( AHSP )
BIDANG KECIPTAKARYAAN
TAHUN 2013
JENAWI, TAWANGMANGU, JATIYOSO
WILAYAH III
JENAWI,
TAWANGMANGU,
JATIYOSO
1.
2.
3.
No.
PERINCIAN KEGIATAN
SATUAN
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
UPAH TENAGA :
Ass. Driller
Buruh Semi Terlatih
Buruh Terlatih
Crew Drilling
Driller
Geophysicst
Kepala Tukang
Koordinator Logging
Mandor
Masinis / Operator
Mekanik
Mekanik Pembantu
Mekanik/Welder
Operator Pompa
Operator Semi Terlatih
Operator Terlatih
Pekerja / buruh tak terlatih
Pembantu Geophysicst
Pembantu Masinis / Operator
Pembantu Sopir
Sopir
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Elektro
Tukang Kayu
Tukang Listrik
Tukang Masak Aspal
Tukang Pompa
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
m3
bh
set
bh
bh
m'
lbr
m'
lbr
lbr
kg
kg
unit
m3
kg
ljr
bh
bh
m2
m3
kg
ton
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
roll
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
lbr
bh
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
kg
bh
bh
bh
bh
bh
bh
lbr
bh
bh
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m3
m3
m2
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
Granit 60 x 60
Gunting Pangkas
Gypsum 6,5 mm (120 x 240 )
Gypsum 9 mm
Hak Angin ( biasa )
Hak Angin ( sedang )
Hak Angin ( super )
Handle Jendela
Hardplek 1 x 1 m' tebal 3 mm
Ijuk
Jaring Rajut
Jas Hujan
Kabel Listrik 1,50 mm
Kabel Listrik 2,50 mm
Kabel Power
Kaca Aluminium profil / patri
Kaca Bening 3 mm
Kaca Bening 5 mm
Kaca Bening 8 mm
Kaca Es Tebal 5 mm
Kaca naco merk Daici / daun bening
Kaca Rayben 5 mm
Kait Angin ( biasa )
Kait Angin ( sedang )
Kait Angin ( Super )
Kapur Pasang
Kayu Acuan
Kayu Bakar
Kayu Bangkiray Balok
Kayu Bangkiray Papan
Kayu Begesting / sengon
Kayu Dudukan Fitting
Kayu Jati Grajen Lokal Kusen
Kayu Jati Grajen Lokal Rangka Atap
Kayu Jati Grajen untuk Kozen
Kayu Jati Grajen untuk Rangka Atap
Kayu Jati untuk Konstruksi Jembatan
Kayu Jati untuk perquet
Kayu Kamper Balok
Kayu Kamper Papan
Kayu Kruing Balok
Kayu Kruing Papan
Kayu List Profil
Kayu Meranti 5/7
Kayu Perancah
Kawat Bendrat
Kawat Bronjong
m2
bh
lbr
lbr
bh
bh
bh
bh
lbr
kg
bh
bh
m'
m'
unit
m'
m2
m2
m2
m2
m2
m2
bh
bh
bh
m3
m3
kg
m3
m3
m3
bh
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m'
m3
m3
kg
kg
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
Kawat Bronjong Q 6 mm
Kawat Harmonika
Kawat Las Listrik
Kawat Saringan
Kawat Segel
Keramik 20 x 20
Keramik 20 x 25 dinding
Keramik 30 x 30 polos
Keramik 30 x 30 warna motif
Kerikil Sungai di quary
Klosed Jongkok Porselin
Kompas
Kran Air d. 1/2" ( biasa )
Kran Air d. 1/2" ( sedang )
Kran Air d. 1/2" ( super )
Kran Air d. 3/4" ( biasa )
Kran Air d. 3/4" ( sedang )
Kran Air d. 3/4" ( super )
Kran Air d. 1" ( biasa )
Kran Air d. 1" ( sedang )
Kran Air d. 1" ( super )
Kusen Almunium Coklat
Kusen Almunium Putih
Kuwas 4"
Lampu SL 18 watt
Lampu SL 20 watt
Lem kayu putih ex. Fox
Lem kuning ex. Aica Aibon
Lem wallpaper
Linggis
List gypsum profil
Marmer lokal ex. Tulung Agung
Marmer import ex. Italy
Masker
Mesin Potong Rumput Dorong
Mesin Potong Rumput Gendong
Minyak Bensin
Minyak Cat/Tiner B
Minyak Diesel/Solar
Minyak Pelumas
Minyak Tanah
Multiplex 4 mm
Multiplex 6 mm
Multiplex 8 mm
Multiplex 9 mm
Multiplek 12 mm
Multi Tester Digital
m2
m2
kg
m2
m'
m2
m2
m2
m2
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
kg
kg
kg
bh
m
m2
m2
bh
bh
bh
ltr
kg
ltr
ltr
ltr
lbr
lbr
lbr
lbr
lbr
bh
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
bh
kg
lbr
kg
kg
kg
bj
bj
kg
kg
unit
bh
m3
m3
m3
m3
m3
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
ljr
ljr
ljr
ljr
ljr
2
m
bh
bh
bh
m2
bh
m2
m2
m2
bh
unit
m2
bh
bh
bh
bh
bh
bh
tube
bh
m'
m'
m'
unit
m3
lbr
lbr
lbr
bh
pak
bh
bh
bh
bh
unit
set
set
bh
bh
bh
m3
m3
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
bh
bh
bh
bh
bh
lbr
m2
m2
m2
m2
m2
m2
bh
bh
pak
bh
bh
bh
lbr
lbr
lbr
lbr
kg
bh
bh
unit
bh
bh
m'
1
2
3
4
5
6
7
Stom Walls ZM
Bureng Stom Walls ZM.
Drek Kopling Stom Walls ZM.
Geer Pinion Stom Walls ZM.
Gigi Roda Besar/Ring Gear Stom Walls ZM.
Kampas Kopling maju-mundur Stom Walls ZM.
Lager Drek Kopling 6019 Stom Walls ZM.
Sil Drek Kopling 105 130 Stom Walls ZM.
bh
bh
bh
bh
set
bh
bh
1
2
3
4
5
6
7
set
set
set
bh
bh
set
set
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
bh
bh
bh
bh
bh
set
set
set
bh
bh
bh
bh
bh
bh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
bh
set
bh
set
bh
bh
bh
set
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
21
22
23
24
25
26
27
28
29
30
31
32
bh
bh
bh
bh
bh
set
set
set
bh
bh
bh
bh
1
2
3
4
5
6
7
set
bh
bh
bh
bh
bh
bh
Accu
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
6
7
8
9
Laker
6206
6304
6305
22212 NACHI
22212 NTN
22212 TWB
22215 NACHI
22215 NTN/NSK/K040
62/28 NR
63/28 NR
Biting
Seal
Seal 105130
Seal 4060
Seal 5080
Seal 6085
TC 30 x 42 x 8
TC 40 x 60 x 10
TC 50 x 72 x 12
TC 50 x 80 x 10
TC 60 x 85 x 13/12
120 Amper
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
1
2
3
4
5
6
1
2
3
4
5
Oli
Oli Gardan
Oli Hidrolis
Oli Mesin
Oli Ronsel
Stimped
bh
bh
liter
bh
kg
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Jam
Jam
Jam
Jam
bh
Jam
Jam
Jam
Jam
Jam
Jam
bh
bh
bh
bh
bh
bh
bh
bh
bh
Jam
bh
Jam
bh
Jam
Jam
Jam
Jam
Jam
bh
kg
kg
kg
kg
kg
kg
31
32
33
34
35
Jam
Jam
Jam
Jam
Jam
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
set
set
set
set
set
pc
pc
pc
pc
set
pc
set
set
set
set
set
set
set
set
pc
pc
pc
pc
pc
pc
set
set
set
set
set
set
set
set
pc
pc
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
10 in x 0.01 in
20 in x 0.01 in
30 in x 0.01 in
50 in x 0.01 in
Dial Thermometers
Direct Shear Test Set
Distilation of Cutback Asphalts
Ductility of Bituminous Materials Test
Dutch Cone Penetrometer 10 Tons Capacity
Dutch Cone Penetrometer 2,5 Tons Capacity
Dutch Cone Penetrometer 5 Tons Capacity
Dynamic Cone Penetrometer
Electric Compresion Machine
Electric Compression/Compression Machine Electric
50 tons capacity, 0,5 ton readability
100 tons capacity, 1,0 ton readability
150 tons capacity, 2,0 ton readability
200 tons capacity, 2,5 ton readability
Electric Liquid Limit Device Test Set
Electric Marshall Compactor weight 10 lbs & dia 4"
Electric Marshall Compactor weight 20 lbs & dia 6"
Electric Motorized CBR Loading Machine
Erlenmeyer
500 ml capacity
250 ml capacity
100 ml capacity
Field CBR Test Set / In Situ CBR Test Set
Flakiness Sieves BS-812 ( all size )
Flash and Fire Point by Cleveland Open Cup
Graduated Cylinder Glass made, single numbering
1000 ml capacity
500 ml capacity
250 ml capacity
100 ml capacity
50 ml capacity
Hand bor
Hydraulic Concrete Beam Testing
Hydrometer Analysis Test Set
Laboratory Concrete Mixer
Laboratory Penetration Test Set
Length Gauge BS-812
Liquid Limit Device With Counter
Liquid Limit Test Set
Los Angeles Abrassion Machine
Loss on Heating/Thin Film Test
Manometer
100 kg capacity
pc
pc
pc
pc
unit
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
pc
pc
pc
set
pc
set
pc
pc
pc
pc
pc
set
set
set
set
set
set
set
set
set
set
pc
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
250 kg capacity
300 kg capacity
500 kg capacity
600 kg capacity
1000 kg capacity
Manually Laboratorium CBR Test Set
Marshall Test Set
Mechanical Balances Cent-O-Gram Balance
Mechanical Balances Dial-O-Gram Balance
Mechanical Balances Heavy Duty Solution Balance
Mechanical Balances Triple Beam Balance
Mechanical Beam Testing Mechine
Modulus of Elasticity in Concrete Test
Moisture Content Test Set
Mot Straight Edge
Motorized Direct Shear Test
Motorized Flow Table
Organic Impurities Test Set
Oven
Plastic Limit Test Set
Plate Bearing Test Set
Proving Ring
100 kg capacity
200 kg capacity
500 kg capacity
1.000 kg capacity
2.000 kg capacity
6.000 kg capacity
10.000 kg capacity
Proving Ring Penetrometer
Reflux Extrator Test Set
Sample Extruder Horizontal type dia. 68 mm
Sample Extruder Vertical type dia 35 mm
Sand Cone Test Set
Sand Equivalent Shaker
Sand Equivalent Test Set
Saybolt Viscossimeter
Shrinkage Limit Test Set
Sieve Shaker Dynamic System
Sieve Shaker Dynamic System ( Analog Timer )
Sieve Shaker Dynamic System ( Digital Timer )
Simple Splitter Stainless Steel ( all size )
Slump Test Set
Softening Point Test Set
Soundness Test Set
Specific Gravity & Absorbtion of Coarse Aggregate Test Set
Specific Gravity ( Heating Method )
pc
pc
pc
pc
pc
set
set
unit
unit
unit
unit
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
92
93
94
95
96
97
98
99
100
101
102
103
104
set
set
set
set
set
set
set
set
set
set
set
set
set
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Unit/tahun
Unit/tahun
Unit/tahun
Buah/tahun
Buah/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
Unit/tahun
IV
1
2
3
4
5
6
7
Unit
Unit
Unit
Unit
Unit
Unit
Set
Unit
Gedung ( Per - M2 )
a. Gedung Bertingkat
'- Kelas Sederhana
'- Kelas Tidak Sederhana
b. Gedung Tidak Bertingkat
'- Kelas Sederhana
'- Kelas Tidak Sederhana
c. Rumah Negara
'- Tipe A
'- Tipe B
'- Tipe C
Pagar ( Per - M2 )
a. Gedung Bertingkat
Depan
'- Kelas Sederhana
'- Kelas Tidak Sederhana
Samping
'- Kelas Sederhana
'- Kelas Tidak Sederhana
b. Rumah Negara
Depan
'- Tipe A
'- Tipe B
'- Tipe C
Samping
'- Tipe A
'- Tipe B
'- Tipe C
HARGA BUPATI
2013
HARGA REAL
/ DASAR
2013
107,000.00
49,500.00
55,000.00
65,000.00
149,800.00
214,000.00
61,500.00
187,250.00
58,500.00
61,500.00
61,500.00
55,500.00
55,500.00
74,900.00
55,500.00
61,500.00
43,000.00
171,200.00
48,150.00
37,450.00
55,500.00
55,500.00
55,500.00
55,500.00
58,850.00
61,500.00
53,500.00
61,500.00
64,200.00
85,000.00
37,500.00
44,000.00
52,500.00
120,000.00
172,500.00
50,000.00
150,000.00
46,000.00
50,000.00
50,000.00
45,000.00
45,000.00
60,000.00
45,000.00
50,000.00
34,000.00
135,000.00
38,500.00
30,250.00
45,000.00
45,000.00
45,000.00
45,000.00
47,500.00
50,000.00
42,500.00
50,000.00
50,000.00
WILAYAH I
HARGA DASAR
PPN 10 %
5
85,000.00
37,500.00
44,000.00
52,000.00
120,000.00
172,000.00
49,000.00
150,000.00
46,000.00
49,000.00
49,000.00
44,500.00
44,500.00
60,000.00
44,500.00
49,000.00
34,000.00
135,000.00
38,500.00
30,000.00
44,500.00
44,500.00
44,500.00
44,500.00
47,000.00
49,000.00
42,500.00
49,000.00
50,000.00
93,500.00
41,250.00
48,400.00
57,200.00
132,000.00
189,200.00
53,900.00
165,000.00
50,600.00
53,900.00
53,900.00
48,950.00
48,950.00
66,000.00
48,950.00
53,900.00
37,400.00
148,500.00
42,350.00
33,000.00
48,950.00
48,950.00
48,950.00
48,950.00
51,700.00
53,900.00
46,750.00
53,900.00
55,000.00
90,000.00
5,623,000.00
53,500.00
1,016,500.00
37,450,000.00
30,000.00
2,250.00
34,000.00
73,562.50
56,175.00
12,000.00
13,000.00
1,669,200.00
60,187.50
17,500.00
8,025.00
2,475.00
590.00
167,188.00
153,750.00
12,706.00
521,625.00
150,000.00
170,531.00
167,188.00
153,813.00
158,500.00
220,688.00
200,625.00
214,000.00
180,563.00
26,750.00
12,038.00
16,050.00
24,075.00
25,412.50
33,438.00
41,462.50
66,875.00
69,550.00
73,562.50
83,460.00
70,000.00
4,500,000.00
41,500.00
825,000.00
30,000,000.00
24,000.00
1,800.00
26,500.00
58,000.00
43,750.00
9,500.00
10,500.00
1,350,000.00
45,000.00
13,500.00
6,000.00
2,000.00
470.00
130,000.00
117,500.00
9,750.00
420,000.00
120,000.00
132,500.00
130,000.00
123,000.00
122,500.00
120,000.00
177,500.00
160,000.00
170,000.00
145,000.00
21,000.00
2,000.00
9,750.00
12,000.00
12,500.00
18,750.00
19,750.00
25,750.00
32,000.00
52,000.00
55,600.00
57,000.00
65,000.00
50,000.00
4,500,000.00
41,500.00
817,500.00
30,000,000.00
24,000.00
1,800.00
26,500.00
58,000.00
43,750.00
9,250.00
10,000.00
1,340,000.00
45,000.00
8,500.00
6,000.00
1,950.00
460.00
130,000.00
117,500.00
9,750.00
419,500.00
30,000.00
120,000.00
132,500.00
130,000.00
123,000.00
122,500.00
120,000.00
162,500.00
157,500.00
152,500.00
125,000.00
21,000.00
2,000.00
9,000.00
12,000.00
12,500.00
18,750.00
19,750.00
25,750.00
32,000.00
52,000.00
55,600.00
57,000.00
65,000.00
55,000.00
4,950,000.00
45,650.00
899,250.00
33,000,000.00
26,400.00
1,975.00
29,150.00
63,800.00
48,125.00
10,175.00
11,000.00
1,474,000.00
49,500.00
9,350.00
6,600.00
2,150.00
506.00
143,000.00
129,250.00
10,725.00
461,450.00
33,000.00
132,000.00
145,750.00
143,000.00
135,300.00
134,750.00
132,000.00
178,750.00
173,250.00
167,750.00
137,500.00
23,100.00
2,200.00
9,900.00
13,200.00
13,750.00
20,625.00
21,725.00
28,325.00
35,200.00
57,200.00
61,150.00
62,700.00
71,500.00
14,980.00
113,018.75
46,200.00
48,150.00
60,187.50
23,406.25
23,406.25
26,750.00
93,625.00
9,416.00
1,537,590.00
1,237,187.50
20,062.50
11,770.00
26,750.00
267,500.00
9,362.50
20,062.50
33,437.50
11,502.50
287,562.50
7,000.00
802,500.00
159,965.00
67,324.40
67,945.00
8,025.00
8,025.00
5,350.00
4,280.00
2,250.00
2,750.00
3,200.00
963.00
4,013.00
642.00
44,844.00
13,453,110.00
5,231,765.00
8,693.75
12,037.50
18,725.00
123,718.75
167,187.50
-
11,750.00
85,000.00
37,000.00
37,000.00
45,000.00
18,000.00
18,000.00
21,000.00
75,000.00
7,500.00
1,200,000.00
1,000,000.00
15,000.00
9,000.00
7,500.00
200,000.00
7,000.00
15,000.00
25,000.00
8,750.00
230,000.00
5,000.00
650,000.00
125,000.00
52,000.00
52,000.00
5,750.00
5,500.00
6,250.00
4,000.00
3,250.00
1,825.00
2,200.00
2,550.00
750.00
3,100.00
500.00
34,500.00
10,000,000.00
4,000,000.00
6,500.00
9,250.00
14,500.00
100,000.00
130,000.00
125,000.00
11,750.00
85,000.00
37,000.00
37,000.00
45,000.00
18,000.00
18,000.00
21,000.00
75,000.00
7,500.00
1,200,000.00
995,000.00
15,000.00
9,000.00
7,500.00
200,000.00
7,000.00
15,000.00
25,000.00
8,750.00
230,000.00
5,000.00
645,000.00
125,000.00
52,000.00
52,000.00
5,700.00
5,450.00
6,200.00
3,950.00
3,200.00
1,750.00
2,150.00
2,500.00
700.00
3,050.00
450.00
34,500.00
10,000,000.00
4,000,000.00
19,000.00
6,500.00
9,250.00
14,500.00
99,500.00
130,000.00
125,000.00
12,925.00
93,500.00
40,700.00
40,700.00
49,500.00
19,800.00
19,800.00
23,100.00
82,500.00
8,250.00
1,320,000.00
1,094,500.00
16,500.00
9,900.00
8,250.00
220,000.00
7,700.00
16,500.00
27,500.00
9,625.00
253,000.00
5,500.00
709,500.00
137,500.00
57,200.00
57,200.00
6,275.00
6,000.00
6,825.00
4,350.00
3,500.00
1,922.50
2,350.00
2,750.00
775.00
3,350.00
500.00
37,950.00
11,000,000.00
4,400,000.00
20,900.00
7,150.00
10,175.00
15,950.00
109,450.00
143,000.00
137,500.00
112,168.10
10,031.25
20,062.50
33,437.50
22,000.00
597,916.00
134,531.10
4,012.50
5,350.00
1,909,950.00
60,187.50
60,187.50
80,250.00
8,693.75
12,037.50
18,725.00
250,380.00
1,270,625.00
1,187.70
9,897,500.00
10,432,500.00
1,112,800.00
5,500.00
8,693,750.00
8,145,375.00
16,718,750.00
11,368,750.00
23,406,250.00
10,031,250.00
10,365,625.00
6,018,750.00
6,353,125.00
1,337,500.00
20,062.50
24,075.00
87,000.00
65,000.00
75,000.00
7,500.00
15,500.00
25,500.00
8,000.00
17,500.00
10,000.00
475,000.00
100,000.00
3,100.00
4,100.00
1,500,000.00
750,000.00
47,000.00
48,000.00
250,000.00
135,000.00
65,000.00
6,500.00
9,000.00
14,500.00
200,000.00
980,000.00
950.00
8,000,000.00
8,450,000.00
900,000.00
4,000.00
7,000,000.00
6,500,000.00
13,550,000.00
9,100,000.00
19,000,000.00
23,000.00
8,100,000.00
8,350,000.00
4,850,000.00
5,100,000.00
4,000.00
4,500,000.00
1,000,000.00
16,000.00
18,500.00
130,000.00
87,000.00
65,000.00
75,000.00
7,500.00
15,500.00
25,500.00
8,000.00
17,500.00
10,000.00
475,000.00
100,000.00
3,100.00
4,100.00
1,500,000.00
750,000.00
47,000.00
48,000.00
250,000.00
135,000.00
64,500.00
6,500.00
9,000.00
14,500.00
200,000.00
980,000.00
950.00
7,860,000.00
8,290,000.00
895,000.00
4,000.00
6,990,000.00
6,550,000.00
13,450,000.00
9,125,000.00
18,800,000.00
23,000.00
7,950,000.00
8,225,000.00
4,725,000.00
5,000,000.00
4,000.00
4,500,000.00
1,050,000.00
16,000.00
18,500.00
143,000.00
95,700.00
71,500.00
82,500.00
8,250.00
17,050.00
28,050.00
8,800.00
19,250.00
11,000.00
522,500.00
110,000.00
3,400.00
4,500.00
1,650,000.00
825,000.00
51,700.00
52,800.00
275,000.00
148,500.00
70,950.00
7,150.00
9,900.00
15,950.00
220,000.00
1,078,000.00
1,000.00
8,646,000.00
9,119,000.00
984,500.00
4,400.00
7,689,000.00
7,205,000.00
14,795,000.00
10,037,500.00
20,680,000.00
25,300.00
8,745,000.00
9,047,500.00
5,197,500.00
5,500,000.00
4,400.00
4,950,000.00
1,155,000.00
17,600.00
20,350.00
3,500.00
53,500.00
40,125.00
45,000.00
20,062.50
147,125.00
256,800.00
20,062.50
33,437.50
50,156.25
23,406.25
36,781.25
53,500.00
46,812.50
66,875.00
73,562.50
107,000.00
93,625.00
20,000.00
30,093.75
36,781.25
67,945.00
8,239.00
5,605,462.50
5,231,765.00
4,500.00
22,405.80
4,500.00
24,610.00
8,025.00
450,000.00
18,500.00
15,000.00
2,700.00
45,000.00
43,000.00
32,000.00
36,000.00
16,250.00
115,000.00
200,000.00
16,100.00
26,750.00
40,000.00
18,750.00
29,500.00
42,750.00
37,500.00
53,500.00
58,750.00
85,000.00
75,000.00
15,000.00
22,500.00
27,500.00
12,500.00
62,000.00
61,000.00
52,500.00
10,000.00
125,000.00
425,000.00
6,500.00
4,500,000.00
4,200,000.00
4,500.00
15,000.00
4,500.00
19,000.00
7,500.00
75,000.00
94,000.00
110,000.00
150,000.00
200,000.00
350,000.00
18,500.00
15,000.00
2,700.00
45,000.00
43,000.00
32,000.00
36,000.00
16,000.00
115,000.00
200,000.00
16,100.00
26,750.00
40,000.00
18,750.00
29,500.00
42,750.00
37,500.00
53,500.00
58,750.00
85,000.00
75,000.00
15,000.00
22,500.00
27,500.00
12,500.00
62,000.00
61,000.00
52,500.00
10,000.00
125,000.00
425,000.00
6,500.00
4,500,000.00
4,200,000.00
4,500.00
15,000.00
4,500.00
19,000.00
7,500.00
75,000.00
94,000.00
110,000.00
150,000.00
200,000.00
350,000.00
20,350.00
16,500.00
2,975.00
49,500.00
47,300.00
35,200.00
39,600.00
17,600.00
126,500.00
220,000.00
17,700.00
29,425.00
44,000.00
20,625.00
32,450.00
47,025.00
41,250.00
58,850.00
64,625.00
93,500.00
82,500.00
16,500.00
24,750.00
30,250.00
13,750.00
68,200.00
67,100.00
57,750.00
11,000.00
137,500.00
467,500.00
7,150.00
4,950,000.00
4,620,000.00
4,500.00
16,500.00
4,500.00
20,900.00
7,500.00
82,500.00
103,400.00
121,000.00
165,000.00
220,000.00
385,000.00
250,000.00
1,500.00
183,906.00
20,063.00
23,406.00
16,050.00
4,213,125.00
44,833.00
144,450.00
127,062.50
93,625.00
80,250.00
115,000.00
2,340.00
82,272.00
508,250.00
60,187.50
66,875.00
86,937.50
100,312.50
160,500.00
167,187.50
300,937.50
133,750.00
173,875.00
280,875.00
361,125.00
526,440.00
674,100.00
708,875.00
23,406.25
28,087.50
35,443.75
64,868.75
195,000.00
1,475.00
147,500.00
16,000.00
18,000.00
22,500.00
600.00
450.00
16,000.00
12,500.00
3,350,000.00
34,500.00
115,000.00
100,000.00
75,000.00
50,000.00
90,000.00
1,800.00
10,000.00
63,000.00
400,000.00
1,800,000.00
4,700,000.00
4,800,000.00
5,000,000.00
5,400,000.00
5,700,000.00
6,200,000.00
180,000.00
46,500.00
52,000.00
67,500.00
75,000.00
125,000.00
130,000.00
235,000.00
105,000.00
135,000.00
225,000.00
290,000.00
425,000.00
540,000.00
570,000.00
18,000.00
21,500.00
27,500.00
50,000.00
195,000.00
1,200.00
147,500.00
16,000.00
18,000.00
22,500.00
600.00
450.00
16,000.00
12,500.00
3,350,000.00
34,500.00
95,000.00
90,000.00
75,000.00
50,000.00
90,000.00
1,800.00
10,000.00
63,000.00
400,000.00
1,800,000.00
4,700,000.00
4,800,000.00
5,000,000.00
5,400,000.00
5,700,000.00
6,200,000.00
180,000.00
46,500.00
52,000.00
67,500.00
75,000.00
125,000.00
130,000.00
235,000.00
105,000.00
135,000.00
225,000.00
290,000.00
422,500.00
540,000.00
570,000.00
18,000.00
21,500.00
27,500.00
50,000.00
214,500.00
1,320.00
162,250.00
17,600.00
19,800.00
24,750.00
650.00
500.00
17,600.00
13,750.00
3,685,000.00
37,950.00
104,500.00
99,000.00
82,500.00
55,000.00
99,000.00
1,975.00
11,000.00
69,300.00
440,000.00
1,980,000.00
5,170,000.00
5,280,000.00
5,500,000.00
5,940,000.00
6,270,000.00
6,820,000.00
198,000.00
51,150.00
57,200.00
74,250.00
82,500.00
137,500.00
143,000.00
258,500.00
115,500.00
148,500.00
247,500.00
319,000.00
464,750.00
594,000.00
627,000.00
19,800.00
23,650.00
30,250.00
55,000.00
96,300.00
176,550.00
256,800.00
521,625.00
802,500.00
46,813.00
702,188.00
501,563.00
1,121,093.00
15,167,250.00
601,875.00
82,272.00
18,725.00
16,050.00
6,003.00
29,896.00
59,792.00
74,740.00
1,235,850.00
243,425.00
80,250.00
86,938.00
73,563.00
112,168.00
173,875.00
80,250.00
147,125.00
247,437.50
300,937.50
3,852,000.00
15,000.00
240,000.00
225,000.00
36,781.25
75,000.00
137,500.00
200,000.00
410,000.00
650,000.00
15,600.00
23,500.00
31,250.00
7,100.00
37,250.00
350.00
550,000.00
400,000.00
350,000.00
800,000.00
12,250,000.00
481,500.00
3,000.00
35,000.00
65,000.00
14,750.00
12,750.00
4,750.00
25,000.00
24,000.00
47,750.00
59,750.00
1,250.00
987,500.00
195,000.00
64,200.00
69,550.00
58,850.00
90,000.00
139,500.00
64,000.00
117,750.00
198,000.00
240,750.00
3,000,000.00
12,000.00
192,000.00
180,000.00
29,500.00
75,000.00
137,500.00
200,000.00
410,000.00
645,000.00
15,600.00
23,500.00
31,250.00
7,100.00
37,250.00
350.00
550,000.00
400,000.00
350,000.00
800,000.00
12,200,000.00
481,500.00
3,000.00
35,000.00
65,000.00
14,750.00
12,750.00
4,750.00
25,000.00
24,000.00
47,750.00
59,750.00
1,250.00
987,500.00
195,000.00
64,200.00
69,550.00
58,850.00
90,000.00
139,500.00
64,000.00
117,750.00
198,000.00
240,750.00
3,000,000.00
115,000.00
140,000.00
12,000.00
192,000.00
180,000.00
29,500.00
82,500.00
151,250.00
220,000.00
451,000.00
709,500.00
17,150.00
25,850.00
34,375.00
7,800.00
40,975.00
375.00
605,000.00
440,000.00
385,000.00
880,000.00
13,420,000.00
529,650.00
3,300.00
38,500.00
71,500.00
16,225.00
14,025.00
5,225.00
27,500.00
26,400.00
52,525.00
65,725.00
1,375.00
1,086,250.00
214,500.00
70,600.00
76,500.00
64,700.00
99,000.00
153,450.00
70,400.00
129,525.00
217,800.00
264,825.00
3,300,000.00
126,500.00
154,000.00
13,200.00
211,200.00
198,000.00
32,450.00
523,176.50
2,500,000.00
50,000.00
40,000.00
125,190.00
45,000.00
52,000.00
91,200.00
111,000.00
86,700.00
100,000.00
844,615.20
5,350,000.00
25,000.00
321,000.00
31,907.40
167,187.50
53,500.00
48,150.00
66,875.00
61,525.00
735,625.00
22,000,000.00
90,000.00
5,500,000.00
67,500.00
1,150,000.00
418,500.00
2,000,000.00
40,000.00
32,000.00
100,000.00
36,000.00
41,500.00
73,000.00
89,000.00
69,000.00
80,000.00
675,000.00
4,325,000.00
20,000.00
246,000.00
25,500.00
134,000.00
42,800.00
38,500.00
53,500.00
49,200.00
1,150,000.00
418,500.00
2,000,000.00
40,000.00
32,000.00
100,000.00
36,000.00
41,500.00
73,000.00
89,000.00
69,000.00
80,000.00
675,000.00
4,300,000.00
20,000.00
246,000.00
25,500.00
134,000.00
42,800.00
38,500.00
53,500.00
49,200.00
47,500.00
590,000.00
800,000.00
17,500,000.00
72,000.00
4,400,000.00
54,000.00
1,265,000.00
460,350.00
2,200,000.00
44,000.00
35,200.00
110,000.00
39,600.00
45,650.00
80,300.00
97,900.00
75,900.00
88,000.00
742,500.00
4,730,000.00
22,000.00
270,600.00
28,050.00
147,400.00
47,100.00
42,350.00
58,850.00
54,100.00
52,250.00
649,000.00
880,000.00
19,250,000.00
79,200.00
4,840,000.00
59,400.00
441,375.00
396,435.00
1,524,750.00
15,247,500.00
722,250.00
1,043,250.00
72,225.00
353,100.00
317,100.00
1,219,800.00
12,198,000.00
577,800.00
834,600.00
57,700.00
388,400.00
348,800.00
1,341,800.00
13,417,800.00
635,600.00
918,100.00
63,500.00
601,875.00
722,250.00
56,175.00
1,203,750.00
240,750.00
240,750.00
56,175.00
481,500.00
577,800.00
44,900.00
963,000.00
192,600.00
192,600.00
44,900.00
529,700.00
635,600.00
49,400.00
1,059,300.00
211,900.00
211,900.00
49,400.00
595,000.00
800,000.00
17,500,000.00
72,000.00
4,400,000.00
54,000.00
91,806.00
2,808,750.00
1,364,250.00
120,375.00
1,524,750.00
102,399.00
120,375.00
1,524,750.00
280,875.00
56,175.00
56,175.00
108,337.50
1,203,750.00
396,435.00
152,475.00
200,625.00
1,564,875.00
762,375.00
56,175.00
601,875.00
361,125.00
2,006,250.00
722,250.00
56,175.00
321,000.00
73,400.00
2,247,000.00
1,091,400.00
96,300.00
1,219,800.00
81,900.00
96,300.00
1,219,800.00
224,700.00
44,900.00
44,900.00
86,600.00
963,000.00
317,100.00
121,900.00
160,500.00
1,251,900.00
609,900.00
44,900.00
481,500.00
288,900.00
1,605,000.00
577,800.00
44,900.00
256,800.00
80,700.00
2,471,700.00
1,200,500.00
105,900.00
1,341,800.00
90,100.00
105,900.00
1,341,800.00
247,200.00
49,400.00
49,400.00
95,300.00
1,059,300.00
348,800.00
134,100.00
176,600.00
1,377,100.00
670,900.00
49,400.00
529,700.00
317,800.00
1,765,500.00
635,600.00
49,400.00
282,500.00
1,524,750.00
1,524,750.00
383,113.50
536,070.00
722,250.00
2,166,750.00
361,125.00
722,250.00
1,444,500.00
20,009.00
4,597,362.00
200,625.00
1,524,750.00
401,250.00
722,250.00
642,000.00
280,875.00
1,524,750.00
240,750.00
255,409.00
1,219,800.00
1,219,800.00
306,400.00
428,800.00
577,800.00
1,733,400.00
288,900.00
577,800.00
1,155,600.00
16,000.00
3,677,800.00
160,500.00
1,219,800.00
321,000.00
577,800.00
513,600.00
224,700.00
1,219,800.00
192,600.00
204,300.00
1,341,800.00
1,341,800.00
337,000.00
471,700.00
635,600.00
1,906,700.00
317,800.00
635,600.00
1,271,200.00
17,600.00
4,045,600.00
176,600.00
1,341,800.00
353,100.00
635,600.00
565,000.00
247,200.00
1,341,800.00
211,900.00
224,700.00
401,250.00
104,325.00
321,000.00
48,150.00
321,000.00
1,364,250.00
722,250.00
306,020.00
2,006,250.00
1,284,000.00
1,253,505.00
24,075.00
321,000.00
83,400.00
256,800.00
38,500.00
256,800.00
1,091,400.00
577,800.00
244,800.00
1,605,000.00
1,027,200.00
1,002,800.00
19,200.00
353,100.00
91,700.00
282,500.00
42,400.00
282,500.00
1,200,500.00
635,600.00
269,300.00
1,765,500.00
1,129,900.00
1,103,100.00
21,100.00
481,500.00
642,000.00
353,100.00
104,325.00
722,250.00
361,125.00
240,750.00
385,200.00
513,600.00
282,400.00
83,400.00
577,800.00
288,900.00
192,600.00
423,700.00
565,000.00
310,600.00
91,700.00
635,600.00
317,800.00
211,900.00
2,140,000.00
1,712,000.00
1,883,200.00
72,225.00
64,200.00
92,287.50
731,880.00
869,107.50
531,255.00
866,700.00
1,030,410.00
88,275.00
112,350.00
88,275.00
57,700.00
51,300.00
73,800.00
585,500.00
695,200.00
425,000.00
693,300.00
824,300.00
70,600.00
89,800.00
70,600.00
63,500.00
56,400.00
81,200.00
644,100.00
764,700.00
467,500.00
762,600.00
906,700.00
77,700.00
98,800.00
77,700.00
80,250.00
28,087.50
56,175.00
64,200.00
11,235.00
13,642.50
17,655.00
19,260.00
21,667.50
64,200.00
22,400.00
44,900.00
51,300.00
8,900.00
10,900.00
14,100.00
15,400.00
17,300.00
70,600.00
24,600.00
49,400.00
56,400.00
9,800.00
12,000.00
15,500.00
16,900.00
19,000.00
64,200.00
64,200.00
64,200.00
64,200.00
64,200.00
64,200.00
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
29,425.00
29,425.00
33,437.50
29,425.00
80,250.00
23,500.00
23,500.00
26,700.00
23,500.00
64,200.00
25,900.00
25,900.00
29,400.00
25,900.00
70,600.00
14,177.50
467,697.00
2,527,554.00
29,639.00
78,000,000.00
179,118.00
72,107.30
109,765.95
172,136.25
250,380.00
79,099.75
218,377,236.25
168,038,620.80
667,497,565.00
690,259,407.50
511,423,486.25
549,907,042.05
634,680,130.00
394,489,542.05
378,524,537.50
21,357.20
121,870,528.30
171,200.00
152,243,949.55
248,448.65
319,100.75
11,871.65
11,770.00
14,744.60
15,860,000.00
11,300.00
374,100.00
2,022,000.00
23,700.00
62,700,000.00
143,200.00
57,600.00
87,800.00
137,700.00
200,300.00
63,200.00
175,684,000.00
135,187,000.00
537,001,000.00
555,313,000.00
411,440,000.00
442,400,000.00
510,600,000.00
317,366,000.00
304,522,000.00
17,000.00
97,997,000.00
136,900.00
122,446,000.00
198,700.00
255,200.00
9,400.00
9,400.00
11,700.00
12,688,000.00
12,400.00
411,500.00
2,224,200.00
26,100.00
68,970,000.00
157,500.00
63,400.00
96,600.00
151,500.00
220,300.00
69,500.00
193,252,400.00
148,705,700.00
590,701,100.00
610,844,300.00
452,584,000.00
486,640,000.00
561,660,000.00
349,102,600.00
334,974,200.00
18,700.00
107,796,700.00
150,600.00
134,690,600.00
218,600.00
280,700.00
10,300.00
10,300.00
12,900.00
13,956,800.00
246,369.00
11,529.25
139,528.00
69,550.00
70,213.40
207,687.00
9,200.00
111,600.00
55,600.00
56,100.00
166,100.00
10,100.00
122,800.00
61,200.00
61,700.00
182,700.00
1,138,212.50
6,835,427.50
7,519,585.50
2,118,921.00
8,092,998.50
910,500.00
5,468,300.00
6,015,600.00
1,695,100.00
6,474,300.00
1,001,600.00
6,015,100.00
6,617,200.00
1,864,600.00
7,121,700.00
119,358.50
63,986.00
38,145.50
36,915.00
11,278,763.00
627,555.00
11,962,921.00
15,760,244.00
11,801,725.50
3,417,098.50
5,090,578.50
4,746,038.50
116,213,342.00
6,435,515.00
340,848.50
393,760.00
381,455.00
430,675.00
1,199,737.50
1,495,057.50
95,400.00
51,100.00
30,500.00
29,500.00
9,023,000.00
502,000.00
9,570,300.00
12,608,100.00
9,441,300.00
2,733,600.00
4,072,400.00
3,796,800.00
93,471,000.00
5,148,400.00
272,600.00
315,000.00
305,100.00
344,500.00
959,700.00
1,196,000.00
104,900.00
56,200.00
33,600.00
32,500.00
9,925,300.00
552,200.00
10,527,300.00
13,868,900.00
10,385,400.00
3,007,000.00
4,479,600.00
4,176,500.00
102,818,100.00
5,663,200.00
299,900.00
346,500.00
335,600.00
379,000.00
1,055,700.00
1,315,600.00
30,619,762.00
41,064,246.00
46,285,257.50
73,107,696.50
20,887,737.50
16,875,077.00
4,984,755.50
30,951,997.00
24,596,000.00
33,002,000.00
37,179,000.00
58,787,000.00
16,786,000.00
13,500,000.00
3,987,800.00
24,862,000.00
27,055,600.00
36,302,200.00
40,896,900.00
64,665,700.00
18,464,600.00
14,850,000.00
4,386,600.00
27,348,200.00
350,692.50
259,635.50
280,500.00
207,700.00
308,600.00
228,500.00
781,367.50
2,870,756.50
4,177,547.50
5,141,029.00
307,625.00
18,848,799.00
5,361,288.50
26,108,749.00
80,323,348.50
39,876,813.50
47,851,684.00
2,563,131.50
22,761,789.00
625,000.00
2,296,600.00
3,342,000.00
4,112,800.00
246,100.00
15,129,000.00
4,289,000.00
20,962,000.00
64,609,000.00
32,052,000.00
38,432,000.00
2,050,500.00
18,260,000.00
687,500.00
2,526,300.00
3,676,200.00
4,524,100.00
270,700.00
16,641,900.00
4,717,900.00
23,058,200.00
71,069,900.00
35,257,200.00
42,275,200.00
2,255,600.00
20,086,000.00
62,663,212.50
73,107,696.50
78,329,938.50
86,163,301.50
4,306,750.00
23,925,842.00
29,647,667.00
27,344,171.00
50,381,000.00
58,737,000.00
62,964,000.00
69,281,000.00
3,445,400.00
19,191,000.00
23,819,000.00
21,976,000.00
55,419,100.00
64,610,700.00
69,260,400.00
76,209,100.00
3,789,900.00
21,110,100.00
26,200,900.00
24,173,600.00
66,447.00
44,298.00
36,915.00
22,748,253.50
682,927.50
3,231,293.00
53,100.00
35,400.00
29,500.00
18,299,000.00
546,300.00
2,585,000.00
58,400.00
38,900.00
32,500.00
20,128,900.00
600,900.00
2,843,500.00
319,930.00
242,408.50
178,422.50
119,358.50
91,067.70
7,348,546.00
29,242,832.50
9,398,559.00
6,322,309.00
6,004,840.00
625,094.00
3,506,925.00
3,353,112.50
35,604,517.50
34,724,710.00
255,900.00
193,900.00
142,700.00
95,400.00
72,800.00
5,878,800.00
23,495,000.00
7,518,800.00
5,057,800.00
4,803,800.00
500,000.00
2,805,500.00
2,682,400.00
28,584,000.00
27,880,000.00
281,500.00
213,300.00
157,000.00
104,900.00
80,100.00
6,466,700.00
25,844,500.00
8,270,700.00
5,563,600.00
5,284,200.00
550,000.00
3,086,100.00
2,950,600.00
31,442,400.00
30,668,000.00
1,423,688.50
1,138,900.00
1,252,800.00
1,423,689.57
1,423,690.64
2,337,950.00
2,337,950.00
3,145,158.00
20,219,576.00
31,287,923.50
3,417,098.50
3,759,177.50
11,620,842.00
3,759,177.50
28,721,100.50
6,657,005.00
30,382,275.50
1,860,516.00
22,478,774.00
6,351,841.00
9,493,307.50
20,507,513.00
682,927.50
5,572,506.50
1,138,900.00
1,138,900.00
1,870,300.00
1,870,300.00
2,516,100.00
16,226,000.00
25,131,000.00
2,733,600.00
3,007,300.00
9,296,600.00
3,007,300.00
23,077,000.00
5,325,600.00
24,406,000.00
1,488,400.00
18,033,000.00
5,081,400.00
7,594,600.00
16,456,000.00
546,300.00
4,458,000.00
1,252,800.00
1,252,800.00
2,057,300.00
2,057,300.00
2,767,700.00
17,848,600.00
27,644,100.00
3,007,000.00
3,308,000.00
10,226,300.00
3,308,000.00
25,384,700.00
5,858,200.00
26,846,600.00
1,637,200.00
19,836,300.00
5,589,500.00
8,354,100.00
18,101,600.00
600,900.00
4,903,800.00
3,524,152.00
3,655,815.50
4,177,547.50
4,700,510.00
5,221,011.50
5,481,877.50
6,300,695.00
5,999,918.00
7,241,492.50
3,417,098.50
3,445,400.00
1,845,750.00
2,278,886.00
3,676,734.00
23,431,181.00
2,088,158.50
5,933,471.00
6,121,737.50
6,306,312.50
2,050,013.00
1,653,792.00
3,137,775.00
1,077,918.00
29,814,400.00
3,759,177.50
2,819,300.00
2,924,600.00
3,342,000.00
3,760,400.00
4,176,800.00
4,385,500.00
5,040,500.00
4,799,900.00
5,793,100.00
2,733,600.00
2,756,300.00
1,476,600.00
1,823,100.00
2,941,300.00
18,820,000.00
1,670,500.00
4,746,700.00
4,897,300.00
5,045,000.00
1,640,000.00
1,323,000.00
2,510,200.00
862,300.00
23,952,000.00
3,007,300.00
3,101,200.00
3,217,100.00
3,676,200.00
4,136,400.00
4,594,500.00
4,824,100.00
5,544,600.00
5,279,900.00
6,372,400.00
3,007,000.00
3,031,900.00
1,624,300.00
2,005,400.00
3,235,400.00
20,702,000.00
1,837,600.00
5,221,400.00
5,387,000.00
5,549,500.00
1,804,000.00
1,455,300.00
2,761,200.00
948,500.00
26,347,200.00
3,308,000.00
13,235,258.00
1,760,845.50
43,067,500.00
2,334,258.50
781,367.50
23,925,842.00
625,094.00
993,600.00
87.846.200
16.637.050
7.808.500
2.927.900
6.655.050
10,588,200.00
1,408,600.00
34,629,000.00
1,867,400.00
