Anda di halaman 1dari 69

KEGIATAN : PEMBANGUNAN PASAR TENTEN DESA ADAT ABIAN

PELAKSANA : PT. KARYA MANDIRI TEKNIK SENTOSA


KONTRAK NOMOR : 454/KNT/TB.CK/DPUPR/2018
TANGGAL : 16 JULI 2018
NILAI KONTRAK : 3,307,075,000
WAKTU PELAKSANAAN : 150 HARI KALENDER ( 20 JULI - 16 DESEMBER 2018)
PEKERJAAN : BELANJA BARANG YANG AKAN DISERAHKAN KEPA
ABIANSEMAL
LOKASI : DESA ABIANSEMAL, KECAMATAN ABIANSEMAL, KA
NO URAIAN PEKERJAAN

1 2
A BANGUNAN PASAR
I. PEKERJAAN PERSIAPAN
1 Pek. Pemasangan Papan Nama Proyek
2 Pek. Pengukuran dan Pemasangan Bowplank

II. PEKERJAAN STRUKTUR


II.1 Pekerjaan Tanah
1 Pek. Galian Tanah Pondasi Telapak
2 Pek. Galian Tanah Pondasi Menerus
3 Pek. Urugan Tanah Kembali
4 Pek. Urugan Tanah Peninggian Lantai Dipadatkan
5 Pek. Urugan Pasir di Bawah Pondasi Menerus
6 Pek. Urugan Pasir di Bawah Pondasi Telapak
7 Pek. Urugan Pasir di Bawah Lantai

II.2 Pekerjaan Pondasi dan Sloof


1 Pek. Pasangan Batu Kosong
2 Pek. Pasangan Batu Kali 1PC : 6 PS
3 FOOT PLAT TYPE P1
- Rabatan Lantai Kerja tebal 5 cm K-100
- Besi Tulangan atas D 16 - 150
- Besi Tulangan bawah D 16 - 150
- Bekisting batako
- Cor Beton K-250
4 FOOT PLAT TYPE P2
- Rabatan Lantai Kerja tebal 5 cm K-100
- Besi Tulangan atas D 16 - 150
- Besi Tulangan bawah D 16 - 150
- Bekisting batako
- Cor Beton K-250
5 SLOOF TYPE S1 20x40 CM
- Rabatan Lantai Kerja tebal 5 cm K-100
- Besi 6 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
6 SLOOF TYPE SP 15x20 CM
7 SLOOF TYPE ST 20x30 CM
- Rabatan Lantai Kerja tebal 5 cm K-100
- Besi 6 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
8 Pek. Pondasi boredpile Ø 30

II.3 Pekerjaan Struktur Lantai I


1 KOLOM TYPE K1 (40x40) CM
- Besi 12 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
2 KOLOM TANGGA A (30x30) CM
- Besi 8 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
3 KOLOM TYPE Kp (11x11) CM
4 RABATAN LANTAI SATU
- Wiremesh M6 (Satu Layer)
- Cor Beton Rabat
5 TANGGA - A
- Tulangan Pokok D 13
- Tulangan Bagi Ø 10
- Bekisting
- Cor Beton K-250
6 PLAT MEJA LOS
- Wiremesh M6 (Satu Layer)
- Bekisting
- Cor Beton K-250

II.4 Pekerjaan Struktur Lantai II


1 KOLOM TYPE K2 (30x30) CM
- Besi 12 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
2 KOLOM TYPE K3 (30x30) CM
- Besi 8 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
3 KOLOM TYPE Kp (11x11) CM
4 BALOK TYPE B1 (30x50) CM
- Besi 13 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
5 BALOK TYPE B2 (20x40) CM
- Besi 11 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
6 BALOK TYPE BA (20x35) CM
- Besi 8 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
7 PLAT LANTAI DUA (t=17 cm)
- Wiremesh M10 (Satu Layer)
- Wiremesh M8 (Pada Tumpuan)
- Besi D 10 Tulangan Over Stek
- Floordeck
- Cor Beton K-250

II.5 Pekerjaan Struktur Atap


1 RING BALOK TYPE RB1 (30x60) CM
- Besi 12 D 19
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
2 RING BALOK TYPE RB2 (20x30) CM
- Besi 6 D 16
- Besi Ø 10 - 150
- Bekisting
- Cor Beton K-250
3 RING BALOK PRAKTIS TYPE RB (15x20) CM
4 PLAT ATAP (t=15 cm)
- Wiremesh M10 (Satu Layer)
- Wiremesh M8 (Pada Tumpuan)
- Besi D 10 Tulangan Over Stek
- Floordeck
- Cor Beton K-250

