Anda di halaman 1dari 3

DAFTAR HARGA SATUAN BAHAN / MATERIAL

PEKERJAAN : JASA KONSULTASI PERENCANAAN HALTE SUNGAI


LOKASI : KECAMATAN CANDI LARAS SELATAN, DESA SEI SALAI, KABUPATEN TAPIN

HARGA SATUAN
NO. BAHAN / MATERIAL SATUAN
( Rp. )
1 Air m3 -
2 Acetelynt botol -
3 Balok kayu perancah Kelas II( balok kayu hutan ) m3 -
4 Balok kayu perancah Kelas III( balok kayu hutan ) m3 -
5 Baja Profil Kg -
6 Besi Beton Kg -
7 Besi plat Kg -
8 Batu Gunung m3 -
9 Grease Kg -
10 Geotextil m2 -
11 Kawat Untuk Beton /Bendrat Kg -
12 Kawat Las /electrode Kg -
13 Batu Split / Coral m3 -
14 Minyak bekisting Liter -
15 Multiplek 9mm lembar -
16 Multiplex 12 mm Bh -
17 Multiplek 16mm lembar -
18 Oksigen Botol -
19 Oli liter -
20 Paku Kg -
21 Pasir Urug m3 -
22 Pasir Cor /Beton m3 -
23 Semen Pc ( 50 Kg ) Zak -
24 Solar Liter -
25 Bensin Liter -
26 Cat Anti Karat Kg -
27 Tiang Pancang baja Ø 457,2 mm t= 12mm Ton -
28 Kayu Galam dia 10/12 - 6m Batang -
29 Kayu Galam dia 8/10 - 4m Batang -
30 Sirtu/ Base cose m3 -
31 Pipa galvanis Ø2" m' -
32 Besi siku m' -
33 Atap + rangka baja ringan m2 -
34 Fender type V 500 H 2000L bh -
35 Fender type V 500 H 1500L bh -
36 Fender type V 500 H 1000L bh -
37 Baut angkur fender bh -
38 Bolard bh -
39 LAMPU SOLAR SELL +Tiang + Asesoris bh -
40 Rambu - rambu bh -
DAFTAR HARGA SATUAN UPAH

PEKERJAAN : JASA KONSULTASI PERENCANAAN HALTE SUNGAI


LOKASI : KECAMATAN CANDI LARAS SELATAN, DESA SEI SALAI, KABUPATEN TAPIN

HARGA SATUAN
NO. URAIAN SATUAN
( Rp. )

1 Juru Gambar hari -

2 Juru Ukur hari -

3 Kepala Tukang hari -

4 Mandor hari -

5 Mekanik hari -

6 Pekerja hari -

7 Pembantu Operator hari -

8 Tukang Batu hari -

9 Tukang Besi hari -

10 Tukang Cat hari -

11 Tukang Listrik hari -

12 Tukang Kayu hari -

13 Tukang Las hari -

14 Crew Pancang hari -

15 Operator Pancang hari -

16 Operator alat Berat hari -

17 Satpam hari -

18 Penjaga Malam hari -


DAFTAR HARGA SATUAN PERALATAN

PEKERJAAN : JASA KONSULTASI PERENCANAAN HALTE SUNGAI

LOKASI : KECAMATAN CANDI LARAS SELATAN, DESA SEI SALAI, KABUPATEN TAPIN

HARGA SATUAN
NO. URAIAN SATUAN
( Rp. )

1 Crane 25 ton hari -

2 Generator Set jam -

3 Ponton Pancang hari -

4 Diesel Hammer + Loader hari -

5 Concrete mixer jam -

6 Concrete Vibrator jam -

7 compressor jam -

8 Mesin Las jam -

9 Ponton Transport hari -

10 Water Pass hari -

11 Theodolit hari -

Anda mungkin juga menyukai