E)
HARGA SATUAN
NO URAIAN SATUAN
( Rp. )
1 2 3 4
I UPAH KERJA
1 Mandor OH 193,000.00
2 Kepala Tukang OH 170,000.00
3 Tukang Batu OH 155,000.00
4 Tukang Besi OH 155,000.00
5 Tukang Kayu OH 155,000.00
6 Tukang Las OH 155,000.00
7 Tukang Cat OH 155,000.00
8 Pekerja OH 117,000.00
9 Pekerja Tak Terlatif OH 80,000.00
10 Operator Alat Berat OJ 198,375.00
11 Mekanik OJ 198,375.00
12 Alat Berat ( Excavator ) Jam 1,500,000.00
13 Stamper Jam 62,000.00
II BAHAN BANGUNAN
1 Batu Tela Bh 3,000.00
2 Batu Bata Merah Bh 4,500.00
3 Batu Kali/Batu gunung M3 1,040,000.00
4 Paving Blok Bh 37,000.00
5 Batu Alam Andesit Tekstur kasar Uk. ( 15 x 30 ) cm M2 390,000.00
6 Batu Alam Bh 25,700.00
7 Pasir Beton M3 1,100,000.00
8 Pasir Beton Kg 932.20
9 Pasir Pasang M3 560,000.00
10 Pasir Urug M3 560,000.00
11 Pasir Plester M3 560,000.00
12 Sirtu M3 560,000.00
13 Tanah Timbunan Biasa M3 250,000.00
14 Tanah Timbunan Pilihan M3 300,000.00
15 Kerikil Cor M3 1,100,000.00
16 Kerikil Cor Kg 887.10
17 Kerikil Pecah/Cipping 2-3 cm M3 1,100,000.00
18 Kerikil Pecah/Cipping Kg 846.15
19 Papan Kayu KLS I M3 5,450,000.00
20 Balok Kayu KLS I M3 5,450,000.00
21 Balok Kayu KLS II M3 4,450,000.00
22 Papan Kayu KLS II M3 4,450,000.00
23 Balok Kayu Putih M3 2,500,000.00
24 Papan Kayu Putih/Papan Begisting M3 2,750,000.00
25 Kayu Dolken dia 8 - 10 Cm / 4 m Batang 12,500.00
26 Kaso 5/7 Batang 35,000.00
27 Besi Beton Ulir/Polos Kg 20,000.00
28 Kawat Ikat / Beton Kg 35,000.00
29 Paku Campuran Kg 29,000.00
30 Paku anti Karat Kg 45,000.00
31 Paku Tripleks Kg 29,000.00
32 Paku Seng + Karet Kg 45,000.00
33 Baut fisher Bh 17,500.00
34 List Plafond Kayu M' 17,500.00
35 Gipsumboard 3 mm Lbr 88,428.00
36 List Plafond Gypsum M' 35,000.00
37 Multiplex 9 mm Lbr 220,000.00
38 Tripleks 4 mm Lbr 78,125.00
40 Tripleks 3 mm Lbr 60,687.00
HARGA SATUAN
NO URAIAN SATUAN
( Rp. )
1 2 3 4
39 Semen PC @ 50 Kg Kg 2,200.00
40 Semen Warna Kg 3,900.00
41 Klosed Jongkok keramik Bh 400,000.00
42 Klosed Duduk porselen + Jetwasher Bh 1,828,333.00
43 Washtafel Bh 602,650.00
44 1 Set Shower Unit 2,140,000.00
45 Floor Drain metal Bh 70,000.00
46 Floor Drain Stainlees Untuk Atap Bh 125,000.00
47 Besi Hollow 40/40 Tebal 0,35 mm M' 55,000.00
48 Pipa GIP diameter 3" M' 105,000.00
49 Pipa GIP diameter 2" M' 90,000.00
50 Pipa GIP diameter 3/4" M' 31,000.00
51 Pipa GIP diameter 1/2" M' 16,650.00
