DAFTAR HARGA BAHAN BANGUNAN


DAN UPAH KERJA
DIWILAYAH KABUPATEN SIDOARJO

SEBELUM PPn UNTUK TAHUN ANGGARAN 2008

DAFTAR HARGA SATUAN TERTINGGI BAHAN BANGUNAN PEREODE BULAN JANUAR

Ke
lom NO.
pok
1

A.

B.

NAMA / JENIS BAHAN

1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

3
BAHAN PASIR
Pasir Urug / Tanah katel.
Pasir Pasang
Pasir Cor
Sirtu urug
Tanah Urug
Tanah grosok
Tanah taman
BAHAN BATU
Batu Kali Pecah 15/20 ( tangan )
Batu Kali/ batu Quary
Batu Kali Pecah 7/10 ( tangan )
Batu Kali Pecah 5/7 ( tangan )
Batu Kali Pecah 3/5 ( mesin )
Batu Kali Pecah 2/3 ( mesin )
Batu Kali Pecah 0.5 - 1 ( mesin )
Batu Kali Pecah 1/2 ( mesin )
Batu pecah tersaring untuk laston
Batu pecah tersaring untuk LPA
Batu pecah tersaring untuk LPB
Koral Beton 1/2
Koral Beton 2/3
Batu kerikil Granito.
Batu kerikil Traso.
Batu tempel.
Batu bata tebal 5,5 cm. Bakaran kayu
Batu bata tebal 5,5 cm. Bakaran sekem.
Batako.
BAHAN PAVING STONE.
Paving stone abu-2 tb. 6 cm (3 berlian-DT1)
Paving stone abu-2 tb. 6 cm (4 persegi pjng )
Paving stone abu-2 tb. 6 cm (type-DT1 / S)
Paving stone abu-2 tb. 6 cm (type-DT2)
Paving stone abu-2 tb. 6 cm (type-DT7)
Paving stone abu-2 tb. 8 cm (3 berlian-DT1)
Paving stone abu-2 tb. 8 cm (4 persegi pjng )
Paving stone abu-2 tb. 8 cm (type-DT1 / S)
Paving stone abu-2 tb. 8 cm (type-DT2)
Paving stone abu-2 tb. 8 cm (type-DT7)
Paving stone merah tb. 6 cm (3 berlian-DT1)
Paving stone merah tb. 6 cm (type-DT1 / S)
Paving stone merah tb. 6 cm (type-segi enam)
Paving stone merah tb. 8 cm (3 berlian-DT1)
Paving stone mrh tb. 8 cm (4 persegi pjng-)
Paving stone merah tb. 8 cm (type-DT1)
Paving stone merah tb. 8 cm (type-segi enam)

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

2
18
19
20
21
22
23
24

3
Paving stone / beton blok kelas I
Paving stone / beton blok kelas II
Rooster beton
Bata berongga
Hollow block 10
Hollow block 15
Hollow block 20

25
26
27
D
1
2
3
4
5
6
E
1
2
3
4
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
G
1
2
3
4
5
6
7
8
9
10

Conblock 10
Conblock 15
Conblock 20
BAHAN SEMEN / P.C.
Semen Gresik 50 kg
Semen Gresik 1kg
Semen warna
Semen Tiga Roda 50 kg
Semen putih ( Azano / Tiga Roda )
Semen merah
BAHAN KAPUR.
Kapur bubuk
Kapur bubuk
Kapur bubuk 1 sak.
Kapur gamping
BAHAN LANTAI.
Tegel ubin Warna 30 x 30 cm
Porselin putih 11 x 11
Porselin warna 11 x 11
Tegel Ubin Warna 40 x 40 cm
Tegel teraso 30 x 30 cm
Tegel teraso 40 x 40 cm
Tegel wafel / Badag 30 x 30 cm
Tegel keramik Granito 40 x 40 cm ( KW I )
Keramic Esensa 40 x 40 cm .
Tegel keramik lis 7,5 x 25 cm ( KW I )
Tegel keramik lis 5 x20 cm ( KW I )
Tegel keramik 20x20 cm ( KW I )
Tegel keramik 25x35 cm ( KW I )
Tegel keramik 30x30 cm ( KW I )
Tegel keramik rock tile 30x30 cm ( KW I )
Tegel keramik 40x40 cm ( KW I )
Tegel keramik motif 30x30 cm
Keramik dinding 20x25 cm ( KW I )
Keramik dinding 25x35 cm ( KW I )
Vinil Oscar / sintetis Kw1
Vinil karet
Vinil oscar / sintetis motif kembang.
Marmer
Mosaik
Tera kota
BAHAN KAYU.
Kayu jati balok 6,15, 8/12. panjang 3mtr.
Kayu reng jati 2/3, 3/5 panjang 2 mtr.
Kayu jat usuk 4/6 ; 5/7 panjang 2 mtr.
Papan jati papan 2/20 ; 3/20 ; 3/30 panj.3mtr
Kayu Kamfer balok 8/12, 6/15
Kayu kamfer usuk 5/7
Kayu kamfer papan 2.5/20
Kayu Kamfer reng 2/3
Kayu kruing / bengkirai / kempas papan 2/20
Kayu kruing /bengkirai/kempas blk 8/12,6/15

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

2
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
26

H
1

3
Kayu kruing / bengkirai/kempas usuk 5/7
Kayu kruing / bengkirai/kempas usuk 4/6
Kayu kruing reng 2/3
Kayu meranti balok 8/12, 6/15
Keyu meranti usuk 5/7
Kayu meranti papan 3/25/400
Kayu glugu usuk 5/7 4meter
Papan begesting (MC)
Rangka plavon kamper potongan
Rangka plavon meranti potongan
Kayu gelagar jembatan meranti.8/15 pj.4 mtr
Kayu dolken.
Kayu Sirap
Kayu Sirap
Kayu bakar.
I j u k
Gedek
BAHAN TRIPLEKS / KAYU LAPIS.
Teakwood 90.210. x 4 mm

2
3
4
5
6
7
8
9
10
11
12
13
14
15
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Teakwood 110.210. x 4 mm
Teakwood 122.244. x 4 mm
Triplek lapis aluminium
Triplek lapis formika
Triplek 90.210. x 3 mm
Triplek 90.210. x 4 mm
Triplek 120.240. x 2 mm
Triplek 120.240. x 3 mm
Triplek 120.240. x 5 mm
Triplek 120.240. x 6 mm
Triplek 120.240. x 9 mm
Triplek 120.240. x 12 mm
List plafond 1,5/4 profil kayu kamper
List plafond 1/5
BAHAN BESI..
Aluminium putih / silver 3"
Aluminium putih / silver 4"
Aluminium coklat / brown 3"
Aluminium coklat / brown. 4"
Aluminium slimar putih / silver 3"
Aluminium slimar coklat / brown 3"
Karet penjepit kaca / multipleks.
Hak window
Besi beton Polos diameter 5 mm
Besi beton Polos diameter 6 mm
Besi beton Polos diameter 8 mm
Besi beton Polos diameter 10 mm
Besi beton Polos diameter 12 mm
Besi beton Polos diameter 16 mm
Besi beton polos.
Besi beton Ulir.
Besi konstruksi ( WF ; H ; INP ; SIKU )
Besi lempeng / bulat / strip (Beugel)
Kawat bendrat
Kawat duri
Kawat bronjong
Kawat ikat
Kawat harmonika.
Kawat nyamuk. besi
Kawat KASA. / kawat burung.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

2
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

J
1
2
3
4
5
6
7
K
1
2
3
4
5
6

3
Paku reng
Paku usuk
Paku eternit
Paku sekrup
Mur baut kuda-kuda
Mur baut kuda-kuda
Plat kuda-kuda
Mur baut gording
Paku payung
Ankur kusen
Pagar BRC 90.240 cm
Pagar BRC 120.240 cm
Besi siku 30x30x3 panjang 6 m
Besi siku 40x40x3 panjang 6 m
Besi siku 40x40x4 panjang 6 m
Kawat berduri 50 m
BAHAN PIPA BESI..
Pipa air galvanis medium 1/2"
Pipa air galvanis medium 3/4"
Pipa air galvanis medium 1"
Pipa air galvanis medium 1,25"
Pipa air galvanis medium 2"
Pipa air galvanis medium 3"
Pipa air galvanis medium 4"
BAHAN PIPA P.V.C..
Pipa PVC AW dia 1/2" 4 m
Pipa PVC AW dia 3/4" 4m
Pipa PVC AW dia 1".4m
Pipa PVC D dia 2" 4 m
Pipa PVC D dia 3" 4 m
Pipa PVC D dia 4" 4m

7
8
L
1
2
3
4
5
6
7
8
9
10
M
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Talang " U " Maspion 4m


Pengait talang PVC
BAHAN BUIS BETON..
Buis beton bulat dia 15 cm, 1 m'
Buis beton bulat dia 20 cm, 1 m'
Buis beton bulat dia 30 cm, 1 m'
Buis beton bulat dia 40 cm, 1 m'
Buis beton bulat dia 50 cm, 1 m'
Buis beton bulat dia 60 cm, 1 m'
Buis beton bulat dia 80 cm, 1 m'
Buis beton bulat dia 100 cm, 1 m'
Buis beton U - 20cm , m'
Buis beton U - 30cm , m'
BAHAN PENUTUP ATAP.
Genteng lokal ex Mojokembamg
Genteng Nglayur
Genteng bubungan Nglayur
Genteng beton
Genteng flam pres lokal
Genteng kaca
Genteng keramik
Genteng kodok model karang pilang
Genteng kodok karang pilang ( bambe)
Bubungan genteng bambe.
Bubungan glazur Kanmuri / KIA.enteng bambe.
Eternit 1x1m tebal 6 mm
Eternit 1x1m tebal 5 mm
Acustik ukuran 30 x 60 Cm.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

2
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
O
1
2
3
4

3
Acustik ukuran 60 x 120 Cm.
Calsiboardt 1x1m Calsibort 5 mm
Asbes datar tebal 4 mm
Asbes datar tebal 3,5 mm
Asbes gelombang besar 225 x 110
Asbes gelombang besar Per M2
Asbes gelombang kecil 225 x 105
Asbes gelombang kecil Per M2.
Bubungan Asbes Gelombang besar
Bubungan Asbes Gelombang kecil
Seng plat BJLS 30.80.300 cm
Seng gelombang BJLS 28
Seng gelombang BJLS 30
Seng plat BJLS 28
Seng plat BJLS 30
Seng Galvalum DJLS 45 warna lebar efektif 73
Seng Galvalum DJLS 45 polos lbr efektif 73 Cm
BAHAN PENGECATAN + POLITUR..
Kertas gosok
Plamur tembok
Plamur kayu " PEDANG "
Cat kayu / besi EMCO/setara
Cat tembok "wathershilt" merk Duluk ; Jotun.
Cat tembok "DECOLITH"
Cat tembok "PARAGON"
Cat kayu dasar
Cat tembok "ICI Catilac"
Cat meni "PEDANG"
Dempul kayu
Minyak cat / thiner B
Tinner A
Spiritus
Plitur jadi
Vernis
Lem putih " RAJAWALI "
Lem kayu aica aibon
Teer
Cherlag
BAHAN KACA.
Kaca bening 3 mm
Kaca bening 5 mm
Kaca raybend 5 mm
Kaca buram 5 mm

5
6
7
8
9
P
1
2
3
4
5
6
7
8
9
10

Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca patri warna 5 mm
Kaca painting 5 mm
Kaca nako + rangka "NIKY"
BAHAN PENGANTUNG + KUNCI.
Kunci "ALPHA Bulat" 1 x putar
Kunci "SILINDER" 1 x putar
Kunci "ANCHOR" / UNION / Yale 2 x tanam
Kunci "KUDA TERBANG" 2 x putar
Kunci tanam "ANTIK" 2 x putar
Kunci selot kuningngan panjang 25 Cm
Kunci selot kuningngan panjang 15 Cm
Kunci selot hitam panjang 25 Cm
Kunci selot hitam panjang 15 Cm
Kunci lemari 808.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

2
11
12
13
14
15
16
17
18
19
20
21

Q
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

3
Door holder / pegangan pintu antik / baik.
Rel pintu dorong
Engsel Nylon "ARCH" asli pintu
Engsel jendela
Grendel injak
Grendel tanam pintu
Grendel jendela
Door closer
Door STOP
Kait angin sikutan yang baik.
Hak angin
BAHAN SANITAIR.
Kran air "SAN EI"
Kran air "AMICO 1/2"
Kran air "AMICO 3/4"
Pompa air "GOLD STAR"
Pompa air "NASIONAL"
Floor drains / plastik.
Closed Jongkok trasso
Closed Jongkok keramic INA warna
Closed duduk monoblock.
Tutup bak mandi
Lem paralon
Westafel
Urinoir keramic.
Sumur + pompatangan dragon terpasang
Septiktank + resapan komplit 1 M3
Septiktank + resapan komplit 2 M3
Septiktank + resapan komplit 6 M3
Septiktank + resapan komplit 8 M3
BAHAN ELEKTRIKAL.
Pasang listrik /Wirring.
Lampu TL 1 x 10 w PHILIPS
Lampu TL 1 x 20 w PHILIPS
Lampu TL 1 x 40 w PHILIPS
Lampu pijar 40 - 100 w PHILIPS
Isolator
Las Doof
Fiting Plafoond
T dos PVC
Stop Kontak "BROCO"
Saklar tunggal "BROCO"
Saklar ganda " BROCO "
Kabel NYA 1000 Volt 1,5 mm
Kabel NYA 1000 Volt 2,5 mm
Kabel NYA 1000 Volt 4 mm
Sekrering Tunggal "LN" biasa
Sekering ganda "LN" biasa
Sekering 1 group + MCB
Sekering 2 group + MCB
Sekering 3 group + MCB

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

DAFTAR HARGA TERTINGGI UPAH KERJA ORANG

NO.

URAIAN TENAGA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

MANDOR
KEPALA TUKANG GALI TANAH
KEPALA TUKANG BATU
KEPALA TUKANG KAYU
KEPALA TUKANG BESI
KEPALA TUKANG CAT
KEPALA TUKANG LISTRIK
TUKANG GALI TANAH
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG ASPAL
TUKANG PLITUR
TUKANG LISTRIK
PEKERJA TUKANG GALI TANAH.
PEMBANTU TUKANG BATU
PEMBANTU TUKANG KAYU
PEMBANTU TUKANG CAT
PEMBANTU TUKANG BESI
PEMBANTU TUKANG LISTRIK
SOPIR TRUK.
PEJAGA API
PEJAGA MALAM

Menyetujui:
Plt. Kasubdin Tata Bangunan
Dinas PU Cipta Karya dan Permukiman
Kabupaten Sidoarjo.

BUDI UTOMO, ST.MM.


Penata
Nip. 110 022 647.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Compres 95 %.

GA BAHAN BANGUNAN
N UPAH KERJA
KABUPATEN SIDOARJO

NTUK TAHUN ANGGARAN 2008

N BANGUNAN PEREODE BULAN JANUARI 2008 ( SEMESTER . I )

SATUAN

HARGA
SATUAN BAHAN

HARGA 2008-I

M3
M3
M3
M3
M3
M3
M3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,520.00
90,684.40
93,610.00
39,100.00
39,100.00
68,310.00
59,800.00

81,000.00
98,570.00
101,750.00
42,500.00
42,500.00
74,250.00
65,000.00

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Bh
Bh
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

92,000.00
85,330.00
87,942.80
108,713.64
116,380.00
151,294.00
146,740.00
157,117.60
212,520.00
195,500.00
149,776.00
174,570.00
137,126.00
380,696.00
346,104.00
38,962.00
300.00
270.00
2,226.40

100,000.00
92,750.00
95,590.00
118,167.00
126,500.00
164,450.00
159,500.00
170,780.00
231,000.00
212,500.00
162,800.00
189,750.00
149,050.00
413,800.00
376,200.00
42,350.00
300.00
270.00
2,420.00

Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900.00
1,500.00
800.00
1,100.00
1,200.00
1,350.00
1,350.00
1,700.00
800.00
1,650.00
1,350.00
1,350.00
1,350.00
1,700.00
1,750.00
1,200.00
1,530.00

4
M2
M2
bh
bh
bh
bh
bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900.00
765.00
800.00
1,012.00
1,104.00
1,242.00
1,210.00
1,550.00
800.00
1,518.00
1,242.00
1,242.00
1,242.00
1,550.00
1,550.00
1,104.00
1,407.60
Halaman : 122
5
0.00
0.00
4,480.40
2,226.40
0.00
0.00
0.00

4,870.00
2,420.00

bh
bh
bh

Rp.
Rp.
Rp.

Zak
1Kg
1Kg
Zak
Zak
M3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

M3
1Kg
1 Sak
1Kg

Rp.
Rp.
Rp.
Rp.

Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4
M3
M3
M3
M3
M3
M3
1 Btg
M3
M3
M3
M3
Btg
M2
Lbr/ 1m'
M3
KG
M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

lbr

Rp.

0.00
0.00
4,968.00
0.00
41,492.00
829.84
6,900.00
0.00
67,675.20
138,000.00
0.00
450,174.40
552.00
4,553.08
2,336.80
0.00
2,350.00
460.00
5,290.00
4,800.00
5,888.00
6,210.00
0.00
140,000.00
130,000.00
11,500.00
9,062.00
33,764.00
33,994.00
36,938.00
38,713.60
38,410.00
35,677.60
37,195.60
41,998.00
49,496.00
43,240.00
60,030.00
65,000.00
42,000.00
59,156.00
0.00
15,939,000.00
8,602,000.00
10,810,000.00
17,940,000.00
5,750,000.00
4,100,000.00
6,520,500.00
3,499,526.36
3,946,800.00
3,864,000.00
Halaman : 123
5
3,818,000.00
3,818,000.00
2,530,000.00
3,542,000.00
3,404,000.00
3,818,000.00
46,211.60
2,622,000.00
2,248,480.00
1,978,000.00
2,609,120.00
3,680.00
1,886.00
0.00
2,208,920.00
5,372.80
10,672.00
0.00
65,780.00

5,400.00
45,100.00
902.00
7,500.00
73,560.00
150,000.00
489,320.00
600.00
4,949.00
2,540.00
700.00
500.00
5,750.00
14,200.00
6,400.00
6,750.00
148,500.00
90,000.00
12,500.00
9,850.00
36,700.00
36,950.00
40,150.00
42,080.00
41,750.00
38,780.00
40,430.00
45,650.00
53,800.00
47,000.00
65,250.00
65,000.00
64,300.00
17,325,000.00
9,350,000.00
11,750,000.00
19,500,000.00
5,887,833.00
4,168,333.00
7,087,500.00
3,803,833.00
4,290,000.00
4,200,000.00
4,150,000.00
4,150,000.00
2,750,000.00
3,850,000.00
3,700,000.00
4,150,000.00
50,230.00
2,850,000.00
2,444,000.00
2,150,000.00
2,836,000.00
4,000.00
2,050.00
2,401,000.00
5,840.00
11,600.00
71,500.00

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m'
m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

M1
M1
M1
M1
M1
M1
M1
Bh
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Kg
Kg
Kg
Kg
Kg
M1
Kg
Kg
M1
M1
M1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4
KG
KG
KG
KG
KG
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Ljr
Ljr
Ljr
Rol

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Ljr
Ljr
Ljr
Ljr
Ljr
Ljr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

85,468.00
81,512.00
59,800.00
62,330.00
26,910.00
41,998.00
52,992.00
54,142.00
91,908.00
89,700.00
119,600.00
126,500.00
10,350.00
3,312.00
0.00
44,640.00
55,680.00
47,040.00
59,040.00
44,640.00
47,040.00
2,400.00
11,500.00
14,926.08
29,083.04
41,084.44
62,538.84
76,566.08
124,200.00
8,740.00
11,638.00
10,530.00
10,166.00
10,764.00
6,808.00
11,220.32
13,965.60
19,044.00
17,181.00
15,675.00
Halaman : 124
5
9,779.60
10,478.80
10,478.80
15,985.00
11,891.00
29,900.00
9,384.00
2,990.00
216.20
1,679.00
240,488.00
274,712.00
82,873.60
94,116.00
102,580.00
248,630.00
0.00
64,000.00
80,270.00
105,800.00
200,422.00
269,100.00
365,332.00
608,580.00
0.00
42,166.36
27,351.60
36,340.00
52,900.00
77,740.00
336,720.00

92,900.00
88,600.00
65,000.00
67,750.00
29,250.00
45,650.00
57,600.00
58,850.00
99,900.00
97,500.00
130,000.00
137,500.00
11,250.00
3,600.00
46,500.00
58,000.00
49,000.00
61,500.00
46,500.00
49,000.00
2,500.00
12,500.00

16,224.00
31,612.00
44,657.00
67,977.00
83,224.00
135,000.00
9,500.00
12,650.00
11,700.00
11,050.00
11,700.00
7,400.00
12,196.00
15,180.00
20,700.00
18,675.00
16,500.00
10,630.00
11,390.00
11,390.00
17,375.00
12,925.00
32,500.00
10,200.00
3,250.00
235.00
1,825.00
261,400.00
298,600.00
90,080.00
102,300.00
111,500.00
270,250.00
69,800.00
87,250.00
115,000.00
217,850.00
292,500.00
397,100.00
661,500.00
45,833.00
29,730.00
39,500.00
57,500.00
84,500.00
366,000.00

Ljr
Bh

Rp.
Rp.

Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
M2
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
M1
M1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

m2
m2
m2
m2

Rp.
Rp.
Rp.
Rp.

78,200.00
6,900.00
0.00
21,620.00
24,288.00
29,578.00
34,040.00
62,100.00
71,300.00
96,600.00
110,400.00
16,100.00
20,700.00
0.00
984.40
1,058.00
2,732.40
5,032.40
1,094.80
11,996.80
7,866.00
1,812.40
3,063.60
4,370.00
8,740.00
13,570.00
11,270.00
36,018.00
Halaman : 125
5
54,970.00
15,088.00
10,782.40
9,200.00
80,012.40
29,090.40
56,810.00
19,991.60
63,093.60
48,438.00
32,200.00
78,660.00
64,400.00
62,560.00
78,660.00
103,224.00
59,800.00
0.00
4,000.00
9,196.00
10,351.84
46,432.40
54,648.00
21,620.00
20,447.00
32,117.20
31,924.00
12,420.00
19,200.40
5,888.00
14,664.80
13,340.00
35,420.00
41,593.20
8,625.00
19,320.00
7,636.00
39,100.00
0.00
37,306.00
56,396.00
65,090.00
91,080.00

85,000.00
7,500.00
23,500.00
26,400.00
32,150.00
37,000.00
67,500.00
77,500.00
105,000.00
120,000.00
17,500.00
22,500.00
1,070.00
1,150.00
2,970.00
5,470.00
1,190.00
13,040.00
8,550.00
1,970.00
3,330.00
4,750.00
9,500.00
14,750.00
12,250.00
39,150.00
59,750.00
16,400.00
11,720.00
10,000.00
86,970.00
31,620.00
61,750.00
21,730.00
68,580.00
52,650.00
35,000.00
85,500.00
70,000.00
68,000.00
85,500.00
112,200.00
65,000.00
4,150.00
9,680.00
11,252.00
50,470.00
59,400.00
23,500.00
22,225.00
34,910.00
34,700.00
13,500.00
20,870.00
6,400.00
15,940.00
14,500.00
38,500.00
45,210.00
9,375.00
21,000.00
8,300.00
42,500.00
40,550.00
61,300.00
70,750.00
99,000.00

m2
m2
m2
m2
Dn

Rp.
Rp.
Rp.
Rp.
Rp.

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Psg
Psg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M1
M1
Bh
Bh
Unit
Unit
Unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

126,500.00
328,900.00
325,000.00
192,280.00
16,100.00
0.00
58,420.00
47,610.00
82,800.00
121,440.00
110,400.00
100,510.00
53,820.00
14,674.00
16,872.80
6,440.00
Halaman : 126
5

137,500.00
357,500.00
378,500.00
209,000.00
17,500.00

100,740.00
115,000.00
15,410.00
7,562.40
12,788.00
61,097.20
8,602.00
187,000.00
25,300.00
16,399.00
6,976.36
0.00
39,790.00
27,830.00
32,752.00
331,200.00
322,000.00
13,800.00
82,800.00
111,320.00
814,660.00
11,500.00
5,750.00
365,000.00
203,669.60
989,230.00
1,766,400.00
5,899,960.00
6,489,680.00
7,138,280.00
0.00
73,600.00
11,500.00
20,240.00
27,600.00
8,740.00
10,626.00
2,300.00
2,999.20
2,336.80
17,305.20
11,040.00
15,640.00
3,261.40
3,400.32
4,979.04
18,400.00
27,600.00
73,416.00
104,880.00
149,040.00

109,500.00
125,000.00
16,750.00
8,220.00
13,900.00
66,410.00
9,350.00
187,000.00
27,500.00
17,825.00
7,583.00

63,500.00
51,750.00
90,000.00
132,000.00
120,000.00
109,250.00
58,500.00
15,950.00
18,340.00
7,000.00

43,250.00
30,250.00
35,600.00
360,000.00
350,000.00
15,000.00
90,000.00
121,000.00
885,500.00
12,500.00
6,250.00
375,000.00
221,380.00
1,075,250.00
1,920,000.00
6,413,000.00
7,054,000.00
7,759,000.00
80,000.00
12,500.00
22,000.00
30,000.00
9,500.00
11,550.00
2,500.00
3,260.00
2,540.00
18,810.00
12,000.00
17,000.00
3,545.00
3,696.00
5,412.00
20,000.00
30,000.00
79,800.00
114,000.00
162,000.00

Halaman : 127

RTINGGI UPAH KERJA ORANG per HARI

SATUAN

UPAH PERHARI

3
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr

Sidoarjo,

4
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,000.000
44,000.000
44,000.000
44,000.000
44,000.000
44,000.000
44,000.000
#REF!
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
31,300.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
40,000.000

Januari 2008.

Disurvey dan disusun oleh :


Staf Perencanaan Teknik Ta- Ba.
Dinas PU Cipta Karya & Permukiman
Kabupaten Sidoarjo.

KUSDI

Halaman : 128

61,750.00
46,310.00
46,310.00
46,000.00
46,310.00
46,310.00
46,000.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
34,500.00
34,500.00
34,500.00
34,500.00
34,500.00
34,500.00
40,250.00
34,500.00
40,250.00

Margin top= 18 mm
2

Compres 95 %.
7

19

PEMERINTAH KABUPATEN SIDOARJO


DINAS P.U.CIPTA KARYA dan PERMUKIMAN
KABUPATEN SIDOARJO.
Jl. AHMAD YANI No.4 .S I D O A R J O.
Telp. :(031) 8960982 - FAX - : 8951349

ANALISA HARGA TERTINGGI metode S.N.I


PEKERJAAN PEMBORONGAN
PEREODE Bulan JANUARI 2008 ( Semester Pertama )
PEKERJAAN PERSIAPAN
1. 1 m2 Pembersihan Lapangan dan Peralatan
Upah
An. SNI ( Revisi ) 6.8.1
0.100 O/hr Pekerja
0.050 O/hr Mandor

@ Rp.
@ Rp.
Harga 1 m2

2. 1 m' Pengukuran dan Pasang Papan Bowplank


Bahan
An. SNI ( Revisi ) 6.4.1
0.012
m3 Kayu meranti 5/7
0.020
kg
Paku biasa 2" - 5 "
0.007
m3 Kayu Papan meranti 3/20

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.4.2


0.100
Oh Tukang Kayu
0.100
Oh Pekerja
0.010
Oh Kepala Tukang
0.005
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

3. 1 m' Pagar sementara dari kayu tinggi 2 m


Bahan
An. SNI ( Revisi ) 6.1.1
1.250
Btg Dolken kayu 8-10 / 400 cm
5.500
kg
Semen Portland
0.005
m3 Pasir beton
0.009
m3 Koral beton
0.072
m3 Kayu meranti 5/7
0.060
kg
Paku biasa 2" - 5 "
0.400
Lt
Residu

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.1.2


0.200
Oh Tukang Kayu
0.400
Oh Pekerja
0.020
Oh Kepala Tukang
0.020
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1 m' Pagar sementara dari kawat duri tinggi 1.8 m


Bahan
An. SNI ( Revisi ) 6.3.1
1.250
Btg Dolken kayu 8-10 / 400 cm
2.000
kg
Semen Portland
25.000
kg
Kawat duri
0.005
m3 Pasir beton
0.009
m3 Koral beton
0.060
kg
Paku biasa 2" - 5 "

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.3.2


0.200
Oh Tukang Kayu
0.300
Oh Pekerja
0.020
Oh Kepala Tukang
0.020
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

1 m2 Pembuatan kantor sementara, dengan lantai plesteran (Direksi keet)


Bahan
An. SNI ( Revisi ) 6.5.1
1.250
Btg `
@ Rp.
0.180
m3 Kayu meranti 5/7
@ Rp.
0.850
kg
Paku biasa 2" - 5 "
@ Rp.
1.100
kg
Besi strip
@ Rp.
35.000
kg
Semen Portland
@ Rp.
0.150
m3 Pasir pasang
@ Rp.
0.100
m3 Pasir beton
@ Rp.
0.150
m3 Koral beton
@ Rp.
30.000
Bh Bata merah
@ Rp.
0.250
Lbr Seng plat
@ Rp.
2.000
m2 Jendela nako
@ Rp.
0.080
m2 Kaca polos
@ Rp.
0.150
Bh Kunci tanam
@ Rp.
0.060
Lbr Playwood 4mm
@ Rp.
Sub total :
Upah

An. SNI ( Revisi ) 6.5.2


2.000
Oh Tukang Kayu
1.000
Oh Tukang batu
1.000
Oh Pekerja
0.300
Oh Kepala Tukang
0.050
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

1 m2 Pembuatan gudang semen dan alat-alat


Bahan
An. SNI ( Revisi ) 6.6.1
1.700
Btg Dolken kayu 8-10 / 400 cm
0.210
m3 Kayu meranti 5/7
0.300
kg
Paku biasa 2" - 5 "
10.500
kg
Semen Portland
0.030
m3 Pasir beton
0.050
m3 Koral beton
1.500
Lbr Seng gelombang bljs 32

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah

An. SNI ( Revisi ) 6.6.2


2.000
Oh Tukang Kayu
1.000
Oh Pekerja
0.200
Oh Kepala Tukang
0.050
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

1 m2 Pembuatan rumah jaga/konstruksi kayu


Bahan
An. SNI ( Revisi ) 6.7.1
3.000
Btg Dolken kayu 8-10 / 400 cm
0.276
m3 Kayu meranti 5/7
0.700
kg
Paku biasa 2" - 5 "
1.500
Lbr Seng gelombang bljs 32

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.7.2


1.500
Oh Tukang Kayu
1.000
Oh Pekerja
0.150
Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.050

Oh

Mandor

@ Rp.
Sub total :
Total Upah dan Bahan

1 m2 Pembuatan bedeng buruh


Bahan
An. SNI ( Revisi ) 6.9.1
1.250
Btg Dolken kayu 8-10 / 400 cm
0.186
m3 Kayu meranti 5/7
0.300
kg
Paku biasa 2" - 5 "
18.000
kg
Semen Portland
0.030
m3 Pasir beton
0.050
m3 Koral beton
1.500
Lbr Seng gelombang bljs 32
1.350
Lbr Playwood 4mm

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.9.2


2.000
Oh Tukang Kayu
1.000
Oh Pekerja
0.200
Oh Kepala Tukang
0.050
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

1 m2 Pembuatan bak adukan ukuran ( 40 x 50 x 25 ) cm


Bahan
An. SNI ( Revisi ) 6.10.1
0.036
m3 Kayu Terentang / meranti
0.080
kg
Paku biasa 2" - 5 "
1.000
Btg Kaso meranti 5/7

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.10.2


0.300
Oh Tukang Kayu
0.0015
Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10 1 m2 Pembuatan stegger dari bambu


Bahan
An. SNI ( Revisi ) 6.11.1
1.000
Btg Bambu 6 - 10 / 600 cm
0.250
Kg Tali ijuk

@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.11.2


0.250
Oh Tukang Kayu
0.002
Oh Kepala Tukang
0.017
Oh Pekerja
0.013
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

11 1 m2 Pembuatan jalan sementara


Bahan
An. SNI ( Revisi ) 6.12.1
0.150
m3 Batu belah 15/20
0.090
m3 Batu pecah 5/7
0.010
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.12.2


1.000
Oh Pekerja
0.050
Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

12 1 m3 Bongkaran beton bertulang


Upah
An. SNI ( Revisi ) 6.13.1
6.667
Oh Pekerja
0.333
Oh Mandor

@ Rp.
@ Rp.
Sub total :

Total Upah
13 1 m3 Bongkaran dinding tembok bata merah
Upah

An. SNI ( Revisi ) 6.14.1+ membuat


6.667
Oh Pekerja
0.033
Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah

14 1 m' Pagar sementara dari seng gelombang tinggi 2 m


Bahan
An. SNI ( Revisi ) 6.2.1
1.250
Btg Dolken kayu 8-10 / 400 cm
2.500
kg
Semen Portland
1.200
Lbr Seng gelombang 3" - 5"
0.005
m3 Pasir beton
0.009
m3 Koral beton
0.072
m3 Kayu meranti 5/7
0.060
kg
Paku biasa 2" - 5 "
0.450
kg
Meni besi

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.2.2


0.200
Oh Tukang Kayu

@ Rp.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.400
0.020
0.020

Oh
Oh
Oh

Pekerja
Kepala Tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

15. 1 m' Pasang pagar kawat jaring galvanis(Harmonikaq), tinggi 1 meter.


Bahan
An. SNI ( Revisi ) 6.15.1
0.434
Lbr Pagar kawat jaring
@ Rp.
Sub total :
Upah

An. SNI ( Revisi ) 6.15.2


0.042
Oh Pekerja
0.004
Oh Kepala Tukang
0.042
Oh Tukang
0.002
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

16. 1 m' Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm tinggi 1 meter


Bahan
An. SNI ( Revisi ) 6.16.1
0.986
Lbr Panel beton pracetak
@ Rp.
0.525
Btg Kolom beton pracetak
@ Rp.
0.074
m3 Pasir beton
@ Rp.
0.146
m3 Koral 2/3
@ Rp.
45.000
Kg Semen abu-abu
@ Rp.
Sub total :
Upah

An. SNI ( Revisi ) 6.16.2


0.125
Oh Tukang batu
0.375
Oh Pekerja
0.012
Oh Kepala tukang
0.019
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah dan Bahan

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10

12

EN SIDOARJO
PERMUKIMAN
ARJO.

D O A R J O.

- : 8951349

NGGI metode S.N.I. 03-2835-2002

ONGAN
Semester Pertama )

32,750.00
55,000.00
Harga 1 m2

3,404,000.00
10,478.80
3,818,000.00
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

3,275.00
2,750.00
6,025.00
6,025.00

= Rp
= Rp
= Rp
=
Rp

40,848.00
209.58
26,726.00
67,783.58

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,200.00
3,275.00
440.00
275.00
8,190.00
75,973.58

3,680.00
829.84
93,610.00
137,126.00
3,404,000.00
10,478.80
7,636.00
Sub total :

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,600.00
4,564.12
468.05
1,234.13
245,088.00
628.73
3,054.40
259,637.43

44,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,800.00
13,100.00
880.00
1,100.00
23,880.00
283,517.43

42,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan

Sub total :
Total Upah dan Bahan

Halaman : 1

3,680.00
829.84
6,808.00
93,610.00
137,126.00
10,478.80
Sub total :

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,600.00
1,659.68
170,200.00
468.05
1,234.13
628.73
178,790.59

44,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,800.00
9,825.00
880.00
1,100.00
20,605.00
199,395.59

3,680.00
3,404,000.00
10,478.80
10,166.00
829.84
90,684.40
93,610.00
137,126.00
270.00
62,560.00
16,100.00
56,396.00
82,800.00
54,142.00
Sub total :

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,600.00
612,720.00
8,906.98
11,182.60
29,044.40
13,602.66
9,361.00
20,568.90
8,100.00
15,640.00
32,200.00
4,511.68
12,420.00
3,248.52
786,106.74

44,000.00
42,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

88,000.00
42,000.00
32,750.00
13,200.00
2,750.00
178,700.00
964,806.74

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,256.00
714,840.00
3,143.64
435,666.00
2,808.30
6,856.30
48,300.00
1,217,870.24

Sub total :
Total Upah dan Bahan

Sub total :
Total Upah dan Bahan

3,680.00
3,404,000.00
10,478.80
41,492.00
93,610.00
137,126.00
32,200.00
Sub total :

Halaman : 2
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan

3,680.00
3,404,000.00
10,478.80
32,200.00
Sub total :

44,000.00
32,750.00
44,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

88,000.00
32,750.00
8,800.00
2,750.00
132,300.00
1,350,170.24

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

11,040.00
939,504.00
7,335.16
48,300.00
1,006,179.16

= Rp
= Rp
= Rp

66,000.00
32,750.00
6,600.00

55,000.00
Sub total :
Total Upah dan Bahan

= Rp
= Rp
= Rp

2,750.00
108,100.00
1,114,279.16

3,680.00
3,404,000.00
10,478.80
41,492.00
93,610.00
137,126.00
32,200.00
54,142.00
Sub total :

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,600.00
633,144.00
3,143.64
746,856.00
2,808.30
6,856.30
48,300.00
73,091.70
1,518,799.94

44,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

88,000.00
32,750.00
8,800.00
2,750.00
132,300.00
1,651,099.94

=
=
=
=

Rp
Rp
Rp
Rp

137,448.00
838.30
54,000.00
192,286.30

= Rp
= Rp
= Rp

13,200.00
82.50
13,200.00

= Rp

205,486.30
Halaman : 3

20,000.00
5,372.80

= Rp
= Rp
= Rp

20,000.00
1,343.20
21,343.20

44,000.00
44,000.00
32,750.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

11,000.00
88.00
556.75
715.00
12,359.75
33,702.95

92,000.00
108,713.64
90,684.40
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

13,800.00
9,784.23
906.84
24,491.07

32,750.00
55,000.00

=
=
=
=

Rp
Rp
Rp
Rp

32,750.00
2,750.00
35,500.00
59,991.07

= Rp
= Rp
= Rp

218,344.25
18,315.00
236,659.25

Sub total :
Total Upah dan Bahan

3,818,000.00
10,478.80
54,000.00
Sub total :
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan

Sub total :

Sub total :
Total Upah dan Bahan

Sub total :
Total Upah dan Bahan

32,750.00
55,000.00
Sub total :

Total Upah

= Rp

236,659.25

32,750.00
55,000.00

=
=
=
=

Rp
Rp
Rp
Rp

218,344.25
1,815.00
220,159.25
220,159.25

3,680.00
829.84
32,200.00
93,610.00
137,126.00
3,404,000.00
10,478.80
12,420.00
Sub total :

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,600.00
2,074.60
38,640.00
468.05
1,234.13
245,088.00
628.73
5,589.00
298,322.51

44,000.00

= Rp

8,800.00

32,750.00
44,000.00
55,000.00

=
=
=
=
=

Sub total :
Total Upah

Rp
Rp
Rp
Rp
Rp

Halaman : 4
13,100.00
880.00
1,100.00
23,880.00
322,202.51

19,044.00

= Rp
= Rp

8,265.10
8,265.10

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,375.50
176.00
1,848.00
110.00
3,509.50
11,774.60

197,025.00
127,650.00
93,610.00
137,126.00
829.84
Sub total :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

194,266.65
67,016.25
6,927.14
20,020.40
37,342.80
325,573.24

42,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
12,281.25
528.00
1,045.00
19,104.25
344,677.49

Sub total :
Total Upah dan Bahan

Sub total :

Sub total :
Total Upah dan Bahan

Sub total :
Total Upah dan Bahan

197,025.00
63,825.00

Halaman : 5

19

PEKERJAAN TANAH
1.