625,000.00
19,241,000.00
500,000.00
794,800.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,647,000.00
1,549,500.00
38,091,900.00
2,054,100.00
687,500.00
21,165,100.00
550,000.00
874,300.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,385,851.16
4,462,101.16
7,291,943.00
461,437.50
4,954,301.16
6,012,531.16
7,243,031.16
2,677,876.16
1,076,687.50
462,052.75
922,875.00
3,428,481.16
3,293,126.16
2,862,451.16
615,250.00
1,211,181.15
2,196,442.50
742,917.05
2,293,347.05
1,108,600.00
3,569,600.00
5,833,500.00
369,100.00
3,963,400.00
4,810,000.00
5,794,400.00
2,142,300.00
861,300.00
369,600.00
738,300.00
2,742,700.00
2,634,500.00
2,289,900.00
492,200.00
968,900.00
1,757,100.00
594,300.00
1,834,600.00
1,219,500.00
3,926,600.00
6,416,900.00
406,000.00
4,359,700.00
5,291,000.00
6,373,800.00
2,356,500.00
947,400.00
406,600.00
812,100.00
3,017,000.00
2,898,000.00
2,518,900.00
541,400.00
1,065,800.00
1,932,800.00
653,700.00
2,018,100.00
1,729,800.00
3,675,000.00
13,282,500.00
1,232,000.00
1,383,800.00
2,940,000.00
10,626,000.00
985,600.00
1,522,200.00
3,234,000.00
11,688,600.00
1,084,200.00
63,868,000.00
53,694,000.00
1,360,000.00
26,985,000.00
51,345,000.00
43,156,000.00
1,088,000.00
21,688,000.00
56,479,500.00
47,471,600.00
1,196,800.00
23,856,800.00
3,799,570.00
5,318,970.00
3,039,600.00
4,255,100.00
3,343,600.00
4,680,600.00
2,802,330.00
3,923,690.00
2,241,800.00
3,138,900.00
2,466,000.00
3,452,800.00
2,695,920.64
3,421,860.00
2,851,550.00
2,156,700.00
2,737,400.00
2,281,200.00
2,372,400.00
3,011,100.00
2,509,300.00
1,391,000.00
1,530,100.00
1,112,800.00
1,224,000.00
1,224,100.00
1,346,400.00
1,091,400.00
1,200,540.00
873,100.00
960,400.00
960,400.00
1,056,400.00
1,431,647.00
1,156,670.00
1,051,810.00
1,145,300.00
925,300.00
841,400.00
1,259,800.00
1,017,800.00
925,500.00
1,622,994.00
976,203.80
887,458.00
1,298,300.00
780,900.00
709,900.00
1,428,100.00
859,000.00
780,900.00
WILAYAH I
WILAYAH II
PPN 10 % + 13 %
HARGA DASAR
PPN 10 %
PPN 10 % + 13 %
105,655.00
46,612.50
54,692.00
64,636.00
149,160.00
213,796.00
60,907.00
186,450.00
57,178.00
60,907.00
60,907.00
55,313.50
55,313.50
74,580.00
55,313.50
60,907.00
42,262.00
167,805.00
47,855.50
37,290.00
55,313.50
55,313.50
55,313.50
55,313.50
58,421.00
60,907.00
52,827.50
60,907.00
62,150.00
85,000.00
37,500.00
44,000.00
52,000.00
120,000.00
172,000.00
49,000.00
150,000.00
46,000.00
49,000.00
49,000.00
44,500.00
44,500.00
60,000.00
44,500.00
49,000.00
34,000.00
135,000.00
38,500.00
30,000.00
44,500.00
44,500.00
44,500.00
44,500.00
47,000.00
49,000.00
42,500.00
49,000.00
50,000.00
93,500.00
41,250.00
48,400.00
57,200.00
132,000.00
189,200.00
53,900.00
165,000.00
50,600.00
53,900.00
53,900.00
48,950.00
48,950.00
66,000.00
48,950.00
53,900.00
37,400.00
148,500.00
42,350.00
33,000.00
48,950.00
48,950.00
48,950.00
48,950.00
51,700.00
53,900.00
46,750.00
53,900.00
55,000.00
105,655.00
46,612.50
54,692.00
64,636.00
149,160.00
213,796.00
60,907.00
186,450.00
57,178.00
60,907.00
60,907.00
55,313.50
55,313.50
74,580.00
55,313.50
60,907.00
42,262.00
167,805.00
47,855.50
37,290.00
55,313.50
55,313.50
55,313.50
55,313.50
58,421.00
60,907.00
52,827.50
60,907.00
62,150.00
62,150.00
5,593,500.00
51,584.50
1,016,152.50
37,290,000.00
29,832.00
2,231.75
32,939.50
72,094.00
54,381.25
11,497.75
12,430.00
1,665,620.00
55,935.00
10,565.50
7,458.00
2,429.50
571.78
161,590.00
146,052.50
12,119.25
521,438.50
37,290.00
149,160.00
164,697.50
161,590.00
152,889.00
152,267.50
149,160.00
201,987.50
195,772.50
189,557.50
155,375.00
26,103.00
2,486.00
11,187.00
14,916.00
15,537.50
23,306.25
24,549.25
32,007.25
39,776.00
64,636.00
69,099.50
70,851.00
80,795.00
60,000.00
4,500,000.00
41,500.00
817,500.00
30,000,000.00
24,000.00
1,800.00
26,500.00
58,000.00
43,750.00
9,250.00
10,000.00
1,340,000.00
45,000.00
8,500.00
6,000.00
1,950.00
465.00
130,000.00
117,500.00
9,750.00
419,500.00
30,000.00
120,000.00
132,500.00
130,000.00
123,000.00
122,500.00
120,000.00
172,500.00
158,500.00
155,000.00
135,000.00
21,000.00
2,000.00
9,000.00
12,000.00
12,500.00
18,750.00
19,750.00
25,750.00
32,000.00
52,000.00
55,600.00
57,000.00
65,000.00
66,000.00
4,950,000.00
45,650.00
899,250.00
33,000,000.00
26,400.00
1,975.00
29,150.00
63,800.00
48,125.00
10,175.00
11,000.00
1,474,000.00
49,500.00
9,350.00
6,600.00
2,150.00
511.50
143,000.00
129,250.00
10,725.00
461,450.00
33,000.00
132,000.00
145,750.00
143,000.00
135,300.00
134,750.00
132,000.00
189,750.00
174,350.00
170,500.00
148,500.00
23,100.00
2,200.00
9,900.00
13,200.00
13,750.00
20,625.00
21,725.00
28,325.00
35,200.00
57,200.00
61,150.00
62,700.00
71,500.00
74,580.00
5,593,500.00
51,584.50
1,016,152.50
37,290,000.00
29,832.00
2,231.75
32,939.50
72,094.00
54,381.25
11,497.75
12,430.00
1,665,620.00
55,935.00
10,565.50
7,458.00
2,429.50
578.00
161,590.00
146,052.50
12,119.25
521,438.50
37,290.00
149,160.00
164,697.50
161,590.00
152,889.00
152,267.50
149,160.00
214,417.50
197,015.50
192,665.00
167,805.00
26,103.00
2,486.00
11,187.00
14,916.00
15,537.50
23,306.25
24,549.25
32,007.25
39,776.00
64,636.00
69,099.50
70,851.00
80,795.00
14,605.25
105,655.00
45,991.00
45,991.00
55,935.00
22,374.00
22,374.00
26,103.00
93,225.00
9,322.50
1,491,600.00
1,236,785.00
18,645.00
11,187.00
9,322.50
248,600.00
8,701.00
18,645.00
31,075.00
10,876.25
285,890.00
6,215.00
801,735.00
155,375.00
64,636.00
64,636.00
7,090.75
6,780.00
7,712.25
4,915.50
3,955.00
2,172.43
2,655.50
3,107.50
875.75
3,785.50
565.00
42,883.50
12,430,000.00
4,972,000.00
23,617.00
8,079.50
11,497.75
18,023.50
123,678.50
161,590.00
155,375.00
11,750.00
85,000.00
37,000.00
37,000.00
45,000.00
18,000.00
18,000.00
21,000.00
75,000.00
7,500.00
1,200,000.00
995,000.00
15,000.00
9,000.00
7,500.00
200,000.00
7,000.00
15,000.00
25,000.00
8,750.00
230,000.00
5,000.00
645,000.00
125,000.00
52,000.00
52,000.00
5,725.00
5,475.00
6,225.00
3,975.00
3,225.00
1,775.00
2,175.00
2,525.00
725.00
3,075.00
475.00
34,500.00
10,000,000.00
4,000,000.00
19,000.00
6,500.00
9,250.00
14,500.00
99,500.00
130,000.00
125,000.00
12,925.00
93,500.00
40,700.00
40,700.00
49,500.00
19,800.00
19,800.00
23,100.00
82,500.00
8,250.00
1,320,000.00
1,094,500.00
16,500.00
9,900.00
8,250.00
220,000.00
7,700.00
16,500.00
27,500.00
9,625.00
253,000.00
5,500.00
709,500.00
137,500.00
57,200.00
57,200.00
6,300.00
6,025.00
6,850.00
4,375.00
3,550.00
1,947.50
2,400.00
2,775.00
800.00
3,375.00
525.00
37,950.00
11,000,000.00
4,400,000.00
20,900.00
7,150.00
10,175.00
15,950.00
109,450.00
143,000.00
137,500.00
14,605.25
105,655.00
45,991.00
45,991.00
55,935.00
22,374.00
22,374.00
26,103.00
93,225.00
9,322.50
1,491,600.00
1,236,785.00
18,645.00
11,187.00
9,322.50
248,600.00
8,701.00
18,645.00
31,075.00
10,876.25
285,890.00
6,215.00
801,735.00
155,375.00
64,636.00
64,636.00
7,119.00
6,808.25
7,740.50
4,943.75
4,011.50
2,200.68
2,712.00
3,135.75
904.00
3,813.75
593.25
42,883.50
12,430,000.00
4,972,000.00
23,617.00
8,079.50
11,497.75
18,023.50
123,678.50
161,590.00
155,375.00
161,590.00
108,141.00
80,795.00
93,225.00
9,322.50
19,266.50
31,696.50
9,944.00
21,752.50
12,430.00
590,425.00
124,300.00
3,842.00
5,085.00
1,864,500.00
932,250.00
58,421.00
59,664.00
310,750.00
167,805.00
80,173.50
8,079.50
11,187.00
18,023.50
248,600.00
1,218,140.00
1,130.00
9,769,980.00
10,304,470.00
1,112,485.00
4,972.00
8,688,570.00
8,141,650.00
16,718,350.00
11,342,375.00
23,368,400.00
28,589.00
9,881,850.00
10,223,675.00
5,873,175.00
6,215,000.00
4,972.00
5,593,500.00
1,305,150.00
19,888.00
22,995.50
130,000.00
87,000.00
65,000.00
75,000.00
7,500.00
15,500.00
25,500.00
8,000.00
17,500.00
10,000.00
475,000.00
100,000.00
3,100.00
4,100.00
1,500,000.00
750,000.00
47,000.00
48,000.00
250,000.00
135,000.00
64,500.00
6,500.00
9,000.00
14,500.00
200,000.00
980,000.00
950.00
7,910,000.00
8,340,000.00
895,000.00
4,000.00
6,990,000.00
6,550,000.00
13,450,000.00
9,125,000.00
18,800,000.00
23,000.00
8,000,000.00
8,275,000.00
4,775,000.00
5,050,000.00
4,000.00
4,500,000.00
1,050,000.00
16,000.00
18,500.00
143,000.00
95,700.00
71,500.00
82,500.00
8,250.00
17,050.00
28,050.00
8,800.00
19,250.00
11,000.00
522,500.00
110,000.00
3,400.00
4,500.00
1,650,000.00
825,000.00
51,700.00
52,800.00
275,000.00
148,500.00
70,950.00
7,150.00
9,900.00
15,950.00
220,000.00
1,078,000.00
1,000.00
8,701,000.00
9,174,000.00
984,500.00
4,400.00
7,689,000.00
7,205,000.00
14,795,000.00
10,037,500.00
20,680,000.00
25,300.00
8,800,000.00
9,102,500.00
5,252,500.00
5,555,000.00
4,400.00
4,950,000.00
1,155,000.00
17,600.00
20,350.00
161,590.00
108,141.00
80,795.00
93,225.00
9,322.50
19,266.50
31,696.50
9,944.00
21,752.50
12,430.00
590,425.00
124,300.00
3,842.00
5,085.00
1,864,500.00
932,250.00
58,421.00
59,664.00
310,750.00
167,805.00
80,173.50
8,079.50
11,187.00
18,023.50
248,600.00
1,218,140.00
1,130.00
9,832,130.00
10,366,620.00
1,112,485.00
4,972.00
8,688,570.00
8,141,650.00
16,718,350.00
11,342,375.00
23,368,400.00
28,589.00
9,944,000.00
10,285,825.00
5,935,325.00
6,277,150.00
4,972.00
5,593,500.00
1,305,150.00
19,888.00
22,995.50
22,995.50
18,645.00
3,361.75
55,935.00
53,449.00
39,776.00
44,748.00
19,888.00
142,945.00
248,600.00
20,001.00
33,250.25
49,720.00
23,306.25
36,668.50
53,138.25
46,612.50
66,500.50
73,026.25
105,655.00
93,225.00
18,645.00
27,967.50
34,182.50
15,537.50
77,066.00
75,823.00
65,257.50
12,430.00
155,375.00
528,275.00
8,079.50
5,593,500.00
5,220,600.00
5,085.00
18,645.00
5,085.00
23,617.00
8,475.00
93,225.00
116,842.00
136,730.00
186,450.00
248,600.00
435,050.00
18,500.00
15,000.00
2,700.00
45,000.00
43,000.00
32,000.00
36,000.00
16,000.00
115,000.00
200,000.00
16,100.00
26,750.00
40,000.00
18,750.00
29,500.00
42,750.00
37,500.00
53,500.00
58,750.00
85,000.00
75,000.00
15,000.00
22,500.00
27,500.00
12,500.00
62,000.00
61,000.00
52,500.00
10,000.00
125,000.00
425,000.00
6,500.00
4,500,000.00
4,200,000.00
4,500.00
15,000.00
4,500.00
19,000.00
7,500.00
75,000.00
94,000.00
110,000.00
150,000.00
200,000.00
350,000.00
20,350.00
16,500.00
2,975.00
49,500.00
47,300.00
35,200.00
39,600.00
17,600.00
126,500.00
220,000.00
17,700.00
29,425.00
44,000.00
20,625.00
32,450.00
47,025.00
41,250.00
58,850.00
64,625.00
93,500.00
82,500.00
16,500.00
24,750.00
30,250.00
13,750.00
68,200.00
67,100.00
57,750.00
11,000.00
137,500.00
467,500.00
7,150.00
4,950,000.00
4,620,000.00
4,500.00
16,500.00
4,500.00
20,900.00
7,500.00
82,500.00
103,400.00
121,000.00
165,000.00
220,000.00
385,000.00
22,995.50
18,645.00
3,361.75
55,935.00
53,449.00
39,776.00
44,748.00
19,888.00
142,945.00
248,600.00
20,001.00
33,250.25
49,720.00
23,306.25
36,668.50
53,138.25
46,612.50
66,500.50
73,026.25
105,655.00
93,225.00
18,645.00
27,967.50
34,182.50
15,537.50
77,066.00
75,823.00
65,257.50
12,430.00
155,375.00
528,275.00
8,079.50
5,593,500.00
5,220,600.00
5,085.00
18,645.00
5,085.00
23,617.00
8,475.00
93,225.00
116,842.00
136,730.00
186,450.00
248,600.00
435,050.00
242,385.00
1,491.60
183,342.50
19,888.00
22,374.00
27,967.50
734.50
565.00
19,888.00
15,537.50
4,164,050.00
42,883.50
118,085.00
111,870.00
93,225.00
62,150.00
111,870.00
2,231.75
12,430.00
78,309.00
497,200.00
2,237,400.00
5,842,100.00
5,966,400.00
6,215,000.00
6,712,200.00
7,085,100.00
7,706,600.00
223,740.00
57,799.50
64,636.00
83,902.50
93,225.00
155,375.00
161,590.00
292,105.00
130,515.00
167,805.00
279,675.00
360,470.00
525,167.50
671,220.00
708,510.00
22,374.00
26,724.50
34,182.50
62,150.00
195,000.00
1,200.00
147,500.00
16,000.00
18,000.00
22,500.00
600.00
450.00
16,000.00
12,500.00
3,350,000.00
34,500.00
100,000.00
95,000.00
70,000.00
50,000.00
90,000.00
1,800.00
10,000.00
63,000.00
400,000.00
1,800,000.00
4,700,000.00
4,800,000.00
5,000,000.00
5,400,000.00
5,700,000.00
6,200,000.00
180,000.00
46,500.00
52,000.00
67,500.00
75,000.00
125,000.00
130,000.00
235,000.00
105,000.00
135,000.00
225,000.00
290,000.00
422,500.00
540,000.00
570,000.00
18,000.00
21,500.00
27,500.00
50,000.00
214,500.00
1,320.00
162,250.00
17,600.00
19,800.00
24,750.00
650.00
500.00
17,600.00
13,750.00
3,685,000.00
37,950.00
110,000.00
104,500.00
77,000.00
55,000.00
99,000.00
1,975.00
11,000.00
69,300.00
440,000.00
1,980,000.00
5,170,000.00
5,280,000.00
5,500,000.00
5,940,000.00
6,270,000.00
6,820,000.00
198,000.00
51,150.00
57,200.00
74,250.00
82,500.00
137,500.00
143,000.00
258,500.00
115,500.00
148,500.00
247,500.00
319,000.00
464,750.00
594,000.00
627,000.00
19,800.00
23,650.00
30,250.00
55,000.00
242,385.00
1,491.60
183,342.50
19,888.00
22,374.00
27,967.50
734.50
565.00
19,888.00
15,537.50
4,164,050.00
42,883.50
124,300.00
118,085.00
87,010.00
62,150.00
111,870.00
2,231.75
12,430.00
78,309.00
497,200.00
2,237,400.00
5,842,100.00
5,966,400.00
6,215,000.00
6,712,200.00
7,085,100.00
7,706,600.00
223,740.00
57,799.50
64,636.00
83,902.50
93,225.00
155,375.00
161,590.00
292,105.00
130,515.00
167,805.00
279,675.00
360,470.00
525,167.50
671,220.00
708,510.00
22,374.00
26,724.50
34,182.50
62,150.00
93,225.00
170,912.50
248,600.00
509,630.00
801,735.00
19,379.50
29,210.50
38,843.75
8,814.00
46,301.75
423.75
683,650.00
497,200.00
435,050.00
994,400.00
15,164,600.00
598,504.50
3,729.00
43,505.00
80,795.00
18,334.25
15,848.25
5,904.25
31,075.00
29,832.00
59,353.25
74,269.25
1,553.75
1,227,462.50
242,385.00
79,778.00
86,445.00
73,111.00
111,870.00
173,398.50
79,552.00
146,363.25
246,114.00
299,252.25
3,729,000.00
142,945.00
174,020.00
14,916.00
238,656.00
223,740.00
36,668.50
75,000.00
137,500.00
200,000.00
410,000.00
645,000.00
15,600.00
23,500.00
31,250.00
7,100.00
37,250.00
350.00
550,000.00
400,000.00
350,000.00
800,000.00
12,200,000.00
481,500.00
3,000.00
35,000.00
65,000.00
14,750.00
12,750.00
4,750.00
25,000.00
24,000.00
47,750.00
59,750.00
1,250.00
987,500.00
195,000.00
64,200.00
69,550.00
58,850.00
90,000.00
139,500.00
64,000.00
117,750.00
198,000.00
240,750.00
3,000,000.00
115,000.00
140,000.00
12,000.00
192,000.00
180,000.00
29,500.00
82,500.00
151,250.00
220,000.00
451,000.00
709,500.00
17,150.00
25,850.00
34,375.00
7,800.00
40,975.00
375.00
605,000.00
440,000.00
385,000.00
880,000.00
13,420,000.00
529,650.00
3,300.00
38,500.00
71,500.00
16,225.00
14,025.00
5,225.00
27,500.00
26,400.00
52,525.00
65,725.00
1,375.00
1,086,250.00
214,500.00
70,600.00
76,500.00
64,700.00
99,000.00
153,450.00
70,400.00
129,525.00
217,800.00
264,825.00
3,300,000.00
126,500.00
154,000.00
13,200.00
211,200.00
198,000.00
32,450.00
93,225.00
170,912.50
248,600.00
509,630.00
801,735.00
19,379.50
29,210.50
38,843.75
8,814.00
46,301.75
423.75
683,650.00
497,200.00
435,050.00
994,400.00
15,164,600.00
598,504.50
3,729.00
43,505.00
80,795.00
18,334.25
15,848.25
5,904.25
31,075.00
29,832.00
59,353.25
74,269.25
1,553.75
1,227,462.50
242,385.00
79,778.00
86,445.00
73,111.00
111,870.00
173,398.50
79,552.00
146,363.25
246,114.00
299,252.25
3,729,000.00
142,945.00
174,020.00
14,916.00
238,656.00
223,740.00
36,668.50
1,429,450.00
520,195.50
2,486,000.00
49,720.00
39,776.00
124,300.00
44,748.00
51,584.50
90,739.00
110,627.00
85,767.00
99,440.00
839,025.00
5,344,900.00
24,860.00
305,778.00
31,696.50
166,562.00
53,223.00
47,855.50
66,500.50
61,133.00
59,042.50
733,370.00
994,400.00
21,752,500.00
89,496.00
5,469,200.00
67,122.00
1,150,000.00
418,500.00
2,000,000.00
40,000.00
32,000.00
100,000.00
36,000.00
41,500.00
73,000.00
89,000.00
69,000.00
80,000.00
675,000.00
4,300,000.00
20,000.00
246,000.00
25,500.00
134,000.00
42,800.00
38,500.00
53,500.00
49,200.00
47,500.00
590,000.00
800,000.00
17,500,000.00
72,000.00
4,400,000.00
54,000.00
1,265,000.00
460,350.00
2,200,000.00
44,000.00
35,200.00
110,000.00
39,600.00
45,650.00
80,300.00
97,900.00
75,900.00
88,000.00
742,500.00
4,730,000.00
22,000.00
270,600.00
28,050.00
147,400.00
47,100.00
42,350.00
58,850.00
54,100.00
52,250.00
649,000.00
880,000.00
19,250,000.00
79,200.00
4,840,000.00
59,400.00
1,429,450.00
520,195.50
2,486,000.00
49,720.00
39,776.00
124,300.00
44,748.00
51,584.50
90,739.00
110,627.00
85,767.00
99,440.00
839,025.00
5,344,900.00
24,860.00
305,778.00
31,696.50
166,562.00
53,223.00
47,855.50
66,500.50
61,133.00
59,042.50
733,370.00
994,400.00
21,752,500.00
89,496.00
5,469,200.00
67,122.00
438,892.00
394,144.00
1,516,234.00
15,162,114.00
718,228.00
1,037,453.00
71,755.00
353,100.00
317,100.00
1,219,800.00
12,198,000.00
577,800.00
834,600.00
57,700.00
388,400.00
348,800.00
1,341,800.00
13,417,800.00
635,600.00
918,100.00
63,500.00
438,892.00
394,144.00
1,516,234.00
15,162,114.00
718,228.00
1,037,453.00
71,755.00
598,561.00
718,228.00
55,822.00
1,197,009.00
239,447.00
239,447.00
55,822.00
481,500.00
577,800.00
44,900.00
963,000.00
192,600.00
192,600.00
44,900.00
529,700.00
635,600.00
49,400.00
1,059,300.00
211,900.00
211,900.00
49,400.00
598,561.00
718,228.00
55,822.00
1,197,009.00
239,447.00
239,447.00
55,822.00
91,191.00
2,793,021.00
1,356,565.00
119,667.00
1,516,234.00
101,813.00
119,667.00
1,516,234.00
279,336.00
55,822.00
55,822.00
107,689.00
1,197,009.00
394,144.00
151,533.00
199,558.00
1,556,123.00
758,117.00
55,822.00
598,561.00
359,114.00
1,995,015.00
718,228.00
55,822.00
319,225.00
73,400.00
2,247,000.00
1,091,400.00
96,300.00
1,219,800.00
81,900.00
96,300.00
1,219,800.00
224,700.00
44,900.00
44,900.00
86,600.00
963,000.00
317,100.00
121,900.00
160,500.00
1,251,900.00
609,900.00
44,900.00
481,500.00
288,900.00
1,605,000.00
577,800.00
44,900.00
256,800.00
80,700.00
2,471,700.00
1,200,500.00
105,900.00
1,341,800.00
90,100.00
105,900.00
1,341,800.00
247,200.00
49,400.00
49,400.00
95,300.00
1,059,300.00
348,800.00
134,100.00
176,600.00
1,377,100.00
670,900.00
49,400.00
529,700.00
317,800.00
1,765,500.00
635,600.00
49,400.00
282,500.00
91,191.00
2,793,021.00
1,356,565.00
119,667.00
1,516,234.00
101,813.00
119,667.00
1,516,234.00
279,336.00
55,822.00
55,822.00
107,689.00
1,197,009.00
394,144.00
151,533.00
199,558.00
1,556,123.00
758,117.00
55,822.00
598,561.00
359,114.00
1,995,015.00
718,228.00
55,822.00
319,225.00
1,516,234.00
1,516,234.00
380,810.00
533,021.00
718,228.00
2,154,571.00
359,114.00
718,228.00
1,436,456.00
19,888.00
4,571,528.00
199,558.00
1,516,234.00
399,003.00
718,228.00
638,450.00
279,336.00
1,516,234.00
239,447.00
253,911.00
1,219,800.00
1,219,800.00
306,400.00
428,800.00
577,800.00
1,733,400.00
288,900.00
577,800.00
1,155,600.00
16,000.00
3,677,800.00
160,500.00
1,219,800.00
321,000.00
577,800.00
513,600.00
224,700.00
1,219,800.00
192,600.00
204,300.00
1,341,800.00
1,341,800.00
337,000.00
471,700.00
635,600.00
1,906,700.00
317,800.00
635,600.00
1,271,200.00
17,600.00
4,045,600.00
176,600.00
1,341,800.00
353,100.00
635,600.00
565,000.00
247,200.00
1,341,800.00
211,900.00
224,700.00
1,516,234.00
1,516,234.00
380,810.00
533,021.00
718,228.00
2,154,571.00
359,114.00
718,228.00
1,436,456.00
19,888.00
4,571,528.00
199,558.00
1,516,234.00
399,003.00
718,228.00
638,450.00
279,336.00
1,516,234.00
239,447.00
253,911.00
399,003.00
103,621.00
319,225.00
47,912.00
319,225.00
1,356,565.00
718,228.00
304,309.00
1,995,015.00
1,276,787.00
1,246,503.00
23,843.00
321,000.00
83,400.00
256,800.00
38,500.00
256,800.00
1,091,400.00
577,800.00
244,800.00
1,605,000.00
1,027,200.00
1,002,800.00
19,200.00
353,100.00
91,700.00
282,500.00
42,400.00
282,500.00
1,200,500.00
635,600.00
269,300.00
1,765,500.00
1,129,900.00
1,103,100.00
21,100.00
399,003.00
103,621.00
319,225.00
47,912.00
319,225.00
1,356,565.00
718,228.00
304,309.00
1,995,015.00
1,276,787.00
1,246,503.00
23,843.00
478,781.00
638,450.00
350,978.00
103,621.00
718,228.00
359,114.00
239,447.00
385,200.00
513,600.00
282,400.00
83,400.00
577,800.00
288,900.00
192,600.00
423,700.00
565,000.00
310,600.00
91,700.00
635,600.00
317,800.00
211,900.00
478,781.00
638,450.00
350,978.00
103,621.00
718,228.00
359,114.00
239,447.00
2,128,016.00
1,712,000.00
1,883,200.00
2,128,016.00
71,755.00
63,732.00
91,756.00
727,833.00
864,111.00
528,275.00
861,738.00
1,024,571.00
87,801.00
111,644.00
87,801.00
57,700.00
51,300.00
73,800.00
585,500.00
695,200.00
425,000.00
693,300.00
824,300.00
70,600.00
89,800.00
70,600.00
63,500.00
56,400.00
81,200.00
644,100.00
764,700.00
467,500.00
762,600.00
906,700.00
77,700.00
98,800.00
77,700.00
71,755.00
63,732.00
91,756.00
727,833.00
864,111.00
528,275.00
861,738.00
1,024,571.00
87,801.00
111,644.00
87,801.00
79,778.00
27,798.00
55,822.00
63,732.00
11,074.00
13,560.00
17,515.00
19,097.00
21,470.00
64,200.00
22,400.00
44,900.00
51,300.00
8,900.00
10,900.00
14,100.00
15,400.00
17,300.00
70,600.00
24,600.00
49,400.00
56,400.00
9,800.00
12,000.00
15,500.00
16,900.00
19,000.00
79,778.00
27,798.00
55,822.00
63,732.00
11,074.00
13,560.00
17,515.00
19,097.00
21,470.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
29,267.00
29,267.00
33,222.00
29,267.00
79,778.00
23,500.00
23,500.00
26,700.00
23,500.00
64,200.00
25,900.00
25,900.00
29,400.00
25,900.00
70,600.00
29,267.00
29,267.00
33,222.00
29,267.00
79,778.00
14,012.00
464,995.00
2,513,346.00
29,493.00
77,936,100.00
177,975.00
71,642.00
109,158.00
171,195.00
248,939.00
78,535.00
218,375,212.00
168,037,441.00
667,492,243.00
690,254,059.00
511,419,920.00
549,903,200.00
634,675,800.00
394,485,938.00
378,520,846.00
21,131.00
121,810,271.00
170,178.00
152,200,378.00
247,018.00
317,191.00
11,639.00
11,639.00
14,577.00
15,771,184.00
11,300.00
374,100.00
2,022,000.00
23,700.00
62,700,000.00
143,200.00
57,600.00
87,800.00
137,700.00
200,300.00
63,200.00
175,684,000.00
135,187,000.00
537,001,000.00
555,313,000.00
411,440,000.00
442,400,000.00
510,600,000.00
317,366,000.00
304,522,000.00
17,000.00
97,997,000.00
136,900.00
122,446,000.00
198,700.00
255,200.00
9,400.00
9,400.00
11,700.00
12,688,000.00
12,400.00
411,500.00
2,224,200.00
26,100.00
68,970,000.00
157,500.00
63,400.00
96,600.00
151,500.00
220,300.00
69,500.00
193,252,400.00
148,705,700.00
590,701,100.00
610,844,300.00
452,584,000.00
486,640,000.00
561,660,000.00
349,102,600.00
334,974,200.00
18,700.00
107,796,700.00
150,600.00
134,690,600.00
218,600.00
280,700.00
10,300.00
10,300.00
12,900.00
13,956,800.00
14,012.00
464,995.00
2,513,346.00
29,493.00
77,936,100.00
177,975.00
71,642.00
109,158.00
171,195.00
248,939.00
78,535.00
218,375,212.00
168,037,441.00
667,492,243.00
690,254,059.00
511,419,920.00
549,903,200.00
634,675,800.00
394,485,938.00
378,520,846.00
21,131.00
121,810,271.00
170,178.00
152,200,378.00
247,018.00
317,191.00
11,639.00
11,639.00
14,577.00
15,771,184.00
11,413.00
138,764.00
69,156.00
69,721.00
206,451.00
9,200.00
111,600.00
55,600.00
56,100.00
166,100.00
10,100.00
122,800.00
61,200.00
61,700.00
182,700.00
11,413.00
138,764.00
69,156.00
69,721.00
206,451.00
1,131,808.00
6,797,063.00
7,477,436.00
2,106,998.00
8,047,521.00
910,500.00
5,468,300.00
6,015,600.00
1,695,100.00
6,474,300.00
1,001,600.00
6,015,100.00
6,617,200.00
1,864,600.00
7,121,700.00
1,131,808.00
6,797,063.00
7,477,436.00
2,106,998.00
8,047,521.00
118,537.00
63,506.00
37,968.00
36,725.00
11,215,589.00
623,986.00
11,895,849.00
15,671,857.00
11,735,502.00
3,397,910.00
5,061,948.00
4,719,445.00
116,184,453.00
6,399,416.00
338,887.00
391,545.00
379,228.00
428,270.00
1,192,941.00
1,486,628.00
95,400.00
51,100.00
30,500.00
29,500.00
9,023,000.00
502,000.00
9,570,300.00
12,608,100.00
9,441,300.00
2,733,600.00
4,072,400.00
3,796,800.00
93,471,000.00
5,148,400.00
272,600.00
315,000.00
305,100.00
344,500.00
959,700.00
1,196,000.00
104,900.00
56,200.00
33,600.00
32,500.00
9,925,300.00
552,200.00
10,527,300.00
13,868,900.00
10,385,400.00
3,007,000.00
4,479,600.00
4,176,500.00
102,818,100.00
5,663,200.00
299,900.00
346,500.00
335,600.00
379,000.00
1,055,700.00
1,315,600.00
118,537.00
63,506.00
37,968.00
36,725.00
11,215,589.00
623,986.00
11,895,849.00
15,671,857.00
11,735,502.00
3,397,910.00
5,061,948.00
4,719,445.00
116,184,453.00
6,399,416.00
338,887.00
391,545.00
379,228.00
428,270.00
1,192,941.00
1,486,628.00
30,572,828.00
41,021,486.00
46,213,497.00
73,072,241.00
20,864,998.00
16,780,500.00
4,956,858.00
30,903,466.00
24,596,000.00
33,002,000.00
37,179,000.00
58,787,000.00
16,786,000.00
13,500,000.00
3,987,800.00
24,862,000.00
27,055,600.00
36,302,200.00
40,896,900.00
64,665,700.00
18,464,600.00
14,850,000.00
4,386,600.00
27,348,200.00
30,572,828.00
41,021,486.00
46,213,497.00
73,072,241.00
20,864,998.00
16,780,500.00
4,956,858.00
30,903,466.00
348,718.00
258,205.00
280,500.00
207,700.00
308,600.00
228,500.00
348,718.00
258,205.00
776,875.00
2,854,719.00
4,154,106.00
5,112,233.00
305,891.00
18,805,347.00
5,331,227.00
26,055,766.00
80,308,987.00
39,840,636.00
47,770,976.00
2,548,828.00
22,697,180.00
625,000.00
2,296,600.00
3,342,000.00
4,112,800.00
246,100.00
15,129,000.00
4,289,000.00
20,962,000.00
64,609,000.00
32,052,000.00
38,432,000.00
2,050,500.00
18,260,000.00
687,500.00
2,526,300.00
3,676,200.00
4,524,100.00
270,700.00
16,641,900.00
4,717,900.00
23,058,200.00
71,069,900.00
35,257,200.00
42,275,200.00
2,255,600.00
20,086,000.00
776,875.00
2,854,719.00
4,154,106.00
5,112,233.00
305,891.00
18,805,347.00
5,331,227.00
26,055,766.00
80,308,987.00
39,840,636.00
47,770,976.00
2,548,828.00
22,697,180.00
62,623,583.00
73,010,091.00
78,264,252.00
86,116,283.00
4,282,587.00
23,854,413.00
29,607,017.00
27,316,168.00
50,381,000.00
58,737,000.00
62,964,000.00
69,281,000.00
3,445,400.00
19,191,000.00
23,819,000.00
21,976,000.00
55,419,100.00
64,610,700.00
69,260,400.00
76,209,100.00
3,789,900.00
21,110,100.00
26,200,900.00
24,173,600.00
62,623,583.00
73,010,091.00
78,264,252.00
86,116,283.00
4,282,587.00
23,854,413.00
29,607,017.00
27,316,168.00
65,992.00
43,957.00
36,725.00
22,745,657.00
679,017.00
3,213,155.00
53,100.00
35,400.00
29,500.00
18,299,000.00
546,300.00
2,585,000.00
58,400.00
38,900.00
32,500.00
20,128,900.00
600,900.00
2,843,500.00
65,992.00
43,957.00
36,725.00
22,745,657.00
679,017.00
3,213,155.00
318,095.00
241,029.00
177,410.00
118,537.00
90,513.00
7,307,371.00
29,204,285.00
9,345,891.00
6,286,868.00
5,971,146.00
621,500.00
3,487,293.00
3,334,178.00
35,529,912.00
34,654,840.00
255,900.00
193,900.00
142,700.00
95,400.00
72,800.00
5,878,800.00
23,495,000.00
7,518,800.00
5,057,800.00
4,803,800.00
500,000.00
2,805,500.00
2,682,400.00
28,584,000.00
27,880,000.00
281,500.00
213,300.00
157,000.00
104,900.00
80,100.00
6,466,700.00
25,844,500.00
8,270,700.00
5,563,600.00
5,284,200.00
550,000.00
3,086,100.00
2,950,600.00
31,442,400.00
30,668,000.00
318,095.00
241,029.00
177,410.00
118,537.00
90,513.00
7,307,371.00
29,204,285.00
9,345,891.00
6,286,868.00
5,971,146.00
621,500.00
3,487,293.00
3,334,178.00
35,529,912.00
34,654,840.00
1,415,664.00
1,138,900.00
1,252,800.00
1,415,664.00
1,415,664.00
1,415,664.00
2,324,749.00
2,324,749.00
3,127,501.00
20,168,918.00
31,237,833.00
3,397,910.00
3,738,040.00
11,555,719.00
3,738,040.00
28,684,711.00
6,619,766.00
30,336,658.00
1,850,036.00
22,415,019.00
6,316,135.00
9,440,133.00
20,454,808.00
679,017.00
5,541,294.00
1,138,900.00
1,138,900.00
1,870,300.00
1,870,300.00
2,516,100.00
16,226,000.00
25,131,000.00
2,733,600.00
3,007,300.00
9,296,600.00
3,007,300.00
23,077,000.00
5,325,600.00
24,406,000.00
1,488,400.00
18,033,000.00
5,081,400.00
7,594,600.00
16,456,000.00
546,300.00
4,458,000.00
1,252,800.00
1,252,800.00
2,057,300.00
2,057,300.00
2,767,700.00
17,848,600.00
27,644,100.00
3,007,000.00
3,308,000.00
10,226,300.00
3,308,000.00
25,384,700.00
5,858,200.00
26,846,600.00
1,637,200.00
19,836,300.00
5,589,500.00
8,354,100.00
18,101,600.00
600,900.00
4,903,800.00
1,415,664.00
1,415,664.00
2,324,749.00
2,324,749.00
3,127,501.00
20,168,918.00
31,237,833.00
3,397,910.00
3,738,040.00
11,555,719.00
3,738,040.00
28,684,711.00
6,619,766.00
30,336,658.00
1,850,036.00
22,415,019.00
6,316,135.00
9,440,133.00
20,454,808.00
679,017.00
5,541,294.00
3,504,356.00
3,635,323.00
4,154,106.00
4,674,132.00
5,191,785.00
5,451,233.00
6,265,398.00
5,966,287.00
7,200,812.00
3,397,910.00
3,426,047.00
1,835,459.00
2,266,102.00
3,656,002.00
23,393,260.00
2,076,488.00
5,900,182.00
6,087,310.00
6,270,935.00
2,038,520.00
1,644,489.00
3,120,156.00
1,071,805.00
29,772,336.00
3,738,040.00
2,819,300.00
2,924,600.00
3,342,000.00
3,760,400.00
4,176,800.00
4,385,500.00
5,040,500.00
4,799,900.00
5,793,100.00
2,733,600.00
2,756,300.00
1,476,600.00
1,823,100.00
2,941,300.00
18,820,000.00
1,670,500.00
4,746,700.00
4,897,300.00
5,045,000.00
1,640,000.00
1,323,000.00
2,510,200.00
862,300.00
23,952,000.00
3,007,300.00
3,101,200.00
3,217,100.00
3,676,200.00
4,136,400.00
4,594,500.00
4,824,100.00
5,544,600.00
5,279,900.00
6,372,400.00
3,007,000.00
3,031,900.00
1,624,300.00
2,005,400.00
3,235,400.00
20,702,000.00
1,837,600.00
5,221,400.00
5,387,000.00
5,549,500.00
1,804,000.00
1,455,300.00
2,761,200.00
948,500.00
26,347,200.00
3,308,000.00
3,504,356.00
3,635,323.00
4,154,106.00
4,674,132.00
5,191,785.00
5,451,233.00
6,265,398.00
5,966,287.00
7,200,812.00
3,397,910.00
3,426,047.00
1,835,459.00
2,266,102.00
3,656,002.00
23,393,260.00
2,076,488.00
5,900,182.00
6,087,310.00
6,270,935.00
2,038,520.00
1,644,489.00
3,120,156.00
1,071,805.00
29,772,336.00
3,738,040.00
13,161,110.00
1,750,935.00
43,043,847.00
2,321,133.00
776,875.00
23,916,563.00
621,500.00
987,959.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
10,588,200.00
1,408,600.00
34,629,000.00
1,867,400.00
625,000.00
19,241,000.00
500,000.00
794,800.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,647,000.00
1,549,500.00
38,091,900.00
2,054,100.00
687,500.00
21,165,100.00
550,000.00
874,300.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13,161,110.00
1,750,935.00
43,043,847.00
2,321,133.00
776,875.00
23,916,563.00
621,500.00
987,959.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,378,035.00
4,437,058.00
7,251,097.00
458,780.00
4,926,461.00
5,978,830.00
7,202,394.00
2,662,845.00
1,070,562.00
459,458.00
917,673.00
3,409,210.00
3,274,740.00
2,846,357.00
611,782.00
1,204,354.00
2,184,064.00
738,681.00
2,280,453.00
1,108,600.00
3,569,600.00
5,833,500.00
369,100.00
3,963,400.00
4,810,000.00
5,794,400.00
2,142,300.00
861,300.00
369,600.00
738,300.00
2,742,700.00
2,634,500.00
2,289,900.00
492,200.00
968,900.00
1,757,100.00
594,300.00
1,834,600.00
1,219,500.00
3,926,600.00
6,416,900.00
406,000.00
4,359,700.00
5,291,000.00
6,373,800.00
2,356,500.00
947,400.00
406,600.00
812,100.00
3,017,000.00
2,898,000.00
2,518,900.00
541,400.00
1,065,800.00
1,932,800.00
653,700.00
2,018,100.00
1,378,035.00
4,437,058.00
7,251,097.00
458,780.00
4,926,461.00
5,978,830.00
7,202,394.00
2,662,845.00
1,070,562.00
459,458.00
917,673.00
3,409,210.00
3,274,740.00
2,846,357.00
611,782.00
1,204,354.00
2,184,064.00
738,681.00
2,280,453.00
1,720,086.00
3,654,420.00
13,208,118.00
1,225,146.00
1,383,800.00
2,940,000.00
10,626,000.00
985,600.00
1,522,200.00
3,234,000.00
11,688,600.00
1,084,200.00
1,720,086.00
3,654,420.00
13,208,118.00
1,225,146.00
63,821,835.00
53,642,908.00
1,352,384.00
26,958,184.00
51,345,000.00
43,156,000.00
1,088,000.00
21,688,000.00
56,479,500.00
47,471,600.00
1,196,800.00
23,856,800.00
63,821,835.00
53,642,908.00
1,352,384.00
26,958,184.00
3,778,268.00
5,289,078.00
3,039,600.00
4,255,100.00
3,343,600.00
4,680,600.00
3,778,268.00
5,289,078.00
2,786,580.00
3,901,664.00
2,241,800.00
3,138,900.00
2,466,000.00
3,452,800.00
2,786,580.00
3,901,664.00
2,680,812.00
3,402,543.00
2,835,509.00
2,156,700.00
2,737,400.00
2,281,200.00
2,372,400.00
3,011,100.00
2,509,300.00
2,680,812.00
3,402,543.00
2,835,509.00
1,383,233.00
1,521,432.00
1,112,800.00
1,224,000.00
1,224,100.00
1,346,400.00
1,383,233.00
1,521,432.00
1,085,252.00
1,193,732.00
873,100.00
960,400.00
960,400.00
1,056,400.00
1,085,252.00
1,193,732.00
1,423,574.00
1,150,114.00
1,045,815.00
1,145,300.00
925,300.00
841,400.00
1,259,800.00
1,017,800.00
925,500.00
1,423,574.00
1,150,114.00
1,045,815.00
1,613,753.00
970,670.00
882,417.00
1,298,300.00
780,900.00
709,900.00
1,428,100.00
859,000.00
780,900.00
1,613,753.00
970,670.00
882,417.00
Karanganyar, ...2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
WILAYAH III
HARGA DASAR
PPN 10 %
PPN 10 % + 13 %
85,000.00
37,500.00
44,000.00
52,000.00
120,000.00
172,000.00
49,000.00
150,000.00
46,000.00
49,000.00
49,000.00
44,500.00
44,500.00
60,000.00
44,500.00
49,000.00
34,000.00
135,000.00
38,500.00
30,000.00
44,500.00
44,500.00
44,500.00
44,500.00
47,000.00
49,000.00
42,500.00
49,000.00
50,000.00
93,500.00
41,250.00
48,400.00
57,200.00
132,000.00
189,200.00
53,900.00
165,000.00
50,600.00
53,900.00
53,900.00
48,950.00
48,950.00
66,000.00
48,950.00
53,900.00
37,400.00
148,500.00
42,350.00
33,000.00
48,950.00
48,950.00
48,950.00
48,950.00
51,700.00
53,900.00
46,750.00
53,900.00
55,000.00
KET.