II.6 Pekerjaan Kap dan Atap


1 Pek Kuda-Kuda Baja WF 250x125x6x9
2 Pek. Baja Siku "∟" 60x60x6mm
3 Pek. Baja Gording "[" 150x50x3mm
4 Pek. Plat baja Pengaku t=18mm
5 Pas. Kait Angin Kuda - Kuda Besi 16 mm
6 Pas. Trek Stank Besi 13 mm (gording)
7 Baut Anker ǿ 22mm p=90cm
8 Mur + Baut Baja Ø 16mm
Pas. Usuk Baja Ringan UK-75 (Galvalume 0,53mm), Reng purlin
9
0,45mm
10 Pas. Lambersering
12 Pas. Atap Genteng Karang Pilang
13 Pas. Bubungan Karang Pilang
14 Pas. Lisplank Condwood
16 Pas. Murda Cor Tembaga
17 Pas. Ikut Celedu Cor Tembaga
18 Pek. Atap Tangga Kanopi
19 Pek. Pas. Loster Kayu Pada Atap

III PEKERJAAN ARSITEKTUR


III.1 Pekerjaan Pasangan dan Pelapis Dinding
III.1.1 Lantai Satu
1 Pek. Pasangan Dinding Bata Merah 1PC : 6PS
2 Pek. Pasangan Bata Merah 1PC : 6PS Meja Los
3 Pek. Pasangan Dinding Tangga Bata Merah 1PC : 6PS
4 Pek. Plesteran 1PC : 6PS
5 Pek. Acian
6 Pek. Pasangan Keramik Dinding 20x30 cm

III.1.2 Lantai Dua


1 Pek. Pasangan Dinding Bata Merah 1PC : 6PS
2 Pek. Pasangan Dinding Bata Merah Selasar 1PC : 6PS
3 Pek. Plesteran 1PC : 6PS
4 Pek. Acian
5 Pek. Pasangan Keramik Dinding 20x30 cm

III.1.3 Lantai Atap


1 Pek. Pasangan Dinding Bata Merah 1PC : 6PS
2 Pek. Plesteran 1PC : 6PS
3 Pek. Acian

III.2 Pekerjaan Pasangan dan Pelapis Lantai


III.2.1 Lantai Satu
1 Pek. Pasangan Lantai Keramik 60x60 cm, Polished
2 Pek. Pasangan Lantai Keramik 40x40 cm, Unpolished
3 Pek. Border/Plint Keramik 10x60 cm, Polished
4 Pek. Pasangan Keramik Meja 40x40 cm, Polished

III.2.2 Lantai Dua


1 Pek. Pasangan Lantai Keramik 60x60 cm, Polished
2 Pek. Pasangan Lantai Keramik 40x40 cm, Unpolished
3 Pek. Border/Plint Keramik 10x60 cm, Polished

III.2.3 Tangga - A
1 Pek. Pasangan Lantai Keramik 30x30 cm, Unpolished

III.3 Pekerjaan Pasangan Plafond


III.3.1 Lantai Satu
1 Pek. Pas. Rangka Hollow
2 Pek. Pas. Plafond Gypsum
3 Pek. Pas. Plafond Kalsiboard
4 Pek. Pas. List Plafond Shadow Line
5 Pek. Pas. List Plafond Gypsum
III.3.2 Lantai Dua
1 Pek. Pas. Rangka Hollow Plafond
2 Pek. Pas. Plafond Gypsum
3 Pek. Pas. Plafond Kalsiboard
4 Pek. Pas. List Plafond Shadow Line
5 Pek. Pas. List Plafond Gypsum

III.4 Pekerjaan Pasangan Pintu dan Jendela


III.4.1 Lantai Satu
1 Pek. Pas. Rolling Door Alluminium 1,2 mm
2 Pek. Pas. Pintu Type P4
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
3 Pek. Pas. Pintu Type PS
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
4 Pek. Pas. Ventilasi Type V1
Kusen Jendela 6/10 cm Kayu Bengkirai
Daun Jendela Kayu Bengkirai & Kaca Bening 5 mm
Engsel Jendela
Grendel Jendela
Kait Angin

