KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.

Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu / Sumatera
DIREKTORAT JENDERAL SUMBER DAYA AIR
Utara
BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :
SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Primer ( P0 - P16 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian 3
Rata-rata Luas Volume Merapikan Tanah
No. Stationing 2 2 Jarak (m) Volume Galian (m ) No. Stationing Merapikan Tanah 2 Jarak (m) 3
Galian (m ) (m ) 2 Merapikan Tanah (m ) (m )
(m )

1 0+000 4,765 1 0+000 5,237


4,830 100 482,950 5,309 100 530,935
2 0+100 4,894 2 0+100 5,382
4,834 100 483,425 5,315 100 531,530
3 0+200 4,775 3 0+200 5,249
4,810 100 481,025 5,414 100 541,440
4 0+300 4,846 4 0+300 5,580
5,019 100 501,900 5,644 100 564,350
5 0+400 5,192 5 0+400 5,707
4,918 100 491,790 5,407 100 540,670
6 0+500 4,643 6 0+500 5,106
4,709 100 470,915 5,179 100 517,870
7 0+600 4,775 7 0+600 5,251
4,810 100 481,025 5,289 100 528,880
8 0+700 4,846 8 0+700 5,327
4,850 100 484,960 5,332 100 533,170
9 0+800 4,854 9 0+800 5,337
4,827 100 482,690 5,309 100 530,905
10 0+900 4,800 10 0+900 5,281
4,939 100 493,860 5,431 100 543,140
11 1+000 5,077 11 1+000 5,582
4,939 100 493,860 5,431 100 543,100
12 1+100 4,800 12 1+100 5,280
4,889 100 488,875 5,377 100 537,655
13 1+200 4,977 13 1+200 5,473
4,871 100 487,135 5,357 100 535,710
14 1+300 4,765 14 1+300 5,242
4,667 100 466,685 5,132 100 513,190
15 1+400 4,568 15 1+400 5,022
4,929 100 492,935 5,420 100 541,990
16 1+500 5,290 16 1+500 5,818
5,206 100 520,625 5,725 100 572,485
17 1+600 5,122 17 1+600 5,632

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 3893,410 3911,245 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 4293,630 4313,390
3 3
TOTAL VOLUME (m ) 7804,66 TOTAL VOLUME (m ) 8607,02

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu / Sumatera
DIREKTORAT JENDERAL SUMBER DAYA AIR
Utara
BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :
SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 1 ( P16 - P31 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan Tanah
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) Merapikan Tanah (m2) (m3)
(m2)

1 0+000 2,853 1 0+000 3,138


2,858 100 285,800 3,143 100 314,280
2 0+100 2,863 2 0+100 3,147
2,974 100 297,350 3,269 100 326,860
3 0+200 3,084 3 0+200 3,390
3,101 100 310,080 3,408 100 340,760
4 0+300 3,118 4 0+300 3,425
2,848 100 284,810 3,131 100 313,090
5 0+400 2,579 5 0+400 2,837
2,817 100 281,675 3,099 100 309,920
6 0+500 3,055 6 0+500 3,362
3,003 100 300,290 3,304 100 330,370
7 0+600 2,951 7 0+600 3,246
2,751 100 275,105 3,025 100 302,530
8 0+700 2,551 8 0+700 2,805
2,795 100 279,545 3,073 100 307,290
9 0+800 3,040 9 0+800 3,341
2,985 100 298,530 3,283 100 328,250
10 0+900 2,931 10 0+900 3,224
2,933 100 293,250 3,225 100 322,500
11 1+000 2,934 11 1+000 3,226
2,819 100 281,925 3,098 100 309,790
12 1+100 2,705 12 1+100 2,970
2,744 100 274,410 3,016 100 301,570
13 1+200 2,784 13 1+200 3,061
2,788 100 278,820 3,066 100 306,580
14 1+300 2,793 14 1+300 3,070
2,859 100 3,140 100 314,040
15 1+400 2,925 15 1+400 3,211
2,842 100 284,215 3,121 100 312,135
16 1+500 2,760 16 1+500 3,032

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 2296,150 1729,655 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 2524,245 2215,720
3 3
TOTAL VOLUME (m ) 4025,81 TOTAL VOLUME (m ) 4739,97

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu / Sumatera
DIREKTORAT JENDERAL SUMBER DAYA AIR
Utara
BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :
SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 2 ( P31 - P54 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan Tanah
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) (m3)
(m )

