Depth
qc γ Soil Description φ' Su
To
m kN/m2 kN/m2 (based on SBT chart ) o
kN/m2
0.00 0 0.00 0 0.00
0.20 2943 18.22 Silt Mixtures : clayey silt and silty clay 33.6 21.10
0.40 2943 18.22 Silt Mixtures : clayey silt and silty clay 31.9 20.39
0.60 4414.5 18.37 Sand Mixtures : silty sand to sandy silt 31.9 26.53
0.80 5886 18.48 Sand Mixtures : silty sand to sandy silt 31.9 31.96
1.00 8829 18.64 Sands : clean sands to silty sands 32.3 42.88
1.20 9810 19.47 Sands : clean sands to silty sands 32.0 45.05
1.40 11772 19.21 Sands : clean sands to silty sands 32.1 51.16
1.60 13244 19.26 Sands : clean sands to silty sands 32.1 55.08
1.80 14715 19.63 Sands : clean sands to silty sands 32.0 58.64
2.00 16677 19.35 Sands : clean sands to silty sands 32.1 64.10
2.50 18639 19.72 Sands : clean sands to silty sands 31.8 66.92
3.00 21582 19.78 Sands : clean sands to silty sands 31.7 72.86
3.50 24525 19.03 Dense sand to gravelly sand 31.7 79.41
Uraian Tugas :
1. Perhitungan daya dukung menggunakan data tanah yang diberikan, dengan posisi MAT pada
kedalaman 2.6 m dari permukaan tanah.
2. Perhitungan daya dukung menggunakan metode : Terzaghi, Meyerhof, Vesic dan Hansen.
3. Beban yang bekerja :
- Beban vertical sentris (Fz);
- Beban eksentrisitas 1 arah (My);
- Beban inklinasi dengan beban H pada arah lebar (Fx) dan panjang pondasi (Fy)
4. Perhitungan daya dukung pada kondisi :
- Horizontal ground, tanpa pengaruh gempa dan dengan pengaruh gempa. Penentuan
koefisien gempa berdasarkan tempat tinggal masing-masing mahasiswa;
- Pondasi di puncak lereng (Kasus a), tanpa pengaruh gempa dan dengan pengaruh gempa;
- Semua kondisi mempertimbangkan kondisi beban yang bekerja pada poin 3
5. Analisa kestabilan lereng dilakukan pada kondisi pondasi di puncak lereng setelah
mendapatkan dimensi pondasi yang mampu memikul beban design (Pall > Fz), dengan
mempertimbangkan pengaruh MAT (garis freatik pada lereng).
6. Tinggi lereng adalah 6 m dan kemiringan lereng adalah 40o.

UTARI LAMBAIHANG [18021101151] Page 2


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
LEMBAR ASISTENSI
Nama : UTARI LAMBAIHANG
NIM : 18021101151

NO TANGGAL KETERANGAN PARAF DOSEN


1.) Gambar skema design pondasi : B dan Df yang
direncanakan, H, posisi MAT dan layer-layer.
1 20 April 2020
2.) Cek pengaruh MAT lalu lanjut hitung DD
berdasarkan B.
1.) Lanjut metode lain
2 27 April 2020 2.) Coba-coba penampang mulai 1 m , 1.1, 1.2, 1.3,
1.4, 1.5
1.) Perbaiki perhitungan daya dukung yang tidak
konsisten dalam penentuan ukuran penampang
setiap metode beda ukuran.
3 4 Mei 2020
2.) Setiap penampang yang dicoba dihitung dengan
semua metode.

1.) Untuk table yang ada dibagian awal, dipindahkan


menurut masing-masing metode dan dicantumkan
dibagian akhir setiap contoh perhitungan di setiap
4 11 Mei 2020 metode.
2.) Dalam masing-masing tabel harus ditambah
kolom-kolom faktor-faktor daya dukung tanah dan
faktor-faktor koreksi.
1.) Jangan lupa kolom kontrol Pall terhadap Fz pada
masing-masing tabel.

2.) Dibagian awal sebelum perhitungan, lampirkan


data beban dan uraian tugas yang diberikan.
5 12Mei 2020

3.) Lanjut perhitungan daya dukung gempa.


Tentukan lokasi dan koordinat dari google earth dan
respon spektrum dan PGA dari website puskim .

UTARI LAMBAIHANG [18021101151] Page 3


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

1.) Tabel-tabel dalam perhitungan diperbesar


sehingg jelas terbaca .

6 15 Mei 2020
2.) Selanjutnya hitung dan gambar lintasan freatik
berdasarkan data MAT dan kemiringan lereng.

1.) Gambar lapisan-lapisan tanah pada lereng.

7 19 Mei 2020
2.) Hitung terlebih dahulu . Pada metode Meyerhof
coba-coba jarak b = 0 m, 1 m, 2 m, 3 m.

1.) Perbaiki gambar lintasan freatik .

8 22 Mei 2020
2.) Perbaiki b = 1 m, 2 m, 3 m, 4 m. Kemudian cek
rasionya

3.) b dicoba disetiap penampang

1.) Periksa penulisan tanda > dan < pada setiap


penampang detail dari awal sampai akhir.
9 25 Mei 2020
2.) Lanjut daya dukung eksentris pada Meyerhof
menggunakan rumus : qult on slope x Re dengan
memakai B actual.

1.) Perbaiki perhitungan daya dukung eksentrisitas


meyerhof , B actual BUKAN B' .

10 27 Mei 2020
2.) Hitung daya dukung inklinasi Meyerhof . Jarak b
yang digunakan hanya yang memiliki penampang
memenuhi di daya dukung eksentrisitas

UTARI LAMBAIHANG [18021101151] Page 4


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

1.) Lanjut daya dukung sentri metode Vesic dan


11 28 Mei 2020 Hansen . Jika rasio b/B sudah > 1.5 maka nilai Nc'
dan Ny' diambil pada rasio b/B = 1.5

1.) Lanjut hitung daya dukung gempa semua kasus


12 29 Mei 2020 pada semuda metode HANYA pada b yang
memiliki penampang memenuhi di statis.

1.) Lanjut hitung penurunan semua penampang


dengan metode Schmertmann secara
Handcalculation dan menggunakan Settle3D.
13 03 Juni 2020
2.) Hitung faktor kestabilan lereng dengan Slide
terhadap b terkecil dengan semua penampang .

1.) Buat resume dan kesimpulan berdasarkan hasil


perhitungan dari awal sampai kestabilan lereng .
14 10 Juni 2020
2.) Perbaiki uraian pada lembar asistensi. Gunakan
bahasa Indonesia yang baik dan benar

15
Selesai tugas : C
Manado, 2020

DOSEN PENGAJAR

Roski R. I. Legrans, S.T., M.Agr


NIP. 19790427005011010

UTARI LAMBAIHANG [18021101151] Page 5


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

GAMBAR DESAIN PONDASI

UTARI LAMBAIHANG [18021101151] Page 6


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

PERHITUNGAN DAYA DUKUNG TANAH

1. METODE TERZAGHI
DIKETAHUI :
Df = 1.3 m ϕ' = 32.013 ˚
Dw= 2.6 m c' = 57.086 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m Fz = 485.1474
SF = 3 kN/m²
Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE TERZAGHI

H= 1.1
d1 = 1.70

a. Mencari Nilai Nc, Nq dan Nϒ

Nc = Nq =

=
=

= 45.7782 = 25.0469

24.0469

b. Mencari Overburden Pressure :


= 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 7


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
c. Hitung Daya Dukung Tanah
qult =
=

= 4106.4967 kPa

qall =

= 1368.8322 kPa

pall =
=
= 1971.1184 kN

KONTROL :
Pall > Fz
1971.1184> 485.1474 ….OK!

Perhitungan Metode Terzaghi dengan ukuran penampang berbeda

Df B L ϕ c ϒ nc nq nϒ
1.3 1 1 32.013 57.086 19.383 45.7782 25.0469 24.0469
1.3 1.1 1.1 32.013 57.086 19.383 45.7782 25.0469 24.0469
1.3 1.2 1.2 32.013 57.086 19.383 45.7782 25.0469 24.0469
1.3 1.3 1.3 32.013 57.086 19.383 45.7782 25.0469 24.0469
1.3 1.4 1.4 32.013 57.086 19.383 45.7782 25.0469 24.0469
1.3 1.5 1.5 32.013 57.086 19.383 45.7782 25.0469 24.0469

qbar qult qall pall P desain Kontrol (Pall > P desain)


19.3825 4069.2095 1356.4032 1356.403158 485.1474 OK
19.3825 4087.8531 1362.6177 1648.767407 485.1474 OK
19.3825 4106.4967 1368.8322 1971.118403 485.1474 OK
19.3825 4125.1403 1375.0468 2323.82902 485.1474 OK
19.3825 4143.7839 1381.2613 2707.272129 485.1474 OK
19.3825 4162.4275 1387.4758 3121.820603 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 8


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. METODE MEYERHOF (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE MEYERHOF (beban vertikal sentris)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 22.046821
=

= 23.18772

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.256263

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.651253 dc = 1.390978

= =

= 1.325626 = 1.195489

d. Hitung q
= ϒ' = ϒ
= 19.3825
f. Hitung Daya Dukung Tanah
qult =
= 1.651253 x 1.390978 ) + ( 19.3825 x 23.18772 x 1.325626 x 1.195489 ) + ( 0.5 x 19.383 x 1.2 x 22.04682 x 1.32563 x 1.19549)
= 5772.058 kPa

qall = qult/SF
=

= 1924.019

UTARI LAMBAIHANG [18021101151] Page 9


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
pall = KONTROL :
= Pall > Fz
= 2770.5877 kN 2770.5877 > 485.1474 ….OK!

Perhitungan Metode Meyerhof (Sentris) dengan ukuran penampang berbeda

Df B L ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263
1.3 1.1 1.1 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263
1.3 1.2 1.2 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263
1.3 1.3 1.3 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263
1.3 1.4 1.4 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263
1.3 1.5 1.5 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.3256263

dc dq dϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.469173 1.234587 1.234587 19.3825 6000.30558 2000.102 2000.102 485.1474 OK
1.426521 1.213261 1.213261 19.3825 5873.231863 1957.744 2368.87 485.1474 OK
1.390978 1.195489 1.195489 19.3825 5772.057682 1924.019 2770.588 485.1474 OK
1.360902 1.180451 1.180451 19.3825 5690.806221 1896.935 3205.821 485.1474 OK
1.335124 1.167562 1.167562 19.3825 5625.208325 1875.069 3675.136 485.1474 OK
1.312782 1.156391 1.156391 19.3825 5572.133282 1857.378 4179.100 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 10


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE MEYERHOF (eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.847837

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE MEYERHOF (beban eksentrisitas 1 arah)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 22.04682
=

= 23.1877183

H= 1.08270717 H < d1 ( lapis tanah tidak berpengaruh pada


d1 = 1.70 pondasi)

= 3.25626338

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.651253 dc = 1.39097759

= =

= 1.325626 = 1.19548879

d. Hitung q

= 19.3825
e. Hitung Daya Dukung Tanah
qult =
= )x 0.847837
= 4893.76507 kPa

UTARI LAMBAIHANG [18021101151] Page 11


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

qall = qult/SF KONTROL :


Pall > Fz
=
2349.0072 > 485.1474 ….OK!
= 1631.25502

pall =
=
= 2349.0072 kN

Perhitungan Metode Meyerhof (Eksentris) dengan ukuran penampang berbeda

Df B B' L Af Re ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.01740461 1 1.017405 1.01740461 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626
1.3 1.1 1.11740461 1.1 1.229145 0.92491328 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626
1.3 1.2 1.21740461 1.2 1.460886 0.84783717 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626
1.3 1.3 1.31740461 1.3 1.712626 0.78261893 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626
1.3 1.4 1.41740461 1.4 1.984366 0.72671758 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626
1.3 1.5 1.51740461 1.5 2.276107 0.67826974 32.013 57.086 19.383 35.49054 23.18772 22.04682 1.651253 1.325626 1.325626

dc dq dϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.469173 1.23459 1.23459 19.3825 6104.739 2034.913 2034.913 485.1474 OK
1.426521 1.21326 1.21326 19.3825 5432.23 1810.743 2191.00 485.1474 OK
1.390978 1.19549 1.19549 19.3825 4893.765 1631.255 2349.007 485.1474 OK
1.360902 1.18045 1.18045 19.3825 4453.733 1484.578 2508.936 485.1474 OK
1.335124 1.16756 1.16756 19.3825 4087.938 1362.646 2670.786 485.1474 OK
1.312782 1.32563 1.32563 19.3825 3896.565 1298.855 2922.424 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 12


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE MEYERHOF (inklinasi)


DIKETAHUI : Pengaruh beban inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114
L= 1.2 m = 19.3825 kN/m² My = -4.2219
SF = 3 kN/m²
Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE MEYERHOF (beban inklinasi)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 22.04682
=

= 23.18772

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.256263

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.651253 dc = 1.390978

= =

= 1.325626 = 1.195489

d. Hitung q

= 19.3825

PENGARUH LEBAR :

tan β =
Fz = 485.1474
tan β = -0.00691
HB = -3.3526 β = -0.39593 ˚

e. Mencari Ic, Iq, dan Iϒ

= =

= 1.008818 = 1.02488924

UTARI LAMBAIHANG [18021101151] Page 13


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

f. Mencari qult, qall dan pall


qult = C
= 5829.485 kPa

qall =

= 1943.162 kPa

pall =
= 2798.153
PENGARUH PANJANG :

tan β =
Fz = 485.1474
tan β = 0.042073
HL = 20.4114 β = 2.40916

e. Mencari Ic, Iq, dan Iϒ

= =

= 0.94718 = 0.85514988

f. Mencari qult, qall dan pall


qult = C
= 5429.782 kPa

qall =

= 1809.927 kPa

pall =
= 2606.295

KONTROL :
Pall > Fz
2606.3 > 485.1474 …. OK!

UTARI LAMBAIHANG [18021101151] Page 14


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Metode Meyerhof (Inklinasi Pengaruh Lebar) dengan ukuran penampang berbeda

Df B L ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.1 1.1 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.2 1.2 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.3 1.3 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.4 1.4 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.5 1.5 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.469173 1.234587 1.234587 1.008818 1.008818 1.024889 19.3825 6058.836 2019.612 2019.612 485.1474 OK
1.426521 1.213261 1.213261 1.008818 1.008818 1.024889 19.3825 5931.096 1977.032 2392.209 485.1474 OK
1.390978 1.195489 1.195489 1.008818 1.008818 1.024889 19.3825 5829.485 1943.162 2798.153 485.1474 OK
1.360902 1.180451 1.180451 1.008818 1.008818 1.024889 19.3825 5747.973 1915.991 3238.025 485.1474 OK
1.335124 1.167562 1.167562 1.008818 1.008818 1.024889 19.3825 5682.251 1894.084 3712.404 485.1474 OK
1.312782 1.156391 1.156391 1.008818 1.008818 1.024889 19.3825 5629.164 1876.388 4221.873 485.1474 OK

Perhitungan Metode Meyerhof (Inklinasi Pengaruh Panjang) dengan ukuran penampang berbeda

Df B L ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.1 1.1 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.2 1.2 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.3 1.3 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.4 1.4 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626
1.3 1.5 1.5 32.013 57.086 19.383 35.49054 23.1877183 22.04682 1.651253 1.325626 1.325626

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.469173 1.234587 1.234587 0.94718 0.94718 0.85515 19.3825 5651.187 1883.729 1883.729 485.1474 OK
1.426521 1.213261 1.213261 0.94718 0.94718 0.85515 19.3825 5528.218 1842.739 2229.715 485.1474 OK
1.390978 1.195489 1.195489 0.94718 0.94718 0.85515 19.3825 5429.782 1809.927 2606.295 485.1474 OK
1.360902 1.180451 1.180451 0.94718 0.94718 0.85515 19.3825 5350.215 1783.405 3013.955 485.1474 OK
1.335124 1.167562 1.167562 0.94718 0.94718 0.85515 19.3825 5285.476 1761.825 3453.177 485.1474 OK
1.312782 1.156391 1.156391 0.94718 0.94718 0.85515 19.3825 5232.597 1744.199 3924.448 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 15


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3.METODE HANSEN (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE HANSEN (beban vertikal sentris)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 20.80674
=

= 23.1877183

H= 1.0827072 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.25626338

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.653349 dc = 1.433333

= 1.530104 = 1.299085

= 0.6 =1

UTARI LAMBAIHANG [18021101151] Page 16


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
d. Hitung q

= 19.3825

e. Hitung Daya Dukung Tanah


qult =
= 5839.81099 kPa

qall = qult/SF
= 1946.6

pall =
= 2803.1093 kN

KONTROL :
Pall > Fz
2803.1093 > 485.1474 ….OK!

Perhitungan Metode Hansen (Sentris) dengan ukuran penampang berbeda

Df B L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000
1.3 1.1 1.1 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000
1.3 1.2 1.2 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000
1.3 1.3 1.3 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000
1.3 1.4 1.4 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000
1.3 1.5 1.5 57.086 19.383 35.49054 23.18772 20.80674 1.653349 1.530104 0.6000

dc dq dϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.5200 1.35890 1.0000 19.3825 6147.058 2049.019 2049.019 485.1474 OK
1.4727 1.326275 1.0000 19.3825 5978.369 1992.79 2411.275 485.1474 OK
1.4333 1.299085 1.0000 19.3825 5839.811 1946.604 2803.109 485.1474 OK
1.4000 1.276079 1.0000 19.3825 5724.431 1908.144 3224.763 485.1474 OK
1.3714 1.256359 1.0000 19.3825 5627.262 1875.754 3676.478 485.1474 OK
1.3467 1.239268 1.0000 19.3825 5544.662 1848.221 4158.497 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 17


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN (eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.847837

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE HANSEN (beban eksentrisitas 1 arah)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 20.80674
=

= 23.187718

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.2562634

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.662825 dc = 1.43333

= 1.537793 = 1.299085

= 0.594198 =1

UTARI LAMBAIHANG [18021101151] Page 18


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
d. Hitung q

= 19.3825

e. Hitung Daya Dukung Tanah


qult =
= 5872.4997 kPa

qall = qult/SF
= 1957.5

pall =
= 2818.7999 kN

KONTROL :
Pall > Fz
2818.8 > 485.1474 ….OK!