III.4.2 Lantai Dua


1 Pek. Pas. Pintu Kaca Rangka Alluminium Type P1
2 Pek. Pas. Rolling Door Alluminium 1,2 mm
3 Pek. Pas. Pintu Type P2
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
4 Pek. Pas. Pintu Type P3
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
5 Pek. Pas. Pintu Type P4
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
6 Pek. Pas. Pintu Type P5
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
Espagnoleth
7 Pek. Pas. Pintu Type PS
Kusen Pintu 6/10 cm Kayu Bengkirai
Daun Pintu Panel Kayu Kamper Bengkirai
Engsel Pintu
Kunci Pintu Dan Handle
8 Pek. Pas. Jendela Type J2
Kusen Jendela 6/10 cm Kayu Bengkirai
Daun Jendela Kayu Bengkirai & Kaca Bening 5 mm
Engsel Jendela
Grendel Jendela
Kait Angin
9 Pek. Pas. Ventilasi Type V1
Kusen Jendela 6/10 cm Kayu Bengkirai
Daun Jendela Kayu Bengkirai & Kaca Bening 5 mm
Engsel Jendela
Grendel Jendela
Kait Angin

III.5 Pekerjaan Pengecatan


III.5.1 Lantai Satu
1 Pengecatan Dinding
2 Pengecatan Plafond
3 Politur Kusen Pintu dan Jendela
4 Politur Daun Pintu, Jendela dan Ventilasi
III.5.2 Lantai Dua
1 Pengecatan Dinding
2 Pengecatan Plafond
3 Politur Kusen Pintu dan Jendela
4 Politur Daun Pintu, Jendela dan Ventilasi

III.5.3 Lantai Atap


1 Pengecatan Dinding
2 Pengecatan Waterproofing Coating Listplank Beton
3 Pengecetan Lisplank condwood

III.6 Pekerjaan Style Bali


1 Tempelan Batu Alam Palimanan
2 Tempelan Batu Bata Press Oven
3 Pas. Tulisan Papan Nama Pasar Bahan Acrilic

IV PEKERJAAN PLUMBING
1 Pek. Washtafel
2 Pek. Closet Jongkok Porselin
3 Pek. Floor Drain
4 Pek. Kran Air
5 Pek. Pipa Air Bersih PVC 1/2" AW
6 Pek. Pipa Air Bersih PVC 1" AW
7 Pek. Pipa Air Bersih PVC 1 1/2" AW
8 Pek. Pipa Air Kotor PVC 2" AW
9 Pek. Pipa Air Kotor PVC 4" AW
10 Pek. Pipa Air Kotor PVC 6" AW
11 Pek. Pas. Bio Septictank
12 Pek. Pas. Peresapan
13 Pek. Tangki Air Stainless 2000 liter
14 Pek. Pas. Pompa Pendorong Booster Pump
15 Pek. Sumur Bor

V PEKERJAAN MEKANIKAL ELEKTRIKAL


V.1 Lantai Satu
1 Pas. Instalasi Titik Lampu
2 Pek. Instalasi Stop Kontak
3 Pek. Instalasi Exhaust Fan
4 Pek. Instalasi Celing Fan
5 Pas. Lampu Downlight SL 13 Watt
6 Pas. Lampu TKL 2x18 Watt RMI
7 Pas. Lampu LED
8 Pas. Lampu Spotlight
9 Pas. Exhaust Fan
10 Pas. Stop Kontak
11 Pas. Saklar Tunggal
12 Pas. Saklar Ganda
13 Pas. MCB Panel 4 Group
14 Pas. Fire Estignguizer 3 kg

V.2 Lantai Dua


1 Pas. Instalasi Titik Lampu
2 Pek. Instalasi Stop Kontak
3 Pek. Instalasi Exhaust Fan
4 Pek. Instalasi AC 1/2 PK
5 Pek. Instalasi AC 3/4 PK
6 Pek. Instalasi AC Outdoor
7 Pas. Lampu Downlight SL 13 Watt
8 Pas. Lampu Pijar Gantung 13 Watt
9 Pas. Exhaust Fan
10 Pas. Stop Kontak
11 Pas. Saklar Tunggal
12 Pas. Saklar Ganda
13 Pas. Penangkal Petir Konvensional ( 2 Tombak 1 Blitzem )
14 Pas. MCB Panel 4 Group
15 Pas. Fire Estignguizer 3 kg

RENCANA
REALISASI

Mengetahui / Menyetujui
PEJABAT PEMBUAT KOMITMEN /
(PPK)
Mengetahui / Menyetujui
PEJABAT PEMBUAT KOMITMEN /
(PPK)