1 0+000 2,630 1 0+000 2,883


2,835 100 283,460 2,862 100 286,220
2 0+100 3,039 2 0+100 2,842
2,815 100 281,525 2,846 100 284,580
3 0+200 2,591 3 0+200 2,850
2,583 100 258,250 2,841 100 284,070
4 0+300 2,574 4 0+300 2,831
2,770 100 276,955 3,046 100 304,610
5 0+400 2,965 5 0+400 3,261
3,010 100 300,960 3,310 100 330,960
6 0+500 3,054 6 0+500 3,358
3,001 100 300,070 3,299 100 329,930
7 0+600 2,948 7 0+600 3,240
2,885 100 288,490 3,171 100 317,080
8 0+700 2,822 8 0+700 3,101
2,846 100 284,590 3,127 100 312,740
9 0+800 2,870 9 0+800 3,153
2,810 100 280,960 3,087 100 308,670
10 0+900 2,750 10 0+900 3,020
2,794 100 279,415 3,070 100 307,000
11 1+000 2,839 11 1+000 3,120
2,763 100 276,285 3,036 100 303,560
12 1+100 2,687 12 1+100 2,951
2,813 100 281,265 3,091 100 309,060
13 1+200 2,938 13 1+200 3,230
2,934 100 293,415 3,226 100 322,600
14 1+300 2,930 14 1+300 3,222
2,903 100 3,192 100 319,230
15 1+400 2,876 15 1+400 3,163
2,813 100 281,265 3,092 100 309,170
16 1+500 2,750 16 1+500 3,021

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 2263,085 1703,820 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 2462,330 2167,150
3 3
TOTAL VOLUME (m ) 3966,91 TOTAL VOLUME (m ) 4629,48

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu /
DIREKTORAT JENDERAL SUMBER DAYA AIR
Sumatera Utara

BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :


SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 3 ( P54 - P77 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

1 0+000 3,026 1 0+000 3,328


3,020 100 302,000 3,322 100 332,200
2 0+100 3,014 2 0+100 3,316
2,994 100 299,400 3,294 100 329,400
3 0+200 2,974 3 0+200 3,272
2,972 100 297,150 2,973 100 297,250
4 0+300 2,969 4 0+300 2,673
3,022 100 302,150 3,027 100 302,650
5 0+400 3,074 5 0+400 3,380
3,066 100 306,550 3,372 100 337,200
6 0+500 3,057 6 0+500 3,364
3,050 100 304,950 3,051 100 305,050
7 0+600 3,042 7 0+600 2,737
2,992 100 299,150 2,987 100 298,650
8 0+700 2,941 8 0+700 3,236
2,941 100 294,100 3,236 100 323,600
9 0+800 2,941 9 0+800 3,236
2,983 100 298,250 3,282 100 328,150
10 0+900 3,024 10 0+900 3,327
2,971 100 297,050 3,268 100 326,750
11 1+000 2,917 11 1+000 3,208
2,955 100 295,500 3,251 100 325,050
12 1+100 2,993 12 1+100 3,293
2,972 100 297,200 3,269 100 326,900
13 1+200 2,951 13 1+200 3,245
3,043 100 304,250 3,346 100 334,550
14 1+300 3,134 14 1+300 3,446
3,131 100 313,100 3,446 100 344,600
15 1+400 3,128 15 1+400 3,446
3,089 100 308,900 3,401 100 340,050
16 1+500 3,050 16 1+500 3,355
3,031 100 303,050 3,335 100 333,450
17 1+600 3,011 17 1+600 3,314
3,029 100 302,850 3,332 100 333,200
18 1+700 3,046 18 1+700 3,350
3,038 100 303,800 3,341 100 334,100
19 1+800 3,030 19 1+800 3,332
3,003 100 300,300 3,303 100 330,250
20 1+900 2,976 20 1+900 3,273
3,099 100 309,850 3,408 100 340,800
21 2+000 3,221 21 2+000 3,543
3,233 100 323,300 3,557 100 355,650
22 2+100 3,245 0,000 22 2+100 3,570

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 3338,200 3024,650 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 3612,200 3267,300
3 3
TOTAL VOLUME STA 0+000 - 2+100 (m ) 6362,85 TOTAL VOLUME STA 0+000 - 2+100 (m ) 6879,50
BACK UP DATA BACK UP DATA
Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

22 2+100 3,245 22 2+100 3,570


3,189 100 318,900 3,508 100 350,800
23 2+200 3,133 23 2+200 3,446
3,127 100 312,650 3,440 100 344,000
24 2+300 3,120 24 2+300 3,434
3,159 100 315,850 3,475 100 347,450
25 2+400 3,197 25 2+400 3,515
3,002 100 300,200 3,301 100 330,050
26 2+500 2,807 26 2+500 3,086
2,898 50 144,875 3,187 50 159,350
27 2+550 2,988 27 2+550 3,288

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 779,625 612,850 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 857,600 674,050

TOTAL VOLUME STA 2+100 - 2+550 (m3) 1392,48 TOTAL VOLUME STA 2+100 - 2+550 (m3) 1531,65

TOTAL VOLUME STA 0+000 - 2+100 6362,85 m3 TOTAL VOLUME STA 0+000 - 2+100 6879,50 m3

TOTAL VOLUME STA 2+100 - 2+550 1392,48 m3 TOTAL VOLUME STA 2+100 - 2+550 1531,65 m3

TOTAL VOLUME GALIAN TANAH KESELURUHAN 7755,33 m3 TOTAL VOLUME MERAPIKAN TANAH KESELURUHAN 8411,15 m3

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu /
DIREKTORAT JENDERAL SUMBER DAYA AIR
Sumatera Utara

BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :


SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 4 ( P77 - P100 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

1 0+000 2,827 1 0+000 3,107


2,823 100 282,320 3,103 100 310,275
2 0+100 2,820 2 0+100 3,099
2,928 100 292,835 3,218 100 321,780
3 0+200 3,037 3 0+200 3,337
2,963 100 296,335 3,256 100 325,645
4 0+300 2,890 4 0+300 3,176
2,769 100 276,930 3,043 100 304,345
5 0+400 2,649 5 0+400 2,911
2,641 100 264,140 2,903 100 290,330
6 0+500 2,634 6 0+500 2,896
2,693 100 269,345 2,962 100 296,155
7 0+600 2,753 7 0+600 3,028
2,674 100 267,400 2,939 100 293,940
8 0+700 2,595 8 0+700 2,851
2,673 100 267,315 2,939 100 293,850
9 0+800 2,751 9 0+800 3,026
2,698 100 269,795 2,966 100 296,575
10 0+900 2,645 10 0+900 2,906
2,652 100 265,225 2,915 100 291,495
11 1+000 2,660 11 1+000 2,924
2,667 100 266,700 2,931 100 293,065
12 1+100 2,674 12 1+100 2,937
2,691 100 269,120 2,957 100 295,700
13 1+200 2,708 13 1+200 2,977
2,773 100 277,315 3,049 100 304,865
14 1+300 2,838 14 1+300 3,120
2,843 100 284,275 3,126 100 312,560
15 1+400 2,848 15 1+400 3,131
2,685 100 268,530 2,950 100 295,010
16 1+500 2,523 16 1+500 2,769
2,578 100 257,805 2,833 100 283,255
17 1+600 2,633 17 1+600 2,896
2,639 100 263,915 2,902 100 290,215
18 1+700 2,645 18 1+700 2,909
2,723 100 272,335 2,995 100 299,490
19 1+800 2,802 19 1+800 3,081
2,776 100 277,565 3,051 100 305,120
20 1+900 2,750 20 1+900 3,021
2,736 100 273,550 3,006 100 300,590
21 2+000 2,721 21 2+000 2,991
2,646 100 264,600 2,908 100 290,840
22 2+100 2,571 0,000 22 2+100 2,826

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 2998,615 2728,735 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 3295,880 2999,220
3 3
TOTAL VOLUME STA 0+000 - 2+100 (m ) 5727,35 TOTAL VOLUME STA 0+000 - 2+100 (m ) 6295,10
BACK UP DATA BACK UP DATA
Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

22 2+100 2,571 22 2+100 2,8262


2,714 100 271,405 2,985 100 298,450
23 2+200 2,857 23 2+200 3,1428
2,863 100 286,330 3,147 100 314,740
24 2+300 2,869 24 2+300 3,152
1,435 100 143,465 1,576 100 157,600

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 414,870 286,330 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 456,050 314,740

TOTAL VOLUME (m3) 701,20 TOTAL VOLUME (m3) 770,79

TOTAL VOLUME STA 0+000 - 2+100 5727,35 m3 TOTAL VOLUME STA 0+000 - 2+100 6295,10 m3

TOTAL VOLUME STA 2+100 - 2+800 701,20 m3 TOTAL VOLUME STA 2+100 - 2+800 770,79 m3

TOTAL VOLUME GALIAN TANAH KESELURUHAN 6428,55 m3 TOTAL VOLUME MERAPIKAN TANAH KESELURUHAN 7065,89 m3

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu /
DIREKTORAT JENDERAL SUMBER DAYA AIR
Sumatera Utara

BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :


SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 5 ( P100 - P131 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) Merapikan Tanah (m2) Tanah (m3)
(m2)

1 0+000 3,031 1 0+000 3,333


3,034 100 303,350 3,337 100 333,650
2 0+100 3,036 2 0+100 3,340
3,031 100 303,100 3,334 100 333,350
3 0+200 3,026 3 0+200 3,327
3,003 100 300,300 3,329 100 332,850
4 0+300 2,980 4 0+300 3,330
3,067 100 306,650 3,399 100 339,850
5 0+400 3,153 5 0+400 3,467
3,086 100 308,550 3,564 100 356,350
6 0+500 3,018 6 0+500 3,660
3,048 100 304,750 3,523 100 352,250
7 0+600 3,077 7 0+600 3,385
3,084 100 308,350 3,392 100 339,200
8 0+700 3,090 8 0+700 3,399
3,058 100 305,800 3,364 100 336,400
9 0+800 3,026 9 0+800 3,329
3,097 100 309,650 3,407 100 340,650
10 0+900 3,167 10 0+900 3,484
3,243 100 324,250 3,567 100 356,650
11 1+000 3,318 11 1+000 3,649
3,212 100 321,200 3,534 100 353,350
12 1+100 3,106 12 1+100 3,418
3,059 100 305,900 3,367 100 336,650
13 1+200 3,012 13 1+200 3,315
3,062 100 306,200 3,370 100 337,000
14 1+300 3,112 14 1+300 3,425
3,119 100 311,900 3,432 100 343,150
15 1+400 3,126 15 1+400 3,438
3,210 100 320,950 3,530 100 352,950
16 1+500 3,293 16 1+500 3,621
3,205 100 320,450 3,525 100 352,450
17 1+600 3,116 17 1+600 3,428
3,102 100 310,200 3,413 100 341,250
18 1+700 3,088 18 1+700 3,397
3,118 100 311,800 3,431 100 343,050
19 1+800 3,148 19 1+800 3,464
3,127 100 312,650 3,440 100 344,000
20 1+900 3,105 20 1+900 3,416
3,126 100 312,600 3,440 100 343,950
21 2+000 3,147 21 2+000 3,463
3,094 100 309,350 3,404 100 340,400
22 2+100 3,040 0,000 22 2+100 3,345

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 3410,750 3107,200 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 3771,650 3437,750
3 3
TOTAL VOLUME STA 0+000 - 2+100 (m ) 6517,95 TOTAL VOLUME STA 0+000 - 2+100 (m ) 7209,40
BACK UP DATA BACK UP DATA
Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

22 2+100 3,040 22 2+100 3,345


3,088 100 308,800 3,397 100 339,700
23 2+200 3,136 23 2+200 3,449
3,174 100 317,400 3,492 100 349,200
24 2+300 3,212 24 2+300 3,535
3,151 100 315,050 3,468 100 346,750
25 2+400 3,089 25 2+400 3,400
3,052 100 305,150 3,359 100 335,900
26 2+500 3,014 26 2+500 3,318
3,069 100 306,850 3,377 100 337,700
27 2+600 3,123 27 2+600 3,436
3,126 100 312,550 3,439 100 343,900
28 2+700 3,128 28 2+700 3,442
3,079 100 307,850 3,387 100 338,700
29 2+800 3,029 29 2+800 3,332

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 1238,550 935,100 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 1362,850 1029,000

TOTAL VOLUME (m3) 2173,65 TOTAL VOLUME (m3) 2391,85

TOTAL VOLUME STA 0+000 - 2+100 6517,95 m3 TOTAL VOLUME STA 0+000 - 2+100 7209,40 m3

TOTAL VOLUME STA 2+100 - 2+800 2173,65 m3 TOTAL VOLUME STA 2+100 - 2+800 2391,85 m3

TOTAL VOLUME GALIAN TANAH KESELURUHAN 8691,60 m3 TOTAL VOLUME MERAPIKAN TANAH KESELURUHAN 9601,25 m3

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu /
DIREKTORAT JENDERAL SUMBER DAYA AIR
Sumatera Utara

BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :


SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 6 ( P131 - P154 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) Merapikan Tanah (m2) Tanah (m3)
(m2)

1 0+000 2,695 1 0+000 2,965


2,751 100 275,055 3,026 100 302,590
2 0+100 2,807 2 0+100 3,087
2,757 100 275,680 3,174 100 317,430
3 0+200 2,707 3 0+200 3,262
2,736 100 273,595 3,152 100 315,160
4 0+300 2,765 4 0+300 3,042
2,749 100 274,865 3,024 100 302,360
5 0+400 2,733 5 0+400 3,006
2,729 100 272,895 3,002 100 300,170
6 0+500 2,725 6 0+500 2,998
2,723 100 272,340 2,996 100 299,585
7 0+600 2,721 7 0+600 2,994
2,752 100 275,225 3,028 100 302,810
8 0+700 2,783 8 0+700 3,062
2,752 100 275,150 3,027 100 302,730
9 0+800 2,720 9 0+800 2,992
2,724 100 272,405 2,998 100 299,760
10 0+900 2,728 10 0+900 3,003
2,721 100 272,135 2,995 100 299,510
11 1+000 2,715 11 1+000 2,987
2,711 100 271,075 2,983 100 298,330
12 1+100 2,707 12 1+100 2,979
2,727 100 272,660 3,000 100 299,985
13 1+200 2,746 13 1+200 3,020
2,746 100 274,620 3,021 100 302,110
14 1+300 2,746 14 1+300 3,022
2,759 100 275,895 3,036 100 303,575
15 1+400 2,772 15 1+400 3,050
2,797 100 279,650 3,077 100 307,675
16 1+500 2,821 16 1+500 3,104
2,791 100 279,085 3,070 100 306,955
17 1+600 2,760 17 1+600 3,035
2,755 100 275,485 3,030 100 302,950
18 1+700 2,749 18 1+700 3,024
2,740 100 273,985 3,014 100 301,420
19 1+800 2,730 19 1+800 3,005
2,757 100 275,670 3,033 100 303,305
20 1+900 2,783 20 1+900 3,061
2,834 100 283,380 2,970 100 297,040
21 2+000 2,885 21 2+000 2,879
2,809 100 280,925 2,943 100 294,340
22 2+100 2,734 0,000 22 2+100 3,007

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 3026,600 2755,175 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 3329,200 3030,590
3 3
TOTAL VOLUME STA 0+000 - 2+100 (m ) 5781,78 TOTAL VOLUME STA 0+000 - 2+100 (m ) 6359,79
BACK UP DATA BACK UP DATA
Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

22 2+100 2,734 22 2+100 3,007


2,767 100 276,720 3,044 100 304,400
23 2+200 2,801 23 2+200 3,081
2,801 100 280,145 3,082 100 308,205
24 2+300 2,802 24 2+300 3,084
1,401 100 140,120 1,542 100 154,175

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 416,840 280,145 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 458,575 308,205

TOTAL VOLUME (m3) 696,99 TOTAL VOLUME (m3) 766,78

TOTAL VOLUME STA 0+000 - 2+100 5781,78 m3 TOTAL VOLUME STA 0+000 - 2+100 6359,79 m3

TOTAL VOLUME STA 2+100 - 2+800 696,99 m3 TOTAL VOLUME STA 2+100 - 2+800 766,78 m3

TOTAL VOLUME GALIAN TANAH KESELURUHAN 6478,76 m3 TOTAL VOLUME MERAPIKAN TANAH KESELURUHAN 7126,57 m3

KETERANGAN:
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Pekerjaan : Pemeliharaan D.I.R Kualuh Desa Penggantungan Wonosari Kabupaten Labuhan Batu /
DIREKTORAT JENDERAL SUMBER DAYA AIR
Sumatera Utara

BALAI WILAYAH SUNGAI SUMATERA II No. Kontrak :


SATUAN KERJA OPERASIONAL DAN PEMELIHARAAN SDA SUMATERA II Tgl Kontrak :
OPERASI DAN PEMELIHARAAN SDA III Penyedia :
Jln. Jend. Besar DR. A.H. NASUTION No. 30 Pkl. Mansyur Telp. (061) 7867579 Fax. (061) 7867579 Kode Pos 20143 MEDAN
Lokasi : Saluran Sekunder 7 ( P154 - P177 )

BACK UP DATA BACK UP DATA


Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) Merapikan Tanah (m2) Tanah (m3)
(m2)

1 0+000 3,485 1 0+000 3,834


3,497 100 349,700 3,847 100 384,745
2 0+100 3,509 2 0+100 3,861
3,523 100 352,295 3,876 100 387,590
3 0+200 3,537 3 0+200 3,891
3,517 100 351,685 3,869 100 386,890
4 0+300 3,497 4 0+300 3,847
3,491 100 349,120 3,840 100 384,045
5 0+400 3,485 5 0+400 3,834
3,495 100 349,515 3,845 100 384,515
6 0+500 3,505 6 0+500 3,856
3,484 100 348,350 3,833 100 383,305
7 0+600 3,462 7 0+600 3,810
3,478 100 347,760 3,827 100 382,685
8 0+700 3,493 8 0+700 3,844
3,532 100 353,170 3,885 100 388,535
9 0+800 3,570 9 0+800 3,927
3,562 100 356,230 3,918 100 391,835
10 0+900 3,554 10 0+900 3,910
3,558 100 355,805 3,915 100 391,455
11 1+000 3,562 11 1+000 3,919
3,543 100 354,300 3,898 100 389,805
12 1+100 3,524 12 1+100 3,877
3,615 100 361,465 3,977 100 397,715
13 1+200 3,705 13 1+200 4,077
3,615 100 361,455 3,977 100 397,700
14 1+300 3,524 14 1+300 3,877
3,569 100 356,930 3,927 100 392,675
15 1+400 3,615 15 1+400 3,977
3,566 100 356,600 3,923 100 392,315
16 1+500 3,518 16 1+500 3,869
3,568 100 356,770 3,925 100 392,530
17 1+600 3,618 17 1+600 3,981
3,639 100 363,900 4,004 100 400,435
18 1+700 3,660 18 1+700 4,028
3,641 100 364,070 4,006 100 400,645
19 1+800 3,621 19 1+800 3,985
3,628 100 362,800 3,992 100 399,205
20 1+900 3,635 20 1+900 3,999
3,579 100 357,915 4,108 100 410,815
21 2+000 3,524 21 2+000 4,218
3,585 100 358,520 4,114 100 411,445
22 2+100 3,647 0,000 22 2+100 4,011

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 3912,465 3555,890 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 4321,575 3929,310
3 3
TOTAL VOLUME STA 0+000 - 2+100 (m ) 7468,36 TOTAL VOLUME STA 0+000 - 2+100 (m ) 8250,89
BACK UP DATA BACK UP DATA
Galian Tanah Sedimen (Mekanis) Merapikan Tanah Hasil Galian Sedimen (Mekanis)
Luas Penampang
Luas Penampang Rata-rata Luas Galian Rata-rata Luas Volume Merapikan
No. Stationing 2 2 Jarak (m) Volume Galian (m3) No. Stationing Merapikan Tanah Jarak (m)
Galian (m ) (m ) 2 Merapikan Tanah (m2) Tanah (m3)
(m )

22 2+100 3,647 22 2+100 4,011


3,574 100 357,370 3,931 100 393,080
23 2+200 3,500 23 2+200 3,850
3,587 100 358,670 3,946 100 394,620
24 2+300 3,673 24 2+300 4,042
3,624 100 362,395 3,987 100 398,705
25 2+400 3,575 25 2+400 3,932

VOLUME GALIAN TANAH SEDIMEN (MEKANIS) (m3) 719,765 358,670 VOLUME MERAPIKAN TANAH SEDIMEN (MEKANIS) (m3) 791,785 394,620

TOTAL VOLUME STA 2+100 - 2+550 (m3) 1078,44 TOTAL VOLUME STA 2+100 - 2+550 (m3) 1186,41

TOTAL VOLUME STA 0+000 - 2+100 7468,36 m3 TOTAL VOLUME STA 0+000 - 2+100 8250,89 m3

TOTAL VOLUME STA 2+100 - 2+550 1078,44 m3 TOTAL VOLUME STA 2+100 - 2+550 1186,41 m3

TOTAL VOLUME GALIAN TANAH KESELURUHAN 8546,79 m3 TOTAL VOLUME MERAPIKAN TANAH KESELURUHAN 9437,29 m3

KETERANGAN: