0.432 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

AN PEKERJAAN PONDASI
817,994.43
177,750.00
70,000.00 105,000.00
80,000.00 60,000.00
85,000.00 6,375.00
85,000.00 6,375.00
565,881.30
226,200.00 271,440.00
1,350.00 157,950.00
243,300.00 136,491.30

743,631.30
10% 74,363.13
817,994.43

472,202.28
92,430.00
70,000.00 54,600.00
80,000.00 31,200.00
85,000.00 3,315.00
85,000.00 3,315.00
336,844.80
226,200.00 271,440.00
151,400.00 65,404.80

429,274.80
10% 42,927.48
472,202.28
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

II A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Te
9 A.4.4.1.9 1 m2 1SP : 4PP
A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
11.50 Kg Portland Semen
0.043 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Te


1 A.4.4.1.11 1 m2 1SP : 6PP
A Tenaga
L.01 0.30 OH Pekerja
L.02 0.1 OH Tukang Batu
L.03 0.01 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
70 Buah Bata Merah 5 x 11 x 22
8.32 Kg Portland Semen
0.049 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

F Harga Satuan Pekerjaan (D+E)


HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

AN PEKERJAAN PASANGAN DINDING


nding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
95,548.09

31,125.00
70,000.00 21,000.00
80,000.00 8,000.00
85,000.00 850.00
85,000.00 1,275.00
55,736.90
425.00 29,750.00
1,350.00 15,525.00
243,300.00 10,461.90

86,861.90
10% 8,686.19
95,548.09

nding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.


92,431.57

31,125.00
70,000.00 21,000.00
80,000.00 8,000.00
85,000.00 850.00
85,000.00 1,275.00
52,903.70
425.00 29,750.00
1,350.00 11,232.00
243,300.00 11,921.70

84,028.70
10% 8,402.87
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp
92,431.57
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

III A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


4 A.4.4.2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
A Tenaga

L.01 0.3 OH Pekerja

L.02 0.15 OH Tukang batu

L.03 0.015 OH Kepala Tukang

L.04 0.015 OH Mandor


B Bahan
6.240 Kg Portland Semen
0.024 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 A.4.4.2.6 1 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm


Tenaga

L.01 0.3 OH Pekerja

L.02 0.15 OH Tukang batu

L.03 0.015 OH Kepala Tukang

L.04 0.015 OH Mandor


Bahan
4.416 Kg Portland Semen
0.027 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

4 A.4.4.2.27 1 m2 Pemasangan Acian


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Tenaga

L.01 0.20 OH Pekerja

L.02 0.10 OH Tukang batu

L.03 0.010 OH Kepala Tukang

L.04 0.010 OH Mandor


Bahan
3.25 Kg Portland Semen
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

esteran 1 Pc : 4 Pp Tebal 15 mm 54,794.52


35,550.00
70,000.00 21,000.00
80,000.00 12,000.00
85,000.00 1,275.00
85,000.00 1,275.00
14,263.20
1,350.00 8,424.00
243,300.00 5,839.20

49,813.20
10% 4,981.32
54,794.52

esteran 1 Pc : 6 Pp Tebal 15 mm 52,888.77


35,550.00
70,000.00 21,000.00
80,000.00 12,000.00
85,000.00 1,275.00
85,000.00 1,275.00
12,530.70
1,350.00 5,961.60
243,300.00 6,569.10

48,080.70
10% 4,808.07
52,888.77

30,896.25
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

23,700.00
70,000.00 14,000.00
80,000.00 8,000.00
85,000.00 850.00
85,000.00 850.00
4,387.50
1,350.00 4,387.50

28,087.50
10% 2,808.75
30,896.25
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

IV A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


2 A.4.6.1.5 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati
A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Jati Kampung (Papan)
0.500 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan & Pemasangan Pintu Teakwood Rangkap, Ra


11 A.4.6.1.11 1 m2
I
A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Klas I (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 210) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 A.4.6.1.14.A 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu Ja


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.1 m3 Jati Kampung (Balok/pesagen)
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

5 A.4.6.1.15.A 1 m3 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai k


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.1 m3 Jati Kampung (Balok/pesagen)
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

5 A.4.6.1.15.a 1 m3 Pemasangan konstruksi Gording, Kayu Bengkirai


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.1 m3 Kayu Klas I (bengkirai), balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

6 A.4.6.1.17.B 1 m2 Pemasangan Rangka Atap Genteng Plentong Kayu Jati


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 kayu Jati Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

emasangan Daun Pintu Panel, Kayu Jati 819,691.40


339,750.00
70,000.00 70,000.00
80,000.00 240,000.00
85,000.00 25,500.00
85,000.00 4,250.00
405,424.00
9,818,100.00 392,724.00
25,400.00 12,700.00

745,174.00
10% 74,517.40
819,691.40

emasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas


652,170.75

271,800.00
70,000.00 56,000.00
80,000.00 192,000.00
85,000.00 20,400.00
85,000.00 3,400.00
321,082.50
9,818,100.00 245,452.50
17,000.00 510.00
25,400.00 7,620.00
67,500.00 67,500.00

592,882.50
10% 59,288.25
652,170.75
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

masangan Konstruksi Kuda-kuda Kayu Jati 10,776,111.50


2,276,325.00
70,000.00 469,000.00
80,000.00 1,608,000.00
85,000.00 170,850.00
85,000.00 28,475.00
7,520,140.00
6,545,400.00 7,199,940.00
15,000.00 225,000.00
17,000.00 95,200.00

9,796,465.00
10% 979,646.50
10,776,111.50
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

nstruksi Nok, Gording, Muirplat & Jurai kayu jati 10,727,491.50


2,276,325.00
70,000.00 469,000.00
80,000.00 1,608,000.00
85,000.00 170,850.00
85,000.00 28,475.00
7,475,940.00
6,545,400.00 7,199,940.00
15,000.00 225,000.00
17,000.00 51,000.00

9,752,265.00
10% 975,226.50
10,727,491.50

nstruksi Gording, Kayu Bengkirai 13,367,469.50


2,276,325.00
70,000.00 469,000.00
80,000.00 1,608,000.00
85,000.00 170,850.00
85,000.00 28,475.00
9,875,920.00
8,727,200.00 9,599,920.00
15,000.00 225,000.00
17,000.00 51,000.00

12,152,245.00
10% 1,215,224.50
13,367,469.50

angka Atap Genteng Plentong Kayu Jati 149,296.44


HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

16,275.00
70,000.00 7,000.00
80,000.00 8,000.00
85,000.00 850.00
85,000.00 425.00
119,449.04
6,545,400.00 91,635.60
6,545,400.00 23,563.44
17,000.00 4,250.00

135,724.04
10% 13,572.40
149,296.44
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 1 m2 Pemasangan Atap Genteng Plentong Kecil
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0075 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
25 Buah Genteng Plentong
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 A.4.5.2.4 1 m' Pemasangan Genteng Bubung Plentong


A Tenaga
L.01 0.4 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
5 Buah Genteng Bubung Plentong
8 Kg Portland Semen
0.032 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PEKERJAAN
Rp Rp

N PEKERJAAN PENUTUP ATAP


55,349.25
17,817.50
70,000.00 10,500.00
80,000.00 6,000.00
85,000.00 637.50
85,000.00 680.00
32,500.00
1,300.00 32,500.00

50,317.50
10% 5,031.75
55,349.25

125,901.16
45,870.00
70,000.00 28,000.00
80,000.00 16,000.00
85,000.00 1,700.00
85,000.00 170.00
68,585.60
10,000.00 50,000.00
1,350.00 10,800.00
243,300.00 7,785.60

114,455.60
10% 11,445.56
125,901.16
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

VII A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium
A Tenaga
L.01 0.043 OH Pekerja
L.02 0.043 OH Tukang Besi
L.03 0.0043 OH Kepala Tukang
L.04 0.0021 OH Mandor
B Bahan
1.1 m' Profil Allumunium
2 buah Skrup Fixer
0.06 Tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 dihitung 04 1 m' Pemasangan 1 m2 jendela kaca rangka allumunium


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
4.2 m' Profil Allumunium (Ram jendela jungkit)
1 m2 Kaca tebal 5mm
0.27 tube Sealant (Dokorning)
ls Perlengkapan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

F Harga Satuan Pekerjaan (D+E)

