A PEKERJAAN PERSIAPAN
1 Persiapan lapangan M2 0.0 10,000.00 -
Jumlah -
PEKERJAAN POLINDES
C PEKERJAAN TANAH
1 Galian Tanah m3 10.47 75,000.00 785,250.00
2 Urugan Tanah kembali m3 3.14 19,200.00 60,307.20
3 Urugan Sirtu tebal 10 cm m3 6.06 390,400.00 2,365,824.00
4 Urugan Tanah Paras 40 Cm m3 25.12 122,440.00 3,075,625.46
Jumlah 6,287,006.66
D PEKERJAAN PASANGAN
1 Pas, Pondasi Batu Kumbung 2 Lapis m3 7.63 709,120.90 5,407,046.86
2 Pasangan Bata Putih Camp. 1 : 5 m2 215.53 102,097.30 22,004,724.78
3 Plesteran 1 : 5 m2 217.88 49,840.08 10,859,007.11
4 Acian m2 217.88 20,257.50 4,413,643.33
5 Benangan m1 0.00 7,989.67 -
6 Rabat Lantai tebal 5 cm Camp. 1:3:5 m3 3.03 923,465.00 2,798,098.95
7 Pas. Keramik Lantai 40 x 40 motif m2 0.00 144,104.50 -
45,482,521.03
E PEKERJAAN BETON
2 Beton Poer 50x50x12 m3 0.12 2,712,971.76 325,556.61
1 Sloof 15/25 & 15/20 m3 2.21 2,712,971.76 6,002,450.02
2 Kolom Praktis 12/15 m3 1.94 2,712,971.76 5,274,017.10
3 Balok Ring 12/15 m3 1.06 2,712,971.76 2,881,176.01
4 Balok Konsol, Gantung dan Kolom STR 12/25 m3 0.16 3,520,541.76 549,204.51
5 Balok Latei dan balok sabuk 12/15 m3 1.06 2,712,971.76 2,881,176.01
6 Plat Dag Beton tebal 10 cm m3 0.65 3,520,541.76 2,302,434.31
20,216,014.58
F PEKERJAAN ATAP
1 Rangka Atap Galvalum C75x70x,7 m2 76.50 247,042.00 18,898,713.00
2 Pasangan Atap Genteng Karangpilang m2 76.50 160,750.00 12,297,375.00
3 Genteng Wuwung m1 33.04 60,363.31 1,994,403.76
4 Kalsiplank 2/20 m1 35.00 18,720.00 655,200.00
33,845,691.76
G PEKERJAAN PLAFOND
HARGA SATUAN JUMLAH BIAYA
NO URAIAN KEGIATAN SATUAN VOLUME
( RP ) ( RP )
1 2 3 4 5 6
1 Plafond Kalsiboard 3,5 mm + Rangka Plafond m2 77.25 100,035.93 7,727,775.85
Holow 4x4 & 2x4
2 List Gypsum m1 92.50 31,817.00 2,943,072.50
10,670,848.35
HARGA SATUAN JUMLAH BIAYA
NO URAIAN KEGIATAN SATUAN VOLUME
( RP ) ( RP )
1 2 3 4 5 6
H PEKERJAAN KUSEN
1 Kusen Pintu dan Jendela Almunium 4" M1 49.80 143,950.00 7,168,710.00
2 Daun Pintu Almunium swing kaca 8 mm Unit 6.00 1,500,000.00 9,000,000.00
3 Daun jendela Almunium swing kaca 5 mm unit 4.00 650,000.00 2,600,000.00
4 Daun Pintu PVC Komplit unit 2.00 484,500.00 969,000.00
5 Daun BV unit 2.00 450,000.00 900,000.00
19,737,710.00
I PEKERJAAN ME
1 Instalasi kabel NYM 2x2,5 titik 18.00 146,534.00 2,637,612.00
2 Stop Kontak bh 7.00 40,177.50 281,242.50
3 Sekaklar Tunggal bh 9.00 25,700.00 231,300.00
4 Sekaklar Ganda bh 2.00 28,700.00 57,400.00
3,207,554.50
J PEKERJAAN KM/WC
1 Keramik Lantai 20 x 20 Anti slip m2 3.75 144,104.50 540,391.88
2 Keramik Dinding 20 x 25 m2 16.50 150,404.50 2,481,674.25
3 Kloset Jongkok bh 1.00 150,000.00 150,000.00
4 Kran Air ф 3/4" bh 3.00 50,000.00 150,000.00
5 Septictank dan Peresapan Komplit dari Bis Beton ф Unit 1.00 1,500,000.00 1,500,000.00
0 4,822,066.13
K PEKERJAAN FINISHING
1 Cat Tembok m2 217.88 24,240.00 5,281,338.48
5,281,338.48
Disetujui/Mengesahkan Mojogede,__________________2019
KEPALA DESA MOJOGEDE Pelaksana Kegiatan
( ) (_____________________)
RENCANA ANGGARAN BIAYA
A PEKERJAAN PERSIAPAN
1 Persiapan lapangan, M2 1 12,700.00 12,700.00 0.01
12,700.00 0.01
B BAHAN
1 Sirtu M3 8.00 Rp 304,500.00 Rp 2,436,000 1.62
2 Semen PC Zak 187.00 Rp 52,400.00 Rp 9,798,800 6.53
3 Pasir pasang M3 25.00 Rp 253,700.00 Rp 6,342,500 4.23
4 Tanah Paras M3 31.00 Rp 81,200.00 Rp 2,517,200 1.68
5 Batu kumbung ( 25 x 25x 50 ) bh 257.00 Rp 12,180.00 Rp 3,130,260 2.09
6 Batu bata putih bh 7975.00 Rp 1,000.00 Rp 7,975,000 5.32
7 Batu pecah 2/3 M3 8.00 Rp 360,300.00 Rp 2,882,400 1.92
8 Besi beton polos Kg 689.00 Rp 11,100.00 Rp 7,647,900 5.10
9 Kawat bendrat Kg 10.00 Rp 22,300.00 Rp 223,000 0.15
10 Papan Bekisting / meranti M3 16.00 Rp 73,080.00 Rp 1,169,280 0.78
11 Paku Kg 3.00 Rp 25,600.00 Rp 76,800 0.05
12 Keramik 40 x 40 motif m2 0.00 Rp 55,000.00 Rp - -
13 Semen Warna Kg 27.00 Rp 17,000.00 Rp 459,000 0.31
14 Balok kayu M3 0.00 Rp 336.00 Rp - -
15 Baja Ringan C75x70x0,7 Kg 310.00 Rp 14,000.00 Rp 4,340,000 2.89
16 Reng galvalum ljr 71.00 Rp 31,000.00 Rp 2,201,000 1.47
17 asesoris ls 0.10 Rp 6,541,000.00 Rp 654,100 0.44
18 Genteng Karang Pilang / Wisma m2 1913.00 Rp 5,500.00 Rp 10,521,500 7.01
19 Wuwung Genteng Karang Pilang / Wisma bh 100.00 Rp 5,500.00 Rp 550,000 0.37
20 Kalsiplank 2/20 m1 39.00 Rp 12,000.00 Rp 468,000 0.31
21 Sekrup bh 511.00 Rp 500.00 Rp 255,500 0.17
22 Hollow galvalum 40/40 lonjor 16.00 Rp 49,000.00 Rp 784,000 0.52
23 Kalsiboard 3,5mm lbr 29.00 Rp 72,400.00 Rp 2,099,600 1.40
24 Paku Triplek/Eternit Kg 9.00 Rp 23,400.00 Rp 210,600 0.14
25 Hollow galvalum 20/40 lonjor 33.00 Rp 24,500.00 Rp 808,500 0.54
26 Paku Asbes Skrup 4 Buah 464.00 Rp 1,600.00 Rp 742,400 0.49
27 Lis Gypsum m 98.00 Rp 11,000.00 Rp 1,078,000 0.72
28 Kusen Pintu dan Jendela Almunium 4" m1 53.00 Rp 94,000.00 Rp 4,982,000 3.32
29 Daun Pintu Almunium swing kaca 8 mm Unit 6.00 Rp 1,500,000.00 Rp 9,000,000 6.00
30 Daun jendela Almunium swing kaca 5 mm Unit 4.00 Rp 650,000.00 Rp 2,600,000 1.73
31 Daun Pintu PVC Komplit unit 2.00 Rp 484,500.00 Rp 969,000 0.65
32 Daun BV unit 2.00 Rp 450,000.00 Rp 900,000 0.60
33 Kabel NYY 2 x 2,5 mm2 m' 109.00 Rp 13,300.00 Rp 1,449,700 0.97
34 Pipa conduit 5/8 m' 40.00 Rp 2,700.00 Rp 108,000 0.07
35 Isolator bh 37.00 Rp 6,400.00 Rp 236,800 0.16
36 Las dop bh 73.00 Rp 1,600.00 Rp 116,800 0.08
37 Klem PVC bh 91.00 Rp 200.00 Rp 18,200 0.01
