Analisa Harga Satuan
Analisa Harga Satuan
No.
I.
II.
II.A.
II.B.
Terbilang :
JENIS PEKERJAAN
PEKERJAAN STANDART
PEKERJAAN STRUKTUR STANDART PEKERJAAN ARSITEKTUR STANDART
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR
PEKERJAAN NON STANDART
PEKERJAAN STRUKTUR NON STANDART PEKERJAAN ARSITEKTUR NON STANDART PEKERJAAN MEKANIKA
Terbilang :
267,216,147.20
267,216,147.20
17,566,930,941.52
14,526,483,714.47
3,040,447,227.06
17,834,147,088.72
1,783,414,708.87
19,617,561,797.60
19,617,562,000.00
ta lima ratus
Makassar, 09 Desember 2019
PT. RIMBA RAYA UTAM
21,200,000,000.00
2,120,000,000.00
19,080,000,000.00
537,561,797.60
REKAPITULAS
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI :
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
8,915,079,200.20
2,734,348,636.30
1,268,627,351.95
323,459,920.66
319,700,655.28
468,614,330.26
56,115,230.75
292,353,245.05
5,477,902.35
2,794,387,765.44
1,341,632,841.53
381,938,707.98
313,924,284.56
396,797,914.88
63,515,755.00
296,578,261.49
2,828,454,829.50
1,367,068,354.92
381,938,707.98
320,984,693.04
396,126,320.15
63,515,755.00
298,820,998.41
557,887,968.96
171,975,865.65
30,720,554.79
76,917,784.24
8,578,633.44
118,716.00
67,700,127.23
201,876,287.61
50,000,000.00
409,252,875.58
219,217,226.12
89,987,616.36
82,794,033.10
17,254,000.00
9,324,332,075.78
RENCANA ANGGARAN BIAY
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI :
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
1 Pek. Pasangan Dinding Bata Ringan t=7,5 cm Termasuk Dinding Railling Tangga
Kusen Alum. 3 Powder Coating + Daun Pintu Frame Alum. Powder Coating, Kaca
3 Clear 5 mm & Daun Jendela Frame Alum. Powder Coating, Kaca Clear 5 mm + BV
Kaca Clear 5 mm (lengkap terpasang ) type PJ-3
9 Kusen Alum. 3 Powder Coating + Daun Pintu UPVC (lengkap terpasang ) type PT
10 Kusen Alum. 3 Powder Coating + Daun Pintu UPVC (lengkap terpasang ) type PTD
Kusen Besi Hollow Powder Coating + Daun Pintu Besi (lengkap terpasang ) type
11
PB
Kusen Alum. 3 Powder Coating + Daun Pintu Alum. Powder Coating (lengkap
12
terpasang) type PS
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
13
Clear 5 mm (lengkap terpasang) type J1
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
14
Clear 5 mm (lengkap terpasang) type J2
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
15
Clear 5 mm (lengkap terpasang) type J4
Kusen Alum. 3 Powder Coating + Jendela Frame Alum. Powder Coating, Kaca Clear
16
5 mm (lengkap terpasang) type J5
17 Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1
18 Glass Block + Rooster 20X20 (lengkap terpasang) type RB-2
19 Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4
20 Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5
21 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-1
22 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-2
23 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
I.3 PEKERJAAN PLAFOND
Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka
1
60x60 cm
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60
1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang)
9 Pasang Kran Stainless - Unit Hunian, Toilet Umum, dan Janitor (lengkap terpasang)
1 Pek. Pasangan Dinding Bata Ringan t=7,5 cm Termasuk Dinding Railling Tangga
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela
5 Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dinding
6 Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon Gypsum + Rangka Hollow
7
Galvanis
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3 & dia 1, di Atas
8
Dinding dan Nempel pada Didinding
9 Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur
10 Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit Kamar
11 Pek. Keramik 20x20 cm Meja Dapur
5 Kusen Alum. 3 Powder Coating + Daun Pintu UPVC (lengkap terpasang ) type PT
Kusen Alum. 3 Powder Coating + Daun Pintu Alum. Powder Coating (lengkap
6
terpasang) type PS
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
7
Clear 5 mm (lengkap terpasang) type J1
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
8
Clear 5 mm (lengkap terpasang) type J2
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating, Kaca
9
Clear 5 mm & Jendela Krepyak Alum. Powder Coating (lengkap terpasang) type J3
13 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-1
14 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-2
15 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
16 Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-1
17 Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-2
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60
1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang)
Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap
2
terpasang)
3 Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang)
4 Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap terpasang)
5 Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang)
Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang Cuci, di Janitor, dan di
6
Tempat Sampah
7 Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang)
1 Pek. Pasangan Dinding Bata Ringan t=7,5 cm Termasuk Dinding Railling Tangga
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela
5 Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dinding
6 Pek. Partisi Gypsum Rangka Metal Stud + Lapis Rockwool
Pek. Cover/Penutup Pipa Air Hujan Bagian Balkon Gypsum + Rangka Hollow
7
Galvanis
Pek. Pasang Hand Railling Tangga pipa Black Steel Medium dia 3 & dia 1, di Atas
8
Dinding dan Nempel pada Didinding
9 Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur
10 Pek. Plint 10x60 cm Dinding Coridor/Selasar dan Unit Kamar
11 Pek. Keramik 20x20 cm Meja Dapur
5 Kusen Alum. 3 Powder Coating + Daun Pintu UPVC (lengkap terpasang ) type PT
Kusen Alum. 3 Powder Coating + Daun Pintu Alum. Powder Coating (lengkap
6
terpasang) type PS
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
7
Clear 5 mm (lengkap terpasang) type J1
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating Kaca
8
Clear 5 mm (lengkap terpasang) type J2
Kusen Alum. 3 Powder Coating + Daun Jendela Frame Alum. Powder Coating, Kaca
9
Clear 5 mm & Jendela Krepyak Alum. Powder Coating (lengkap terpasang) type J3
13 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-1
14 Kusen Alum. 3 Powder Coating + Kaca Clear 5 mm (lengkap terpasang) type BV-2
15 Besi Hollow 40x40 Cm + Besi Hollow 40x20 Cm (lengkap terpasang) type JL-1
16 Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-1
17 Railing Besi Hollow 40x40 Cm (lengkap terpasang) type R-2
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60
1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang)
II BAK KONTROL
B RUANG POMPA
1 Pek. Pasangan Dinding Bata 15
2 Pek. Plester Dinding Exterior/Dind. Terluar
3 Pek. Acian Dinding Exterior/Dind. Terluar
4 Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk Opening Kusen Aluminium
5 Pek. Perapihan Daerah Dak Beton
Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan
6
Dinding
7 Pek. Waterproofing membran bakar t=3cm di Daerah Dak
8 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)
9 Pek. Pasang Keramik Dinding 20x20
10 Pek. Cat Dinding dan Dak Bag. Luar (exterior)
11 Pek. Pintu Besi
A PEKERJAAN AKSESORIS
1 Pek. Pembuatan Lemari Surat
2 Pek. Nama Ruangan 10x20 cm -acrylic (lengkap terasang)
3 Pek. Nama Lantai 30x30 -acrylic (lengkap terasang)
NO.
2.1.A
A.1
1
8
9
10
11
12
13
14
A.2
1
3
4
10
11
12
13
14
15
16
17
18
19
20
21
A.3
1
3
4
10
11
12
13
14
15
16
17
A.4
1
6
7
10
11
12
13
14
15
16
A.5
1
A.6
1
2
A.7
1
2
a
b
c
d
.1.B.
B.1
A.1
1
2
3
7
8
9
10
11
12
13
14
15
16
17
B.2
A
1
2
3
4
8
9
10
11
B
1
2
3
6
7
8
10
11
12
C
1
2
3
4
5
6
7
RENCANA ANGGARAN BIAYA
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI :
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
URAIAN PEKERJAAN
LANTAI 2
Kolom K1
Beton K-300
Besi beton
Bekisting
Kolom K2
Beton K-300
Besi beton
Bekisting
Balok G1.1
Beton K-300
Besi beton
Bekisting
Balok G1.2
Beton K-300
Besi beton
Bekisting
Balok G1.3
Beton K-300
Besi beton
Bekisting
Balok G1.4
Beton K-300
Besi beton
Bekisting
Balok G1.5
Beton K-300
Besi beton
Bekisting
Balok G1.6
Beton K-300
Besi beton
Bekisting
Balok G1.7
Beton K-300
Besi beton
Bekisting
Balok B1.1
Beton K-300
Besi beton
Bekisting
Plat lantai t =130 mm
Beton K-300
Besi beton
Bekisting
Plat lantai t =150 mm
Beton K-300
Besi beton
Bekisting
Sear Wall (SW)
Beton K-300
Besi beton
Bekisting
Pelat Beton Canopy Jendela t= 10 cm
Beton K-300
Besi beton
Bekisting
Tangga Service lt.2
Beton K-300
Besi beton
Bekisting
Balok Bordes 20x35 cm (tangga Service)
Beton K-300
Besi beton
Bekisting
Kolom KB (Tangga Service)
Beton K-300
Besi beton
Bekisting
Tangga Utama lt. 2
Beton K-300
Besi beton
Bekisting
Balok Bordes 20x35 cm Tangga Utama
Beton K-300
Besi beton
Bekisting
Kolom KB (Tangga Utama)
Beton K-300
Besi beton
Bekisting
LANTAI 3
Kolom K1
- Beton K-300
- Besi beton
- Bekisting
Kolom K2
- Beton K-300
- Besi beton
- Bekisting
Kolom K3
- Beton K-300
- Besi beton
- Bekisting
Balok G1.1
- Beton K-300
- Besi beton
- Bekisting
Balok G2.1
- Beton K-300
- Besi beton
- Bekisting
Balok G4.1
- Beton K-300
- Besi beton
- Bekisting
Balok G5.1
- Beton K-300
- Besi beton
- Bekisting
Balok B2.1
- Beton K-300
- Besi beton
- Bekisting
Balok B2.2
- Beton K-300
- Besi beton
- Bekisting
Balok B2.3
- Beton K-300
- Besi beton
- Bekisting
Balok B3.1
- Beton K-300
- Besi beton
- Bekisting
Tangga lt.4 (Samping kanan & kiri)
- Beton K-300
- Besi beton
- Bekisting
Balok Bordes 20x35 cm
- Beton K-300
- Besi beton
- Bekisting
Plat lantai 4 t=13 cm
- Beton K-300
- Besi beton
- Bekisting
Kolom KB
- Beton K-300
- Besi beton
- Bekisting
Pelat Beton Canopy Jendela t= 10 cm
- Beton K-300
- Besi beton
- Bekisting
Janggutan Beton
- Beton K-300
- Besi beton
- Bekisting
LANTAI ATAP
Kolom K3
Beton K-300
Besi beton
Bekisting
Kolom K2
Beton K-300
Besi beton
Bekisting
Balok G1.1
Beton K-300
Besi beton
Bekisting
Balok G1.2
Beton K-300
Besi beton
Bekisting
Balok G1.3
Beton K-300
Besi beton
Bekisting
Balok G1.4
Beton K-300
Besi beton
Bekisting
Balok G1.5
Beton K-300
Besi beton
Bekisting
Balok G1.6
Beton K-300
Besi beton
Bekisting
Balok G1.7
Beton K-300
Besi beton
Bekisting
Balok B1.1
Beton K-300
Besi beton
Bekisting
Plat lantai t=13 cm
Beton K-300
Besi beton
Bekisting
Plat lantai t =150 mm
Beton K-300
Besi beton
Bekisting
Pelat Beton Canopy Jendela t= 10 cm
Beton K-300
Besi beton
Bekisting
Tangga Service lt.4
Beton K-300
Besi beton
Bekisting
Balok Bordes 20x35 cm (tangga Service)
Beton K-300
Besi beton
Bekisting
Kolom KB (Tangga Service)
Beton K-300
Besi beton
Bekisting
LANTAI DAK
Kolom K3
Beton K-300
Besi beton
Bekisting
Kolom K2
Beton K-300
Besi beton
Bekisting
Balok G1.2
Beton K-300
Besi beton
Bekisting
Balok G1.8
Beton K-300
Besi beton
Bekisting
Balok G2.1
Beton K-300
Besi beton
Bekisting
Balok B1.2
Beton K-300
Besi beton
Bekisting
Plat Dak t=15 cm
Beton K-300
Besi beton
Bekisting
Pondasi Water Tank Plat Dak t=15 cm
Beton K-300
Besi beton
Bekisting
Beton Tanggulan
Beton K-300
Besi beton
Bekisting
LANTAI ATAP
Balok G3.1 (Ring Balok)
Beton K-300
Besi beton
Bekisting
Kolom K3 (sopi-sopi)
Beton K-300
Besi beton
Bekisting
Balok G3.1 (sopi-sopi)
Beton K-300
Besi beton
Bekisting
A.1. LANTAI 1
1 PEMIPAAN AIR BERSIH
2 PEMIPAAN AIR KOTOR & AIR BEKAS
3 PEMIPAAN AIR HUJAN
4 PEMIPAAN VENT
5 INSTALASI PANEL
6 INSTALASI KABEL FEEDER
7 INSTALASI KABEL TRAY
8 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9 INSTALASI PENERANGAN & STOP KONTAK
A.2. LANTAI 2
1 PEMIPAAN AIR BERSIH
2 PEMIPAAN AIR KOTOR & AIR BEKAS
3 PEMIPAAN AIR HUJAN
4 PEMIPAAN VENT
5 INSTALASI PANEL
6 INSTALASI KABEL FEEDER
7 INSTALASI KABEL TRAY
8 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9 INSTALASI PENERANGAN & STOP KONTAK
A.3. LANTAI 3
1 PEMIPAAN AIR BERSIH
2 PEMIPAAN AIR KOTOR & AIR BEKAS
3 PEMIPAAN AIR HUJAN
4 PEMIPAAN VENT
5 INSTALASI PANEL
6 INSTALASI KABEL FEEDER
7 INSTALASI KABEL TRAY
8 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9 INSTALASI PENERANGAN & STOP KONTAK
831,118,707.25
208,081,351.81
21,275,022.00
74,127,459.00
35,019,088.00
14,065,584.00
7,452,000.00
10,143,908.50
27,554,986.31
12,838,529.00
5,604,775.00
166,998,297.91
22,774,280.00
45,553,819.60
18,109,002.00
18,754,112.00
6,300,000.00
10,449,846.00
20,755,530.31
16,934,733.00
7,366,975.00
159,478,590.31
22,774,280.00
37,661,416.00
14,415,648.00
18,754,112.00
9,436,000.00
11,379,896.00
20,755,530.31
16,934,733.00
7,366,975.00
12,333,541.33
2,933,853.33
9,399,688.00
258559191.916.67
221,804,245.73
34,956,390.19
631,431.00
1,167,125.00
13,500,000.00
13,500,000.00
12,167,733.96
12,167,733.96
12,167,733.96
380,516,358.73
125,106,705.00
125,106,705.00
40,509,280.00
128,717,754.40
128,717,754.40
86182619.333.33
73,336,146.00
9,125,000.00
3,721,473.33
1,211,635,065.98
RENCANA ANGGARAN
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI :
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
No.
A.
A.1
1
2
3
6
a
b
7
A.2.
1
2
5
6
a.
b.
8
9
A.3.
1
3
4
6
a.
b.
7
A.4.
1
2
A.5.
1
a.
b.
c.
d.
e.
3
a.
b.
4
a.
b.
A.6.
1
a.
b.
A.7.
1
B.
B.1.
I
a
c
B.2
A
1
B.3.
I
A.
B.
C.
D.
E.
II
A.
B
d
B.4.
I
I.1
4
a
b
c
d
e
f
g
h
i
j
5
a
b
I.2
1
II
1
IV
RENCANA ANGGARAN B
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI :
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
URAIAN PEKERJAAN
PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
Dia. 80 ( pipa riser )
Dia. 32
INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.1
dengan komponen panel, sbb
MCCB 3P, 75 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 63 A
Accessories & Termination
Box Panel
KW-meter/1ph/6A
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb
MCB 1P, 6 A
MCB 1P, 6 A
Box Hanger
LANTAI 2
PEMIPAAN AIR BERSIH
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PVC AW dia. 15
PVC AW dia. 20
PVC AW dia. 40
PVC AW dia. 50 (Riser dari Tangki Air Atas)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
dia. 40
Meter Air c/w BV dia. 20
PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
Dia. 80 ( pipa riser )
Dia. 32
INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2
dengan komponen panel, sbb
MCCB 3P, 63 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 63 A
Accessories & Termination
Box Panel
KW-meter/1ph/6A
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb
MCB 1P, 6 A
MCB 1P, 6 A
Box Hanger
LANTAI 3
PEMIPAAN AIR BERSIH
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PVC AW dia. 15
PVC AW dia. 20
PVC AW dia. 40
PVC AW dia. 50 (Riser dari Tangki Air Atas)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
dia. 40
Meter Air c/w BV dia. 20
PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
Dia. 80 ( pipa riser )
Dia. 32
INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.3
dengan komponen panel, sbb
MCCB 3P, 63 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 63 A
Accessories & Termination
Box Panel
KW-meter/1ph/6A
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb
MCB 1P, 6 A
MCB 1P, 6 A
Box Hanger
LANTAI ATAP
PEMIPAAN AIR BERSIH
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PVC AW dia. 50
PVC AW dia. 32 (Pipa Drain)
PVC AW dia. 100 (Header)
Peralatan Katup-katup
(Ball Valve & Gate Valve)
dia. 50
dia. 32
PEKERJAAN UTILITAS
INSTALASI PANEL
P-PLN
MCCB 3P, 200 A
Accessories & Termination
Box Panel
P-MDP
Pengadaan dan pemasangan MDP, dengan komponen panel,
sbb
Mgs 3P, 63 A
MCCB 3P, 200 A
MCCB 3P, 80 A
MCCB 3P, 32 A
MCB 3P, 32 A
Contacto, (timer switch)
Earth Fault Relay
Over Current Relay
Over / Under Voltage Relay
Power Factor-meter
Frequency-metr
Ampere-meter 300/5 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
CT 300/5 A
CT 50/5 A
Fuse Carrier 4 A
Indicator Lamp
Rel MCCB 3P
CU Bar 5 x 400 A
Accessories & Termination
Box Panel
P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA
dengan komponen panel, sbb
MCCB 3P, 80 A
MCB 3P, 63 A
MCB 3P, 32 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 80 A
Accessories & Termination
Box Panel
KW-meter/3ph/80A
P-POMPA AIR BERSIH
Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan kompo-
nen panel, sbb
MCB 3P, 32 A
MCB 3P, 10 A
WLC 61F G-AP 220 Volt
DOL ( Direct On Line )
Radar diantaki air atas
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 32 A
Accessories & Termination
Box Panel
P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan kompo-
nen panel, sbb
MCB 3P, 40 A
MCB 3P, 16 A
WLC 61F G-AP 220 Volt
DOL ( Direct On Line )
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 32 A
Accessories & Termination
Box Panel
unit 1,550,000.00 -
20.00 bh 150,000.00
1.00 bh 180,000.00 180,000.00
1.00 bh 64,000.00 64,000.00
1.00 bh 240,000.00 240,000.00
2.00 bh 10,500,000.00 21,000,000.00
1.00 bh 630,000.00 630,000.00
JUMLAH HARGA
197,289,147.20
69,927,000.00
267,216,147.20
Makassar, 09 Desember 2019
PT. RIMBA RAYA UTAM
NO.
I.B.
1
a
b
2
a
c
-
-
-
-
-
d
e
f
g
3
a
b
c
d
e
4
a
b
c
d
e
f
g
h
h
i
j
k
l
m
5
a
b
6
a
b
c
d
e
f
g
h
i
j
7
a
b
c
d
e
f
g
TOTAL HARAG
RENCANA ANGGARAN
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI : JL. JEND. AHMAD YANI KEL. LAPADDE, KEC. UJUNG, KOTA PARE-PARE
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
JENIS PEKERJAAN
P3K
Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll)
Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter,
TOTAL HARAG
GARAN BIAYA
B)
69,927,000.00
GA (Rp.)
