REKAP ENGINEERING ESTIMATE ( EE )

SHOHWATUL IS'AD PANGKEP


POROS PADANG LAMPE, KM. 3 MA'RANG, KAB. PANGKAJENE & KEPULAUAN
SULAWESI SELATAN
TAHUN 2018

PEKERJAAN MEKANIKAL & ELEKTRIKAL


JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
A. PEKERJAAN ELEKTRIKAL
A.1 PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK -
A.2 PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA -
A.3 PEKERJAAN INSTALASI PENYALUR PETIR -
A.4 PEKERJAAN INSTALASI SOUND SYSTEM -
A.5 PEKERJAAN INSTALASI TELEPON -

TOTAL PEKERJAAN ELEKTRIKAL -

B. PEKERJAAN MEKANIKAL PLUMBING


B.1 PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT CUP -
B.2 PEKERJAAN INSTALASI AIR BERSIH DINGIN -
B.3 PEKERJAAN INSTALASI AIR HUJAN -
B.4 PEKERJAAN FIRE EXTINGUISER -
B.5 PEKERJAAN INSTALASI PENGKONDISIAN UDARA -

TOTAL PEKERJAAN MEKANIKAL -

C. PEKERJAAN MEP INFRASTRUKTUR


C.1 PEKERJAAN PASANG DAYA LISTRIK 147 KVA -
C.2 PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA -

TOTAL PEKERJAAN MEP INFRASTRUKTUR -

TOTAL PEKERJAAN -
PPN -
JUMLAH -

DIBULATKAN -
BILL OF QUANTITY( BQ )
PEKERJAAN ELEKTRIKAL

PEKERJAAN : SHOHWATUL IS'AD PANGKEP


LOKASI : POROS PADANG LAMPE, KM. 3 MA'RANG, KAB. PANGKAJENE & KEPULAUAN, SULAWESI SELATAN
TAHUN : 2018

HARGA SAT JUMLAH HARGA SUB TOTAL TOTAL HARGA


NO JENIS PEKERJAAN VOL SAT
(Rp) (Rp) (Rp) (Rp)
A. PEKERJAAN ELKRIKAL & ELEKTRONIK

A.1 PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK


Pekerjaan Pengadaan dan pemasangan penerangan dan kotak kontak
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 109 titik
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 12 titik
3 Downlight LED 12 W 40 bh
4 Downlight LED 6 W 30 bh
5 Downlight Surface LED 12 W 7 bh
6 RM LED Tube 2 x 18 W 10 bh
7 Barret Ceiling Light LED 27 W 22 bh
8 Kotak Kontak Biasa 12 bh
9 Saklar Ganda 10 bh
10 Saklar Tunggal 20 bh
11 Saklar Hotel Ganda 6 bh
SUB TOTAL
Lantai 2
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 288 titik
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 8 titik
3 Downlight LED 30 W 260 bh
4 Downlight LED 12 W 6 bh
5 Downlight LED 6 W 8 bh
6 RM LED Tube 2 x 18 W 14 bh
7 Kotak Kontak Biasa 8 bh
8 Saklar Ganda 8 bh
9 Saklar Tunggal 4 bh
10 Saklar Hotel Ganda 2 bh
11 Saklar Grid 12 Gang 2 bh
SUB TOTAL
Penerangan Arena
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 10 m1
2 #REF! 10 bh
SUB TOTAL
TOTAL PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK

A.2 PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA


Pekerjaan Pengadaan dan pemasangan kabel touvur dan panel daya
lengkap dgn assesories sesuai gambar dan spek teknis
1 Kabel NYY 4 x 6 mm2 dari MDP s/d Panel Penerangan lantai 1 4 m1
2 Kabel NYY 4 x 6 mm2 dari MDP s/d Panel Penerangan lantai 2 68 m1
3 Kabel NYY 4 x 10 mm2 dari MDP s/d Panel Penerangan Arena 70 m1
4 Kabel NYY 4 x 70 mm2 dari MDP s/d Panel Power AC lantai 1 5 m1
5 Kabel NYY 4 x 16 mm2 dari MDP s/d Panel Power AC lantai 2 69 m1
6 MDP 1 unit
7 Panel Penerangan lantai 1 1 unit
8 Panel Penerangan lantai 2 1 unit
9 Panel Penerangan Arena 1 unit
10 Power Panel AC lantai 1 1 unit
11 Power Panel AC lantai 2 1 unit
12 Grounding System (Petanahan) 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA

A.3 PEKERJAAN INSTALASI PENYALUR PETIR


Pekerjaan Pengadaan dan pemasangan penyalur petir lengkap dengan assesories
sesuai dengan gambar dan spek teknis
1 Head terminal type KURN Radius proteksi 68 meter (R : 80) 1 Unit
2 Tiang penyangga penangkal petir 3 meter terpasang dg obstruction lamp 1 unit
3 Kabel NYY 1 x 70 mm2 Down Conductor 45 m1
4 Kabel BC 50 mm2 Down Conductor 15 m1
5 Instalasi Pentanahan/ grounding lengkap dengan baut Coupling/Join Conector 1 unit
6 Bak Kontrol Uk. 40 x 40 Cm lengkap dengan elektroda tanah 1 unit
7 Fitting + Supporting 1 lot
SUB TOTAL
TOTAL PEKERJAAN PENYALUR PETIR

A.4 PEKERJAAN INSTALASI SOUND SYSTEM


Pekerjaan Pengadaan dan pemasangan tata suara/ sound system
lengkap dgn assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Instalasi Ceiling speaker dgn kabel NYMHY 2 x 1,5mm dlm pipa conduit PVC dia. 20 mm2 5 titik
2 Instalasi Speaker dgn kabel NYMHY 3 x 2,5mm dlm pipa conduit PVC dia. 20 mm2 6 titik
3 Instalasi Microphone dlm pipa conduit PVC dia. 20 mm2 96 m1
4 Celling Speaker 3 W 5 bh
5 Speaker Front 100 W 2 bh
6 Box Speaker 15 W 4 bh
7 Volume Kontrol 2 bh
8 Inlet Jack Microphone 4 outlet 1 set
9 Terminal Box Sound System (TB-SS) 1 set
SUB TOTAL
Lantai 2
1 Instalasi Ceiling speaker dgn kabel NYMHY 2 x 1,5mm d 16 titik
2 Celling Speaker 3 W 4 bh
3 Coaxxial Array 100 W 6 bh
4 Speaker Array 200 W 4 bh
5 Subwofer Speaker 200 W 2 bh
6 Volume Kontrol 3 bh
7 Terminal Box Sound System (TB-SS) 1 set
Central System Sound Lengkap Terpasang :
8 Amplifier 240 Watt 7 unit
9 Digital Prossesor 1 unit
10 Mixer power amplifier 240 Watt 1 unit
11 Equalizer 2 unit
12 Paging Microphone 1 unit
13 Selector Swicth 10 zone 1 unit
14 CD/VCD/DVD/MP3+ Radio tuner 1 unit
15 Cabinet Rack w/ Accessories. 1 unit
16 Main Distrubution Fram (MDF) Sound System 1 unit
17 Power Surge Arester 15 KA 1 unit
SUB TOTAL
TOTAL PEKERJAAN INSTALASI SOUND SYSTEM
A.5 PEKERJAAN INSTALASI TELEPON
Pekerjaan Pengadaan dan pemasangan telepon lengkap dengan
assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Instalasi Telephone dg Kabel ITC 2x2x0.6 mm dlm Pipa Conduit 20 mm 3 titik
2 Direct Outlet 3 bh
3 Handset single Telephone 3 unit
4 Private Automatic Branch eXchange 3 Line 8 Ext. 1 unit
- KX-TES824 / KX-TEM824 Kap. 3 Line 8 Ext.
- 8-port Trunk Card Untuk 8 Line Telkom : 1 unit
- card expand KX-TE82480 Kap. 2 line 8 ext : 1 unit
- key telephone KX-T7730 ( Operator ) : 1 unit
5 Power Surge Arester 15 KA 1 unit
6 Penyambungan Jaringan Telepon 1 set
SUB TOTAL
TOTAL PEKERJAAN INSTALASI TELEPON
A.6 PEKERJAAN INSTALASI CCTV
Pekerjaan Pengadaan dan pemasangan CCTV lengkap dengan
assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa condu 5 titik
2 In door Camera CCTV IR type Fixed 5 bh
3 Fitting & Supporting 1 ls
SUB TOTAL
Lantai 2
1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa condu 2 titik
2 Color Dome type camera 2 bh
3 DVR kap 16 chanel, hardisc 4 T 1 unit
4 Monitor LED 32" 1 unit
5 Kabel HDMI 10 m1
3 Fitting & Supporting 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI CCTV
BILL OF QUANTITY( BQ )
PEKERJAAN MEKANIKAL PLUMBING

