JENIS PEKERJAAN
JUMLAH ( RP )
SITE DEVELOPMENT
TOURIST INFORMATION CENTRE
MENARA PENGAWAS (4 UNIT )
PASAR SENI & SOUVENIR AREA
TOILET UMUM
GAZEBO (5 UNIT )
PANGGUNG TERBUKA
KANTOR PENGELOLA & PUJASERA
KANTOR POLISI (RENOVASI)
BABINSA
GEDUNG SERBA GUNA
PENGANGKARAN PENYU
SARANA KESEHATAN
RESTORAN
FASILITAS OLAHRAGA
KELURAHAN
ME KAWASAN
TONG SAMPAH DAN LAMPU JALAN
JUMLAH TOTAL
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
SEBELAS MILYAR TUJUH RATUS TUJUH PULUH SATU JUTA TUJUH PULUH DUA RI
RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
STIMATE
N KABUPATEN SAMBAS
JUMLAH ( RP )
1,726,935,000.00
1,282,179,000.00
110,160,000.00
876,542,000.00
391,976,000.00
484,440,000.00
390,686,000.00
45,952,000.00
270,790,000.00
302,926,000.00
1,229,257,000.00
992,460,000.00
394,621,000.00
661,140,000.00
34,333,000.00
31,280,000.00
1,403,798,000.00
71,500,000.00
JUMLAH TOTAL
PPN 10%
TOTAL
DIBULATKAN
10,700,975,000.00
1,070,097,500.00
11,771,072,500.00
11,771,072,000.00
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
PEKERJAAN ;
No
Uraian
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
19
22
23
25
27
28
26
34
35
B. BAHAN
Ampelas
Atap Sirap
Atap Zinculome collor (Multi Roof)
Aspal Curah
Bak Cuci Piring Aluminium1 (satu) lobang
Bak Mandi Fibre 50x50 Segi Empat Kecil
Balok Kayu KL. I
Balok Kayu KL. II
Balok Kayu KL. III
Papan KL. I
Papan KL. II
Papan KL. III
Bata Merah
Batako
Batu Belah 10/15 cm
Batu Belah 5/7 cm
Batu Pecah 2/3 cm
Batu Pecah 1/2 cm
Baut / mur
Besi Beton U.24
Plat Strip
Satuan
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
Org/Hari
lbr
lbr
lbr
kg
Buah
buah
m3
m3
m3
m3
m3
m3
Buah
Buah
M3
M3
M3
M3
Bj
Kg
Kg
39
40
42
43
44
45
46
47
48
49
50
51
52
55
56
57
60
61
62
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
81
83
86
87
88
89
90
91
92
93
94
Buah
Btg
buah
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Set
bh
bh
Kg
kg
kg
Pasang
Pasang
Buah
Buah
Buah
Lembar
bh
Kg
bh
bh
lbr
lbr
m1
Buah
Buah
Lembar
Buah
Kg
Rd
Ro
M2
M2
M2
M2
M2
M2
M2
95
98
99
100
101
102
103
105
106
107
109
110
111
114
115
115
116
117
118
119
120
121
122
123
124
127
128
129
130
131
133
134
135
136
137
138
139
140
141
142
143
145
146
147
148
149
M2
Lembar
Lembar
Lembar
Kg
Kg
Lembar
Batang
RoIl
Kg
Rol
M2
M2
Batang
Batang
Batang
M
Batang
M2
M2
M2
M2
M2
M2
Lembar
Dos
Dos
Dos
Dos
M3
Buah
bh
Buah
Buab
Buah
Buah
Buah
M
Buah
Buah
bh
M1
M1
M1
M1
M1
150
151
154
155
156
157
158
159
162
163
164
166
167
168
169
170
173
174
176
177
178
179
188
189
190
191
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
216
M1
M1
M
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buab
Buah
Buah
Buali
Lembar
Liter
kg
Liter
Liter
Liter
Lembar
Lembar
Liter
Liter
Kg
Kg
Buah
Kg
Kg
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
MS
M3
217
218
219
220
223
224
225
226
227
228
229
230
231
249
250
251
252
253
254
255
258
259
260
261
262
263
264
265
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
Pasir Pasang
Pasir Urug
Tanah Urug Dari Luar
Paving Stone
Pipa Leding 1 (G)
Pipa Leding 1.1/2 (G)
Pipa Leding 1/2 (G)
Pipa Leding 3/4 (G)
Pipa PVC 1/2" AW Wavin
Pipa PVC 1" AW Wavin
Pipa PVC 2" AW Wavin
Pipa PVC 3" AW Wavin
Pipa PVC 4" AW Wavin
Plamur Kayu Merk TKS
Plamur Tembok 5 Kg
Plywood 3 mm
Plywood 4 mm
Plywood 9 mm
Plywood 12 mm
Pompa air listrik 200 w
Porselin 11 x 11
Rel Cooper 3 x 30 mm
Reng Kayu Meranti 2/3
Reng Kayu Meranti 3/4
Residu / Teer kayu
Roll Cat
Rolling Door
Roster
Schakelar (Standar)
Saklar Ganda
Saklar Tunggal
Stop Kontak
Kabel, NYM 3 x 2,5 mm2
Pipa Conduit
Socket Pipa
Tee Doos
Klem Pipa
Fhiser
Las Doop
Isolasi ban
Sekop Lokal
Semen Warna 1 Bks = 1 Kg
Semen PC (isi 40 Kg/Zak/Gresik)
Semen PC (isi 50 Kg/Zak/Gresik)
Semen PC
Semen Warna
M3
M3
M3
M2
Batang
Batang
Batang
Batang
m1
m1
m1
m1
m1
Kg
Kg
lbr
lbr
lbr
lbr
Unit
M2
Buah
Batang
Batang
Liter
Buah
m2
bh
Buah
Buah
Buah
Buah
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Buah
Kg
Zak
Zak
Kg
Kg
283
284
286
293
M
Lembar
m1
M3
10
NAN
Harga
(Rp)
85,800
92,950
135,850
92,950
135,850
92,950
135,850
92,950
135,850
92,950
128,700
117,000
130,000
128,700
3,630
3,120
186,360
8,000
244,750
350,000
5,925,920
3,705,000
2,524,000
5,590,000
3,965,000
2,405,000
1,650
3,900
1,072,500
1,090,375
1,343,485
1,453,738
21,780
28,314
11
12,000
27,133
74,880
52,852
33,221
75,504
18,800
37,100
44,200
19,214
100,200
59,100
100,000
1,188,833
214,500
214,500
24,150
27,627
49,420
17,400
11,700
25,300
30,100
69,100
72,542
26,000
18,980
9,438
7,550
63,700
98,100
135,907
38,333
8,600
107,770
21,000
9,500
404,640
306,019
145,470
226,512
225,636
88,700
168,600
175,000
155,276
12
200,600
81,700
151,100
227,300
9,250
11,100
15,300
4,200
72,433
42,750
300,800
22,242
20,200
17,160
15,000
29,900
6,450
10,100
42,300
81,150
94,380
124,581
20,300
71,700
162,500
59,600
64,300
28,900
63,700
196,000
20,900
35,000
98,000
181,075
119,800
13,400
246,500
42,000
5,000
16,250
32,500
117,000
126,750
84,500
97,500
91,000
13
110,500
117,000
13,752
7,150
73,444
41,788
112,900
141,900
26,000
7,500
25,000
28,700
57,250
71,800
83,600
95,200
68,200
41,900
60,403
3,345
17,300
9,000
141,750
240,800
56,000
62,600
39,733
20,367
100
30,201
33,100
31,800
38,800
38,300
36,000
2,750,000
2,750,000
9,812,000
3,970,000
3,040,000
2,920,000
2,720,000
3,090,000
3,090,000
3,090,000
239,900
14
239,900
195,000
228,020
139,200
26,200
59,000
8,850
18,300
6,864
12,870
25,740
49,764
77,220
10,148
84,650
103,616
132,132
254,824
358,650
686,000
25,648
4,090
11,600
19,000
23,400
40,000
300,000
7,800
18,366
41,100
32,000
26,000
16,250
9,750
1,463
6,500
2,438
1,463
975
13,000
57,500
12,183
95,800
120,100
2,870
26,000
15
65,533
49,225
27,500
135,500
16
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
3,705,000.00
30,201.00
2,405,000.00
85,800.00
92,950.00
135,850.00
128,700.00
44,460.00
604.02
16,835.00
61,899.02
6,189.90
68,088.92
68,000.00
Bahan
Tenaga
Pekerja
Mandor
Oh
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 1 meter
Tukang gali
Tenaga Kerja
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Menggali 1 m3 tanah biasa sedalam 2 meter
Tukang gali
Tenaga Kerja
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1m3 Urugan tanah kembali
Tenaga
Tukang gali
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Mengurug 1 m3 pasir urug
Bahan
Pasir Urug
m3
Tenaga Kerja
Pekerja
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Mengurug 1 m3 Tanah Urug
Bahan
Tanah Urug
m3
Tenaga Kerja
Pekerja
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1m3 pondasi batu belah,campuran 1PC : 5PP
Batu belah 15 cm/20 cm
M
Bahan
Portland Cement
Kg
Pasir Pasang
M
Pekerja
OH
Tenaga Kerja Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
0.1000
0.0050
85,800.00
128,700.00
-
0.550
0.025
135,850.00
128,700.00
-
0.700
0.03
135,850.00
128,700.00
-
0.1920
0.0190
135,850.00
128,700.00
-
1.200
0.300
0.010
195,000.00
85,800.00
128,700.00
234,000.00
234,000.00
23,400.00
257,400.00
257,400.00
1.200
0.300
0.010
228,020.00
85,800.00
128,700.00
273,624.00
273,624.00
27,362.40
300,986.40
300,900.00
1.100
81.600
0.544
0.800
0.750
0.075
0.075
1,072,500.00
2,870.00
239,900.00
85,800.00
92,950.00
135,850.00
128,700.00
1,179,750.00
234,192.00
130,505.60
1,544,447.60
154,444.76
1,698,892.36
1,698,800.00
135
10
11
12
13
1,072,500.00
195,000.00
85,800.00
92,950.00
135,850.00
128,700.00
1,287,000.00
84,240.00
1,371,240.00
137,124.00
1,508,364.00
1,508,300.00
2,870.00
239,900.00
100.00
85,800.00
92,950.00
135,850.00
128,700.00
708,890.00
86,863.79
21,500.00
817,253.79
81,725.38
898,979.17
898,900.00
2,870.00
239,900.00
1,453,738.00
100.00
85,800.00
92,950.00
135,850.00
128,700.00
708,890.00
86,863.79
605,118.44
21,500.00
1,422,372.23
142,237.22
1,564,609.46
1,564,600.00
2,870.00
239,900.00
1,453,738.00
21,780.00
85,800.00
92,950.00
135,850.00
128,700.00
858,130
79,867
616,021
4,682,700
6,236,718
623,672
6,860,390
6,860,300
2,870.00
239,900.00
1,453,738.00
21,780.00
85,800.00
92,950.00
135,850.00
128,700.00
1,064,770
69,771
634,193
4,791,600
141,570
25,561
3,804
10,682
6,741,951
674,195
7,416,146
7,416,100
2,870.00
239,900.00
1,453,738.00
21,780.00
85,800.00
92,950.00
135,850.00
128,700.00
858,130
79,867
616,021
3,920,400
5,474,418
547,442
6,021,860
6,021,800
2,524,000.00
30,201.00
7,000.00
33,653.33
3,020.10
233.33
135
Tenaga kerja
14
15
16
17
18
19
Pekerja
Tukang kayu
Kepala tukang
Mandor
OH
OH
OH
OH
0.173
0.087
0.009
0.009
85,800.00
92,950.00
135,850.00
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1m2 Bekisting untuk Kolom 3x Pakai
Bahan
Kayu kelas lll
m3
0.010
2,524,000.00
Paku 5 cm-12cm
kg
0.133
30,201.00
Minyak bekisting
Liter
0.067
7,000.00
Balok kayu kelas ll
m3
0.005
3,705,000.00
Tenaga kerja
Pekerja
OH
0.220
85,800.00
Tukang kayu
OH
0.110
92,950.00
Kepala tukang
OH
0.011
135,850.00
Mandor
OH
0.011
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1m2 bekisting untuk balok 3x Pakai
Bahan
Kayu kelas lll
m3
0.013
2,524,000.00
Paku 5 cm-12cm
kg
0.133
30,201.00
Minyak bekisting
Liter
0.067
7,000.00
Balok kayu kelas ll
m3
0.006
3,705,000.00
Tenaga kerja
Pekerja
OH
0.220
85,800.00
Tukang kayu
OH
0.110
92,950.00
Kepala tukang
OH
0.011
135,850.00
Mandor
OH
0.011
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1 M2 Pengecatan bidang kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni
Kg
0.2000
60,403.00
Plamir
Kg
0.1500
27,627.00
Cat dasar
Kg
0.1700
33,221.00
Bahan
Cat penutup
Kg
0.2600
34,150.00
Ampelas
Lbr
0.0100
3,630.00
Kwas 3"
Bh
0.0500
5,000.00
Pekerja
Oh
0.1400
85,800.00
Tukang cat
Oh
0.0180
92,950.00
Tenaga Kerja
Kepala tukang cat
Oh
0.0120
135,850.00
Mandor
Oh
0.0050
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1 M2 Pengecatan tembok baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (INTERIOR)
Plamir
Kg
0.1000
27,627.00
Cat dasar
Kg
0.1000
33,221.00
Cat penutup 2 x
Kg
0.2600
34,150.00
Bahan
Ampelas
Lbr
0.1000
3,630.00
Roll Cat
Bh
0.0250
16,250.00
Pekerja
Oh
0.0400
85,800.00
Tukang cat
Oh
0.0800
92,950.00
Tenaga Kerja
Kepala tukang cat
Oh
0.0126
135,850.00
Mandor
Oh
0.0050
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1 M2 Pengecatan tembok baru 1 lapis cat dasar, 2 lapis cat penutup (EXTERIOR)
Cat dasar
Kg
0.2000
33,221.00
Cat penutup 2 x
Kg
0.2600
34,150.00
Bahan
Ampelas
Lbr
0.1000
3,630.00
Roll Cat
Bh
0.0250
16,250.00
Pekerja
Oh
0.0400
85,800.00
Tukang cat
Oh
0.1260
92,950.00
Tenaga Kerja
Kepala tukang cat
Oh
0.0126
135,850.00
Mandor
Oh
0.0050
128,700.00
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1 M2 Pengecatan plapond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir
Kg
0.1000
27,627.00
Cat dasar
Kg
0.1000
33,221.00
36,906.77
3,690.68
40,597.44
40,500.00
25,240.00
4,026.80
466.67
18,525.00
48,258.47
4,825.85
53,084.31
53,000.00
33,653.33
4,026.80
466.67
22,230.00
60,376.80
6,037.68
66,414.48
66,400.00
12,080.60
4,144.05
5,647.57
8,879.00
36.30
250.00
31,037.52
3,103.75
34,141.27
34,100.00
2,762.70
3,322.10
8,879.00
363.00
406.25
15,733.05
1,573.31
17,306.36
17,300.00
6,644.20
8,879.00
363.00
406.25
16,292.45
1,629.25
17,921.70
17,900.00
2,762.70
3,322.10
135
Bahan
Tenaga Kerja
20
21
22
23
24
25
Cat penutup 2 x
Ampelas
Roll Cat
Pekerja
Tukang cat
Kepala tukang cat
Mandor
Kg
Lbr
Bh
Oh
Oh
Oh
Oh
0.2600
0.1000
0.0250
0.0400
0.0900
0.0126
0.0050
34,150.00
3,630.00
16,250.00
85,800.00
92,950.00
135,850.00
128,700.00
8,879.00
363.00
406.25
Jumlah
15,733.05
Keuntungan Max 15%
10%
1,573.31
Jumlah+keuntungan
17,306.36
Dibulatkan
17,300.00
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 5 PP
Bata merah
buah
70.000
1,650.00
115,500.00
Bahan
Portland Cement
Kg
6.776
2,870.00
19,447.12
Pasir Pasang
m3
0.045
239,900.00
10,795.50
Tenaga Kerja
Pekerja
OH
0.200
85,800.00
Tukang batu
OH
0.100
92,950.00
Kepala Tukang
OH
0.010
135,850.00
Mandor
OH
0.015
128,700.00
Jumlah
145,742.62
Keuntungan Max 15%
10%
14,574.26
Jumlah+keuntungan
160,316.88
Dibulatkan
160,300.00
Memasang 1 m2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm
Semen Portland
Kg
4.3200
2,870.00
12,398.40
Bahan
Pasir Pasang
M3
0.0220
239,900.00
5,277.80
Pekerja
Oh
0.2000
85,800.00
Tukang Batu
Oh
0.1500
92,950.00
Tenaga Kerja
Kepala Tukang Batu
Oh
0.0150
135,850.00
Mandor
Oh
0.0100
128,700.00
Jumlah
17,676.20
Keuntungan Max 15%
10%
1,767.62
Jumlah+keuntungan
19,443.82
Dibulatkan
19,400.00
Memasang 1 m2 Acian Dinding
Semen Portland
Kg
0.1260
2,870.00
361.62
Bahan
Pekerja
Oh
0.3000
85,800.00
Tukang Batu
Oh
0.0150
92,950.00
Tenaga Kerja
Kepala Tukang Batu
Oh
0.0050
135,850.00
Mandor
Oh
0.0040
128,700.00
Jumlah
361.62
Keuntungan Max 15%
10%
36.16
Jumlah+keuntungan
397.78
Dibulatkan
300.00
Memasang 1 Titik Instalasi Penerangan/Lampu
Kabel, NYM 3 x 2,5 mm2
M'
5.0000
16,250.00
81,250.00
Bahan
Pipa Conduit
M'
3.0000
9,750.00
29,250.00
Socket Pipa
Bh
1.0000
1,462.50
1,462.50
Tee Doos
Bh
2.0000
6,500.00
13,000.00
Klem Pipa
Bh
3.0000
2,437.50
7,312.50
Fhiser
Bh
6.0000
1,462.50
8,775.00
Las Doop
Bh
2.0000
975.00
1,950.00
Isolasi ban
Bh
0.2500
13,000.00
3,250.00
Pekerja
Oh
0.1667
85,800.00
Tukang
Oh
0.2100
92,950.00
Tenaga Kerja
Mandor
Oh
0.0900
128,700.00
Jumlah
146,250.00
Keuntungan Max 15%
10%
14,625.00
Jumlah+keuntungan
160,875.00
Dibulatkan
160,800.00
Memasang 1 Titik Stop Kontak/Daya 1Phase
Kabel, NYM 3 x 2,5 mm2
M'
5.5000
16,250.00
89,375.00
Bahan
Pipa Conduit
M'
3.0000
9,750.00
29,250.00
Socket Pipa
Bh
1.0000
1,462.50
1,462.50
Tee Doos
Bh
2.0000
6,500.00
13,000.00
Klem Pipa
Bh
3.0000
2,437.50
7,312.50
Fhiser
Bh
6.0000
1,462.50
8,775.00
Las Doop
Bh
2.0000
975.00
1,950.00
Isolasi ban
Bh
0.2500
13,000.00
3,250.00
Pekerja
Oh
0.1667
85,800.00
Tukang
Oh
0.2100
92,950.00
Tenaga Kerja
Mandor
Oh
0.0900
128,700.00
Jumlah
154,375.00
Keuntungan Max 15%
10%
15,437.50
Jumlah+keuntungan
169,812.50
Dibulatkan
169,800.00
Memasang 1 Bh Saklar Tunggal/Engkel
Saklar Tunggal
bh
1.0000
32,000.00
32,000.00
Bahan
Pekerja
Oh
0.0250
85,800.00
135
Tenaga Kerja
26
27
28
29
30
31
32
Tukang
Mandor
Oh
Oh
0.0500
0.0500
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 Bh Saklar Ganda/Double
Saklar Ganda
bh
1.0000
Bahan
Pekerja
Oh
0.0250
Tukang
Oh
0.0500
Tenaga Kerja
Mandor
Oh
0.0500
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 Bh Stop Kontak Daya 10A/16A
Stop kontak daya 10/16 A
bh
1.0000
Bahan
Pekerja
Oh
0.0250
Tukang
Oh
0.0600
Tenaga Kerja
Mandor
Oh
0.0600
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 Bh Lampu Philips 11 Watt
Lampu Philips 18 Watt
bh
1.0000
Bahan
Fitting Plafon
bh
1.0000
Pekerja
Oh
0.0333
Tukang
Oh
0.0667
Tenaga Kerja
Mandor
Oh
0.0667
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 Bh Lampu Philips 18 Watt
Lampu Philips 18 Watt
bh
1.0000
Bahan
Fitting Plafon
bh
1.0000
Pekerja
Oh
0.0333
Tukang
Oh
0.0667
Tenaga Kerja
Mandor
Oh
0.0667
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 m3 konstruksi kuda-kuda
Balok kayu Kelas I
M3
1.100
Bahan
Besi trip tebal 5 mm
Kg
15.000
Paku 12 cm
Kg
5.800
Pekerja
OH
4.000
Tukang kayu
OH
12.000
Kepala tukang
OH
1.200
Tenaga kerja
Mandor
OH
0.200
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 m3 Gordeng
Balok kayu Kelas II
M3
1.100
Bahan
Besi trip tebal 5 mm
Kg
15.000
Paku 12 cm
Kg
5.800
Pekerja
OH
2.400
Tukang kayu
OH
7.200
Kepala tukang
OH
0.270
Tenaga kerja
Mandor
OH
0.120
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang 1 m2 rangka langit-langit (60x60) cm, kayu kelas ll atau lll
Kaso-kaso (5x7) cm
M3
0.016
Bahan
Paku 7 cm - 10 cm
Kg
0.250
Pekerja
OH
0.200
Tukang kayu
OH
0.300
Tenaga kerja
Kepala tukang
OH
0.030
Mandor
OH
0.010
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
92,950.00
128,700.00
32,000.00
3,200.00
35,200.00
35,200.00
41,100.00
85,800.00
92,950.00
128,700.00
41,100.00
41,100.00
4,110.00
45,210.00
45,200.00
26,000.00
85,800.00
92,950.00
128,700.00
26,000.00
26,000.00
2,600.00
28,600.00
28,600.00
26,000.00
7,500.00
85,800.00
92,950.00
128,700.00
26,000.00
7,500.00
33,500.00
3,350.00
36,850.00
36,800.00
26,000.00
7,500.00
85,800.00
92,950.00
128,700.00
26,000.00
7,500.00
33,500.00
3,350.00
36,850.00
36,800.00
5,925,920.00
28,314.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
6,518,512.00
424,710.00
175,165.80
7,118,387.80
711,838.78
7,830,226.58
7,830,200.00
3,705,000.00
28,314.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
4,075,500.00
424,710.00
175,165.80
4,675,375.80
467,537.58
5,142,913.38
5,142,900.00
2,524,000.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
41,141.20
7,550.25
48,691.45
4,869.15
53,560.60
53,500.00
135
5,590,000.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
61,490.00
1,510.05
63,000.05
6,300.01
69,300.06
69,300.00
27,625.00
21,125.00
107,770.00
1,814.31
37,100.00
5,459.53
85,800.00
92,950.00
135,850.00
128,700.00
36,465.00
25,350.00
36,286.20
1,814.31
9,275.00
5,459.53
114,650.03
11,465.00
126,115.03
126,100.00
27,500.00
6,875.00
85,800.00
92,950.00
135,850.00
128,700.00
28,875.00
1,031.25
29,906.25
2,990.63
32,896.88
32,800.00
2,524,000.00
4,250.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
42,403.20
17,000.00
7,550.25
66,953.45
6,695.35
73,648.80
73,600.00
98,100.00
5,380.65
85,800.00
92,950.00
135,850.00
128,700.00
107,612.99
5,380.65
112,993.64
11,299.36
124,293.00
124,200.00
135,907.00
6,795.350
85,800.00
92,950.00
135,850.00
128,700.00
135,907.00
6,795.35
142,702.35
14,270.24
156,972.59
156,900.00
5,590,000.00
8,385.00
85,800.00
92,950.00
135,850.00
128,700.00
167,700.00
100,620.00
268,320.00
135
40
41
43
44
45
46
47
26,832.00
295,152.00
295,100.00
1.1000
0.0150
0.0500
0.0150
0.0008
226,512.00
85,800.00
92,950.00
135,850.00
128,700.00
249,163.20
249,163.20
24,916.32
274,079.52
274,000.00
1.0000
6.3800
0.0420
1.5000
0.1240
0.1050
0.0350
0.0300
94,380.00
2,870.00
239,900.00
26,000.00
85,800.00
92,950.00
135,850.00
128,700.00
94,380.00
18,310.60
10,075.80
39,000.00
161,766.40
16,176.64
177,943.04
177,900.00
1.0000
5.6900
0.0420
1.5000
0.4000
0.2000
0.0150
0.0015
81,150.00
2,870.00
239,900.00
26,000.00
85,800.00
92,950.00
135,850.00
128,700.00
81,150.00
16,330.30
10,075.80
39,000.00
146,556.10
14,655.61
161,211.71
161,200.00
1.0000
5.6900
0.0420
1.5000
0.4500
0.2000
0.0150
0.0015
81,150.00
2,870.00
239,900.00
26,000.00
85,800.00
92,950.00
135,850.00
128,700.00
81,150.00
16,330.30
10,075.80
39,000.00
146,556.10
14,655.61
161,211.71
161,200.00
1.0000
6.0000
0.0100
1.0000
1.5000
0.1500
0.0200
214,500.00
2,870.00
239,900.00
85,800.00
92,950.00
135,850.00
128,700.00
214,500.00
17,220.00
2,399.00
234,119.00
23,411.90
257,530.90
257,500.00
1.0000
1.0000
0.0100
0.1000
0.0100
0.0050
35,000.00
5,250.00
85,800.00
92,950.00
135,850.00
128,700.00
35,000.00
5,250.00
40,250.00
4,025.00
44,275.00
44,200.00
1.0000
0.0100
0.1000
26,000.00
85,800.00
92,950.00
26,000.00
135
48
49
50
51
52
53
Oh
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang I m' pipa PVC tipe AW .1/2"
Pipa PVC 1/2"
M'
Bahan
Perlengkapan 10% dari harga bahan
ls
Pekerja
Oh
Tukang Pipa
Oh
Tenaga Kerja
Kepala tukang pipa
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang I m' pipa PVC tipe AW .3"
Pipa PVC 3"
M'
Bahan
Perlengkapan 10% dari harga bahan
ls
Pekerja
Oh
Tukang Pipa
Oh
Tenaga Kerja
Kepala tukang pipa
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang I m' pipa PVC tipe AW .4"
Pipa PVC 4"
M'
Bahan
Perlengkapan 10% dari harga bahan
ls
Pekerja
Oh
Tukang Pipa
Oh
Tenaga Kerja
Kepala tukang pipa
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang I buah bak mandl fibreglass volume 0,30 m3
Bak fibre glass
Bh
Bahan
Perlengkapan 10% dari harga bahan
ls
Pekerja
Oh
Tukang batu
Oh
Tenaga Kerja
Kepala tukang batu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
Memasang I bh bak cuci piring stainles steel Lokal 1 Lubang
Bak cuci stainless steel
Bh
Bahan
Water drain+ asesories
Ls
Pekerja
Oh
Tukang batu
Oh
Tenaga Kerja
Kepala tukang batu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
1 Unti Septic Tank 1,5x1,5x1
Galian Tanah
m3
Pasir Urug
m3
Lantai Kerja
m3
Pas 1 bata + Plester Aci Campuran 1 : 3
m2
Plat Beton Penutup & Balok
m3
Pipa PVC 4" jenis AW + Sambungan
m1
Pipa GIP 1 1/2"
m1
Galian Tanah Untuk Rembesan
m3
Pas Injuk
kg
Urugan Kerikil 3,5 cm
m3
Batu Belah
m3
Pipa PVC 4" Berlobang jenis AW
m1
Urugan Kembali Peralatan Tanah
m3
Tambahan Upah
ls
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
0.0100
0.0050
135,850.00
128,700.00
26,000.00
2,600.00
28,600.00
28,600.00
1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
6,864.00
686.40
85,800.00
92,950.00
135,850.00
128,700.00
8,236.80
686.40
8,923.20
892.32
9,815.52
9,800.00
1.2000
1.0000
0.0810
0.1350
0.0135
0.0041
49,764.00
4,976.40
85,800.00
92,950.00
135,850.00
128,700.00
59,716.80
4,976.40
64,693.20
6,469.32
71,162.52
71,100.00
1.2000
1.0000
0.0810
0.1350
0.0135
0.0041
77,220.00
7,722.00
85,800.00
92,950.00
135,850.00
128,700.00
92,664.00
7,722.00
100,386.00
10,038.60
110,424.60
110,400.00
1.0000
1.0000
0.9000
1.8000
0.5400
0.1100
350,000.00
35,000.00
85,800.00
92,950.00
135,850.00
128,700.00
350,000.00
35,000.00
385,000.00
38,500.00
423,500.00
423,500.00
1.0000
1.0000
0.0300
0.3000
0.0300
0.0015
244,750.00
85,662.50
85,800.00
92,950.00
135,850.00
128,700.00
244,750.00
85,662.50
330,412.50
33,041.25
363,453.75
363,400.00
2.9250
0.2250
0.1125
6.0000
0.2250
9.0000
0.6000
2.2500
10.0000
0.6750
0.9000
9.0000
0.5625
0.0650
85,700.00
287,100.00
1,098,700.00
281,800.00
1,098,700.00
77,220.00
35,000.00
85,700.00
9,500.00
1,453,738.00
1,072,500.00
77,220.00
31,300.00
5,694,178.00
250,672.50
64,597.50
123,603.75
1,690,800.00
247,207.50
694,980.00
21,000.00
192,825.00
95,000.00
981,273.15
965,250.00
694,980.00
17,606.25
6,039,795.65
603,979.57
6,643,775.22
135
Dibulatkan
54 Tiang penyangga
Kayu Dolken
btg
Ijuk
kg
Paku 5/7
Kg
Bahan
Pekerja
Oh
Tukang Kayu
Oh
Tenaga Kerja
Kepala Tukang Kayu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
55 Gelagar
Kayu Dolken
btg
Bahan
Ijuk
kg
Paku 5/7
Kg
Pekerja
Oh
Tukang Kayu
Oh
Tenaga Kerja
Kepala Tukang Kayu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
56 Rangka Atap + Penutup Ijuk
Bambu
btg
Bahan
Kayu Dolken
btg
Ijuk
kg
Paku 5/7
Kg
Pekerja
Oh
Tukang Kayu
Oh
Tenaga Kerja
Kepala Tukang Kayu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
57 Tangga
Kayu Dolken
btg
Bahan
Ijuk
kg
Paku 5/7
Kg
Pekerja
Oh
Tukang Kayu
Oh
Tenaga Kerja
Kepala Tukang Kayu
Oh
Mandor
Oh
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
58 Memasang 1 m2 Pasangan Onderlag Batu Belah 25 cm
Pasir Pasang
m3
Bahan
Batu Belah
m3
Pekerja Ahli
OH
Tenaga Kerja
Peralatan
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
59 Memasang 1 m2 Amparan Batu Pecah 5/7 t = 10 cm
Bahan
Batu Pecah 5/7
m3
Pekerja Ahli
OH
Tenaga Kerja
Peralatan
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
60 Memasang 1 m2 Amparan Batu Pecah 2/3 t = 5 cm
Bahan
Batu Pecah 2/3
m3
Pekerja Ahli
OH
Tenaga Kerja
Peralatan
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
61 Memasang 1 m2Lapisan Pengisi/Penutup
Bahan
Batu Pecah 1/2
m3
Pasir Beton
m3
Pekerja Ahli
OH
6,643,700.00
48.0000
6.0000
0.2500
2.0000
1.5000
0.7500
0.5000
17,160.00
9,500.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
823,680.00
57,000.00
7,550.25
888,230.25
88,823.03
977,053.28
977,000.00
64.0000
4.0000
0.2500
2.0000
1.5000
0.7500
0.5000
17,160.00
9,500.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
1,098,240.00
38,000.00
7,550.25
1,143,790.25
114,379.03
1,258,169.28
1,258,100.00
12.0000
6.0000
10.0000
0.2500
2.0000
1.5000
0.7500
0.5000
15,000.00
17,160.00
9,500.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
180,000.00
102,960.00
95,000.00
7,550.25
385,510.25
38,551.03
424,061.28
424,000.00
16.0000
3.0000
0.2500
2.0000
1.5000
0.7500
0.5000
17,160.00
9,500.00
30,201.00
85,800.00
92,950.00
135,850.00
128,700.00
274,560.00
28,500.00
7,550.25
310,610.25
31,061.03
341,671.28
341,600.00
0.150
0.250
0.150
0.120
239,900.00
1,072,500.00
135,850.00
324,487.50
35,985.00
268,125.00
304,110.00
30,411.00
334,521.00
334,500.00
0.120
0.110
0.320
1,090,375.00
135,850.00
145,788.50
130,845.00
130,845.00
13,084.50
143,929.50
143,900.00
0.060
0.080
0.500
39,150.00
135,850.00
13,217.00
2,349.00
2,349.00
234.90
2,583.90
2,500.00
0.012
0.010
0.050
35,150.00
12,150.00
135,850.00
421.80
121.50
135
Tenaga Kerja
Peralatan
OH
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
62 Memasang 1 m2 Lapisan Penetrasi (Pengaspalan Manual)
Abu Batu/Pasir Beton
m3
Bahan
Asphal
kg
Kayu bakar
m3
Pekerja
Oh
Peralatan
Oh
Tenaga
Jumlah
Keuntungan Max 15%
10%
Jumlah+keuntungan
Dibulatkan
0.950
7,335.80
543.30
54.33
597.63
500.00
0.0500
4.0000
0.0300
0.0600
0.1800
239,900.00
8,000.00
6,000.00
135,850.00
16,981.25
11,995.00
32,000.00
180.00
44,175.00
4,417.50
48,592.50
48,500.00
135
8,580.00
9,295.00
1,358.50
643.50
19,877.00
1,987.70
21,864.70
21,800.00
61,899.02
8,177.60
89,953.62
89,800.00
8,580.00
643.50
9,223.50
922.35
10,145.85
10,100.00
0.00
922.35
10,145.85
10,100.00
74,717.50
3,217.50
77,935.00
7,793.50
85,728.50
85,700.00
77,935.00
7,793.50
85,728.50
85,700.00
95,095.00
3,861.00
98,956.00
9,895.60
108,851.60
108,800.00
98,956.00
9,895.60
108,851.60
108,800.00
26,083.20
2,445.30
28,528.50
2,852.85
31,381.35
31,300.00
28,528.50
2,852.85
31,381.35
31,300.00
25,740.00
1,287.00
27,027.00
2,702.70
29,729.70
29,700.00
261,027.00
26,102.70
287,129.70
287,100.00
25,740.00
1,287.00
27,027.00
2,702.70
29,729.70
29,700.00
300,651.00
30,065.10
330,716.10
330,700.00
68,640.00
69,712.50
10,188.75
9,652.50
158,193.75
15,819.38
174,013.13
174,000.00
1,702,641.35
170,264.14
1,872,905.49
1,872,900.00
135
66,924.00
36,250.50
5,298.15
5,019.30
113,491.95
11,349.20
124,841.15
124,800.00
1,484,731.95
148,473.20
1,633,205.15
1,633,200.00
141,570.00
25,561.25
3,803.80
10,682.10
181,617.15
18,161.72
199,778.87
199,700.00
998,870.94
99,887.09
1,098,758.04
1,098,700.00
141,570.00
25,561.25
3,803.80
10,682.10
181,617.15
18,161.72
199,778.87
199,700.00
1,603,989.38
160,398.94
1,764,388.32
1,764,300.00
141,570
25,561
3,804
10,682
181,617
18,162
199,779
199,700
6,418,335
641,834
7,060,169
7,060,100
141,570
25,561
3,804
10,682
181,617
18,162
199,779
199,700
6,923,568
692,357
7,615,925
7,615,900
141,570
25,561
3,804
10,682
181,617
18,162
199,779
199,700
5,656,035
565,604
6,221,639
6,221,600
135
14,872.00
8,055.67
1,177.37
1,115.40
25,220.43
2,522.04
27,742.48
27,700.00
62,127.20
6,212.72
68,339.92
68,300.00
18,876.00
10,224.50
1,494.35
1,415.70
32,010.55
3,201.06
35,211.61
35,200.00
80,269.02
8,026.90
88,295.92
88,200.00
18,876.00
10,224.50
1,494.35
1,415.70
32,010.55
3,201.06
35,211.61
35,200.00
92,387.35
9,238.74
101,626.09
101,600.00
12,012.00
1,673.10
1,630.20
643.50
15,958.80
1,595.88
17,554.68
17,500.00
46,996.32
4,699.63
51,695.95
51,600.00
3,432.00
7,436.00
1,711.71
643.50
13,223.21
1,322.32
14,545.53
14,500.00
28,956.26
2,895.63
31,851.89
31,800.00
3,432.00
11,711.70
1,711.71
643.50
17,498.91
1,749.89
19,248.80
19,200.00
33,791.36
3,379.14
37,170.50
37,100.00
135
3,432.00
8,365.50
1,711.71
643.50
14,152.71
1,415.27
15,567.98
15,500.00
29,885.76
2,988.58
32,874.34
32,800.00
17,160.00
9,295.00
1,358.50
1,930.50
29,744.00
2,974.40
32,718.40
32,700.00
175,486.62
17,548.66
193,035.28
193,000.00
17,160.00
13,942.50
2,037.75
1,287.00
34,427.25
3,442.73
37,869.98
37,800.00
52,103.45
5,210.35
57,313.80
57,300.00
25,740.00
1,394.25
679.25
514.80
28,328.30
2,832.83
31,161.13
31,100.00
28,689.92
2,868.99
31,558.91
31,500.00
14,300.00
19,519.50
11,583.00
45,402.50
4,540.25
49,942.75
49,900.00
191,652.50
19,165.25
210,817.75
210,700.00
14,300.00
19,519.50
11,583.00
45,402.50
4,540.25
49,942.75
49,900.00
199,777.50
19,977.75
219,755.25
219,700.00
2,145.00
135
4,647.50
6,435.00
13,227.50
1,322.75
14,550.25
14,500.00
45,227.50
4,522.75
49,750.25
49,700.00
2,145.00
4,647.50
6,435.00
13,227.50
1,322.75
14,550.25
14,500.00
54,327.50
5,432.75
59,760.25
59,700.00
2,145.00
5,577.00
7,722.00
15,444.00
1,544.40
16,988.40
16,900.00
41,444.00
4,144.40
45,588.40
45,500.00
2,860.00
6,196.67
8,580.00
17,636.67
1,763.67
19,400.33
19,400.00
51,136.67
5,113.67
56,250.33
56,200.00
2,860.00
6,196.67
8,580.00
17,636.67
1,763.67
19,400.33
19,400.00
51,136.67
5,113.67
56,250.33
56,200.00
343,200.00
1,115,400.00
163,020.00
25,740.00
1,647,360.00
164,736.00
1,812,096.00
1,812,000.00
8,765,747.80
876,574.78
9,642,322.58
9,642,300.00
205,920.00
669,240.00
36,679.50
15,444.00
927,283.50
92,728.35
1,020,011.85
1,020,000.00
5,602,659.30
560,265.93
6,162,925.23
6,162,900.00
17,160.00
27,885.00
4,075.50
1,287.00
50,407.50
5,040.75
55,448.25
55,400.00
99,098.95
9,909.90
109,008.85
109,000.00
135
8,580.00
18,590.00
2,717.00
643.50
30,530.50
3,053.05
33,583.55
33,500.00
93,530.55
9,353.06
102,883.61
102,800.00
12,870.00
37,180.00
3,396.25
9,652.50
63,098.75
6,309.88
69,408.63
69,400.00
177,748.78
17,774.88
195,523.66
195,500.00
4,290.00
2,788.50
815.10
386.10
8,279.70
827.97
9,107.67
9,100.00
38,185.95
3,818.60
42,004.55
42,000.00
12,870.00
13,942.50
1,358.50
643.50
28,814.50
2,881.45
31,695.95
31,600.00
95,767.95
9,576.80
105,344.75
105,300.00
21,450.00
7,436.00
1,086.80
1,029.60
31,002.40
3,100.24
34,102.64
34,100.00
143,996.04
14,399.60
158,395.64
158,300.00
17,160.00
9,295.00
1,358.50
1,287.00
29,100.50
2,910.05
32,010.55
32,000.00
171,802.85
17,180.29
188,983.14
188,900.00
8,580.00
4,647.50
679.25
257.40
14,164.15
282,484.15
135
1,416.42
15,580.57
15,500.00
28,248.42
310,732.57
310,700.00
1,287.00
4,647.50
2,037.75
96.53
8,068.78
806.88
8,875.65
8,800.00
257,231.98
25,723.20
282,955.17
282,900.00
10,639.20
9,759.75
4,754.75
3,861.00
29,014.70
2,901.47
31,916.17
31,900.00
190,781.10
19,078.11
209,859.21
209,800.00
34,320.00
18,590.00
2,037.75
193.05
55,140.80
5,514.08
60,654.88
60,600.00
201,696.90
20,169.69
221,866.59
221,800.00
38,610.00
18,590.00
2,037.75
193.05
59,430.80
5,943.08
65,373.88
65,300.00
205,986.90
20,598.69
226,585.59
226,500.00
85,800.00
139,425.00
20,377.50
2,574.00
248,176.50
24,817.65
272,994.15
272,900.00
482,295.50
48,229.55
530,525.05
530,500.00
858.00
9,295.00
1,358.50
643.50
12,155.00
1,215.50
13,370.50
13,300.00
52,405.00
5,240.50
57,645.50
57,600.00
858.00
9,295.00
135
1,358.50
643.50
12,155.00
1,215.50
13,370.50
13,300.00
38,155.00
3,815.50
41,970.50
41,900.00
3,088.80
5,577.00
815.10
231.66
9,712.56
971.26
10,683.82
10,600.00
18,635.76
1,863.58
20,499.34
20,400.00
6,949.80
12,548.25
1,833.98
527.67
21,859.70
2,185.97
24,045.66
24,000.00
86,552.90
8,655.29
95,208.18
95,200.00
6,949.80
12,548.25
1,833.98
527.67
21,859.70
2,185.97
24,045.66
24,000.00
122,245.70
12,224.57
134,470.26
134,400.00
77,220.00
167,310.00
73,359.00
14,157.00
332,046.00
33,204.60
365,250.60
365,200.00
717,046.00
71,704.60
788,750.60
788,700.00
2,574.00
27,885.00
4,075.50
193.05
34,727.55
3,472.76
38,200.31
38,200.00
365,140.05
36,514.01
401,654.06
401,600.00
17,606.25
370,121.57
387,727.82
38,772.78
426,500.60
6,427,523.47
642,752.35
7,070,275.82
135
426,500.00
7,070,200.00
171,600.00
139,425.00
101,887.50
64,350.00
477,262.50
47,726.25
524,988.75
524,900.00
1,365,492.75
136,549.28
1,502,042.03
1,502,000.00
171,600.00
139,425.00
101,887.50
64,350.00
477,262.50
47,726.25
524,988.75
524,900.00
1,621,052.75
162,105.28
1,783,158.03
1,783,100.00
171,600.00
139,425.00
101,887.50
64,350.00
477,262.50
47,726.25
524,988.75
524,900.00
862,772.75
86,277.28
949,050.03
949,000.00
171,600.00
139,425.00
101,887.50
64,350.00
477,262.50
47,726.25
524,988.75
524,900.00
787,872.75
78,787.28
866,660.03
866,600.00
20,377.50
38,938.50
59,316.00
5,931.60
65,247.60
65,200.00
363,426.00
36,342.60
399,768.60
399,700.00
14,943.50
46,652.32
61,595.82
6,159.58
67,755.40
67,700.00
192,440.82
19,244.08
211,684.90
211,600.00
10,868.00
6,608.50
17,476.50
1,747.65
19,224.15
19,200.00
19,825.50
1,982.55
21,808.05
21,800.00
6,792.50
135
6,969.01
13,761.51
1,376.15
15,137.66
15,100.00
14,304.81
1,430.48
15,735.29
15,700.00
8,151.00
3,056.63
11,207.63
1,120.76
12,328.39
12,300.00
55,382.63
5,538.26
60,920.89
60,900.00
135
JENIS PEKERJAAN
1 m'
1m2
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
10
1 m3
11
1m2
12
1m2
13
1m2
14
1 m3
15
1 m3
16
1 m3
17
1m3
18
1 m2
19
1 m2
20
1 m2
Pek. Acian
21
1 unit
22
1 unit
Pek. Bovenlight
23
1 unit
24
1 unit
25
1 unit
26
1 unit
27
1 m2
28
1 m2
29
1 m2
30
1 m2
31
1 m2
32
1 m2
33
1m2
34
1 m2
35
1m1
41
1 m1
42
1 m1
135
43
1 m1
44
1 m1
45
1 unit
46
1 bh
47
1 bh
48
1 bh
49
1 bh
50
1 titik
51
1 titik
53
1 bh
54
1 bh
55
1 bh
56
1 bh
57
1 m2
58
1 m2
59
1 m2
60
1 m2
61
1 titik
62
1 titik
63
1 titik
64
1 titik
65
1 titik
66
1m3
67
1m3
68
1m2
69
1m2
70
1m2
71
1m2
72
1m1
73
1m3
74
1m3
75
1m3
Pek. Pengaspalan
76
1 m2
Pek. Kanstin
77
80
1 m2
1m2
82
1m2
83
1bh
84
1bh
85
1m2
86
1m1
73
1m2
74
1m2
75
1 m2
76
1 m2
77
1m2
78
1m2
79
1m2
80
1m2
135
135
PEKERJAAN
135
95,200.00
134,400.00
530,500.00
401,600.00
57,600.00
788,700.00
41,900.00
197,900.00
206,100.00
51,300.00
45,400.00
54,500.00
41,600.00
40,900.00
31,800.00
37,100.00
32,800.00
210,700.00
219,700.00
49,700.00
59,700.00
45,500.00
9,642,300.00
6,162,900.00
105,300.00
75,000.00
310,700.00
233,025.00
161,500.00
550,000.00
750,000.00
1,250,000.00
165,000.00
222,900.00
44,500.00
8,700.00
51,300.00
7,070,200.00
753,500.00
15,000.00
225,000.00
175,000.00
399,700.00
211,600.00
21,800.00
15,700.00
60,900.00
250,000.00
135
135
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
6
PEKERJAAN PERSIAPAN
Pembersihan
Pengukuran dan pemasangan Bowplank
Asbuild Drawing
Dokumentasi dan Pelaporan
Direksi keet
papan nama proyek
24.00
20.00
1.00
1.00
1.00
1.00
HARGA SATUAN
Rp
6
m2
m1
ls
ls
ls
ls
10,100.00
89,800.00
1,500,000.00
1,000,000.00
5,000,000.00
1,000,000.00
JUMLAH I
115.00
215.00
M3
M3
Rp
Rp
108,800.00
330,700.00
JUMLAH II
1,395.00
1,395.00
1,395.00
1,395.00
1,395.00
M2
M2
M2
M2
M2
Rp
Rp
Rp
Rp
Rp
399,700.00
211,600.00
21,800.00
15,700.00
250,000.00
JUMLAH III
IV
1
2
3
4
5
6
PEK. PEDESTRIAN
Pek. Paving Block T = 6 cm
Pek. Amparan Batu Pecah T = 10 cm
Pek. Amparan Batu Pecah 2/3 T = 5 cm
Pek. Lapisan Penutup/ Pengisi
Pek. Kansteen
Pek. Gorong Gorong D40
345.00
345.00
345.00
345.00
225.00
115.00
M2
M2
M2
M2
M2
M2
Rp
Rp
Rp
Rp
Rp
Rp
220,000.00
211,600.00
21,800.00
15,700.00
165,000.00
200,000.00
JUMLAH IV
JUMLAH I - IV
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
JUMLAH I
JUMLAH II
III PEKERJAAN PEDESTRIAN DAN JALAN
JUMLAH III
IV
PEK. PEDESTRIAN
JUMLAH IV
JUMLAH I - IV
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
SATU MILYAR TUJUH RATUS DUA PULUH JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
.
Nip.
TOTAL BIAYA
Rp
7
242,400.00
1,796,000.00
1,500,000.00
1,000,000.00
5,000,000.00
1,000,000.00
10,538,400.00
Rp
Rp
12,512,000.00
71,100,500.00
Rp
83,612,500.00
Rp
Rp
Rp
Rp
Rp
557,581,500.00
295,182,000.00
30,411,000.00
21,901,500.00
348,750,000.00
1,253,826,000.00
Rp
Rp
Rp
Rp
Rp
Rp
75,900,000.00
73,002,000.00
7,521,000.00
5,416,500.00
37,125,000.00
23,000,000.00
221,964,500.00
1,569,941,400.00
156,994,140.00
1,726,935,540.00
1,726,935,000.00
TE
10,538,400.00
83,612,500.00
1,253,826,000.00
221,964,500.00
1,569,941,400.00
156,994,140.00
1,726,935,540.00
1,726,935,000.00
MA RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
JUMLAH ( RP )
Terbilang :
Disetujui,
Disetujui,
.
Nip.
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
2
3
4
5
6
7
8
530.00
115.00
15.12
1.00
m2
m1
m3
Ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
2,500,000.00
JUMLAH I
II
1
1,992.00
7.47
13.28
3.60
0.40
13.28
0.48
1.20
m1
m3
m3
m3
m3
m3
m3
m3
25,000.00
7,128,400.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
JUMLAH II
III
1
2
3
4
5
6
7
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Kayu Kelas I uk 8/15
Pekerjaan Gordeng Kayu Kelas II uk 5/10
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Nor Metal Roof
Pekerjaan List Plank Kayu KL.II
Pekerjaan Talang Jurai
IV
1
2
3
PEKERJAAN ARSITEK
Pekerjaan Lantai Papan Kayu Kelas I uk 3 x 30
Pekerjaan Dinding Papan Kayu Kelas I uk 2 x 30
Pekerjaan Pengecoran Pelat lantai Kamar mandi
a. Pekerjaan Keramik Lantai KM 20x20
Pekerjaan Kusen Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Jendela Lengkap + Kusen J1
c. Pekerjaan Bovenlight BV
d. Pekerjaan Pintu PVC
Pekerjaan Tangga
Pekerjaan Relling
Pekerjaan Plafon
a. Pekerjaan Rangka Plafon kaso 5/7
b. Pekerjaan Plafon Gypsum 9mm
Pekerjaan Pengecatan
a. Pekerjaan Pengecatan Dinding Dalam
b. Pekerjaan Pengecatan Dinding Luar
b. Pekerjaan Pengecatan Plafon
c. Pekerjaan Pengecatan Reling Tangga & Teras
d. Pekerjaan Pengecatan List Plank
4.32
3.46
524.12
524.12
46.00
118.40
45.00
m3
m3
m2
m2
m1
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
65,000.00
JUMLAH III
5
6
7
350.00
319.25
2.16
18.00
m2
m2
m3
m2
310,700.00
161,500.00
7,128,400.00
221,800.00
13.00
22.00
4.00
4.00
2.00
4.00
unit
unit
unit
unit
unit
m2
2,500,000.00
1,750,000.00
600,000.00
650,000.00
450,000.00
1,309,480.00
528.00
528.00
m2
m2
109,000.00
195,500.00
327.45
252.45
528.00
8.00
144.00
m2
m2
m2
m2
m2
31,800.00
37,100.00
32,800.00
40,900.00
40,900.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
9
10
PEKERJAAN ME
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Saklar Tunggal
Pasang Saklat Ganda
Pasang Stop Kontak
Pasang Lampu Down light Philips 11 Watt
Pasang Lampu TL Philips 36 Watt
Pasang Lampu Baret Philips 20 Watt
4.00
1.00
76.00
20.00
7.00
12.00
20.00
48.00
24.00
4.00
titik
Ls
titik
titik
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
197,900.00
206,100.00
45,400.00
54,500.00
41,600.00
51,300.00
45,400.00
54,500.00
JUMLAH V
VI PEKERJAAN SANITAIR
1
2
3
4
5
6
7
Pekerjaan
Pekerjaan
Pekerjaan
Pekerjaan
Pekerjaan
Pekerjaan
Pekerjaan
12.00
10.00
4.00
4.00
4.00
4.00
1.00
m1
m1
bh
bh
bh
bh
unit
95,200.00
134,400.00
546,500.00
788,700.00
57,600.00
41,900.00
7,070,200.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
JUMLAH ( RP )
19,475,784.00
413,916,900.00
224,922,322.00
465,921,544.00
26,086,200.00
15,295,400.00
1,165,618,150.00
116,561,815.00
1,282,179,965.00
1,282,179,000.00
RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
TOTAL BIAYA
Rp
7
5,353,000.00
10,327,000.00
1,295,784.00
2,500,000.00
19,475,784.00
49,800,000.00
53,249,148.00
128,049,744.00
34,712,280.00
3,856,920.00
128,049,744.00
4,628,304.00
11,570,760.00
413,916,900.00
41,654,736.00
21,323,634.00
55,189,836.00
82,968,196.00
8,689,400.00
12,171,520.00
2,925,000.00
224,922,322.00
108,745,000.00
51,558,875.00
15,397,344.00
3,992,400.00
32,500,000.00
38,500,000.00
2,400,000.00
2,600,000.00
900,000.00
5,237,920.00
57,552,000.00
103,224,000.00
10,412,910.00
9,365,895.00
17,318,400.00
327,200.00
5,889,600.00
465,921,544.00
600,000.00
750,000.00
15,040,400.00
4,122,000.00
317,800.00
654,000.00
832,000.00
2,462,400.00
1,089,600.00
218,000.00
26,086,200.00
1,142,400.00
1,344,000.00
2,186,000.00
3,154,800.00
230,400.00
167,600.00
7,070,200.00
15,295,400.00
1,165,618,150.00
116,561,815.00
1,282,179,965.00
1,282,179,000.00
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
PEKERJAAN TANAH
Pembersihan Lahan
Pengukuran dan pemasangan Bowplank
Galian Tanah Pondasi
Urugan Pasir Dibawah Pondasi T=10 cm
Lantai Kerja T = 5cm
25.00
20.00
0.90
0.30
0.30
m2
m1
m3
m3
m3
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
287,100.00
1,098,700.00
JUMLAH I
II
1
2
3
4
5
6
40.00
1.50
0.60
1.00
1.00
1.00
m1
m3
m3
ls
ls
unit
15,000.00
1,633,200.00
1,764,300.00
1,502,000.00
1,783,100.00
866,600.00
JUMLAH II
15.00
m2
949,000.00
JUMLAH III
JUMLAH I - III
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN TANAH
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
JUMLAH I - III
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
DUA PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
AS
TOTAL BIAYA
Rp
7
252,500.00
1,796,000.00
77,130.00
86,130.00
329,610.00
2,541,370.00
600,000.00
2,449,800.00
1,058,580.00
1,502,000.00
1,783,100.00
866,600.00
8,260,080.00
14,235,000.00
14,235,000.00
25,036,450.00
2,503,645.00
27,540,095.00
27,540,000.00
ATE
AS
2,541,370.00
8,260,080.00
14,235,000.00
25,036,450.00
25,036,450.00
2,503,645.00
27,540,095.00
27,540,000.00
UH RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
6
PEKERJAAN TANAH
Pembersihan Lahan
Pengukuran dan pemasangan Bowplank
Galian Tanah Tiang Pondasi
Urugan Pasir Dibawah Pondasi T=10 cm
Lantai Kerja T = 5cm
Biaya Penyambungan Listrik Baru
1
2
3
4
5
6
480.00
32.00
322.56
40.32
20.16
1.00
m2
m1
m3
m3
m3
Ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
287,100.00
1,098,700.00
2,500,000.00
JUMLAH I
II
864.00
1.80
11.16
5.76
0.95
6.30
m1
m3
m3
m3
m3
m3
25,000.00
7,128,400.00
7,128,400.00
6,875,500.00
6,323,200.00
6,875,500.00
JUMLAH II
III
1
2
3
4
5
6
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Balok 8/15 Kayu Kelas I
Pekerjaan Gordeng Balok 5/10 Kayu Kelas II
Pekerjaan Rangka Atap
Penutup Atap Metal Roof
Pekerjaan Nok Atap Metal Roof
Pekerjaan Listplank Kayu KL.II
6.60
2.40
868.00
868.00
120.00
264.00
m3
m3
m2
m2
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
JUMLAH III
IV PEKERJAAN ARSITEK
1 Pekerjaan Pasangan dan Plesteran
a. Pekerjaan Dinding 1/2 Bata 1:5
b. Pekerjaan Plester + Acian 1:5
c. Pekerjaan Acian
2 Pekerjaan Lantai
a. Pekerjaan Keramik 30 x 30
4 Pekerjaan Plafond Gypsum + rangka
5 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
27.00
54.00
54.00
m2
m2
m2
193,000.00
57,300.00
31,500.00
312.00
312.00
m2
m2
209,800.00
195,500.00
54.00
54.00
312.00
m2
m2
m2
37,100.00
31,800.00
32,800.00
JUMLAH IV
V
1
2
3
4
5
6
7
PEKERJAAN ELEKTRIKAL
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Lampu TL Philips 36 Watt
Pasang Saklar Tunggal
Pasang Stop Kontak
4.00
1.00
32.00
16.00
16.00
16.00
16.00
titik
Ls
titik
titik
titik
titik
titik
150,000.00
750,000.00
210,700.00
219,700.00
51,300.00
59,700.00
45,500.00
JUMLAH V
VI PEKERJAAN SANITAIR
1 Pekerjaan Buis Beton U-30
127.50
m1
326,180.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN TANAH
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
V
PEKERJAAN ELEKTRIKAL
JUMLAH V
VI PEKERJAAN SANITAIR
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
DELAPAN RATUS TUJUH PULUH ENAM JUTA LIMA RATUS EMPAT PULUH DUA RIBU RUPIAH
Disetujui,
Disetujui,
.
Nip.
.
Nip.
EA
TOTAL BIAYA
Rp
7
4,848,000.00
2,873,600.00
27,643,392.00
11,575,872.00
22,149,792.00
2,500,000.00
71,590,656.00
21,600,000.00
12,831,120.00
79,552,944.00
39,602,880.00
5,975,424.00
43,315,650.00
202,878,018.00
63,639,180.00
14,790,960.00
91,400,400.00
137,404,400.00
22,668,000.00
27,139,200.00
357,042,140.00
5,211,000.00
3,094,200.00
1,701,000.00
65,457,600.00
60,996,000.00
2,003,400.00
1,717,200.00
10,233,600.00
150,414,000.00
600,000.00
750,000.00
6,742,400.00
3,515,200.00
820,800.00
955,200.00
728,000.00
14,111,600.00
41,587,950.00
41,587,950.00
837,624,364.00
83,762,436.40
921,386,800.40
921,386,000.00
EA
71,590,656.00
202,878,018.00
357,042,140.00
150,414,000.00
14,111,600.00
820,800.00
796,857,214.00
79,685,721.40
876,542,935.40
876,542,000.00
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
6
PEKERJAAN TANAH
Pembersihan Lahan
Pengukuran dan pemasangan Bowplank
Galian Tanah Tiang Pondasi
Urugan Pasir Dibawah Pondasi T=10 cm
Lantai Kerja T = 5cm
Biaya Penyambungan Listrik Baru
1
2
3
4
5
6
7
8
9
119.00
64.00
19.20
3.00
1.50
1.00
m2
m1
m3
m3
m3
Ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
287,100.00
1,098,700.00
2,500,000.00
JUMLAH I
II
III
1
2
3
4
5
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Balok 8/15 Kayu Kelas I
Pekerjaan Gordeng Balok 5/10 Kayu Kelas II
Pekerjaan Rangka Atap
Penutup Atap Metal Roof
Pekerjaan Listplank Kayu KL.II
IV PEKERJAAN ARSITEK
1 Pekerjaan Pasangan dan Plesteran
a. Pekerjaan Dinding 1/2 Bata 1:5
b. Pekerjaan Plester + Acian 1:5
c. Pekerjaan Acian
2 Pekerjaan Lantai
a. Pekerjaan Keramik lantai WC 20x20
b. Pekerjaan Keramik Dinding 20x20
c. Pekerjaan Rabat Beton
3 Pekerjaan Kusen, Pintu dan Jendela
a. Pekerjaan Pintu PVC
d. Pekerjaan Kusen BV
f. Pekerjaan Kaca Polos 5mm
4 Pekerjaan Plafond Gypsum 9mm + Rangka
5 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
1,710.00
5.70
13.89
1.43
1.59
0.57
0.85
1.81
0.46
m1
m3
m3
m3
m3
m3
m3
m3
m3
25,000.00
1,633,200.00
1,872,900.00
7,128,400.00
6,875,500.00
6,875,500.00
6,875,500.00
6,323,200.00
6,875,500.00
JUMLAH II
2.10
1.13
172.50
172.50
56.00
m3
m3
m2
m2
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
102,800.00
JUMLAH III
188.50
287.00
287.00
m2
m2
m2
193,000.00
57,300.00
31,500.00
63.00
90.00
3.60
m2
m2
m3
221,800.00
226,500.00
1,622,800.00
12.00
12.00
6.00
115.00
bh
bh
m2
m2
650,000.00
250,000.00
165,000.00
195,500.00
122.50
90.00
115.00
m2
m2
m2
37,100.00
31,800.00
32,800.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
PEKERJAAN ELEKTRIKAL
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Lampu Pijar Philips 20 Watt
Pasang Lampu TL Philips 36 Watt
Pasang Saklar Tunggal
Pasang Stop Kontak
4.00
1.00
16.00
2.00
12.00
4.00
10.00
2.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
210,700.00
219,700.00
51,300.00
45,400.00
59,700.00
45,500.00
JUMLAH V
VI
1
2
3
4
5
6
7
9
PEKERJAAN PLUMBING
Pekerjaan Pipa PVC 1/2 " AW
Pekerjaan Pipa PVC 4 " AW
Pekerjaan Pasang Kloset Jongkok
Pekerjaan Bak Fiber
Pekerjaan Pasang Kran
Pekerjaan Floor Drain
Pekerjaan Septic Tank 1,5x1,5x1 + Peresapan
Pekerjaan Buis Beton U-30
38.00
28.00
13.00
13.00
13.00
13.00
1.00
15.50
m1
m1
bh
bh
bh
bh
unit
m1
20,400.00
134,400.00
530,500.00
788,700.00
57,600.00
41,900.00
7,070,200.00
161,500.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN TANAH
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
V
PEKERJAAN ELEKTRIKAL
JUMLAH V
VI PEKERJAAN PLUMBING
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
TIGA RATUS SEMBILAN PULUH SATU JUTA SEMBILAN RATUS TUJUH PULUH ENAM RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
1,201,900.00
5,747,200.00
1,645,440.00
861,300.00
1,648,050.00
2,500,000.00
13,603,890.00
42,750,000.00
9,309,240.00
26,021,604.38
10,157,970.00
10,940,295.60
3,898,408.50
5,856,275.88
11,426,022.40
3,137,290.65
77,609,816.76
20,248,830.00
6,933,262.50
18,164,250.00
27,306,750.00
5,756,800.00
78,409,892.50
36,380,500.00
16,445,100.00
9,040,500.00
13,973,400.00
20,385,000.00
5,842,080.00
7,800,000.00
3,000,000.00
990,000.00
22,482,500.00
4,544,750.00
2,862,000.00
3,772,000.00
147,517,830.00
600,000.00
750,000.00
3,371,200.00
439,400.00
615,600.00
181,600.00
597,000.00
91,000.00
6,645,800.00
775,200.00
3,763,200.00
6,896,500.00
10,253,100.00
748,800.00
544,700.00
7,070,200.00
2,503,250.00
32,554,950.00
356,342,179.26
35,634,217.93
391,976,397.18
391,976,000.00
13,603,890.00
77,609,816.76
78,409,892.50
147,517,830.00
6,645,800.00
32,554,950.00
356,342,179.26
35,634,217.93
391,976,397.18
391,976,000.00
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
PEKERJAAN PERSIAPAN
Pembersihan
Pengukuran dan pemasangan Bowplank
Asbuild Drawing
Dokumentasi dan Pelaporan
Biaya Penyambungan Listrik Baru
24.00
20.00
1.00
1.00
1
m2
m1
ls
ls
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
1,500,000.00
1,000,000.00
2,500,000.00
JUMLAH I
II
2.16
0.75
0.96
0.60
0.36
m3
m3
m3
m3
m3
85,700.00
1,872,900.00
9,642,300.00
9,642,300.00
9,642,300.00
JUMLAH II
III
1
2
3
4
5
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Balok 8/12 Kayu Kelas I
Pekerjaan Gordeng Balok 6/12 Kayu Kelas II
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Listplank 3/30 Kayu Kelas I
IV
1
2
3
4
PEKERJAAN ARSITEK
Pekerjaan Lantai Papan 3/30 Kayu Kelas I
Pekerjaan Tangga
Pekerjaan Reling
Pekerjaan Pengecatan
20.00
2.00
14.00
40.54
m2
Unit
m2
m2
310,700.00
2,500,000.00
450,000.00
40,900.00
JUMLAH IV
PEKERJAAN ELEKTRIKAL
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Lampu Pijar Philips 20 Watt
Pasang Lampu TL Philips 36 Watt
Pasang Saklar Tunggal
Pasang Stop Kontak
4.00
1.00
16.00
2.00
12.00
4.00
10.00
2.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
210,700.00
219,700.00
51,300.00
45,400.00
59,700.00
45,500.00
0.46
0.16
25.20
25.20
18.00
m3
m3
m2
m2
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
102,800.00
JUMLAH III
1
2
3
4
5
6
7
8
JUMLAH IV
JUMLAH I - IV
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
JUMLAH I - IV
JUMLAH 5 UNIT
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
SEMBILAN PULUH ENAM JUTA DELAPAN RATUS DELAPAN PULUH DELAPAN RIBU RUPIAH
Disetujui,
Disetujui,
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
242,400.00
1,796,000.00
1,500,000.00
1,000,000.00
2,500,000.00
7,038,400.00
185,112.00
1,404,675.00
9,256,608.00
5,785,380.00
3,471,228.00
20,103,003.00
4,454,742.60
986,064.00
16,848.00
3,989,160.00
1,850,400.00
11,297,214.60
6,214,000.00
5,000,000.00
6,300,000.00
1,658,086.00
30,469,300.60
600,000.00
750,000.00
3,371,200.00
439,400.00
615,600.00
181,600.00
597,000.00
91,000.00
49,641,386.60
88,080,004.20
8,808,000.42
96,888,004.62
96,888,000.00
7,038,400.00
20,103,003.00
11,297,214.60
49,641,386.60
88,080,004.20
88,080,004.20
8,808,000.42
96,888,004.62
96,888,000.00
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
PEKERJAAN PERSIAPAN
Pembersihan
Pengukuran dan pemasangan Bowplank
Asbuild Drawing
Dokumentasi dan Pelaporan
Biaya Penyambungan Listrik Baru
24.00
20.00
1.00
1.00
1
m2
m1
ls
ls
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
1,500,000.00
1,000,000.00
2,500,000.00
JUMLAH I
II
10.24
745.80
35.70
m3
m3
m3
85,700.00
65,000.00
1,872,900.00
JUMLAH II
III
1
2
3
4
5
6
7
IV
1
2
3
PEKERJAAN ARSITEK
Pek. Plester dan Acian
Pek. Batu Sikat
Pek. Grass Block
1.44
0.64
0.75
0.64
1.36
3.24
18.90
m3
m3
m3
m3
m3
m3
m3
6,323,200.00
7,704,100.00
6,323,200.00
7,704,100.00
7,128,400.00
7,128,400.00
6,323,200.00
JUMLAH III
35.00
105.00
173.00
m2
m2
m2
57,300.00
225,000.00
175,000.00
JUMLAH IV
JUMLAH I - IV
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
JUMLAH I
JUMLAH II
III PEKERJAAN STRUKTUR TANGGA
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
JUMLAH I - IV
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
TIGA RATUS SEMBILAN PULUH JUTA ENAM RATUS DELAPAN PULUH ENAM RIBU RUPIAH
Disetujui,
Disetujui,
Nip.
Nip.
TOTAL BIAYA
Rp
7
242,400.00
1,796,000.00
1,500,000.00
1,000,000.00
2,500,000.00
7,038,400.00
877,568.00
48,477,000.00
66,862,530.00
116,217,098.00
9,105,408.00
4,930,624.00
4,742,400.00
4,930,624.00
9,694,624.00
23,096,016.00
119,508,480.00
176,008,176.00
2,005,500.00
23,625,000.00
30,275,000.00
55,905,500.00
355,169,174.00
35,516,917.40
390,686,091.40
390,686,000.00
7,038,400.00
116,217,098.00
176,008,176.00
55,905,500.00
355,169,174.00
35,516,917.40
390,686,091.40
390,686,000.00
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pemasangan Esteger
224.00
64.00
m2
m1
HARGA SATUAN
Rp
6
10,100.00
89,800.00
JUMLAH I
II
PEKERJAAN ARSITEK
1 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
408.00
264.00
312.00
m2
m2
m2
37,100.00
31,800.00
32,800.00
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN ARSITEK
JUMLAH I
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
EMPAT PULUH LIMA JUTA SEMBILAN RATUS LIMA PULUH DUA RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
2,262,400.00
5,747,200.00
8,009,600.00
15,136,800.00
8,395,200.00
10,233,600.00
33,765,600.00
41,775,200.00
4,177,520.00
45,952,720.00
45,952,000.00
8,009,600.00
33,765,600.00
41,775,200.00
4,177,520.00
45,952,720.00
45,952,000.00
RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
PEKERJAAN TANAH
Pembersihan Lahan
Galian Tanah Tiang Pondasi
Urugan Pasir Dibawah Pondasi T=10 cm
Lantai Kerja T = 5cm
19.00
24.06
3.80
1.90
m2
m3
m3
m3
HARGA SATUAN
Rp
6
10,100.00
85,700.00
287,100.00
1,098,700.00
JUMLAH I
II
III
1
2
3
4
5
Pek.
Pek.
Pek.
Pek.
Pek.
Ansamping
Pondasi Batu Belah
Sloof 12/15
Kolom 12/15
Ring Balk 12/12
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Balok 6/12 Kayu Kelas I
Pekerjaan Gordeng Balok 5/10 Kayu Kelas II
Pekerjaan Rangka Atap
Penutup Atap Metal Roof
Pekerjaan Listplank Kayu KL.II
IV PEKERJAAN ARSITEK
1 Pekerjaan Pasangan dan Plesteran
a. Pekerjaan Dinding 1/2 Bata 1:5
b. Pekerjaan Plester + Acian 1:5
c. Pekerjaan Acian
2 Pekerjaan Lantai
a. Pekerjaan Keramik Lantai utama 30x30
b. Pekerjaan Rabat Beton
c. Pekerjaan Keramik Selasar Luar 30x30
3 Pekerjaan Kusen, Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Jendela Lengkap + Kusen J1
c. Pekerjaan Kaca Polos 5mm
4 Pekerjaan Plafond Gypsum 9mm + Rangka
5 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
4.00
5.40
0.61
0.32
0.29
m3
m3
m3
m3
m3
1,633,200.00
1,872,900.00
7,128,400.00
6,875,500.00
6,323,200.00
JUMLAH II
0.97
0.76
145.20
145.20
48.40
m3
m3
m2
m2
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
102,800.00
JUMLAH III
40.00
80.00
80.00
m2
m2
m2
193,000.00
57,300.00
31,500.00
91.80
4.80
38.40
m2
m3
m2
209,800.00
1,764,300.00
209,800.00
4.00
4.00
2.00
130.20
unit
unit
m2
m2
6,875,500.00
7,310,300.00
165,000.00
195,500.00
139.00
115.20
130.20
m2
m2
m2
37,100.00
31,800.00
32,800.00
JUMLAH IV
V
1
2
3
4
5
PEKERJAAN MEKANIKAL
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Lampu Philips 8 Watt
Pasang Saklar Tunggal
Pasang Stop Kontak
12.00
8.00
12.00
12.00
8.00
titik
titik
titik
titik
titik
210,700.00
219,700.00
51,300.00
59,700.00
45,500.00
JUMLAH V
VI PEKERJAAN PLUMBING
1 Pekerjaan Buis Beton U-30
38.00
m1
161,500.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN TANAH
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
V
PEKERJAAN MEKANIKAL
JUMLAH V
VI PEKERJAAN PLUMBING
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
DUA RATUS TUJUH PULUH JUTA TUJUH RATUS SEMBILAN PULUH RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
191,900.00
2,062,284.80
1,090,980.00
2,087,530.00
5,432,694.80
6,532,800.00
10,113,660.00
4,362,580.80
2,227,662.00
1,857,503.23
25,094,206.03
9,372,315.60
4,677,641.10
15,289,560.00
22,985,160.00
4,975,520.00
57,300,196.70
7,720,000.00
4,584,000.00
2,520,000.00
19,259,640.00
8,468,640.00
8,056,320.00
27,502,000.00
29,241,200.00
330,000.00
25,454,100.00
5,156,900.00
3,663,360.00
4,270,560.00
146,226,720.00
2,528,400.00
1,757,600.00
615,600.00
716,400.00
364,000.00
5,982,000.00
6,137,000.00
6,137,000.00
246,172,817.53
24,617,281.75
270,790,099.29
270,790,000.00
5,432,694.80
25,094,206.03
57,300,196.70
146,226,720.00
5,982,000.00
6,137,000.00
246,172,817.53
24,617,281.75
270,790,099.29
270,790,000.00
RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
5
6
PEKERJAAN TANAH
Pembersihan Lahan
Pengukuran dan pemasangan Bowplank
Galian Tanah Tiang Pondasi
Urugan Pasir Dibawah Pondasi T=10 cm
Lantai Kerja T = 5cm
Biaya Peyambungan Baru
80.00
14.00
18.56
2.80
1.40
1.00
m2
m1
m3
m3
m3
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
287,100.00
1,098,700.00
2,500,000.00
JUMLAH I
II
III
1
2
3
4
5
Pek.
Pek.
Pek.
Pek.
Pek.
Ansamping
Pondasi Batu Belah
Sloof 12/15
Kolom 12/15
Ring Balk 12/12
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Balok 6/12 Kayu Kelas I
Pekerjaan Gordeng Balok 5/10 Kayu Kelas II
Pekerjaan Rangka Atap
Penutup Atap Metal Roof
Pekerjaan Listplank Kayu KL.II
IV PEKERJAAN ARSITEK
1 Pekerjaan Pasangan dan Plesteran
a. Pekerjaan Dinding 1/2 Bata 1:5
b. Pekerjaan Plester + Acian 1:5
c. Pekerjaan Acian
2 Pekerjaan Lantai
a. Pekerjaan Keramik Lantai utama 30x30
b. Pekerjaan Rabat Beton
c. Pekerjaan Keramik Selasar Luar 30x30
3 Pekerjaan Kusen, Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Jendela Lengkap + Kusen J1
c. Pekerjaan Kaca Polos 5mm
4 Pekerjaan Plafond Gypsum 9mm + Rangka
5 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
6 Pasangan Profil dinding luar
V
5.60
7.56
0.84
0.49
0.40
m3
m3
m3
m3
m3
1,633,200.00
1,872,900.00
7,128,400.00
6,875,500.00
6,323,200.00
JUMLAH II
0.68
0.14
99.00
99.00
39.00
m3
m3
m2
m2
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
102,800.00
JUMLAH III
126.00
162.00
162.00
m2
m2
m2
193,000.00
57,300.00
31,500.00
48.00
23.90
40.00
m2
m3
m2
221,800.00
1,622,800.00
221,800.00
3.00
3.00
4.80
88.00
unit
unit
m2
m2
7,310,300.00
8,350,900.00
165,000.00
195,500.00
128.00
80.00
88.00
40.00
m2
m2
m2
m2
37,100.00
31,800.00
32,800.00
300,000.00
JUMLAH IV
8.00
4.00
8.00
8.00
4.00
titik
titik
titik
titik
titik
210,700.00
219,700.00
51,300.00
59,700.00
45,500.00
PEKERJAAN MEKANIKAL
1
2
3
4
5
Pasang
Pasang
Pasang
Pasang
Pasang
Instalasi Penerangan
Instalasi Stop Kontak
Lampu Philips 8 Watt
Saklar Tunggal
Stop Kontak
JUMLAH V
VI PEKERJAAN PLUMBING
1 Pekerjaan Buis Beton U-30
40.00
m1
161,500.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN TANAH
II
JUMLAH I
JUMLAH II
III PEKERJAAN ATAP
JUMLAH III
IV PEKERJAAN ARSITEK
JUMLAH IV
V
PEKERJAAN MEKANIKAL
JUMLAH V
VI PEKERJAAN PLUMBING
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
TIGA RATUS DUA JUTA SEMBILAN RATUS DUA PULUH ENAM RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
808,000.00
1,257,200.00
1,590,592.00
803,880.00
1,538,180.00
2,500,000.00
8,497,852.00
9,145,920.00
14,159,124.00
5,987,856.00
3,341,493.00
2,549,514.24
35,183,907.24
6,508,552.50
831,991.50
10,424,700.00
15,671,700.00
4,009,200.00
37,446,144.00
24,318,000.00
9,282,600.00
5,103,000.00
10,646,400.00
38,784,920.00
8,872,000.00
21,930,900.00
25,052,700.00
792,000.00
17,204,000.00
4,748,800.00
2,544,000.00
2,886,400.00
12,000,000.00
184,165,720.00
1,685,600.00
878,800.00
410,400.00
477,600.00
182,000.00
3,634,400.00
6,460,000.00
6,460,000.00
275,388,023.24
27,538,802.32
302,926,825.56
302,926,000.00
8,497,852.00
35,183,907.24
37,446,144.00
184,165,720.00
3,634,400.00
6,460,000.00
275,388,023.24
27,538,802.32
302,926,825.56
302,926,000.00
RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
JUMLAH ( RP )
Terbilang :
SATU MILYAR DUA RATUS DUA PULUH SEMBILAN JUTA DUA RATUS LIMA PULUH TUJUH RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
1
1
2
3
4
5
6
600.00
125.00
54.00
1.00
m2
m1
m3
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
2,500,000.00
JUMLAH I
II
III
1
2
3
4
5
6
7
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Kayu Kelas I uk 6/15
Pekerjaan Gordeng Kayu Kelas II uk 5/10
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Nor Metal Roof
Pekerjaan List Plank Kayu KL.II
Pekerjaan Talang Jurai
1.70
30.00
40.50
4.50
1.19
16.32
2.16
m3
m3
m3
m3
m3
m3
m3
7,128,400.00
1,633,200.00
1,872,900.00
7,128,400.00
6,875,500.00
7,128,400.00
6,323,200.00
JUMLAH II
2.25
4.38
875.00
875.00
120.00
155.00
48.00
m3
m3
m2
m2
m1
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
65,000.00
JUMLAH III
IV PEKERJAAN ARSITEK
1 Pekerjaan Pasangan dan Plesteran
a. Pekerjaan Dinding 1/2 Bata 1:5
b. Pekerjaan Plester + Acian 1:5
c. Pekerjaan Acian
2 Pekerjaan Lantai
a. Pekerjaan Keramik Lantai utama 30x30
b. Pekerjaan Rabat Beton
c. Pekerjaan Keramik Selasar Luar 30x30
3 Pekerjaan Dinding Papan Kayu Kelas I uk 2 x 30
4 Pekerjaan Kusen Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Pintu Lengkap + Kusen P2
c. Pekerjaan Jendela Lengkap + Kusen J1
d. Pekerjaan Bovenlight BV
e. Pekerjaan Pintu PVC
5 Pekerjaan Plafon
a. Pekerjaan Rangka Plafon kaso 5/7
b. Pekerjaan Plafon Gypsum 9mm
6 Pekerjaan Pengecatan
a. Pekerjaan Pengecatan Dinding Dalam
b. Pekerjaan Pengecatan Dinding Luar
b. Pekerjaan Pengecatan Plafon
c. Pekerjaan Pengecatan List Plank
137.00
274.00
274.00
m2
m2
m2
86,600.00
102,800.00
20,400.00
875.00
10.00
100.00
206.00
m2
m3
m2
m2
75,000.00
326,180.00
75,000.00
161,500.00
8.00
12.00
32.00
10.00
7.00
unit
unit
unit
unit
unit
2,500,000.00
4,500,000.00
1,750,000.00
600,000.00
650,000.00
600.00
600.00
m2
m2
109,000.00
195,500.00
480.00
120.00
600.00
155.00
m2
m2
m2
m2
31,800.00
37,100.00
32,800.00
102,800.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
PEKERJAAN ME
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Saklar Tunggal
Pasang Saklat Ganda
Pasang Stop Kontak
Pasang Lampu Philips 11 Watt
4.00
1.00
60.00
20.00
40.00
10.00
20.00
60.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
197,900.00
206,100.00
45,400.00
54,500.00
41,600.00
51,300.00
JUMLAH V
VI
1
2
3
4
5
6
PEKERJAAN SANITAIR
Pekerjaan Saluran Air Bersih PVC 1/2"
Pekerjaan Saluran Air Kotor PVC 5"
Pekerjaan Pasang Kloset Jongkok
Pekerjaan Pasang Kran
Pekerjaan Floor Drain
Pekerjaan Septic Tank 1,5x1,5x1 + Peresapan
120.00
50.00
5.00
20.00
7.00
1.00
m1
m1
bh
bh
bh
unit
95,200.00
134,400.00
546,500.00
57,600.00
41,900.00
7,070,200.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
AH ( RP )
24,412,800.00
307,206,224.00
321,029,862.50
411,849,000.00
23,617,000.00
29,392,000.00
1,117,506,886.50
111,750,688.65
1,229,257,575.15
1,229,257,000.00
UH RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
TOTAL BIAYA
Rp
7
6,060,000.00
11,225,000.00
4,627,800.00
2,500,000.00
24,412,800.00
12,118,280.00
48,996,000.00
75,852,450.00
32,077,800.00
8,168,094.00
116,335,488.00
13,658,112.00
307,206,224.00
21,695,175.00
26,962,687.50
92,137,500.00
138,512,500.00
22,668,000.00
15,934,000.00
3,120,000.00
321,029,862.50
11,864,200.00
28,167,200.00
5,589,600.00
65,625,000.00
3,261,800.00
7,500,000.00
33,269,000.00
20,000,000.00
54,000,000.00
56,000,000.00
6,000,000.00
4,550,000.00
65,400,000.00
117,300,000.00
15,264,000.00
4,452,000.00
19,680,000.00
15,934,000.00
411,849,000.00
600,000.00
750,000.00
11,874,000.00
4,122,000.00
1,816,000.00
545,000.00
832,000.00
3,078,000.00
23,617,000.00
11,424,000.00
6,720,000.00
2,732,500.00
1,152,000.00
293,300.00
7,070,200.00
29,392,000.00
1,117,506,886.50
111,750,688.65
1,229,257,575.15
1,229,257,000.00
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
JUMLAH ( RP )
Terbilang :
SEMBILAN RATUS SEMBILAN PULUH DUA JUTA EMPAT RATUS ENAM PULUH RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
1
2
3
4
5
6
7
144.00
48.00
17.28
1.00
m2
m1
m3
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
2,500,000.00
JUMLAH I
II
2.40
7.68
4.32
0.40
4.16
0.48
1.68
m3
m3
m3
m3
m3
m3
m3
7,128,400.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
JUMLAH II
III
1
2
3
4
5
6
7
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Kayu Kelas I uk 6/15
Pekerjaan Gordeng Kayu Kelas II uk 5/10
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Nor Metal Roof
Pekerjaan List Plank Kayu KL.II
Pekerjaan Talang Jurai
IV
1
2
3
PEKERJAAN ARSITEK
Pekerjaan Lantai Papan Kayu Kelas I uk 3 x 30
Pekerjaan Dinding Papan Kayu Kelas I uk 2 x 30
Pekerjaan Kusen Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Jendela Lengkap + Kusen J1
c. Pekerjaan Bovenlight BV
d. Pekerjaan Pintu PVC
Pekerjaan Tangga
Pekerjaan Relling
Pekerjaan Plafon
a. Pekerjaan Rangka Plafon kaso 5/7
b. Pekerjaan Plafon Gypsum 9mm
Pekerjaan Pengecata
a. Pekerjaan Pengecatan Dinding Dalam
b. Pekerjaan Pengecatan Dinding Luar
b. Pekerjaan Pengecatan Plafon
c. Pekerjaan Pengecatan Reling Tangga & Teras
d. Pekerjaan Pengecatan List Plank
3.50
2.46
484.00
484.00
46.00
96.00
45.00
m3
m3
m2
m2
m1
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
65,000.00
JUMLAH III
4
5
6
484.00
276.00
m2
m2
310,700.00
161,500.00
13.00
22.00
4.00
4.00
2.00
4.00
unit
unit
unit
unit
unit
m2
2,500,000.00
1,750,000.00
600,000.00
650,000.00
450,000.00
1,309,480.00
484.00
484.00
m2
m2
109,000.00
195,500.00
271.35
196.35
484.00
8.00
108.00
m2
m2
m2
m2
m2
31,800.00
37,100.00
32,800.00
40,900.00
40,900.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
PEKERJAAN ME
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Saklar Tunggal
Pasang Saklat Ganda
Pasang Stop Kontak
Pasang Lampu Philips 11 Watt
4.00
1.00
42.00
22.00
20.00
15.00
22.00
42.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
197,900.00
206,100.00
45,400.00
54,500.00
41,600.00
51,300.00
JUMLAH V
VI
1
2
3
4
5
6
PEKERJAAN SANITAIR
Pekerjaan Saluran Air Bersih PVC 1/2"
Pekerjaan Saluran Air Kotor PVC 5"
Pekerjaan Pasang Kloset Jongkok
Pekerjaan Pasang Kran
Pekerjaan Floor Drain
Pekerjaan Septic Tank 1,5x1,5x1 + Peresapan
48.00
20.00
4.00
4.00
4.00
1.00
m1
m1
bh
bh
bh
unit
95,200.00
134,400.00
546,500.00
57,600.00
41,900.00
7,070,200.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
AH ( RP )
9,745,696.00
197,612,016.00
197,974,384.00
461,001,835.00
18,991,300.00
16,911,800.00
902,237,031.00
90,223,703.10
992,460,734.10
992,460,000.00
BU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
TOTAL BIAYA
Rp
7
1,454,400.00
4,310,400.00
1,480,896.00
2,500,000.00
9,745,696.00
17,108,160.00
74,052,864.00
41,654,736.00
3,856,920.00
40,111,968.00
4,628,304.00
16,199,064.00
197,612,016.00
33,748,050.00
15,160,734.00
50,965,200.00
76,617,200.00
8,689,400.00
9,868,800.00
2,925,000.00
197,974,384.00
150,378,800.00
44,574,000.00
32,500,000.00
38,500,000.00
2,400,000.00
2,600,000.00
900,000.00
5,237,920.00
52,756,000.00
94,622,000.00
8,628,930.00
7,284,585.00
15,875,200.00
327,200.00
4,417,200.00
461,001,835.00
600,000.00
750,000.00
8,311,800.00
4,534,200.00
908,000.00
817,500.00
915,200.00
2,154,600.00
18,991,300.00
4,569,600.00
2,688,000.00
2,186,000.00
230,400.00
167,600.00
7,070,200.00
16,911,800.00
902,237,031.00
90,223,703.10
992,460,734.10
992,460,000.00
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
JUMLAH ( RP )
Terbilang :
TIGA RATUS SEMBILAN PULUH EMPAT JUTA ENAM RATUS DUA PULUH SATU RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
1
2
3
4
5
6
7
72.00
44.00
8.64
1.00
m2
m1
m3
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
2,500,000.00
JUMLAH I
II
2.10
3.84
2.16
0.20
2.08
0.24
0.84
m3
m3
m3
m3
m3
m3
m3
7,128,400.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
JUMLAH II
III
1
2
3
4
5
6
7
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Kayu Kelas I uk 6/15
Pekerjaan Gordeng Kayu Kelas II uk 5/10
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Nor Metal Roof
Pekerjaan List Plank Kayu KL.II
Pekerjaan Talang Jurai
IV
1
2
3
PEKERJAAN ARSITEK
Pekerjaan Lantai Papan Kayu Kelas I uk 3 x 30
Pekerjaan Dinding Papan Kayu Kelas I uk 2 x 30
Pekerjaan Kusen Pintu dan Jendela
a. Pekerjaan Pintu Lengkap + Kusen P1
b. Pekerjaan Jendela Lengkap + Kusen J1
c. Pekerjaan Bovenlight BV
d. Pekerjaan Pintu PVC
Pekerjaan Tangga
Pekerjaan Relling
Pekerjaan Plafon
a. Pekerjaan Rangka Plafon kaso 5/7
b. Pekerjaan Plafon Gypsum 9mm
Pekerjaan Pengecata
a. Pekerjaan Pengecatan Dinding Dalam
b. Pekerjaan Pengecatan Dinding Luar
b. Pekerjaan Pengecatan Plafon
c. Pekerjaan Pengecatan Reling Tangga & Teras
d. Pekerjaan Pengecatan List Plank
1.75
1.23
121.00
121.00
23.00
48.00
24.00
m3
m3
m2
m2
m1
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
65,000.00
JUMLAH III
4
5
6
121.00
138.00
m2
m2
310,700.00
161,500.00
9.00
9.00
2.00
2.00
2.00
4.00
unit
unit
unit
unit
unit
m2
2,500,000.00
1,750,000.00
600,000.00
650,000.00
450,000.00
1,309,480.00
121.00
121.00
m2
m2
109,000.00
195,500.00
135.68
98.18
121.00
8.00
54.00
m2
m2
m2
m2
m2
31,800.00
37,100.00
32,800.00
40,900.00
40,900.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
PEKERJAAN ME
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Saklar Tunggal
Pasang Saklat Ganda
Pasang Stop Kontak
Pasang Lampu Philips 11 Watt
4.00
1.00
20.00
10.00
10.00
8.00
10.00
20.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
197,900.00
206,100.00
45,400.00
54,500.00
41,600.00
51,300.00
JUMLAH V
VI
1
2
3
4
5
6
PEKERJAAN SANITAIR
Pekerjaan Saluran Air Bersih PVC 1/2"
Pekerjaan Saluran Air Kotor PVC 5"
Pekerjaan Pasang Kloset Jongkok
Pekerjaan Pasang Kran
Pekerjaan Floor Drain
Pekerjaan Septic Tank 1,5x1,5x1 + Peresapan
24.00
10.00
2.00
2.00
2.00
1.00
m1
m1
bh
bh
bh
unit
95,200.00
134,400.00
546,500.00
57,600.00
41,900.00
7,070,200.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
AH ( RP )
7,918,848.00
105,221,568.00
67,189,092.00
158,075,477.50
8,351,000.00
11,991,000.00
358,746,985.50
35,874,698.55
394,621,684.05
394,621,000.00
IBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
TOTAL BIAYA
Rp
7
727,200.00
3,951,200.00
740,448.00
2,500,000.00
7,918,848.00
14,969,640.00
37,026,432.00
20,827,368.00
1,928,460.00
20,055,984.00
2,314,152.00
8,099,532.00
105,221,568.00
16,874,025.00
7,580,367.00
12,741,300.00
19,154,300.00
4,344,700.00
4,934,400.00
1,560,000.00
67,189,092.00
37,594,700.00
22,287,000.00
22,500,000.00
15,750,000.00
1,200,000.00
1,300,000.00
900,000.00
5,237,920.00
13,189,000.00
23,655,500.00
4,314,465.00
3,642,292.50
3,968,800.00
327,200.00
2,208,600.00
158,075,477.50
600,000.00
750,000.00
3,958,000.00
2,061,000.00
454,000.00
436,000.00
416,000.00
1,026,000.00
8,351,000.00
2,284,800.00
1,344,000.00
1,093,000.00
115,200.00
83,800.00
7,070,200.00
11,991,000.00
358,746,985.50
35,874,698.55
394,621,684.05
394,621,000.00
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
JUMLAH ( RP )
Terbilang :
ENAM RATUS ENAM PULUH SATU JUTA SERATUS EMPAT PULUH RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
I
1
2
3
4
1
2
3
4
5
6
7
312.00
56.00
48.96
1.00
m2
m1
m3
ls
HARGA SATUAN
Rp
6
10,100.00
89,800.00
85,700.00
2,500,000.00
JUMLAH I
II
1.30
3.20
1.80
0.20
4.16
0.24
0.80
m3
m3
m3
m3
m3
m3
m3
7,128,400.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
9,642,300.00
JUMLAH II
III
1
2
3
4
5
6
7
PEKERJAAN ATAP
Pekerjaan Kuda Kuda Kayu Kelas I uk 6/15
Pekerjaan Gordeng Kayu Kelas II uk 5/10
Pekerjaan Rangka Atap
Pekerjaan Penutup Atap Metal Roof
Pekerjaan Nor Metal Roof
Pekerjaan List Plank Kayu KL.II
Pekerjaan Talang Jurai
1.25
1.10
528.00
528.00
23.00
112.00
24.00
m3
m3
m2
m2
m1
m1
m1
9,642,300.00
6,162,900.00
105,300.00
158,300.00
188,900.00
102,800.00
65,000.00
JUMLAH III
IV
1
2
3
4
PEKERJAAN ARSITEK
Pekerjaan Lantai Papan Kayu Kelas I uk 3 x 30
Pekerjaan Dinding Papan Kayu Kelas I uk 2 x 30
Pekerjaan Kusen Pintu dan Jendela
Pekerjaan Plafon
a. Pekerjaan Rangka Plafon kaso 5/7
b. Pekerjaan Plafon Gypsum 9mm
5 Pekerjaan Pengecata
a. Pekerjaan Pengecatan Dinding Dalam
b. Pekerjaan Pengecatan Plafon
c. Pekerjaan Pengecatan List Plank
388.00
72.00
m2
m2
310,700.00
161,500.00
388.00
388.00
m2
m2
109,000.00
195,500.00
72.00
388.00
112.00
m2
m2
m2
31,800.00
32,800.00
40,900.00
JUMLAH IV
V
1
2
3
4
5
6
7
8
PEKERJAAN ME
Pasang Pembatas Daya Listrik (MCB 6A)
Pasang Box Zekering 4 Group
Pasang Instalasi Penerangan
Pasang Instalasi Stop Kontak
Pasang Saklar Tunggal
Pasang Saklat Ganda
Pasang Stop Kontak
Pasang Lampu Philips 11 Watt
4.00
1.00
38.00
10.00
15.00
10.00
10.00
38.00
titik
Ls
titik
titik
titik
titik
titik
titik
150,000.00
750,000.00
197,900.00
206,100.00
45,400.00
54,500.00
41,600.00
51,300.00
JUMLAH V
VI PEKERJAAN SANITAIR
1 Pekerjaan Buis Beton U-30
112.00
m1
161,500.00
JUMLAH VI
JUMLAH I - VI
PPN 10%
TOTAL
DIBULATKAN
AH ( RP )
14,875,872.00
109,546,840.00
175,431,165.00
269,922,400.00
13,172,600.00
18,088,000.00
601,036,877.00
60,103,687.70
661,140,564.70
661,140,000.00
RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
TOTAL BIAYA
Rp
7
3,151,200.00
5,028,800.00
4,195,872.00
2,500,000.00
14,875,872.00
9,266,920.00
30,855,360.00
17,356,140.00
1,928,460.00
40,111,968.00
2,314,152.00
7,713,840.00
109,546,840.00
12,052,875.00
6,779,190.00
55,598,400.00
83,582,400.00
4,344,700.00
11,513,600.00
1,560,000.00
175,431,165.00
120,551,600.00
11,628,000.00
42,292,000.00
75,854,000.00
2,289,600.00
12,726,400.00
4,580,800.00
269,922,400.00
600,000.00
750,000.00
7,520,200.00
2,061,000.00
681,000.00
545,000.00
416,000.00
1,949,400.00
13,172,600.00
18,088,000.00
18,088,000.00
601,036,877.00
60,103,687.70
661,140,564.70
661,140,000.00
URAIAN PEKERJAAN
VOLUME
SAT
PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
120.00
m2
HARGA SATUAN
Rp
6
10,100.00
JUMLAH I
II
2.00
unit
15,000,000.00
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
JUMLAH I
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
TINGGAL PULUH EMPAT JUTA TIGA RATUS TIGA PULUH TIGA RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
1,212,000.00
1,212,000.00
30,000,000.00
30,000,000.00
31,212,000.00
3,121,200.00
34,333,200.00
34,333,000.00
1,212,000.00
30,000,000.00
31,212,000.00
3,121,200.00
34,333,200.00
34,333,000.00
RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
URAIAN PEKERJAAN
VOLUME
SAT
PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pemasangan Esteger
245.00
62.00
m2
m1
HARGA SATUAN
Rp
6
10,100.00
89,800.00
JUMLAH I
II
PEKERJAAN ARSITEK
1 Pekerjaan Pengecatan
a. Pengecatan Dinding Dalam
b. Pengecatan Dinding Luar
c. Pengecatan Plafond
258.30
160.20
174.30
m2
m2
m2
37,100.00
31,800.00
32,800.00
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN ARSITEK
JUMLAH I
JUMLAH II
JUMLAH I - II
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
TIGA PULUH SATU JUTA DUA RATUS DELAPAN PULUH RIBU RUPIAH
Disetujui,
Disetujui,
.
Nip.
.
Nip.
TOTAL BIAYA
Rp
7
2,474,500.00
5,567,600.00
8,042,100.00
9,582,930.00
5,094,360.00
5,717,040.00
20,394,330.00
28,436,430.00
2,843,643.00
31,280,073.00
31,280,000.00
8,042,100.00
20,394,330.00
28,436,430.00
2,843,643.00
31,280,073.00
31,280,000.00
UPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
No.
URAIAN PEKERJAAN
SAT
VOLUME
HARGA
SATUAN
(Rp)
( a)
(b)
(c)
(d)
(e)
set
set
bh
kms
set
bh
mtr
bh
bh
set
set
set
bh
bh
bh
bh
bh
mtr
bh
mtr
bh
bh
bh
bh
5
2
7
0.85
6
3
15
3
6
5
2
2
2
8
2
2
8
25
2
1,000
16
6
5
6
Penomoran tiang TM
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
56,100
123,750
23,100
4,252,320
90,750
33,600
12,540
36,960
33,000
594,000
1,320,000
90,750
23,100
8,250
252,120
62,700
41,250
14,850
82,500
18,720
287,760
610,500
3,217,500
69,960
SUB JUMLAH
B
BANGUNAN GARDU
10
11
Pondasi Gardu
12
Pengadaan Arrester 20 kv
10
Pengadaan link 25 x 25
11
12
Fusk Link 5 A
13
14
CCO 70/70
bh
buah
buah
buah
buah
buah
buah
buah
set
bh
m3
Bh
2
1
1
4
1
4
1
4
2
6
7
1
3,217,500
14,784,000
924,000
907,500
132,000
112,200
15,840
13,200
594,000
288,750
1,412,400
114,840,000
SUB JUMLAH
set
set
set
bh
mtr
bh
bh
bh
mtr
bh
bh
set
BH
BH
2
3
1
3
36
2
15
2
14
14
2
3
3
6
132,000
2,072,400
642,180
1,980,000
80,850
32,340
8,250
59,400
20,460
8,250
39,600
330,000
92,400
9,900
SUB JUMLAH
BANGUNAN LISTRIK
Kawat A3C 70 MM
set
bh
set
mtr
mtr
bh
bh
bh
mtr
bh
ls
ls
1
1
1
48
192
16
8
12
15
8
5
10
13,860,000
99,000
675,840
158,400
136,800
41,316
46,200
42,900
25,200
41,316
60,000
57,000
SUB JUMLAH
10
Bimetal 70/70
11
12
55
6,517,296.00
226
1,316,736.00
15
185
60
77,328.00
10
256,708.80
120
62,625.60
115
77,328.00
75
116
77,328.00
145
77,328.00
67
49,248.00
10
256,708.80
120
77,328.00
140
153,244.80
90
220,464.00
ls
Dari PP SM -->
10
11
12
13
14
15
Dari PP 13 --> PP
16
17
Dari PP ILP MJ
Dari PP LR --> SDP 4
Dari PP 12 --> PP
825,292.80
1,057,536.00
153,244.80
3,000,000.00
SUB JUMLAH
DESKRIPSI
BAGIAN PEMASANGAN JARINGAN SUTM
BANGUNAN GARDU
BANGUNAN PELINDUNG PENGONTROL
BANGUNAN LISTRIK
PEKERJAAN INST. KABEL POWER SITE PLAN
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
SATU MILYAR EMPAT RATUS TIGA JUTA TUJUH RATUS SEMBILAN PULUH DELAPAN RIBU RUPIAH
Disetujui,
Kuasa Pengguna Anggaran (KPA)
.
Nip.
.
Nip.
JUMLAH
HARGA
(Rp)
( f ) = (d x e )
280,500.00
247,500.00
161,700.00
3,614,472.00
544,500.00
100,800.00
188,100.00
110,880.00
198,000.00
2,970,000.00
2,640,000.00
181,500.00
46,200.00
66,000.00
504,240.00
125,400.00
330,000.00
371,250.00
165,000.00
18,720,000.00
4,604,160.00
3,663,000.00
16,087,500.00
419,760.00
56,340,462.00
6,435,000.00
14,784,000.00
924,000.00
3,630,000.00
132,000.00
448,800.00
15,840.00
52,800.00
1,188,000.00
1,732,500.00
9,180,600.00
114,840,000.00
153,363,540.00
264,000.00
6,217,200.00
642,180.00
5,940,000.00
2,910,600.00
64,680.00
123,750.00
118,800.00
286,440.00
115,500.00
79,200.00
990,000.00
277,200.00
18,029,550.00
36,059,100.00
13,860,000.00
99,000.00
675,840.00
7,603,200.00
26,265,600.00
661,056.00
369,600.00
514,800.00
378,000.00
330,528.00
300,000.00
570,000.00
51,627,624.00
358,451,280.00
297,582,336.00
12,379,392.00
195,644,160.00
4,639,680.00
2,567,088.00
7,515,072.00
8,892,720.00
11,493,360.00
8,970,048.00
11,212,560.00
3,299,616.00
2,567,088.00
9,279,360.00
21,454,272.00
19,841,760.00
3,000,000.00
978,789,792.00
JUMLAH
Rp
Rp
Rp
Rp
Rp
56,340,462.00
153,363,540.00
36,059,100.00
51,627,624.00
978,789,792.00
Rp
Rp
Rp
Rp
1,276,180,518
127,618,052
1,403,798,570
1,403,798,000
AN RIBU RUPIAH
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.
Disetujui,
Kuasa Pengguna Anggaran (KPA)
Disetujui,
Pejabat Pembuat Komitmen (PPK)
.
Nip.
.
Nip.
65,000,000.00
65,000,000.00
6,500,000.00
71,500,000.00
71,500,000.00
Dibuat Oleh,
Konsultan Perencana
PT. TIGACAKRA GEMAKARYA
Ir. Meilantri
Direktur
Diperiksa,
Kordinator Tim
.
Nip.