TITIK A

TITIK A1 A2 A3 A4 A5 A6 A7 A8 A9

+423.483

+422.851

+422.838

+423.837
+423.703

+423.880

+424.000

+423.143
ELEVASI TANAH

+424
ASLI (m)
Eksisting
Saluran

JARAK (m) 0,750 0,413 0,420 9,300 0,500 0,960 0,413


JARAK
KUMULATIF (m) 0,750 1,163 1,583 10,883 11,388 12,343 12,756
+424.666

+424.666

+424.000

+423.143
+422.850

+424.000

+422.851

+422.838

+423.837
ELEVASI TANAH
ASLI (m)

JARAK (m)
0,441 1.027 0.114 9,100 0,470 0,990 0,750
Rencana
Saluran

JARAK
KUMULATIF (m) 0,441 1,468 1,582 10,682 11,152 12,142 12,892

Luas
(m²)
Galian 0.776
:
Timbunan 0.0303
:

Hal :
HMP HIMPUNAN MAHASISWA PENGAIRAN
No Tugas :

POTONGAN MELINTANG SALURAN A


FAKULTAS TEKNIK

W
No :

A
R
F

B
A
K

I
UNIVERSITAS BRAWIJAYA

N
U
L

U
T
A
S
T E K N I K
Lembar :

SKALA 1:50 JUDUL GAMBAR

P0TONGAN MELINTANG
SKALA

1:50
DISETUJUI
Tanggal
Catatan
:
:
SALURAN A

Direncana :
Rifqy. A. Fadhil
Diperiksa : Zefanya. Alovy. P. D.
Dosen Pengampu : Dr. Eng Riyanto Haribowo,ST., MT.
1.
2. Rahmah Dara Lufira ,ST., MT.