1 m3
Upah

Galian Untuk Tanah Biasa sedalam 1 m


An. SNI ( Revisi ) 6.1.1
0.400 Oh Pekerja
0.040 Oh Mandor

@ Rp.
@ Rp.
Total Upah

2.

1 m3
Upah

Galian Untuk Tanah Biasa sedalam 2 m


An. SNI ( Revisi ) 6.2.1
0.526 Oh Pekerja
0.052 Oh Mandor

@ Rp.
@ Rp.
Total Upah

3.

1 m3
Upah

Galian Untuk Tanah Biasa sedalam 3 m


An. SNI ( Revisi ) 6.3.1
0.735 Oh Pekerja
0.073 Oh Mandor

@ Rp.
@ Rp.
Total Upah

4.

1 m3
Upah

Galian Untuk Tanah keras sedalam 1 m


An. SNI ( Revisi ) 6.4.1
0.625 Oh Pekerja
0.062 Oh Mandor

@ Rp.
@ Rp.
Total Upah

5.

1 m3
Upah

Galian Untuk Tanah cadas sedalam 1 m


An. SNI ( Revisi ) 6.5.1
1.250 Oh Pekerja
0.125 Oh Mandor

@ Rp.
@ Rp.
Total Upah

6.

1 m3
Upah

Galian Untuk Tanah lumpur sedalam 1 m


An. SNI ( Revisi ) 6.6.1
0.825 Oh Pekerja
0.082 Oh Mandor

@ Rp.
@ Rp.
Total Upah

7.

1 m2
Upah

Pekerjaan stripping setinggi 1 m


An. SNI ( Revisi ) 6.7.1
0.050 Oh Pekerja
0.005 Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah

8.

1 m3
Upah

Pembuangan tanah sejauh 150 m


An. SNI ( Revisi ) 6.8.1
0.516 Oh Pekerja

@ Rp.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.050

Oh

Mandor

@ Rp.
Sub total :
Total Upah

9.

1 m3
Upah

Urugan kembali
An. SNI ( Revisi ) 6.9.1
0.192 Oh Pekerja
0.019 Oh Mandor

@ Rp.
@ Rp.

Sub total :
Total Upah
10.

1 m3
Upah

Pemadatan tanah konvensional.


An. SNI ( Revisi ) 6.10.1
0.500 Oh Pekerja
0.050 Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah

11.

1 m3
Bahan

Urugan pasir dengan pasir urug.


An. SNI ( Revisi ) 6.11.1
1.200 m3 Pasir urug

@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.11.2


0.300 Oh Pekerja
0.0100 Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah + bahan

12.

1 m3
Bahan

Lapisan pudel campuran 1 Kp : 3 Ps : 7 Tnh liat.


An. SNI ( Revisi ) 6.12.1
0.330 m3 Pasir urug
@ Rp.
0.109 m3 Kapur padam
@ Rp.
0.763 m3 tanah urug / tanah liat @ Rp.

Upah

An. SNI ( Revisi ) 6.12.2


0.833 Oh Pekerja
0.416 Oh Tukang batu
0.040 Oh Kepala tukang
0.0830 Oh Mandor

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah + bahan
13.

1 m3
Bahan

Lapisan pudel campuran 1 Kp : 5 Tnh liat


An. SNI ( Revisi ) 6.13.1
0.200 m3 Kapur padam
1.000 m3 tanah urug / tanah liat

@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.13.2


0.833 Oh Pekerja
0.416 Oh Tukang batu
0.041 Oh Kepala tukang
0.081 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total Upah + bahan

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

14.

1 m3
Bahan

Pemasangan lapisan ijuk


An. SNI ( Revisi ) 6.14.1
1.200 m3 Ijuk

@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.14.2


0.150 Oh Pekerja
0.015 Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah + bahan

15.

1 m2 Pembuatan jalan sementara, tebal 25 cm


Bahan
An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu belah
0.030 m3 Kerikil
0.050 m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.17.2


1.000 Oh Pekerja
0.100 Oh Mandor

@ Rp.
@ Rp.

Sub total :
Total Upah + bahan

MENGURUG DENGAN SIRTU

TANPA PEMADATAN DAN CUKUP DIGELAR / DIRATAKAN DENG


16

1 m3
Bahan

Urugan sirtu
An. SNI ( Revisi ) 6.15.1
1.200 m3 Sirtu

@ Rp.
Sub total :

Upah

An. SNI ( Revisi ) 6.15.2


0.250 Oh Pekerja
0.025 Oh Mandor

@ Rp.
@ Rp.
Sub total :
Total Upah + bahan

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

MENGURUG DENGAN SIRTU UNTUK PARTAI BESA


DENGAN ARMADA TRUK TRONTON + PEMADATAN

1 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 10 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
1 Biaya transportasi.
Total Biaya / M3

2 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 20 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
2 Biaya transportasi.
Total Biaya / M3

3 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 30 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
3 Biaya transportasi.
Total Biaya / M3

4 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 40 K
Bahan
An. SNI ( Revisi ) 6.15.1

Upah

An. SNI ( Revisi ) 6.15.2

3 Biaya transportasi.
Total Biaya / M3

5 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 50 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
4 Biaya transportasi.
Total Biaya / M3

6 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 60 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
5 Biaya transportasi.
Total Biaya / M3

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

MENGURUG DENGAN SIRTU UNTUK PARTAI KECIL ( KURA


DENGAN ANGKUTAN TRUK DISEL 3/4. TANPA PEMADATAN (Cuku

1 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 10 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
1 Biaya transportasi.
Total Biaya / M3

2 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 20 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
3 Biaya transportasi.
Total Biaya / M3

3 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 30 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
4 Biaya transportasi.
Total Biaya / M3

4 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 40 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
4 Biaya transportasi.
Total Biaya / M3

5 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 50 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
5 Biaya transportasi.
Total Biaya / M3

6 - Menguruk sirtu per M3 (An- SNI -revisi 6.15.)


(Jarak dengan penggambilan sirtu +/- 60 K
Bahan
An. SNI ( Revisi ) 6.15.1
Upah
An. SNI ( Revisi ) 6.15.2
6 Biaya transportasi.
Total Biaya / M3

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10

12

12

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

13,100.00
2,200.00
15,300.00
15,300.00

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

17,226.50
2,860.00
20,086.50
20,086.50

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

24,071.25
4,015.00
28,086.25
28,086.25

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

20,468.75
3,410.00
23,878.75
23,878.75

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

40,937.50
6,875.00
47,812.50
47,812.50

Total Upah

32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp

27,018.75
4,510.00
31,528.75
31,528.75

32,750.00 = Rp.
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah
= Rp

1,637.50
275.00
1,912.50
1,912.50

32,750.00 = Rp.

16,899.00
Halaman : 6

55,000.00 = Rp.
= Rp.
= Rp

2,750.00
19,649.00
19,649.00

32,750.00 = Rp.
55,000.00 = Rp.

6,288.00
1,045.00

Sub total :
Total Upah

Sub total :
Total Upah

= Rp.
= Rp

7,333.00
7,333.00

32,750.00 = Rp.
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah
= Rp

16,375.00
2,750.00
19,125.00
19,125.00

74,520.00 = Rp.
= Rp.

89,424.00
89,424.00

32,750.00 = Rp.
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah + bahan
= Rp

9,825.00
550.00
10,375.00
99,799.00

Sub total :

74,520.00
450,174.40
39,100.00
Sub total :

= Rp.
= Rp.
= Rp.
= Rp.

24,591.60
49,069.01
29,833.30
103,493.91

32,750.00
42,000.00
44,000.00
55,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp

27,280.75
17,472.00
1,760.00
4,565.00
51,077.75
154,571.66

450,174.40 = Rp.
39,100.00 = Rp.
Sub total :
= Rp.

90,034.88
39,100.00
129,134.88

Sub total :
Total Upah + bahan

32,750.00
42,000.00
44,000.00
55,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp

27,280.75
17,472.00
1,804.00
4,455.00
51,011.75
180,146.63
Halaman : 7

4,029,600.00 = Rp.
Sub total :
= Rp.

4,835,520.00
4,835,520.00

32,750.00 = Rp.
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah + bahan
= Rp

4,912.50
825.00
5,737.50
4,841,257.50

Sub total :
Total Upah + bahan

92,000.00
174,570.00
90,684.40
Sub total :

= Rp.
= Rp.
= Rp.
= Rp.

23,000.00
5,237.10
4,534.22
32,771.32

32,750.00 = Rp.
55,000.00 = Rp.

32,750.00
5,500.00

Sub total :
Total Upah + bahan

= Rp.
= Rp

38,250.00
71,021.32

URUG DENGAN SIRTU

ELAR / DIRATAKAN DENGAN TENAGA MANUSIA.

39,100.00 = Rp.
= Rp.

46,920.00
46,920.00

32,750.00 = Rp.
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah + bahan
= Rp

8,187.50
1,375.00
9,562.50
56,482.50

Sub total :

Halaman : 8

U UNTUK PARTAI BESAR ( DIATAS 200 m3 )


RONTON + PEMADATAN DENGAN DOSER..

penggambilan sirtu +/- 10 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
1,500.00
57,982.50

penggambilan sirtu +/- 20 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
3,062.50
59,545.00

penggambilan sirtu +/- 30 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
3,750.00
60,232.50

penggambilan sirtu +/- 40 Km)


= Rp.

46,920.00

= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

9,562.50
56,482.50
4,875.00
61,357.50

penggambilan sirtu +/- 50 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
7,000.00
63,482.50

penggambilan sirtu +/- 60 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
8,312.50
64,795.00

Halaman : 9

UK PARTAI KECIL ( KURANG DARI 200 m3 )


ANPA PEMADATAN (Cukup digelar dan diratakan)

1.34290
1.34290

penggambilan sirtu +/- 10 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
2,013.00
58,495.50

penggambilan sirtu +/- 20 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
4,637.50
61,120.00

penggambilan sirtu +/- 30 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
5,325.00
61,807.50

penggambilan sirtu +/- 40 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,500.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
6,675.00
63,157.50

penggambilan sirtu +/- 50 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
9,362.50
65,845.00

penggambilan sirtu +/- 60 Km)


= Rp.
= Rp.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp

46,920.00
9,562.50
56,482.50
10,937.50
67,420.00

Halaman : 10

19

PEKERJAAN PONDASI
1.

1 m3 Pasang pondasi batu kosong (Aanstamping)


Bahan
An. SNI ( Revisi ) 6.14.1
1.200
m3
Batu belah ( 15/20 )
0.300
m3
Pasir urug
Upah

2.

An. SNI ( Revisi ) 6.1.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi batu kali 1 Pc : 2 Ps


Bahan
An. SNI ( Revisi ) 6.2.1
1.100
m3
267.000
Kg
0.427
m3
Upah

4.

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi batu kali 1 Pc : 1 Ps


Bahan
An. SNI ( Revisi ) 6.1.1
1.200
m3
392.000
Kg
0.314
m3
Upah

3.

An. SNI ( Revisi ) 6.14.2


0.780
0.390
0.039
0.039

An. SNI ( Revisi ) 6.2.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi batu kali 1 Pc : 2.5 Ps


Bahan
An. SNI ( Revisi ) 6.3.1
1.100
m3
234.500
Kg
0.400
m3
Upah

An. SNI ( Revisi ) 6.3.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

5.

1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps


Bahan
An. SNI ( Revisi ) 6.4.1
1.100
m3
202.000
Kg
0.485
m3
Upah

An. SNI ( Revisi ) 6.4.2


1.500
0.600

Oh
Oh

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu

0.060
0.075

6.

1 m3 Pasang pondasi batu kali 1 Pc : 4 Ps


Bahan
An. SNI ( Revisi ) 6.5.1
1.100
m3
163.000
Kg
0.520
m3
Upah

7.

An. SNI ( Revisi ) 6.5.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi batu kali 1 Pc : 5 Ps


Bahan
An. SNI ( Revisi ) 6.6.1
1.100
m3
136.000
Kg
0.544
m3
Upah

8.

Oh
Oh

An. SNI ( Revisi ) 6.6.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi batu kali 1 Pc : 6 Ps


Bahan
An. SNI ( Revisi ) 6.7.1
1.100
m3
117.000
Kg
0.561
m3
Upah

An. SNI ( Revisi ) 6.7.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

9.

1 m3 Pasang pondasi batu kali 1 Pc : 8 Ps


Bahan
An. SNI ( Revisi ) 6.8.1
1.100
m3
91.000
Kg
0.561
m3
Upah

10.

An. SNI ( Revisi ) 6.8.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Batu belah ( 15/20 )


Semen porland
Pasir pasang

Pekerja
Tukang batu
Kepala tukang
Mandor

1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 1 Ps


Bahan
An. SNI ( Revisi ) 6.9.1
1.100
m3
Batu belah ( 15/20 )
0.229
m3
Kapur pasang
0.229
m3
Semen merah
0.544
m3
Pasir pasang

Upah

11.

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 2 Ps


Bahan
An. SNI ( Revisi ) 6.10.1
1.100
m3
Batu belah ( 15/20 )
0.170
m3
Kapur pasang
0.170
m3
Semen merah
0.340
m3
Pasir pasang
Upah

12.

An. SNI ( Revisi ) 6.9.2


1.500
0.600
0.060
0.075

An. SNI ( Revisi ) 6.10.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

1 m3 Pasang pondasi batu kali 1 Pc : 1/4 Kp : 4 Ps


Bahan
An. SNI ( Revisi ) 6.11.1
1.100
m3
Batu belah ( 15/20 )
156.000
Kg
Semen portland
0.032
m3
Kapur pasang
0.584
m3
Pasir pasang
Upah

An. SNI ( Revisi ) 6.11.2


1.500
0.600
0.060

Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang

Oh

Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.075

13.

1 m3 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps


Bahan
An. SNI ( Revisi ) 6.12.1
1.100
m3
Batu belah ( 15/20 )
61.000
Kg
Semen portland
0.147
m3
Kapur pasang
0.492
m3
Pasir pasang
Upah

14.

An. SNI ( Revisi ) 6.12.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

1 m3 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps


Bahan
An. SNI ( Revisi ) 6.13.1
1.100
m3
Batu belah ( 15/20 )
41.000
Kg
Semen portland
0.131
m3
Kapur pasang
0.523
m3
Pasir pasang
Upah

An. SNI ( Revisi ) 6.13.2


1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

15.

1 m3 Pasang pondasi siklop 40 % batu kali


Bahan
An. SNI ( Revisi ) 6.15.1
75.000
Kg
202.000
Kg
0.320
m3
0.490
m3
0.800
Kg
Upah

16.

An. SNI ( Revisi ) 6.15.2


3.000
0.850
0.085
0.150

Oh
Oh
Oh
Oh

1 m3 Pasang pondasi sumuran 100 cm


Bahan
An. SNI ( Revisi ) 6.16.1
0.450
m3
280.000
Kg
0.450
m3

Besi beton
Semen portland
Pasir beton
Koral beton
Kawat beton

Pekerja
Tukang batu
Kepala tukang
Mandor

Batu belah ( 15/20 )


Semen portland
Pasir beton

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.670
Upah

17.

An. SNI ( Revisi ) 6.16.2


2.380
0.300
0.030
0.080

m3

Koral beton

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

1 m' Pembuatan tiang pancang ( 40 x 40 ) cm, beton bertulang


Bahan
An. SNI ( Revisi ) 6.17.1
0.019
m3
Pasir urug darat
0.094
m3
Pasir beton
0.150
m3
Koral beton
60.500
Kg
Semen portland
45.000
Kg
Besi beton
0.900
Kg
Kawat beton
0.032
m3
Kayu meranti 5/7
0.120
Kg
Paku
0.090
Lt
Minyak bekisting
0.240
Kg
Plamuur tembok
Upah

An. SNI ( Revisi ) 6.17.2


1.000
0.670
0.067
0.050

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Jadi harga 1 Meter Tiang pancang ukuran 40 x 40 Cm2


18.

1 m' Pembuatan tiang pancang ( 35 x 35 ) cm, beton bertulang


Bahan
An. SNI ( Revisi ) 6.18.1
0.016
m3
Pasir urug darat
0.080
m3
Pasir beton
0.125
m3
Koral beton
49.000
Kg
Semen portland
34.500
Kg
Besi beton
0.700
Kg
Kawat beton
0.027
m3
Kayu meranti 5/7
0.120
Kg
Paku

0.090
0.200
Upah

An. SNI ( Revisi ) 6.18.2


0.800
0.500
0.050
0.040

Lt
Kg

Minyak bekisting
Plamuur tembok

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Jadi harga 1 Meter Tiang pancang ukuran 35 x 35 Cm2

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

@ Rp.
@ Rp.

10

12

92,000.00
74,520.00

=
=
=

Rp
Rp
Rp

110,400.00
22,356.00
132,756.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

25,545.00
16,380.00
1,716.00
2,145.00
45,786.00
178,542.00

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

110,400.00
325,297.28
28,474.90
464,172.18

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
545,262.18

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
221,567.28
38,722.24
361,489.52

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
442,579.52

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
194,597.48
36,228.42
332,025.90

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
413,115.90
Halaman : 11

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
167,627.68
43,981.93
312,809.61

32,750.00
42,000.00

=
=

Rp
Rp

49,125.00
25,200.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.

12

@ Rp.
@ Rp.

44,000.00
55,000.00

=
=
=
=

Rp
Rp
Rp
Rp

2,640.00
4,125.00
81,090.00
393,899.61

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
135,263.92
47,155.89
283,619.81

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
364,709.81

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
112,858.24
49,332.31
263,390.55

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
344,480.55

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
97,091.28
50,873.95
249,165.23

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
330,255.23
Halaman : 12

92,000.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
75,515.44
50,873.95
227,589.39

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
308,679.39

92,000.00
450,174.40
138,000.00
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

101,200.00
103,089.94
31,602.00
49,332.31

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :

Rp

285,224.25

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
366,314.25

92,000.00
450,174.40
138,000.00
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

101,200.00
76,529.65
23,460.00
30,832.70
232,022.34

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

52,500.00
33,000.00
2,100.00
4,125.00
91,725.00
323,747.34

92,000.00
829.84
450,174.40
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

101,200.00
129,455.04
14,405.58
52,959.69
298,020.31

@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
35,000.00

=
=
=

Rp
Rp
Rp

@ Rp.

55,000.00

=
=
=

Rp
Rp
Rp

52,500.00
33,000.00
2,100.00
Halaman : 13
4,125.00
91,725.00
389,745.31

92,000.00
829.84
450,174.40
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

101,200.00
50,620.24
66,175.64
44,616.72
262,612.60

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

52,500.00
33,000.00
2,100.00
4,125.00
91,725.00
354,337.60

92,000.00
829.84
450,174.40
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

101,200.00
34,023.44
58,972.85
47,427.94
241,624.23

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=

Rp
Rp
Rp
Rp

49,125.00
25,200.00
2,100.00
4,125.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :
Total upah+bahan :

=
=

Rp
Rp

80,550.00
322,174.23

8,740.00
829.84
93,610.00
137,126.00
10,764.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

655,500.00
167,627.68
29,955.20
67,191.74
8,611.20
928,885.82

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

98,250.00
35,700.00
2,975.00
8,250.00
145,175.00
1,074,060.82

92,000.00
829.84
93,610.00

=
=
=

Rp
Rp
Rp

137,126.00

=
=

Rp
Rp

41,400.00
232,355.20
42,124.50
Halaman : 14
91,874.42
407,754.12

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

77,945.00
12,600.00
1,050.00
4,400.00
95,995.00
503,749.12

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

74,520.00
93,610.00
137,126.00
829.84
8,740.00
10,764.00
3,818,000.00
10,478.80
5,888.00
9,196.00
Sub total :

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,415.88
8,799.34
20,568.90
50,205.32
393,300.00
9,687.60
122,176.00
1,257.46
529.92
2,207.04
610,147.46

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
28,140.00
2,345.00
2,750.00
65,985.00
676,132.46
676,132.46

74,520.00
74,520.00
137,126.00
829.84
8,740.00
10,764.00
3,818,000.00
10,478.80

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,192.32
5,961.60
17,140.75
40,662.16
301,530.00
7,534.80
103,086.00
1,257.46

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

5,888.00
9,196.00

=
=
=

Rp
Rp
Rp

529.92
1,839.20
480,734.21

32,750.00
42,000.00
35,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
21,000.00
1,750.00
2,200.00
51,150.00
531,884.21
531,884.21

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Halaman : 15

Halaman : 13

19

PEKERJAAN BETON TUMBUK & BETON BERTUL


BETON TUMBUK.
1. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.1.1
218.000 Kg Semen portland
0.520 m3 Pasir beton
0.870 m3 Koral beton
Upah An. SNI ( Revisi ) 6.1.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

2. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr


Bahan An. SNI ( Revisi ) 6.2.1
197.000 Kg Semen portland
0.470 m3 Pasir beton
0.940 m3 Koral beton
Upah An. SNI ( Revisi ) 6.2.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

3. 1 m3 Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr


Bahan An. SNI ( Revisi ) 6.3.1
173.000 Kg Semen portland
0.570 m3 Pasir beton
0.870 m3 Koral beton
Upah An. SNI ( Revisi ) 6.3.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

4. 1 m2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr tebal 5 Cm


Bahan An. SNI ( Revisi ) 6.4.1
10.900 Kg Semen portland
0.026 m3 Pasir beton
0.044 m3 Koral beton
Upah An. SNI ( Revisi ) 6.4.2
0.08250 Oh Pekerja
0.01250 Oh Tukang batu
0.00125 Oh Kepala tukang
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.00400 Oh Mandor

BETON BERTULANG.
5. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr

Bahan An. SNI ( Revisi ) 6.5.1


232.000 Kg Semen portland
0.520 m3 Pasir beton
0.870 m3 Koral beton
Upah An. SNI ( Revisi ) 6.5.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

6. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 4 Kr


Bahan An. SNI ( Revisi ) 6.6.1
280.000 Kg Semen portland
0.450 m3 Pasir beton
0.900 m3 Koral beton
Upah An. SNI ( Revisi ) 6.6.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

7. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 2.5 Kr


Bahan An. SNI ( Revisi ) 6.7.1
352.000 Kg Semen portland
0.560 m3 Pasir beton
0.700 m3 Koral beton
Upah An. SNI ( Revisi ) 6.7.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

8. 1 m3 Membuat campuran beton bertulang, 1 Pc : 1.5 Ps : 3 Kr


Bahan An. SNI ( Revisi ) 6.8.1
357.000 Kg Semen portland
0.420 m3 Pasir beton
0.840 m3 Koral beton
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.8.2


1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

9. 1 m3 Membuat campuran beton bertulang, 1 Pc : 1.5 Ps : 2.5 Kr


Bahan An. SNI ( Revisi ) 6.9.1
386.000 Kg Semen portland
0.470 m3 Pasir beton
0.700 m3 Koral beton
Upah An. SNI ( Revisi ) 6.9.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

10. 1 m3 Membuat campuran beton bertulang, 1 Pc : 1 Ps : 2 Kr


Bahan An. SNI ( Revisi ) 6.10.1
479.000 Kg Semen portland
0.370 m3 Pasir beton
0.740 m3 Koral beton
Upah An. SNI ( Revisi ) 6.10.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

11. 1 m3 Membuat beton tiang pancang prestressed beton


Bahan An. SNI ( Revisi ) 6.11.1
440.000 Kg Semen portland
0.500 m3 Pasir beton
0.800 m3 Koral beton
2.460 Gln Repidrant
Upah An. SNI ( Revisi ) 6.11.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

12. 1 m3 Membuat beton dengan puzzdith - 100 XR


Bahan An. SNI ( Revisi ) 6.12.1
336.000 Kg Semen portland
0.540 m3 Pasir beton
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.810 m3 Koral beton


1.000 Ltr Puzzdith - 100 XR
Upah An. SNI ( Revisi ) 6.12.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor

13. 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr


Bahan An. SNI ( Revisi ) 6.17.1
615.000 Kg Semen portland
0.520 m3 Pasir beton
0.520 m3 Koral beton
Upah An. SNI ( Revisi ) 6.17.2
2.000 Oh Pekerja
0.350 Oh Tukang batu
0.035 Oh Kepala tukang
1.000 Oh Mandor

14. 1 m3 Membuat beton kedap air dengan storox - 100


Bahan An. SNI ( Revisi ) 6.18.1
400.000 Kg Semen portland
0.480 m3 Pasir beton
0.800 m3 Koral beton 2/3
1.200 Kg Storox - 100

Upah An. SNI ( Revisi ) 6.18.2


2.000 Oh Pekerja
0.350 Oh Tukang batu
0.035 Oh Kepala tukang
1.000 Oh Mandor

PEMBESIAN.
15 1 Kg Pembesian dengan besi polos
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( polos )
0.015 Kg Kawat beton
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja
0.007 Oh Tukang besi
0.0007 Oh Kepala tukang
0.0003 Oh Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

15.a 1 Kg Pembesian dengan besi ulir


Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( ulir )
0.015 Kg Kawat beton
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja
0.007 Oh Tukang besi
0.0007 Oh Kepala tukang
0.0003 Oh Mandor

16 1 Kg Kabel presstessed polos/strands


Bahan An. SNI ( Revisi ) 6.26.1
1.050 Kg Besi presstessed polos
0.010 Kg Kawat beton
Upah An. SNI ( Revisi ) 6.26.2
0.005 Oh Pekerja
0.005 Oh Tukang besi
0.0005 Oh Kepala tukang
0.0003 Oh Mandor

17 1 Kg Jaring kawat baja


Bahan An. SNI ( Revisi ) 6.27.1
1.020 Kg Besi jaring kawat baja
0.805 Kg Kawat beton
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pekerja
0.025 Oh Tukang besi
0.0025 Oh Kepala tukang
0.0015 Oh Mandor

BEGESTING.
18 1 m2 Pasang bekisting untuk pondasi

Bahan An. SNI ( Revisi ) 6.28.1


0.040 m3 Kayu terentang/Meranti
0.300 Kg Paku biasa 2" - 5"
0.100 Ltr Minyak bekisting
Upah An. SNI ( Revisi ) 6.28.2
0.300 Oh Pekerja
0.260 Oh Tukang kayu
0.026 Oh Kepala tukang
0.005 Oh Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19 1 m2 Pasang bekisting untuk sloof


Bahan An. SNI ( Revisi ) 6.29.1
0.045 m3 Kayu terentang/Meranti (MC)
0.300 Kg Paku biasa 2" - 5"
0.100 Ltr Minyak bekisting
Upah An. SNI ( Revisi ) 6.29.2
0.300 Oh Pekerja
0.260 Oh Tukang kayu
0.026 Oh Kepala tukang
0.005 Oh Mandor

20 1 m2 Pasang bekisting untuk kolom


Bahan An. SNI ( Revisi ) 6.30.1
0.040 m3 Kayu terentang/Meranti (MC)
0.400 Kg Paku biasa 2" - 5"
0.200 Ltr Minyak bekisting
0.015 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
2.000 Btg Dolken kayu galam 8-10 / 4 m
Upah An. SNI ( Revisi ) 6.30.2
0.300 Oh Pekerja
0.330 Oh Tukang kayu
0.033 Oh Kepala tukang
0.006 Oh Mandor

21 1 m2 Pasang bekisting untuk balok


Bahan An. SNI ( Revisi ) 6.31.1
0.040 m3 Kayu terentang/Meranti (MC)
0.400 Kg Paku biasa 2" - 5"
0.200 Ltr Minyak bekisting
0.018 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
2.000 Btg Dolken kayu galam 8-10 / 4 m
Upah An. SNI ( Revisi ) 6.31.2
0.320 Oh Pekerja
0.330 Oh Tukang kayu
0.033 Oh Kepala tukang
0.006 Oh Mandor

22 1 m2 Pasang bekisting untuk lantai


Bahan An. SNI ( Revisi ) 6.32.1
0.040 m3 Kayu terentang/Meranti (MC)
0.400 Kg Paku biasa 2" - 5"

0.200 Ltr Minyak bekisting


0.015 m3 Balok kayu borneo
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.350 Lbr Plywood tebal 9 mm


6.000 Btg Dolken kayu galam 8-10 / 4 m
Upah An. SNI ( Revisi ) 6.32.2
0.320 Oh Pekerja
0.330 Oh Tukang kayu
0.033 Oh Kepala tukang
0.006 Oh Mandor

23 1 m2 Pasang bekisting untuk dinding ( shear wall )


Bahan An. SNI ( Revisi ) 6.33.1
0.030 m3 Kayu terentang/Meranti (MC)
0.400 Kg Paku biasa 2" - 5"
0.200 Ltr Minyak bekisting
0.020 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
3.000 Btg Dolken kayu galam 8-10 / 4 m
4.000 Bh Formtie/penjaga jarak bkstng
Upah An. SNI ( Revisi ) 6.33.2
0.320 Oh Pekerja
0.330 Oh Tukang kayu
0.033 Oh Kepala tukang
0.006 Oh Mandor

24 1 m2 Pasang bekisting untuk tangga


Bahan An. SNI ( Revisi ) 6.34.1
0.030 m3 Kayu terentang/Meranti (MC)
0.400 Kg Paku biasa 2" - 5"
0.150 Ltr Minyak bekisting
0.015 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
2.000 Btg Dolken kayu galam 8-10 / 4 m
Upah An. SNI ( Revisi ) 6.34.2
0.320 Oh Pekerja
0.330 Oh Tukang kayu
0.033 Oh Kepala tukang
0.006 Oh Mandor

25 1 m2 Membuat begesting jembatan cor


Bahan An. SNI ( Revisi ) 6.37.1
0.0264 m3 Kayu terentang/Meranti (MC)
0.600 Kg Paku biasa 2" - 5"
0.500 Btg Dolken kayu galam 8-10 / 4 m
Upah An. SNI ( Revisi ) 6.37.2
0.150 Oh Pekerja
0.050 Oh Tukang batu
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.005 Oh Kepala tukang


0.007 Oh Mandor

PONDASI BETON

30 1 m3 Membuat pondasi beton bertulang ( 150 Kg besi + bekisting )

Bahan An. SNI ( Revisi ) 6.38.1


0.200 m3 Kayu terentang/Meranti (MC)
1.500 Kg Paku biasa 2" - 5"
0.400 Ltr Minyak bekisting
150.000 Kg Besi beton polos
2.250 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
Upah An. SNI ( Revisi ) 6.38.2
3.900 Oh Pekerja
0.350 Oh Tukang batu
1.040 Oh Tukang kayu
1.050 Oh Tukang besi
0.245 Oh Kepala tukang
0.165 Oh Mandor

Sloof
31 1 m3 Membuat sloof beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti (MC)
2.000 Kg Paku biasa 2" - 5"
0.600 Ltr Minyak bekisting
300.000 Kg Besi beton polos
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.400 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor

32 1 m3 Membuat sloof beton bertulang ukuran 20 x 30 Cm dengan besi 5 dia 19 mm


Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti (MC)
2.000 Kg Paku biasa 2" - 5"
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

262

0.600
179.859
81.656
3.000
323.000
0.520
0.780

Ltr
Kg
Kg
Kg
Kg
m3
m3

Minyak bekisting
Besi beton polos dia 16 mm
Besi begel polos dia 6 mm
Kawat beton
Semen portland
Pasir beton
Koral beton

Upah An. SNI ( Revisi ) 6.39.2


4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.350 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor

33 1 m3 Membuat sloof beton bertulang ukuran 20 x 30 Cm dengan besi 5 dia 16 mm

Bahan An. SNI ( Revisi ) 6.39.1


0.270 m3 Kayu terentang/Meranti (MC)
2.000 Kg Paku biasa 2" - 5"
0.600 Ltr Minyak bekisting
127.505 Kg Besi beton polos dia 16 mm
45.745 Kg Besi begel polos dia 6 mm
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.350 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor

34 1 m3 Membuat sloof beton bertulang ukuran 15 x 20 Cm dengan besi 4 dia 12 mm


Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti (MC)
2.000 Kg Paku biasa 2" - 5"
0.600 Ltr Minyak bekisting
114.419 Kg Besi beton polos dia 12 mm
35.631 Kg Besi begel polos dia 6 mm
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1.560
1.350
0.331
0.170

Oh
Oh
Oh
Oh

Tukang kayu
Tukang besi
Kepala tukang
Mandor

35 1 m3 Membuat sloof beton bertulang ukuran 15 x 20 Cm dengan besi 4 dia 10 mm


Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti (MC)
2.000 Kg Paku biasa 2" - 5"
0.600 Ltr Minyak bekisting
79.387 Kg Besi beton polos dia 10 mm
35.631 Kg Besi begel polos dia 6 mm
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.300 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor

Kolom
36 1 m3 Membuat kolom beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.40.1
0.400 m3 Kayu terentang/Meranti (MC)
4.000 Kg Paku biasa 2" - 5"
2.000 Ltr Minyak bekisting
300.000 Kg Besi beton polos
4.500 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
0.015 m3 Balok kayu borneo
3.500 Lbr Plywood tebal 9 mm
20.000 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.40.2
7.300 Oh Pekerja
0.350 Oh Tukang batu
3.300 Oh Tukang kayu
2.100 Oh Tukang besi
0.570 Oh Kepala tukang
0.250 Oh Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

37 1 m' Membuat kolom penguat ( kolom praktis ) beton bertulang ( 11 x 11 ) cm


Catatan : besi memakai diameter 12 mm beugel diameter 5 mm.
Bahan An. SNI ( Revisi ) 6.45.1
0.002 m3 Kayu terentang/Meranti (MC)
0.010 Kg Paku biasa 2" - 5"
3.436 Kg Besi beton polos dia. 10 mm
0.280 Kg Besi begel polos dia. 6 mm
0.125 Kg Kawat beton
3.908 Kg Semen portland
0.006 m3 Pasir beton
0.009 m3 Koral beton
Upah An. SNI ( Revisi ) 6.45.2
0.060 Oh Pekerja
0.020 Oh Tukang batu
0.020 Oh Tukang kayu
0.020 Oh Tukang besi
0.006 Oh Kepala tukang
0.003 Oh Mandor

Biaya kolom praktis dengan besi polos 4 diameter 12 mm


Analog biaya / M3.
=
49,165.19

38 1 m' Membuat kolom penguat ( kolom praktis ) beton bertulang ( 11 x 11 ) cm


Catatan : besi memakai diameter 10 mm beugel diameter 5 mm.
Bahan An. SNI ( Revisi ) 6.45.1
0.002 m3 Kayu terentang/Meranti (MC)
0.010 Kg Paku biasa 2" - 5"
2.300 Kg Besi beton polos dia. 10 mm
0.280 Kg Besi begel polos dia. 6 mm
0.250 Kg Kawat beton
4.000 Kg Semen portland
0.006 m3 Pasir beton
0.009 m3 Koral beton
Upah An. SNI ( Revisi ) 6.45.2

0.060
0.020
0.020
0.020
0.006
0.003

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Biaya kolom praktis dengan besi polos 4 diameter 10 mm