Perhitungan Metode Hansen (Eksentris) dengan ukuran penampang berbeda

Df B B' L ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.0174 1 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.664721 1.539331 0.593038
1.3 1.1 1.1174 1.1 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.663687 1.538492 0.593671
1.3 1.2 1.2174 1.2 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.662825 1.537793 0.594198
1.3 1.3 1.3174 1.3 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.662096 1.537201 0.594645
1.3 1.4 1.4174 1.4 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.661472 1.536694 0.595027
1.3 1.5 1.5174 1.5 32.013 57.086 19.383 35.49054 23.18772 20.80674 1.66093 1.536255 0.595359

dc dq dϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.5200 1.35890 1.00000 19.3825 6188.389 2062.796 2062.796 485.1474 OK
1.4727 1.32627 1.00000 19.3825 6014.893 2004.964 2426.007 485.1474 OK
1.4333 1.29909 1.00000 19.3825 5872.500 1957.500 2818.800 485.1474 OK
1.4000 1.27608 1.00000 19.3825 5753.995 1917.998 3241.417 485.1474 OK
1.3714 1.25636 1.00000 19.3825 5654.236 1884.745 3694.101 485.1474 OK
1.3467 1.23927 1.00000 19.3825 5569.457 1856.486 4177.093 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 19


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN (inklinasi)


DIKETAHUI : Pengaruh beban inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474 e = -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114 Af = 1.460886
L= 1.2 m = 19.3825 kN/m² My = -4.2219 Re = 0.847837
SF = 3 kN/m² Ca = 45.669
Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE HANSEN (beban inklinasi)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 20.80674
=

= 23.187718

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.2562634

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.662825 dc = 1.43333

= 1.537793 = 1.2990854

= 0.594198 =1

d. Hitung q

= 19.3825

UTARI LAMBAIHANG [18021101151] Page 20


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

1. Mencari Iq, Ic, Iγ pada PENGARUH LEBAR :

2≤a ≤ 5

Iq = 1.010

Ic = 1.010137

2≤a ≤ 5

Iγ = 1.013

e. Hitung Daya Dukung Tanah


qult =
= 5932.0554 kPa

qall = qult/SF
= 1977.4

pall =
= 2847.3866 kN

UTARI LAMBAIHANG [18021101151] Page 21


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. Mencari Iq, Ic, Iγ pada PENGARUH PANJANG :

2≤a ≤ 5

Iq = 0.9423

Ic = 0.939699

2≤a ≤ 5

Iγ = 0.9199

e. Hitung Daya Dukung Tanah


qult =
= 5517.8317 kPa

qall = qult/SF
= 1839.3
KONTROL :
Pall > Fz
2648.5592 > 485.1474 ….OK!
pall =
= 2648.5592 kN

UTARI LAMBAIHANG [18021101151] Page 22


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Metode Hansen (Inklinasi Pengaruh Lebar) dengan ukuran penampang berbeda

Df B B' L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.0174046 1 57.086 19.383 35.49054 23.18772 20.80674 1.66472 1.53933 0.59304
1.3 1.1 1.1174046 1.1 57.086 19.383 35.49054 23.18772 20.80674 1.66369 1.53849 0.59367
1.3 1.2 1.2174046 1.2 57.086 19.383 35.49054 23.18772 20.80674 1.66283 1.53779 0.59420
1.3 1.3 1.3174046 1.3 57.086 19.383 35.49054 23.18772 20.80674 1.66210 1.53720 0.59464
1.3 1.4 1.4174046 1.4 57.086 19.383 35.49054 23.18772 20.80674 1.66147 1.53669 0.59503
1.3 1.5 1.5174046 1.5 57.086 19.383 35.49054 23.18772 20.80674 1.66093 1.53626 0.59536

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.5200 1.3589 1.0000 1.01014 1.010 1.013 19.3825 6251.059 2083.686 2083.686 485.1474 OK
1.4727 1.3263 1.0000 1.01014 1.010 1.013 19.3825 6075.849 2025.283 2450.593 485.1474 OK
1.4333 1.2991 1.0000 1.01014 1.010 1.013 19.3825 5932.055 1977.352 2847.387 485.1474 OK
1.4000 1.2761 1.0000 1.01014 1.010 1.013 19.3825 5812.391 1937.464 3274.314 485.1474 OK
1.3714 1.2564 1.0000 1.01014 1.010 1.013 19.3825 5711.662 1903.887 3731.619 485.1474 OK
1.3467 1.2393 1.0000 1.01014 1.010 1.013 19.3825 5626.063 1875.354 4219.547 485.1474 OK

Perhitungan Metode Hansen (Inklinasi Pengaruh Panjang) dengan ukuran penampang berbeda

Df B B' L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.0174046 1 57.086 19.383 35.49054 23.18772 20.80674 1.66472 1.53933 0.59304
1.3 1.1 1.1174046 1.1 57.086 19.383 35.49054 23.18772 20.80674 1.66369 1.53849 0.59367
1.3 1.2 1.2174046 1.2 57.086 19.383 35.49054 23.18772 20.80674 1.66283 1.53779 0.59420
1.3 1.3 1.3174046 1.3 57.086 19.383 35.49054 23.18772 20.80674 1.66210 1.53720 0.59464
1.3 1.4 1.4174046 1.4 57.086 19.383 35.49054 23.18772 20.80674 1.66147 1.53669 0.59503
1.3 1.5 1.5174046 1.5 57.086 19.383 35.49054 23.18772 20.80674 1.66093 1.53626 0.59536

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.5200 1.3589 1.0000 0.93970 0.942 0.9199 19.3825 5815.262 1938.421 1938.421 485.1474 OK
1.4727 1.3263 1.0000 0.93970 0.942 0.9199 19.3825 5651.928 1883.976 2279.611 485.1474 OK
1.4333 1.2991 1.0000 0.93970 0.942 0.9199 19.3825 5517.832 1839.277 2648.559 485.1474 OK
1.4000 1.2761 1.0000 0.93970 0.942 0.9199 19.3825 5406.191 1802.064 3045.488 485.1474 OK
1.3714 1.2564 1.0000 0.93970 0.942 0.9199 19.3825 5312.172 1770.724 3470.619 485.1474 OK
1.3467 1.2393 1.0000 0.93970 0.942 0.9199 19.3825 5232.234 1744.078 3924.176 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 23


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

4. METODE VESIC (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE VESIC (beban vertikal sentris)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 30.243
=

= 23.187718

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.2562634

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.653349 dc = 1.433333

= 1.625173 = 1.299085

= 0.6 =1

UTARI LAMBAIHANG [18021101151] Page 24


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

d. Hitung q

= 19.3825

e. Hitung Daya Dukung Tanah


qult =
= 5961.1607 kPa

qall = qult/SF
= 1987.1

pall =
= 2861.3571 kN

KONTROL :
Pall > Fz
2861.3571 > 485.1474 ….OK!

Perhitungan Metode Vesic (Sentris) dengan ukuran penampang berbeda

Df B L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000
1.3 1.1 1.1 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000
1.3 1.2 1.2 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000
1.3 1.3 1.3 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000
1.3 1.4 1.4 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000
1.3 1.5 1.5 57.086 19.383 35.49054 23.18772 30.243 1.653349 1.625173 0.6000

dc dq dϒ qbar qult qall pall P desain Kontrol (Pall > P desain)


1.5200 1.35890 1.0000 19.3825 6259.99 2086.663 2086.663 485.1474 OK
1.4727 1.326275 1.0000 19.3825 6095.393 2031.798 2458.475 485.1474 OK
1.4333 1.299085 1.0000 19.3825 5961.161 1987.054 2861.357 485.1474 OK
1.4000 1.276079 1.0000 19.3825 5850.285 1950.095 3295.660 485.1474 OK
1.3714 1.256359 1.0000 19.3825 5757.76 1919.253 3761.737 485.1474 OK
1.3467 1.239268 1.0000 19.3825 5679.917 1893.306 4259.938 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 25


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC (eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.847837

Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE VESIC (beban eksentrisitas 1 arah)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 30.243
=

= 23.1877183

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.25626338

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.662825 dc = 1.433333

= 1.537793 = 1.299085

= 0.594198 =1

UTARI LAMBAIHANG [18021101151] Page 26


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
d. Hitung q

= 19.3825

e. Hitung Daya Dukung Tanah


qult =
= 5938.65226 kPa

qall = qult/SF
= 1979.6

pall =
= 2850.5531 kN

KONTROL :
Pall > Fz
2850.5531 > 485.1474 ….OK!

Perhitungan Metode Vesic (Eksentris) dengan ukuran penampang berbeda

Df B B' L ϕ c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.0174 1 32.013 57.086 19.383 35.49054 23.18772 30.243 1.664721 1.539331 0.593038
1.3 1.1 1.1174 1.1 32.013 57.086 19.383 35.49054 23.18772 30.243 1.663687 1.538492 0.593671
1.3 1.2 1.2174 1.2 32.013 57.086 19.383 35.49054 23.18772 30.243 1.662825 1.537793 0.594198
1.3 1.3 1.3174 1.3 32.013 57.086 19.383 35.49054 23.18772 30.243 1.662096 1.537201 0.594645
1.3 1.4 1.4174 1.4 32.013 57.086 19.383 35.49054 23.18772 30.243 1.661472 1.536694 0.595027
1.3 1.5 1.5174 1.5 32.013 57.086 19.383 35.49054 23.18772 30.243 1.66093 1.536255 0.595359

dc dq dϒ qbar qult qall pall P desain Kontrol (Pa l l > P desain)


1.5200 1.35890 1.00000 19.3825 6243.566 2081.189 2081.189 485.1474 OK
1.4727 1.32627 1.00000 19.3825 6075.558 2025.186 2450.475 485.1474 OK
1.4333 1.29909 1.00000 19.3825 5938.652 1979.551 2850.553 485.1474 OK
1.4000 1.27608 1.00000 19.3825 5825.635 1941.878 3281.775 485.1474 OK
1.3714 1.25636 1.00000 19.3825 5731.364 1910.455 3744.491 485.1474 OK
1.3467 1.23927 1.00000 19.3825 5652.072 1884.024 4239.054 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 27


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC (Inklinasi)


DIKETAHUI : Pengaruh beban inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474 e = -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114 Af = 1.460886
L= 1.2 m = 19.3825 kN/m² My = -4.2219 Re = 0.847837
SF = 3 kN/m² Ca = 45.669
Penyelesaian
1. MENGHITUNG NILAI DAYA DUKUNG TANAH MENURUT METODE VESIC (beban eksentrisitas 1 arah)
a. Mencari nilai Nq, Nc, N ϒ

=
= 35.49054 = 30.243
=

= 23.1877183

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

= 3.25626338

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.662825 dc = 1.433333

= 1.537793 = 1.299085

= 0.594198 =1

d. Hitung q

= 19.3825

UTARI LAMBAIHANG [18021101151] Page 28


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
1. Mencari Iq, Ic, Iγ pada PENGARUH LEBAR :

2.1213
1.5 1.5

Iq = 1.012

Ic = 1.012598

Iγ = 1.017787

e. Hitung Daya Dukung Tanah


qult =
= 6014.07749 kPa
qall = qult/SF
= 2004.7
pall =
= 2886.7572 kN

UTARI LAMBAIHANG [18021101151] Page 29


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
2. Mencari Iq, Ic, Iγ pada PENGARUH PANJANG :

Iq = 0.9283

Ic = 0.925022

Iγ = 0.896243

e. Hitung Daya Dukung Tanah


qult =
= 5490.18537 kPa
qall = qult/SF
= 1830.1
pall =
= 2635.2890 kN

KONTROL :
Pall > Fz
2635.2890 > 485.1474 ….OK!

UTARI LAMBAIHANG [18021101151] Page 30


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Metode Vesic (Inklinasi Pengaruh Lebar) dengan ukuran penampang berbeda

Df B B' L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.01740 1 57.086 19.383 35.49054 23.18772 30.243 1.66472 1.53933 0.59304
1.3 1.1 1.11740 1.1 57.086 19.383 35.49054 23.18772 30.243 1.66369 1.53849 0.59367
1.3 1.2 1.21740 1.2 57.086 19.383 35.49054 23.18772 30.243 1.66283 1.53779 0.59420
1.3 1.3 1.31740 1.3 57.086 19.383 35.49054 23.18772 30.243 1.66210 1.53720 0.59464
1.3 1.4 1.41740 1.4 57.086 19.383 35.49054 23.18772 30.243 1.66147 1.53669 0.59503
1.3 1.5 1.51740 1.5 57.086 19.383 35.49054 23.18772 30.243 1.66093 1.53626 0.59536

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pall > P desain)


1.5200 1.3589 1.0000 1.01260 1.012 1.017787 19.3825 6322.627 2107.542 2107.542 485.1474 OK
1.4727 1.3263 1.0000 1.01260 1.012 1.017787 19.3825 6152.606 2050.869 2481.551 485.1474 OK
1.4333 1.2991 1.0000 1.01260 1.012 1.017787 19.3825 6014.077 2004.692 2886.757 485.1474 OK
1.4000 1.2761 1.0000 1.01260 1.012 1.017787 19.3825 5899.737 1966.579 3323.518 485.1474 OK
1.3714 1.2564 1.0000 1.01260 1.012 1.017787 19.3825 5804.377 1934.792 3792.193 485.1474 OK
1.3467 1.2393 1.0000 1.01260 1.012 1.017787 19.3825 5724.184 1908.061 4293.138 485.1474 OK

Perhitungan Metode Vesic (Inklinasi Pengaruh Panjang) dengan ukuran penampang berbeda

Df B B' L c ϒ nc nq nϒ sc sq sϒ
1.3 1 1.01740 1 57.086 19.383 35.49054 23.18772 30.243 1.66472 1.53933 0.59304
1.3 1.1 1.11740 1.1 57.086 19.383 35.49054 23.18772 30.243 1.66369 1.53849 0.59367
1.3 1.2 1.21740 1.2 57.086 19.383 35.49054 23.18772 30.243 1.66283 1.53779 0.59420
1.3 1.3 1.31740 1.3 57.086 19.383 35.49054 23.18772 30.243 1.66210 1.53720 0.59464
1.3 1.4 1.41740 1.4 57.086 19.383 35.49054 23.18772 30.243 1.66147 1.53669 0.59503
1.3 1.5 1.51740 1.5 57.086 19.383 35.49054 23.18772 30.243 1.66093 1.53626 0.59536

dc dq dϒ ic iq iϒ qbar qult qall pall P desain Kontrol (Pall > P desain)


1.5200 1.3589 1.0000 0.92502 0.928 0.896243 19.3825 5773.386 1924.462 1924.462 485.1474 OK
1.4727 1.3263 1.0000 0.92502 0.928 0.896243 19.3825 5617.394 1872.465 2265.682 485.1474 OK
1.4333 1.2991 1.0000 0.92502 0.928 0.896243 19.3825 5490.185 1830.062 2635.289 485.1474 OK
1.4000 1.2761 1.0000 0.92502 0.928 0.896243 19.3825 5385.083 1795.028 3033.597 485.1474 OK
1.3714 1.2564 1.0000 0.92502 0.928 0.896243 19.3825 5297.329 1765.776 3460.922 485.1474 OK
1.3467 1.2393 1.0000 0.92502 0.928 0.896243 19.3825 5223.438 1741.146 3917.578 485.1474 OK

UTARI LAMBAIHANG [18021101151] Page 31


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

PERHITUNGAN HORIZONTAL GROUND (PENGARUH GEMPA)

Gambar Lokasi Dan Koordinat

Nilai Spektral Dan PGA

UTARI LAMBAIHANG [18021101151] Page 32


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
ϕ' = 32.013 ˚
A0 = PGA = 0.456

Koefisien Horizontal dan Vertikal


Kh = 0.2 (I + 1) A 0
= 0.1824

Kv =
0.1216
Mencari Nilai θ, α, αAE, αPE

θ=

= 13.03419
α= ϕ-θ
= 18.978

αAE = +

= 74.1121

αPE = +
= 14.51185

Mencari Nilai KAE dan KPE Menghitung Nilai Daya Dukung Tanah Dengan Pengaruh Gempa
KAE =
Nq E =
= 10.35706
KAE = 0.4509
N ϒE =
= 32.87458
KPE =

NCE =

= 14.96717
KPE = 4.670

UTARI LAMBAIHANG [18021101151] Page 33


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
1. METODE TERZAGHI

Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

UTARI LAMBAIHANG [18021101151] Page 34


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Menghitung Daya Dukung Tanah

q ult = .NqE + 0.4ϒ.B.NϒE


= 1617.343 kN/m²

q all =
= 539.1143 kN/m²

P all = q all X A
= 776.3245 kN

KONTROL SF

= 5.0936 > 1.25 ….. OK


.
(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Terzaghi Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE q ult q all P all SF KONTROL (SF > 1.25)


1.3 1 1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1566.3675 522.1225 522.1225 3.363 OK
1.3 1.1 1.1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1591.8552 530.6184 642.0482 4.172 OK
1.3 1.2 1.2 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1617.3428 539.1143 776.3245 5.094 OK
1.3 1.3 1.3 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1642.8305 547.6102 925.4612 6.137 OK
1.3 1.4 1.4 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1668.3181 556.1060 1089.968 7.313 OK
1.3 1.5 1.5 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1693.8058 564.6019 1270.354 8.631 OK

UTARI LAMBAIHANG [18021101151] Page 35


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. METODE MEYERHOF (Beban Sentris)


Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²
Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)
a. Menghitung Nilai Overburden Pressure

= 19.3825
c. Hitung Faktor Bentuk Pondasi (Shape Factor)
b. Bearing Capacity Factor Pengaruh Gempa
N ϒE =
NCE =

= 14.96717 = 32.87458
Sc = 1.651253

Nq E =
=
= 10.35706 = 3.256263 = 1.325626
d. Hitung Faktor Kedalaman Pondasi (Depth Factor )

dc = 1.390978

= 1.195489

e. Menghitung Daya Dukung Tanah


q ult = .NqE.Sq.dq + 0.5.ϒ.B.NϒE.Sϒ.dϒ
= 2886.496 kN/m²

UTARI LAMBAIHANG [18021101151] Page 36


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

q all = KONTROL SF

= 962.1652 kN/m²
=
P all = q all X A
= 1385.518 kN = 9.0906 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Meyerhof (Beban Sentris) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.1 1.1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.2 1.2 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.3 1.3 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.4 1.4 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.5 1.5 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.469173 1.234587 1.234587 2922.755 974.2518 974.2518 485.1474 6.275173 OK
1.426521 1.213261 1.213261 2899.138 966.3793 1169.319 485.1474 7.598003 OK
1.390978 1.195489 1.195489 2886.496 962.1652 1385.518 485.1474 9.090597 OK
1.360902 1.180451 1.180451 2882.296 960.7653 1623.693 485.1474 10.76741 OK
1.335124 1.335124 1.335124 3028.395 1009.465 1978.551 485.1474 13.27419 OK
1.312782 1.156391 1.156391 2892.470 964.1566 2169.352 485.1474 14.73956 OK

UTARI LAMBAIHANG [18021101151] Page 37


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE MEYERHOF (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405 m
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886 m²
L= 1.2 m = 19.383 kN/m² e= -0.0087 m Re = 1.014504
Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)
a. Menghitung Nilai Overburden Pressure

= 19.383
b. Bearing Capacity Factor Pengaruh Gempa

NCE = N ϒE =
Nq E =
= 14.96717 = 10.35706 = 32.87458
= 3.256263

c. Hitung Faktor Bentuk Pondasi (Shape Factor) d. Hitung Faktor Kedalaman Pondasi (Depth Factor )

Sc = 1.651253 dc = 1.390978

= =

= 1.325626 = 1.195489

e. Menghitung Daya Dukung Tanah


q ult = ( .NqE.Sq.dq + 0.5.ϒ.B.NϒE.Sϒ.dϒ ) x (Re)
= 2928.361 kN/m²

q all =
= 976.1203 kN/m²

UTARI LAMBAIHANG [18021101151] Page 38


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
P all = q all X A
= 1405.613 kN

KONTROL SF

= 9.2224 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Meyerhof (Beban Eksentrisitas) Dengan Penampang Berbeda-beda

Df B L Re c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 1.01740 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.1 1.1 1.01582 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.2 1.2 1.01450 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.3 1.3 1.01339 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.4 1.4 1.01243 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.5 1.5 1.01160 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.46917 1.234587 1.234587 2973.625 991.2083 991.2083 485.1474 6.38439 OK
1.42652 1.213261 1.213261 2945.009 981.6697 1187.82 485.1474 7.718221 OK
1.39098 1.195489 1.195489 2928.361 976.1203 1405.613 485.1474 9.222445 OK
1.36090 1.180451 1.180451 2920.884 973.6281 1645.432 485.1474 10.91157 OK
1.33512 1.335124 1.335124 3066.044 1022.015 2003.148 485.1474 13.43921 OK
1.31278 1.156391 1.156391 2926.031 975.3437 2194.523 485.1474 14.91058 OK

UTARI LAMBAIHANG [18021101151] Page 39


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
METODE MEYERHOF (inklinasi)

DIKETAHUI : Pengaruh beban inklinasi


Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114
L= 1.2 m = 19.3825 kN/m² My = -4.2219
SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.383

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

c. Hitung Faktor Bentuk Pondasi (Shape Factor) d. Hitung Faktor Kedalaman Pondasi (Depth Factor )

Sc = 1.651253 dc = 1.390978

= =

= 1.325626 = 1.195489

UTARI LAMBAIHANG [18021101151] Page 40


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
e. Mencari Ic, Iq, dan Iϒ

1. PENGARUH LEBAR :

tan β =
Fz = 485.1474
tan β = -0.00691
HB = -3.3526 β = -0.39593 ˚

= =

= 1.00882 = 1.02489

2. PENGARUH PANJANG

tan β =
Fz = 485.1474
tan β = 0.042073
HL = 20.4114 β = 2.40916

= =

= 0.94718 = 0.85515

f. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B.NϒE.Sϒ.dϒ. Iϒ


= 2921.686 kN/m²

q all =
= 973.8952 kN/m²

P all = q all X A
= 1402.409 kN

UTARI LAMBAIHANG [18021101151] Page 41


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
2. PENGARUH PANJANG :
KONTROL SF
q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B.NϒE.Sϒ.dϒ. Iϒ
= 2678.271 kN/m²
=
q all =
= 8.4348 > 1.25 ….. OK
= 892.7569 kN/m²
(PONDASI DAPAT DIGUNAKAN)
P all = q all X A
= 1285.57 kN