3 dihitung 05 1 m' Pemasangan 1 m2 pintu kaca rangka allumunium


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
4.4 m' Profil Allumunium (Moher / Ram pintu)
1 m2 Kaca Rayband 5 mm
0.27 tube Sealant (Dokorning)
ls Perlengkapan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 dihitung 06 1 m' Pemasangan 1 m2 pintu kaca tempered rangka allumuniu


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
4.4 m' Profil Allumunium (Moher / Ram pintu)
1 m2 Kaca bening 8mm temperet
0.27 tube Sealant (Dokorning)
ls Perlengkapan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

13 A.4.2.1.14 1 m2 Pemasangan Venetions Blinds & Vertical Blinds


A Tenaga
L.01 0.35 OH Pekerja
L.02 0.35 OH Tukang Besi
L.03 0.035 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
1 m2 Venetions Blinds atau Vertical Blinds (tirai)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

N PEKERJAAN BESI & ALLUMUNIUM


101,413.40
6,994.00
70,000.00 3,010.00
80,000.00 3,440.00
85,000.00 365.50
85,000.00 178.50
85,200.00
75,000.00 82,500.00
750.00 1,500.00
20,000.00 1,200.00

92,194.00
10% 9,219.40
101,413.40

m2 jendela kaca rangka allumunium 633,699.00


13,940.00
70,000.00 5,950.00
80,000.00 6,800.00
85,000.00 765.00
85,000.00 425.00
562,150.00
75,000.00 315,000.00
100,000.00 100,000.00
20,000.00 5,400.00
45% x profil 141,750.00

576,090.00
10% 57,609.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

633,699.00

m2 pintu kaca rangka allumunium 664,884.00


13,940.00
70,000.00 5,950.00
80,000.00 6,800.00
85,000.00 765.00
85,000.00 425.00
590,500.00
75,000.00 330,000.00
106,600.00 106,600.00
20,000.00 5,400.00
45% x profil 148,500.00

604,440.00
10% 60,444.00
664,884.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

m2 pintu kaca tempered rangka allumunium 960,124.00


13,940.00
70,000.00 5,950.00
80,000.00 6,800.00
85,000.00 765.00
85,000.00 425.00
858,900.00
75,000.00 330,000.00
375,000.00 375,000.00
20,000.00 5,400.00
45% x profil 148,500.00

872,840.00
10% 87,284.00
960,124.00

netions Blinds & Vertical Blinds 167,205.50


57,005.00
70,000.00 24,500.00
80,000.00 28,000.00
85,000.00 2,975.00
85,000.00 1,530.00
95,000.00
95,000.00 95,000.00

152,005.00
10% 15,200.50
167,205.50
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IX A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDI


11 A.4.4.3.35 1 m2 Pemasangan Lantai Keramik 30 x 30 cm
A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
11.87 Buah Keramik 30 x 30 cm
10.00 Kg Portland Semen
0.045 m3 Pasir Pasang
0.50 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

3 A.4.4.3.50 1 m2 Pemasangan Dinding Keramik 20x20 cm,


A Tenaga
L.01 0.9 OH Pekerja
L.02 0.45 OH Tukang Batu
L.03 0.045 OH Kepala Tukang
L.04 0.045 OH Mandor
B Bahan
26.0 Buah Keramik
9.3 Kg Portland Semen
0.018 m3 Pasir Pasang
1.94 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

F Harga Satuan Pekerjaan (D+E)

4 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
1.10 m2 Batu Paros
11.75 Kg Portland Semen
0.035 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

28 dihit 1 1 m2 1 m2 Pasang Paving Block Holland tebal 6 cm K.300


Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Batu
L.03 0.03 OH Kepala Tukang
L.04 0.025 OH Mandor
Bahan
1.01 m2 Paving Block Holland tb. 6 cm K.300 (ALDAS)
0.1 m3 Pasir Urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)


HARGA BAHAN/UPAH JUMLAH
MINIMUM MINIMUM
Rp Rp

PEKERJAAN PENUTUP LANTAI dan DINDING


174,126.25
82,950.00
70,000.00 49,000.00
80,000.00 28,000.00
85,000.00 2,975.00
85,000.00 2,975.00
75,346.59
3,790.91 44,998.09
1,350.00 13,500.00
243,300.00 10,948.50
11,800.00 5,900.00

158,296.59
15,829.66
174,126.25

221,756.04
106,650.00
70,000.00 63,000.00
80,000.00 36,000.00
85,000.00 3,825.00
85,000.00 3,825.00
94,946.40
2,120.00 55,120.00
1,350.00 12,555.00
243,300.00 4,379.40
11,800.00 22,892.00

201,596.40
20,159.64
HARGA BAHAN/UPAH JUMLAH
MINIMUM MINIMUM
Rp Rp

221,756.04

ding Batu Paros / Batu Tempel Hitam 257,210.80


82,950.00
70,000.00 49,000.00
80,000.00 28,000.00
85,000.00 2,975.00
85,000.00 2,975.00
150,878.00
115,000.00 126,500.00
1,350.00 15,862.50
243,300.00 8,515.50

233,828.00
23,382.80
257,210.80
HARGA BAHAN/UPAH JUMLAH
MINIMUM MINIMUM
Rp Rp

135,811.50
42,675.00
70,000.00 14,000.00
80,000.00 24,000.00
85,000.00 2,550.00
85,000.00 2,125.00
80,790.00
65,000.00 65,650.00
151,400.00 15,140.00

123,465.00
12,346.50
135,811.50
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON

7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm


A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
371 Kg Portland Semen
698 Kg Pasir Beton
1,047 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 A.4.1.1.17.a 1 Kg Pembesian dg Besi Polos


A Tenaga
L.01 0.0070 OH Pekerja
L.02 0.0070 OH Tukang Besi
L.03 0.0007 OH Kepala Tukang
L.04 0.0004 OH Mandor
B Bahan
1.050 Kg Besi Beton polos
0.015 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

3 A.4.1.1.20.a 1 m2 Memasang Bekisting untuk Pondasi 3x pakai


A Tenaga
L.01 0.520 OH Pekerja
L.02 0.260 OH Tukang Kayu
L.03 0.026 OH Kepala Tukang
L.04 0.026 OH Mandor
B Bahan
0.013 m3 Kayu Perancah
0.100 Kg Paku Biasa 2" - 5"
0.033 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 A.4.1.1.21.a 1 m2 Memasang Bekisting untuk Sloof 3x pakai


A Tenaga
L.01 0.520 OH Pekerja
L.02 0.260 OH Tukang Kayu
L.03 0.026 OH Kepala Tukang
L.04 0.026 OH Mandor
B Bahan
0.015 m3 Kayu Perancah
0.100 Kg Paku Biasa 2" - 5"
0.033 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

5 A.4.1.1.22.a 1 m2 Memasang Bekisting untuk Kolom 3x pakai


A Tenaga
L.01 0.660 OH Pekerja
L.02 0.330 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.013 m3 Kayu Perancah
0.133 Kg Paku Biasa 2" - 5"
0.067 Ltr Minyak Bekisting
0.005 m3 Balok Kayu perancah
0.000 Lbr Plywood tebal 9mm
0.667 Btg bambu
C PERALATAN
D Memasang Bekisting untuk Kolom
E Tenaga
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

F Harga Satuan Pekerjaan (D+E)

6 A.4.1.1.23.a 1 m2 Memasang Bekisting untuk Balok 3x pakai


A Tenaga
L.01 0.660 OH Pekerja
L.02 0.330 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.013 m3 Kayu Perancah
0.133 Kg Paku Biasa 2" - 5"
0.067 Ltr Minyak Bekisting
0.006 m3 Balok Kayu perancah
0.667 Btg bambu
C PERALATAN
D Memasang Bekisting untuk Kolom
E Tenaga
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

7 A.4.1.1.24.a 1 m2 Memasang Bekisting untuk Lantai 3X Pakai


A Tenaga
L.01 0.660 OH Pekerja
L.02 0.330 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.013 m3 Kayu Perancah
0.133 Kg Paku Biasa 2" - 5"
0.067 Ltr Minyak Bekisting
0.005 m3 Balok Kayu perancah
0.117 Lbr Plywood tebal 9mm
2.000 Btg bambu
C PERALATAN
D Memasang Bekisting untuk Kolom
E Tenaga
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,125,911.34


146,935.00
70,000.00 115,500.00
80,000.00 22,000.00
85,000.00 2,380.00
85,000.00 7,055.00
876,620.76
1,350.00 500,850.00
193.29 134,913.43
219.78 230,107.33
50.00 10,750.00

