F.085a Pasang lisplang ukuran (2 x 20) cm, kayu meranti m¹ - Baru
F.085b Pasang lisplang ukuran (2 x 25) cm, kayu meranti m¹ - Baru
F. Pasang lisplang Kalsiplank lebar 20 cm m¹ 42,200.00 Baru
F.085d Pasang lisplang Kalsiplank lebar 20 cm m¹ - Baru
G. Ring balok beton bertulang (10 x 20) cm m¹ 85,880.00 Merubah Dimensi dari 10/15 ke 11/15
G. Sloof beton bertulang (15 x 25) cm m¹ 144,294.31 Merubah Dimensi dari 10/15 ke 11/16
Btn.001 Analisa Beton Struktural Perubahan Campuran
Lama:
Semen 336.00
Pasir 0.54
Koral 0.81
Lama:
Semen 371.00
Pasir 0.50
Koral 0.78
H.008A Pasang bubung samping genteng karangpilang ex. Malang m1 - Baru
Err:509 Err:509 Err:509 Err:509 Baru
K. Pasang Pagar Besi Hollow m² - Bahan Besi Profil Diganti besi hollow
K. Pasang Rangka Atap Besi Hollow Penutup Atap Asbes / Seng m² - Bahan Besi Profil Diganti besi hollow
K. Pasang pintu pagar besi hollow m² - Bahan Besi Profil Diganti besi hollow
M.057.A Pasang dinding keramik putih ukuran 30 x 30 cm m2 - Baru
M.057.B Pasang dinding keramik warna/motif ukuran 30 x 30 cm m2 - Baru
REKAPITULASI
BILL OF QUANTITY (BOQ)
PEKERJAAN : PEMBANGUNAN RUANG OSIS,RUANG UKS DAN RUANG PERPUSTAKAAN
LOKASI : SMK NAHDATUL ULAMA GONDANG LEGI
TAHUN : 2020 ###
###
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN TANAH Rp -
III PEKERJAAN BETON Rp -
IV PEKERJAAN DINDING DAN PLESTERAN Rp -
V PEKERJAAN KERAMIK Rp -
VI PEKERJAAN ALLUMINIUM,PINTU,JENDELA DAN PLAFOND Rp -
VII PEKERJAAN SANITA AIR Rp -
VIII PEKERJAAN LISTRIK Rp -
IX PEKERJAAN PENGECATAN Rp -
#NAME? ### #NAME?
JUMLAH A #NAME?
MALANG, ……………………….2020
KONTRAKTOR PELAKSANA
###
###
………………………………………….
Direktur
BILL OF QUANTITY (BOQ)
PEKERJAAN : PEMBANGUNAN RUANG OSIS,RUANG UKS DAN RUANG PERPUSTAKAAN
LOKASI : SMK NAHDATUL ULAMA GONDANG LEGI
TAHUN : 2020
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan 1.00 ls Rp -
2 Pekerjaan bowplank 35.20 m'
Rp -
###
II PEKERJAAN TANAH
1 Pekerjaan galian Tanah foot plate 18.00 m3 Rp -
###
Rp -
###
Rp -
###
IX PEKERJAAN PENGECATAN
1 Pengecatan tembok interior ex catylag 378.56 m2 Rp -
2 Pengecatan plafond ex catylag 86.98 m2 Rp -
Rp -
LANTAI II
I PEKERJAAN BETON