Analog biaya / M3.
=
40,618.14

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Balok
39 1 m3 Membuat balok beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.41.1
0.320 m3 Kayu terentang/Meranti (MC)
3.200 Kg Paku biasa 2" - 5"
1.600 Ltr Minyak bekisting
200.000 Kg Besi beton polos
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
0.140 m3 Balok kayu borneo
2.800 Lbr Plywood tebal 9 mm
16.000 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.41.2
5.960 Oh Pekerja
0.350 Oh Tukang batu
2.800 Oh Tukang kayu
1.400 Oh Tukang besi
0.455 Oh Kepala tukang
0.208 Oh Mandor

40 1 m3 Membuat balok beton bertulang ( 150 Kg besi + bekisting )


Bahan An. SNI ( Revisi ) 6.42.1
0.320 m3 Kayu terentang/Meranti (MC)
0.003 Kg Paku biasa 2" - 5"
0.020 Ltr Minyak bekisting
150.000 Kg Besi beton polos
2.250 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
0.120 m3 Balok kayu borneo
2.800 Lbr Plywood tebal 9 mm
16.000 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.42.2
5.800 Oh Pekerja
0.350 Oh Tukang batu
2.800 Oh Tukang kayu
1.050 Oh Tukang besi
0.420 Oh Kepala tukang
0.185 Oh Mandor

41 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm


Catatan : besi memakai diameter 12 mm beugel diameter 5 mm.
Bahan An. SNI ( Revisi ) 6.46.1
0.003 m3 Kayu terentang/Meranti (MC)

0.020 Kg Paku biasa 2" - 5"


3.436 Kg Besi beton polos dia 12 mm
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.050
0.050
5.500
0.009
0.015

Kg
Kg
Kg
m3
m3

Besi begel polos dia. 6 mm


Kawat beton
Semen portland
Pasir beton
Koral beton

Upah An. SNI ( Revisi ) 6.46.2


0.100 Oh Pekerja
0.033 Oh Tukang batu
0.033 Oh Tukang kayu
0.033 Oh Tukang besi
0.010 Oh Kepala tukang
0.005 Oh Mandor

Biaya kolom praktis dengan besi polos 4 diameter 10 mm


Analog biaya / M3.
=
47,649.58

42 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm


Catatan : besi memakai diameter 10 mm beugel diameter 5 mm.
Bahan An. SNI ( Revisi ) 6.46.1
0.003 m3 Kayu terentang/Meranti (MC)
0.020 Kg Paku biasa 2" - 5"
2.384 Kg Besi beton polos dia 10 mm
0.280 Kg Besi begel polos dia. 6 mm
0.050 Kg Kawat beton
5.500 Kg Semen portland
0.009 m3 Pasir beton
0.015 m3 Koral beton
Upah An. SNI ( Revisi ) 6.46.2
0.100 Oh Pekerja
0.033 Oh Tukang batu
0.033 Oh Tukang kayu
0.033 Oh Tukang besi
0.010 Oh Kepala tukang
0.005 Oh Mandor

Biaya kolom praktis dengan besi polos 4 diameter 10 mm


Analog biaya / M3.
=
47,508.64

43 1 m3 Membuat dinding beton bertulang ( 150 Kg besi + bekisting )


Bahan An. SNI ( Revisi ) 6.43.1
0.240 m3 Kayu terentang/Meranti (MC)
3.200 Kg Paku biasa 2" - 5"
1.600 Ltr Minyak bekisting
150.000 Kg Besi beton polos
2.250 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.780
0.160
2.800
24.000

m3
m3
Lbr
Btg

Koral beton
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu galam 8 / 4 m

Upah An. SNI ( Revisi ) 6.43.2


5.600 Oh Pekerja
0.350 Oh Tukang batu

2.640
1.050
0.400
0.193

Oh
Oh
Oh
Oh

Tukang kayu
Tukang besi
Kepala tukang
Mandor

44 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + bekisting )


Bahan An. SNI ( Revisi ) 6.44.1
0.250 m3 Kayu terentang/Meranti (MC)
3.000 Kg Paku biasa 2" - 5"
1.200 Ltr Minyak bekisting
200.000 Kg Besi beton polos
3.000 Kg Kawat beton
323.000 Kg Semen portland
0.520 m3 Pasir beton
0.780 m3 Koral beton
0.105 m3 Balok kayu borneo
2.500 Lbr Plywood tebal 9 mm
14.000 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.44.2
5.600 Oh Pekerja
0.350 Oh Tukang batu
2.300 Oh Tukang kayu
1.400 Oh Tukang besi
0.405 Oh Kepala tukang
0.202 Oh Mandor

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Plat Lantai

45 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 10 mm , pemb


Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti (MC)
0.0000 Kg Paku biasa 2" - 5"
0.192 Ltr Minyak bekisting
5.690 Kg Besi beton polos 10 mm & 8 mm
0.225 Kg Kawat beton
38.760 Kg Semen portland
0.062 m3 Pasir beton
0.094 m3 Koral beton
0.014 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
3.500 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.42.2
0.696 Oh Pekerja
0.042 Oh Tukang batu
0.336 Oh Tukang kayu
0.126 Oh Tukang besi

0.050 Oh Kepala tukang


0.022 Oh Mandor

Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm dengan besi dia 10 - 12


dan besi polos dia 8 - 15
Analog biaya / M3.
=
459,598.25

46 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 12 mm , pemb


Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti (MC)
0.2500 Kg Paku biasa 2" - 5"
0.192 Ltr Minyak bekisting
9.700 Kg Besi beton polos 10 mm & 8 mm
0.225 Kg Kawat beton
38.760 Kg Semen portland
0.062 m3 Pasir beton
0.094 m3 Koral beton
0.014 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
3.500 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.42.2
0.696 Oh Pekerja
0.042 Oh Tukang batu
0.336 Oh Tukang kayu
0.126 Oh Tukang besi
0.050 Oh Kepala tukang
0.022 Oh Mandor

Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm dengan besi dia 12 - 15


dan besi polos dia 10 - 15
Analog biaya / M3.
=
497,265.35
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

47 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 10 mm jarak 1


arak 15 rangkap atas bawah ( doble wappening)
Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti (MC)
0.2500 Kg Paku biasa 2" - 5"
0.192 Ltr Minyak bekisting
15.893 Kg Besi beton polos 10 mm
0.225 Kg Kawat beton
38.760 Kg Semen portland
0.062 m3 Pasir beton
0.094 m3 Koral beton
0.014 m3 Balok kayu borneo
0.350 Lbr Plywood tebal 9 mm
3.500 Btg Dolken kayu galam 8 / 4 m
Upah An. SNI ( Revisi ) 6.42.2
0.696 Oh Pekerja
0.042 Oh Tukang batu
0.336 Oh Tukang kayu
0.126 Oh Tukang besi
0.050 Oh Kepala tukang
0.022 Oh Mandor

Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm penulangan rangkap dengan be


dan besi polos dia 8 - 15 (doble wappening) atas bawah.
Analog biaya / M3.
=
551,392.17

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10### 3

12

MBUK & BETON BERTULANG

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
418,919.44

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

163,478.48
43,996.70
128,898.44
336,373.62

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
406,411.12

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

143,562.32
53,357.70
119,299.62
316,219.64

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

180,905.12
48,677.20
119,299.62
348,881.94

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
386,257.14

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

9,045.26
2,433.86
5,964.98
17,444.10

@ Rp.
@ Rp.
@ Rp.

32,750.00 = Rp
42,000.00 = Rp
44,000.00 = Rp

2,701.88
525.00
55.00
Halaman : 32

@ Rp.

55,000.00 = Rp
= Rp
= Rp

220.00
3,501.88
20,945.97

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Ps : 5 Kr tebal 5 Cm
@ Rp.
@ Rp.
@ Rp.
Sub total :

Sub total :
Total upah+bahan :

218.000
0.520
0.870
An. SNI ( Revisi ) 6.1.2
1.650
0.250
0.025

0.080
418,919.44

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
430,537.20

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

232,355.20
42,124.50
123,413.40
397,893.10

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
467,930.60

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

292,103.68
52,421.60
95,988.20
440,513.48

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :

@ Rp.
@ Rp.
@ Rp.
@ Rp.

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
537,968.10

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

296,252.88
39,316.20
115,185.84
450,754.92
Halaman : 33

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
520,792.42

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

320,318.24
43,996.70
95,988.20
460,303.14

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

192,522.88
48,677.20
119,299.62
360,499.70

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

=
=
=
=

Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00

1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


218.000
0.520
0.870
An. SNI ( Revisi ) 6.1.2
1.650
0.250
0.025
0.080
418919

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

= Rp
= Rp

70,037.50
530,340.64

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

397,493.36
34,635.70
101,473.24
533,602.30

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
603,639.80

829.84
93,610.00
137,126.00
41,250.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

365,129.60
46,805.00
109,700.80
101,475.00
623,110.40

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
693,147.90

@ Rp.
@ Rp.

829.84 = Rp
93,610.00 = Rp

@ Rp.
@ Rp.

137,126.00 = Rp
42,500.00 = Rp
= Rp

278,826.24
50,549.40
Halaman : 34
111,072.06
42,500.00
482,947.70

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
552,985.20

829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
= Rp

510,351.60
48,677.20
71,305.52
630,334.32

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

65,500.00
14,700.00
1,540.00
55,000.00
136,740.00
767,074.32

829.84
93,610.00
137,126.00
65,000.00

=
=
=
=

Rp
Rp
Rp
Rp

331,936.00
44,932.80
109,700.80
78,000.00

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

= Rp

564,569.60

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

65,500.00
14,700.00
1,540.00
55,000.00
136,740.00
701,309.60

8,740.00 = Rp
10,764.00 = Rp
= Rp

9,177.00
161.46
9,338.46

32,750.00
42,000.00
44,000.00
55,000.00

229.25
294.00
30.80
16.50
570.55
9,909.01

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Halaman : 35

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

11,638.00 = Rp
10,764.00 = Rp
= Rp

12,219.90
161.46
12,381.36

32,750.00
42,000.00
42,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

229.25
294.00
29.40
16.50
569.15
12,950.51

9,100.00 = Rp
10,764.00 = Rp
= Rp

9,555.00
107.64
9,662.64

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
42,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

163.75
210.00
21.00
16.50
411.25
10,073.89

8,750.00 = Rp
10,764.00 = Rp
= Rp

8,925.00
8,665.02
17,590.02

32,750.00
42,000.00
42,000.00
55,000.00

818.75
1,050.00
105.00
82.50
2,056.25
19,646.27

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00 = Rp
10,478.80 = Rp
5,888.00 = Rp
= Rp
32,750.00
42,000.00
42,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
10,920.00
1,092.00
275.00
22,112.00
130,724.44
Halaman : 36

2,622,000.00 = Rp
10,478.80 = Rp
5,888.00 = Rp
= Rp

117,990.00
3,143.64
588.80
121,722.44

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
10,920.00
1,092.00
275.00
22,112.00
143,834.44

2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

104,880.00
4,191.52
1,177.60
53,130.00
41,860.00
7,360.00
212,599.12

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
13,860.00
1,386.00
330.00
25,401.00
238,000.12

2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

104,880.00
4,191.52
1,177.60
63,756.00
41,860.00
7,360.00
223,225.12

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
13,860.00
1,386.00
330.00
26,056.00
249,281.12

2,622,000.00 = Rp
10,478.80 = Rp

104,880.00
4,191.52

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.

=
=
=
=
=
=

104,880.00
3,143.64
588.80
108,612.44

@ Rp.
@ Rp.

5,888.00 = Rp
3,542,000.00 = Rp

@ Rp.
@ Rp.

119,600.00 = Rp
3,680.00 = Rp
= Rp

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,177.60
53,130.00
Halaman : 37
41,860.00
22,080.00
117,070.00

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
13,860.00
1,386.00
330.00
26,056.00
143,126.00

2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00
35,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

78,660.00
4,191.52
1,177.60
70,840.00
41,860.00
11,040.00
140,000.00
192,900.00

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
13,860.00
1,386.00
330.00
26,056.00
218,956.00

2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

78,660.00
4,191.52
883.20
53,130.00
41,860.00
7,360.00
186,084.72

32,750.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
13,860.00
1,386.00
330.00
26,056.00
212,140.72

2,622,000.00 = Rp
10,478.80 = Rp
3,680.00 = Rp
= Rp

69,220.80
6,287.28
1,840.00
77,348.08

@ Rp.
@ Rp.

32,750.00 = Rp
42,000.00 = Rp

@ Rp.
@ Rp.

42,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

4,912.50
2,100.00
Halaman : 38
210.00
385.00
7,607.50
84,955.58

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

524,400.00
15,718.20
2,355.20
1,311,000.00
24,219.00
71,305.52
48,677.20
106,958.28
2,104,633.40

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

127,725.00
14,700.00
43,680.00
44,100.00
10,780.00
9,075.00
250,060.00
2,354,693.40

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

707,940.00
20,957.60
3,532.80
2,622,000.00
32,292.00
268,038.32
48,677.20
106,958.28
3,810,396.20

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

158,837.50
14,700.00
65,520.00
58,800.00
14,564.00
9,350.00
321,771.50
4,132,167.70

2,622,000.00 = Rp
10,478.80 = Rp

707,940.00
20,957.60
Halaman : 39

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

30 Cm dengan besi 5 dia 19 mm + beugel dia 8 mm .


@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,888.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,532.80
1,571,967.66
713,676.24
32,292.00
268,038.32
48,677.20
106,958.28
3,474,040.10

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

158,837.50
14,700.00
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
3,793,711.60

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

30 Cm dengan besi 5 dia 16 mm + beugel dia 6 mm .

1
0.0300
33.3333

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

707,940.00
20,957.60
3,532.80
1,114,389.33
399,808.15
32,292.00
268,038.32
48,677.20
106,958.28
2,702,593.68

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

158,837.50
14,700.00
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
3,022,265.18

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

707,940.00
20,957.60
3,532.80
1,000,020.31
311,414.94
32,292.00
268,038.32
48,677.20
106,958.28
2,499,831.45

@ Rp.
@ Rp.

32,750.00 = Rp
42,000.00 = Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

158,837.50
14,700.00
Halaman : 40
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
2,819,502.95

10,478.80
5,888.00
8,740.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,829.28
11,776.00
5,244.00
693,844.13
311,414.94
32,292.00
268,038.32
48,677.20
106,958.28
1,481,074.14

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

158,837.50
14,700.00
65,520.00
54,600.00
14,564.00
9,350.00
317,571.50
1,798,645.64

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

20 Cm dengan besi 4 dia 12 mm + beugel dia 6mm .


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
Sub total :

Sub total :
Total upah+bahan :

20 Cm dengan besi 4 dia 10 mm + kegesting .


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

1.0000
0.0600
16.6667

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,048,800.00
41,915.20
11,776.00
2,622,000.00
48,438.00
268,038.32
48,677.20
106,958.28
53,130.00
418,600.00
73,600.00
4,741,933.00

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

239,075.00
14,700.00
138,600.00
88,200.00
25,080.00
13,750.00
519,405.00
5,261,338.00
Halaman : 41

2,622,000.00
10,478.80
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,244.00
104.79
30,030.64
2,447.20
1,345.50
3,243.26
561.66
1,234.13
44,211.19

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
840.00
840.00
880.00
264.00
165.00
4,954.00
49,165.19

= Rp
60.61 = Rp

49,165.19
2,979,901.90

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ton bertulang ( 11 x 11 ) cm
ugel diameter 5 mm.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ton bertulang ( 11 x 11 ) cm
ugel diameter 5 mm.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
Sub total :

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,244.00
104.79
20,102.00
2,447.20
2,691.00
3,319.36
561.66
1,234.13
35,704.14

3.72
1
0.0121
82.6446
307

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
840.00
840.00
840.00
264.00
165.00
4,914.00
40,618.14

= Rp
60.61 = Rp

40,618.14
2,461,865.59

Sub total :
Total upah+bahan :

=
=
=
=
=
=
=
=

Halaman : 42

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

839,040.00
33,532.16
9,420.80
1,748,000.00
32,292.00
268,038.32
48,677.20
106,958.28
495,880.00
334,880.00
58,880.00
3,975,598.76

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

195,190.00
14,700.00
117,600.00
58,800.00
20,020.00
11,440.00
417,750.00
4,393,348.76

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

839,040.00
31.44
117.76
1,311,000.00
24,219.00
268,038.32
48,677.20
106,958.28
425,040.00
334,880.00
58,880.00
3,416,882.00

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

189,950.00
14,700.00
117,600.00
44,100.00
18,480.00
10,175.00
395,005.00
3,811,887.00

10,478.80 = Rp

31.44

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ugel diameter 5 mm.


@ Rp.

1
69.44
0.01440
1.00000
1.00000

@ Rp.
@ Rp.

8,740.00 = Rp
8,740.00 = Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

174.80
30,030.64
Halaman : 43
437.00
538.20
4,564.12
842.49
2,056.89
38,675.58

42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
0.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,200.00
1,386.00
1,386.00
1,452.00
550.00
0.00
8,974.00
47,649.58

= Rp
60.61 = Rp

47,649.58
2,888,040.83

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ugel diameter 5 mm.


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,866.00
209.58
20,836.16
2,447.20
538.20
4,564.12
842.49
2,056.89
39,360.64

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
1,386.00
1,386.00
1,386.00
440.00
275.00
8,148.00
47,508.64

= Rp
60.61 = Rp

47,508.64
2,879,498.43

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

137,126.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

629,280.00
33,532.16
9,420.80
1,311,000.00
24,219.00
268,038.32
48,677.20
Halaman : 44
106,958.28
566,720.00
334,880.00
88,320.00
3,421,045.76

32,750.00 = Rp
42,000.00 = Rp

183,400.00
14,700.00

Sub total :
@ Rp.
@ Rp.

0.01500
66.66667

@ Rp.
@ Rp.
@ Rp.
@ Rp.

42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

110,880.00
44,100.00
17,600.00
10,615.00
381,295.00
3,802,340.76

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
3,680.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

655,500.00
31,436.40
7,065.60
1,748,000.00
32,292.00
268,038.32
48,677.20
106,958.28
371,910.00
299,000.00
51,520.00
3,620,397.80

32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

183,400.00
14,700.00
96,600.00
58,800.00
17,820.00
11,110.00
382,430.00
4,002,827.80

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Halaman : 45

si polos diameter 10 mm , pembagi 8 mm.


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
32,750.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,684.80
0.00
1,130.50
49,730.60
2,421.90
32,164.60
5,841.26
12,834.99
51,004.80
41,860.00
114,625.00
412,298.45

32,750.00
42,000.00
42,000.00
42,000.00

=
=
=
=

Rp
Rp
Rp
Rp

22,794.00
1,764.00
14,112.00
5,292.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8.33333
0.320
40.00
8.00
320.00
8.33
4.65
323.00

8.33

6.6667
5.8824
1.600
323
0.520
0.780
0.120
1.200
5.000
5.800
0.350
2.800
1.050

3.44
2.25
5.69

@ Rp.
@ Rp.

Sub total :
Total upah+bahan :
dengan besi dia 10 - 12

42,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

2,116.80
1,221.00
47,299.80
459,598.25

= Rp
8.33 = Rp

459,598.25
3,828,453.44

0.420
0.185

8.33

si polos diameter 12 mm , pembagi 10 mm.


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
32,750.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,684.80
2,619.70
1,130.50
84,778.00
2,421.90
32,164.60
5,841.26
12,834.99
51,004.80
41,860.00
114,625.00
449,965.55

32,750.00
42,000.00
42,000.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,794.00
1,764.00
14,112.00
5,292.00
2,116.80
1,221.00
47,299.80
497,265.35

= Rp
8.33 = Rp

497,265.35
4,142,220.38

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :
Total upah+bahan :
dengan besi dia 12 - 15
x

8.33333
0.320

6.6667
5.8824
1.600

40.00
8.00
320.00
8.33
4.65
323.00

323
0.520
0.780
0.120
1.200
5.000

8.33

5.800
0.350
2.800
1.050
0.420
0.185

6.67

5.7267
5.7267

###

"Halaman : 46

si polos diameter 10 mm jarak 15 , pembagi 10 mm.


8.33333
0.320
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
32,750.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,684.80
2,619.70
1,130.50
138,904.82
2,421.90
32,164.60
5,841.26
12,834.99
51,004.80
41,860.00
114,625.00
504,092.37

32,750.00
42,000.00
42,000.00
42,000.00
42,000.00
55,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,794.00
1,764.00
14,112.00
5,292.00
2,116.80
1,221.00
47,299.80
551,392.17

= Rp
8.33 = Rp

551,392.17
4,593,096.79

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

penulangan rangkap dengan besi dia 10 - 15


x

6.6667
5.8824
1.600

40.00
8.00
320.00
8.33
0.03
323.00

323
0.520
0.780
0.120
1.200
5.000

8.33

5.800
0.350
2.800
1.050
0.420
0.185

13.33

15.8933

3.44
2.25
5.69

"Halaman : 47

uk, 1 Pc : 3 Ps : 5 Kr

PEKERJAAN PASANGAN
1.

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps


Bahan
An. SNI ( Revisi ) 6.1.1
140.000
Bh
55.600
Kg
0.056 m3
Upah

2.

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps


Bahan
An. SNI ( Revisi ) 6.2.1
140.000
Bh
37.900
Kg
0.076 m3
Upah

3.

An. SNI ( Revisi ) 6.2.2


0.640
Oh
0.200
Oh
0.020
Oh
0.030
Oh

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps


Bahan
An. SNI ( Revisi ) 6.3.1
140.000
Bh
28.740
Kg
0.080 m3
Upah

4.

An. SNI ( Revisi ) 6.1.2


0.650
Oh
0.200
Oh
0.020
Oh
0.030
Oh

An. SNI ( Revisi ) 6.3.2


0.640
Oh
0.200
Oh
0.020
Oh
0.030
Oh

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


Bahan
An. SNI ( Revisi ) 6.4.1
140.000
Bh
26.550
Kg
0.093 m3
Upah

An. SNI ( Revisi ) 6.4.2


0.650
Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.200
0.020
0.030

5.

Oh
Oh
Oh

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps


Bahan
An. SNI ( Revisi ) 6.5.1

140.000
19.360
0.102
Upah

6.

An. SNI ( Revisi ) 6.6.2


0.650
Oh
0.200
Oh
0.020
Oh
0.030
Oh

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


Bahan
An. SNI ( Revisi ) 6.7.1
140.0000
Bh
9.0000
Kg
0.0260 m3
0.0275 m3
Upah

8.

An. SNI ( Revisi ) 6.5.2


0.650
Oh
0.200
Oh
0.020
Oh
0.030
Oh

1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps


Bahan
An. SNI ( Revisi ) 6.6.1
140.000
Bh
16.640
Kg
0.122 m3
Upah

7.

Bh
Kg
m3

An. SNI ( Revisi ) 6.7.2


0.650
Oh
0.200
Oh
0.020
Oh
0.030
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 1 Ps


Bahan
An. SNI ( Revisi ) 6.8.1
70.000
Bh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

27.800
0.030
Upah

9.

Kg
m3

An. SNI ( Revisi ) 6.8.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


Bahan
An. SNI ( Revisi ) 6.9.1
70.000
Bh
18.950
Kg
0.038 m3
Upah

An. SNI ( Revisi ) 6.9.2


0.320
Oh
0.100
Oh

0.010
0.015

10.

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


Bahan
An. SNI ( Revisi ) 6.10.1
70.000
Bh
14.370
Kg
0.040 m3
Upah

11.

Oh
Oh

An. SNI ( Revisi ) 6.10.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


Bahan
An. SNI ( Revisi ) 6.4.1
70.000
Bh
11.500
Kg
0.050 m3
Upah

An. SNI ( Revisi ) 6.4.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

12.

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps


Bahan
An. SNI ( Revisi ) 6.12.1
70.000
Bh
9.680
Kg
0.051 m3
Upah

13.

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps


Bahan
An. SNI ( Revisi ) 6.13.1
70.000
Bh
8.320
Kg
0.0610 m3
Upah

14.

An. SNI ( Revisi ) 6.12.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

An. SNI ( Revisi ) 6.13.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps


Bahan
An. SNI ( Revisi ) 6.14.1

70.000
6.500
0.009
Upah

15.

Bh
Kg
m3

An. SNI ( Revisi ) 6.14.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 5 Ps


Bahan
An. SNI ( Revisi ) 6.15.1
70.0000
Bh
4.5000
Kg
0.0130 m3
0.0137 m3
Upah

An. SNI ( Revisi ) 6.15.2


0.325
Oh
0.100
Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.010
0.015

16.

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps


Bahan
An. SNI ( Revisi ) 6.16.1
70.0000
Bh
0.0180
Kg
0.0180 m3
0.0180 m3
Upah

17.

An. SNI ( Revisi ) 6.16.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps


Bahan
An. SNI ( Revisi ) 6.17.1
70.0000
Bh
0.0140
Kg
0.0280 m3
0.0140 m3
Upah

18

Oh
Oh

An. SNI ( Revisi ) 6.17.2


0.320
Oh
0.100
Oh
0.010
Oh
0.015
Oh

1 m2 Pasangan dinding conblock ( CB. 20 )


Bahan
An. SNI ( Revisi ) 6.21.1
12.5000
Bh
14.0500
Kg
0.0040 m3
0.0420 m3

3.8700
0.0060
0.0010
0.0300
0.0050
Upah

Kg
Kg
m3
Kg
m3

An. SNI ( Revisi ) 6.21.2


0.3700
Oh
0.1570
Oh
0.0070
Oh
0.0164
Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.0185

19

1 m2 Pasangan dinding roster/terawang ( 12 x 11 x 24 ) cm


Bahan
An. SNI ( Revisi ) 6.25.1
36.0000
Bh
12.8000
Kg
0.0350 m3

Upah

20

An. SNI ( Revisi ) 6.25.2


0.3000
Oh
0.1000
Oh
0.0100
Oh
0.0150
Oh

1 m2 Pasangan bata berongga ( 5 x 11 x 24 ) cm


Bahan
An. SNI ( Revisi ) 6.26.1
80.0000
Bh
23.6500
Kg
0.5700 m3
Upah

27.

Oh

An. SNI ( Revisi ) 6.26.2


0.3200
Oh
0.1500
Oh
0.0150
Oh
0.0150
Oh

1 m2 Pasangan dinding anyaman bambu, rangka kayu


Bahan
An. SNI ( Revisi ) 6.27.1
1.5000 M2
0.0140 M3
0.0120
Kg
0.0030 m3
Upah

An. SNI ( Revisi ) 6.27.2


0.1000
Oh
0.0500
Oh
0.0050
Oh
0.0020
Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19

10

12

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
46,139.10
5,078.33
93,217.43

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,287.50
8,400.00
880.00
1,650.00
32,217.50
125,434.93
482,442.04

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
31,450.94
6,892.01
80,342.95

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,960.00
8,400.00
880.00
1,650.00
31,890.00
112,232.95
431,665.19

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
23,849.60
7,254.75
73,104.35

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,960.00
8,400.00
880.00
1,650.00
31,890.00
104,994.35
403,824.44

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
22,032.25
8,433.65
72,465.90
21,287.50
Halaman : 16
8,400.00
880.00
1,650.00
32,217.50
104,683.40
402,628.47

EKERJAAN PASANGAN

ata merah tebal 1 bata, 1 Pc : 1 Ps


NI ( Revisi ) 6.1.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.1.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan /m2:
Total per : M3

ata merah tebal 1 bata, 1 Pc : 2 Ps


NI ( Revisi ) 6.2.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.2.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1 bata, 1 Pc : 3 Ps


NI ( Revisi ) 6.3.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.3.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1 bata, 1 Pc : 4 Ps


NI ( Revisi ) 6.4.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.4.2
Pekerja

@ Rp.

32,750.00

Rp

Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.

42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

ata merah tebal 1 bata, 1 Pc : 5 Ps


NI ( Revisi ) 6.5.1

Sub total :
Total upah+bahan :
Total per : M3

Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
16,065.70
9,249.81
67,315.51

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,287.50
8,400.00
880.00
1,650.00
32,217.50
99,533.01
382,819.27

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

42,000.00
13,808.54
11,063.50
66,872.03

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,287.50
8,400.00
880.00
1,650.00
32,217.50
99,089.53
381,113.59

300.00
829.84
90,684.40
450,174.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

42,000.00
7,468.56
2,357.79
12,379.80
64,206.15

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,287.50
8,400.00
880.00
1,650.00
32,217.50
96,423.65
370,860.19

@ Rp.

300.00

Rp

@ Rp.
@ Rp.

829.84
90,684.40

=
=
=

Rp
Rp
Rp

21,000.00
Halaman : 17
23,069.55
2,675.19
46,744.74

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
62,689.74
482,228.78

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
15,725.47
3,446.01
40,171.48

32,750.00
42,000.00

=
=

Rp
Rp

10,480.00
4,200.00

Sub total :

NI ( Revisi ) 6.5.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1 bata, 1 Pc : 6 Ps


NI ( Revisi ) 6.6.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.6.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


NI ( Revisi ) 6.7.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
Kapur pasang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.7.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Pc : 1 Ps


NI ( Revisi ) 6.8.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

Sub total :

NI ( Revisi ) 6.8.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Pc : 2 Ps


NI ( Revisi ) 6.9.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.9.2
Pekerja
Tukang batu

@ Rp.
@ Rp.

Kepala tukang
Mandor

@ Rp.
@ Rp.

44,000.00
55,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

440.00
825.00
15,945.00
56,116.48
431,665.19

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
11,924.80
3,627.38
36,552.18

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
52,497.18
403,824.44

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
9,543.16
4,534.22
35,077.38

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
51,022.38
392,479.85
Halaman : 18

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
8,032.85
4,624.90
33,657.76

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
49,602.76
381,559.66

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
6,904.27
5,531.75
33,436.02

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
49,381.02
379,853.98

Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Pc : 3 Ps


NI ( Revisi ) 6.10.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.10.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Pc : 4 Ps


NI ( Revisi ) 6.4.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.4.2
Pekerja
Tukang batu
Kepala tukang
Mandor

ata merah tebal 1/2 bata, 1 Pc : 5 Ps


NI ( Revisi ) 6.12.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

NI ( Revisi ) 6.12.2
Pekerja
Tukang batu
Kepala tukang
Mandor

ata merah tebal 1/2 bata, 1 Pc : 6 Ps


NI ( Revisi ) 6.13.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

NI ( Revisi ) 6.13.2
Pekerja
Tukang batu
Kepala tukang
Mandor

ata merah tebal 1/2 bata, 1 Pc : 8 Ps


NI ( Revisi ) 6.14.1

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.

300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

21,000.00
5,393.96
816.16
27,210.12

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
43,155.12
331,962.46

300.00
829.84
90,684.40
450,174.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

21,000.00
3,734.28
1,178.90
6,167.39
32,080.57

@ Rp.
@ Rp.

32,750.00
42,000.00

=
=

Rp
Rp

@ Rp.
@ Rp.

44,000.00
55,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

10,643.75
4,200.00
Halaman : 19
440.00
825.00
16,108.75
48,189.32
370,687.05

300.00
829.84
90,684.40
450,174.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

21,000.00
14.94
1,632.32
8,103.14
30,750.40

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
46,695.40
359,195.35

300.00
829.84
90,684.40
450,174.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

21,000.00
11.62
2,539.16
6,302.44
29,853.22

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
4,200.00
440.00
825.00
15,945.00
45,798.22
352,294.02

4,968.00
829.84
93,610.00
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

62,100.00
11,659.25
374.44
3,808.74

Sub total :

NI ( Revisi ) 6.14.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Pc : 3 Kp : 5 Ps


NI ( Revisi ) 6.15.1
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
Kapur padam

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

NI ( Revisi ) 6.15.2
Pekerja
Tukang batu
Kepala tukang
Mandor

Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps


NI ( Revisi ) 6.16.1
Bata merah 5 x 11 x 22 cm
@ Rp.
Semen merah / bata merah tumbuk@ Rp.
Pasir pasang
@ Rp.
Kapur padam
@ Rp.

NI ( Revisi ) 6.16.2
Pekerja
Tukang batu
Kepala tukang
Mandor

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

ata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps


NI ( Revisi ) 6.17.1
Bata merah 5 x 11 x 22 cm
@ Rp.
Semen merah / bata merah tumbuk@ Rp.
Pasir pasang
@ Rp.
Kapur padam
@ Rp.

NI ( Revisi ) 6.17.2
Pekerja
Tukang batu
Kepala tukang
Mandor

nding conblock ( CB. 20 )


NI ( Revisi ) 6.21.1
Concrete block ( CB. 20 )
Semen portland
Pasir beton
Pasir pasang

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Besi beton polos 8 mm


Paku biasa 2" - 5"
Kayu terentang
Kawat beton
Koral beton

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,740.00
10,478.80
2,622,000.00
10,764.00
137,126.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

33,823.80
62.87
2,622.00
322.92
685.63
115,459.66

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
44,000.00

=
=
=
=

Rp
Rp
Rp
Rp

12,117.50
6,594.00
308.00
721.60

@ Rp.

55,000.00

=
=
=

Rp
Rp
Rp

Halaman : 20
1,017.50
20,758.60
136,218.26

4,480.40
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

161,294.40
10,621.95
3,173.95
175,090.31

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
4,200.00
440.00
825.00
15,290.00
190,380.31

2,226.40
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

178,112.00
19,625.72
51,690.11
71,315.82

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
6,300.00
660.00
825.00
18,265.00
89,580.82
373,253.43

10,672.00
3,404,000.00
10,478.80
3,312.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

16,008.00
47,656.00
125.75
9.94
63,799.68

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
2,100.00
220.00
110.00
5,705.00
69,504.68

Sub total :

NI ( Revisi ) 6.21.2
Pekerja
Tukang batu
Tukang besi
Kepala tukang

Mandor

nding roster/terawang ( 12 x 11 x 24 ) cm
NI ( Revisi ) 6.25.1
Roster/terawang
Semen portland
Pasir pasang

NI ( Revisi ) 6.25.2
Pekerja
Tukang batu
Kepala tukang
Mandor

ata berongga ( 5 x 11 x 24 ) cm
NI ( Revisi ) 6.26.1
Bata berongga
Semen portland
Pasir pasang

NI ( Revisi ) 6.26.2
Pekerja
Tukang batu
Kepala tukang
Mandor

nding anyaman bambu, rangka kayu


NI ( Revisi ) 6.27.1
Bilik bambu
Kayu meranti 5/7
Paku
List kayu 2/4

NI ( Revisi ) 6.27.2
Pekerja
Tukang batu
Kepala tukang
Mandor

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Halaman : 21

3.84615
482,442.04
482,228.78

3.84615
431,665.19
431,665.19

3.84615
403,824.44
403,824.44

3.84615
402,628.47
392,479.85

3.84615
382,819.27
379,853.98

3.84615
381,113.59

331,962.46

3.84615
370,860.19
370,687.05

140.000
55.60

64.030
0.059

0.650
0.200
0.020
0.030
7.69231
482,228.78

8.33333
7.69231
431,665.19

73104

7.69231
403,824.44

7.69231
392,479.85

7.69231
381,559.66

7.69231
379,853.98

31890
104994
52497

7.69231
331,962.46

7.69231
370,687.05

7.69231
359,195.35

7.69231
352,294.02

4.16667
373,253.43

4.54545
315,930.37

18

PEKERJAAN PLESTERAN
1. 1 m2 Plesteran, 1 Pc : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.1.1
12.920
Kg Semen portland
0.013
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.1.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

2. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.2.1
8.520
Kg Semen portland
0.017
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.2.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

3. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.3.1
6.480
Kg Semen portland
0.019
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.3.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

4. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.4.1
5.200
Kg Semen portland
0.020
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.4.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

5. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.5.1
4.320
Kg Semen portland
0.022
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.5.2


0.200
Oh Pekerja
0.150
Oh Tukang batu

@ Rp.
@ Rp.

