B #REF!
I #REF! #REF!
II #REF! #REF!
III #REF! #REF!
IV #REF! #REF!
V #REF! #REF!
JUMLAH #REF!
BIAYA PERENCANAAN (5%) DAN PENGAWASAN (3%) #REF!
JUMLAH TOTAL #REF!
DIBULATKAN #REF!
TERBILANG : Err:511
10 50.00 50.00
6 42.17 42.17
Total panjang (meter) 42.17 0.00 50.00 0.00 0.00 0.00
Total Lonjor 4.00 0.00 5.00 0.00 0.00 0.00
Total bobot 9.35 0.00 30.81 0.00 0.00 0.00
10 60.00 60.00
8 39.20 39.20
Total panjang (meter) 0.00 39.20 60.00 0.00 0.00 0.00
Total Lonjor 0.00 4.00 5.00 0.00 0.00 0.00
Total bobot 0.00 15.46 36.97 0.00 0.00 0.00
10 244.00 244.00
6 122.50 122.50
Total panjang (meter) 122.50 0.00 244.00 0.00 0.00 0.00
Total Lonjor 11.00 0.00 21.00 0.00 0.00 0.00
Total bobot 27.18 0.00 150.36 0.00 0.00 0.00
Jumlah Jumlah
Kg/m3
19 Lonjor Bobot
5 5
4 4
0.00
0.00
0.00 40.17 143
5 5
4 4
0.00
0.00
0.00 52.43 194
21 21
11 11
0.00
0.00
0.00 177.53 259
Item Pekerjaan besi 10 besi 8 besi 6
Beton kolom (KP) 15 x 15 cm 5 4
Beton Balok (B1) 30 x 15 cm 5 4
Beton Balok (B2) 15 x 15 cm 21 11
UPAH KERJA
NO TENAGA / JABATAN SATUAN
( Rp. )
BAHAN PASIR
1 Pasir Urug m3 200,000
2 Pasir Pasang m3 300,000
3 Pasir Cor m3 400,000
Pasir Cor kg 286
4 Pedel m3 100,000
BAHAN BATU
1 Batu Kali Pecah 2/3 m3 340,000
Batu Kali Pecah 2/3 kg 189
BAHAN PASANGAN
1 Bata putih/ juring (10x12x27) cm bh 1,050
2 Pavingstone tb.6 K300 m2 53,000
3 Bata merah kelas II bh 650
4 Bata ringan 7,5 cm bh 6,500
BAHAN CAMPURAN
1 Semen PC zak 46,000
2 Semen PC kg 1,150
3 Semen Warna / Nat kg 12,000
BAHAN BESI
1 Besi Beton polos kg 10,970
2 Kawat Beton kg 25,000
3 Besi Strip kg 10,300
BAHAN KAYU
1 Kayu Kamper Papan (2/20) m3 8,000,000
2 Kayu Kamper Usuk 5/7, 4/6 cm - 4 m m3 7,900,000
3 Kayu Kamper Balok 8/12, 6/12 cm m3 8,000,000
4 Kayu Meranti Balok 8/12, 6/12 cm m3 6,500,000
5 Kayu Meranti Usuk 5/7, 4/6 cm - 4 m m3 6,000,000
6 Kayu Meranti Papan 3/20 m3 7,000,000
6 Kayu Meranti MC / Begisting m3 3,000,000
7 Kayu Dolken dia 12p - 3 m ljr 27,000
8 Multiplek 9 mm lbr 120,000
BAHAN Alumunium
1 Profil kusen alluminium brown m 110,000
1 Slimar aluminium brown 4" m 107,100
2 Slimar jendela alluminium 3" m 86,700
2 Profil kaca m 6,500
3 Profil alluminium m 22,000
4 Sealant tube 35,000
BAHAN PAKU
1 Paku kg 18,000
2 Paku Skrup kg 25,000
3 Skrup fixer bh 1,500
BAHAN KUNCI DAN KACA
1 Kunci pintu bh 210,000
BAHAN PENUTUP ATAP
1 Genteng fabrikasi type kodok bh 5,040
2 bubungan fabrikasi karangpilang bh 21,000
3 Kalsiboard 4.5 mm lbr 52,000
4 ub , kain dan alat bantu ls 3,000
BAHAN PELAPIS LANTAI
1 Keramik 40x40 cm polos m2 65,000
2 Keramik 20x25 cm m2 45,500
BAHAN CAT
1 Plamir Tembok kg 28,000
2 Cat Tembok kg 22,000
NO. URAIAN STN HARGA ( Rp. )
BAHAN CAT
1 Minyak Begisting ltr 23,500
LAIN - LAIN
1 Tulisan acrylic cm 5,000
K3 (KESELAMATAN dan KESEHATAN KERJA)
1 Helm Keselamatan Bh 55,000
2 Sepatu Boot Bh 125,000
3 Sarung Tangan Bh 25,000