38 Perlengkapan 10% harga bahan Ls 19.00 Rp 10,594.00 Rp 201,286 0.13
39 Stop Kontak bh 7.00 Rp 27,875.00 Rp 195,125 0.13
40 Tdos PVC bh 19.00 Rp 3,902.50 Rp 74,148 0.05
41 Saklar Tunggal bh 9.00 Rp 22,300.00 Rp 200,700 0.13
42 Saklar Seri/ganda bh 2.00 Rp 25,645.00 Rp 51,290 0.03
43 Keramik Lantai Anti Slip 20 x 20 m2 4.00 Rp 55,000.00 Rp 220,000 0.15
44 Keramik Dinding 20 x 25 m2 18.00 Rp 61,000.00 Rp 1,098,000 0.73
45 Kloset Jongkok bh 1.00 Rp 150,000.00 Rp 150,000 0.10
HARGA SATUAN JUMLAH BIAYA
NO URAIAN KEGIATAN SATUAN VOLUME BOBOT ( % )
+ PPN ( RP ) ( RP )
1 2 3 4 5 6 7
46 Kran Air ф 3/4" bh 3.00 Rp 50,000.00 Rp 150,000 0.10
HARGA SATUAN JUMLAH BIAYA
NO URAIAN KEGIATAN SATUAN VOLUME BOBOT ( % )
+ PPN ( RP ) ( RP )
1 2 3 4 5 6 7
47 Plamir Tembok kg 22.00 Rp 34,000.00 Rp 748,000 0.50
48 Cat Tembok kg 57.00 Rp 39,000.00 Rp 2,223,000 1.48
49 Cat Dasar kg 22.00 Rp 22,000.00 Rp 484,000 0.32
Rp 95,547,389 63.70
C TENAGA
1 Pekerja OH 342.00 Rp 100,000 Rp 34,200,000 22.80
2 Tukang batu OH 184.00 Rp 110,000 Rp 20,240,000 13.49
Rp 54,440,000 36.29
Disetujui/Mengesahkan Wahas,__________________2019
KEPALA DESA MOJOGEDE Pelaksana Kegiatan
1 m2 Pembersihan lokasi
Upah :
Pekerja Org/hr 0.100 100,000.00 10,000.00
JUMLAH 10,000.00
An. G.31.h
1 m3 Pasang batu belah 1 : 4
Bahan :
Batu Belah M3 1.100 228,300.00 251,130.00
Semen PC Zak 4.075 52,400.00 213,530.00
Pasir pasang M3 0.520 253,700.00 131,924.00
Upah :
Tukang batu Org/hr 0.750 110,000.00 82,500.00
Pekerja Org/hr 1.500 100,000.00 150,000.00
JUMLAH 829,084.00
1 m3 Pasang pondasi batu kumbung 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.5.1
Batu kumbung ( 25 x 25x 50 ) bh 33.6 12,180.00 Rp 409,248.00
Semen porland zak 0.55 52,400.00 Rp 28,820.00
Pasir pasang m3 0.217 253,700.00 Rp 55,052.90
Upah An. SNI ( Revisi ) 6.5.2
Pekerja Org/hr 1.5 100,000.00 Rp 150,000.00
Tukang batu Org/hr 0.6 110,000.00 Rp 66,000.00
JUMLAH 709,120.90
An. (SNI-Edisi 2007) 6.10
1 m2 Pasang batu bata Putih ukuran (8,5 x 12 x 25) camp. 1 Pc: 5 Ps
Bahan :
Batu bata putih bh 37.000 1,000.00 37,000.00
Semen PC Zak 0.242 52,400.00 12,680.80
Pasir pasang M3 0.045 253,700.00 11,416.50
Upah :
Tukang batu Org/hr 0.100 110,000.00 11,000.00
Pekerja Org/hr 0.3 100,000.00 30,000.00
JUMLAH 102,097.30
An. (SNI-Edisi 2007) 6.5
1 m2 Plesteran tembok camp 1 Pc : 5 Ps tebal 1,5 cm
Bahan :
Semen PC Zak 0.1287 52,400.00 6,743.88
Pasir pasang M3 0.026 253,700.00 6,596.20
Upah :
Tukang batu Org/hr 0.15 110,000.00 16,500.00
Pekerja Org/hr 0.2 100,000.00 20,000.00
JUMLAH 49,840.08
1 m2 Acian
Bahan :
Semen (Pc) Zak 0.08125 52,400.00 4,257.50
Upah :
Tukang batu Org/hr 0.1 110,000.00 11,000.00
