RENCANA ANGGARAN BIAYA ( RAB )

DENAH 1
KEGIATAN : PERAKTIKUM LEB. BAJA DAN BETON
PEKERJAAN : PEMBAGNUNAN SLOOF
LOKASI : KAMPUS UNIERSITAS HALU OLEO

NO. URAIAN PEKERJAAN SAT. VOLUME

01 02 03 04

1 Pemasangan Sloof 1 M3 Beton Bertulang (200 Kg Besi + Bekisting ) M3 2.52


JUMLAH

REKAP URAIAN PEKERJAAN

KEGIATAN : PERAKTIKUM LEB. BAJA DAN BETON


PEKERJAAN : PEMBAGNUNAN SLOOF
LOKASI : KAMPUS UNIERSITAS HALU OLEO

NO. URAIAN PEKERJAAN JUMLAH HARG

1 Pemasangan Sloof 1 M3 Beton Bertulang (200 Kg Besi + Bekisting ) Rp.

REAL COST Rp.


PPN 10% Rp.
TOTAL COST Rp.
DIBULATKAN Rp.

Terbilang : Sembilan Jutah Rupiah


ARAN BIAYA ( RAB )
NAH 1
BETON

LEO

HARGA SATUAN JUMLAH HARGA

05 06

3,256,810 8,207,162
8,207,162

AN PEKERJAAN

BETON

LEO

JUMLAH HARGA ( Rp )

8,207,162

8,207,162
820,716
9,027,878
9,000,000

bilan Jutah Rupiah


ANALISA HARGA SATUAN

A.4.4.1.7 Pemasangan 1 m2 dinding batu bata merah


Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00
Tukang batu L.02 OH 0.100 120,000.00
Kepala Tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.015 135,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 27.000 800.00
Semen portland Kg 18.950 1,300.00
Pasir pasang m3 0.038 158,730.16
JUMLAH BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.1.8 Pasangan Dinding Batu bata merah Trasram 1/2 (camp. 1 PC ; 2 Psr) 50 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00
Tukang batu L.02 OH 0.100 120,000.00
Kepala Tukang L.03 OH 0.010 145,000.00
Mandor L.04 OH 0.015 135,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 28.000 800.00
Semen portland Kg 18.950 1,300.00
Pasir pasang m3 0.038 158,730.16
JUMLAH BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN

Jumlah Harga
(Rp)

25,500.00
12,000.00
1,450.00
2,025.00
40,975.00

21,600.00
24,635.00
6,031.75
52,266.75

-
-

93,241.75
13,986.26
107,228.01

Jumlah Harga
(Rp)

25,500.00
12,000.00
1,450.00
2,025.00
40,975.00

22,400.00
24,635.00
6,031.75
53,066.75

-
-

94,041.75
14,106.26
108,148.01
DAFTAR UPAH HARGA BAHAN
TAHUN 2018

NO URAIAN KETERANGAN SATUAN


1 2 3 4

I BATA, BATU DAN PASIR :


1 Bata Merah uk. 5 x 11 x 22 cm bh
2 Bata beton ringan ex Celcon uk. 9 x 19 x 39 cm bh
3 Batu kali Batu belah pondasi m3
4 Batu Split Pecah Mesin 1/2 m3
5 Batu Split Pecah Mesin 3/5 m3
6 Batu Kerikil m3
7 Pasir Beton m3
8 Pasir Pasang m3
9 Pasir Urug m3
10 Tanah Urug m3

II BAHAN PEREKAT :
1 Semen (50 Kg) Semen Indonesia zak
2 Semen Warna Semen Indonesia kg

III BAHAN BAJA :


1 Besi Beton U-24 KS Kg
2 Besi Beton U-39 KS Kg
3 Besi Plat rata2 KS Kg
4 Besi Tempa m2
5 Rangka atap baja ringan Smart truss;Prima truss m2
6 Kawat beton Kawat Beton kg

IV BAHAN KAYU :
1 Kayu Klas I Jati m3
2 Kayu Klas II Kamper m3
3 Kayu Klas III Meranti m3
4 Kayu Klas IV Terentang m3
5 Dolken dia 8 s/d 10 cm p. 4 m btg

