Anda di halaman 1dari 20

LMK LAB

No. :
DATA PERALATAN
Jenis Peralatan :
Merek :
Tipe :
Versi Firmware :
Serial Number :
Tanggal Pengujian :

HASIL UJI IED BCU DARI LOKAL HMI


LOKAL HMI
Item Uji
LOKAL HMI SOGI 1 LOKAL HMI SOGI 2 LOKAL HMI SOGI 3 LOKAL HMI SOGI 4 LOKAL HMI DIRI SENDIRI
Telesignal Double (TSD)
Remote Control Digital (RCD)
Telesignal Single (TSS)
Telemetering (TM)

HASIL UJI GOOSE IED BCU


IED
Item Uji
IED BCU SOGI 1 IED BCU SOGI 2 IED BCU SOGI 3 IED BCU SOGI 4
Interlock antar BCU
IED PROTEKSI SOGI 1 IED PROTEKSI SOGI 2 IED PROTEKSI SOGI 3 IED PROTEKSI SOGI 4 IED PROTEKSI DIRI SENDIRI
Trip IED Proteksi

HASIL UJI IED BCU


Item Uji Hasil
Sinkronisasi waktu
Command Interlock
Pemeriksaan Peralatan Diuji oleh, Disaksikan oleh, Diperiksa oleh,
Pemeriksaan Catu Daya
Pemeriksaan CPU

AE SCADATEL PEMINTA JASA AM UJI SISTGI


LMK LAB
No:

1. Pemeriksaan Visual Peralatan

No. Peralatan Mata Uji Hasil Periksa Kriteria Kesimpulan


Port Power Supply Baik
Port I/O Baik
Port Communication Baik
1 IED BCU Interface Baik
Display Baik
Event / Alarm Baik
Logical Node (ICD File) Sesuai

2. Foto Peralatan :
a. Single Line Diagram

b. Alarm

c. Event

d. Versi Firmware (about)

e. Annunciator

f. Tampak Depan

g. Tampak Belakang

Pada pemeriksaan Peralatan


1. Pemeriksaan visual: pemeriksaan operasi kondisi fisik dari AVR dari indikasi alarm, indikasi operasi, tampilan event di IED, Versi
Firmware, Tampak Depan, dan Belakang
2. Pemeriksaan Logical Node: pemeriksaan dilakukan dengan melihat Logical yang digunakan dalam pengujian apakah sudah
sesuai atau belum
LMK LAB
No:

1. Pengujian Catu Daya BCU

Hasil
No. ITEM UJI Kriteria Aktual Hasil Kesimpulan
OK / NOK
1 Cek Indikator Operasi Normal Indikator operasi Normal normal / tidak normal
NOK Tidak Memenuhi
2 Cek Alarm Alarm ada / tidak ada OK Memenuhi
Peralatan bekerja normal
3 Cek Polaritas normal / tidak normal
setelah simulasi Memenuhi

Pengujian Catu Daya


- Pemeriksaan modul catu daya : Melakukan cek indikator operasi normal dan alarm tidak menyala
- Pemeriksaan Polaritas : Membalik polaritas supply DC pada peralatan
LMK LAB
No:

1. Pengujian CPU BCU

No. Item Uji Kriteria Aktual Hasil


Pemeriksaan Modul CPU
1 - Cek Indikator Operasi Indikator operasi Normal Normal / Tidak normal
- Cek Alarm Alarm Ada Ada / Tidak ada
Pemeriksaan Database Konfigurasi
- Manual book Ada Ada / Tidak ada
Sesuai/kompatibel dengan manual book dan
2 - Versi Firmware Sesuai / Tidak sesuai
sertifikat conformance test (major)

- Software Konfigurator Sesuai/kompatibel dengan manual book Sesuai / Tidak sesuai


Pemeriksaan fungsi upload dan download database
- Upload Database Berhasi di-upload Berhasil / Tidak berhasil
3
- Download Database Berhasi di-download Berhasil / Tidak berhasil
- Dokumentasi Foto Foto proses upload & download Terlampir
Pemeriksaan Rekaman Event