1 Pekerjaan beton kolom 15/25 1.35 m3 Rp -
2 Pekerjaan beton ring balok 15/20 0.74 m3 Rp -
3 Pekerjaan balok latai 0.20 m3 Rp -
4 Pekerjaan kolom praktis - m3 Rp -
Rp -
II PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dinding bata merah 158.67 m2 Rp -
2 Pekerjaan plesteran 317.33 m2 Rp -
3 Pekerjaan acian dinding 317.33 m2 Rp -
4 Pekerjaan benangan 126.93 m' Rp -
Rp -
III PEKERJAAN KERAMIK
1 Pasang keramik lantai 40 x 40 53.09 m2 Rp -
Rp -
IV PEKERJAAN ALLUMINIUM,PINTU,JENDELA DAN PLAFOND
1 Pasang alluminium kusen pintu dan jendela 28.00 m' Rp -
2 Pasang daun jendela BV 6.00 unit Rp -
3 Pasang daun jendela 4.00 unit Rp -
4 Pasang plafond rangka metal stud 53.04 m2 Rp -
5 Pasang daun pintu doubel triplek lapisi HPL 2.00 bh Rp -
6 Pasang engsel pintu 6.00 bh Rp -
7 Pasang slot pintu 1.00 bh Rp -
8 Pasang grendel tanam kupu tarung 1.00 set Rp -
Rp -
V PEKERJAAN SANITA AIR
1 Pasang talang alluminium 10.21
2 Pasang pipa PVC dia 3 " 32.00
Rp -
VI PEKERJAAN LISTRIK
1 Pasang instalasi listrik titik lampu 12.00 ttk Rp -
2 Pasang instalasi listrik titik stop kontak 5.00 ttk Rp -
3 Pemasangan saklar tunggal broco 2.00 ttk Rp -
4 Pemasangan saklar gandal broco 3.00 ttk Rp -
5 Pemasangan titik lampu dan pittingan plafond 12.00 ttk Rp -
6 Pemasangan titik stop kontak 5.00 ttk Rp -
7 Pemasangan titik MCB 1.00 ttk Rp -
Rp -
VII PEKERJAAN PENGECATAN
NO KEGIATAN VOLUME SAT HARGA SATUAN JUMLAH
Rp -
DIMENSI
NO JENIS PEKERJAAN VOLUME SATUAN
P L
A LANTAI I
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan 1.00 ls
2 Pekerjaan bowplank 35.20 m' 12.50 5.10
II PEKERJAAN TANAH
1 Pekerjaan galian Tanah foot plate 18.00 m3 1.20 1.20
2 Pekerjaan galian tanah sloof 3.19 m3 42.50 0.25
3 Pekerjaan galian tanah sapitank dan resapan 6.25 m3 2.00 1.25
4 Pekerjaan urukan pasir bawah foot plate 0.72 m3 1.20 1.20
5 Pekerjaan urukan pasir bawah lantai 3.19 m3 12.50 5.10
V PEKERJAAN KERAMIK
1 Pasang keramik lantai 40 x 40 53.70 m2
Ruang osis 4.00 5.40
Ruang uks 4.50 3.40
Ruang selasar 8.48 1.60
Ruang depan KM 1.90 1.70
2 Pasang keramik lantai KM 2.85 m2 1.90 1.50
3 Pasang keramik dinding KM 12.80 m2 6.40 2.00
IX PEKERJAAN PENGECATAN