Pekerja Org/hr 0.05 100,000.00 5,000.00
JUMLAH 20,257.50
Sekonengan Sudut Dinding/m'
Bahan
NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH
Upah :
Tukang kayu Org/hr 0.5 110,000.00 55,000.00
Pekerja Org/hr 0.2 100,000.00 20,000.00
JUMLAH 311,400.00
JUMLAH 311,400.00
Harga satuan per M2 Pembuatan Begisting 3 X pakai 31,140.00
NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH
Jumlah 160,750.00
NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH
A.4.7.1.4. Pengecatan 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
BAHAN
Cat menie Kg 0.2 Rp 66,000 13,200.00
Plamir Kg 0.15 Rp 50,000 7,500.00
Cat dasar Kg 0.17 Rp 64,000 10,880.00
Cat penutup Kg 0.26 Rp 64,000 16,640.00
Kuas buah 0.01 Rp 27,000 270.00
Pengencer Kg 0.03 Rp 27,000 810.00
Ampelas Lbr 0.2 Rp 8,900 1,780.00
TENAGA
Pekerja oh 0.07 100,000.00 7,000.00
Tukang cat oh 0.105 110,000.00 11,550.00
69,630.00
Memasang 1 m² Lantai Keramik Ukuran (40x40) cm
Bahan Material
Keramik 40 x 40 motif m2 1.05 55,000.00 57,750.00
Semen Portland Zak 0.245 52,400.00 12,838.00
Pasir Pasang M³ 0.045 253,700.00 11,416.50
Semen Warna Kg 1.3 17,000.00 22,100.00
Tenaga Kerja
Pekerja Oh 0.25 110,000.00 27,500.00
Tukang batu Oh 0.125 100,000.00 12,500.00
144,104.50
NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH
PEKERJAAN POLINDES
C PEKERJAAN TANAH lebar = 0.3 m
1 Galian Tanah
Induk = 61 + 8.8 x 0.3 x 0.5
D PEKERJAAN PASANGAN
1 Pas, Pondasi Batu Kumbung 2 Lapis Ukuran Kumbung 25x25x50
A 0.25 x 0.5 x 61
3 Plesteran 1 : 5
215.53 x 1
4 Acian
5 Benangan
4 x 12
9.9 + 1 x 2 x 4
F PEKERJAAN ATAP
1 Gording Kayu kelas II
7.5 + 7.4 x 2+ 5 x 0.06 x
Kuda-Kuda 6.32 + 1.2 + 0 x 2.3 x
2 Rangka Atap Galvalum C75x70x,7
9 x 8.5
3 Genteng Wuwung
8.11 x 4 + 0.6
4 Kalsiplank 2/20
9 + 8.5 x 2
G PEKERJAAN PLAFOND
Plafond Kalsiboard 3,5 mm + Rangka Plafond Holow 4x4 & 2x4
7.5 x 7
Plafon luar 8.5 + 8 x 2 x
List Gypsum
7.5 + 2 + 2.5 + 3.5 + 2.5 +
2.5 + 2.5 + 1.5 + 2.5 + 1.75 +
1.5 + 1.5 + 1.25 + 1.5 + 1 +
H PEKERJAAN KUSEN
1 Kusen Pintu dan Jendela Almunium 4"
P 2.1 x 14 + 1.8 + 0.9 x 6
J 1.5 x 4 + 1.2 x 6 + 1.5 x
3 Daun Pintu Almunium swing kaca 8 mm
6
4 Daun jendela Almunium swing kaca 5 mm
4
5 Daun Pintu PVC Komplit
2
6 Daun BV
2
NO. SKET & GAMBAR TAKE OF SHEET
I PEKERJAAN ME
1 Instalasi kabel NYM 2x2,5
1 x 18
2 Stop Kontak
7
3 Sekaklar Tunggal
9
4 Sekaklar Ganda
2
J PEKERJAAN KM/WC
1 Keramik Lantai 20 x 20 Anti slip
1.25 x 1.5 x 2
2 Keramik Dinding 20 x 25 tinggi = 1.5 m
1.25 x 1.5 x 2 x 1.5 x 2
3 Kloset Jongkok
4 Kran Air ф 3/4"
5 Septictank dan Peresapan Komplit dari Bis Beton ф 60 Cm
K PEKERJAAN FINISHING
1 Cat Tembok
Tembok 217.88