0.015
0.010

Oh
Oh

Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

6. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.6.1
3.680
Kg Semen portland
0.023
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.6.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

7. 1 m2 Plesteran, 1 Pc : 8 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.7.1
2.880
Kg Semen portland
0.024
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.7.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

8. 1 m2 Plesteran, 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.8.1
5.760
Kg Semen portland
0.003
m3 Kapur Padam
0.013
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.8.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

9. 1 m2 Plesteran, 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.9.1
1.840
Kg Semen portland
0.0035
m3 Kapur Padam
0.014
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.9.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

10 1 m2 Plesteran, 1 Pc : 3 Kp : 8 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.9.1
2.208
Kg Semen portland
0.0042
m3 Kapur Padam
0.011
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.9.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

11 1 m2 Plesteran, 1 Pc : 3 Kp : 5 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.9.1
2.760
Kg Semen portland
0.005
m3 Kapur Padam
0.007
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.9.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

12 1 m2 Plesteran, 0.5 Pc : 1 Kp : 4 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.10.1
1.925
Kg Semen portland
0.0022
m3 Kapur Padam
0.019
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.10.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

11. 1 m2 Plesteran, 1 Kp : 1 Sm : 1 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.11.1
0.009
m3 Semen merah
0.009
m3 Kapur Padam
0.009
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.11.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

12. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.12.1
0.007
m3 Semen merah
0.007
m3 Kapur Padam
0.015
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.12.2


0.200
Oh Pekerja
0.150
Oh Tukang batu
0.015
Oh Kepala tukang
0.010
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

13. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 20 mm


Bahan An. SNI ( Revisi ) 6.13.1

11.360
0.023

Kg
m3

Semen portland
Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.13.2


0.250
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0150
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

14. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 20 mm


Bahan An. SNI ( Revisi ) 6.14.1
8.640
Kg Semen portland
0.025
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.14.2


0.250
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0125
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

15. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 20 mm


Bahan An. SNI ( Revisi ) 6.15.1
6.933
Kg Semen portland
0.027
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.15.2


0.250
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0125
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

16. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 20 mm


Bahan An. SNI ( Revisi ) 6.16.1
5.760
Kg Semen portland
0.029
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.16.2


0.250
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0125
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

17. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 20 mm


Bahan An. SNI ( Revisi ) 6.17.1
4.907
Kg Semen portland
0.030
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.17.2


0.250
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0125
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

18. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 20 mm

Bahan An. SNI ( Revisi ) 6.18.1


0.009
m3 Semen merah
0.009
m3 Pasir padam
0.018
m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.18.2


0.2667
Oh Pekerja
0.2000
Oh Tukang batu
0.0200
Oh Kepala tukang
0.0133
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 25 mm


Bahan An. SNI ( Revisi ) 6.19.1
14.200
Kg Semen portland
0.028
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.19.2


0.300
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

20. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 25 mm


Bahan An. SNI ( Revisi ) 6.20.1
10.800
Kg Semen portland
0.032
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.20.2


0.300
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

21. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 25 mm


Bahan An. SNI ( Revisi ) 6.21.1
8.667
Kg Semen portland
0.033
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.21.2


0.300
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

22. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 25 mm


Bahan An. SNI ( Revisi ) 6.22.1
7.200
Kg Semen portland
0.037
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.22.2


0.300
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

23. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 30 mm


Bahan An. SNI ( Revisi ) 6.23.1
17.040
Kg Semen portland
0.034
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.23.2


0.320
Oh Pekerja
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.0150
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

24. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 30 mm


Bahan An. SNI ( Revisi ) 6.24.1
12.960
Kg Semen portland
0.038
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.24.2


0.320
Oh Pekerja
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.0150
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

25. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 30 mm


Bahan An. SNI ( Revisi ) 6.25.1
10.400
Kg Semen portland
0.040
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.25.2


0.320
Oh Pekerja
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.0150
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

26. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 30 mm


Bahan An. SNI ( Revisi ) 6.26.1
8.640
Kg Semen portland
0.044
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.26.2


0.320
Oh Pekerja
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.0150
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

27. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 30 mm


Bahan An. SNI ( Revisi ) 6.27.1
7.070
Kg Semen portland
0.021
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

1 m2 Berapen, 1 Pc : 5 Ps, tebal 30 mm


Upah An. SNI ( Revisi ) 6.27.2
0.150
Oh Pekerja

@ Rp.

0.070
0.007
0.0080

Oh
Oh
Oh

Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

28. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.28.1
5.670
Kg Semen portland
0.023
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.28.2


0.150
Oh Pekerja
0.070
Oh Tukang batu
0.007
Oh Kepala tukang
0.0080
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

29. 1 m2 Plesteran beton, 1 Pc : 2 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.29.1
9.300
Kg Semen portland
0.017
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.29.2


0.260
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

30. 1 m2 Plesteran beton, 1 Pc : 3 Ps, tebal 15 mm


Bahan An. SNI ( Revisi ) 6.30.1
7.070
Kg Semen portland
0.019
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.30.2


0.260
Oh Pekerja
0.200
Oh Tukang batu
0.020
Oh Kepala tukang
0.0130
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

31. 1 m2 Plesteran skoning, 1 Pc : 2 Ps


Bahan An. SNI ( Revisi ) 6.31.1
0.500
Kg Semen portland
0.002
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.31.2


0.057
Oh Pekerja
0.038
Oh Tukang batu
0.038
Oh Kepala tukang
0.0020
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

32. 1 m2 Plesteran granito, 1 Pc warna : 2 Granito, tebal 10 mm


Bahan An. SNI ( Revisi ) 6.32.1
0.144
Kg Pc warna
@ Rp.
5.680
Kg Semen portland
@ Rp.
0.011
m3 Pasir pasang
@ Rp.
15.000
Kg Batu granito
@ Rp.

Sub total :
Upah An. SNI ( Revisi ) 6.32.2
0.450
Oh Pekerja
0.200
Oh Tukang batu
0.002
Oh Kepala tukang
0.025
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

33. 1 m2 Plesteran Teraso, 1 Pc warna : 2 batu teraso, tebal 10 mm


Bahan An. SNI ( Revisi ) 6.33.1
0.144
Kg Pc warna
@ Rp.
5.680
Kg Semen portland
@ Rp.
0.011
m3 Pasir pasang
@ Rp.
11.500
Kg Batu teraso
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.33.2
0.450
Oh Pekerja
0.200
Oh Tukang batu
0.002
Oh Kepala tukang
0.025
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

34. 1 m2 Plesteran ciprat ,( kamprotan) 1 Pc : 2 Ps


Bahan An. SNI ( Revisi ) 6.34.1
4.320
Kg Semen portland
0.016
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.34.2


0.250
Oh Pekerja
0.100
Oh Tukang batu
0.001
Oh Kepala tukang
0.015
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

35. 1 m2 Plesteran siar / setrikan adukan, 1 Pc : 2 Ps


Bahan An. SNI ( Revisi ) 6.35.1
4.320
Kg Semen portland
0.016
m3 Pasir pasang

@ Rp.
@ Rp.
Sub total :

1 m2 Plesteran siar / setrikan adukan, 1 Pc : 2 Ps


Upah An. SNI ( Revisi ) 6.35.2
0.150
Oh Pekerja
0.070
Oh Tukang batu
0.007
Oh Kepala tukang
0.008
Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

36 1 m' Benangan
Bahan

Kg

Semen portland

@ Rp.
Sub total :

Upah

0
0

Oh
Oh

Tukang batu
Mandor

@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

10,721.53
1,178.90
11,900.43

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
25,960.43

Rp
Rp
Rp

7,070.24
1,541.63
8,611.87

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
22,671.87

Rp
Rp
Rp

5,377.36
1,723.00
7,100.37

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
21,160.37

Rp
Rp
Rp

4,315.17
1,813.69
6,128.86

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
20,188.86
Halaman : 22

Rp
Rp
Rp

3,584.91
1,995.06
5,579.97

Rp
Rp

6,550.00
6,300.00

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00 =
42,000.00 =

12

Rp
Rp
Rp

=
=
=
=

Sub total :
Total upah+bahan :

44,000.00 =
55,000.00 =
Sub total :
Total upah+bahan :

=
=

Rp
Rp
Rp
Rp

660.00
550.00
14,060.00
19,639.97

Rp
Rp
Rp

3,053.81
2,085.74
5,139.55

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
19,199.55

Rp
Rp
Rp

2,389.94
2,176.43
4,566.36

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
18,626.36

Rp
Rp
Rp
Rp

4,779.88
1,350.52
1,178.90
7,309.30

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
21,369.30
Halaman : 23

Rp
Rp
Rp
Rp

1,526.91
1,575.61
1,269.58
4,372.10

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
18,432.10

Rp
Rp
Rp
Rp

1,832.29
1,890.73
997.53
4,720.55

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
450,174.40 =
90,684.40 =
Sub total :

1M3 KAPUR

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
450,174.40 =
90,684.40 =
Sub total :

0,006

1650
9,900.00

18371

1 Sak kapua
0 KG - Pc a
0 m3 pasir a

Rp
Rp
Rp

0.00
0.00
0.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
18,780.55

Rp
Rp
Rp
Rp

2,290.36
2,363.42
634.79
5,288.56

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
19,348.56

Rp
Rp
Rp
Rp

1,597.44
990.38
1,723.00
4,310.83

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
18,370.83
Halaman : 24

Rp
Rp
Rp
Rp

1,242.00
4,051.57
816.16
6,109.73

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
20,169.73

Rp
Rp
Rp
Rp

966.00
3,151.22
1,360.27
5,477.49

=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
550.00
14,060.00
19,537.49

829.84 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

138,000.00 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

138,000.00 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp

9,426.98
2,055.51
11,482.50

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
8,400.00
880.00
825.00
18,292.50
29,775.00

Rp
Rp
Rp

7,169.82
2,297.34
9,467.16

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
8,400.00
880.00
687.50
18,155.00
27,622.16
Halaman : 25

Rp
Rp
Rp

5,753.56
2,418.25
8,171.81

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
8,400.00
880.00
687.50
18,155.00
26,326.81

Rp
Rp
Rp

4,779.88
2,660.08
7,439.95

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
8,400.00
880.00
687.50
18,155.00
25,594.95

Rp
Rp
Rp

4,071.75
2,720.53
6,792.28

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
8,400.00
880.00
687.50
18,155.00
24,947.28

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=

138,000.00 =
450,174.40 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp

1,242.00
4,051.57
1,632.32
6,925.89

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,733.33
8,400.00
880.00
733.33
18,746.67
25,672.56
Halaman : 26

Rp
Rp
Rp

11,783.73
2,569.39
14,353.12

=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
8,400.00
880.00
715.00
19,820.00
34,173.12

Rp
Rp
Rp

8,962.27
2,871.67
11,833.94

=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
8,400.00
880.00
715.00
19,820.00
31,653.94

Rp
Rp
Rp

7,191.95
3,022.81
10,214.76

=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
8,400.00
880.00
715.00
19,820.00
30,034.76

Rp
Rp
Rp

5,974.85
3,325.09
9,299.94

=
=

Rp
Rp
Rp
Rp
Rp
Rp

9,825.00
8,400.00
880.00
715.00
19,820.00
29,119.94

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=

25702

Halaman : 27

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp

14,140.47
3,083.27
17,223.74

=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
10,500.00
1,100.00
825.00
22,905.00
40,128.74

Rp
Rp
Rp

10,754.73
3,446.01
14,200.73

=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
10,500.00
1,100.00
825.00
22,905.00
37,105.73

Rp
Rp
Rp

8,630.34
3,627.38
12,257.71

=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
10,500.00
1,100.00
825.00
22,905.00
35,162.71

Rp
Rp
Rp

7,169.82
3,990.11
11,159.93

=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,480.00
10,500.00
1,100.00
825.00
22,905.00
34,064.93

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

Halaman : 28

829.84 =
90,684.40 =
Sub total :

32,750.00 =

Rp
Rp
Rp

5,866.97
1,904.37
7,771.34

Rp

4,912.50

28436

42,000.00 =
44,000.00 =
55,000.00 =
Sub total :
Total upah+bahan :

=
=

Rp
Rp
Rp
Rp
Rp

2,940.00
308.00
440.00
8,600.50
16,371.84

Rp
Rp
Rp

4,705.19
2,085.74
6,790.93

=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,940.00
308.00
440.00
8,600.50
15,391.43

Rp
Rp
Rp

7,717.51
1,541.63
9,259.15

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,515.00
8,400.00
880.00
715.00
18,510.00
27,769.15

Rp
Rp
Rp

5,866.97
1,723.00
7,589.97

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,515.00
8,400.00
880.00
715.00
18,510.00
26,099.97
Halaman : 29

Rp
Rp
Rp

414.92
181.37
596.29

=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,866.75
1,596.00
1,672.00
110.00
5,244.75
5,841.04

Rp
Rp
Rp
Rp

993.60
4,713.49
1,027.76
3,005.49

829.84 =
90,684.40 =
Sub total :
.
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

6,900.00
829.84
90,684.40
200.37

=
=
=
=

Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

9,740.34

=
=

Rp
Rp
Rp
Rp
Rp
Rp

14,737.50
8,400.00
88.00
1,375.00
24,600.50
34,340.84

Rp
Rp
Rp
Rp
Rp

993.60
4,713.49
1,027.76
2,094.84
8,829.69

=
=

Rp
Rp
Rp
Rp
Rp
Rp

14,737.50
8,400.00
88.00
1,375.00
24,600.50
33,430.19

Rp
Rp
Rp

3,584.91
1,450.95
5,035.86

=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
4,200.00
44.00
825.00
13,256.50
18,292.36
Halaman : 30

Rp
Rp
Rp

3,584.91
1,450.95
5,035.86

=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,940.00
308.00
440.00
8,600.50
13,636.36

Rp
Rp

1,867.14
1,867.14

=
=

Rp
Rp
Rp
Rp

4,200.00
550.00
4,750.00
6,617.14

=
=
=
=

Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

Rp

=
=
=
=

Sub total :
Total upah+bahan :

6,900.00
829.84
90,684.40
182.16

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
90,684.40 =
Sub total :

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=

Sub total :
Total upah+bahan :

829.84 =
Sub total :
42,000.00 =
55,000.00 =
Sub total :
Total upah+bahan :

Halaman : 31

=
=
=

Rp :
Rp :
Rp :

0.00
0.00
0.00

PEKERJAAN
1.

KUSEN PINTU + JENDELA

1 m3 Pasang kusen pintu & jendela kayu jati


Bahan
An. SNI ( Revisi ) 6.1.1
1.100
m3
Upah

2.

1 m3 Pasang kusen pintu & jendela kayu kamper


Bahan
An. SNI ( Revisi ) 6.2.1
1.200
m3
Upah

3.

An. SNI ( Revisi ) 6.3.2


6.000
Oh
18.000
Oh
2.000
Oh
0.300
Oh

PEKERJAAN PINTU

1 m2 Pasang pintu klamp kayu kamper


Bahan
An. SNI ( Revisi ) 6.5.1
0.036
m3
0.050
Kg
Upah

6.

An. SNI ( Revisi ) 6.2.2


6.000
Oh
18.000
Oh
2.000
Oh
0.300
Oh

1 m3 Pasang kusen pintu & jendela kayu borneo ( Kruwing , kempas


Bahan
An. SNI ( Revisi ) 6.3.1
1.200
m3
Upah

An. SNI ( Revisi ) 6.1.2


6.000
Oh
20.000
Oh
2.000
Oh
0.300
Oh

An. SNI ( Revisi ) 6.5.2


0.350
Oh
1.050
Oh
0.105
Oh
0.018
Oh

1 m2 Pasang pintu klamp kayu borneo


Bahan
An. SNI ( Revisi ) 6.6.1
0.036
m3

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.050
Upah

Kg

An. SNI ( Revisi ) 6.6.2


0.350
Oh
1.050
Oh
0.105
Oh
0.018
Oh

7.

1 m2 Pasang pintu panil kayu jati


Bahan
An. SNI ( Revisi ) 6.7.1
0.040
m3
Upah

8.

1 m2 Pasang pintu panil kayu kamper


Bahan
An. SNI ( Revisi ) 6.8.1
0.040
m3
Upah

9.

An. SNI ( Revisi ) 6.8.2


1.000
Oh
2.500
Oh
0.250
Oh
0.050
Oh

1 m2 Pasang pintu & jendela kaca kayu jati


Bahan
An. SNI ( Revisi ) 6.9.1
0.035
m3
Upah

10.

An. SNI ( Revisi ) 6.7.2


1.000
Oh
2.500
Oh
0.250
Oh
0.050
Oh

An. SNI ( Revisi ) 6.9.2


0.800
Oh
2.000
Oh
0.200
Oh
0.040
Oh

1 m2 Pasang pintu & jendela kaca kayu kamper


Bahan
An. SNI ( Revisi ) 6.10.1
0.035
m3
Upah

An. SNI ( Revisi ) 6.10.2


0.800
Oh
2.000
Oh
0.200
Oh
0.040
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

11.

1 m2 Pasang pintu & jendela kaca kayu borneo


Bahan
An. SNI ( Revisi ) 6.11.1
0.035
m3
Upah

12.

An. SNI ( Revisi ) 6.11.2


0.800
Oh
2.000
Oh
0.200
Oh
0.040
Oh

1 m2 Pasang pintu & jendela jalusi kayu jati


Bahan
An. SNI ( Revisi ) 6.12.1
0.064
m3
Upah

An. SNI ( Revisi ) 6.12.2


1.000
Oh
3.000
Oh
0.300
Oh

0.300

13.

1 m2 Pasang pintu & jendela jalusi kayu kamper


Bahan
An. SNI ( Revisi ) 6.13.1
0.064
m3
Upah

14.

An. SNI ( Revisi ) 6.13.2


1.000
Oh
3.000
Oh
0.300
Oh
0.500
Oh

1 m2 Pasang pintu plywood rangkap, rangka kayu jati


Bahan
An. SNI ( Revisi ) 6.14.1
0.0196
m3
0.030
Kg
0.300
Lt
1.000
Lbr
Upah

15.

Oh

An. SNI ( Revisi ) 6.14.2


0.600
Oh
2.000
Oh
0.200
Oh
0.030
Oh

1 m2 Pasang pintu plywood rangkap, rangka kayu kamper


Bahan
An. SNI ( Revisi ) 6.15.1
0.0196
m3
0.030
Kg

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.300
1.000
Upah

16.

An. SNI ( Revisi ) 6.15.2


0.600
Oh
2.000
Oh
0.200
Oh
0.030
Oh

JALUSI / KREPYAK MATI.

1 m2 Pasang jalusi mati kusen kayu jati


Bahan
An. SNI ( Revisi ) 6.16.1
0.060
m3
0.150
Kg
Upah

17.

Lt
Lbr

An. SNI ( Revisi ) 6.16.2


0.500
Oh
2.000
Oh
0.200
Oh
0.025
Oh

1 m2 Pasang jalusi mati kusen kayu kamper


Bahan
An. SNI ( Revisi ) 6.17.1
0.060
m3
0.150
Kg
Upah

An. SNI ( Revisi ) 6.17.2

0.500
2.000
0.200
0.025

18.

1 m2 Pasang pintu plywood rangkap,rangka kayu borneo


Bahan
An. SNI ( Revisi ) 6.18.1
0.0196
m3
0.030
Kg
0.300
Lt
1.000
Lbr
Upah

19.

Oh
Oh
Oh
Oh

An. SNI ( Revisi ) 6.18.2


0.600
Oh
2.000
Oh
0.200
Oh
0.030
Oh

1 m2 Pasang pintu teakwood rangkap, rangka kayu jati


Bahan
An. SNI ( Revisi ) 6.19.1
0.0196
m3

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.300
0.300
1.000
Upah

20.

An. SNI ( Revisi ) 6.19.2


0.600
Oh
2.000
Oh
0.200
Oh
0.030
Oh

1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper


Bahan
An. SNI ( Revisi ) 6.20.1
0.0196
m3
0.300
Kg
0.300
Lt
1.000
Lbr
Upah

21.

Kg
Lt
Lbr

An. SNI ( Revisi ) 6.20.2


0.600
Oh
2.000
Oh
0.200
Oh
0.030
Oh

1 m2 Pasang pintu plywood & formika, rangka kayu jati


Bahan
An. SNI ( Revisi ) 6.21.1
0.0196
m3
0.300
Kg
0.800
Lt
1.000
Lbr
0.500
Lbr
Upah

An. SNI ( Revisi ) 6.21.2


0.800
Oh
2.500
Oh
0.250
Oh
0.040
Oh

22.

1 m2 Pasang pintu plywood & formika, rangka kayu kamper


Bahan
An. SNI ( Revisi ) 6.22.1
0.0196
m3
0.300
Kg
0.800
Lt
1.000
Lbr
0.500
Lbr
Upah

An. SNI ( Revisi ) 6.22.2


0.800
Oh
2.500
Oh
0.250
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.040

23.

1 m2 Pasang pintu teakwood & formika, rangka kayu jati


Bahan
An. SNI ( Revisi ) 6.23.1
0.0196
m3
0.300
Kg
0.800
Lt
0.500
Lbr
0.500
Lbr
Upah

24.

An. SNI ( Revisi ) 6.24.2


0.800
Oh
2.500
Oh
0.250
Oh
0.040
Oh

1 m2 Pasang pintu formika double, rangka kayu jati


Bahan
An. SNI ( Revisi ) 6.25.1
0.0196
m3
0.300
Kg
1.200
Lt
2.000
Lbr
Upah

26.

An. SNI ( Revisi ) 6.23.2


0.800
Oh
2.500
Oh
0.250
Oh
0.040
Oh

1 m2 Pasang pintu teakwood & formika, rangka kayu kamper ( dipoli


Bahan
An. SNI ( Revisi ) 6.24.1
0.0196
m3
0.300
Kg
0.800
Lt
0.500
Lbr
0.500
Lt
0.500
Lbr
Upah

25.

Oh

An. SNI ( Revisi ) 6.25.2


1.000
Oh
2.600
Oh
0.260
Oh
0.050
Oh

1 m2 Pasang pintu formika double, rangka kayu kamper


Bahan
An. SNI ( Revisi ) 6.26.1
0.0196
m3
0.300
Kg
1.200
Lt

2.000

Lbr

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

Upah

27.

KUDA KUDA

1 m3 Pasang konstruksi kuda-kuda kayu jati


Bahan
An. SNI ( Revisi ) 6.27.1
1.100
m3
15.000
Kg
0.800
Kg
Upah

28.

An. SNI ( Revisi ) 6.28.2


4.000
Oh
12.000
Oh
1.200
Oh
0.200
Oh

1 m3 Pasang konstruksi kuda-kuda kayu kruing / bengkirai / kempas.


Bahan
An. SNI ( Revisi ) 6.30.1
1.100
m3
15.000
Kg
0.800
Kg
Upah

30

An. SNI ( Revisi ) 6.27.2


4.000
Oh
12.000
Oh
1.200
Oh
0.200
Oh

1 m3 Pasang konstruksi kuda-kuda kayu kamper


Bahan
An. SNI ( Revisi ) 6.28.1
1.100
m3
15.000
Kg
0.800
Kg
Upah

29

An. SNI ( Revisi ) 6.26.2


1.000
Oh
2.600
Oh
0.260
Oh
0.050
Oh

An. SNI ( Revisi ) 6.30.2


4.000
Oh
12.000
Oh
1.200
Oh
0.200
Oh

1 m3 Pasang konstruksi kuda-kuda kayu meranti.


Bahan
An. SNI ( Revisi ) 6.28.1
1.100
m3
15.000
Kg
0.800
Kg

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

Upah

An. SNI ( Revisi ) 6.28.2


4.000
Oh
12.000
Oh
1.200
Oh
0.200
Oh

31.

PASANG USUK.

1 m2 Pasang kaso + reng genteng kodok kayu kamper


Bahan
An. SNI ( Revisi ) 6.31.1
0.012
m3
0.150
Kg
Upah

32.

1 m2 Pasang kaso + reng genteng kodok kayu kruwing / bengkirai / k


Bahan
An. SNI ( Revisi ) 6.32.1
0.012
m3
0.150
Kg
Upah

33

An. SNI ( Revisi ) 6.32.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

1 m2 Pasang kaso + reng genteng kodok kayu meranti.


Bahan
An. SNI ( Revisi ) 6.32.1
0.012
m3
0.150
Kg
Upah

34

An. SNI ( Revisi ) 6.31.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

An. SNI ( Revisi ) 6.32.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

1 m2 Pasang kaso + reng genteng munier kayu jati


Bahan
An. SNI ( Revisi ) 6.33.1
0.014
m3
0.150
Kg
Upah

An. SNI ( Revisi ) 6.33.2


0.100
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.100
0.010
0.005

35

1 m2 Pasang kaso + reng genteng munier kayu kamper


Bahan
An. SNI ( Revisi ) 6.34.1
0.014
m3
0.150
Kg
Upah

36

Oh
Oh
Oh

An. SNI ( Revisi ) 6.34.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

1 m2 Pasang kaso + reng genteng beton kayu kruwing / bengkirai / ke

37

Bahan

An. SNI ( Revisi ) 6.35.1


0.014
m3
0.150
Kg

Upah

An. SNI ( Revisi ) 6.35.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

1 m2 Pasang kaso + reng genteng beton kayu meranti.


Bahan
An. SNI ( Revisi ) 6.35.1
0.014
m3
0.150
Kg
Upah

38

An. SNI ( Revisi ) 6.35.2


0.100
Oh
0.100
Oh
0.010
Oh
0.005
Oh

1 m2 Pasang kaso + reng atap sirap kayu kamper


Bahan
An. SNI ( Revisi ) 6.36.1
0.165
m3
0.200
Kg
Upah

An. SNI ( Revisi ) 6.36.2


0.120
Oh
0.120
Oh
0.012
Oh
0.006
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

39

1 m2 Pasang kaso + reng atap sirap kayu kruwing / bengkirai / kempa


Bahan
An. SNI ( Revisi ) 6.37.1
0.165
m3
0.200
Kg
Upah

An. SNI ( Revisi ) 6.37.2


0.120
Oh
0.120
Oh
0.012
Oh
0.006
Oh

RANGKA PLAVON / LANGIT2.


40

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu jati


Bahan
An. SNI ( Revisi ) 6.38.1
0.012
m3
0.100
Kg
Upah

41

An. SNI ( Revisi ) 6.38.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper pam


Bahan
An. SNI ( Revisi ) 6.39.1

0.012
0.100
Upah

42

m3
Kg

An. SNI ( Revisi ) 6.39.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper poto


Bahan
An. SNI ( Revisi ) 6.39.1
0.012
m3
0.100
Kg
Upah

An. SNI ( Revisi ) 6.39.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

43

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kruwing / ben


Bahan
An. SNI ( Revisi ) 6.40.1
0.012
m3
0.100
Kg
Upah

44

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu MERANTI


Bahan
An. SNI ( Revisi ) 6.39.1
0.012
m3
0.100
Kg
Upah

45

An. SNI ( Revisi ) 6.40.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

An. SNI ( Revisi ) 6.39.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu meranti poto


Bahan
An. SNI ( Revisi ) 6.39.1
0.012
m3
0.100
Kg
Upah

An. SNI ( Revisi ) 6.39.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

46

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu jati


Bahan
An. SNI ( Revisi ) 6.41.1
0.023
m3
0.150
Kg
Upah

An. SNI ( Revisi ) 6.41.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

47

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kamper panjan


Bahan
An. SNI ( Revisi ) 6.42.1
0.023
m3
0.150
Kg
Upah

48

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kamper potong


Bahan
An. SNI ( Revisi ) 6.42.1
0.023
m3
0.150
Kg
Upah

49

An. SNI ( Revisi ) 6.43.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu Meranti panjan


Bahan
An. SNI ( Revisi ) 6.43.1
0.023
m3
0.150
Kg
Upah

51

An. SNI ( Revisi ) 6.42.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kruwing , bemg


Bahan
An. SNI ( Revisi ) 6.43.1
0.023
m3
0.150
Kg
Upah

50

An. SNI ( Revisi ) 6.42.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

An. SNI ( Revisi ) 6.43.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu Meranti potong


Bahan
An. SNI ( Revisi ) 6.43.1
0.023
m3

0.150

Kg

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

Upah

52

1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu jati


Bahan
An. SNI ( Revisi ) 6.44.1
0.027
m3
0.200
Kg
Upah

53

An. SNI ( Revisi ) 6.45.2


0.250
Oh
0.350
Oh
0.035
Oh
0.0125
Oh

1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu kamper potong


Bahan
An. SNI ( Revisi ) 6.45.1
0.027
m3
0.200
Kg
Upah

55

An. SNI ( Revisi ) 6.44.2


0.250
Oh
0.350
Oh
0.035
Oh
0.0125
Oh

1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu kamper panjan


Bahan
An. SNI ( Revisi ) 6.45.1
0.027
m3
0.200
Kg
Upah

54

An. SNI ( Revisi ) 6.43.2


0.200
Oh
0.300
Oh
0.030
Oh
0.010
Oh

An. SNI ( Revisi ) 6.45.2


0.250
Oh
0.350
Oh
0.035
Oh
0.0125
Oh

1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu bengkirai / kruw


Bahan
An. SNI ( Revisi ) 6.46.1
0.027
m3
0.200
Kg
Upah

An. SNI ( Revisi ) 6.46.2


0.250
Oh
0.350
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.035
0.0125

56

Oh
Oh

PASANG LISPLANG

1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu jati


Bahan
An. SNI ( Revisi ) 6.47.1

0.0072
0.050
Upah

57

An. SNI ( Revisi ) 6.48.2


0.100
Oh
0.200
Oh
0.025
Oh
0.0050
Oh

1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu meranti.


Bahan
An. SNI ( Revisi ) 6.48.1
0.0072
m3
0.050
Kg
Upah

59

An. SNI ( Revisi ) 6.47.2


0.100
Oh
0.200
Oh
0.025
Oh
0.0050
Oh

1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu kamper


Bahan
An. SNI ( Revisi ) 6.48.1
0.0072
m3
0.050
Kg
Upah

58

m3
Kg

An. SNI ( Revisi ) 6.48.2


0.100
Oh
0.200
Oh
0.025
Oh
0.0050
Oh

1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu jati


Bahan
An. SNI ( Revisi ) 6.49.1
0.011
m3
0.050
Kg
Upah

An. SNI ( Revisi ) 6.49.2


0.110
Oh
0.220
Oh
0.022
Oh
0.005
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

60

1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu kamper


Bahan
An. SNI ( Revisi ) 6.50.1
0.011
m3
0.050
Kg
Upah

61

An. SNI ( Revisi ) 6.50.2


0.110
Oh
0.220
Oh
0.022
Oh
0.005
Oh

1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu meranti.


Bahan
An. SNI ( Revisi ) 6.50.1
0.011
m3
0.050
Kg
Upah

An. SNI ( Revisi ) 6.50.2


0.110
Oh

0.220
0.022
0.005

62

1 m' Pasang lisplang ukuran 2 x ( 3 x 20 ) cm, kayu kamper


Bahan
An. SNI ( Revisi ) 6.51.1
0.0145
m3
0.060
Kg
Upah

63

An. SNI ( Revisi ) 6.51.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

1 m' Pasang lisplang ukuran 2 x ( 3 x 20 ) cm, kayu meranti.


Bahan
An. SNI ( Revisi ) 6.51.1
0.0145
m3
0.060
Kg
Upah

64

Oh
Oh
Oh

An. SNI ( Revisi ) 6.51.2


0.150
Oh
0.250
Oh
0.025
Oh
0.075
Oh

1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu kamper


Bahan
An. SNI ( Revisi ) 6.52.1
0.0086
m3

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.060
Upah

65

An. SNI ( Revisi ) 6.52.2


0.100
Oh
0.100
Oh
0.010
Oh
0.050
Oh

1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu meranti.


Bahan
An. SNI ( Revisi ) 6.52.1
0.0086
m3
0.060
Kg
Upah

66

Kg

An. SNI ( Revisi ) 6.52.2


0.100
Oh
0.100
Oh
0.010
Oh
0.050
Oh

1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu kruwing / bengkira


Bahan
An. SNI ( Revisi ) 6.53.1
0.0088
m3
0.060
Kg
Upah

An. SNI ( Revisi ) 6.53.2


0.100
Oh
0.100
Oh

0.010
0.050

67

DINDING PEMISAH KAYU / TRIPLEKS

1 m2 Pasang rangka dan dinding pemisah kayu kamper


Bahan
An. SNI ( Revisi ) 6.54.1
0.0195
m3
0.007
m3
0.100
Kg
Upah

68

Oh
Oh

An. SNI ( Revisi ) 6.54.2


0.150
Oh
0.450
Oh
0.045
Oh
0.075
Oh

1 m2 Pasang rangka dan dinding pemisah kayu kruwing / bengkirai /


Bahan
An. SNI ( Revisi ) 6.55.1
0.0195
m3
0.007
m3

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

0.100
Upah

67

An. SNI ( Revisi ) 6.54.2


0.150
Oh
0.450
Oh
0.045
Oh
0.075
Oh

1 m2 Pasang dinding pemisah tripleks 4mm rangkap, rangka kayu ka


Bahan
An. SNI ( Revisi ) 6.56.1
0.0195
m3
0.007
m3
0.100
Kg
0.560
Lt
1.000
Lbr
Upah

68

An. SNI ( Revisi ) 6.55.2


0.150
Oh
0.450
Oh
0.045
Oh
0.075
Oh

1 m2 Pasang rangka dan dinding pemisah kayu meranti.


Bahan
An. SNI ( Revisi ) 6.54.1
0.0195
m3
0.007
m3
0.100
Kg
Upah

68

Kg

An. SNI ( Revisi ) 6.56.2


0.200
Oh
0.600
Oh
0.060
Oh
0.010
Oh

1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamp


Bahan
An. SNI ( Revisi ) 6.56.1

0.0195
0.007
0.100
0.560
1.000
Upah

m3
m3
Kg
Lt
Lbr

An. SNI ( Revisi ) 6.56.2


0.200
Oh
0.600
Oh
0.060
Oh
0.010
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

69

1 m2 Pasang dinding pemisah plywood / formica rangkap, rangka kay


Bahan
An. SNI ( Revisi ) 6.57.1
0.0195
m3
0.007
m3
0.100
Kg
0.560
Lt
1.000
Lbr
Upah

70

PASANG DINDING LAMBRESIRING

1 m2 Pasang dinding lambriziring dari papan jati


Bahan
An. SNI ( Revisi ) 6.58.1
0.0070
m3
0.100
Kg
0.150
Kg
Upah

71

An. SNI ( Revisi ) 6.58.2


0.600
Oh
1.800
Oh
0.180
Oh
0.030
Oh

1 m' Pasang list plafond, kayu profil


Bahan
An. SNI ( Revisi ) 6.60.1
1.050
m'
Upah

72

An. SNI ( Revisi ) 6.57.2


0.200
Oh
0.600
Oh
0.060
Oh
0.010
Oh

An. SNI ( Revisi ) 6.60.2


0.021
Oh
0.021
Oh
0.002
Oh
0.001
Oh

1 m' Pasang list plafond, kayu kamper 1/5.


Bahan
An. SNI ( Revisi ) 6.60.1
1.050
m'
Upah

An. SNI ( Revisi ) 6.60.2


0.021
Oh
0.021
Oh
0.002
Oh
0.001
Oh

D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..

19

10### 3

12

PEKERJAAN KAYU

KUSEN PINTU + JENDELA

sen pintu & jendela kayu jati


SNI ( Revisi ) 6.1.1
Kayu jati, balok

@ Rp.

SNI ( Revisi ) 6.1.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

15,939,000.00 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

196,500.00
840,000.00
88,000.00
16,500.00
1,141,000.00
18,673,900.00

5,750,000.00 = Rp
= Rp

6,900,000.00
6,900,000.00

Sub total :
Total upah+bahan :

sen pintu & jendela kayu kamper


SNI ( Revisi ) 6.2.1
Kayu kamper, balok

@ Rp.
Sub total :

SNI ( Revisi ) 6.2.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

17,532,900.00
17,532,900.00

Rp
Rp
Rp
Rp
Rp
Rp

196,500.00
756,000.00
88,000.00
16,500.00
1,057,000.00
7,957,000.00

= Rp
= Rp

4,636,800.00
4,636,800.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

196,500.00
756,000.00
88,000.00
16,500.00
1,057,000.00
5,693,800.00

6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

234,738.00
523.94
235,261.94

Sub total :
Total upah+bahan :

sen pintu & jendela kayu borneo ( Kruwing , kempas , Meranti batu )
SNI ( Revisi ) 6.3.1
Kayu borneo, balok
@ Rp.
3,864,000.00
Sub total :
SNI ( Revisi ) 6.3.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

PEKERJAAN PINTU

tu klamp kayu kamper


SNI ( Revisi ) 6.5.1
Kayu kamper papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.5.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

11,462.50
44,100.00
4,620.00
990.00
61,172.50
296,434.44

3,946,800.00 = Rp

142,084.80
Halaman : 48
523.94
142,608.74

Sub total :
Total upah+bahan :

tu klamp kayu borneo


SNI ( Revisi ) 6.6.1
Kayu borneo papan
Paku biasa 2" - 5"

SNI ( Revisi ) 6.6.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

10,478.80 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

11,462.50
44,100.00
4,620.00
990.00
61,172.50
203,781.24

43750

SNI ( Revisi ) 6.7.1


Kayu jati, papan

@ Rp.

SNI ( Revisi ) 6.7.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

tu panil kayu kamper


SNI ( Revisi ) 6.8.1
Kayu kamper, papan

SNI ( Revisi ) 6.8.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.9.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

tu & jendela kaca kayu borneo


SNI ( Revisi ) 6.11.1
Kayu borneo, papan

SNI ( Revisi ) 6.11.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

32,750.00
105,000.00
11,000.00
2,750.00
151,500.00
869,100.00

6,520,500.00 = Rp
= Rp

260,820.00
260,820.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

717,600.00
717,600.00

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
105,000.00
11,000.00
2,750.00
151,500.00
412,320.00

17,940,000.00 = Rp
Sub total :
= Rp

627,900.00
627,900.00

Sub total :
Total upah+bahan :

@ Rp.

SNI ( Revisi ) 6.10.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

tu & jendela kaca kayu jati


SNI ( Revisi ) 6.9.1
Kayu jati, papan

tu & jendela kaca kayu kamper


SNI ( Revisi ) 6.10.1
Kayu kamper, papan

17,940,000.00 = Rp
Sub total :
= Rp

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
749,100.00

6,520,500.00 = Rp
= Rp

228,217.50
228,217.50

Sub total :
Total upah+bahan :

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
349,417.50
Halaman : 49

3,946,800.00 = Rp
= Rp

138,138.00
138,138.00

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

@ Rp.

=
=
=
=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
259,338.00

tu & jendela jalusi kayu jati


SNI ( Revisi ) 6.12.1
Kayu jati, papan

@ Rp.

17,940,000.00 = Rp
Sub total :
= Rp

1,148,160.00
1,148,160.00

SNI ( Revisi ) 6.12.2


Pekerja
Tukang kayu
Kepala tukang

@ Rp.
@ Rp.
@ Rp.