8
105,655.00
46,612.50
54,692.00
64,636.00
149,160.00
213,796.00
60,907.00
186,450.00
57,178.00
60,907.00
60,907.00
55,313.50
55,313.50
74,580.00
55,313.50
60,907.00
42,262.00
167,805.00
47,855.50
37,290.00
55,313.50
55,313.50
55,313.50
55,313.50
58,421.00
60,907.00
52,827.50
60,907.00
62,150.00
1,345.00
2,887.50
308.00
364.00
640.00
204.00
593.00
800.00
1,322.00
593.00
593.00
186.50
186.50
320.00
186.50
593.00
738.00
3,395.00
294.50
160.00
186.50
186.50
186.50
186.50
429.00
593.00
672.50
593.00
2,050.00
70,000.00
4,500,000.00
41,500.00
817,500.00
30,000,000.00
24,000.00
1,800.00
26,500.00
58,000.00
43,750.00
9,250.00
10,000.00
1,340,000.00
45,000.00
8,500.00
6,000.00
1,950.00
470.00
130,000.00
117,500.00
9,750.00
419,500.00
30,000.00
120,000.00
132,500.00
130,000.00
123,000.00
122,500.00
120,000.00
177,500.00
160,000.00
157,500.00
145,000.00
21,000.00
2,000.00
9,000.00
12,000.00
12,500.00
18,750.00
19,750.00
25,750.00
32,000.00
52,000.00
55,600.00
57,000.00
65,000.00
77,000.00
4,950,000.00
45,650.00
899,250.00
33,000,000.00
26,400.00
1,975.00
29,150.00
63,800.00
48,125.00
10,175.00
11,000.00
1,474,000.00
49,500.00
9,350.00
6,600.00
2,150.00
517.00
143,000.00
129,250.00
10,725.00
461,450.00
33,000.00
132,000.00
145,750.00
143,000.00
135,300.00
134,750.00
132,000.00
195,250.00
176,000.00
173,250.00
159,500.00
23,100.00
2,200.00
9,900.00
13,200.00
13,750.00
20,625.00
21,725.00
28,325.00
35,200.00
57,200.00
61,150.00
62,700.00
71,500.00
87,010.00
5,593,500.00
51,584.50
1,016,152.50
37,290,000.00
29,832.00
2,231.75
32,939.50
72,094.00
54,381.25
11,497.75
12,430.00
1,665,620.00
55,935.00
10,565.50
7,458.00
2,429.50
584.21
161,590.00
146,052.50
12,119.25
521,438.50
37,290.00
149,160.00
164,697.50
161,590.00
152,889.00
152,267.50
149,160.00
220,632.50
198,880.00
195,772.50
180,235.00
26,103.00
2,486.00
11,187.00
14,916.00
15,537.50
23,306.25
24,549.25
32,007.25
39,776.00
64,636.00
69,099.50
70,851.00
80,795.00
27,850.00
29,500.00
1,915.50
347.50
160,000.00
168.00
18.25
1,060.50
1,468.50
1,793.75
502.25
570.00
3,580.00
4,252.50
6,934.50
567.00
45.50
18.22
5,598.00
7,697.50
586.75
186.50
(37,290.00)
840.00
5,833.50
5,598.00
924.00
6,232.50
(149,160.00)
18,700.50
1,745.00
24,442.50
25,188.00
647.00
(2,486.00)
851.00
(14,916.00)
512.50
768.75
863.25
1,430.75
1,686.50
2,239.00
450.50
2,711.50
2,665.00
11,750.00
85,000.00
37,000.00
37,000.00
45,000.00
18,000.00
18,000.00
21,000.00
75,000.00
7,500.00
1,200,000.00
995,000.00
15,000.00
9,000.00
7,500.00
200,000.00
7,000.00
15,000.00
25,000.00
8,750.00
230,000.00
5,000.00
645,000.00
125,000.00
52,000.00
52,000.00
5,750.00
5,500.00
6,250.00
4,000.00
3,250.00
1,800.00
2,200.00
2,550.00
750.00
3,100.00
500.00
34,500.00
10,000,000.00
4,000,000.00
19,000.00
6,500.00
9,250.00
14,500.00
99,500.00
130,000.00
125,000.00
12,925.00
93,500.00
40,700.00
40,700.00
49,500.00
19,800.00
19,800.00
23,100.00
82,500.00
8,250.00
1,320,000.00
1,094,500.00
16,500.00
9,900.00
8,250.00
220,000.00
7,700.00
16,500.00
27,500.00
9,625.00
253,000.00
5,500.00
709,500.00
137,500.00
57,200.00
57,200.00
6,325.00
6,050.00
6,875.00
4,400.00
3,575.00
1,972.50
2,425.00
2,800.00
825.00
3,400.00
550.00
37,950.00
11,000,000.00
4,400,000.00
20,900.00
7,150.00
10,175.00
15,950.00
109,450.00
143,000.00
137,500.00
14,605.25
105,655.00
45,991.00
45,991.00
55,935.00
22,374.00
22,374.00
26,103.00
93,225.00
9,322.50
1,491,600.00
1,236,785.00
18,645.00
11,187.00
9,322.50
248,600.00
8,701.00
18,645.00
31,075.00
10,876.25
285,890.00
6,215.00
801,735.00
155,375.00
64,636.00
64,636.00
7,147.25
6,836.50
7,768.75
4,972.00
4,039.75
2,228.93
2,740.25
3,164.00
932.25
3,842.00
621.50
42,883.50
12,430,000.00
4,972,000.00
23,617.00
8,079.50
11,497.75
18,023.50
123,678.50
161,590.00
155,375.00
374.75
7,363.75
209.00
2,159.00
4,252.50
1,032.25
1,032.25
647.00
400.00
93.50
45,990.00
402.50
1,417.50
583.00
17,427.50
18,900.00
661.50
1,417.50
2,362.50
626.25
1,672.50
785.00
765.00
4,590.00
2,688.40
3,309.00
934.25
(6,780.00)
312.75
434.50
325.00
77.57
94.50
92.50
87.25
227.50
77.00
1,960.50
1,023,110.00
259,765.00
(23,617.00)
614.25
539.75
701.50
40.25
5,597.50
(155,375.00)
130,000.00
87,000.00
65,000.00
75,000.00
7,500.00
15,500.00
25,500.00
8,000.00
17,500.00
10,000.00
475,000.00
100,000.00
3,100.00
4,100.00
1,500,000.00
750,000.00
47,000.00
48,000.00
250,000.00
135,000.00
64,500.00
6,500.00
9,000.00
14,500.00
200,000.00
980,000.00
950.00
7,960,000.00
8,390,000.00
895,000.00
4,000.00
6,990,000.00
6,550,000.00
13,450,000.00
9,125,000.00
18,800,000.00
23,000.00
8,050,000.00
8,325,000.00
4,825,000.00
5,100,000.00
4,000.00
4,500,000.00
1,050,000.00
16,000.00
18,500.00
143,000.00
95,700.00
71,500.00
82,500.00
8,250.00
17,050.00
28,050.00
8,800.00
19,250.00
11,000.00
522,500.00
110,000.00
3,400.00
4,500.00
1,650,000.00
825,000.00
51,700.00
52,800.00
275,000.00
148,500.00
70,950.00
7,150.00
9,900.00
15,950.00
220,000.00
1,078,000.00
1,000.00
8,756,000.00
9,229,000.00
984,500.00
4,400.00
7,689,000.00
7,205,000.00
14,795,000.00
10,037,500.00
20,680,000.00
25,300.00
8,855,000.00
9,157,500.00
5,307,500.00
5,610,000.00
4,400.00
4,950,000.00
1,155,000.00
17,600.00
20,350.00
161,590.00
108,141.00
80,795.00
93,225.00
9,322.50
19,266.50
31,696.50
9,944.00
21,752.50
12,430.00
590,425.00
124,300.00
3,842.00
5,085.00
1,864,500.00
932,250.00
58,421.00
59,664.00
310,750.00
167,805.00
80,173.50
8,079.50
11,187.00
18,023.50
248,600.00
1,218,140.00
1,130.00
9,894,280.00
10,428,770.00
1,112,485.00
4,972.00
8,688,570.00
8,141,650.00
16,718,350.00
11,342,375.00
23,368,400.00
28,589.00
10,006,150.00
10,347,975.00
5,997,475.00
6,339,300.00
4,972.00
5,593,500.00
1,305,150.00
19,888.00
22,995.50
(161,590.00)
4,027.10
(80,795.00)
(93,225.00)
708.75
796.00
1,741.00
(9,944.00)
247.50
(12,430.00)
7,491.00
10,231.10
170.50
265.00
45,450.00
(932,250.00)
1,766.50
523.50
(310,750.00)
(167,805.00)
76.50
614.25
850.50
701.50
1,780.00
52,485.00
57.70
127,520.00
128,030.00
315.00
528.00
5,180.00
3,725.00
400.00
26,375.00
37,850.00
(28,589.00)
149,400.00
141,950.00
145,575.00
138,125.00
(4,972.00)
(5,593,500.00)
32,350.00
174.50
1,079.50
18,500.00
15,000.00
2,700.00
45,000.00
43,000.00
32,000.00
36,000.00
16,000.00
115,000.00
200,000.00
16,100.00
26,750.00
40,000.00
18,750.00
29,500.00
42,750.00
37,500.00
53,500.00
58,750.00
85,000.00
75,000.00
15,000.00
22,500.00
27,500.00
12,500.00
62,000.00
61,000.00
52,500.00
10,000.00
125,000.00
425,000.00
6,500.00
4,500,000.00
4,200,000.00
4,500.00
15,000.00
4,500.00
19,000.00
7,500.00
75,000.00
94,000.00
110,000.00
150,000.00
200,000.00
350,000.00
20,350.00
16,500.00
2,975.00
49,500.00
47,300.00
35,200.00
39,600.00
17,600.00
126,500.00
220,000.00
17,700.00
29,425.00
44,000.00
20,625.00
32,450.00
47,025.00
41,250.00
58,850.00
64,625.00
93,500.00
82,500.00
16,500.00
24,750.00
30,250.00
13,750.00
68,200.00
67,100.00
57,750.00
11,000.00
137,500.00
467,500.00
7,150.00
4,950,000.00
4,620,000.00
4,500.00
16,500.00
4,500.00
20,900.00
7,500.00
82,500.00
103,400.00
121,000.00
165,000.00
220,000.00
385,000.00
22,995.50
18,645.00
3,361.75
55,935.00
53,449.00
39,776.00
44,748.00
19,888.00
142,945.00
248,600.00
20,001.00
33,250.25
49,720.00
23,306.25
36,668.50
53,138.25
46,612.50
66,500.50
73,026.25
105,655.00
93,225.00
18,645.00
27,967.50
34,182.50
15,537.50
77,066.00
75,823.00
65,257.50
12,430.00
155,375.00
528,275.00
8,079.50
5,593,500.00
5,220,600.00
5,085.00
18,645.00
5,085.00
23,617.00
8,475.00
93,225.00
116,842.00
136,730.00
186,450.00
248,600.00
435,050.00
(22,995.50)
(18,645.00)
138.25
(55,935.00)
51.00
349.00
252.00
174.50
4,180.00
8,200.00
61.50
187.25
436.25
100.00
112.75
361.75
200.00
374.50
536.25
1,345.00
400.00
1,355.00
2,126.25
2,598.75
(15,537.50)
(77,066.00)
(75,823.00)
2,687.50
(12,430.00)
(155,375.00)
(528,275.00)
159.50
11,962.50
11,165.00
(585.00)
3,760.80
(585.00)
993.00
(450.00)
(93,225.00)
(116,842.00)
(136,730.00)
(186,450.00)
(248,600.00)
14,950.00
195,000.00
1,200.00
147,500.00
16,000.00
18,000.00
22,500.00
600.00
450.00
16,000.00
12,500.00
3,350,000.00
34,500.00
115,000.00
100,000.00
65,000.00
50,000.00
90,000.00
1,800.00
10,000.00
63,000.00
400,000.00
1,800,000.00
4,700,000.00
4,800,000.00
5,000,000.00
5,400,000.00
5,700,000.00
6,200,000.00
180,000.00
46,500.00
52,000.00
67,500.00
75,000.00
125,000.00
130,000.00
235,000.00
105,000.00
135,000.00
225,000.00
290,000.00
422,500.00
540,000.00
570,000.00
18,000.00
21,500.00
27,500.00
50,000.00
214,500.00
1,320.00
162,250.00
17,600.00
19,800.00
24,750.00
650.00
500.00
17,600.00
13,750.00
3,685,000.00
37,950.00
126,500.00
110,000.00
71,500.00
55,000.00
99,000.00
1,975.00
11,000.00
69,300.00
440,000.00
1,980,000.00
5,170,000.00
5,280,000.00
5,500,000.00
5,940,000.00
6,270,000.00
6,820,000.00
198,000.00
51,150.00
57,200.00
74,250.00
82,500.00
137,500.00
143,000.00
258,500.00
115,500.00
148,500.00
247,500.00
319,000.00
464,750.00
594,000.00
627,000.00
19,800.00
23,650.00
30,250.00
55,000.00
242,385.00
1,491.60
183,342.50
19,888.00
22,374.00
27,967.50
734.50
565.00
19,888.00
15,537.50
4,164,050.00
42,883.50
142,945.00
124,300.00
80,795.00
62,150.00
111,870.00
2,231.75
12,430.00
78,309.00
497,200.00
2,237,400.00
5,842,100.00
5,966,400.00
6,215,000.00
6,712,200.00
7,085,100.00
7,706,600.00
223,740.00
57,799.50
64,636.00
83,902.50
93,225.00
155,375.00
161,590.00
292,105.00
130,515.00
167,805.00
279,675.00
360,470.00
525,167.50
671,220.00
708,510.00
22,374.00
26,724.50
34,182.50
62,150.00
7,615.00
8.40
563.50
175.00
1,032.00
(27,967.50)
(734.50)
(565.00)
(19,888.00)
512.50
49,075.00
1,949.50
26,365.00
15,192.50
400.00
18,100.00
3,130.00
108.25
(12,430.00)
3,963.00
11,050.00
(2,237,400.00)
(5,842,100.00)
(5,966,400.00)
(6,215,000.00)
(6,712,200.00)
(7,085,100.00)
(7,706,600.00)
(223,740.00)
2,388.00
2,239.00
3,035.00
7,087.50
5,125.00
5,597.50
8,832.50
3,235.00
6,070.00
1,200.00
655.00
1,272.50
2,880.00
365.00
1,032.25
1,363.00
1,261.25
2,718.75
75,000.00
137,500.00
200,000.00
410,000.00
645,000.00
15,600.00
23,500.00
31,250.00
7,100.00
37,250.00
350.00
550,000.00
400,000.00
350,000.00
800,000.00
12,200,000.00
481,500.00
3,000.00
35,000.00
65,000.00
14,750.00
12,750.00
4,750.00
25,000.00
24,000.00
47,750.00
59,750.00
1,250.00
987,500.00
195,000.00
64,200.00
69,550.00
58,850.00
90,000.00
139,500.00
64,000.00
117,750.00
198,000.00
240,750.00
3,000,000.00
115,000.00
140,000.00
12,000.00
192,000.00
180,000.00
29,500.00
82,500.00
151,250.00
220,000.00
451,000.00
709,500.00
17,150.00
25,850.00
34,375.00
7,800.00
40,975.00
375.00
605,000.00
440,000.00
385,000.00
880,000.00
13,420,000.00
529,650.00
3,300.00
38,500.00
71,500.00
16,225.00
14,025.00
5,225.00
27,500.00
26,400.00
52,525.00
65,725.00
1,375.00
1,086,250.00
214,500.00
70,600.00
76,500.00
64,700.00
99,000.00
153,450.00
70,400.00
129,525.00
217,800.00
264,825.00
3,300,000.00
126,500.00
154,000.00
13,200.00
211,200.00
198,000.00
32,450.00
93,225.00
170,912.50
248,600.00
509,630.00
801,735.00
19,379.50
29,210.50
38,843.75
8,814.00
46,301.75
423.75
683,650.00
497,200.00
435,050.00
994,400.00
15,164,600.00
598,504.50
3,729.00
43,505.00
80,795.00
18,334.25
15,848.25
5,904.25
31,075.00
29,832.00
59,353.25
74,269.25
1,553.75
1,227,462.50
242,385.00
79,778.00
86,445.00
73,111.00
111,870.00
173,398.50
79,552.00
146,363.25
246,114.00
299,252.25
3,729,000.00
142,945.00
174,020.00
14,916.00
238,656.00
223,740.00
36,668.50
3,075.00
5,637.50
8,200.00
11,995.00
765.00
(19,379.50)
(29,210.50)
(38,843.75)
(8,814.00)
511.25
(423.75)
18,538.00
4,363.00
(435,050.00)
126,693.00
2,650.00
3,370.50
(3,729.00)
(43,505.00)
1,477.00
390.75
201.75
98.75
(31,075.00)
64.00
438.75
470.75
(1,553.75)
8,387.50
1,040.00
472.00
493.00
452.00
298.00
476.50
698.00
761.75
1,323.50
1,685.25
123,000.00
(142,945.00)
(174,020.00)
84.00
1,344.00
1,260.00
112.75
1,150,000.00
418,500.00
2,000,000.00
40,000.00
32,000.00
100,000.00
36,000.00
41,500.00
73,000.00
89,000.00
69,000.00
80,000.00
675,000.00
4,300,000.00
20,000.00
246,000.00
25,500.00
134,000.00
42,800.00
38,500.00
53,500.00
49,200.00
47,500.00
590,000.00
800,000.00
17,500,000.00
72,000.00
4,400,000.00
54,000.00
1,265,000.00
460,350.00
2,200,000.00
44,000.00
35,200.00
110,000.00
39,600.00
45,650.00
80,300.00
97,900.00
75,900.00
88,000.00
742,500.00
4,730,000.00
22,000.00
270,600.00
28,050.00
147,400.00
47,100.00
42,350.00
58,850.00
54,100.00
52,250.00
649,000.00
880,000.00
19,250,000.00
79,200.00
4,840,000.00
59,400.00
1,429,450.00
520,195.50
2,486,000.00
49,720.00
39,776.00
124,300.00
44,748.00
51,584.50
90,739.00
110,627.00
85,767.00
99,440.00
839,025.00
5,344,900.00
24,860.00
305,778.00
31,696.50
166,562.00
53,223.00
47,855.50
66,500.50
61,133.00
59,042.50
733,370.00
994,400.00
21,752,500.00
89,496.00
5,469,200.00
67,122.00
(1,429,450.00)
2,981.00
14,000.00
280.00
224.00
890.00
252.00
415.50
461.00
373.00
933.00
560.00
5,590.20
5,100.00
140.00
15,222.00
210.90
625.50
277.00
294.50
374.50
392.00
(59,042.50)
2,255.00
(994,400.00)
247,500.00
504.00
30,800.00
378.00
353,100.00
317,100.00
1,219,800.00
12,198,000.00
577,800.00
834,600.00
57,700.00
388,400.00
348,800.00
1,341,800.00
13,417,800.00
635,600.00
918,100.00
63,500.00
438,892.00
394,144.00
1,516,234.00
15,162,114.00
718,228.00
1,037,453.00
71,755.00
2,483.00
2,291.00
8,516.00
85,386.00
4,022.00
5,797.00
470.00
481,500.00
577,800.00
44,900.00
963,000.00
192,600.00
192,600.00
44,900.00
529,700.00
635,600.00
49,400.00
1,059,300.00
211,900.00
211,900.00
49,400.00
598,561.00
718,228.00
55,822.00
1,197,009.00
239,447.00
239,447.00
55,822.00
3,314.00
4,022.00
353.00
6,741.00
1,303.00
1,303.00
353.00
73,400.00
2,247,000.00
1,091,400.00
96,300.00
1,219,800.00
81,900.00
96,300.00
1,219,800.00
224,700.00
44,900.00
44,900.00
86,600.00
963,000.00
317,100.00
121,900.00
160,500.00
1,251,900.00
609,900.00
44,900.00
481,500.00
288,900.00
1,605,000.00
577,800.00
44,900.00
256,800.00
80,700.00
2,471,700.00
1,200,500.00
105,900.00
1,341,800.00
90,100.00
105,900.00
1,341,800.00
247,200.00
49,400.00
49,400.00
95,300.00
1,059,300.00
348,800.00
134,100.00
176,600.00
1,377,100.00
670,900.00
49,400.00
529,700.00
317,800.00
1,765,500.00
635,600.00
49,400.00
282,500.00
91,191.00
2,793,021.00
1,356,565.00
119,667.00
1,516,234.00
101,813.00
119,667.00
1,516,234.00
279,336.00
55,822.00
55,822.00
107,689.00
1,197,009.00
394,144.00
151,533.00
199,558.00
1,556,123.00
758,117.00
55,822.00
598,561.00
359,114.00
1,995,015.00
718,228.00
55,822.00
319,225.00
615.00
15,729.00
7,685.00
708.00
8,516.00
586.00
708.00
8,516.00
1,539.00
353.00
353.00
648.50
6,741.00
2,291.00
942.00
1,067.00
8,752.00
4,258.00
353.00
3,314.00
2,011.00
11,235.00
4,022.00
353.00
1,775.00
1,219,800.00
1,219,800.00
306,400.00
428,800.00
577,800.00
1,733,400.00
288,900.00
577,800.00
1,155,600.00
16,000.00
3,677,800.00
160,500.00
1,219,800.00
321,000.00
577,800.00
513,600.00
224,700.00
1,219,800.00
192,600.00
204,300.00
1,341,800.00
1,341,800.00
337,000.00
471,700.00
635,600.00
1,906,700.00
317,800.00
635,600.00
1,271,200.00
17,600.00
4,045,600.00
176,600.00
1,341,800.00
353,100.00
635,600.00
565,000.00
247,200.00
1,341,800.00
211,900.00
224,700.00
1,516,234.00
1,516,234.00
380,810.00
533,021.00
718,228.00
2,154,571.00
359,114.00
718,228.00
1,436,456.00
19,888.00
4,571,528.00
199,558.00
1,516,234.00
399,003.00
718,228.00
638,450.00
279,336.00
1,516,234.00
239,447.00
253,911.00
8,516.00
8,516.00
2,303.50
3,049.00
4,022.00
12,179.00
2,011.00
4,022.00
8,044.00
121.00
25,834.00
1,067.00
8,516.00
2,247.00
4,022.00
3,550.00
1,539.00
8,516.00
1,303.00
1,498.00
321,000.00
83,400.00
256,800.00
38,500.00
256,800.00
1,091,400.00
577,800.00
244,800.00
1,605,000.00
1,027,200.00
1,002,800.00
19,200.00
353,100.00
91,700.00
282,500.00
42,400.00
282,500.00
1,200,500.00
635,600.00
269,300.00
1,765,500.00
1,129,900.00
1,103,100.00
21,100.00
399,003.00
103,621.00
319,225.00
47,912.00
319,225.00
1,356,565.00
718,228.00
304,309.00
1,995,015.00
1,276,787.00
1,246,503.00
23,843.00
2,247.00
704.00
1,775.00
238.00
1,775.00
7,685.00
4,022.00
1,711.00
11,235.00
7,213.00
7,002.00
232.00
385,200.00
513,600.00
282,400.00
83,400.00
577,800.00
288,900.00
192,600.00
423,700.00
565,000.00
310,600.00
91,700.00
635,600.00
317,800.00
211,900.00
478,781.00
638,450.00
350,978.00
103,621.00
718,228.00
359,114.00
239,447.00
2,719.00
3,550.00
2,122.00
704.00
4,022.00
2,011.00
1,303.00
1,712,000.00
1,883,200.00
2,128,016.00
11,984.00
57,700.00
51,300.00
73,800.00
585,500.00
695,200.00
425,000.00
693,300.00
824,300.00
70,600.00
89,800.00
70,600.00
63,500.00
56,400.00
81,200.00
644,100.00
764,700.00
467,500.00
762,600.00
906,700.00
77,700.00
98,800.00
77,700.00
71,755.00
63,732.00
91,756.00
727,833.00
864,111.00
528,275.00
861,738.00
1,024,571.00
87,801.00
111,644.00
87,801.00
470.00
468.00
531.50
4,047.00
4,996.50
2,980.00
4,962.00
5,839.00
474.00
706.00
474.00
64,200.00
22,400.00
44,900.00
51,300.00
8,900.00
10,900.00
14,100.00
15,400.00
17,300.00
70,600.00
24,600.00
49,400.00
56,400.00
9,800.00
12,000.00
15,500.00
16,900.00
19,000.00
79,778.00
27,798.00
55,822.00
63,732.00
11,074.00
13,560.00
17,515.00
19,097.00
21,470.00
472.00
289.50
353.00
468.00
161.00
82.50
140.00
163.00
197.50
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
51,300.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
56,400.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
63,732.00
468.00
468.00
468.00
468.00
468.00
468.00
23,500.00
23,500.00
26,700.00
23,500.00
64,200.00
25,900.00
25,900.00
29,400.00
25,900.00
70,600.00
29,267.00
29,267.00
33,222.00
29,267.00
79,778.00
158.00
158.00
215.50
158.00
472.00
11,300.00
374,100.00
2,022,000.00
23,700.00
62,700,000.00
143,200.00
57,600.00
87,800.00
137,700.00
200,300.00
63,200.00
175,684,000.00
135,187,000.00
537,001,000.00
555,313,000.00
411,440,000.00
442,400,000.00
510,600,000.00
317,366,000.00
304,522,000.00
17,000.00
97,997,000.00
136,900.00
122,446,000.00
198,700.00
255,200.00
9,400.00
9,400.00
11,700.00
12,688,000.00
12,400.00
411,500.00
2,224,200.00
26,100.00
68,970,000.00
157,500.00
63,400.00
96,600.00
151,500.00
220,300.00
69,500.00
193,252,400.00
148,705,700.00
590,701,100.00
610,844,300.00
452,584,000.00
486,640,000.00
561,660,000.00
349,102,600.00
334,974,200.00
18,700.00
107,796,700.00
150,600.00
134,690,600.00
218,600.00
280,700.00
10,300.00
10,300.00
12,900.00
13,956,800.00
14,012.00
464,995.00
2,513,346.00
29,493.00
77,936,100.00
177,975.00
71,642.00
109,158.00
171,195.00
248,939.00
78,535.00
218,375,212.00
168,037,441.00
667,492,243.00
690,254,059.00
511,419,920.00
549,903,200.00
634,675,800.00
394,485,938.00
378,520,846.00
21,131.00
121,810,271.00
170,178.00
152,200,378.00
247,018.00
317,191.00
11,639.00
11,639.00
14,577.00
15,771,184.00
165.50
2,702.00
14,208.00
146.00
63,900.00
1,143.00
465.30
607.95
941.25
1,441.00
564.75
2,024.25
1,179.80
5,322.00
5,348.50
3,566.25
3,842.05
4,330.00
3,604.05
3,691.50
226.20
60,257.30
1,022.00
43,571.55
1,430.65
1,909.75
232.65
131.00
167.60
88,816.00
9,200.00
111,600.00
55,600.00
56,100.00
166,100.00
10,100.00
122,800.00
61,200.00
61,700.00
182,700.00
11,413.00
138,764.00
69,156.00
69,721.00
206,451.00
116.25
764.00
394.00
492.40
1,236.00
910,500.00
5,468,300.00
6,015,600.00
1,695,100.00
6,474,300.00
1,001,600.00
6,015,100.00
6,617,200.00
1,864,600.00
7,121,700.00
1,131,808.00
6,797,063.00
7,477,436.00
2,106,998.00
8,047,521.00
6,404.50
38,364.50
42,149.50
11,923.00
45,477.50
95,400.00
51,100.00
30,500.00
29,500.00
9,023,000.00
502,000.00
9,570,300.00
12,608,100.00
9,441,300.00
2,733,600.00
4,072,400.00
3,796,800.00
93,471,000.00
5,148,400.00
272,600.00
315,000.00
305,100.00
344,500.00
959,700.00
1,196,000.00
104,900.00
56,200.00
33,600.00
32,500.00
9,925,300.00
552,200.00
10,527,300.00
13,868,900.00
10,385,400.00
3,007,000.00
4,479,600.00
4,176,500.00
102,818,100.00
5,663,200.00
299,900.00
346,500.00
335,600.00
379,000.00
1,055,700.00
1,315,600.00
118,537.00
63,506.00
37,968.00
36,725.00
11,215,589.00
623,986.00
11,895,849.00
15,671,857.00
11,735,502.00
3,397,910.00
5,061,948.00
4,719,445.00
116,184,453.00
6,399,416.00
338,887.00
391,545.00
379,228.00
428,270.00
1,192,941.00
1,486,628.00
821.50
480.00
177.50
190.00
63,174.00
3,569.00
67,072.00
88,387.00
66,223.50
19,188.50
28,630.50
26,593.50
28,889.00
36,099.00
1,961.50
2,215.00
2,227.00
2,405.00
6,796.50
8,429.50
24,596,000.00
33,002,000.00
37,179,000.00
58,787,000.00
16,786,000.00
13,500,000.00
3,987,800.00
24,862,000.00
27,055,600.00
36,302,200.00
40,896,900.00
64,665,700.00
18,464,600.00
14,850,000.00
4,386,600.00
27,348,200.00
30,572,828.00
41,021,486.00
46,213,497.00
73,072,241.00
20,864,998.00
16,780,500.00
4,956,858.00
30,903,466.00
46,934.00
42,760.00
71,760.50
35,455.50
22,739.50
94,577.00
27,897.50
48,531.00
280,500.00
207,700.00
308,600.00
228,500.00
348,718.00
258,205.00
1,974.50
1,430.50
625,000.00
2,296,600.00
3,342,000.00
4,112,800.00
246,100.00
15,129,000.00
4,289,000.00
20,962,000.00
64,609,000.00
32,052,000.00
38,432,000.00
2,050,500.00
18,260,000.00
687,500.00
2,526,300.00
3,676,200.00
4,524,100.00
270,700.00
16,641,900.00
4,717,900.00
23,058,200.00
71,069,900.00
35,257,200.00
42,275,200.00
2,255,600.00
20,086,000.00
776,875.00
2,854,719.00
4,154,106.00
5,112,233.00
305,891.00
18,805,347.00
5,331,227.00
26,055,766.00
80,308,987.00
39,840,636.00
47,770,976.00
2,548,828.00
22,697,180.00
4,492.50
16,037.50
23,441.50
28,796.00
1,734.00
43,452.00
30,061.50
52,983.00
14,361.50
36,177.50
80,708.00
14,303.50
64,609.00
50,381,000.00
58,737,000.00
62,964,000.00
69,281,000.00
3,445,400.00
19,191,000.00
23,819,000.00
21,976,000.00
55,419,100.00
64,610,700.00
69,260,400.00
76,209,100.00
3,789,900.00
21,110,100.00
26,200,900.00
24,173,600.00
62,623,583.00
73,010,091.00
78,264,252.00
86,116,283.00
4,282,587.00
23,854,413.00
29,607,017.00
27,316,168.00
39,629.50
97,605.50
65,686.50
47,018.50
24,163.00
71,429.00
40,650.00
28,003.00
53,100.00
35,400.00
29,500.00
18,299,000.00
546,300.00
2,585,000.00
58,400.00
38,900.00
32,500.00
20,128,900.00
600,900.00
2,843,500.00
65,992.00
43,957.00
36,725.00
22,745,657.00
679,017.00
3,213,155.00
455.00
341.00
190.00
2,596.50
3,910.50
18,138.00
255,900.00
193,900.00
142,700.00
95,400.00
72,800.00
5,878,800.00
23,495,000.00
7,518,800.00
5,057,800.00
4,803,800.00
500,000.00
2,805,500.00
2,682,400.00
28,584,000.00
27,880,000.00
281,500.00
213,300.00
157,000.00
104,900.00
80,100.00
6,466,700.00
25,844,500.00
8,270,700.00
5,563,600.00
5,284,200.00
550,000.00
3,086,100.00
2,950,600.00
31,442,400.00
30,668,000.00
318,095.00
241,029.00
177,410.00
118,537.00
90,513.00
7,307,371.00
29,204,285.00
9,345,891.00
6,286,868.00
5,971,146.00
621,500.00
3,487,293.00
3,334,178.00
35,529,912.00
34,654,840.00
1,835.00
1,379.50
1,012.50
821.50
554.70
41,175.00
38,547.50
52,668.00
35,441.00
33,694.00
3,594.00
19,632.00
18,934.50
74,605.50
69,870.00
1,138,900.00
1,252,800.00
1,415,664.00
8,024.50
1,138,900.00
1,138,900.00
1,870,300.00
1,870,300.00
2,516,100.00
16,226,000.00
25,131,000.00
2,733,600.00
3,007,300.00
9,296,600.00
3,007,300.00
23,077,000.00
5,325,600.00
24,406,000.00
1,488,400.00
18,033,000.00
5,081,400.00
7,594,600.00
16,456,000.00
546,300.00
4,458,000.00
1,252,800.00
1,252,800.00
2,057,300.00
2,057,300.00
2,767,700.00
17,848,600.00
27,644,100.00
3,007,000.00
3,308,000.00
10,226,300.00
3,308,000.00
25,384,700.00
5,858,200.00
26,846,600.00
1,637,200.00
19,836,300.00
5,589,500.00
8,354,100.00
18,101,600.00
600,900.00
4,903,800.00
1,415,664.00
1,415,664.00
2,324,749.00
2,324,749.00
3,127,501.00
20,168,918.00
31,237,833.00
3,397,910.00
3,738,040.00
11,555,719.00
3,738,040.00
28,684,711.00
6,619,766.00
30,336,658.00
1,850,036.00
22,415,019.00
6,316,135.00
9,440,133.00
20,454,808.00
679,017.00
5,541,294.00
8,025.57
8,026.64
13,201.00
13,201.00
17,657.00
50,658.00
50,090.50
19,188.50
21,137.50
65,123.00
21,137.50
36,389.50
37,239.00
45,617.50
10,480.00
63,755.00
35,706.00
53,174.50
52,705.00
3,910.50
31,212.50
2,819,300.00
2,924,600.00
3,342,000.00
3,760,400.00
4,176,800.00
4,385,500.00
5,040,500.00
4,799,900.00
5,793,100.00
2,733,600.00
2,756,300.00
1,476,600.00
1,823,100.00
2,941,300.00
18,820,000.00
1,670,500.00
4,746,700.00
4,897,300.00
5,045,000.00
1,640,000.00
1,323,000.00
2,510,200.00
862,300.00
23,952,000.00
3,007,300.00
3,101,200.00
3,217,100.00
3,676,200.00
4,136,400.00
4,594,500.00
4,824,100.00
5,544,600.00
5,279,900.00
6,372,400.00
3,007,000.00
3,031,900.00
1,624,300.00
2,005,400.00
3,235,400.00
20,702,000.00
1,837,600.00
5,221,400.00
5,387,000.00
5,549,500.00
1,804,000.00
1,455,300.00
2,761,200.00
948,500.00
26,347,200.00
3,308,000.00
3,504,356.00
3,635,323.00
4,154,106.00
4,674,132.00
5,191,785.00
5,451,233.00
6,265,398.00
5,966,287.00
7,200,812.00
3,397,910.00
3,426,047.00
1,835,459.00
2,266,102.00
3,656,002.00
23,393,260.00
2,076,488.00
5,900,182.00
6,087,310.00
6,270,935.00
2,038,520.00
1,644,489.00
3,120,156.00
1,071,805.00
29,772,336.00
3,738,040.00
19,796.00
20,492.50
23,441.50
26,378.00
29,226.50
30,644.50
35,297.00
33,631.00
40,680.50
19,188.50
19,353.00
10,291.00
12,784.00
20,732.00
37,921.00
11,670.50
33,289.00
34,427.50
35,377.50
11,493.00
9,303.00
17,619.00
6,113.00
42,064.00
21,137.50
10,588,200.00
1,408,600.00
34,629,000.00
1,867,400.00
625,000.00
19,241,000.00
500,000.00
794,800.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,647,000.00
1,549,500.00
38,091,900.00
2,054,100.00
687,500.00
21,165,100.00
550,000.00
874,300.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13,161,110.00
1,750,935.00
43,043,847.00
2,321,133.00
776,875.00
23,916,563.00
621,500.00
987,959.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
74,148.00
9,910.50
23,653.00
13,125.50
4,492.50
9,279.00
3,594.00
5,641.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,108,600.00
3,569,600.00
5,833,500.00
369,100.00
3,963,400.00
4,810,000.00
5,794,400.00
2,142,300.00
861,300.00
369,600.00
738,300.00
2,742,700.00
2,634,500.00
2,289,900.00
492,200.00
968,900.00
1,757,100.00
594,300.00
1,834,600.00
1,219,500.00
3,926,600.00
6,416,900.00
406,000.00
4,359,700.00
5,291,000.00
6,373,800.00
2,356,500.00
947,400.00
406,600.00
812,100.00
3,017,000.00
2,898,000.00
2,518,900.00
541,400.00
1,065,800.00
1,932,800.00
653,700.00
2,018,100.00
1,378,035.00
4,437,058.00
7,251,097.00
458,780.00
4,926,461.00
5,978,830.00
7,202,394.00
2,662,845.00
1,070,562.00
459,458.00
917,673.00
3,409,210.00
3,274,740.00
2,846,357.00
611,782.00
1,204,354.00
2,184,064.00
738,681.00
2,280,453.00
7,816.16
25,043.16
40,846.00
2,657.50
27,840.16
33,701.16
40,637.16
15,031.16
6,125.50
2,594.75
5,202.00
19,271.16
18,386.16
16,094.16
3,468.00
6,827.15
12,378.50
4,236.05
12,894.05
1,383,800.00
2,940,000.00
10,626,000.00
985,600.00
1,522,200.00
3,234,000.00
11,688,600.00
1,084,200.00
1,720,086.00
3,654,420.00
13,208,118.00
1,225,146.00
9,714.00
20,580.00
74,382.00
6,854.00
51,345,000.00
43,156,000.00
1,088,000.00
21,688,000.00
56,479,500.00
47,471,600.00
1,196,800.00
23,856,800.00
63,821,835.00
53,642,908.00
1,352,384.00
26,958,184.00
46,165.00
51,092.00
7,616.00
26,816.00
3,039,600.00
4,255,100.00
3,343,600.00
4,680,600.00
3,778,268.00
5,289,078.00
21,302.00
29,892.00
2,241,800.00
3,138,900.00
2,466,000.00
3,452,800.00
2,786,580.00
3,901,664.00
15,750.00
22,026.00
2,156,700.00
2,737,400.00
2,281,200.00
2,372,400.00
3,011,100.00
2,509,300.00
2,680,812.00
3,402,543.00
2,835,509.00
15,108.64
19,317.00
16,041.00
1,112,800.00
1,224,000.00
1,224,100.00
1,346,400.00
1,383,233.00
1,521,432.00
7,767.00
8,668.00
873,100.00
960,400.00
960,400.00
1,056,400.00
1,085,252.00
1,193,732.00
6,148.00
6,808.00
1,145,300.00
925,300.00
841,400.00
1,259,800.00
1,017,800.00
925,500.00
1,423,574.00
1,150,114.00
1,045,815.00
8,073.00
6,556.00
5,995.00
1,298,300.00
780,900.00
709,900.00
1,428,100.00
859,000.00
780,900.00
1,613,753.00
970,670.00
882,417.00
9,241.00
5,533.80
5,041.00
Karanganyar, ...2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
1,345.00
2,887.50
308.00
364.00
640.00
204.00
593.00
800.00
1,322.00
593.00
593.00
186.50
186.50
320.00
186.50
593.00
738.00
3,395.00
294.50
160.00
186.50
186.50
186.50
186.50
429.00
593.00
672.50
593.00
2,050.00
1,345.00
2,887.50
308.00
364.00
640.00
204.00
593.00
800.00
1,322.00
593.00
593.00
186.50
186.50
320.00
186.50
593.00
738.00
3,395.00
294.50
160.00
186.50
186.50
186.50
186.50
429.00
593.00
672.50
593.00
2,050.00
15,420.00
29,500.00
1,915.50
347.50
160,000.00
168.00
18.25
1,060.50
1,468.50
1,793.75
502.25
570.00
3,580.00
4,252.50
6,934.50
567.00
45.50
12.00
5,598.00
7,697.50
586.75
186.50
(37,290.00)
840.00
5,833.50
5,598.00
924.00
6,232.50
(149,160.00)
6,270.50
3,609.50
21,335.00
12,758.00
647.00
(2,486.00)
851.00
(14,916.00)
512.50
768.75
863.25
1,430.75
1,686.50
2,239.00
450.50
2,711.50
2,665.00
2,990.00
29,500.00
1,915.50
347.50
160,000.00
168.00
18.25
1,060.50
1,468.50
1,793.75
502.25
570.00
3,580.00
4,252.50
6,934.50
567.00
45.50
5.79
5,598.00
7,697.50
586.75
186.50
(37,290.00)
840.00
5,833.50
5,598.00
924.00
6,232.50
(149,160.00)
55.50
1,745.00
18,227.50
328.00
647.00
(2,486.00)
851.00
(14,916.00)
512.50
768.75
863.25
1,430.75
1,686.50
2,239.00
450.50
2,711.50
2,665.00
374.75
7,363.75
209.00
2,159.00
4,252.50
1,032.25
1,032.25
647.00
400.00
93.50
45,990.00
402.50
1,417.50
583.00
17,427.50
18,900.00
661.50
1,417.50
2,362.50
626.25
1,672.50
785.00
765.00
4,590.00
2,688.40
3,309.00
906.00
(6,808.25)
284.50
406.25
268.50
49.32
38.00
64.25
59.00
199.25
48.75
1,960.50
1,023,110.00
259,765.00
(23,617.00)
614.25
539.75
701.50
40.25
5,597.50
(155,375.00)
374.75
7,363.75
209.00
2,159.00
4,252.50
1,032.25
1,032.25
647.00
400.00
93.50
45,990.00
402.50
1,417.50
583.00
17,427.50
18,900.00
661.50
1,417.50
2,362.50
626.25
1,672.50
785.00
765.00
4,590.00
2,688.40
3,309.00
877.75
(6,836.50)
256.25
378.00
240.25
21.07
9.75
36.00
30.75
171.00
20.50
1,960.50
1,023,110.00
259,765.00
(23,617.00)
614.25
539.75
701.50
40.25
5,597.50
(155,375.00)
(161,590.00)
4,027.10
(80,795.00)
(93,225.00)
708.75
796.00
1,741.00
(9,944.00)
247.50
(12,430.00)
7,491.00
10,231.10
170.50
265.00
45,450.00
(932,250.00)
1,766.50
523.50
(310,750.00)
(167,805.00)
76.50
614.25
850.50
701.50
1,780.00
52,485.00
57.70
65,370.00
65,880.00
315.00
528.00
5,180.00
3,725.00
400.00
26,375.00
37,850.00
(28,589.00)
87,250.00
79,800.00
83,425.00
75,975.00
(4,972.00)
(5,593,500.00)
32,350.00
174.50
1,079.50
(161,590.00)
4,027.10
(80,795.00)
(93,225.00)
708.75
796.00
1,741.00
(9,944.00)
247.50
(12,430.00)
7,491.00
10,231.10
170.50
265.00
45,450.00
(932,250.00)
1,766.50
523.50
(310,750.00)
(167,805.00)
76.50
614.25
850.50
701.50
1,780.00
52,485.00
57.70
3,220.00
3,730.00
315.00
528.00
5,180.00
3,725.00
400.00
26,375.00
37,850.00
(28,589.00)
25,100.00
17,650.00
21,275.00
13,825.00
(4,972.00)
(5,593,500.00)
32,350.00
174.50
1,079.50
(22,995.50)
(18,645.00)
138.25
(55,935.00)
51.00
349.00
252.00
174.50
4,180.00
8,200.00
61.50
187.25
436.25
100.00
112.75
361.75
200.00
374.50
536.25
1,345.00
400.00
1,355.00
2,126.25
2,598.75
(15,537.50)
(77,066.00)
(75,823.00)
2,687.50
(12,430.00)
(155,375.00)
(528,275.00)
159.50
11,962.50
11,165.00
(585.00)
3,760.80
(585.00)
993.00
(450.00)
(93,225.00)
(116,842.00)
(136,730.00)
(186,450.00)
(248,600.00)
14,950.00
(22,995.50)
(18,645.00)
138.25
(55,935.00)
51.00
349.00
252.00
174.50
4,180.00
8,200.00
61.50
187.25
436.25
100.00
112.75
361.75
200.00
374.50
536.25
1,345.00
400.00
1,355.00
2,126.25
2,598.75
(15,537.50)
(77,066.00)
(75,823.00)
2,687.50
(12,430.00)
(155,375.00)
(528,275.00)
159.50
11,962.50
11,165.00
(585.00)
3,760.80
(585.00)
993.00
(450.00)
(93,225.00)
(116,842.00)
(136,730.00)
(186,450.00)
(248,600.00)
14,950.00
7,615.00
8.40
563.50
175.00
1,032.00
(27,967.50)
(734.50)
(565.00)
(19,888.00)
512.50
49,075.00
1,949.50
20,150.00
8,977.50
6,615.00
18,100.00
3,130.00
108.25
(12,430.00)
3,963.00
11,050.00
(2,237,400.00)
(5,842,100.00)
(5,966,400.00)
(6,215,000.00)
(6,712,200.00)
(7,085,100.00)
(7,706,600.00)
(223,740.00)
2,388.00
2,239.00
3,035.00
7,087.50
5,125.00
5,597.50
8,832.50
3,235.00
6,070.00
1,200.00
655.00
1,272.50
2,880.00
365.00
1,032.25
1,363.00
1,261.25
2,718.75
7,615.00
8.40
563.50
175.00
1,032.00
(27,967.50)
(734.50)
(565.00)
(19,888.00)
512.50
49,075.00
1,949.50
1,505.00
2,762.50
12,830.00
18,100.00
3,130.00
108.25
(12,430.00)
3,963.00
11,050.00
(2,237,400.00)
(5,842,100.00)
(5,966,400.00)
(6,215,000.00)
(6,712,200.00)
(7,085,100.00)
(7,706,600.00)
(223,740.00)
2,388.00
2,239.00
3,035.00
7,087.50
5,125.00
5,597.50
8,832.50
3,235.00
6,070.00
1,200.00
655.00
1,272.50
2,880.00
365.00
1,032.25
1,363.00
1,261.25
2,718.75
3,075.00
5,637.50
8,200.00
11,995.00
765.00
(19,379.50)
(29,210.50)
(38,843.75)
(8,814.00)
511.25
(423.75)
18,538.00
4,363.00
(435,050.00)
126,693.00
2,650.00
3,370.50
(3,729.00)
(43,505.00)
1,477.00
390.75
201.75
98.75
(31,075.00)
64.00
438.75
470.75
(1,553.75)
8,387.50
1,040.00
472.00
493.00
452.00
298.00
476.50
698.00
761.75
1,323.50
1,685.25
123,000.00
(142,945.00)
(174,020.00)
84.00
1,344.00
1,260.00
112.75
3,075.00
5,637.50
8,200.00
11,995.00
765.00
(19,379.50)
(29,210.50)
(38,843.75)
(8,814.00)
511.25
(423.75)
18,538.00
4,363.00
(435,050.00)
126,693.00
2,650.00
3,370.50
(3,729.00)
(43,505.00)
1,477.00
390.75
201.75
98.75
(31,075.00)
64.00
438.75
470.75
(1,553.75)
8,387.50
1,040.00
472.00
493.00
452.00
298.00
476.50
698.00
761.75
1,323.50
1,685.25
123,000.00
(142,945.00)
(174,020.00)
84.00
1,344.00
1,260.00
112.75
(1,429,450.00)
2,981.00
14,000.00
280.00
224.00
890.00
252.00
415.50
461.00
373.00
933.00
560.00
5,590.20
5,100.00
140.00
15,222.00
210.90
625.50
277.00
294.50
374.50
392.00
(59,042.50)
2,255.00
(994,400.00)
247,500.00
504.00
30,800.00
378.00
(1,429,450.00)
2,981.00
14,000.00
280.00
224.00
890.00
252.00
415.50
461.00
373.00
933.00
560.00
5,590.20
5,100.00
140.00
15,222.00
210.90
625.50
277.00
294.50
374.50
392.00
(59,042.50)
2,255.00
(994,400.00)
247,500.00
504.00
30,800.00
378.00
2,483.00
2,291.00
8,516.00
85,386.00
4,022.00
5,797.00
470.00
2,483.00
2,291.00
8,516.00
85,386.00
4,022.00
5,797.00
470.00
3,314.00
4,022.00
353.00
6,741.00
1,303.00
1,303.00
353.00
3,314.00
4,022.00
353.00
6,741.00
1,303.00
1,303.00
353.00
615.00
15,729.00
7,685.00
708.00
8,516.00
586.00
708.00
8,516.00
1,539.00
353.00
353.00
648.50
6,741.00
2,291.00
942.00
1,067.00
8,752.00
4,258.00
353.00
3,314.00
2,011.00
11,235.00
4,022.00
353.00
1,775.00
615.00
15,729.00
7,685.00
708.00
8,516.00
586.00
708.00
8,516.00
1,539.00
353.00
353.00
648.50
6,741.00
2,291.00
942.00
1,067.00
8,752.00
4,258.00
353.00
3,314.00
2,011.00
11,235.00
4,022.00
353.00
1,775.00
8,516.00
8,516.00
2,303.50
3,049.00
4,022.00
12,179.00
2,011.00
4,022.00
8,044.00
121.00
25,834.00
1,067.00
8,516.00
2,247.00
4,022.00
3,550.00
1,539.00
8,516.00
1,303.00
1,498.00
8,516.00
8,516.00
2,303.50
3,049.00
4,022.00
12,179.00
2,011.00
4,022.00
8,044.00
121.00
25,834.00
1,067.00
8,516.00
2,247.00
4,022.00
3,550.00
1,539.00
8,516.00
1,303.00
1,498.00
2,247.00
704.00
1,775.00
238.00
1,775.00
7,685.00
4,022.00
1,711.00
11,235.00
7,213.00
7,002.00
232.00
2,247.00
704.00
1,775.00
238.00
1,775.00
7,685.00
4,022.00
1,711.00
11,235.00
7,213.00
7,002.00
232.00
2,719.00
3,550.00
2,122.00
704.00
4,022.00
2,011.00
1,303.00
2,719.00
3,550.00
2,122.00
704.00
4,022.00
2,011.00
1,303.00
11,984.00
11,984.00
470.00
468.00
531.50
4,047.00
4,996.50
2,980.00
4,962.00
5,839.00
474.00
706.00
474.00
470.00
468.00
531.50
4,047.00
4,996.50
2,980.00
4,962.00
5,839.00
474.00
706.00
474.00
472.00
289.50
353.00
468.00
161.00
82.50
140.00
163.00
197.50
472.00
289.50
353.00
468.00
161.00
82.50
140.00
163.00
197.50
468.00
468.00
468.00
468.00
468.00
468.00
468.00
468.00
468.00
468.00
468.00
468.00
158.00
158.00
215.50
158.00
472.00
158.00
158.00
215.50
158.00
472.00
165.50
2,702.00
14,208.00
146.00
63,900.00
1,143.00
465.30
607.95
941.25
1,441.00
564.75
2,024.25
1,179.80
5,322.00
5,348.50
3,566.25
3,842.05
4,330.00
3,604.05
3,691.50
226.20
60,257.30
1,022.00
43,571.55
1,430.65
1,909.75
232.65
131.00
167.60
88,816.00
165.50
2,702.00
14,208.00
146.00
63,900.00
1,143.00
465.30
607.95
941.25
1,441.00
564.75
2,024.25
1,179.80
5,322.00
5,348.50
3,566.25
3,842.05
4,330.00
3,604.05
3,691.50
226.20
60,257.30
1,022.00
43,571.55
1,430.65
1,909.75
232.65
131.00
167.60
88,816.00
116.25
764.00
394.00
492.40
1,236.00
116.25
764.00
394.00
492.40
1,236.00
6,404.50
38,364.50
42,149.50
11,923.00
45,477.50
6,404.50
38,364.50
42,149.50
11,923.00
45,477.50
821.50
480.00
177.50
190.00
63,174.00
3,569.00
67,072.00
88,387.00
66,223.50
19,188.50
28,630.50
26,593.50
28,889.00
36,099.00
1,961.50
2,215.00
2,227.00
2,405.00
6,796.50
8,429.50
821.50
480.00
177.50
190.00
63,174.00
3,569.00
67,072.00
88,387.00
66,223.50
19,188.50
28,630.50
26,593.50
28,889.00
36,099.00
1,961.50
2,215.00
2,227.00
2,405.00
6,796.50
8,429.50
46,934.00
42,760.00
71,760.50
35,455.50
22,739.50
94,577.00
27,897.50
48,531.00
46,934.00
42,760.00
71,760.50
35,455.50
22,739.50
94,577.00
27,897.50
48,531.00
1,974.50
1,430.50
1,974.50
1,430.50
4,492.50
16,037.50
23,441.50
28,796.00
1,734.00
43,452.00
30,061.50
52,983.00
14,361.50
36,177.50
80,708.00
14,303.50
64,609.00
4,492.50
16,037.50
23,441.50
28,796.00
1,734.00
43,452.00
30,061.50
52,983.00
14,361.50
36,177.50
80,708.00
14,303.50
64,609.00
39,629.50
97,605.50
65,686.50
47,018.50
24,163.00
71,429.00
40,650.00
28,003.00
39,629.50
97,605.50
65,686.50
47,018.50
24,163.00
71,429.00
40,650.00
28,003.00
455.00
341.00
190.00
2,596.50
3,910.50
18,138.00
455.00
341.00
190.00
2,596.50
3,910.50
18,138.00
1,835.00
1,379.50
1,012.50
821.50
554.70
41,175.00
38,547.50
52,668.00
35,441.00
33,694.00
3,594.00
19,632.00
18,934.50
74,605.50
69,870.00
1,835.00
1,379.50
1,012.50
821.50
554.70
41,175.00
38,547.50
52,668.00
35,441.00
33,694.00
3,594.00
19,632.00
18,934.50
74,605.50
69,870.00
8,024.50
8,024.50
8,025.57
8,026.64
13,201.00
13,201.00
17,657.00
50,658.00
50,090.50
19,188.50
21,137.50
65,123.00
21,137.50
36,389.50
37,239.00
45,617.50
10,480.00
63,755.00
35,706.00
53,174.50
52,705.00
3,910.50
31,212.50
8,025.57
8,026.64
13,201.00
13,201.00
17,657.00
50,658.00
50,090.50
19,188.50
21,137.50
65,123.00
21,137.50
36,389.50
37,239.00
45,617.50
10,480.00
63,755.00
35,706.00
53,174.50
52,705.00
3,910.50
31,212.50
19,796.00
20,492.50
23,441.50
26,378.00
29,226.50
30,644.50
35,297.00
33,631.00
40,680.50
19,188.50
19,353.00
10,291.00
12,784.00
20,732.00
37,921.00
11,670.50
33,289.00
34,427.50
35,377.50
11,493.00
9,303.00
17,619.00
6,113.00
42,064.00
21,137.50
19,796.00
20,492.50
23,441.50
26,378.00
29,226.50
30,644.50
35,297.00
33,631.00
40,680.50
19,188.50
19,353.00
10,291.00
12,784.00
20,732.00
37,921.00
11,670.50
33,289.00
34,427.50
35,377.50
11,493.00
9,303.00
17,619.00
6,113.00
42,064.00
21,137.50
74,148.00
9,910.50
23,653.00
13,125.50
4,492.50
9,279.00
3,594.00
5,641.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
74,148.00
9,910.50
23,653.00
13,125.50
4,492.50
9,279.00
3,594.00
5,641.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7,816.16
25,043.16
40,846.00
2,657.50
27,840.16
33,701.16
40,637.16
15,031.16
6,125.50
2,594.75
5,202.00
19,271.16
18,386.16
16,094.16
3,468.00
6,827.15
12,378.50
4,236.05
12,894.05
7,816.16
25,043.16
40,846.00
2,657.50
27,840.16
33,701.16
40,637.16
15,031.16
6,125.50
2,594.75
5,202.00
19,271.16
18,386.16
16,094.16
3,468.00
6,827.15
12,378.50
4,236.05
12,894.05
9,714.00
20,580.00
74,382.00
6,854.00
9,714.00
20,580.00
74,382.00
6,854.00
46,165.00
51,092.00
7,616.00
26,816.00
46,165.00
51,092.00
7,616.00
26,816.00
21,302.00
29,892.00
21,302.00
29,892.00
15,750.00
22,026.00
15,750.00
22,026.00
15,108.64
19,317.00
16,041.00
15,108.64
19,317.00
16,041.00
7,767.00
8,668.00
7,767.00
8,668.00
6,148.00
6,808.00
6,148.00
6,808.00
8,073.00
6,556.00
5,995.00
8,073.00
6,556.00
5,995.00
9,241.00
5,533.80
5,041.00
9,241.00
5,533.80
5,041.00
NO
:
:
:
:
SKET GAMBAR
URAIAN
KET.