52 Pipa GIP diameter 1" M' 27,875.00
53 Pipa GIP diameter 1 1/2" M' 170,000.00
54 Pipa PVC AW diameter 5 " M' 111,875.00
55 Pipa PVC AW diameter 4 " M' 79,625.00
56 Pipa PVC AW diameter 3 " M' 34,218.75
57 Pipa PVC diameter 2 " M' 15,339.25
58 Pipa PVC diameter 1" M' 10,196.25
59 Pipa PVC diameter 3/4" M' 7,593.75
60 Pipa PVC diameter 1/2" M' 12,812.50
61 Pipa Listrik Union 5/8" M' 8,500.00
62 Sambungan L Pipa GIP dia 3/4" Bh 19,100.00
63 Sambungan L Pipa GIP dia 2" Bh 24,000.00
64 Assesories pipa GIP Set 25,000.00
65 Stop Kran Bh 17,142.00
66 Kran air 1/4 putaran stainles kualitas baik Bh 110,000.00
67 Kran air 1/2" Bh 35,000.00
68 Sheltip Pipa GIP Bh 12,000.00
69 Lem Pipa PVC Kg 27,500.00
70 Mesin Pompa Air Unit 1,200,000.00
71 Lem Kayu Kg 39,500.00
72 Kunci Tanam 2 Slaag Bh 160,500.00
73 Kunci Tanam 1 Slaag Bh 90,000.00
74 Engsel Ring Nylon 4" Bh 50,000.00
75 Engsel Jendela Ring Nylon 3" Bh 20,000.00
76 Engsel Hjendela Pas 17,333.00
77 Engsel H Pintu Pas 25,250.00
78 Spring knive Bh 45,000.00
79 Expanyolet Psg 250,000.00
80 Hak Angin Biasa Bh 10,625.00
81 Gerendel Biasa untuk Jendela Bh 12,000.00
82 Gerendel Panjang untuk Pintu Bh 20,000.00
83 Atap Spandek 0.4 mm M2 120,000.00
84 Nok Atap Spandek 4 mm M' 75,000.00
85 Screw Cteks 12-4x50 BH 2,000.00
86 Screw Cteks 10X16-16 BH 1,500.00
87 Atap Seng Gelombang BJLS-0.30 Lbr 72,333.00
88 Seng Plat BjLS 0.30 Lbr 118,500.00
89 Lampu Philips 24 Watt + Pitting Set 66,250.00
90 Lampu Philips XL 14 Watt + Pitting Set 60,658.00
91 Lampu Philips XL 23 Watt + Pitting Set 66,250.00
92 Lampu Philips TL 18 Watt + Pitting Set 65,250.00
93 AC Split 1.1/2 PK Unit 5,750,000.00
94 Box Sekring Bh 73,000.00
95 Sekring Bh 30,000.00
96 Lampu Down Light + Pitting 25W Set 550,000.00
97 Lampu Down Light + Pitting 11 W Set 400,000.00
98 Kabel Listrik NYA 2 x 1,5 mm dan Assesories M' 19,500.00
99 Kabel Listrik NYA 2 x 2,5 mm dan Assesories M' 27,800.00
100 Stop Kontak 200 Watt Bh 23,583.00
101 Stop Kontak Khusus AC Bh 90,000.00
102 Saklar Tunggal Bh 19,000.00
103 Saklar Ganda Bh 22,300.00
104 Pentanahan Ttk 285,000.00
HARGA SATUAN
NO URAIAN SATUAN
( Rp. )
1 2 3 4
1 M2 Memasang Dinding Batu Bata Merah tebal 1/2 bata, camp. 1 : 4 A.4.4.1.a
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 Rp 117,000.00 Rp 35,100.00
2 Tukang Batu L.02 OH 0.100 Rp 155,000.00 Rp 15,500.00