32,750.00 = Rp
42,000.00 = Rp
44,000.00 = Rp

32,750.00
126,000.00
13,200.00

Mandor

@ Rp.
Sub total :
Total upah+bahan :

tu & jendela jalusi kayu kamper


SNI ( Revisi ) 6.13.1
Kayu kamper, papan

@ Rp.
Sub total :

SNI ( Revisi ) 6.13.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

55,000.00 = Rp
= Rp
= Rp

16,500.00
188,450.00
1,336,610.00

6,520,500.00 = Rp
= Rp

417,312.00
417,312.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
126,000.00
13,200.00
27,500.00
199,450.00
616,762.00

Sub total :
Total upah+bahan :

tu plywood rangkap, rangka kayu jati


SNI ( Revisi ) 6.14.1
Kayu jati, papan
Paku biasa 1/2" - 1"
Lem kayu
Plywood 4' x 3' x 4 mm

@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,940,000.00
10,478.80
8,625.00
81,512.00
Sub total :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

351,624.00
314.36
2,587.50
81,512.00
436,037.86

SNI ( Revisi ) 6.14.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
550,137.86

127,801.80
314.36
Halaman : 50
2,587.50
81,512.00
212,215.66

Sub total :
Total upah+bahan :

tu plywood rangkap, rangka kayu kamper


SNI ( Revisi ) 6.15.1
Kayu kamper, papan
Paku biasa 1/2" - 1"

@ Rp.
@ Rp.

6,520,500.00 = Rp
10,478.80 = Rp

Lem kayu
Plywood 4' x 3' x 4 mm

@ Rp.
@ Rp.

8,625.00 = Rp
81,512.00 = Rp
= Rp

SNI ( Revisi ) 6.15.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
326,315.66

17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

1,076,400.00
1,571.82
1,077,971.82

Sub total :
Total upah+bahan :

=
=
=
=
=
=

JALUSI / KREPYAK MATI.

usi mati kusen kayu jati


SNI ( Revisi ) 6.16.1
Kayu jati, papan
Paku biasa 1/2" - 1"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.16.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

usi mati kusen kayu kamper


SNI ( Revisi ) 6.17.1
Kayu kamper, papan
Paku biasa 1/2" - 1"

SNI ( Revisi ) 6.17.2

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

16,375.00
84,000.00
8,800.00
1,375.00
110,550.00
1,188,521.82

6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

391,230.00
1,571.82
392,801.82

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.

=
=
=
=
=
=

Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,375.00
84,000.00
8,800.00
1,375.00
110,550.00
503,351.82

3,946,800.00
10,478.80
8,625.00
81,512.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

77,357.28
314.36
2,587.50
81,512.00
161,771.14

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
275,871.14

@ Rp.

17,940,000.00 = Rp

@ Rp.
@ Rp.
@ Rp.

10,478.80 = Rp
8,625.00 = Rp
81,512.00 = Rp
= Rp

351,624.00
Halaman : 51
3,143.64
2,587.50
81,512.00
438,867.14

Sub total :
Total upah+bahan :

tu plywood rangkap,rangka kayu borneo


SNI ( Revisi ) 6.18.1
Kayu borneo, papan
Paku biasa 1/2" - 1"
Lem kayu
Plywood 4' x 3' x 4 mm

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

SNI ( Revisi ) 6.18.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

tu teakwood rangkap, rangka kayu jati


SNI ( Revisi ) 6.19.1
Kayu jati, papan
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm

SNI ( Revisi ) 6.19.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

tu teakwood rangkap, rangka kayu kamper


SNI ( Revisi ) 6.20.1
Kayu kamper, papan
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm

SNI ( Revisi ) 6.20.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
552,967.14

6,520,500.00
10,478.80
8,625.00
81,512.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

127,801.80
3,143.64
2,587.50
81,512.00
215,044.94

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
329,144.94

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

tu plywood & formika, rangka kayu jati


SNI ( Revisi ) 6.21.1
Kayu jati, papan
Paku biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formica 4' x 3'

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,940,000.00
10,478.80
8,625.00
81,512.00
62,330.00
Sub total :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

351,624.00
3,143.64
6,900.00
81,512.00
31,165.00
474,344.64

SNI ( Revisi ) 6.21.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
618,744.64

Sub total :
Total upah+bahan :

0.80
2.10
###

tu plywood & formika, rangka kayu kamper


SNI ( Revisi ) 6.22.1
Kayu kamper, papan
Paku biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formica 4' x 3'

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,520,500.00
10,478.80
8,625.00
81,512.00
62,330.00

Rp
Rp
Rp
Rp
Rp
Rp

127,801.80
3,143.64
6,900.00
81,512.00
31,165.00
250,522.44

@ Rp.
@ Rp.
@ Rp.

32,750.00 = Rp
42,000.00 = Rp
44,000.00 = Rp

@ Rp.

55,000.00 = Rp
= Rp
= Rp

26,200.00
105,000.00
11,000.00
Halaman : 52
2,200.00
144,400.00
394,922.44

Sub total :

SNI ( Revisi ) 6.22.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

Sub total :
Total upah+bahan :

=
=
=
=
=
=

tu teakwood & formika, rangka kayu jati


SNI ( Revisi ) 6.23.1
Kayu jati, papan
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Formica 4' x 8'

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.23.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

17,940,000.00
10,478.80
8,625.00
81,512.00
62,330.00
Sub total :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

351,624.00
3,143.64
6,900.00
40,756.00
31,165.00
433,588.64

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
577,988.64

6,520,500.00
10,478.80
8,625.00
81,512.00
35,420.00
62,330.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

127,801.80
3,143.64
6,900.00
40,756.00
17,710.00
31,165.00
227,476.44

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
371,876.44

Sub total :
Total upah+bahan :

tu teakwood & formika, rangka kayu kamper ( dipolitur )


SNI ( Revisi ) 6.24.1
Kayu kamper, papan
@ Rp.
Paku biasa 1/2" - 1"
@ Rp.
Lem kayu
@ Rp.
Teakwood 4' x 8' x 4 mm
@ Rp.
Politur
@ Rp.
Formica 4' x 8'
@ Rp.

SNI ( Revisi ) 6.24.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

tu formika double, rangka kayu jati


SNI ( Revisi ) 6.25.1
Kayu jati, papan
Paku biasa 1/2" - 1"
Lem kayu
Formica 4' x 8'

@ Rp.
@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.25.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

17,940,000.00
10,478.80
8,625.00
62,330.00
Sub total :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

351,624.00
3,143.64
10,350.00
124,660.00
489,777.64

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
109,200.00
11,440.00
2,750.00
156,140.00
645,917.64

6,520,500.00 = Rp
10,478.80 = Rp
8,625.00 = Rp

127,801.80
3,143.64
10,350.00

tu formika double, rangka kayu kamper


SNI ( Revisi ) 6.26.1
Kayu kamper, papan
Paku biasa 1/2" - 1"
Lem kayu

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.

Plywood 4' x 8' x 4 mm

@ Rp.
Sub total :

SNI ( Revisi ) 6.26.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

62,330.00 = Rp
= Rp

124,660.00
265,955.44
Halaman : 53

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
109,200.00
11,440.00
2,750.00
156,140.00
422,095.44

Sub total :
Total upah+bahan :

KUDA KUDA

struksi kuda-kuda kayu jati


SNI ( Revisi ) 6.27.1
Kayu jati, balok
Besi strip
Paku biasa 2" - 5"

@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.27.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

15,939,000.00
10,166.00
10,478.80
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

17,532,900.00
152,490.00
8,383.04
17,693,773.04

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
18,392,573.04

5,750,000.00 = Rp
10,166.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

6,325,000.00
152,490.00
8,383.04
6,485,873.04

Sub total :
Total upah+bahan :

struksi kuda-kuda kayu kamper


SNI ( Revisi ) 6.28.1
Kayu kamper, balok
Besi strip
Paku biasa 2" - 5"

@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.28.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
7,184,673.04

3,864,000.00 = Rp
10,166.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

4,250,400.00
152,490.00
8,383.04
4,411,273.04

Sub total :
Total upah+bahan :

struksi kuda-kuda kayu kruing / bengkirai / kempas.


SNI ( Revisi ) 6.30.1
Kayu kruing, balok
@ Rp.
Besi strip
@ Rp.
Paku biasa 2" - 5"
@ Rp.

SNI ( Revisi ) 6.30.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

32,750.00
42,000.00
44,000.00
55,000.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
5,110,073.04

3,542,000.00 = Rp
10,166.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

3,896,200.00
152,490.00
8,383.04
4,057,073.04
Halaman : 54

Sub total :
Total upah+bahan :

struksi kuda-kuda kayu meranti.


SNI ( Revisi ) 6.28.1
Kayu kamper, balok
Besi strip
Paku biasa 2" - 5"

@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.28.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Sub total :
Total upah+bahan :

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
4,755,873.04

PASANG USUK.

o + reng genteng kodok kayu kamper


SNI ( Revisi ) 6.31.1
Kayu kamper, usuk 5/7.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.31.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
275.00
8,190.00
58,961.82

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

45,816.00
1,571.82
47,387.82

Sub total :
Total upah+bahan :

o + reng genteng kodok kayu kruwing / bengkirai / kempas.


SNI ( Revisi ) 6.32.1
Ky. kruw/beng/kempas, usuk @ Rp.
Paku biasa 2" - 5"
@ Rp.

SNI ( Revisi ) 6.32.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
275.00
8,190.00
55,577.82

3,404,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

40,848.00
1,571.82
42,419.82

Sub total :
Total upah+bahan :

o + reng genteng kodok kayu meranti.


SNI ( Revisi ) 6.32.1
Kayu meranti, usuk
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.32.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

49,200.00
1,571.82
50,771.82

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
275.00
8,190.00
50,609.82

o + reng genteng munier kayu jati


SNI ( Revisi ) 6.33.1
Kayu jati, balok / usuk.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

10,810,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

151,340.00
1,571.82
152,911.82

SNI ( Revisi ) 6.33.2


Pekerja

@ Rp.

32,750.00 = Rp

@ Rp.
@ Rp.
@ Rp.

42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

3,275.00
Halaman : 55
4,200.00
440.00
275.00
8,190.00
161,101.82

4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

57,400.00
1,571.82
58,971.82

Tukang kayu
Kepala tukang
Mandor

Sub total :
Total upah+bahan :

o + reng genteng munier kayu kamper


SNI ( Revisi ) 6.34.1
Kayu kamper, usuk 5/7.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.34.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

o + reng genteng beton kayu kruwing / bengkirai / kempas.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
275.00
8,190.00
67,161.82

SNI ( Revisi ) 6.35.1


Ky. kruw/beng/kempas, usuk
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.35.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

@ Rp.
@ Rp.

SNI ( Revisi ) 6.35.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

3,275.00
4,200.00
440.00
275.00
8,190.00
63,213.82

3,404,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

47,656.00
1,571.82
49,227.82

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
275.00
8,190.00
57,417.82

4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

676,500.00
2,095.76
678,595.76

Sub total :
Total upah+bahan :

o + reng atap sirap kayu kamper


SNI ( Revisi ) 6.36.1
Kayu kamper, usuk 5/7.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.36.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,930.00
5,040.00
528.00
330.00
9,828.00
688,423.76
Halaman : 56

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

629,970.00
2,095.76
632,065.76

Sub total :
Total upah+bahan :

o + reng atap sirap kayu kruwing / bengkirai / kempas.


SNI ( Revisi ) 6.37.1
Ky. kruw/beng/kempas, usuk @ Rp.
Paku biasa 2" - 5"
@ Rp.

=
=
=
=
=
=

53,452.00
1,571.82
55,023.82

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

o + reng genteng beton kayu meranti.


SNI ( Revisi ) 6.35.1
Kayu meranti, usuk
Paku biasa 2" - 5"

SNI ( Revisi ) 6.37.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,930.00
5,040.00
528.00
330.00
9,828.00
641,893.76

10,810,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

129,720.00
1,047.88
130,767.88

Sub total :
Total upah+bahan :

=
=
=
=
=
=

ANGKA PLAVON / LANGIT2.

gka langit-langit ( 1.00 x 1.00 ) m, kayu jati


SNI ( Revisi ) 6.38.1
Kayu jati, usuk 5/7 & 4/6.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.38.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

gka langit-langit ( 1.00 x 1.00 ) m, kayu kamper pamjamg 4 m.


SNI ( Revisi ) 6.39.1

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
151,405.38

Kayu kamper 5/7 - 4 mtr.


Paku biasa 2" - 5"

SNI ( Revisi ) 6.39.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.

4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

gka langit-langit ( 1.00 x 1.00 ) m, kayu kamper potongan 5/7 2 meter.


SNI ( Revisi ) 6.39.1
Kayu kamper 5/7 - 2 mtr.
@ Rp.
2,248,480.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.39.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 1.00 x 1.00 ) m, kayu kruwing / bengkirai / kempas.


SNI ( Revisi ) 6.40.1
Ky. kruw/beng/kempas, usuk @ Rp.
3,818,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.40.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 1.00 x 1.00 ) m, kayu MERANTI 5/7 panjang 4 m.


SNI ( Revisi ) 6.39.1
Kayu meranti 5/7 - 4 mtr.
@ Rp.
3,404,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.39.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 1.00 x 1.00 ) m, kayu meranti potongan 5/7 - 2 meter.


SNI ( Revisi ) 6.39.1
Kayu meranti 5/7 - 2 mtr.
@ Rp.
1,978,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.39.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

49,200.00
1,047.88
50,247.88

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
70,885.38

= Rp
= Rp
= Rp

26,981.76
1,047.88
28,029.64

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
48,667.14
Halaman : 57

= Rp
= Rp
= Rp

45,816.00
1,047.88
46,863.88

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
67,501.38

= Rp
= Rp
= Rp

40,848.00
1,047.88
41,895.88

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
62,533.38

= Rp
= Rp
= Rp

23,736.00
1,047.88
24,783.88

=
=
=
=
=
=

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
45,421.38

Rp
Rp
Rp
Rp
Rp
Rp

gka langit-langit ( 30 x 60 ) cm, kayu jati


SNI ( Revisi ) 6.41.1
Kayu jati, usuk 5/7.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.41.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

10,810,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 60 ) cm, kayu kamper panjang 4mtr.- 5/7


SNI ( Revisi ) 6.42.1
Kayu kamper, usuk 5/7
@ Rp.
4,100,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.42.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 60 ) cm, kayu kamper potongan panjang 2 mtr.- 5/7


SNI ( Revisi ) 6.42.1
Kayu kamper, potongan 2 mtr @ Rp.
2,248,480.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.42.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 60 ) cm, kayu kruwing , bemgkirai / kempas.


SNI ( Revisi ) 6.43.1
Ky. kruw/beng/kempas, usuk @ Rp.
3,818,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.43.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 60 ) cm, kayu Meranti panjang 4 meter - 5/7.


SNI ( Revisi ) 6.43.1
Kayu meranti 5/7 - 4 mtr.
@ Rp.
3,404,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.43.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

248,630.00
1,571.82
250,201.82

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
271,221.82
Halaman : 58

= Rp
= Rp
= Rp

94,300.00
1,571.82
95,871.82

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
116,891.82

= Rp
= Rp
= Rp

51,715.04
1,571.82
53,286.86

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
74,306.86

= Rp
= Rp
= Rp

87,814.00
1,571.82
89,385.82

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
110,405.82

= Rp
= Rp
= Rp

78,292.00
1,571.82
79,863.82

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
100,883.82

gka langit-langit ( 30 x 60 ) cm, kayu Meranti potongan panjang 2 meter - 5/7.


SNI ( Revisi ) 6.43.1
Kayu meranti 5/7 - 2 mtr.
@ Rp.
1,978,000.00 = Rp

45,494.00

Paku biasa 2" - 5"

@ Rp.
Sub total :

SNI ( Revisi ) 6.43.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

10,478.80 = Rp
= Rp

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
12,600.00
1,320.00
550.00
21,020.00
68,085.82

10,810,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

291,870.00
2,095.76
293,965.76

Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 30 ) cm, kayu jati


SNI ( Revisi ) 6.44.1
Kayu jati, balok
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.44.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 30 ) cm, kayu kamper panjang 4 mtr Uk.5/7


SNI ( Revisi ) 6.45.1
Kayu kamper, usuk 5/7
@ Rp.
4,100,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.45.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 30 ) cm, kayu kamper potongan panjang 2 mtr Uk.5/7


SNI ( Revisi ) 6.45.1
Kayu kamper, usuk 5/7
@ Rp.
2,248,480.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.45.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

gka langit-langit ( 30 x 30 ) cm, kayu bengkirai / kruwing / kempas. 5/7


SNI ( Revisi ) 6.46.1
Kayu borneo, usuk.
@ Rp.
3,818,000.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.46.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00
Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

PASANG LISPLANG

ang ukuran ( 3 x 20 ) cm, kayu jati


SNI ( Revisi ) 6.47.1

=
=
=
=
=
=

1,571.82
47,065.82
Halaman : 59

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
14,700.00
1,540.00
687.50
25,115.00
319,080.76

= Rp
= Rp
= Rp

110,700.00
2,095.76
112,795.76

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
14,700.00
1,540.00
687.50
25,115.00
137,910.76

= Rp
= Rp
= Rp

60,708.96
2,095.76
62,804.72

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
14,700.00
1,540.00
687.50
25,115.00
87,919.72

= Rp
= Rp
= Rp

103,086.00
2,095.76
105,181.76

= Rp
= Rp

8,187.50
14,700.00
Halaman : 60
1,540.00
687.50
25,115.00
130,296.76

44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

Kayu jati, papan


Paku biasa 2" - 5"

SNI ( Revisi ) 6.47.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.

17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
8,400.00
1,100.00
275.00
13,050.00
142,741.94

6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

46,947.60
523.94
47,471.54

Sub total :
Total upah+bahan :

ang ukuran ( 3 x 20 ) cm, kayu kamper


SNI ( Revisi ) 6.48.1
Kayu kamper, papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.48.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
8,400.00
1,100.00
275.00
13,050.00
60,521.54

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

27,489.60
523.94
28,013.54

Sub total :
Total upah+bahan :

ang ukuran ( 3 x 20 ) cm, kayu meranti.


SNI ( Revisi ) 6.48.1
Kayu meranti, papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.48.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

@ Rp.
@ Rp.

SNI ( Revisi ) 6.49.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

3,275.00
8,400.00
1,100.00
275.00
13,050.00
41,063.54

17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

197,340.00
523.94
197,863.94

32,750.00
42,000.00
44,000.00
55,000.00

@ Rp.
@ Rp.

SNI ( Revisi ) 6.50.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,602.50
9,240.00
968.00
275.00
14,085.50
211,949.44
Halaman : 61

6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

71,725.50
523.94
72,249.44

Sub total :
Total upah+bahan :

ang ukuran ( 3 x 30 ) cm, kayu kamper


SNI ( Revisi ) 6.50.1
Kayu kamper, papan
Paku biasa 2" - 5"

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

ang ukuran ( 3 x 30 ) cm, kayu jati


SNI ( Revisi ) 6.49.1
Kayu jati, papan
Paku biasa 2" - 5"

=
=
=
=
=
=

129,168.00
523.94
129,691.94

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,602.50
9,240.00
968.00
275.00
14,085.50
86,334.94

ang ukuran ( 3 x 30 ) cm, kayu meranti.


SNI ( Revisi ) 6.50.1
Kayu kamper, meranti.
Paku biasa 2" - 5"

@ Rp.
@ Rp.

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

41,998.00
523.94
42,521.94

SNI ( Revisi ) 6.50.2


Pekerja

@ Rp.

32,750.00 = Rp

3,602.50

Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.

42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

9,240.00
968.00
275.00
14,085.50
56,607.44

6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

94,547.25
628.73
95,175.98

Sub total :
Total upah+bahan :

ang ukuran 2 x ( 3 x 20 ) cm, kayu kamper


SNI ( Revisi ) 6.51.1
Kayu kamper, papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.51.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
115,813.48

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

55,361.00
628.73
55,989.73

Sub total :
Total upah+bahan :

ang ukuran 2 x ( 3 x 20 ) cm, kayu meranti.


SNI ( Revisi ) 6.51.1
Kayu kamper, papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.

SNI ( Revisi ) 6.51.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
76,627.23

6,520,500.00 = Rp

56,076.30
Halaman : 62
628.73
56,705.03

Sub total :
Total upah+bahan :

ang ukuran 2 x ( 2 x 20 ) cm, kayu kamper


SNI ( Revisi ) 6.52.1
Kayu kamper, papan
Paku biasa 2" - 5"

SNI ( Revisi ) 6.52.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

SNI ( Revisi ) 6.52.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

10,478.80 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
2,750.00
10,665.00
67,370.03

3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

32,834.80
628.73
33,463.53

Sub total :
Total upah+bahan :

ang ukuran 2 x ( 2 x 20 ) cm, kayu meranti.


SNI ( Revisi ) 6.52.1
Kayu kamper, papan
Paku biasa 2" - 5"

=
=
=
=
=
=

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

ang ukuran 2 x ( 2 x 20 ) cm, kayu kruwing / bengkirai / kempas.


SNI ( Revisi ) 6.53.1
Kayu borneo, papan
@ Rp.
3,946,800.00
Paku biasa 2" - 5"
@ Rp.
10,478.80
Sub total :
SNI ( Revisi ) 6.53.2
Pekerja
@ Rp.
32,750.00
Tukang kayu
@ Rp.
42,000.00

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
4,200.00
440.00
2,750.00
10,665.00
44,128.53

= Rp
= Rp
= Rp

34,731.84
628.73
35,360.57

= Rp
= Rp

3,275.00
4,200.00

Kepala tukang
Mandor

@ Rp.
@ Rp.

44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp

440.00
2,750.00
10,665.00
46,025.57

5,750,000.00 = Rp
6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

112,125.00
45,643.50
1,047.88
158,816.38

Sub total :
Total upah+bahan :

NG PEMISAH KAYU / TRIPLEKS

gka dan dinding pemisah kayu kamper


SNI ( Revisi ) 6.54.1
Kayu kamper, balok
Kayu kamper, papan
Paku biasa 2" - 5"

@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.54.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
188,733.88

3,864,000.00 = Rp
3,946,800.00 = Rp

75,348.00
27,627.60
Halaman : 63
1,047.88
104,023.48

Sub total :
Total upah+bahan :

gka dan dinding pemisah kayu kruwing / bengkirai / kempas.


SNI ( Revisi ) 6.55.1
Kayu , balok
@ Rp.
Kayu , papan
@ Rp.
Paku biasa 2" - 5"

SNI ( Revisi ) 6.55.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

SNI ( Revisi ) 6.54.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
133,940.98

3,542,000.00 = Rp
3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp

69,069.00
26,726.00
1,047.88
96,842.88

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
126,760.38

5,750,000.00
6,520,500.00
10,478.80
19,320.00
91,908.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

112,125.00
45,643.50
1,047.88
10,819.20
91,908.00
149,418.58

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
184,358.58

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ding pemisah teakwood rangkap, rangka kayu kamper


SNI ( Revisi ) 6.56.1

=
=
=
=
=
=

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

ding pemisah tripleks 4mm rangkap, rangka kayu kamper


SNI ( Revisi ) 6.56.1
Kayu kamper, balok
@ Rp.
Kayu kamper, papan
@ Rp.
Paku biasa 2" - 5"
@ Rp.
Lem kayu
@ Rp.
Tripleks 4' x 8' x 4 mm
@ Rp.

SNI ( Revisi ) 6.56.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

10,478.80 = Rp
= Rp

Sub total :
Total upah+bahan :

gka dan dinding pemisah kayu meranti.


SNI ( Revisi ) 6.54.1
Kayu meranti, balok
Kayu meranti, papan
Paku biasa 2" - 5"

=
=
=
=
=
=

Kayu kamper, balok


Kayu kamper, papan
Paku biasa 2" - 5"
Lem kayu
Teakwood 4' x 8' x 4 mm

SNI ( Revisi ) 6.56.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

112,125.00
45,643.50
1,047.88
10,819.20
81,512.00
139,022.58

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
173,962.58
Halaman : 64

5,750,000.00
6,520,500.00
10,478.80
19,320.00
62,330.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

112,125.00
45,643.50
1,047.88
10,819.20
62,330.00
119,840.58

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
154,780.58

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ding pemisah plywood / formica rangkap, rangka kayu kamper


SNI ( Revisi ) 6.57.1
Kayu kamper, balok
@ Rp.
Kayu kamper, papan
@ Rp.
Paku biasa 2" - 5"
@ Rp.
Lem kayu
@ Rp.
Plywood / formika.
@ Rp.

SNI ( Revisi ) 6.57.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

5,750,000.00
6,520,500.00
10,478.80
19,320.00
81,512.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

ANG DINDING LAMBRESIRING

ding lambriziring dari papan jati


SNI ( Revisi ) 6.58.1
Kayu jati, balok
Paku biasa 2" - 5"
Paku skrup 3,5"

@ Rp.
@ Rp.
@ Rp.

15,939,000.00
10,478.80
15,985.00
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

111,573.00
1,047.88
2,397.75
115,018.63

SNI ( Revisi ) 6.58.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
75,600.00
7,920.00
1,650.00
104,820.00
219,838.63

10,350.00 = Rp
= Rp

10,867.50
10,867.50

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

687.75
882.00
88.00
55.00
1,712.75
12,580.25

3,312.00 = Rp
= Rp

3,477.60
3,477.60

lafond, kayu profil


SNI ( Revisi ) 6.60.1
Kayu profil

SNI ( Revisi ) 6.60.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

lafond, kayu kamper 1/5.


SNI ( Revisi ) 6.60.1
Kayu profil

SNI ( Revisi ) 6.60.2


Pekerja
Tukang kayu
Kepala tukang
Mandor

Sub total :
Total upah+bahan :

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :

=
=
=
=
=
=

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

687.75
882.00
88.00
55.00
1,712.75

Total upah+bahan :

= Rp

5,190.35
Halaman : 65

19

10###

12

PEKERJAAN PENUTUP PLAVON


1. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Lbr Asbes langit-langit tbl @ Rp
13,570.00
0.010 Kg Paku
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.1.2
0.030 Oh Pekerja
@ Rp
32,750.00
0.070 Oh Tukang kayu
@ Rp
42,000.00
0.007 Oh Kepala tukang
@ Rp
44,000.00
0.0015 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
2. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.2.1
1.100 Lbr Asbes langit-langit tbl @ Rp
11,270.00
0.010 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.2.2
0.030 Oh Pekerja
@ Rp
32,750.00
0.070 Oh Tukang kayu
@ Rp
42,000.00
0.007 Oh Kepala tukang
@ Rp
44,000.00
0.0015 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
3

1 m2 Pasang langit-langit calsibord ( 1.00 x 1.00 ) m, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.2.1
1.100 Lbr Asbes langit-langit tbl @ Rp
15,088.00
0.010 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.2.2
0.030 Oh Pekerja
@ Rp
32,750.00
0.070 Oh Tukang kayu
@ Rp
42,000.00
0.007 Oh Kepala tukang
@ Rp
44,000.00
0.0015 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.3.1
1.100 Lbr Asbes langit-langit tbl @ Rp
10,782.40
0.010 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.030 Oh Pekerja
@ Rp
32,750.00
0.070 Oh Tukang kayu
@ Rp
42,000.00
0.007 Oh Kepala tukang
@ Rp
44,000.00
0.0015 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :

= Rp
= Rp
= Rp

14,927.00
104.79
15,031.79

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

982.50
2,940.00
308.00
82.50
4,313.00
19,344.79

= Rp
= Rp
= Rp

12,397.00
150.88
12,547.88

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

982.50
2,940.00
308.00
82.50
4,313.00
16,860.88

= Rp
= Rp
= Rp

16,596.80
150.88
16,747.68

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

982.50
2,940.00
308.00
82.50
4,313.00
21,060.68

= Rp
= Rp
= Rp

11,860.64
150.88
12,011.52

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

982.50
2,940.00
308.00
82.50
4,313.00
16,324.52
Halaman : 66

= Rp
= Rp
= Rp

10,120.00
150.88
10,270.88

= Rp

982.50

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 3.5 mm


Bahan An. SNI ( Revisi ) 6.4.1
1.100 Lbr Asbes langit-langit tbl 3 @ Rp
9,200.00
0.010 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.4.2
0.030 Oh Pekerja
@ Rp
32,750.00

0.070 Oh Tukang kayu


0.007 Oh Kepala tukang
0.0015 Oh Mandor

@ Rp
@ Rp
@ Rp

42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp

6. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm


Bahan An. SNI ( Revisi ) 6.6.1
5.800 Lbr Akustik ukuran 30 x 60 @ Rp
0.050 Kg Paku
@ Rp
Upah An. SNI ( Revisi ) 6.6.2
0.060 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.003 Oh Mandor

10,750.00 = Rp
15,088.00 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

7. 1 m2 Pasang langit-langit akustik ( 60 x 120 ) cm


Bahan An. SNI ( Revisi ) 6.7.1
1.500 Lbr Akustik arm strong 60 x @ Rp
0.050 Kg Paku
@ Rp
Upah An. SNI ( Revisi ) 6.7.2
0.060 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.003 Oh Mandor

62,350.00
754.40
63,104.40

Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
4,200.00
440.00
165.00
6,770.00
69,874.40

39,500.00 = Rp
15,088.00 = Rp
Sub total :
= Rp

59,250.00
754.40
60,004.40

Sub total :
Total upah+bahan :

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :
8. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.360 Lbr Plywood 4' x 8' x 4 mm @ Rp
65,780.00
0.030 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.0035 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

2,940.00
308.00
82.50
4,313.00
14,583.88

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
4,200.00
440.00
165.00
6,770.00
66,774.40

= Rp
= Rp
= Rp

23,680.80
452.64
24,133.44

=
=
=
=
=
=

2,292.50
4,200.00
440.00
192.50
7,125.00
31,258.44

Rp
Rp
Rp
Rp
Rp
Rp

Halaman : 67

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

9. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm


Bahan An. SNI ( Revisi ) 6.9.1
0.360 Lbr Plywood 4' x 8' x 6 mm @ Rp
200,422.00
0.030 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.0035 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :

= Rp
= Rp
= Rp

72,151.92
452.64
72,604.56

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,292.50
4,200.00
440.00
192.50
7,125.00
79,729.56

10. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm


Bahan An. SNI ( Revisi ) 6.10.1
0.375 Lbr Plywood 4' x 8' x 4 mm @ Rp
200,422.00 = Rp
0.030 Kg Paku
@ Rp
15,088.00 = Rp
Sub total :
= Rp

75,158.25
452.64
75,610.89

Upah An. SNI ( Revisi ) 6.10.2


0.070 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0035 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :
11 1 m2 Pasang langit-langit tripleks ( 60 x 120 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.375 Lbr Teakwood 4' x 8' x 4 mm@ Rp
89,700.00
0.030 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.13.2
0.070 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.0035 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
12 1 m2 Pasang langit-langit lat kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.024 m3 Kayu jati, papan
0.010 Kg Paku
0.050 Kg Paku sekrup
Upah An. SNI ( Revisi ) 6.14.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,292.50
4,200.00
440.00
192.50
7,125.00
82,735.89

= Rp
= Rp
= Rp

33,637.50
452.64
34,090.14

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,292.50
4,200.00
440.00
192.50
7,125.00
41,215.14

@ Rp
@ Rp
@ Rp

17,940,000.00
9,779.60
15,985.00
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

430,560.00
97.80
799.25
431,457.05

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
466,397.05
Halaman : 68

@ Rp
@ Rp
@ Rp

6,500,000.00
9,779.60
15,985.00
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

156,000.00
97.80
799.25
156,897.05

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
191,837.05

@ Rp
@ Rp
@ Rp

6,520,500.00
9,779.60
15,985.00
Sub total :

=
=
=
=

Rp
Rp
Rp
Rp

156,492.00
97.80
799.25
157,389.05

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
25,200.00
2,640.00
550.00
34,940.00
192,329.05

Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

13 1 m2 Pasang langit-langit Lat kayu ramin


Bahan An. SNI ( Revisi ) 6.15.1
0.024 m3 Kayu ramin
0.010 Kg Paku
0.050 Kg Paku sekrup
Upah An. SNI ( Revisi ) 6.15.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor

Sub total :
Total upah+bahan :
14 1 m2 Pasang langit-langit lat kayu kamper
Bahan An. SNI ( Revisi ) 6.16.1
0.024 m3 Kayu kamper, papan
0.010 Kg Paku
0.050 Kg Paku sekrup
Upah An. SNI ( Revisi ) 6.16.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor

Sub total :
Total upah+bahan :
15 1 m2 Pasang langit-langit soft board
Bahan An. SNI ( Revisi ) 6.17.1

0.350 Lbr Soft board 4' x 8' x 4mm @ Rp


10.000 Bh Paku
@ Rp
Upah An. SNI ( Revisi ) 6.17.2
0.600 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.003 Oh Mandor

35,000.00 = Rp
216.20 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,650.00
4,200.00
440.00
165.00
24,455.00
38,867.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

45,000.00
2,094.84
750.00
59,250.00
107,094.84

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
21,000.00
2,200.00
412.50
28,525.00
135,619.84
Halaman : 69

10,350.00 = Rp
9,779.60 = Rp
Sub total :
= Rp

11,385.00
97.80
11,482.80

Sub total :
Total upah+bahan :
16 1 m2 Pasang langit-langit akustik 60 x 120 cm + rangka alluminium
Bahan An. SNI ( Revisi ) 6.18.1
3.600 m' Profil alluminium T
@ Rp
12,500.00
0.150 Kg Kawat seng polos
@ Rp
13,965.60
1.000 Bh Ramset/dinabolt
@ Rp
750.00
1.500 Lbr Akustik arm strong 60x @ Rp
39,500.00
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.500 Oh Tukang kayu
@ Rp
42,000.00
0.050 Oh Kepala tukang
@ Rp
44,000.00
0.0075 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

17 1 m' Pasang list langit-langit kayu profil


Bahan An. SNI ( Revisi ) 6.19.1
1.100 m' List kayu profil
0.010 Kg Paku

@ Rp
@ Rp

Upah An. SNI ( Revisi ) 6.19.2


0.050 Oh Pekerja
0.050 Oh Tukang kayu
0.005 Oh Kepala tukang
0.003 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,637.50
2,100.00
220.00
165.00
4,122.50
15,605.30

115,000.00 = Rp
15,985.00 = Rp
Sub total :
= Rp

41,860.00
1,758.35
43,618.35

Sub total :
Total upah+bahan :
18 1 m2 Pasang langit-langit gypsum board, tebal 9 mm
Bahan An. SNI ( Revisi ) 6.24.1
0.364 Lbr Gypsum board ( 120x24 @ Rp
0.110 Kg Paku sekrup
@ Rp
Upah An. SNI ( Revisi ) 6.24.2
0.100 Oh Pekerja
0.050 Oh Tukang kayu
0.005 Oh Kepala tukang
0.0050 Oh Mandor

12,250.00
2,162.00
14,412.00

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,275.00
2,100.00
220.00
275.00
5,870.00
49,488.35

Halaman : 70

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN PENUTUP ATAP


1. 1 m2 Pasang atap genteng plenthong kecil (lokal)
Bahan An. SNI ( Revisi ) 6.1.1
25.000 Bh Genteng plenthong
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

1,094.80 = Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
3,300.00
352.00
440.00
9,004.50
36,374.50

2,150.00 = Rp
= Rp

53,750.00
53,750.00

Sub total :
Total upah+bahan :
2. 1 m2 Pasang atap genteng kodok/glazzur
Bahan An. SNI ( Revisi ) 6.2.1
25.000 Bh Genteng kodok

@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.2.2


0.150 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
3,300.00
352.00
440.00
9,004.50
62,754.50

= Rp
= Rp

39,000.00
39,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,640.00
2,640.00
440.00
10,632.50
49,632.50

7,866.00 = Rp
= Rp

94,392.00
94,392.00

Sub total :
Total upah+bahan :
3. 1 m2 Pasang atap genteng plenthong super/besar ex kanmuri
Bahan An. SNI ( Revisi ) 6.3.1
12.000 Bh Genteng plenthong supe@ Rp
3,250.00
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.060 Oh Tukang kayu
@ Rp
44,000.00
0.060 Oh Kepala tukang
@ Rp
44,000.00
0.008 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
4

1 m2 Pasang atap genteng Glazur Kanmuri / KIA.


Bahan An. SNI ( Revisi ) 6.3.1
12.000 Bh Genteng plenthong supe@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
0.060 Oh Tukang kayu
0.060 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,640.00
2,640.00
440.00
10,632.50
105,024.50

1 m2 Pasang atap genteng bambe / good year / Jatiwangi type Alto.Kw 1.


Bahan An. SNI ( Revisi ) 6.3.1
21.000 Bh Genteng plenthong supe@ Rp
3,063.60 = Rp

64,335.60

Sub total :
Total upah+bahan :
5

=
=
=
=
=
=

27,370.00
27,370.00

=
=
=
=
=
=

Upah An. SNI ( Revisi ) 6.3.2


0.150 Oh Pekerja

Sub total :
@ Rp

= Rp

64,335.60

32,750.00 = Rp

4,912.50
Halaman : 71
2,640.00
2,640.00
440.00
10,632.50
74,968.10

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.060 Oh Tukang kayu


0.060 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp

44,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp

1 m2 Pasang atap genteng model Kaang pilang .Kw 1.