Perubahan Event Event dan Timetag terekam di event log Terekam / Tidak terekam
4
Perubahan Alarm Event dan Timetag terekam di event log Terekam / Tidak terekam
Data Event dan Alarm Dapat di-download Berhasil / Tidak berhasil
Alarm/Notifikasi Ada / Tidak ada
5 Self Diagnostic / Watchdog
Kontak output NO/NC Ada / Tidak ada

2. Foto Pemeriksaan Rekaman Event


a. Event

b. Proses Download

Pengujian CPU
- Pemeriksaan Modul CPU : Mengecek indikator operasi normal dan alarm tidak menyala secara visual
- Pemeriksaan Database Konfigurasi : Memeriksa versi firmware peralatan dan software konfigurator sesuai atau
kompatible sesuai manual book ; Memeriksa lisensi firmware peralatan dan software konfigurator memenuhi kebutuhan
- Pemeriksaan Fungsi Upload & Download Database : Melakukan prosedur upload dan download database
- Pemeriksaan Rekaman Event : Membuat perubahan status dan alarm pada masukan peralatan, lihat pada event log
aplikasi konfigurasi peralatan bahwa event telah diterima dan dikonfigurasi
- Pemeriksaan Fungsi Self Diagnostic : Pengujian dilakukan dengan melakukan simulasi gangguan IED/modul komunikasi,
dimonitor melalui indikasi dan kontak watchdog
- Pengujian Watchdog Peralatan : Pengujian dilakukan dengan melakukan simulasi gangguan IED, dimonitor melalui indikasi
dan kontak watchdog
LMK LAB
No:

1. Pengujian Sinkronisasi Waktu

SEBELUM SESUDAH
Parameter Waktu Hasil
IED BCU GPS IED BCU GPS

Tanggal - Bulan - Tahun 10 November 1997 01 Februari 2021 01 Februari 2021 01 Februari 2021
memenuhi
Jam : Menit : Detik 01:02:03 15:15:02 15:20:01 15:20:01

ITEM UJI WAKTU PERUBAHAN KRITERIA HASIL

Waktu yang dibutuhkan untuk sinkronisasi waktu < 5 menit

Pengujian Time Synchronizing


- Pengujian dilakukan dengan memutus komunikasi peralatan dengan GPS/gateway, lalu ubah waktu peralatan yang dibedakan dengan waktu GPS/gateway mulai dari tahun, bulan, tanggal, jam,
menit dan detik. Kemudian hubungkan peralatan dengan GPS/gateway.
- Peralatan merespon dan menyesuaikan perubahan waktu sesuai dengan waktu GPS/gateway (tahun, bulan, tanggal, jam, menit dan detik)
- Waktu yang dibutuhkan untuk sinkronisasi waktu maksimal 5 menit, penghitungan dilakukan dengan menggunakan stopwatch
- Peminta Jasa menyediakan GPS secara mandiri
LMK LAB
No:

HASIL UJI GOOSE INTERLOCKING ANTAR BCU

SUBSCRIBER
Q1
BCU LAB1 BCU LAB2 BCU LAB3 BCU LAB4
Indikasi Goose
PUBLISHER

Q15 Close
Q15 Open
Q2
BCU LAB1 BCU LAB2 BCU LAB3 BCU LAB4
Indikasi Goose
Q25 Close
Q25 Open

PUBLISHER
Q1
BCU LAB1 BCU LAB2 BCU LAB3 BCU LAB4
Indikasi Goose
SUBSCRIBER

Q15 Close
Q15 Open
Q2
BCU LAB1 BCU LAB2 BCU LAB3 BCU LAB4
Indikasi Goose
Q25 Close
Q25 Open

Ekspektasi : Q15 Close Q1 tidak bisa Close


Q15 Open Q2 bisa Close
Q25 Close Q2 tidak bisa Close
Q25 Open Q1 bisa Close

Pengujian Fungsi GOOSE dari IED Proteksi ke IED BCU

PUBLISHER
IED PROTEKSI
SUBSCRIBER

IED BCU
SOGI 1 SOGI 2 SOGI 3 SOGI 4 Diri Sendiri
Indikasi Goose
Trip
Normal / Reset

