00
6 6
PRT
±0.00 1.50
KRAN
± 0.00
KULKAS
Inst air bersih ke tower lnt 2
Inst air bersih ke tower lnt 2
(pipa pengisi) TURUN
(pipa distribusi) 4 4
15 2.65
KRAN
-0.05 1.50 13
KRAN 1.75
Sistem Ring PVC 2" (pipa distribusi) KM/WC
KRAN
+3.30
+3.25
6.85 KRAN
KRAN
3
diatas plafond 3
(instalasi air bersih)
9
16.00 16.00
8 R.TIDUR UTAMA
R. KELUARGA
+ 3.30
± 0.00
7
6
3.10 VIDE 3.10
5 2.85
- 0.20 4
NAIK
1 2
2 - 0.25
2
- 0.39
TERAS 1.50
-0.05
KRAN
- 0.25
4.00
- 0.20
JALUR INSTALASI AIR BERSIH PVC Ø 3/4"
JALUR INSTALASI AIR KOTOR BEKAS PVC Ø3"
JALUR INSTALASI AIR KOTOR BUIS BETON Ø 20 CM
A B C D E F RT ROOF TANK A B C D E F
POMPA AIR
DENAH INSTALASI AIR BERSIH LNT. 1 KRAN AIR DENAH INSTALASI AIR BERSIH LNT. 2
Skala 1:100 WATER HEATER Skala 1:100
BK BAK KONTROL
BM BIOMED BM2