1,023,555.76
10% 102,355.58
1,125,911.34

13,088.35
1,143.50
70,000.00 490.00
80,000.00 560.00
85,000.00 59.50
85,000.00 34.00
10,755.00
10,000.00 10,500.00
17,000.00 255.00

11,898.50
10% 1,189.85
13,088.35
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

sting untuk Pondasi 3x pakai 96,459.00


61,620.00
70,000.00 36,400.00
80,000.00 20,800.00
85,000.00 2,210.00
85,000.00 2,210.00
26,070.00
1,800,000.00 24,000.00
17,000.00 1,700.00
11,100.00 370.00

87,690.00
10% 8,769.00
96,459.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

99,759.00
61,620.00
70,000.00 36,400.00
80,000.00 20,800.00
85,000.00 2,210.00
85,000.00 2,210.00
29,070.00
1,800,000.00 27,000.00
17,000.00 1,700.00
11,100.00 370.00

90,690.00
10% 9,069.00
99,759.00

140,305.00
78,210.00
70,000.00 46,200.00
80,000.00 26,400.00
85,000.00 2,805.00
85,000.00 2,805.00
49,340.00
1,800,000.00 24,000.00
17,000.00 2,266.67
11,100.00 740.00
1,800,000.00 9,000.00
115,500.00 -
20,000.00 13,333.33

127,550.00
10% 12,755.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

140,305.00

142,285.00
78,210.00
70,000.00 46,200.00
80,000.00 26,400.00
85,000.00 2,805.00
85,000.00 2,805.00
51,140.00
1,800,000.00 24,000.00
17,000.00 2,266.67
11,100.00 740.00
1,800,000.00 10,800.00
20,000.00 13,333.33

129,350.00
10% 12,935.00
142,285.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

184,460.83
78,210.00
70,000.00 46,200.00
80,000.00 26,400.00
85,000.00 2,805.00
85,000.00 2,805.00
89,481.67
1,800,000.00 24,000.00
17,000.00 2,266.67
11,100.00 740.00
1,800,000.00 9,000.00
115,500.00 13,475.00
20,000.00 40,000.00

167,691.67
10% 16,769.17
184,460.83
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

V A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7a 1 m2 Memasang Langit-langit Gypsu Board, tebal 9 mm + ran
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.415 btg hollow 4/4 Zincromate
0.500 btg hollow 2/4 Zincromate
0.364 Lbr Gypsum Board
0.110 Kg Paku gypsum
4.000 bh Ramset / dina bolt
0.072 bh Contton plaster
0.125 zak Compoun
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN
Rp Rp

N PEKERJAAN LANGIT-LANGIT
git-langit Gypsu Board, tebal 9 mm + rangka besi hollow 115,316.85
11,850.00
70,000.00 7,000.00
80,000.00 4,000.00
85,000.00 425.00
85,000.00 425.00
92,983.50
29,500.00 12,242.50
22,500.00 11,250.00
74,000.00 26,936.00
30,000.00 3,300.00
7,200.00 28,800.00
15,000.00 1,080.00
75,000.00 9,375.00

104,833.50
10% 10,483.35
115,316.85
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDU


2 A.5.1.1.2 1 Unit Memasang Closet Jongkok Porselen
A Tenaga
L.01 1.00 OH Pekerja
L.02 1.50 OH Tukang Batu
L.03 0.15 OH Kepala Tukang
L.04 0.16 OH Mandor
B Bahan
1 Buah Kloset Jongkok
6 Kg Portland Semen
0.01 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

3 A.5.1.1.14 1 buah Pemasangan Floor Drain


A Tenaga
L.01 0.010 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 bh Floor Drain

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

5 A.5.1.1.25 1 m' Pemasangan Pipa PVC tipe AW Ø ½"


A Tenaga
L.01 0.036 OH Pekerja
L.02 0.060 OH Tukang Batu
L.03 0.006 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
1.20 m' Pipa PVC Ø ½"
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

27 A.5.1.1.33 1 m' Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm


A Tenaga
L.01 0.080 OH Pekerja
L.02 0.040 OH Tukang Batu
L.03 0.004 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
1.60 bh pipa tanah PVC 8''
35.00 kg Semen Portlan
0.014 m3 Pasir Pasang
0.014 m3 Pasir Urug

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
RAIAN PEKERJAAN
Rp Rp

N PEKERJAAN SANITASI DALAM GEDUNG


754,471.30
216,350.00
70,000.00 70,000.00
80,000.00 120,000.00
85,000.00 12,750.00
85,000.00 13,600.00
469,533.00
459,000.00 459,000.00
1,350.00 8,100.00
243,300.00 2,433.00

685,883.00
10% 68,588.30
754,471.30

21,972.50
9,975.00

70,000.00 700.00
80,000.00 8,000.00
85,000.00 850.00
85,000.00 425.00
10,000.00
10,000.00 10,000.00

19,975.00
10% 1,997.50
21,972.50
HARGA BAHAN/UPAH JUMLAH
RAIAN PEKERJAAN
Rp Rp

19,030.00
8,000.00
70,000.00 2,520.00
80,000.00 4,800.00
85,000.00 510.00
85,000.00 170.00
9,300.00
6,000.00 7,200.00
6,000.00 2,100.00

17,300.00
10% 1,730.00
19,030.00
HARGA BAHAN/UPAH JUMLAH
RAIAN PEKERJAAN
Rp Rp

a Air Limbah Jenis Pipa Tanah Ø 20 cm 192,561.38


9,480.00
70,000.00 5,600.00
80,000.00 3,200.00
85,000.00 340.00
85,000.00 340.00
165,575.80
70,500.00 112,800.00
1,350.00 47,250.00
243,300.00 3,406.20
151,400.00 2,119.60
-

175,055.80
10% 17,505.58
192,561.38
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VIII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa
A Tenaga
L.01 0.01 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 Buah Kunci Tanam Biasa 2 Slag
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contoh 10%)

3 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.0008 OH Mandor
B Bahan
1 Buah Engsel pintu Nylon Kupu-Kupu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

4 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu


A Tenaga
L.01 0.01 OH Pekerja
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

L.02 0.1 OH Tukang Kayu


L.03 0.01 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1 Buah Engsel Jendela Kupu-Kupu Biasa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

6 A.4.6.2.9 1 Buah Pemasangan Kait Angin


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1 Buah Kait Angin
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

8 A.4.6.2.11 1 Buah Pemasangan Kunci Selot


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.001 OH Mandor
B Bahan
1 Buah Kunci Selot
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

9 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm


A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.00080 OH Mandor
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

B Bahan
1.1 m2 Kaca tebal 5mm
0.050 Kg Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PEKERJAAN
Rp Rp

N PEKERJAAN KUNCI dan KACA


187,412.50
45,375.00
70,000.00 700.00
80,000.00 40,000.00
85,000.00 4,250.00
85,000.00 425.00
125,000.00
125,000.00 125,000.00

170,375.00
10% 17,037.50
187,412.50

32,332.30
14,393.00
70,000.00 1,050.00
80,000.00 12,000.00
85,000.00 1,275.00
85,000.00 68.00
15,000.00
15,000.00 15,000.00

29,393.00
10% 2,939.30
32,332.30

29,801.75
9,592.50
70,000.00 700.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PEKERJAAN
Rp Rp

80,000.00 8,000.00
85,000.00 850.00
85,000.00 42.50
17,500.00
17,500.00 17,500.00

27,092.50
10% 2,709.25
29,801.75
HARGA BAHAN/UPAH JUMLAH
URAIAN PEKERJAAN
Rp Rp

23,105.50
15,005.00
70,000.00 1,050.00
80,000.00 12,000.00
85,000.00 1,275.00
85,000.00 680.00
6,000.00
6,000.00 6,000.00

21,005.00
10% 2,100.50
23,105.50

27,703.50
19,185.00
70,000.00 1,400.00
80,000.00 16,000.00
85,000.00 1,700.00
85,000.00 85.00
6,000.00
6,000.00 6,000.00

25,185.00
10% 2,518.50
27,703.50

136,832.30
14,393.00
70,000.00 1,050.00
80,000.00 12,000.00
85,000.00 1,275.00
85,000.00 68.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PEKERJAAN
Rp Rp

110,000.00
100,000.00 110,000.00
5,000.00 250.00

124,393.00
10% 12,439.30
136,832.30
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

