PERHITUNGAN VOLUME PEKERJAAN MARKA JALAN

DESKRIPSI MARKA JALAN


LOKASI BENDUNGAN WAY SEKAMPUNG

0.90
31.608
3.15
3.89 15.58
1.30
3.54 15.42 3.11 33.452 30.826
33.529 33.529 2.60
0.40
0.65

33.311
1.82
2.75
1.20
5.00 33.482 30.843
33.461 5.50

1.90 1.99 2.40


1.20 27.568 27.898
33.529 33.529
0.85 33.461
0.651.00
1.20
0.85 33.461

36.10 30.339 25.503


26.866

32.00

1.00
13.00 2.99 10.00

33.529 33.529
31.138 26.368 26.746
5.51 33.352 5.51

6.10 3.90 9.40 3.90 3.70

NO. URAIAN Panjang Lebar Tinggi Volume Satuan Harga Satuan Jumlah

1 Ketebalan 2 mm
2 Dengan Material Dasar Perekat
3 Uji Media Jalan
4 Standar Marka APBN Dan Bandara

5 Volume M2 Marka
Kanan 5,300 0.12 636.00 M2 250,000.00 159,000,000.00
Kiri 5,300 0.12 636.00 M2 250,000.00 159,000,000.00
Tengah Rata - Rata 238.50 M2 250,000.00 59,625,000
377,625,000.00

6 Latasir Untuk Oprit 3.00 M3 1,250,000.00 3,750,000.00


Mobilisasi Alat 1.00 Ls 3,000,000.00 3,000,000.00
6,750,000.00

JUMLAH 384,375,000.00