Plafond 52.50
TAKE OF SHEET VOLUME Satuan
tinggi = 0.5 m
10.47 m3
= 10.47
3.14 m3
= 3.14
6.06 m3
= 6.06
25.12 m3
= 25.11945
7.63 m3
= 7.625
215.53 m2
= 236
= 3.888 20.47
= 9.135
= 3.15
= 1.8
= 1.8
= 0
= 0.7
TAKE OF SHEET VOLUME Satuan
217.88 m2
= 217.88
= 217.88 217.88 m2
m1
= 48
= 87.2
3.03 m3
= 3.03
m2
= 52.5
= 8.1
= 3.75
0.12 m3
= 0.12
2.21 m3
= 2.2125
0.37 m3
= 0.372
1.944 m3
= 1.944
1.06 m3
= 1.062
0.16 m3
= 0.156
1.06 m3
= 1.062
- m3
0.15 x 0 = -
0.65 m3
0.1 = 0.654
TAKE OF SHEET VOLUME Satuan
m3
0.12 = 0.25
0.06 x 0.12 = 0.07
76.50 m2
= 76.5
76.50 m2
= 76.50
33.04 m1
= 33.04
35.00 m1
= 35.00
77.25 m2
= 52.50
0.75 = 24.75
92.50 m1
3.25 + 2.5 + = 92.50
2.5 + 1.25 +
1.25 x 2
49.80 M1
= 36.600
0 + 2.4 x 0 = 13.200
6.00 Unit
= 6
4.00 unit
= 4
2.00 unit
= 2
2.00 unit
= 2
TAKE OF SHEET VOLUME Satuan
18.00 titik
= 18
7.00 bh
= 7
9.00 bh
= 9
2.00 bh
= 2
3.75 m2
= 3.75
16.50 m2
= 16.5
= 1 1.00 bh
= 3 3.00 bh
= 1 1.00 Unit
217.88 m2
= 217.88
=
DAFTAR HARGA SATUAN BAHAN, UPAH & ALAT
KABUPATEN GRESIK
NO JENIS SATUAN HARGA SATUAN HARGA + PPN
1 2 3 4 5
A DAFTAR HARGA SATUAN BAHAN
BAHAN AIR, TANAH, BATUAN & BETON
1 Pasir Pasang m3 Rp 250,000 Rp 253,700
2 Pasir Urug m3 Rp 210,000 Rp 213,100
3 Pasir Beton m3 Rp 300,000 Rp 304,500
4 Kawat Beton Kg Rp 20,000 Rp 22,300
5 Tanah Urug m3 Rp 66,000 Rp 66,900
6 Tanah Paras m3 Rp 80,000 Rp 81,200
7 Batu Belah Putih m3 Rp 225,000 Rp 228,300
8 Sirtu m3 Rp 300,000 Rp 304,500
9 Batu Pecah 2/3 m3 Rp 355,000 Rp 360,300
10 Portland Cement (PC 40 Kg / Zak) zak Rp 47,000 Rp 52,400
11 Paving K 300 Polos Tebal 6 CM m2 Rp 63,000 Rp 70,200
12 Uskup K 300 Polos Tebal 6 CM bh Rp 3,500 Rp 3,900
13 Kanstein Cetak Uk. 10 x 20 x 40 bh Rp 15,000 Rp 16,700
14 Paving K 300 Polos Tebal 8 CM m2 Rp 74,000 Rp 82,500
15 Uskup K 300 Polos Tebal 8 CM bh Rp 4,500 Rp 5,000
16 Pipa Galvanis kg Rp 17,500 Rp 19,500
17 NET Unit Rp 200,000 Rp 223,000
18 Bola bh Rp 350,000 Rp 390,200
19 Lampu LED bh Rp 200,000 Rp 223,000
20 Kabel NYY 2 x 2,5 mm2 m' Rp 12,000 Rp 13,300
21 Pipa conduit 5/8 m' Rp 2,500 Rp 2,700
22 Isolator bh Rp 5,750 Rp 6,400
23 Las dop bh Rp 1,500 Rp 1,600
24 kle PVC bh Rp 200 Rp 220
25 Stop Kontak bh Rp 25,000 Rp 27,870
26 Saklar Tunggal bh Rp 20,000 Rp 22,300
27 Saklar Seri/ganda bh Rp 23,000 Rp 25,640
Tdos PVC bh Rp 3,500 Rp 3,900
28 Batu Kumbung uk. 25x25x50 bh Rp 12,000 Rp 12,180
29 Bata Putih bh Rp 1,000 Rp 1,000
30 Keramik 40 x 40 motif m2 Rp 50,000 Rp 55,000
31 Semen Warna Kg Rp 15,500 Rp 17,000
28 Genteng bh Rp 5,000 Rp 5,500
29 Wuwung bh Rp 4,500 Rp 5,000
30 Keramik Lantai Anti Slip 20 x 20 m2 Rp 50,000 Rp 55,000
31 Keramik Dinding 20 x 25 m2 Rp 55,000 Rp 61,000