RENCANA ANGGARAN BIAYA
(RAB)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN T-24 3 LT PENDEK
LOKASI : JL. JEND. AHMAD YANI KEL. LAPADDE, KEC. UJUNG, KOTA PARE-PARE
SATUAN KERJA : PENYEDIA RUMAH SUSUN
TAHUN ANGGARAN : 2020
288,480.00 57,696,000.00
2,152,825.00 51,667,800.00
300,000.00 300,000.00
150,000.00 450,000.00
1,000,000.00 1,000,000.00
3,000,000.00 3,000,000.00
415,876.74 83,175,347.20
197,289,147.20
HARGA SATUAN PEKERJAAN
No Kode
73,700
75,900
95,700
288,480
2,152,825
318,450
385,550
385,550
18,150
385,550
40,260
110,715
241,912
120,956
11,374
60,676
86,075
105,435
125,081
114,576
173,580
138,435
6,215
37,730
31,075
62,150
179,630
153,120
18,645
31,075
276,375
276,375
276,375
276,375
276,375
276,375
276,375
276,375
143,715
512,380
388,377
230,340
230,340
230,340
713,514
230,340
230,340
230,340
230,340
230,340
1,054,108
292,985
292,985
292,985
11,055
13,464
14,740
6,698
12,639
110,058
180,069
63,233
322,813
332,924
366,813
335,805
302,398
24,354
973,104
1,096,040
1,366,200
1,190,255
973,500
448,404
1,096,040
209,453
48,114
18,447
23,078
27,599
34,628
73,954
5,709
5,709
8,723
14,135
11,429
66,979
68,893
62,040
42,377
38,582
52,497
14,818
14,818
14,818
-
-
59,466
36,652
79,013
34,648
15,081
23,947
23,947
724,589
7,370
310,706
293,898
110,594
116,732
251,350
154,791
1,080,621
21,538
88,044
867,106
136,328
48,983
182,884
57,904
276,366
331,995
191,118
184,481
483,202
97,130
275,667
97,130
97,130
97,130
97,130
48,565
115,972
48,565
48,565
48,565
48,565
48,565
48,565
48,565
61,204
61,204
53,592
53,592
48,565
48,565
48,565
48,565
55,275
329,122
56,375
55,275
67,844
65,777
55,275
55,275
55,275
55,275
55,275
58,278
58,278
58,278
58,278
73,986
71,342
73,986
73,986
73,986
81,070
27,775
65,121
83,050
83,050
48,565
27,775
13,035
63,021
40,076
1,111,275
42,790
46,200
46,200
49,885
46,200
47,905
49,885
46,200
47,905
480,903
47,905
46,200
47,905
44,220
46,200
47,905
22,693
22,693
22,693
22,693
22,693
22,693
23,683
22,693
22,693
22,693
22,693
22,693
75,355
22,693
22,693
66,330
128,975
128,975
128,975
377,079
213,697
193,600
128,975
181,621
26,125
26,125
188,584
128,975
42,801
30,162
128,975
128,975
184,250
165,825
165,825
165,825
165,825
165,825
165,825
239,525
184,250
128,975
128,975
37,774
62,205
30,162
20,108
30,162
61,407
167,225
61,407
61,407
27,775
208,311
199,648
13,266
30,162
30,162
25,135
25,135
201,080
41,149
125,675
12,639
60,775
18,425
49,661
20,560
27,709
27,775
27,775
71,126
71,126
71,126
25,432
26,675
26,675
25,795
25,795
25,795
25,795
25,795
25,795
25,795
25,795
25,795
25,795
25,795
25,795
26,653
26,653
26,653
26,653
26,653
26,653
31,438
26,653
36,850
60,126
139,563
35,563
52,954
73,700
48,158
85,263
48,158
22,110
26,752
118,668
152,350
24,354
3,638,250
3,118,500
181,984
181,984
519,750
415,800
519,750
363,825
415,800
390,005
1,117,842
441,859
2,079,000
3,482,325
3,482,325
25,135
25,135
30,162
67,485
63,690
38,555
38,555
78,034
78,034
103,950
311,850
13,024
18,425
49,888
87,549
165,165
68,079
68,079
63,061
14,591
37,911
22,924
22,924
73,029
29,183
73,029
15,235
87,549
36,485
21,894
156,424
188,162
36,485
22,924
25,971
22,924
28,952
16,929
16,929
17,644
86,609
21,362
20,768
14,201
11,858
39,501
48,003
9,145
9,145
16,991
5,428
29,397
29,397
59,615
61,235
15,873
154,220
140,800
140,800
1,514,535
678,385
318,450
886,595
1,185,104
109,329
1,009,800
1,066,890
1,009,800
95,535
1,189,514
286,446
76,175
29,679
335,797
494,890
494,890
21,879
107,615
21,879
110,279
36,751
345,113
46,112
35,698
35,698
44,278
100,347
18,447
160,199
199,979
118,079
14,740
11,055
25,795
70,015
925,001
347,458
15,015
17,314
19,536
21,835
35,002
47,366
54,274
100,474
123,706
149,578
176,957
299,035
312,543
350,328
387,970 Err:504 Err:504
425,612
6,336
7,392
8,448
11,429
18,821
24,596
31,416
53,592
66,418
79,915
94,589
164,923
250,052
306,658
335,995
437,976
63,624
555,403
82,819
93,566
147,158
175,450
177,067
223,949
249,931
271,546
245,333
430,012
484,748
537,999
591,360
299,299
72,655
81,224
91,036
126,896
141,185
144,496
165,152
201,452
234,485
253,416
470,941
599,377
745,886
826,846
952,675
74,140
86,020
96,305
370,833
165,286
196,834
210,056
351,384
331,265
361,075
327,965
578,699
557,051
726,836
799,964
875,050
863
2,530
4,037
5,654
14,894
23,683
28,512
61,215
54,516
95,755
115,027
201,322
210,903
237,600
264,154
290,708
7,961
17,020
23,174
30,033
46,258
61,713
77,146
115,536
135,721
156,467
189,060
283,275
363,113
424,592
467,965
560,629
3,586
10,747
16,973
24,255
62,832
87,648
93,082
136,411
156,739
173,943
159,610
289,564
327,096
364,738
402,523
440,165
10,505
16,555
23,650
54,384
70,719
75,955
139,700
168,839
194,755
194,425
385,880
500,445
597,080
702,515
816,970
4,235
12,551
19,756
27,291
70,719
98,461
110,561
213,840
207,790
231,440
213,389
389,631
441,155
492,910
544,544
596,299
264,154
316,690
323,912
369,600
637,124
633,754
739,200
262,647
264,154
330,110
316,690
475,167
554,400
554,400
19,646
39,974
60,302
80,630
121,286
141,614
161,942
202,598
243,254
283,910
324,566
365,222
405,878
446,534
270,974
304,238
387,398
470,558
553,718
636,878
803,198
886,358
969,518
1,135,838
1,302,158
1,468,478
994
994
994
994
994
994
994
994
994
994
-
42,900
24,475
24,475
24,475
24,475
369,966
424,966
58,774
48,904
68,811
33,567
111,650
29,967
30,519
39,956
124,437
162,937
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKA - -
C PERALATAN - -
Pipa listrik 5/8” btg 3 #N/A #N/A
T Dus buah 1 #N/A #N/A
L Bow buah 2 #N/A #N/A
NO URAIAN PEKERJAAN VOL SAT HARGA SAT
1 PEKERJAAN PJ 1
1 Pek. Kusen Alumunium 3" 16.16 m2 154,791.00
2 Daun Pintu Kaca 8 mm 2.29 m3 188,162.00
3 Engsel Pintu 6.00 Bh 63,061.00
4 Handle Pintu 2.00 Bh 165,165.00
5 Kaca Polos 5mm 3.67 m2 156,424.00
Jumlah
2,501,422.56
431,643.63
378,366.00
330,330.00
574,576.64
4,216,338.82
JUMLAH HARGA
2,269,236.06
660,034.66
378,366.00
330,330.00
548,704.11
4,186,670.83
JUMLAH HARGA
2,043,241.20
189,183.00
330,330.00
477,875.32
3,040,629.52
JUMLAH HARGA
1,563,389.10
1,173,734.10
189,183.00
165,165.00
477,875.32
3,569,346.52
JUMLAH HARGA
1,052,578.80
1,812,245.45
189,183.00
165,165.00
44,674.69
3,263,846.94
JUMLAH HARGA
1,083,537.00
253,416.58
189,183.00
165,165.00
28,907.16
1,720,208.74
JUMLAH HARGA
1,693,174.50
1,409,466.60
1,072,391.72
189,183.00
165,165.00
4,529,380.82
JUMLAH HARGA
1,693,174.50
1,093,839.55
189,183.00
165,165.00
3,141,362.05
JUMLAH HARGA
1,513,233.21
1,478,161.56
189,183.00
165,165.00
3,345,742.77
JUMLAH HARGA
1,922,251.05
1,090,651.36
378,366.00
330,330.00
3,721,598.41
JUMLAH HARGA
762,345.68
1,099,531.87
189,183.00
165,165.00
2,216,225.54
JUMLAH HARGA
786,338.28
1,724,671.12
189,183.00
165,165.00
2,865,357.40
JUMLAH HARGA
1,482,897.78
126,122.00
15,751.90
1,624,771.68
JUMLAH HARGA
865,281.69
126,122.00
157,518.97
1,148,922.66
JUMLAH HARGA
1,888,450.20
126,122.00
134,243.08
2,148,815.28
JUMLAH HARGA
1,767,713.22
126,122.00
320,731.77
2,214,566.99
JUMLAH HARGA
1,903,929.30
1,295,190.72
3,199,120.02
JUMLAH HARGA
773,955.00
279,526.93
1,053,481.93
JUMLAH HARGA
314,888.00
87,808.00
402,696.00
JUMLAH HARGA
134,952.00
18,816.00
153,768.00
JUMLAH HARGA
730,990.00
101,920.00
832,910.00
JUMLAH HARGA
179,936.00
50,176.00
230,112.00
JUMLAH HARGA
404,856.00
56,448.00
461,304.00
JUMLAH HARGA
303,390.36
25,027.84
328,418.20
JUMLAH HARGA
532,481.04
50,055.68
582,536.72
JUMLAH HARGA
9,396,444.00
9,396,444.00
JUMLAH HARGA
4,974,588.00
4,974,588.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang
Semen portland Kg
Pasir beton m3
Koral beton m3
Kayu 5/7 m3
Paku biasa Kg
Residu Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang
Semen portland Kg
Seng gelombang Lbr
Pasir beton m3
Koral beton m3
Kayu 5/7 m3
Paku biasa Kg
Meni besi Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang
Semen portland Kg
Kawat duri M’
Pasir beton m3
Koral beton m3
Paku biasa 2” - 5” Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu b
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3
Semen portland Kg
Pasir Beton m3
Kerikil m3
Besi beton (polos/ulir) Kg
Kawat beton Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan ta
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) m
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg
Pasir beton Kg
Kerikil (Maks 30 mm) Kg
Air L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) m
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg
Pasir beton Kg
Kerikil (Maks 30 mm) Kg
Air L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) m
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg
Pasir beton Kg
Kerikil (Maks 30 mm) Kg
Air L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3
Phenol film 12mm Lbr
Minyak bekisting L
Dynabol dia 12 x 120 mm Bh
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3
Phenol film 12mm Lbr
Minyak bekisting L
Paku Biasa Kg
Dynabol dia 12 x 120 mm Bh
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Las L.02.11 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg
Besi plat baja Kg
Kawat las Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang L.02.01 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m
Paku Biasa kg
Besi strip kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm M1
Assesoris (perkuatan, las dll) Ls
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIA
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 M'
Baut (Srew driver) bh
Dynabol dia 12 x 120 mm bh
Reng Canai Dingin M'
Talang / Jurai Canai Dingin M'
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen Merah Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen Merah Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
HB-20 m3
Semen portland Kg
Pasir Pasang m3
Besi angker dia 8 Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5 cm m3
Mortar siap pakai Kg
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5 cm m3
Mortar siap pakai Kg
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh
Semen portland Kg
Pasir Pasang M3
Semen Warna Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Tripleks Lembar
Paku tripleks kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m
Kawat dia 4 mm kg
Ramset Buah
Akustik 60 x 120 Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Paku Biasa Kg
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Plywood 4 mm Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Plywood 4 mm Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Teakwood 4 mm 90 x 220 cm Lembar
Formika Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Besi strip kg
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/7 m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/7 m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg
Plamuur Kg
Cat dasar Kayu Kg
Cat Penutup Kayu Kg
Kuas Bh
Pengencer Kg
Ampelas Lbr
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg
Plamuur Kg
Cat dasar Kayu Kg
Cat Penutup Kayu Kg
Kuas Bh
Pengencer Kg
Ampelas Lbr
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Tembok Kg
Cat Penutup Tembok Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg
Kuas Bh
Pengencer L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg
Pengencer L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3
Semen portland Kg
Pasir pasang M3
Porselen 11x11 bh
Semen warna Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah Bh
Semen portland Kg
Pasir pasang M3
Pasir urug M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 150 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 250 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 400 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 450 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.2500 -
5.0000 -
0.0050 -
0.0090 -
0.0720 -
0.0600 -
0.4000 -
UMLAH HARGA BAHAN -
1.2500 -
2.5000 -
1.2000 -
0.0050 -
0.0090 -
0.0720 -
0.0600 -
0.4500 -
UMLAH HARGA BAHAN -
-
JUMLAH HARGA ALAT -
69,000.00
10% 6,900.00
- 75,900.00
3.0000 -
0.2760 -
0.7000 -
1.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 289,500.00
10% 28,950.00
- 318,450.00
1.2500 -
0.1860 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 350,500.00
10% 35,050.00
- 385,550.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
- -
0.3000 110,000.00 33,000.00
0.0300 120,000.00 3,600.00
MLAH TENAGA KERJA 36,600.00
- -
0.0360 -
0.0210 -
0.0800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 36,600.00
10% 3,660.00
- 40,260.00
pekerjaan galian
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
- -
0.2500 100,000.00 25,000.00
0.0250 130,000.00 3,250.00
MLAH TENAGA KERJA 28,250.00
- -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 28,250.00
10% 2,825.00
- 31,075.00
1.2000 -
0.1700 -
170.0000 -
0.3400 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 251,250.00
10% 25,125.00
- 276,375.00
1.2000 -
61.0000 -
0.1470 -
0.4920 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 251,250.00
10% 25,125.00
- 276,375.00
1.2000 -
41.0000 -
0.1310 -
0.5230 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 251,250.00
10% 25,125.00
- 276,375.00
1.2000 -
0.4320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 130,650.00
10% 13,065.00
- 143,715.00
0.4800 -
194.0000 -
0.3120 -
0.4680 -
126.0000 -
1.8000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 465,800.00
10% 46,580.00
- 512,380.00
0.4500 -
194.0000 -
0.3120 -
0.4680 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 353,070.00
10% 35,307.00
- 388,377.00
247.0000 -
869.0000 -
999.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
276.0000 -
828.0000 -
1012.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
299.0000 -
799.0000 -
1017.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
326.0000 -
760.0000 -
1029.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
m, w/c = 0,61
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
352.0000 -
731.0000 -
1031.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
371.0000 -
698.0000 -
1047.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
m, w/c = 0,56
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
384.0000 -
692.0000 -
1039.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
406.0000 -
684.0000 -
1026.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 209,400.00
10% 20,940.00
- 230,340.00
439.0000 -
670.0000 -
1006.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 266,350.00
10% 26,635.00
- 292,985.00
448.0000 -
667.0000 -
1000.0000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 266,350.00
10% 26,635.00
- 292,985.00
448.0000 -
667.0000 -
1000.0000 -
4.5000 -
215.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 266,350.00
10% 26,635.00
- 292,985.00
400.0000 -
0.4800 -
0.8000 -
1.2000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 266,350.00
10% 26,635.00
- 292,985.00
1.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 10,050.00
10% 1,005.00
- 11,055.00
1.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 12,240.00
10% 1,224.00
- 13,464.00
1.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 13,400.00
10% 1,340.00
- 14,740.00
10.5000 -
0.1000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 11,490.00
10% 1,149.00
- 12,639.00
0.0264 -
0.6000 -
0.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,140.00
10% 2,214.00
- 24,354.00
0.2000 -
1.5000 -
0.4000 -
157.5000 -
2.2500 -
336.0000 -
0.5400 -
0.8100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 884,640.00
10% 88,464.00
- 973,104.00
0.2700 -
2.0000 -
0.6000 -
210.0000 -
3.0000 -
336.0000 -
0.5400 -
0.8100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 996,400.00
10% 99,640.00
- 1,096,040.00
0.4000 -
4.0000 -
2.0000 -
315.0000 -
4.5000 -
336.0000 -
0.5400 -
0.8100 -
0.1500 -
3.5000 -
20.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 1,242,000.00
10% 124,200.00
- 1,366,200.00
0.3200 -
3.2000 -
1.6000 -
210.0000 -
3.0000 -
336.0000 -
0.5400 -
0.8100 -
0.1400 -
2.8000 -
16.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 1,082,050.00
10% 108,205.00
- 1,190,255.00
0.3200 -
3.2000 -
1.6000 -
157.5000 -
2.2500 -
336.0000 -
0.5400 -
0.8100 -
0.1200 -
2.8000 -
32.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 885,000.00
10% 88,500.00
- 973,500.00
0.2400 -
3.2000 -
1.6000 -
157.5000 -
2.2500 -
336.0000 -
0.5400 -
0.8100 -
0.1600 -
2.8000 -
24.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 407,640.00
10% 40,764.00
- 448,404.00
0.2500 -
3.0000 -
1.2000 -
210.0000 -
3.0000 -
336.0000 -
0.5400 -
0.8100 -
0.1050 -
2.5000 -
14.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 996,400.00
10% 99,640.00
- 1,096,040.00
0.0030 -
0.0200 -
1.2000 -
3.6000 -
0.0500 -
5.5000 -
0.0090 -
0.0150 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,740.00
10% 4,374.00
- 48,114.00
26.0800 -
60.8000 -
82.3200 -
17.2000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 16,770.00
10% 1,677.00
- 18,447.00
32.6000 -
76.0000 -
102.9000 -
21.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,980.00
10% 2,098.00
- 23,078.00
48.9000 -
114.0000 -
154.3500 -
32.2500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 31,480.00
10% 3,148.00
- 34,628.00
0.0050 -
0.0430 -
0.2000 -
0.6930 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 5,190.00
10% 519.00
- 5,709.00
0.0040 -
0.0480 -
0.2000 -
0.0460 -
0.6930 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 5,190.00
10% 519.00
- 5,709.00
6.676 -
UMLAH HARGA BAHAN -
0.067 -
1.1 -
JUMLAH HARGA ALAT -
- 38,525.00
10% 3,852.50
- 42,377.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
6.11 -
UMLAH HARGA BAHAN -
0.061 -
1.1 -
JUMLAH HARGA ALAT -
- 35,075.00
10% 3,507.50
- 38,582.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
8.277 -
UMLAH HARGA BAHAN -
0.083 -
2.2 -
JUMLAH HARGA ALAT -
- 47,725.00
10% 4,772.50
- 52,497.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.8970 -
UMLAH HARGA BAHAN -
0.0190 -
JUMLAH HARGA ALAT -
- 13,471.00
10% 1,347.10
- 14,818.00
1.8970 -
UMLAH HARGA BAHAN -
0.0190 -
JUMLAH HARGA ALAT -
- 13,471.00
10% 1,347.10
- 14,818.00
1.8970 -
UMLAH HARGA BAHAN -
0.0190 -
JUMLAH HARGA ALAT -
- 13,471.00
10% 1,347.10
- 14,818.00
0.0120 -
0.0040 -
0.2640 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 33,320.00
10% 3,332.00
- 36,652.00
1.1500 -
UMLAH HARGA BAHAN -
1.0000 -
0.1000 -
UMLAH HARGA BAHAN -
0.8000 -
JUMLAH HARGA ALAT -
- 21,770.00
10% 2,177.00
- 23,947.00
0.4000 -
0.3000 -
0.0400 -
UMLAH HARGA BAHAN -
0.1700 -
JUMLAH HARGA ALAT -
- 6,700.00
10% 670.00
- 7,370.00
4.7600 -
4.5220 -
20.0000 6,700.00 134,000.00
UMLAH HARGA BAHAN 134,000.00
1.0000 -
UMLAH HARGA BAHAN -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 100,540.00
10% 10,054.00
- 110,594.00
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 106,120.00
10% 10,612.00
- 116,732.00
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 228,500.00
10% 22,850.00
- 251,350.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
4.4000 -
4.5000 -
0.2700 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 19,580.00
10% 1,958.00
- 21,538.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 80,040.00
10% 8,004.00
- 88,044.00
1.1000 -
10.0000 -
7.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,530.00
10% 4,453.00
- 48,983.00
1.0500 -
0.0100 -
0.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 52,640.00
10% 5,264.00
- 57,904.00
cm, dinding partisi
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
4.0500 -
UMLAH HARGA BAHAN -
- -
0.1000 -
JUMLAH HARGA ALAT -
- 173,744.00
10% 17,374.40
- 191,118.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
4.0500 -
UMLAH HARGA BAHAN -
0.1000 -
JUMLAH HARGA ALAT -
- 167,710.00
10% 16,771.00
- 184,481.00
0.1000 34,483.31
JUMLAH HARGA ALAT -
- 439,274.77
10% 43,927.48
- 483,202.00
mpuran 1 SP : 2 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
140.0000 -
43.5000 -
0.0800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 88,300.00
10% 8,830.00
- 97,130.00
mpuran 1 SP : 3 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
mpuran 1 SP : 4 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
140.0000 -
26.5500 -
0.0930 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 88,300.00
10% 8,830.00
- 97,130.00
mpuran 1 SP : 5 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
140.0000 -
22.2000 -
0.1020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 88,300.00
10% 8,830.00
- 97,130.00
mpuran 1 SP : 6 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
140.0000 -
18.5000 -
0.1220 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 88,300.00
10% 8,830.00
- 97,130.00
140.0000 -
10.0800 -
0.0275 -
0.0925 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 88,300.00
10% 8,830.00
- 97,130.00
70.0000 -
11.5000 -
0.0430 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
mpuran 1 SP : 5 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
70.0000 -
9.6800 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
mpuran 1 SP : 6 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
70.0000 -
8.3200 -
0.0490 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
mpuran 1SP : 8 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
70.0000 -
6.5000 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
70.0000 -
4.5000 -
0.0150 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
70.0000 -
0.0180 -
0.0180 -
0.0180 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
70.0000 -
0.0140 -
0.0140 -
0.0280 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
12.5000 -
30.3200 -
0.7280 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 55,640.00
10% 5,564.00
- 61,204.00
12.5000 -
24.2600 -
0.7720 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 55,640.00
10% 5,564.00
- 61,204.00
12.5000 -
22.7400 -
0.5500 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 48,720.00
10% 4,872.00
- 53,592.00
12.5000 -
18.2000 -
0.5820 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 48,720.00
10% 4,872.00
- 53,592.00
12.5000 -
15.1600 -
0.3640 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
12.5000 -
12.1300 -
0.3880 -
0.2800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
30.0000 -
11.0000 -
0.0350 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
30.0000 -
11.0000 -
0.0350 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
uran 1 SP : 3 PP
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
70.0000 -
14.0000 -
0.0320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
ap pakai B.