V BAHAN ALUMINIUM :
1 Kusen Aluminium 3", Alexindo m'
2 Rangka Jendela Almunium Alexindo m'
3 Rangka Pintu Almunium Alexindo m'
4 Kusen & Pintu PVC toilet Maspion unt
5 Engsel 3", ex Bos bh
6 Handle pintu type HRE 75.01 ex. Cisa bh
7 Selinder type 08510 ex. Cisa bh
8 Door Stoper bh
9 Door Closer bh
10 Slot Tanam bh
11 Kait Angin bh
12 Grendel bh

VI BAHAN PELAPIS :
1 Triplex t.3 mm Uk.120 x 240 cm lbr
2 Triplex t.4 mm Uk.120 x 240 cm lbr
3 Triplex t.9 mm Uk.120 x 240 cm lbr

VII BAHAN LANTAI & DINDING KERAMIK :


1 Keramik 30/30 ex. Masterina m2
2 Granite Tile 40/40 ex. Granito tile m2
3 Plint keramik 10/30 cm ex. Roman bh
4 Plint Granitetile 10/40 cm ex. Granito bh

VIII BAHAN PENUTUP ATAP :


1 Genteng keramik 25 bh/m2 ex.Jatiwangi bh
2 Genteng keramik Glazur 15 bh/m2 KANMURI bh
3 Nok Genteng Keramik 4 bh/m ex Jatiwangi bh

4 Nok genteng Keramik Glasur 4 bh/m ex KANMURI bh


5 seng Plat BJLS 30 L. 90 cm m'

IX BAHAN KACA :
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m2
3 Kaca Polos 8 mm m2

X BAHAN PAKU DAN MUR BAUT :


1 Paku 1 s/d 3 cm kg
2 Paku 5 s/d 10 cm kg
3 Paku 8 s/d 12 cm kg
4 Paku Skrup bh

XI BAHAN FINISHING :
1 Cat kayu/Besi ex. SEIV Kg
2 Palmir Kayu Kg
3 Meni Kayu ex. Nippon Kg
4 Wood Filler Impra Kg
5 Thinner ND IMPALA Ltr
6 Amplas Kayu Lbr
7 Kwas Cat bh
8 Cat Tembok kw 1 ex. Dulux ; Warna standard Kg
9 Cat Tembok kw2 ex. Vinilex ; Warna standard Kg
10 Plamir Tembok Kg
11 Lem Kayu Kg
12 Seal Tape bh
13 Minyak bekisting Ltr

XII BAHAN SANITARI :


1 wastafel LW 240 Cj ex Toto, Komplit kran & acc unt
2 Kloset duduk CW 600 J / SW 660 J Komplit & acc unt
3 Kloset Jongkok type CE 6 ex. Toto unt
4 Urinoir type U 57 M ex. Toto unt
5 Bak air fibreglass uk. 55 x 55 x 60 cm bh
6 Shower Spray type THX 20 NBPIV ex. Toto unt
7 Shower Set type TX 423 SZ ex. Toto unt
8 Floordrain TX 18 ex. Toto bh
9 Tempat Sabun S 11 N EX. Toto bh
10 Kran zink T.30 AR13NV7N ex. Toto bh
11 Kitchenzink Hwaco 1L unt
12 Kran dinding type T 23 B13V7N ex. Toto bh

XIII BAHAN PARTISI DINDING/PLAFOND :


1 Gypsumboard t.9 mm ex. Jayaboard ; uk. 120 x 240 cm lbr
2 List Profil 5 cm Gypsum m
3 Rangka plafond Metal furing termasuk paku ripet & acc m2

XIV BAHAN SALURAN AIR :


1 Pipa PVC dia 1/2" ex. Wavin ; P.4 m m'
2 Pipa PVC dia 3/4" ex. Wavin ; P.4 m m'
3 Pipa PVC dia 1" ex. Wavin ; P.4 m m'
4 Pipa PVC di 2" ex. Wavin ; P.4 m m'
5 Pipa PVC dia 3" ex. Wavin ; P.4 m m'
6 Pipa PVC dia 4" ex. Wavin ; P.4 m m'
7 Stop kran dia 1" ex. Onda bh
8 Klep diameter 3/4" ex. Onda bh
9 Tangki air 1000 liter EXEL bh
10 Tangki air 500 liter EXEL bh
11 Pelampung otomatis bh
12 Roof Drain Metal bh
13 Mesin Jet Pump kap. 250 watt Graundfos unt
14 Mesin Pompa tekan kap. 150 wa Graundfos unt