Perhitungan Pengaruh Gempa Metode Meyerhof (Beban Inklinasi Pengaruh Lebar ) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.1 1.1 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.2 1.2 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.3 1.3 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.4 1.4 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.5 1.5 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.469173 1.234587 1.234587 1.00882 1.00882 1.02489 2956.908 985.6359 985.6359 485.1474 6.3485 OK
1.426521 1.213261 1.213261 1.00882 1.00882 1.02489 2933.761 977.9202 1183.284 485.1474 7.6887 OK
1.390978 1.195489 1.195489 1.00882 1.00882 1.02489 2921.686 973.8952 1402.409 485.1474 9.2014 OK
1.360902 1.180451 1.180451 1.00882 1.00882 1.02489 2918.128 972.7092 1643.879 485.1474 10.9013 OK
1.335124 1.335124 1.335124 1.00882 1.00882 1.02489 3067.786 1022.595 2004.287 485.1474 13.4468 OK
1.312782 1.156391 1.156391 1.00882 1.00882 1.02489 2929.749 976.5829 2197.312 485.1474 14.9295 OK

Perhitungan Pengaruh Gempa Metode Meyerhof (Beban Inklinasi Pengaruh Panjang ) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.1 1.1 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.2 1.2 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.3 1.3 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.4 1.4 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626
1.3 1.5 1.5 57.0863 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.651253 1.325626 1.325626

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.469173 1.234587 1.234587 0.94718 0.94718 0.85515 2720.389 906.7963 906.7963 485.1474 5.8407 OK
1.426521 1.213261 1.213261 0.94718 0.94718 0.85515 2694.132 898.044 1086.633 485.1474 7.0607 OK
1.390978 1.195489 1.195489 0.94718 0.94718 0.85515 2678.271 892.7569 1285.57 485.1474 8.4348 OK
1.360902 1.180451 1.180451 0.94718 0.94718 0.85515 2670.406 890.1353 1504.329 485.1474 9.9759 OK
1.335124 1.335124 1.335124 0.94718 0.94718 0.85515 2795.784 931.9278 1826.579 485.1474 12.2546 OK
1.312782 1.156391 1.156391 0.94718 0.94718 0.85515 2672.269 890.7563 2004.202 485.1474 13.6175 OK

UTARI LAMBAIHANG [18021101151] Page 42


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
3. METODE HANSEN (Beban Sentris)

Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

UTARI LAMBAIHANG [18021101151] Page 43


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
C. Hitung Faktor Bentuk Pondasi (Shape Factor)

Sc = 1.653349

= 1.530104

= 0.6

D. Hitung Faktor Kedalaman Pondasi (D)

dc = 1.433333

= 1.299085

=1

UTARI LAMBAIHANG [18021101151] Page 44


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
e. Menghitung Daya Dukung Tanah

q ult = .NqE.Sq.dq + 0.5.ϒ.B.NϒE.Sϒ.dϒ


= 2653.222 kN/m²

q all =
= 884.4073 kN/m²

P all = q all X A
= 1627.842 kN

KONTROL SF

= 8.3559 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Hansen (Beban Sentris) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.1 1.1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.2 1.2 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.3 1.3 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.4 1.4 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.5 1.5 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.5200 1.358902 1.000 2755.794 918.598 918.598 485.1474 5.917 OK
1.4727 1.326275 1.000 2698.108 899.3693 1088.237 485.1474 7.071 OK
1.4333 1.299085 1.000 2653.222 884.4073 1273.547 485.1474 8.356 OK
1.4000 1.276079 1.000 2618.183 872.7275 1474.91 485.1474 9.781 OK
1.3714 1.256359 1.000 2590.88 863.6265 1692.708 485.1474 11.356 OK
1.3467 1.239268 1.000 2569.766 856.5886 1927.324 485.1474 13.095 OK

UTARI LAMBAIHANG [18021101151] Page 45


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087 m
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405 m
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886 m²
L= 1.2 m = 19.383 kN/m² Re = 1.014504

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

==

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

UTARI LAMBAIHANG [18021101151] Page 46


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
C. Hitung Faktor Bentuk Pondasi (Shape Factor)

Sc = 1.662825

= 1.537793

= 0.594198

D. Hitung Faktor Kedalaman Pondasi (D)

dc = 1.433333

= 1.299085

=1

UTARI LAMBAIHANG [18021101151] Page 47


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

e. Menghitung Daya Dukung Tanah

q ult = .NqE.Sq.dq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ


= 2667.909 kN/m²

q all =

= 889.303 kN/m²

P all = q all X A
= 1280.596 kN

KONTROL SF

= 8.4022 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Hansen (Beban Eksentrisitas) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.1 1.1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.2 1.2 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.3 1.3 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.4 1.4 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600
1.3 1.5 1.5 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.530104 0.600

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.5200 1.358902 1.000 2755.794 918.598 918.598 485.1474 5.917 OK
1.4727 1.326275 1.000 2698.108 899.3693 1088.237 485.1474 7.071 OK
1.4333 1.299085 1.000 2653.222 884.4073 1273.547 485.1474 8.356 OK
1.4000 1.276079 1.000 2618.183 872.7275 1474.91 485.1474 9.781 OK
1.3714 1.256359 1.000 2590.88 863.6265 1692.708 485.1474 11.356 OK
1.3467 1.239268 1.000 2569.766 856.5886 1927.324 485.1474 13.095 OK

UTARI LAMBAIHANG [18021101151] Page 48


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN (inklinasi)

DIKETAHUI : Pengaruh beban inklinasi


Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474 e = -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114 Af = 1.460886
L= 1.2 m = 19.3825 kN/m² My = -4.2219 Re = 0.847837
SF = 3 kN/m² Ca = 45.669

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.383

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

UTARI LAMBAIHANG [18021101151] Page 49


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

UTARI LAMBAIHANG [18021101151] Page 50


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

e. Mencari Ic, Iq, dan Iϒ

1. PENGARUH LEBAR :

2≤a ≤ 5

Iq = 1.010

Ic = 1.010137

2≤a ≤ 5

Iγ = 1.013

UTARI LAMBAIHANG [18021101151] Page 51


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. PENGARUH PANJANG

2≤a ≤ 5

Iq = 0.9423

Ic = 0.939699

2≤a ≤ 5

Iγ = 0.9199

UTARI LAMBAIHANG [18021101151] Page 52


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
f. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ. Iϒ


= 2695.438 kN/m²

q all =
= 898.4795 kN/m²

P all = q all X A
= 1293.81 kN

2. PENGARUH PANJANG :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ. Iϒ


= 2503.512 kN/m²

q all =

= 834.5041 kN/m²

P all = q all X A
= 1201.686 kN

KONTROL SF

= 7.88 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 53


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Metode Hansen (Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

Df B L B' c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ


1.3 1 1 1.01740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.1 1.1 1.11740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.2 1.2 1.21740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.3 1.3 1.31740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.4 1.4 1.41740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.5 1.5 1.51740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.52000 1.35890 1.000 1.010137 1.010 1.0130 2800.109 933.3698 933.370 485.1474 6.0119 OK
1.47273 1.32627 1.000 1.010137 1.010 1.0130 2741.273 913.7576 1105.647 485.1474 7.1843 OK
1.43333 1.29909 1.000 1.010137 1.010 1.0130 2695.438 898.4795 1293.810 485.1474 8.4889 OK
1.40000 1.27608 1.000 1.010137 1.010 1.0130 2659.606 886.5353 1498.245 485.1474 9.9355 OK
1.37143 1.25636 1.000 1.010137 1.010 1.0130 2631.632 877.2106 1719.333 485.1474 11.5351 OK
1.34667 1.23927 1.000 1.010137 1.010 1.0130 2609.945 869.9815 1957.458 485.1474 13.2999 OK

Perhitungan Pengaruh Gempa Metode Hansen (Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

Df B L B' c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ


1.3 1 1 1.01740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.1 1.1 1.11740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.2 1.2 1.21740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.3 1.3 1.31740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.4 1.4 1.41740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.5 1.5 1.51740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.52000 1.35890 1.000 0.939699 0.94230 0.9199 2601.79 867.2635 867.263 485.1474 5.5861 OK
1.47273 1.32627 1.000 0.939699 0.94230 0.9199 2546.601 848.867 1027.129 485.1474 6.6741 OK
1.43333 1.29909 1.000 0.939699 0.94230 0.9199 2503.512 834.5041 1201.686 485.1474 7.8844 OK
1.40000 1.27608 1.000 0.939699 0.94230 0.9199 2469.732 823.244 1391.282 485.1474 9.2262 OK
1.37143 1.25636 1.000 0.939699 0.94230 0.9199 2443.265 814.4217 1596.266 485.1474 10.7094 OK
1.34667 1.23927 1.000 0.939699 0.94230 0.9199 2422.649 807.5496 1816.987 485.1474 12.3454 OK

UTARI LAMBAIHANG [18021101151] Page 54


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

4. METODE VESIC (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

Penyelesaian
Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.967165

Nq E =
= 10.357064

N ϒE =

= 32.874575

= 3.2562634

UTARI LAMBAIHANG [18021101151] Page 55


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
b. Hitung Faktor Bentuk Pondasi (Shape Factor)

Sc = 1.6533493

= 1.6251727

= 0.6
c. Hitung Faktor Kedalaman Pondasi (D)

dc = 1.433333

= 1.299085

=1

UTARI LAMBAIHANG [18021101151] Page 56


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

e. Menghitung Daya Dukung Tanah

q ult = .NqE.Sq.dq + 0.5.ϒ.B.NϒE.Sϒ.dϒ


= 2678.0145 kN/m²

q all =

= 892.67151 kN/m²

P all = q all X A
= 1285.447 kN

KONTROL SF

= 8.434 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Vesic (Beban Sentris) Dengan Penampang Berbeda-beda

Df B L c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ
1.3 1 1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600
1.3 1.1 1.1 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600
1.3 1.2 1.2 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600
1.3 1.3 1.3 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600
1.3 1.4 1.4 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600
1.3 1.5 1.5 57.08625 32.0125 19.3825 19.3825 14.96717 10.35706 32.87458 1.653349 1.625173 0.600

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.5200 1.358902 1.000 2781.728 927.2427 927.2427 485.1474 5.972 OK
1.4727 1.326275 1.000 2723.419 907.8064 1098.446 485.1474 7.137 OK
1.4333 1.299085 1.000 2678.015 892.6715 1285.447 485.1474 8.434 OK
1.4000 1.276079 1.000 2642.536 880.8453 1488.629 485.1474 9.872 OK
1.3714 1.256359 1.000 2614.857 871.6189 1708.373 485.1474 11.462 OK
1.3467 1.239268 1.000 2593.417 864.4722 1945.062 485.1474 13.216 OK

UTARI LAMBAIHANG [18021101151] Page 57


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087 m
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405 m
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886 m²
L= 1.2 m = 19.383 kN/m² Re = 1.014504

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.383

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

UTARI LAMBAIHANG [18021101151] Page 58


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

UTARI LAMBAIHANG [18021101151] Page 59


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
e. Menghitung Daya Dukung Tanah

q ult = .NqE.Sq.dq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ


= 2667.909 kN/m²

q all =
= 889.303 kN/m²

P all = q all X A
= 1280.596 kN

KONTROL SF

= 8.4022 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

Perhitungan Pengaruh Gempa Metode Vesic (Beban Eksentrisitas) Dengan Penampang Berbeda-beda

Df B L B' c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ


1.3 1 1 1.01740 57.0863 32.013 19.383 19.383 14.96717 10.35706 32.87458 1.664721 1.539331 0.59303816
1.3 1.1 1.1 1.11740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.663687 1.538492 0.59367105
1.3 1.2 1.2 1.21740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.59419846
1.3 1.3 1.3 1.31740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662096 1.537201 0.59464474
1.3 1.4 1.4 1.41740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.661472 1.536694 0.59502726
1.3 1.5 1.5 1.51740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.66093 1.536255 0.59535877

dc dq dϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.52000 1.35890 1.000 2774.149 924.7165 924.7165 485.1474 5.9561 OK
1.47273 1.32627 1.000 2714.423 904.8076 1094.817 485.1474 7.1139 OK
1.43333 1.29909 1.000 2667.909 889.303 1280.596 485.1474 8.4022 OK
1.40000 1.27608 1.000 2631.543 877.181 1482.436 485.1474 9.8307 OK
1.37143 1.25636 1.000 2603.141 867.7136 1700.719 485.1474 11.4102 OK
1.34667 1.23927 1.000 2581.102 860.3673 1935.826 485.1474 13.1529 OK

UTARI LAMBAIHANG [18021101151] Page 60


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC (inklinasi)

DIKETAHUI : Pengaruh beban inklinasi


Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474 e = -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114 Af = 1.460886
L= 1.2 m = 19.3825 kN/m² My = -4.2219 Re = 0.847837
SF = 3 kN/m² Ca = 45.669

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.383

b. Bearing Capacity Factor Pengaruh Gempa

NCE =

= 14.96717

Nq E =
= 10.35706

N ϒE =

= 32.87458

= 3.256263

UTARI LAMBAIHANG [18021101151] Page 61


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
C. Hitung Faktor Bentuk Pondasi (Shape Factor) D. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.662825 dc = 1.433333

= 1.537793 = 1.299085

= 0.594198 =1

e. Mencari Ic, Iq, dan Iϒ

1. PENGARUH LEBAR :

2.1213
1.5 1.5

Iq = 1.012

Ic = 1.012598

Iγ = 1.017787

UTARI LAMBAIHANG [18021101151] Page 62


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. PENGARUH PANJANG

Iq = 0.9283

Ic = 0.925022

Iγ = 0.896243

UTARI LAMBAIHANG [18021101151] Page 63


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

f. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ. Iϒ


= 2702.496 kN/m²

q all =
= 900.8321 kN/m²

P all = q all X A
= 1297.198 kN

2. PENGARUH PANJANG :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B'.NϒE.Sϒ.dϒ. Iϒ


= 2462.539 kN/m²

q all =
= 820.8462 kN/m²

P all = q all X A
= 1182.019 kN

KONTROL SF

= 7.76 > 1.25 ….. OK

(PONDASI DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 64


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Metode Vesic (Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

Df B L B' c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ


1.3 1 1 1.01740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.1 1.1 1.11740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.2 1.2 1.21740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.3 1.3 1.31740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.4 1.4 1.41740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.5 1.5 1.51740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.52000 1.35890 1.000 1.012598 1.0121 1.017787 2807.332 935.7774 935.777 485.1474 6.0274 OK
1.47273 1.32627 1.000 1.012598 1.0121 1.017787 2748.397 916.1325 1108.520 485.1474 7.2029 OK
1.43333 1.29909 1.000 1.012598 1.0121 1.017787 2702.496 900.8321 1297.198 485.1474 8.5111 OK
1.40000 1.27608 1.000 1.012598 1.0121 1.017787 2666.621 888.8737 1502.197 485.1474 9.9617 OK
1.37143 1.25636 1.000 1.012598 1.0121 1.017787 2638.624 879.5412 1723.901 485.1474 11.5657 OK
1.34667 1.23927 1.000 1.012598 1.0121 1.017787 2616.928 872.3093 1962.696 485.1474 13.3354 OK

Perhitungan Pengaruh Gempa Metode Vesic (Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

Df B L B' c ϕ ϒ qbar NCE Nq E N ϒE sc sq sϒ


1.3 1 1 1.01740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.1 1.1 1.11740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.2 1.2 1.21740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.3 1.3 1.31740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.4 1.4 1.41740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198
1.3 1.5 1.5 1.51740 57.0863 32.013 19.3825 19.3825 14.96717 10.35706 32.87458 1.662825 1.537793 0.594198

dc dq dϒ ic iq iϒ q ult q all P all P desaign SF KONTROL (SF > 1.25)


1.52000 1.35890 1.000 0.925022 0.92826 0.8962 2559.646 853.2152 853.215 485.1474 5.4956 OK
1.47273 1.32627 1.000 0.925022 0.92826 0.8962 2505.136 835.0453 1010.405 485.1474 6.5654 OK
1.43333 1.29909 1.000 0.925022 0.92826 0.8962 2462.539 820.8462 1182.019 485.1474 7.7554 OK
1.40000 1.27608 1.000 0.925022 0.92826 0.8962 2429.105 809.7017 1368.396 485.1474 9.0744 OK
1.37143 1.25636 1.000 0.925022 0.92826 0.8962 2402.872 800.9572 1569.876 485.1474 10.5324 OK
1.34667 1.23927 1.000 0.925022 0.92826 0.8962 2382.398 794.1327 1786.799 485.1474 12.1403 OK

UTARI LAMBAIHANG [18021101151] Page 65


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Lintasan Freatik

DIK :
L= 3 m
0.3L = 0.9 m
H= 6 m
Koordinat Garis Freatik Embung
= 40
MAT = 2.6 m
x y
0 0.511227
h = H-MAT
1 1.133052
= 3.4 m
2 1.518638
3 1.824477
4 2.085946
5 2.318108
6 2.529047
7 2.723698
= 7.15052 m
8 2.905337
9 3.07627
d = x + L + 0.3L
10 3.238193
= 11.05052 m
11 3.392395
11.05052 3.4
y0 = -d
= 0.511227

Permukaan Basah

= 1.515147 m

Koreksi Permukaan Basah

= 2.185145
0.669998 m

0.306615

UTARI LAMBAIHANG [18021101151] Page 66


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

UTARI LAMBAIHANG [18021101151] Page 67


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
PERHITUNGAN PONDASI PADA PUNCAK LERENG (FACTOR ON TOP OF SLOPE)

METODE MEYERHOF
(BEBAN SENTRIS)
Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m² b= 1
B= 1.2 ϒ' = 19.3825 kN/m² b= 2
L= 1.2 = 19.3825 kN/m² b= 3
β= 40 SF = 3 kN/m² b= 4

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825
b. Menghitung Bearing Capacity Factor ( Foundations On Top Of Slope)

UTARI LAMBAIHANG [18021101151] Page 68


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Diketahui data di atas β = 40 , maka kita menginterpolasi data tabel


Ncq
b/B
β
Ns 0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
30 6.4 6.7 6.733333 6.8 6.9 6.933333 7 7 7 7 7
Df/B=1 0 40 6 6.45 6.5 6.6 6.766667 6.822222 6.933333 6.966667 7 7 7
45 5.8 6.325 6.383333 6.5 6.7 6.766667 6.9 6.95 7 7 7
30 4.2 4.875 4.95 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1
Df/B=0 0 40 3.866667 4.716667 4.811111 5 5.05 5.066667 5.1 5.1 5.1 5.1 5.1
60 3.2 4.4 4.533333 4.8 4.95 5 5.1 5.1 5.1 5.1 5.1
Nϒq
b/B
φ β
0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
0 200 200 200 200 200 200 200 200 200 200 200
40 20 88 103 104.6667 108 122.5 127.3333 137 145.5 154 159.6667 171
40 34 58.75 61.5 67 78.5 82.33333 90 99 108 119 141
Df/B=1
0 54 54 54 54 54 54 54 54 54 54 54
30 30 14 33.5 35.66667 40 45 46.66667 50 52 54 54 54
40 0.666667 26.66667 29.55556 35.33333 42 44.22222 48.66667 51.33333 54 54 54
0 76 76 76 76 76 76 76 76 76 76 76
40 20 16 41.5 44.33333 50 55.5 57.33333 61 65 69 70.33333 73
40 3 26.25 28.83333 34 43.5 46.66667 53 64 75 74 72
Df/B=0
0 16 16 16 16 16 16 16 16 16 16 16
30 30 2 8 8.666667 10 13 14 16 16 16 16 16
40 -2.66667 5.333333 6.222222 8 12 13.33333 16 16 16 16 16

Untuk mencari Ncq dan Nϒq, interpolasi sesuai data dengan tabel diatas
b= 1 Df = 1.3
diperoleh b/B = 0.833333 diperoleh Df/B = 1.083333
B = 1.2 B = 1.2
maka Ncq dan Nϒq adalah :
Ncq
0 4.811111
6.640741
1 6.5

Nϒq
0 6.222222
31.5
1 29.55556

c. Menghitung Daya Dukung Tanah


q ult = + 0.5.ϒ.B.Nϒq
= 745.4242 kN/m²
q all =
KONTROL :
= 248.4747 kN/m²
Pall > Fz
P all = q all X A 357.8036 < 485.1474 …NOT OK!
= 357.8036 kN

UTARI LAMBAIHANG [18021101151] Page 69


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Meyerhof (Beban Sentris) Dengan Penampang Berbeda-beda

Pehitungan b = 1 , B = 1.2 (b/B = 0.833)


b B L Df c ϒ b/B Df/B Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
1 1 1 1.3 57.08625 19.3825 1 1.3 7.006667 36.55556 754.2534 251.4178 251.4178 485.1474 TIDAK OK!!!
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 6.807071 33.79798 748.8893 249.6298 302.052 485.1474 TIDAK OK!!!
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 6.640741 31.5 745.4242 248.4747 357.8036 485.1474 TIDAK OK!!!
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 6.5 29.55556 743.42 247.8067 418.7933 485.1474 TIDAK OK!!!
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 6.379365 27.88889 742.5635 247.5212 485.1415 485.1474 TIDAK OK!!!
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 6.274815 26.44444 742.6252 247.5417 556.9689 485.1474 OK!!