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.1 -
4.4 -
UMLAH HARGA BAHAN -
0.1000 - -
JUMLAH HARGA ALAT -
- 51,250.00
10% 5,125.00
- 56,375.00
15.5040 -
0.0160 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
6.2400 -
0.0240 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
5.1840 -
0.0260 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
4.4160 -
0.0270 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
3.9360 -
0.0280 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
3.4560 -
0.0290 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 50,250.00
10% 5,025.00
- 55,275.00
5.7600 -
0.0030 -
0.0130 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 52,980.00
10% 5,298.00
- 58,278.00
3.0000 -
0.0050 -
0.0200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 52,980.00
10% 5,298.00
- 58,278.00
0.0090 -
0.0090 -
0.0090 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 52,980.00
10% 5,298.00
- 58,278.00
0.0070 -
0.0070 -
0.0150 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 52,980.00
10% 5,298.00
- 58,278.00
13.6320 -
0.0270 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 67,260.00
10% 6,726.00
- 73,986.00
8.3200 -
0.0320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 67,260.00
10% 6,726.00
- 73,986.00
6.9120 -
0.0350 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 67,260.00
10% 6,726.00
- 73,986.00
5.8880 -
0.0360 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 67,260.00
10% 6,726.00
- 73,986.00
0.0090 -
0.0090 -
0.0180 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 73,700.00
10% 7,370.00
- 81,070.00
5.1840 -
0.0260 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,250.00
10% 2,525.00
- 27,775.00
10.0000 -
15.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 75,500.00
10% 7,550.00
- 83,050.00
10.0000 -
15.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 75,500.00
10% 7,550.00
- 83,050.00
4.3200 -
0.0060 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 44,150.00
10% 4,415.00
- 48,565.00
3.1080 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,250.00
10% 2,525.00
- 27,775.00
1.6000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 11,850.00
10% 1,185.00
- 13,035.00
6.6300 -
9.8000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
11.8700 -
10.0000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
26.5000 -
10.4000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 45,350.00
10% 4,535.00
- 49,885.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
26.5000 -
10.4000 -
1.6200 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 45,350.00
10% 4,535.00
- 49,885.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,550.00
10% 4,355.00
- 47,905.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,550.00
10% 4,355.00
- 47,905.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,550.00
10% 4,355.00
- 47,905.00
3.1000 -
9.6000 -
1.5000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 40,200.00
10% 4,020.00
- 44,220.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 42,000.00
10% 4,200.00
- 46,200.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,550.00
10% 4,355.00
- 47,905.00
3.5300 -
1.2400 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6500 -
1.2400 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
3.5300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 21,530.00
10% 2,153.00
- 23,683.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,630.00
10% 2,063.00
- 22,693.00
0.0360 -
0.1000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 60,300.00
10% 6,030.00
- 66,330.00
53.0000 -
8.1900 -
0.0450 -
2.7500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
106.0000 -
8.1900 -
0.0450 -
3.2000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
10.0000 -
8.1900 -
0.0450 -
1.6200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
33.0000 -
9.8000 -
0.0450 -
4.3700 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 176,000.00
10% 17,600.00
- 193,600.00
11.8700 -
14.1500 -
0.0390 -
2.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
10.6000 -
1.1400 -
0.0030 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,750.00
10% 2,375.00
- 26,125.00
5.3000 -
1.1400 -
0.0030 -
0.1000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 171,440.00
10% 17,144.00
- 188,584.00
1.0600 -
8.1900 -
0.0450 -
0.6500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
1.0500 -
0.3500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 38,910.00
10% 3,891.00
- 42,801.00
1.0500 -
0.3500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 27,420.00
10% 2,742.00
- 30,162.00
1.0500 -
0.6000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
1.0500 -
0.6000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
86.0000 -
9.3000 -
0.0180 -
1.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 167,500.00
10% 16,750.00
- 184,250.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
26.0000 -
9.3000 -
0.0180 -
1.9400 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
106.0000 -
9.3000 -
0.0180 -
2.9000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
26.5000 -
9.3000 -
0.0180 -
1.9400 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 150,750.00
10% 15,075.00
- 165,825.00
1.0600 -
12.4400 -
0.0250 -
0.6500 -
3.0300 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 217,750.00
10% 21,775.00
- 239,525.00
63.0000 -
12.4400 -
0.0250 -
2.7500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 167,500.00
10% 16,750.00
- 184,250.00
1.1000 -
11.7500 -
0.0350 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 117,250.00
10% 11,725.00
- 128,975.00
11.8700 -
0.3500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 34,340.00
10% 3,434.00
- 37,774.00
2.2000 -
0.2500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 56,550.00
10% 5,655.00
- 62,205.00
1.7600 -
0.0800 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 18,280.00
10% 1,828.00
- 20,108.00
0.0030 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 27,420.00
10% 2,742.00
- 30,162.00
1.0100 -
0.0500 -
UMLAH HARGA BAHAN -
-
0.1000 - -
JUMLAH HARGA ALAT -
- 55,825.00
10% 5,582.50
- 61,407.00
1.0100 -
0.0500 -
UMLAH HARGA BAHAN -
-
0.1000 - -
JUMLAH HARGA ALAT -
- 55,825.00
10% 5,582.50
- 61,407.00
0.3650 -
20.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,250.00
10% 2,525.00
- 27,775.00
1.1000 -
0.0100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 12,060.00
10% 1,206.00
- 13,266.00
12.0000 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 27,420.00
10% 2,742.00
- 30,162.00
5.8000 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 27,420.00
10% 2,742.00
- 30,162.00
1.5000 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,850.00
10% 2,285.00
- 25,135.00
3 mm, 4 mm & 6
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.3750 -
0.0300 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,850.00
10% 2,285.00
- 25,135.00
0.0150 -
0.0100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 182,800.00
10% 18,280.00
- 201,080.00
m, tebal 9 mm
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
3.6000 -
0.1500 -
1.0500 -
1.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 114,250.00
10% 11,425.00
- 125,675.00
1.0500 -
0.0100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 11,490.00
10% 1,149.00
- 12,639.00
1.0500 -
18.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 55,250.00
10% 5,525.00
- 60,775.00
1.0500 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 16,750.00
10% 1,675.00
- 18,425.00
- -
JUMLAH HARGA ALAT -
- 45,146.60
10% 4,514.66
- 49,661.00
25.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,190.00
10% 2,519.00
- 27,709.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
25.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,250.00
10% 2,525.00
- 27,775.00
12.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 25,250.00
10% 2,525.00
- 27,775.00
5.0000 -
8.0000 -
0.0320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 64,660.00
10% 6,466.00
- 71,126.00
5.0000 -
8.0000 -
0.0320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 64,660.00
10% 6,466.00
- 71,126.00
4.0000 -
8.0000 -
0.0320 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 64,660.00
10% 6,466.00
- 71,126.00
0.6000 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,120.00
10% 2,312.00
- 25,432.00
0.5000 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,250.00
10% 2,425.00
- 26,675.00
0.6000 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,250.00
10% 2,425.00
- 26,675.00
0.6000 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.7500 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.3500 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.4200 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.4400 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.5100 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.8000 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.3700 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.3800 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.4600 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.4900 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
0.5700 -
0.1200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
2.4000 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,230.00
10% 2,423.00
- 26,653.00
2.1000 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,230.00
10% 2,423.00
- 26,653.00
2.0500 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,230.00
10% 2,423.00
- 26,653.00
1.2000 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,230.00
10% 2,423.00
- 26,653.00
1.2000 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,230.00
10% 2,423.00
- 26,653.00
1.1000 -
6.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 28,580.00
10% 2,858.00
- 31,438.00
11.0000 -
0.0300 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 33,500.00
10% 3,350.00
- 36,850.00
6.9000 -
0.3500 -
0.0300 -
0.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 54,660.00
10% 5,466.00
- 60,126.00
2.0000 -
0.2000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 32,330.00
10% 3,233.00
- 35,563.00
30.0000 -
0.2000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 48,140.00
10% 4,814.00
- 52,954.00
3.5000 -
0.0500 -
10.8000 -
0.0320 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 67,000.00
10% 6,700.00
- 73,700.00
2.0000 -
0.0500 -
0.0035 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,780.00
10% 4,378.00
- 48,158.00
0.4000 -
0.0500 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 43,780.00
10% 4,378.00
- 48,158.00
- -
0.1200 100,000.00 12,000.00
0.0600 110,000.00 6,600.00
0.0060 120,000.00 720.00
0.0060 130,000.00 780.00
MLAH TENAGA KERJA 20,100.00
0.7000 -
0.0200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,100.00
10% 2,010.00
- 22,110.00
0.3000 -
0.0400 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,320.00
10% 2,432.00
- 26,752.00
1.0500 -
0.0200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 107,880.00
10% 10,788.00
- 118,668.00
1.2000 -
0.0400 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 138,500.00
10% 13,850.00
- 152,350.00
1.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,140.00
10% 2,214.00
- 24,354.00
1.1000 -
1.2500 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 3,307,500.00
10% 330,750.00
- 3,638,250.00
1.2000 -
1.2500 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 2,835,000.00
10% 283,500.00
- 3,118,500.00
0.0400 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 165,440.00
10% 16,544.00
- 181,984.00
0.0400 -
0.0500 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 165,440.00
10% 16,544.00
- 181,984.00
0.0400 -
0.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 472,500.00
10% 47,250.00
- 519,750.00
0.0240 -
0.3000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 378,000.00
10% 37,800.00
- 415,800.00
0.0640 -
0.5000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 472,500.00
10% 47,250.00
- 519,750.00
0.0250 -
0.0300 -
0.5000 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 330,750.00
10% 33,075.00
- 363,825.00
0.0256 -
0.0300 -
0.5000 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 378,000.00
10% 37,800.00
- 415,800.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.06 -
0.15 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 354,550.00
10% 35,455.00
- 390,005.00
ayu kelas II
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.025 -
0.03 -
0.8 -
1.000 -
0.5 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 401,690.00
10% 40,169.00
- 441,859.00
1.100 -
15.000 -
5.600 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 1,890,000.00
10% 189,000.00
- 2,079,000.00
1.200 -
15.000 -
5.600 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 3,165,750.00
10% 316,575.00
- 3,482,325.00
1.100 -
15.000 -
3.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 3,165,750.00
10% 316,575.00
- 3,482,325.00
0.014 -
0.036 -
0.25 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,850.00
10% 2,285.00
- 25,135.00
0.014 -
0.057 -
0.25 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,850.00
10% 2,285.00
- 25,135.00
0.014 -
0.057 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 27,420.00
10% 2,742.00
- 30,162.00
0.0154 -
0.2 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 61,350.00
10% 6,135.00
- 67,485.00
0.0163 -
0.25 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 57,900.00
10% 5,790.00
- 63,690.00
0.0108 -
0.1 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 35,050.00
10% 3,505.00
- 38,555.00
0.011 -
0.05 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 35,050.00
10% 3,505.00
- 38,555.00
0.028 -
0.15 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 70,940.00
10% 7,094.00
- 78,034.00
0.028 -
0.15 -
0.86 -
0.56 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 70,940.00
10% 7,094.00
- 78,034.00
0.028 -
0.15 -
0.86 -
0.56 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 94,500.00
10% 9,450.00
- 103,950.00
0.007 -
0.100 -
0.150 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 283,500.00
10% 28,350.00
- 311,850.00
0.400 -
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 11,840.00
10% 1,184.00
- 13,024.00
1.500 -
0.014 -
0.012 -
0.003 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 16,750.00
10% 1,675.00
- 18,425.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 61,890.00
10% 6,189.00
- 68,079.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 61,890.00
10% 6,189.00
- 68,079.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 13,265.00
10% 1,326.50
- 14,591.00
- -
0.100 100,000.00 10,000.00
0.200 110,000.00 22,000.00
0.020 120,000.00 2,400.00
0.001 130,000.00 65.00
MLAH TENAGA KERJA 34,465.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 34,465.00
10% 3,446.50
- 37,911.00
- -
0.015 100,000.00 1,500.00
0.150 110,000.00 16,500.00
0.015 120,000.00 1,800.00
0.008 130,000.00 1,040.00
MLAH TENAGA KERJA 20,840.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,840.00
10% 2,084.00
- 22,924.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,840.00
10% 2,084.00
- 22,924.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 66,390.00
10% 6,639.00
- 73,029.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 26,530.00
10% 2,653.00
- 29,183.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 66,390.00
10% 6,639.00
- 73,029.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 13,850.00
10% 1,385.00
- 15,235.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 79,590.00
10% 7,959.00
- 87,549.00
1.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 33,169.00
10% 3,316.90
- 36,485.00
1.100 -
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 19,904.00
10% 1,990.40
- 21,894.00
1.100 -
0.070 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 33,169.00
10% 3,316.90
- 36,485.00
1.100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,840.00
10% 2,084.00
- 22,924.00
1.100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,610.00
10% 2,361.00
- 25,971.00
1.100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 20,840.00
10% 2,084.00
- 22,924.00
1.100 -
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 26,320.00
10% 2,632.00
- 28,952.00
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 15,390.00
10% 1,539.00
- 16,929.00
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 15,390.00
10% 1,539.00
- 16,929.00
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 16,040.00
10% 1,604.00
- 17,644.00
0.200 -
0.150 -
0.170 -
0.350 -
0.010 -
0.030 -
0.200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 19,420.00
10% 1,942.00
- 21,362.00
0.360 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 18,880.00
10% 1,888.00
- 20,768.00
0.150 -
0.372 -
2.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 12,910.00
10% 1,291.00
- 14,201.00
0.350 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 10,780.00
10% 1,078.00
- 11,858.00
0.150 -
0.050 -
0.100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 35,910.00
10% 3,591.00
- 39,501.00
lapis cat penutup)
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.120 -
0.180 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 8,314.00
10% 831.40
- 9,145.00
0.100 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 8,314.00
10% 831.40
- 9,145.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.150 -
0.100 -
0.250 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 15,447.00
10% 1,544.70
- 16,991.00
0.300 -
0.200 -
0.250 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 4,935.00
10% 493.50
- 5,428.00
1.200 -
0.200 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 26,725.00
10% 2,672.50
- 29,397.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
0.100 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 26,725.00
10% 2,672.50
- 29,397.00
0.100 -
0.010 -
0.010 -
0.002 385,550.00 771.10
UMLAH HARGA BAHAN 771.10
- -
JUMLAH HARGA ALAT -
- 54,196.10
10% 5,419.61
- 59,615.00
0.100 -
0.100 -
0.080 -
0.010 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 55,669.00
10% 5,566.90
- 61,235.00
0.300 -
0.010 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 14,430.00
10% 1,443.00
- 15,873.00
0.110 -
0.170 -
0.080 -
0.010 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 140,200.00
10% 14,020.00
- 154,220.00
0.300 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 128,000.00
10% 12,800.00
- 140,800.00
0.300 -
0.010 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 128,000.00
10% 12,800.00
- 140,800.00
1.000 -
6.000 -
0.010 -
7.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 289,500.00
10% 28,950.00
- 318,450.00
1.000 -
20.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 99,390.00
10% 9,939.00
- 109,329.00
1.000 -
12.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 918,000.00
10% 91,800.00
- 1,009,800.00
150.000 -
120.000 -
0.300 -
360.000 -
6.000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 969,900.00
10% 96,990.00
- 1,066,890.00
1.000 -
0.120 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 918,000.00
10% 91,800.00
- 1,009,800.00
1.000 -
12.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 86,850.00
10% 8,685.00
- 95,535.00
1.000 -
1.000 -
20.000 -
0.050 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 69,250.00
10% 6,925.00
- 76,175.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
40.000 -
44.000 -
0.070 -
0.060 -
0.070 -
1.600 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 305,270.00
10% 30,527.00
- 335,797.00
70.000 -
77.000 -
0.130 -
0.090 -
0.020 -
2.600 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 449,900.00
10% 44,990.00
- 494,890.00
123.000 -
114.000 -
0.184 -
0.120 -
0.033 -
4.850 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 449,900.00
10% 44,990.00
- 494,890.00
1.200 -
35.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 19,890.00
10% 1,989.00
- 21,879.00
1.200 -
35.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 19,890.00
10% 1,989.00
- 21,879.00
1.200 -
35.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 33,410.00
10% 3,341.00
- 36,751.00
1.200 -
35.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 41,920.00
10% 4,192.00
- 46,112.00
1.200 -
35.000 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 16,770.00
10% 1,677.00
- 18,447.00
1.600 -
35.000 -
0.014 -
0.014 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 13,400.00
10% 1,340.00
- 14,740.00
1.600 -
0.680 -
0.013 -
0.011 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 10,050.00
10% 1,005.00
- 11,055.00
1.100 -
0.027 -
3.920 -
0.056 -
0.024 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 23,450.00
10% 2,345.00
- 25,795.00
1.100 -
0.550 -
10.300 -
0.061 -
0.069 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 63,650.00
10% 6,365.00
- 70,015.00
1.000 -
UMLAH HARGA BAHAN -
0.006 -
JUMLAH HARGA ALAT -
- 13,650.00
10% 1,365.00
- 15,015.00
1.000 -
UMLAH HARGA BAHAN -
0.008 -
JUMLAH HARGA ALAT -
- 15,740.00
10% 1,574.00
- 17,314.00
1.000 -
UMLAH HARGA BAHAN -
0.010 -
JUMLAH HARGA ALAT -
- 17,760.00
10% 1,776.00
- 19,536.00
1.000 -
UMLAH HARGA BAHAN -
0.012 -
JUMLAH HARGA ALAT -
- 19,850.00
10% 1,985.00
- 21,835.00
1.000 -
UMLAH HARGA BAHAN -
0.024 -
JUMLAH HARGA ALAT -
- 31,820.00
10% 3,182.00
- 35,002.00
1.000 -
UMLAH HARGA BAHAN -
0.034 -
JUMLAH HARGA ALAT -
- 43,060.00
10% 4,306.00
- 47,366.00
1.000 -
UMLAH HARGA BAHAN -
0.040 -
JUMLAH HARGA ALAT -
- 49,340.00
10% 4,934.00
- 54,274.00
1.000 -
UMLAH HARGA BAHAN -
0.080 -
JUMLAH HARGA ALAT -
- 91,340.00
10% 9,134.00
- 100,474.00
1.000 -
UMLAH HARGA BAHAN -
0.100 -
JUMLAH HARGA ALAT -
- 112,460.00
10% 11,246.00
- 123,706.00
1.000 -
UMLAH HARGA BAHAN -
0.122 -
JUMLAH HARGA ALAT -
- 135,980.00
10% 13,598.00
- 149,578.00
1.000 -
UMLAH HARGA BAHAN -
0.145 -
JUMLAH HARGA ALAT -
- 160,870.00
10% 16,087.00
- 176,957.00
1.000 -
UMLAH HARGA BAHAN -
0.250 -
JUMLAH HARGA ALAT -
- 271,850.00
10% 27,185.00
- 299,035.00
1.000 -
UMLAH HARGA BAHAN -
0.262 -
JUMLAH HARGA ALAT -
- 284,130.00
10% 28,413.00
- 312,543.00
1.000 -
UMLAH HARGA BAHAN -
0.294 -
- -
JUMLAH HARGA ALAT -
- 318,480.00
10% 31,848.00
- 350,328.00
- -
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.000 -
UMLAH HARGA BAHAN -
0.327 -
JUMLAH HARGA ALAT -
- 352,700.00
10% 35,270.00
- 387,970.00
1.000 -
UMLAH HARGA BAHAN -
0.359 -
JUMLAH HARGA ALAT -
- 386,920.00
10% 38,692.00
- 425,612.00
1.000 -
UMLAH HARGA BAHAN -
0.019 -
JUMLAH HARGA ALAT -
- 5,760.00
10% 576.00
- 6,336.00
1.000 -
UMLAH HARGA BAHAN -
0.019 -
JUMLAH HARGA ALAT -
- 6,720.00
10% 672.00
- 7,392.00
1.000 -
UMLAH HARGA BAHAN -
0.019 -
JUMLAH HARGA ALAT -
- 7,680.00
10% 768.00
- 8,448.00
1.000 -
UMLAH HARGA BAHAN -
0.019 -
JUMLAH HARGA ALAT -
- 10,390.00
10% 1,039.00
- 11,429.00
0.019 -
JUMLAH HARGA ALAT -
- 17,110.00
10% 1,711.00
- 18,821.00
1.000 -
UMLAH HARGA BAHAN -
0.042 -
JUMLAH HARGA ALAT -
- 22,360.00
10% 2,236.00
- 24,596.00
1.000 -
UMLAH HARGA BAHAN -
0.065 -
JUMLAH HARGA ALAT -
- 28,560.00
10% 2,856.00
- 31,416.00
1.000 -
UMLAH HARGA BAHAN -
0.152 -
JUMLAH HARGA ALAT -
- 48,720.00
10% 4,872.00
- 53,592.00
1.000 -
UMLAH HARGA BAHAN -
0.200 -
JUMLAH HARGA ALAT -
- 60,380.00
10% 6,038.00
- 66,418.00
1.000 -
UMLAH HARGA BAHAN -
0.251 -
JUMLAH HARGA ALAT -
- 72,650.00
10% 7,265.00
- 79,915.00
1.000 -
UMLAH HARGA BAHAN -
0.307 -
JUMLAH HARGA ALAT -
- 85,990.00
10% 8,599.00
- 94,589.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.000 -
UMLAH HARGA BAHAN -
0.573 -
JUMLAH HARGA ALAT -
- 149,930.00
10% 14,993.00
- 164,923.00
1.000 -
UMLAH HARGA BAHAN -
0.883 -
JUMLAH HARGA ALAT -
- 227,320.00
10% 22,732.00
- 250,052.00
1.000 -
UMLAH HARGA BAHAN -
1.093 -
JUMLAH HARGA ALAT -
- 278,780.00
10% 27,878.00
- 306,658.00
1.000 -
UMLAH HARGA BAHAN -
1.205 -
JUMLAH HARGA ALAT -
- 305,450.00
10% 30,545.00
- 335,995.00
1.000 -
UMLAH HARGA BAHAN -
1.584 -
JUMLAH HARGA ALAT -
- 398,160.00
10% 39,816.00
- 437,976.00
1.000 -
UMLAH HARGA BAHAN -
0.038 -
JUMLAH HARGA ALAT -
- 57,840.00
10% 5,784.00
- 63,624.00
0.038 -
JUMLAH HARGA ALAT -
- 504,912.50
10% 50,491.25
- 555,403.00
1.000 -
UMLAH HARGA BAHAN -
0.038 -
JUMLAH HARGA ALAT -
- 75,290.00
10% 7,529.00
- 82,819.00
1.000 -
UMLAH HARGA BAHAN -
0.042 -
JUMLAH HARGA ALAT -
- 85,060.00
10% 8,506.00
- 93,566.00
1.000 -
UMLAH HARGA BAHAN -
0.042 -
JUMLAH HARGA ALAT -
- 133,780.00
10% 13,378.00
- 147,158.00
1.000 -
UMLAH HARGA BAHAN -
0.042 -
JUMLAH HARGA ALAT -
- 159,500.00
10% 15,950.00
- 175,450.00
1.000 -
UMLAH HARGA BAHAN -
0.042 -
JUMLAH HARGA ALAT -
- 160,970.00
10% 16,097.00
- 177,067.00
1.000 -
UMLAH HARGA BAHAN -
0.058 -
JUMLAH HARGA ALAT -
- 203,590.00
10% 20,359.00
- 223,949.00
1.000 -
UMLAH HARGA BAHAN -
0.058 -
JUMLAH HARGA ALAT -
- 227,210.00
10% 22,721.00
- 249,931.00
1.000 -
UMLAH HARGA BAHAN -
0.077 -
JUMLAH HARGA ALAT -
- 246,860.00
10% 24,686.00
- 271,546.00
1.000 -
UMLAH HARGA BAHAN -
0.077 -
JUMLAH HARGA ALAT -
- 223,030.00
10% 22,303.00
- 245,333.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 390,920.00
10% 39,092.00
- 430,012.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 440,680.00
10% 44,068.00
- 484,748.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 489,090.00
10% 48,909.00
- 537,999.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 537,600.00
10% 53,760.00
- 591,360.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 272,090.00
10% 27,209.00
- 299,299.00
1.000 -
UMLAH HARGA BAHAN -
0.380 -
JUMLAH HARGA ALAT -
- 66,050.00
10% 6,605.00
- 72,655.00
1.000 -
UMLAH HARGA BAHAN -
0.380 -
JUMLAH HARGA ALAT -
- 73,840.00
10% 7,384.00
- 81,224.00
1.000 -
UMLAH HARGA BAHAN -
0.380 -
JUMLAH HARGA ALAT -
- 82,760.00
10% 8,276.00
- 91,036.00
1.000 -
UMLAH HARGA BAHAN -
0.380 -
JUMLAH HARGA ALAT -
- 115,360.00
10% 11,536.00
- 126,896.00
1.000 -
UMLAH HARGA BAHAN -
0.050 -
JUMLAH HARGA ALAT -
- 128,350.00
10% 12,835.00
- 141,185.00
1.000 -
UMLAH HARGA BAHAN -
0.071 -
JUMLAH HARGA ALAT -
- 131,360.00
10% 13,136.00
- 144,496.00
1.000 -
UMLAH HARGA BAHAN -
0.023 -
0.031 -
JUMLAH HARGA ALAT -
- 150,139.00
10% 15,013.90
- 165,152.00
1.000 -
UMLAH HARGA BAHAN -
0.029 -
0.039 -
JUMLAH HARGA ALAT -
- 183,139.00
10% 18,313.90
- 201,452.00
1.000 -
UMLAH HARGA BAHAN -
0.034 -
0.045 -
JUMLAH HARGA ALAT -
- 213,169.00
10% 21,316.90
- 234,485.00
1.000 -
UMLAH HARGA BAHAN -
0.058 -
0.077 -
JUMLAH HARGA ALAT -
- 230,379.00
10% 23,037.90
- 253,416.00
1.000 -
UMLAH HARGA BAHAN -
0.084 -
0.225 -
JUMLAH HARGA ALAT -
- 428,129.00
10% 42,812.90
- 470,941.00
1.000 -
UMLAH HARGA BAHAN -
0.093 -
0.248 -
JUMLAH HARGA ALAT -
- 544,889.00
10% 54,488.90
- 599,377.00
1.000 -
UMLAH HARGA BAHAN -
0.112 -
0.298 -
JUMLAH HARGA ALAT -
- 678,079.00
10% 67,807.90
- 745,886.00
1.000 -
UMLAH HARGA BAHAN -
0.152 -
0.304 -
JUMLAH HARGA ALAT -
- 751,679.00
10% 75,167.90
- 826,846.00
1.000 -
UMLAH HARGA BAHAN -
0.180 -
0.360 -
JUMLAH HARGA ALAT -
- 866,069.00
10% 86,606.90
- 952,675.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 67,400.00
10% 6,740.00
- 74,140.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 78,200.00
10% 7,820.00
- 86,020.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 87,550.00
10% 8,755.00
- 96,305.00
0.004 -
JUMLAH HARGA ALAT -
- 337,121.40
10% 33,712.14
- 370,833.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 150,260.00
10% 15,026.00
- 165,286.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 178,940.00
10% 17,894.00
- 196,834.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 190,960.00
10% 19,096.00
- 210,056.00
1.000 -
UMLAH HARGA BAHAN -
0.027 -
0.039 -
JUMLAH HARGA ALAT -
- 319,440.00
10% 31,944.00
- 351,384.00
1.000 -
UMLAH HARGA BAHAN -
0.026 -
0.037 -
JUMLAH HARGA ALAT -
- 301,150.00
10% 30,115.00
- 331,265.00
1.000 -
UMLAH HARGA BAHAN -
0.029 -
0.045 -
JUMLAH HARGA ALAT -
- 328,250.00
10% 32,825.00
- 361,075.00
1.000 -
UMLAH HARGA BAHAN -
0.027 -
0.039 -
JUMLAH HARGA ALAT -
- 298,150.00
10% 29,815.00
- 327,965.00
1.000 -
UMLAH HARGA BAHAN -
0.046 -
0.098 -
JUMLAH HARGA ALAT -
- 526,090.00
10% 52,609.00
- 578,699.00
1.000 -
UMLAH HARGA BAHAN -
0.052 -
0.115 -
JUMLAH HARGA ALAT -
- 506,410.00
10% 50,641.00
- 557,051.00
1.000 -
UMLAH HARGA BAHAN -
0.058 -
0.133 -
JUMLAH HARGA ALAT -
- 660,760.00
10% 66,076.00
- 726,836.00
1.000 -
UMLAH HARGA BAHAN -
0.064 -
0.150 -
JUMLAH HARGA ALAT -
- 727,240.00
10% 72,724.00
- 799,964.00
1.000 -
UMLAH HARGA BAHAN -
0.070 -
0.167 -
JUMLAH HARGA ALAT -
- 795,500.00
10% 79,550.00
- 875,050.00
1.000 -
UMLAH HARGA BAHAN -
0.003 -
JUMLAH HARGA ALAT -
- 785.00
10% 78.50
- 863.00
1.000 -
UMLAH HARGA BAHAN -
0.003 -
JUMLAH HARGA ALAT -
- 2,300.00
10% 230.00
- 2,530.00
1.000 -
UMLAH HARGA BAHAN -
0.003 -
JUMLAH HARGA ALAT -
- 3,670.00
10% 367.00
- 4,037.00
1.000 -
UMLAH HARGA BAHAN -
0.003 -
JUMLAH HARGA ALAT -
- 5,140.00
10% 514.00
- 5,654.00
1.000 -
UMLAH HARGA BAHAN -
0.017 -
JUMLAH HARGA ALAT -
- 13,540.00
10% 1,354.00
- 14,894.00
1.000 -
UMLAH HARGA BAHAN -
0.030 -
JUMLAH HARGA ALAT -
- 21,530.00
10% 2,153.00
- 23,683.00
1.000 -
UMLAH HARGA BAHAN -
0.037 -
JUMLAH HARGA ALAT -
- 25,920.00
10% 2,592.00
- 28,512.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 55,650.00
10% 5,565.00
- 61,215.00
1.000 -
UMLAH HARGA BAHAN -
0.054 -
JUMLAH HARGA ALAT -
- 49,560.00
10% 4,956.00
- 54,516.00
1.000 -
UMLAH HARGA BAHAN -
0.069 -
JUMLAH HARGA ALAT -
- 87,050.00
10% 8,705.00
- 95,755.00
1.000 -
UMLAH HARGA BAHAN -
0.086 -
JUMLAH HARGA ALAT -
- 104,570.00
10% 10,457.00
- 115,027.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.000 -
UMLAH HARGA BAHAN -
0.160 -
JUMLAH HARGA ALAT -
- 183,020.00
10% 18,302.00
- 201,322.00
1.000 -
UMLAH HARGA BAHAN -
0.168 -
JUMLAH HARGA ALAT -
- 191,730.00
10% 19,173.00
- 210,903.00
1.000 -
UMLAH HARGA BAHAN -
0.191 -
JUMLAH HARGA ALAT -
- 216,000.00
10% 21,600.00
- 237,600.00
1.000 -
UMLAH HARGA BAHAN -
0.213 -
JUMLAH HARGA ALAT -
- 240,140.00
10% 24,014.00
- 264,154.00
1.000 -
UMLAH HARGA BAHAN -
0.236 -
JUMLAH HARGA ALAT -
- 264,280.00
10% 26,428.00
- 290,708.00
1.000 -
UMLAH HARGA BAHAN -
0.004 -
JUMLAH HARGA ALAT -
- 7,238.00
10% 723.80
- 7,961.00
1.000 -
UMLAH HARGA BAHAN -
0.005 -
JUMLAH HARGA ALAT -
- 15,473.00
10% 1,547.30
- 17,020.00
1.000 -
UMLAH HARGA BAHAN -
0.006 -
JUMLAH HARGA ALAT -
- 21,068.00
10% 2,106.80
- 23,174.00
1.000 -
UMLAH HARGA BAHAN -
0.009 -
JUMLAH HARGA ALAT -
- 27,303.00
10% 2,730.30
- 30,033.00
0.017 -
JUMLAH HARGA ALAT -
- 42,053.00
10% 4,205.30
- 46,258.00
1.000 -
UMLAH HARGA BAHAN -
0.023 -
JUMLAH HARGA ALAT -
- 56,103.00
10% 5,610.30
- 61,713.00
1.0000 -
UMLAH HARGA BAHAN -
0.0300 -
JUMLAH HARGA ALAT -
- 70,133.00
10% 7,013.30
- 77,146.00
0.0550 -
JUMLAH HARGA ALAT -
- 105,033.00
10% 10,503.30
- 115,536.00
1.0000 -
UMLAH HARGA BAHAN -
0.0700 -
JUMLAH HARGA ALAT -
- 123,383.00
10% 12,338.30
- 135,721.00
1.0000 -
UMLAH HARGA BAHAN -
0.0850 -
JUMLAH HARGA ALAT -
- 142,243.00
10% 14,224.30
- 156,467.00
1.0000 -
UMLAH HARGA BAHAN -
0.1010 -
JUMLAH HARGA ALAT -
- 171,873.00
10% 17,187.30
- 189,060.00
1.0000 -
UMLAH HARGA BAHAN -
0.1790 -
JUMLAH HARGA ALAT -
- 257,523.00
10% 25,752.30
- 283,275.00
1.0000 -
UMLAH HARGA BAHAN -
0.2700 -
JUMLAH HARGA ALAT -
- 330,103.00
10% 33,010.30
- 363,113.00
1.0000 -
UMLAH HARGA BAHAN -
0.3320 -
JUMLAH HARGA ALAT -
- 385,993.00
10% 38,599.30
- 424,592.00
1.0000 -
UMLAH HARGA BAHAN -
0.3650 -
JUMLAH HARGA ALAT -
- 425,423.00
10% 42,542.30
- 467,965.00
1.0000 -
UMLAH HARGA BAHAN -
0.4770 -
JUMLAH HARGA ALAT -
- 509,663.00
10% 50,966.30
- 560,629.00
1.0000 -
UMLAH HARGA BAHAN -
0.0170 -
JUMLAH HARGA ALAT -
- 3,260.00
10% 326.00
- 3,586.00
1.0000 -
UMLAH HARGA BAHAN -
0.0170 -
JUMLAH HARGA ALAT -
- 9,770.00
10% 977.00
- 10,747.00
1.0000 -
UMLAH HARGA BAHAN -
0.0340 -
JUMLAH HARGA ALAT -
- 15,430.00
10% 1,543.00
- 16,973.00
1.0000 -
UMLAH HARGA BAHAN -
0.0340 -
JUMLAH HARGA ALAT -
- 22,050.00
10% 2,205.00
- 24,255.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
0.0510 -
JUMLAH HARGA ALAT -
- 57,120.00
10% 5,712.00
- 62,832.00
1.0000 -
UMLAH HARGA BAHAN -
0.0510 -
JUMLAH HARGA ALAT -
- 79,680.00
10% 7,968.00
- 87,648.00
1.0000 -
UMLAH HARGA BAHAN -
0.0510 -
JUMLAH HARGA ALAT -
- 84,620.00
10% 8,462.00
- 93,082.00
1.0000 -
UMLAH HARGA BAHAN -
0.0680 -
JUMLAH HARGA ALAT -
- 124,010.00
10% 12,401.00
- 136,411.00
1.0000 -
UMLAH HARGA BAHAN -
0.0680 -
JUMLAH HARGA ALAT -
- 142,490.00
10% 14,249.00
- 156,739.00
1.0000 -
UMLAH HARGA BAHAN -
0.0680 -
JUMLAH HARGA ALAT -
- 158,130.00
10% 15,813.00
- 173,943.00
0.0850 -
JUMLAH HARGA ALAT -
- 145,100.00
10% 14,510.00
- 159,610.00
1.0000 -
UMLAH HARGA BAHAN -
0.0850 -
JUMLAH HARGA ALAT -
- 263,240.00
10% 26,324.00
- 289,564.00
1.0000 -
UMLAH HARGA BAHAN -
0.0850 -
JUMLAH HARGA ALAT -
- 297,360.00
10% 29,736.00
- 327,096.00
1.0000 -
UMLAH HARGA BAHAN -
0.1020 -
JUMLAH HARGA ALAT -
- 331,580.00
10% 33,158.00
- 364,738.00
1.0000 -
UMLAH HARGA BAHAN -
0.1020 -
JUMLAH HARGA ALAT -
- 365,930.00
10% 36,593.00
- 402,523.00
1.0000 -
UMLAH HARGA BAHAN -
0.1020 -
JUMLAH HARGA ALAT -
- 400,150.00
10% 40,015.00
- 440,165.00
1.0000 -
UMLAH HARGA BAHAN -
0.0030 -
JUMLAH HARGA ALAT -
- 9,550.00
10% 955.00
- 10,505.00
1.0000 -
UMLAH HARGA BAHAN -
0.0100 -
JUMLAH HARGA ALAT -
- 15,050.00
10% 1,505.00
- 16,555.00
1.0000 -
UMLAH HARGA BAHAN -
0.0180 -
JUMLAH HARGA ALAT -
- 21,500.00
10% 2,150.00
- 23,650.00
1.0000 -
UMLAH HARGA BAHAN -
0.0540 -
JUMLAH HARGA ALAT -
- 49,440.00
10% 4,944.00
- 54,384.00
1.0000 -
UMLAH HARGA BAHAN -
0.0730 -
JUMLAH HARGA ALAT -
- 64,290.00
10% 6,429.00
- 70,719.00
1.0000 -
UMLAH HARGA BAHAN -
0.0790 -
JUMLAH HARGA ALAT -
- 69,050.00
10% 6,905.00
- 75,955.00
1.0000 -
UMLAH HARGA BAHAN -
0.1580 -
JUMLAH HARGA ALAT -
- 127,000.00
10% 12,700.00
- 139,700.00
1.0000 -
UMLAH HARGA BAHAN -
0.1760 -
JUMLAH HARGA ALAT -
- 153,490.00
10% 15,349.00
- 168,839.00
1.0000 -
UMLAH HARGA BAHAN -
0.1920 -
JUMLAH HARGA ALAT -
- 177,050.00
10% 17,705.00
- 194,755.00
1.0000 -
UMLAH HARGA BAHAN -
0.1920 -
JUMLAH HARGA ALAT -
- 176,750.00
10% 17,675.00
- 194,425.00
1.0000 -
UMLAH HARGA BAHAN -
0.3100 -
JUMLAH HARGA ALAT -
- 350,800.00
10% 35,080.00
- 385,880.00
1.0000 -
UMLAH HARGA BAHAN -
0.3810 -
JUMLAH HARGA ALAT -
- 454,950.00
10% 45,495.00
- 500,445.00
1.0000 -
UMLAH HARGA BAHAN -
0.4410 -
JUMLAH HARGA ALAT -
- 542,800.00
10% 54,280.00
- 597,080.00
1.0000 -
UMLAH HARGA BAHAN -
0.5060 -
JUMLAH HARGA ALAT -
- 638,650.00
10% 63,865.00
- 702,515.00
1.0000 -
UMLAH HARGA BAHAN -
0.5760 -
JUMLAH HARGA ALAT -
- 742,700.00
10% 74,270.00
- 816,970.00
1.0000 -
UMLAH HARGA BAHAN -
0.0370 -
JUMLAH HARGA ALAT -
- 3,850.00
10% 385.00
- 4,235.00
1.0000 -
UMLAH HARGA BAHAN -
0.0400 -
JUMLAH HARGA ALAT -
- 11,410.00
10% 1,141.00
- 12,551.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
0.0420 -
JUMLAH HARGA ALAT -
- 17,960.00
10% 1,796.00
- 19,756.00
1.0000 -
UMLAH HARGA BAHAN -
0.0450 -
JUMLAH HARGA ALAT -
- 24,810.00
10% 2,481.00
- 27,291.00
1.0000 -
UMLAH HARGA BAHAN -
0.0600 -
JUMLAH HARGA ALAT -
- 64,290.00
10% 6,429.00
- 70,719.00
1.0000 -
UMLAH HARGA BAHAN -
0.0680 -
JUMLAH HARGA ALAT -
- 89,510.00
10% 8,951.00
- 98,461.00
1.0000 -
UMLAH HARGA BAHAN -
0.0720 -
JUMLAH HARGA ALAT -
- 100,510.00
10% 10,051.00
- 110,561.00
1.0000 -
UMLAH HARGA BAHAN -
0.1050 -
JUMLAH HARGA ALAT -
- 194,400.00
10% 19,440.00
- 213,840.00
1.0000 -
UMLAH HARGA BAHAN -
0.1070 -
JUMLAH HARGA ALAT -
- 188,900.00
10% 18,890.00
- 207,790.00
1.0000 -
UMLAH HARGA BAHAN -
0.1070 -
JUMLAH HARGA ALAT -
- 210,400.00
10% 21,040.00
- 231,440.00
1.0000 -
UMLAH HARGA BAHAN -
0.1130 -
JUMLAH HARGA ALAT -
- 193,990.00
10% 19,399.00
- 213,389.00
1.0000 -
UMLAH HARGA BAHAN -
0.1660 -
JUMLAH HARGA ALAT -
- 354,210.00
10% 35,421.00
- 389,631.00
1.0000 -
UMLAH HARGA BAHAN -
0.1830 -
JUMLAH HARGA ALAT -
- 401,050.00
10% 40,105.00
- 441,155.00
1.0000 -
UMLAH HARGA BAHAN -
0.2010 -
JUMLAH HARGA ALAT -
- 448,100.00
10% 44,810.00
- 492,910.00
1.0000 -
UMLAH HARGA BAHAN -
0.2180 -
JUMLAH HARGA ALAT -
- 495,040.00
10% 49,504.00
- 544,544.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
0.2360 -
JUMLAH HARGA ALAT -
- 542,090.00
10% 54,209.00
- 596,299.00
1.0000 -
UMLAH HARGA BAHAN -
0.1000 -
JUMLAH HARGA ALAT -
- 240,140.00
10% 24,014.00
- 264,154.00
1.0000 -
UMLAH HARGA BAHAN -
0.3000 -
JUMLAH HARGA ALAT -
- 287,900.00
10% 28,790.00
- 316,690.00
0.4000 -
JUMLAH HARGA ALAT -
- 294,465.69
10% 29,446.57
- 323,912.00
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
JUMLAH HARGA ALAT -
- 336,000.00
10% 33,600.00
- 369,600.00
1.0000 -
JUMLAH HARGA ALAT -
- 579,203.99
10% 57,920.40
- 637,124.00
1.0000 -
JUMLAH HARGA ALAT -
- 576,140.00
10% 57,614.00
- 633,754.00
1.0000 -
UMLAH HARGA BAHAN -
1.0000 -
JUMLAH HARGA ALAT -
- 672,000.00
10% 67,200.00
- 739,200.00
1.0000 -
UMLAH HARGA BAHAN -
0.6000 -
0.3000 -
JUMLAH HARGA ALAT -
- 238,770.00
10% 23,877.00
- 262,647.00
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
0.5000 -
JUMLAH HARGA ALAT -
- 240,140.00
10% 24,014.00
- 264,154.00
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
0.5000 -
JUMLAH HARGA ALAT -
- 300,100.00
10% 30,010.00
- 330,110.00
1.0000 -
UMLAH HARGA BAHAN -
0.7500 -
0.7500 -
JUMLAH HARGA ALAT -
- 287,900.00
10% 28,790.00
- 316,690.00
1.0000 -
UMLAH HARGA BAHAN -
1.0000 -
1.0000 -
JUMLAH HARGA ALAT -
- 431,970.00
10% 43,197.00
- 475,167.00
1.0000 -
UMLAH HARGA BAHAN -
1.0000 -
1.0000 -
JUMLAH HARGA ALAT -
- 504,000.00
10% 50,400.00
- 554,400.00
1.0000 -
UMLAH HARGA BAHAN -
1.0000 -
1.0000 -
JUMLAH HARGA ALAT -
- 504,000.00
10% 50,400.00
- 554,400.00
1.0000 -
UMLAH HARGA BAHAN -
0.0280 -
JUMLAH HARGA ALAT -
- 17,860.00
10% 1,786.00
- 19,646.00
1.0000 -
UMLAH HARGA BAHAN -
0.0290 -
JUMLAH HARGA ALAT -
- 36,340.00
10% 3,634.00
- 39,974.00
1.0000 -
UMLAH HARGA BAHAN -
0.0390 -
JUMLAH HARGA ALAT -
- 54,820.00
10% 5,482.00
- 60,302.00
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
JUMLAH HARGA ALAT -
- 73,300.00
10% 7,330.00
- 80,630.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
JUMLAH HARGA ALAT -
- 110,260.00
10% 11,026.00
- 121,286.00
1.0000 -
UMLAH HARGA BAHAN -
0.5000 -
JUMLAH HARGA ALAT -
- 128,740.00
10% 12,874.00
- 141,614.00
1.0000 -
UMLAH HARGA BAHAN -
0.6000 -
JUMLAH HARGA ALAT -
- 147,220.00
10% 14,722.00
- 161,942.00
1.0000 -
UMLAH HARGA BAHAN -
0.1930 -
0.0960 -
JUMLAH HARGA ALAT -
- 184,180.00
10% 18,418.00
- 202,598.00
1.0000 -
UMLAH HARGA BAHAN -
0.2250 -
0.1130 -
JUMLAH HARGA ALAT -
- 221,140.00
10% 22,114.00
- 243,254.00
1.0000 -
UMLAH HARGA BAHAN -
0.2570 -
0.1290 -
JUMLAH HARGA ALAT -
- 258,100.00
10% 25,810.00
- 283,910.00
1.0000 -
UMLAH HARGA BAHAN -
0.3210 -
0.1610 -
JUMLAH HARGA ALAT -
- 295,060.00
10% 29,506.00
- 324,566.00
1.0000 -
UMLAH HARGA BAHAN -
0.3660 -
0.1830 -
JUMLAH HARGA ALAT -
- 332,020.00
10% 33,202.00
- 365,222.00
1.0000 -
UMLAH HARGA BAHAN -
0.3860 -
0.1930 -
JUMLAH HARGA ALAT -
- 368,980.00
10% 36,898.00
- 405,878.00
1.0000 -
UMLAH HARGA BAHAN -
0.4500 -
0.2250 -
JUMLAH HARGA ALAT -
- 405,940.00
10% 40,594.00
- 446,534.00
1.0000 -
UMLAH HARGA BAHAN -
0.6060 -
0.0750 -
0.9680 -
0.8650 -
JUMLAH HARGA ALAT -
- 246,340.00
10% 24,634.00
- 270,974.00
1.0000 -
UMLAH HARGA BAHAN -
0.6500 -
0.1590 -
1.0780 -
0.9110 -
JUMLAH HARGA ALAT -
- 276,580.00
10% 27,658.00
- 304,238.00
Koefisien Harga Satuan (Rp
Jumlah Harga (Rp.)
1.0000 -
UMLAH HARGA BAHAN -
0.7600 -
0.3690 -
1.3530 -
1.0260 -
JUMLAH HARGA ALAT -
- 352,180.00
10% 35,218.00
- 387,398.00
1.0000 -
UMLAH HARGA BAHAN -
0.8700 -
0.5790 -
1.6280 -
1.1410 -
JUMLAH HARGA ALAT -
- 427,780.00
10% 42,778.00
- 470,558.00
1.0000 -
UMLAH HARGA BAHAN -
0.9800 -
0.7890 -
1.9030 -
1.2560 -
JUMLAH HARGA ALAT -
- 503,380.00
10% 50,338.00
- 553,718.00
1.0000 -
UMLAH HARGA BAHAN -
1.0900 -
0.9990 -
2.1780 -
1.3710 -
JUMLAH HARGA ALAT -
- 578,980.00
10% 57,898.00
- 636,878.00
1.0000 -
UMLAH HARGA BAHAN -
1.3100 -
1.4190 -
2.7280 -
1.6010 -
JUMLAH HARGA ALAT -
- 730,180.00
10% 73,018.00
- 803,198.00
1.0000 -
UMLAH HARGA BAHAN -
1.4200 -
1.6290 -
3.0030 -
1.7160 -
JUMLAH HARGA ALAT -
- 805,780.00
10% 80,578.00
- 886,358.00
1.0000 -
UMLAH HARGA BAHAN -
1.5300 -
1.8390 -
3.2780 -
1.8310 -
JUMLAH HARGA ALAT -
- 881,380.00
10% 88,138.00
- 969,518.00
1.0000 -
UMLAH HARGA BAHAN -
1.7500 -
2.2590 -
3.8280 -
2.0610 -
JUMLAH HARGA ALAT -
- 1,032,580.00
10% 103,258.00
- 1,135,838.00
1.0000 -
UMLAH HARGA BAHAN -
1.9700 -
2.6790 -
4.3780 -
2.2910 -
JUMLAH HARGA ALAT -
- 1,183,780.00
10% 118,378.00
- 1,302,158.00
1.0000 -
UMLAH HARGA BAHAN -
2.1900 -
3.0990 -
4.9280 -
2.5210 -
JUMLAH HARGA ALAT -
- 1,334,980.00
10% 133,498.00
- 1,468,478.00
0.0020 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.0040 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.0080 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.0180 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.0490 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.0710 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.1260 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.1580 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
0.2830 -
0.0600 -
0.0020 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 904.00
10% 90.40
- 994.00
1.0000 - -
MLAH TENAGA KERJA -
0.2830 -
24.0000 -
3.0000 -
4.0000 -
3.0000 -
24.0000 -
1.0000 -
1.0000 -
1.0000 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- -
10% -
- -
11.00 -
11.00 -
1.00 -
2.00 -
3.00 -
6.00 -
2.00 -
0.25 -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 39,000.00
10% 3,900.00
- 42,900.00
1.00 - -
5.00 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,250.00
10% 2,225.00
- 24,475.00
1.00 - -
5.00 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,250.00
10% 2,225.00
- 24,475.00
1.00 - -
5.00 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,250.00
10% 2,225.00
- 24,475.00
1.00 - -
5.00 - -
UMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 22,250.00
10% 2,225.00
- 24,475.00
1 2
A. BAHAN ATAP
1 Genteng Flat Corak / garis/ polos Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2
2 Genteng Flat Corak / garis/ polos Warna Standar 33x39x20 cm - 10 Bh/M2
3 Genteng Flat Corak / garis/ polos Warna Spesial 33x39x20 cm - 10 Bh/M2
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2
17 Nok Genteng Biasa tanpa warna
18 Nok Genteng Keramik
19 Atap Genteng Keramik Standar
20 Atap Genteng Keramik Warna
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 628
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M'
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M'
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M'
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M'
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M'
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M'
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M'
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M'
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M'
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M'
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M'
32 Nok Cabang 3/Ujung Natural (tidak dicat)
33 Nok Cabang 3/Ujung Warna Standar
34 Nok Cabang 3/Ujung Warna Spesial
35 Nok Genteng Multi Roof Kasar, pjg 80 cm
36 Nok Genteng Multi Roof Licin, pjg 80 cm
37 Nok Genteng Surya, pjg 80 cm
38 Nok Genteng Sakura, pjg 80 cm
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm
45 Genteng Metal Star Licin pjg 77 lb. 80 cm
46 Seng BWG 33 BJLS 0,20 MM
47 Seng BWG 28 BJLS 0,35 MM
48 Seng Gelombang bjls 0,35 (6 Kaki)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 629
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
49 Seng Gelombang bjls 0,30 (6 Kaki)
50 Seng Gelombang bjls 0,25 (6 Kaki)
51 Seng Gelombang bjls 0,20 (7 Kaki)
52 Seng Gelombang bjls 0,20 (10 Kaki)
53 Seng Plat bjls 0,35 (6 KK)
54 Seng Plat bjls 0,30 (6 KK)
55 Seng Plat bjls 0,20 (6 KK)
56 Seng Fiber
57 Fiber Semen Harflex ( 240x105x0,4 )
58 Eternit Jibesmen 1 m x 1 m
59 Eternit Harflex 1 m x 1 m
60 Eternit Atrisco 1 m x 1 m
61 Karet Lapis Paku Asbes
62 Karet Talang (50 cm)
63 Karet Lapisan Genteng ( 50 cm)
64 Karet Lapisan Genteng ( 90 cm)
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m
67 Onduline panjang 2 m + baut
68 Nok onduline 1 m
69 Ondulclear 95 x 2 m + baut
70 Lisplank GRC
B. BAHAN DASAR
1 Batu Kali
2 Batu kali Belah
3 Batu Gunung
4 Batu gunung Belah 10 - 15 cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 630
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
5 Batu Pecah 7 - 10 cm
6 Batu Pecah 5 - 7 cm
7 Batu Pecah 3 - 5 cm
8 Batu Pecah 2 - 3 cm
9 Batu Pecah 1- 2 cm
10 Batu Pecah 0,5 - 1 cm
11 Batu Merah Standar
12 Bata Ringan
13 Batako 40x20x10 cm - 13 Bh/M2 @Rp.4950
14 Roster Beton 20 x 20 cm
15 Roster Keramik 20 x 20 cm
16 Roster Keramik 30 x 30 cm
17 Roster Keramik 20 x 40 cm
18 Glass Block
19 Gravel
20 Pasir Kasar/Pasir Beton/Pasir Pasangan
21 Sirtu A
22 Sirtu B
23 Sirtu C
24 Pasir Timbunan
25 Tanah Timbunan
26 Kerikil Sungai
27 Semen 50 kg (Tonasa) PC
28 Semen 40 kg (Tonasa) PC
29 Semen (Bosowa 40 kg) PC
30 Semen Tiga Roda 40 Kg PC
31 Semen Holcim 40 Kg PC
32 Semen Putih 40 kg per sak
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 631
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
33 Pigmen Warna
34 Semen Nat Tegel
35 Semen Abu Tiga Roda 40 Kg
36 Semen Abu Tiga Roda 50 Kg
37 Semen Putih Tiga Roda 40 Kg
38 Semen Acian Mortar Putih 40 Kg
39 Water Proofing
40 Paku jembatan
41 Plastik untuk beton
42 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung)
D 'BAHAN BESI
1 Angker Mur Baut Kecil
2 Angker Baut Tinggi 70 cm
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150
4 Baut Diameter 12 mm x 12,50 cm (stainless)
5 Baut Diameter 12 mm x 18 cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 632
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
6 Baut Diameter 12 mm x 20 cm
7 Baut Diameter 12 mm x 25 cm
8 Baut Diameter 12 mm x 30 cm
9 Baut Skrup
10 Baut Baja
11 Ramset / dina bolt
12 Besi Streep 30 x 3 mm
13 Besi Hollow 40.60.1,2 mm P = 6 m
14 Besi Hollow 40.60.1 mm P = 6 m
15 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m
16 Besi Hollow 40.40.1,5 mm P = 6 m
17 Besi Hollow 40.20.2 mm P =6 m
18 Besi Hollow 40.20.1,5 mm P =6 m
19 Besi Hollow 40.20.1,2 mm P = 6 m
20 Besi Hollow 20.20.1,5 mm P = 6 m
21 Besi Hollow 2x4 (12x31), 0.25mm P = 4m
22 Besi Hollow 2x4 (15x35), 0.25mm P = 4m
23 Besi Hollow 2x4 (18x38), 0.25mm P = 4m
24 Besi Hollow 2x4 (18x38), 0.30mm P = 4m
25 Besi Hollow 2x4 (18x38), 0.35mm P = 4m
26 Besi Hollow 4x4 (34x37), 0.25mm P = 4m
27 Besi Hollow 4x4 (34x37), 0.30mm P = 4m
28 Besi Hollow 4x4 (34x37), 0.40mm P = 4m
29 Besi Kanal C 8 cm, 0.55mm P = 6m
30 Besi Kanal C 8 cm, 0.60mm P = 6m
31 Besi Kanal C 8 cm, 0.65mm P = 6m
32 Besi Kanal C 8 cm, 0.70mm P = 6m
33 Besi Kanal C 8 cm, 0.75mm P = 6m
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 633
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
34 Besi Kanal C 8 cm, 1mm P = 6m
35 Besi Kanal C 8 cm, 0.55mm P = 5,8m
36 Besi Kanal C 8 cm, 0.60mm P = 5,8m
37 Besi Kanal C 8 cm, 0.65mm P = 5,8m
38 Besi Kanal C 8 cm, 0.70mm P = 5,8m
39 Besi Kanal C 8 cm, 0.75mm P = 5,8m
40 Besi Reng 3 cm, 0,4mm P = 6m
41 Besi Reng 3 cm, 0,45mm P = 6m
42 Besi Reng 3 cm, 0,4mm P = 5,8m
43 Besi Reng 3 cm, 0,45mm P = 5,8m
44 Besi Reng 3,8 cm, 0,4mm P = 6m
45 Besi Reng 3,8 cm, 0,45mm P = 6m
46 Besi Reng 3,8 cm, 0,4mm P = 5,8m
47 Besi Reng 3,8 cm, 0,45mm P = 5,8m
48 Plat Besi Kembang 2,3 mm
49 Besi Metal Stud L. 76 mm
50 Besi Siku L. 30.30.3/ 2,8 mm banci
51 Besi siku L. 40.40.4/ 3,8 mm
52 Besi siku L. 50.50.5/ 4,8 mm
53 Besi Siku L. 60. 60. 6/ 5,8 mm
54 Besi Siku L. 70. 70. 7 / 6,8 mm
55 Besi Siku L. 70.70.6 / 5 mm
56 Besi Siku L.100.100.10
57 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7)
58 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8)
59 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8)
60 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8)
61 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 634
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
62 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8)
63 Besi Beton 19 mm ( 2, 23 kg / M' )
64 Besi Beton 20 mm ( 2, 46 kg / M' )
65 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full
66 Besi Beton Ulir Dia. 16 mm SNI
67 Besi Plat 1,5mm 1,2 mm
68 Besi Plat 2 mm (1,8)
69 Besi Plat 2,5mm
70 Besi Plat 3 mm (2,8)
71 Besi Plat 3,5mm
72 Besi Plat 4 mm
73 Besi Plat 4,5mm
74 Besi Plat 5 mm (4,8)
75 Besi Plat 5,5mm
76 Besi Plat 6 mm (5,8)
77 Besi Plat 8 mm (7,8)
78 Besi Plat 9 mm 10 mm (9,8)
79 Besi Plat T = 12 mm Ukr. 120x240
80 Besi Plat T = 16 mm Ukr. 120x240
81 Besi Plat T = 18 mm Ukr. 120x240
82 Baja Tulangan ( Polos ) U24 ᶲ 6
83 Baja Tulangan ( Polos ) U24 ᶲ 8
84 Baja Tulangan ( Polos ) U24 ᶲ 10
85 Baja Tulangan ( Polos ) U24 ᶲ 12
86 Baja Tulangan ( Polos ) U24 ᶲ 16
87 Baja Tulangan ( Polos ) U24 ᶲ 16
88 Baja Tulang ( Ulir ) D32, D39 16
89 Baja Tulang ( Ulir ) D32, D39 18
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 635
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
90 Besi Profil H 200x200 P = 12 meter
91 Besi Profil H 100x100 P = 12 meter
92 Besi IWF 300 P = 12 meter
93 Besi IWF 200 P = 12 meter
94 Besi UNP 100 P = 6 meter
95 Beugel kap V Plat Besi
96 Kawat Ikat Beton 1 roll 20 Kg
97 Kawat Dul ( 1 Roll = M ')
98 Kawat Ram Lubang 3,0 cm ( Rang Armonika )
99 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm
100 Kawat Nyamuk Aluminium
101 Kawat Nyamuk Baja
102 Kawat Las 2,6 nikko
103 Kawat Saringan Pasir / Ayakan
104 Kawat Bronjong
105 Karet Untuk Pintu dan Jendela Aluminium PVC
106 Door Closer Set
107 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll
108 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500
109 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr )
110 Lem Karet ( Fox ) Besar 450 10 kg
111 Lem Seng
112 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm
113 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm
114 Paku Campuran ( 5-10 cm )
115 Paku Asbes dan Karet
116 Paku 5 cm 7 cm 10 cm
117 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm )
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 636
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
118 Paku 4 cm
119 Paku 2-3 cm
120 Paku Sirap ( Setara Paku 2-3 cm )
121 Paku Seng ( 1 kg/ Dos )
122 Paku Skrup 5 cm
123 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm )
124 Paku skrup Gyapsum - 500 biji per dos bungkus
125 Paku Jembatan
126 Paku Beton 5 cm
127 Paku Beton 6 cm
128 Paku Beton 7 cm - 10 cm
129 Paku Payung Berulir ( 1 kg/ Dos )
130 Paku Asbes Berulir
131 Paku Asbes Biasa
132 Paku Tripl ( Setara Paku 2-3 cm)
133 Paku Eter ( Setara Paku 2-3 Cm )
134 Paku Ripet
135 Skamp ( Paku Tembak Hollow alumunium )
136 pagar Jadi Besi ( Tinggi 1 M )
137 Pagar Pracetak - 5 panel
138 Pagar Pracetak - 6 panel
139 Pagar Pracetak - 7 panel
140 Tiang Beton untuk 5 Daun
141 Tiang Beton untuk 6 Daun
142 Tiang Beton untuk 7 Daun
143 Rangka Baja Ringan 0,75
144 Spandek 0,25 silver
145 Spandek 0,35 silver
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 637
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
146 Spandek 0,4 silver
147 Spandek 0,45 0,35
148 Nok Spandek
149 Hollow Aluminium Rangka Plafond 0,25 (2x4)
150 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4
151 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm
152 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm
153 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm
154 Kawat Penggantung Hollow Aluminium
155 Aluminium 4'' Brown - 6 Meter
156 Aluminium 3'' Brown - 6 Meter
157 Aluminium Slimar 4'' Brown Untuk Daun Jendela
158 Aluminium Slimar 3'' Brown Untuk Daun Jendela
159 Pas. Kusen Aluminium 4'
160 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent
161 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories )
162 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm
163 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm
164 Pintu fiberglass KM/WC
165 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star
E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg
2 Cat Kayu Ex Avian (0,9 kg)
3 Cat Minyak Ex Emco
4 Cat kKayu Ex Mowilex 1kg
5 Cat Minyak
6 Cat Minyak Super klg
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 638
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
7 Cat Kayu Dulux 1kg
8 Cat Dasar 3,5 kg
9 Cat Dasar Meni 3,5 Kg
10 Cat Meni Glatik 3,5 kg
11 Cat Tenner
12 Cat Genteng Cap Belmas 1kg
13 Cat Genteng yoko 4kg
14 Cat Genteng Biasa AGA (4 kg)
15 Cat Genteng Minyak Nippon 2,5 liter
16 Cat Residu/ cloter (10 kg) 30.000/ kg
17 Cat seng Nippon (2,5 kg)
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg)
19 Cat Tembok Wintex / Maxilite (5kg)
20 Cat Tembok ICI (Dalam)
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang
23 Cat Tembok Aries 5kg
24 Cat Minyak Avian
25 Cat Tembok Kimex (5kg)
26 Cat Tembok Dulux (luar) 2,5 kg
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax)
28 Vernis/Plitur (24 Klg)
29 Cat Altex
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg
31 Cat Anti Lumut (No drop) (Klg 20 kg)
32 Cat Dasar Glatik kembang 1 kg
33 Plamur Tembok Boyo Dan Setara (5kg)
34 Minyak Cat (aff Dunner)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 639
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg
36 Dempul Ex Impra
37 Dempul Ex Isamu
38 Tenner A ( Ex Avian) super
39 Minyak Te Botol
40 Kertas Gosok
41 Pewarna Natural
42 pewarna brown
43 Pewarna Ex Impra
44 Wood Filler Ex Impra
45 Clear
46 Clear ex Impra
47 Sending
48 Sending ex Impra
49 Cat Kayu Ex Dullux Mengkilap
50 Melamin Ex Impra
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA)
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA)
53 Kuas 2" (Eterna)
54 Kuas 3" (Eterna)
55 Kuas 4" (Eterna)
56 Bahan Anti Karat
57 Comice - 20 kg (dingding eksterior )
58 Comice - 20 kg (dingding interior)
59 Lem Fox Kaleng
60 Lem Efoxi
61 Perban Conpon
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 640
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
63 Cat Waterproof eks aquaproo- kw.1
64 Cat waterproof- biasa
65 Cat Marka Jalan (aries gold 5kg)
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 (Indoor)
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, Safron, Olive Brown
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush
F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw
2 Kayu Kls. I Bayam (balok) Sawmill
3 Kayu Kls. I Ulin (papan)
4 Kayu Kls. I Ulin (tiang)
5 Kayu Kls. I Bayam (papan) Shain Saw
6 Kayu Kls I Bayam(papan) sawmil
7 Kayu Klas. II Samarinda (papan)/ Lokal
8 Kayu Klas. II Samarinda (balok)/ Lokal
9 Kayu Kls. III Kapur (balok)/ Kemiri
10 Kayu Kls. III (papan)
11 Kayu Mangga/Kemiri (papan)
12 Kayu Kumea Balok
13 Kayu Kumea Papan
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 641
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm)
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm)
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm
G BAHAN PENGGANTUNG
1 Engsel Baja
Engsel Baja (Dumont)
2 Engsel Kuningan 4 Lubang
Engsel Kuningan 4 Lubang (Dumont)
3 Engsel Stainless Steel
4 Engsel H3 Lubang
5 Engsel Kupu-kupu
6 Engsel antik jendela
7 Engsel Pintu Biasa (Merk 777)
Engsel Pintu Biasa (Dumont)
8 Engsel Pintu Lemari Biasa
Engsel Pintu Lemari Biasa (Dakson)
9 Engsel Jendela Biasa (Merk 777)
Engsel Jendela Biasa (Dumont)
10 Engsel Jendela Kuningan (merk Kuningan)
Engsel Jendela Kuningan (Dakson)
11 Engsel Pintu 4" (SES)
Engsel Pintu 4" (Dumont)
12 Engsel Jendela 3"(SES)
Engsel Jendela 3"(Dumont)
13 Engsel Pintu Kuningan SES
Engsel Pintu Kuningan (Dumont)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 642
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
14 Gagang Pintu Lemari
Gagang Pintu Lemari (Dakson)
15 Grendel jendela Kuningan
Grendel jendela Kuningan (Dakson)
16 Grendel Pintu Biasa