###
depan
blkg
kiri
kanan
tgh
###
depan
blkg
kiri
kanan
tgh
F1
Pekerjaan pasangan
Pasangan batu kali pondasi
Bangunan induk
0.30 + 0.80 x 1.00
2
0.30 + 0.80 x 1.00
2
0.30 + 0.80 x 1.00
2
0.30 + 0.80 x 1.00
2
0.30 + 0.80 x 1.00
2
0.30 + 0.80 x 1.00
2
Pekerjaan tanah
Galian tanah pondasi
Galian pondasi batu kali
Bangunan induk
1.00 x 0.75 x 24.00
1.00 x 0.75 x 24.00
1.00 x 0.75 x 8.00
1.00 x 0.75 x 8.00
1.00 x 0.75 x 6.00
1.00 x 0.75 x 24.00
###
depan
blkg
kiri
kanan
tgh
F1
###
induk
tritis
###
dpn
blkg
kr
knn
tgh
gng
tritis
tritis
###
Urugan pasir
Urugan pasir dibawah pondasi batu
Bangunan induk
1.00 x 0.10 x 24.00
1.00 x 0.10 x 24.00
1.00 x 0.10 x 8.00
1.00 x 0.10 x 8.00
1.00 x 0.10 x 6.00
1.00 x 0.10 x 24.00
Urugan pasir dibawah pondasi footp
1.10 x 1.10 x 0.10
Urugan pasir dibawah lantai
0.10 x 8.00 x 24.00
2
2
gndg
###
depan
blkg
kiri
knn
tgh
1
1
0.80 x 1.40 x
BV
2.30 x 0.50 x
4
22
PEKERJAAN BETON
BETON STRUKTUR
FOOTPLAT 1
0.15 x 1.00 x 1.00
0.30 + 1.00 x 1.00
2
0.30 x 0.40 x 1.75
FOOTPLAT 2
0.15 x 1.00 x 1.00
0.30 + 1.00 x 1.00
2
0.30 x 0.30 x 1.75
SLOOF 15/25
INDUK
0.15 x 0.25
0.15 x 0.25
0.15 x 0.25
0.15 x 0.25
0.15 x 0.25
0.15 x 0.25
x
x
x
x
x
x
24.00
24.00
8.00
8.00
6.00
24.00
KOLOM 30/40
0.30 x 0.40 x 4.10
0.30 x 0.30 x 4.10
BETON PRAKTIS
KOLOM 12/20
0.12 x 0.20 x 4.10
F1
depan
blkg
kiri
knn
x
x
x
x
24.00
24.00
8.00
8.00
tgh
depan
blkg
kiri
knn
tgh
gng
balok
isian
induk
tritis
###
24.00
24.00
8.00
8.00
6.00
24.00
4.62
KONSOL BETON
0.12 x 0.20 x 1.20
0.47 x 0.40 x 0.12
2
induk
depan
blkg
kiri
knn
LATIO 12/12
0.12 + 0.12
0.12 + 0.12
0.12 + 0.12
0.12 + 0.12
x
x
x
x
24.00
24.00
8.00
8.00
tgh
depan
blkg
kiri
knn
tgh
gng
balok
isian
###
24.00
24.00
8.00
8.00
6.00
24.00
4.62
Konsol beton
0.12 + 0.20 x 1.10
0.47 x 0.40 x 2.00
2
balk
kaki
makelar
makelar
sokong
sokong
kunci
gapit
gapit
kres
PEKERJAAN KAYU
RANGKA ATAP
KUDA-KUDA (4 SET), INDUK
0.08 x 0.12 x 8.20
0.08 x 0.12 x 4.40
0.08 x 0.12 x 1.40
0.08 x 0.12 x 1.20
0.08 x 0.12 x 1.20
0.08 x 0.12 x 1.65
0.08 x 0.12 x 1.20
0.06 x 0.10 x 3.40
0.06 x 0.10 x 2.20
0.06 x 0.10 x 3.30
balk
kaki
makelar
makelar
sokong
sokong
kunci
gapit
gapit
NOK
induk
konsol
induk
konsol
induk
induk
konsol
konsol
ind
ind
hor
vert
nok
jurai
jur kon
###
induk
induk
konsol
konsol
nok ind
jur ind
jur kons
induk
0.08
0.08
0.08
JURAI
0.08
0.08
x 0.12 x 16.00
x 0.12 x 8.00
x 0.12 x 24.00
x 0.12 x 8.20
x 0.12 x 2.31
Gording
0.08 x 0.12 x 20.00
0.08 x 0.12 x 4.10
0.06 x 0.12 x 10.20
0.06 x 0.12 x 26.20
Murplat
0.08 x 0.12 x 8.00
0.08 x 0.12 x 24.00
Balok siku dinding
0.08 x 0.12 x 2.60
0.08 x 0.12 x 1.00
Papan reuter
0.02 x 0.20 x 16.00
0.02 x 0.20 x 8.20
0.02 x 0.20 x 2.31
PEKERJAAN ATAP
LUASAN ATAP
16.00 + 26.00 x 5.774
2
10.00 x 5.77 x
1
2
24.00 + 27.00 x 1.617
2
8.00 + 11.00 x 1.617
2
BUBUNGAN
16.00 x
1
8.20 x
4
2.31 x
4
LISPLANG
26.00 x 2.00
induk
konsol
konsol
10.00 x 2.00
27.00 x 2.00
11.00 x 2.00
###
ETERNIT/PLAFON
INDUK
8.00 x 24.00
KONSOL
24.00 + 27.00 x 1.732
2
8.00 + 11.00 x 1.732
2
###
KERAMIK LANTAI
INDUK
8.00 x 24.00
###
tgk
dtr
ram
tgk
tgk
tgk
dtr
dtr
ram
tgk
dtr
ram
tgk
dtr
Kusen Bouwpen
0.06 x 0.12 x 1.02
0.06 x 0.12 x 2.34
###
###
dtr
tgk
dtr
tgk
###
daun
daun
daun
###
tgk
dtr
ram
tgk
tgk
tgk
dtr
dtr
ram
tgk
dtr
ram
DAUN PINTU
Daun pintu type 1
0.80 x 2.00 x
Daun pintu type 2
0.70 x 2.00 x
4
4
DAUN JENDELA
Kayu daun jendela type 1
0.08 x 0.70 x
6
0.08 x 0.80 x
6
Kayu daun jendela pintu gendong
0.08 x 0.70 x
2
0.08 x 0.80 x
2
PASANG KACA
Kaca daun jendela type 1
0.54 x 0.64 x
3
Kaca daun jendela gendong
0.54 x 0.64 x
1
Kaca bv
0.40 x 0.70 x
3
tgk
dtr
Kusen bv
0.06 + 0.12 x 1.32
0.06 + 0.12 x 2.34
###
###
dtr
tgk
dtr
tgk
###
###
KERAMIK DINDING
INDUK (DAPUR)
1.50 x 8.00
1.50 x 6.60
1.50 x 8.00
MEJA DAPUR
0.80 x 8.65
0.80 x 4.05
UAL CHECK ( MC 0 % )
URAIAN
VOLUME
JML. VOL.
kali pondasi
x 24.00
13.20
x 24.00
13.20
x 8.00
4.40
x 8.00
4.40
x 6.00
3.30
x 24.00
13.20
51.70
x
x
x
x
x
x
1
1
1
1
1
1
18.00
18.00
6.00
6.00
4.50
18.00
70.50
25
54.45
54.45
x
1
x
1
x
1
x
1
x
1
x
1
ibawah pondasi footplat
x 25
bawah lantai
2.40
2.40
0.80
0.80
0.60
2.40
3.03
19.20
31.63
98.40
98.40
32.80
32.80
24.60
98.40
29.40
9.90
24.30
449.00
354.80
8.16
10.20
46.06
4.48
25.30
94.20
0.1
0.1
x
x
18
18
2.70
1.17
18
3.78
x
x
7
7
1.05
0.46
1.10
0.90
0.90
0.30
0.30
0.23
0.90
x
x
18
7
8.86
2.58
25.22
FOOTPLAT
x
25
1.51
x
x
x
x
1
1
1
1
0.35
0.35
0.12
0.12
x
x
1
1
0.09
0.35
x
x
x
x
x
x
x
1
1
1
1
1
1
2
0.58
0.58
0.19
0.19
0.14
0.58
0.67
x
x
26
26
0.75
0.29
6.83
TON (1 PC : 3 PS)
N STRUKTUR
x
18
22.51
17.00
8.20
x
x
x
x
1
1
1
1
x
x
x
x
1
1
1
1
6.76
6.76
2.92
2.92
N PRAKTIS
x
x
1
1
x
x
1
1
2.44
6.76
x
x
x
x
x
x
x
1
1
1
1
1
1
2
x
x
x
x
x
x
x
1
1
1
1
1
1
3
10.60
10.60
4.20
4.20
3.40
10.60
6.70
x
x
26
26
x
x
2
2
11.15
4.89
SET), INDUK
x
x
x
x
x
x
x
x
x
x
142.61
1
2
1
2
2
2
4
2
4
2
2 (2 SET), INDUK
x
1
x
1
x
1
x
1
x
1
x
1
x
2
x
2
x
2
x
x
x
x
x
x
x
x
x
x
4
4
4
4
4
4
4
4
4
2
0.31
0.34
0.05
0.09
0.09
0.13
0.18
0.16
0.21
0.08
1.66
x
x
x
x
x
x
x
x
x
2
2
2
2
2
2
2
2
2
0.08
0.08
0.04
0.02
0.03
0.02
0.05
0.04
0.05
0.42
x
x
2
2
0.15
0.15
0.46
x
x
4
4
0.31
0.09
x
x
x
x
2
2
2
2
0.38
0.08
0.15
0.38
x
x
2
2
0.15
0.46
x
x
4
4
0.10
0.04
x
x
4
4
0.06
0.13
0.04
3.14
242.49
57.74
82.45
30.72
413.39
16.00
32.79
9.24
58.03
52.00
20.00
54.00
22.00
148.00
192.00
x
88.34
32.91
313.25
192.00
192.00
JENDELA
e 1 , satu pintu
x
2
x
2
x
1
x
x
x
4
4
4
0.15
0.05
0.04
e 2 gendong
x
x
x
x
x
x
2
2
1
2
1
4
x
x
x
x
x
x
2
2
2
2
2
2
0.04
0.07
0.01
0.09
0.01
0.08
x
x
x
4
3
3
x
x
x
14
14
14
0.56
0.71
0.40
x
x
4
2
x
x
22
22
0.65
0.74
3.59
6.40
5.60
12.00
ela type 1
x 14
x 14
ela pintu gendong
x
2
x
2
4.70
5.38
0.22
0.26
10.56
x
ela gendong
x
14
14.52
1.38
22
18.48
34.38
e 2 gendong
x
x
x
x
x
x
x
x
x
2
2
1
x
x
x
4
4
4
x
x
x
2
2
2
7.26
2.65
3.54
2
2
1
2
1
4
x
x
x
x
x
x
2
2
2
2
2
2
x
x
x
x
x
x
2
2
2
2
2
2
1.99
3.63
0.37
3.80
0.45
6.66
4
3
3
x
x
x
14
14
14
x
x
x
2
2
2
27.82
35.38
34.94
x
x
4
2
x
x
22
22
x
x
2
2
41.82
37.07
AUN PINTU
x
e 2, gendong
x
12.80
11.20
AUN JENDELA
ela type 1
x 14
x 14
x
x
2
2
9.41
10.75
2
2
0.45
0.51
252.49
12.00
9.90
12.00
6.92
3.24
44.06
NO.
URAIAN
ANALYSA
HARGA SAT
UPAH
5
Pembersihan lapangan
Daftar harga
500,000.00
An. Dihitung
279,675.00
Ps.6.4.2002
31,792.55
9,020.00
Ps.6.14.2002
257,861.48
257,861.48
Ps.6.13.2002
273,455.48
241,996.00
T.6.1.2008
30,114.50
30,114.50
T.6.2.2008
36,917.10
36,917.10
T.6.3.2008
43,823.66
43,823.66
T.6.4.2008
40,083.36
40,083.36
10
T.6.5.2008
60,748.80
60,748.80
11
T.6.6.2008
48,443.10
48,443.10
12
T.6.7.2008
2,180.90
2,180.90
13
T.6.8.2008
13,198.40
13,198.40
14
T.6.9.2008
10,020.84
10,020.84
15
T.6.10.2008
21,809.00
21,809.00
16
An. Dihitung
52,047.80
10,660.00
17
T.6.11.2008
79,845.80
10,660.00
18
T.6.12.2008
165,070.40
50,640.00
19
T.6.13.2008
155,307.20
50,640.00
20
T.6.14.2008
74,342.70
5,790.00
21
T.6.15.2008
132,944.50
9,650.00
22
P.6.1.2008
591,442.00
91,500.00
23
P.6.2.2008
542,513.00
91,500.00
24
P.6.3.2008
508,613.00
91,500.00
25
P.6.4.2008
484,770.00
91,500.00
26
P.6.5.2008
452,113.00
91,500.00
27
P.6.6.2008
377,024.50
91,500.00
28
P.6.7.2008
434,259.00
91,500.00
29
P.6.8.2008
407,026.00
91,500.00
30
P.6.9.2008
237,503.40
47,580.00
31
P.6.10.2008
1,951,510.00
165,410.00
32
P.6.11.2008
589,700.67
126,594.00
33
D.6.1.2008
178,155.80
31,660.00
34
D.6.2.2008
165,093.00
31,660.00
35
D.6.3.2008
156,640.60
31,660.00
36
D.6.4.2008
151,759.00
31,660.00
37
D.6.5.2008
149,001.80
31,660.00
38
D.6.6.2008
140,465.78
31,660.00
39
D.6.7.2008
85,055.10
15,830.00
40
D.6.8.2008
79,070.62
15,830.00
41
D.6.9.2008
75,517.90
15,830.00
42
D.6.10.2008
73,275.98
15,830.00
43
D.6.11.2008
71,883.82
15,830.00
44
D.6.12.2008
69,528.90
15,830.00
45
D.6.13.2008
70,206.90
15,830.00
46
D.6.14.2008
65,133.20
15,830.00
47
D.6.15.2008
64,477.80
15,830.00
48
D.6.16.2008
247,856.46
20,138.00
49
D.6.17.2008
244,611.10
20,138.00
50
D.6.18.2008
115,657.76
17,544.00
51
D.6.19.2008
113,117.52
17,544.00
52
D.6.20.2008
82,424.46
15,830.00
53
D.6.21.2008
81,027.78
15,830.00
54
D.6.22.2008
142,187.90
15,830.00
55
D.6.23.2008
138,458.90
15,830.00
56
D.6.24.2008
755,179.00
18,300.00
57
Plt.6.1.2008
43,510.42
18,300.00
58
Plt.6.2.2008
36,802.74
18,300.00
59
Plt.6.3.2008
33,822.26
18,300.00
60
Plt.6.4.2008
31,852.44
18,300.00
61
Plt.6.5.2008
30,646.50
18,300.00
62
Plt.6.6.2008
29,718.10
18,300.00
63
Plt.6.7.2008
29,180.22
18,300.00
64
Plt.6.8.2008
28,642.34
18,300.00
65
Plt.6.9.2008
31,423.04
18,996.00
66
Plt.6.10.2008
28,923.48
18,996.00
37,500.00
67
Plt.6.11.2008
26,499.63
18,996.00
68
Plt.6.12.2008
26,284.93
18,996.00
69
Plt.6.13.2008
49,211.95
24,492.00
70
Plt.6.14.2008
39,391.35
19,318.00
71
Plt.6.15.2008
42,573.88
24,492.00
72
Plt.6.16.2008
41,003.63
24,492.00
73
Plt.6.17.2008
39,728.09
24,492.00
74
Plt.6.18.2008
36,380.35
26,840.00
75
Plt.6.19.2008
20,360.68
9,197.50
76
Plt.6.20.2008
27,757.32
22,664.00
77
Plt.6.21.2008
146,332.18
27,497.50
78
Plt.6.22.2008
44,632.18
27,497.50
79
Plt.6.23.2008
24,423.82
15,830.00
80
Plt.6.24.2008
14,607.62
9,197.50
81
Plt.6.25.2008
7,048.38
4,317.50
82
Plt.6.26.2008
30,632.04
18,300.00
83
Memasang acian
Plt.6.27.2008
18,193.00
12,200.00
84
85
K.6.1.2008.a
12,026,731.25
1,386,000.00
86
K.6.1.2008.b
11,604,111.25
1,386,000.00
87
Pasang kusen pintu dan kusen jendela, kayu kelas II atau III
88
K.6.2.2008.a
19,612,421.25
1,188,000.00
89
K.6.2.2008.b
10,852,661.25
1,188,000.00
90
K.6.2.2008.c
7,916,921.25
1,188,000.00
91
K.6.3.2008
79,041.24
69,323.00
92
K.6.4.2008
79,041.24
69,323.00
93
K.6.5.2008
94
K.6.5.2008.a
838,742.50
198,000.00
95
K.6.5.2008.b
607,092.50
198,000.00
96
Membuat dan memasang pintu dan jendela kaca , kayu kelas I atau II
97
Membuat dan memasang pintu dan jendela kaca , kayu Jati hutan
K.6.6.2008.a
547,993.50
158,400.00
98
K.6.6.2008.b
409,003.50
158,400.00
99
Membuat dan memasang pintu dan jendela jalusi, kayu kelas I atau II
K.6.7.2008
230,802.50
198,000.00
100
Membuat daun pintu kayu lapis ( plywood) rangkap, rangka tertutup ky kelas II
K.6.8.2008
485,871.75
138,600.00
101
K.6.9.2008
513,934.17
158,400.00
102
K.6.10.2008
1,078,997.45
145,990.00
103
K.6.11.2008
533,670.75
158,400.00
104
K.6.12.2008
551,946.24
168,323.00
105
K.6.13.2008
106
K.6.13.2008.a
107
108
109
110
111
112
K.6.15.2008.a
10,626,181.00
475,200.00
113
K.6.15.2008.b
6,729,376.00
475,200.00
114
115
K.6.16.2008.a
172,032.33
9,020.00
116
K.6.16.2008.b
109,683.45
9,020.00
117
K.6.16.2008.c
33,351.95
9,020.00
118
K.6.17.2008
78,486.41
9,020.00
119
K.6.17.2008.a
129,311.55
9,020.00
120
K.6.18.2008
15,056.12
10,824.00
121
K.6.18.2008.a
914,677.37
10,824.00
122
123
124
125
126
0.00
0.00
127
K.6.21.2008.a
79,936.20
14,410.00
128
K.6.21.2008.b
119,294.10
14,410.00
129
K.6.21.2008.c
32,950.80
14,410.00
130
131
132
133
Memasang rangka dinding pemisah ( 60 x 120 ) cm kayu kruing ( kelas II atau III )
134
K.6.1.2008
K.6.2.2008
K.6.6.2008
11,020,890.00
792,000.00
K.6.13.2008.b
7,124,085.00
792,000.00
K.6.13.2008.c
12,468,985.00
792,000.00
K.6.13.2008.d
1,126,610.00
792,000.00
K.6.14.2008
14,104,208.00
1,326,600.00
K.6.15.2008
K.6.16.2008
K.6.19.2008
K.6.19.2008.a
K.6.20.2008
K.6.20.2008.a
K.6.21.2008
K.6.22.2008
114,723.25
24,720.00
0.00
0.00
118,878.83
23,430.00
0.00
0.00
K.6.22.2008.a
119,381.11
14,410.00
K.6.22.2008.b
118,587.85
14,410.00
K.6.23.2008
188,368.74
29,723.00
K.6.24.2008
293,458.74
29,723.00
135
K.6.25.2008
280,324.75
39,600.00
136
K.6.26.2008
244,164.75
118,800.00
137
K.6.27.2008
51,514.44
4,963.00
138
K.6.28.2008
83,661.81
6,325.00
139
Membuat beton mutu f'c = 7,4 Mpa (K 100), slump (12 + 2), w/c = 0,87
Bt.6.1.2008
631,633.28
73,527.50
140
Membuat beton mutu f'c = 9,8 Mpa (K 125), slump (12 + 2), w/c = 0,78
Bt.6.2.2008
668,838.53
73,527.50
141
Membuat beton mutu f'c =12,2 Mpa (K 150), slump (12 + 2), w/c = 0,72
Bt.6.3.2008
697,961.45
73,527.50
142
Membuat lt. kerja btn mutu f'c = 7,4 Mpa (K 100), slump (3 - 6), w/c = 0,87
Bt.6.4.2008
591,744.28
53,440.00
143
Membuat beton mutu f'c = 14,5 Mpa (K 175), slump (12 + 2), w/c = 0,66
Bt.6.5.2008
732,536.63
73,527.50
144
Membuat beton mutu f'c = 16,9 Mpa (K.200), slump (12 + 2), w/c = 0,61
Bt.6.6.2008
765,419.63
73,527.50
145
Membuat beton mutu f'c = 19,3 Mpa (K 225), slump (12 + 2), w/c = 0,58
Bt.6.7.2008
790,330.48
73,527.50
146
Membuat beton mutu f'c = 21,7 Mpa ( K 250 ), slump ( 12 + 2 ), w/c = 0,56
Bt.6.8.2008
806,240.88
73,527.50
147
Membuat beton mutu f'c = 24,0 Mpa ( K 275 ), slump ( 12 + 2 ), w/c = 0,53
Bt.6.9.2008
833,643.38
73,527.50
148
Membuat beton mutu f'c = 26,4 Mpa ( K 300 ), slump ( 12 + 2 ), w/c = 0,52
Bt.6.10.2008
842,033.63
73,527.50
149
Membuat beton mutu f'c = 28,8 Mpa ( K 325 ), slump ( 12 + 2 ), w/c = 0,49
Bt.6.11.2008
897,013.78
93,520.00
150
Membuat beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 12 + 2 ), w/c = 0,48
Bt.6.12.2008
908,116.03
93,520.00
151
Bt.6.13.2008
908,260.10
93,520.00
152
Bt.6.14.2008
4,135.80
3,660.00
153
Bt.6.15.2008
4,878.78
4,317.50
154
Bt.6.16.2008
5,514.40
4,880.00
155
Bt.6.17.2008
116,301.86
6,022.00
156
Bt.6.17.2008
11,630.19
602.20
157
Bt.6.18.2008
113,461.04
4,308.00
158
Bt.6.19.2008
107,018.35
2,106.50
159
Bt.6.20.2008
82,365.70
32,890.00
160
161
Memasang bekisting
162
Bt.6.21.2008
87,422.45
32,890.00
Bt.6.21.2008.a
87,422.45
32,890.00
Bt.6.22.2008
184,975.35
41,745.00
163
Bt.6.23.2008
188,534.85
41,745.00
164
Bt.6.24.2008
212,095.35
41,745.00
165
Bt.6.25.2008
214,694.35
41,745.00
166
Bt.6.26.2008
174,607.60
41,745.00
167
Bt.6.27.2008
47,788.83
8,163.00
168
Bt.6.28.2008
2,908,411.52
327,890.50
169
Bt.6.28.2008.a
2,810,860.50
327,890.50
170
Bt.6.28.2008.b
2,753,066.65
327,890.50
171
Bt.6.29.2008
3,584,526.68
371,922.50
172
Bt.6.29.2008.a
2,905,854.33
371,922.50
173
Bt.6.29.2008.b
3,809,125.48
371,922.50
174
Bt.6.30.2008
5,855,205.18
462,222.50
175
Bt.6.30.2008.a
5,018,257.49
462,222.50
176
Bt.6.30.2008.b
3,950,407.49
462,222.50
177
Bt.6.30.2008.c
3,416,482.49
462,222.50
178
Bt.6.30.2008.d
3,358,688.64
462,222.50
179
Bt.6.31.2008
4,440,569.48
402,232.50
180
Bt.6.31.2008.a
3,762,650.46
402,232.50
181
Bt.6.31.2008.b
3,228,725.46
402,232.50
182
Bt.6.31.2008.c
3,170,931.61
402,232.50
183
Bt.6.32.2008
3,888,909.13
328,037.50
184
Bt.6.32.2008.a
3,154,490.11
328,037.50
185
Bt.6.32.2008.b
3,096,696.26
328,037.50
186
Bt.6.32.2008.c
2,892,612.61
328,037.50
187
Bt.6.33.2008
3,806,140.02
327,890.50
188
Bt.6.33.2008.a
3,072,385.82
327,890.50
189
Bt.6.34.2008
4,224,728.18
371,922.50
190
Bt.6.35.2008
52,127.47
9,588.00
191
Bt.6.35.2008.a
50,067.10
9,588.00
192
Bt.6.36.2008
70,019.89
15,832.00
193
Bt.6.36.2008.a
63,420.69
15,832.00
194
L.6.1.2008
16,681.06
4,977.00
195
L.6.1.2008.a
27,557.31
4,977.00
196
L.6.2.2008
13,135.12
10,824.00
197
L.6.3.2008
11,096.60
9,020.00
198
L.6.4.2008
11,096.60
9,020.00
199
L.6.5.2008
33,405.63
9,020.00
200
L.6.6.2008
81,721.60
72,160.00
201
202
203
L.6.7.2008
33,815.25
6,325.00
L.6.7.2008.a
36,561.15
6,325.00
L.6.8.2008
15,099.06
5,412.00
204
L.6.9.2008
54,014.00
45,100.00
205
L.6.10.2008
10,049.09
4,533.00
206
Dihitung
37,290.00
6,100.00
207
Bs.6.1.2008
26,732.41
5,142.00
208
Bs.6.2.2008
16,856.21
5,142.00
209
Bs.6.3.2008
16,417.77
0.00
210
Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Bs.6.4.2008
972,327.71
89,962.00
211
Bs.6.5.2008
13,503.50
2,440.00
212
Bs.6.6.2008
413,220.66
55,682.00
213
Bs.6.7.2008
657,497.28
100,356.00
214
Bs.6.8.2008
771,460.04
37,708.00
215
Bs.6.9.2008
47,939.12
42,424.00
216
Bs.6.10.2008
640,936.00
85,700.00
217
Bs.6.11.2008
110,381.56
3,682.80
218
Bs.6.12.2008
777,080.89
7,282.20
219
Bs.6.13.2008
1,660,075.66
7,343.50
220
Bs.6.14.2008
33,920.34
30,018.00
221
Bs.6.15.2008
286,779.85
143,096.00
222
Bs.6.16.2008
49,905.76
8,570.00
223
Bs.6.17.2008
129,244.88
16,726.00
224
Bs.6.18.2008
100,396.43
26,285.00
225
Bs.6.19.2008
29,846.69
20,288.00
226
TL.6.1.2008
35,659.98
15,297.50
227
TL.6.2.2008
36,566.80
15,860.00
228
TL.6.3.2008
37,852.18
16,517.50
229
TL.6.4.2008
50,349.98
15,297.50
230
TL.6.5.2008
53,516.80
15,860.00
231
TL.6.6.2008
56,158.18
16,517.50
232
TL.6.7.2008
50,349.98
15,297.50
233
TL.6.8.2008
53,516.80
15,860.00
234
TL.6.9.2008
191,599.98
15,297.50
235
TL.6.10.2008
53,516.80
15,860.00
236
TL.6.10.2008.a
201,724.81
15,860.00
237
TL.6.10.2008.b
17,921.80
15,860.00
238
TL.6.11.2008
50,349.98
15,297.50
239
TL.6.12.2008
53,516.80
15,860.00
240
TL.6.13.2008
531,845.80
14,640.00
241
TL.6.14.2008
50,349.98
15,297.50
242
TL.6.15.2008
53,516.80
15,860.00
243
TL.6.16.2008
11,431.08
7,736.00
244
TL.6.17.2008
10,762.12
7,736.00
245
TL.6.18.2008
10,762.12
7,736.00
246
TL.6.19.2008
11,756.52
7,736.00
247
TL.6.20.2008
11,756.52
7,736.00
248
TL.6.21.2008
11,756.52
7,736.00
249
TL.6.22.2008
11,756.52
7,736.00
250
TL.6.23.2008
11,756.52
7,736.00
251
TL.6.24.2008
105,334.65
7,736.00
252
TL.6.25.2008
105,495.67
7,736.00
253
TL.6.26.2008
11,756.52
7,736.00
254
TL.6.27.2008
11,756.52
7,736.00
255
TL.6.28.2008
11,756.52
7,736.00
256
TL.6.29.2008
11,756.52
7,736.00
257
TL.6.30.2008
11,756.52
7,736.00
258
TL.6.31.2008
24,814.80
21,960.00
259
TL.6.32.2008
95,516.64
42,700.00
260
TL.6.33.2008
100,601.64
42,700.00
261
TL.6.34.2008
118,907.64
42,700.00
262
TL.6.35.2008
124,526.00
42,700.00
263
TL.6.35.2008.a
120,006.00
42,700.00
264
TL.6.36.2008
85,744.40
42,700.00
265
TL.6.37.2008
140,184.98
64,097.50
266
TL.6.38.2008
94,445.40
42,700.00
267
TL.6.39.2008
53,430.92
7,736.00
268
TL.6.40.2008
11,191.52
7,736.00
269
TL.6.41.2008
9,831.00
7,736.00
270
TL.6.42.2008
75,671.58
64,298.00
271
TL.6.43.2008
213,036.64
42,700.00
272
TL.6.44.2008
143,794.76
15,357.00
273
TL.6.45.2008
36,752.12
10,824.00
274
TL.6.46.2008
119,356.25
44,275.00
275
TL.6.47.2008
92,066.75
44,275.00
276
TL.6.48.2008
142,617.30
61,000.00
277
TL.6.49.2008
149,849.30
54,900.00
278
TL.6.50.2008
140,696.30
54,900.00
279
TL.6.51.2008
107,756.80
54,900.00
280
TL.6.52.2008
109,451.80
54,900.00
281
TL.6.53.2008
107,756.80
54,900.00
282
TL.6.54.2008
147,193.80
54,900.00
283
TL.6.55.2008
308,790.02
79,300.00
284
TL.6.56.2008
119,698.64
61,000.00
285
TL.6.57.2008
167,579.00
42,700.00
286
TL.6.58.2008
167,579.00
42,700.00
287
TL.6.58.2008.a
130,289.00
42,700.00
288
TL.6.58.2008.b
267,019.00
42,700.00
289
TL.6.59.2008
39,073.14
12,878.00
290
TL.6.60.2008
40,524.63
20,612.50
291
TL.6.61.2008
11,620.92
10,284.00
292
TL.6.62.2008
13,352.08
6,856.00
293
TL.6.63.2008
12,513.62
10,824.00
294
At.8.6.1.2002
61,243.18
9,197.50
295
At.8.6.2.2002
10,393.18
9,197.50
296
At.8.6.3.2002
82,430.68
9,197.50
297
At.8.6.4.2002
73,587.86
23,572.00
298
At.8.6.5.2002
73,587.86
23,572.00
299
At.8.6.6.2002
67,090.36
23,572.00
300
At.8.6.10.2002
52,381.15
8,855.00
301
302
At.8.6.17.2002
12,891.04
8,708.00
At.8.6.17.2002.a
83,682.15
303
8,855.00
At.8.6.22.2002
87,012.26
304
9,802.00
At.8.6.22.2002.a
15,144.26
305
9,802.00
At.8.6.24.2002
15,144.26
9,802.00
306
At.8.6.33.2002
13,599.55
9,535.00
307
At.8.6.37.2002
325,521.36
24,472.00
308
At.8.6.38.2002
8,576.70
7,590.00
309
At.8.6.39.2002
10,393.74
9,198.00
310
At.8.6.42.2002
9,224.19
8,163.00
311
312
313
Daftar harga
180,000.00
Sn.11.6.1.2002
190,471.67
168,559.00
Sn.11.6.2.2002
344,435.30
181,610.00
314
Memasang urinoir
Sn.11.6.4.2002
108,706.00
88,000.00
315
Memasang wastafel
Sn.11.6.5.2002
888,490.75
117,275.00
316
Sn.11.6.9.2002
58,293.88
51,587.50
317
Sn.11.6.11.2002
355,144.88
56,687.50
318
Sn.11.6.11.2002.a
1,521,417.88
58,387.50
319
Sn.11.6.17.2002
245,565.95
74,897.50
320
Sn.11.6.18.2002
245,565.95
74,897.50
321
Sn.11.6.20.2002
23,681.78
7,524.00
322
Sn.11.6.22.2002
50,967.60
12,812.40
323
Sn.11.6.25.2002
12,707.75
4,270.80
324
Sn.11.6.26.2002
14,240.32
4,270.80
325
Sn.11.6.27.2002
16,867.57
4,270.80
326
Sn.11.6.28.2002
26,719.75
4,270.80
327
Sn.11.6.29.2002
40,079.63
6,406.20
328
Sn.11.6.31.2002
40,033.87
6,365.70
329
Sn.11.6.32.2002
98,436.11
9,611.60
330
Sn.11.6.33.2002
1,238,377.17
15,909.00
331
Sn.11.6.35.2002
39,617.80
5,510.00
332
An. Dihitung
69,167.30
11,210.00
333
An. Dihitung
99,507.80
6,060.00
334
An. Dihitung
43,685.80
9,660.00
335
An. Dihitung
91,753.74
36,300.00
336
An. Dihitung
99,946.24
36,300.00
337
Kc.12.6.2.2002
28,882.80
25,560.00
338
Kc.12.6.5.2002
17,661.34
8,629.50
339
Kc.12.6.5.2002.a
26,701.34
8,629.50
340
Kc.12.6.5.2002.b
38,001.34
8,629.50
341
Kc.12.6.6.2002
14,410.89
5,753.00
342
Kc.12.6.9.2002
18,226.34
8,629.50
343
Kc.12.6.9.2002.a
27,266.34
8,629.50
344
Kc.12.6.9.2002.b
38,566.34
8,629.50
345
Kc.12.6.11.2002
146,059.28
11,506.00
346
An. Dihitung
15,096.80
5,360.00
347
An. Dihitung
13,401.80
5,360.00
348
An. Dihitung
16,509.30
5,360.00
349
An. Dihitung
22,441.80
5,360.00
350
Kc.12.6.12.2002
13,001.78
11,506.00
351
Kc.12.6.16.2002
68,172.34
8,629.50
352
Kc.12.6.17.2002
69,415.34
8,629.50
353
Kc.12.6.17.2002.a
89,924.84
8,629.50
354
Kc.12.6.17.2002.b
177,556.34
8,629.50
355
Kc.12.6.18.2002
321,475.17
9,491.30
356
F.14.6.7.2002
23,763.90
6,200.00
357
F.14.6.9.2002
36,672.46
7,363.50
358
F.14.6.11.2002
8,406.07
3,839.00
359
F.14.6.12.2002
696.08
616.00
360
F.14.6.13.2002
16,982.77
13,949.00
361
362
363
F.14.6.14.2002
14,652.94
3,907.20
F.14.6.14.2002.a
29,840.14
3,907.20
F.14.6.15.2002
10,669.23
3,141.80
364
F.14.6.20.2002
14,656.10
11,020.00
365
An. Dihitung
55,675.10
9,270.00
366
An. Dihitung
35,436.80
3,860.00
367
An. Dihitung
29,786.80
3,860.00
368
An. Dihitung
21,989.80
4,710.00
369
An. Dihitung
19,729.80
4,710.00
370
An. Dihitung
18,882.30
4,710.00
371
An. Dihitung
33,572.30
4,710.00
372
Pasang MCB
An. Dihitung
53,838.85
15,645.00
373
An. Dihitung
34,628.85
15,645.00
374
An. Dihitung
185,020.00
5,020.00
375
An. Dihitung
55,946.30
5,510.00
376
An. Dihitung
91,541.30
5,510.00
377
An. Dihitung
109,621.30
5,510.00
378
An. Dihitung
87,021.30
5,510.00
379
An. Dihitung
99,451.30
5,510.00
380
An. Dihitung
49,731.30
5,510.00
381
An. Dihitung 3
153,542.14
382
An. Dihitung 5
111,401.43
( tanah padas )
383
An. Dihitung 5
157,643.53
( tanah sulit )
384
An. Dihitung 6
26,179.21
385
Gravel Pack
An. Dihitung 7
7,989.10
386
An. Dihitung 4
23,179.69
387
Pumping Test
An. Dihitung 8
125,074.05
388
Pumping Test
An. Dihitung 8
4,502,665.80
389
An. Dihitung 9
494,249.57
390
An. Dihitung 9
8,896,492.26
391
Accessories di Reservoir
An. Dihitung 10
1,533,313.95
392
An. Dihitung 11
1,463,058.46
393
Tutup Manhole
An. Dihitung 12
923,878.96
394
An. Dihitung 13
4,133,147.90
395
An. Dihitung 14
5,917,810.00
396
An. Dihitung 15
1,305,376.42
397
An. Dihitung 16
41,292.02
398
An. Dihitung 17
399
Daftar harga
65,203.68
5,900,000.00
( u/ 36 jam )
( u/ 18 jam )
VOL.
6
ls
ls
PEKERJAAN PERSIAPAN
m'
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
PEKERJAAN PONDASI
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
PEKERJAAN DINDING
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
PEKERJAAN PLESTERAN
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m2
m2
m2
m2
m2
m2
m2
m3
PEKERJAAN KAYU
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
PEKERJAAN LAIN-LAIN
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m3
m2
m3
m3
m2
PEKERJAAN BETON
m3
m3
m3
m3
m3
m3
m3
m'
m3
m3
10 kg
kg
kg
kg
m2
m3
m2
m3
bh
bh
bh
bh
m'
bh
m3
m3
bh
m3
m3
m2
m3
m3
m3
m3
m2
m3
m3
m3
m2
m3
m3
m3
m2
m3
m2
m'
m'
m'
m'
m2
PEKERJAAN LANGIT-LANGIT
m2
m2
m2
m2
m2
m2
m2
m2
m'
m2
m'
m2
kg
kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m2
m2
m2
m'
m'
m'
m2
m'
m2
m'
m2
m2
bh
PEKERJAAN SANITASI
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
PEKERJAAN CAT
m2
m2
m2
m2
m2
m2
m2
m2
ttk
bh
bh
bh
bh
bh
bh
bh
bh
set
m2
m2
m2
m2
PEKERJAAN KELISTRIKAN
m2
m2
m'
hari
SUMUR DALAM
hari
m'
m'
m'
jam
36 jam
jam
18 jam
ls
ls
unit
unit
unit
unit
m'
m'
titik
No.
1
2
3
208 m2
BANGSRI, KARANGPANDAN
KARANGANYAR
2012
Uraian Pekerjaan
1
A
:
:
:
:
:
:
2
PEKERJAAN PERSIAPAN
Pembersihan lapangan
Administrasi dan dokumentasi
Pembersihan lapangan
Volume
Sat.
1.00
52.00
1.00
Analysa
ls
ls
m'
Daftar harga
An. Dihitung
Dihitung
Harga
Satuan
Rp.
5
Jumlah
Harga
Rp.
6
500,000.00
279,675.00
416,000.00
500,000.00
14,543,100.00
416,000.00
JUMLAH I.
B
1
2
3
4
PEKERJAAN TANAH
Bongkaran beton bertulang
Membuang tanah sejauh 15 meter
Memadatkan tanah ( per 20 cm )
Memasang bak kontrol pas. Batu bata ( 60 x 60 x 65 cm)
19.38
13.06
13.06
5.47
m3
m3
m3
bh
Ps.6.13.2002
T.6.8.2008
T.6.10.2008
Sn.11.6.18.2002
273,455.48
13,198.40
21,809.00
245,565.95
5,299,567.20
172,371.10
284,825.54
1,343,245.75
JUMLAH II.
C
1
2
3
4
5
6
7
8
9
10
PEKERJAAN PASANGAN
Memasang pondasi batu belah, campuran 1 PC : 5 PP
Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 5 PP
Memasang lisplank ukuran ( 3 x 20 ) cm, kayu kruing
Membuat beton mutu f'c = 9,8 Mpa (K 125), slump (12 + 2), w/c = 0,78
Membuat beton mutu f'c = 14,5 Mpa (K 175), slump (12 + 2), w/c = 0,66
Memasang lisplank ukuran ( 3 x 20 ) cm, kayu klas I / II
Memasang plesteran 1 PC : 6 PP, tebal 15 mm
Memasang finishing siar pasangan dinding conblock ekspose ( = 8 M' )
Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
Memasang jendela nako dan tralis
10.66
4.36
16.00
599.51
83.11
171.86
193.81
2.34
46.92
0.36
m3
m2
m'
m3
m3
m'
m2
m2
m2
m2
P.6.3.2008
D.6.10.2008
K.6.21.2008.a
Bt.6.2.2008
Bt.6.5.2008
K.6.21.2008
Plt.6.6.2008
Plt.6.25.2008
Plt.6.18.2008
Bs.6.17.2008
508,613.00
73,275.98
79,936.20
668,838.53
732,536.63
0.00
29,718.10
7,048.38
36,380.35
129,244.88
5,421,814.58
319,483.27
1,278,779.36
400,975,387.12
60,881,119.32
0.00
5,759,664.96
16,493.21
1,706,966.02
46,528.16
JUMLAH III.
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
0.43
65.23
65.23
9.00
11.30
15.75
55.97
55.97
23.26
0.33
10.00
1.94
1.94
1.94
1.94
1.94
1.94
1.94
m2
m3
m3
m'
m'
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
K.6.10.2008
K.6.13.2008.a
K.6.13.2008.c
TL.6.25.2008
TL.6.26.2008
K.6.15.2008.a
Bt.6.21.2008
Bt.6.28.2008.a
K.6.16.2008.a
Plt.6.27.2008
K.6.3.2008
K.6.5.2008.a
Plt.6.5.2008
Plt.6.5.2008
Plt.6.5.2008
Plt.6.5.2008
Plt.6.5.2008
Plt.6.5.2008
1,078,997.45
11,020,890.00
12,468,985.00
105,495.67
11,756.52
10,626,181.00
87,422.45
2,810,860.50
172,032.33
18,193.00
79,041.24
838,742.50
30,646.50
30,646.50
30,646.50
30,646.50
30,646.50
30,646.50
463,968.90
718,892,654.70
813,351,891.55
949,461.03
132,848.68
167,362,350.75
4,893,034.53
157,323,862.19
4,001,472.00
6,003.69
790,412.40
1,627,160.45
59,454.21
59,454.21
59,454.21
59,454.21
59,454.21
59,454.21
JUMLAH IV.
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
PEKERJAAN LAIN-LAIN
Memasang plint ubin teralux marmer ukuran ( 10 x 60 ) cm
Memasang plint ubin teralux marmer ukuran ( 10 x 40 ) cm
Memasang plint ubin teralux kerang ukuran ( 10 x 40 ) cm
Memasang plint ubin granit ukuran ( 10 x 30 ) cm
Memasang lantai teraso cor di tempat tebal 3 cm
Memasang lantai keramik ukuran 30/30 cm, motif
Memasang lantai keramik ukuran 30/30 cm, polos
Memasang lantai keramik ukuran ( 20 x 20 ) cm
Memasang lantai keramik ukuran ( 10 x 33 ) cm, variasi / border
Memasang lantai mosaik ukuran ( 30 x 30 ) cm, campuran spesi 1 PC : 3 PP
Memasang plint keramik ukuran ( 10 x 20 ) cm
Memasang plint keramik ukuran ( 10 x 10 ) cm
Memasang plint keramik ukuran ( 5 x 20 ) cm
Memasang lantai marmer ukuran ( 100 x 100 ) cm
Memasang lantai karpet
Memasang underlayer / rubber corrugated
Memasang lantai keramik artistik ukuran ( 10 x 10 ) cm atau ( 5 x20 ) cm
Memasang dinding porselen ukuran ( 20 x 20 ) cm
195.93
45.00
38.65
4.88
11.63
18.00
12.00
12.00
5.00
6.00
12.00
6.00
6.00
1.00
4.00
4.00
9.00
5.00
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m'
m'
m'
m2
m2
m2
m2
m2
TL.6.28.2008
TL.6.29.2008
TL.6.26.2008
TL.6.25.2008
TL.6.31.2008
TL.6.35.2008
TL.6.35.2008.a
TL.6.36.2008
TL.6.37.2008
TL.6.38.2008
TL.6.39.2008
TL.6.40.2008
TL.6.41.2008
TL.6.43.2008
TL.6.44.2008
TL.6.45.2008
TL.6.33.2008
TL.6.50.2008
11,756.52
11,756.52
11,756.52
105,495.67
24,814.80
124,526.00
120,006.00
85,744.40
140,184.98
94,445.40
53,430.92
11,191.52
9,831.00
213,036.64
143,794.76
36,752.12
100,601.64
140,696.30
2,303,454.96
529,043.40
454,389.50
514,818.87
288,596.12
2,241,468.00
1,440,072.00
1,028,932.80
700,924.90
566,672.40
641,171.04
67,149.12
58,986.00
213,036.64
575,179.04
147,008.48
905,414.76
703,481.50
JUMLAH V.
REKAPITULASI :
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PASANGAN
D PEKERJAAN ATAP DAN KAYU
E PEKERJAAN LAIN-LAIN
:
:
:
:
:
JUMLAH
PPn 10%
JUMLAH TOTAL
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,459,100.00
7,100,009.59
476,406,236.00
1,870,151,846.13
13,379,799.53
2,382,496,991.25
238,249,699.13
2,620,746,690.38
2,620,746,600.00
No.
Uraian Pekerjaan
Volume
Sat.
Analysa
Harga
Satuan
Rp.
5
Jumlah
Harga
Rp.
6
Terbilang : ( ....................................................................................................................................... )
Karanganyar, 2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
Ir. PRIHARYANTO, MM
NIP. 19630331 199103 1 005
0.765
5.4774
4.0545
0.765
0.1512
11.0619
Harga
Semua
Rp.