XV PERALATAN ELEKTRIKAL :
1 Box Panel PVC isi 4 MCB Legran bh
2 MCB 6 A Legran bh
3 MCB 4 A Legran bh
4 Kabel NYM 2 x 2,5 mm2 m'
5 Kabel NYM 3 x 2,5 mm2 m'
6 Kabel telephone 4 x 0,5 mm m'
7 Isolasi bh
8 Saklar tunggal Broco bh
9 Saklar ganda Broco bh
10 Stop kontak Broco bh
11 Outlet tv Broco bh
12 Outlet telephone Broco bh
13 Down light / PLC 13 W bh
14 Fitting plafond + lampu SL Panasonic bh
15 Lampu TL 2 x 18 watt grille Panasonic bh
16 Lampu TL 2 x 36 watt grille Panasonic bh

XVI UPAH PEKERJA :


1 Tukang Besi Konstruksi Org/Hari
2 Tukang Besi Tulangan Org/Hari
3 Kepala Tukang Besi Org/Hari
4 Tukang Kayu Kasar (Plafond, Kuda/Gording, R.Atap) Org/Hari
5 Tukang Kayu Halus (Kusen) Org/Hari
6 Kepala Tukang Kayu Org/Hari
7 Tukang Batu Kasar Tukang Batu Kasar Org/Hari
8 Tukang Batu Halus Tukang Batu Halus (Bata, Plester, Acian list2)Org/Hari
9 Kepala Tukang Batu Org/Hari
10 Tukang Cat Biasa Org/Hari
11 kepala Tukang Cat Org/Hari
12 Tukang Listrik Org/Hari
13 Kepala Tukang Listrik Org/Hari
14 Pekerja Org/Hari
15 Mandor Org/Hari

XVII LAIN-LAIN
1 IMB m2
R UPAH HARGA BAHAN
TAHUN 2018

HARGA SATUAN BAHAN PENGGANTI


5 6

800 -
1,800 bataco uk.10x18x30
101,563 -
234,375 -
222,700 -
103,700 -
187,850 -
140,625 -
119,141 -
33,203 -

72,000 ex. tonasa


21,000 -

10,400 Besi Beton U-10


10,232 Besi Beton U-12
45,000 -
450,000 hollow
180,000 -
25,000 -

7,500,000 -
3,500,000 -
2,500,000 -
1,800,000 -
14,250 -

75,000 -
93,500 -
117,000 -
700,000 -
28,500 -
110,000 merek lain
50,000 merek lain
42,500 -
195,000 -
92,500 -
17,500 -
20,500 -

55,500 -
87,000 -
135,000 -

61,750 ex. Platinum


75,000 ex. platinum
2,000 ex. platinum
15,000 ex. platinum

2,067 ex. Soka. 0.75x1.6


8,117 ex. Soka. 0.75x1.6
7,777 ex. Soka. 90 cm

7,777 ex. Soka. 90 cm


20,000 L. 50 cm

145,000 -
200,000 -
297,000 -

20,500 -
18,500 -
17,500 -
200 -

56,250 ex. Nippon


62,250 -
43,750 ex avian
39,750 -
33,750 -
9,250 -
18,000 -
76,500 ex. nippon
55,500 -
3,375 -
34,250 -
4,000 -
4,500 residu

250,000 -
1,200,000 -
147,500 ex. Ina
968,150 -
425,000 -
195,000 -
250,000 ex. Merek lain
25,000 ex. Merek lain
53,333 -
150,000 -
500,000 -
120,000 -

