DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA

DATA HARGA BAHAN BANGUNAN


HARGA SURVAI
NO NAMA BAHAN SATUAN (Rp)
KETERANGAN

A. BAHAN PASANGAN
1 PASIR BETON m3 247,818
2 PASIR PASANG m3 247,818
3 PASIR URUG m3 177,300
4 SEMEN PC (50 Kg) zak 91,667
5 KERIKIL BETON UK. 3 cm s/d 4 cm m3 475,139
6 KERIKIL KORAL m3 477,405
B. BAHAN PONDASI
7 BATU KALI / BATU BELAH / BATU GUNUNG m3 235,275
C. BAHAN LANTAI
8 KERAMIK 30 X 30 m2 72,100
D. BAHAN DINDING
9 BATAKO UK. 20 X 40 X 10 bh PILIH SALAH SATU SESUAI
DENGAN BAHAN YANG
10 BATU BATA UK. 5.5 X 11 X 23 bh 1,000 TERSEDIA
11 BATU TELA UK. 20 X 30 X 10 bh
12 BETON ROSTER / KERAWANG bh
E. BAHAN PENUTUP LANGIT-LANGIT
13 ETERNIT, UK. 100 X 100 lbr PILIH SALAH SATU SESUAI
BAHAN YANG TERSEDIA
14 KAYU LAPIS 4 MM UK 120 X 240 lbr 82,812
F. BAHAN PENUTUP ATAP
15 BUBUNGAN GENTENG PLENTONG "S" bh 0 PILIH SALAH SATU SESUAI
DENGAN BAHAN YANG
16 GENTENG PLENTONG "S" bh 0 TERSEDIA
17 SENG DATAR BJLS 0.3 m 75,293
18 SENG GELOMBANG KECIL lbr
19 BUBUNGAN ASBES GELOMBANG m
20 ASBES GELOMBANG KECIL lbr
G. BAHAN KAYU
21 KAYU BALOK KLAS I m3 11,833,333
22 KAYU BALOK KLAS II m3 6,933,960
23 KAYU PAPAN KLAS II m3 6,933,960
24 KAYU PAPAN KLAS III m3 4,774,050
25 KAYU PAPAN KLAS IV m3 2,121,800
26 KAYU LAPIS 4 mm UK. 8" X 4" lbr 82,812
27 KAYU LAPIS 12 mm UK. 8" X 4" lbr 196,318
H. BAHAN BESI
28 BESI BETON POLOS DIA. 10 mm Kg 13,760
29 BESI BETON ULIR DIA. 13 mm Kg 14,317
30 KAWAT BENDRAT / BETON Kg 25,750
31 PAKU UK. 3 CM - 7 CM Kg 20,000
32 PAGAR BRC JADI (T 1M) m 330,630
33 BESI PROFIL C a PIPA BESI DIA. 2" m 205,000
I. BAHAN SANITAIR / SALURAN AIR
34 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh 515,000
35 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh 1,350,000
36 BUIS BETON 1/2 DIA. 20 CM bh 248,063
37 PIPA GIP DIA. 1" m 46,778
38 PIPA GIP DIA. 1 1/2" m 93,275
39 PIPA GIP DIA. 2" m 139,771
40 PIPA PVC DIA. 1/2" m 6,489
41 PIPA PVC DIA. 3/4" m 8,750
42 PIPA PVC DIA. 2" m 24,514
43 PIPA PVC DIA. 3" m 43,338
44 PIPA PVC DIA. 4" m 81,250
44 KLOSET DUDUK KERAMIK bh 2,373,944
45 KLOSET JONGKOK KERAMIK STANDAR bh 181,350
46 URINOAR KERAMIK STANDAR bh 1,763,978
47 WASTAFEL GANTUNG KERAMIK bh 569,054
J BAHAN FINISHING
48 CAT BESI Kg 65,000
49 CAT DINDING Kg 110,000
50 CAT KAYU Kg 65,000
K. BAHAN LAIN - LAIN
51 KACA BENING 5 MM m2 180,353
52 POMPA TANGAN bh 361,942
53 INSTALASI LISTRIK titik 458,735
DATA UPAH KERJA
HARGA SURVAI
NO TENAGA KERJA SATUAN
(Rp)
1 MANDOR ORG/HARI 150,000
2 KEPALA TUKANG ORG/HARI 210,000
3 TUKANG BATU ORG/HARI 170,000
4 LADEN TUKANG BATU ORG/HARI 135,000
5 TUKANG BESI ORG/HARI 170,000
6 LADEN TUKANG BESI ORG/HARI 135,000
7 TUKANG KAYU ORG/HARI 170,000
8 LADEN TUKANG KAYU ORG/HARI 135,000
9 TUKANG CAT ORG/HARI 170,000
10 LADEN TUKANG CAT ORG/HARI 135,000
11 TUKANG BONGKAR ORG/HARI 135,000
12 PEKERJA GALIAN & URUG ORG/HARI 135,000
13 TUKANG LISTRIK ORG/HARI 170,000
14 TUKANG PIPA ORG/HARI 170,000

Diperiksa, Dibuat Oleh,


PEJABAT PEMBUAT KOMITMEN CV. DAS CONSULTANT

SEMART PALEBANGAN, ST, MT ANJAR F. SUTRISNO, ST


NIP. 19800311 200604 1 008 Direktur

Mengetahui/Menyetujui,
Plt. KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA MANADO

ROYKE F. MAMAHIT, ST.MT


NIP. 19730630 200003 1 007

Anda mungkin juga menyukai