Grendel Pintu Biasa (Dumont)
17 Grendel Pintu Kuningan/ Vertikal
18 Grendel Pintu Besar
19 Grendel Pintu Tanam (Expanyolet)
20 Kunci Tanam Yale 1 x Putar
21 Kunci Tanam Yale 2 x Putar
22 Kunci Tanam Pintu 2 x Putar Besar Biasa
23 Kunci Tanam Pintu 2 x Putar kecil Biasa
24 Kunci Tanam Pintu 2 x Putar SES
25 Hak Angin Kecil Antik
26 Hak Angin Besar
Hak Angin Besar (Dumont)
27 Hak Angin Kecil
Hak Angin Kecil (Dumont)
28 Kait angin Jendela Alumunium Kualias 1
Kait angin Jendela Alumunium (Dumont)
29 Kait angin Jendela Alumunium biasa
Kait angin Jendela Alumunium (Dumont)
H BAHAN KACA
1 Kaca Bening 3 mm
2 Kaca Bening 5 mm
3 Kaca Bening 6 mm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 643
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
4 Kaca Bening 8 mm
5 Kaca Bening 10 mm
6 Kaca Ryben Tebal 5 mm
7 Kaca Ryben Tebal 6 mm
8 Kaca Ryben Tebal 3 mm
9 Kaca Ryben Tebal 8 mm
10 Kaca Ryben Tebal 10 mm
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand
12 Kaca Es Buram 5 mm/ 10 mm
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM
Ukuran (1221 x 153)
Ukuran (200 x 90)
Ukuran (200 x 100)
Ukuran (213 x 122)
Ukuran (183 x 122)
Ukuran (244 x 183)
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM
16 Kaca Bening 12 mm
Cermin Toilet
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap
5 Kloset Jongkok KIA
6 Kloset Jongkok Biasa (American Standar)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 644
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
7 Wastafel polos / putih lengkap
8 Wastafel warna lengkap
9 Slypon Wastafel Biasa
10 Urinoir Polos /Putih American Standart
11 Partisi Urinoir
12 Urinoir ex TOTO (lengkap)
13 Bak Tube Fiber Biasa
14 Bak Tube Fiber ex TOTO
15 Tangki Air Fiberglass Kap 0,25 M3
16 Tangki Air Fiberglass Kap 0,50 M3
17 Tangki Air Fiberglass Kap 1 M3
18 Tangki Air Alumunium Kap 1 M3
19 Kran Air Kuningan DIA 3/4 Biasa
20 Kran Air Kuningan DIA 1/2 Biasa
21 Kran Air Vernrkel DIA 3/4 Biasa
22 Kran Air Antik DIA 1/2
23 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air
24 Kran air 2 / Biasa/ bisa
25 Seal Tape
26 Bak Mandi
27 Kloset Jongkok Biasa
28 Wallpaper & Penutup Dinding
29 Foil (Kertas Alumunium Foil)
30 Kloset Duduk (Data)
31 Kloset Jongkok TOTO (Putih)
32 Toilet Portable Fiberglass 400 Liter
33 Toilet Portable Fiberglass 400 Liter
34 Jet Washer
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 645
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm
2 Triplex 3 mm 120 x 240 cm
3 Triplex 4 mm 120 x 240 cm
4 Triplex 5 ml
5 Triplex 6 mm 120 x 240 cm
6 Triplex 7 ml
7 Triplex 10 ml
8 Triplex 15 ml
9 Triplex 20 ml
10 Triplex Ukuran Pintu
11 Triplex Melamin 120 x 240 cm 3 mm
12 Teakwood 120 x 240 cm t.4mm
13 Multiplex 120 x 240 cm t. 6 mm
14 Multiplex 120 x 240 cm t. 9 mm
15 Multiplex 120 x 240 cm t. 12 mm
16 Multiplex 120 x 240 cm t. 18 mm
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro
18 Kalsiboard tebal 3,5 mm
19 Kalsiboard tebal 4,5 mm
20 Kalsiboard tebal 6 mm
21 Kalsiboard tebal 8 mm
22 Kalsiboard tebal 10 mm
23 Kalsiboard tebal 20 mm
24 Kalsiplank 8mm (10cm x 3m)
25 Kalsiplank 8mm (10cm x 3m) Polos
26 Kalsiplank 8mm (20cm x 3m) Jati
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 646
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
27 Kalsiplank 8mm (30cm x 3m) Polos
28 Kalsiplank 8mm (30cm x 4m) Jati
29 Kalsiplank 9mm (20cm x 4m) Polos
30 Kalsiplank 9mm (20cm x 4m) Cedar
31 Lambriziring t:4mm, (4m')
32 GRC ( 120 x 240 x 4 ) mm
33 HPL
34 Les Kayu Profil Lebar 5 cm ( 4 M' )
35 Les Kayu Profil Lebar 3 cm ( 4 M' )
36 Les Kayu Profil Lebar 11/2 cm ( 4 M' )
37 Les Kayu 1 x 10 x 400 cm
38 Les Kayu Profil 4 x 4 x 400 cm
39 Les Kayu Biasa 0,5 x 3 cm
40 Les Gypsum Polos
41 Les Gypsum Polos - Kecil
42 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm
43 Les Gypsum - Sedang
44 Les Gypsum - lebar 10 cm
45 Les Gypsum - Besar - lebar 15 cm
46 Les Gypsum Profil
47 Beding Gypsum - Kecil
48 Beding Gypsum - Sedang
49 Beding Gypsum - Besar
50 Cotton plaster
51 Compoun
K BAHAN LANTAI
1 Tegel PC 30 x30 cm
2 Tegel Motif 30 x30 cm Platinum Diego grey / brown 2
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 647
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
3 Tegel Keramik Putih 10 x 20 cm
4 Tegel Keramik Putih 20 x 20 cm
5 Tegel Keramik Putih 20 x 25 cm
6 Tegel Keramik Putih 30 x 30 cm
7 Tegel Keramik Putih 40 x 40 cm (accura)
8 Tegel Keramik Putih 50 x 50 cm # Platinum (accura motif)
9 Tegel Keramik Putih 60 x 60 cm Ex Granito (granit sandimas mega white)
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda
11 Tegel Keramik Putih 30 x 60 cm Ex Granito (granit eleganza new vorio)
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress
13 Tegel Keramik Warna 60 x 60 cm EX Garuda/Pangress Double wodding (sandimas)
14 Tegel Keramik warna 30 x 60 cm Ex Garuda /Roman (kwalitas LebihBagus)
15 Tegel Keramik Putih 30 x 60 cm
16 Tegel Keramik Warna 20 x 20 cm
17 Tegel Keramik Warna 30 x 30 cm
18 Tegel Keramik Warna 20 x 25 cm
19 Tegel Keramik Warna 40 x 40 cm
20 Tegel Keramik Warna 50 x 50 cm
21 Tegel Keramik Warna 60 x 60 cm
22 Tegel Keramik Warna 30 x 60 cm
23 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (GNS Ruffian)
24 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Topaz)
25 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Cottonwood)
26 Granit Uku 60 x 160 x 185 cm Dasar Putih
27 Granit Uku 60 x 185 cm Dasar Hitam / 63 X 198 cm (sandimas 60x60)
28 Granit ukuran 30 x 30 cm Asia Tile
29 Granit ukuran 40 x 40 cm Granito Asia Tile
30 Granit ukuran 60 x 60 cm (sandimas)
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 648
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
31 Keramik WC 20 x 20 cm
32 Keramik WC 20 x 25 cm
33 Keramik WC 30 x 30 cm Asia Tile
34 Keramik uku 30 x 30 cm
35 Keramik uku 40 x 40 cm
36 Keramik Warna uk. 25 x 40 cm (accura)
37 Batu Alam 10 x 20 cm Polos
38 Batu Alam 20 x 20 cm Polos 10x30 cm
39 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm / 20x40 cm
40 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm
41 Batu Alam ukuran 10 x 20 cm Polos / 30 X 60 CM Polos
42 Marmer Ukuran Slabs(type Burito/acaro/Great I) / 100 x 100 cm
43 Marmer Ukuran Slabs(type Burito/acaro/Great II)
44 Marmer Ukuran Slabs(type Burito/acaro/Great III)
45 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / cream urat kayu
46 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II)
47 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III)
48 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I)
49 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II)
50 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III)
51 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm
53 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana
54 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm
55 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm
56 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm
57 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm
58 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 649
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm
64 Plint Granit Impor 10x60 cm
65 Plint Granit Impor 10x40 cm
L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 )
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna
18 Paving Blok SegiTiga Uskup 6 cm
19 Paving Blok SegiTiga Uskup 8 cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 650
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna
26 Paving Kombinasi 6 cm ( K 300 )
27 Paving 20 x 20 8 cm ( K 300 )
28 1 tegel pedestrian untuk pengarah difabel 30 x 30
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
38 Grass Block 8 cm Standar
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M'
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M'
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M'
42 Kanstin Pracetak 60 x 25 x 15 cm
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm
44 Kanstin Pracetak 15 x 20 x 40 cm
45 Kanstin Pracetak 15 x 25 x 40 cm
46 Kanstin Pracetak 15 x 30 x 40 cm
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 651
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
48 Kanstin Pracetak 12 x 25 x 40 cm
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm
50 Kanstin Pracetak 22 x 25 x 60 cm
51 U Ditch L : 20 cm, T: 20 cm, P:60 cm
52 U Ditch L : 30 cm, T: 40 cm, P:80 cm
53 U Ditch L : 40 cm, T: 50 cm, P:100 cm
54 U Ditch L : 50 cm, T: 50 cm, P:100 cm
55 U Ditch L : 60 cm, T: 60 cm, P:100 cm
56 U Ditch L : 70 cm, T: 80 cm, P:100 cm
57 U Ditch L : 80 cm, T: 100 cm, P:100 cm 5 TON
58 U Ditch L : 100 cm, T: 120 cm, P:100 cm 5 TON
59 Gutter Crub 2.5 Bh/M'
60 Topi Uskup T = 6 cm
61 Topi Uskup T = 8 cm 3 Bh/M'
62 Tali Nilon
63 Aspal Emulsi
64 Aspal Bitumen
65 Aspal Curah (ton)
66 Aspal Drum 1 Drum. 155 kg / Drum
67 Aspal cement
68 B.0
69 Solar Non Industri
70 Solar Industri
71 Minyak Pelumas
72 Bensin
73 Minyak bakesting
74 Mortar
75 Filler/abu batu M3
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 652
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
76 Kerosen/Minyak Tanah
77 Beton Mutu K500
78 Beton Mutu K450
79 Beton Mutu K400
80 Beton Mutu K350
81 Beton Mutu K300
82 Beton Mutu K275
83 Beton Mutu K 250
84 Beton Mutu K 225
85 Beton Mutu K175
86 Beton Mutu K125
87 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single
88 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double
89 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single
90 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double
91 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single
92 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double
93 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single
94 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single
95 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double
96 Deuker T 6 cm, L 60 cm
97 Deuker T 6 cm, L 80 cm
98 Deuker T 10 cm, L 60 cm
99 Deuker T 10 cm, L 80 cm
100 Deuker T 12 cm, L 60 cm
101 Deuker T 12 cm, L 80 cm
102 Deuker T 15 cm, L 60 cm
103 Deuker T 15 cm, L 80 cm
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 653
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
104 Sewa C. Pump Standard
105 Sewa C. Pump Long Boom
106 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000
107 Kantung Plastik Uk 46 Isi 50
108 Kantung Plastik Uk 15 Isi 10
109 Aspal (Asphal grade 60/70)
110 Aspal (curah grade 60/70 Lokal) 6 drum
111 Exkontainer (Peti Kemas) Ukuran 20 Feet Kondisi 80 %
112 Exkontainer (Peti Kemas) Ukuran 40 Feet Kondisi 80 %
U-Ditch (ukuran lain)
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 654
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400
130 Hexagon (Segi Enam) Ukuran 6 cm
131 Urug (terima jadi) Ukuran 8 cm
132 Pemasangan
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 655
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
( SII ) 3/4 Inci - 4 M
1 Inci -4M
1 1/4 Inci - 4 M
1 1/2 Inci - 4 M
2 Inci -4M
2 1/2 Inci - 4 M
3 Inci -4M
3" -6M S - 10
S - 10
S - 12.5
S - 12.5
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 656
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
4" -6M S - 10
S - 10
S - 12.5
S - 12.5
-6M S-8
S - 10 MOF
S - 12,5
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 657
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 658
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
S - 12,5 RR
S - 16
S - 16
1/2" S - 6,3
S-8
S - 10
-6M S - 12,5
3/4" S - 6,3
S-8
S - 10
-6M S - 12,5
1" S - 6,3
S-8
S - 10
S - 10
-6M S - 10 Mof
1 1/4" S - 6,3
S-8
S - 10
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 659
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
-6M S - 10 Mof
S - 12,5
1 1/2" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5
-6M S - 12,5 Mof
S - 16
2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
2 1/2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 660
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
3" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
4" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 661
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
S - 16
14" -6M S - 10 RR
-6M S - 12,5 RR
16" -6M S - 10 RR
-6M S - 12,5 RR
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 662
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
18" -6M S - 10 RR
-6M S - 12,5 RR
20" -6M S - 10 RR
-6M S - 12,5 RR
24" -6M S - 10 RR
-6M S - 12,5 RR
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 663
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa )
1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa )
3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )
8" -6M S - 10 / 12,5 Bar (12,5 Mpa )
10" -6M S - 10 / 12,5 Bar (12,5 Mpa )
12" -6M S - 10 / 12,5 Bar (12,5 Mpa )
16" -6M S - 10 / 12,5 Bar (12,5 Mpa )
20" -6M S - 10 / 12,5 Bar (12,5 Mpa )
24" -6M S - 10 / 12,5 Bar (12,5 Mpa )
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 664
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M
5" -6M
6" -6M
8" -6M
10" -6M
12" -6M
16" -6M
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 665
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
2" -6M
21/2" -6M
3" -6M
4" -6M
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 666
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
PIPA PVC 2 "
PIPA PVC 2 1/2
PIPA PVC Wavin Kual D(4"x 4 M)
PIPA PVC Winlon Kual D (4"'x 4 M)
PIPA PVC vinilon Kual D (4'' x 4 M)
PIPA PVC Maspion Kual D ( 4"x 4 M)
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual AW ( 4 x 4 M)
Pipa PVC Maspion Kual D( 4 x 4 M)
Pipa PVC Wavin AW ( 4 x 4 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual (4 x 4 M)
Pipa PVC Pravilon 4 Inci
Pipa PVC Pravilon End 6 Mi
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 667
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
Endcap/ Dop 2"
Endcap/ Dop 3"
Endcap/ Dop 4"
6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 668
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
21 Lem Pipa PVC
22 Lem Besi - kw 1
23 Lem Besi - biasa
24 Talang PVC
25 Double Nipple GIV 1/2"
26 Double Nipple GIV 3/4"
27 Double Nipple 4"
28 Doubble Nipple 2"
29 Dop PVC 3/4"
30 Dop PVC 1"
31 Dop PVC 2"
32 Dop PVC 4"
33 Elbow GIV 3/4"
34 Elbow GIV 2"
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 669
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
3/4"
1"
2'
6 TEE 1/2"
3/4"
7 V. KNIE 3/4"
1"
8 V NEPLE 3/4"
1"
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 670
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
16 Pipa Baja Hitam -6M 1" tbl=2 mm
17 Pipa Baja Putih -6M 1" tbl=2 mm
18 Pipa Baja Hitam -6M 2" tbl=2 mm
19 Pipa Baja Putih -6M 2" tbl=2 mm
20 Pipa Baja Hitam -6M 3" tbl=2 mm
21 Pipa Baja Putih -6M 3" tbl=2 mm
22 Pipa Baja Hitam -6M 4" tbl=2 mm
23 Pipa Baja Putih -6M 4" tbl=2 mm
24 Pipa PVP dlm 2" Resapan
25 Pipa PVP dlm 3" Resapan
26 Pipa PVP dlm 4" Resapan
P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt )
2 Pompa Air Shimizu 230 ( 200 Watt )
3 Pompa Air Panasonik 130 Jak ( 125 Watt )
4 Pompa Air Panasonik 200 Jak
5 Pompa Air Sanyo 137 AC
6 Pompa Air Sanyo PH 130 AC
7 Pompa Air Wasser 139 EA
8 Pompa Air Lakoni 129 A
9 Pompa Air Inoto I Hp + Kabel 50 Meter
10 Pompa Air Evak I Hp
11 Pompa Air Franklin I Hp
12 Pompa Wasser 60 Ea
13 Pompa Wasser 169 EA
14 Pompa Air Tsutumi 3
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 671
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 672
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
25 Fitting Lampu Taman E 27
26 Fitting Lampu E 40
27 Fotosell 6 A
28 Ignitor HPIT 400 W ( SI.51 ) PH
29 Injektor 3 Kutub
30 Injektor SN 58
31 Isolasi Kabel Tanah (Bahan Karet)
32 Isolasi Unibell
33 Kabel NYA 1000 Volt 1,5 mm
34 Kabel NYA 1000 Volt 2x1,5 mm
35 Kabel NYA 1000 Volt 3x1,5 mm
36 Kabel NYA 1000 Volt 2,5 mm
37 Kabel NYA 1000 Volt 4 mm
38 Kabel NYA 1000 Volt 6 mm
39 Kabel NYA 1000 Volt 10 mm
40 Kabel NYA 1000 Volt 16 mm
41 Kabel NYA 1000 Volt 50 mm
42 Kabel NYM 300/750 Volt 3x2,5 mm2
43 Kabel NYM 300/750 Volt 3x4 mm2
44 Kabel NYY 0,6/1 Kv 4x2,5 mm2
45 Kabel NYY 0,6/1 Kv 4x4 mm2
46 Kabel NYY 0,6/1 Kv 4x6 mm2
47 Kabel NYY 0,6/1 Kv 4x10 mm2
48 Kabel NYY 0,6/1 Kv 4x185 mm2
49 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2
50 Kabel NYFGBY 0,6/1 Kv 4x25 mm2
51 Kabel NYY 0,6/1 Kv 4x16 mm2
52 Kabel NYY 0,6/1 Kv 4x50 mm2
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 673
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
53 Kabel NYFGBY 0,6/1 Kv 4x240 mm2
54 Kabel NYY 0,6/1 Kv 70 mm2
55 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor)
56 Kabel NYM 2 x 1,5 mm
57 Kabel NYM 2 x 1,5 mm
58 Kabel NYM 2 x 2,5 mm
59 Kabel NYM 2 x 2,5 mm
60 Kabel NYFGBY 4 x 6 mm
61 Kabel NYFGBY 4 x 10 mm
62 Kabel NYFGBY 4 x 16 mm
63 Kabel Twistik 2 x 10 mm
64 Kabel Twistik 2 x 16 mm
65 Kap E 27 Hijau
66 Kapasitor HPIT 250 W PH
67 Kapasitor HPIT 400 W PH
68 Kapasitor SON T 400 W
69 Kapasitor SON T 250 W
70 Kapasitor SON T 150 W
71 Kapasitor 8 Mf
72 Kapasitor 25 Mf
73 Kapasitor 32 Mf
74 Konektor Double Baut
75 Konektor Kedap Air 1 Baut
76 Kontaktor SN 50/80 Ampere
77 Klem Service Plastik
78 Kawat Seng
79 Lampu Hemat Energi 18 W
80 Lampu Hemat Energi 23 W
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 674
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
81 Lampu Hemat Energi 85 W
82 Lampu Hemat Energi 75 W
83 Lampu Hemat Energi 70 W
84 Lampu Hemat Energi 65 W
85 Lampu Hemat Energi 50 W
86 Lampu LED Hemat Energi 7 W
87 Lampu LED Hemat Energi 9 W
88 Lampu LED Hemat Energi 13 W
89 Lampu Selang Hias
90 MCB 1 A MG 1 Phase
91 MCB 2 - 20 A MG 1 Phase
92 MCB 25 - 32 A MG 1 Phase
93 MCB 1 A 1 Phase
94 MCB 6 A 1 Phase
95 MCB 16 A 1 Phase
96 MCB 20 A 1 Phase
97 MCB 50 A 1 Phase
98 Mour / Baut
99 NFB 75 A Mitsubishi 3 Phase
100 NFB 80 A Mitsubishi 3 Phase
101 NFB 100 A Mitsubishi 3 Phase
102 Pipa Gip 1 1/2" (listrik)
103 Rang Lampu Taman TO.2
104 Relay lampu Selang
105 Saklar Engkel In Clipsal
106 Saklar Engkel In Broco
107 Saklar Seri II In Clipsal
108 Saklar Seri II In Broco
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 675
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
109 Skun Kabel 10 mm
110 Skun Kabel 16 mm
111 Skun Kabel 25 mm
112 Skun Kabel 50 mm
113 Selonsong 10
114 Selonsong 16
115 Stop Kontak Broco
116 Stop Kontak Clipsal
117 Terminal Elegram 25mm
118 Tiang PJU 9 M Galvanis Single David
119 Tiang PJU 9 M Galvanis Double David
120 Tiang Besi 7 M
121 Tiang Besi 9 M
122 Tiang Lampu Taman
123 Timer Sweet Thebend
124 Travo HPIT 400 Watt Philips
125 Travo HPLN 125 Watt PH / HQL 80 Watt
126 Travo Son T 400 W
127 Travo Son T 250 W
128 Travo Son T 150 W
129 Travo TL 40 W PH
130 Bohlam (Lampu Penerangan) TL Simbat 18 W
131 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat
132 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
133 Kawat Non Galbani Lainnya (Kawat Las)
134 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
135 Stop Kontak dan Soket (Broco 2 Saklar)
136 Control Desk / Meja Kontrol KWH METER 450 WATT
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 676
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
137 Control Desk / Meja Kontrol KWH METER 900 WATT
138 Kabel Listrik NYM (2 MM x 2.5 MM)
139 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM)
140 Kabel Listrik NYY (3 x 2,5) MM
141 Kabel Lainnya Eterna (3 x 2,5) 50 M
142 Bohlam (Lampu Penerangan) Philips Pijar 40 Watt
143 Lampu Neon Philips 40 Watt 100 Buah
144 Lampu Neon Philips TL 40 Watt
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 677
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
19 Solder
20 Tang Ampere 600 A
21 Tang Press Skun Besar
22 Tang Press Skun Kecil
23 Tangga Aluminium untuk lampu jalan
24 Tangga Bambu 2,5 Meter
25 Tangga Bambu 5 Meter
26 Tangga Fiber
27 Tools Kit
28 Topi
S UPAH KERJA
1 Mandor Lapangan
2 Kepala tukang
3 Kepala Tukang Listrik
4 Tukang Batu /Cat
5 Tukang Kayu / besi
6 Tukang pasang paving
7 Pembantu Sopir
8 Pembantu Mekanik
9 Pembantu Tukang Listrik
10 Pembantu Operator
11 Mekanik
12 Operator Terlatih
13 Pekerja
14 Sopir Terampil
15 Biaya Pasang Canstein
16 Biaya Pasang Paving
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 678
NO BAHAN MATERIAL DAN UPAH KERJA
1 2
T BAHAN PERBENGKELAN
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 679
AN BAHAN & UPAH KERJA
TAHUN ANGGARAN 2019
Buah Rp 3,851.87
Buah Rp 5,077.47
Buah Rp 5,515.18
Buah Rp 3,851.87
Buah Rp 5,077.47
Buah Rp 5,515.18
Buah Rp 3,851.87
Buah Rp 5,077.47
Buah Rp 5,515.18
Buah Rp 5,952.89
Buah Rp 3,851.87
Buah Rp 5,077.47
Buah Rp 5,515.18
Buah Rp 3,851.87
Buah Rp 5,077.47
Buah Rp 5,515.18
Buah Rp 13,131.38
Buah Rp 14,882.23
Buah Rp 9,629.68
Buah Rp 13,131.38
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 680
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 12,133.39
Buah Rp 16,633.08
Buah Rp 16,755.63
Buah Rp 21,885.63
Buah Rp 12,868.75
Buah Rp 16,545.53
Buah Rp 17,771.13
Buah Rp 10,942.81
Buah Rp 15,319.94
Buah Rp 15,101.08
Buah Rp 17,508.50
Buah Rp 74,411.13
Buah Rp 83,165.38
Buah Rp 100,673.88
Buah Rp 50,336.94
Buah Rp 54,714.06
Buah Rp 41,582.69
Buah Rp 28,889.03
Lembar Rp 94,545.90
Lembar Rp 94,108.19
Lembar Rp 78,788.25
Lembar Rp 78,788.25
Lembar Rp 48,148.38
Lembar Rp 66,532.30
Lembar Rp 26,262.75
kaki Rp 6,303.06
kaki Rp 70,034.00
Lembar Rp 70,034.00
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 681
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 61,279.75
Lembar Rp 39,919.38
Lembar Rp 42,895.83
Lembar Rp 63,030.60
Lembar Rp 74,411.13
Lembar Rp 65,656.88
Lembar Rp 46,397.53
KK Rp 15,757.65
Lembar Rp 70,034.00
Lembar Rp 13,131.38
Lembar Rp 15,757.65
Lembar Rp 10,505.10
Biji Rp 6,303.06
M Rp 6,565.69
M Rp 7,003.40
M Rp 11,380.53
Rol Rp 306,398.75
Rol Rp 350,170.00
Lbr Rp 144,445.13
Lbr Rp 69,158.58
Lbr Rp 280,136.00
Lbr Rp 78,788.25
Rp -
Rp -
M3 Rp 306,398.75
M3 Rp 218,856.25
M3 Rp 306,398.75
M3 Rp 218,856.25
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 682
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M3 Rp 350,170.00
M3 Rp 306,398.75
M3 Rp 306,398.75
M3 Rp 306,398.75
M3 Rp 306,398.75
M3 Rp 306,398.75
Biji Rp 875.43
M3 Rp 787,882.50
M2 Rp 56,333.60
Biji Rp 21,885.63
Biji Rp 45,522.10
Biji Rp 54,276.35
Biji Rp 54,276.35
Biji Rp 26,262.75
M3 Rp 131,313.75
M3 Rp 110,000.00
M3 Rp 227,610.50
M3 Rp 227,610.50
M3 Rp 227,610.50
M3 Rp 140,068.00
M3 Rp 175,085.00
M3 Rp 284,513.13
Sak Rp 45,125.00
Sak Rp 42,020.40
Zak Rp 41,144.98
Zak Rp 41,144.98
Zak Rp 39,394.13
Sak Rp 61,279.75
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 683
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Sak Rp 218,856.25
Kg Rp 17,508.50
Kg Rp 39,394.13
Kg Rp 49,461.51
Kg Rp 100,455.02
Kg Rp 60,000.00
M2 Rp 43,333.54
kg Rp 26,262.75
M2 Rp 70,034.00
M3 Rp 306,398.75
Rp -
Rp -
Batang Rp 87,542.50
Batang Rp 35,017.00
Batang Rp 26,262.75
Batang Rp 21,885.63
Ikat Rp 30,639.88
Buah Rp 131,313.75
Buah Rp 175,085.00
Buah Rp 262,627.50
Buah Rp 306,398.75
Rp -
Rp -
Bh Rp 7,616.20
Bh Rp 6,294.31
Batang/Biji Rp 11,328.87
Batang Rp 18,380.42
Batang Rp 11,700.06
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 684
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 12,320.73
Batang Rp 15,248.15
Batang Rp 17,465.60
Bh Rp 4,814.84
Bh Rp 21,885.63
Bh Rp 6,303.06
M'/ Btg Rp 166,330.75
Btg Rp 160,202.78
Btg Rp 161,953.63
Btg Rp 166,330.75
Btg Rp 140,068.00
Btg Rp 118,182.38
Btg Rp 100,673.88
Btg Rp 83,165.38
Btg Rp 74,411.13
Btg Rp 15,757.65
Btg Rp 16,633.08
Btg Rp 18,383.93
Btg Rp 21,010.20
Btg Rp 23,636.48
Btg Rp 21,885.63
Btg Rp 25,387.33
Btg Rp 32,390.73
Btg Rp 56,902.63
Btg Rp 62,155.18
Btg Rp 65,656.88
Btg Rp 70,034.00
Btg Rp 74,411.13
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 685
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Btg Rp 101,549.30
Btg Rp 55,151.78
Btg Rp 60,404.33
Btg Rp 63,906.03
Btg Rp 67,845.44
Btg Rp 28,500.00
Btg Rp 30,639.88
Btg Rp 32,390.73
Btg Rp 29,764.45
Btg Rp 31,515.30
Btg Rp 41,144.98
Btg Rp 45,522.10
Btg Rp 40,269.55
Btg Rp 44,208.96
M2 Rp 691,585.75
Btg Rp 61,279.75
Btg Rp 89,731.06
Btg Rp 148,822.25
Btg Rp 218,856.25
Btg Rp 393,941.25
Btg Rp 538,386.38
Btg Rp 456,971.85
Btg Rp 936,704.75
Btg Rp 24,511.90
Btg Rp 42,020.40
Btg Rp 56,902.63
Btg Rp 74,411.13
Btg Rp 126,936.63
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 686
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Btg Rp 162,829.05
Btg Rp 214,479.13
Btg Rp 323,907.25
Btg Rp 68,633.32
Btg Rp 168,431.77
M2 Rp 398,318.38
M2 Rp 566,399.98
M2 Rp 639,060.25
M2 Rp 796,636.75
M2 Rp 1,138,052.50
M2 Rp 1,225,595.00
M2 Rp 1,418,188.50
M2 Rp 1,514,485.25
M2 Rp 1,707,078.75
M2 Rp 1,794,621.25
M2 Rp 2,284,859.25
M2 Rp 2,932,673.75
Lembar Rp 3,294,399.36
Lembar Rp 4,363,118.20
Lembar Rp 5,000,427.60
Batang Rp 29,326.74
Batang Rp 38,518.70
Batang Rp 57,778.05
Batang Rp 87,542.50
Batang Rp 157,576.50
Batang Rp 137,441.73
Batang Rp 144,445.13
Batang Rp 236,364.75
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 687
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 9,265,498.20
Batang Rp 3,255,180.32
Batang Rp 6,451,532.08
Batang Rp 3,691,492.14
Batang Rp 431,409.44
kg Rp 12,080.87
kg Rp 175,700.00
Roll Rp 153,199.38
M' Rp 30,639.88
M Rp 8,754.25
M Rp 21,885.63
M Rp 30,639.88
Dos Rp 113,805.25
M Rp 15,757.65
kg Rp 21,885.63
M'/Roll Rp 56,902.63
Unit Rp 161,953.63
M2 Rp 503,369.38
M2 Rp 218,856.25
Tube Rp 13,131.38
Tube Rp 161,953.63
M Rp 14,006.80
Roll Rp 1,291,251.88
Roll Rp 2,626,275.00
Kg Rp 14,882.23
Kg Rp 48,148.38
Kg Rp 14,882.23
Kg Rp 17,508.50
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 688
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 15,757.65
Kg Rp 16,633.08
Kg Rp 19,259.35
Kg Rp 43,771.25
Biji Rp 218,856.25
Dos/ Bgks Rp 153,199.38
Dos/ Bgks Rp 52,525.50
Kg Rp 12,255.95
Dos Rp 13,131.38
Dos Rp 13,131.38
Dos Rp 13,131.38
Kg Rp 30,639.88
Dos Rp 41,582.69
Dos Rp 43,771.25
Kg Rp 21,885.63
Kg Rp 21,885.63
Biji Rp 875.43
Bh Rp 21,885.63
M' Rp 350,170.00
M' Rp 393,941.25
M' Rp 437,712.50
M' Rp 502,493.95
Buah Rp 210,102.00
Buah Rp 252,122.40
Buah Rp 294,142.80
M2/ 6 Rp 68,283.15
M Rp 33,266.15
M Rp 45,522.10
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 689
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M Rp 48,148.38
M Rp 49,023.80
M Rp 39,394.13
Btg Rp 16,633.08
Btg Rp 26,262.75
Btg Rp 21,010.20
Btg Rp 18,383.93
Btg Rp 56,902.63
Kg Rp 26,262.75
Btg Rp 183,839.25
Btg Rp 109,428.13
Btg Rp 139,630.29
Btg Rp 79,488.59
M' Rp 105,051.00
M2 Rp 1,116,692.13
Unit Rp 240,741.88
Unit Rp 218,856.25
Unit Rp 201,347.75
Lembar Rp 192,593.50
Unit Rp 183,839.25
Rp -
Rp -
Liter/botol Rp 4,377.13
Kaleng Rp 55,151.78
Kg Rp 56,902.63
Kaleng Rp 36,767.85
Liter Rp 15,757.65
liter Rp 31,515.30
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 690
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 46,397.53
Kaleng Rp 103,737.86
Kaleng Rp 119,933.23
Kaleng Rp 84,040.80
Kg Rp 24,599.44
Kg Rp 41,144.98
Kaleng Rp 87,542.50
Kaleng Rp 161,953.63
Kaleng Rp 175,085.00
Kaleng Rp 262,627.50
Kaleng Rp 61,279.75
Kg Rp 140,068.00
Kaleng Rp 15,757.65
Kaleng Rp 140,068.00
Kaleng Rp 144,445.13
Kaleng Rp 227,610.50
Kaleng Rp 56,902.63
Liter Rp 144,445.13
Kaleng Rp 105,926.43
Kaleng Rp 113,805.25
kg Rp 70,034.00
kg Rp 49,899.23
Kg Rp 115,556.10
Pail Rp 634,683.13
Pail Rp 630,306.00
Kg Rp 26,262.75
Kaleng Rp 39,394.13
Liter Rp 7,003.40
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 691
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 35,017.00
Kg Rp 35,017.00
Kg Rp 48,148.38
Liter Rp 28,013.60
Liter Rp 7,441.11
Lembar Rp 4,377.13
Kaleng Rp 83,165.38
Kaleng Rp 61,279.75
Kaleng Rp 56,902.63
Kaleng Rp 56,902.63
Kaleng Rp 63,240.70
Ltr Rp 52,525.50
kg Rp 52,525.50
Ltr Rp 52,525.50
Kg Rp 74,411.13
kg Rp 118,182.38
kg Rp 170,707.88
kg Rp 88,855.64
Buah Rp 7,003.40
Buah Rp 10,505.10
Buah Rp 15,757.65
Kg Rp 43,771.25
kg Rp 65,656.88
kg Rp 49,899.23
kg Rp 126,936.63
ltr Rp 161,953.63
Roll/Bh Rp 10,505.10
kg Rp 23,636.48
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 692
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
kg Rp 140,068.00
Liter Rp 115,556.10
kg Rp 59,091.19
Lembar Rp 415,826.88
Lembar Rp 607,544.95
Lembar Rp 621,551.75
Lembar Rp 636,433.98
Lembar Rp 646,939.08
Lembar Rp 843,034.28
Rp -
Rp -
M3 Rp 11,380,525.00
M3 Rp 13,131,375.00
M3 Rp 18,350,000.00
M3 Rp 18,350,000.00
M3 Rp 17,508,500.00
M3 Rp 17,508,500.00
M3 Rp 2,282,843.00
M3 Rp 3,063,987.50
M3 Rp 1,750,850.00
M3 Rp 1,750,850.00
M3 Rp 1,588,562.50
M3 Rp 7,441,112.50
M3 Rp 8,316,537.50
Lembar Rp 52,525.50
Lembar Rp 43,771.25
Lembar Rp 70,034.00
Lembar Rp 245,119.00
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 693
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 157,576.50
Lembar Rp 105,051.00
Lembar Rp 43,771.25
Lembar Rp 175,085.00
Rp -
Rp -
Biji Rp 21,885.63
Biji Rp 144,445.13
Psg Rp 21,885.63
Psg Rp 67,407.73
Psg Rp 37,424.42
Psg Rp 13,131.38
Psg Rp 8,754.25
Psg Rp 13,131.38
Psg Rp 13,131.38
Psg Rp 67,407.73
Psg Rp 9,629.68
Psg Rp 52,525.50
Psg Rp 10,942.81
Psg Rp 45,522.10
Psg Rp 17,508.50
Psg Rp 50,774.65
Bh Rp 30,639.88
Bh Rp 46,222.44
Bh Rp 21,885.63
Bh Rp 45,522.10
Psg Rp 67,407.73
Psg Rp 67,407.73
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 694
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 21,885.63
Bh Rp 29,764.45
Bh Rp 42,020.40
Bh Rp 42,020.40
Bh Rp 30,639.88
Bh Rp 39,481.67
Bh Rp 17,508.50
Bh Rp 57,778.05
Bh Rp 131,313.75
Bh Rp 580,669.40
Bh Rp 87,500.00
Bh Rp 131,313.75
Bh Rp 87,542.50
Bh Rp 256,149.36
Bh Rp 43,771.25
Bh Rp 35,017.00
Bh Rp 59,528.90
Bh Rp 21,885.63
Bh Rp 97,259.72
Bh Rp 13,744.17
Bh Rp 150,222.93
Bh Rp 6,565.69
Bh Rp 80,976.81
Rp -
Rp -
M2 Rp 96,296.75
M2 Rp 110,500.00
M2 Rp 135,500.00
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 695
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 135,000.00
M2 Rp 385,187.00
M2 Rp 122,559.50
M2 Rp 367,678.50
M2 Rp 96,296.75
M2 Rp 503,369.38
M2 Rp 525,255.00
M2 Rp 47,272.95
M2 Rp 210,102.00
M2 Rp 56,902.63
M2 Rp 135,690.88
M2 Rp 148,822.25
Lembar Rp 161,953.63
Lembar Rp 161,953.63
Lembar Rp 188,216.38
Lembar Rp 236,364.75
Lembar Rp 188,216.38
Lembar Rp 424,581.13
M2 Rp 1,982,837.63
M2 Rp 415,826.88
Unit Rp 100,673.88
Rp -
Unit Rp 1,313,137.50
Unit Rp 2,013,477.50
Unit Rp 1,614,019.00
Unit Rp 2,363,647.50
Bh Rp 306,398.75
Bh Rp 249,496.13
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 696
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 569,026.25
Bh Rp 577,780.50
Bh Rp 306,398.75
Unit Rp 437,712.50
Unit Rp 679,800.00
Unit Rp 835,000.00
Bh Rp 196,970.63
Bh Rp 2,626,275.00
Bh Rp 437,712.50
Bh Rp 656,568.75
Bh Rp 1,050,510.00
Bh Rp 2,932,673.75
Bh Rp 47,272.95
Bh Rp 35,017.00
Bh Rp 35,017.00
Bh Rp 201,347.75
Bh Rp 196,970.63
Bh Rp 96,296.75
Bh Rp 4,377.13
Unit Rp 262,627.50
Bh Rp 96,296.75
Rol Rp 262,627.50
M Rp 140,068.00
Bh Rp 393,941.25
Bh Rp 302,021.63
Unit Rp 18,383,925.00
Unit Rp 23,286,305.00
Bh Rp 262,627.50
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 697
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Rp -
Rp -
Lembar Rp 175,085.00
Lembar Rp 43,771.25
Lembar Rp 52,525.50
Lembar Rp 74,411.13
Lembar Rp 78,788.25
Lembar Rp 118,182.38
Lembar Rp 166,330.75
Lembar Rp 192,593.50
Lembar Rp 231,987.63
Lembar Rp 109,428.13
Lembar Rp 96,296.75
Lembar Rp 131,313.75
Lembar Rp 55,300.00
Lembar Rp 87,542.50
Lembar Rp 144,445.13
Lembar Rp 231,987.63
Lembar Rp 55,300.00
Lembar Rp 59,528.90
Lembar Rp 79,663.68
Lembar Rp 111,178.98
Lembar Rp 153,199.38
Lembar Rp 195,219.78
Lembar Rp 520,002.45
Lembar Rp 23,198.76
Lembar Rp 38,956.41
Lembar Rp 41,144.98
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 698
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 57,778.05
Lembar Rp 59,528.90
Lembar Rp 56,027.20
Lembar Rp 58,653.48
Lembar Rp 39,394.13
Lembar Rp 59,091.19
Lembar Rp 192,593.50
Batang Rp 17,508.50
Batang Rp 32,040.56
Batang Rp 17,508.50
Btg Rp 50,336.94
Btg Rp 27,838.52
Btg Rp 62,242.72
Batang Rp 17,508.50
M' Rp 6,500.00
M' Rp 10,942.81
M' Rp 15,319.94
M' Rp 17,508.50
M' Rp 21,885.63
Batang Rp 22,060.71
M' Rp 8,754.25
M' Rp 13,131.38
M' Rp 21,885.63
Bh Rp 13,131.38
Zak Rp 65,656.88
Rp -
Dos Rp 74,411.13
Dos Rp 80,539.10
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 699
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Dos Rp 50,074.31
Dos Rp 50,774.65
Dos Rp 52,175.33
Dos Rp 43,508.62
Dos Rp 93,670.48
Dos Rp 93,670.48
Dos Rp 208,351.15
Dos Rp 140,068.00
Dos Rp 231,024.66
Dos Rp 310,775.88
Dos Rp 153,199.38
Dos Rp 258,250.38
Dos Rp 94,458.36
Dos Rp 77,037.40
Dos Rp 52,525.50
M2 Rp 50,774.65
M2 Rp 56,902.63
Dos Rp 99,798.45
Dos Rp 120,808.65
Dos Rp 175,085.00
Dos Rp 170,000.00
Dos Rp 279,260.58
Dos Rp 302,021.63
M2 Rp 1,061,190.19
M2 Rp 700,340.00
Dos Rp 43,858.79
Dos Rp 59,528.90
Dos Rp 157,576.50
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 700
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Dos Rp 54,276.35
Dos Rp 52,525.50
Dos Rp 50,774.65
Dos Rp 438,587.93
Dos Rp 52,525.50
Dos Rp 67,407.73
M2 Rp 140,068.00
M2 Rp 169,307.20
M2 Rp 210,627.26
Bj Rp 91,919.63
M2 Rp 153,199.38
Dos Rp 701,653.14
Dos Rp 551,342.67
Dos Rp 550,642.33
Dos Rp 525,255.00
Dos Rp 393,941.25
Dos Rp 300,708.49
Dos Rp 250,634.18
Dos Rp 210,539.71
Dos Rp 150,398.02
M2 Rp 59,528.90
Dos Rp 64,081.11
M2 Rp 59,528.90
M2 Rp 64,081.11
M2 Rp 59,528.90
M2 Rp 39,394.13
M2 Rp 39,394.13
M2 Rp 41,232.52
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 701
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 45,784.73
M2 Rp 43,946.34
M2 Rp 41,232.52
M2 Rp 38,431.16
M2 Rp 43,946.34
buah Rp 26,332.78
buah Rp 25,282.27
Rp -
Rp -
M2 Rp 57,602.97
M2 Rp 60,141.70
M2 Rp 122,559.50
M2 Rp 61,892.55
M2 Rp 131,313.75
M2 Rp 73,448.16
M2 Rp 112,929.83
M2 Rp 76,949.86
M2 Rp 148,034.37
M2 Rp 78,963.34
M2 Rp 158,014.21
M2 Rp 85,616.57
M2 Rp 151,448.53
M2 Rp 112,667.20
M2 Rp 157,138.79
M2 Rp 118,882.72
M2 Rp 172,458.73
Biji Rp 5,427.64
Biji Rp 5,952.89
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 702
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 76,774.77
M2 Rp 116,256.44
M2 Rp 82,289.95
M2 Rp 138,317.15
M2 Rp 88,943.18
M2 Rp 153,199.38
M2 Rp 83,603.09
M2 Rp 93,670.48
Buah Rp 22,936.14
Buah Rp 14,356.97
Buah Rp 18,208.84
Buah Rp 20,134.78
Buah Rp 14,356.97
Buah Rp 18,208.84
Buah Rp 20,134.78
Buah Rp 14,356.97
Buah Rp 18,208.84
Buah Rp 20,134.78
Bj Rp 26,875.55
M' Rp 76,512.15
M' Rp 66,970.01
M' Rp 81,939.78
Buah Rp 49,549.06
Buah Rp 25,124.70
Buah Rp 19,259.35
Buah Rp 31,865.47
Buah Rp 31,865.47
Buah Rp 27,138.18
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 703
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 35,104.54
Buah Rp 39,394.13
Buah Rp 50,161.85
Buah Rp 84,916.23
Buah Rp 168,081.60
Buah Rp 288,890.25
Buah Rp 389,564.13
Buah Rp 503,369.38
Buah Rp 827,276.63
Buah Rp 1,520,613.23
Buah Rp 2,163,175.18
M' Rp 100,236.16
M' Rp 11,818.24
M' Rp 13,131.38
Kg Rp 4,377.13
Kg Rp 13,043.83
Kg Rp 13,043.83
Kg Rp 13,043.83
kg Rp 1,094,281.25
Kg Rp 13,043.83
M3 Rp 534,009.25
Ltr Rp 4,508.44
Ltr Rp 7,441.11
Ltr Rp 35,017.00
Ltr Rp 5,646.49
Ltr Rp 21,010.20
M3 Rp 630,306.00
M3 Rp 205,724.88
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 704
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Ltr Rp 11,380.53
M3 Rp 927,950.50
M2 Rp 879,802.13
M3 Rp 836,030.88
M3 Rp 801,013.88
M3 Rp 761,619.75
M3 Rp 700,340.00
M3 Rp 691,585.75
M3 Rp 665,323.00
M3 Rp 625,928.88
M3 Rp 560,272.00
Buah Rp 921,384.81
Buah Rp 1,152,759.64
Buah Rp 1,075,897.33
Buah Rp 1,190,578.00
Buah Rp 1,542,498.85
Buah Rp 1,225,595.00
Buah Rp 3,253,954.73
Buah Rp 8,838,290.80
Buah Rp 8,690,781.69
M' Rp 120,458.48
M' Rp 177,973.90
M' Rp 205,024.54
M' Rp 153,812.17
M' Rp 177,186.02
M' Rp 236,277.21
M' Rp 315,765.80
M' Rp 420,991.88
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 705
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M3 Rp 51,650.08
M3 Rp 109,428.13
M2 Rp 1,575.77
Bungkus Rp 87,542.50
Ikat Rp 17,508.50
Drum Rp 9,629,675.00
1 Ton Rp 6,565,687.50
Buah Rp 26,262,750.00
Buah Rp 39,394,125.00
Rp -
Buah Rp 510,547.86
Buah Rp 561,234.97
Buah Rp 862,293.63
Buah Rp 941,081.88
Buah Rp 1,018,994.70
Buah Rp 780,704.02
Buah Rp 834,717.74
Buah Rp 1,325,393.45
Buah Rp 1,520,613.23
Buah Rp 1,355,157.90
Buah Rp 2,163,175.18
Rp -
Buah Rp 189,704.60
Buah Rp 228,573.47
Buah Rp 291,166.36
Buah Rp 1,098,220.66
Rp -
Buah Rp 393,941.25
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 706
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 405,759.49
M2 Rp 57,690.51
M2 Rp 71,434.68
M2 Rp 126,236.29
M2 Rp 24,774.53
M2 Rp 33,703.86
M2 Rp 13,131.38
Rp -
Rp -
Bh Rp 56,902.63
Bh Rp 455,221.00
Bh Rp 26,262.75
Bh Rp 61,279.75
Bh Rp 21,885.63
Bh Rp 13,131.38
Bh Rp 109,428.13
Bh Rp 13,131.38
Bh Rp 4,377.13
Bh Rp 153,199.38
M3 Rp 47,710.66
Bh Rp 52,525.50
Unit Rp 74,411.13
Unit Rp 6,565.69
Bh Rp 72,660.28
Bh Rp 48,148.38
Rp -
Rp -
Batang Rp 21,885.63
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 707
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 28,451.31
Batang Rp 37,205.56
Batang Rp 50,336.94
Batang Rp 42,020.40
Batang Rp 64,781.45
Batang Rp 78,788.25
Batang Rp 96,296.75
Rp -
Batang Rp 21,885.63
Batang Rp 39,394.13
Batang Rp 59,091.19
Batang Rp 88,417.93
Batang Rp 218,856.25
Batang Rp 214,479.13
Batang Rp 439,901.06
Batang Rp 358,924.25
Batang Rp 529,632.13
Rp -
Batang Rp 306,398.75
Batang Rp 325,658.10
Batang Rp 249,496.13
Batang Rp 269,193.19
Rp -
Batang Rp 459,598.13
Batang Rp 455,221.00
Batang Rp 398,756.09
Batang Rp 372,055.63
Rp -
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 708
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 271,381.75
Batang Rp 661,996.39
Batang Rp 599,666.13
Batang Rp 536,197.81
Rp -
Batang Rp 17,508.50
Batang Rp 21,885.63
Batang Rp 17,946.21
Rp -
Batang Rp 26,262.75
Batang Rp 32,390.73
Batang Rp 30,639.88
Rp -
Batang Rp 48,148.38
Batang Rp 56,902.63
Batang Rp 31,077.59
Rp -
Batang Rp 76,161.98
Batang Rp 61,279.75
Batang Rp 55,589.49
Rp -
Batang Rp 118,182.38
Batang Rp 135,690.88
Batang Rp 111,616.69
Batang Rp 96,296.75
Rp -
Batang Rp 192,593.50
Batang Rp 198,721.48
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 709
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 214,479.13
Batang Rp 161,953.63
Batang Rp 179,462.13
Batang Rp 144,445.13
Rp -
Batang Rp 269,193.19
Batang Rp 302,021.63
Batang Rp 284,513.13
Batang Rp 302,021.63
Batang Rp 230,674.49
Batang Rp 253,873.25
Batang Rp 196,970.63
Batang Rp 214,916.84
Rp -
Batang Rp 380,809.88
Batang Rp 405,321.78
Batang Rp 262,627.50
Batang Rp 288,890.25
Batang Rp 210,102.00
Batang Rp 227,610.50
Batang Rp 278,822.86
Batang Rp 306,836.46
Rp -
Batang Rp 576,029.65
Batang Rp 602,292.40
Batang Rp 415,826.88
Batang Rp 446,466.75
Batang Rp 315,153.00
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 710
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 337,038.63
Batang Rp 420,204.00
Batang Rp 446,466.75
Rp -
M' Rp 8,754.25
M' Rp 7,003.40
M' Rp 6,565.69
M' Rp 4,377.13
Rp -
M' Rp 13,131.38
M' Rp 7,441.11
M' Rp 6,565.69
M' Rp 5,252.55
Rp -
M' Rp 13,131.38
M' Rp 8,754.25
M' Rp 6,565.69
M' Rp 10,942.81
Rp -
M' Rp 17,946.21
M' Rp 15,757.65
M' Rp 13,131.38
M' Rp 8,316.54
M' Rp 8,754.25
Rp -
M' Rp 35,454.71
M' Rp 26,262.75
M' Rp 13,569.09
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 711
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 11,818.24
M' Rp 17,508.50
Rp -
M' Rp 45,959.81
M' Rp 32,828.44
M' Rp 17,508.50
M' Rp 16,195.36
M' Rp 26,262.75
M' Rp 19,697.06
M' Rp 21,885.63
Rp -
M' Rp 56,902.63
M' Rp 52,525.50
M' Rp 19,697.06
M' Rp 35,454.71
M' Rp 199,159.19
M' Rp 30,639.88
M' Rp 20,572.49
M' Rp 37,205.56
Rp -
M' Rp 74,411.13
M' Rp 76,599.69
M' Rp 56,902.63
M' Rp 44,208.96
M' Rp 70,034.00
M' Rp 41,582.69
M' Rp 43,771.25
M' Rp 31,077.59
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 712
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 52,525.50
M' Rp 35,017.00
M' Rp 48,586.09
M' Rp 37,205.56
Rp -
M' Rp 96,734.46
M' Rp 105,051.00
M' Rp 836,030.88
M' Rp 37,205.56
M' Rp 100,673.88
M' Rp 205,724.88
M' Rp 59,091.19
M' Rp 72,222.56
M' Rp 48,148.38
M' Rp 59,091.19
M' Rp 70,034.00
Rp -
M' Rp 159,327.35
M' Rp 148,822.25
M' Rp 76,599.69
M' Rp 50,774.65
M' Rp 131,751.46
M' Rp 56,902.63
M' Rp 101,111.59
M' Rp 43,771.25
M' Rp 102,862.44
M' Rp 297,644.50
M' Rp 85,791.65
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 713
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 96,734.46
Rp -
M' Rp 131,313.75
M' Rp 130,000.61
Rp -
M' Rp 131,313.75
M' Rp 175,522.71
M' Rp 129,125.19
Rp -
M' Rp 262,627.50
M' Rp 267,442.34
M' Rp 214,479.13
M' Rp 190,404.94
Rp -
M' Rp 410,136.61
M' Rp 427,645.11
M' Rp 339,664.90
M' Rp 280,136.00
Rp -
M' Rp 656,568.75
M' Rp 674,077.25
M' Rp 536,197.81
Rp -
M' Rp 874,024.32
M' Rp 523,854.32
Rp -
M' Rp 1,111,352.04
M' Rp 691,148.04
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 714
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Rp -
M' Rp 1,391,925.75
6M' Rp 866,670.75
Rp -
M' Rp 1,838,830.21
M' Rp 1,138,490.21
Rp -
M' Rp 1,728,964.38
M' Rp 1,725,024.96
Rp -
M' Rp 2,521,661.71
Rp -
Batang Rp 21,447.91
Batang Rp 30,202.16
Batang Rp 39,394.13
Batang Rp 57,077.71
Batang Rp 98,047.60
Rp -
Batang Rp 155,825.65
Batang Rp 313,402.15
Batang Rp 490,238.00
Batang Rp 1,006,738.75
Rp -
Batang Rp 125,623.49
Batang Rp 261,314.36
Batang Rp 385,187.00
Batang Rp 822,899.50
Rp -
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 715
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 85,791.65
Rp -
Batang Rp 154,512.51
Batang Rp 329,597.51
Batang Rp 495,928.26
Batang Rp 1,029,937.51
Batang Rp 1,590,209.51
Batang Rp 2,466,947.65
Batang Rp 3,928,907.40
Batang Rp 6,467,639.90
Batang Rp 10,083,145.15
Batang Rp 16,676,846.25
Rp -
Batang Rp 129,562.90
Batang Rp 278,385.15
Batang Rp 392,190.40
Batang Rp 847,411.40
Batang Rp 1,293,878.15
Batang Rp 2,029,235.15
Batang Rp 3,228,567.40
Batang Rp 5,174,637.18
Batang Rp 8,104,684.65
Batang Rp 13,535,821.35
Rp -
Rp -
Batang Rp 153,199.38
Batang Rp 192,593.50
Batang Rp 297,644.50
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 716
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 376,432.75
Batang Rp 437,712.50
Batang Rp 590,911.88
Batang Rp 765,996.88
Batang Rp 1,006,738.75
Batang Rp 1,575,765.00
Batang Rp 1,448,828.38
Batang Rp 1,621,287.10
Batang Rp 2,499,338.38
Batang Rp 4,862,985.88
Batang Rp 6,228,648.88
Batang Rp 9,739,103.13
Rp -
Batang Rp 113,805.25
Batang Rp 148,822.25
Batang Rp 192,593.50
Batang Rp 245,119.00
Batang Rp 284,513.13
Batang Rp 350,170.00
Batang Rp 446,466.75
Batang Rp 569,026.25
Batang Rp 744,111.25
Rp -
Batang Rp 74,411.13
Batang Rp 96,296.75
Batang Rp 153,199.38
Batang Rp 175,085.00
Batang Rp 192,593.50
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 717
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 218,856.25
Batang Rp 284,513.13
Batang Rp 372,055.63
Batang Rp 481,483.75
Rp -
Batang Rp 24,511.90
Batang Rp 39,394.13
Batang Rp 55,151.78
Batang Rp 80,976.81
Rp -
Batang Rp 21,885.63
Batang Rp 28,451.31
Batang Rp 30,639.88
Batang Rp 35,017.00
Batang Rp 46,397.53
Batang Rp 61,279.75
Batang Rp 96,296.75
Batang Rp 157,576.50
Batang Rp 201,347.75
Batang Rp 372,055.63
Batang Rp 612,797.50
Rp -
Rp -
Batang Rp 13,131.38
Batang Rp 15,319.94
Batang Rp 26,700.46
Batang Rp 32,390.73
Batang Rp 39,394.13
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 718
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 54,714.06
M' Rp 70,034.00
Batang Rp 109,428.13
Batang Rp 118,182.38
Batang Rp 109,428.13
Batang Rp 201,347.75
M' Rp 297,644.50
Batang Rp 146,195.98
Batang Rp 363,301.38
Batang Rp 179,899.84
Batang Rp 280,136.00
Batang Rp 118,182.38
Batang Rp 148,822.25
Batang Rp 32,828.44
Batang Rp 37,205.56
Rp -
Rp -
Batang Rp 170,707.88
Batang Rp 240,741.88
Batang Rp 305,085.61
Rp -
Rp -
Bh Rp 32,828.44
Bh Rp 4,202.04
Bh Rp 65,656.88
Bh Rp 42,458.11
Bh Rp 45,959.81
Bh Rp 96,296.75
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 719
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 24,949.61
Bh Rp 41,582.69
Bh Rp 42,458.11
Rp -
Rp -
Pcs Rp 201,347.75
Pcs Rp 258,250.38
Pcs Rp 325,658.10
Pcs Rp 431,584.53
Pcs Rp 465,726.10
Pcs Rp 645,188.23
Pcs Rp 709,094.25
Pcs Rp 1,059,264.25
Rp -
Batang Rp 11,818.24
Batang Rp 8,754.25
Bh Rp 10,505.10
Bh Rp 2,626.28
Bh Rp 21,885.63
Bh Rp 13,569.09
Bh Rp 15,319.94
Bh Rp 13,131.38
M' Rp 24,074.19
Bh Rp 21,885.63
Bh Rp 13,131.38
Bh Rp 24,074.19
Kg Rp 39,394.13
Tube Rp 15,319.94
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 720
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 63,468.31
Tube Rp 30,639.88
Tube Rp 21,885.63
Meter Rp 100,673.88
Buah Rp 6,565.69
Buah Rp 13,131.38
Buah Rp 118,182.38
Buah Rp 35,454.71
Buah Rp 3,063.99
Buah Rp 6,565.69
Buah Rp 13,131.38
Buah Rp 24,074.19
Buah Rp 17,508.50
Buah Rp 66,094.59
Rp -
Rp -
Buah Rp 9,191.96
Buah Rp 8,754.25
Buah Rp 13,569.09
Rp -
Batang Rp 154,512.51
Batang Rp 172,021.01
Batang Rp 285,826.26
Batang Rp 49,461.51
Batang Rp 1,064,954.51
Batang Rp 1,388,861.76
Rp -
Batang Rp 126,936.63
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 721
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 161,953.63
Batang Rp 262,627.50
Batang Rp 547,578.34
Rp -
Buah Rp 41,582.69
Buah Rp 56,902.63
Buah Rp 85,353.94
Rp -
Buah Rp 183,839.25
Buah Rp 59,528.90
Buah Rp 100,673.88
Rp -
Buah Rp 8,316.54
Buah Rp 14,882.23
Rp -
Buah Rp 13,131.38
Buah Rp 13,569.09
Rp -
Buah Rp 8,754.25
Buah Rp 21,885.63
Rp -
Buah Rp 24,074.19
Buah Rp 41,144.98
Batang Rp 7,003.40
Batang Rp 190,842.65
Batang Rp 245,119.00
Batang Rp 243,368.15
Batang Rp 304,647.90
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 722
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 303,772.48
Batang Rp 387,813.28
Batang Rp 560,272.00
Batang Rp 713,471.38
Batang Rp 1,183,399.52
Batang Rp 1,503,980.15
Batang Rp 1,600,276.90
Batang Rp 1,952,197.75
Batang Rp 56,902.63
Batang Rp 137,441.73
Batang Rp 252,997.83
Rp -
Rp -
Buah Rp 459,598
Buah Rp 787,883
Buah Rp 490,238
Buah Rp 538,386
Buah Rp 494,615
Buah Rp 1,063,641
Buah Rp 2,289,236
Buah Rp 455,221
Buah Rp 2,341,762
Buah Rp 4,530,324
Buah Rp 8,929,335
Buah Rp 560,272
Buah Rp 840,408
Buah Rp 3,063,988
Unit Rp 22,812,875.16
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 723
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Unit Rp 16,924,153.81
Unit Rp 16,375,262.34
Rp -
Rp -
Bh Rp 65,657
Bh Rp 126,937
Bh Rp 196,971
Bh Rp 218,856
Bh Rp 52,526
Bh Rp 43,771
Bh Rp 13,131
Bh Rp 131,314
Bh Rp 135,691
Bh Rp 153,199
Set Rp 744,111
Bh Rp 170,708
Bh Rp 161,954
Bh Rp 78,788
Bh Rp 612,798
Bh Rp 415,827
Bh Rp 65,657
Bh Rp 65,657
Bh Rp 19,259
Bh Rp 652,192
Bh Rp 853,539
Bh Rp 1,138,053
Bh Rp 8,754
Bh Rp 4,377
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 724
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 6,128
Bh Rp 26,263
Bh Rp 87,543
Bh Rp 48,148
Bh Rp 74,411
Bh Rp 56,903
Roll Rp 65,657
Roll Rp 7,441
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M2
M1
M1
M1
M1
M2
M1
M1
M1
m'
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 725
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M1
M1
Meter Rp 9,630
Meter Rp 5,690
Meter Rp 5,690
Meter Rp 7,879
Meter Rp 8,229
Meter Rp 65,657
Meter Rp 82,071
Meter Rp 109,428
Meter Rp 4,114
Meter Rp 6,128
Bh Rp 24,687
Bh Rp 48,148
Bh Rp 48,148
Bh Rp 50,337
Bh Rp 50,337
Bh Rp 61,280
Bh Rp 26,263
Bh Rp 52,526
Bh Rp 59,441
Bh Rp 23,199
Bh Rp 9,630
Bh Rp 612,798
Bh Rp 4,377
Kg Rp 22,849
Bh Rp 30,640
Bh Rp 39,394
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 726
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 161,954
Bh Rp 118,182
Bh Rp 157,577
Bh Rp 262,628
Bh Rp 138,317
Bh Rp 41,145
Bh Rp 49,899
Bh Rp 59,529
Meter Rp 15,758
Bh Rp 61,280
Bh Rp 48,148
Bh Rp 52,526
Bh Rp 39,394
Bh Rp 52,526
Bh Rp 52,526
Bh Rp 52,526
Bh Rp 148,822
Bh Rp 438
Bh Rp 700,340
Bh Rp 700,340
Bh Rp 700,340
Batang Rp 315,503
Bh Rp 182,964
Bh Rp 22,849
Bh Rp 14,620
Bh Rp 10,943
Bh Rp 23,199
Bh Rp 13,744
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 727
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 1,751
Bh Rp 2,189
Bh Rp 3,064
Bh Rp 5,253
Bh Rp 2,626
Bh Rp 4,377
Bh Rp 11,818
Bh Rp 29,239
Papan Rp 131,314
Bh Rp 3,282,844
Bh Rp 4,289,583
Bh Rp 1,750,850
Bh Rp 1,925,935
Bh Rp 74,411
Bh Rp 372,056
Bh Rp 227,611
Bh Rp 262,628
Bh Rp 398,318
Bh Rp 231,988
Bh Rp 218,856
Bh Rp 36,593
Pcs Rp 10,505
Pcs Rp 35,892
Ton Rp 14,357
Kg Rp 27,488
Kg Rp 14,620
Buah Rp 22,849
Buah Rp 103,650
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 728
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 103,650
M Rp 7,879
M Rp 4,377
M Rp 17,509
M Rp 13,131
Buah Rp 6,566
Buah Rp 13,131
Buah Rp 13,131
Rp -
Rp -
Buah Rp 195,745.03
Buah Rp 8,096,193.03
Buah Rp 61,279.75
Psng Rp 26,262.75
Psng Rp 350,170.00
Buah Rp 100,673.88
Buah Rp 48,148.38
Buah Rp 228,748.55
Buah Rp 3,755,573.25
Buah Rp 831,653.75
Buah Rp 402,695.50
Psng Rp 475,705.95
Buah Rp 56,902.63
Buah Rp 13,131.38
Buah Rp 83,165.38
Psng Rp 420,204.00
Psng Rp 437,712.50
Buah Rp 74,411.13
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 729
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 13,131.38
Buah Rp 1,006,738.75
Buah Rp 962,967.50
Buah Rp 612,797.50
Buah Rp 1,356,908.75
Buah Rp 68,633.32
Buah Rp 118,970.26
Buah Rp 5,493,291.88
Set Rp 4,841,100.25
Buah Rp 26,262.75
Rp -
Rp -
O/H Rp 175,085.00
O/H Rp 151,448.53
O/H Rp 151,448.53
O/H Rp 140,068.00
O/H Rp 140,068.00
O/H Rp 140,068.00
O/H Rp 116,431.53
O/H Rp 149,697.68
O/H Rp 116,431.53
O/H Rp 162,829.05
O/H Rp 140,068.00
O/H Rp 177,711.28
O/H Rp 112,667.20
O/H Rp 151,448.53
/M' Rp 116,431.53
/M2 Rp 151,448.53
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 730
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 731