80,000 -
15,000 list uk. 10-12 cm
100,000 -

6,438 rucika
7,813 rucika
12,813 rucika
21,875 rucika
32,500 rucika
44,063 rucika
25,000 -
23,333 -
1,600,000 -
900,000 -
180,000 -
35,000 -
1,800,000 -
700,000 sanyo
62,500 -
63,750 -
70,000 -
12,000 -
14,750 -
10,000 -
8,000 -
19,500 -
26,250 -
21,250 -
35,000 -
15,000 -
46,250 -
30,000 -
47,500 -
50,000 -

135,000 -
135,000 -
167,500 -
120,000 -
135,000 -
167,500 -
120,000 -
135,000 -
167,500 -
135,000 -
167,500 -
135,000 -
167,500 -
85,000 -
150,000 -

-
DAFTAR HARGA UPAH DAN BAHAN

I. UPAH KERJA
HARGA
No. NAMA TENAGA KERJA SATUAN UPAH/HARI KERJA
1 2 3 4
1 Pekerja Org/Hr Rp 85,000.00
2 Tukang batu Org/Hr Rp 120,000.00
3 Tukang kayu Org/Hr Rp 120,000.00
4 Tukang besi Org/Hr Rp 120,000.00
5 Tukang Cat Org/Hr Rp 120,000.00
6 Tukang Listrik Org/Hr Rp 120,000.00
7 Kepala Tukang Org/Hr Rp 145,000.00
8 Mandor Org/Hr Rp 135,000.00

II. HARGA BAHAN

No. NAMA BAHAN SATUAN HARGA BAHAN

A BAHAN DASAR
1 Tanah Urug Biasa M3 Rp 35,714.29
2 Pasir urug M3 Rp 136,161.14
3 Pasir Pasangan M3 Rp 158,730.16
4 Pasir Beton Ret Rp 650,000.00
5 Pasir Beton M3 Rp 162,500.00
6 Batu Gunung Ret Rp 600,000.00
7 Split 2 - 3 cm/Kerikil Ret Rp 1,200,000
8 Split 2 - 3 cm/Kerikil M3 Rp 300,000.00
9 Batako Buah Rp 4,500.00
10 Portland Cement 50 Kg Zak Rp 65,000.00
Portland Cement Kg Rp 1,300.00
11 Semen Warna Kg Rp 21,000.00
12 Kayu Kelas III BH Rp 25,000
Kayu Kelas III M3 Rp 1,300,000
13 Besi Tulangan Ø 12 Btg Rp 115,000
14 Besi Tulangan Ø 8 Btg Rp 50,000
Besi Tulangan Kg Rp 10,400.00
15 Kawat Beton/Bindrat Kg Rp 25,000
16 Paku 5-12 cm Kg Rp 20,500
17 Minyak Bekisting Kg Rp 15,000
HARGA UPAH/JAM
KERJA
5
12,142.86
17,142.86
17,142.86
17,142.86
17,142.86
17,142.86
20,714.29
19,285.71

KETERANGAN

Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Toko
Toko
Toko
Somel
Somel
Toko
Toko
Toko
Toko
Toko
Toko
A.4.1.1.29 Membuat 1 m3 Sloef Beton Bertulang (200 kg besi + bekisting)
No. Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.650
Tukang Batu L.02 OH 0.275
Tukang Kayu L.02 OH 1.560
Tukang Besi L.02 OH 1050.000
Kepala Tukang L.03 OH 0.262
Mandor L.04 OH 0.265
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III m3 0.270
Paku 5-12 cm Kg 2.000
Minyak bekisting Ltr 0.600
Besi beton polos Ø 10 Buah 210.00
Besi beton polos Ø 8 Buah
Kawat beton Kg 3.000
Semen portland Kg 336.000
Pasir beton m3 0.540
Kerikil/Split m3 0.810
JUMLAH BAHAN
C PERALATAN
0
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
+ bekisting)
Harga Satuan Jumlah Harga
(Rp) (Rp)

85,000 480,250 1,050 120,000 126000000


120,000 33,000
120,000 187,200
120,000 126,000,000
145,000 37,990
135,000 35,775
126,774,215

2,500 675.000
20,500 41,000
18,000 10,800
75,500 15,855,000
50,000
25,000 75,000
1,440 483,840
214,686 115,930
267,857 216,964
3,802,535

0 0
0

4,727,775
709,166
5,436,941
Analisa Membuat 1 m3 Sloof Beton Bertulang (200 kg besi + bekisting)

No. Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 5,650
Tukang Batu L.02 OH 0.275
Tukang Kayu L.02 OH 1,560
Tukang Besi L.02 OH 1,400
Kepala Tukang L.03 OH 0.323
Mandor L.04 OH 0.283
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.270
Paku 5-12 cm Kg 2.000
Minyak bekisting Ltr 0.600
Besi beton polos Ø 12 Kg 73.62
Besi beton polos Ø 8 Kg 22.79
Kawat beton Kg 3.00
Semen portland Kg 343
Pasir beton m3 0.540
Kerikil/Split m3 0.810
JUMLAH BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
f Beton Bertulang (200 kg besi + bekisting)

Harga Satuan Jumlah Harga


(Rp) (Rp)

85,000 480,250.00
120,000 33,000.00
120,000 187,200.00
120,000 168,000.00
145,000 46,835.00
135,000 38,205.00
JUMLAH TENAGA KERJA 953,490.00

1,300,000 351,000.00
20,500 41,000.00
15,000 9,000.00
10,400 765,648
10,400 237,016
25,000 75,000.00
1,300 445,718.00
162,500 87,750.00
300,000 243,000.00
JUMLAH BAHAN 2,255,132.00

- -
JUMLAH HARGA ALAT -

3,208,622
48,188
3,256,810
DAFTAR HARGA UPAH DAN BAHAN
TAHUN 2018

I. UPAH KERJA
No. NAMA TENAGA KERJA SATUAN HARGA UPAH/HARI KERJA

1 2 3 4
1 Pekerja Org/Hr Rp 85,000.00
2 Tukang batu Org/Hr Rp 120,000.00
3 Tukang kayu Org/Hr Rp 120,000.00
4 Tukang besi Org/Hr Rp 120,000.00
5 Tukang Cat Org/Hr Rp 120,000.00
6 Tukang Listrik Org/Hr Rp 120,000.00
7 Kepala Tukang Org/Hr Rp 145,000.00
8 Mandor Org/Hr Rp 135,000.00

II. HARGA BAHAN


No. NAMA BAHAN SATUAN HARGA BAHAN

A BAHAN DASAR
1 Tanah Urug Biasa M3 Rp 35,714.29
2 Pasir urug M3 Rp 136,161.14
3 Pasir Pasangan M3 Rp 158,730.16
4 Pasir Beton M3 Rp 214,685.71
5 Pasir Beton Kg Rp 214.69
6 Batu Gunung M3 Rp 116,071.43
7 Split 2 - 3 cm/Kerikil M3 Rp 267,857.14
8 Split 2 - 3 cm/Kerikil Kg Rp 267.86
9 Batako Buah Rp 1,800.00
10 Portland Cement 50 Zak Rp 72,000.00
Portland Cement Kg Rp 1,440.00
11 Semen Warna Kg Rp 21,000.00
HARGA UPAH/JAM KERJA

5
12,142.86
17,142.86
17,142.86
17,142.86
17,142.86
17,142.86
20,714.29
19,285.71

KETERANGAN

Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Basecamp
Basecamp
Basecamp
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5650 85000 480250
Tukang BatL.02 OH 0.275 120000 33000
Tukang Ka L.02 OH 1560 120000 187200
Tukang BesL.02 OH 1400 120000 168000
Kepala TukL.03 OH 0.323 145000 46835
Mandor L.04 OH 0.283 135000 38205
JUMLAH TENAGA KERJA 953490
B BAHAN
Kayu Kelas III Lmbr 21 25000 525000
Paku 5-12 cm Kg 2 20500 41000
Minyak bekisting Ltr 0.6 15000 9000
Besi beton polos Ø 12 Ljr 7 115000 805000
Besi beton polos Ø 8 Ljr 5 50000 250000
Kawat beton Kg 3 25000 75000
Semen portland Sak 336 65000 21840
Pasir beton m3 0.54 214000 115560
Kerikil/Split m3 0.81 350000 283500
JUMLAH BAHAN 2125900
C PERALATAN
0 0 0
JUMLAH HARGA ALAT 0