Bahan An. SNI ( Revisi ) 6.3.1
25.000 Bh Genteng model krg.pila @ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
0.060 Oh Tukang kayu
0.060 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

1,812.40 = Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,640.00
2,640.00
440.00
10,632.50
55,942.50

1,058.00 = Rp
= Rp

26,450.00
26,450.00

Sub total :
Total upah+bahan :
7

1 m2 Pasang atap genteng Nglayur .Kw 1.


Bahan An. SNI ( Revisi ) 6.3.1
25.000 Bh Genteng nglayur.
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
0.060 Oh Tukang kayu
0.060 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
2,640.00
2,640.00
440.00
10,632.50
37,082.50

3,500.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp

17,500.00
6,638.72
2,901.90
27,040.62

Sub total :
Total upah+bahan :
8

1 m' Pasang genteng bubung plenthong kecil


Bahan An. SNI ( Revisi ) 6.4.1
5.000 Bh Genteng bubung plentho@ Rp
8.000 Kg Semen portland
@ Rp
0.032 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.002 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

1 m' Pasang genteng bubung kodok glazzur


Bahan An. SNI ( Revisi ) 6.5.1
5.000 Bh Genteng bubung kodok @ Rp
8.000 Kg Semen portland
@ Rp
0.032 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.5.2
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.002 Oh Mandor

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

13,100.00
8,800.00
880.00
110.00
22,890.00
49,930.62

7,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp

35,000.00
6,638.72
2,901.90
44,540.62

Sub total :
Total upah+bahan :
9

=
=
=
=
=
=

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

13,100.00
8,800.00
880.00
110.00
22,890.00
67,430.62
Halaman : 72

8,250.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp

33,000.00
6,638.72
2,901.90
42,540.62

Sub total :
Total upah+bahan :

=
=
=
=
=
=

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

10 1 m' Pasang genteng bubung plenthong besar


Bahan An. SNI ( Revisi ) 6.6.1
4.000 Bh Genteng bubung plentho@ Rp
8.000 Kg Semen portland
@ Rp
0.032 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.6.2

45,310.00
45,310.00

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

11 1 m2 Pasang genteng bubungan bambe / good year / Jatiwangi type Alto.Kw 1.


Bahan An. SNI ( Revisi ) 6.4.1
5.000 Bh Genteng bubung good ye@ Rp
4,370.00 = Rp
8.000 Kg Semen portland
@ Rp
829.84 = Rp
0.032 m3 Pasir pasang
@ Rp
90,684.40 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang kayu
@ Rp
44,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.002 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
12 1 m2 Pasang genteng bubungan Galazur ex Kanmuri / KIA.
Bahan An. SNI ( Revisi ) 6.4.1
5.000 Bh Genteng bubung good ye@ Rp
8,740.00
8.000 Kg Semen portland
@ Rp
829.84
0.032 m3 Pasir pasang
@ Rp
90,684.40
Sub total :
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja
@ Rp
32,750.00
0.200 Oh Tukang kayu
@ Rp
44,000.00
0.020 Oh Kepala tukang
@ Rp
44,000.00
0.002 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
13 1 m2 Pasang atap genteng beton
Bahan An. SNI ( Revisi ) 6.30.1
11.000 Bh Genteng beton
0.030 Kg Paku biasa 2" - 5"

@ Rp
@ Rp

Upah An. SNI ( Revisi ) 6.30.2


0.200 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.010 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

43,700.00
6,638.72
2,901.90
53,240.62

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

13,100.00
8,800.00
880.00
110.00
22,890.00
76,130.62

5,032.40 = Rp
9,779.60 = Rp
Sub total :
= Rp

55,356.40
293.39
55,649.79

32,750.00
44,000.00
55,000.00
2,750.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
4,400.00
550.00
27.50
11,527.50
67,177.29
Halaman : 73

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

7,500.00
9,779.60
829.84
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,250.00
488.98
8,962.27
2,901.90
1,725.00
40,328.15

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

13,100.00
8,800.00
880.00
1,100.00
23,880.00
64,208.15

Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
15 1 m2 Pasang atap asbes gelombang besar.
Bahan An. SNI ( Revisi ) 6.8.1

13,100.00
8,800.00
880.00
110.00
22,890.00
54,280.62

Rp
Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.34.2


0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.020 Oh Mandor

21,850.00
6,638.72
2,901.90
31,390.62

=
=
=
=

Sub total :
Total upah+bahan :

14 1 m' Pasang nok genteng beton


Bahan An. SNI ( Revisi ) 6.34.1
3.500 Bh Nok genteng beton
0.050 Kg Paku biasa 2" - 5"
10.800 Kg Semen abu-abu
0.032 m3 Pasir pasang
0.250 Kg Semen warna

13,100.00
8,800.00
880.00
110.00
22,890.00
65,430.62

1.200 M2 Asbes glmbg


@ Rp
0.120 Kg Paku pancing 60 x 230 @ Rp
Upah An. SNI ( Revisi ) 6.8.2
0.140 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala tukang
0.008 Oh Mandor

29,090.40 = Rp
15,985.00 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,585.00
3,300.00
352.00
440.00
8,677.00
45,503.68

19,991.60 = Rp
15,985.00 = Rp
Sub total :
= Rp

23,989.92
1,918.20
25,908.12

Sub total :
Total upah+bahan :
16 1 m2 Pasang atap asbes gelombang kecil.
Bahan An. SNI ( Revisi ) 6.9.1
1.200 M2 Asbes glmbg
@ Rp
0.120 Kg Paku pancing 60 x 230 @ Rp
Upah An. SNI ( Revisi ) 6.9.2
0.140 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,585.00
3,300.00
352.00
440.00
8,677.00
34,585.12

63,093.60 = Rp
50.00 = Rp
Sub total :
= Rp

63,093.60
200.00
63,293.60

Sub total :
Total upah+bahan :
17 1 m1 Pasang BUBUNGAN asbes gelombang besar
Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Nok asbes gel.besar@ Rp
4.000 Bh skrup kayu/paku pa @ Rp
Upah An. SNI ( Revisi ) 6.9.2
0 Oh Pekerja
0 Oh Tukang kayu
0 Oh Kepala tukang
0 Oh Mandor

=
=
=
=
=
=

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

163.75
4,840.00
88.00
825.00
5,916.75
69,210.35
Halaman : 74

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

18 1 m1 Pasang BUBUNGAN asbes gelombang kecil..


Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Nok asbes gel.besar@ Rp
4.000 Bh skrup kayu/paku pa @ Rp
Upah An. SNI ( Revisi ) 6.9.2
0 Oh Pekerja
0 Oh Tukang kayu
0 Oh Kepala tukang
0 Oh Mandor

34,908.48
1,918.20
36,826.68

48,438.00 = Rp
50.00 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :
19 1 m2 Pasang atap seng Galvalum type DJLS 45 Warna
Bahan An. SNI
1 M2 1 M! SENG GALVALUM
103,224.00
( Lebar efektif 73 Cm.) @ Rp
4.000 Bh Paku rifet
@ Rp
300.00
Sub total :
Upah An. SNI
@ Rp
32,750.00
0 Oh Pekerja
@ Rp
44,000.00
0 Oh Tukang kayu
@ Rp
55,000.00
0 Oh Mandor
1 Ls Biaya mekanik/pera @ Rp
2,650.00
Sub total :
Total upah+bahan :
20 1 m2 Pasang atap seng Galvalum type DJLS 45 Warna
Bahan An. SNI

=
=
=
=
=
=

48,438.00
200.00
48,638.00

Rp
Rp
Rp
Rp
Rp
Rp

163.75
4,840.00
88.00
825.00
5,916.75
54,554.75

= Rp
= Rp
= Rp

141,416.88
1,200.00
142,616.88

= Rp
= Rp
= Rp
Rp
= Rp
= Rp

687.75
484.00
220.00
2,650.00
4,041.75
146,658.63

1 M2 1 M! SENG GALVALUM
( Lebar efektif 73 Cm.) @ Rp
4.000 Bh Paku rifet
@ Rp

59,800.00 = Rp
300.00 = Rp
Sub total :
= Rp

81,926.00
1,200.00
83,126.00

32,750.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
2,650.00
Rp
Sub total :
= Rp
Total upah+bahan :
= Rp

687.75
484.00
220.00
2,650.00
4,041.75
87,167.75

Upah An. SNI


@ Rp
0 Oh Pekerja
@ Rp
0 Oh Tukang kayu
@ Rp
0 Oh Mandor
1 Ls Biaya mekanik/pera @ Rp

21 1 m2 Pasang atap POLYCARBONAT.


Bahan An. SNI
1 m2 Polycarbonat warna@ Rp
4.000 Bh Paku rifet
@ Rp

100,000.00
Rp
300.00 = Rp
Sub total :
= Rp

115,000.00
1,200.00
116,200.00

32,750.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
2,750.00
Rp
Sub total :
= Rp
Total upah+bahan :
= Rp

687.75
484.00
220.00
2,750.00
4,141.75
120,341.75

Upah An. SNI


@ Rp
0 Oh Pekerja
@ Rp
0 Oh Tukang PASANG
@ Rp
0 Oh Mandor
1 Ls Biaya mekanik/pera @ Rp

Halaman : 75

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

22 1 m2 Pasang atap sirap


Bahan An. SNI ( Revisi ) 6.33.1
60.000 Bh Genteng sirap
0.200 Kg Paku biasa 1/2" - 1"
Upah An. SNI ( Revisi ) 6.33.2
0.166 Oh Pekerja
0.250 Oh Tukang kayu
0.025 Oh Kepala tukang
0.008 Oh Mandor

@ Rp
@ Rp

0.00 = Rp
9,779.60 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,436.50
11,000.00
1,100.00
440.00
17,976.50
19,932.42

78,660.00
9,779.60
9,779.60
3,946,800.00
Sub total :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

31,464.00
586.78
488.98
15,787.20
48,326.96

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,093.75
11,000.00
1,100.00
330.00
16,523.75
64,850.71

78,660.00 = Rp
9,779.60 = Rp
Sub total :
= Rp

55,062.00
195.59
55,257.59

Sub total :
Total upah+bahan :
23 1 m' Pasang nok sirap
Bahan An. SNI ( Revisi ) 6.37.1
0.400 Lbr Seng plat 3" x 6" bjls 28 @ Rp
0.060 Kg Paku biasa 1/2" - 1"
@ Rp
0.050 Kg Paku biasa 2" - 5"
@ Rp
0.004 m3 Kayu borneo, papan teb @ Rp
Upah An. SNI ( Revisi ) 6.37.2
0.125 Oh Pekerja
0.250 Oh Tukang kayu
0.025 Oh Kepala tukang
0.006 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

24 1 m2 Pasang atap seng gelombang BJLS 28


Bahan An. SNI ( Revisi ) 6.38.1
0.700 Lbr Seng glmbg 3" x 6" bjls @ Rp
0.020 Kg Paku biasa 1/2" - 1"
@ Rp
Upah An. SNI ( Revisi ) 6.38.2
0.120 Oh Pekerja
0.060 Oh Tukang kayu
0.006 Oh Kepala tukang
0.006 Oh Mandor

0.00
1,955.92
1,955.92

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,930.00
2,640.00
264.00
330.00
7,164.00
62,421.59

25 1 m2 Pasang atap nok seng BJLS 28


Bahan An. SNI ( Revisi ) 6.39.1
0.300 Lbr Seng plat 3" x 6" bjls 28 @ Rp
0.040 Kg Paku biasa 1/2" - 1"
@ Rp
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja
0.070 Oh Tukang kayu
0.008 Oh Kepala tukang
0.006 Oh Mandor

78,660.00 = Rp
9,779.60 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26 1 m2 Pasang atap seng gelombang BJLS 30


Bahan An. SNI ( Revisi ) 6.38.1
0.700 Lbr Seng glmbg 3" x 6" bjls @ Rp
0.020 Kg Paku biasa 1/2" - 1"
@ Rp

64,400.00 = Rp
78,660.00 = Rp
Sub total :
= Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

27 1 m2 Pasang atap nok seng BJLS 30


Bahan An. SNI ( Revisi ) 6.39.1
0.300 Lbr Seng plat 3" x 6" bjls 28 @ Rp
0.040 Kg Paku biasa 1/2" - 1"
@ Rp

3,930.00
2,640.00
264.00
330.00
7,164.00
53,817.20

64,400.00 = Rp
78,660.00 = Rp
Sub total :
= Rp

19,320.00
3,146.40
22,466.40

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

45,080.00
1,573.20
46,653.20

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

Upah An. SNI ( Revisi ) 6.39.2


0.150 Oh Pekerja
0.070 Oh Tukang kayu
0.008 Oh Kepala tukang
0.006 Oh Mandor

4,912.50
3,080.00
352.00
330.00
8,674.50
32,663.68
Halaman : 76

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.38.2


0.120 Oh Pekerja
0.060 Oh Tukang kayu
0.006 Oh Kepala tukang
0.006 Oh Mandor

23,598.00
391.18
23,989.18

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
3,080.00
352.00
330.00
8,674.50
31,140.90

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Halaman : 77

19

10

PEKERJAAN BESI & ALUMINIUM


1. 1 Kg Pasang rangka atap baja
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Kg Besi profil WF
0.080 Kg Meni besi

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.1.2


1
0.006 Oh Pekerja
6
0.060 Oh Tukang besi
1
0.006 Oh Kepala tukang
0
0.0003 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

10,530.00 =
12,420.00 =
=

Rp
Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

275,000.00 =
=

Rp
Rp

Sub total :
Total upah+bahan :
2. 1 m2 Pasang pintu besi baja
Bahan An. SNI ( Revisi ) 6.2.1
1.000 m2 Pintu besi baja

@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.2.2


0.650 Oh Tukang besi
0.650 Oh Pekerja
0.065 Oh Kepala tukang
0.032 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

42,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

265,000.00 =
=

Rp
Rp

Sub total :
Total upah+bahan :
3. 1 m2 Pasang jendela besi
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m2 Jendela besi

@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.3.2


1.050 Oh Tukang besi
1.050 Oh Pekerja
0.105 Oh Kepala tukang
0.00525 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

42,000.00
32,750.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,750.00 =
=

Rp
Rp

42,000.00
32,750.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :
4

1 m2 Pasang teraliS besi


Bahan An. SNI ( Revisi ) 6.12.1
11.500 m' Besi strip 2 x 3

@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.12.2


1.200 Oh Tukang las
1.200 Oh Pekerja
0.012 Oh Kepala tukang
0.0006 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

1 m2 Pasang kawat harmonika


Bahan An. SNI ( Revisi ) 6.13.1
1.100 m2 Kawat harmonika
0.020 Kg Paku biasa 1/2" - 1"
0.0018 m3 Kayu kamper, reng

@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

19,044.00 =
9,779.60 =
3,499,526.36 =

Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Sub total :
Upah An. SNI ( Revisi ) 6.13.2
0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

32,750.00
44,000.00
44,000.00
55,000.00

Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1 m2 Pasang kawat nyamuk


Bahan An. SNI ( Revisi ) 6.14.1
1.100 m2 Kawat nyamuk
0.020 Kg Paku biasa 1/2" - 1"
0.0018 m3 Kayu kamper, reng

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.14.2


0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,181.00 =
9,779.60 =
3,499,526.36 =
=

Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,675.00 =
9,779.60 =
3,499,526.36 =
=

Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :
7

1 m2 Pasang kawat kassa / kawat burung.


Bahan An. SNI ( Revisi ) 6.15.1
1.100 m2 Kawat kassa
0.020 Kg Paku biasa 1/2" - 1"
0.0018 m3 Kayu kamper, reng

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.15.2


0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

1 m2 Pasang pagar kawat dari besi siku tinggi 1,5 m dan panjang 3m tidak termasuk pondasi setempat.
Bahan
@ Rp.
15,686.00 =
Rp
12 m1 m' besi L 40 . 40 . 5
@ Rp.
6,808.00 =
Rp
34 m1 m'kawat duri
Sub total :
= Rp
Upah Pekerjaan mengelas diperhitungkan.
Ongkos kerja diperhitungkan
Sub total :
Total upah+bahan :
Harga per M2 pagar kawat :=

=
=
=
=
=
=

1 m2 Pasang pagar besi tralis dengan besi beton diameter 16 mm.


Bahan
11 m1 btg.besi beton panjang 1 m @ Rp.
Plat pengikat diperhitungkan
Baja Cor / mainan diperhitungkan

=
=
=

Rp
Rp
Rp
Rp

254,457.60 :

10,350.00 =

Rp

Sub total :

Rp
Rp

Sub total :
Total upah+bahan :

=
=
=

Rp
Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah Pekerjaan mengelas diperhitungkan.


Ongkos kerja diperhitungkan

11 1 m2 Pintu Rolling bahan dari Aluminium.


Bahan
1 M2 Pintu dari aluminium

@ Rp.
Sub total :

255,000.00 =
=

Sub total :
Total upah+bahan :

=
=

Upah Biaya pasang / Upah diperhitungkan.

12 1 m2 Pintu Rolling bahan dari plat besi / steel.


Bahan
1 M2 Pintu dari aluminium

@ Rp.
Sub total :

240,488.00 =
=

Sub total :

Upah Biaya pasang / Upah diperhitungkan.

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Total upah+bahan :
13 1 m2 Pintu Besi B.R.C.
Bahan
1 M2 pagar besi BRC.

@ Rp.
Sub total :

Upah Biaya pasang / Upah diperhitungkan.


Biaya transfotasi (relatif) jarak
jauh dekatnya.

Rp

240,488.00 =
=
=

Rp
Rp
Rp

=
=
=

Rp
Rp
Rp

Sub total :
Total upah+bahan :
14 1 m2 Pagar Besi B.R.C.
Bahan

@ Rp.
1 M2 pagar besi BRC.
1 M2 Rangka besi besi pintu diameter 2 incs.

240,488.00 =
Sub total :

Rp

=
=

Rp
Rp

=
=
=

Rp
Rp
Rp

44,640.00 =
=

Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

55,680.00 =
=

Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

Upah Biaya pasang / Upah diperhitungkan.


Biaya transfotasi (relatif) jarak
jauh dekatnya.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN KUSEN ALUMINIUM.


15 1 M' Pasang kusen aluminium 3" putih. (Silver)
Bahan An. SNI ( Revisi ) 6.12.1
1 M1 Aluminium putih 3".

@ Rp.
Sub total :

Upah

0.104
0.104
0.001
0.0001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

16 1 M' Pasang kusen aluminium 4" putih. (Silver)


Bahan An. SNI ( Revisi ) 6.12.1
1 M1 Aluminium putih 4".

@ Rp.
Sub total :

Upah

0.104
0.104
0.001
0.0001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

17 1 M' Pasang kusen aluminium 3" coklat. (Brown)


Bahan An. SNI ( Revisi ) 6.12.1

=
=
=
=
=
=

1 M1 Aluminium coklat/ brown 3".

@ Rp.
Sub total :

Upah

0.104
0.104
0.001
0.0001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

47,040.00 =
=

Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

59,040.00 =
=

Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

44,640.00 =
2,400.00
15,410.00
58,420.00
56,396.00
119,600.00
7,500.00
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

18 1 M' Pasang kusen aluminium 4" coklat. (Brown)


Bahan An. SNI ( Revisi ) 6.12.1
1 M1 Aluminium coklat/ brown 3".

@ Rp.
Sub total :

Upah

0.104
0.104
0.001
0.0001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19 1 Bh. Pasang pintu aluminium 2,75" putih ( Silver) UKURAN 0.80 X 2.00 Mtr.
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan An. SNI ( Revisi ) 6.9.1
6 M1 Slimar Aluminium putih 2.75" @ Rp.
15 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel.
@ Rp.
1 Bh Kunci
@ Rp.
1 M2 Kaca bening 5 mm
@ Rp.
1 M2 Multipleks 9 mm
1 Ls Paku Skrup
@ Rp.
Sub total :
koefisen tenaga ditambah 35 % dari anlisa untuk 1 M2 pembuatan pintu aluminium.
Upah
1.418 Oh Pekerja
@ Rp.
1.418 Oh Tukang besi
@ Rp.
0.142 Oh Kepala tukang besi
@ Rp.
0.0070 Oh Mandor
@ Rp.
Sub total :
Total upah+bahan :

32,750.00
44,000.00
44,000.00
55,000.00

20 1 Bh. Pasang pintu aluminium 2,75" coklat ( Brown) UKURAN 0.80 X 2.00 Mtr.
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan An. SNI ( Revisi ) 6.9.1
47,040.00
6 M1 Slimar Aluminium coklat 2.75" @ Rp.
2,400.00
15 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
13,800.00
1 set Engsel.
@ Rp.
58,420.00
1 Bh Kunci
@ Rp.
56,396.00
1 M2 Kaca bening 5 mm
@ Rp.
119,600.00
1 M2 Multipleks 9 mm
1 Ls Paku Skrup
@ Rp.
7,500.00
Sub total :
koefisen tenaga ditambah 30 % dari anlisa untuk 1 M2 pembuatan pintu aluminium karena
pintu ini ukuran 80 x 200 Cm.dan ada ambang tengah.
Upah
1.418 Oh Pekerja
@ Rp.
32,750.00
1.418 Oh Tukang besi
@ Rp.
44,000.00
0.142 Oh Kepala tukang besi
@ Rp.
44,000.00
0.0070 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
21 1M2 Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Bahan An. SNI ( Revisi ) 6.3.1


5 M1 Slimar Aluminium putih 2"
9 M1 Karet penjepit kaca/ tripleks.
1 set Engsel jendela.
1 Bh Hak window .
1 M2 Kaca bening 5 mm

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,640.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

44,640.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

44,640.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

47,040.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

22 1Bh Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 0.50 X 0.60 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
@ Rp.
2 M1 Slimar Aluminium putih 2"
4 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel jendela.
@ Rp.
1 Bh Hak window .
@ Rp.
0 M2 Kaca bening 5 mm
Sub total :
Upah

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

23 1Bh Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 0.50 X 0.50 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
@ Rp.
2 M1 Slimar Aluminium putih 2"
4 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel jendela.
@ Rp.
1 Bh Hak window .
@ Rp.
0 M2 Kaca bening 5 mm
Sub total :
Upah

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

24 1M2 Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
@ Rp.
5 M1 Slimar Aluminium coklat 2"
9 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel jendela.
@ Rp.
1 Bh Hak window .
@ Rp.
1 M2 Kaca bening 5 mm
Sub total :
Upah

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

25 1Bh Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 50 X 60 Cm.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
@ Rp.
2 M1 Slimar Aluminium coklat 2"
4 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel jendela.
@ Rp.
1 Bh Hak window .
@ Rp.
0 M2 Kaca bening 5 mm
Sub total :

47,040.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
42,000.00
42,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26 1Bh. Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 50 X 50 Cm.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
@ Rp.
2 M1 Slimar Aluminium coklat 2"
4 M1 Karet penjepit kaca/ tripleks. @ Rp.
@ Rp.
1 set Engsel jendela.
@ Rp.
1 Bh Hak window .
@ Rp.
0 M2 Kaca bening 5 mm
Sub total :

47,040.00 =
2,400.00
7,562.40
11,500.00
56,396.00
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
42,000.00
42,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

Upah

Upah

1.050
1.050
0.105
0.0052

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN TALANG SENG ; KARET & PVC.


19 1 m' Pasang talang datar, seng bjls 28
Bahan An. SNI ( Revisi ) 6.18.1
0.500 Lbr Seng plat 3' x 6' bjls 28
0.015 Kg Paku biasa 1/2" - 1"
0.0096 m3 Kayu borneo, papan

@ Rp.
@ Rp.
@ Rp.

8,602.00 =
10,478.80 =
3,818,000.00 =

Rp
Rp
Rp

Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja
0.400 Oh Tukang kayu
0.025 Oh Kepala tukang
0.00125 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

20

Analog - talang karet per m' + papan= 70 % talang seng

21 1 m' Pasang talang miring / jurai seng bjls 28


Bahan An. SNI ( Revisi ) 6.19.1
0.500 Lbr Seng plat 3' x 6' bjls 28
0.015 Kg Paku biasa 1/2" - 1"
0.019 m3 Kayu borneo, papan

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.19.2


0.040 Oh Pekerja
0.400 Oh Tukang kayu
0.025 Oh Kepala tukang
0.00125 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :
Upah An. SNI ( Revisi ) 6.20.2
0.150 Oh Pekerja
0.250 Oh Tukang kayu
0.025 Oh Kepala tukang
0.00125 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

78,660.00 =
32,750.00 =
6,500.00 =
=

Rp
Rp
Rp
Rp

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

77,740.00
6,500.00
3,750.00
2,750.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Upah

=
=
=
=
=
=

78,660.00 =
32,750.00 =
3,818,000.00 =
=

Sub total :
Total upah+bahan :
13 1 m' Pasang talang dari PVC diameter 3".
Bahan
0 Ljr lonjor PVC diameter 3"
1 Bh Knie 3"
0 Bh tube lem pvc
1 Bh buah klem + 2 paku beton

Rp

== Rp :

Sub total :
Total upah+bahan :
22 1 m' Pasang talang 1/2 lingkaran 10 cm, seng bjls 28
Bahan An. SNI ( Revisi ) 6.20.1
0.300 Lbr Seng plat 3' x 6' bjls 28
@ Rp.
0.100 Kg Paku biasa 1/2" - 1"
@ Rp.
0.500 Kg Besi strip
@ Rp.

LUMSUM
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

14 1 m' Pasang talang dari PVC diameter 4".


Bahan
0 Ljr lonjor PVC diameter 3"
1 Bh Knie 3"
0 Bh tube lem pvc
1 Bh buah klem + 2 paku beton

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,500.00 =
=

Rp
Rp

77,740.00
6,500.00
3,750.00
2,750.00

=
=
=
=
=

LUMSUM
Total upah+bahan :

PEKERJAAN PENGECATAN
Pemersihan Cat

1. 1 m2 Mengikis/mengerok permukaan cat tembok lama


Bahan An. SNI ( Revisi ) 6.1.1
0.050 Kg Soda api
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.1.2

0.150
0
0
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,750.00 =
=

Rp
Rp

Sub total :
Total upah+bahan :
2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
Bahan An. SNI ( Revisi ) 6.2.1
0.050 Kg S a b u n
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja
0 Oh Tukang cat
0 Oh Kepala tukang
0.0025 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,750.00 =
=

Rp
Rp

Sub total :
Total upah+bahan :
3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Bahan An. SNI ( Revisi ) 6.3.1
0.050 Kg S a b u n
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
@ Rp.
0 Oh Tukang cat
@ Rp.
0 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
Sub total :
Total upah+bahan :
4. 1 m2 Menyabun permukaan tembok lama
Bahan An. SNI ( Revisi ) 6.4.1
0.050 Kg S a b u n

@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.4.2


0.150 Oh Pekerja

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,750.00 =
=

Rp
Rp

@ Rp.

32,750.00 =

Rp

@ Rp.
@ Rp.
@ Rp.

44,000.00 =
44,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0 Oh Tukang cat
0 Oh Kepala tukang
0.0025 Oh Mandor

Sub total :
Total upah+bahan :

5. 1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting )
dengan tingkat kebersihan Sa 2.5%
Bahan UNTUK 10 m2 'An. SNI ( Revisi ) 6.5.1
40.000 Kg Pasir silika
@ Rp.
25.00
10.000 Ltr B B M
@ Rp.
3,250.00
Sub total :
Alat An. SNI ( Revisi ) 6.5.2 PER 10 M2.
Sewa / hari
Kompressor, blasting pot,
@ Rp.
250,000.00
selang dan nozle
Sub total :
Upah An. SNI ( Revisi ) 6.5.3
1.600 Oh Pekerja
@ Rp.
32,750.00
1.600 Oh Tukang cat
@ Rp.
44,000.00
0.800 Oh Kepala tukang
@ Rp.
44,000.00
0.500 Oh Mandor
@ Rp.
55,000.00
Sub total :
Untuk 10 M2 Total upah+bahan :
Untuk 1 M2
6. 1 m2 Mendempul dan menggosok kayu
Bahan An. SNI ( Revisi ) 6.6.1 Per 10M2
0.080 Kg Dempul jati

@ Rp.

=
=
=

Rp
Rp
Rp

Rp

Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Rp

19,200.40 =

Rp

0.020 Lt Minyak cat


0.010 Kg Batu apung

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.6.2


0.040 Oh Pekerja
0.040 Oh Tukang cat
0.004 Oh Kepala tukang
0.0025 Oh Mandor
.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,888.00 =
2,500.00 =
=
32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

10,351.84 =
32,117.20 =
46,432.40 =
=

Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,420.00
10,351.84
32,117.20
46,432.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,420.00
10,351.84
32,117.20
46,432.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

35,420.00 =
=

Rp
Rp

32,750.00 =
44,000.00 =

Rp
Rp

Sub total :
Total upah+bahan :

Cat KAYU
7. 1 m2 Pengecatan bidang kayu lama
Bahan An. SNI ( Revisi ) 6.7.1
0.150 Kg Plamir
0.170 Kg Cat dasar
0.170 Kg Cat penutup
Upah An. SNI ( Revisi ) 6.7.2
0.070 Oh Pekerja
0.075 Oh Tukang cat
0.0075 Oh Kepala tukang
0.0025 Oh Mandor
.

@ Rp.
@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

8. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 2x cat penutup )


Bahan An. SNI ( Revisi ) 6.8.1
0.200 Kg Cat meni
@ Rp.
0.150 Kg Plamir
@ Rp.
0.170 Kg Cat dasar
@ Rp.
0.260 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja
@ Rp.
0.009 Oh Tukang cat
@ Rp.
0.0060 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
9. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 3x cat penutup )
Bahan An. SNI ( Revisi ) 6.9.1
0.200 Kg Cat meni
@ Rp.
0.150 Kg Plamir
@ Rp.
0.170 Kg Cat dasar
@ Rp.
0.350 Kg Cat penutup 3 x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja
@ Rp.
0.014 Oh Tukang cat
@ Rp.
0.0040 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :

POLITUR , TEAK OIL , PENGETIRAN


10. 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan An. SNI ( Revisi ) 6.10.1
0.360 Ltr Teak oil

@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.10.2


0.040 Oh Pekerja
0.063 Oh Tukang cat

@ Rp.
@ Rp.

0.0630 Oh Kepala tukang


0.0025 Oh Mandor

@ Rp.
@ Rp.

44,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp

35,420.00 =
35,420.00 =
2,250.00 =
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.

32,750.00 =
44,000.00 =
44,000.00 =

Rp
Rp
Rp

@ Rp.

55,000.00 =
=
=

Rp
Rp
Rp

39,100.00
13,340.00
19,200.40
2,500.00
4,000.00
750.00
Sub total : A

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sub total : B

35,420.00 =
44,000.00 =
=

Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,636.00 =
=

Rp
Rp

Sub total :
Total upah+bahan :

11. 1 m2 Pelaburan bidang kayu dengan politur ( TAK MENGKILAP)


Bahan An. SNI ( Revisi ) 6.11.1
0.150 Ltr Politur
@ Rp.
0.372 Ltr Politur jadi
@ Rp.
2.000 Lbr Ampelas
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.11.2
0.000 Oh Pekerja
0.060 Oh Tukang cat
0.0160 Oh Kepala tukang
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.0025 Oh Mandor
.

Sub total :
Total upah+bahan :

12 10 m2 Pemelituran dengan serlag. ( SAMPAI MENGKILAP)


Bahan Politur dengan serlag mencampur sendiri.
@ Rp.
2 Kg Serlag
@ Rp.
1 Ltr Spirtus.
@ Rp.
1 Kg Dempul
@ Rp.
2 Kg Batu kambang
@ Rp.
2 Lbr Kertas gosok.
@ Rp.
2 Lbr Kain pop
Upah Menggosok dan mendempul
0 Oh Tukang politur
0 Oh Kepala tukangTukang cat

Upah Memlitur sampai mengkilap.


2.500 Oh Pekerja
3.000 Oh Tukang politur
0.300 Oh Kepala tukangTukang cat
0.400 Oh Mandor

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total : C
Untuk 10 M2 Total upah+bahan :
Untuk 1 M2 Total upah+bahan :
13 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Ltr Residu atau ter
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.12.2
0.100 Oh Pekerja
0.000 Oh Tukang cat
0.0000 Oh Kepala tukang
0.0060 Oh Mandor
.

14 1 m2 Pelaburan bidang kayu dengan vernis


Bahan An. SNI ( Revisi ) 6.13.1
0.150 Ltr Vernis
0.050 Kg Dempul
0.100 Lbr Ampelas
0.010 Bh Kuas

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

41,593.20
19,200.40
4,000.00
4,500.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=

Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.13.2


0.160 Oh Pekerja
0.160 Oh Tukang cat
0.0160 Oh Kepala tukang
0.0025 Oh Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :
Total upah+bahan :

=
=

Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Cat TEMBOK

Cat BARU.
14. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp.
0.250 Lbr Ampelas
@ Rp.
0.020 Bh Kuwas / roll
@ Rp.
0.100 Kg Cat dasar
@ Rp.
0.260 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp.
0.063 Oh Tukang cat
@ Rp.
0.0063 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
15 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp.
0.250 Lbr Ampelas
@ Rp.
0.020 Bh Kuwas / roll
@ Rp.
0.100 Kg Cat dasar
@ Rp.
0.260 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp.
0.063 Oh Tukang cat
@ Rp.
0.0063 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
16 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp.
0.250 Lbr Ampelas
@ Rp.
0.020 Bh Kuwas / roll
@ Rp.
0.100 Kg Cat dasar
@ Rp.
0.260 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp.
0.063 Oh Tukang cat
@ Rp.
0.0063 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
Cat LAMA.
17 1 m2 Pengecatan tembok lama ( Ngamplas, 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.010 Kg Plamir
@ Rp.
0.120 Lbr Ampelas
@ Rp.

Cat Paragon /Decolith


9,196.00
4,000.00
6,500.00
20,447.00
20,447.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Cat I.C.I. Catilac


9,196.00
4,000.00
6,500.00
31,924.00
31,924.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Watershild
9,196.00
4,000.00
6,500.00
54,648.00
54,648.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Cat Paragon /Decolith


9,196.00 =
4,000.00 =

Rp
Rp

6,500.00 =
20,447.00 =
20,447.00 =
=

Rp
Rp
Rp
Rp

32,750.00 =
44,000.00 =

Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.033 Bh Kuwas / roll


0.110 Kg Cat dasar
0.220 Kg Cat penutup 2x

@ Rp.
@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.14.2


0.028 Oh Pekerja
0.042 Oh Tukang cat

@ Rp.
@ Rp.

0.0042 Oh Kepala tukang


0.0025 Oh Mandor
.

@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

18 1 m2 Pengecatan tembok lama ( Ngamplas, 1x cat dasar, 2x cat penutup )


Bahan An. SNI ( Revisi ) 6.14.1
0.010 Kg Plamir
@ Rp.
0.120 Lbr Ampelas
@ Rp.
0.033 Bh Kuwas / roll
@ Rp.
0.110 Kg Cat dasar
@ Rp.
0.220 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.028 Oh Pekerja
@ Rp.
0.042 Oh Tukang cat
@ Rp.
0.0042 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
19 1 m2 Pengecatan tembok lama ( Ngamplas, 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.010 Kg Plamir
@ Rp.
0.120 Lbr Ampelas
@ Rp.
0.033 Bh Kuwas / roll
@ Rp.
0.110 Kg Cat dasar
@ Rp.
0.220 Kg Cat penutup 2x
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.028 Oh Pekerja
@ Rp.
0.042 Oh Tukang cat
@ Rp.
0.0042 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
20 1 m2 Melabur tembok dengan kapur sirih
Bahan An. SNI ( Revisi ) 6.17.1
0.100 Lbr Ampelas
0.250 Ikt Alang-alang
0.002 Bh Andang andang
0.150 Kg Kapur sirih

@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,000.00 =
55,000.00 =
=
=

Cat I.C.I. Catilac


9,196.00
4,000.00
6,500.00
31,924.00
31,924.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Watershild
9,196.00
4,000.00
6,500.00
54,648.00
54,648.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,000.00
750.00
300,000.00
552.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Sub total :
Upah An. SNI ( Revisi ) 6.17.2
0.150 Oh Pekerja
0.001 Oh Tukang cat
0.0001 Oh Kepala tukang

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.

32,750.00 =
44,000.00 =
44,000.00 =

Rp
Rp
Rp

@ Rp.

55,000.00 =
=
=

Rp
Rp
Rp

300,000.00 =
552.00 =
=

Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.0025 Oh Mandor
.

Sub total :
Total upah+bahan :

21 1 m2 Melabur tembok lama dengan kapur sirih ( untuk pemeliharaan )


Bahan An. SNI ( Revisi ) 6.18.1
0.002 m3 Andang andang
@ Rp.
0.300 Kg Kapur sirih
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.040 Oh Pekerja
@ Rp.
0.005 Oh Tukang cat
@ Rp.
0.0005 Oh Kepala tukang
@ Rp.
0.0025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
22 1 m2 Pemasangan wallpaper
Bahan An. SNI ( Revisi ) 6.19.1

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1.200 m2 Wall paper


0.200 Kg Perekat

@ Rp.
@ Rp.
Sub total :

Upah An. SNI ( Revisi ) 6.19.2


0.020 Oh Pekerja
0.200 Oh Tukang cat
0.0020 Oh Kepala tukang
0.0025 Oh Mandor
.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,420.00 =
6,500.00 =
=

Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,420.00 =
6,500.00 =
750,000.00 =
=

Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

24 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah


Bahan An. SNI ( Revisi ) 6.21.1
0.100 Kg Meni besi
@ Rp.
0.010 Bh Kuas
@ Rp.
0.002 m3 Perancah kayu
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.21.2
0.030 Oh Pekerja
0.300 Oh Tukang cat
0.030 Oh Kepala tukang
0.015 Oh Mandor
.

