Anda di halaman 1dari 8

Form No:WB-PTRN QC-63

Contractor : PT.WIJAYA KARYA BETON Tbk


Formulir Pengujian Penetrometer Konus Dinamis (DCP)
Project : Elevated Toll Road Pettarani Makassar

Tanggal pengujian : 07/12/2020 Lokasi Pengujian *Ukuran konus : 30


Request No : Elevasi pengujian Jenis Material :
Ref.Shop Drawing No. : Stasioning :

Banyak Kumulatif Penetrasi DCP


CBR
Tumbukan Tumbukan
(mm) mm/tumbukan 60 30
10

0 20
5 80
5 125
5 165
5 200
5 250 41.98 28.64
5 291
5 320
5 340
5 365
5 425
5 500
5 625
5
Kumulatif Tumbukan

5 Err:502 Err:502
5 570

8.07 41.98

0
0 100 200 300 400 500 600 700

Penetrasi (mm)

Check by Create & Check by


PT. BOSOWA MARGA NUSANTARA NIPPON KOEI-INDO KOEI-CIPTA STRADA PT. WIJAYA KARYA BETON

Name : Name : Name :


Date : Date : Date :
Time : Time : Time :
Form No:WB-PTRN QC-63
Contractor : PT.WIJAYA KARYA BETON Tbk
Formulir Pengujian Penetrometer Konus Dinamis (DCP)
Project : Elevated Toll Road Pettarani Makassar

Tanggal pengujian : Lokasi Pengujian : *Ukuran konus : 60


Request No : Elevasi pengujian : Jenis Material : Tanah Berbutir halus / Granular
Ref.Shop Drawing No. : Stasioning :

Banyak Kumulatif Penetrasi DCP


CBR
Tumbukan Tumbukan
(mm) mm/tumbukan 60 30
80
0 0 0
2 2 7
2 4 26
2 6 50 70
2 8 76
2 10 98 98.21 59.33
2 12 108
2 14 115
60
2 16 120
2 18 123
2 20 128
2 22 132
2 24 135 50
2 26 138
Kumulatif Tumbukan

2 28 142 Err:502 Err:502


2 30 144
2 32 144 40
2 34 151
2 36 155 4.22 98.21
2 38 158
2 40 163
30
2 42 165
2 44 172
2 46 182
2 48 188
2 50 195 20
2 52 203
2 54 213
2 56 224
2 58 237 10
2 60 247
2 62 255
2 64 265
2 66 274
0
2 68 285 0 50 100 150 200 250 300 350
2 70 294
2 72 304 Penetrasi (mm)

Disetujui Oleh Diperiksa oleh Dibuat & Diperiksa oleh


PT. BOSOWA MARGA
NUSANTARA PPK 3.2 PROVINSI SUL-SEL NIPPON KOEI-INDO KOEI-CIPTA STRADA PT. WIJAYA KARYA BETON

PT. WIRA MARGA

Nama : Nama : Nama : Nama : Nama :


Tanggal : Tanggal : Tanggal : Tanggal : Tanggal :
Jam : Jam : Jam : Jam : Jam :