7
15,459,100.00
7,100,009.59
476,406,236.00
1,870,151,846.13
13,379,799.53
2,382,496,991.25
138,736,070.00
(2,243,760,921.25)
(190,852.47)
Harga
Semua
Rp.
7
:
:
:
:
:
:
2013
NAMA UPAH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
8
9
10
11
SATUAN
HARGA
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
34,000.00
37,500.00
44,000.00
49,000.00
49,000.00
49,000.00
49,000.00
49,000.00
46,000.00
44,500.00
44,500.00
44,500.00
44,500.00
49,000.00
42,500.00
50,000.00
34,000.00
44,500.00
or / hr
or / hr
or / hr
or / hr
or / hr
or / hr
OH
OH
or / hr
or / hr
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
49,000.00
44,500.00
49,000.00
60,000.00
150,000.00
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
NAMA UPAH
BAHAN TAMBANG
Air
Sirtu
Tanah Urug Cadas
Tanah Liat
Batu Kali
Batu pecah /1 cm, cruser
Batu pecah 1/2 cm, cruser
Batu pecah 2/3 cm (split), cruser
Batu pecah 3/5 cm, manual
Batu pecah 5/7 cm, manual
Batu pecah 10/15 cm, manual
Batu pecah 15/20 cm, manual
Kerikil Sungai di Quary
Minyak begesting
Minyak Pelumas
Minyak Solar
Pasir Urug
Pasir Pasang
SATUAN
ltr
m
m
m
m
m
m
m
m
m
m
m
m
ltr
liter
liter
m
m
HARGA
5.00
90,000.00
29,500.00
30,000.00
117,500.00
177,500.00
160,000.00
157,500.00
130,000.00
123,000.00
122,500.00
120,000.00
16,000.00
4,500.00
19,000.00
4,500.00
50,000.00
100,000.00
20
21
22
24
25
25
25
26
27
28
29
30
31
32
33
34
35
Pasir Beton
Pasir tras
Abu Batu
Batu Candi
Batu Palimanan
Batu lempeng tidak beraturan
Batu andesit
Batu Paras
Batu candi berpori
Batu granit
Ijuk
Kawur/ Kapur Pasang
Olie mesin
Olie hydroulik
Grease
Bentonite
Gravel pack 0,5 - 1,5 cm
m
m
m
m
m
m
m
m
m
kg
kg
m
ltr
ltr
ltr
kg
m3
115,000.00
65,000.00
70,000.00
130,000.00
120,000.00
50,000.00
160,000.00
80,000.00
80,000.00
6,000.00
10,000.00
200,000.00
26,700.00
23,500.00
26,700.00
4,400.00
130,000.00
1
2
3
4
5
6
7
8
9
10
11
bj
bj
bj
kg
zak
zak
kg
kg
bj
bj
kg
470.00
9,000.00
7,000.00
1,200.00
1,800.00
400,000.00
10,000.00
195,000.00
3,000.00
35,000.00
40,000.00
1
2
3
4
5
6
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
KAYU
Kayu Bangkiray Balok
Kayu Bangkiray Papan
Kayu Kamper Balok
Kayu Kamper Papan
Kayu Kruing Balok
Kayu Kruing Papan
Kayu Sengon Papan
Kayu Jati Lokal untuk Kusen
Kayu Jati Lokal untuk Rangka Atap
Kayu Jati hutan untuk Kusen
Kayu Jati hutan untuk Rangka Atap
Kayu Jati hutan untuk perquet
Kayu Jati hutan untuk Konstrusi Jembatan
Kayu Meranti 5/7
Kayu Begesting
Kayu stagger bekesting
Kayu Perancah
Kayu lis profil
Kayu Dudukan Fitting
Bambu Apus/Ori ( kayu dolken )
Teakwood 4 mm ( 1,20 x 240 )
Teakwood 3 mm ( 1,20 x 2,40 )
Triplex 4 mm (1.2 x 2.4 ) Kruing
Triplex 4 mm (1.2 x 2.4 ) Sengon
Triplex 2.7 mm (1.2 x 2.4 ) Kruing
Triplex 2.7 mm (1.2 x 2.4 ) Sengon
Multiplex 4 mm
Multiplex 6 mm
Multiplex 9 mm
Multiplek 12 mm
Woodplank ( 4 M )
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m2
m
m'
m
btg
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
Lb
m'
7,960,000.00
8,390,000.00
8,050,000.00
8,325,000.00
4,825,000.00
5,100,000.00
895,000.00
6,990,000.00
6,550,000.00
13,450,000.00
9,125,000.00
23,000.00
18,800,000.00
4,500,000.00
895,000.00
23,000.00
1,050,000.00
4,000.00
4,000.00
6,000.00
100,000.00
1
2
3
4
5
6
7
8
kg
kg
kg
kg
kg
kg
m'
m'
16,000.00
9,000.00
8,500.00
18,500.00
12,000.00
16,100.00
24,000.00
85,000.00
53,500.00
49,200.00
42,800.00
38,500.00
75,000.00
94,000.00
150,000.00
200,000.00
54,000.00
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
m'
m2
m
kg
kg
kg
kg
kg
bj
kg
bj
bh
unit
kg
lbr
m'
m'
kg
roll
75,000.00
481,500.00
645,000.00
12,500.00
12,500.00
16,000.00
16,000.00
22,500.00
600.00
5,000.00
100.00
5,000.00
987,500.00
21,000.00
147,500.00
9,000.00
7,500.00
18,000.00
60,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
m2
m2
m2
m2
m2
m'
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
47,000.00
48,000.00
64,500.00
135,000.00
250,000.00
750,000.00
11,500.00
135,000.00
64,000.00
198,000.00
240,750.00
117,750.00
7,000.00
15,000.00
25,000.00
25,500.00
15,500.00
7,500.00
14,500.00
9,250.00
6,500.00
8,000.00
180,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m'
m
m
m
m'
pak
lbr
lbr
m'
m'
m'
lbr
lbr
lbr
lbr
m'
kg
m2
m2
1,800.00
5,750.00
2,200.00
2,550.00
5,500.00
750.00
4,000.00
58,000.00
43,750.00
26,500.00
550,000.00
400,000.00
56,000.00
139,500.00
64,200.00
69,550.00
58,850.00
27,700.00
42,300.00
8,750.00
17,500.00
60,000.00
70,000.00
7,000.00
4,000.00
85,900.00
180,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
m2
m2
m2
m2
m2
m
m
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
dos
bh
m'
m
m
m
m
m
m
32,000.00
36,000.00
125,000.00
73,200.00
43,000.00
125,000.00
425,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
KELISTRIKAN
Fitting porselin
Saklar Ganda
Saklar Tunggal
Stop Kontak
Stop kontak digital
Stop kontak analog
Kabel Listrik 1.50 mm
Kabel Listrik 2.50 mm
Lampu SL 18 watt
Lampu SL 20 watt
Stabilizer 5000 Watt
Kabel power
Down light 4"
MCB 32 Amper
Box MCB
bh
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
unit
bh
bh
bh
5,000.00
14,750.00
12,750.00
12,000.00
192,000.00
180,000.00
3,100.00
4,100.00
22,500.00
27,500.00
3,000,000.00
1,500,000.00
25,000.00
32,000.00
15,000.00
bh
bh
bh
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
115,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
125,000.00
130,000.00
15,600.00
23,500.00
31,250.00
7,100.00
37,250.00
350.00
41,500.00
36,000.00
73,000.00
89,000.00
69,000.00
80,000.00
590,000.00
800,000.00
230,000.00
1,150,000.00
40,000.00
16,100.00
26,750.00
42,750.00
29,500.00
18,750.00
58,750.00
37,500.00
53,500.00
103,500.00
360,000.00
34,375.00
1,092,500.00
60,200.00
27,000.00
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
bh
bh
bh
bh
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bj
bj
46,500.00
52,000.00
67,500.00
75,000.00
125,000.00
130,000.00
235,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
FINISHING
Cat kayu (dalam)
Cat kayu (luar)
Cat tembok ( dalam )
Cat tembok ( luar )
Meni Kayu
Meni Besi
Cat Besi
Dempul Jadi / Wood Filler
Plamur
Amplas besi/kayu
Kuwas 4"
Lem Kayu (ex. Fox)
Lem Kuning (ex. Aica Aibon)
Lem Wallpaper
kg
kg
kg
kg
kg
kg
kg
kg
kg
Lbr
bh
kg
kg
kg
37,000.00
45,000.00
21,000.00
75,000.00
18,000.00
18,000.00
37,000.00
15,000.00
15,000.00
1,800.00
15,000.00
12,500.00
62,000.00
61,000.00
1
2
3
4
5
6
7
8
9
10
LAIN - LAIN
Sewa alat
Sealent
Ball point
Cetak Foto
Kertas folio 70 gr
Kertas sampul
Tinta print refill
Papan Nama Proyek
Marmer Prasasti
Pembersihan lapangan
jam
tube
bh
bh
rim
bh
bh
bh
bh
ls
25,000.00
8,500.00
86,500.00
37,000.00
1,500.00
30,000.00
350,000.00
350,000.00
500,000.00
105,000.00
50,000.00
80,000.00
25,000.00
250,000.00
2,000.00
135,000.00
225,000.00
290,000.00
422,500.00
540,000.00
570,000.00
18,000.00
21,500.00
27,500.00
50,000.00
75,000.00
137,500.00
200,000.00
410,000.00
645,000.00
18,800.00
17,500.00
54,000.00
12,500.00
18,750.00
19,750.00
25,750.00
32,000.00
52,000.00
55,600.00
57,000.00
65,000.00
NAMA UPAH
Alat-alat kerja
Alat bantu
Chainsaw
Jack hammer
Mesin las listrik 250 A diesel
Mesin potong besi
Molen 0,35 m3
Stamper
SATUAN
set
set
jam
bh
sewa/hari
sewa/hari
unit/hari
sewa/hari
HARGA
41,500.00
41,500.00
50,000.00
350,000.00
50,000.00
50,000.00
75,000.00
Karanganyar, 2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
Ir. PRIHARYANTO, MM
NIP. 19630331 199103 1 005
NO
NAMA UPAH
SATUAN
HARGA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
hr
hr
ls
ls
ls
ls
bh
bh
bh
bh
ls
ls
ls
bh
unit
unit
unit
bh
402,000.00
805,200.00
140,000.00
1,347,300.00
70,000.00
310,000.00
1,250,000.00
850,000.00
125,000.00
250,000.00
1,500,000.00
500,000.00
750,000.00
12,000.00
1,560,000.00
14,175,000.00
4,300,000.00
1,552,500.00
19
20
Alat tulis
Pemasangan tiang listrik komplit
ls
titik
30,000.00
5,900,000.00
( RAB )
KET.
HARGA 2012
35,000.00
40,000.00
42,500.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
45,000.00
40,000.00
40,000.00
40,000.00
40,000.00
45,000.00
50,000.00
60,000.00
35,000.00
40,000.00
200,000.00
160,000.00
140,000.00
100,000.00
60,000.00
50,000.00
42,500.00
50,000.00
70,000.00
175,000.00
KET.
5.00
87,300.00
33,325.00
28,750.00
121,300.00
200,100.00
194,000.00
181,900.00
151,600.00
139,425.00
133,400.00
107,500.00
18,200.00
6,000.00
22,300.00
4,500.00
72,750.00
115,200.00
130,950.00
84,900.00
57,600.00
151,600.00
87,900.00
80,000.00
170,000.00
10,925.00
227,000.00
31,250.00
27,500.00
22,100.00
12,100.00
150,000.00
455.90
1,212.50
84,900.00
84,900.00
2,121.39
220,700.00
7,000.00
7,000.00
8,972,500.00
9,457,500.00
9,093,800.00
9,396,900.00
5,456,300.00
5,759,400.00
1,782,500.00
7,881,300.00
7,384,125.00
15,156,300.00
10,306,300.00
201,250.00
21,218,800.00
4,715,000.00
1,008,800.00
1,212,500.00
9,500.00
4,500.00
8,625.00
113,500.00
92,000.00
60,625.00
55,800.00
48,500.00
43,700.00
60,625.00
80,500.00
126,625.00
207,000.00
66,000.00
18,200.00
10,900.00
13,325.00
20,000.00
28,500.00
14,000.00
45,000.00
97,000.00
84,900.00
545,625.00
727,500.00
14,600.00
14,600.00
18,250.00
18,200.00
21,000.00
650.00
650.00
650.00
5,000.00
1,155,000.00
25,000.00
54,600.00
72,800.00
84,900.00
145,000.00
10,000.00
10,062.50
11,571.88
72,800.00
224,300.00
272,800.00
133,400.00
8,500.00
18,200.00
30,300.00
30,300.00
18,200.00
9,100.00
17,000.00
10,900.00
7,900.00
7,500.00
242,000.00
1,625.00
7,300.00
2,175.00
2,300.00
7,300.00
850.00
4,900.00
66,700.00
50,925.00
16,000.00
636,600.00
454,700.00
72,800.00
78,800.00
66,700.00
24,150.00
36,800.00
10,425.00
15,300.00
74,750.00
180,000.00
27,772.50
42,320.00
85,962.50
36,400.00
42,425.00
115,200.00
63,700.00
48,500.00
212,000.00
97,750.00
74,750.00
86,250.00
97,750.00
204,950.00
165,700.00
241,500.00
241,500.00
8,250.00
34,000.00
25,000.00
2,500.00
3,500.00
6,500.00
4,000.00
28,750.00
28,750.00
33,925.00
44,600.00
37,825.00
6,700.00
17,000.00
14,600.00
12,000.00
12,000.00
12,000.00
3,600.00
4,900.00
27,300.00
33,325.00
3,492,000.00
1,785,000.00
133,375.00
666,900.00
666,900.00
45,450.00
18,175.00
30,300.00
48,500.00
33,325.00
21,200.00
66,675.00
42,425.00
60,625.00
103,500.00
360,000.00
34,375.00
1,092,500.00
60,200.00
27,000.00
73,255.00
54,600.00
60,625.00
78,800.00
90,925.00
145,500.00
151,600.00
272,800.00
503,175.00
805,000.00
121,300.00
1,750.00
157,625.00
254,625.00
327,400.00
477,200.00
611,100.00
642,625.00
21,200.00
25,500.00
32,100.00
58,800.00
87,300.00
160,100.00
232,800.00
472,900.00
727,500.00
18,800.00
17,500.00
54,000.00
14,600.00
21,825.00
23,000.00
30,300.00
37,600.00
63,100.00
75,700.00
60,625.00
66,700.00
43,700.00
54,600.00
24,300.00
84,900.00
21,200.00
21,200.00
54,600.00
18,200.00
18,200.00
2,875.00
11,500.00
12,650.00
35,650.00
25,875.00
10,000.00
60,000.00
8,500.00
86,500.00
37,000.00
1,500.00
30,000.00
350,000.00
350,000.00
500,000.00
2013
KERJAAN UMUM
ARANGANYAR
199103 1 005
KET.
51,900.00
51,900.00
50,000.00
350,000.00
50,000.00
50,000.00
75,000.00
KET.
402,000.00
805,200.00
140,000.00
1,347,300.00
70,000.00
310,000.00
1,250,000.00
850,000.00
125,000.00
250,000.00
1,500,000.00
500,000.00
750,000.00
12,000.00
1,560,000.00
14,175,000.00
4,300,000.00
1,552,500.00
30,000.00
3,750,000.00
:
:
:
:
:
:
Karanganyar, 2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
Ir. PRIHARYANTO, MM
NIP. 19630331 199103 1 005
2013
PEKERJAAN UMUM
N KARANGANYAR
ARYANTO, MM
31 199103 1 005
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
0.750
0.025
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
25,500.00
1,150.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
0.900
0.045
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
30,600.00
2,070.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
1.050
0.067
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
35,700.00
3,082.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
1.000
0.032
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
34,000.00
1,472.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Pekerja
Mandor
Peralatan
C
D
E
Satuan
Indeks
OH
OH
1.500
0.060
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
51,000.00
2,760.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
1.200
0.045
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
40,800.00
2,070.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
0.050
0.005
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
1,700.00
230.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Satuan
Indeks
OH
OH
0.330
0.010
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
11,220.00
460.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
10
Pekerja
Mandor
Satuan
Indeks
OH
OH
0.250
0.008
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
8,500.00
368.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Pekerja
Mandor
Peralatan
C
D
E
Satuan
Indeks
OH
OH
0.500
0.050
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
17,000.00
2,300.00
(A+B)
10%
C
(C+D)
11
Bahan
Pasir Urug
m3
1.200
Harga Satuan
Bahan / Upah
( Rp. )
50,000.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.300
0.010
34,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
Kebutuhan
No.
12
10%
Satuan
Indeks
Jumlah
( Rp. )
60,000.00
10,200.00
460.00
(A+B+C)
D
(D+E)
Bahan
Kapur Padam
Pasir Pasang
Tanah Liat
m3
m3
m3
0.135
0.400
0.948
Harga Satuan
Bahan / Upah
( Rp. )
200,000.00
100,000.00
30,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.800
0.400
0.040
0.080
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No.
13
10%
Jumlah
( Rp. )
27,000.00
40,000.00
28,440.00
27,200.00
17,800.00
1,960.00
3,680.00
(A+B+C)
D
(D+E)
Bahan
Kapur Padam
Tanah Liat
m3
m3
0.248
1.240
Harga Satuan
Bahan / Upah
( Rp. )
200,000.00
30,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.800
0.400
0.040
0.080
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
No.
14
10%
Jumlah
( Rp. )
49,600.00
37,200.00
27,200.00
17,800.00
1,960.00
3,680.00
(A+B+C)
D
(D+E)
Bahan
Ijuk
kg
6.000
Harga Satuan
Bahan / Upah
( Rp. )
10,000.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.150
0.015
34,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No.
10%
Jumlah
( Rp. )
60,000.00
5,100.00
690.00
(A+B+C)
D
(D+E)
15
Bahan
Sirtu
m3
1.200
Harga Satuan
Bahan / Upah
( Rp. )
90,000.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.250
0.025
34,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No.
10%
Satuan
Indeks
Jumlah
( Rp. )
108,000.00
8,500.00
1,150.00
(A+B+C)
D
(D+E)
PEKERJAAN PONDASI
1
Bahan
m3
kg
m3
1.200
202.000
0.485
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
242,400.00
48,500.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
1.200
163.000
0.520
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
195,600.00
52,000.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
1.200
136.000
0.544
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
163,200.00
54,400.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
1.200
117.000
0.561
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Jumlah
( Rp. )
141,000.00
140,400.00
56,100.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
1.200
91.000
0.584
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
109,200.00
58,400.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
m3
m3
m3
1.200
0.170
0.170
0.340
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
200,000.00
195,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
34,000.00
33,150.00
34,000.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
m3
1.200
61.000
0.147
0.492
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
73,200.00
29,400.00
49,200.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
m3
1.200
41.000
0.131
0.523
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.500
0.750
0.075
0.075
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Jumlah
( Rp. )
141,000.00
49,200.00
26,200.00
52,300.00
51,000.00
33,375.00
3,675.00
3,450.00
(A+B+C)
D
(D+E)
Bahan
m3
m3
1.200
0.432
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
50,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.780
0.390
0.039
0.039
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
141,000.00
21,600.00
26,520.00
17,355.00
1,911.00
1,794.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
m3
kg
kg
0.480
194.000
0.312
0.468
126.000
1.800
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
115,000.00
157,500.00
9,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
3.400
0.850
0.085
0.170
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
11
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
56,400.00
232,800.00
35,880.00
73,710.00
1,134,000.00
28,800.00
115,600.00
37,825.00
4,165.00
7,820.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
m3
m3
0.450
194.000
0.312
0.468
Harga Satuan
Bahan / Upah
( Rp. )
117,500.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.400
0.800
0.080
0.119
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No.
10%
3%
Jumlah
( Rp. )
52,875.00
232,800.00
35,880.00
73,710.00
81,600.00
35,600.00
3,920.00
5,474.00
(A+B+C)
D
(D+E)
PEKERJAAN DINDING
1
No.
Kebutuhan
Satuan
Buah
kg
m3
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
OH
OH
OH
OH
10%
140.000
43.500
0.080
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
Indeks
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
Jumlah
( Rp. )
65,800.00
52,200.00
8,000.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
No.
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
OH
OH
OH
OH
10%
140.000
32.950
0.091
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
Jumlah
( Rp. )
65,800.00
39,540.00
9,100.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
No.
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
OH
OH
OH
OH
10%
140.000
26.550
0.093
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
Jumlah
( Rp. )
65,800.00
31,860.00
9,300.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
No.
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
OH
OH
OH
OH
10%
140.000
22.200
0.102
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
65,800.00
26,640.00
10,200.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
No.
Kebutuhan
Satuan
Buah
kg
m3
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
OH
OH
OH
OH
10%
140.000
18.500
0.122
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
65,800.00
22,200.00
12,200.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
No.
A
Bahan
Batu Merah
PC
Pasir Pasang
Kapur Pasang
Buah
kg
m3
m3
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
Peralatan
D
E
F
10%
140.000
10.080
0.093
0.028
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
200,000.00
0.600
0.200
0.020
0.030
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
65,800.00
12,096.00
9,250.00
5,500.00
20,400.00
8,900.00
980.00
1,380.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
70.000
18.950
0.038
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
No
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Jumlah
( Rp. )
32,900.00
22,740.00
3,800.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
70.000
14.370
0.040
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
No
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
32,900.00
17,244.00
4,000.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
No
Kebutuhan
Satuan
Buah
kg
m3
70.000
11.500
0.043
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10
10%
Indeks
Jumlah
( Rp. )
32,900.00
13,800.00
4,300.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
70.000
9.680
0.045
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
No
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
11
10%
Jumlah
( Rp. )
32,900.00
11,616.00
4,500.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
70.000
8.320
0.049
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
No
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
12
10%
Jumlah
( Rp. )
32,900.00
9,984.00
4,900.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Buah
kg
m3
70.000
6.500
0.050
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
No
A
Bahan
Batu Merah
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
32,900.00
7,800.00
5,000.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
13
Bahan
Batu Merah
PC
Pasir Pasang
Kapur Pasang
Buah
kg
m3
m3
70.000
4.500
0.050
0.015
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
200,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
14
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
32,900.00
5,400.00
5,000.00
3,000.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Bahan
Batu Merah
Semen Merah
Pasir Pasang
Kapur Pasang
Buah
m3
m3
m3
70.000
0.018
0.018
0.018
Harga Satuan
Bahan / Upah
( Rp. )
470.00
195,000.00
100,000.00
200,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
15
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
32,900.00
3,510.00
1,800.00
3,600.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Bahan
Batu Merah
Semen Merah
Pasir Pasang
Kapur Pasang
Buah
kg
m3
m3
70.000
0.014
0.028
0.014
Harga Satuan
Bahan / Upah
( Rp. )
470.00
195,000.00
100,000.00
200,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
16
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
32,900.00
2,730.00
2,800.00
2,800.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
HB 20
Semen
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Buah
kg
m3
kg
12.500
30.320
0.728
0.280
Harga Satuan
Bahan / Upah
( Rp. )
7,000.00
1,200.00
100,000.00
9,000.00
OH
OH
OH
OH
0.350
0.150
0.015
0.018
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
87,500.00
36,384.00
72,800.00
2,520.00
11,900.00
6,675.00
735.00
828.00
(A+B+C)
D
(D+E)
17
Kebutuhan
No
A
Bahan
HB 20
Semen
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
18
Buah
kg
m3
kg
12.500
24.260
0.772
0.280
Harga Satuan
Bahan / Upah
( Rp. )
7,000.00
1,200.00
100,000.00
9,000.00
OH
OH
OH
OH
0.350
0.150
0.015
0.018
34,000.00
44,500.00
49,000.00
46,000.00
Satuan
10%
Indeks
Jumlah
( Rp. )
87,500.00
29,112.00
77,200.00
2,520.00
11,900.00
6,675.00
735.00
828.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
HB 15
Semen
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Peralatan
D
E
F
19
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
Buah
kg
m3
kg
12.500
22.740
0.550
0.280
1,200.00
100,000.00
9,000.00
27,288.00
55,000.00
2,520.00
OH
OH
OH
OH
0.320
0.120
0.012
0.016
34,000.00
44,500.00
49,000.00
46,000.00
10,880.00
5,340.00
588.00
736.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
HB 15
Semen
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Peralatan
D
E
F
20
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
Buah
kg
m3
kg
12.500
18.200
0.582
0.280
1,200.00
100,000.00
9,000.00
21,840.00
58,200.00
2,520.00
OH
OH
OH
OH
0.320
0.120
0.012
0.016
34,000.00
44,500.00
49,000.00
46,000.00
10,880.00
5,340.00
588.00
736.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
HB 10
PC
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Jumlah
( Rp. )
Buah
kg
m3
kg
12.500
15.160
0.364
0.280
1,200.00
100,000.00
9,000.00
18,192.00
36,400.00
2,520.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
10,200.00
4,450.00
490.00
690.00
3%
(A+B+C)
D
(D+E)
21
Kebutuhan
No
A
Bahan
HB 10
PC
Pasir Pasang
Angkur = 8 mm
Tenaga Kerja
Peralatan
D
E
F
22
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Buah
kg
m3
kg
12.500
12.130
0.388
0.280
1,200.00
100,000.00
9,000.00
14,556.00
38,800.00
2,520.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
10,200.00
4,450.00
490.00
690.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Terawang ( roster )
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
23
Buah
kg
m3
30.000
14.000
0.032
Harga Satuan
Bahan / Upah
( Rp. )
3,000.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
90,000.00
16,800.00
3,200.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Terawang ( roster )
PC
Pasir Pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
24
Buah
kg
m3
30.000
11.000
0.035
Harga Satuan
Bahan / Upah
( Rp. )
3,000.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
90,000.00
13,200.00
3,500.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Buah
kg
m3
70.000
14.000
0.032
Harga Satuan
Bahan / Upah
( Rp. )
9,000.00
1,200.00
100,000.00
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
630,000.00
16,800.00
3,200.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
PEKERJAAN PLESTERAN
1
Bahan
PC
Pasir Pasang
kg
m3
15.504
0.016
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
18,604.80
1,600.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
10.224
0.020
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
12,268.80
2,000.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
7.776
0.023
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
9,331.20
2,300.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
6.240
0.024
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
7,488.00
2,400.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
5.184
0.026
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
6,220.80
2,600.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
4.416
0.027
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
5,299.20
2,700.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
3.936
0.028
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
4,723.20
2,800.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
3.456
0.029
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
4,147.20
2,900.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
Kapur Padam
Pasir Pasang
kg
m3
m3
5.760
0.003
0.013
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.360
0.120
0.012
0.018
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
6,912.00
600.00
1,300.00
12,240.00
5,340.00
588.00
828.00
(A+B+C)
D
(D+E)
Bahan
PC
Kapur Padam
Pasir Pasang
kg
m3
m3
3.000
0.005
0.020
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.360
0.120
0.012
0.018
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
11
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
3,600.00
1,000.00
2,000.00
12,240.00
5,340.00
588.00
828.00
(A+B+C)
D
(D+E)
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
m3
m3
m3
0.009
0.009
0.009
Harga Satuan
Bahan / Upah
( Rp. )
195,000.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.360
0.120
0.012
0.018
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
12
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
1,755.00
1,800.00
900.00
12,240.00
5,340.00
588.00
828.00
(A+B+C)
D
(D+E)
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
m3
m3
m3
0.007
0.007
0.015
Harga Satuan
Bahan / Upah
( Rp. )
195,000.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.360
0.120
0.012
0.018
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
1,365.00
1,400.00
1,500.00
12,240.00
5,340.00
588.00
828.00
(A+B+C)
D
(D+E)
13
Bahan
PC
Pasir Pasang
kg
m3
13.632
0.027
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.400
0.200
0.020
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
14
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
16,358.40
2,700.00
13,600.00
8,900.00
980.00
1,012.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
10.368
0.031
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.260
0.200
0.020
0.013
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
15
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
12,441.60
3,100.00
8,840.00
8,900.00
980.00
598.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
8.320
0.032
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.400
0.200
0.020
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
16
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
9,984.00
3,200.00
13,600.00
8,900.00
980.00
1,012.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
6.912
0.035
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.400
0.200
0.020
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
8,294.40
3,500.00
13,600.00
8,900.00
980.00
1,012.00
(A+B+C)
D
(D+E)
17
Bahan
PC
Pasir Pasang
kg
m3
5.888
0.036
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.400
0.200
0.020
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
18
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
7,065.60
3,600.00
13,600.00
8,900.00
980.00
1,012.00
(A+B+C)
D
(D+E)
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
m3
m3
m3
0.009
0.009
0.018
Harga Satuan
Bahan / Upah
( Rp. )
195,000.00
200,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.440
0.220
0.022
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
19
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
1,755.00
1,800.00
1,800.00
14,960.00
9,790.00
1,078.00
1,012.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
5.184
0.026
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.075
0.008
0.008
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
20
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
6,220.80
2,600.00
5,100.00
3,337.50
392.00
368.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
0.500
0.013
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.080
0.400
0.040
0.004
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
600.00
1,300.00
2,720.00
17,800.00
1,960.00
184.00
(A+B+C)
D
(D+E)
21
Bahan
PC
Batu Granit
kg
kg
10.000
15.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.450
0.225
0.023
0.023
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
22
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
12,000.00
90,000.00
15,300.00
10,012.50
1,127.00
1,058.00
(A+B+C)
D
(D+E)
No
A
Bahan
PC
Batu Teraso
kg
kg
10.000
15.000
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.450
0.225
0.023
0.023
Peralatan
D
E
F
23
10%
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
12,000.00
15,300.00
10,012.50
1,127.00
1,058.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
4.320
0.006
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.100
0.010
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
24
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
5,184.00
600.00
10,200.00
4,450.00
490.00
690.00
(A+B+C)
D
(D+E)
Bahan
PC
kg
3.108
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.075
0.008
0.008
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
3,729.60
5,100.00
3,337.50
392.00
368.00
(A+B+C)
D
(D+E)
25
Bahan
PC
kg
1.600
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.070
0.035
0.004
0.004
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
26
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
1,920.00
2,380.00
1,557.50
196.00
184.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Pasang
kg
m3
6.340
0.012
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.300
0.150
0.015
0.015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
27
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
7,608.00
1,200.00
10,200.00
6,675.00
735.00
690.00
(A+B+C)
D
(D+E)
Memasang acian
m2
Bahan
PC
kg
3.250
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.200
0.100
0.010
0.010
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
3,900.00
6,800.00
4,450.00
490.00
460.00
(A+B+C)
D
(D+E)
PEKERJAAN KAYU
1
No
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Bahan
m3
kg
kg
1.100
1.250
1.000
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
7.000
21.000
2.100
0.350
Peralatan
D
E
F
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Balok Kayu BK
Paku 10 cm
Lem Kayu
m3
kg
kg
1.100
1.250
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
7.000
21.000
2.100
0.350
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
9,229,000.00
15,625.00
12,500.00
238,000.00
1,029,000.00
102,900.00
16,100.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.100
1.250
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,050,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
7.000
21.000
2.100
0.350
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
8,855,000.00
15,625.00
12,500.00
238,000.00
1,029,000.00
102,900.00
16,100.00
(A+B+C)
D
(D+E)
Pasang kusen pintu dan kusen jendela, kayu kelas II atau III
m3
Kebutuhan
No
Jumlah
( Rp. )
Bahan
m3
kg
kg
1.200
1.250
1.000
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
6.000
18.000
1.800
0.300
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.200
1.250
1.000
Harga Satuan
Bahan / Upah
( Rp. )
13,450,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
6.000
18.000
1.800
0.300
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
16,140,000.00
15,625.00
12,500.00
204,000.00
882,000.00
88,200.00
13,800.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.200
1.250
1.000
Harga Satuan
Bahan / Upah
( Rp. )
6,990,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
6.000
18.000
1.800
0.300
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
8,388,000.00
15,625.00
12,500.00
204,000.00
882,000.00
88,200.00
13,800.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.200
1.250
1.000
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
6.000
18.000
1.800
0.300
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
Jumlah
( Rp. )
5,790,000.00
15,625.00
12,500.00
204,000.00
882,000.00
88,200.00
13,800.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
A
Bahan
Jumlah
( Rp. )
Papan kayu
Paku 5 cm - 7 cm
m3
kg
0.040
0.050
12,500.00
625.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.350
1.050
0.105
0.018
34,000.00
49,000.00
49,000.00
46,000.00
11,900.00
51,450.00
5,145.00
828.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
No
A
Bahan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Papan kayu
Paku 5 cm - 7 cm
m3
kg
0.040
0.050
12,500.00
625.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.350
1.050
0.105
0.018
34,000.00
49,000.00
49,000.00
46,000.00
11,900.00
51,450.00
5,145.00
828.00
Tenaga Kerja
Peralatan
D
E
F
10
Satuan
10%
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Papan kayu
Paku 5 cm - 7 cm
m3
kg
0.040
0.500
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
3.000
0.300
0.050
Peralatan
D
E
F
11
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Paku 5 cm - 7 cm
m3
kg
0.040
0.500
Harga Satuan
Bahan / Upah
( Rp. )
13,450,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
3.000
0.300
0.050
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
12
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
538,000.00
6,250.00
34,000.00
147,000.00
14,700.00
2,300.00
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Paku 5 cm - 7 cm
m3
kg
0.040
0.500
Harga Satuan
Bahan / Upah
( Rp. )
8,325,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
3.000
0.300
0.050
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
333,000.00
6,250.00
34,000.00
147,000.00
14,700.00
2,300.00
(A+B+C)
D
(D+E)
13
Membuat dan memasang pintu dan jendela kaca , kayu kelas I atau II
m2
No
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Bahan
Papan kayu
Lem kayu
m3
kg
0.024
0.300
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.800
2.400
0.240
0.040
Peralatan
D
E
F
14
10%
3%
Kebutuhan
Satuan
Indeks
(A+B+C)
D
(D+E)
Membuat dan memasang pintu dan jendela kaca , kayu Jati hutan
m2
Bahan
Papan kayu
Lem kayu
m3
kg
0.024
0.300
Harga Satuan
Bahan / Upah
( Rp. )
13,450,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.800
2.400
0.240
0.040
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
No
15
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
322,800.00
3,750.00
27,200.00
117,600.00
11,760.00
1,840.00
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Lem kayu
m3
kg
0.024
0.300
Harga Satuan
Bahan / Upah
( Rp. )
8,325,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.800
2.400
0.240
0.040
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
No
16
10%
Jumlah
( Rp. )
199,800.00
3,750.00
27,200.00
117,600.00
11,760.00
1,840.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Papan kayu
Lem kayu
m3
kg
0.064
0.500
12,500.00
6,250.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
3.000
0.300
0.050
34,000.00
49,000.00
49,000.00
46,000.00
34,000.00
147,000.00
14,700.00
2,300.00
Membuat dan memasang pintu dan jendela jalusi, kayu kelas I atau II
m2
No
A
Bahan
B
Tenaga Kerja
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
17
Membuat daun pintu kayu lapis ( plywood) rangkap, rangka tertutup ky kelas II
( lebar sampai 90 cm )
m2
No
Kebutuhan
Satuan
m3
kg
kg
Lembar
0.025
0.030
0.500
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
12,500.00
75,000.00
OH
OH
OH
OH
0.700
2.100
0.210
0.035
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
Papan kayu
Paku 1 cm-2,5 cm
Lem kayu
Plywood tbl 4 mm
Ukrn 90 x 220 cm
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
18
10%
Indeks
Jumlah
( Rp. )
209,750.00
375.00
6,250.00
75,000.00
23,800.00
102,900.00
10,290.00
1,610.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
m3
kg
kg
Lembar
0.0256
0.030
0.500
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
12,500.00
75,000.00
OH
OH
OH
OH
0.800
2.400
0.240
0.040
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
Papan kayu
Paku 1 cm-2,5 cm
Lem kayu
Plywood tbl 4 mm
Ukrn 90 x 220 cm
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
19
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
214,784.00
375.00
6,250.00
75,000.00
27,200.00
117,600.00
11,760.00
1,840.00
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Paku 1 - 2,5 cm
m3
kg
0.060
0.150
Harga Satuan
Bahan / Upah
( Rp. )
13,450,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.670
2.000
0.200
0.335
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
20
10%
Jumlah
( Rp. )
807,000.00
1,875.00
22,780.00
98,000.00
9,800.00
15,410.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
m3
kg
kg
Lembar
0.025
0.030
0.300
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
12,500.00
100,000.00
OH
OH
OH
OH
0.800
2.400
0.240
0.040
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
Papan kayu
Paku 1 cm-2,5 cm
Lem kayu
Teakwood tb 4 mm
Ukrn 90 x 220 cm
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
209,750.00
375.00
3,750.00
100,000.00
27,200.00
117,600.00
11,760.00
1,840.00
(A+B+C)
D
(D+E)
21
Bahan
Kebutuhan
Satuan
Papan kayu
Paku 1 cm-2,5 cm
Lem kayu
Teakwood tb 4 mm
Ukrn 90 x 220 cm
Formika
m3
kg
kg
Lembar
0.025
0.030
0.800
1.000
Lembar
0.500
OH
OH
OH
OH
0.850
2.550
0.255
0.043
Tenaga Kerja
Peralatan
D
E
F
22
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
12,500.00
100,000.00
Jumlah
( Rp. )
209,750.00
375.00
10,000.00
100,000.00
-
34,000.00
49,000.00
49,000.00
46,000.00
28,900.00
124,950.00
12,495.00
1,978.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Balok kayu
Besi strip tb 5 mm
Paku 12 cm
m3
kg
kg
1.1000
15.000
5.600
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
4.000
12.000
1.200
0.200
Peralatan
D
E
F
23
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.1000
15.000
5.600
Harga Satuan
Bahan / Upah
( Rp. )
7,960,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
4.000
12.000
1.200
0.200
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
24
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
8,756,000.00
135,000.00
70,000.00
136,000.00
588,000.00
58,800.00
9,200.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
1.1000
15.000
5.600
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
4.000
12.000
1.200
0.200
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
5,307,500.00
135,000.00
70,000.00
136,000.00
588,000.00
58,800.00
9,200.00
(A+B+C)
D
(D+E)
25
Bahan
m3
kg
kg
1.100
15.000
5.600
Harga Satuan
Bahan / Upah
( Rp. )
9,125,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
4.000
12.000
1.200
0.200
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
26
Satuan
10%
Indeks
Jumlah
( Rp. )
10,037,500.00
135,000.00
70,000.00
136,000.00
588,000.00
58,800.00
9,200.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
A
Bahan
Balok Kayu
Besi strip tb 5 mm
Paku 12 cm
kg
kg
15.000
5.600
9,000.00
12,500.00
135,000.00
70,000.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
4.000
12.000
1.200
0.200
34,000.00
49,000.00
49,000.00
46,000.00
136,000.00
588,000.00
58,800.00
9,200.00
Tenaga Kerja
Peralatan
D
E
F
27
Jumlah
( Rp. )
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Balok kayu
Besi strip tb 5 mm
Paku 12 cm
m3
kg
kg
1.2000
15.000
5.600
Harga Satuan
Bahan / Upah
( Rp. )
9,125,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
6.700
20.100
2.010
0.335
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
28
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
10,950,000.00
135,000.00
70,000.00
227,800.00
984,900.00
98,490.00
15,410.00
(A+B+C)
D
(D+E)
No
Jumlah
( Rp. )
Bahan
Balok kayu
Besi strip tb 5 mm
Paku 12 cm
m3
kg
kg
1.1000
15.000
3.000
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.400
7.200
0.720
0.120
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
29
Bahan
Balok kayu
Besi strip tb 5 mm
Paku 12 cm
m3
kg
kg
1.1000
15.000
3.000
Harga Satuan
Bahan / Upah
( Rp. )
7,960,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.400
7.200
0.720
0.120
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
30
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
8,756,000.00
135,000.00
37,500.00
81,600.00
352,800.00
35,280.00
5,520.00
(A+B+C)
D
(D+E)
Bahan
Balok kayu
Besi strip tb 5 mm
Paku 12 cm
m3
kg
kg
1.1000
15.000
3.000
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
9,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.400
7.200
0.720
0.120
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
31
10%
Jumlah
( Rp. )
5,307,500.00
135,000.00
37,500.00
81,600.00
352,800.00
35,280.00
5,520.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Kaso 5/7 cm
Reng 2/3 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0036
0.250
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
Peralatan
D
E
F
32
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Kaso 5/7 cm
Reng 2/3 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0036
0.250
Harga Satuan
Bahan / Upah
( Rp. )
7,960,000.00
7,960,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
111,440.00
28,656.00
3,125.00
3,400.00
4,900.00
490.00
230.00
(A+B+C)
D
(D+E)
33
Bahan
Kaso 5/7 cm
Reng 2/3 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0036
0.250
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
34
Satuan
10%
Indeks
Jumlah
( Rp. )
67,550.00
17,370.00
3,125.00
3,400.00
4,900.00
490.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
A
Bahan
Kaso 5/7 cm
Reng 2/3 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0036
0.250
4,825,000.00
12,500.00
17,370.00
3,125.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
3,400.00
4,900.00
490.00
230.00
Tenaga Kerja
Peralatan
D
E
F
35
Jumlah
( Rp. )
10%
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
A
Bahan
Kaso 5/7 cm
Reng 3/4 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0072
0.250
7,960,000.00
12,500.00
57,312.00
3,125.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
3,400.00
4,900.00
490.00
230.00
Tenaga Kerja
Peralatan
D
E
F
36
Jumlah
( Rp. )
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Kaso 5/7 cm
Reng 3/4 cm
Paku 5 cm&10 cm
m3
m3
kg
0.014
0.0072
0.250
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
67,550.00
34,740.00
3,125.00
3,400.00
4,900.00
490.00
230.00
(A+B+C)
D
(D+E)
37
No
A
Bahan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Kayu kelas II
Paku 5 cm&10 cm
m3
kg
0.165
0.200
12,500.00
2,500.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.120
0.120
0.012
0.006
34,000.00
49,000.00
49,000.00
46,000.00
4,080.00
5,880.00
588.00
276.00
Tenaga Kerja
Peralatan
D
E
F
38
Satuan
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Kayu kruing
Paku 5 cm&10 cm
m3
kg
0.165
0.200
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.120