Pehitungan b = 2 , B = 1.2 (b/B = 1.666)


b B L Df c ϒ b/B Df/B Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
2 1 1 1.3 57.08625 19.3825 2 1.3 7.348889 53.48889 937.8947 312.6316 312.6316 485.1474 TIDAK OK!!!
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 7.141414 49.83838 938.9724 312.9908 378.7189 485.1474 TIDAK OK!!!
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 6.968519 46.7963 942.0241 314.008 452.1716 485.1474 TIDAK OK!!!
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 6.822222 44.22222 946.5943 315.5314 533.2481 485.1474 OK!!
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 6.696825 42.01587 952.3575 317.4525 622.2069 485.1474 OK!!
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 6.588148 40.1037 959.0752 319.6917 719.3064 485.1474 OK!!

Pehitungan b = 3 , B = 1.2 (b/B = 2.5)


b B L Df c ϒ b/B Df/B Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
3 1 1 1.3 57.08625 19.3825 3 1.3 7.526667 61.93333 1029.881 343.2935 343.2935 485.1474 TIDAK OK!!!
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 7.306061 57.75758 1032.793 344.2643 416.5599 485.1474 TIDAK OK!!!
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 7.122222 54.27778 1037.804 345.9348 498.1461 485.1474 OK!!
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 6.966667 51.33333 1044.43 348.1434 588.3624 485.1474 OK!!
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 6.833333 48.80952 1052.325 350.7749 687.5189 485.1474 OK!!
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 6.717778 46.62222 1061.234 353.7447 795.9256 485.1474 OK!!

Pehitungan b = 4 , B = 1.2 (b/B = 3.333)


b B L Df c ϒ b/B Df/B Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
4 1 1 1.3 57.08625 19.3825 4 1.3 7.57 65.4 1065.951 355.3169 355.3169 485.1474 TIDAK OK!!!
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 7.345455 60.90909 1068.638 356.2127 431.0174 485.1474 TIDAK OK!!!
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 7.158333 57.16667 1073.462 357.8207 515.2618 485.1474 OK!!
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 7 54 1079.93 359.9765 608.3603 485.1474 OK!!
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 6.864286 51.28571 1087.688 362.5627 710.6229 485.1474 OK!!
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 6.746667 48.93333 1096.48 365.4932 822.3597 485.1474 OK!!

UTARI LAMBAIHANG [18021101151] Page 70


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE MEYERHOF
(BEBAN EKSENTRIS)
Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474 My = -4.2219
Dw= 2.6 c' = 57.08625 kN/m² b= 1 e= -0.0087
B= 1.2 ϒ' = 19.3825 kN/m² b= 2 B' = 1.217405
L= 1.2 = 19.3825 kN/m² b= 3 Af = 1.460886
β= 40 SF = 3 kN/m² b= 4 Re = 0.847837

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825
b. Menghitung Bearing Capacity Factor ( Foundations On Top Of Slope)
Diketahui data di atas β = 40 , maka kita menginterpolasi data tabel
Ncq
b/B
β
Ns 0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
30 6.4 6.7 6.733333 6.8 6.9 6.933333 7 7 7 7 7
Df/B=1 0 40 6 6.45 6.5 6.6 6.766667 6.822222 6.933333 6.966667 7 7 7
45 5.8 6.325 6.383333 6.5 6.7 6.766667 6.9 6.95 7 7 7
30 4.2 4.875 4.95 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1
Df/B=0 0 40 3.8666667 4.716667 4.811111 5 5.05 5.066667 5.1 5.1 5.1 5.1 5.1
60 3.2 4.4 4.533333 4.8 4.95 5 5.1 5.1 5.1 5.1 5.1

Nϒq
b/B
φ β
0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
0 200 200 200 200 200 200 200 200 200 200 200
40 20 88 103 104.6667 108 122.5 127.3333 137 145.5 154 159.6667 171
40 34 58.75 61.5 67 78.5 82.33333 90 99 108 119 141
Df/B=1
0 54 54 54 54 54 54 54 54 54 54 54
30 30 14 33.5 35.66667 40 45 46.66667 50 52 54 54 54
40 0.6666667 26.66667 29.55556 35.33333 42 44.22222 48.66667 51.33333 54 54 54
0 76 76 76 76 76 76 76 76 76 76 76
40 20 16 41.5 44.33333 50 55.5 57.33333 61 65 69 70.33333 73
40 3 26.25 28.83333 34 43.5 46.66667 53 64 75 74 72
Df/B=0
0 16 16 16 16 16 16 16 16 16 16 16
30 30 2 8 8.666667 10 13 14 16 16 16 16 16
40 -2.666667 5.333333 6.222222 8 12 13.33333 16 16 16 16 16

UTARI LAMBAIHANG [18021101151] Page 71


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Untuk mencari Ncq dan Nϒq, interpolasi sesuai data dengan tabel diatas
b= 1 Df = 1.3
diperoleh b/B = 0.833333 diperoleh Df/B = 1.083333
B = 1.2 B = 1.2
maka Ncq dan Nϒq adalah :

Ncq
0 4.811111
6.640741
1 6.5

Nϒq
0 6.222222
31.5
1 29.55556

c. Menghitung Daya Dukung Tanah

q ult = + 0.5.ϒ.B.Nϒq) x Re
= 631.9984 kN/m²

q all =
= 210.6661 kN/m²

P all = q all X A
= 303.3592 kN

KONTROL :
Pall > Fz
303.3592 < 485.1474 …NOT OK!

UTARI LAMBAIHANG [18021101151] Page 72


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Meyerhof (Beban Eksentris) Dengan Penampang Berbeda-beda

Pehitungan b = 1 , B = 1.2 (b/B = 0.833)

b B L Re Df c ϒ b/B Df/B
1 1 1 1.017405 1.3 57.08625 19.3825 1 1.3
1 1.1 1.1 0.924913 1.3 57.08625 19.3825 0.909091 1.181818
1 1.2 1.2 0.847837 1.3 57.08625 19.3825 0.833333 1.083333
1 1.3 1.3 0.782619 1.3 57.08625 19.3825 0.769231 1
1 1.4 1.4 0.726718 1.3 57.08625 19.3825 0.714286 0.928571
1 1.5 1.5 0.678270 1.3 57.08625 19.3825 0.666667 0.866667
Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
7.006667 36.55556 767.3808 255.7936 255.7936 485.1474 TIDAK OK!!!
6.807071 33.79798 692.6576 230.8859 279.3719 485.1474 TIDAK OK!!!
6.640741 31.5 631.9984 210.6661 303.3592 485.1474 TIDAK OK!!!
6.5 29.55556 581.8146 193.9382 327.7555 485.1474 TIDAK OK!!!
6.379365 27.88889 539.6339 179.878 352.5608 485.1474 TIDAK OK!!!
6.274815 26.44444 503.7002 167.9001 377.7752 485.1474 TIDAK OK!!!

Pehitungan b = 2 , B = 1.2 (b/B = 1.666)

b B L Re Df c ϒ b/B Df/B
2 1 1 1.017405 1.3 57.08625 19.3825 2 1.3
2 1.1 1.1 0.924913 1.3 57.08625 19.3825 1.818182 1.181818
2 1.2 1.2 0.847837 1.3 57.08625 19.3825 1.666667 1.083333
2 1.3 1.3 0.782619 1.3 57.08625 19.3825 1.538462 1
2 1.4 1.4 0.726718 1.3 57.08625 19.3825 1.428571 0.928571
2 1.5 1.5 0.678270 1.3 57.08625 19.3825 1.333333 0.866667
Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
7.348889 53.48889 954.2184 318.0728 318.0728 485.1474 TIDAK OK!!!
7.141414 49.83838 868.4681 289.4894 350.2821 485.1474 TIDAK OK!!!
6.968519 46.7963 798.6831 266.2277 383.3679 485.1474 TIDAK OK!!!
6.822222 44.22222 740.8226 246.9409 417.3301 485.1474 TIDAK OK!!!
6.696825 42.01587 692.0949 230.6983 452.1687 485.1474 TIDAK OK!!!
6.588148 40.1037 650.5117 216.8372 487.8838 485.1474 OK!!

UTARI LAMBAIHANG [18021101151] Page 73


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Pehitungan b = 3 , B = 1.2 (b/B = 2.5)

b B L Re Df c ϒ b/B Df/B
3 1 1 1.017405 1.3 57.08625 19.3825 3 1.3
3 1.1 1.1 0.924913 1.3 57.08625 19.3825 2.727273 1.181818
3 1.2 1.2 0.847837 1.3 57.08625 19.3825 2.5 1.083333
3 1.3 1.3 0.782619 1.3 57.08625 19.3825 2.307692 1
3 1.4 1.4 0.726718 1.3 57.08625 19.3825 2.142857 0.928571
3 1.5 1.5 0.678270 1.3 57.08625 19.3825 2 0.866667
Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
7.526667 61.93333 1047.805 349.2684 349.2684 485.1474 TIDAK OK!!!
7.306061 57.75758 955.244 318.4147 385.2817 485.1474 TIDAK OK!!!
7.122222 54.27778 879.8891 293.2964 422.3468 485.1474 TIDAK OK!!!
6.966667 51.33333 817.3909 272.4636 460.4635 485.1474 TIDAK OK!!!
6.833333 48.80952 764.7429 254.9143 499.632 485.1474 OK!!
6.717778 46.62222 719.803 239.9343 539.8523 485.1474 OK!!

Pehitungan b = 4 , B = 1.2 (b/B = 3.333)

b B L Re Df c ϒ b/B Df/B
4 1 1 1.017405 1.3 57.08625 19.3825 4 1.3
4 1.1 1.1 0.924913 1.3 57.08625 19.3825 3.636364 1.181818
4 1.2 1.2 0.847837 1.3 57.08625 19.3825 3.333333 1.083333
4 1.3 1.3 0.782619 1.3 57.08625 19.3825 3.076923 1
4 1.4 1.4 0.726718 1.3 57.08625 19.3825 2.857143 0.928571
4 1.5 1.5 0.678270 1.3 57.08625 19.3825 2.666667 0.866667
Ncq Nϒq qult qall pall Fz KONTROL (pall > Fz)
7.57 65.4 1084.503 361.501 361.501 485.1474 TIDAK OK!!!
7.345455 60.90909 988.3977 329.4659 398.6537 485.1474 TIDAK OK!!!
7.158333 57.16667 910.1211 303.3737 436.8581 485.1474 TIDAK OK!!!
7 54 845.1733 281.7244 476.1143 485.1474 TIDAK OK!!!
6.864286 51.28571 790.442 263.4807 516.4221 485.1474 OK!!
6.746667 48.93333 743.709 247.903 557.7817 485.1474 OK!!

UTARI LAMBAIHANG [18021101151] Page 74


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE MEYERHOF
(BEBAN INKLINASI)
Diketahui : Pengaruh beban inklinasi
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474 b= 2
Dw= 2.6 c' = 57.08625 kN/m² Fx = HB = -3.3526 b= 3
B= 1.2 ϒ' = 19.3825 kN/m² Fy = HL = 20.4114 b= 4
L= 1.2 = 19.3825 kN/m² My = -4.2219
β= 40 SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)
a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Menghitung Bearing Capacity Factor ( Foundations On Top Of Slope)


Diketahui data di atas β = 40 , maka kita menginterpolasi data tabel
Ncq
b/B
β
Ns 0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
30 6.4 6.7 6.733333 6.8 6.9 6.933333 7 7 7 7 7
Df/B=1 0 40 6 6.45 6.5 6.6 6.766667 6.822222 6.933333 6.966667 7 7 7
45 5.8 6.325 6.383333 6.5 6.7 6.766667 6.9 6.95 7 7 7
30 4.2 4.875 4.95 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1
Df/B=0 0 40 3.866667 4.716667 4.811111 5 5.05 5.066667 5.1 5.1 5.1 5.1 5.1
60 3.2 4.4 4.533333 4.8 4.95 5 5.1 5.1 5.1 5.1 5.1
Nϒq
b/B
φ β
0 0.75 0.833333 1 1.5 1.666667 2 2.5 3 3.333333 4
0 200 200 200 200 200 200 200 200 200 200 200
40 20 88 103 104.6667 108 122.5 127.3333 137 145.5 154 159.6667 171
40 34 58.75 61.5 67 78.5 82.33333 90 99 108 119 141
Df/B=1
0 54 54 54 54 54 54 54 54 54 54 54
30 30 14 33.5 35.66667 40 45 46.66667 50 52 54 54 54
40 0.666667 26.66667 29.55556 35.33333 42 44.22222 48.66667 51.33333 54 54 54
0 76 76 76 76 76 76 76 76 76 76 76
40 20 16 41.5 44.33333 50 55.5 57.33333 61 65 69 70.33333 73
40 3 26.25 28.83333 34 43.5 46.66667 53 64 75 74 72
Df/B=0
0 16 16 16 16 16 16 16 16 16 16 16
30 30 2 8 8.666667 10 13 14 16 16 16 16 16
40 -2.66667 5.333333 6.222222 8 12 13.33333 16 16 16 16 16

UTARI LAMBAIHANG [18021101151] Page 75


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
Untuk mencari Ncq dan Nϒq, interpolasi sesuai data dengan tabel diatas
b= 2 Df = 1.3
diperoleh b/B = 1.666667 diperoleh Df/B = 1.083333
B = 1.2 B = 1.2

maka Ncq dan Nϒq adalah :

Ncq
0 5.05
6.909722
1 6.766667

Nϒq
0 12
44.5
1 42.00

c. Mencari Ic dan Iϒ

1. PENGARUH LEBAR :

tan β =
Fz = 485.1474
tan β = -0.00691
HB = -3.3526 β = -0.39593 ˚

= =

= 1.00882 = 1.02489

2. PENGARUH PANJANG

tan β =
Fz = 485.1474
tan β = 0.042073
HL = 20.4114 β = 2.40916

= =

= 0.94718 = 0.85515

UTARI LAMBAIHANG [18021101151] Page 76


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
d. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = + 0.5.ϒ.B.Nϒq.Iϒ
= 928.3216 kN/m²

q all =
= 309.4405 kN/m²

P all = q all X A
= 445.5944 kN

2. PENGARUH PANJANG :

q ult = + 0.5.ϒ.B.Nϒq.Iϒ
= 816.1661 kN/m²

q all =

= 272.0554 kN/m²

P all = q all X A
= 391.7597 kN

KONTROL :
Pall > Fz
445.5944 < 485.1474 …NOT OK!

UTARI LAMBAIHANG [18021101151] Page 77


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Meyerhof (Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

Pehitungan b = 2 , B = 1.2 (b/B = 1.666)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
2 1 1 1.3 57.08625 19.3825 2 1.3 7.281667 51 1.008818 1.024889 925.9038 308.6346 308.6346 485.1474 TIDAK OK!!!
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 7.078788 47.45455 1.008818 1.024889 926.1391 308.713 373.5428 485.1474 TIDAK OK!!!
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 6.909722 44.5 1.008818 1.024889 928.3216 309.4405 445.5944 485.1474 TIDAK OK!!!
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 6.766667 42 1.008818 1.024889 932.002 310.6673 525.0278 485.1474 OK!!
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 6.644048 39.85714 1.008818 1.024889 936.8594 312.2865 612.0815 485.1474 OK!!
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 6.537778 38 1.008818 1.024889 942.6583 314.2194 706.9937 485.1474 OK!!

Pehitungan b = 3 , B = 1.2 (b/B = 2.5)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
3 1 1 1.3 57.08625 19.3825 3 1.3 7.526667 61.93333 1.008818 1.024889 1048.608 349.5361 349.5361 485.1474 TIDAK OK!!!
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 7.306061 57.75758 1.008818 1.024889 1051.795 350.5985 424.2242 485.1474 TIDAK OK!!!
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 7.122222 54.27778 1.008818 1.024889 1057.1 352.3667 507.4081 485.1474 OK!!
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 6.966667 51.33333 1.008818 1.024889 1064.034 354.6779 599.4057 485.1474 OK!!
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 6.833333 48.80952 1.008818 1.024889 1072.247 357.4157 700.5348 485.1474 OK!!
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 6.717778 46.62222 1.008818 1.024889 1081.484 360.4947 811.1132 485.1474 OK!!

Pehitungan b = 4 , B = 1.2 (b/B = 3.333)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
4 1 1 1.3 57.08625 19.3825 4 1.3 7.57 65.4 1.008818 1.024889 1085.536 361.8454 361.8454 485.1474 TIDAK OK!!!
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 7.345455 60.90909 1.008818 1.024889 1088.497 362.8322 439.027 485.1474 TIDAK OK!!!
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 7.158333 57.16667 1.008818 1.024889 1093.612 364.5375 524.9339 485.1474 OK!!
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 7 54 1.008818 1.024889 1100.386 366.7953 619.8841 485.1474 OK!!
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 6.864286 51.28571 1.008818 1.024889 1108.462 369.4874 724.1953 485.1474 OK!!
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 6.746667 48.93333 1.008818 1.024889 1117.58 372.5268 838.1853 485.1474 OK!!

UTARI LAMBAIHANG [18021101151] Page 78


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Meyerhof (Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

Pehitungan b = 2 , B = 1.2 (b/B = 1.666)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
2 1 1 1.3 57.08625 19.3825 2 1.3 7.281667 51 0.94718 0.85515 816.3876 272.1292 272.1292 485.1474 TIDAK OK!!!
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 7.078788 47.45455 0.94718 0.85515 815.3627 271.7876 328.8629 485.1474 TIDAK OK!!!
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 6.909722 44.5 0.94718 0.85515 816.1661 272.0554 391.7597 485.1474 TIDAK OK!!!
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 6.766667 42 0.94718 0.85515 818.3759 272.792 461.0184 485.1474 TIDAK OK!!!
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 6.644048 39.85714 0.94718 0.85515 821.6908 273.8969 536.838 485.1474 OK!!
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 6.537778 38 0.94718 0.85515 825.8896 275.2965 619.4172 485.1474 OK!!

Pehitungan b = 3 , B = 1.2 (b/B = 2.5)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
3 1 1 1.3 57.08625 19.3825 3 1.3 7.526667 61.93333 0.94718 0.85515 920.2446 306.7482 306.7482 485.1474 TIDAK OK!!!
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 7.306061 57.75758 0.94718 0.85515 921.5762 307.1921 371.7024 485.1474 TIDAK OK!!!
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 7.122222 54.27778 0.94718 0.85515 924.8958 308.2986 443.95 485.1474 TIDAK OK!!!
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 6.966667 51.33333 0.94718 0.85515 929.7448 309.9149 523.7562 485.1474 OK!!
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 6.833333 48.80952 0.94718 0.85515 935.7953 311.9318 611.3862 485.1474 OK!!
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 6.717778 46.62222 0.94718 0.85515 942.807 314.269 707.1053 485.1474 OK!!

Pehitungan b = 4 , B = 1.2 (b/B = 3.333)


b B L Df c ϒ b/B Df/B Ncq Nϒq Ic Iϒ qult qall pall Fz KONTROL (pall > Fz)
4 1 1 1.3 57.08625 19.3825 4 1.3 7.57 65.4 0.94718 0.85515 951.3176 317.1059 317.1059 485.1474 TIDAK OK!!!
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 7.345455 60.90909 0.94718 0.85515 952.4362 317.4787 384.1493 485.1474 TIDAK OK!!!
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 7.158333 57.16667 0.94718 0.85515 955.5783 318.5261 458.6776 485.1474 TIDAK OK!!!
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 7 54 0.94718 0.85515 960.277 320.0923 540.9561 485.1474 OK!!
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 6.864286 51.28571 0.94718 0.85515 966.1988 322.0663 631.2499 485.1474 OK!!
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 6.746667 48.93333 0.94718 0.85515 973.099 324.3663 729.8242 485.1474 OK!!

UTARI LAMBAIHANG [18021101151] Page 79


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN
(BEBAN SENTRIS)
Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)
a. Menghitung Nilai Overburden Pressure

= 19.3825
b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.653349 dc = 1.433333

= 1.530104 = 1.299085

= 0.6 =1

UTARI LAMBAIHANG [18021101151] Page 80


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Hitung Bearing Capacity Factor ( Foundations On Top Of Slope)


Untuk mencari Nc dan Nq, interpolasi sesuai data dengan tabel diatas
b= 1 Df = 1.3
diperoleh b/B = 0.833333 diperoleh Df/B = 1.083333
B = 1.2 B = 1.2
ϕ = 32.0125 berada diantara 30 dan 40 maka di Interpolasi dan mendapatkan hasil yaitu :
Df/B = 0.75 Df/B = 1.5
b/B = 0.75 b/B = 1.5

1.Nilai Nc
β φ β φ
30 32.0125 40 30 32.0125 40
30 30.14 36.96238 64.04 30 30.14 39.23046 75.31
40 28.07333 34.08266 57.93333 40 30.14 38.39662 71.16667
60 23.94 28.32323 45.72 60 30.14 36.72893 62.88

b/B = 0.8333 , Df/B = 1.08333 berada di antara 0.75 dan 1.5


Nc
0.75 34.08266
35.99997
1.5 38.39662

2.Nilai Nq
β φ β φ
30 32.0125 40 30 32.0125 40
30 14.52 19.39025 38.72 30 18.4 25.28879 52.63
40 13.03 17.11605 33.33333 40 17.84 23.7373 47.14333
60 10.05 12.56764 22.56 60 16.72 20.63431 36.17

b/B = 0.8333 , Df/B = 1.08333 berada di antara 0.75 dan 1.5


Nq
0.75 17.11605
20.05882
1.5 23.7373

UTARI LAMBAIHANG [18021101151] Page 81


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3.Nilai Nϒ'

untuk mencari Kpmax digunakan : α = 90 , β = 40 , ф= δ = 32.0125

Kpmax = 0.1978
untuk mencari Kpmin digunakan : α = 90 , β = - 40 , ф= δ = 32.0125

Kpmin = 0.2982

R = 1.507944
Nϒ = 20.80674

= 22.92047

d. Menghitung Daya Dukung Tanah

q ult = .Nq.Sq.dq + 0.5.ϒ.B.Nϒ.Sϒ.dϒ


= 5802.93 kN/m²

q all =
KONTROL :
= 1934.31 kN/m²
Pall > Fz
2785.406 > 485.1474 … OK!
P all = q all X A
= 2785.406 kN

UTARI LAMBAIHANG [18021101151] Page 82


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Hansen (Beban Sentris) Dengan Penampang Berbeda-beda

b=1
b B L Df c ϒ b/B Df/B sc sq sϒ
1 1 1 1.3 57.08625 19.3825 19.3825 1 1.3 1.653349 1.530104 0.600
1 1.1 1.1 1.3 57.08625 19.3825 19.3825 0.909091 1.181818 1.653349 1.530104 0.600
1 1.2 1.2 1.3 57.08625 19.3825 19.3825 0.833333 1.083333 1.653349 1.530104 0.600
1 1.3 1.3 1.3 57.08625 19.3825 19.3825 0.769231 1 1.653349 1.530104 0.600
1 1.4 1.4 1.3 57.08625 19.3825 19.3825 0.714286 0.928571 1.653349 1.530104 0.600
1 1.5 1.5 1.3 57.08625 19.3825 19.3825 0.666667 0.866667 1.653349 1.530104 0.600
dc dq dϒ Nc Nq Nϒ qult qall pall Fz KONTROL (pall > Fz)
1.5200 1.358902 1.000 37.24623 21.97163 23.4489 6365.288 2121.763 2121.763 485.1474 OK!!
1.4727 1.326275 1.000 36.56645 20.92828 23.18468 6054.26 2018.087 2441.885 485.1474 OK!!
1.4333 1.299085 1.000 35.99997 20.05882 22.92047 5802.93 1934.31 2785.406 485.1474 OK!!
1.4000 1.276079 1.000 35.52064 19.32313 22.65625 5596.134 1865.378 3152.489 485.1474 OK!!
1.3714 1.256359 1.000 35.10979 18.69253 22.39203 5423.392 1807.797 3543.283 485.1474 OK!!
1.3467 1.239268 1.000 34.75372 18.14602 22.12782 5277.234 1759.078 3957.925 485.1474 OK!!

b=2

b B L Df c ϒ b/B Df/B sc sq sϒ
2 1.4 1.4 1.3 57.08625 19.3825 19.3825 1.428571 0.928571 1.653349 1.530104 0.600
2 1.5 1.5 1.3 57.08625 19.3825 19.3825 1.333333 0.866667 1.653349 1.530104 0.600
dc dq dϒ Nc Nq Nϒ qult qall pall Fz KONTROL (pall > Fz)
1.3714 1.256359 1.000 35.1098 18.69253 18.693 5393.28 1797.76 3523.609 485.1474 OK!!
1.3467 1.239268 1.000 34.7537 18.14602 18.16457 5242.666 1747.555 3931.999 485.1474 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 83


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC
(BEBAN SENTRIS)
Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²

Pengaruh Muka Air Tanah

H= 1.082707 H < d1 ( lapis tanah tidak berpengaruh


d1 = 1.70 pada pondasi)

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Hitung Faktor Bentuk Pondasi (Shape Factor) c. Hitung Faktor Kedalaman Pondasi (D)

Sc = 1.653349 dc = 1.433333

= 1.530104 = 1.299085

= 0.6 =1

UTARI LAMBAIHANG [18021101151] Page 84


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Hitung Bearing Capacity Factor ( Foundations On Top Of Slope)


Untuk mencari Nc dan Nq, interpolasi sesuai data dengan tabel diatas
b= 1 Df = 1.3
diperoleh b/B = 0.833333 diperoleh Df/B = 1.083333
B = 1.2 B = 1.2
ϕ = 32.0125 berada diantara 30 dan 40 maka di Interpolasi dan mendapatkan hasil yaitu :
Df/B = 0.75 Df/B = 1.5
b/B = 0.75 b/B = 1.5

1.Nilai Nc
β φ β φ
30 32.0125 40 30 32.0125 40
30 30.14 36.96238 64.04 30 30.14 39.23046 75.31
40 28.07333 34.08266 57.93333 40 30.14 38.39662 71.16667
60 23.94 28.32323 45.72 60 30.14 36.72893 62.88

b/B = 0.8333 , Df/B = 1.08333 berada di antara 0.75 dan 1.5


Nc
0.75 34.08266
35.99997
1.5 38.39662

2.Nilai Nq
β φ β φ
30 32.0125 40 30 32.0125 40
30 14.52 19.39025 38.72 30 18.4 25.28879 52.63
40 13.03 17.11605 33.33333 40 17.84 23.7373 47.14333
60 10.05 12.56764 22.56 60 16.72 20.63431 36.17

b/B = 0.8333 , Df/B = 1.08333 berada di antara 0.75 dan 1.5


Nq
0.75 17.11605
20.05882
1.5 23.7373

UTARI LAMBAIHANG [18021101151] Page 85


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3.Nilai Nϒ'

untuk mencari Kpmax digunakan : α = 90 , β = 40 , ф= δ = 32.0125

Kpmax = 0.1978
untuk mencari Kpmin digunakan : α = 90 , β = - 40 , ф= δ = 32.0125

Kpmin = 0.2982

R = 1.507944
Nϒ = 30.243

= 33.31535
d. Menghitung Daya Dukung Tanah

q ult = .Nq.Sq.dq + 0.5.ϒ.B.Nϒ.Sϒ.dϒ


= 5875.462 kN/m²

q all =
KONTROL :
= 1958.487 kN/m² Pall > Fz
2820.222 > 485.1474 … OK!
P all = q all X A
= 2820.222 kN

UTARI LAMBAIHANG [18021101151] Page 86


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Pada Puncak Lereng Metode Vesic (Beban Sentris) Dengan Penampang Berbeda-beda

b=1

b B L Df c ϒ b/B Df/B sc sq sϒ
1 1 1 1.3 57.08625 19.3825 19.3825 1 1.3 1.653349 1.530104 0.600
1 1.1 1.1 1.3 57.08625 19.3825 19.3825 0.909091 1.181818 1.653349 1.530104 0.600
1 1.2 1.2 1.3 57.08625 19.3825 19.3825 0.833333 1.083333 1.653349 1.530104 0.600
1 1.3 1.3 1.3 57.08625 19.3825 19.3825 0.769231 1 1.653349 1.530104 0.600
1 1.4 1.4 1.3 57.08625 19.3825 19.3825 0.714286 0.928571 1.653349 1.530104 0.600
1 1.5 1.5 1.3 57.08625 19.3825 19.3825 0.666667 0.866667 1.653349 1.530104 0.600
dc dq dϒ Nc Nq Nϒ qult qall pall Fz KONTROL (pall > Fz)
1.5200 1.358902 1.000 37.24623 21.97163 34.08344 6427.125 2142.375 2142.375 485.1474 OK!!
1.4727 1.326275 1.000 36.56645 20.92828 33.6994 6121.514 2040.505 2469.011 485.1474 OK!!
1.4333 1.299085 1.000 35.99997 20.05882 33.31535 5875.462 1958.487 2820.222 485.1474 OK!!
1.4000 1.276079 1.000 35.52064 19.32313 32.93131 5673.805 1891.268 3196.244 485.1474 OK!!
1.3714 1.256359 1.000 35.10979 18.69253 32.54727 5506.062 1835.354 3597.294 485.1474 OK!!
1.3467 1.239268 1.000 34.75372 18.14602 32.16322 5364.764 1788.255 4023.573 485.1474 OK!!

b=2
b B L Df c ϒ b/B Df/B sc sq sϒ
2 1.4 1.4 1.3 57.08625 19.3825 19.3825 1.428571 0.928571 1.653349 1.530104 0.600
2 1.5 1.5 1.3 57.08625 19.3825 19.3825 1.333333 0.866667 1.653349 1.530104 0.600
dc dq dϒ Nc Nq Nϒ qult qall pall Fz KONTROL (pall > Fz)
1.3714 1.256359 1.000 35.1098 18.69253 27.17065 5462.293 1820.764 3568.698 485.1474 OK!!
1.3467 1.239268 1.000 34.7537 18.14602 26.40257 5314.519 1771.506 3985.889 485.1474 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 87


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

PERHITUNGAN DAYA DUKUNG PONDASI PADA PUNCAK LERENG DENGAN PENGARUH GEMPA
PERHITUNGAN DAYA DUKUNG PONDASI PADA LERENG DENGAN PENGARUH GEMPA

Dik :
PGA = A0 = 0.456
I1 = 1
I= 1
I2 = 1
Kh = 0.2(I+1)A0
= 0.1824
Kv = 2/3Kh
= 0.1216
ϕ= 32.0125
θ=

= 13.03419

KPE =

= 3.151443

tan αp =

= 0.106383

αp = 6.072456
α3 =

= 40.40162

UTARI LAMBAIHANG [18021101151] Page 88


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

1. METODE MEYERHOF (Beban Sentris)

Diketahui :
Df = 1.3 ϕ' = 32.0125 ˚ Fz = 485.1474
Dw= 2.6 c' = 57.08625 kN/m²
B= 1.2 ϒ' = 19.3825 kN/m²
L= 1.2 = 19.3825 kN/m²
SF = 3 kN/m²

a. Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 1.57644
Nɣe =

= 5.9835

UTARI LAMBAIHANG [18021101151] Page 89


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b.Menghitung
c. Bearing Capacity Equation
Daya Dukung : :
Tanah
q ult =
= 72.19985 kN/m²

q all =

= 24.06662 kN/m²

P all = q all X A
= 34.65593 kN

Seismic Safety Factor :

KONTROL SAFETY FACTOR > 1.25

= 0.2274 < 1.25 . NOT OK

(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 90


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Metode Meyerhof Pada Puncak Lereng Dengan Pengaruh Gempa Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βɣ
1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 1.57644
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 1.57644
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 1.57644
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 1.57644
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 1.57644
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 1.57644
Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 6.94381 76.87027 25.62342 25.62342 485.1474 0.165 NOT OK!!!
0.000599 6.42001 68.4739 22.82463 27.61781 485.1474 0.179 NOT OK!!!
0.045803 5.98350 72.19985 24.06662 34.65593 485.1474 0.227 NOT OK!!!
0.277648 5.61415 86.58045 28.86015 48.77365 485.1474 0.323 NOT OK!!!
0.004866 5.29756 72.15376 24.05125 47.14045 485.1474 0.316 NOT OK!!!
0.10935 5.02319 79.2638 26.42127 59.44785 485.1474 0.404 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
2 1 1 1.3 57.08625 19.3825 2 1.3 3.052096 1.7853 1.57644
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 3.227306 7.4195 1.57644
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 3.402515 3.0834 1.57644
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 3.577725 1.2814 1.57644
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 1.57644
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 1.57644
Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.16034 108.0424 36.01415 36.01415 485.1474 0.232 NOT OK!!!
0.000599 9.46692 100.9551 33.65171 40.71857 485.1474 0.265 NOT OK!!!
0.045803 8.88907 105.9901 35.33005 50.87527 485.1474 0.334 NOT OK!!!
0.277648 8.40012 121.6798 40.55994 68.5463 485.1474 0.455 NOT OK!!!
0.004866 7.98101 108.5622 36.1874 70.9273 485.1474 0.476 NOT OK!!!
0.10935 7.61779 116.9813 38.99377 87.73598 485.1474 0.596 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 91


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b B L Df c ϒ b/B Df/B HE βc βɣ
3 1 1 1.3 57.08625 19.3825 3 1.3 3.052096 1.7853 1.57644
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 3.227306 7.4195 1.57644
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 3.402515 3.0834 1.57644
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 3.577725 1.2814 1.57644
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 3.752935 5.3255 1.57644
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 2.284872 2.2132 1.57644

Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 11.76438 123.5876 41.19587 41.19587 485.1474 0.265 NOT OK!!!
0.000599 10.97119 116.9912 38.99707 47.18645 485.1474 0.307 NOT OK!!!
0.045803 10.31019 122.5171 40.83904 58.80822 485.1474 0.386 NOT OK!!!
0.277648 9.75089 138.6977 46.23256 78.13303 485.1474 0.518 NOT OK!!!
0.004866 9.27148 126.071 42.02366 82.36637 485.1474 0.553 NOT OK!!!
0.10935 8.85600 134.981 44.99366 101.2357 485.1474 0.688 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
4 1 1 1.3 57.08625 19.3825 4 1.3 3.052096 1.7853 1.57644
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 3.227306 7.4195 1.57644
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 3.402515 3.0834 1.57644
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 3.577725 1.2814 1.57644
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 3.752935 5.3255 1.57644
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 2.284872 2.2132 1.57644
Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 12.42289 129.9693 43.32311 43.32311 485.1474 0.279 NOT OK!!!
0.000599 11.56983 123.3729 41.1243 49.76041 485.1474 0.323 NOT OK!!!
0.045803 10.85894 128.8988 42.96628 61.87144 485.1474 0.406 NOT OK!!!
0.277648 10.25743 145.0794 48.3598 81.72806 485.1474 0.542 NOT OK!!!
0.004866 9.74184 132.4527 44.15089 86.53574 485.1474 0.581 NOT OK!!!
0.10935 9.29500 141.3627 47.1209 106.022 485.1474 0.720 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 92


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE MEYERHOF (eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.914842

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 1.57644
Nɣe =

= 5.9835

c. Menghitung Daya Dukung Tanah :


b. Bearing Capacity Equation :
Seismic Safety Factor :
q ult = ( X Re
= 66.05144 kN/m² KONTROL SAFETY FACTOR > 1.25

q all =
=
= 22.01715 kN/m²
= 0.2080 < 1.25 .. NOT OK

P all = q all X A (PONDASI TIDAK DAPAT DIGUNAKAN)


= 31.70469 kN

UTARI LAMBAIHANG [18021101151] Page 93


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pondasi Metode Meyerhof Pada Puncak Lereng Dengan Pengaruh Gempa Dengan Penampang Berbeda-beda

b B L Df e Re c ϒ b/B Df/B HE βc βɣ
1 1 1 1.3 -0.0087 0.906714 57.08625 19.3825 1 1.3 3.052096 1.7853 1.57644
1 1.1 1.1 1.3 -0.0087 0.911055 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 1.57644
1 1.2 1.2 1.3 -0.0087 0.914842 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 1.57644
1 1.3 1.3 1.3 -0.0087 0.918183 57.08625 19.3825 0.769231 1 3.577725 1.2814 1.57644
1 1.4 1.4 1.3 -0.0087 0.921159 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 1.57644
1 1.5 1.5 1.3 -0.0087 0.923832 57.08625 19.3825 0.666667 0.866667 2.284872 2.2132 1.57644

Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 6.94381 69.69934 23.23311 23.23311 485.1474 0.150 NOT OK!!!
0.000599 6.42001 62.3835 20.7945 25.16134 485.1474 0.163 NOT OK!!!
0.045803 5.98350 66.05144 22.01715 31.70469 485.1474 0.208 NOT OK!!!
0.277648 5.61415 79.49666 26.49889 44.78312 485.1474 0.297 NOT OK!!!
0.004866 5.29756 66.46507 22.15502 43.42384 485.1474 0.291 NOT OK!!!
0.10935 5.02319 73.22645 24.40882 54.91984 485.1474 0.373 NOT OK!!!

b B L Df e Re c ϒ b/B Df/B HE βc βɣ
2 1 1 1.3 -0.0087 0.906714 57.08625 19.3825 2 1.3 3.052096 1.7853 1.57644
2 1.1 1.1 1.3 -0.0087 0.911055 57.08625 19.3825 1.818182 1.181818 3.227306 7.4195 1.57644
2 1.2 1.2 1.3 -0.0087 0.914842 57.08625 19.3825 1.666667 1.083333 3.402515 3.0834 1.57644
2 1.3 1.3 1.3 -0.0087 0.918183 57.08625 19.3825 1.538462 1 3.577725 1.2814 1.57644
2 1.4 1.4 1.3 -0.0087 0.921159 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 1.57644
2 1.5 1.5 1.3 -0.0087 0.923832 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 1.57644

Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.16034 97.96358 32.65453 32.65453 485.1474 0.210 NOT OK!!!
0.000599 9.46692 91.97569 30.65856 37.09686 485.1474 0.241 NOT OK!!!
0.045803 8.88907 96.96422 32.32141 46.54282 485.1474 0.305 NOT OK!!!
0.277648 8.40012 111.7243 37.24143 62.93802 485.1474 0.417 NOT OK!!!
0.004866 7.98101 100.003 33.33434 65.33531 485.1474 0.438 NOT OK!!!
0.10935 7.61779 108.0711 36.0237 81.05332 485.1474 0.551 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 94