PEKERJAAN : SHOHWATUL IS'AD PANGKEP


LOKASI : POROS PADANG LAMPE, KM. 3 MA'RANG, KAB. PANGKAJENE & KEPULAUAN, SULAWESI SELATAN
TAHUN : 2018

HARGA SAT JUMLAH HARGA SUB TOTAL TOTAL HARGA


NO JENIS PEKERJAAN VOL SAT
(Rp) (Rp) (Rp) (Rp)
B. PEKERJAAN MEKANIKAL & PLAMBING

B.1 PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT CUP


Pekerjaan Pengadaan dan pemasangan Instalasi air kotor/bekas dan vent
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Pipa PVC dia. 100 mm kelas AW 58 m1
2 Pipa PVC dia. 75 mm kelas AW 87 m1
3 Clean Out dia. 100 mm 2 bh
4 Clean Out dia. 75 mm 2 bh
5 Septictank BF-08 4 Unit
6 Resapan 4 Unit
7 Fitting + Supporting termasuk hanger dan u-trap 1 ls
SUB TOTAL
Lantai 2
1 Pipa PVC dia. 100 mm kelas AW 23 m1
2 Pipa PVC dia. 75 mm kelas AW 37 m1
3 Clean Out dia. 100 mm 2 bh
4 Clean Out dia. 75 mm 2 bh
5 Fitting + Supporting termasuk hanger dan u-trap 1 ls
SUB TOTAL
Pipa Riser
1 Pipa PVC dia. 100 mm kelas AW 15 m1
2 Pipa PVC dia. 75 mm kelas AW 15 m1
3 Fitting + Supporting termasuk hanger dan u-trap 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT CUP

B.2 PEKERJAAN INSTALASI AIR BERSIH DINGIN


Pekerjaan Pengadaan dan pemasangan instalasi air bersih
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Pipa PPR PN 10 dia. 30 mm 97 m1
2 Pipa PPR PN 10 dia. 25 mm 5 m1
3 Pipa PPR PN 10 dia. 20 mm 23 m1
4 Pipa PPR PN 10 dia. 16 mm 93 m1
5 Gate Valve dia. 30 mm 2 bh
6 Sumur Bor kedalaman ± 20 meter 1 unit
lengkap dgn Pipa Galvanis dari Pompa s/d dalam sumur bor
7 Jet Pump di sumur Bor 1 unit
Flow : 5 m3/ h
Head : 42 meter
Outlet pipa : dia. 30 mm
Pengkabelan Instalasi Jet Pump
8 Pipa PPR PN 10 dia. 30 mm Pipa suplay ke Rofftank 33 m1
9 Fitting + Supporting termasuk hanger 1 ls
SUB TOTAL
Lantai 2
1 Pipa PPR PN 10 dia. 30 mm 38 m1
2 Pipa PPR PN 10 dia. 25 mm 2 m1
3 Pipa PPR PN 10 dia. 20 mm 14 m1
4 Pipa PPR PN 10 dia. 16 mm 21 m1
5 Gate Valve dia. 30 mm 1 bh
6 Gate Valve dia. 25 mm 2 bh
7 Fitting + Supporting termasuk hanger 1 ls
SUB TOTAL
Lantai Atap
1 Memasang Rooftank Stainless Stell 2 m3 2 unit
2 Memasang AAV 1 bh
3 Pompa Booster 1 unit
Flow : 5 m3/ jam
Head : 19 meter
Pengkabelan/ Instalasi pompa Boster
4 Header dia. 50 mm dgn gate Valve + pressure Gauge dan material bantu 1 set
5 Fitting + Supporting termasuk hanger 1 ls
SUB TOTAL
Riser dan distribusi
1 Pipa PPR PN 10 dia. 30 mm 12 m1
2 Fitting + Supporting termasuk hanger 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI AIR BERSIH DINGIN

B.3 PEKERJAAN INSTALASI AIR HUJAN


Pekerjaan Pengadaan dan pemasangan instalasi air hujan lengkap dengan
assesories/ alat bantu sesuai gambar dan spek teknis
1 Roofdrain dia. 75 mm 24 bh
2 Pipa PVC dia. 75 mm kelas AW 299 m1
3 Bak Kontrol Air Hujan 18 unit
4 Sumur Peresapan Air Hujan (SPAH) 18 unit
5 Fitting dan assesories termasuk hanger 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI AIR HUJAN

B.4 PEKERJAAN FIRE EXTINGUISER


Pekerjaan Pengadaan dan pemasangan Fire Extinguisher lengkap
dengan assesories/ alat bantu sesuai gambar dan spek teknis
Lantai Dasar
1 Memasang Portable Fire Extinguisher type ABC 3.5 kg 4 set
lengkap dengan brecket
SUB TOTAL
Lantai 1
1 Memasang Portable Fire Extinguisher type ABC 3.5 kg 4 set
lengkap dengan brecket
SUB TOTAL
TOTAL PEKERJAAN FIRE EXTINGUISER