Rp
Rp
Rp

Sub total :
Total upah+bahan :

23 1 m2 Pengecatan permukaan baja dengan meni besi


Bahan An. SNI ( Revisi ) 6.20.1
0.100 Kg Meni besi
@ Rp.
0.020 Bh Kuas
@ Rp.
Upah An. SNI ( Revisi ) 6.20.2
0.020 Oh Pekerja
0.200 Oh Tukang cat
0.0200 Oh Kepala tukang
0.0100 Oh Mandor
.

45,000.00 =
8,625.00 =
=

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,420.00
15,250.00
6,500.00
22,500.00
26,250.00
5,888.00
300,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

46,432.40 =
6,500.00 =
=

Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

25 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual


sistem 4 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.22.1
0.100 Kg Meni ( read lead ) A
@ Rp.
0.100 Kg Meni ( read lead ) B
@ Rp.
0.010 Bh Kuas
@ Rp.
0.040 Kg Alluminium C
@ Rp.
0.040 Kg Alluminium B
@ Rp.
0.010 Ltr Pengencer
@ Rp.
0.002 m3 Andang andang
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.22.2
0.040 Oh Pekerja
@ Rp.
0.500 Oh Tukang cat
@ Rp.
0.050 Oh Kepala tukang
@ Rp.
0.025 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :
26 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.23.1
0.300 Kg C a t
@ Rp.
0.010 Bh Kuas
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.23.2
0.020 Oh Pekerja
@ Rp.
0.200 Oh Tukang cat
@ Rp.
0.002 Oh Kepala tukang
@ Rp.
0.003 Oh Mandor
@ Rp.

=
=
=
=

Sub total :
Total upah+bahan :

=
=

Rp
Rp

46,432.40
46,432.40
6,500.00
46,432.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

28 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara semprot ( airless spray )
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.25.1
0.300 Kg Cat dasar
@ Rp.
46,432.40 =
Peralatan Lumsum
=
Sub total :
=

Rp
Rp
Rp

27 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual


sistem 3 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.24.1
0.110 Kg Cat dasar
@ Rp.
0.170 Kg Cat antara
@ Rp.
0.010 Bh Kuas
@ Rp.
0.080 Kg Cat penutup
@ Rp.
Sub total :
Upah An. SNI ( Revisi ) 6.24.2
0.040 Oh Pekerja
@ Rp.
0.400 Oh Tukang cat
@ Rp.
0.004 Oh Kepala tukang
@ Rp.
0.005 Oh Mandor
@ Rp.
.
Sub total :
Total upah+bahan :

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.25.2


0.020 Oh Pekerja
0.200 Oh Tukang cat
0.020 Oh Kepala tukang
0.010 Oh Mandor
.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

12

11,583.00
993.60
12,576.60
196.50
2,520.00
264.00
16.50
2,997.00
15,573.60

275,000.00
275,000.00
27,300.00
21,287.50
2,860.00
1,760.00
53,207.50
328,207.50

265,000.00
265,000.00
44,100.00
34,387.50
4,620.00
288.75
83,396.25
348,396.25

192,625.00
192,625.00
50,400.00
39,300.00
528.00
33.00
90,261.00
282,886.00

20,948.40
195.59
6,299.15
Halaman : 78
27,443.14
3,275.00
4,400.00
440.00
27.50
8,142.50
35,585.64

18,899.10
195.59
6,299.15
25,393.84
3,275.00
4,400.00
440.00
27.50
8,142.50
33,536.34

17,242.50
195.59
6,299.15
23,737.24
3,275.00
4,400.00
440.00
27.50
8,142.50
31,879.74

181,957.60
231,472.00
413,429.60
27,500.00
45,000.00
72,500.00
254,457.60
56,546.13

113,850.00
70,000.00
95,000.00
278,850.00
Halaman : 79
85,000.00
65,000.00
65,000.00
343,850.00

293,250.00
293,250.00
52,500.00
52,500.00
345,750.00

255,000.00 harga
52,500.00 upah

276,561.20
276,561.20
25,000.00
25,000.00

235,000.00 harga
52,500.00 upah

301,561.20

264,536.80
264,536.80
60,000.00
5,000.00
65,000.00
329,536.80

264,536.80
45,000.00
309,536.80
60,000.00
5,000.00
65,000.00
374,536.80

Halaman : 80

49,104.00
49,104.00
3,406.00
4,368.00
44.00
2.75
7,820.75
56,924.75

61,248.00
61,248.00
3,406.00
4,368.00
44.00
2.75
7,820.75
69,068.75

55,000.00
9,500.00

65,000.00

55,000.00
9,500.00

51,744.00
51,744.00
3,406.00
4,368.00
44.00
2.75
7,820.75
59,564.75

64,944.00
64,944.00
3,406.00
4,368.00
44.00
2.75
7,820.75
72,764.75
Halaman : 81

279,000.00
36,000.00
15,410.00
58,420.00
36,093.44
148,304.00
7,500.00
580,727.44
46,423.13
62,370.00
6,237.00
386.10
115,416.23
696,143.67

294,000.00
36,000.00
13,800.00
58,420.00
36,093.44
148,304.00
7,500.00
594,117.44

46,423.13
62,370.00
6,237.00
386.10
115,416.23
709,533.67

0
0

214,272.00
20,400.00
7,562.40
11,500.00
50,897.39
304,631.79
34,387.50
46,200.00
4,620.00
286.00
85,493.50
390,125.29
Halaman : 82

98,208.00
10,560.00
7,562.40
11,500.00
16,918.80
144,749.20
34,387.50
46,200.00
4,620.00
286.00
85,493.50
230,242.70

89,280.00
9,600.00
7,562.40
11,500.00
14,099.00
132,041.40
34,387.50
46,200.00
4,620.00
286.00
85,493.50
217,534.90

225,792.00
20,400.00
7,562.40
11,500.00
50,897.39
316,151.79
34,387.50
44,100.00
4,620.00
286.00
83,393.50
399,545.29

1.050
1.050
0.105
0.0052

0.840
0.840
0.084
0.0042

Halaman : 83

103,488.00
10,560.00
7,562.40
11,500.00
16,918.80
150,029.20
34,387.50
44,100.00
4,410.00
286.00
83,183.50
233,212.70

94,080.00
9,600.00
7,562.40
11,500.00
14,099.00
136,841.40
34,387.50
44,100.00
4,410.00
286.00
83,183.50
220,024.90

Halaman : 84

4,301.00
157.18
36,652.80

41,110.98
4,912.50
16,800.00
1,100.00
68.75
22,881.25
63,992.23

44,794.56

39,330.00
491.25
72,542.00
112,363.25
1,310.00
16,800.00
1,100.00
68.75
19,278.75
131,642.00

23,598.00
3,275.00
3,250.00
30,123.00
4,912.50
10,500.00
1,100.00
68.75
16,581.25
46,704.25
19,435.00
3,250.00
1,312.50
2,062.50
26,060.00
4,500.00
30,560.00
Halaman : 85
19,435.00
3,250.00
1,312.50
2,062.50
26,060.00
4,500.00
30,560.00

375.00
375.00

4,912.50
0.00
0.00
137.50
5,050.00
5,425.00

187.50
187.50
4,912.50
0.00
0.00
137.50
5,050.00
5,237.50

187.50
187.50
4,912.50
0.00
0.00
137.50
5,050.00
5,237.50

187.50
187.50
4,912.50
Halaman : 86
0.00
0.00
137.50
5,050.00
5,237.50

1,000.00
32,500.00
33,500.00
250,000.00
250,000.00
52,400.00
70,400.00
35,200.00
27,500.00
185,500.00
435,500.00
43,550.00

1,536.03

5410,38

117.76
25.00
1,678.79
1,310.00
1,760.00
176.00
137.50
3,383.50
5,062.29

1,552.78
5,459.92
7,893.51
14,906.21
2,292.50
3,300.00
330.00
137.50
6,060.00
20,966.21
Halaman : 87

2,484.00
1,552.78
5,459.92
12,072.42
21,569.12
2,292.50
396.00
264.00
137.50
3,090.00
24,659.12

2,484.00
1,552.78
5,459.92
16,251.34
25,748.04
2,292.50
594.00
176.00
137.50
3,200.00
28,948.04

12,751.20
12,751.20
1,310.00
2,772.00

2,772.00
137.50
6,991.50
19,742.70

5,313.00
13,176.24
4,500.00
17,676.24
0.00
2,640.00
704.00
Halaman : 88
137.50
3,481.50
21,157.74

78,200.00
13,340.00
15,360.32
3,750.00
8,000.00
1,500.00
120,150.32
14,168.00
1,760.00
15,928.00

81,875.00
132,000.00
13,200.00
22,000.00
249,075.00
385,153.32
38,515.33

2,672.60
2,672.60
3,275.00
0.00
0.00
330.00
3,605.00
6,277.60

6,238.98
960.02
400.00
45.00
445.00
5,240.00
7,040.00
704.00
137.50

13,121.50
13,566.50

Halaman : 89

Cat Paragon /Decolith


919.60
1,000.00
130.00
2,044.70
5,316.22
9,410.52
655.00
2,772.00
277.20
137.50
3,841.70
13,252.22
Cat I.C.I. Catilac
919.60
1,000.00
130.00
3,192.40
8,300.24
13,542.24
655.00
2,772.00
277.20
137.50
3,841.70
17,383.94
Watershild
919.60
1,000.00
130.00
5,464.80
14,208.48
21,722.88
655.00
2,772.00
277.20
137.50
3,841.70
25,564.58

Cat Paragon /Decolith


91.96
480.00
Halaman : 90
216.67
2,249.17
4,498.34
7,536.14
917.00
1,848.00

184.80
137.50
3,087.30
10,623.44
Cat I.C.I. Catilac
91.96
480.00
216.67
3,511.64
7,023.28
11,323.55
917.00
1,848.00
184.80
137.50
3,087.30
14,410.85
Watershild
91.96
480.00
216.67
6,011.28
12,022.56
18,822.47
917.00
1,848.00
184.80
137.50
3,087.30
21,909.77

400.00
187.50
600.00
82.80
682.80
4,912.50
44.00
4.40
Halaman : 91
137.50
5,098.40
5,781.20

600.00
165.60
765.60
1,310.00
220.00
22.00
137.50
1,689.50
2,455.10

5,250.00

21,909.77
27,159.77

54,000.00
1,725.00
55,725.00
655.00
8,800.00
88.00
137.50
9,680.50
65,405.50

1,242.00
130.00
1,372.00
655.00
8,800.00
880.00
550.00
10,885.00
12,257.00

1,242.00
65.00
1,500.00
1,565.00
982.50
13,200.00
1,320.00
825.00
16,327.50
17,892.50
Halaman : 92

1,242.00
1,525.00
65.00
900.00
1,050.00
58.88
600.00
5,440.88
1,310.00
22,000.00
2,200.00
1,375.00
26,885.00
32,325.88

13,929.72
65.00
13,994.72
655.00
8,800.00
88.00
137.50

9,680.50
23,675.22

5,107.56
7,893.51
65.00
3,714.59
11,673.10
1,310.00
17,600.00
176.00
275.00
19,361.00
31,034.10

13,929.72
3,000.00
16,929.72
Halaman : 93
655.00
8,800.00
880.00
550.00
10,885.00
27,814.72

Halaman : 94

PEKERJAAN PENUTUP LANTAI


1

1 m2 Pasang lantai ubin warna akuran 40 x 40 cm


Bahan An. SNI ( Revisi ) 6.4.1
6.630 Bh
8.160 Kg
0.023 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.4.2
0.250 Oh
0.120 Oh
0.012 Oh
0.0125 Oh

1 m2 Pasang lantai ubin warna akuran 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.5.1
11.200 Bh
8.360 Kg
0.023 m3
0.600 Kg
Upah An. SNI ( Revisi ) 6.5.2
0.250 Oh
0.120 Oh
0.012 Oh
0.0125 Oh

1 m2 Pasang lantai ubin teraso akuran 40 x 40 cm


Bahan An. SNI ( Revisi ) 6.7.1
6.250 Bh
8.800 Kg
0.0215 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.7.2
0.250 Oh
0.120 Oh
0.012 Oh
0.0125 Oh
Biaya poles.

1 m2 Pasang lantai ubin teraso akuran 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.8.1
11.200 Bh
10.000 Kg
0.0215 m3
0.600 Kg

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.8.2


0.260 Oh
0.125 Oh
0.013 Oh
0.0125 Oh
Biaya poles.

1 m2 Pasang lantai ubin granito akuran 40 x 40 cm


Bahan An. SNI ( Revisi ) 6.9.1
6.250 Bh
9.800 Kg
0.0215 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.9.2
0.250 Oh
0.120 Oh
0.012 Oh
0.0125 Oh

1 m2 Pasang lantai keramic Exensa 40 x 40 cm


Bahan An. SNI ( Revisi ) 6.10.1
6.250 Bh
10.000 Kg
0.0215 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.10.2
0.260 Oh
0.125 Oh
0.0130 Oh
0.0125 Oh

1 m2 Pasang lantai marmer akuran 60 x 60 cm


Bahan An. SNI ( Revisi ) 6.13.1
2.940 Bh
8.190 Kg
0.045 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh
0.120 Oh
0.012 Oh
0.0125 Oh
Biaya poles.

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1 m2 Pasang teraso cor ditempat nat kaca 4Cm x 5 mm


Bahan An. SNI ( Revisi ) 6.31.1
0.0036 m3
12.285 Kg
0.095 m3
2.000 m1
1.000 Kg

Upah An. SNI ( Revisi ) 6.31.2


0.900 Oh
0.090 Oh
0.009 Oh
0.0045 Oh
Biaya poles.

10 1 m2 Pasang TRASO cor ditempat nat kuningan


Bahan An. SNI ( Revisi ) 6.31.1

0.0036
12.285
0.095
2.000
1.000

m3
Kg
m3
m1
Kg

Upah An. SNI ( Revisi ) 6.31.2


0.900 Oh
0.090 Oh
0.009 Oh
0.0045 Oh
Biaya poles.

11 1 m1 Pasang lantai keramik artistik 5 x 20 cm / Lis / Ban


Bahan An. SNI ( Revisi ) 6.36.1
5.000 Bh
0.850 Kg
0.0022 m3
0.080 Kg
Upah An. SNI ( Revisi ) 6.36.2
0.090 Oh
0.090 Oh
0.009 Oh
0.0450 Oh

12 1 m1 Pasang lantai keramik artistik 7,5 x 25 cm / Lis / Ban


Bahan An. SNI ( Revisi ) 6.37.1
5.000 Bh
1.063 Kg
0.003 m3
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.100 Kg
Upah An. SNI ( Revisi ) 6.37.2
0.090 Oh
0.090 Oh
0.009 Oh
0.0045 Oh

13 1 m2 Pasang lantai keramik 20 x 20 cm


Bahan An. SNI ( Revisi ) 6.42.1
1.050 m2
7.454 Kg
3.926 Kg
0.0420 m3
0.350 Kg
Upah An. SNI ( Revisi ) 6.42.2
0.250 Oh
0.120 Oh
0.012 Oh
0.013 Oh

14 1 m2 Pasang lantai keramik 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.47.1
1.050 M2
7.454 Kg
3.926 Kg
0.0420 m3

0.300 Kg
Upah An. SNI ( Revisi ) 6.47.2
0.220 Oh
0.120 Oh
0.012 Oh
0.013 Oh

14 1 m2 Pasang lantai keramik 40 x 40 cm


Bahan An. SNI ( Revisi ) 6.47.1
1.050 M2
7.454 Kg
3.926 Kg
0.0420 m3
0.200 Kg
Upah An. SNI ( Revisi ) 6.47.2
0.220 Oh
0.100 Oh
0.012 Oh
0.013 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

15 1 m1 Pasang lantai keramik 30 x 30 cm anti slip / Rock tile


Bahan An. SNI ( Revisi ) 6.48.1
1.050 M2
7.454 Kg
3.926 Kg
0.0420 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.48.2
0.220 Oh
0.120 Oh
0.012 Oh
0.013 Oh

16 1 m2 Pasang lantai mosaik 30 x 30 cm.


Bahan An. SNI ( Revisi ) 6.51.1
1.050 m2
7.454 Kg
3.926 Kg
0.042 m3
0.300 Kg
Upah An. SNI ( Revisi ) 6.51.2
0.220 Oh
0.120 Oh
0.012 Oh
0.013 Oh

17 1 m2 Pasang lantai karpet 100% wool


Bahan An. SNI ( Revisi ) 6.52.1
1.050 m2
0.350 Kg
Upah An. SNI ( Revisi ) 6.52.2
0.170 Oh
0.170 Oh
0.017 Oh
0.0085 Oh

18 1 m2 Pasang lantai karpet 80% wool, 20% nylon


Bahan An. SNI ( Revisi ) 6.53.1
1.050 m2
0.350 Kg
Upah An. SNI ( Revisi ) 6.53.2
0.170 Oh
0.170 Oh
0.017 Oh
0.0085 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19 1 m2 Pasang lantai parquet jati


Bahan An. SNI ( Revisi ) 6.56.1
1.050 m2
0.600 Kg
Upah An. SNI ( Revisi ) 6.56.2
0.650 Oh
0.350 Oh
0.035 Oh
0.0325 Oh

20 1 m2 Pasang dinding porselin 11 x 11 cm, putih


Bahan An. SNI ( Revisi ) 6.58.1
83.000 Bh
6.929 Kg
2.372 Kg
0.0180 m3
0.500 Kg
Upah An. SNI ( Revisi ) 6.58.2
0.220 Oh
0.200 Oh
0.020 Oh
0.013 Oh

21 1 m2 Pasang dinding porselin 11 x 11 cm, warna


Bahan An. SNI ( Revisi ) 6.59.1
83.000 Bh
6.929 Kg
2.372 Kg
0.0180 m3
0.500 Kg
Upah An. SNI ( Revisi ) 6.59.2
0.220 Oh
0.200 Oh
0.020 Oh
0.013 Oh

22 1 m2 Pasang dinding keramik 20 x 25 cm


Bahan An. SNI ( Revisi ) 6.69.1
1.050 M2
6.929 Kg
2.372 Kg
0.0180 m3
0.400 Kg

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.69.2


0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

23 1 m2 Pasang dinding keramik 20 x 35 cm


Bahan An. SNI ( Revisi ) 6.69.1
1.050 M2
6.929 Kg
2.372 Kg
0.0180 m3
0.250 Kg
Upah An. SNI ( Revisi ) 6.69.2
0.230 Oh
0.200 Oh
0.020 Oh
0.010 Oh

24 1 m2 Pasang dinding marmer


Bahan An. SNI ( Revisi ) 6.70.1
1.020 m2
2.000 Bh
12.440 Kg
0.0250 m3
0.400 Kg
Upah An. SNI ( Revisi ) 6.70.2
0.720 Oh
0.650 Oh
0.065 Oh
0.0350 Oh

25 1 m2 Pasang dinding bata pelapis 7 x 3 x 24 cm


Bahan An. SNI ( Revisi ) 6.71.1
1.050 M2
12.440 Kg
0.0250 m3
Upah An. SNI ( Revisi ) 6.71.2
0.220 Oh
0.200 Oh
0.020 Oh
0.013 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

26 1 m2 Pasang dinding bata klinker 5 x 5 x 24 cm


Bahan An. SNI ( Revisi ) 6.72.1
1.050 M2
12.440 Kg
0.0250 m3
Upah An. SNI ( Revisi ) 6.72.2
0.220 Oh
0.180 Oh

0.019 Oh
0.012 Oh

27 1 m2 Pasang dinding batu paros


Bahan An. SNI ( Revisi ) 6.73.1
1.050 m2
11.750 Kg
0.0350 m3
Upah An. SNI ( Revisi ) 6.73.2
0.220 Oh
0.180 Oh
0.019 Oh
0.012 Oh

28 1 m2 Pasang dinding batu tempel hitam


Bahan An. SNI ( Revisi ) 6.74.1
1.050 m2
11.750 Kg
0.0350 m3
Upah An. SNI ( Revisi ) 6.74.2
0.220 Oh
0.180 Oh
0.019 Oh
0.012 Oh

29 1 m2 Pasang lantai vinyl oscar / xsintetis 30 x 30 cm KL 1


Bahan An. SNI ( Revisi ) 6.75.1
11.050 Bh
0.350 Kg
Upah An. SNI ( Revisi ) 6.75.2
0.150 Oh
0.150 Oh
0.015 Oh
0.0075 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

30 1 m2 Pasang lantai vinyl karet 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.76.1
11.050 Bh
0.350 Kg
Upah An. SNI ( Revisi ) 6.76.2
0.150 Oh
0.150 Oh
0.015 Oh
0.0075 Oh

78. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.78.1
11.050 Bh
0.350 Kg
Upah An. SNI ( Revisi ) 6.78.2
0.150 Oh

0.150 Oh
0.015 Oh
0.0075 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN PAVING STONE


1

1 m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo /


Bahan An. SNI ( Revisi )
36 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo /


Bahan An. SNI ( Revisi )
36 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Din


Bahan An. SNI ( Revisi )
36 Bj

0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Din


Bahan An. SNI ( Revisi )
36 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1 m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo


Bahan An. SNI ( Revisi )
35 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo


Bahan An. SNI ( Revisi )
35 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Di


Bahan An. SNI ( Revisi )
35 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

1 m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Di


Bahan An. SNI ( Revisi )

35 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

1 m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo


Bahan An. SNI ( Revisi )
46 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

10 1 m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo


Bahan An. SNI ( Revisi )
46 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

11 1 m2 Pasang PAVING STONE warna merah TYPE segi empat EX Din


Bahan An. SNI ( Revisi )
46 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

12 1 m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Din


Bahan An. SNI ( Revisi )
26 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

13 1 m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Din


Bahan An. SNI ( Revisi )
26 Bj
0.121 m3
Upah An. SNI ( Revisi )
0.248 Oh
0.200 Oh
0.020 Oh
0.010 Oh

PEKERJAAN KANSTIN / SKERB.


1

1 m1 Pasang KANSTIN / SKERB Model lengkung Uk. 50 x 18 x 30 Cm


Bahan An. SNI ( Revisi )
2 Bj
0.050 m3
1.000 Ls
Upah An. SNI ( Revisi )
0.200 Oh
0.150 Oh
0.015 Oh
0.008 Oh

1 m1 Pasang KANSTIN / SKERB Model lurus Uk. 8 x 40 x 20 Cm.


Bahan An. SNI ( Revisi )
3 Bj
0.030 m3
1.000 Ls
Upah An. SNI ( Revisi )
0.200 Oh
0.150 Oh
0.015 Oh
0.008 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN GEBALAN RUMPUT


1

1 m2 Penanaman Rumput LAMUR.


Bahan An. SNI ( Revisi )
1 m2
0.030 m3
Upah An. SNI ( Revisi )
0.060 Oh

0.015 Oh
0.008 Oh

1 m2 Penanaman Rumput GAJAH.


Bahan An. SNI ( Revisi )
1 m2
0.030 m3
Upah An. SNI ( Revisi )
0.060 Oh
0.015 Oh
0.008 Oh

1 m2 Penanaman Rumput JEPANG.


Bahan An. SNI ( Revisi )
1 m2
0.030 m3
Upah An. SNI ( Revisi )
0.060 Oh
0.015 Oh
0.008 Oh

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

19

10

12

PEKERJAAN PENUTUP LANTAI

m2 Pasang lantai ubin warna akuran 40 x 40 cm


An. SNI ( Revisi ) 6.4.1
Ubin warna 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,800.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

31,824.00
6,771.49
2,085.74
2,070.00
42,751.24

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
14,443.00
57,194.24

2,350.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

26,320.00
6,937.46
2,085.74
4,140.00
39,483.20

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
14,443.00
53,926.20

6,210.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

38,812.50
7,302.59
1,949.71
2,070.00
50,134.81

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
1,750.00
16,193.00
66,327.81

5,888.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

65,945.60
8,298.40
1,949.71
4,140.00
80,333.71
Halaman : 95

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,515.00
5,250.00
550.00
687.50
1,750.00
16,752.50
97,086.21

Sub total :
An. SNI ( Revisi ) 6.4.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai ubin warna akuran 30 x 30 cm


An. SNI ( Revisi ) 6.5.1
Ubin warna 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.5.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai ubin teraso akuran 40 x 40 cm


An. SNI ( Revisi ) 6.7.1
Ubin teraso 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.7.2


Pekerja
Tukang batu
Kepala tukang
Mandor
Biaya poles.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Lumsum
Sub total :
Total upah+bahan :

m2 Pasang lantai ubin teraso akuran 30 x 30 cm


An. SNI ( Revisi ) 6.8.1
Ubin teraso 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

An. SNI ( Revisi ) 6.8.2


Pekerja
Tukang batu
Kepala tukang
Mandor
Biaya poles.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Lumsum
Sub total :
Total upah+bahan :

1
0
6

11

m2 Pasang lantai ubin granito akuran 40 x 40 cm


An. SNI ( Revisi ) 6.9.1
Ubin granito 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.

22,400.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

140,000.00
8,132.43
1,949.71
2,070.00
152,152.15

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
14,443.00
166,595.15

20,800.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

130,000.00
8,298.40
1,949.71
2,070.00
142,318.11

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,515.00
5,250.00
572.00
687.50
15,024.50
157,342.61

22,108.84
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

65,000.00
6,796.39
4,080.80
2,070.00
77,947.19

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
1,750.00
16,193.00
94,140.19

Sub total :
An. SNI ( Revisi ) 6.9.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai keramic Exensa 40 x 40 cm


An. SNI ( Revisi ) 6.10.1
Keramic esensas 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.10.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai marmer akuran 60 x 60 cm


An. SNI ( Revisi ) 6.13.1
Ubin teralux marmer 60 x 60 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.13.2


Pekerja
Tukang batu
Kepala tukang
Mandor
Biaya poles.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Lumsum
Sub total :
Total upah+bahan :

Halaman : 96

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang teraso cor ditempat nat kaca 4Cm x 5 mm


An. SNI ( Revisi ) 6.31.1
Bahan teraso cor
Semen portland
Pasir pasang
nat kaca
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

346,104.00
829.84
90,684.40
2,250.00
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,245.97
10,194.58
8,615.02
4,500.00
6,900.00
31,455.58

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

29,475.00
3,780.00
396.00
247.50
2,250.00
36,148.50
67,604.08

Sub total :
An. SNI ( Revisi ) 6.31.2
Pekerja
Tukang batu
Kepala tukang
Mandor
Biaya poles.

m2 Pasang TRASO cor ditempat nat kuningan


An. SNI ( Revisi ) 6.31.1

1
0
3
0

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Lumsum
Sub total :
Total upah+bahan :

8.190
45000
0
1800

Bahan teraso cor


Semen portland
Pasir pasang
nat kaca
Semen warna

@ Rp.
@ Rp.
0.00
@ Rp.
@ Rp.

380,696.00
829.84
90,684.40
7,500.00
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,370.51
10,194.58
8,615.02
15,000.00
6,900.00
42,080.11

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

29,475.00
3,780.00
396.00
247.50
2,500.00
36,398.50
78,478.61

9,062.00
829.84
90,684.40
6,900.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

45,310.00
705.36
199.51
552.00
46,766.87

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,947.50
3,780.00
396.00
2,475.00
9,598.50
56,365.37

Rp
Rp
Rp
Rp
Rp

45,310.00
881.71
249.38
Halaman : 97
690.00
47,131.09

Sub total :
An. SNI ( Revisi ) 6.31.2
Pekerja
Tukang batu
Kepala tukang
Mandor
Biaya poles.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Sub total :
Total upah+bahan :

m1 Pasang lantai keramik artistik 5 x 20 cm / Lis / Ban


An. SNI ( Revisi ) 6.36.1
Ubin keramik artistik 5x20 cm
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.36.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m1 Pasang lantai keramik artistik 7,5 x 25 cm / Lis / Ban


An. SNI ( Revisi ) 6.37.1
Plint keramik artistik 10x20 cm
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.

11500 =
829.84 =
90,684.40 =

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

Semen warna

@ Rp.
Sub total :

An. SNI ( Revisi ) 6.37.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,900.00 =
=
32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,947.50
3,780.00
396.00
247.50
7,371.00
54,502.09

33,764.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

35,452.20
6,185.54
2,167.21
3,808.74
2,415.00
50,028.70

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,187.50
5,040.00
528.00
687.50
14,443.00
64,471.70

36,938.00
829.84
552.00
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

38,784.90
6,185.54
2,167.21
3,808.74

Sub total :
Total upah+bahan :

m2 Pasang lantai keramik 20 x 20 cm


An. SNI ( Revisi ) 6.42.1
Ubin keramik 10x20 cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.42.2


Pekerja
Tukang batu
Kepala tukang
Mandor

m2 Pasang lantai keramik 30 x 30 cm


An. SNI ( Revisi ) 6.47.1
Ubin keramik 30 x 30 Cm
Semen portland
Kapur bubuk
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.

8.190

JANGAN DIHAPUS
1
0

1
0

Semen warna
An. SNI ( Revisi ) 6.47.2
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,900.00 =
=

An. SNI ( Revisi ) 6.47.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
5,040.00
528.00
687.50
13,460.50
66,476.90 60,731.00

38,410.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

40,330.50
6,185.54
2,167.21
3,808.74
1,380.00
53,872.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
4,200.00
528.00
687.50
12,620.50
66,492.50
Halaman : 98

38,713.60
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

40,649.28
6,185.54
2,167.21
3,808.74
2,070.00
54,880.78

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
5,040.00
528.00
687.50
13,460.50
68,341.28 61,751.00

42,000.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

44,100.00
6,185.54
2,167.21
3,808.74
2,070.00
58,331.50

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
5,040.00
528.00
687.50
13,460.50
71,792.00

195,000.00 =
19,320.00 =
=

Rp
Rp
Rp

204,750.00
6,762.00
211,512.00

Rp
Rp
Rp
Rp
Rp
Rp

5,567.50
7,140.00
748.00
467.50
13,923.00
225,435.00

Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,070.00
53,016.40

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

m2 Pasang lantai keramik 40 x 40 cm


An. SNI ( Revisi ) 6.47.1
Ubin keramik 40 x 40 Cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

Rp
Rp

Sub total :
Total upah+bahan :

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m1 Pasang lantai keramik 30 x 30 cm anti slip / Rock tile


An. SNI ( Revisi ) 6.48.1
Ubin keramik 30x30 anti slip
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.48.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai mosaik 30 x 30 cm.


An. SNI ( Revisi ) 6.51.1
Mosaik 30x30cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.51.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai karpet 100% wool


An. SNI ( Revisi ) 6.52.1
Feltex carpet 100% T-21
Lem vinyl
An. SNI ( Revisi ) 6.52.2
Pekerja
Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

1
0

1
0

1
0

m2 Pasang lantai karpet 80% wool, 20% nylon


An. SNI ( Revisi ) 6.53.1
Carpet 80% wool, 20% nylon
Lem vinyl
An. SNI ( Revisi ) 6.53.2
Pekerja
Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.

155,000.00 =
19,320.00 =
=

Rp
Rp
Rp

162,750.00
6,762.00
169,512.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,567.50
7,140.00
748.00
467.50
13,923.00
183,435.00
Halaman : 99

192,500.00 =
19,320.00 =
=

Rp
Rp
Rp

202,125.00
11,592.00
213,717.00

32,750.00
42,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang lantai parquet jati


An. SNI ( Revisi ) 6.56.1
Parquet jati
Lem vinyl

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.56.2


Pekerja
Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

21,287.50
14,700.00
1,540.00
1,787.50
39,315.00
253,032.00

375.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

31,125.00
5,749.55
1,309.07
1,632.32
3,450.00
43,265.93

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
8,400.00
880.00
687.50
17,172.50
60,438.43

395.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,785.00
5,749.55
1,309.07
1,632.32
3,450.00
44,925.93

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
8,400.00
880.00
687.50
17,172.50
62,098.43

37,195.60
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

39,055.38
5,749.55
1,309.07
1,632.32
2,760.00
50,506.31

Sub total :
Total upah+bahan :

m2 Pasang dinding porselin 11 x 11 cm, putih


An. SNI ( Revisi ) 6.58.1
Porselin 11x11 cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.58.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang dinding porselin 11 x 11 cm, warna


An. SNI ( Revisi ) 6.59.1
Porselin 11x11 cm, warna
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.59.2


Pekerja
Tukang batu
Kepala tukang
Mandor

m2 Pasang dinding keramik 20 x 25 cm


An. SNI ( Revisi ) 6.69.1
Keramik 20 x 25 cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

1
1
0
1

1
0

1
0

Halaman : 100

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

An. SNI ( Revisi ) 6.69.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
68,458.31

41,998.00
829.84
552.00
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

44,097.90
5,749.55
1,309.07
1,632.32
1,725.00
54,513.83

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,532.50
8,400.00
880.00
550.00
17,362.50
71,876.33

65,000.00
1,750.00
829.84
90,684.40
6,900.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

66,300.00
3,500.00
10,323.21
2,267.11
2,760.00
85,150.32

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

23,580.00
27,300.00
2,860.00
1,925.00
55,665.00
140,815.32

59,156.00 =
829.84 =
90,684.40 =
=

Rp
Rp
Rp
Rp

62,113.80
10,323.21
2,267.11
74,704.12

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
8,400.00
880.00
715.00
17,200.00
91,904.12
Halaman : 101

59,156.00 =
829.84 =
90,684.40 =
=

Rp
Rp
Rp
Rp

62,113.80
10,323.21
2,267.11
74,704.12

32,750.00 =
42,000.00 =

Rp
Rp

7,205.00
7,560.00

Sub total :
Total upah+bahan :

m2 Pasang dinding keramik 20 x 35 cm


An. SNI ( Revisi ) 6.69.1
Keramik 20 x 35 cm
Semen portland
Kapur bubuk
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.69.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang dinding marmer


An. SNI ( Revisi ) 6.70.1
Marmer
Paku pancing 60x230
Semen portland
Pasir pasang
Semen warna

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.70.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang dinding bata pelapis 7 x 3 x 24 cm


An. SNI ( Revisi ) 6.71.1
Bata pelapis dinding
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.71.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang dinding bata klinker 5 x 5 x 24 cm


An. SNI ( Revisi ) 6.72.1
Bata pelapis klinker
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.72.2


Pekerja
Tukang batu

@ Rp.
@ Rp.

0.620
0.500
0.050
0.025

1
0

0.050

65763

Kepala tukang
Mandor

@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang dinding batu paros


An. SNI ( Revisi ) 6.73.1
Batu paros
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.73.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp

836.00
660.00
16,261.00
90,965.12

48,000.00 =
829.84 =
90,684.40 =
=

Rp
Rp
Rp
Rp

50,400.00
9,750.62
3,173.95
63,324.57

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
7,560.00
836.00
660.00
16,261.00
79,585.57

25,000.00 =
829.84 =
90,684.40 =
=

Rp
Rp
Rp
Rp

26,250.00
9,750.62
3,173.95
39,174.57

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,205.00
7,560.00
836.00
660.00
16,261.00
55,435.57

4,479.28 =
19,320.00 =
=

Rp
Rp
Rp

49,496.00
6,762.00
56,258.00

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
6,300.00
660.00
412.50
12,285.00
68,543.00

Sub total :
Total upah+bahan :

m2 Pasang dinding batu tempel hitam


An. SNI ( Revisi ) 6.74.1
Batu tempel hitam
Semen portland
Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.74.2


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai vinyl oscar / xsintetis 30 x 30 cm KL 1


An. SNI ( Revisi ) 6.75.1
Vinyl oscar/sintetist 30x30 cm KL1
Lem vinyl

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.75.2


Pekerja
Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Halaman : 102

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang lantai vinyl karet 30 x 30 cm


An. SNI ( Revisi ) 6.76.1
Vinyl karet 30x30 cm
Lem vinyl

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.76.2


Pekerja
Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang lantai vinyl motif kembang 30 x 30 cm


An. SNI ( Revisi ) 6.78.1
Vinyl mtf kembang 30x30 cm ex DN
Lem vinyl

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi ) 6.78.2


Pekerja

@ Rp.

3,913.12 =
19,320.00 =
=

Rp
Rp
Rp

43,240.00
6,762.00
50,002.00

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,912.50
6,300.00
660.00
412.50
12,285.00
62,287.00

5,432.58 =
19,320.00 =
=

Rp
Rp
Rp

60,030.00
6,762.00
66,792.00

32,750.00 =

Rp

4,912.50

Tukang
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

42,000.00 =
44,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

6,300.00
660.00
412.50
12,285.00
79,077.00

Halaman : 103

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN PAVING STONE

m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 6 Cm.
An. SNI ( Revisi )
Paving type "S"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 8 Cm.
An. SNI ( Revisi )
Paving type "S"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

800.000 =
74,520.00 =
=

Rp
Rp
Rp

28,800.00
9,016.92
37,816.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
55,768.92

1550.000 =
74,520.00 =
=

Rp
Rp
Rp

55,800.00
9,016.92
64,816.92

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
82,768.92

Rp

44,712.00

=
=
=
=
=
=

m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 6 Cm
An. SNI ( Revisi )
Paving type "S"
@ Rp.
1242.000 =

Pasir urug 10 Cm.

@ Rp.
Sub total :

An. SNI ( Revisi )


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

74,520.00 =
=

Rp
Rp

9,016.92
53,728.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
71,680.92

1104.000 =
74,520.00 =
=

Rp
Rp
Rp

39,744.00
9,016.92
48,760.92

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
66,712.92

Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )
Paving type "S"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Halaman : 103

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo / UPS. tebal 6 Cm
An. SNI ( Revisi )
Paving type "Tiga berlian"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )
Paving type "Tiga berlian"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

900.000 =
74,520.00 =
=

Rp
Rp
Rp

31,500.00
9,016.92
40,516.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
58,468.92

1242.000 =
74,520.00 =
=

Rp
Rp
Rp

43,470.00
9,016.92
52,486.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
70,438.92

=
=
=

Rp
Rp
Rp

43,470.00
9,016.92
52,486.92

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
70,438.92

m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Dinoyo / UPS. tebal 6 Cm
An. SNI ( Revisi )
Paving type "Tiga berlian"
@ Rp.
1242.000
Pasir urug 10 Cm.
@ Rp.
74,520.00
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
32,750.00
Tukang batu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )

Paving type "Tiga berlian"


Pasir urug 10 Cm.

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi )


Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.

1550.000 =
74,520.00 =
=

Rp
Rp
Rp

54,250.00
9,016.92
63,266.92

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
81,218.92

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Halaman : 104

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo / UPS. tebal 6 Cm
An. SNI ( Revisi )
Paving type "Segi empat"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )
Paving type "Ssgi empat"
@ Rp.
Pasir urug 10 Cm.
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
Tukang batu
@ Rp.
Kepala tukang
@ Rp.
Mandor
@ Rp.
Sub total :
Total upah+bahan :

765.000 =
74,520.00 =
=

Rp
Rp
Rp

35,190.00
9,016.92
44,206.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
62,158.92

1210.000 =
74,520.00 =
=

Rp
Rp
Rp

55,660.00
9,016.92
64,676.92

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
82,628.92

=
=
=

Rp
Rp
Rp

71,300.00
9,016.92
80,316.92

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
98,268.92

=
=
=

Rp
Rp
Rp

32,292.00
9,016.92
41,308.92

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
59,260.92

m2 Pasang PAVING STONE warna merah TYPE segi empat EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )
Paving type "Ssgi empat"
@ Rp.
1550.000
Pasir urug 10 Cm.
@ Rp.
74,520.00
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
32,750.00
Tukang batu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Dinoyo / UPS. tebal 6 Cm
An. SNI ( Revisi )
Paving type "Ssgi ENAM"
@ Rp.
1242.000
Pasir urug 10 Cm.
@ Rp.
74,520.00
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
32,750.00
Tukang batu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

80111

18502

Halaman : 105

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Dinoyo / UPS. tebal 8 Cm
An. SNI ( Revisi )
Paving type "Ssgi ENAM"
@ Rp.
1407.600
Pasir urug 10 Cm.
@ Rp.
74,520.00
Sub total :
An. SNI ( Revisi )
Pekerja
@ Rp.
32,750.00
Tukang batu
@ Rp.
42,000.00
Kepala tukang
@ Rp.
44,000.00
Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :

=
=
=

Rp
Rp
Rp

36,597.60
9,016.92
45,614.52

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

8,122.00
8,400.00
880.00
550.00
17,952.00
63,566.52

35,000.00 =
90,684.40 =
1,450.00 =
=

Rp
Rp
Rp
Rp

70,000.00
4,534.22
1,450.00
75,984.22

32,750.00
42,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
440.00
13,950.00
89,934.22

27,500.00 =
829.84 =
1,250.00 =
=

Rp
Rp
Rp
Rp

68,750.00
24.90
1,250.00
70,024.90

32,750.00
42,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
6,300.00
660.00
440.00
13,950.00
83,974.90

PEKERJAAN KANSTIN / SKERB.

m1 Pasang KANSTIN / SKERB Model lengkung Uk. 50 x 18 x 30 Cm.


An. SNI ( Revisi )
Skreb lengkung
@ Rp.
Pasir pasang
@ Rp.
Spesi utk sambungan
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

m1 Pasang KANSTIN / SKERB Model lurus Uk. 8 x 40 x 20 Cm.


An. SNI ( Revisi )
skerb"
@ Rp.
Pasir pasang
@ Rp.
Spesi utk sambungan
@ Rp.
Sub total :
An. SNI ( Revisi )
Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Halaman : 106

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

PEKERJAAN GEBALAN RUMPUT

m2 Penanaman Rumput LAMUR.


An. SNI ( Revisi )
Rumput lamur
Tnh humus + pupuk kandang

@ Rp.
@ Rp.
Sub total :

An. SNI ( Revisi )


Pekerja

@ Rp.

12,500.00 =
70,000.00 =
=

Rp
Rp
Rp

12,500.00
2,100.00
14,600.00

32,750.00 =

Rp

1,965.00

Tukang batu
Mandor

@ Rp.
@ Rp.

42,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp

630.00
440.00
3,035.00
17,635.00

Sub total :

14,000.00 =
70,000.00 =
=

Rp
Rp
Rp

14,000.00
2,100.00
16,100.00

Sub total :
Total upah+bahan :

32,750.00 =
42,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

1,965.00
630.00
440.00
3,035.00
19,135.00

Sub total :

18,000.00 =
70,000.00 =
=

Rp
Rp
Rp

18,000.00
2,100.00
20,100.00

Sub total :
Total upah+bahan :

32,750.00 =
42,000.00 =
55,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

1,965.00
630.00
440.00
3,035.00
23,135.00

Sub total :
Total upah+bahan :

m2 Penanaman Rumput GAJAH.


An. SNI ( Revisi )
Rumput gajah.
Tnh humus + pupuk kandang
An. SNI ( Revisi )
Pekerja
Tukang batu
Mandor

m2 Penanaman Rumput JEPANG.


An. SNI ( Revisi )
Rumput jepang.
Tnh humus + pupuk kandang
An. SNI ( Revisi )
Pekerja
Tukang batu
Mandor

Budi\ANALISA-2008\SNI.08-A.wk4\2008.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

Halaman : 107

JANGAN DIHAPUS
11.380
11.3800

11
11

11
11

11.380
11.3800

11.380
11.3800

9
9

9
9
7718

9
9

9
9

19

10### 3

12

PEKERJAAN KUNCI DAN KACA


1. 1 buah pasang kunci tanam antik
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kunci tanam antik

@ Rp

Upah An. SNI ( Revisi ) 6.1.2


0.060 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.005 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

2. 1 buah pasang kunci tanam biasa 2 X PUTAR.


Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kunci tanam biasa
@ Rp
Upah An. SNI ( Revisi ) 6.2.2
0.060 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.005 Oh Mandor

3. 1 buah pasang kunci tanam KM/WC


Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kunci tanam KM/WC
Upah An. SNI ( Revisi ) 6.3.2
0.005 Oh Pekerja
0.500 Oh Tukang kayu
0.005 Oh Kepala tukang
0.0025 Oh Mandor

4. 1 buah pasang kunci silinder


Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Kunci silinder
Upah An. SNI ( Revisi ) 6.4.2
0.005 Oh Pekerja
0.500 Oh Tukang kayu
0.005 Oh Kepala tukang
### Oh Mandor

110,400.00 = Rp
Sub total :
= Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
25,200.00
2,640.00
275.00
30,080.00
140,480.00

82,800.00 = Rp
Sub total :
= Rp

82,800.00
82,800.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
25,200.00
2,640.00
275.00
30,080.00
112,880.00

58,420.00 = Rp
Sub total :
= Rp

58,420.00
58,420.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

=
=
=
=
=
=

110,400.00
110,400.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

163.75
21,000.00
220.00
137.50
21,521.25
79,941.25

47,610.00 = Rp
Sub total :
= Rp

47,610.00
47,610.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

163.75
21,000.00
220.00
13.75
21,397.50
69,007.50

5. 1 buah pasang engsel pintu


Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Engsel pintu

@ Rp

15,410.00 = Rp
Sub total :
= Rp

15,410.00
15,410.00

Upah An. SNI ( Revisi ) 6.5.2


0.015 Oh Pekerja

@ Rp

32,750.00 = Rp
Rp
Rp
Rp
Rp
Rp

491.25
Halaman : 108
6,300.00
660.00
41.25
7,492.50
22,902.50

7,562.40 = Rp

7,562.40

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

0.150 Oh Tukang kayu


0.015 Oh Kepala tukang
### Oh Mandor

6. 1 buah pasang engsel jendela kupu-kupu


Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Engsel jendela

@ Rp
@ Rp
@ Rp

42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

=
=
=
=
=

Sub total :
Upah An. SNI ( Revisi ) 6.6.2
0.010 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor

7. 1 buah pasang engsel angin


Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Engsel angin
Upah An. SNI ( Revisi ) 6.7.2
0.010 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.001 Oh Mandor

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

1 buah pasang door closer


Bahan An. SNI ( Revisi ) 6.10.1
1.000 Bh Door closer
Upah An. SNI ( Revisi ) 6.10.2
0.050 Oh Pekerja
0.500 Oh Tukang kayu
0.050 Oh Kepala tukang
0.0025 Oh Mandor

327.50
4,200.00
440.00
27.50
4,995.00
12,557.40

6,976.36 = Rp
Sub total :
= Rp

6,976.36
6,976.36

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

Rp
Rp
Rp
Rp
Rp
Rp

327.50
4,200.00
440.00
27.50
4,995.00
11,971.36

16,399.00 = Rp
Sub total :
= Rp

16,399.00
16,399.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
23,891.50

187,000.00 = Rp
Sub total :
= Rp

187,000.00
187,000.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

10 1 buah pasang kunci selot kuningan panjang 25 Cm


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot
@ Rp

=
=
=
=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,637.50
21,000.00
2,200.00
137.50
24,975.00
211,975.00

100,510.00 = Rp
Sub total :
= Rp

100,510.00
100,510.00
Halaman : 109

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

Upah An. SNI ( Revisi ) 6.11.2


0.020 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.001 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

11 1 buah pasang kunci selot kuningan panjang 15 Cm


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot
@ Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.001 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

7,562.40

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp
@ Rp
@ Rp
@ Rp

1 buah pasang kait angin sikutan YANG BAIK


Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Kait angin
@ Rp
Upah An. SNI ( Revisi ) 6.9.2
0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

= Rp

Rp
Rp
Rp
Rp
Rp
Rp

655.00
8,400.00
880.00
55.00
9,990.00
110,500.00

53,820.00 = Rp
Sub total :
= Rp

53,820.00
53,820.00

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

655.00
8,400.00
880.00
55.00
9,990.00
63,810.00

12 1 buah pasang kunci selot hitam panjang 25 Cm


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot
@ Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.001 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

13 1 buah pasang kunci selot hitam panjang 15 Cm


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot
@ Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.001 Oh Mandor

14 1 buah pasang pegangan pintu/door holder


Bahan An. SNI ( Revisi ) 6.12.1
1.000 Bh Door holder
Upah An. SNI ( Revisi ) 6.12.2
0.050 Oh Pekerja
0.500 Oh Tukang kayu
0.050 Oh Kepala tukang
0.0025 Oh Mandor

14,674.00 = Rp
Sub total :
= Rp
Rp
Rp
Rp
Rp
Rp
Rp

655.00
8,400.00
880.00
55.00
9,990.00
24,664.00

16,872.80 = Rp
Sub total :
= Rp

16,872.80
16,872.80

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

655.00
8,400.00
880.00
55.00
9,990.00
26,862.80

100,740.00 = Rp
Sub total :
= Rp

100,740.00
100,740.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,637.50
21,000.00
2,200.00
137.50
24,975.00
125,715.00
Halaman : 110

21,250.00 = Rp
Sub total :
= Rp

21,250.00
21,250.00

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

15 1 buah pasang door stop


Bahan An. SNI ( Revisi ) 6.13.1
1.000 Bh Door stop
Upah An. SNI ( Revisi ) 6.13.2
0.010 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor

16 1 buah pasang rel pintu dorong


Bahan An. SNI ( Revisi ) 6.14.1
1.000 Bh Rel pintu dorong
Upah An. SNI ( Revisi ) 6.14.2
0.060 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.003 Oh Mandor

@ Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

@ Rp
@ Rp
@ Rp
@ Rp

14,674.00
14,674.00

Rp
Rp
Rp
Rp
Rp
Rp

327.50
4,200.00
440.00
27.50
4,995.00
26,245.00

115,000.00 = Rp
Sub total :
= Rp

115,000.00
115,000.00

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,965.00
25,200.00
2,640.00
165.00
29,970.00
144,970.00

17 1 buah pasang kunci lemari


Bahan An. SNI ( Revisi ) 6.15.1
1.000 Bh Kunci lemari

@ Rp

6,440.00 = Rp
Sub total :
= Rp

6,440.00
6,440.00

Upah An. SNI ( Revisi ) 6.15.2


0.025 Oh Pekerja
0.250 Oh Tukang kayu

@ Rp
@ Rp

32,750.00 = Rp
42,000.00 = Rp

818.75
10,500.00

0.025 Oh Kepala tukang


### Oh Mandor

18 1 m2 pasang kaca, tebal 3 mm


Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kaca tebal 3 mm
Upah An. SNI ( Revisi ) 6.16.2
0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp

44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

Rp
Rp
Rp
Rp

1,100.00
68.75
12,487.50
18,927.50

37,306.00 = Rp
Sub total :
= Rp

41,036.60
41,036.60

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
48,529.10

19 1 m2 pasang kaca, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Kaca tebal 5 mm

@ Rp

56,396.00 = Rp
Sub total :
= Rp

62,035.60
62,035.60

Upah An. SNI ( Revisi ) 6.17.2


0.015 Oh Pekerja
0.150 Oh Tukang kayu

@ Rp
@ Rp

32,750.00 = Rp
42,000.00 = Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
Halaman : 111
660.00
41.25
7,492.50
69,528.10

65,090.00 = Rp
Sub total :
= Rp

71,599.00
71,599.00

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

0.015 Oh Kepala tukang


### Oh Mandor

20 1 m2 pasang kaca, rayben 5 mm


Bahan An. SNI ( Revisi ) 6.18.1
1.100 m2 Kaca tebal 8 mm

@ Rp
@ Rp

44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

Upah An. SNI ( Revisi ) 6.18.2


0.0150 Oh Pekerja
0.1500 Oh Tukang kayu
0.0150 Oh Kepala tukang
0.0008 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

21 1 m2 pasang kaca buram, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.19.1
1.100 m2 Kaca buram

@ Rp

Upah An. SNI ( Revisi ) 6.19.2


0.025 Oh Pekerja
0.250 Oh Tukang kayu
0.025 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

22 1 m2 pasang kaca cermin, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.20.1
1.100 m2 Kaca cermin

@ Rp

Upah An. SNI ( Revisi ) 6.20.2


0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
79,091.50

91,080.00 = Rp
Sub total :
= Rp

100,188.00
100,188.00

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

818.75
10,500.00
1,100.00
68.75
12,487.50
112,675.50

126,500.00 = Rp
Sub total :
= Rp

139,150.00
139,150.00

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
146,642.50

23 1 m2 pasang kaca cermin, tebal 6 mm


Bahan An. SNI ( Revisi ) 6.21.1
1.100 m2 Kaca cermin

@ Rp

Upah An. SNI ( Revisi ) 6.21.2


0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

328,900.00 = Rp
Sub total :
= Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
369,282.50
Halaman : 112

192,280.00 = Rp
Sub total :
= Rp

211,508.00
211,508.00

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

24 1 m2 pasang kaca painting / gambar, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.23.1
1.100 m2 Kaca wireglass
@ Rp
Upah An. SNI ( Revisi ) 6.23.2
0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

25 1 m2 pasang kaca patri, tebal 5 mm


Bahan An. SNI ( Revisi ) 6.24.1
1.100 m2 Kaca patri
Upah An. SNI ( Revisi ) 6.24.2
0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
### Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

@ Rp

@ Rp
@ Rp
@ Rp
@ Rp

361,790.00
361,790.00

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
219,000.50

325,000.00 = Rp
Sub total :
= Rp

357,500.00
357,500.00

32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :

=
=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

491.25
6,300.00
660.00
41.25
7,492.50
364,992.50

D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.

Halaman : 113

7 3

19

10 1

12

PEKERJAAN SANITAIR
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp
6.000 % Perlengkapan CLOSED
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja
1.100 Oh Tukang batu
0.001 Oh Kepala tukang
0.1600 Oh Mandor

814,660.00 = Rp
= Rp
Sub total :
=
Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

108,075.00
48,400.00
44.00
8,800.00
165,319.00
1,028,858.60

111,320.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp

111,320.00
4,979.04
906.84
117,205.88

Sub total :
Total upah+bahan :
2. Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp
6.000 Kg Semen portland
@ Rp
0.010 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.2.2
1.000 Oh Pekerja
1.500 Oh Tukang batu
0.150 Oh Kepala tukang
0.160 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
66,000.00
6,600.00
8,800.00
114,150.00
231,355.88

82,800.00
300.00
829.84
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

82,800.00
2,100.00
4,979.04
906.84
7,985.88

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

32,750.00
66,000.00
13,200.00
6,050.00
118,000.00
125,985.88

203,669.60 = Rp
Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp

203,669.60
61,100.88
4,979.04
90,684.40
360,433.92

Sub total :
Total upah+bahan :
3. Memasang 1 buah kloset jongkok teraso
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kloset jongkok teraso
7.000 Bh Bata merah 5 x 11 x 22
6.000 Kg Semen portland
0.010 m3 Pasir pasang

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.3.2


1.000 Oh Pekerja
1.500 Oh Tukang batu
0.300 Oh Kepala tukang
0.110 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

4. Memasang 1 buah urinoir


Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Urinoir
30.000 % Perlengkapan urinoir
6.000 Kg Semen portland
0.010 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.4.2
1.000 Oh Pekerja
1.000 Oh Tukang batu
0.100 Oh Kepala tukang

@ Rp
@ Rp
@ Rp

=
=
=
=
=
=

@ Rp
@ Rp
@ Rp

32,750.00 = Rp
44,000.00 = Rp
44,000.00 = Rp

@ Rp

55,000.00 = Rp
=
Rp
=
Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.100 Oh Mandor

Sub total :
Total upah+bahan :
5. Memasang 1 buah wastafel
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Wastafel
@ Rp
12.000 % Perlengkapan washtafel

814,660.00
48,879.60
863,539.60

365,000.00 = Rp
= Rp

32,750.00
44,000.00
4,400.00
Halaman : 114
5,500.00
86,650.00
447,083.92

365,000.00
43,800.00

6.000 Kg Semen portland


0.010 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja
1.450 Oh Tukang batu
0.150 Oh Kepala tukang
0.100 Oh Mandor

@ Rp
@ Rp

829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

6,550.00
63,800.00
6,600.00
5,500.00
82,450.00
586,913.44

75,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp

75,000.00
4,979.04
90,684.40
170,663.44

Sub total :
Total upah+bahan :
6. Memasang 1 buah bak mandi teraso volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Bak teraso
@ Rp
6.000 Kg Semen portland
@ Rp
0.010 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.6.2
2.100 Oh Pekerja
0.750 Oh Tukang batu
0.070 Oh Kepala tukang
0.110 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

68,775.00
33,000.00
3,080.00
6,050.00
110,905.00
281,568.44

145,000.00 = Rp
= Rp
Sub total :
=
Rp

145,000.00
26,100.00
171,100.00

Sub total :
Total upah+bahan :
7. Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Bak fiberglass
@ Rp
18.000 % Perlengkapan bak fiber
Upah An. SNI ( Revisi ) 6.7.2
1.800 Oh Pekerja
2.700 Oh Tukang batu
0.540 Oh Kepala tukang
0.110 Oh Mandor

=
=
=
=
=
=

@ Rp
@ Rp
@ Rp
@ Rp

=
=
=
=
=
=

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

58,950.00
118,800.00
23,760.00
6,050.00
207,560.00
378,660.00

300.00
829.84
90,684.40
460.00
1,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

120.00
99,580.80
27,205.32
165,600.00
6,000.00
198,805.32
Halaman : 115

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

196,500.00
132,000.00
13,200.00
16,500.00
358,200.00
557,005.32

1,250,000.00 = Rp
= Rp
Sub total :
=
Rp

1,250,000.00
250,000.00
1,500,000.00

Sub total :
Total upah+bahan :
8. Memasang 1 buah bak mandi batu bata volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.8.1
0.400 m3 Batu bata
@ Rp
### Kg Semen portland
@ Rp
0.300 m3 Pasir pasang
@ Rp
### Bh Porselen ( 11x11 ) cm @ Rp
6.000 Kg Semen nat
@ Rp
Sub total :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.8.2


6.000 Oh Pekerja
3.000 Oh Tukang batu
0.300 Oh Kepala tukang
0.300 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

9. Memasang 1 buah badtub porselen KIA ; INA ; Toto


Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip
@ Rp
20.000 % Perlengkapan badkip
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja
0.075 Oh Tukang batu
0.750 Oh Kepala tukang
0.250 Oh Mandor

4,979.04
90,684.40
504,463.44

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00
Sub total :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

0.00
3,300.00
33,000.00
13,750.00
50,050.00

Total upah+bahan :
9. Memasang 1 buah badtub fiber glass.
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip
20.000 % Perlengkapan badkip
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja
0.075 Oh Tukang batu
0.750 Oh Kepala tukang
0.250 Oh Mandor

@ Rp

Rp

1,550,050.00

575,000.00 = Rp
= Rp
Sub total :
=
Rp

575,000.00
115,000.00
690,000.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

0.00
3,300.00
33,000.00
13,750.00
50,050.00
740,050.00

345,000.00
8,740.00
2,622,000.00
37,195.60

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

310,500.00
1,573,200.00
655,500.00
185,978.00
15,000.00
2,740,178.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

114,625.00
198,000.00
39,600.00
49,500.00
401,725.00
3,141,903.00

Sub total :
Total upah+bahan :
10. Membuat 1 buah bak beton volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.10.1
0.900 m3 Beton 1 : 1.5 : 2.5
@ Rp
### Kg Besi beton
@ Rp
0.250 m3 Kayu cetakan
@ Rp
5.000 m2 Keramic 20 x 25
@ Rp
1.000 Ls Perlengkapan

Sub total :
Upah An. SNI ( Revisi ) 6.10.2
3.500 Oh Pekerja
4.500 Oh Tukang batu
0.900 Oh Kepala tukang
0.900 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

11. Memasang 1 buah bak mandi fiberglass volume 1 m3 air


Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Bak fiberglass
@ Rp
13,340.00 = Rp
12.000 % Perlengkapan bak fiber
= Rp
Sub total :
=
Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.11.2


3.000 Oh Pekerja
4.500 Oh Tukang batu
0.900 Oh Kepala tukang
0.900 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

98,250.00
198,000.00
39,600.00
49,500.00
385,350.00
400,290.80

24,288.00
300.00
829.84
90,684.40
74,520.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,716.80
8.10
3,252.97
5,894.49
1,788.48
37,660.84

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,585.00
3,080.00
308.00
385.00
8,358.00
46,018.84

29,578.00
300.00
829.84
90,684.40

=
=
=
=

Rp
Rp
Rp
Rp

32,535.80
165.00
8,547.35
5,531.75

Sub total :
Total upah+bahan :
14. Memasang 1 m' pipa beton, 15 - 20 cm
Bahan An. SNI ( Revisi ) 6.14.1
1.100 Bh Pipa beton
0.027 m3 Batu bata
3.920 Kg Semen portland
0.065 m3 Pasir pasang
0 m3 Pasir urug

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.14.2


0.140 Oh Pekerja
0.070 Oh Tukang batu
0.007 Oh Kepala tukang
0.007 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

15. Memasang 1 m' pipa beton, 30 - 100 cm


Bahan An. SNI ( Revisi ) 6.15.1
1.100 Bh Pipa beton
0.550 m3 Batu bata
10.300 Kg Semen portland
0.061 m3 Pasir pasang

@ Rp
@ Rp
@ Rp
@ Rp

13,340.00
1,600.80
14,940.80
Halaman : 116

0 m3 Pasir urug

@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.15.2


0.380 Oh Pekerja
0.190 Oh Tukang batu
0.019 Oh Kepala tukang
0.019 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

74,520.00 = Rp
=
Rp

5,141.88
51,921.78

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,445.00
8,360.00
836.00
1,045.00
22,686.00
74,607.78

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

43.50
36,512.96
6,347.91
9,598.82
13,984.00
5,616.60
72,103.79

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,458.33
44,660.00
66.00
880.00
51,064.33
123,168.12
Halaman : 117

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

75.00
63,897.68
11,788.97
2,742.52
22,724.00
8,424.90
109,653.07

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

46,505.00
20,680.00
2,068.00
3,905.00
73,158.00
182,811.07

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

111.30
94,601.76
16,685.93
4,525.16
42,389.00
11,233.20
169,546.35

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,740.00
31,680.00
3,168.00
5,940.00
4,400.00
115,928.00
285,474.35

16,000.00 = Rp
= Rp
Sub total :
=
Rp

19,200.00
5,600.00
24,800.00

Sub total :
Total upah+bahan :
16. Memasang 1 buah bak kontrol pas. batu bata ( 30x30 ) cm, tinggi 35 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.145 m3 Batu bata
@ Rp
300.00
44.000 Kg Semen portland
@ Rp
829.84
0.070 m3 Pasir pasang
@ Rp
90,684.40
0.070 m3 Batu kerikil
@ Rp
137,126.00
1.600 Kg Besi beton
@ Rp
8,740.00
0.060 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.16.2
0.167 Oh Pekerja
@ Rp
32,750.00
1.015 Oh Tukang batu
@ Rp
44,000.00
0.0015 Oh Kepala tukang
@ Rp
44,000.00
0.016 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

17. Memasang 1 buah bak kontrol pas. batu bata ( 45x45 ) cm, tinggi 50 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu bata
@ Rp
300.00
77.000 Kg Semen portland
@ Rp
829.84
0.130 m3 Pasir pasang
@ Rp
90,684.40
0.020 m3 Batu kerikil
@ Rp
137,126.00
2.600 Kg Besi beton
@ Rp
8,740.00
0.090 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.17.2
1.420 Oh Pekerja
@ Rp
32,750.00
0.470 Oh Tukang batu
@ Rp
44,000.00
0.047 Oh Kepala tukang
@ Rp
44,000.00
0.071 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
18. Memasang 1 buah bak kontrol pas. batu bata ( 60x60 ) cm, tinggi 65 cm
Bahan An. SNI ( Revisi ) 6.18.1
0.371 m3 Batu bata
@ Rp
300.00
114.000 Kg Semen portland
@ Rp
829.84
0.184 m3 Pasir pasang
@ Rp
90,684.40
0.033 m3 Batu kerikil
@ Rp
137,126.00
4.850 Kg Besi beton
@ Rp
8,740.00
0.120 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
2.160 Oh Pekerja
@ Rp
32,750.00
0.720 Oh Tukang batu
@ Rp
44,000.00
0.072 Oh Kepala tukang
@ Rp
44,000.00
0.108 Oh Mandor
@ Rp
55,000.00
0.100 Oh Tukang gali
@ Rp
44,000.00
Sub total :
Total upah+bahan :
19. Memasang 1 m' pipa galvanis 1/2"
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.19.2

@ Rp

0.054
0.090
0.009
0.027

Oh Pekerja
Oh Tukang batu
Oh Kepala tukang
Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,768.50
3,960.00
396.00
1,485.00
7,609.50
32,409.50

20,067.50 = Rp
= Rp
Sub total :
=
Rp

24,081.00
7,023.63
31,104.63

Sub total :
Total upah+bahan :
20. Memasang 1 m' pipa galvanis 3/4"
Bahan An. SNI ( Revisi ) 6.20.1
1.200 m' Pipa galvanis
35
% Perlengkapan

@ Rp

=
=
=
=
=
=

Halaman : 118

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Upah An. SNI ( Revisi ) 6.20.2


0.054 Oh Pekerja
0.090 Oh Tukang batu
0.009 Oh Kepala tukang
0.027 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,768.50
3,960.00
396.00
1,485.00
7,609.50
38,714.13

26,450.00 = Rp
= Rp
Sub total :
=
Rp

31,740.00
9,257.50
40,997.50

Sub total :
Total upah+bahan :
21. Memasang 1 m' pipa galvanis 1"
Bahan An. SNI ( Revisi ) 6.21.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.21.2
0.054 Oh Pekerja
0.090 Oh Tukang batu
0.009 Oh Kepala tukang
0.027 Oh Mandor

@ Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,768.50
3,960.00
396.00
1,485.00
7,609.50
48,607.00

50,105.50 = Rp
= Rp
Sub total :
=
Rp

60,126.60
17,536.93
77,663.53

Sub total :
Total upah+bahan :
22. Memasang 1 m' pipa galvanis 1,25"
Bahan An. SNI ( Revisi ) 6.22.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.22.2
0.108 Oh Pekerja
0.180 Oh Tukang batu
0.018 Oh Kepala tukang
0.0054 Oh Mandor

@ Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Upah An. SNI ( Revisi ) 6.23.2


0.108 Oh Pekerja
0.180 Oh Tukang batu
0.018 Oh Kepala tukang
0.0054 Oh Mandor

@ Rp

3,537.00
7,920.00
792.00
297.00
12,546.00
90,209.53

67,275.00 = Rp
= Rp
Sub total :
=
Rp

80,730.00
23,546.25
104,276.25

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

@ Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,537.00
7,920.00
792.00
297.00
12,546.00
116,822.25

91,333.00 = Rp
= Rp
Sub total :
=
Rp

109,599.60
31,966.55
141,566.15

Sub total :
Total upah+bahan :
24. Memasang 1 m' pipa galvanis 3"
Bahan An. SNI ( Revisi ) 6.24.1
1.200 m' Pipa galvanis
35
% Perlengkapan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :
23. Memasang 1 m' pipa galvanis 2"
Bahan An. SNI ( Revisi ) 6.23.1
1.200 m' Pipa galvanis
35
% Perlengkapan

=
=
=
=
=
=

=
=
=
=
=
=

Upah An. SNI ( Revisi ) 6.24.2


0.135 Oh Pekerja
0.225 Oh Tukang batu

@ Rp
@ Rp

32,750.00 = Rp
44,000.00 = Rp

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

0.0225 Oh Kepala tukang


0.0068 Oh Mandor

25. Memasang 1 m' pipa PVC tipe AW 1/2"


Bahan An. SNI ( Revisi ) 6.25.1
1.200 m' Pipa PVC
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.25.2
0.036 Oh Pekerja
0.060 Oh Tukang batu
0.006 Oh Kepala tukang
0.0018 Oh Mandor

@ Rp
@ Rp

44,000.00 = Rp
55,000.00 = Rp
Sub total :
=
Rp
Total upah+bahan :
=
Rp

@ Rp

10,541.59 = Rp
= Rp
Sub total :
=
Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

26. Memasang 1 m' pipa PVC tipe AW 3/4"


Bahan An. SNI ( Revisi ) 6.26.1
1.200 m' Pipa PVC
35
% Perlengkapan

@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.26.2


0.036 Oh Pekerja
0.060 Oh Tukang batu
0.006 Oh Kepala tukang
0.0018 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

1,179.00
2,640.00
264.00
99.00
4,182.00
20,521.46

6,837.90 = Rp
= Rp
=
Rp

8,205.48
2,393.27
10,598.75

32,750.00
44,000.00
44,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,179.00
2,640.00
264.00
99.00
4,182.00
14,780.75

9,085.00 = Rp
= Rp
=
Rp

10,902.00
3,179.75
14,081.75

Sub total :
Total upah+bahan :
27. Memasang 1 m' pipa PVC tipe AW 1"
Bahan An. SNI ( Revisi ) 6.27.1
1.200 m' Pipa PVC
35
% Perlengkapan

@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.27.2


0.036 Oh Pekerja
0.060 Oh Tukang batu
0.006 Oh Kepala tukang
0.0018 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Upah An. SNI ( Revisi ) 6.29.2


0.036 Oh Pekerja
0.060 Oh Tukang batu
0.006 Oh Kepala tukang
0.0018 Oh Mandor

@ Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,179.00
2,640.00
264.00
99.00
4,182.00
18,263.75

13,225.00 = Rp
= Rp
Sub total :
=
Rp

15,870.00
4,628.75
20,498.75

Sub total :
Total upah+bahan :
28 Memasang 1 m' pipa PVC tipe D 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.200 m' Pipa PVC
35
% Perlengkapan

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,179.00
2,640.00
264.00
99.00
4,182.00
24,680.75
Halaman : 120

19,435.00 = Rp
= Rp
Sub total :
=
Rp

23,322.00
6,802.25
30,124.25

Sub total :
Total upah+bahan :

=
=
=
=
=
=

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

29 Memasang 1 m' pipa PVC tipe D 3"


Bahan An. SNI ( Revisi ) 6.30.1
1.200 m' Pipa PVC
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.30.2
0.036 Oh Pekerja

@ Rp

@ Rp

12,649.91
3,689.56
16,339.46

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

=
=
=
=
=
=

4,421.25
9,900.00
Halaman : 119
990.00
374.00
15,685.25
157,251.40

32,750.00 = Rp

1,179.00

0.060 Oh Tukang batu


0.0060 Oh Kepala tukang
0.0018 Oh Mandor

30 Memasang 1 m' pipa PVC tipe D 4"


Bahan An. SNI ( Revisi ) 6.31.1
1.200 m' Pipa PVC
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.31.2
0.081 Oh Pekerja
0.135 Oh Tukang batu
0.0135 Oh Kepala tukang
0.0041 Oh Mandor

@ Rp
@ Rp
@ Rp

44,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
=
Rp
Total upah+bahan :
=
Rp

@ Rp

84,180.00 = Rp
= Rp
Sub total :
=
Rp

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

31 Memasang 1 buah bak cuci piring stainless steel


Bahan An. SNI ( Revisi ) 6.33.1
1.000 Bh Bak cuci stainless steel @ Rp
1.000 set Water drain + assesorie @ Rp
Upah An. SNI ( Revisi ) 6.33.2
0.030 Oh Pekerja
0.300 Oh Tukang batu
0.030 Oh Kepala tukang
0.0015 Oh Mandor

2,652.75
5,940.00
594.00
225.50
9,412.25
139,891.25

265,000.00 = Rp
75,000.00 = Rp
Sub total :
=
Rp

265,000.00
75,000.00
340,000.00

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

982.50
13,200.00
1,320.00
82.50
15,585.00
355,585.00

115,000.00
55,000.00
829.84
90,684.40

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

115,000.00
55,001.00
849.84
90,684.45
261,535.29

32,750.00
44,000.00
44,000.00
55,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,637.50
22,000.00
2,200.00
137.50
25,975.00
287,510.29

Sub total :
Total upah+bahan :
32 Memasang 1 buah bak cuci piring teraso
Bahan An. SNI ( Revisi ) 6.34.1
1.000 Bh Bak cuci teraso
1.000 set Water drain + assesorie
20.000 Kg Semen portland
0.050 m3 Pasir pasang

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.34.2


0.050 Oh Pekerja
0.500 Oh Tukang batu
0.050 Oh Kepala tukang
0.0025 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :

Halaman : 121

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

33 Memasang 1 buah kran 3/4" atau 1/2"


Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air
0.025 Bh Seal tape

@ Rp
@ Rp

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.005 Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

35,000.00 = Rp
2,500.00 = Rp
Sub total :
=
Rp
32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :
34 Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain

@ Rp
Sub total :

Upah An. SNI ( Revisi ) 6.36.2

101,016.00
29,463.00
130,479.00

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Total upah+bahan :

=
=
=
=
=
=

2,640.00
264.00
99.00
4,182.00
34,306.25

=
=
=
=
=
=

35,000.00
62.50
35,062.50

Rp
Rp
Rp
Rp
Rp
Rp

327.50
4,400.00
440.00
275.00
5,442.50
40,505.00

15,000.00 = Rp
=
Rp

15,000.00
15,000.00

0.010
0.100
0.010
0.005

Oh Pekerja
Oh Tukang batu
Oh Kepala tukang
Oh Mandor

@ Rp
@ Rp
@ Rp
@ Rp

32,750.00
44,000.00
44,000.00
55,000.00

Sub total :
Total upah+bahan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

327.50
4,400.00
440.00
275.00
5,442.50
20,442.50

PEMBUATAN SEPTIKTANK UNTUK KAPASITAS 15 ORANG.


( Ukuran 1.5 X 2.5 X dalam 1.75 & resapan diameter 1.5 m dalam 2m )

Volume
13
4
3
29
1
0
2
2
1
5
20
1

Uraian pekerjaan
@ Rp
M3 Galian tanah
M3Urug kembali tanah (1@ Rp
M3 Pasang batu bata 1: @ Rp
@ Rp
M2 Plesteran 1:2
@ Rp
Beton tumbuk 1:2:3.
M3 Beton bertulang 123 @ Rp
@ Rp
Kerikil keringan
@ Rp
M3 Pasir saringan
M' Pasang pipa besi O 2 @ Rp
M' Pasang pipa PVC O @ Rp
@ Rp
Kg Ijuk Saringan
@ Rp
Alat - alat bantu

D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.

Harga satuan.
20,086.50
7,333.00
431,665.19
22,671.87
430,537.20
2,819,502.95
137,126.00
90,684.40
35,000.00
139,891.25
5,372.80
35,000.00
Jumlah

Jumlah harga
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp

261,124.50
29,332.00
1,294,995.58
657,484.28
301,376.04
563,900.59
205,689.00
181,368.80
35,000.00
699,456.25
107,456.00
35,000.00
4,372,183.04

Halaman : 122

2,725,178.00