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b B L Df e Re c ϒ b/B Df/B HE βc βɣ
3 1 1 1.3 -0.0087 0.906714 57.08625 19.3825 3 1.3 3.052096 1.7853 1.57644
3 1.1 1.1 1.3 -0.0087 0.911055 57.08625 19.3825 2.727273 1.181818 3.227306 7.4195 1.57644
3 1.2 1.2 1.3 -0.0087 0.914842 57.08625 19.3825 2.5 1.083333 3.402515 3.0834 1.57644
3 1.3 1.3 1.3 -0.0087 0.918183 57.08625 19.3825 2.307692 1 3.577725 1.2814 1.57644
3 1.4 1.4 1.3 -0.0087 0.921159 57.08625 19.3825 2.142857 0.928571 3.752935 5.3255 1.57644
3 1.5 1.5 1.3 -0.0087 0.923832 57.08625 19.3825 2 0.866667 2.284872 2.2132 1.57644

Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 11.76438 112.0586 37.35287 37.35287 485.1474 0.241 NOT OK!!!
0.000599 10.97119 106.5854 35.52848 42.98946 485.1474 0.279 NOT OK!!!
0.045803 10.31019 112.0838 37.36126 53.80022 485.1474 0.353 NOT OK!!!
0.277648 9.75089 127.3498 42.44994 71.74039 485.1474 0.476 NOT OK!!!
0.004866 9.27148 116.1314 38.71046 75.8725 485.1474 0.509 NOT OK!!!
0.10935 8.85600 124.6998 41.56659 93.52483 485.1474 0.635 NOT OK!!!

b B L Df e Re c ϒ b/B Df/B HE βc βɣ
4 1 1 1.3 -0.0087 0.906714 57.08625 19.3825 4 1.3 3.052096 1.7853 1.57644
4 1.1 1.1 1.3 -0.0087 0.911055 57.08625 19.3825 3.636364 1.181818 3.227306 7.4195 1.57644
4 1.2 1.2 1.3 -0.0087 0.914842 57.08625 19.3825 3.333333 1.083333 3.402515 3.0834 1.57644
4 1.3 1.3 1.3 -0.0087 0.918183 57.08625 19.3825 3.076923 1 3.577725 1.2814 1.57644
4 1.4 1.4 1.3 -0.0087 0.921159 57.08625 19.3825 2.857143 0.928571 3.752935 5.3255 1.57644
4 1.5 1.5 1.3 -0.0087 0.923832 57.08625 19.3825 2.666667 0.866667 2.284872 2.2132 1.57644

Nce Nɣe q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 12.42289 117.8450 39.28166 39.28166 485.1474 0.253 NOT OK!!!
0.000599 11.56983 112.3995 37.46651 45.33448 485.1474 0.295 NOT OK!!!
0.045803 10.85894 117.9220 39.30734 56.60258 485.1474 0.371 NOT OK!!!
0.277648 10.25743 133.2094 44.40313 75.04128 485.1474 0.498 NOT OK!!!
0.004866 9.74184 122.0099 40.66998 79.71316 485.1474 0.535 NOT OK!!!
0.10935 9.29500 130.5954 43.5318 97.94655 485.1474 0.665 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 95


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE MEYERHOF (Inklinasi)


DIKETAHUI : Pengaruh beban Inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114
L= 1.2 m = 19.3825 kN/m² My = -4.2219
SF = 3 kN/m²

a. Menghitung Nilai Overburden Pressure

= 19.3825

b. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 1.57644
Nɣe =

= 5.9835

UTARI LAMBAIHANG [18021101151] Page 96


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Mencari Ic dan Iϒ

1. PENGARUH LEBAR :

tan β =
Fz = 485.1474
tan β = -0.00691
HB = -3.3526 β = -0.39593 ˚

= =

= 1.00882 = 1.02489

2. PENGARUH PANJANG

tan β =
Fz = 485.1474
tan β = 0.042073
HL = 20.4114 β = 2.40916

= =

= 0.94718 = 0.85515

UTARI LAMBAIHANG [18021101151] Page 97


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
d. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = + 0.5.ϒ.B.NϒE.Iϒ
= 73.95482 kN/m²

q all =

= 24.65161 kN/m²

P all = q all X A
= 35.49832 kN

2. PENGARUH PANJANG :

q ult = + 0.5.ϒ.B.NϒE.Iϒ
= 61.98232 kN/m²

q all =

= 20.66077 kN/m²

P all = q all X A
= 29.75152 kN

Seismic Safety Factor :

KONTROL SAFETY FACTOR > 1.25

= 0.2329 < 1.25 .. NOT OK

(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 98


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Meyerhof


(Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βɣ
1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 1.57644
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 1.57644
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 1.57644
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 1.57644
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 1.57644
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 6.94381 1.00882 1.02489 78.62962 26.20987 26.20987 485.1474 0.169 NOT OK!!!
0.000599 6.42001 1.00882 1.02489 70.17761 23.39254 28.30497 485.1474 0.184 NOT OK!!!
0.045803 5.98350 1.00882 1.02489 73.95482 24.65161 35.49832 485.1474 0.233 NOT OK!!!
0.277648 5.61415 1.00882 1.02489 88.48064 29.49355 49.84409 485.1474 0.331 NOT OK!!!
0.004866 5.29756 1.00882 1.02489 73.94514 24.64838 48.31083 485.1474 0.324 NOT OK!!!
0.10935 5.02319 1.00882 1.02489 81.1363 27.04543 60.85222 485.1474 0.413 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
2 1 1 1.3 57.08625 19.3825 2 1.3 3.052096 1.7853 1.57644
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 3.227306 7.4195 1.57644
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 3.402515 3.0834 1.57644
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 3.577725 1.2814 1.57644
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 1.57644
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.16034 1.00882 1.02489 110.5776 36.85921 36.85921 485.1474 0.237 NOT OK!!!
0.000599 9.46692 1.00882 1.02489 103.4673 34.48909 41.7318 485.1474 0.271 NOT OK!!!
0.045803 8.88907 1.00882 1.02489 108.5861 36.19538 52.12135 485.1474 0.342 NOT OK!!!
0.277648 8.40012 1.00882 1.02489 124.4536 41.48453 70.10886 485.1474 0.465 NOT OK!!!
0.004866 7.98101 1.00882 1.02489 111.2598 37.08659 72.68971 485.1474 0.488 NOT OK!!!
0.10935 7.61779 1.00882 1.02489 119.7926 39.93085 89.84442 485.1474 0.610 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 99


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b B L Df c ϒ b/B Df/B HE βc βɣ
3 1 1 1.3 57.08625 19.3825 3 1.3 3.052096 1.7853 1.57644
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 3.227306 7.4195 1.57644
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 3.402515 3.0834 1.57644
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 3.577725 1.2814 1.57644
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 3.752935 5.3255 1.57644
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 11.76438 1.00882 1.02489 126.5097 42.16991 42.16991 485.1474 0.272 NOT OK!!!
0.000599 10.97119 1.00882 1.02489 119.9025 39.96749 48.36067 485.1474 0.314 NOT OK!!!
0.045803 10.31019 1.00882 1.02489 125.5245 41.84149 60.25174 485.1474 0.395 NOT OK!!!
0.277648 9.75089 1.00882 1.02489 141.8950 47.29835 79.93421 485.1474 0.530 NOT OK!!!
0.004866 9.27148 1.00882 1.02489 129.2043 43.0681 84.41348 485.1474 0.566 NOT OK!!!
0.10935 8.85600 1.00882 1.02489 138.2402 46.08008 103.6802 485.1474 0.704 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
4 1 1 1.3 57.08625 19.3825 4 1.3 3.052096 1.7853 1.57644
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 3.227306 7.4195 1.57644
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 3.402515 3.0834 1.57644
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 3.577725 1.2814 1.57644
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 3.752935 5.3255 1.57644
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 12.42289 1.00882 1.02489 133.0503 44.35009 44.35009 485.1474 0.286 NOT OK!!!
0.000599 11.56983 1.00882 1.02489 126.4430 42.14767 50.99868 485.1474 0.331 NOT OK!!!
0.045803 10.85894 1.00882 1.02489 132.0650 44.02167 63.3912 485.1474 0.416 NOT OK!!!
0.277648 10.25743 1.00882 1.02489 148.4356 49.47853 83.61871 485.1474 0.555 NOT OK!!!
0.004866 9.74184 1.00882 1.02489 135.7449 45.24828 88.68664 485.1474 0.595 NOT OK!!!
0.10935 9.29500 1.00882 1.02489 144.7808 48.26026 108.5856 485.1474 0.738 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 100


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Meyerhof


(Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βɣ
1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 1.57644
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 1.57644
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 1.57644
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 1.57644
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 1.57644
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 6.94381 0.94718 0.85515 66.61689 22.20563 22.20563 485.1474 0.143 NOT OK!!!
0.000599 6.42001 0.94718 0.85515 58.55859 19.51953 23.61863 485.1474 0.153 NOT OK!!!
0.045803 5.98350 0.94718 0.85515 61.98232 20.66077 29.75152 485.1474 0.195 NOT OK!!!
0.277648 5.61415 0.94718 0.85515 75.49792 25.16597 42.5305 485.1474 0.282 NOT OK!!!
0.004866 5.29756 0.94718 0.85515 61.72784 20.57595 40.32886 485.1474 0.271 NOT OK!!!
0.10935 5.02319 0.94718 0.85515 68.35692 22.78564 51.26769 485.1474 0.348 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
2 1 1 1.3 57.08625 19.3825 2 1.3 3.052096 1.7853 1.57644
2 1.1 1.1 1.3 57.08625 19.3825 1.818182 1.181818 3.227306 7.4195 1.57644
2 1.2 1.2 1.3 57.08625 19.3825 1.666667 1.083333 3.402515 3.0834 1.57644
2 1.3 1.3 1.3 57.08625 19.3825 1.538462 1 3.577725 1.2814 1.57644
2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 1.57644
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.16034 0.94718 0.85515 93.2738 31.09125 31.09125 485.1474 0.200 NOT OK!!!
0.000599 9.46692 0.94718 0.85515 86.3349 28.77831 34.82175 485.1474 0.226 NOT OK!!!
0.045803 8.88907 0.94718 0.85515 90.8781 30.2927 43.62149 485.1474 0.286 NOT OK!!!
0.277648 8.40012 0.94718 0.85515 105.5131 35.17105 59.43907 485.1474 0.394 NOT OK!!!
0.004866 7.98101 0.94718 0.85515 92.8625 30.95417 60.67017 485.1474 0.407 NOT OK!!!
0.10935 7.61779 0.94718 0.85515 100.6110 33.53701 75.45828 485.1474 0.513 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 101


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b B L Df c ϒ b/B Df/B HE βc βɣ
3 1 1 1.3 57.08625 19.3825 3 1.3 3.052096 1.7853 1.57644
3 1.1 1.1 1.3 57.08625 19.3825 2.727273 1.181818 3.227306 7.4195 1.57644
3 1.2 1.2 1.3 57.08625 19.3825 2.5 1.083333 3.402515 3.0834 1.57644
3 1.3 1.3 1.3 57.08625 19.3825 2.307692 1 3.577725 1.2814 1.57644
3 1.4 1.4 1.3 57.08625 19.3825 2.142857 0.928571 3.752935 5.3255 1.57644
3 1.5 1.5 1.3 57.08625 19.3825 2 0.866667 2.284872 2.2132 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 11.76438 0.94718 0.85515 106.5672 35.5224 35.5224 485.1474 0.229 NOT OK!!!
0.000599 10.97119 0.94718 0.85515 100.0482 33.34939 40.35276 485.1474 0.262 NOT OK!!!
0.045803 10.31019 0.94718 0.85515 105.0111 35.00371 50.40535 485.1474 0.331 NOT OK!!!
0.277648 9.75089 0.94718 0.85515 120.0660 40.02199 67.63717 485.1474 0.449 NOT OK!!!
0.004866 9.27148 0.94718 0.85515 107.8351 35.94505 70.45229 485.1474 0.473 NOT OK!!!
0.10935 8.85600 0.94718 0.85515 116.0035 38.66782 87.00259 485.1474 0.591 NOT OK!!!

b B L Df c ϒ b/B Df/B HE βc βɣ
4 1 1 1.3 57.08625 19.3825 4 1.3 3.052096 1.7853 1.57644
4 1.1 1.1 1.3 57.08625 19.3825 3.636364 1.181818 3.227306 1.7853 1.57644
4 1.2 1.2 1.3 57.08625 19.3825 3.333333 1.083333 3.402515 1.7853 1.57644
4 1.3 1.3 1.3 57.08625 19.3825 3.076923 1 3.577725 1.7853 1.57644
4 1.4 1.4 1.3 57.08625 19.3825 2.857143 0.928571 3.752935 1.7853 1.57644
4 1.5 1.5 1.3 57.08625 19.3825 2.666667 0.866667 2.284872 1.7853 1.57644
Nce Nɣe Ic Iɣ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 12.42289 0.94718 0.85515 112.0245 37.34151 37.34151 485.1474 0.241 NOT OK!!!
0.167747 11.56983 0.94718 0.85515 114.5433 38.1811 46.19913 485.1474 0.300 NOT OK!!!
0.167747 10.85894 0.94718 0.85515 117.0620 39.02068 56.18978 485.1474 0.369 NOT OK!!!
0.167747 10.25743 0.94718 0.85515 119.5808 39.86027 67.36385 485.1474 0.447 NOT OK!!!
0.167747 9.74184 0.94718 0.85515 122.0996 40.69986 79.77172 485.1474 0.535 NOT OK!!!
0.167747 9.29500 0.94718 0.85515 124.6183 41.53944 93.46374 485.1474 0.635 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 102


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2.METODE HANSEN (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

a. Overburden Pressure

= 19.3825

b. Shape Factor

Sc = 1.662825

= 1.537793

= 0.594198

UTARI LAMBAIHANG [18021101151] Page 103


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
c. Bearing Capacity Factor
HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0.693861
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835

d. Menghitung Daya Dukung Tanah :


q ult = Seismic Safety Factor :
= 320.2045 kN/m²

KONTROL SAFETY FACTOR > 1.25


q all =

= 106.7348 kN/m² =

P all = q all X A = 1.0084 < 1.25 .. NOT OK


= 153.6982 kN
(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 104


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Hansen Dengan
Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.167747 10.08803 6.94381
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.000599 9.608986 6.42001
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.045803 9.209784 5.98350
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.277648 8.871999 5.61415
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 5.29756
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.02319

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.664721 1.539331 0.593038 356.8366 118.9455 118.9455 485.1474 0.766 NOT OK!!!
1.663687 1.538492 0.593671 327.2258 109.0753 131.9811 485.1474 0.858 NOT OK!!!
1.662825 1.537793 0.594198 320.2045 106.7348 153.6982 485.1474 1.008 NOT OK!!!
1.662096 1.537201 0.594645 332.7431 110.9144 187.4453 485.1474 1.243 NOT OK!!!
1.661472 1.536694 0.595027 298.8583 99.6194 195.2541 485.1474 1.310 OK!!
1.66093 1.536255 0.595359 301.926 100.6420 226.4445 485.1474 1.539 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 7.98101
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.331541 7.61779

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.661472 1.536694 0.595027 320.5223 106.84078 209.40792 485.1474 1.405 OK!!
1.66093 1.536255 0.595359 324.3814 108.12713 243.28605 485.1474 1.653 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 105


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE HANSEN (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.914842

a. Overburden Pressure

= 19.3825

b. Shape Factor

Sc = 1.662825

= 1.537793

= 0.594198

UTARI LAMBAIHANG [18021101151] Page 106


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835

d. Menghitung Daya Dukung Tanah :


q ult = Seismic Safety Factor :
= 320.2045 kN/m²

KONTROL SAFETY FACTOR > 1.25


q all =

= 106.7348 kN/m² =

P all = q all X Af = 1.0084 < 1.25 .. NOT OK


= 155.9274 kN
(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 107


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Hansen Dengan
Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.167747 10.08803 6.94381
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.000599 9.608986 6.42001
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.045803 9.209784 5.98350
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.277648 8.871999 5.61415
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 5.29756
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.02319

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.664721 1.539331 0.593038 356.8366 118.9455 118.9455 485.1474 0.766 NOT OK!!!
1.663687 1.538492 0.593671 327.2258 109.0753 131.9811 485.1474 0.858 NOT OK!!!
1.662825 1.537793 0.594198 320.2045 106.7348 153.6982 485.1474 1.008 NOT OK!!!
1.662096 1.537201 0.594645 332.7431 110.9144 187.4453 485.1474 1.243 NOT OK!!!
1.661472 1.536694 0.595027 298.8583 99.6194 195.2541 485.1474 1.310 OK!!
1.66093 1.536255 0.595359 301.926 100.6420 226.4445 485.1474 1.539 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 7.98101
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.331541 7.61779

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.661472 1.536694 0.595027 320.5223 106.84078 209.40792 485.1474 1.405 OK!!
1.66093 1.536255 0.595359 324.3814 108.12713 243.28605 485.1474 1.653 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 108


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE HANSEN (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.914842

a. Overburden Pressure

= 19.3825

b. Shape Factor

Sc = 1.662825

= 1.537793

= 0.594198

UTARI LAMBAIHANG [18021101151] Page 109


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835
d. Menghitung Daya Dukung Tanah :
q ult =
= 320.2045 kN/m² Seismic Safety Factor :

q all =
KONTROL SAFETY FACTOR > 1.25
= 106.7348 kN/m²

=
P all = q all X Af
= 155.9274 kN = 1.0084 < 1.25 .. NOT OK

(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 110


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Hansen Dengan
Penampang Berbeda-beda

b B L Df Af c ϒ b/B Df/B HE βc βq βɣ
1 1 1 1.3 1.220886 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644
1 1.1 1.1 1.3 1.340886 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644
1 1.2 1.2 1.3 1.460886 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644
1 1.3 1.3 1.3 1.580886 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644
1 1.4 1.4 1.3 1.700886 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644
1 1.5 1.5 1.3 1.820886 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644
Nce Nqe Nɣe sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.08803 6.94381 1.664721 1.539331 0.593038 356.8366 118.9455 145.2189 485.1474 0.766 NOT OK!!!
0.000599 9.608986 6.42001 1.663687 1.538492 0.593671 327.2258 109.0753 146.2574 485.1474 0.858 NOT OK!!!
0.045803 9.209784 5.98350 1.662825 1.537793 0.594198 320.2045 106.7348 155.9274 485.1474 1.008 NOT OK!!!
0.277648 8.871999 5.61415 1.662096 1.537201 0.594645 332.7431 110.9144 175.3429 485.1474 1.243 NOT OK!!!
0.004866 8.582468 5.29756 1.661472 1.536694 0.595027 298.8583 99.6194 169.4413 485.1474 1.310 OK!!
0.10935 8.331541 5.02319 1.66093 1.536255 0.595359 301.926 100.6420 183.2575 485.1474 1.539 OK!!

b B L Df Af c ϒ b/B Df/B HE βc βq βɣ
2 1.4 1.4 1.3 1.700886 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644
2 1.5 1.5 1.3 1.820886 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644
Nce Nqe Nɣe sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.004866 8.582468 7.98101 1.661472 1.536694 0.595027 320.5223 106.8408 181.7239 485.1474 1.405 OK!!
0.10935 8.331541 7.61779 1.66093 1.536255 0.595359 324.3814 108.1271 196.8871 485.1474 1.653 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 111


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE HANSEN (Inklinasi)


DIKETAHUI : Pengaruh beban Inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114
L= 1.2 m = 19.3825 kN/m² My = -4.2219
SF = 3 kN/m²

a. Menghitung Nilai Overburden Pressure

= 19.3825
b. Shape Factor c. Bearing Capacity Factor
HE =

= 3.402515

Sc = 1.662825
= 3.0834
Nce=
= 0.045803

= 1.537793
= 0
Nqe =

= 9.209784

= 0.594198

= 1.57644
Nɣe =

= 5.9835

UTARI LAMBAIHANG [18021101151] Page 112


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

d. Mencari Ic, Iq, dan Iϒ

1. PENGARUH LEBAR :

2≤a ≤ 5

Iq = 1.010

Ic = 1.010137

2≤a ≤ 5

Iγ = 1.013

2. PENGARUH PANJANG

2≤a ≤ 5

Iq = 0.9423

UTARI LAMBAIHANG [18021101151] Page 113


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Ic = 0.939699

2≤a ≤ 5

Iγ = 0.9199

f. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = .NqE.Sq.Iq + 0.5.ϒ.B.NϒE.Sϒ. Iϒ


= 323.4489 kN/m²

q all =

= 107.8163 kN/m²

P all = q all X A
= 465.7664 kN
2. PENGARUH PANJANG :

q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B.NϒE.Sϒ.dϒ. Iϒ KONTROL SF


= 300.7912 kN/m²
q all = =

= 100.2637 kN/m² = 1.019 < 1.25 .. NOT OK

P all = q all X A (PONDASI TIDAK DAPAT DIGUNAKAN)


= 144.3798 kN

UTARI LAMBAIHANG [18021101151] Page 114


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Hansen (Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.16775 10.08803 6.943815
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.00060 9.608986 6.420007
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.04580 9.209784 5.98350
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.27765 8.871999 5.614148
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.582468 5.297561
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.023185
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.664721 1.539331 0.593038 1.010137 1.010 1.0130 360.4366 120.1455 120.1455 485.1474 0.774 NOT OK!!!
1.663687 1.538492 0.593671 1.010137 1.010 1.0130 330.534 110.1780 133.3154 485.1474 0.866 NOT OK!!!
1.662825 1.537793 0.594198 1.010137 1.010 1.0130 323.4489 107.8163 155.2555 485.1474 1.019 NOT OK!!!
1.662096 1.537201 0.594645 1.010137 1.010 1.0130 336.121 112.0403 189.3482 485.1474 1.256 OK!!
1.661472 1.536694 0.595027 1.010137 1.010 1.0130 301.8986 100.6329 197.2404 485.1474 1.323 OK!!
1.66093 1.536255 0.595359 1.010137 1.010 1.0130 305.0026 101.6675 228.7520 485.1474 1.554 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.582468 7.981015
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.331541 7.617794
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.661472 1.536694 0.595027 1.010137 1.010 1.0130 323.8442 107.9481 211.5782 485.1474 1.419 OK!!
1.66093 1.536255 0.595359 1.010137 1.010 1.0130 327.75 109.25 245.8125 485.1474 1.670 OK!!

UTARI LAMBAIHANG [18021101151] Page 115


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Hansen (Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.16775 10.08803 6.943815
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.00060 9.608986 6.420007
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.04580 9.209784 5.9835
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.27765 8.871999 5.614148
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.582468 5.297561
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.023185
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.664721 1.539331 0.593038 0.93970 0.94230 0.91990 335.3117 111.7706 111.7706 485.1474 0.720 NOT OK!!!
1.663687 1.538492 0.593671 0.93970 0.94230 0.91990 307.4346 102.4782 123.9986 485.1474 0.806 NOT OK!!!
1.662825 1.537793 0.594198 0.93970 0.94230 0.91990 300.7912 100.2637 144.3798 485.1474 0.947 NOT OK!!!
1.662096 1.537201 0.594645 0.93970 0.94230 0.91990 312.5332 104.1777 176.0604 485.1474 1.168 NOT OK!!!
1.661472 1.536694 0.595027 0.93970 0.94230 0.91990 280.655 93.5517 183.3613 485.1474 1.230 NOT OK!!!
1.66093 1.536255 0.595359 0.93970 0.94230 0.91990 283.504 94.5013 212.6280 485.1474 1.445 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.582468 7.981015
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.331541 7.617794
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.66147 1.53669 0.59503 0.939699 0.942300 0.919900 300.5837 100.1946 196.3814 485.1474 1.318 OK!!
1.66093 1.53626 0.59536 0.939699 0.942300 0.919900 304.1608 101.3869 228.1206 485.1474 1.550 OK!!

UTARI LAMBAIHANG [18021101151] Page 116


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3.METODE VESIC (Beban Sentris)


DIKETAHUI : Pengaruh beban sentris
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² SF = 3 kN/m²
B= 1.2 m ϒ' = 19.383 kN/m²
L= 1.2 m = 19.3825 kN/m²

b. Shape Factor

Sc = 1.653349

= 1.625173

= 0.6

UTARI LAMBAIHANG [18021101151] Page 117


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835

b. Bearing Capacity Equation :


q ult =
= 336.1815 kN/m²
Seismic Safety Factor :

q all =
KONTROL SAFETY FACTOR > 1.25

= 112.0605 kN/m²
=

P all = q all X A = 1.0588 < 1.25 .. NOT OK


= 161.3671 kN
(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 118


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Vesic Dengan
Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.167747 10.08803 6.943815
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.000599 9.608986 6.420007
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.045803 9.209784 5.9835
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.277648 8.871999 5.614148
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 5.297561
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.023185

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.653349 1.625173 0.600 373.981 124.6603 124.6603 485.1474 0.803 NOT OK!!!
1.653349 1.625173 0.600 343.8026 114.6009 138.6670 485.1474 0.901 NOT OK!!!
1.653349 1.625173 0.600 336.1815 112.0605 161.3671 485.1474 1.059 NOT OK!!!
1.653349 1.625173 0.600 348.1109 116.0370 196.1025 485.1474 1.300 OK!!
1.653349 1.625173 0.600 313.9318 104.6439 205.1021 485.1474 1.376 OK!!
1.653349 1.625173 0.600 316.5765 105.5255 237.4324 485.1474 1.613 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 5.297561
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.331541 5.023185

sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)


1.653349 1.625173 0.6 313.9318 104.6439 205.1021 485.1474 1.376 OK!!
1.653349 1.625173 0.6 316.5765 105.5255 237.4324 485.1474 1.613 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 119


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

MEDOTE VESIC (Eksentrisitas)


DIKETAHUI : Pengaruh beban eksentrisitas
Df = 1.3 m ϕ' = 32.013 ˚ My = -4.2219 e= -0.0087
Dw= 2.6 m c' = 57.086 kN/m² Fz = 485.1474 B' = 1.217405
B= 1.2 m ϒ' = 19.383 kN/m² SF = 3 kN/m² Af = 1.460886
L= 1.2 m = 19.3825 kN/m² Re = 0.914842

a. Overburden Pressure

= 19.3825
b. Shape Factor

Sc = 1.653349

= 1.625173

= 0.6

UTARI LAMBAIHANG [18021101151] Page 120


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835
b. Bearing Capacity Equation :
q ult = Seismic Safety Factor :
= 336.1815 kN/m²

q all = KONTROL SAFETY FACTOR > 1.25

= 112.0605 kN/m²
=

P all = q all X Af = 1.0588 < 1.25 .. NOT OK


= 163.7076 kN
(PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 121


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Vesic Dengan
Penampang Berbeda-beda

b B L Df Af c ϒ b/B Df/B HE βc βq βɣ
1 1 1 1.3 1.220886 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644
1 1.1 1.1 1.3 1.340886 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644
1 1.2 1.2 1.3 1.460886 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644
1 1.3 1.3 1.3 1.580886 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644
1 1.4 1.4 1.3 1.700886 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644
1 1.5 1.5 1.3 1.820886 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644
Nce Nqe Nɣe sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.167747 10.08803 6.94381 1.653349 1.625173 0.6 373.981 124.6603 152.1960 485.1474 0.803 NOT OK!!!
0.000599 9.608986 6.42001 1.653349 1.625173 0.6 343.8026 114.6009 153.6666 485.1474 0.901 NOT OK!!!
0.045803 9.209784 5.98350 1.653349 1.625173 0.6 336.1815 112.0605 163.7076 485.1474 1.059 NOT OK!!!
0.277648 8.871999 5.61415 1.653349 1.625173 0.6 348.1109 116.0370 183.4412 485.1474 1.300 OK!!
0.004866 8.582468 5.29756 1.653349 1.625173 0.6 313.9318 104.6439 177.9874 485.1474 1.376 OK!!
0.10935 8.331541 5.02319 1.653349 1.625173 0.6 316.5765 105.5255 192.1499 485.1474 1.613 OK!!

b B L Df Af c ϒ b/B Df/B HE βc βq βɣ
2 1.4 1.4 1.3 1.700886 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644
2 1.5 1.5 1.3 1.820886 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644
Nce Nqe Nɣe sc sq sϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
0.004866 8.582468 7.98101 1.653349 1.625173 0.6 335.7769 111.9256 190.3727 485.1474 1.472 OK!!
0.10935 8.331541 7.61779 1.653349 1.625173 0.6 339.207 113.069 205.8857 485.1474 1.729 OK!!

Jika b/B > 1.5 maka b tersebut tidak berlaku tidak berlaku untuk penampang yang dicoba

UTARI LAMBAIHANG [18021101151] Page 122


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

METODE VESIC (Inklinasi)


DIKETAHUI : Pengaruh beban Inklinasi
Df = 1.3 m ϕ' = 32.013 ˚ Fz = 485.1474
Dw= 2.6 m c' = 57.086 kN/m² Fx = HB = -3.3526
B= 1.2 m ϒ' = 19.383 kN/m² Fy = HL = 20.4114
L= 1.2 m = 19.3825 kN/m² My = -4.2219
SF = 3 kN/m²

a. Menghitung Nilai Overburden Pressure

= 19.3825
b. Shape Factor

Sc = 1.653349

= 1.625173

= 0.6

UTARI LAMBAIHANG [18021101151] Page 123


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. Bearing Capacity Factor


HE =

= 3.402515

= 3.0834
Nce=
= 0.045803

= 0
Nqe =

= 9.209784

= 1.57644
Nɣe =

= 5.9835

d. Mencari Ic, Iq, dan Iϒ

1. PENGARUH LEBAR :

2.1213
1.5 1.5

UTARI LAMBAIHANG [18021101151] Page 124


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Iq = 1.012

Ic = 1.012598

Iγ = 1.017787

2. PENGARUH PANJANG

Iq = 0.9283

UTARI LAMBAIHANG [18021101151] Page 125


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
2. PENGARUH PANJANG :

Ic = 0.925022

Iγ = 0.896243

f. Menghitung Daya Dukung Tanah

1. PENGARUH LEBAR :

q ult = .NqE.Sq.Iq + 0.5.ϒ.B.NϒE.Sϒ. Iϒ


= 340.4757 kN/m²

q all =

= 113.4919 kN/m²

P all = q all X A
= 163.4283 kN

2. PENGARUH PANJANG :
q ult = .NqE.Sq.dq.Iq + 0.5.ϒ.B.NϒE.Sϒ.dϒ. Iϒ KONTROL SF
= 310.7118 kN/m²
q all =
=
= 103.5706 kN/m²
= 1.072 < 1.25 .. NOT OK
P all = q all X A
= 149.1417 kN (PONDASI TIDAK DAPAT DIGUNAKAN)

UTARI LAMBAIHANG [18021101151] Page 126


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Vesic (Beban Inklinasi Pengaruh Lebar) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.16775 10.08803 6.94381
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.00060 9.60899 6.42001
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.04580 9.20978 5.98350
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.27765 8.87200 5.61415
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.58247 5.29756
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.33154 5.02319
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.653349 1.625173 0.600 1.0126 1.012 1.0178 378.7292 126.2431 126.2431 485.1474 0.813 NOT OK!!!
1.653349 1.625173 0.600 1.0126 1.012 1.0178 348.1823 116.0608 140.4335 485.1474 0.913 NOT OK!!!
1.653349 1.625173 0.600 1.0126 1.012 1.0178 340.4757 113.4919 163.4283 485.1474 1.072 NOT OK!!!
1.653349 1.625173 0.600 1.0126 1.012 1.0178 352.5647 117.5216 198.6114 485.1474 1.317 OK!!
1.653349 1.625173 0.600 1.0126 1.012 1.0178 317.9635 105.9878 207.7362 485.1474 1.394 OK!!
1.653349 1.625173 0.600 1.0126 1.012 1.0178 320.6494 106.8831 240.4870 485.1474 1.634 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.58247 5.29756
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.33154 5.02319
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.653349 1.530104 0.600 1.0126 1.012 1.0178 301.9583 100.6528 197.2794 485.1474 1.324 OK!!
1.653349 1.530104 0.600 1.0126 1.012 1.0178 305.1121 101.704 228.8341 485.1474 1.555 OK!!

UTARI LAMBAIHANG [18021101151] Page 127


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perhitungan Pengaruh Gempa Pondasi Pada Puncak Lereng Metode Vesic (Beban Inklinasi Pengaruh Panjang) Dengan Penampang Berbeda-beda

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


1 1 1 1.3 57.08625 19.3825 1 1.3 3.052096 1.7853 0.693861 1.57644 0.167747 10.08803 6.943815
1 1.1 1.1 1.3 57.08625 19.3825 0.909091 1.181818 3.227306 7.4195 0.693861 1.57644 0.000599 9.608986 6.420007
1 1.2 1.2 1.3 57.08625 19.3825 0.833333 1.083333 3.402515 3.0834 0.693861 1.57644 0.045803 9.209784 5.9835
1 1.3 1.3 1.3 57.08625 19.3825 0.769231 1 3.577725 1.2814 0.693861 1.57644 0.277648 8.871999 5.614148
1 1.4 1.4 1.3 57.08625 19.3825 0.714286 0.928571 3.752935 5.3255 0.693861 1.57644 0.004866 8.582468 5.297561
1 1.5 1.5 1.3 57.08625 19.3825 0.666667 0.866667 3.928144 2.2132 0.693861 1.57644 0.10935 8.331541 5.023185
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.653349 1.625173 0.600 0.9250 0.928 0.8962 345.8062 115.2687 115.2687 485.1474 0.742 NOT OK!!!
1.653349 1.625173 0.600 0.9250 0.928 0.8962 317.8219 105.9406 128.1882 485.1474 0.833 NOT OK!!!
1.653349 1.625173 0.600 0.9250 0.928 0.8962 310.7118 103.5706 149.1417 485.1474 0.979 NOT OK!!!
1.653349 1.625173 0.600 0.9250 0.928 0.8962 321.6926 107.2309 181.2202 485.1474 1.202 NOT OK!!!
1.653349 1.625173 0.600 0.9250 0.928 0.8962 290.0269 96.6756 189.4842 485.1474 1.271 OK!!
1.653349 1.625173 0.600 0.9250 0.928 0.8962 292.428 97.4760 219.3210 485.1474 1.490 OK!!

b B L Df c ϒ b/B Df/B HE βc βq βɣ Nce Nqe Nɣe


2 1.4 1.4 1.3 57.08625 19.3825 1.428571 0.928571 3.752935 5.3255 0.693861 1.57644 0.00487 8.58247 5.29756
2 1.5 1.5 1.3 57.08625 19.3825 1.333333 0.866667 2.284872 2.2132 0.693861 1.57644 0.10935 8.33154 5.02319
sc sq sϒ ic iq iϒ q ult q all P all P desaign Seismic SF KONTROL (SF > 1.25)
1.653349 1.530104 0.600 0.9250 0.928 0.8962 275.3469 91.7823 179.8933 485.1474 1.207 NOT OK!!!
1.653349 1.530104 0.600 0.9250 0.928 0.8962 278.1772 92.72572 208.6329 485.1474 1.418 OK!!

UTARI LAMBAIHANG [18021101151] Page 128


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

SETTLEMENT
Metode Schmertmann
Menggunakan Handcalculation

1.) B= 1m
L= 1m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 129


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 1.8 0.5 1.55 0.3 36021.25 4.16421E-06
2 1.8 - 3 1.2 2.4 0.308 36021.25 1.02606E-05
3 3 - 3.3 0.3 3.15 0.0605 61312.5 2.96024E-07
TOTAL 1.47208E-05

= 485.1474

= 25.19725

= 0.97261

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.009416 m
= 9.41642 mm

UTARI LAMBAIHANG [18021101151] Page 130


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2.) B= 1.1 m
L= 1.1 m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 131


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 1.85 0.55 1.575 0.30475 36021.25 4.65316E-06
2 1.85 - 3 1.15 2.425 0.325225 36021.25 1.0383E-05
3 3 - 3.5 0.5 3.25 0.07525 61312.5 6.1366E-07
TOTAL 1.56498E-05

= 400.948264

= 25.19725

= 0.96647

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.008221 m
= 8.221057 mm

UTARI LAMBAIHANG [18021101151] Page 132


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3.) B= 1.2 m
L= 1.2 m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 133


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 1.9 0.6 1.6 0.296 36021.25 4.93042E-06
2 1.9 - 3 1.1 2.45 0.3655 36021.25 1.11615E-05
3 3 - 3.7 0.7 3.35 0.1225 61312.5 1.39857E-06
TOTAL 1.74905E-05

= 336.907917

= 25.19725

= 0.95958

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.007665 m
= 7.665421 mm

UTARI LAMBAIHANG [18021101151] Page 134


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

4.) B= 1.3 m
L= 1.3 m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 135


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 1.95 0.65 1.625 0.299375 36021.25 5.40219E-06
2 1.95 - 3 1.05 2.475 0.3664 36021.25 1.06804E-05
3 3 - 3.9 0.9 3.45 0.1168 61312.5 1.7145E-06
TOTAL 1.77971E-05

= 287.069467

= 25.19725

= 0.95189

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.006593 m
= 6.592697 mm

UTARI LAMBAIHANG [18021101151] Page 136


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

5.) B= 1.4 m
L= 1.4 m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 137


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 2 0.7 1.65 0.3005 36021.25 5.83961E-06
2 2.0 - 3.0 1 2.5 0.37 36021.25 1.02717E-05
3 3 - 3.5 0.5 3.25 0.19 61312.5 1.54944E-06
3 3.5 - 4.1 0.6 3.8 0.058 61312.5 5.67584E-07
TOTAL 1.76608E-05

= 247.524184

= 25.19725

= 0.94333

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.00559 m
= 5.590277 mm

UTARI LAMBAIHANG [18021101151] Page 138


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

6.) B= 1.5 m
L= 1.5 m
Df = 1.3 m
Fz = 485.1474 kN
ϒ = 19.3825 kN/m²

UTARI LAMBAIHANG [18021101151] Page 139


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Layer Depth Δz z to center Iz Es (Iz / Es) * Δz


1 1.3 - 2.05 0.75 1.675 0.31475 36021.25 6.55342E-06
2 2.05 - 3 0.95 2.525 0.364 36021.25 9.59989E-06
3 3 - 3.5 0.5 3.25 0.19 61312.5 1.54944E-06
3 3.5 - 4.3 0.8 3.9 0.034 61312.5 4.43629E-07
TOTAL 1.77028E-05

= 215.621067

= 25.19725

= 0.93384

Calculate the elastic settlement aster 6 years of construction (t = 6 )

= 1.3556

= 0.004832 m
= 4.832204 mm

UTARI LAMBAIHANG [18021101151] Page 140


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Menggunakan Settle3D

a. B = 1 m

UTARI LAMBAIHANG [18021101151] Page 141


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

b. B = 1.1 m

UTARI LAMBAIHANG [18021101151] Page 142


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

c. B = 1.2 m

UTARI LAMBAIHANG [18021101151] Page 143


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

d. B = 1.3 m

UTARI LAMBAIHANG [18021101151] Page 144


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

e. B = 1.4 m

UTARI LAMBAIHANG [18021101151] Page 145


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

Perbandingan Hasil Handcalculation dan Settle3D

Penampang Handcalculation Settle3D Selisih


1 9.416 13.2 -3.784
1.1 8.221 11.62 -3.399
1.2 7.665 10.22 -2.555
1.3 6.593 8.96 -2.367
1.4 5.590 7.86 -2.270
1.5 4.832 6.88 -2.048

UTARI LAMBAIHANG [18021101151] Page 146


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

KESTABILAN LERENG (MENGGUNAKAN SLIDE)

1. B = 1 m L = 1 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 147


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

2. B = 1.1 m L = 1.1 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 148


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

3. B = 1.2 m L = 1.2 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 149


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

4. B = 1.3 m L = 1.3 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 150


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr
5. B = 1.4 m L = 1.4 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 151


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

6. B = 1.5 m L = 1.5 m
a. Metode Bishop

b. Metode Fellenius/Ordinary

UTARI LAMBAIHANG [18021101151] Page 152


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

RESUME DAN KESIMPULAN

RESUME

STATIS
Df B L ϕ c ϒ nc nq nϒ qbar qult qall pall P desain Kontrol (Pall > P desain)
1.3 1 1 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4069.2 1356.4 1356.4 485.1474 OK
T 1.3 1.1 1.1 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4087.9 1362.6 1648.8 485.1474 OK
E 1.3 1.2 1.2 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4106.5 1368.8 1971.1 485.1474 OK
1.3 1.3 1.3 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4125.1 1375 2323.8 485.1474 OK
R 1.3 1.4 1.4 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4143.8 1381.3 2707.3 485.1474 OK
Z 1.3 1.5 1.5 32.013 57.086 19.3825 45.778 25.047 24.047 19.3825 4162.4 1387.5 3121.8 485.1474 OK
A SEISMIC
Df B L c ϕ ϒ qbar NCE NqE NϒE qult qall Pall SF KONTROL (SF > 1.25)
G 1.3 1 1 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1566.4 522.12 522.12 3.363 OK
H 1.3 1.1 1.1 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1591.9 530.62 642.05 4.171902 OK
I 1.3 1.2 1.2 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1617.3 539.11 776.32 5.093585 OK
1.3 1.3 1.3 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1642.8 547.61 925.46 6.137133 OK
1.3 1.4 1.4 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1668.3 556.11 1090 7.312641 OK
1.3 1.5 1.5 57.086 32.013 19.3825 19.383 14.967 10.357 32.8746 1693.8 564.6 1270.4 8.63136 OK

MEYERHOF
STATIS SEISMIC ON TOP OF SLOPE SEISMIC ON TOP OF SLOPE
Df B L Pengaruh Beban Fz Kontrol Kontrol Kontrol Kontrol
qult Pall qult Pall SF qult Pall qult Pall SF
(qult > Fz) (SF > 1.25) (Pall > Fz) (SF > 1.25)
Sentris 6000.3 2000.1 OK 2922.8 974.25 6.2752 OK 937.89 312.63 NOT OK!!! 25.623 25.623 0.165 NOT OK!!!
Eksentris 6104.7 2034.9 OK 2973.6 991.21 6.3844 OK 954.22 318.07 NOT OK!!! 69.699 23.233 0.1496 NOT OK!!!
1.3 1 1 485.1474
Inklinasi (Lebar) 6058.8 2019.6 OK 2956.9 985.64 6.3485 OK 925.9 308.63 NOT OK!!! 78.63 26.21 0.1688 NOT OK!!!
Inklinasi (Panjang) 5651.2 1883.7 OK 2720.4 906.8 5.8407 OK 816.39 272.13 NOT OK!!! 66.617 22.206 0.143 NOT OK!!!
Sentris 5873.2 2368.9 OK 2899.1 1169.3 7.598 OK 938.97 378.72 NOT OK!!! 22.825 27.618 0.1795 NOT OK!!!
Eksentris 5432.2 2191 OK 2945 1187.8 7.7182 OK 868.47 350.28 NOT OK!!! 62.383 25.161 0.1635 NOT OK!!!
1.3 1.1 1.1 485.1474
Inklinasi (Lebar) 5931.1 2392.2 OK 2933.8 1183.3 7.6887 OK 926.14 373.54 NOT OK!!! 70.178 28.305 0.1839 NOT OK!!!
Inklinasi (Panjang) 5528.2 2229.7 OK 2694.1 1086.6 7.0607 OK 815.36 328.86 NOT OK!!! 58.559 23.619 0.1535 NOT OK!!!
Sentris 5772.1 2770.6 OK 2886.5 1385.5 9.0906 OK 942.02 452.17 NOT OK!!! 24.067 34.656 0.2274 NOT OK!!!
Eksentris 4893.8 2349 OK 2928.4 1405.6 9.2224 OK 798.68 383.37 NOT OK!!! 66.051 31.705 0.208 NOT OK!!!
1.3 1.2 1.2 485.1474
Inklinasi (Lebar) 5829.5 2798.2 OK 2921.7 1402.4 9.2014 OK 928.32 445.59 NOT OK!!! 73.955 35.498 0.2329 NOT OK!!!
Inklinasi (Panjang) 5429.8 2606.3 OK 2678.3 1285.6 8.4348 OK 816.17 391.76 NOT OK!!! 61.982 29.752 0.1952 NOT OK!!!
Sentris 5690.8 3205.8 OK 2882.3 1623.7 10.767 OK 946.59 533.25 OK 28.86 48.774 0.3234 NOT OK!!!
Eksentris 4453.7 2508.9 OK 2920.9 1645.4 10.912 OK 740.82 417.33 NOT OK!!! 79.497 44.783 0.297 NOT OK!!!
1.3 1.3 1.3 485.1474
Inklinasi (Lebar) 5748 3238 OK 2918.1 1643.9 10.901 OK 932 525.03 OK 88.481 49.844 0.3305 NOT OK!!!
Inklinasi (Panjang) 5350.2 3014 OK 2670.4 1504.3 9.9759 OK 818.38 461.02 NOT OK!!! 75.498 42.53 0.282 NOT OK!!!
Sentris 5625.2 3675.1 OK 3028.4 1978.6 13.274 OK 952.36 622.21 OK 24.051 47.14 0.3163 NOT OK!!!
Eksentris 4087.9 2670.8 OK 3066 2003.1 13.439 OK 692.09 452.17 NOT OK!!! 66.465 43.424 0.2913 NOT OK!!!
1.3 1.4 1.4 485.1474
Inklinasi (Lebar) 5682.3 3712.4 OK 3067.8 2004.3 13.447 OK 936.86 612.08 OK 73.945 48.311 0.3241 NOT OK!!!
Inklinasi (Panjang) 5285.5 3453.2 OK 2795.8 1826.6 12.255 OK 821.69 536.84 OK 61.728 40.329 0.2706 NOT OK!!!
Sentris 5572.1 4179.1 OK 2892.5 2169.4 14.74 OK 959.08 719.31 OK 26.421 59.448 0.4039 NOT OK!!!
Eksentris 3896.6 2922.4 OK 2926 2194.5 14.911 OK 650.51 487.88 OK 73.226 54.92 0.3732 NOT OK!!!
1.3 1.5 1.5 485.1474
Inklinasi (Lebar) 5629.2 4221.9 OK 2929.7 2197.3 14.93 OK 942.66 706.99 OK 81.136 60.852 0.4135 NOT OK!!!
Inklinasi (Panjang) 5232.6 3924.4 OK 2672.3 2004.2 13.617 OK 825.89 619.42 OK 68.357 51.268 0.3483 NOT OK!!!

UTARI LAMBAIHANG [18021101151] Page 153


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

H A N S E N
Kontrol
Df B L Pengaruh Beban Fz qult Pall
(qult > Fz)
Sentris 6147.1 2049.02 OK
Eksentris 6188.4 2062.8 OK
1.3 1 1 485.15
Inklinasi (Lebar) 6251.1 2083.69 OK
Inklinasi (Panjang) 5815.3 1938.42 OK
Sentris 5978.4 2411.28 OK
Eksentris 6014.9 2426.01 OK
S 1.3 1.1 1.1
Inklinasi (Lebar)
485.15
6075.8 2450.59 OK
Inklinasi (Panjang) 5651.9 2279.61 OK
T Sentris 5839.8 2803.11 OK
Eksentris 5872.5 2818.8 OK
A 1.3 1.2 1.2
Inklinasi (Lebar)
485.15
5932.1 2847.39 OK

T Inklinasi (Panjang)
Sentris
5517.8
5724.4
2648.56
3224.76
OK
OK

I 1.3 1.3 1.3


Eksentris
Inklinasi (Lebar)
485.15
5754
5812.4
3241.42
3274.31
OK
OK
S Inklinasi (Panjang)
Sentris
5406.2
5627.3
3045.49
3676.48
OK
OK
Eksentris 5654.2 3694.1 OK
1.3 1.4 1.4 485.15
Inklinasi (Lebar) 5711.7 3731.62 OK
Inklinasi (Panjang) 5312.2 3470.62 OK
Sentris 5544.7 4158.5 OK
Eksentris 5569.5 4177.09 OK
1.3 1.5 1.5 485.15
Inklinasi (Lebar) 5626.1 4219.55 OK
Inklinasi (Panjang) 5232.2 3924.18 OK
Kontrol
Df B L Pengaruh Beban Fz qult Pall SF
(SF > 1.25)
Sentris 2755.8 918.6 5.917 OK
Eksentris 2774.1 924.72 5.956 OK
1.3 1 1 485.1474
Inklinasi (Lebar) 2802.6 934.21 6.017 OK
Inklinasi (Panjang) 2604.2 868.05 5.591 OK
Sentris 2698.1 1088.2 7.071 OK
S 1.3 1.1 1.1
Eksentris
485.1474
2714.4 1094.8 7.114 OK
Inklinasi (Lebar) 2742.4 1106.1 7.187 OK
E Inklinasi (Panjang) 2547.6 1027.5 6.677 OK
Sentris 2653.2 1273.5 8.356 OK
I 1.3 1.2 1.2
Eksentris
485.1474
2667.9 1280.6 8.402 OK
Inklinasi (Lebar) 2695.4 1293.8 8.489 OK
S Inklinasi (Panjang) 2503.5 1201.7 7.884 OK

M Sentris
Eksentris
2618.2
2631.5
1474.9
1482.4
9.781
9.831
OK
OK
1.3 1.3 1.3 485.1474
I Inklinasi (Lebar)
Inklinasi (Panjang)
2658.8
2468.9
1497.8
1390.8
9.932
9.223
OK
OK
C Sentris
Eksentris
2590.9
2603.1
1692.7
1700.7
11.356
11.410
OK
OK
1.3 1.4 1.4 485.1474
Inklinasi (Lebar) 2630.1 1718.4 11.528 OK
Inklinasi (Panjang) 2441.9 1595.3 10.703 OK
Sentris 2569.8 1927.3 13.095 OK
Eksentris 2581.1 1935.8 13.153 OK
1.3 1.5 1.5 485.1474
Inklinasi (Lebar) 2607.9 1955.9 13.290 OK
Inklinasi (Panjang) 2420.8 1815.6 12.336 OK

UTARI LAMBAIHANG [18021101151] Page 154


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

ON TOP OF SLOPE
Kontrol
B L Df b/B Df/B qult qall pall Fz
(pall > Fz)
1 1 1.3 1 1.3 6365.3 2121.8 2121.8 OK
1.1 1.1 1.3 0.9091 1.181818182 6054.3 2018.1 2441.9 OK
1.2 1.2 1.3 0.8333 1.083333333 5802.9 1934.3 2785.4 OK
485.147
1.3 1.3 1.3 0.7692 1 5596.1 1865.4 3152.5 OK
1.4 1.4 1.3 0.7143 0.928571429 5423.4 1807.8 3543.3 OK
1.5 1.5 1.3 0.6667 0.866666667 5277.2 1759.1 3957.9 OK
Kontrol
Df B L Pengaruh Beban Fz qult Pall SF
S (SF > 1.25)
E Sentris 356.84 118.95 0.76613 NOT OK!!!
I Eksentris 356.84 145.22 0.76613 NOT OK!!!
1.3 1 1 485.15
Inklinasi (Lebar) 360.44 120.15 0.77386 NOT OK!!!
S
Inklinasi (Panjang) 335.31 111.77 0.71992 NOT OK!!!
M
Sentris 327.23 131.98 0.85759 NOT OK!!!
I
Eksentris 327.23 146.26 0.85759 NOT OK!!!
C 1.3 1.1 1.1 485.15
Inklinasi (Lebar) 330.53 133.32 0.86626 NOT OK!!!
Inklinasi (Panjang) 307.43 124 0.80572 NOT OK!!!
O
Sentris 320.2 153.7 1.00844 NOT OK!!!
N
Eksentris 320.2 155.93 1.00844 NOT OK!!!
1.3 1.2 1.2 485.15
Inklinasi (Lebar) 323.45 155.26 1.01866 NOT OK!!!
T
Inklinasi (Panjang) 300.79 144.38 0.94730 NOT OK!!!
O
Sentris 332.74 187.45 1.24303 NOT OK!!!
P
Eksentris 332.74 175.34 1.24303 NOT OK!!!
1.3 1.3 1.3 485.15
Inklinasi (Lebar) 336.12 189.35 1.25565 OK
O
Inklinasi (Panjang) 312.53 176.06 1.16753 NOT OK!!!
F
Sentris 298.86 195.25 1.30997 OK
Eksentris 298.86 169.44 1.30997 OK
S 1.3 1.4 1.4 485.15
Inklinasi (Lebar) 301.9 197.24 1.32329 OK
L
Inklinasi (Panjang) 280.65 183.36 1.23018 NOT OK!!!
O
Sentris 301.93 226.44 1.53857 OK
P
Eksentris 301.93 183.26 1.53857 OK
E 1.3 1.5 1.5 485.15
Inklinasi (Lebar) 305 228.75 1.55424 OK
Inklinasi (Panjang) 283.5 212.63 1.44469 OK

UTARI LAMBAIHANG [18021101151] Page 155


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

V E S I C
Kontrol
Df B L Pe ngaruh Be ban Fz qult Pall
(qult > Fz)
Se ntris 6260 2049.02 OK
Ekse ntris 6243.6 2062.8 OK
1.3 1 1 485.15
Inklinasi (Le bar) 6322.6 2083.69 OK
Inklinasi (Panjang) 5773.4 1938.42 OK
Se ntris 6095.4 2411.28 OK
Ekse ntris 6075.6 2426.01 OK
S 1.3 1.1 1.1
Inklinasi (Le bar)
485.15
6152.6 2450.59 OK
Inklinasi (Panjang) 5617.4 2279.61 OK
T Se ntris 5961.2 2803.11 OK
Ekse ntris 5938.7 2818.8 OK
A 1.3 1.2 1.2
Inklinasi (Le bar)
485.15
6014.1 2847.39 OK

T Inklinasi (Panjang)
Se ntris
5490.2
5850.3
2648.56
3224.76
OK
OK

I 1.3 1.3 1.3


Ekse ntris
Inklinasi (Le bar)
485.15
5825.6
5899.7
3241.42
3274.31
OK
OK
S Inklinasi (Panjang)
Se ntris
5385.1
5757.8
3045.49
3676.48
OK
OK
Ekse ntris 5731.4 3694.1 OK
1.3 1.4 1.4 485.15
Inklinasi (Le bar) 5804.4 3731.62 OK
Inklinasi (Panjang) 5297.3 3470.62 OK
Se ntris 5679.9 4158.5 OK
Ekse ntris 5652.1 4177.09 OK
1.3 1.5 1.5 485.15
Inklinasi (Le bar) 5724.2 4219.55 OK
Inklinasi (Panjang) 5223.4 3924.18 OK
Kontrol
Df B L Pengaruh Beban Fz qult Pall SF
(SF > 1.25)
Sentris 2781.7 927.24 5.97239 OK
Eksentris 2774.1 924.72 5.95612 OK
1.3 1 1 485.1474
Inklinasi (Lebar) 2809.9 936.62 6.03280 OK
Inklinasi (Panjang) 2562 853.99 5.50058 OK
Sentris 2723.4 1098.4 7.13748 OK
S 1.3 1.1 1.1
Eksentris
485.1474
2714.4 1094.8 7.11391 OK
Inklinasi (Lebar) 2749.5 1109 7.20582 OK
E Inklinasi (Panjang) 2506.1 1010.8 6.56805 OK
Sentris 2678 1285.4 8.43402 OK
I 1.3 1.2 1.2
Eksentris
485.1474
2667.9 1280.6 8.40219 OK
Inklinasi (Lebar) 2702.5 1297.2 8.51112 OK
S Inklinasi (Panjang) 2462.5 1182 7.75541 OK

M Sentris
Eksentris
2642.5
2631.5
1488.6
1482.4
9.87174
9.83067
OK
OK
1.3 1.3 1.3 485.1474
I Inklinasi (Lebar)
Inklinasi (Panjang)
2665.8
2428.3
1501.7
1368
9.95856
9.07151
OK
OK
C Sentris
Eksentris
2614.9
2603.1
1708.4
1700.7
11.46155
11.41019
OK
OK
1.3 1.4 1.4 485.1474
Inklinasi (Lebar) 2637.1 1722.9 11.55912 OK
Inklinasi (Panjang) 2401.5 1569 10.52628 OK
Sentris 2593.4 1945.1 13.21563 OK
Eksentris 2581.1 1935.8 13.15288 OK
1.3 1.5 1.5 485.1474
Inklinasi (Lebar) 2615.5 1961.6 13.32807 OK
Inklinasi (Panjang) 2381.1 1785.8 12.13351 OK

UTARI LAMBAIHANG [18021101151] Page 156


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

ON TOP OF SLOPE
Kontrol
B L Df b/B Df/B qult qall pall Fz
(pall > Fz)
1 1 1.3 1 1.3 6427.1 2142.4 2142.4 OK
1.1 1.1 1.3 0.9091 1.181818182 6121.5 2040.5 2469 OK
1.2 1.2 1.3 0.8333 1.083333333 5875.5 1958.5 2820.2 OK
485.147
1.3 1.3 1.3 0.7692 1 5673.8 1891.3 3196.2 OK
1.4 1.4 1.3 0.7143 0.928571429 5506.1 1835.4 3597.3 OK
1.5 1.5 1.3 0.6667 0.866666667 5364.8 1788.3 4023.6 OK
Kontrol
Df B L Pengaruh Beban Fz qult Pall SF
S (SF > 1.25)
E Sentris 373.98 124.66 0.80294 NOT OK!!!
I Eksentris 373.98 152.2 0.80294 NOT OK!!!
1.3 1 1 485.15
Inklinasi (Lebar) 378.73 126.24 0.81313 NOT OK!!!
S
Inklinasi (Panjang) 345.81 115.27 0.74245 NOT OK!!!
M
Sentris 343.8 138.67 0.90103 NOT OK!!!
I
Eksentris 343.8 153.67 0.90103 NOT OK!!!
C 1.3 1.1 1.1 485.15
Inklinasi (Lebar) 348.18 140.43 0.91251 NOT OK!!!
Inklinasi (Panjang) 317.82 128.19 0.83294 NOT OK!!!
O
Sentris 336.18 161.37 1.05875 NOT OK!!!
N
Eksentris 336.18 163.71 1.05875 NOT OK!!!
1.3 1.2 1.2 485.15
Inklinasi (Lebar) 340.48 163.43 1.07228 NOT OK!!!
T
Inklinasi (Panjang) 310.71 149.14 0.97854 NOT OK!!!
O
Sentris 348.11 196.1 1.30044 OK
P
Eksentris 348.11 183.44 1.30044 OK
1.3 1.3 1.3 485.15
Inklinasi (Lebar) 352.56 198.61 1.31708 OK
O
Inklinasi (Panjang) 321.69 181.22 1.20175 NOT OK!!!
F
Sentris 313.93 205.1 1.37604 OK
Eksentris 313.93 177.99 1.37604 OK
S 1.3 1.4 1.4 485.15
Inklinasi (Lebar) 317.96 207.74 1.39371 OK
L
Inklinasi (Panjang) 290.03 189.48 1.27126 OK
O
Sentris 316.58 237.43 1.61322 OK
P
Eksentris 316.58 192.15 1.61322 OK
E 1.3 1.5 1.5 485.15
Inklinasi (Lebar) 320.65 240.49 1.63398 OK
Inklinasi (Panjang) 292.43 219.32 1.49017 OK

UTARI LAMBAIHANG [18021101151] Page 157


2020
Dosen Pengajar : Roski Rolans Izack Legrans, S.T., M.Agr

KESIMPULAN

Berdasarkan data diatas, dapat kita simpulkan bahwa pondasi


yang dapat digunakan pada horizontal ground adalah pondasi dengan
penampang B = L = 1.2 m dengan kedalaman 1.3 m (karena sudah
dikontrol dan mendapat nilai AMAN) karena mampu menahan
beban pada setiap metode dalam kondisi statis maupun dalam
kondisi gempa.
Sedangkan pada puncak lereng penampang yang dapat
digunakan adalah pondasi dengan penampang B = L = 1.5 m
dengan kedalaman 1.3 m yang memiliki nilai AMAN dengan
kemiringan lereng 40˚ Ukuran penampang pondasi ini dapat
menahan beban rencana dalam perhitungan metode Vesic dan
Hansen baik dalam kondisi statis maupun dalam kondisi gempa .
Berdasarkan data penurunan yang telah dihitung, penampang
berukuran kecil memiliki penurunan yang lebih besar, sedangkan
penampang yang lebih besar memiliki penurunan yang lebih kecil.