0.120
0.012
0.006
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
39
10%
Jumlah
( Rp. )
796,125.00
2,500.00
4,080.00
5,880.00
588.00
276.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Kaso 5/7 cm
Paku 7 - 10 cm
m3
kg
0.0154
0.200
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.300
0.030
0.075
Peralatan
D
E
F
40
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Kaso 5/7 cm
Paku 7 - 10 cm
m3
kg
0.0154
0.200
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.300
0.030
0.075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
74,305.00
2,500.00
5,100.00
14,700.00
1,470.00
3,450.00
(A+B+C)
D
(D+E)
41
No
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
Bahan
Kaso 5/7 cm
Paku 7 - 10 cm
m3
kg
0.0163
0.250
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.200
0.300
0.030
0.010
Peralatan
D
E
F
42
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Kaso 5/7 cm
Paku 7 - 10 cm
m3
kg
0.0163
0.250
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.200
0.300
0.030
0.010
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
43
10%
Jumlah
( Rp. )
78,647.50
3,125.00
6,800.00
14,700.00
1,470.00
460.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.0108
0.100
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
Peralatan
D
E
F
44
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.0108
0.100
Harga Satuan
Bahan / Upah
( Rp. )
5,100,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
55,080.00
1,250.00
3,400.00
9,800.00
980.00
230.00
(A+B+C)
D
(D+E)
45
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.0108
0.100
Harga Satuan
Bahan / Upah
( Rp. )
8,325,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
46
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
89,910.00
1,250.00
3,400.00
9,800.00
980.00
230.00
(A+B+C)
D
(D+E)
Bahan
Woodplank
Paku 5 dan 7 cm
m'
kg
1.0000
0.100
Harga Satuan
Bahan / Upah
( Rp. )
13,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
47
10%
Jumlah
( Rp. )
13,500.00
1,250.00
3,400.00
9,800.00
980.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
Jumlah
( Rp. )
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.011
0.050
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
Peralatan
D
E
F
48
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.011
0.050
Harga Satuan
Bahan / Upah
( Rp. )
8,390,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
90,612.00
625.00
3,400.00
9,800.00
980.00
230.00
(A+B+C)
D
(D+E)
49
Bahan
Papan kayu
Paku 5 dan 7 cm
m3
kg
0.011
0.050
Harga Satuan
Bahan / Upah
( Rp. )
8,325,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.200
0.020
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
50
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
89,910.00
625.00
3,400.00
9,800.00
980.00
230.00
(A+B+C)
D
(D+E)
Memasang rangka dinding pemisah ( 60 x 120 ) cm kayu kruing ( kelas II atau III )
m2
Bahan
Balok kayu
Paku 5 dan 7 cm
m3
kg
0.028
0.150
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.450
0.045
0.008
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
51
Satuan
10%
Indeks
Jumlah
( Rp. )
135,100.00
1,875.00
5,100.00
22,050.00
2,205.00
368.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
m3
kg
lembar
0.0280
0.150
0.860
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
100,000.00
kg
0.560
12,500.00
7,000.00
OH
OH
OH
OH
0.150
0.450
0.045
0.008
34,000.00
49,000.00
49,000.00
46,000.00
5,100.00
22,050.00
2,205.00
368.00
Bahan
Tenaga Kerja
Peralatan
D
E
F
52
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
135,100.00
1,875.00
86,000.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
m3
kg
lembar
0.0280
0.150
0.860
Harga Satuan
Bahan / Upah
( Rp. )
4,825,000.00
12,500.00
75,000.00
kg
0.560
12,500.00
7,000.00
OH
OH
OH
OH
0.200
0.600
0.060
0.010
34,000.00
49,000.00
49,000.00
46,000.00
6,800.00
29,400.00
2,940.00
460.00
Bahan
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
135,100.00
1,875.00
64,500.00
(A+B+C)
D
(D+E)
53
Bahan
Papan kayu
Paku 5 dan 10 cm
Paku skrup 10 cm
m3
kg
kg
0.007
0.100
0.150
Harga Satuan
Bahan / Upah
( Rp. )
13,450,000.00
12,500.00
12,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.600
1.800
0.180
0.030
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
54
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
94,150.00
1,250.00
1,875.00
20,400.00
88,200.00
8,820.00
1,380.00
(A+B+C)
D
(D+E)
Kebutuhan
Satuan
Lembar
Kg
0.400
0.050
Harga Satuan
Bahan / Upah
( Rp. )
100,000.00
12,500.00
OH
OH
OH
OH
0.025
0.075
0.008
0.001
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
Plywood tb 4 mm
Paku 1 & 2,5 cm
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
55
10%
Indeks
Jumlah
( Rp. )
40,000.00
625.00
850.00
3,675.00
392.00
46.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Bilik Bambu
Kaso 5/7 cm
Paku
List Kayu 2/4
m2
m3
kg
m3
1.500
0.014
0.012
0.003
4,825,000.00
12,500.00
4,000.00
67,550.00
150.00
12.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.050
0.005
0.005
34,000.00
49,000.00
49,000.00
46,000.00
3,400.00
2,450.00
245.00
230.00
Bahan
Tenaga Kerja
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
PEKERJAAN BETON
Catatan :
1,400.00
1,350.00
0.20
kg/m
3
kg/m
Membuat beton mutu f'c = 7,4 Mpa (K 100), slump (12 + 2), w/c = 0,87
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
247.000
0.621
0.740
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
296,400.00
71,415.00
116,550.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 9,8 Mpa (K 125), slump (12 + 2), w/c = 0,78
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
276.000
0.591
0.750
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
331,200.00
67,965.00
118,125.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c =12,2 Mpa (K 150), slump (12 + 2), w/c = 0,72
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
299.000
0.571
0.753
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
358,800.00
65,665.00
118,597.50
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat lt. kerja btn mutu f'c = 7,4 Mpa (K 100), slump (3 - 6), w/c = 0,87
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
230.000
0.638
0.761
200.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.200
0.200
0.020
0.060
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
276,000.00
73,370.00
119,857.50
1,000.00
40,800.00
8,900.00
980.00
2,760.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 14,5 Mpa (K 175), slump (12 + 2), w/c = 0,66
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
326.000
0.543
0.762
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
391,200.00
62,445.00
120,015.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 16,9 Mpa (K.200), slump (12 + 2), w/c = 0,61
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
352.000
0.522
0.764
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
422,400.00
60,030.00
120,330.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 19,3 Mpa (K 225), slump (12 + 2), w/c = 0,58
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
371.000
0.499
0.776
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
445,200.00
57,385.00
122,220.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 21,7 Mpa ( K 250 ), slump ( 12 + 2 ), w/c = 0,56
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
384.000
0.494
0.770
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
460,800.00
56,810.00
121,275.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 24,0 Mpa ( K 275 ), slump ( 12 + 2 ), w/c = 0,53
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
406.000
0.489
0.760
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
487,200.00
56,235.00
119,700.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 26,4 Mpa ( K 300 ), slump ( 12 + 2 ), w/c = 0,52
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
413.000
0.486
0.756
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.650
0.275
0.028
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
11
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
495,600.00
55,890.00
119,070.00
1,075.00
56,100.00
12,237.50
1,372.00
3,818.00
(A+B+C)
D
(D+E)
Membuat beton mutu f'c = 28,8 Mpa ( K 325 ), slump ( 12 + 2 ), w/c = 0,49
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
439.000
0.479
0.745
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.100
0.350
0.035
0.105
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
526,800.00
55,085.00
117,337.50
1,075.00
71,400.00
15,575.00
1,715.00
4,830.00
(A+B+C)
D
(D+E)
12
Membuat beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 12 + 2 ), w/c = 0,48
m3
Bahan
PC
Pasir Beton
Kerikil ( maks 30 mm )
Air
kg
m3
m3
ltr
448.000
0.476
0.741
215.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.100
0.350
0.035
0.105
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
13
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
537,600.00
54,740.00
116,707.50
1,075.00
71,400.00
15,575.00
1,715.00
4,830.00
(A+B+C)
D
(D+E)
Bahan
PC
Pasir Beton
Kerikil ( 2 cm / 3 cm )
Strorox - 100
Air
kg
m3
m3
kg
ltr
400.000
0.480
0.800
1.200
210.000
Harga Satuan
Bahan / Upah
( Rp. )
1,200.00
115,000.00
157,500.00
40,000.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
2.100
0.350
0.035
0.105
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
14
10%
Jumlah
( Rp. )
480,000.00
55,200.00
126,000.00
48,000.00
1,050.00
71,400.00
15,575.00
1,715.00
4,830.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
1.050
Tenaga Kerja
Pekerja
Tukang Batu / pipa
Kepala Tukang
Mandor
OH
OH
OH
OH
0.060
0.030
0.003
0.003
Peralatan
D
E
F
15
10%
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
2,040.00
1,335.00
147.00
138.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
1.050
Tenaga Kerja
Pekerja
Tukang Batu / pipa
Kepala Tukang
Mandor
OH
OH
OH
OH
0.070
0.035
0.004
0.004
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
2,380.00
1,557.50
196.00
184.00
(A+B+C)
D
(D+E)
16
Kebutuhan
No
Satuan
Indeks
Bahan
1.050
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.080
0.040
0.004
0.004
Peralatan
D
E
F
17
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
2,720.00
1,780.00
196.00
184.00
(A+B+C)
D
(D+E)
Bahan
kg
kg
10.500
0.150
Harga Satuan
Bahan / Upah
( Rp. )
9,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.070
0.070
0.007
0.004
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
18
10%
3%
0.10
Jumlah
( Rp. )
94,500.00
2,400.00
2,380.00
3,115.00
343.00
184.00
(A+B+C)
D
(D+E)
x
116,301.86
Bahan
kg
kg
10.500
0.100
Harga Satuan
Bahan / Upah
( Rp. )
9,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.050
0.050
0.005
0.003
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
19
Satuan
10%
Indeks
3%
0.10
Jumlah
( Rp. )
94,500.00
1,600.00
1,700.00
2,225.00
245.00
138.00
(A+B+C)
D
(D+E)
x
113,461.04
Bahan
kg
kg
10.200
0.050
Harga Satuan
Bahan / Upah
( Rp. )
9,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.025
0.025
0.002
0.001
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
0.10
x
107,018.35
Jumlah
( Rp. )
91,800.00
800.00
850.00
1,112.50
98.00
46.00
(A+B+C)
D
(D+E)
20
Bahan
m3
kg
ltr
0.040
0.300
0.100
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.520
0.260
0.026
0.026
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
21
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
35,800.00
3,750.00
450.00
17,680.00
12,740.00
1,274.00
1,196.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
0.045
0.300
0.100
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.520
0.260
0.026
0.026
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
22
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
40,275.00
3,750.00
450.00
17,680.00
12,740.00
1,274.00
1,196.00
(A+B+C)
D
(D+E)
Memasang bekisting
m2
Bahan
m3
kg
ltr
0.045
0.300
0.100
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.520
0.260
0.026
0.026
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
23
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
40,275.00
3,750.00
450.00
17,680.00
12,740.00
1,274.00
1,196.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
m3
lbr
btg
0.040
0.400
0.200
0.015
0.350
2.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.660
0.330
0.033
0.033
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
35,800.00
5,000.00
900.00
15,750.00
52,500.00
12,000.00
22,440.00
16,170.00
1,617.00
1,518.00
(A+B+C)
D
(D+E)
24
Bahan
m3
kg
ltr
m3
lbr
btg
0.040
0.400
0.200
0.018
0.350
2.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.660
0.330
0.033
0.033
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
25
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
35,800.00
5,000.00
900.00
18,900.00
52,500.00
12,000.00
22,440.00
16,170.00
1,617.00
1,518.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
m3
lbr
btg
0.040
0.400
0.200
0.015
0.350
6.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.660
0.330
0.033
0.033
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
26
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
35,800.00
5,000.00
900.00
15,750.00
52,500.00
36,000.00
22,440.00
16,170.00
1,617.00
1,518.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
m3
kg
ltr
m3
lbr
btg
0.030
0.400
0.200
0.020
0.350
3.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
1,050,000.00
150,000.00
6,000.00
Buah
4.000
6,000.00
24,000.00
OH
OH
OH
OH
0.660
0.330
0.033
0.033
34,000.00
49,000.00
49,000.00
46,000.00
22,440.00
16,170.00
1,617.00
1,518.00
3%
Jumlah
( Rp. )
26,850.00
5,000.00
900.00
21,000.00
52,500.00
18,000.00
(A+B+C)
D
(D+E)
27
Bahan
m3
kg
ltr
m3
lbr
btg
0.030
0.400
0.150
0.015
0.350
2.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.660
0.330
0.033
0.033
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
28
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
26,850.00
5,000.00
675.00
15,750.00
52,500.00
12,000.00
22,440.00
16,170.00
1,617.00
1,518.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
btg
0.0264
0.600
0.500
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.050
0.005
0.008
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
29
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
23,628.00
7,500.00
3,000.00
5,100.00
2,450.00
245.00
368.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.262
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
179,000.00
18,750.00
1,800.00
1,417,500.00
36,000.00
403,200.00
62,100.00
127,575.00
180,200.00
12,237.50
63,700.00
46,725.00
12,838.00
12,190.00
(A+B+C)
D
(D+E)
30
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
0.067
1.500
0.400
157.500
2.250
371.000
0.499
0.776
215.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.262
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
31
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
59,666.67
18,750.00
1,800.00
1,417,500.00
36,000.00
445,200.00
57,385.00
122,220.00
1,075.00
180,200.00
12,237.50
63,700.00
46,725.00
12,838.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
0.067
1.500
0.400
157.500
2.250
326.000
0.543
0.762
215.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.262
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
32
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
59,666.67
18,750.00
1,800.00
1,417,500.00
36,000.00
391,200.00
62,445.00
120,015.00
1,075.00
180,200.00
12,237.50
63,700.00
46,725.00
12,838.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.650
0.275
1.560
1.400
0.323
0.283
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
241,650.00
25,000.00
2,700.00
1,890,000.00
48,000.00
403,200.00
62,100.00
127,575.00
192,100.00
12,237.50
76,440.00
62,300.00
15,827.00
13,018.00
(A+B+C)
D
(D+E)
33
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
0.090
2.000
0.600
157.500
3.000
371.000
0.499
0.776
215.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.650
0.275
1.560
1.400
0.323
0.283
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
34
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
80,550.00
25,000.00
2,700.00
1,417,500.00
48,000.00
445,200.00
57,385.00
122,220.00
1,075.00
192,100.00
12,237.50
76,440.00
62,300.00
15,827.00
13,018.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
0.090
2.000
0.600
252.000
3.000
326.000
0.543
0.762
215.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.650
0.275
1.560
1.400
0.323
0.283
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
35
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
80,550.00
25,000.00
2,700.00
2,268,000.00
48,000.00
391,200.00
62,445.00
120,015.00
1,075.00
192,100.00
12,237.50
76,440.00
62,300.00
15,827.00
13,018.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
0.4000
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
7.050
0.275
1.650
2.100
0.403
0.353
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
358,000.00
50,000.00
9,000.00
2,835,000.00
72,000.00
403,200.00
62,100.00
127,575.00
157,500.00
525,000.00
120,000.00
239,700.00
12,237.50
80,850.00
93,450.00
19,747.00
16,238.00
(A+B+C)
D
(D+E)
36
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.1333
4.000
2.000
315.000
4.500
371.000
0.499
0.776
215.000
0.050
1.167
6.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
7.050
0.275
1.650
2.100
0.403
0.353
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
37
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
119,333.33
50,000.00
9,000.00
2,835,000.00
72,000.00
445,200.00
57,385.00
122,220.00
1,075.00
52,500.00
175,000.00
40,000.00
239,700.00
12,237.50
80,850.00
93,450.00
19,747.00
16,238.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.1333
4.000
2.000
210.000
4.500
371.000
0.499
0.776
215.000
0.050
1.167
6.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
7.050
0.275
1.650
2.100
0.403
0.353
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
119,333.33
50,000.00
9,000.00
1,890,000.00
72,000.00
445,200.00
57,385.00
122,220.00
1,075.00
52,500.00
175,000.00
40,000.00
239,700.00
12,237.50
80,850.00
93,450.00
19,747.00
16,238.00
(A+B+C)
D
(D+E)
38
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.1333
4.000
2.000
157.500
4.500
371.000
0.499
0.776
215.000
0.050
1.167
6.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
7.050
0.275
1.650
2.100
0.403
0.353
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
39
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
119,333.33
50,000.00
9,000.00
1,417,500.00
72,000.00
445,200.00
57,385.00
122,220.00
1,075.00
52,500.00
175,000.00
40,000.00
239,700.00
12,237.50
80,850.00
93,450.00
19,747.00
16,238.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.1333
4.000
2.000
157.500
4.500
326.000
0.543
0.762
215.000
0.050
1.167
6.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
7.050
0.275
1.650
2.100
0.403
0.353
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
119,333.33
50,000.00
9,000.00
1,417,500.00
72,000.00
391,200.00
62,445.00
120,015.00
1,075.00
52,500.00
175,000.00
40,000.00
239,700.00
12,237.50
80,850.00
93,450.00
19,747.00
16,238.00
(A+B+C)
D
(D+E)
40
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
6.350
0.275
1.650
1.400
0.333
0.318
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
41
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
286,400.00
40,000.00
7,200.00
1,890,000.00
48,000.00
403,200.00
62,100.00
127,575.00
147,000.00
420,000.00
96,000.00
215,900.00
12,237.50
80,850.00
62,300.00
16,317.00
14,628.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
210.000
3.000
371.000
0.499
0.776
215.000
0.047
0.933
5.333
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
6.350
0.275
1.650
1.400
0.333
0.318
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,890,000.00
48,000.00
445,200.00
57,385.00
122,220.00
1,075.00
49,000.00
140,000.00
32,000.00
215,900.00
12,237.50
80,850.00
62,300.00
16,317.00
14,628.00
(A+B+C)
D
(D+E)
42
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
157.500
3.000
371.000
0.499
0.776
215.000
0.047
0.933
5.333
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
6.350
0.275
1.650
1.400
0.333
0.318
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
43
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,417,500.00
48,000.00
445,200.00
57,385.00
122,220.00
1,075.00
49,000.00
140,000.00
32,000.00
215,900.00
12,237.50
80,850.00
62,300.00
16,317.00
14,628.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
157.500
3.000
326.000
0.543
0.762
215.000
0.047
0.933
5.333
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
6.350
0.275
1.650
1.400
0.333
0.318
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,417,500.00
48,000.00
391,200.00
62,445.00
120,015.00
1,075.00
49,000.00
140,000.00
32,000.00
215,900.00
12,237.50
80,850.00
62,300.00
16,317.00
14,628.00
(A+B+C)
D
(D+E)
44
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
0.320
3.200
1.600
157.000
2.250
336.000
0.540
0.810
0.120
2.800
32.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.265
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
45
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
286,400.00
40,000.00
7,200.00
1,413,000.00
36,000.00
403,200.00
62,100.00
127,575.00
126,000.00
420,000.00
192,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,985.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
157.000
2.250
371.000
0.499
0.776
215.000
0.040
0.933
10.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.265
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,413,000.00
36,000.00
445,200.00
57,385.00
122,220.00
1,075.00
42,000.00
140,000.00
64,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,985.00
12,190.00
(A+B+C)
D
(D+E)
46
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
157.000
2.250
326.000
0.543
0.762
215.000
0.040
0.933
10.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.265
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
47
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,413,000.00
36,000.00
391,200.00
62,445.00
120,015.00
1,075.00
42,000.00
140,000.00
64,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,985.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.107
3.200
1.600
131.250
2.250
371.000
0.499
0.776
215.000
0.040
0.933
10.667
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.265
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
95,466.67
40,000.00
7,200.00
1,181,250.00
36,000.00
445,200.00
57,385.00
122,220.00
1,075.00
42,000.00
140,000.00
64,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,985.00
12,190.00
(A+B+C)
D
(D+E)
48
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.262
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
48
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
214,800.00
40,000.00
7,200.00
1,417,500.00
36,000.00
403,200.00
62,100.00
127,575.00
168,000.00
420,000.00
144,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,838.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
ltr
m3
lbr
btg
0.080
3.200
1.600
157.500
2.250
326.000
0.543
0.762
215.000
0.053
0.933
8.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
5.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
5.300
0.275
1.300
1.050
0.262
0.265
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
49
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
71,600.00
40,000.00
7,200.00
1,417,500.00
36,000.00
391,200.00
62,445.00
120,015.00
1,075.00
56,000.00
140,000.00
48,000.00
180,200.00
12,237.50
63,700.00
46,725.00
12,838.00
12,190.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
0.2500
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
14.000
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
4,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
1,050,000.00
150,000.00
6,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
OH
OH
OH
OH
OH
5.650
0.275
1.560
1.400
0.323
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
Kebutuhan
No
Jumlah
( Rp. )
223,750.00
37,500.00
5,400.00
1,890,000.00
48,000.00
403,200.00
62,100.00
127,575.00
110,250.00
375,000.00
84,000.00
192,100.00
12,237.50
76,440.00
62,300.00
15,827.00
Mandor
C
Peralatan
D
E
F
50
10%
0.283
3%
Satuan
Indeks
46,000.00
13,018.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
kg
kg
m3
m3
0.002
0.010
3.000
0.045
4.000
0.006
0.009
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
0.180
0.020
0.020
0.020
0.006
0.009
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
51
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
1,790.00
125.00
27,000.00
720.00
4,800.00
690.00
1,417.50
6,120.00
890.00
980.00
890.00
294.00
414.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
kg
kg
m3
m3
0.001
0.010
2.930
0.045
4.000
0.006
0.009
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
0.180
0.020
0.020
0.020
0.006
0.009
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
52
OH
10%
3%
Jumlah
( Rp. )
596.67
125.00
26,370.00
720.00
4,800.00
690.00
1,417.50
6,120.00
890.00
980.00
890.00
294.00
414.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
kg
kg
m3
m3
0.003
0.020
3.600
0.050
5.500
0.009
0.015
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
0.297
0.033
0.033
0.033
0.010
0.015
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
53
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
2,685.00
250.00
32,400.00
800.00
6,600.00
1,035.00
2,362.50
10,098.00
1,468.50
1,617.00
1,468.50
490.00
690.00
(A+B+C)
D
(D+E)
Bahan
m3
kg
kg
kg
kg
m3
m3
0.001
0.020
3.150
0.050
5.500
0.009
0.015
Harga Satuan
Bahan / Upah
( Rp. )
895,000.00
12,500.00
9,000.00
16,000.00
1,200.00
115,000.00
157,500.00
Tenaga Kerja
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
0.297
0.033
0.033
0.033
0.010
0.015
34,000.00
44,500.00
49,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
895.00
250.00
28,350.00
800.00
6,600.00
1,035.00
2,362.50
10,098.00
1,468.50
1,617.00
1,468.50
490.00
690.00
(A+B+C)
D
(D+E)
PEKERJAAN LANGIT-LANGIT
Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm dan 6 mm
Memasang langit-langit asbes semen, tebal 3 mm
m2
Bahan
m2
kg
1.100
0.010
Harga Satuan
Bahan / Upah
( Rp. )
8,750.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.030
0.070
0.007
0.004
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
9,625.00
160.00
1,020.00
3,430.00
343.00
184.00
(A+B+C)
D
(D+E)
Bahan
Harplek
Paku tripleks
m2
kg
1.100
0.010
Harga Satuan
Bahan / Upah
( Rp. )
17,500.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.030
0.070
0.007
0.004
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
Jumlah
( Rp. )
19,250.00
160.00
1,020.00
3,430.00
343.00
184.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Lembar
kg
12.000
0.050
16,000.00
800.00
OH
OH
OH
OH
0.120
0.120
0.012
0.006
34,000.00
49,000.00
49,000.00
46,000.00
4,080.00
5,880.00
588.00
276.00
Bahan
Tenaga Kerja
Peralatan
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
( Rp. )
D
E
F
4
10%
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Lembar
kg
5.800
0.050
16,000.00
800.00
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
3,400.00
4,900.00
490.00
230.00
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Lembar
kg
1.500
0.050
16,000.00
800.00
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
3,400.00
4,900.00
490.00
230.00
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10%
3%
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
Kebutuhan
Satuan
Lembar
kg
0.375
0.030
Harga Satuan
Bahan / Upah
( Rp. )
53,500.00
16,000.00
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
Langit-langit tripleks
Paku tripleks
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Indeks
Jumlah
( Rp. )
20,062.50
480.00
3,400.00
4,900.00
490.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
A
Bahan
Jumlah
( Rp. )
m3
kg
0.015
0.010
16,000.00
160.00
Pekerja
Tukang kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.800
0.800
0.080
0.040
34,000.00
49,000.00
49,000.00
46,000.00
27,200.00
39,200.00
3,920.00
1,840.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
Bahan
Gypsum Board
Paku skrup
Lembar
kg
0.364
0.110
Harga Satuan
Bahan / Upah
( Rp. )
60,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.050
0.005
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
No
Kebutuhan
Satuan
10%
Indeks
Jumlah
( Rp. )
21,840.00
1,760.00
3,400.00
2,450.00
245.00
230.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Lembar
kg
0.364
0.110
Harga Satuan
Bahan / Upah
( Rp. )
70,000.00
5,000.00
OH
OH
OH
OH
0.100
0.050
0.005
0.005
34,000.00
49,000.00
49,000.00
46,000.00
Bahan
GRC
Paku skrup
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Peralatan
D
E
F
10
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
25,480.00
550.00
3,400.00
2,450.00
245.00
230.00
(A+B+C)
D
(D+E)
Bahan
m'
kg
1.050
0.150
Harga Satuan
Bahan / Upah
( Rp. )
7,000.00
4,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.060
0.060
0.006
0.003
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
11
10%
Jumlah
( Rp. )
7,350.00
600.00
2,040.00
2,940.00
294.00
138.00
(A+B+C)
D
(D+E)
3%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Tenaga Kerja
Peralatan
Kebutuhan
Satuan
Profil allumi T
Kawat D 4 mm
Ramset
langit-langit akustik
Ukuran 60 x 120
m'
kg
buah
lembar
3.600
0.150
1.050
1.500
OH
OH
OH
OH
0.500
0.500
0.050
0.025
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
18,000.00
34,000.00
49,000.00
49,000.00
46,000.00
Jumlah
( Rp. )
2,700.00
17,000.00
24,500.00
2,450.00
1,150.00
D
E
F
12
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
m'
kg
1.050
0.010
Harga Satuan
Bahan / Upah
( Rp. )
4,000.00
16,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.050
0.050
0.005
0.003
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
4,200.00
160.00
1,700.00
2,450.00
245.00
138.00
(A+B+C)
D
(D+E)
13
Bahan
Hollow 4/4
Hollow 2/2
Kawat D 4 mm
Paku sekrup
m'
m'
kg
bh
1.600
1.200
0.150
8.000
Harga Satuan
Bahan / Upah
( Rp. )
9,000.00
7,500.00
18,000.00
100.00
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.050
0.005
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
14,400.00
9,000.00
2,700.00
800.00
3,400.00
2,225.00
245.00
230.00
(A+B+C)
D
(D+E)
Bahan
Besi Profil
kg
1.150
Harga Satuan
Bahan / Upah
( Rp. )
16,100.00
Tenaga Kerja
Pekerja
Tukang las konstruksi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.060
0.060
0.006
0.003
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
18,515.00
2,040.00
2,670.00
294.00
138.00
(A+B+C)
D
(D+E)
Bahan
kg
1.150
Harga Satuan
Bahan / Upah
( Rp. )
8,500.00
Tenaga Kerja
Pekerja
Tukang las konstruksi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.060
0.060
0.006
0.003
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
9,775.00
2,040.00
2,670.00
294.00
138.00
(A+B+C)
D
(D+E)
Liter
Liter
1.000
0.100
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
19,000.00
Pekerja
Tukang besi konstruksi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.001
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Sewa Alat
Jam
0.800
Kebutuhan
No
A
Bahan
Solar
Minyak Pelumas
Tenaga Kerja
Peralatan
Jumlah
( Rp. )
4,500.00
1,900.00
3,400.00
4,450.00
49.00
230.00
-
D
E
F
4
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
m2
Bahan
kg
kg
kg
15.000
32.800
0.050
Harga Satuan
Bahan / Upah
( Rp. )
16,100.00
16,100.00
18,500.00
Tenaga Kerja
Pekerja
Tukang las biasa
Kepala Tukang
Mandor
OH
OH
OH
OH
1.050
1.050
0.105
0.052
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
241,500.00
528,080.00
925.00
35,700.00
46,725.00
5,145.00
2,392.00
(A+B+C)
D
(D+E)
kg
Liter
Liter
0.400
0.300
0.040
Harga Satuan
Bahan / Upah
( Rp. )
18,500.00
4,500.00
19,000.00
Pekerja
Tukang besi konstruksi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.040
0.020
0.002
0.002
34,000.00
44,500.00
49,000.00
46,000.00
Sewa Alat
Jam
0.170
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
10%
3%
0.10
Jumlah
( Rp. )
7,400.00
1,350.00
760.00
1,360.00
890.00
98.00
92.00
(A+B+C)
D
(D+E)
x
13,503.50
Kebutuhan
No
A
Bahan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
m
m
cm
4.760
4.522
20.000
15,500.00
310,000.00
Pekerja
Tukang las biasa
Kepala Tukang
Mandor
OH
OH
OH
OH
0.650
0.650
0.065
0.032
34,000.00
44,500.00
49,000.00
46,000.00
22,100.00
28,925.00
3,185.00
1,472.00
Tenaga Kerja
Peralatan
D
E
F
Satuan
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
m2
1.000
Harga Satuan
Bahan / Upah
( Rp. )
481,500.00
Tenaga Kerja
Pekerja
Tukang las biasa
Kepala Tukang
Mandor
OH
OH
OH
OH
1.200
1.200
0.120
0.006
34,000.00
44,500.00
49,000.00
46,000.00
Kebutuhan
No
Jumlah
( Rp. )
481,500.00
40,800.00
53,400.00
5,880.00
276.00
Peralatan
D
E
F
10%
3%
Kebutuhan
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Pintu Lipat
m2
1.000
Harga Satuan
Bahan / Upah
( Rp. )
645,000.00
Tenaga Kerja
Pekerja
Tukang besi
Kepala Tukang
Mandor
OH
OH
OH
OH
0.440
0.440
0.044
0.022
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
Jumlah
( Rp. )
645,000.00
14,960.00
19,580.00
2,156.00
1,012.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Sunscreen alluminium
m2
1.000
Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor
OH
OH
OH
OH
0.080
0.800
0.080
0.004
Peralatan
D
E
F
10
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
2,720.00
35,600.00
3,920.00
184.00
(A+B+C)
D
(D+E)
Bahan
m2
1.000
Harga Satuan
Bahan / Upah
( Rp. )
481,500.00
Tenaga Kerja
Pekerja
Tukang khusus allumunium
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
1.000
0.100
0.050
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
11
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
481,500.00
34,000.00
44,500.00
4,900.00
2,300.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Profil alluminium
Skrup fisher
Sealant
Tenaga Kerja
Pekerja
Tukang khusus allumunium
Kepala Tukang
Mandor
Peralatan
m
buah
tube
1.100
2.000
0.060
Harga Satuan
Bahan / Upah
( Rp. )
75,000.00
5,000.00
25,000.00
OH
OH
OH
OH
0.043
0.043
0.0043
0.0021
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
82,500.00
10,000.00
1,500.00
1,462.00
1,913.50
210.70
96.60
(A+B+C)
E
F
12
10%
3%
D
(D+E)
Bahan
Profil alluminium
Alluminium strip
m
m
4.400
14.600
Harga Satuan
Bahan / Upah
( Rp. )
75,000.00
24,000.00
Tenaga Kerja
Pekerja
Tukang khusus allumunium
Kepala Tukang
Mandor
OH
OH
OH
OH
0.085
0.085
0.0085
0.0042
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
13
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
330,000.00
350,400.00
2,890.00
3,782.50
416.50
193.20
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Pintu alluminium
Profil kaca
Sealent
Tenaga Kerja
Pekerja
Tukang allumunium/kaca
Kepala Tukang
Mandor
Peralatan
D
E
F
14
10%
m
m
Tube
4.400
4.500
0.270
Harga Satuan
Bahan / Upah
( Rp. )
75,000.00
250,000.00
25,000.00
OH
OH
OH
OH
0.085
0.085
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
330,000.00
1,125,000.00
6,750.00
2,890.00
3,782.50
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
m2
1.000
Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor
OH
OH
OH
OH
0.350
0.350
0.035
0.018
Peralatan
D
E
F
15
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
11,900.00
15,575.00
1,715.00
828.00
(A+B+C)
D
(D+E)
Bahan
Besi Strip
Pengelasan
kg
cm
6.177
27.080
Harga Satuan
Bahan / Upah
( Rp. )
12,000.00
1,350.35
Tenaga Kerja
Pekerja
Tukang las
Kepala Tukang
Mandor
OH
OH
OH
OH
1.670
1.670
0.167
0.083
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
No
Jumlah
( Rp. )
74,124.00
36,567.48
56,780.00
74,315.00
8,183.00
3,818.00
D
E
F
16
10%
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Kawat Nyamuk
Pengelasan
Baja strip 0,2x 2 cm
m2
cm
kg
1.100
11.110
1.716
1,350.35
12,000.00
15,002.39
20,592.00
Pekerja
Tukang
Kepala Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,400.00
4,450.00
490.00
230.00
Tenaga Kerja
Peralatan
D
E
F
17
Jumlah
( Rp. )
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Jendela nako
(rangka + kaca 5 mm)
Paku skrup 1-2,5 cm
Besi Strip
Tenaga Kerja
Peralatan
D
E
F
18
Pekerja
Tukang
Kepala Tukang
Mandor
10%
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
11,500.00
Buah
m2
10.000
7.000
100.00
12,000.00
12,650.00
1,000.00
84,000.00
OH
OH
OH
OH
0.200
0.200
0.020
0.001
34,000.00
44,500.00
49,000.00
46,000.00
6,800.00
8,900.00
980.00
46.00
3%
Satuan
Indeks
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
Bahan
Seng Plat
Paku 1 - 2,5 cm
Papan kayu kelas II
atau III
m'
kg
m2
1.050
0.015
0.019
Harga Satuan
Bahan / Upah
( Rp. )
58,850.00
12,500.00
30,600.00
Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor
OH
OH
OH
OH
0.200
0.400
0.025
0.010
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
19
10%
Jumlah
( Rp. )
61,792.50
187.50
581.40
6,800.00
17,800.00
1,225.00
460.00
(A+B+C)
D
(D+E)
3%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Satuan
Jumlah
( Rp. )
m2
kg
kg
1.050
0.010
0.500
12,500.00
12,000.00
125.00
6,000.00
Pekerja
Tukang
OH
OH
0.150
0.300
34,000.00
44,500.00
5,100.00
13,350.00
Kepala Tukang
Mandor
C
Peralatan
D
E
F
OH
OH
10%
0.030
0.008
49,000.00
46,000.00
1,470.00
368.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
6.630
9.800
0.045
1,200.00
100,000.00
11,760.00
4,500.00
OH
OH
OH
OH
0.250
0.125
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,500.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
11.870
10.000
0.045
1,200.00
100,000.00
12,000.00
4,500.00
OH
OH
OH
OH
0.260
0.130
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
26.500
10.400
0.045
1,200.00
100,000.00
12,480.00
4,500.00
OH
0.270
34,000.00
9,180.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
OH
OH
OH
10%
0.135
0.014
0.014
44,500.00
49,000.00
46,000.00
6,007.50
686.00
644.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
6.630
9.800
0.045
1.300
1,200.00
100,000.00
10,000.00
11,760.00
4,500.00
13,000.00
OH
OH
OH
OH
0.250
0.125
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,500.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
0.5
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
11.870
10.000
0.045
1.500
1,200.00
100,000.00
10,000.00
12,000.00
4,500.00
15,000.00
OH
OH
OH
OH
0.260
0.130
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
2.4
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
26.500
10.400
0.045
1.620
1,200.00
100,000.00
10,000.00
12,480.00
4,500.00
16,200.00
OH
OH
OH
OH
0.270
0.135
0.014
0.014
34,000.00
44,500.00
49,000.00
46,000.00
9,180.00
6,007.50
686.00
644.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
kg
6.630
9.800
0.045
1.300
1,200.00
100,000.00
10,000.00
11,760.00
4,500.00
13,000.00
OH
0.250
34,000.00
8,500.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
OH
OH
OH
10%
0.125
0.013
0.013
44,500.00
49,000.00
46,000.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
11.870
10.000
0.045
1.500
1,200.00
100,000.00
10,000.00
12,000.00
4,500.00
15,000.00
OH
OH
OH
OH
0.260
0.130
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10
10%
buah
kg
m3
kg
6.630
9.800
0.045
1.300
Harga Satuan
Bahan / Upah
( Rp. )
18,853.70
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.250
0.125
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
125,000.00
11,760.00
4,500.00
13,000.00
8,500.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
11
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
11.870
10.000
0.045
1.500
1,200.00
100,000.00
10,000.00
12,000.00
4,500.00
15,000.00
OH
OH
OH
OH
0.260
0.130
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
buah
kg
m3
kg
2.946
10.000
0.045
1.500
Harga Satuan
Bahan / Upah
( Rp. )
44,520.55
1,200.00
100,000.00
10,000.00
OH
0.260
34,000.00
Jumlah
( Rp. )
131,157.53
12,000.00
4,500.00
15,000.00
8,840.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
12
OH
OH
OH
10%
0.130
0.013
0.013
44,500.00
49,000.00
46,000.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
13
10%
buah
kg
m3
kg
2.946
10.000
0.045
1.500
OH
OH
OH
OH
0.260
0.130
0.013
0.013
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
14
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
6.630
9.800
0.045
1.300
1,200.00
100,000.00
10,000.00
11,760.00
4,500.00
13,000.00
OH
OH
OH
OH
0.250
0.125
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,500.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
buah
kg
m3
kg
11.870
10.000
0.045
1.500
Tenaga Kerja
Pekerja
OH
0.260
Memasang 1 m3 konstruksi
Tukang kuda-kuda
Batu
konvensional, kayu kelas I, II dan
OH III bentang
0.130
3m
Kepala Tukang
OH
0.013
Mandor
OH
0.013
Peralatan
D
E
F
15
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
1,200.00
100,000.00
10,000.00
12,000.00
4,500.00
15,000.00
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
buah
kg
m3
kg
3.100
9.600
0.045
1.500
Harga Satuan
Bahan / Upah
( Rp. )
137,096.77
1,200.00
100,000.00
10,000.00
OH
0.240
34,000.00
Jumlah
( Rp. )
425,000.00
11,520.00
4,500.00
15,000.00
8,160.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
16
OH
OH
OH
10%
0.120
0.012
0.012
44,500.00
49,000.00
46,000.00
5,340.00
588.00
552.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
17
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
6.630
9.800
0.045
1.300
1,200.00
100,000.00
10,000.00
11,760.00
4,500.00
13,000.00
OH
OH
OH
OH
0.250
0.125
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,500.00
5,562.50
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
18
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
11.870
10.000
0.045
1.500
1,200.00
100,000.00
10,000.00
12,000.00
4,500.00
15,000.00
OH
OH
OH
OH
0.260
0.130
0.013
0.013
34,000.00
44,500.00
49,000.00
46,000.00
8,840.00
5,785.00
637.00
598.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
19
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
5.300
1.650
0.004
1,200.00
100,000.00
1,980.00
400.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
3.530
1.240
0.003
1,200.00
100,000.00
1,488.00
300.00
OH
OH
OH
0.090
0.090
0.009
34,000.00
44,500.00
49,000.00
3,060.00
4,005.00
441.00
Mandor
C
Peralatan
D
E
F
20
OH
10%
0.005
3%
Satuan
Indeks
46,000.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
21
10%
buah
kg
m3
2.650
1.240
0.003
Harga Satuan
Bahan / Upah
( Rp. )
0.00
1,200.00
100,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
1,488.00
300.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
22
10%
buah
kg
m3
kg
5.300
1.140
0.003
0.100
Harga Satuan
Bahan / Upah
( Rp. )
0.00
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
1,368.00
300.00
1,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
23
10%
buah
kg
m3
kg
3.530
1.140
0.003
0.100
Harga Satuan
Bahan / Upah
( Rp. )
0.00
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
1,368.00
300.00
1,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
buah
kg
m3
kg
2.650
1.140
0.003
0.100
Harga Satuan
Bahan / Upah
( Rp. )
0.00
1,200.00
100,000.00
10,000.00
OH
0.090
34,000.00
Jumlah
( Rp. )
1,368.00
300.00
1,000.00
3,060.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
24
OH
OH
OH
10%
0.090
0.009
0.005
44,500.00
49,000.00
46,000.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
25
10%
Jumlah
( Rp. )
buah
kg
m3
kg
3.530
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
26
10%
Jumlah
( Rp. )
buah
kg
m3
kg
2.650
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
27
10%
buah
kg
m3
kg
2.650
1.140
0.003
0.100
Harga Satuan
Bahan / Upah
( Rp. )
31,250.00
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
82,812.50
1,368.00
300.00
1,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
buah
kg
m3
kg
3.530
1.140
0.003
0.100
Harga Satuan
Bahan / Upah
( Rp. )
23,500.00
1,200.00
100,000.00
10,000.00
OH
0.090
34,000.00
Jumlah
( Rp. )
82,955.00
1,368.00
300.00
1,000.00
3,060.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
28
OH
OH
OH
10%
0.090
0.009
0.005
44,500.00
49,000.00
46,000.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
29
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
2.650
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
30
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
3.530
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
31
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
1.700
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
kg
2.650
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
0.090
34,000.00
3,060.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
32
OH
OH
OH
10%
0.090
0.009
0.005
44,500.00
49,000.00
46,000.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
33
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
3.530
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
m3
0.036
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.360
0.180
0.018
0.018
Peralatan
D
E
F
34
10%
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
12,240.00
8,010.00
882.00
828.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
35
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
53.000
8.190
0.045
2.750
1,200.00
100,000.00
10,000.00
9,828.00
4,500.00
27,500.00
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
3%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Satuan
buah
kg
m3
kg
OH
OH
OH
OH
Jumlah
( Rp. )
106.000
8.190
0.045
3.200
1,200.00
100,000.00
10,000.00
9,828.00
4,500.00
32,000.00
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
23,800.00
15,575.00
1,715.00
1,610.00
Peralatan
D
E
F
36
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Ubin Keramik
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
10.000
8.190
0.045
1.620
Harga Satuan
Bahan / Upah
( Rp. )
3,200.00
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
37
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
32,000.00
9,828.00
4,500.00
16,200.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Bahan
Ubin Keramik
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
11.870
10.000
0.045
1.500
Harga Satuan
Bahan / Upah
( Rp. )
3,032.86
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
38
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
36,000.00
12,000.00
4,500.00
15,000.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
39
10%
buah
kg
m3
kg
11.870
10.000
0.045
1.500
Harga Satuan
Bahan / Upah
( Rp. )
2,695.87
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
32,000.00
12,000.00
4,500.00
15,000.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
kg
26.500
10.400
0.045
1.620
1,200.00
100,000.00
10,000.00
12,480.00
4,500.00
16,200.00
OH
0.700
34,000.00
23,800.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
40
OH
OH
OH
10%
0.350
0.035
0.035
44,500.00
49,000.00
46,000.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
41
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
33.000
9.800
0.045
4.370
1,200.00
100,000.00
10,000.00
11,760.00
4,500.00
43,700.00
OH
OH
OH
OH
1.050
0.525
0.053
0.053
34,000.00
44,500.00
49,000.00
46,000.00
35,700.00
23,362.50
2,597.00
2,438.00
(A+B+C)
D
(D+E)
3%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
42
Satuan
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
11.870
14.150
0.039
2.000
1,200.00
100,000.00
10,000.00
16,980.00
3,900.00
20,000.00
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
23,800.00
15,575.00
1,715.00
1,610.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
43
10%
buah
kg
m3
kg
5.300
1.140
0.003
0.025
Harga Satuan
Bahan / Upah
( Rp. )
7,100.00
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
37,630.00
1,368.00
300.00
250.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Jumlah
( Rp. )
buah
kg
m3
kg
10.600
1.140
0.003
0.050
1,200.00
100,000.00
10,000.00
1,368.00
300.00
500.00
OH
0.090
34,000.00
3,060.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
44
OH
OH
OH
10%
0.090
0.009
0.005
44,500.00
49,000.00
46,000.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
45
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
5.300
0.570
0.0015
0.013
1,200.00
100,000.00
10,000.00
684.00
150.00
130.00
OH
OH
OH
OH
0.090
0.090
0.009
0.005
34,000.00
44,500.00
49,000.00
46,000.00
3,060.00
4,005.00
441.00
230.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
46
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
5.300
1.140
0.003
0.100
1,200.00
100,000.00
10,000.00
1,368.00
300.00
1,000.00
OH
OH
OH
OH
0.750
0.750
0.075
0.038
34,000.00
44,500.00
49,000.00
46,000.00
25,500.00
33,375.00
3,675.00
1,748.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Marmer
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
1.060
8.190
0.045
0.650
Harga Satuan
Bahan / Upah
( Rp. )
117,924.53
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
47
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
125,000.00
9,828.00
4,500.00
6,500.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Bahan
Karpet
Lem
m2
kg
1.050
0.350
Harga Satuan
Bahan / Upah
( Rp. )
85,900.00
62,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
OH
OH
OH
0.170
0.170
0.017
34,000.00
49,000.00
49,000.00
Kebutuhan
No
Jumlah
( Rp. )
90,195.00
21,700.00
5,780.00
8,330.00
833.00
Mandor
C
Peralatan
D
E
F
48
OH
10%
0.009
46,000.00
414.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Uderlayer
Lem
m2
kg
1.050
0.350
62,000.00
21,700.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.120
0.120
0.012
0.006
34,000.00
49,000.00
49,000.00
46,000.00
4,080.00
5,880.00
588.00
276.00
Tenaga Kerja
Peralatan
D
E
F
49
Jumlah
( Rp. )
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Parquet
Lem
m2
kg
1.050
0.600
Harga Satuan
Bahan / Upah
( Rp. )
23,000.00
62,000.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
50
10%
Jumlah
( Rp. )
24,150.00
37,200.00
23,800.00
17,150.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Gymfloor
Lem
m2
kg
1.050
0.600
62,000.00
37,200.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
49,000.00
49,000.00
46,000.00
23,800.00
17,150.00
1,715.00
1,610.00
Tenaga Kerja
Peralatan
D
E
F
51
Jumlah
( Rp. )
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Porselen
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
86.000
9.300
0.018
1.500
Harga Satuan
Bahan / Upah
( Rp. )
433.14
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.000
0.500
0.050
0.050
34,000.00
44,500.00
49,000.00
46,000.00
Kebutuhan
No
Jumlah
( Rp. )
37,250.00
11,160.00
1,800.00
15,000.00
34,000.00
22,250.00
2,450.00
2,300.00
Peralatan
D
E
F
52
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Porselen
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
53.000
9.300
0.018
2.750
Harga Satuan
Bahan / Upah
( Rp. )
702.83
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.900
0.450
0.045
0.045
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
53
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
37,250.00
11,160.00
1,800.00
27,500.00
30,600.00
20,025.00
2,205.00
2,070.00
(A+B+C)
D
(D+E)
Bahan
Porselen
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
26.500
9.300
0.018
1.940
Harga Satuan
Bahan / Upah
( Rp. )
1,405.66
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.900
0.450
0.045
0.045
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
54
10%
Jumlah
( Rp. )
37,250.00
11,160.00
1,800.00
19,400.00
30,600.00
20,025.00
2,205.00
2,070.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
55
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
buah
kg
m3
kg
53.000
9.300
0.018
2.750
1,200.00
100,000.00
10,000.00
11,160.00
1,800.00
27,500.00
OH
OH
OH
OH
0.900
0.450
0.045
0.045
34,000.00
44,500.00
49,000.00
46,000.00
30,600.00
20,025.00
2,205.00
2,070.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Tenaga Kerja
buah
kg
m3
kg
OH
Jumlah
( Rp. )
106.000
9.300
0.018
2.900
1,200.00
100,000.00
10,000.00
11,160.00
1,800.00
29,000.00
0.900
34,000.00
30,600.00
Tukang Batu
Kepala Tukang
Mandor
C
Peralatan
D
E
F
56
OH
OH
OH
10%
0.450
0.045
0.045
44,500.00
49,000.00
46,000.00
20,025.00
2,205.00
2,070.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Jumlah
( Rp. )
Keramik 10/20
PC
Pasir Pasang
Semen Warna
buah
kg
m3
kg
53.000
9.300
0.018
2.750
1,200.00
100,000.00
10,000.00
11,160.00
1,800.00
27,500.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.900
0.450
0.045
0.045
34,000.00
44,500.00
49,000.00
46,000.00
30,600.00
20,025.00
2,205.00
2,070.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
57
Kebutuhan
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
58
10%
buah
kg
m3
kg
26.500
9.300
0.018
1.940
Harga Satuan
Bahan / Upah
( Rp. )
1,622.64
1,200.00
100,000.00
10,000.00
OH
OH
OH
OH
0.900
0.450
0.045
0.045
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
43,000.00
11,160.00
1,800.00
19,400.00
30,600.00
20,025.00
2,205.00
2,070.00
(A+B+C)
D
(D+E)
Bahan
Marmer
Paku 12 cm
PC
Pasir Pasang
Semen Warna
m2
buah
kg
m3
Kg
1.060
3.003
12.440
0.025
0.650
Harga Satuan
Bahan / Upah
( Rp. )
125,000.00
12,500.00
1,200.00
100,000.00
10,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
1.300
0.650
0.065
0.065
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
59
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
132,500.00
37,537.50
14,928.00
2,500.00
6,500.00
44,200.00
28,925.00
3,185.00
2,990.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
m2
kg
m3
Kg
63.000
12.440
0.025
2.750
1,200.00
100,000.00
10,000.00
Jumlah
( Rp. )
14,928.00
2,500.00
27,500.00
Tenaga Kerja
Peralatan
D
E
F
60
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
10%
1.000
0.500
0.050
0.050
3%
Kebutuhan
Satuan
Indeks
34,000.00
44,500.00
49,000.00
46,000.00
34,000.00
22,250.00
2,450.00
2,300.00
(A+B+C)
D
(D+E)
Bahan
Batu Paras
PC
Pasir Pasang
m2
kg
m3
1.100
11.750
0.035
Harga Satuan
Bahan / Upah
( Rp. )
80,000.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
61
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
88,000.00
14,100.00
3,500.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Bahan
m2
kg
m3
1.100
11.750
0.035
Harga Satuan
Bahan / Upah
( Rp. )
80,000.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
62
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
88,000.00
14,100.00
3,500.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Bahan
m2
kg
m3
1.100
11.750
0.035
Harga Satuan
Bahan / Upah
( Rp. )
50,000.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
63
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
55,000.00
14,100.00
3,500.00
23,800.00
15,575.00
1,715.00
1,610.00
(A+B+C)
D
(D+E)
Bahan
Bt lempeng andesit
PC
Pasir Pasang
m2
kg
m3
1.100
11.750
0.035
Harga Satuan
Bahan / Upah
( Rp. )
160,000.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.700
0.350
0.035
0.035
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
Kebutuhan
No
Jumlah
( Rp. )
176,000.00
14,100.00
3,500.00
23,800.00
15,575.00
1,715.00
1,610.00
D
E
F
64
10%
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Vinyl
Lem vinyl
Tenaga Kerja
Peralatan
D
E
F
65
Pekerja
Tukang Batu
Kepala Tukang
Mandor
10%
Jumlah
( Rp. )
Buah
kg
11.870
0.350
62,000.00
21,700.00
OH
OH
OH
OH
0.150
0.150
0.015
0.008
34,000.00
44,500.00
49,000.00
46,000.00
5,100.00
6,675.00
735.00
368.00
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Bahan
Wall paper
Lem
m
kg
2.200
0.250
Harga Satuan
Bahan / Upah
( Rp. )
0.00
61,000.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.350
0.175
0.017
0.002
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
66
10%
Jumlah
( Rp. )
15,250.00
11,900.00
7,787.50
833.00
92.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Floor hardener
kg
5.000
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.120
0.120
0.012
0.006
Peralatan
D
E
F
67
10%
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
4,080.00
5,340.00
588.00
276.00
(A+B+C)
D
(D+E)
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Vinyl karet
Lem vinyl
buah
Kg
1.760
0.080
62,000.00
4,960.00
OH
OH
OH
OH
0.080
0.080
0.008
0.004
34,000.00
44,500.00
49,000.00
46,000.00
2,720.00
3,560.00
392.00
184.00
No
A
Bahan
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
Jumlah
( Rp. )
(A+B+C)
E
F
68
10%
3%
D
(D+E)
Kebutuhan
No
A
Bahan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
m3
Kg
0.003
0.050
5,000.00
250.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.120
0.120
0.012
0.006
34,000.00
49,000.00
49,000.00
46,000.00
4,080.00
5,880.00
588.00
276.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
T.6.1.2008
Total Harga
( Rp. )
26,650.00
26,650.00
3,464.50
30,114.50
T.6.2.2008
Total Harga
( Rp. )
32,670.00
32,670.00
4,247.10
36,917.10
T.6.3.2008
Total Harga
( Rp. )
38,782.00
38,782.00
5,041.66
43,823.66
T.6.4.2008
Total Harga
( Rp. )
35,472.00
35,472.00
4,611.36
40,083.36
T.6.5.2008
Total Harga
( Rp. )
53,760.00
53,760.00
6,988.80
60,748.80
T.6.6.2008
Total Harga
( Rp. )
42,870.00
42,870.00
5,573.10
48,443.10
T.6.7.2008
Total Harga
( Rp. )
1,930.00
1,930.00
250.90
2,180.90
T.6.8.2008
Total Harga
( Rp. )
11,680.00
11,680.00
1,518.40
13,198.40
T.6.9.2008
Total Harga
( Rp. )
8,868.00
8,868.00
1,152.84
10,020.84
T.6.10.2008
Total Harga
( Rp. )
19,300.00
19,300.00
2,509.00
21,809.00
T.6.11.2008
Total Harga
( Rp. )
60,000.00
10,660.00
70,660.00
9,185.80
79,845.80
T.6.12.2008
Total Harga
( Rp. )
95,440.00
50,640.00
146,080.00
18,990.40
165,070.40
T.6.13.2008
Total Harga
( Rp. )
86,800.00
50,640.00
137,440.00
17,867.20
155,307.20
T.6.14.2008
Total Harga
( Rp. )
60,000.00
5,790.00
65,790.00
8,552.70
74,342.70
T.6.15.2008
Total Harga
( Rp. )
108,000.00
9,650.00
117,650.00
15,294.50
132,944.50
P.6.1.2008
Total Harga
( Rp. )
431,900.00
91,500.00
523,400.00
68,042.00
591,442.00
P.6.2.2008
Total Harga
( Rp. )
388,600.00
91,500.00
480,100.00
62,413.00
542,513.00
P.6.3.2008
Total Harga
( Rp. )
358,600.00
91,500.00
450,100.00
58,513.00
508,613.00
P.6.4.2008
Total Harga
( Rp. )
337,500.00
91,500.00
429,000.00
55,770.00
484,770.00
P.6.5.2008
Total Harga
( Rp. )
308,600.00
91,500.00
400,100.00
52,013.00
452,113.00
P.6.6.2008
Total Harga
( Rp. )
242,150.00
91,500.00
333,650.00
43,374.50
377,024.50
P.6.7.2008
Total Harga
( Rp. )
292,800.00
91,500.00
384,300.00
49,959.00
434,259.00
P.6.8.2008
Total Harga
( Rp. )
268,700.00
91,500.00
360,200.00
46,826.00
407,026.00
P.6.9.2008
Total Harga
( Rp. )
162,600.00
47,580.00
210,180.00
27,323.40
237,503.40
P.6.10.2008
Total Harga
( Rp. )
1,561,590.00
165,410.00
1,727,000.00
224,510.00
1,951,510.00
P.6.11.2008
Total Harga
( Rp. )
395,265.00
126,594.00
521,859.00
67,841.67
589,700.67
D.6.1.2008
Total Harga
( Rp. )
126,000.00
31,660.00
157,660.00
20,495.80
178,155.80
D.6.2.2008
Total Harga
( Rp. )
114,440.00
31,660.00
146,100.00
18,993.00
165,093.00
D.6.3.2008
Total Harga
( Rp. )
106,960.00
31,660.00
138,620.00
18,020.60
156,640.60
D.6.4.2008
Total Harga
( Rp. )
102,640.00
31,660.00
134,300.00
17,459.00
151,759.00
D.6.5.2008
Total Harga
( Rp. )
100,200.00
31,660.00
131,860.00
17,141.80
149,001.80
D.6.6.2008
Total Harga
( Rp. )
92,646.00
31,660.00
124,306.00
16,159.78
140,465.78
D.6.7.2008
Total Harga
( Rp. )
59,440.00
15,830.00
75,270.00
9,785.10
85,055.10
D.6.8.2008
Total Harga
( Rp. )
54,144.00
15,830.00
69,974.00
9,096.62
79,070.62
D.6.9.2008
Total Harga
( Rp. )
51,000.00
15,830.00
66,830.00
8,687.90
75,517.90
D.6.10.2008
Total Harga
( Rp. )
49,016.00
15,830.00
64,846.00
8,429.98
73,275.98
D.6.11.2008
Total Harga
( Rp. )
47,784.00
15,830.00
63,614.00
8,269.82
71,883.82
D.6.12.2008
Total Harga
( Rp. )
45,700.00
15,830.00
61,530.00
7,998.90
69,528.90
D.6.13.2008
Total Harga
( Rp. )
46,300.00
15,830.00
62,130.00
8,076.90
70,206.90
D.6.14.2008
Total Harga
( Rp. )
41,810.00
15,830.00
57,640.00
7,493.20
65,133.20
D.6.15.2008
Total Harga
( Rp. )
41,230.00
15,830.00
57,060.00
7,417.80
64,477.80
D.6.16.2008
Total Harga
( Rp. )
199,204.00
20,138.00
219,342.00
28,514.46
247,856.46
D.6.17.2008
Total Harga
( Rp. )
196,332.00
20,138.00
216,470.00
28,141.10
244,611.10
D.6.18.2008
Total Harga
( Rp. )
84,808.00
17,544.00
102,352.00
13,305.76
115,657.76
D.6.19.2008
Total Harga
( Rp. )
82,560.00
17,544.00
100,104.00
13,013.52
113,117.52
D.6.20.2008
Total Harga
( Rp. )
57,112.00
15,830.00
72,942.00
9,482.46
82,424.46
D.6.21.2008
Total Harga
( Rp. )
55,876.00
15,830.00
71,706.00
9,321.78
81,027.78
D.6.22.2008
Total Harga
( Rp. )
110,000.00
15,830.00
125,830.00
16,357.90
142,187.90
D.6.23.2008
Total Harga
( Rp. )
106,700.00
15,830.00
122,530.00
15,928.90
138,458.90
D.6.24.2008
Total Harga
( Rp. )
650,000.00
18,300.00
668,300.00
86,879.00
755,179.00
Plt.6.1.2008
Total Harga
( Rp. )
20,204.80
18,300.00
38,504.80
5,005.62
43,510.42
Plt.6.2.2008
Total Harga
( Rp. )
14,268.80
18,300.00
32,568.80
4,233.94
36,802.74
Plt.6.3.2008
Total Harga
( Rp. )
11,631.20
18,300.00
29,931.20
3,891.06
33,822.26
Plt.6.4.2008
Total Harga
( Rp. )
9,888.00
18,300.00
28,188.00
3,664.44
31,852.44
Plt.6.5.2008
Total Harga
( Rp. )
8,820.80
18,300.00
27,120.80
3,525.70
30,646.50
Plt.6.6.2008
Total Harga
( Rp. )
7,999.20
18,300.00
26,299.20
3,418.90
29,718.10
Plt.6.7.2008
Total Harga
( Rp. )
7,523.20
18,300.00
25,823.20
3,357.02
29,180.22
Plt.6.8.2008
Total Harga
( Rp. )
7,047.20
18,300.00
25,347.20
3,295.14
28,642.34
Plt.6.9.2008
Total Harga
( Rp. )
8,812.00
18,996.00
27,808.00
3,615.04
31,423.04
Plt.6.10.2008
Total Harga
( Rp. )
6,600.00
18,996.00
25,596.00
3,327.48
28,923.48
Plt.6.11.2008
Total Harga
( Rp. )
4,455.00
18,996.00
23,451.00
3,048.63
26,499.63
Plt.6.12.2008
Total Harga
( Rp. )
4,265.00
18,996.00
23,261.00
3,023.93
26,284.93
Plt.6.13.2008
Total Harga
( Rp. )
19,058.40
24,492.00
43,550.40
5,661.55
49,211.95
Plt.6.14.2008
Total Harga
( Rp. )
15,541.60
19,318.00
34,859.60
4,531.75
39,391.35
Plt.6.15.2008
Total Harga
( Rp. )
13,184.00
24,492.00
37,676.00
4,897.88
42,573.88
Plt.6.16.2008
Total Harga
( Rp. )
11,794.40
24,492.00
36,286.40
4,717.23
41,003.63
Plt.6.17.2008
Total Harga
( Rp. )
10,665.60
24,492.00
35,157.60
4,570.49
39,728.09
Plt.6.18.2008
Total Harga
( Rp. )
5,355.00
26,840.00
32,195.00
4,185.35
36,380.35
Plt.6.19.2008
Total Harga
( Rp. )
8,820.80
9,197.50
18,018.30
2,342.38
20,360.68
Plt.6.20.2008
Total Harga
( Rp. )
1,900.00
22,664.00
24,564.00
3,193.32
27,757.32
Plt.6.21.2008
Total Harga
( Rp. )
102,000.00
27,497.50
129,497.50
16,834.68
146,332.18
Plt.6.22.2008
Total Harga
( Rp. )
12,000.00
27,497.50
39,497.50
5,134.68
44,632.18
Plt.6.23.2008
Total Harga
( Rp. )
5,784.00
15,830.00
21,614.00
2,809.82
24,423.82
Plt.6.24.2008
Total Harga
( Rp. )
3,729.60
9,197.50
12,927.10
1,680.52
14,607.62
Plt.6.25.2008
Total Harga
( Rp. )
1,920.00
4,317.50
6,237.50
810.88
7,048.38
Plt.6.26.2008
Total Harga
( Rp. )
8,808.00
18,300.00
27,108.00
3,524.04
30,632.04
Plt.6.27.2008
Total Harga
( Rp. )
3,900.00
12,200.00
16,100.00
2,093.00
18,193.00
K.6.1.2008
Total Harga
( Rp. )
K.6.1.2008.a
Total Harga
( Rp. )
9,257,125.00
1,386,000.00
10,643,125.00
1,383,606.25
12,026,731.25
K.6.1.2008.b
Total Harga
( Rp. )
8,883,125.00
1,386,000.00
10,269,125.00
1,334,986.25
11,604,111.25
K.6.2.2008
Total Harga
( Rp. )
K.6.2.2008.a
Total Harga
( Rp. )
16,168,125.00
1,188,000.00
17,356,125.00
2,256,296.25
19,612,421.25
K.6.2.2008.b
Total Harga
( Rp. )
8,416,125.00
1,188,000.00
9,604,125.00
1,248,536.25
10,852,661.25
K.6.2.2008.c
Total Harga
( Rp. )
5,818,125.00
1,188,000.00
7,006,125.00
910,796.25
7,916,921.25
K.6.3.2008
Total Harga
( Rp. )
625.00
69,323.00
69,948.00
9,093.24
79,041.24
K.6.4.2008
Total Harga
( Rp. )
625.00
69,323.00
69,948.00
9,093.24
79,041.24
K.6.5.2008
Total Harga
( Rp. )
K.6.5.2008.a
Total Harga
( Rp. )
544,250.00
198,000.00
742,250.00
96,492.50
838,742.50
K.6.5.2008.b
Total Harga
( Rp. )
339,250.00
198,000.00
537,250.00
69,842.50
607,092.50
K.6.6.2008
Total Harga
( Rp. )
K.6.6.2008.a
Total Harga
( Rp. )
326,550.00
158,400.00
484,950.00
63,043.50
547,993.50
K.6.6.2008.b
Total Harga
( Rp. )
203,550.00
158,400.00
361,950.00
47,053.50
409,003.50
K.6.7.2008
Total Harga
( Rp. )
6,250.00
198,000.00
204,250.00
26,552.50
230,802.50
K.6.8.2008
Total Harga
( Rp. )
291,375.00
138,600.00
429,975.00
55,896.75
485,871.75
K.6.9.2008
Total Harga
( Rp. )
296,409.00
158,400.00
454,809.00
59,125.17
513,934.17
K.6.10.2008
Total Harga
( Rp. )
808,875.00
145,990.00
954,865.00
124,132.45
1,078,997.45
K.6.11.2008
Total Harga
( Rp. )
313,875.00
158,400.00
472,275.00
61,395.75
533,670.75
K.6.12.2008
Total Harga
( Rp. )
320,125.00
168,323.00
488,448.00
63,498.24
551,946.24
K.6.13.2008
Total Harga
( Rp. )
K.6.13.2008.a
Total Harga
( Rp. )
8,961,000.00
792,000.00
9,753,000.00
1,267,890.00
11,020,890.00
K.6.13.2008.b
Total Harga
( Rp. )
5,512,500.00
792,000.00
6,304,500.00
819,585.00
7,124,085.00
K.6.13.2008.c
Total Harga
( Rp. )
10,242,500.00
792,000.00
11,034,500.00
1,434,485.00
12,468,985.00
K.6.13.2008.d
Total Harga
( Rp. )
205,000.00
792,000.00
997,000.00
129,610.00
1,126,610.00
K.6.14.2008
Total Harga
( Rp. )
11,155,000.00
1,326,600.00
12,481,600.00
1,622,608.00
14,104,208.00
K.6.15.2008
Total Harga
( Rp. )
K.6.15.2008.a
Total Harga
( Rp. )
8,928,500.00
475,200.00
9,403,700.00
1,222,481.00
10,626,181.00
K.6.15.2008.b
Total Harga
( Rp. )
5,480,000.00
475,200.00
5,955,200.00
774,176.00
6,729,376.00
K.6.16.2008
Total Harga
( Rp. )
K.6.16.2008.a
Total Harga
( Rp. )
143,221.00
9,020.00
152,241.00
19,791.33
172,032.33
K.6.16.2008.b
Total Harga
( Rp. )
88,045.00
9,020.00
97,065.00
12,618.45
109,683.45
K.6.16.2008.c
Total Harga
( Rp. )
20,495.00
9,020.00
29,515.00
3,836.95
33,351.95
K.6.17.2008
Total Harga
( Rp. )
60,437.00
9,020.00
69,457.00
9,029.41
78,486.41
K.6.17.2008.a
Total Harga
( Rp. )
105,415.00
9,020.00
114,435.00
14,876.55
129,311.55
K.6.18.2008
Total Harga
( Rp. )
2,500.00
10,824.00
13,324.00
1,732.12
15,056.12
K.6.18.2008.a
Total Harga
( Rp. )
798,625.00
10,824.00
809,449.00
105,228.37
914,677.37
K.6.19.2008
Total Harga
( Rp. )
K.6.19.2008.a
Total Harga
( Rp. )
76,805.00
24,720.00
101,525.00
13,198.25
114,723.25
K.6.20.2008
Total Harga
( Rp. )
K.6.20.2008.a
Total Harga
( Rp. )
81,772.50
23,430.00
105,202.50
13,676.33
118,878.83
K.6.21.2008
Total Harga
( Rp. )
K.6.21.2008.a
Total Harga
( Rp. )
56,330.00
14,410.00
70,740.00
9,196.20
79,936.20
K.6.21.2008.b
Total Harga
( Rp. )
91,160.00
14,410.00
105,570.00
13,724.10
119,294.10
K.6.21.2008.c
Total Harga
( Rp. )
14,750.00
14,410.00
29,160.00
3,790.80
32,950.80
K.6.22.2008
Total Harga
( Rp. )
K.6.22.2008.a
Total Harga
( Rp. )
91,237.00
14,410.00
105,647.00
13,734.11
119,381.11
K.6.22.2008.b
Total Harga
( Rp. )
90,535.00
14,410.00
104,945.00
13,642.85
118,587.85
K.6.23.2008
Total Harga
( Rp. )
136,975.00
29,723.00
166,698.00
21,670.74
188,368.74
K.6.24.2008
Total Harga
( Rp. )
229,975.00
29,723.00
259,698.00
33,760.74
293,458.74
K.6.25.2008
Total Harga
( Rp. )
208,475.00
39,600.00
248,075.00
32,249.75
280,324.75
K.6.26.2008
Total Harga
( Rp. )
97,275.00
118,800.00
216,075.00
28,089.75
244,164.75
K.6.27.2008
Total Harga
( Rp. )
40,625.00
4,963.00
45,588.00
5,926.44
51,514.44
K.6.28.2008
Total Harga
( Rp. )
67,712.00
6,325.00
74,037.00
9,624.81
83,661.81
Bt.6.1.2008
Total Harga
( Rp. )
485,440.00
73,527.50
558,967.50
72,665.78
631,633.28
Bt.6.2.2008
Total Harga
( Rp. )
518,365.00
73,527.50
591,892.50
76,946.03
668,838.53
Bt.6.3.2008
Total Harga
( Rp. )
544,137.50
73,527.50
617,665.00
80,296.45
697,961.45
Bt.6.4.2008
Total Harga
( Rp. )
470,227.50
53,440.00
523,667.50
68,076.78
591,744.28
Bt.6.5.2008
Total Harga
( Rp. )
574,735.00
73,527.50
648,262.50
84,274.13
732,536.63
Bt.6.6.2008
Total Harga
( Rp. )
603,835.00
73,527.50
677,362.50
88,057.13
765,419.63
Bt.6.7.2008
Total Harga
( Rp. )
625,880.00
73,527.50
699,407.50
90,922.98
790,330.48
Bt.6.8.2008
Total Harga
( Rp. )
639,960.00
73,527.50
713,487.50
92,753.38
806,240.88
Bt.6.9.2008
Total Harga
( Rp. )
664,210.00
73,527.50
737,737.50
95,905.88
833,643.38
Bt.6.10.2008
Total Harga
( Rp. )
671,635.00
73,527.50
745,162.50
96,871.13
842,033.63
Bt.6.11.2008
Total Harga
( Rp. )
700,297.50
93,520.00
793,817.50
103,196.28
897,013.78
Bt.6.12.2008
Total Harga
( Rp. )
710,122.50
93,520.00
803,642.50
104,473.53
908,116.03
Bt.6.13.2008
Total Harga
( Rp. )
710,250.00
93,520.00
803,770.00
104,490.10
908,260.10
Bt.6.14.2008
Total Harga
( Rp. )
3,660.00
3,660.00
475.80
4,135.80
Bt.6.15.2008
Total Harga
( Rp. )
4,317.50
4,317.50
561.28
4,878.78
Bt.6.16.2008
Total Harga
( Rp. )
4,880.00
4,880.00
634.40
5,514.40
Bt.6.17.2008
Total Harga
( Rp. )
96,900.00
6,022.00
102,922.00
13,379.86
116,301.86
11,630.19
Bt.6.18.2008
Total Harga
( Rp. )
96,100.00
4,308.00
100,408.00
13,053.04
113,461.04
11,346.10
Bt.6.19.2008
Total Harga
( Rp. )
92,600.00
2,106.50
94,706.50
12,311.85
107,018.35
10,701.84
Bt.6.20.2008
Total Harga
( Rp. )
40,000.00
32,890.00
72,890.00
9,475.70
82,365.70
Bt.6.21.2008
Total Harga
( Rp. )
44,475.00
32,890.00
77,365.00
10,057.45
87,422.45
Bt.6.21.2008.a
Total Harga
( Rp. )
44,475.00
32,890.00
77,365.00
10,057.45
87,422.45
Bt.6.22.2008
Total Harga
( Rp. )
121,950.00
41,745.00
163,695.00
21,280.35
184,975.35
Bt.6.23.2008
Total Harga
( Rp. )
125,100.00
41,745.00
166,845.00
21,689.85
188,534.85
Bt.6.24.2008
Total Harga
( Rp. )
145,950.00
41,745.00
187,695.00
24,400.35
212,095.35
Bt.6.25.2008
Total Harga
( Rp. )
148,250.00
41,745.00
189,995.00
24,699.35
214,694.35
Bt.6.26.2008
Total Harga
( Rp. )
112,775.00
41,745.00
154,520.00
20,087.60
174,607.60
Bt.6.27.2008
Total Harga
( Rp. )
34,128.00
8,163.00
42,291.00
5,497.83
47,788.83
Bt.6.28.2008
Total Harga
( Rp. )
2,245,925.00
327,890.50
2,573,815.50
334,596.02
2,908,411.52
Bt.6.28.2008.a
Total Harga
( Rp. )
2,159,596.67
327,890.50
2,487,487.17
323,373.33
2,810,860.50
Bt.6.28.2008.b
Total Harga
( Rp. )
2,108,451.67
327,890.50
2,436,342.17
316,724.48
2,753,066.65
Bt.6.29.2008
Total Harga
( Rp. )
2,800,225.00
371,922.50
3,172,147.50
412,379.18
3,584,526.68
Bt.6.29.2008.a
Total Harga
( Rp. )
2,199,630.00
371,922.50
2,571,552.50
334,301.83
2,905,854.33
Bt.6.29.2008.b
Total Harga
( Rp. )
2,998,985.00
371,922.50
3,370,907.50
438,217.98
3,809,125.48
Bt.6.30.2008
Total Harga
( Rp. )
4,719,375.00
462,222.50
5,181,597.50
673,607.68
5,855,205.18
Bt.6.30.2008.a
Total Harga
( Rp. )
3,978,713.33
462,222.50
4,440,935.83
577,321.66
5,018,257.49
Bt.6.30.2008.b
Total Harga
( Rp. )
3,033,713.33
462,222.50
3,495,935.83
454,471.66
3,950,407.49
Bt.6.30.2008.c
Total Harga
( Rp. )
2,561,213.33
462,222.50
3,023,435.83
393,046.66
3,416,482.49
Bt.6.30.2008.d
Total Harga
( Rp. )
2,510,068.33
462,222.50
2,972,290.83
386,397.81
3,358,688.64
Bt.6.31.2008
Total Harga
( Rp. )
3,527,475.00
402,232.50
3,929,707.50
510,861.98
4,440,569.48
Bt.6.31.2008.a
Total Harga
( Rp. )
2,927,546.67
402,232.50
3,329,779.17
432,871.29
3,762,650.46
Bt.6.31.2008.b
Total Harga
( Rp. )
2,455,046.67
402,232.50
2,857,279.17
371,446.29
3,228,725.46
Bt.6.31.2008.c
Total Harga
( Rp. )
2,403,901.67
402,232.50
2,806,134.17
364,797.44
3,170,931.61
Bt.6.32.2008
Total Harga
( Rp. )
3,113,475.00
328,037.50
3,441,512.50
447,396.63
3,888,909.13
Bt.6.32.2008.a
Total Harga
( Rp. )
2,463,546.67
328,037.50
2,791,584.17
362,905.94
3,154,490.11
Bt.6.32.2008.b
Total Harga
( Rp. )
2,412,401.67
328,037.50
2,740,439.17
356,257.09
3,096,696.26
Bt.6.32.2008.c
Total Harga
( Rp. )
2,231,796.67
328,037.50
2,559,834.17
332,778.44
2,892,612.61
Bt.6.33.2008
Total Harga
( Rp. )
3,040,375.00
327,890.50
3,368,265.50
437,874.52
3,806,140.02
Bt.6.33.2008.a
Total Harga
( Rp. )
2,391,035.00
327,890.50
2,718,925.50
353,460.32
3,072,385.82
Bt.6.34.2008
Total Harga
( Rp. )
3,366,775.00
371,922.50
3,738,697.50
486,030.68
4,224,728.18
Bt.6.35.2008
Total Harga
( Rp. )
36,542.50
9,588.00
46,130.50
5,996.97
52,127.47
Bt.6.35.2008.a
Total Harga
( Rp. )
34,719.17
9,588.00
44,307.17
5,759.93
50,067.10
Bt.6.36.2008
Total Harga
( Rp. )
46,132.50
15,832.00
61,964.50
8,055.39
70,019.89
Bt.6.36.2008.a
Total Harga
( Rp. )
40,292.50
15,832.00
56,124.50
7,296.19
63,420.69
L.6.1.2008
Total Harga
( Rp. )
9,785.00
4,977.00
14,762.00
1,919.06
16,681.06
L.6.1.2008.a
Total Harga
( Rp. )
19,410.00
4,977.00
24,387.00
3,170.31
27,557.31
L.6.2.2008
Total Harga
( Rp. )
800.00
10,824.00
11,624.00
1,511.12
13,135.12
L.6.3.2008
Total Harga
( Rp. )
800.00
9,020.00
9,820.00
1,276.60
11,096.60
L.6.4.2008
Total Harga
( Rp. )
800.00
9,020.00
9,820.00
1,276.60
11,096.60
L.6.5.2008
Total Harga
( Rp. )
20,542.50
9,020.00
29,562.50
3,843.13
33,405.63
L.6.6.2008
Total Harga
( Rp. )
160.00
72,160.00
72,320.00
9,401.60
81,721.60
L.6.7.2008
Total Harga
( Rp. )
23,600.00
6,325.00
29,925.00
3,890.25
33,815.25
L.6.7.2008.a
Total Harga
( Rp. )
26,030.00
6,325.00
32,355.00
4,206.15
36,561.15
L.6.8.2008
Total Harga
( Rp. )
7,950.00
5,412.00
13,362.00
1,737.06
15,099.06
L.6.9.2008
Total Harga
( Rp. )
2,700.00
45,100.00
-
47,800.00
6,214.00
54,014.00
L.6.10.2008
Total Harga
( Rp. )
4,360.00
4,533.00
8,893.00
1,156.09
10,049.09
Dihitung
Total Harga
( Rp. )
26,900.00
6,100.00
33,000.00
4,290.00
37,290.00
Bs.6.1.2008
Total Harga
( Rp. )
18,515.00
5,142.00
23,657.00
3,075.41
26,732.41
Bs.6.2.2008
Total Harga
( Rp. )
9,775.00
5,142.00
14,917.00
1,939.21
16,856.21
Bs.6.3.2008
Total Harga
( Rp. )
6,400.00
8,129.00
14,529.00
1,888.77
16,417.77
Bs.6.4.2008
Total Harga
( Rp. )
770,505.00
89,962.00
860,467.00
111,860.71
972,327.71
Bs.6.5.2008
Total Harga
( Rp. )
9,510.00
2,440.00
11,950.00
1,553.50
13,503.50
1,350.35
Bs.6.6.2008
Total Harga
( Rp. )
310,000.00
55,682.00
365,682.00
47,538.66
413,220.66
Bs.6.7.2008
Total Harga
( Rp. )
481,500.00
100,356.00
581,856.00
75,641.28
657,497.28
Bs.6.8.2008
Total Harga
( Rp. )
645,000.00
37,708.00
682,708.00
88,752.04
771,460.04
Bs.6.9.2008
Total Harga
( Rp. )
42,424.00
42,424.00
5,515.12
47,939.12
Bs.6.10.2008
Total Harga
( Rp. )
481,500.00
85,700.00
567,200.00
73,736.00
640,936.00
Bs.6.11.2008
Total Harga
( Rp. )
94,000.00
3,682.80
97,682.80
12,698.76
110,381.56
Bs.6.12.2008
Total Harga
( Rp. )
680,400.00
7,282.20
687,682.20
89,398.69
777,080.89
Bs.6.13.2008
Total Harga
( Rp. )
1,461,750.00
7,343.50
1,469,093.50
190,982.16
1,660,075.66
Bs.6.14.2008
Total Harga
( Rp. )
30,018.00
30,018.00
3,902.34
33,920.34
Bs.6.15.2008
Total Harga
( Rp. )
110,691.48
143,096.00
253,787.48
32,992.37
286,779.85
Bs.6.16.2008
Total Harga
( Rp. )
35,594.39
8,570.00
44,164.39
5,741.37
49,905.76
Bs.6.17.2008
Total Harga
( Rp. )
97,650.00
16,726.00
114,376.00
14,868.88
129,244.88
Bs.6.18.2008
Total Harga
( Rp. )
62,561.40
26,285.00
88,846.40
11,550.03
100,396.43
Bs.6.19.2008
Total Harga
( Rp. )
6,125.00
20,288.00
26,413.00
3,433.69
29,846.69
TL.6.1.2008
Total Harga
( Rp. )
16,260.00
15,297.50
31,557.50
4,102.48
35,659.98
TL.6.2.2008
Total Harga
( Rp. )
16,500.00
15,860.00
32,360.00
4,206.80
36,566.80
TL.6.3.2008
Total Harga
( Rp. )
16,980.00
16,517.50
33,497.50
4,354.68
37,852.18
TL.6.4.2008
Total Harga
( Rp. )
29,260.00
15,297.50
44,557.50
5,792.48
50,349.98
TL.6.5.2008
Total Harga
( Rp. )
31,500.00
15,860.00
47,360.00
6,156.80
53,516.80
TL.6.6.2008
Total Harga
( Rp. )
33,180.00
16,517.50
49,697.50
6,460.68
56,158.18
TL.6.7.2008
Total Harga
( Rp. )
29,260.00
15,297.50
44,557.50
5,792.48
50,349.98
TL.6.8.2008
Total Harga
( Rp. )
31,500.00
15,860.00
47,360.00
6,156.80
53,516.80
TL.6.9.2008
Total Harga
( Rp. )
6.5625
1.010286
2.916666667
2.945833
154,260.00
15,297.50
169,557.50
22,042.48
191,599.98
TL.6.10.2008
Total Harga
( Rp. )
31,500.00
15,860.00
47,360.00
6,156.80
53,516.80
TL.6.10.2008.a
Total Harga
( Rp. )
162,657.53
1.010057
15,860.00
178,517.53
23,207.28
201,724.81
TL.6.10.2008.b
Total Harga
( Rp. )
15,860.00
15,860.00
2,061.80
17,921.80
TL.6.11.2008
Total Harga
( Rp. )
29,260.00
15,297.50
44,557.50
5,792.48
50,349.98
TL.6.12.2008
Total Harga
( Rp. )
31,500.00
15,860.00
47,360.00
6,156.80
53,516.80
TL.6.13.2008
Total Harga
( Rp. )
456,020.00
14,640.00
470,660.00
61,185.80
531,845.80
TL.6.14.2008
Total Harga
( Rp. )
29,260.00
15,297.50
44,557.50
5,792.48
50,349.98
TL.6.15.2008
Total Harga
( Rp. )
31,500.00
15,860.00
47,360.00
6,156.80
53,516.80
TL.6.16.2008
Total Harga
( Rp. )
2,380.00
7,736.00
10,116.00
1,315.08
11,431.08
TL.6.17.2008
Total Harga
( Rp. )
1,788.00
7,736.00
9,524.00
1,238.12
10,762.12
TL.6.18.2008
Total Harga
( Rp. )
1,788.00
7,736.00
9,524.00
1,238.12
10,762.12
TL.6.19.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.20.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.21.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.22.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.23.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.24.2008
Total Harga
( Rp. )
85,480.50
7,736.00
93,216.50
12,118.15
105,334.65
TL.6.25.2008
Total Harga
( Rp. )
85,623.00
7,736.00
93,359.00
12,136.67
105,495.67
TL.6.26.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.27.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.28.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.29.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.30.2008
Total Harga
( Rp. )
2,668.00
7,736.00
10,404.00
1,352.52
11,756.52
TL.6.31.2008
Total Harga
( Rp. )
21,960.00
21,960.00
2,854.80
24,814.80
TL.6.32.2008
Total Harga
( Rp. )
41,828.00
42,700.00
84,528.00
10,988.64
95,516.64
TL.6.33.2008
Total Harga
( Rp. )
46,328.00
42,700.00
89,028.00
11,573.64
100,601.64
TL.6.34.2008
Total Harga
( Rp. )
62,528.00
42,700.00
105,228.00
13,679.64
118,907.64
TL.6.35.2008
Total Harga
( Rp. )
67,500.00
42,700.00
110,200.00
14,326.00
124,526.00
TL.6.35.2008.a
Total Harga
( Rp. )
63,500.00
42,700.00
106,200.00
13,806.00
120,006.00
TL.6.36.2008
Total Harga
( Rp. )
33,180.00
42,700.00
75,880.00
9,864.40
85,744.40
TL.6.37.2008
Total Harga
( Rp. )
59,960.00
64,097.50
124,057.50
16,127.48
140,184.98
TL.6.38.2008
Total Harga
( Rp. )
40,880.00
42,700.00
83,580.00
10,865.40
94,445.40
TL.6.39.2008
Total Harga
( Rp. )
39,548.00
7,736.00
47,284.00
6,146.92
53,430.92
TL.6.40.2008
Total Harga
( Rp. )
2,168.00
7,736.00
9,904.00
1,287.52
11,191.52
TL.6.41.2008
Total Harga
( Rp. )
964.00
7,736.00
8,700.00
1,131.00
9,831.00
TL.6.42.2008
Total Harga
( Rp. )
2,668.00
64,298.00
66,966.00
8,705.58
75,671.58
TL.6.43.2008
Total Harga
( Rp. )
145,828.00
42,700.00
188,528.00
24,508.64
213,036.64
TL.6.44.2008
Total Harga
( Rp. )
111,895.00
15,357.00
127,252.00
16,542.76
143,794.76
TL.6.45.2008
Total Harga
( Rp. )
21,700.00
10,824.00
32,524.00
4,228.12
36,752.12
TL.6.46.2008
Total Harga
( Rp. )
61,350.00
44,275.00
105,625.00
13,731.25
119,356.25
TL.6.47.2008
Total Harga
( Rp. )
37,200.00
44,275.00
81,475.00
10,591.75
92,066.75
TL.6.48.2008
Total Harga
( Rp. )
65,210.00
61,000.00
126,210.00
16,407.30
142,617.30
TL.6.49.2008
Total Harga
( Rp. )
77,710.00
54,900.00
132,610.00
17,239.30
149,849.30
TL.6.50.2008
Total Harga
( Rp. )
69,610.00
54,900.00
124,510.00
16,186.30
140,696.30
TL.6.51.2008
Total Harga
( Rp. )
40,460.00
54,900.00
95,360.00
12,396.80
107,756.80
TL.6.52.2008
Total Harga
( Rp. )
41,960.00
54,900.00
96,860.00
12,591.80
109,451.80
TL.6.53.2008
Total Harga
( Rp. )
40,460.00
54,900.00
95,360.00
12,396.80
107,756.80
TL.6.54.2008
Total Harga
( Rp. )
75,360.00
54,900.00
130,260.00
16,933.80
147,193.80
TL.6.55.2008
Total Harga
( Rp. )
193,965.50
79,300.00
273,265.50
35,524.52
308,790.02
TL.6.56.2008
Total Harga
( Rp. )
44,928.00
61,000.00
105,928.00
13,770.64
119,698.64
TL.6.57.2008
Total Harga
( Rp. )
105,600.00
42,700.00
148,300.00
19,279.00
167,579.00
TL.6.58.2008
Total Harga
( Rp. )
105,600.00
42,700.00
148,300.00
19,279.00
167,579.00
TL.6.58.2008.a
Total Harga
( Rp. )
72,600.00
42,700.00
115,300.00
14,989.00
130,289.00
TL.6.58.2008.b
Total Harga
( Rp. )
193,600.00
42,700.00
236,300.00
30,719.00
267,019.00
TL.6.59.2008
Total Harga
( Rp. )
21,700.00
12,878.00
34,578.00
4,495.14
39,073.14
TL.6.60.2008
Total Harga
( Rp. )
15,250.00
20,612.50
35,862.50
4,662.13
40,524.63
TL.6.61.2008
Total Harga
( Rp. )
10,284.00
10,284.00
1,336.92
11,620.92
TL.6.62.2008
Total Harga
( Rp. )
4,960.00
6,856.00
11,816.00
1,536.08
13,352.08
TL.6.63.2008
Total Harga
( Rp. )
250.00
10,824.00
11,074.00
1,439.62
12,513.62
Bahan
Kertas folio 70 gr
ball point
kertas sampul
cuci cetak
tinta print refill
rim
bh
lb
bh
bh
1.000
4.000
15.000
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
37,000.00
8,500.00
1,500.00
86,500.00
30,000.00
Tenaga Kerja
Administratur
OH
1.000
37,500.00
C
D
E
Kebutuhan
No
Satuan
Indeks
Jumlah
( Rp. )
37,000.00
34,000.00
22,500.00
86,500.00
30,000.00
37,500.00
(A+B)
10%
3%
C
(C+D)
Bahan
Kayu 5/7
Paku biasa 2" - 5 "
Kayu papan 3/20
m3
Kg
m3
0.012
0.020
0.007
Harga Satuan
Bahan / Upah
( Rp. )
1,050,000.00
12,500.00
895,000.00
Tenaga Kerja
Tukang kayu
Pekerja
Kep.Tukang
Mandor
OH
OH
OH
OH
0.100
0.100
0.010
0.005
49,000.00
34,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Satuan
Indeks
OH
OH
6.667
0.033
3%
Jumlah
( Rp. )
12,600.00
250.00
6,265.00
4,900.00
3,400.00
490.00
230.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Tenaga Kerja
Peralatan
C
D
E
Pekerja
Mandor
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
226,678.00
1,518.00
(A+B)
10%
C
(C+D)
Kebutuhan
No
A
Tenaga Kerja
Pekerja
Mandor
Peralatan
C
D
E
Satuan
Indeks
OH
OH
6.667
0.333
3%
Harga Satuan
Bahan / Upah
( Rp. )
34,000.00
46,000.00
Jumlah
( Rp. )
226,678.00
15,318.00
(A+B)
10%
C
(C+D)
Bahan
Genteng magas
Buah
25.000
Harga Satuan
Bahan / Upah
( Rp. )
1,800.00
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.075
0.008
0.008
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
Satuan
Indeks
Jumlah
( Rp. )
45,000.00
5,100.00
3,337.50
392.00
368.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Genteng kodok
Buah
25.000
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.075
0.008
0.008
Peralatan
D
E
F
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
5,100.00
3,337.50
392.00
368.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Genteng Morando
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
Buah
OH
OH
OH
OH
10%
25.00
Harga Satuan
Bahan / Upah
( Rp. )
2,550.00
0.150
0.075
0.008
0.008
3%
Satuan
Indeks
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
63,750.00
5,100.00
3,337.50
392.00
368.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Genteng bubung
Semen portland
Pasir pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Buah
Kg
m3
5.000
8.000
0.032
Harga Satuan
Bahan / Upah
( Rp. )
5,750.00
1,200.00
100,000.00
OH
OH
OH
OH
0.400
0.200
0.020
0.002
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
28,750.00
9,600.00
3,200.00
13,600.00
8,900.00
980.00
92.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Genteng bubung
Semen portland
Pasir pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
Buah
Kg
m3
5.000
8.000
0.032
Harga Satuan
Bahan / Upah
( Rp. )
5,750.00
1,200.00
100,000.00
OH
OH
OH
OH
0.400
0.200
0.020
0.002
34,000.00
44,500.00
49,000.00
46,000.00
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
28,750.00
9,600.00
3,200.00
13,600.00
8,900.00
980.00
92.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Genteng bubung
Semen portland
Pasir pasang
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Peralatan
D
E
F
10%
Buah
Kg
m3
4.000
8.000
0.032
Harga Satuan
Bahan / Upah
( Rp. )
5,750.00
1,200.00
100,000.00
OH
OH
OH
OH
0.400
0.200
0.020
0.002
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
23,000.00
9,600.00
3,200.00
13,600.00
8,900.00
980.00
92.00
(A+B+C)
D
(D+E)
Bahan
Asbes gelombang
Paku sekrup
lbr
kg
0.600
0.120
Harga Satuan
Bahan / Upah
( Rp. )
58,000.00
22,500.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.140
0.070
0.007
0.007
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
Jumlah
( Rp. )
34,800.00
2,700.00
4,760.00
3,430.00
343.00
322.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Jumlah
( Rp. )
Asbes gelombang
Paku sekrup
lbr
kg
0.370
0.120
22,500.00
2,700.00
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.140
0.067
0.007
0.007
34,000.00
49,000.00
49,000.00
46,000.00
4,760.00
3,283.00
343.00
322.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
Bahan
Galvalum
Paku pancing
m2
bj
1.100
6.000
Harga Satuan
Bahan / Upah
( Rp. )
56,000.00
600.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.140
0.070
0.007
0.007
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10
Kebutuhan
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
61,600.00
3,600.00
4,760.00
3,430.00
343.00
322.00
(A+B+C)
D
(D+E)
Bahan
Bubung asbes
Paku sekrup 3,5"
lbr
biji
2.400
6.000
Harga Satuan
Bahan / Upah
( Rp. )
26,500.00
600.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.084
0.125
0.013
0.004
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
11
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
63,600.00
3,600.00
2,856.00
6,125.00
637.00
184.00
(A+B+C)
D
(D+E)
Bahan
Bubungan Galvalum
Paku pancing
m'
bj
1.100
6.000
Harga Satuan
Bahan / Upah
( Rp. )
0.00
600.00
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.084
0.125
0.013
0.004
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
12
10%
Jumlah
( Rp. )
3,600.00
2,856.00
6,125.00
637.00
184.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Jumlah
( Rp. )
Bubung asbes
Paku sekrup 3,5"
lbr
biji
2.050
6.000
600.00
3,600.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.084
0.125
0.013
0.004
34,000.00
49,000.00
49,000.00
46,000.00
2,856.00
6,125.00
637.00
184.00
Tenaga Kerja
Peralatan
D
E
F
10%
3%
(A+B+C)
D
(D+E)
13
Kebutuhan
No
A
Bahan
Genteng sirap
Paku biasa
Buah
kg
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
Tenaga Kerja
Peralatan
D
E
F
14
Satuan
10%
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
60.00
0.200
0.150
0.075
0.008
0.008
Jumlah
( Rp. )
12,500.00
2,500.00
34,000.00
49,000.00
49,000.00
46,000.00
5,100.00
3,675.00
392.00
368.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
lbr
Kg
kg
m3
5.000
8.000
0.032
0.032
12,500.00
12,500.00
5,100,000.00
100,000.00
400.00
163,200.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.400
0.200
0.020
0.002
34,000.00
49,000.00
49,000.00
46,000.00
13,600.00
9,800.00
980.00
92.00
Tenaga Kerja
Peralatan
D
E
F
15
Jumlah
( Rp. )
10%
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
lbr
kg
0.700
0.020
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.120
0.060
0.006
0.006
Peralatan
D
E
F
16
10%
Jumlah
( Rp. )
-
34,000.00
49,000.00
49,000.00
46,000.00
4,080.00
2,940.00
294.00
276.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
Seng bjls 28
Paku biasa 1/2" - 1"
lbr
kg
0.300
0.040
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.070
0.008
0.006
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
-
34,000.00
49,000.00
49,000.00
46,000.00
5,100.00
3,430.00
392.00
276.00
(A+B+C)
D
(D+E)
17
Kebutuhan
No
Satuan
Indeks
Bahan
Aluminium foil/sisalation
m2
1.050
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
0.150
0.050
0.005
0.008
Peralatan
D
E
F
10%
3%
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
-
34,000.00
49,000.00
49,000.00
46,000.00
5,100.00
2,450.00
245.00
368.00
(A+B+C)
D
(D+E)
PEKERJAAN SANITASI
1
Kebutuhan
No
A
Bahan
Indeks
Kloset duduk/monoblok
Perlengkapan
( 6% harga kloset )
bh
m3
1.000
1.000
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
3.300
1.100
0.001
0.160
Tenaga Kerja
Peralatan
D
E
F
Satuan
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
112,200.00
48,950.00
49.00
7,360.00
(A+B+C)
D
(D+E)
Bahan
Kloset Jongkok
PC
Pasir pasang
bh
kg
m3
1.000
6.000
0.010
Harga Satuan
Bahan / Upah
( Rp. )
115,000.00
1,200.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
1.000
1.500
1.500
0.160
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
Jumlah
( Rp. )
115,000.00
7,200.00
1,000.00
34,000.00
66,750.00
73,500.00
7,360.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Memasang urinoir
bh
Kebutuhan
No
A
Bahan
Urinoir
Perlengkapan
( 30% harga kloset )
PC
Pasir pasang
kg
m3
6.000
0.010
1,200.00
100,000.00
7,200.00
1,000.00