B.5 PEKERJAAN INSTALASI PENGKONDISIAN UDARA


Pekerjaan Pengadaan dan pemasangan instalasi pengkondisian udara lengkap
dengan assesories/ alat bantu sesuai gambar dan spek teknis
Lantai 1
1 Instalasi Power AC dg Kabel NYM 4 x 4 mm dlm Pipa Conduit dia. 20 mm2 16 titik
2 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 6 titik
2 Kabel Power Kontrol NYM 4 x 2.5 mm2 dari Indoor s/d Outdoor unit 62 m1
3 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 25 m1
3 Air Conditioner Standing Floor 54.000 Btu/h 16 Unit
4 Air Conditioner Split Wall 12.000 Btu/h 6 Unit
5 Refrigerant Ukuran 6.4 mm + Isolator Armaplex 29 m1
6 Refrigerant Ukuran 9.5 mm + Isolator Armaplex 92 m1
7 Refrigerant Ukuran 19.1 mm + Isolator Armaplex 62 m1
8 Pipa PVC dia. 20 mm kelas AW U/ Drain 66 m1
9 Fitting + Supporting dan material bantu 1 ls
SUB TOTAL
Lantai 1
1 Instalasi Power AC dg Kabel NYM 4 x 4 mm dlm Pipa Conduit dia. 20 mm2 5 titik
2 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 2 titik
2 Kabel Power Kontrol NYM 4 x 2.5 mm2 dari Indoor s/d Outdoor unit 52 m1
3 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 10 m1
3 Air Conditioner Ceilling Cassette 54.000 Btu/h 3 Unit
4 Air Conditioner Ceilling Cassette 27.000 Btu/h 2 Unit
4 Air Conditioner Split Wall 9.000 Btu/h 2 Unit
5 Refrigerant Ukuran 6.4 mm + Isolator Armaplex 11 m1
6 Refrigerant Ukuran 9.5 mm + Isolator Armaplex 73 m1
7 Refrigerant Ukuran 15.9 mm + Isolator Armaplex 62 m1
8 Pipa PVC dia. 20 mm kelas AW U/ Drain 14 m1
9 Fitting + Supporting dan material bantu 1 ls
SUB TOTAL
EXSHAUST FAN
Lantai Dasar
1 Instalasi Exshaust FAN dg kabel NYM 3 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 14 titik
2 Ceilling Exshaust FAN 14 W 14 bh
SUB TOTAL
Lantai 1
1 Instalasi Exshaust FAN dg kabel NYM 3 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 4 titik
2 Ceilling Exshaust FAN 14 W 4 bh
SUB TOTAL
TOTAL PEKERJAAN INSTALASI PENGKONDISIAN UDARA
BILL OF QUANTITY( BQ )
PEKERJAAN ELEKTRIKAL

PEKERJAAN : SHOHWATUL IS'AD PANGKEP


LOKASI : POROS PADANG LAMPE, KM. 3 MA'RANG, KAB. PANGKAJENE & KEPULAUAN, SULAWESI SELATAN
TAHUN : 2018

HARGA SAT JUMLAH HARGA SUB TOTAL TOTAL HARGA


NO JENIS PEKERJAAN VOL SAT
(Rp) (Rp) (Rp) (Rp)
C. MEP INFRASTRUKTUR

C.1 PEKERJAAN PASANG DAYA LISTRIK 147 KVA


1 Biaya Penyambungan (BP) 147000 VA
2 Sertifikat Layak Operasional (SLO) 147000 VA
3 Uang Jaminan Langganan (UJL) 147000 VA
4 Biaya Admistrasi (keur gambar + pengurusan ijin PLN). 147000 VA
SUB TOTAL
TOTAL PEKERJAAN PASANG DAYA LISTRIK

C.2 PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA


Pekerjaan Pengadaan dan pemasangan kabel touvur dan panel daya
lengkap dgn assesories sesuai gambar dan spek teknis
1 Kabel NYFGbY 4 x 240 mm2 dari APP PLN s/d COS 15 m1
2 Kabel NYY 4 x 240 mm2 dari COS s/d Genset 10 m1
3 Kabel NYFGbY 4 x 240 mm2 dari COS s/d MDP 50 m1
4 Panel ATS 400 A Motorized 1 unit
5 Grounding System (Petanahan) 1 ls
SUB TOTAL
TOTAL PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA