Anda di halaman 1dari 4

MATERIAL TAKE OFF

PEKERJAAN INSTALASI LISTRIK RUMAH DUA LAN


JUMLAH PERLANTAI
NO ITEM MERK SPESIFIKASI SATUAN LANTAI 1 LANTAI 2
FASA R FASA S FASA T FASA R

1 MCB 1 Fasa SCHNEIDER ELECTRIC 10 A Bh 1


SCHNEIDER ELECTRIC 16 A Bh 1 1 1
SCHNEIDER ELECTRIC 35 A Bh 1 1 1
2 Kabel NYM SUPREME 3 x 4 mm² Meter 1 5
SUPREME 3 x 2,5 mm² Meter 11 39.6 19.8 12.1
SUPREME 2 x 2,5 mm² Meter 1.1 6.6 4.4 0
SUPREME 2 x 1,5 mm² Meter 34.1 25.3 23.1 14.85
Kabel NYY SUPREME 2 x 2,5 mm² Meter 7.7
3 Lampu LED PHILIPS, downlight 5 Watt Bh
PHILIPS, downlight 8 Watt Bh 2 1
PHILIPS, downlight 13 Watt Bh 7 10 3 5
PHILIPS, downlight 20 Watt Bh 2
4 Saklar Tunggal PHILIPS 10 A / 250 V Bh 3 1 1
5 Saklar Ganda PHILIPS 10 A / 250 V Bh 2 1 1 1
6 Saklar Tukar PHILIPS 10 A / 250 V Bh 2
7 Stop Kontak PHILIPS 10 A / 250 V Bh 2 4 1 2
8 Pipa Listrik - 5/8 " / 6 mtr Btg 1.8 2.4 3.3 1.4
9 T Dos - Bh 4 8 5 4
10 Isolasi UNIBEL Unibel Rol 6
11 Paku - 5 cm Kg 1
12 Klem Kabel - 10mm Dos 10
OFF BILL OF QUANTITY (BOQ
UMAH DUA LANTAI PEKERJAAN INSTALASI LISTRIK RUMAH DUA LA

PERLANTAI
JUMLAH PER FASA JUMLAH
LANTAI 2 NO ITEM SPESIFIKASI
TOTAL
FASA S FASA T FASA R FASA S FASA T

1 1 1 1 1 3 1 MCB 1 Fasa 10 A
1 1 1 3 16 A
1 1 1 3 35 A
5 6 0 0 6 2 Kabel NYM 3 x 4 mm²
17.05 20.35 23 57 40 120 3 x 2,5 mm²
5.5 3.3 1 12 8 21 2 x 2,5 mm²
12.1 20.35 49 37 43 130 2 x 1,5 mm²
8 0 0 8 3 Kabel NYY 2 x 2,5 mm²
1 0 1 0 1 4 Lampu LED 5 Watt
1 2 1 1 4 8 Watt
9 12 10 12 34 13 Watt
0 0 2 2 20 Watt
1 3 1 4 4 9 5 Saklar Tunggal 10 A / 250 V
1 3 2 1 6 6 Saklar Ganda 10 A / 250 V
0 0 2 2 7 Saklar Tukar 10 A / 250 V
1 2 4 5 3 12 8 Stop Kontak 10 A / 250 V
1.3 1.8 3 4 5 12 9 Pipa Listrik 5/8 " / 6 mtr
3 5 8 11 10 29 10 T Dos
6 6 6 11 Isolasi Unibel
1 1 1 12 Paku 5 cm
0 10 10 13 Klem kabel 10 mm

JUMLAH TITIK INSTALASI


UANTITY (BOQ) RENCANA ANGGRAN DAN
ASI LISTRIK RUMAH DUA LANTAI PEKERJAAN INSTALASI LISTRIK RUMAH DUA LA

MATERIAL
JUMLAH JUMLAH
SATUAN NO ITEM SPESIFIKASI SATUAN
TOTAL TOTAL HARGA SATUAN

Bh 3 1 MCB 1 Fasa 10 A Bh 3 75,000


Bh 3 16 A Bh 3 75,000
Bh 3 35 A Bh 3 100,000
Meter 6 2 Kabel NYM 3 x 4 mm² Meter 6 17,500
Meter 120 3 x 2,5 mm² Meter 120 12,000
Meter 21 2 x 2,5 mm² Meter 21 9,000
Meter 130 2 x 1,5 mm² Meter 130 7,500
Meter 8 3 Kabel NYY 2 x 2,5 mm² Meter 8 25,500
Bh 1 4 Lampu LED 5 Watt Bh 1 25,500
Bh 4 8 Watt Bh 4 35,500
Bh 34 13 Watt Bh 34 83,317
Bh 2 20 Watt Bh 2 100,000
Bh 9 5 Saklar Tunggal 10 A / 250 V Bh 9 16,000
Bh 6 6 Saklar Ganda 10 A / 250 V Bh 6 18,000
Bh 2 7 Saklar Tukar 10 A / 250 V Bh 2 45,000
Bh 12 8 Stop Kontak 10 A / 250 V Bh 12 37,500
Btg 12 9 Pipa Listrik 5/8 " / 6 mtr Btg 12 10,000
Bh 29 10 T Dos Bh 29 3,000
Rol 6 11 Isolasi Unibel Rol 6 15,000
Kg 1 12 Paku 5 cm Kg 1 17,000
Dos 5 13 Klem kabel 10 mm Dos 5 7,500
JUMLAH MATERIAL

53 TITIK JUMLAH TITIK INSTALASI 53 TITIK


HARGA PER TITIK 287,200 Rp / Titik
NA ANGGRAN DAN BIAYA
AN INSTALASI LISTRIK RUMAH DUA LANTAI

MATERIAL JASA PEMASANGAN


JUMLAH HARGA
HARGA BAGIAN HARGA SATUAN HARGA BAGIAN

225,000 10,000 30,000 255,000


225,000 10,000 30,000 255,000
300,000 10,000 30,000 330,000
105,000 20,000 120,000 225,000
1,438,800 20,000 2,398,000 3,836,800
188,100 20,000 418,000 606,100
973,500 20,000 2,596,000 3,569,500
196,350 20,000 154,000 350,350
25,500 25,000 25,000 50,500
142,000 25,000 100,000 242,000
2,832,778 25,000 850,000 3,682,778
200,000 25,000 50,000 250,000
144,000 10,000 90,000 234,000
108,000 12,000 72,000 180,000
90,000 25,000 50,000 140,000
450,000 10,000 120,000 570,000
120,833 2,500 30,208 151,042
87,000 1,000 29,000 116,000
90,000 500 3,000 93,000
17,000 5,000 5,000 22,000
37,500 5,000 25,000 62,500
7,996,361 JUMLAH JASA 7,225,208 15,221,570
Jlh I + II 15,221,600
PPN 10% 1,522,160
TOTAL HARGA 16,743,760

Anda mungkin juga menyukai