X A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN & KELIS


1 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat da
A Tenaga

L.01 0.070 OH Pekerja


L.02 0.009 OH Tukang Cat
L.03 0.006 OH Kepala Tukang
L.04 0.003 OH Mandor
B Bahan
0.20 kg Cat Menie
0.15 kg Plamuur
0.17 kg Cat Dasar
0.26 kg Cat Kayu (baik)
0.01 bh Kuas
0.03 kg Pengencer (Minyak Cat)
0.20 lbr Amplas
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

2 A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 la


A Tenaga
L.01 0.02 OH Pekerja
L.02 0.063 OH Tukang Cat
L.03 0.0063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.10 Kg Plamir
0.10 Kg Cat Dasar
0.26 Kg Cat Penutup 2 kali
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 dihitung 07 1 bh 1 Unit Pemasangan panel MDP 50x70x25


A Tenaga
L.01 0.50 OH Pekerja
L.02 0.50 OH Pembantu Instalator
L.03 0.50 OH Instalator
B Bahan
1.00 Bh MCCB 4P 180A Ex. Merlin Gerin/scheneider
1.00 Bh MCCB 3P 100A Ex. Merlin Gerin/scheneider
1.00 Bh MCCB 3P 70A Ex. Merlin Gerin/scheneider
3.00 Bh MCCB 3P 40-50A Ex. Merlin Gerin/scheneider
3.00 Bh Pilot Lamp
1.00 Bh Selector V
3.00 Bh Ampere Meter
1.00 Bh Volt Meter
1.00 Set Busbar
1.00 Set Wiring
1.00 Bh Box Panel
1.00 ls Asesories, material bantu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

3 dihitung 08 1 bh 1 Titik Pemasangan Instalasi titik cahaya


A Tenaga
L.01 0.50 OH Pekerja
L.02 0.50 OH Pembantu Instalator
L.03 0.50 OH Instalator
B Bahan
9.00 m' Kabel NYA 1 x 2,5 mm2
1.00 m' Flexible conduit 20 mm
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

2.00 m' uPVC conduit 20 mm


5.00 bh Sock 20 mm
1.00 bh Tee dooz 20 mm
5.00 bh Klem 20 mm
14.00 bh Fisher
0.10 bh Isolasi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

4 dihitung 09 1 bh 1 Titik Pemasangan Instalasi stop kontak


A Tenaga
L.01 0.50 OH Pekerja
L.02 0.50 OH Pembantu Instalator
L.03 0.50 OH Instalator
B Bahan
4.00 m' Kabel NYM 3 x 2,5 mm2
1.00 m' Flexible conduit 20 mm
3.00 m' uPVC conduit 20 mm
5.00 bh Sock 20 mm
2.00 bh Tee dooz 20 mm
2.00 bh Klem 20 mm
14.00 bh Fisher
0.10 bh Isolasi
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

5 dihitung 10 1 bh 1 Titik Pemasangan Lampu RM 2x36 W TL LED (Inbow)


A Tenaga
L.01 0.50 OH Tukang Listrik
B Bahan
1.0 bh Lampu RM 2x36 W TL LED (Inbow) skw. Philips

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

1 dihitung 1 bh 1 Titik Pemasangan Lampu SL 25 watt philips


A Tenaga
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

L.01 0.50 OH Tukang Listrik


B Bahan
1.0 bh SL 25 watt philips + fitting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

6 dihitung 13 1 bh 1 Titik Pemasangan saklar ganda


A Tenaga
L.01 0.50 OH Tukang Listrik
B Bahan
1.0 bh saklar seri double switch IB broco
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

7 dihitung 14 1 bh 1 Titik Pemasangan saklar tunggal


A Tenaga
L.01 0.50 OH Tukang Listrik
B Bahan
1.0 bh saklar tunggal switch IB broco
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

8 dihitung 15 1 m1 1 M' Pemasangan Lisplank GRC Woodplank 2/20


A Tenaga
0.200 OH Pekerja
0.400 OH Tukang kayu
0.025 OH Kepala Tukang
L.01 0.005 OH Mandor
B Bahan
0.250 m' Lisplank (woodplank)
0.050 bh skrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)

8 dihitung 16 1 m2 1 M2 pemasangan railling hollow


A Tenaga
1.200 OH Pekerja
1.200 OH Tukang kayu
0.120 OH Kepala Tukang
L.01 0.010 OH Mandor
B Bahan
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

1.000 m' pipa hollow kotak uk. 40x60x1,1mm


3.000 m' pipa hollow uk.20x40x0,8mm
100.000 cm pengelasan dengan listrik
2.000 bh flange reng dudukan
12.000 bh baut dynabol
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

8 dihitung 19 1 m2 Pemasangan 1 buah kran diameter 1/2" atau 1/4"


A Tenaga
0.010 OH Pekerja
0.400 OH Tukang kayu
0.040 OH Kepala Tukang
0.005 OH Mandor
B Bahan
1.000 bh Kran Air
0.025 bh Sealtape
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%)
F Harga Satuan Pekerjaan (D+E)
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

UAN PEKERJAAN PENGECATAN & KELISTIRKAN


idang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 45,804.00
6,385.00

70,000.00 4,900.00

80,000.00 720.00

85,000.00 510.00

85,000.00 255.00

35,255.00
37,500.00 7,500.00

26,000.00 3,900.00

50,000.00 8,500.00

52,500.00 13,650.00

52,500.00 525.00

16,000.00 480.00

3,500.00 700.00

41,640.00
10% 4,164.00
45,804.00

bok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) 40,513.55
7,230.50
70,000.00 1,400.00
80,000.00 5,040.00
85,000.00 535.50
85,000.00 255.00
29,600.00
14,000.00 1,400.00
48,000.00 4,800.00
90,000.00 23,400.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

36,830.50
10% 3,683.05
40,513.55
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

6,971,250.00
117,500.00
70,000.00 35,000.00
80,000.00 40,000.00
85,000.00 42,500.00
6,220,000.00
400,000.00 400,000.00
300,000.00 300,000.00
300,000.00 300,000.00
300,000.00 900,000.00
15,000.00 45,000.00
85,000.00 85,000.00
85,000.00 255,000.00
85,000.00 85,000.00
1,800,000.00 1,800,000.00
300,000.00 300,000.00
1,500,000.00 1,500,000.00
250,000.00 250,000.00

6,337,500.00
10% 633,750.00
6,971,250.00

209,055.00
117,500.00
70,000.00 35,000.00
80,000.00 40,000.00
85,000.00 42,500.00
72,550.00
6,000.00 54,000.00
1,500.00 1,500.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

2,500.00 5,000.00
700.00 3,500.00
1,000.00 1,000.00
750.00 3,750.00
200.00 2,800.00
10,000.00 1,000.00

190,050.00
10% 19,005.00
209,055.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

197,230.00
117,500.00
70,000.00 35,000.00
80,000.00 40,000.00
85,000.00 42,500.00
61,800.00
10,500.00 42,000.00
1,500.00 1,500.00
2,500.00 7,500.00
700.00 3,500.00
1,000.00 2,000.00
750.00 1,500.00
200.00 2,800.00
10,000.00 1,000.00

179,300.00
10% 17,930.00
197,230.00

angan Lampu RM 2x36 W TL LED (Inbow) skw. Philips 495,000.00


40,000.00
80,000.00 40,000.00
410,000.00
410,000.00 410,000.00

450,000.00
10% 45,000.00
495,000.00

angan Lampu SL 25 watt philips 145,750.00


37,500.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

75,000.00 37,500.00
95,000.00
95,000.00 95,000.00

132,500.00
10% 13,250.00
145,750.00

58,300.00
40,000.00
80,000.00 40,000.00
13,000.00
13,000.00 13,000.00

53,000.00
10% 5,300.00
58,300.00
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

55,000.00
40,000.00
80,000.00 40,000.00
10,000.00
10,000.00 10,000.00

50,000.00
10% 5,000.00
55,000.00

gan Lisplank GRC Woodplank 2/20 75,680.00


48,550.00
70,000.00 14,000.00
80,000.00 32,000.00
85,000.00 2,125.00
85,000.00 425.00
20,250.00
75,000.00 18,750.00
30,000.00 1,500.00

68,800.00
10% 6,880.00
75,680.00

378,234.34
191,050.00
70,000.00 84,000.00
80,000.00 96,000.00
85,000.00 10,200.00
85,000.00 850.00
152,799.40
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

32,200.00 32,200.00
13,700.00 41,100.00
334.99 33,499.40
20,000.00 40,000.00
500.00 6,000.00

343,849.40
10% 34,384.94
378,234.34
HARGA BAHAN/UPAH JUMLAH
URAIAN PAKERJAAN MINIMUM MINIMUM
Rp Rp

1 buah kran diameter 1/2" atau 1/4" 65,518.75


36,525.00
70,000.00 700.00
80,000.00 32,000.00
85,000.00 3,400.00
85,000.00 425.00
23,037.50
23,000.00 23,000.00
1,500.00 37.50

59,562.50
10% 5,956.25
65,518.75
DAFTAR HARGA SATUA

NO. KODE URAIAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m
3 A.2.3.1.9 Pengurugan Kembali
5 A.2.3.1.11 Urugan Pasir
6 A.2.3.1.14 Mengurug Sirtu Padat

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
3 A.4.4.1.11 Dihit. Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/4 Bata Camp.

