HARGA

No. URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA


SATUAN

II.3 PEKERJAAN STRUKTUR LT.1


Pekerjaan Kolom K1 300x300
- adukan beton m3 4.32 815,000.00 3,520,800.00
- bekisting m2 1.10 100,000.00 110,250.00
- pembesian Dia. 12 (polos) kg 113.67 12,000.00 1,364,065.92
- pembesian Dia. 8 (polos) kg 76.98 12,000.00 923,811.84
Pekerjaan Kolom Praktis 150x150
- adukan beton m3 4.32 815,000.00 3,520,800.00
- bekisting m2 - 100,000.00 -
- pembesian Dia. 12 (polos) kg 113.67 12,000.00 1,364,065.92
- pembesian Dia. 8 (polos) kg 76.98 12,000.00 923,811.84
Pekerjaan Kolom K1 WF.300x150x6,5x9 kg 880.8
Pekerjaan Kolom K2 150x75x5x7 kg 252

II.4 PEKERJAAN STRUKTUR LT. ATAS


Pekerjaan Kolom K1A 150x300
- adukan beton m3 4.32 815,000.00 3,520,800.00
- bekisting m2 - 100,000.00 -
- pembesian Dia. 12 (polos) kg 113.67 12,000.00 1,364,065.92
- pembesian Dia. 8 (polos) kg 76.98 12,000.00 923,811.84
Pekerjaan Kolom praktis Kp 150x150
- adukan beton m3 4.32 815,000.00 3,520,800.00
- bekisting m2 - 100,000.00 -
- pembesian Dia. 12 (polos) kg 113.67 12,000.00 1,364,065.92
- pembesian Dia. 8 (polos) kg 76.98 12,000.00 923,811.84

TOTAL 38,148,763.80
No. URAIAN PEKERJAAN BULAN MARET 2020

MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

II.3 PEKERJAAN STRUKTUR LT.1


Pekerjaan Kolom K1 200x400
- adukan beton
- bekisting
- pembesian Dia. 12 (polos)
- pembesian Dia. 8 (polos)
Pekerjaan Kolom Praktis 150x150
- adukan beton
- bekisting
- pembesian Dia. 12 (polos)
- pembesian Dia. 8 (polos)
Pekerjaan Kolom K1 WF.300x150x6,5x9
Pekerjaan Kolom K2 150x75x5x7

II.4 PEKERJAAN STRUKTUR LT. ATAS


Pekerjaan Kolom K1A WF.200x100x5,5x8
Pekerjaan Kolom K2 150x75x5x7