Ekspektasi : IED Proteksi Trip maka CB Open melalui BCU

Pengujian Fungsi Goose


- Interlock antar BCU: IED BCU menerima perubahan status dari BCU lain dan sebaliknya menggunakan sinyal
GOOSE, BCU uji berfungsi sebagai publisher dan sebagai subscriber
- TRIP sinyal dari IED Proteksi: IED BCU menerima sinyal trip danri IED Proteksi melalui GOOSE dan meneruskan
sinyal tersebut untuk mengoperasikan dummy CB, IED BCU berfungsi sebagai subscriber
LMK LAB
No:

1. Pengujian Fungsi Report dari IED BCU ke Lokal HMI

No. HMI Report Keterangan

1 SOGI 1 Unbuffer
2 SOGI 2 Unbuffer urcb02/LLN0/XXX
3 SOGI 3 Unbuffer
4 SOGI 4 Unbuffer
5 DIRI SENDIRI Buffer brcb01/LLN0/xxx

ITEM UJI KRITERIA Aktual Hasil


Terkirim / tidak
Simulasi komunikasi putus buffered report Data Terkirim Tidak memenuhi
terikirm

Pengujian Fungsi Report


- Tipe report yang diuji menggunakan metode buffered report diuji dengan memutus link komunikasi ke server lokal HMI
- membuat simulasi event pada saat link komuniasi putus
- Untuk buffered report, data akan dikirim ke HMI/gateway setelah komunikasi tersambung
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

1. Interlock Command dari IED


Command Dari IED
POSISI LOCAL/REMOTE
Kriteria
BCU Command Eksekusi
Dapat Tidak HASIL
LOCAL Dapat Dieksekusi
DUMMY
REMOTE Tidak dapat dieksekusi

2. Interlock Command dari HMI


POSISI LOCAL/REMOTE Command Dari HMI
Kriteria
Command Eksekusi
BCU HMI
Dapat Tidak HASIL
LOCAL LOCAL Tidak dapat dieksekusi
REMOTE REMOTE Tidak dapat dieksekusi
LOCAL REMOTE Tidak dapat dieksekusi
REMOTE LOCAL Dapat Dieksekusi

Pengujian Command Interlock:


1. Command dari IED: Mengubah posisi local/remote pada BCU, kemudian dilakukan command

2. Command dari HMI: Mengubah posisi local/remote pada BCU dan HMI, kemudian dilakukan command
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

1. Hasil Pengujian Signal Single Status dari IED BCU ke Lokal HMI SOGI 1

Time Tag Waktu


Selisih Kriteria Kriteria
TEST INPUT Perubahan Hasil
IED BCU Lokal HMI (ms) (ms) (ms)
Status (s)
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
Local Remote
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5

2. Hasil Pengujian Signal Single Status dari IED BCU ke Lokal HMI SOGI 2

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
Local Remote
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5

3. Hasil Pengujian Signal Single Status dari IED BCU ke Lokal HMI SOGI 3

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
Local Remote
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

4. Hasil Pengujian Signal Single Status dari IED BCU ke Lokal HMI SOGI 4

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
Local Remote
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5

5. Hasil Pengujian Signal Single Status dari IED BCU ke Lokal HMI SOGI Diri Sendiri

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
Local Remote
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5
ON ≤1 ≤1.5
OFF ≤1 ≤1.5

Pengujian Single Status pada BCU:


1. Pengujian Local/Remote: dilakukan dengan merubah status lokal ke remote dan sebaliknya
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

1. Hasil Pengujian Signal Double Status dari IED BCU ke Lokal HMI SOGI 1

Time Tag Waktu


Selisih Kriteria Kriteria
TEST INPUT Perubahan Hasil
IED BCU Lokal HMI (ms) (ms) (ms)
Status (s)
OPEN ≤1 ≤1.5
Q1
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q2
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q0
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q9
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q15
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q25
CLOSE ≤1 ≤1.5

2. Hasil Pengujian Signal Double Status dari IED BCU ke Lokal HMI SOGI 2

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
OPEN ≤1 ≤1.5
Q1
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q2
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q0
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q9
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q15
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q25
CLOSE ≤1 ≤1.5
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

3. Hasil Pengujian Signal Double Status dari IED BCU ke Lokal HMI SOGI 3

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
OPEN ≤1 ≤1.5
Q1
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q2
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q0
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q9
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q15
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q25
CLOSE ≤1 ≤1.5

4. Hasil Pengujian Signal Double Status dari IED BCU ke Lokal HMI SOGI 4

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
OPEN ≤1 ≤1.5
Q1
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q2
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q0
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q9
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q15
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q25
CLOSE ≤1 ≤1.5
LMK LAB
No.
Pengujian IED BCU ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

5. Hasil Pengujian Signal Double Status dari IED BCU ke Lokal HMI SOGI Diri Sendiri

Time Tag Selisih Kriteria Waktu Kriteria


TEST INPUT Hasil
IED AVR Lokal HMI (ms) (ms) Perubahan (ms)
OPEN ≤1 ≤1.5
CLOSE ≤1 ≤1.5
Q1
INV OP ≤1 ≤1.5
INV CL ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q2
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q0
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q9
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q15
CLOSE ≤1 ≤1.5
OPEN ≤1 ≤1.5
Q25
CLOSE ≤1 ≤1.5

Pengujian Double Status pada BCU:


1. Pengujian Open/Close: dilakukan dengan merubah status open ke close dan sebaliknya
LMK LAB
No:
Pengujian Tele Metering (TM) dari IED BCU SOGI ke Lokal HMI

Merek :
Tipe :
Versi Firmware :

1. Hasil Pengujian TM dari IED BCU ke Lokal HMI SOGI 1

Persen Value
Kesalahan Kriteria
Test Input Pengukur Cal Hasil
IED BCU HMI Ukur (%) (%)
an (%)
0 0,25
IL1 25 0,25
CT rasio 50 0,25
1000 : 1 A 75 0,25
100 0,25
120 0,25
0 0,25
25 0,25
ULST 50 0,25
VT rasio 75 0,25
150 kV : 100 V 100 0,25
120 0,25
0 0,25
25 0,25
P 3Ph (MW) 50 0,25
PF : 0.86 75 0,25
Sudut : 30ᵒ 100 0,25
Under
indikasi
range
Over
indikasi
range
0 0,25
Q 3Ph (MVar) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
0 0,25
S 3Ph (MVA) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
LMK LAB
No:

2. Hasil Pengujian TM dari IED BCU ke Lokal HMI SOGI 2

Persen Value
Kesalahan Kriteria
Test Input Pengukur Cal Hasil
IED BCU HMI Ukur (%) (%)
an (%)
0 0,25
IL1 25 0,25
CT rasio 50 0,25
1000 : 1 A 75 0,25
100 0,25
120 0,25
0 0,25
25 0,25
ULST 50 0,25
VT rasio 75 0,25
150 kV : 100 V 100 0,25
120 0,25
0 0,25
25 0,25
P 3Ph (MW) 50 0,25
PF : 0.86 75 0,25
Sudut : 30ᵒ 100 0,25
Under
indikasi
range
Over
indikasi
range
0 0,25
Q 3Ph (MVar) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
0 0,25
S 3Ph (MVA) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
LMK LAB
No:

3. Hasil Pengujian TM dari IED BCU ke Lokal HMI SOGI 3

Persen Value
Kesalahan Kriteria
Test Input Pengukur Cal Hasil
IED BCU HMI Ukur (%) (%)
an (%)
0 0,25
IL1 25 0,25
CT rasio 50 0,25
1000 : 1 A 75 0,25
100 0,25
120 0,25
0 0,25
25 0,25
ULST 50 0,25
VT rasio 75 0,25
150 kV : 100 V 100 0,25
120 0,25
0 0,25
25 0,25
P 3Ph (MW) 50 0,25
PF : 0.86 75 0,25
Sudut : 30ᵒ 100 0,25
Under
indikasi
range
Over
indikasi
range
0 0,25
Q 3Ph (MVar) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
0 0,25
S 3Ph (MVA) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
LMK LAB
No:

4. Hasil Pengujian TM dari IED BCU ke Lokal HMI SOGI 4

Persen Value
Kesalahan Kriteria
Test Input Pengukur Cal Hasil
IED BCU HMI Ukur (%) (%)
an (%)
0 0,25
IL1 25 0,25
CT rasio 50 0,25
1000 : 1 A 75 0,25
100 0,25
120 0,25
0 0,25
25 0,25
ULST 50 0,25
VT rasio 75 0,25
150 kV : 100 V 100 0,25
120 0,25
0 0,25
25 0,25
P 3Ph (MW) 50 0,25
PF : 0.86 75 0,25
Sudut : 30ᵒ 100 0,25
Under
indikasi
range
Over
indikasi
range
0 0,25
Q 3Ph (MVar) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
0 0,25
S 3Ph (MVA) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
LMK LAB
No:

5. Hasil Pengujian TM dari IED BCU ke Lokal HMI SOGI Diri Sendiri

Persen Value
Kesalahan Kriteria
Test Input Pengukur Cal Hasil
IED BCU HMI Ukur (%) (%)
an (%)
0 0,25
IL1 25 0,25
CT rasio 50 0,25
1000 : 1 A 75 0,25
100 0,25
120 0,25
0 0,25
25 0,25
ULST 50 0,25
VT rasio 75 0,25
150 kV : 100 V 100 0,25
120 0,25
0 0,25
25 0,25
P 3Ph (MW) 50 0,25
PF : 0.86 75 0,25
Sudut : 30ᵒ 100 0,25
Under
indikasi
range
Over
indikasi
range
0 0,25
Q 3Ph (MVar) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25
0 0,25
S 3Ph (MVA) 25 0,25
PF : 0.86 50 0,25
Sudut : 30ᵒ 75 0,25
100 0,25

1. Pengujian dilakukan dengan cara injeksi arus tegangan menggunakan alat injeksi sekunder
2. Perhitungan waktu perubahan nilai pengukuran ≤ 5 detik saatpengukuran berubah dari deadband
3. Over range dan under range dilihat dari flag overflow dari BCU
LMK LAB
No:
Pengujian Remote Control Digital (RCD) dari Lokal HMI ke IED BCU SOGI

Merek :
Tipe :
Versi Firmware :

1. Hasil Pengujian RCD dari Lokal HMI SOGI 1 ke IED BCU


Control SBO
Time Tag Selisih Kriteria
Test Input Hasil
IED BCU Lokal HMI (ms) (ms)
Close <1
Q1
Open <1
Close <1
Q2
Open <1
Close <1
Q0
Open <1
Close <1
Q9
Open <1

2. Hasil Pengujian RCD dari Lokal HMI SOGI 2 ke IED BCU


Control SBO
Time Tag Selisih Kriteria
Test Input Hasil
IED BCU Lokal HMI (ms) (ms)
Close ≤1
Q1
Open ≤1
Close ≤1
Q2
Open ≤1
Memenuhi
Close ≤1
Q0
Open ≤1
Close ≤1
Q9
Open ≤1

3. Hasil Pengujian RCD dari Lokal HMI SOGI 3 ke IED BCU


Control DIRECT
Time Tag Selisih Kriteria
Test Input Hasil
IED BCU Lokal HMI (ms) (ms)
Close 0 ≤1
Q1
Open 0 ≤1
Close 0 ≤1
Q2
Open 0 ≤1
Close 0 ≤1
Q0
Open 0 ≤1
Close 0 ≤1
Q9
Open 0 ≤1
LMK LAB
No:

4. Hasil Pengujian RCD dari Lokal HMI SOGI 4 ke IED BCU


Control SBO
Time Tag Selisih Kriteria
Test Input Hasil
IED BCU Lokal HMI (ms) (ms)
Close ≤1
Q1
Open ≤1
Close ≤1
Q2
Open ≤1
Close ≤1
Q0
Open ≤1
Close ≤1
Q9
Open ≤1

5. Hasil Pengujian RCD Direct dari Lokal HMI Diri Sendiri ke IED BCU
Control DIRECT
Time Tag Selisih Kriteria
Test Input Hasil
IED BCU Lokal HMI (ms) (ms)
Close ≤1
Q1
Open ≤1
Close ≤1
Q2
Open ≤1
Close ≤1
Q0
Open ≤1
Close ≤1
Q9
Open ≤1

1. Pengujian dilakukan dengan memberikan perintah open/close dari HMI


2. Perbedaan timetag waktu perubahan status maksimal 1 ms