3 Kepala Tukang L.03 OH 0.010 Rp 170,000.00 Rp 1,700.00
4 Mandor L.04 OH 0.015 Rp 193,000.00 Rp 2,895.00
JUMLAH TENAGA KERJA Rp 55,195.00
B BAHAN
1 Batu Bata Merah Bh 70.000 Rp 4,500.00 Rp 315,000.00
2 Portland Cement Kg 0.230 Rp 2,200.00 Rp 506.00
3 Pasir Pasang M3 0.043 Rp 560,000.00 Rp 24,080.00
JUMLAH HARGA BAHAN Rp 339,586.00
C PERALATAN
1 M2 Acian A.4.4.2.27
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 Rp 117,000.00 Rp 23,400.00
2 Tukang Batu L.02 OH 0.100 Rp 155,000.00 Rp 15,500.00
3 Kepala Tukang L.03 OH 0.010 Rp 170,000.00 Rp 1,700.00
4 Mandor L.04 OH 0.010 Rp 193,000.00 Rp 1,930.00
JUMLAH TENAGA KERJA Rp 42,530.00
B BAHAN
1 Portland Cement Kg 3.250 Rp 2,200.00 Rp 7,150.00
JUMLAH HARGA BAHAN Rp 7,150.00
C PERALATAN
Harga
No KODE Uraian Pekerjaan Satuan
Satuan ( Rp )
a b c d e
1 A.2.2.1.4 Pengukuran & Pemasangan Bowplank M' Rp 126,494.50
1 A.2.3.1.1 Galian Tanah Biasa M3 Rp 101,832.50
2 A.2.3.1.9 Urugan Tanah Kembali M3 Rp 74,965.00
3 A.2.3.1. Urugan Tanah Biasa Dipadatkan M3 Rp 425,425.00
4 A.2.3.1.11 Urugan Pasir M3 Rp 779,933.00
5 A.3.2.1.9 Pasangan Batu Kosong M3 Rp 1,860,276.00
6 A.3.2.1.2 Pasangan Batu Kali Dengan Campuran 1 PC : 4 PP M3 Rp 2,438,452.50
7 A.4.4.1. Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 4 M2 Rp 204,132.50
8 A.4.4.1. Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 2 M2 Rp 219,081.50
9 A.4.4.1.a Memasang Dinding Batu Bata Merah tebal 1/2 bata, camp. 1 : 4 M2 Rp 434,259.10
10 A.4.4.1 Memasang Paving Blok M2 Rp 1,580,194.00
11 A.4.4.2.4 Plesteran 1 : 4, Tebal 15 mm M2 Rp 100,059.30
12 A.4.4.2.3 Plesteran 1 : 3, Tebal 15 mm M2 Rp 103,160.42
13 A.4.4.2.2 Plesteran 1 : 2, Tebal 15 mm M2 Rp 107,236.58
14 A.4.4.2.27 Acian M2 Rp 54,648.00
15 A.4.4.2. Tali Air Benang Sudut M' Rp 76,483.00
16 A.4.1.1.5 Membuat Beton Camp. K-175 M3 Rp 2,901,746.27
17 A.4.1.1.6 Membuat Beton Camp. K-200 M3 Rp 2,890,447.22
18 A.4.1.1.7 Membuat Beton Camp. K-225 M3 Rp 2,917,480.55
19 A.4.1.1.17 Pembesian Besi Polos Dan Ulir Kg Rp 25,987.72
20 A.4.1.1.20 Bekisting Pondasi M2 Rp 241,205.80
21 A.4.1.1.21 Bekisting Sloof M2 Rp 254,955.80
22 A.4.1.1.22 Bekisting Kolom M2 Rp 378,068.90
23 A.4.1.1.23 Bekisting Balok M2 Rp 392,753.90
24 A.4.1.1. Bekisting Plat Meja Beton M2 Rp 343,693.90
25 A.4.1.1. Bekisting Plat Dak M2 Rp 378,068.90
26 A.4.1.1. Bekisting Dinding Beton M2 Rp 415,193.90
27 A.4.1.1 Pondasi Foot Plat Beton Uk. ( 150 x 150 ) cm Buah Rp 5,292,170.06
28 A.4.1.1 Pondasi Plat Beton Uk. ( 100 x 100 ) cm Buah Rp 2,075,000.08
29 A.4.1.1 Sloof Beton M3 Rp 10,214,657.39
30 A.4.1.1 Sloof Beton Uk. 20/35 K-300 M3 Rp 10,191,615.98
31 A.4.1.1 Kolom beton 35/35 K-300 M3 Rp 12,831,350.83
32 A.4.1.1 Kolom Beton 40/40 K-300 M3 Rp 11,221,270.49
33 A.4.1.1 Kolom Beton 20/40 K-200 M3 Rp 12,106,869.16
34 A.4.1.1 Kolom Beton 10/10 K-225 M3 Rp 24,478,816.94
35 A.4.1.1 Ringbalk Beton Uk. ( 25 x 60 ) cm M3 Rp 11,828,112.49
36 A.4.1.1 Balok Anak / Ring Balk Beton Uk. ( 25x 35 ) cm K 300 M3 Rp 11,990,385.00
37 A.4.1.1 Sloof Beton Uk. ( 15 x 20 ) cm M3 Rp 11,220,841.33
38 A.4.1.1 Sloof Beton Uk. ( 20 x 30 ) cm M3 Rp 9,410,292.88
39 A.4.1.1 Kolom Beton M3 Rp 13,071,100.94
40 A.4.1.1 Balok Beton Uk. ( 15 x 40 ) cm M3 Rp 15,086,028.25
41 A.4.1.1 Balok Beton Uk. ( 25 x 40 ) cm M3 Rp 11,979,521.33
42 A.4.1.1 Ringbalok Beton Uk. 15/20 K-200 M3 Rp 13,573,814.61
43 A.4.1.1 Ringbalk Beton Uk. ( 12 x 30 ) cm M3 Rp 14,523,843.34
44 A.4.1.1 Ringbalk Beton M3 Rp 13,278,003.79
45 A.4.1.1 Plat Meja Beton Tebal 8 cm M3 Rp 9,467,706.83
46 A.4.1.1 Plat Dak Tebal 10 cm M3 Rp 11,116,539.98
47 A.4.1.1 Listplank Beton M3 Rp 12,582,326.66
48 A.4.6.1.1 Pemasangan Konstruksi Kuda-kuda Kayu KLS II M3 Rp 9,339,550.00
Harga
No KODE Uraian Pekerjaan Satuan
Satuan ( Rp )
a b c d e
49 A.4.6.1.15 Pemasangan Konstruksi Gording Kayu KLS II M3 Rp 6,873,169.60
50 A.4.6.1.1 Pembuatan dan Pemasangan Kusen Kayu Besi M3 Rp 11,626,230.00
51 A.4.6.1.20 Pemasangan Rangka Plafond Kayu KLS II M2 Rp 172,386.50
Pasangan plafond Triplex 3mm + LIST M2 Rp 91,968.39
52 A.4.6.1.5 Pembuatan dan Pemasangan Daun Pintu Panel Kayu Kls I M2 Rp 968,440.00
53 A.4.6.1.6 Pembuatan dan Pemasangan Daun Jendela Kaca Bening M2 Rp 861,982.00
54 Pasangan Papan Jalusi M2 Rp 594,264.00
55 A.4.6.1. Pemasangan Kaca Buram M2 Rp 305,129.00
56 A.4.6.1. Pemasangan Kaca Mati Bening M2 Rp 338,721.90
57 A.4.6.1.21 Listplank Papan Kayu Besi M' Rp 119,311.50
58 A.4.5.2. Pasang Atap Seng Gel BJLS 0.3 M2 Rp 130,987.74
59 A.4.5.2. Pasang Nok Atap Seng Plat 0.3 mm M' Rp 94,183.10
60 A.4.5.1. Pemasangan Plafond calsiboard Tanpa Nat M2 Rp 141,444.38
61 A.4.5.1 List Plafon M' Rp 37,063.40
62 A.4.6.2. Pemasangan Kunci Tanam 2 Slaag Buah Rp 273,498.50
63 A.4.6.2. Pemasangan Kunci Tanam 1 Slaag Buah Rp 194,880.40
64 A.4.6.2.5 Pemasangan Engsel Pintu Buah Rp 85,480.34
65 A.4.6.2.6 Pemasangan Engsel Jendela Buah Rp 42,313.15
66 A.4.6.2.8 Pemasangan Spring Knip Buah Rp 81,508.90
67 A.4.6.2.9 Pemasangan Hak Angin Buah Rp 43,696.40
69 A.4.4.3. Pemasangan Keramik Dinding Uk. (40x40) cm M2 Rp 442,436.50
70 A.4.4.3. Pemasangan Keramik Dinding Uk. (20x60) cm M2 Rp 373,241.00
71 A.4.4.3. Pasang Keramik Dinding Uk. ( 20 x 20 ) cm M2 Rp 383,323.60
72 A.4.4.3. Pemasangan Lantai Granit Tile Uk. (60x60) cm M2 Rp 352,226.60
73 A.4.4.3. Pasang Keramik Lantai Uk. ( 40 x 40 ) cm, Tekstur Halus M2 Rp 325,479.00
74 A.4.4.3. Pasang Keramik Lantai Uk. ( 30 x 30 ) cm, M2 Rp 299,322.19
75 A.4.4.3. Pemasangan Lantai Keramik Anti Sleep Uk. (25x25) cm M2 Rp 413,053.30
76 A.4.4.3. Pemasangan Lantai Keramik Anti Sleep Uk. (30x30) cm M2 Rp 459,085.00
77 A.4.4.3. Pemasangan Plint Keramik Dinding Artistik Uk. (5x20) cm M2 Rp 2,265,508.30
78 A.4.4.3. Pasang Plint Keramik Uk. ( 10 x 50 ) cm M' Rp 73,833.00
79 A.4.4.3. Pemasangan Batu Alam M2 Rp 635,330.30
80 A.4.4.3. Pemasangan Dinding Glas Blok M2 Rp 994,790.50
81 A.4.7.1.10 Pengecatan Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat M2 Rp 28,425.43
Penutup )
82 A.4.7.1. Pengecatan Plafond Baru Dengan Cat Tembok (1 Lapis Plamur, 1 Lapis Cat M2 Rp 49,083.10
Dasar, 2 Lapis Cat Penutup)
83 A.4.7.1.4 Pengecatan Kilap Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat M2 Rp 61,843.65
Penutup )
84 A.4.7.1.6 Pengecatan Dengan Teak Oil M2 Rp 49,387.25
Pengecetan Atap 2x Jalan M2 Rp 42,900.00
85 A.4.7.1. Pengecatan Plat Dak Dengan Cat Water Profing M2 Rp 44,724.35
86 Pemasangan Lampu Philips XL 18 Watt Buah Rp 90,767.05
87 Harga Satuan Pekerjaan ( D + E ) Buah Rp 90,767.05
88 Pemasangan Saklar Tunggal 200 Watt Buah Rp 39,892.05
89 Pemasangan Saklar Ganda 200 Watt Buah Rp 43,522.05
90 Pemasangan Stop Kontak 200 Watt Buah Rp 44,933.35
91 MCB 2 Group Buah Rp 102,083.30
92 Pemasangan Titik Nyala Lampu Penerangan Titik Rp 253,407.00
93 Pemasangan Titik Nyala Stop Kontak Titik Rp 326,447.00
94 A.5.1.1.1 Pemasangan Kloset Duduk Buah Rp 2,595,711.78
95 A.5.1.1.2 Pemasangan Kloset Jongkok Buah Rp 924,555.50
96 A.5.1.1.5 Pemasangan Washtafel Porcelin Buah Rp 1,271,190.80
Harga
No KODE Uraian Pekerjaan Satuan
Satuan ( Rp )
a b c d e
97 A.5.1.1.20 Pemasangan Pipa GIP Ø 3/4" M' Rp 79,550.35
98 A.5.1.1.23 Pemasangan Pipa GIP Ø 3" M' Rp 233,012.73
99 A.4.2.1. Pemasangan Rangka Atap Besi Hollow 40/40 Tebal 0,35 mm M2 Rp 531,147.65
100 A.5.1.1.35 Pemasangan Kran Air 1/4 Putaran Buah Rp 148,970.25
101 A.5.1.1.36 Pemasangan Floordrain Buah Rp 97,710.25
102 A.5.1.1. Pemasangan Floordrain Atap Buah Rp 158,210.25
103 A.5.1.1 Pembuatan Septictank Unit Rp 8,139,539.35
104 A.5.1.1 Pembuatan Bak Kontrol Air Kotor Unit Rp 1,151,771.80
105 A.5.1.1 Pembuatan Saluran Air M' Rp 343,006.25
106 A.2.2.1. Pembersihan Lahan dan Alat M' Rp 23,485.00
107 A.2.3.1.4 Galian Tanah Keras M3 Rp 135,493.60
108 A.5.1.1.22 Pemasangan Pipa GIP Ø 1 1/2" M' Rp 90,514.88
109 A.4.1.1 Kolom Pedestal M3 Rp 10,311,331.69
110 A.4.6. Pasang Grendel Pintu BH Rp 111,468.50
111 A.4.6.1. Pasang Grendel jendela BH Rp 102,668.50
112 Pasang Hak Angin BH Rp 101,156.00
113 Pasangan Paving Blok BH Rp -
M2 Rp 420,283.00
RENCANA ANGGARAN BIAYA ( RAB )
ENGINEERING ESTIMATE (E.E)
Unit Kerja : -
Pekerjaan : PERENCANAAN PEMBANGUNAN KLINIK
Lokasi : KAB. KOTA JAYPURA
Anggaran : Tahun 2019
B. KONSTRUKSI
I. PEKERJAAN PERSIAPAN
1 Pasang Bouwplank 20.07
IV PEKERJAAN BETON
1 Pek. Beton sloef 25/25 5.53 -
2 Pek. Kolom Beton 12/12 (1:2:3) 0.29
3 Ring Balk 25/30 7.09 M3 -
4 Ring Balk 15/30 0.32 M3 -
0.00
V PEKERJAAN PASANGAN DAN PLESTERAN
1 Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 4 20.07 M2 -
2 Pas. Dinding Batu Tela Kolam Taman tebal 1/4 bata,camp,1:4 M2 -
3 Plesteran Dinding camp. 1 : 4 M2 -
4 Pek. Acian Dinding M2 -
-
REKAPITULASI AKHIR
Unit Kerja : -
Pekerjaan : PERENCANAAN PEMBANGUNAN KLINIK
Lokasi : KAB. KOTA JAYPURA
Anggaran : Tahun 2019
B. KONSTRUKSI
Rp. 0.00
Rp. -
Rp. 0.00
Rp. -
TERBILANG : -
B. KONSTRUKSI
I PEKERJAAN PERSIAPAN #DIV/0! #DIV/0! #DIV/0! #DIV/0!
II PEKERJAAN TANAH & PASIR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
80
VI PEKERJAAN LANTAI,KERAMIK DAN PAS. PAVING BLOCK #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
VIII PEKERJAAN ATAP DAN PLAFOND #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 40
XII PEKERJAAN KUNCI DAN ALAT PENGGANTUNG #DIV/0! #DIV/0! #DIV/0! #DIV/0!
RENC. REALISASI MINGGUAN KUMULATIF 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
REALISASI MINGGUAN
2
7
NPM 16 111 063
A Mahasiswa
p
r