III A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


4 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
2 A.4.4.2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
4 A.4.4.2.27 Pemasangan Acian

IV A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


2 A.4.6.1.5 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati
11 A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu K
4 A.4.6.1.14.A Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu Jati
10 A.4.6.1.15.a Pemasangan konstruksi Gording, Kayu Bengkirai
6 A.4.6.1.17.B Pemasangan Rangka Atap Genteng Plentong Kayu Jati

IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON


NO. KODE URAIAN PEKERJAAN

2 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
4 A.4.1.1.17.a Pembesian dg Besi Polos
5 A.4.1.1.20.a Memasang Bekisting untuk Pondasi 3x pakai
6 A.4.1.1.21.a Memasang Bekisting untuk Sloof 3x pakai
7 A.4.1.1.22.a Memasang Bekisting untuk Kolom 3x pakai
8 A.4.1.1.23.a Memasang Bekisting untuk Balok 3x pakai
9 A.4.1.1.24.a Memasang Bekisting untuk Lantai 3X Pakai
A.4.1.1.25.a Memasang Bekisting untuk Dinding 3x pakai

VI A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 Pemasangan Atap Genteng Plentong Kecil
6 A.4.5.2.4 Pemasangan Genteng Bubung Plentong

V A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7a Memasang Langit-langit Gypsu Board, tebal 9 mm + rangka besi hollow

VI A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


2 A.5.1.1.2 Memasang Closet Jongkok Porselen
2 A.5.1.1.14 Pemasangan Floor Drain
4 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"

27 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm

VII A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium
2 dihitung 04 Pemasangan 1 m2 jendela kaca rangka allumunium
3 dihitung 05 Pemasangan 1 m2 pintu kaca rangka allumunium
2 dihitung 06 Pemasangan 1 m2 pintu kaca tempered rangka allumunium
13 A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds

VIII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa
2 A.4.6.2.5 Pemasangan Engsel Pintu
3 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu
4 A.4.6.2.9 Pemasangan Kait Angin
NO. KODE URAIAN PEKERJAAN

5 A.4.6.2.11 Pemasangan Kunci Selot


6 A.4.6.2.17 Pemasangan Kaca tebal 5 mm

IX A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


11 A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm
3 A.4.4.3.50 Pemasangan Dinding Keramik 20x20 cm,
5 A.4.4.3.58 Pemasangan Dinding Batu Paros / Batu Tempel Hitam
28 dihit 1 1 m2 Pasang Paving Block Holland tebal 6 cm K.300

X A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN & KELISTIRKAN


1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup
2 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
3 dihitung 07 1 Unit Pemasangan panel MDP 50x70x25
4 dihitung 08 1 Titik Pemasangan Instalasi titik cahaya
5 dihitung 09 1 Titik Pemasangan Instalasi stop kontak
7 dihitung 10 1 Titik Pemasangan Lampu Downligh + SL 25 watt philips
8 dihitung 1 Titik Pemasangan Lampu SL 25 watt philips
11 dihitung 13 1 Titik Pemasangan saklar ganda
12 dihitung 14 1 Titik Pemasangan saklar tunggal
13 dihitung 15 1 M' Pemasangan Lisplank GRC Woodplank 2/20
12 dihitung 16 1 M2 pemasangan railling hollow

Menyetujui, Menyetujui,
Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiata

BANAR SUHARJANTO, S.T., M.T. NGARPAN, S.Pd.


NIP. 19750128 200312 1 002 NIP.19620527 198304 1 007

Menyetujui
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Blora

Ir. SAMGAUTAMA KARNAJAYA, M.T.


NO. KODE URAIAN PEKERJAAN

NIP. 19640817 199003 1 009


DAFTAR HAR GA SAT UAN PE K E R JAAN

HARGA SATUAN PEKERJAAN


URAIAN PEKERJAAN SAT
(Rp)

PERSIAPAN
mbang Tinggi 2,00 m m' 714,927.51

m3 60,087.50
m3 14,391.67
m3 223,883.00
m3 219,587.50

PONDASI
m3 817,994.43
m3 472,202.28

ASANGAN DINDING
Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP m2 95,548.09
Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP m2 92,431.57
Ukuran (5x11x22)cm Tebal 1/4 Bata Camp. 1SP : 6PP m2 46,215.79

m2 54,794.52
m2 52,888.77
m2 30,896.25

Pintu Panel, Kayu Jati m2 819,691.40


Teakwood Rangkap, Rangka Expose Kayu Klas I m2 652,170.75
uksi Kuda-kuda Kayu Jati m3 10,776,111.50
Kayu Bengkirai m3 13,367,469.50
ng Plentong Kayu Jati m2 149,296.44
HARGA SATUAN PEKERJAAN
URAIAN PEKERJAAN SAT
(Rp)
a (K225), slum (12±2)cm, w/c = 0,58 m3 1,125,911.34
Kg 13,088.35
m2 96,459.00
m2 99,759.00
m2 140,305.00
m2 142,285.00
m2 184,460.83
m2 214,493.77

PENUTUP ATAP
m2 55,349.25
m' 125,901.16

LANGIT-LANGIT
oard, tebal 9 mm + rangka besi hollow m2 115,316.85

SANITASI DALAM GEDUNG


Unit 754,471.30
buah 21,972.50
m' 19,030.00
is Pipa Tanah Ø 20 cm m' 192,561.38

BESI & ALLUMUNIUM


m' 101,413.40
angka allumunium m' 633,699.00
gka allumunium m' 664,884.00
mpered rangka allumunium m' 960,124.00
m2 167,205.50

KUNCI dan KACA


Buah 187,412.50
Buah 32,332.30
u-kupu Buah 29,801.75
Buah 23,105.50
HARGA SATUAN PEKERJAAN
URAIAN PEKERJAAN SAT
(Rp)
Buah 27,703.50
m2 136,832.30

PENUTUP LANTAI dan DINDING


m2 174,126.25
m2 221,756.04
/ Batu Tempel Hitam m2 257,210.80
d tebal 6 cm K.300 m2 135,811.50

PENGECATAN & KELISTIRKAN


lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 45,804.00
mir, 1lap Cat Dasar 2 lap. Cat Penutup) m2 40,513.55
bh 6,971,250.00
bh 209,055.00
bh 197,230.00
igh + SL 25 watt philips bh 148,500.00
bh 145,750.00
bh 58,300.00
bh 55,000.00
Woodplank 2/20 m1 75,680.00
m2 378,234.34

Menyetujui, Dibuat,
Pejabat Pelaksana Teknis Kegiatan Konsultan Perencanaan
CV. TIARA SINERGI

NGARPAN, S.Pd. MOCHAMAD ARIANTO, S.T.


NIP.19620527 198304 1 007 Direktur

Menyetujui
Kepala Dinas Perumahan, Permukiman dan Perhubungan
Kabupaten Blora

PRATIKTO NUGROHO, S.Sos., M.M.


HARGA SATUAN PEKERJAAN
URAIAN PEKERJAAN SAT
(Rp)
NIP. 19690617 199009 1 002
DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO. J E N I S B A H A N SATUAN

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah Hitam m3
Bulat Belah Putih m3
Pecah Hitam 10/15 m3
Pecah Hitam 5/7 m3
Pecah Hitam 3/5 m3
1 KERIKIL Timbun m3
Sawur / Koral untuk Beton m3
Beton 0,5/1 m3
Beton ,1/2 m3
Beton ,2/3 m3
Biasa m3
Tras Giling m3
2 BATU BATA ex lokal bh
Expose bh

3 PASIR Urug m3
Pasang m3
Pasang Cukup m3
Beton Ex. Muntilan m3
Beton Kasar Ex.Bengawan Solo m3
5 TANAH Padas m3
Liat m3
Pilihan (Grosok ) m3
Pilihan (Merah) m3
6 KAPUR Pasang (Padam) m3
Semen Merah m3
4 PORTLAND CEMENT
Merk I 40 kg zak
Merk I 50 kg zak
Merk II 40 kg zak
Merk II 50 kg zak
Semen Putih 40 kg zak
Semen Putih 50 kg zak
Semen warna kg
NO. J E N I S B A H A N SATUAN

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak

1 GENTENG BETON Genteng Beton Warna standard bh


Genteng Ex. KIA/Mclass/Kanmuri (Glazour) bh
Genteng Keramik (KIA, M-CLASS, KANMURI)
bh
Natural
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh
Kerpus Ex. KIA/Mclass/Kanmuri (Glazour) bh
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
3 GENTENG TANAH LIAT
Vlaam/Plentong/Pres bh
Kodok bh
Kodok Glasur bh
Nok kerpus Kodok bh
Nok kerpus Kodok Glasur bh
Plentong super besar 12 bh/m2 bh
Nok kerpus plentong super bh
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
NO. J E N I S B A H A N SATUAN

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh
. 225 cm X 102 cm X 5 mm bh
. 250 cm X 102 cm X 5 mm bh
. 200 cm X 102 cm X 6 mm bh
. 225 cm X 102 cm X 6 mm bh
. 250 cm X 102 cm X 6 mm bh
Asbes Gelombang Kecil
. 150 cm X 105 cm X 5 mm bh
. 180 cm X 105 cm X 5 mm bh
. 210 cm X 105 cm X 5 mm bh
. 240 cm X 105 cm X 5 mm bh
. 270 cm X 105 cm X 4 mm bh
. 300 cm X 105 cm X 5 mm bh

2 NOK Jabes nok


. Kerpus Genteng bh
. Stel Besar bh
. Paten Besar bh
Nokstel gelombang harflex
. Stel Besar bh
. Patent Besar bh
. Plat besar bh

Nok Asbes bh
Nok Galfalum m'
Nok Seng Gelombang m'
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh

.100 cm x 100 cm x 5 mm lbr


.100 cm x 200 cm x 5 mm lbr
.120 cm x 240 cm x 5 mm lbr

7 FIBRE GLASS (JABES)


180 X 92 cm bh
200 X 92 cm bh
NO. J E N I S B A H A N SATUAN

250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
3 SENG PLAT
BJLS 0,18 lebar 55 cm m'
BJLS 0,20 lebar 55 cm m'
BJLS 0,28 lebar 55 cm m'
BJLS 0,30 lebar 55 cm m'

Seng Talang BJLS 26 lebar 0,60 m'


Seng Talang BJLS 26 lebar 0,90 m'
Seng Talang BJLS 26 lebar 1,20 m'

Seng Pelat BJLS 26 lebar 0,6 m' m'


Seng Pelat BJLS 26 lebar 0,9 m' m'
Seng Pelat lebar 0,9 m' t= 0,02 m'
Seng Pelat lebar 0,9 m' t= 0,025 m'
Seng Pelat lebar 0,9 m' t= 0,03 m'
Seng Pelat lebar 0,9 m' t= 0,04 m'
Seng Pelat lebar 0,9 m' t= 0,05 m'
4 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr
BJLS 0,20 panjang 180 cm lbr
BJLS 0,30 panjang 180 cm lbr
BJLS 0,40 panjang 180 cm lbr

Seng Gelombang Uk. 0,7 x 1,8, t= 0,02 lbr


Seng Gelombang Uk. 0,7 x 2,1, t= 0,025 lbr
Seng Gelombang Uk. 0,7 x 2,4, t= 0,03 lbr
Seng Gelombang Uk. 0,7 x 3,0, t= 0,05 lbr
NO. J E N I S B A H A N SATUAN

10 GALFALUM
Tb. 3 mm panjang 180 cm lbr
Tb. 3 mm panjang 210 cm lbr
Tb. 3 mm panjang 240 cm lbr
Tb. 3 mm panjang 300 cm lbr
Tb. 3 mm panjang 400 cm lbr
Tb. 3 mm panjang 500 cm lbr
Tb. 3 mm panjang 600 cm lbr

Tb. 3,5 mm panjang 180 cm lbr


Tb. 3,5 mm panjang 210 cm lbr
Tb. 3,5 mm panjang 240 cm lbr
Tb. 3,5 mm panjang 300 cm lbr
Tb. 3,5 mm panjang 400 cm lbr
Tb. 3,5 mm panjang 500 cm lbr
Tb. 3,5 mm panjang 600 cm lbr

Galfalum (lebar 0,7 m) m'

11 ATAP UPVC ALDERON R830 10x885x4000 BLUE lbr

II . B A H A N K A Y U
1 JATI Jati Kampung (Papan) m3
Jati Kampung (Balok/pesagen) m3

2 KAMPER Papan m3
Balok/pesagen m3

3 KRUING Papan m3
Balok/pesagen m3

4 MERANTI Papan m3
Balok/pesagen m3

5 LANAN Papan m3
NO. J E N I S B A H A N SATUAN

Balok/pesagen m3

6 BENGKIRAI Papan m3
Balok/pesagen m3

7 DOLKEN Sedang 8 x 10 x 400 cm bt


Kecil 6 x 7 x 400 cm bt
Besar 10 x 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt
Perancah m3

III . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
Teraso 30 X 30 cm m2
2 TEGEL PLINT
PC warna 10 X 20 cm bh
PC abu-abu 15 x 20 bh

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
NO. J E N I S B A H A N SATUAN

1 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2

1 Keramik 40 x 40 cm (Warna) m2
30 X 30 cm m2
20 X 20 cm m2
33 x 33 cm m2
25 x 25 cm m2
15 x 20 cm m2
10 x 25 cm (List) m2
20 x 25 cm m2
7,5 x 20 cm (List) m2

7 Parquet Jati m2

3 Batu Paros m2

9 Batu Tempel Hitam m2

2 GRANITO 40 x 40 cm m2
30 x 30 cm m2
60 x 60 cm m2
60 x 60 cm (Lokal) m2
3 Marmer m2
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh
NO. J E N I S B A H A N SATUAN

U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh
20 X 20 cm bh
Beton 25 X 25 cm bh
Kayu 25 X 25 cm bh
30 X 30 cm bh
15 X 25 cm bh
15 X 30 cm bh

IV . B A H A N B E S I
1 BESI BETON besi beton polos kg

besi beton prestress kg


besi beton ulir kg

2 BESI PLAT Besi Strip kg

3 BESI PROFIL Besi Profil L 4 x 0,2 mm kg


L 4 x 0,1 mm kg
L 4 x 0,3 mm kg

4 JARING - JARING BAJA


Diameter 4 - 15 kg
Diameter 6 - 15 kg
Kawat Bronjong dia 2 - 4 mm kg
Kawat Pabrikan ( 2 x 1 x 0,5) dia kawat 2,7 mm bh
Kawat Pabrikan ( 2 x 1 x 0,5) dia kawat 3 mm bh
5 BESI SIKU L 40 X 40 X 4 btg
L 50 X 50 X 5 btg
L 60 X 60 X 6 btg
NO. J E N I S B A H A N SATUAN

BESI PROFIL "L" ATAU "C" kg

2 KAWAT - Ikat beton/bendrat kg


- Harmonika 12 X 45 mm m2
- Harmonika 12 X 24 mm m2
- Harmonika 14 X 30 mm m2
- Harmonika 14 X 35 mm m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan pasir m2
- Kawat loket m2
- Kawat duri M'
- Kawat bronjong kg
Kawat Las kg
Besi Hollow 4/4 Zincromate btg
Besi Hollow 2/4 Zincromate btg

V . BAHAN PI PA
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg
Pipa PVC DN 25 ( ¾" ) AW JIS btg
Pipa PVC DN 32 ( 1" ) AW JIS btg
Pipa PVC DN 40 ( 1½" ) btg
Pipa PVC DN 63 ( 2" ) btg
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg
Pipa Medium B Galvanis DN 25 ( ¾" ) btg
Pipa Medium B Galvanis DN 32 ( 1" ) btg
Pipa Medium B Galvanis DN 50 ( 1½" ) btg
Pipa Medium B Galvanis DN 63 ( 2" ) btg
Pipa Medium B Galvanis DN 2½" btg
Pipa Medium B Galvanis DN 90 ( 3" ) btg
NO. J E N I S B A H A N SATUAN

Pipa Medium B Galvanis DN 110 ( 4" ) btg


Pipa Medium B Galvanis DN 160 ( 6" ) btg
Pipa Medium B Galvanis DN 200 ( 8" ) btg
Pipa Medium B Galvanis DN 250 ( 10") btg

VI . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m'
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm (Elepant & Jaya Board) lbr
3 HARD BOARD-uk: 4'X 8' lbr
Kalsiboard 1,20 x 2,40 lbr

4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr
. 120 X 240 X 4 mm lbr
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr
. 120 X 240 X 12 mm lbr
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr
NO. J E N I S B A H A N SATUAN

VII . B A H A N F I N I S H I N G
1 KAYU
Menie kg
Dempul plamur kayu kg
Ambril/amplas lbr
Batu Apung kg
Cat kayu (dasar), cukup kg
. Emco kg
Cotton plaster bh
Compound zak
Cat Kayu (baik) kg
- Kuas bh
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr

2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur tembok kg
Cat Tembok Baik kg
Cat Tembok Biasa kg
Cat Tembok Dalam Baik kg
Cat Tembok Dalam Cukup kg
Cat Tembok Luar Baik kg
Cat Tembok Luar Cukup kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 2,5 kg

3 BESI
Menie kg
Cat mengkilat kg
Cat Baik kg
Cat Cukup kg
Thinner A ltr
Minyak cat ltr
NO. J E N I S B A H A N SATUAN

Thinner Super ltr


Residu (teer/aspal) ltr
Residu (teer/aspal) drum
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
kapasitas 2000 liter. bh
kapasitas 3000 liter. bh
Lem Aica Aibon kg

VIII . B A H A N K A C A
1 POLOS 3 mm m2
5 mm m2

2 ES KABUR 3 mm m2
5 mm m2
12 mm m2

3 RAY BAND 3 mm m2
5 mm m2

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m'
SPLN LMK 1 X 2 1/2 mm2 m'
. 1X4 mm2 m'
1X6 mm2 m'
NYY :. 2 X 1 1/2 mm2 m'
PRIMA 2 X 2 1/2 mm2 m'
. 2X4 mm2 m'
2X6 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'
NO. J E N I S B A H A N SATUAN

NYM :. 2 X 1 1/2 mm2 m'


PRIMA 2 X 2 1/2 mm2 m'
. 2X4 mm2 m'
3 X 1 1/2 mm2 m'
3 X 2 1/2 mm2 m'
3X4 mm2 m'
3X6 mm2 m'

2 SKAKELAR
Out bauw . Ganda bh
. Tunggal bh
In bauw . Ganda bh
. Tunggal bh

3 FUSE BOX (SEKERING KASA)


1 group bh
2 group bh
3 group bh

4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh

6 STOP KONTAK - Arde Outbow putih bh


Arde Outbow hitam bh
Arde IB bh
Arde Putar bh

IX . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh
2 X slag bh
Yale : 1 X slag bh
2 X slag bh
Kuda : 1 X slag bh
NO. J E N I S B A H A N SATUAN

2 X slag bh

2 ENGSEL DAN GERENDEL


Engsel Angin bh
Kupu-kupu biasa bh
Nylon kupu-kupu bh
Espagnoled - dalam negeri bh
Grendel Tanam luar negeri bh
Grendel biasa bh
Kait Angin bh
Door Stop bh

X . BAHAN SANITAIR
1 KLOSET DUDUK bh
2 KLOSET JONGKOK bh
3 WASTAFEL PEDESTAL bh
4 WASTAFEL MEJA OVAL bh
5 WASTAFEL GANTUNG BULAT bh
6 WASTAFEL GANTUNG SUDUT bh
7 WASTAFEL GANTUNG SUDUT KECIL bh
8 WASTAFEL BAK CUCI STAINLESS STEEL bh
9 TEMPAT SABUN GANTUNG bh
10 TEMPAT SABUN TANAM bh
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air bh
Seal tape bh
Floor drain plastik bh
Floor drain stainless steel bh
NO. J E N I S B A H A N SATUAN

XI . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg
2 PAKU -ukuran 2'' s/d 5'' kg
3 PAKU - payung kg
4 PAKU - sekrup kg
5 PAKU - beton kg
6 MUR BAUT (kuda-kuda) kg
7 ANGKUR BAUT bh
8 LEM KAYU bh
9 Tali Ijuk kg
10 Ramset / dina blot bh

XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
3 POMPA AIR SUBMERSIBLE
Grundfos Power 0,75 KW Head 21 Meter bh
Grundfos Power 1,1 KW Head 29 Meter bh
Grundfos Power 1,5 KW Head 41 Meter bh

X VI . PAVING BLOCK
1 SQUARE Abu-abu m2
Merah/hitam m2
2 HOLLAND Abu-abu m2
Merah/hitam m2
3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
NO. J E N I S B A H A N SATUAN

Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH
13 KANSTEEN m'
14 Paving Block K. 300 ( 6 cm) m2
15 Paving Block K. 300 ( 8 cm) m2
16 Kansteen 40 (40 x 20 x 10) bh
17 Kansteen 60 (18 x 30 x60) bh
18 Topi Uskup 30 x 6 x 21 tebal 8 cm Bh

XII L A I N - L A I N
1 KREI 25 MM m2
2 Sliding Pintu J4 bh
3 Naco per Daun bh
4 Rolling door Besi m2
Almunium Profil m'
Rolling door Almunium tb 0,5 mm m2
Rolling door Almunium tb 0,8 mm
Rolling door Galfalum tb 0,8 mm
Folding Gate Baja tb 2mm
Folding Gate Baja tb 1,6 mm
Folding Gate Baja tb 1,4 mm
Folding Gate; tb 4 mm m2
Folding Gate; tb 5 mm m2
Folding Gate; tb 8 mm m2
5 Awning Almunium m2
6 Kusen Almunium 4" Putih m'
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg
NO. J E N I S B A H A N SATUAN

9 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum

Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2

11 PAGAR BRC. Pagar BRC 90 A2 /lb


Pagar BRC 120 A2 /lb
8 LAIN-LAIN
Minyak Beton & bekisting ltr
MCCB 3P 40-50A Ex. Merlin Gerin/scheneider Bh
Pilot Lamp Bh
Selector V Bh
Ampere Meter Bh
Volt Meter Bh
Busbar Set
Wiring Set
Box Panel Bh
Asesories, material bantu ls
Kabel NYA 1 x 2,5 mm2 m'
Kabel NYM 3 x 2,5 mm2 m'
Flexible conduit 20 mm m'
uPVC conduit 20 mm m'
Sock 20 mm bh
Tee dooz 20 mm bh
Klem 20 mm bh
Fisher bh
NO. J E N I S B A H A N SATUAN

Isolasi bh
Lampu RM 2x36 W TL LED (Inbow) skw. Philips bh
Lampu Roset E27 Tornado 18W skw. Philips bh
Lampu Roset E27 Tornado 5W skw. Philips bh
saklar seri double switch IB broco bh
saklar tunggal switch IB broco bh
Pintu Lipat Besi m2
Sunscreen Allumunim m2
Allumunium Foil m2
Soda api kg
Sabun kg
Air m3
Air Bersih ltr
Koas Alang-alang ikat
Solar (Industri) ltr
Premium (Industri) ltr
Pelumas ltr
Vynil 30x30 bh
BAHAN BAHAN TAMBAHAN SANITASI & AIR MINUM
Keramik Porselen 11 x 11
Semen Nat
Box Meteran Air
Meteran Air 1/2 Inch
Fit Kran 1/2 Inch
Plug Kran 1/2 Inch
Stop Kran 1/2 Inch
Clamp Sadle 50 x 13 mm
Double nepple GIP 1/2 Inch
Segel kopling 1/2 Inch
Faucet elbow 1/2 Inch
Water moor 1/2 inch
Pipa HDPE 1/2 Inch
Pipa Galvanis Dia. 1/2"
Pipa Galvanis Dia. 4"
Pipa Air Limbah Jenis Pipa Tanah dia 20 cm
Pipa Air Limbah Jenis Pipa Tanah dia 15 cm
Pipa Air Limbah uPVC 3 Inch
Pipa Air Limbah uPVC 4 Inch
Pipa Air Limbah uPVC 6 Inch
Knee (fitting) Air Limbah uPVC 3 Inch
NO. J E N I S B A H A N SATUAN

Knee (fitting) Air Limbah uPVC 4 Inch


Knee (fitting) Air Limbah uPVC6 Inch
Sock (fitting) Air Limbah uPVC 3 Inch
Sock (fitting) Air Limbah uPVC 4 Inch
Sock (fitting) Air Limbah uPVC 6 Inch
Tee (fitting) Air Limbah uPVC 3 Inch
Tee (fitting) Air Limbah uPVC 4 Inch
Tee (fitting) Air Limbah uPVC 6 Inch
Pipa Beton dia 20 cm
Pipa Beton dia 100 cm
Bathcuip/Bathtube
Tempat Sabun Gantung
Tempat Sabun Tanam
SEPTIC TANK (ETERNIT GRESIK) 5 Pemakai 500 liter
SEPTIC TANK (ETERNIT GRESIK) 5 Pemakai 1000 liter
WASTAFEL PEDESTAL
WASTAFEL MEJA OVAL
WASTAFEL GANTUNG BULAT
WASTAFEL GANTUNG SUDUT
WASTAFEL GANTUNG SUDUT KECIL
WASTAFEL BAK CUCI

Kepala Bidang Perumaha


DINRUMKIMHUB

Pejabat Pembuat

SUHARYONO,

NIP. 19640123 19
GA SATUAN BAHAN BANGUNAN

HARGA
KETERANGAN
(Rp)

150,000
208,600
226,200
204,100
204,100
273,300
140,000
296,700
296,700
296,700
296,700
140,000
220,000
425
1,500

151,400
243,300
190,000
340,000
270,600
80,000
100,000
150,000
128,000
300,000
150,000

54,000
68,000
54,000
68,000
77,000
88,000
11,800
HARGA
KETERANGAN
(Rp)

175,000

6,000
10,000

11,000

6,200
7,400
20,000
25,000
7,750
9,000

1,300
1,300
4,500
10,000
10,000
3,500
10,000

7,000
8,500
8,000
8,800
HARGA
KETERANGAN
(Rp)

87,000
105,000
115,000
102,000
118,000
125,000

65,000
56,000
65,000
73,500
74,300
90,000

33,000
45,000
42,000

41,500
22,000
49,000

35,000
40,000
21,000

16,000
18,000
13,000
12,500

16,500
40,000
57,520

48,000
62,000
HARGA
KETERANGAN
(Rp)
75,000
64,000
67,500
81,000

20,000
25,000
35,000
40,000

21,000
27,000
45,000

21,000
27,000
22,000
26,250
29,000
29,000
35,000

45,000
53,000
61,000
72,000

40,000
45,000
52,000
64,000
HARGA
KETERANGAN
(Rp)

67,500
79,000
90,000
112,500
150,000
187,500
225,000

76,500
89,500
102,000
127,500
170,000
212,500
255,000

45,000

135,000

9,818,100
6,545,400

7,636,300
7,636,300

7,200,000
6,545,400

5,900,000
5,450,000

3,800,000
HARGA
KETERANGAN
(Rp)
3,500,000

9,400,000
8,727,200

32,000
26,000
34,000
1,750,000
139,100
20,000
1,800,000

25,000
23,000
27,500
26,000
50,000

5,500
5,200

42,000
45,000
44,000
47,000
HARGA
KETERANGAN
(Rp)

52,000
52,000
53,000
52,100

43,200
41,700
60,000
53,000
56,875
52,000
300,000
53,000
233,300
2,250
250,000

115,000

125,000

360,000
380,000
180,000
120,000
480,000

30,000
50,000
65,000
85,000
126,250
210,000
300,000
360,000
22,000
30,000
45,000
42,000
HARGA
KETERANGAN
(Rp)

215,000

2,825
6,000
6,500
25,000
7,000
7,250
7,500

10,000

9,100
13,000

15,000

15,000
15,000
15,000

14,000
14,000
25,000
317,000
353,400
110,000
170,000
250,000
HARGA
KETERANGAN
(Rp)

9,100

17,000
19,000
21,000
20,000
18,000
22,800
22,000
17,700
16,875
60,000
19,300
28,000
29,500
22,500

24,000 panjang 4 m
20,000 panjang 4 m
36,000 panjang 4 m
35,350 panjang 4 m
45,600 panjang 4 m
90,000 panjang 4 m
170,000 panjang 4 m
258,000 panjang 4 m
423,000 panjang 4 m
696,000 panjang 4 m
1,390,000 panjang 4 m

90,000 panjang 6 m
114,000 panjang 6 m
195,000 panjang 6 m
210,000 panjang 6 m
252,000 panjang 6 m
490,800 panjang 6 m
640,200 panjang 6 m
HARGA
KETERANGAN
(Rp)
835,000 panjang 6 m
837,500 panjang 6 m
1,800,000 panjang 6 m
- panjang 6 m

5,100
12,500
38,000
4,200

74,000
60,000

100,000
150,000
67,500
145,000
185,000
230,000
290,000

50,000
66,000
77,000

115,500
156,500
194,000
243,000
115,000
HARGA
KETERANGAN
(Rp)

37,500
26,000
3,500
15,250
50,000
60,125
15,000
75,000
52,500
52,500
60,000
29,000
15,000
33,000

4,200
4,750
14,000
90,000
48,000
22,000
17,500
90,000
65,000
98,000
92,000
110,000
270,000

37,500
58,000
35,800
46,000
20,750
16,000
HARGA
KETERANGAN
(Rp)
20,000
5,000
62,000

880,000
1,450,000
2,800,000
8,000,000
25,400

73,125
100,000

87,000
57,500
125,000

88,300
106,600

3,800
6,000
5,900
8,650
9,200
15,200
27,500
36,000
13,500
20,500
35,000
52,000
HARGA
KETERANGAN
(Rp)
11,600
17,400
22,000
8,350
20,000
31,000
45,000

15,000
11,500
13,000
10,000

35,000
230,000
350,000

4,375
11,250
13,000
18,300

10,100
5,700
10,000
10,300

15,000
7,500
12,500
35,000

85,000
60,000
75,000
125,000
70,000
HARGA
KETERANGAN
(Rp)
75,000

27,000
17,500
15,000
52,500
32,500
6,000
6,000
46,600

1,032,000
459,000
950,000
750,000
320,000
250,000
230,000
150,000
30,000
22,500

22,500
1,500
10,000
36,000
HARGA
KETERANGAN
(Rp)

17,000
17,000
21,000
30,000
17,000
12,625
12,800
16,200
6,000
7,200

250,000

975,000
1,450,000
450,000
350,000
375,000
425,000

11,930,000
13,974,000
16,761,000

37,500
62,500
55,000
62,500
42,000
62,500
55,000
62,500
55,000
62,500
55,000
62,500
HARGA
KETERANGAN
(Rp)
55,000
62,500
55,000

55,000
7,500
4,000
17,500
65,000
75,000
16,000
50,000
5,400

45,000
160,000
25,000
300,000
100,000
350,000
400,000
300,000
750,000
600,000
500,000
320,000
350,000
380,000
210,000
75,000

1,260,000
HARGA
KETERANGAN
(Rp)

1,650,000

72,000
72,000
105,000
115,000
1,300,000
1,350,000
1,225,000
1,230,000
1,500,000
1,750,000
8,300
8,300
8,300

150,000

128,900
155,000

11,100
300,000
15,000
85,000
85,000
85,000
1,800,000
300,000
1,500,000
250,000
6,000
10,500
1,500
2,500
700
1,000
750
200
HARGA
KETERANGAN
(Rp)
10,000
410,000
150,000
120,000
13,000
10,000
380,000
20,000
7,300
15,000
13,500
50,000
50
1,500
6,900
7,400
30,600
5,500

15,800

60,000
18,750
1,750
23,000
37,500
20,000

22,500

140,000
1,235,000
859,000
512,000
133,000
22,000
512,000
72,250
HARGA
KETERANGAN
(Rp)
115,250
512,000
17,750
33,000
88,000
17,000
32,250

39,000
77,500

55,000
37,000
45,000

171,500

Kepala Bidang Perumahan dan Permukiman


DINRUMKIMHUB Kab. Blora
Selaku
Pejabat Pembuat Komitmen

SUHARYONO, ST, MM
Penata TK. I
NIP. 19640123 198719 1 001
653,000,000
58,770,000
594,230,000