I G.A.NGR ARINDA TRISNAWATI,ST


PEMBINA
NIP. 19690524199803
T
N DESA ADAT ABIANSEMAL
ENTOSA

16 DESEMBER 2018)
N DISERAHKAN KEPADA MASYARAKAT - PEMBANGUNAN PASAR TENTEN DESA ADAT

AN ABIANSEMAL, KABUPATEN BADUNG


HARGA JUMLAH
VOLUME SAT
SATUAN (Rp) HARGA (Rp)
3 4 6 7

1.00 ls 450,000.00 450,000.00


91.20 m1 60,674.25 5,533,491.60

61.20 m3 73,631.25 4,506,232.50


99.14 m3 73,631.25 7,300,096.65
53.45 m3 52,762.50 2,820,050.10
222.77 m3 52,762.50 11,753,796.60
5.83 m3 218,452.50 1,274,014.98
2.29 m3 218,452.50 499,382.42
21.98 m3 218,452.50 4,801,061.66

105.36 m3 460,845.00 48,556,103.90


65.76 m3 746,786.25 49,108,663.80

1.80 m3 741,180.00 1,334,124.00


1,200.44 kg 9,941.93 11,934,636.73
1,200.44 kg 9,941.93 11,934,636.73
48.00 m2 160,659.45 7,711,653.60
14.40 m3 891,231.38 12,833,731.80

0.49 m3 741,180.00 360,213.48


227.45 kg 9,941.93 2,261,299.59
227.45 kg 9,941.93 2,261,299.59
8.64 m2 160,659.45 1,388,097.65
1.94 m3 891,231.38 1,732,553.79

2.25 m3 741,180.00 1,666,469.11


2,621.37 kg 9,941.93 26,061,477.78
1,570.09 kg 9,941.93 15,609,739.29
213.28 m2 44,598.75 9,512,021.40
16.00 m3 891,231.38 14,256,137.07
165.80 m1 82,365.02 13,656,119.49

0.59 m3 741,180.00 439,519.74


561.99 kg 9,941.93 5,587,294.40
219.53 kg 9,941.93 2,182,536.88
29.58 m2 44,598.75 1,319,231.03
1.97 m3 891,231.38 1,757,508.27
200.00 m1 286,869.46 57,373,892.15

2,084.97 kg 9,941.93 20,728,579.58


814.44 kg 9,941.93 8,097,101.40
176.00 m2 102,099.38 17,969,490.00
17.60 m3 891,231.38 15,685,672.20

543.86 kg 9,941.93 5,407,018.58


233.69 kg 9,941.93 2,323,328.29
51.65 m2 102,099.38 5,273,228.52
3.87 m3 891,231.38 3,452,273.85
287.90 m1 64,120.13 18,460,185.07

1,657.80 kg 9,941.93 16,481,723.27


27.00 m3 741,180.00 20,011,860.00

967.65 kg 9,941.93 9,620,337.93


584.50 kg 9,941.93 5,811,101.56
112.96 m2 96,652.50 10,917,866.40
13.01 m3 891,231.38 11,593,137.73

313.14 kg 9,941.93 3,113,214.39


102.00 m2 96,652.50 9,858,555.00
10.20 m3 891,231.38 9,090,560.03
1,046.27 kg 9,941.93 10,401,978.11
299.71 kg 9,941.93 2,979,733.31
66.24 m2 102,099.38 6,763,062.60
4.97 m3 891,231.38 4,427,637.47

217.97 kg 9,941.93 2,167,078.77


93.66 kg 9,941.93 931,166.66
20.70 m2 102,099.38 2,113,457.06
1.55 m3 891,231.38 1,383,636.71
218.50 m1 64,120.13 14,010,248.13

1,848.04 kg 9,941.93 18,373,059.17


666.36 kg 9,941.93 6,624,901.14
104.00 m2 108,005.63 11,232,585.00
9.12 m3 891,231.38 8,128,030.14

2,475.90 kg 9,941.93 24,615,188.25


773.72 kg 9,941.93 7,692,246.33
132.50 m2 108,005.63 14,310,745.31
7.42 m3 891,231.38 6,612,936.80

1,263.62 kg 9,941.93 12,562,775.50


493.60 kg 9,941.93 4,907,334.18
90.00 m2 108,005.63 9,720,506.25
4.60 m3 891,231.38 4,099,664.33

4,480.52 kg 9,941.93 44,544,944.09


1,578.18 kg 9,941.93 15,690,184.48
820.61 kg 9,941.93 8,158,443.07
526.50 m2 65,100.00 34,275,150.00
71.08 m3 891,231.38 63,346,498.06

2,084.82 kg 9,941.93 20,727,107.38


654.51 kg 9,941.93 6,507,125.12
107.55 m2 108,005.63 11,616,004.97
10.32 m3 891,231.38 9,201,785.70
838.73 kg 9,941.93 8,338,542.24
393.15 kg 9,941.93 3,908,691.67
70.80 m2 108,005.63 7,646,798.25
3.19 m3 891,231.38 2,839,463.16
58.00 m1 82,365.02 4,777,170.87

1,936.26 kg 9,941.93 19,250,142.01


682.01 kg 9,941.93 6,780,528.87
6.42 kg 9,941.93 63,795.34
227.53 m2 65,100.00 14,812,040.25
30.72 m3 891,231.38 27,375,252.30

12,218.88 kg 22,533.00 275,328,023.04


2,737.46 kg 22,533.00 61,683,186.18
3,424.10 kg 22,533.00 77,155,290.37
11.61 kg 22,533.00 261,504.59
268.52 kg 9,941.93 2,669,589.79
240.87 kg 9,941.93 2,394,717.74
1,921.00 bh 12,500.00 24,012,500.00
112.00 bh 4,500.00 504,000.00
722.00 m2 125,000.00 90,250,000.00
156.00 m2 125,000.00 19,500,000.00
722.00 m2 134,505.00 97,112,610.00
113.00 m1 198,250.50 22,402,306.50
156.00 m1 35,000.00 5,460,000.00
2.00 bh 1,750,000.00 3,500,000.00
8.00 bh 875,000.00 7,000,000.00
62.50 m2 225,000.00 14,062,500.00
156.00 bh 25,000.00 3,900,000.00

221.30 m2 136,676.40 30,246,405.31


142.70 m2 136,676.40 19,503,722.28
69.60 m2 136,676.40 9,512,677.44
867.20 m2 55,968.57 48,535,876.74
867.20 m2 34,374.38 29,809,416.75
99.53 m2 371,432.25 36,967,908.98

632.70 m2 136,676.40 86,474,488.57


82.80 m2 136,676.40 11,316,805.92
1,430.99 m2 55,968.57 80,090,475.18
1,430.99 m2 34,374.38 49,189,393.76
47.33 m2 371,432.25 17,579,145.53

62.40 m2 136,676.40 8,528,607.36


124.80 m2 55,968.57 6,984,877.54
124.80 m2 34,374.38 4,289,922.00

515.50 m2 75,678.75 39,012,395.63


18.00 m2 150,549.00 2,709,882.00
343.80 m1 71,541.84 24,596,085.29
102.00 m2 150,549.00 15,355,998.00

517.50 m2 75,678.75 39,163,753.13


9.00 m2 150,549.00 1,354,941.00
356.98 m1 71,541.84 25,539,006.76

43.20 m2 71,919.75 3,106,933.20

520.00 m2 164,025.75 85,293,390.00


522.00 m2 41,973.75 21,910,297.50
18.00 m2 46,341.75 834,151.50
187.00 m1 10,000.00 1,870,000.00
35.10 m1 17,500.00 614,250.00
554.00 m2 164,025.75 90,870,265.50
565.00 m2 41,973.75 23,715,168.75
9.00 m2 46,341.75 417,075.75
687.00 m1 10,000.00 6,870,000.00
24.00 m1 17,500.00 420,000.00

38.80 m2 440,737.50 17,098,852.05

0.19 m3 13,911,187.50 2,702,248.17


7.48 m2 865,987.50 6,477,586.50
15.00 bh 55,501.95 832,529.25
5.00 bh 241,158.75 1,205,793.75

0.05 m3 13,911,187.50 667,737.00


0.84 m2 865,987.50 731,586.24
6.00 bh 55,501.95 333,011.70
2.00 bh 241,158.75 482,317.50

0.18 m3 13,911,187.50 2,441,413.41


2.72 m2 602,280.00 1,639,165.25
18.00 bh 58,697.63 1,056,557.25
9.00 bh 58,697.63 528,278.63
18.00 bh 33,720.75 606,973.50

1.00 unit 2,500,000.00 2,500,000.00


142.25 m2 440,737.50 62,695,790.85

0.24 m3 13,911,187.50 3,317,818.22


10.32 m2 865,987.50 8,936,991.00
18.00 bh 55,501.95 999,035.10
6.00 bh 241,158.75 1,446,952.50

0.08 m3 13,911,187.50 1,080,899.27


3.01 m2 865,987.50 2,606,622.38
6.00 bh 55,501.95 333,011.70
2.00 bh 241,158.75 482,317.50

0.12 m3 13,911,187.50 1,621,348.90


4.39 m2 865,987.50 3,798,221.18
9.00 bh 55,501.95 499,517.55
3.00 bh 241,158.75 723,476.25

0.04 m3 13,911,187.50 585,313.21


2.41 m2 865,987.50 2,085,297.90
6.00 bh 55,501.95 333,011.70
2.00 bh 241,158.75 482,317.50
2.00 bh 58,697.63 117,395.25

0.05 m3 13,911,187.50 667,737.00


0.84 m2 865,987.50 731,586.24
6.00 bh 55,501.95 333,011.70
2.00 bh 241,158.75 482,317.50

0.30 m3 13,911,187.50 4,147,272.77


10.23 m2 602,280.00 6,161,324.40
10.00 bh 58,697.63 586,976.25
5.00 bh 58,697.63 293,488.13
10.00 bh 33,720.75 337,207.50

0.16 m3 13,911,187.50 2,170,145.25


2.42 m2 602,280.00 1,457,035.78
16.00 bh 58,697.63 939,162.00
8.00 bh 58,697.63 469,581.00
16.00 bh 33,720.75 539,532.00

867.20 m2 22,085.18 19,152,237.26


540.00 m2 22,085.18 11,925,994.50
13.93 m2 95,891.25 1,335,285.66
22.09 m2 95,891.25 2,118,506.21
1,430.99 m2 22,085.18 31,603,668.99
574.00 m2 22,085.18 12,676,890.45
32.57 m2 95,891.25 3,122,698.56
67.24 m2 95,891.25 6,447,344.09

124.80 m2 22,085.18 2,756,229.84


55.20 m2 61,367.25 3,387,472.20
31.20 m2 95,891.25 2,991,807.00

48.30 m2 142,506.82 6,883,079.53


396.04 m2 252,013.13 99,806,017.96
1.00 unit 4,500,000.00 4,500,000.00

3.00 unit 2,043,760.00 6,131,280.00


5.00 bh 619,710.00 3,098,550.00
29.00 bh 121,375.00 3,519,875.00
32.00 bh 261,276.75 8,360,856.00
70.00 m1 9,891.00 692,370.00
120.00 m1 9,891.00 1,186,920.00
120.00 m1 14,836.50 1,780,380.00
150.00 m1 14,836.50 2,225,475.00
100.00 m1 22,199.63 2,219,962.50
80.00 m1 22,199.63 1,775,970.00
1.00 unit 8,636,250.00 8,636,250.00
1.00 unit 2,750,000.00 2,750,000.00
1.00 unit 5,500,000.00 5,500,000.00
1.00 unit 2,836,627.50 2,836,627.50
1.00 ls 12,500,000.00 12,500,000.00

77.00 ttk 27,615.00 2,126,355.00


98.00 ttk 27,615.00 2,706,270.00
3.00 ttk 27,615.00 82,845.00
10.00 ttk 27,615.00 276,150.00
27.00 bh 26,643.75 719,381.25
42.00 bh 26,643.75 1,119,037.50
5.00 bh 75,000.00 375,000.00
3.00 bh 75,000.00 225,000.00
3.00 bh 26,643.75 79,931.25
98.00 bh 26,643.75 2,611,087.50
2.00 bh 26,643.75 53,287.50
11.00 bh 26,643.75 293,081.25
1.00 unit 198,975.00 198,975.00
3.00 bh 1,750,000.00 5,250,000.00

85.00 ttk 27,615.00 2,347,275.00


72.00 ttk 27,615.00 1,988,280.00
2.00 ttk 27,615.00 55,230.00
2.00 ttk 27,615.00 55,230.00
5.00 ttk 27,615.00 138,075.00
6.00 ttk 27,615.00 165,690.00
50.00 bh 26,643.75 1,332,187.50
8.00 bh 26,643.75 213,150.00
2.00 ttk 26,643.75 53,287.50
65.00 bh 26,643.75 1,731,843.75
6.00 bh 26,643.75 159,862.50
27.00 bh 26,643.75 719,381.25
1.00 unit 5,750,000.00 5,750,000.00
1.00 unit 198,975.00 198,975.00
3.00 bh 1,750,000.00 5,250,000.00

CANA
ISASI

Disetujui Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN /
(PPTK)
Disetujui Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN /
(PPTK)

KADEK DWI LANTARI, ST


NIP. 19761116 200604 2 018
TIME SCHEDULE

AN PASAR TENTEN DESA ADAT


TOTAL BOBOT
HARGA (Rp) JULI AGUSTUS

8 20-26 27-3 4-10 11-17

5,983,491.60
0.01 0.01
0.18 0.18
-
1,718,802,697.24 -
-
0.15 0.15
0.24 0.24
0.09 0.09
0.39 0.39
0.04 0.04
0.02 0.02
0.16 0.16
- -
- -
1.62 1.62
1.63
-
0.04
0.40
0.40
0.26
0.43
-
0.01
0.08
0.08
0.05
0.06
-
0.06
0.87
0.52
0.32
0.47
0.45
-
0.01
0.19
0.07
0.04
0.06
1.91
-
-
-
0.69
0.27
0.60
0.52
-
0.18
0.08
0.18
0.11
0.61
-
0.55
0.67
-
0.32
0.19
0.36
0.39
-
0.10
0.33
0.30
-
-
-
0.35
0.10
0.22
0.15
-
0.07
0.03
0.07
0.05
0.47
-
0.61
0.22
0.37
0.27
-
0.82
0.26
0.48
0.22
-
0.42
0.16
0.32
0.14
-
1.48
0.52
0.27
1.14
2.11
-
-
-
0.69
0.22
0.39
0.31
-
0.28
0.13
0.25
0.09
0.16
-
0.64
0.23
0.00
0.49
0.91
-
-
9.16
2.05
2.57
0.01
0.09
0.08
0.80
0.02
3.00
0.65
3.23
0.75
0.18
0.12
0.23
0.47
0.13
-
1,182,156,315.24 -
-
-
1.01
0.65
0.32
1.61
0.99
1.23
-
-
2.88
0.38
2.66
1.64
0.58
-
-
0.28
0.23
0.14
-
-
-
1.30
0.09
0.82
0.51
-
-
1.30
0.05
0.85
-
-
0.10
-
-
-
2.84
0.73
0.03
0.06
0.02
-
-
3.02
0.79
0.01
0.23
0.01
-
-
-
0.57
-
0.09
0.22
0.03
0.04
-
0.02
0.02
0.01
0.02
-
0.08
0.05
0.04
0.02
0.02
-
-
0.08
2.09
-
0.11
0.30
0.03
0.05
-
0.04
0.09
0.01
0.02
-
0.05
0.13
0.02
0.02
-
0.02
0.07
0.01
0.02
0.00
-
0.02
0.02
0.01
0.02
-
0.14
0.20
0.02
0.01
0.01
-
0.07
0.05
0.03
0.02
0.02
-
-
-
0.64
0.40
0.04
0.07
-
-
1.05
0.42
0.10
0.21
-
-
0.09
0.11
0.10
-
-
0.23
3.32
0.15
-
63,214,516.00 -
0.20
0.10
0.12
0.28
0.02
0.04
0.06
0.07
0.07
0.06
0.29
0.09
0.18
0.09
0.42
-
36,274,868.75 -
-
0.07
0.09
0.00
0.01
0.02
0.04
0.01
0.01
0.00
0.09
0.00
0.01
0.01
0.17
-
-
0.08
0.07
0.00
0.00
0.00
0.01
0.04
0.01
0.00
0.06
0.01
0.02
0.19
0.01
0.17

3,006,431,888.82 100.00
MINGGUAN 0.35 0.34 0.61 1.62
KOMULATIF 0.35 0.69 1.30 2.91
MINGGUAN 0.40 2.60 3.78 4.30
KOMULATIF 0.40 3.00 6.78 11.07

Diperiksa Oleh :
DIREKSI TEKNIS
Diperiksa Oleh :
DIREKSI TEKNIS

I PUTU DJUNAIDY ATMADJA, ST KADEK HENDRA ROBIAWAN, ST


NIP. 19710607 200801 1 015
ULE
WAKTU PELAKSANAAN = 150 (SERATUS LIMA PULUH ) HARI KALENDER

AGUSTUS SEPTEMBER OKTOBER

18-24 25-31 1-7 8-14 15-21 22=28 29-5 6=12 13-19

1.63
-
0.04
0.40
0.40
0.26
0.43
-
0.01
0.08
0.08
0.05
0.06
-
0.06
0.87
0.52
0.32
0.47
0.45
-
0.01
0.19
0.07
0.04
0.06
1.91
-
-
-
0.69
0.27
0.60
0.52
-
0.18
0.08
0.18
0.11
0.61
-
0.55
0.67
-
0.32
0.19
0.36
0.39
-
0.10
0.33
0.30
-
-
-
0.35
0.10
0.22
0.15
-
0.07
0.03
0.07
0.05
0.47
-
0.61
0.22
0.37
0.27
-
0.82
0.26
0.48
0.22
-
0.42
0.16
0.32
0.14
-
1.48
0.52
0.27
1.14
2.11
-
-
-
0.69
0.22
0.39
0.31
-
0.28
0.13
0.25
0.09
0.16
-
0.64
0.23
0.00
0.49
0.91

2.29 2.29 2.29 2.29


2.05
2.57
0.01
0.09
0.08
0.80
0.02
3.00
0.65
1.62 1.62
0.75
0.18
0.12
0.23
0.47
0.13
-
-
-
-
1.01
0.65
0.32
1.61
0.99
1.23
-
-
2.88
0.38
1.33 1.33
1.64
0.58
-
-
0.28
0.23
0.14
-
-
-
1.30
0.09
0.82
0.51
-
-
1.30
0.05
0.85
-
-
0.10
-
-
-
2.84
0.73
0.03
0.06
0.02
-
-
3.02
0.79

-
0.04
3.32
4.08 5.04 7.85 10.83 12.38 13.12 13.13 11.25 7.24
6.99 12.04 19.88 30.71 43.09 56.21 69.34 80.59 87.83
2.72 1.93
13.79 15.73

Diperiksa Oleh : Di Periksa Oleh :


DIREKSI TEKNIS KONSULTAN PENGAWAS
CV. GANESHA TEKNIKA
Diperiksa Oleh : Di Periksa Oleh :
DIREKSI TEKNIS KONSULTAN PENGAWAS
CV. GANESHA TEKNIKA

NI PUTU NURZELY ASTUTI, ST


Kuasa Direktur
ENDRA ROBIAWAN, ST NI PUTU DITA SEVIANTI PARIATA
ARI KALENDER MASA PEMELIHARAAN
OKTOBER NOVEMBER BULAN VI
730 ( TUJUH RATUS TIGA
20-26 27-2 3-9 10-16 17-23 24-30 1-7 8-16 PULUH HARI)
0.01
0.23
0.01
-
-
-
0.57
-
0.09
0.22
0.03
0.04
-
0.02
0.02
0.01
0.02
-
0.08
0.05
0.04
0.02
0.02
-
-
0.08
2.09
-
0.11
0.30
0.03
0.05
0.09
0.01
0.02
-
0.05
0.13
0.02
0.02
-
0.02
0.07
0.01
0.02
0.00
-
0.02
0.02
0.01
0.02
-
0.14
0.20
0.02
0.01
0.01
-
0.07
0.05
0.03
0.02
-
-
-
0.64
0.40
0.04
0.07
-
-
1.05
0.42
0.10
0.21
-
-
0.09
0.11
0.10
-
-
0.23

0.15
-
-
0.20
0.10
0.12
0.28
0.02
0.04
0.06
0.07
0.07
0.07
0.06
0.29
0.09
0.18
0.09
0.42
-
-
-
0.07
0.09
0.00
0.01
0.02
0.04
0.01
0.01
0.00
0.09
0.00
0.01
0.01
0.17
-
-
0.08
0.07
0.00
0.00
0.00
0.01
0.04
0.01
0.00
0.00
0.01
0.02
0.19
0.01
0.17

3.88 3.05 2.36 1.08 0.62 0.45 0.33 0.40


91.71 94.77 97.13 98.20 98.83 99.27 99.60 100.00

Di Periksa Oleh : DIBUAT


KONSULTAN PENGAWAS PELAKSANA
CV. GANESHA TEKNIKA PT. KARYA MANDIRI TEKNIK SENTOSA
Di Periksa Oleh : DIBUAT
KONSULTAN PENGAWAS PELAKSANA
CV. GANESHA TEKNIKA PT. KARYA MANDIRI TEKNIK SENTOSA

PUTU NURZELY ASTUTI, ST


Kuasa Direktur KETUT WIRANATA, ST . M.Si
Direktur
MASA PEMELIHARAAN

730 ( TUJUH RATUS TIGA


PULUH HARI)