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
1.000
1.000
0.100
0.100
34,000.00
44,500.00
49,000.00
46,000.00
34,000.00
44,500.00
4,900.00
4,600.00
Tenaga Kerja
Peralatan
D
E
F
bh
10%
1.000
1.000
Jumlah
( Rp. )
3%
Satuan
Indeks
(A+B+C)
D
(D+E)
Memasang wastafel
bh
Wastafel
Perlengkapan
( 12% harga wastafel )
PC
Pasir pasang
bh
bh
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
590,000.00
70,800.00
kg
m3
6.000
0.010
1,200.00
100,000.00
7,200.00
1,000.00
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
1.200
1.450
0.150
0.100
34,000.00
44,500.00
49,000.00
46,000.00
40,800.00
64,525.00
7,350.00
4,600.00
Kebutuhan
No
Bahan
Tenaga Kerja
Peralatan
D
E
F
10%
3%
Jumlah
( Rp. )
590,000.00
70,800.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Indeks
Badkip
Perlengkapan
( 20% harga badkip )
bh
m3
1.000
1.000
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.000
0.075
0.750
0.250
Tenaga Kerja
Peralatan
D
E
F
Satuan
10%
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
3,337.50
36,750.00
11,500.00
(A+B+C)
D
(D+E)
Bahan
Bak fiberglass
Perlengkapan
( 12% harga badkip )
bh
m3
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
230,000.00
27,600.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.150
0.075
0.750
0.250
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
230,000.00
27,600.00
5,100.00
3,337.50
36,750.00
11,500.00
(A+B+C)
D
(D+E)
Bahan
Bak fiberglass
Perlengkapan
( 12% harga badkip )
bh
m3
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
1,150,000.00
138,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.200
0.075
0.750
0.250
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
1,150,000.00
138,000.00
6,800.00
3,337.50
36,750.00
11,500.00
(A+B+C)
D
(D+E)
Bahan
Batu bata
PC
Pasir pasang
Batu kerikil
Besi beton
Pasir beton
m3
kg
m3
m3
kg
m3
0.250
77.000
0.130
0.020
2.600
0.090
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
157,500.00
9,000.00
115,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
1.420
0.473
0.047
0.071
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Jumlah
( Rp. )
117.50
92,400.00
13,000.00
3,150.00
23,400.00
10,350.00
48,280.00
21,048.50
2,303.00
3,266.00
(A+B+C)
D
(D+E)
Bahan
Batu bata
PC
Pasir pasang
Batu kerikil
Besi beton
Pasir beton
m3
kg
m3
m3
kg
m3
0.250
77.000
0.130
0.020
2.600
0.090
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
157,500.00
9,000.00
115,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
1.420
0.473
0.047
0.071
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
Kebutuhan
Satuan
Indeks
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
117.50
92,400.00
13,000.00
3,150.00
23,400.00
10,350.00
48,280.00
21,048.50
2,303.00
3,266.00
(A+B+C)
D
(D+E)
Bahan
Batu merah
PC
Pasir pasang
Buis beton
m3
kg
m3
bh
0.600
21.930
0.058
1.000
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
12,500.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
1.000
0.050
34,000.00
46,000.00
Peralatan
D
E
F
No
10
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
282.00
26,316.00
5,800.00
12,500.00
34,000.00
2,300.00
(A+B+C)
D
(D+E)
Bahan
Batu merah
PC
Pasir pasang
Buis beton
m3
kg
m3
bh
0.600
21.930
0.058
1.000
Harga Satuan
Bahan / Upah
( Rp. )
470.00
1,200.00
100,000.00
19,750.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
1.000
0.050
34,000.00
46,000.00
Peralatan
D
E
F
No
11
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
282.00
26,316.00
5,800.00
19,750.00
34,000.00
2,300.00
(A+B+C)
D
(D+E)
Bahan
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,666.67
3,033.33
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.054
0.090
0.009
0.0270
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No
10%
Jumlah
( Rp. )
10,400.00
3,033.33
1,836.00
4,005.00
441.00
1,242.00
(A+B+C)
D
(D+E)
12
Bahan
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
20,833.33
7,291.67
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.108
0.180
0.018
0.0054
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
13
Satuan
10%
Indeks
Jumlah
( Rp. )
25,000.00
7,291.67
3,672.00
8,010.00
882.00
248.40
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
14
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
1,575.00
OH
OH
OH
OH
0.036
0.060
0.006
0.0018
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
5,400.00
1,575.00
1,224.00
2,670.00
294.00
82.80
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
15
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
5,375.00
1,881.25
OH
OH
OH
OH
0.036
0.060
0.006
0.0018
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
6,450.00
1,881.25
1,224.00
2,670.00
294.00
82.80
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
6,875.00
2,406.25
OH
OH
OH
OH
0.036
0.060
0.006
0.0018
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
8,250.00
2,406.25
1,224.00
2,670.00
294.00
82.80
(A+B+C)
D
(D+E)
16
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
17
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
12,500.00
4,375.00
OH
OH
OH
OH
0.036
0.060
0.006
0.0018
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Satuan
10%
Indeks
Jumlah
( Rp. )
15,000.00
4,375.00
1,224.00
2,670.00
294.00
82.80
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
18
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
18,750.00
6,562.50
OH
OH
OH
OH
0.054
0.090
0.009
0.0027
34,000.00
44,500.00
49,000.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
22,500.00
6,562.50
1,836.00
4,005.00
441.00
124.20
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
19
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
18,750.00
6,562.50
OH
OH
OH
OH
0.054
0.090
0.009
0.0027
34,000.00
44,500.00
44,500.00
46,000.00
3%
Satuan
Indeks
Jumlah
( Rp. )
22,500.00
6,562.50
1,836.00
4,005.00
400.50
124.20
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Pipa PVC
Perlengkapan
( 35% harga pipa PVC )
Pekerja
Tukang batu
Kep.Tukang
Mandor
Tenaga Kerja
Peralatan
D
E
F
10%
m
bh
1.200
1.000
Harga Satuan
Bahan / Upah
( Rp. )
50,000.00
17,500.00
OH
OH
OH
OH
0.081
0.135
0.0135
0.0041
34,000.00
44,500.00
49,000.00
46,000.00
3%
Jumlah
( Rp. )
60,000.00
17,500.00
2,754.00
6,007.50
661.50
188.60
(A+B+C)
D
(D+E)
20
Bahan
bh
bh
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
29,500.00
2,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
No
21
Kebutuhan
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
29,500.00
50.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Avour stanles
bh
Tenaga Kerja
Pekerja
Tukang pipa
Kepala tukang
Mandor
OH
OH
OH
OH
Peralatan
D
E
F
22
10%
1.000
Harga Satuan
Bahan / Upah
( Rp. )
50,000.00
0.025
0.100
0.100
0.010
3%
Satuan
Indeks
34,000.00
50,000.00
49,000.00
46,000.00
Jumlah
( Rp. )
50,000.00
850.00
5,000.00
4,900.00
460.00
(A+B+C)
D
(D+E)
No
A
Bahan
Jet sower
Seal tape
bh
bh
Tenaga Kerja
Pekerja
Tukang pipa
Kep.Tukang
Mandor
OH
OH
OH
OH
Peralatan
D
E
F
23
10%
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
80,000.00
2,000.00
0.010
0.100
0.010
0.005
3%
Satuan
Indeks
34,000.00
50,000.00
49,000.00
46,000.00
Jumlah
( Rp. )
80,000.00
2,000.00
340.00
5,000.00
490.00
230.00
(A+B+C)
D
(D+E)
No
A
Bahan
bh
bh
Tenaga Kerja
Pekerja
Tukang pipa
Mandor
OH
OH
OH
Peralatan
D
E
F
10%
1.000
2.000
Harga Satuan
Bahan / Upah
( Rp. )
25,000.00
2,000.00
0.050
0.150
0.010
3%
34,000.00
50,000.00
46,000.00
Jumlah
( Rp. )
25,000.00
4,000.00
1,700.00
7,500.00
460.00
(A+B+C)
D
(D+E)
24
Pasang Shower
bh
Kebutuhan
No
Satuan
Bahan
Shower
Seal tape
bh
bh
Tenaga Kerja
Pekerja
Tukang pipa
Kepala tukang
Mandor
OH
OH
OH
OH
Peralatan
D
E
F
25
10%
Indeks
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
250,000.00
2,000.00
0.025
0.100
0.100
0.010
3%
Satuan
Indeks
34,000.00
50,000.00
49,000.00
46,000.00
Jumlah
( Rp. )
250,000.00
2,000.00
850.00
5,000.00
4,900.00
460.00
(A+B+C)
D
(D+E)
Bahan
m
set
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
800,000.00
280,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.030
0.300
0.0300
0.0015
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No
10%
Jumlah
( Rp. )
800,000.00
280,000.00
1,020.00
13,350.00
1,470.00
69.00
(A+B+C)
D
(D+E)
Kebutuhan
No
Satuan
Indeks
Bahan
bh
1.000
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.500
0.010
0.005
Peralatan
D
E
F
10%
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
-
34,000.00
49,000.00
49,000.00
46,000.00
340.00
24,500.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Engsel pintu
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
7,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
10%
Jumlah
( Rp. )
7,000.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Engsel pintu
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
15,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
10%
Jumlah
( Rp. )
15,000.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Engsel pintu
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
25,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
No
10%
Jumlah
( Rp. )
25,000.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
engsel jendela
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
7,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.0005
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
Satuan
10%
Indeks
Jumlah
( Rp. )
7,000.00
340.00
4,900.00
490.00
23.00
(A+B+C)
D
(D+E)
Bahan
Hak angin
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
7,500.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
10%
Jumlah
( Rp. )
7,500.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Hak angin
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
15,500.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
10%
Jumlah
( Rp. )
15,500.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Hak angin
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
25,500.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No
10%
Jumlah
( Rp. )
25,500.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
kunci selot
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
117,750.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.020
0.200
0.020
0.001
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
Jumlah
( Rp. )
117,750.00
680.00
9,800.00
980.00
46.00
(A+B+C)
D
(D+E)
3%
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Kebutuhan
No
A
Bahan
bh
1.000
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.020
0.200
0.020
0.001
Peralatan
D
E
F
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
-
34,000.00
49,000.00
49,000.00
46,000.00
680.00
9,800.00
980.00
46.00
(A+B+C)
D
(D+E)
Bahan
Handel
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
8,000.00
Tenaga Kerja
Tukang kayu
Mandor
OH
OH
0.100
0.010
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
8,000.00
4,900.00
460.00
(A+B+C)
D
(D+E)
Bahan
Grendel
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
6,500.00
Tenaga Kerja
Tukang kayu
Mandor
OH
OH
0.100
0.010
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
6,500.00
4,900.00
460.00
(A+B+C)
D
(D+E)
Bahan
Grendel
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
9,250.00
Tenaga Kerja
Tukang kayu
Mandor
OH
OH
0.100
0.010
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
9,250.00
4,900.00
460.00
(A+B+C)
D
(D+E)
Bahan
Grendel
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
14,500.00
Tenaga Kerja
Tukang kayu
Mandor
OH
OH
0.100
0.010
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
14,500.00
4,900.00
460.00
(A+B+C)
D
(D+E)
Bahan
Kaca 3 mm
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
47,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
10%
Jumlah
( Rp. )
51,700.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Kaca 5 mm
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
48,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
10%
Jumlah
( Rp. )
52,800.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Kaca 5 mm
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
64,500.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
No
10%
Jumlah
( Rp. )
70,950.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Kaca es 5 mm
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
135,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.015
0.150
0.015
0.00075
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
Kebutuhan
Satuan
10%
Indeks
Jumlah
( Rp. )
148,500.00
510.00
7,350.00
735.00
34.50
(A+B+C)
D
(D+E)
Bahan
Kaca 8 mm
m2
1.100
Harga Satuan
Bahan / Upah
( Rp. )
250,000.00
Tenaga Kerja
Pekerja
Tukang kayu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.0165
0.165
0.0165
0.00080
34,000.00
49,000.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
No
10%
Jumlah
( Rp. )
275,000.00
561.00
8,085.00
808.50
36.80
(A+B+C)
D
(D+E)
PEKERJAAN CAT
1
Bahan
Plamir
cat dasar
cat penutup
kg
kg
kg
0.150
0.170
0.170
Harga Satuan
Bahan / Upah
( Rp. )
15,000.00
37,000.00
37,000.00
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.070
0.075
0.0075
0.0025
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
Kebutuhan
Satuan
10%
Indeks
Jumlah
( Rp. )
2,250.00
6,290.00
6,290.00
2,380.00
3,337.50
367.50
115.00
(A+B+C)
D
(D+E)
Bahan
cat meni
Plamir
cat dasar
cat penutup
kg
kg
kg
kg
0.200
0.150
0.170
0.350
Harga Satuan
Bahan / Upah
( Rp. )
18,000.00
15,000.00
37,000.00
37,000.00
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.070
0.105
0.004
0.0025
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Politur
Politur jadi
Amplas
ltr
ltr
lbr
0.150
0.372
2.000
1,800.00
3,600.00
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.0600
0.0160
0.0025
34,000.00
49,000.00
49,000.00
46,000.00
2,940.00
784.00
115.00
3%
Kebutuhan
Satuan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
No
10%
Jumlah
( Rp. )
3,600.00
2,250.00
6,290.00
12,950.00
2,380.00
4,672.50
196.00
115.00
(A+B+C)
D
(D+E)
No
A
Bahan
Tenaga Kerja
Peralatan
D
E
F
10%
Jumlah
( Rp. )
(A+B+C)
D
(D+E)
No
A
Bahan
Residu / Ter
ltr
0.350
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.0060
3%
Peralatan
D
E
F
10%
Jumlah
( Rp. )
-
34,000.00
44,500.00
49,000.00
46,000.00
340.00
276.00
(A+B+C)
D
(D+E)
Kebutuhan
No
A
Bahan
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
Jumlah
( Rp. )
vernis
Dempul
Ampelas
Kuas
ltr
kg
lbr
bh
0.150
0.050
0.100
0.010
15,000.00
1,800.00
15,000.00
750.00
180.00
150.00
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.160
0.1600
0.0260
0.0025
34,000.00
44,500.00
49,000.00
46,000.00
5,440.00
7,120.00
1,274.00
115.00
3%
Satuan
Indeks
Tenaga Kerja
Peralatan
D
E
F
Satuan
10%
(A+B+C)
D
(D+E)
Bahan
Plamir
Cat dasar
Cat penutup 2 X
kg
kg
kg
0.100
0.100
0.260
Harga Satuan
Bahan / Upah
( Rp. )
15,000.00
21,000.00
21,000.00
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.020
0.0630
0.0063
0.0025
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
10%
Jumlah
( Rp. )
1,500.00
2,100.00
5,460.00
680.00
2,803.50
308.70
115.00
(A+B+C)
D
(D+E)
No
A
Bahan
Cat dasar
Cat penutup 2x
kg
kg
Tenaga Kerja
Pekerja
Tukang cat
Kepala Tukang
Mandor
OH
OH
OH
OH
Peralatan
D
E
F
10%
0.100
0.200
Harga Satuan
Bahan / Upah
( Rp. )
75,000.00
75,000.00
0.020
0.063
0.006
0.003
3%
Kebutuhan
Satuan
Indeks
34,000.00
44,500.00
49,000.00
46,000.00
Jumlah
( Rp. )
7,500.00
15,000.00
680.00
2,803.50
308.70
115.00
(A+B+C)
D
(D+E)
Bahan
Cat dasar
Cat penutup
kg
kg
0.120
0.180
Harga Satuan
Bahan / Upah
( Rp. )
21,000.00
21,000.00
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.028
0.042
0.0042
0.0025
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
3%
No
10%
Jumlah
( Rp. )
2,520.00
3,780.00
952.00
1,869.00
205.80
115.00
(A+B+C)
D
(D+E)
Bahan
Meni besi
Kuas
m2
kg
0.100
0.010
Harga Satuan
Bahan / Upah
( Rp. )
18,000.00
15,000.00
Tenaga Kerja
Pekerja
Tukang cat
Kep.Tukang
Mandor
OH
OH
OH
OH
0.020
0.200
0.020
0.010
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Jumlah
( Rp. )
1,800.00
150.00
680.00
8,900.00
980.00
460.00
(A+B+C)
D
(D+E)
An. Dihitung
Total Harga
( Rp. )
210,000.00
37,500.00
247,500.00
32,175.00
279,675.00
Ps.6.4.2002
Total Harga
( Rp. )
19,115.00
9,020.00
28,135.00
3,657.55
31,792.55
Ps.6.14.2002
Total Harga
( Rp. )
228,196.00
228,196.00
29,665.48
257,861.48
Ps.6.13.2002
Total Harga
( Rp. )
241,996.00
241,996.00
31,459.48
273,455.48
At.8.6.1.2002
Total Harga
( Rp. )
45,000.00
9,197.50
54,197.50
7,045.68
61,243.18
At.8.6.2.2002
Total Harga
( Rp. )
9,197.50
9,197.50
1,195.68
10,393.18
At.8.6.3.2002
Total Harga
( Rp. )
63,750.00
9,197.50
72,947.50
9,483.18
82,430.68
At.8.6.4.2002
Total Harga
( Rp. )
41,550.00
23,572.00
65,122.00
8,465.86
73,587.86
At.8.6.5.2002
Total Harga
( Rp. )
41,550.00
23,572.00
65,122.00
8,465.86
73,587.86
At.8.6.6.2002
Total Harga
( Rp. )
35,800.00
23,572.00
59,372.00
7,718.36
67,090.36
At.8.6.10.2002
Total Harga
( Rp. )
37,500.00
8,855.00
46,355.00
6,026.15
52,381.15
At.8.6.17.2002
Total Harga
( Rp. )
2,700.00
8,708.00
11,408.00
1,483.04
12,891.04
At.8.6.17.2002.a
Total Harga
( Rp. )
65,200.00
8,855.00
74,055.00
9,627.15
83,682.15
At.8.6.22.2002
Total Harga
( Rp. )
67,200.00
9,802.00
77,002.00
10,010.26
87,012.26
At.8.6.22.2002.a
Total Harga
( Rp. )
3,600.00
9,802.00
13,402.00
1,742.26
15,144.26
At.8.6.24.2002
Total Harga
( Rp. )
3,600.00
9,802.00
13,402.00
1,742.26
15,144.26
At.8.6.33.2002
Total Harga
( Rp. )
2,500.00
9,535.00
12,035.00
1,564.55
13,599.55
At.8.6.37.2002
Total Harga
( Rp. )
263,600.00
24,472.00
288,072.00
37,449.36
325,521.36
At.8.6.38.2002
Total Harga
( Rp. )
7,590.00
7,590.00
986.70
8,576.70
At.8.6.39.2002
Total Harga
( Rp. )
9,198.00
9,198.00
1,195.74
10,393.74
At.8.6.42.2002
Total Harga
( Rp. )
8,163.00
8,163.00
1,061.19
9,224.19
Sn.11.6.1.2002
Total Harga
( Rp. )
168,559.00
168,559.00
21,912.67
190,471.67
Sn.11.6.2.2002
Total Harga
( Rp. )
123,200.00
181,610.00
304,810.00
39,625.30
344,435.30
Sn.11.6.4.2002
Total Harga
( Rp. )
8,200.00
88,000.00
96,200.00
12,506.00
108,706.00
Sn.11.6.5.2002
Total Harga
( Rp. )
669,000.00
117,275.00
786,275.00
102,215.75
888,490.75
Sn.11.6.9.2002
Total Harga
( Rp. )
51,587.50
51,587.50
6,706.38
58,293.88
Sn.11.6.11.2002
Total Harga
( Rp. )
257,600.00
56,687.50
314,287.50
40,857.38
355,144.88
Sn.11.6.11.2002.a
Total Harga
( Rp. )
1,288,000.00
58,387.50
1,346,387.50
175,030.38
1,521,417.88
Sn.11.6.17.2002
Total Harga
( Rp. )
142,417.50
74,897.50
217,315.00
28,250.95
245,565.95
Sn.11.6.18.2002
Total Harga
( Rp. )
142,417.50
74,897.50
217,315.00
28,250.95
245,565.95
An. Dihitung
Total Harga
( Rp. )
44,898.00
36,300.00
81,198.00
10,555.74
91,753.74
An. Dihitung
Total Harga
( Rp. )
52,148.00
36,300.00
88,448.00
11,498.24
99,946.24
Sn.11.6.20.2002
Total Harga
( Rp. )
13,433.33
7,524.00
20,957.33
2,724.45
23,681.78
Sn.11.6.22.2002
Total Harga
( Rp. )
32,291.67
12,812.40
45,104.07
5,863.53
50,967.60
Sn.11.6.25.2002
Total Harga
( Rp. )
6,975.00
4,270.80
11,245.80
1,461.95
12,707.75
Sn.11.6.26.2002
Total Harga
( Rp. )
8,331.25
4,270.80
12,602.05
1,638.27
14,240.32
Sn.11.6.27.2002
Total Harga
( Rp. )
10,656.25
4,270.80
14,927.05
1,940.52
16,867.57
Sn.11.6.28.2002
Total Harga
( Rp. )
19,375.00
4,270.80
23,645.80
3,073.95
26,719.75
Sn.11.6.29.2002
Total Harga
( Rp. )
29,062.50
6,406.20
35,468.70
4,610.93
40,079.63
Sn.11.6.31.2002
Total Harga
( Rp. )
29,062.50
6,365.70
35,428.20
4,605.67
40,033.87
Sn.11.6.32.2002
Total Harga
( Rp. )
77,500.00
9,611.60
87,111.60
11,324.51
98,436.11
Sn.11.6.35.2002
Total Harga
( Rp. )
29,550.00
5,510.00
35,060.00
4,557.80
39,617.80
An. Dihitung
Total Harga
( Rp. )
50,000.00
11,210.00
61,210.00
7,957.30
69,167.30
An. Dihitung
Total Harga
( Rp. )
82,000.00
6,060.00
88,060.00
11,447.80
99,507.80
An. Dihitung
Total Harga
( Rp. )
29,000.00
9,660.00
38,660.00
5,025.80
43,685.80
An. Dihitung
Total Harga
( Rp. )
252,000.00
11,210.00
263,210.00
34,217.30
297,427.30
Sn.11.6.33.2002
Total Harga
( Rp. )
1,080,000.00
15,909.00
1,095,909.00
142,468.17
1,238,377.17
Kc.12.6.2.2002
Total Harga
( Rp. )
25,560.00
25,560.00
3,322.80
28,882.80
Kc.12.6.5.2002
Total Harga
( Rp. )
7,000.00
8,629.50
15,629.50
2,031.84
17,661.34
Kc.12.6.5.2002.a
Total Harga
( Rp. )
15,000.00
8,629.50
23,629.50
3,071.84
26,701.34
Kc.12.6.5.2002.b
Total Harga
( Rp. )
25,000.00
8,629.50
33,629.50
4,371.84
38,001.34
Kc.12.6.6.2002
Total Harga
( Rp. )
7,000.00
5,753.00
12,753.00
1,657.89
14,410.89
Kc.12.6.9.2002
Total Harga
( Rp. )
7,500.00
8,629.50
16,129.50
2,096.84
18,226.34
Kc.12.6.9.2002.a
Total Harga
( Rp. )
15,500.00
8,629.50
24,129.50
3,136.84
27,266.34
Kc.12.6.9.2002.b
Total Harga
( Rp. )
25,500.00
8,629.50
34,129.50
4,436.84
38,566.34
Kc.12.6.11.2002
Total Harga
( Rp. )
117,750.00
11,506.00
129,256.00
16,803.28
146,059.28
Kc.12.6.12.2002
Total Harga
( Rp. )
11,506.00
11,506.00
1,495.78
13,001.78
An. Dihitung
Total Harga
( Rp. )
8,000.00
5,360.00
13,360.00
1,736.80
15,096.80
An. Dihitung
Total Harga
( Rp. )
6,500.00
5,360.00
11,860.00
1,541.80
13,401.80
An. Dihitung
Total Harga
( Rp. )
9,250.00
5,360.00
14,610.00
1,899.30
16,509.30
An. Dihitung
Total Harga
( Rp. )
14,500.00
5,360.00
19,860.00
2,581.80
22,441.80
Kc.12.6.16.2002
Total Harga
( Rp. )
51,700.00
8,629.50
60,329.50
7,842.84
68,172.34
Kc.12.6.17.2002
Total Harga
( Rp. )
52,800.00
8,629.50
61,429.50
7,985.84
69,415.34
Kc.12.6.17.2002.a
Total Harga
( Rp. )
70,950.00
8,629.50
79,579.50
10,345.34
89,924.84
Kc.12.6.17.2002.b
Total Harga
( Rp. )
148,500.00
8,629.50
157,129.50
20,426.84
177,556.34
Kc.12.6.18.2002
Total Harga
( Rp. )
275,000.00
9,491.30
284,491.30
36,983.87
321,475.17
F.14.6.7.2002
Total Harga
( Rp. )
14,830.00
6,200.00
21,030.00
2,733.90
23,763.90
F.14.6.9.2002
Total Harga
( Rp. )
25,090.00
7,363.50
32,453.50
4,218.96
36,672.46
F.14.6.11.2002
Total Harga
( Rp. )
3,600.00
3,839.00
7,439.00
967.07
8,406.07
F.14.6.12.2002
Total Harga
( Rp. )
616.00
616.00
80.08
696.08
F.14.6.13.2002
Total Harga
( Rp. )
1,080.00
13,949.00
15,029.00
1,953.77
16,982.77
F.14.6.14.2002
Total Harga
( Rp. )
9,060.00
3,907.20
12,967.20
1,685.74
14,652.94
F.14.6.14.2002.a
Total Harga
( Rp. )
22,500.00
3,907.20
26,407.20
3,432.94
29,840.14
F.14.6.15.2002
Total Harga
( Rp. )
6,300.00
3,141.80
9,441.80
1,227.43
10,669.23
F.14.6.20.2002
Total Harga
( Rp. )
1,950.00
11,020.00
12,970.00
1,686.10
14,656.10
Bahan
fitting
kayu dudukan fitting
kabel
bh
bh
m'
1.000
1.000
10.000
Harga Satuan
Bahan / Upah
( Rp. )
5,000.00
4,000.00
3,100.00
Tenaga Kerja
Pekerja
Tk. listrik
Mandor
OH
OH
OH
0.080
0.100
0.050
34,000.00
42,500.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
Satuan
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
5,000.00
4,000.00
31,000.00
2,720.00
4,250.00
2,300.00
(A+B+C)
D
(D+E)
Bahan
Lampu SL 20 watt
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
27,500.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.100
0.0100
34,000.00
46,000.00
Peralatan
D
E
F
3%
Satuan
Indeks
Kebutuhan
No
10%
Jumlah
( Rp. )
27,500.00
3,400.00
460.00
(A+B+C)
D
(D+E)
Bahan
Lampu SL 18 watt
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
22,500.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.100
0.010
34,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
22,500.00
3,400.00
460.00
(A+B+C)
D
(D+E)
Bahan
Saklar ganda
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
14,750.00
Tenaga Kerja
Tukang listrik
Mandor
OH
OH
0.100
0.01000
42,500.00
46,000.00
Peralatan
D
E
F
3%
No
10%
Jumlah
( Rp. )
14,750.00
4,250.00
460.00
(A+B+C)
D
(D+E)
Bahan
Saklar tunggal
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
12,750.00
Tenaga Kerja
Tukang listrik
Mandor
OH
OH
0.100
0.01000
42,500.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
Kebutuhan
No
Satuan
10%
Indeks
Jumlah
( Rp. )
12,750.00
4,250.00
460.00
(A+B+C)
D
(D+E)
Bahan
Stop kontak
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
12,000.00
Tenaga Kerja
Tukang listrik
Mandor
OH
OH
0.100
0.01000
42,500.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
Satuan
Indeks
No
10%
Jumlah
( Rp. )
12,000.00
4,250.00
460.00
(A+B+C)
D
(D+E)
Bahan
Downligh 4"
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
25,000.00
Tenaga Kerja
Tukang listrik
Mandor
OH
OH
0.100
0.010
42,500.00
46,000.00
Peralatan
D
E
F
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
25,000.00
4,250.00
460.00
(A+B+C)
D
(D+E)
Pasang MCB
bh
Kebutuhan
No
A
Bahan
MCB
bh
Tenaga Kerja
Pekerja
Tukang listrik
Mandor
OH
OH
OH
Peralatan
D
E
F
10%
1.000
Harga Satuan
Bahan / Upah
( Rp. )
32,000.00
0.080
0.250
0.050
3%
Satuan
Indeks
34,000.00
42,500.00
46,000.00
Jumlah
( Rp. )
32,000.00
2,720.00
10,625.00
2,300.00
(A+B+C)
D
(D+E)
No
A
Bahan
Box MCB
bh
Tenaga Kerja
Pekerja
Tk. listrik
Mandor
OH
OH
OH
Peralatan
D
E
F
10%
1.000
Harga Satuan
Bahan / Upah
( Rp. )
15,000.00
0.080
0.250
0.050
3%
34,000.00
42,500.00
46,000.00
Jumlah
( Rp. )
15,000.00
2,720.00
10,625.00
2,300.00
(A+B+C)
D
(D+E)
PEKERJAAN LAIN-LAIN
2
Bahan
Pintu PVC
bh
1.000
Harga Satuan
Bahan / Upah
( Rp. )
180,000.00
Tenaga Kerja
Pekerja
Tukang batu
Mandor
OH
OH
OH
0.010
0.100
0.005
34,000.00
44,500.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
180,000.00
340.00
4,450.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 8 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
41,500.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
41,500.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 8 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
73,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
73,000.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 8 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
89,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Jumlah
( Rp. )
89,000.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 8 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
69,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
Satuan
10%
Indeks
3%
Satuan
Indeks
Jumlah
( Rp. )
69,000.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 8 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
80,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
80,000.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
Paving tebal 6 cm
Pasir Pasang
m2
m3
1.000
0.025
Harga Satuan
Bahan / Upah
( Rp. )
36,000.00
100,000.00
Tenaga Kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.010
0.100
0.010
0.005
34,000.00
44,500.00
49,000.00
46,000.00
Peralatan
D
E
F
Kebutuhan
No
10%
3%
Satuan
Indeks
Jumlah
( Rp. )
36,000.00
2,500.00
340.00
4,450.00
490.00
230.00
(A+B+C)
D
(D+E)
Bahan
m3
1.200
Harga Satuan
Bahan / Upah
( Rp. )
29,500.00
Tenaga Kerja
Pekerja
Mandor
OH
OH
0.300
0.010
34,000.00
46,000.00
Peralatan
D
E
F
3%
Kebutuhan
No
10%
Jumlah
( Rp. )
35,400.00
10,200.00
460.00
(A+B+C)
D
(D+E)
An. Dihitung
Total Harga
( Rp. )
40,000.00
9,270.00
49,270.00
6,405.10
55,675.10
An. Dihitung
Total Harga
( Rp. )
27,500.00
3,860.00
31,360.00
4,076.80
35,436.80
An. Dihitung
Total Harga
( Rp. )
22,500.00
3,860.00
26,360.00
3,426.80
29,786.80
An. Dihitung
Total Harga
( Rp. )
14,750.00
4,710.00
19,460.00
2,529.80
21,989.80
An. Dihitung
Total Harga
( Rp. )
12,750.00
4,710.00
17,460.00
2,269.80
19,729.80
An. Dihitung
Total Harga
( Rp. )
12,000.00
4,710.00
16,710.00
2,172.30
18,882.30
An. Dihitung
Total Harga
( Rp. )
25,000.00
4,710.00
29,710.00
3,862.30
33,572.30
An. Dihitung
Total Harga
( Rp. )
32,000.00
15,645.00
47,645.00
6,193.85
53,838.85
An. Dihitung
Total Harga
( Rp. )
15,000.00
15,645.00
30,645.00
3,983.85
34,628.85
An. Dihitung
Total Harga
( Rp. )
180,000.00
5,020.00
185,020.00
24,052.60
185,020.00
An. Dihitung
Total Harga
( Rp. )
44,000.00
5,510.00
49,510.00
6,436.30
55,946.30
An. Dihitung
Total Harga
( Rp. )
75,500.00
5,510.00
81,010.00
10,531.30
91,541.30
An. Dihitung
Total Harga
( Rp. )
91,500.00
5,510.00
97,010.00
12,611.30
109,621.30
An. Dihitung
Total Harga
( Rp. )
71,500.00
5,510.00
77,010.00
10,011.30
87,021.30
An. Dihitung
Total Harga
( Rp. )
82,500.00
5,510.00
88,010.00
11,441.30
99,451.30
An. Dihitung
Total Harga
( Rp. )
38,500.00
5,510.00
44,010.00
5,721.30
49,731.30
An. Dihitung
Total Harga
( Rp. )
35,400.00
10,660.00
46,060.00
5,987.80
52,047.80
An. Dihitung 3
Bahan
Solar
Olie mesin
Olie hydrolic
Grease
Bentonite
ltr
ltr
ltr
ls
kg
20.000
1.000
1.000
1.000
5.200
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
26,700.00
23,500.00
26,700.00
4,400.00
Tenaga Kerja
Geologis
Assisten Geologis
Driller
Ass. Driller
Crew driller
Tenaga lokal
Mekanik / Operator
Jaga malam
OH
OH
OH
OH
OH
OH
OH
OH
1.000
1.000
1.000
1.000
2.000
2.000
1.000
1.000
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
34,000.00
49,000.00
34,000.00
172,000.00
135,000.00
120,000.00
85,000.00
104,000.00
68,000.00
49,000.00
34,000.00
Peralatan
hr
1.000
402,000.00
402,000.00
D
E
F
G
Kebutuhan
No
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
90,000.00
26,700.00
23,500.00
26,700.00
22,880.00
189,780.00
767,000.00
10%
3%
10
(A+B+C)
D
(D+E)
HSP
An. Dihitung 4
Kebutuhan
No
402,000.00
1,358,780.00
176,641.40
1,535,421.40
153,542.14
Bahan
Tenaga Kerja
Geologis
Ass. Geologis
Koordinator
Driller
Crew driller
Peralatan
D
E
F
G
Satuan
Indeks
ls
1.000
Harga Satuan
Bahan / Upah
( Rp. )
140,000.00
Jumlah
( Rp. )
Total Harga
( Rp. )
OH
OH
OH
OH
OH
1.000
1.000
1.000
1.000
1.000
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
ls
1.000
1,347,300.00
1,347,300.00
140,000.00
140,000.00
564,000.00
10%
3%
100
(A+B+C)
D
(D+E)
HSP
1,347,300.00
2,051,300.00
266,669.00
2,317,969.00
23,179.69
An. Dihitung 5
Bahan
Solar
Olie mesin
Olie hydrolic
Grease
Bentonite
ltr
ltr
ltr
ls
kg
20.000
1.000
1.000
1.000
5.200
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
26,700.00
23,500.00
26,700.00
4,400.00
Tenaga Kerja
Geologis
Assisten Geologis
Driller
Ass. Driller
Crew driller
Tenaga lokal
Mekanik / Operator
Jaga malam
OH
OH
OH
OH
OH
OH
OH
OH
1.000
1.000
2.000
1.000
2.000
2.000
1.000
1.000
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
34,000.00
49,000.00
34,000.00
172,000.00
135,000.00
240,000.00
85,000.00
104,000.00
68,000.00
49,000.00
34,000.00
Peralatan
hr
1.000
402,000.00
402,000.00
D
E
F
402,000.00
1,478,780.00
192,241.40
1,671,021.40
Kebutuhan
No
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
90,000.00
26,700.00
23,500.00
26,700.00
22,880.00
189,780.00
887,000.00
10%
3%
(A+B+C)
D
(D+E)
15.0
HSP
111,401.43
10.6
HSP
157,643.53
An. Dihitung 6
m'
Bahan
Solar
Olie mesin
Olie hydrolic
Grease
Bentonite
ltr
ltr
ltr
ls
kg
0.450
0.010
1.000
1.000
5.200
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
26,700.00
23,500.00
26,700.00
4,400.00
Tenaga Kerja
Geologis
Assisten Geologis
Driller
Ass. Driller
Crew driller
Tenaga lokal
Mekanik / Operator
Jaga malam
OH
OH
OH
OH
OH
OH
OH
OH
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
34,000.00
49,000.00
34,000.00
172,000.00
135,000.00
120,000.00
85,000.00
52,000.00
34,000.00
49,000.00
34,000.00
Peralatan
hr
1.000
402,000.00
402,000.00
D
E
F
G
Kebutuhan
No
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
2,025.00
267.00
23,500.00
26,700.00
22,880.00
75,372.00
681,000.00
10%
3%
50
(A+B+C)
D
(D+E)
HSP
Gravel Pack
m'
An. Dihitung 7
Bahan
Gravel
m3
0.023
Harga Satuan
Bahan / Upah
( Rp. )
130,000.00
Tenaga Kerja
Pekerja
OH
0.120
34,000.00
Peralatan
D
E
F
G
Kebutuhan
No
402,000.00
1,158,372.00
150,588.36
1,308,960.36
26,179.21
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
2,990.00
2,990.00
4,080.00
4,080.00
10%
3%
(A+B+C)
D
(D+E)
HSP
Pumping Test
jam
An. Dihitung 8
Bahan
Solar
Olie mesin
Alat tulis
ltr
ltr
ltr
1.500
0.050
1.000
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
26,700.00
8,500.00
Tenaga Kerja
Geologis
Assisten Geologis
Operator pompa
Crew driller
Tenaga lokal
OH
OH
OH
OH
OH
0.100
0.100
0.100
0.200
0.200
172,000.00
135,000.00
60,000.00
52,000.00
34,000.00
17,200.00
13,500.00
6,000.00
10,400.00
6,800.00
Peralatan
hr
0.100
402,000.00
40,200.00
D
E
F
G
Kebutuhan
No
7,070.00
919.10
7,989.10
7,989.10
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
6,750.00
1,335.00
8,500.00
16,585.00
53,900.00
10%
3%
(A+B+C)
D
(D+E)
HSP
36
HSP
No
A
Bahan
Solar
Olie mesin
40,200.00
110,685.00
14,389.05
125,074.05
125,074.05
4,502,665.80
An. Dihitung 9
Satuan
Indeks
ltr
ltr
2.000
0.070
Harga Satuan
Bahan / Upah
( Rp. )
4,500.00
26,700.00
Jumlah
( Rp. )
Total Harga
( Rp. )
9,000.00
1,869.00
10,869.00
Tenaga Kerja
Geologis
Koordinator
Driller
Crew driller
Tenaga lokal
OH
OH
OH
OH
OH
1.000
1.000
0.100
0.100
0.200
172,000.00
150,000.00
120,000.00
52,000.00
34,000.00
172,000.00
150,000.00
12,000.00
5,200.00
6,800.00
Peralatan
Depresiasi mesin
kompresor
hr
0.100
805,200.00
80,520.00
D
E
F
G
346,000.00
10%
3%
(A+B+C)
D
(D+E)
HSP
18
HSP
Accessories di Reservoir
ls
8,896,492.26
An. Dihitung 10
Bahan
bh
bh
bh
ls
5.000
12.000
5.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
270,000.00
27,000.00
360,000.00
70,000.00
Tenaga Kerja
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
OH
OH
OH
OH
0.054
0.090
0.009
0.003
34,000.00
50,000.00
49,000.00
46,000.00
Peralatan
D
E
F
G
Kebutuhan
No
80,520.00
437,389.00
56,860.57
494,249.57
494,249.57
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
1,350,000.00
1,350,000.00
1,836.00
4,500.00
441.00
138.00
6,915.00
10%
3%
(A+B+C)
D
(D+E)
HSP
An. Dihitung 11
Kebutuhan
No
Bahan
1,356,915.00
176,398.95
1,533,313.95
1,533,313.95
Satuan
Indeks
kg
48.400
Harga Satuan
Bahan / Upah
( Rp. )
16,100.00
Jumlah
( Rp. )
Total Harga
( Rp. )
kg
m2
1.600
4.646
21,000.00
37,000.00
33,600.00
171,902.00
OH
1.000
310,000.00
310,000.00
779,240.00
984,742.00
B
Tenaga Kerja
Pemasangan /
Pengelasan
Peralatan
D
E
F
G
310,000.00
10
10%
3%
(A+B+C)
D
(D+E)
HSP
Tutup Manhole
unit
An. Dihitung 12
Bahan
Besi plat t = 3 mm
Bingkai L 30.30.3
Engsel
Cat Meni
kg
kg
bh
m2
21.600
5.440
2.000
1.236
Harga Satuan
Bahan / Upah
( Rp. )
16,100.00
16,100.00
25,000.00
18,000.00
Tenaga Kerja
Pemasangan /
Pengelasan
OH
1.000
310,000.00
Peralatan
No
1,294,742.00
168,316.46
1,463,058.46
1,463,058.46
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
347,760.00
87,584.00
50,000.00
22,248.00
507,592.00
310,000.00
310,000.00
-
D
E
F
G
11
10%
3%
(A+B+C)
D
(D+E)
HSP
An. Dihitung 13
Kebutuhan
No
817,592.00
106,286.96
923,878.96
923,878.96
Galian tanah
Pas. Batu merah 1 : 4
Plesteran 1 : 3
Pengecatan dinding
Flanged CI 2"
Meter air
Check Valve 1.5"
Stop kran 1.5"
Tutup beton
Satuan
Indeks
m3
m2
m2
m2
bh
bh
bh
bh
m3
0.960
1.350
8.550
4.800
1.000
1.000
1.000
1.000
0.120
Harga Satuan
Bahan / Upah
( Rp. )
40,083.36
75,517.90
33,822.26
14,652.94
60,200.00
1,552,500.00
1,092,500.00
103,500.00
2,908,411.52
Jumlah
( Rp. )
Total Harga
( Rp. )
Bahan
38,480.03
101,949.17
289,180.32
70,334.11
60,200.00
1,552,500.00
1,092,500.00
103,500.00
349,009.38
Tenaga Kerja
Peralatan
D
E
F
G
3,657,653.01
12
10%
3%
(A+B+C)
D
(D+E)
HSP
An. Dihitung 14
Pengadaan
Material
Paket AKLI
Material SR
Material pelengkap
ls
ls
ls
1.000
1.000
1.000
Harga Satuan
Bahan / Upah
( Rp. )
1,250,000.00
850,000.00
125,000.00
Administrasi BTL
ls
1.000
250,000.00
250,000.00
Biaya Penyambungan ( BP )
Uang Jaminan Langganan ( UJL )
Data Teknik Gambar
Materai
ls
ls
ls
ls
1.000
1.000
1.000
1.000
1,500,000.00
500,000.00
750,000.00
12,000.00
1,500,000.00
500,000.00
750,000.00
12,000.00
D
E
F
G
No
3,657,653.01
475,494.89
4,133,147.90
4,133,147.90
Kebutuhan
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
1,250,000.00
850,000.00
125,000.00
2,225,000.00
250,000.00
13
10%
3%
(A+B+C)
D
(D+E)
HSP
An. Dihitung 15
Pekerjaan Pipa
m
m3
bh
12.000
0.350
3.000
Harga Satuan
Bahan / Upah
( Rp. )
50,000.00
50,000.00
34,375.00
Pekerjaan
Pasangan
m2
m2
m3
m3
m2
0.840
5.600
0.140
0.420
5.600
75,517.90
33,822.26
591,744.28
40,083.36
14,652.94
Kebutuhan
No
2,762,000.00
5,237,000.00
680,810.00
5,917,810.00
5,917,810.00
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
600,000.00
17,500.00
103,125.00
720,625.00
63,435.04
189,404.66
82,844.20
16,835.01
82,056.46
434,575.37
D
E
F
G
10%
3%
(A+B+C)
D
(D+E)
HSP
1,155,200.37
150,176.05
1,305,376.42
1,305,376.42
14
An. Dihitung 16
Bahan
m
bh
1.200
0.350
Harga Satuan
Bahan / Upah
( Rp. )
17,500.00
17,500.00
Tenaga kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.054
0.090
0.009
0.003
34,000.00
44,500.00
49,000.00
46,000.00
1,836.00
4,005.00
441.00
124.20
Pekerjaan Tanah
m3
m3
0.080
0.060
30,114.50
10,020.84
2,409.16
601.25
D
E
F
G
Kebutuhan
No
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
21,000.00
6,125.00
27,125.00
6,406.20
15
10%
3%
(A+B+C)
D
(D+E)
HSP
An. Dihitung 17
Bahan
m
bh
1.200
0.350
Harga Satuan
Bahan / Upah
( Rp. )
17,500.00
17,500.00
Tenaga kerja
Pekerja
Tukang batu
Kep.Tukang
Mandor
OH
OH
OH
OH
0.054
0.090
0.009
0.003
34,000.00
44,500.00
49,000.00
46,000.00
1,836.00
4,005.00
441.00
124.20
Pekerjaan
Pasangan
m3
m3
m3
m3
0.150
0.066
0.060
0.024
30,114.50
10,020.84
79,845.80
591,744.28
4,517.18
661.38
4,790.75
14,201.86
D
E
F
G
Kebutuhan
No
3,010.41
36,541.61
4,750.41
41,292.02
41,292.02
Satuan
Indeks
Jumlah
( Rp. )
Total Harga
( Rp. )
21,000.00
6,125.00
27,125.00
6,406.20
10%
3%
(A+B+C)
D
(D+E)
HSP
Karanganyar, 2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
Ir. PRIHARYANTO, MM
NIP. 19630331 199103 1 005
24,171.17
57,702.37
7,501.31
65,203.68
65,203.68
0.066
:
:
:
:
:
:
Uraian Pekerjaan
A
1
2
PEKERJAAN PERSIAPAN
Pekerjaan persiapan
Pengukuran dan pemasangan bowplank
1
2
3
4
5
6
7
7
7
7
7
8
9
10
11
12
13
14
PEKERJAAN RESERVOIR
Menggali tanah keras sedalam 1 meter
Mengurug kembali galian
Mengurug pasir urug
Urug tanah padat
Memasang lisplank ukuran ( 3 x 20 ) cm, kayu kruing
Membuat pondasi beton K.175 (150 kg besi + bekisting)
Membuat sloof beton K.175 ( 150 kg besi + bekisting )
Membuat kolom beton K.175 (150 kg besi + bekisting)
Membuat balok beton K.175 ( 150 kg besi + bekisting )
Membuat dinding beton bertulang ( 150 kg besi + bekisting )
Pemasangan tiang listrik komplit
Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 8 PP
Memasang plesteran 1 PC : 1 PP, tebal 15 mm
Memasang acian
Membuat lt. kerja btn mutu f'c = 7,4 Mpa (K 100), slump (3 - 6), w/c = 0,87
Tutup Manhole
Pengecatan tembok baru
Tutup Pengaman Panel dari Tralis Besi
Volume
Sat.
Analysa
Harga
Satuan
Rp.
Jumlah
Harga
Rp.
6
1.00
8.00
ls
m'
Dihitung
Ps.6.4.2002
1,200,000.00
31,792.55
1,200,000.00
254,340.40
JUMLAH A.
6.05
2.90
2.50
13.07
11.18
5.68
132.55
132.55
1.10
1.00
53.58
1.00
m3
m3
m3
m3
m'
m3
m3
m3
m3
m2
titik
m2
m2
m2
m3
unit
m2
ls
T.6.4.2008
T.6.9.2008
T.6.11.2008
An. Dihitung
K.6.21.2008.a
Bt.6.28.2008.b
Bt.6.29.2008.b
Bt.6.30.2008.d
Bt.6.31.2008.c
Bt.6.33.2008
Daftar harga
D.6.12.2008
Plt.6.1.2008
Plt.6.27.2008
Bt.6.4.2008
An. Dihitung 12
F.14.6.14.2002
An. Dihitung 11
40,083.36
10,020.84
79,845.80
52,047.80
79,936.20
2,753,066.65
3,809,125.48
3,358,688.64
3,170,931.61
3,806,140.02
5,900,000.00
69,528.90
43,510.42
18,193.00
591,744.28
923,878.96
14,652.94
1,463,058.46
242,504.33
29,060.44
199,614.50
680,004.51
893,686.72
0.00
0.00
0.00
0.00
0.00
0.00
394,924.15
5,767,306.17
2,411,482.15
650,918.71
923,878.96
785,104.53
1,463,058.46
JUMLAH B.
100.00
100.00
100.00
m'
m'
hari
An. Dihitung 3
An. Dihitung 4
An. Dihitung 5
153,542.14
23,179.69
157,643.53
15,354,214.00
2,317,969.00
15,764,352.83
100.00
80.00
1.20
m'
m'
m3
An. Dihitung 6
An. Dihitung 7
Bt.6.5.2008
26,179.21
7,989.10
732,536.63
2,617,920.72
639,128.00
879,043.96
18.00
36.00
18 jam
jam
An. Dihitung 9
An. Dihitung 8
8,896,492.26
125,074.05
160,136,860.68
4,502,665.80
JUMLAH I.
7
8
PEKERJAAN SUMUR
PEKERJAAN PENGEBORAN
Pemboran Pilot Hole 4"
Electric Well Logging
Pemboran reaming 8"
( tanah sulit )
Pemasangan Pipa Casing dan Screen
Gravel Pack
Membuat beton mutu f'c = 14,5 Mpa (K 175), slump (12 + 2), w/c = 0,66
( cement grouting )
Penyempurnaan Sumur ( Developing )
Pumping Test
II
1
2
3
4
5
6
7
8
9
10
11
PENGADAAN MATERIAL
Pipa PVC S. 16 2" - 6 m
Pipa Air GI Med. A 2 " / 6 m
Pipa Air GI Med. A 1,5 " / 6 m
Panel control pompa 1 phase
Pompa submersible Q 2 lt/dt H = 70 m
Seling pengaman
Kabel power
Automatic Water Level
Stabilizer 5000 Watt
Whell Head Cover
Accessories di Reservoir
100.00
24.00
72.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
m2
m2
m'
ls
bh
ls
ls
ls
bh
unit
ls
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
Daftar Bahan
An. Dihitung 13
An. Dihitung 10
17,500.00
90,000.00
70,416.67
4,300,000.00
14,175,000.00
987,500.00
1,500,000.00
1,560,000.00
3,000,000.00
4,133,147.90
1,533,313.95
1,750,000.00
2,160,000.00
5,070,000.00
4,300,000.00
14,175,000.00
987,500.00
1,500,000.00
1,560,000.00
3,000,000.00
4,133,147.90
1,533,313.95
JUMLAH II.
III
1
2
3
4
PEKERJAAN LAIN-LAIN
Penyambungan Daya PLN 3500 watt
Memasang pipa S 16 2", terpendam
Memasang Crossing pipa PVC S.16 2"
Pembuatan Kran Umum
1.00
1,500.00
24.00
2.00
unit
m'
m'
unit
An. Dihitung 14
An. Dihitung 16
An. Dihitung 17
An. Dihitung 15
5,917,810.00
41,292.02
65,203.68
1,305,376.42
5,917,810.00
61,938,030.00
1,564,888.32
2,610,752.84
JUMLAH III
I
1
2
3
4
5
6
JUMLAH C.
REKAPITULASI :
A PEKERJAAN PERSIAPAN
B PEKERJAAN RESERVOIR
C PEKERJAAN SUMUR
:
:
:
JUMLAH TOTAL
DIBULATKAN
Rp.
Rp.
Rp.
1,454,340.40
14,441,543.63
314,412,598.00
Rp.
Rp.
330,308,482.03
330,308,000.00
Terbilang : ( ...................................................................................................................................................... )
Karanganyar, 2013
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR
Ir. PRIHARYANTO, MM
NIP. 19630331 199103 1 005
0.765
5.4774
4.0545
0.765
0.1512
11.0619
Harga
Semua
Rp.
7
Persiapan
Pengukuran dan pemasangan bowplank
1,454,340.40
Kebutuhan
Bahan
Tenaga Kerja
Bahan
Tenaga Kerja
Sirap Asbes
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Bahan
Tenaga Kerja
Harga Satuan
Bahan / Upah
( Rp. )
1.000
50,000.00
0.200
28,000.00
0.100
36,500.00
0.010
42,500.00
0.010
37,500.00
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )
Harga Satuan
Bahan / Upah
( Rp. )
1.100
25,000.00
0.200
28,000.00
0.100
36,500.00
0.010
42,500.00
0.010
37,500.00
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )
50,000.000
45,833.333
12,500.000
4,200.000
10,950.000
1,275.000
300.000
125,058.333
Satuan
m2
OH
OH
OH
OH
Indeks
50,000.000
5,600.000
3,650.000
425.000
375.000
60,050.000
Satuan
m2
OH
OH
OH
OH
Indeks
27,500.000
5,600.000
3,650.000
425.000
375.000
37,550.000
Memasang 1 m' lisplank ukuran ( 2.5 x 25 ) cm, kayu kelas I atau II ( SNI 2007 )
Kebutuhan
Bahan
Tenaga Kerja
Jumlah
( Rp. )
Kebutuhan
m
m
ls
OH
OH
OH
OH
Harga Satuan
Bahan / Upah
( Rp. )
4.000
12,500.00
5.000
9,166.67
1.000
12,500.00
0.150
28,000.00
0.300
36,500.00
0.030
42,500.00
0.008
37,500.00
Jumlah harga per satuan pekerjaan
Indeks
Kebutuhan
Satuan
Satuan
m3
kg
OH
OH
OH
OH
Harga Satuan
Bahan / Upah
( Rp. )
0.011
8,200,000.00
0.100
14,000.00
0.100
28,000.00
0.200
36,500.00
0.020
42,500.00
0.005
37,500.00
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )
Harga Satuan
Bahan / Upah
( Rp. )
1.100
#REF!
0.150
28,000.00
0.300
36,500.00
0.030
42,500.00
0.008
37,500.00
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )
Indeks
88,560.00
1,400.00
2,800.00
7,300.00
850.00
187.50
101,097.50
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
OH
OH
OH
OH
Indeks
#REF!
4,200.000
10,950.000
1,275.000
300.000
#REF!
Kebutuhan
Bahan
Tenaga Kerja
Atap Onduline
Sekrup
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satuan
M2
Bh
OH
OH
OH
OH
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
1.000
19.000
0.150
0.075
0.008
0.008
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )
Kebutuhan
Bahan
Tenaga Kerja
Kerpus Onduline
Sekrup
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satuan
M
BH
OH
OH
OH
OH
Indeks
Harga Satuan
Bahan / Upah
( Rp. )
1.000
9.000
0.400
0.200
0.020
0.002
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )