( RAB )
PEKERJAAN :
LOKASI :
Harga Jumlah
No. Uraiian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
1 Management & Administrasi ls 1 25.000.000,00 25.000.000,00
2 Mobilisaso & Demobilisasi ls 1 75.000.000,00 75.000.000,00
3 Direksi Keet & Gudang ls 1 30.000.000,00 30.000.000,00
4 Survei Pengukuran & Stack Out ls 1 25.000.000,00 25.000.000,00
5 Biaya Koordinasi & Keamanan ls 1 50.000.000,00 50.000.000,00
JUMLAH PEKERJAAN PERSIAPAN 205.000.000,00
II PEKERJANAN TANAH
1 Land Clearing M² 13.584 39.873,00 541.634.832,00
2 Galian Berbatu ( L ≤ 1 Km ) M³ 19.123 55.845,00 1.067.923.935,00
3 Galian Berbatu Keras ( L ≤ 1 Km ) M³ 19.123 111.234,00 2.127.127.782,00
4 Timbunan Biasa ( Perataan ) M³ 26.416 46.645,00 1.232.174.320,00
JUMLAH PEKERJANAN TANAH 4.968.860.869,00
III PEKERJAAN PERKERASAN JALAN
1 Pembentukan & Pemadatan Badan Jalan ( CBR 6 %) M² 7.358 102.068,00 751.016.344,00
2 Lapis Pondasi Agregat Klas B ( T - 200 MM CBR > 60%) M³ 1.472 824.643,00 1.213.874.496,00
3 Lapis Pondasi Agregat Klas A ( T - 150 MM CBR > 90%) M³ 1.104 970.097,00 1.070.987.088,00
4 Sand Bedding ( T = 50 mm ) M² 6.792 26.933,00 182.928.936,00
5 Paving Block K 300 T 80 mm M² 6.792 362.178,00 2.459.912.976,00
6 Kanstien K300 (250 195 470 ) M¹ 2.364 144.061,00 340.560.204,00
JUMLAH PEKERJAAN PERKERASAN JALAN 6.019.280.044,00
IV PEKERJAAN PEDESTRIAN JALAN
1 Pembentukan & Pemadatan Badan Jalan ( CBR 6 %) M² 2.264 102.068,00 231.081.952,00
2 Lapis Pondasi Agregat Klas A ( T - 150 MM CBR > 90%) M³ 408 970.097,00 395.799.576,00
3 Sand Bedding ( T = 50 mm ) M² 2.264 26.933,00 60.976.312,00
4 Paving Block K 300 T 80 mm M² 2.264 362.178,00 819.970.992,00
5 Kanstien K300 (250 195 470 ) M¹ 2.264 144.061,00 326.154.104,00
JUMLAH PEKERJAAN PEDESTRIAN JALAN 1.833.982.936,00
V PEKERJAAN DRAINASE JALAN
1 Pengadaan & Pemasangan Street Inlet ( Type MAP Incl. Pipa 4 " D) Unit 453 742.312,00 336.267.336,00
2 Pengadaan & Pemasangan PCP (Precast Concrete Pipe)
( Include Galian, Timbunan Kembali, Pemadatan & Perapihan )