1 Pengecatan tembok interior ex catylag 378.56 m2
2 Pengecatan plafond ex catylag 86.98 m2
plafond 12.50 5.10
balok 50.50 0.46
LANTAI II
I PEKERJAAN BETON
1 Pekerjaan beton kolom 15/25 1.35 m3 4.00 0.15
2 Pekerjaan beton ring balok 15/20 0.74 m3
arah horisontal 14.38 0.15
arah vertikal 10.41 0.15
3 Pekerjaan balok latai 0.20 m3 6.80 0.15
4 Pekerjaan kolom praktis
VI PEKERJAAN LISTRIK
1 Pasang instalasi listrik titik lampu 12.00 ttk
2 Pasang instalasi listrik titik stop kontak 5.00 ttk
3 Pemasangan saklar tunggal broco 2.00 ttk
4 Pemasangan saklar gandal broco 3.00 ttk
5 Pemasangan titik lampu dan pittingan plafond 12.00 ttk
6 Pemasangan titik stop kontak 5.00 ttk
7 Pemasangan titik MCB 1.00 ttk
1.00 ls
35.20 m'
5.47 m3
0.07 10.00 1.01
0.07 1.00 4.46
1.70 m3
0.20 2.00 1.00
0.20 5.00 0.70
0.30 10.00 4.68 m3
2.97 m3
0.35 2.00 1.75
0.35 5.00 1.23
0.35 5.00 0.56 m3
6.87 m3
0.12 1.00 7.64
0.12 1.00 0.77
0.15 5.00 0.23 m3
0.08 1.00 0.05 m3
0.20 1.00 0.14 m3
130.99 m2
1.00 63.64
1.00 77.33
9.98
378.56 m2
261.98
38.85
10.00 44.40
1.00 33.33
378.56 m2
127.40 m'
4.00 10.00 37.00
2.00 3.00 37.50
2.00 5.00 25.50
1.00 1.00 16.80
1.00 1.00 10.60
2.00 bh
53.70 m2
1.00 21.60
1.00 15.30
1.00 13.57
1.00 3.23
1.00 2.85 m2
1.00 12.80 m2
8.00 ttk
4.00 ttk
2.00 ttk
2.00 ttk
8.00 ttk
4.00 ttk
1.00 ttk
378.56 m2
86.98 m2
63.75
23.23
317.33 m2
317.33 m2
126.93 m'
53.09 m2
1.00 53.09
10.21 m'
4.00 32.00 m'
8.00 ttk
4.00 ttk
2.00 ttk
2.00 ttk
8.00 ttk
4.00 ttk
1.00 ttk
317.33 m2
53.04 m2
RENCANA ANGGARAN BIAYA (RAB)
Terbilang :
Seratus Tujuh Puluh Empat Juta Lima Ratus Ribu Rupiah
KONSULTAN PERENCANA
Direktur
BACK UP VOLUME
Panjang Tinggi
No Pekerjaan (p) Lebar (l) (h) Koefisien Jumlah Volume Sat.
I PEKERJAAN PERSIAPAN
### Bongkaran, Buangan dan Pembersihan 1.00 Ls
II PEKERJAAN TANAH
1 Galian tanah biasa
FP. 120x90x30 1.20 0.90 1.60 39.00 67.39 m3
Sloof 20/40 187.90 0.30 0.20 1.00 11.27 m3
Pondasi 80*180 1.80 0.80 1.60 1.00 2.30 m3
80.97 m3
### #NAME?
3.50 2.00 39.00 273.00 m'
### #NAME?
Urugan Bawah Lantai 30.00 11.00 0.30 1.00 1.00 99.55 m3
5.00 5.00 2.00 1.00 1.00 50.00 m3
149.55 m3
### #NAME?
Lantai 1 79.90 1.00 79.90 m'
Lantai 2 149.00 1.00 149.00 m'
228.90 ###
### #NAME?
FP. 120x90x30 1.20 0.90 0.30 39.00 12.64 m3
12.64 m3
### #NAME?
15.63 m3
187.90 0.20 0.40 1.00 15.03 m3
7.50 0.20 0.40 1.00 0.60 m3
### #NAME?
11.00 0.30 0.40 2.00 2.64 m3
1.75 0.30 0.35 2.00 0.37 m3
4.00 0.30 0.40 2.00 0.96 m3
3.97 m3
### #NAME?
30.00 0.20 0.30 4.00 7.20 m3
2.00 0.20 0.30 12.00 1.44 m3
1.50 0.20 0.30 12.00 1.08 m3
3.00 0.20 0.30 3.00 0.54 m3
11.00 0.20 0.30 1.00 0.66 m3
7.00 0.20 0.30 1.00 0.42 m3
11.34 m3
### #NAME?
30.00 0.15 0.25 2.00 2.25 m3
1.00 0.15 0.25 8.00 0.30 m3
2.55 m3
### #NAME?
110.00 0.10 1.00 11.00 m3
11.00 m3
### #NAME?
8.65 1.44 0.12 1.00 1.49 m3
1.49 m3
IV PEKERJAAN DINDING
1 Pasangan bata ringan tebal 10 cm
Lantai 1 183.90 3.90 1.00 717.21 m2
Lantai 2 150.10 4.20 1.00 630.42 m2
Teras 33.50 0.80 1.00 26.80 m2
Selasar 30.00 0.60 2.00 1.00 36.00 m2
Selasar 13.00 0.40 2.00 1.00 10.40 m2
### #NAME?
1.60 1.20 10.00 19.20 m2
4 Benangan Sudut
P1 0.88 2.14 2.00 10.00 103.20 m'
PJ1 2.40 2.10 2.00 1.00 13.20 m'
PJ2 0.88 2.59 2.00 9.00 109.08 m'
1.52 1.83 2.00 9.00 87.66 m'
PJ3 1.48 2.59 2.00 1.00 13.32 m'
0.46 1.83 2.00 2.00 11.00 m'
J1 2.40 2.70 2.00 2.00 40.80 m'
J2 2.40 1.83 2.00 7.00 118.44 m'
J3 1.00 0.60 2.00 1.00 6.40 m'
J4 0.20 2.20 2.00 12.00 115.20 m'
P2 0.75 1.90 2.00 8.00 84.80 m'
BV1 0.60 0.45 2.00 7.00 29.40 m'
### #NAME?
2 #NAME?
31.60 7.70 2.00 486.64 m2
4.00 3.66 1.00 14.64 m3
472.00 m2
### #NAME?
31.60 2.00 63.20 m2
12.60 2.00 25.20 m2
88.40 m2
### #NAME?
31.60 12.60 398.16 m2
5.40 7.00 37.80 m2
435.96 m2
No Pekerjaan Panjang Lebar (l) Tinggi Koefisien Jumlah Volume Sat.
(p) (h)
V PEKERJAAN LANTAI DAN DINDING
1 Pasang keramik lantai 40 x 40
Lantai 1 30.00 11.00 330.00 m2
30.00 2.20 66.00 m2
4.00 3.00 12.00 m2
384.00 m2
### #NAME?
KM 1 1.70 1.20 3.00 2.00 34.80 m2
KM 2 1.70 1.50 2.80 1.00 17.92 m2
KM 3 2.00 2.00 3.00 2.00 48.00 m2
KM 4 2.00 1.50 3.00 2.00 42.00 m2
Tempat Cuci 3.30 0.50 10.00 16.50 m2
Pintu 0.75 1.90 7.00 9.98 m2
149.25 m2
### #NAME?
67.92 m2
33.00 0.80 1.00 26.40 m2
2.40 3.90 5.00 46.80 m2
Kusen 0.20 2.20 12.00 5.28 m2
### #NAME?
### #NAME? 48.00 ###
2 Pemasangan Stop Kontak AC 1.00 ###
### #NAME? 11.00 ###
### #NAME? 26.00 ###
### #NAME? 12.00 ###
### #NAME? 85.00 ###
### #NAME? 6.00 ###
### #NAME? 120.00 ###
### #NAME? 50.00 ###
### #NAME? 1.00 ###
### #NAME? 4.00 ###
### #NAME? 1.00 ###
### #NAME? 1.00 ###
### #NAME? 1.00 ###
### #NAME? 1.00 ###
No Pekerjaan Panjang Lebar (l) Tinggi Koefisien Jumlah Volume Sat.
(p) (h)
### PEKERJAAN PENGECATAN
### #NAME?
Lantai 1 183.90 - 4.00 2.00 1.00 1,471.20 ###
Lantai 2 150.10 - 4.20 2.00 1.00 1,260.84 ###
Balok 30/60 11.00 - 1.26 1.00 10.00 138.60 ###
1.75 - 1.26 1.00 10.00 22.05 ###
Balok 20/30 30.00 0.56 1.00 1.00 16.80 ###
1,725.41 ###
2 #NAME?
Lantai 1 82.00 4.20 1.00 344.40 ###
Lantai 2 82.00 4.20 1.00 344.40 ###
Lisplank 32.00 0.50 2.00 32.00 ###
14.50 0.50 2.00 14.50 ###
31.60 0.20 2.00 12.64 ###
12.60 0.20 2.00 5.04 ###
P1 - 0.88 2.14 10.00 18.83 ###
PJ2 - 0.88 2.59 9.00 20.51 ###
- 1.52 1.83 9.00 25.03 ###
PJ3 - 1.48 2.59 1.00 3.83 ###
- 0.46 1.83 2.00 1.68 ###
J1 - 2.40 2.70 2.00 12.96 ###
J2 2.40 1.83 7.00 30.74 ###
J3 1.00 0.60 1.00 0.60 ###
P2 - 0.75 1.90 8.00 11.40 ###
BV1 - 0.60 0.45 7.00 1.89 ###
Batu Alam - - - - - 67.92 ###
557.57 ###
V. PEKERJAAN PLESTERAN
E.001 Plesteran 1 Pc : 1 Ps, tebal 15 mm m² -
E.002 Plesteran 1 Pc : 2 Ps, tebal 15 mm m² -
E.003 Plesteran 1 Pc : 3 Ps, tebal 15 mm m² -
E.004 Plesteran 1 Pc : 4 Ps, tebal 15 mm m² -
E. Pengupasan Plesteran Lama m² -
E. 2 Plesteran 1 Pc : 5 Ps, tebal 15 mm m² 37,055.00
E.007 Plesteran 1 Pc : 7 Ps, tebal 15 mm m² -
E.008 Plesteran 1 Pc : 8 Ps, tebal 15 mm m² -
E.009 Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm m² -
E.010 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm m² -
E.011 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm m² -
E.012 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm m² -
E.013 Plesteran 1 Pc : 2 Ps, tebal 20 mm m² -
E.014 Plesteran 1 Pc : 3 Ps, tebal 20 mm m² -
E.015 Plesteran 1 Pc : 4 Ps, tebal 20 mm m² -
E.016 Plesteran 1 Pc : 5 Ps, tebal 20 mm m² -
E.017 Plesteran 1 Pc : 6 Ps, tebal 20 mm m² -
E.018 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm m² -
E.019 Berapen 1 Pc : 5 Ps, tebal 15 mm m² -
E.020 Plesteran skoning 1 Pc : 2 Ps, Lebar 10 mm m² -
E.021 Plesteran granito 1 Pc warna : 2 granito, tebal 10 mm m² -
KODE HARGA
JENIS PEKERJAAN SAT.
ANALISA ( Rp )
1 2 3 4
E.022 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, tebal 10 mm m² -
E.023 Plesteran Ciprat 1 Pc : 2 Ps, m² -
E.024 Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps m² -
E.025 Benangan m¹ -
E. Acian m² 29,212.50
E.027 Finishing beton expose m² -
E. 4 Benangan Sudut m¹ 17,245.00
VI. PEKERJAAN KAYU
F. 1 Pasang kaso + reng genteng karangpilang kayu meranti m² -
KODE ANALISA : A. 1
JENIS PEKERJAAN : Pagar sementara dari seng gelombang tinggi 1,8 m
SATUAN PEMBAYARAN : m¹
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : A. 2
JENIS PEKERJAAN : Pengukuran dan pemasangan bouwplank
SATUAN PEMBAYARAN : m¹
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : A. 3
JENIS PEKERJAAN : Pembuatan kantor sementara, dengan lantai plesteran
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : B. 1
JENIS PEKERJAAN : Galian tanah biasa
SATUAN PEMBAYARAN : m3
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : B. 2
JENIS PEKERJAAN : Galian Strous Ø 30 cm
SATUAN PEMBAYARAN : m'
A. TENAGA
B BAHAN
C PERALATAN
1 Alat Bor hr 0.25 250,000 62,500.00
KODE ANALISA : B. 3
JENIS PEKERJAAN : Urugan kembali
SATUAN PEMBAYARAN : m3
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : B. 4
JENIS PEKERJAAN : Urugan pasir
SATUAN PEMBAYARAN : m3
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : B. 5
JENIS PEKERJAAN : Urugan Tanah
SATUAN PEMBAYARAN : m3
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : C. 2
JENIS PEKERJAAN : Pasang pondasi batu kosong
SATUAN PEMBAYARAN : m3
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : C. 1
JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 5 Ps
SATUAN PEMBAYARAN : m3
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : D. 1
JENIS PEKERJAAN : Pasangan bata ringan tebal 10 cm
SATUAN PEMBAYARAN : m²
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : E. 2
JENIS PEKERJAAN : Plesteran 1 Pc : 5 Ps, tebal 15 mm
SATUAN PEMBAYARAN : m²
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.1000 80,000.00 8,000.00
2 Tukang Batu L07 Org/hr 0.1200 100,000.00 12,000.00
3 Kepala Tukang Batu L02 Org/hr 0.0150 110,000.00 1,650.00
4 Mandor L01 Org/hr 0.0150 130,000.00 1,950.00
B BAHAN
1 Portland Cement (PC) - 40 Kg M037 kg 6.5000 1,350.00 8,775.00
2 Pasir Pasang M002 m³ 0.0260 180,000.00 4,680.00
KODE ANALISA : E. 3
JENIS PEKERJAAN : Acian
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.0300 80,000.00 2,400.00
2 Tukang Batu L07 Org/hr 0.1800 100,000.00 18,000.00
3 Kepala Tukang Batu L02 Org/hr 0.0100 110,000.00 1,100.00
4 Mandor L01 Org/hr 0.0100 130,000.00 1,300.00
B BAHAN
1 Portland Cement (PC) - 40 Kg M037 kg 4.7500 1,350.00 6,412.50
C PERALATAN
KODE ANALISA : E. 4
JENIS PEKERJAAN : Benangan Sudut
SATUAN PEMBAYARAN : m¹
A. TENAGA
1 Tukang Batu L07 Org/hr 0.1200 100,000.00 12,000.00
2 Kepala Tukang Batu L02 Org/hr 0.0150 110,000.00 1,650.00
3 Mandor L01 Org/hr 0.0100 130,000.00 1,300.00
B BAHAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.2000 80,000.00 16,000.00
2 Tukang Batu L07 Org/hr 0.1300 100,000.00 13,000.00
3 Kepala Tukang Batu L02 Org/hr 0.0150 110,000.00 1,650.00
4 Mandor L01 Org/hr 0.0150 130,000.00 1,950.00
B BAHAN
1 Portland Cement (PC) - 40 Kg M037 kg 6.5000 1,350.00 8,775.00
2 Pasir Pasang M002 m³ 0.0260 180,000.00 4,680.00
C PERALATAN
KODE ANALISA : F. 1
JENIS PEKERJAAN : Pasang lisplang Kalsiplank lebar 20 cm
SATUAN PEMBAYARAN : m¹
PERKIRAAN JUMLAH
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : G. 1
JENIS PEKERJAAN : Lantai kerja beton mutu fc'=7,4 Mpa (K100)
SATUAN PEMBAYARAN : m3
A. TENAGA
1 Pekerja Biasa L17 Org/hr 1.3000 80,000.00 104,000.00
2 Tukang Batu L07 Org/hr 0.3000 100,000.00 30,000.00
3 Kepala Tukang Batu L02 Org/hr 0.0300 110,000.00 3,300.00
4 Mandor L01 Org/hr 0.0600 130,000.00 7,800.00
B BAHAN
1 Portland Cement (PC) - 40 Kg M037 kg 230.0000 1,350.00 310,500.00
2 Pasir Cor M004 m³ 0.6379 300,000.00 191,357.14
3 Batu pecah mesin 2/3 M019 m³ 0.7607 285,000.00 216,811.11
KODE ANALISA : G. 3
JENIS PEKERJAAN : Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56
SATUAN PEMBAYARAN : m3
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 1.6500 80,000.00 132,000.00
2 Tukang Batu L07 Org/hr 0.2750 100,000.00 27,500.00
3 Kepala Tukang Batu L02 Org/hr 0.0280 110,000.00 3,080.00
4 Mandor L01 Org/hr 0.0830 130,000.00 10,790.00
B BAHAN
1 Portland Cement (PC) - 40 Kg M037 kg 384.0000 1,350.00 518,400.00
2 Pasir Cor M004 m³ 0.4943 300,000.00 148,285.71
3 Batu pecah mesin 2/3 M019 m³ 0.7696 285,000.00 219,344.44
4 Air Bersih M486 Itr 215.000 300.00 64,500.00
KODE ANALISA : G. 4
JENIS PEKERJAAN : Pembesian dengan besi polos
SATUAN PEMBAYARAN : kg
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS
(Rp)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.0200 80,000.00 1,600.00
2 Tukang Besi/Baja L09 Org/hr 0.0300 100,000.00 3,000.00
3 Kepala Tukang Besi L04 Org/hr 0.0020 110,000.00 220.00
4 Mandor L01 Org/hr 0.0010 130,000.00 130.00
B BAHAN
1 Besi Beton Polos M112 kg 1.0500 9,250.00 9,712.50
2 Kawat Beton/Bendrat RRT M135 kg 0.0150 21,000.00 315.00
KODE ANALISA : G. 5
JENIS PEKERJAAN : Pembesian dengan besi ulir
SATUAN PEMBAYARAN : kg
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.0200 80,000.00 1,600.00
2 Tukang Besi/Baja L09 Org/hr 0.0300 100,000.00 3,000.00
3 Kepala Tukang Besi L04 Org/hr 0.0020 110,000.00 220.00
4 Mandor L01 Org/hr 0.0010 130,000.00 130.00
B BAHAN
1 Besi Beton Ulir M113 kg 1.0500 9,750.00 10,237.50
2 Kawat Beton/Bendrat RRT M135 kg 0.0150 21,000.00 315.00
KODE ANALISA : G. 6
JENIS PEKERJAAN : Pasang bekisting untuk pondasi ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.5200 80,000.00 41,600.00
2 Tukang Kayu L08 Org/hr 0.2600 100,000.00 26,000.00
3 Kepala Tukang Kayu L03 Org/hr 0.0260 110,000.00 2,860.00
4 Mandor L01 Org/hr 0.0260 130,000.00 3,380.00
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0200 3,000,000.00 60,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.1500 21,000.00 3,150.00
3 Minyak bekisting M474 Itr 0.0500 12,500.00 625.00
KODE ANALISA : G. 7
JENIS PEKERJAAN : Pasang bekisting untuk sloof ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.2000 80,000.00 16,000.00
2 Tukang Kayu L08 Org/hr 0.2150 100,000.00 21,500.00
3 Kepala Tukang Kayu L03 Org/hr 0.0260 110,000.00 2,860.00
4 Mandor L01 Org/hr 0.0260 130,000.00 3,380.00
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0225 3,000,000.00 67,500.00
2 Paku Kayu Segala Ukuran M140 kg 0.1500 21,000.00 3,150.00
3 Minyak bekisting M474 Itr 0.0500 12,500.00 625.00
C PERALATAN
KODE ANALISA : G. 8
JENIS PEKERJAAN : Pasang bekisting untuk kolom ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0150 3,000,000.00 45,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.2000 21,000.00 4,200.00
3 Minyak bekisting M474 Itr 0.1000 12,500.00 1,250.00
4 Balok Kayu (Kayu Kelas III) M511 bh 0.0075 2,750,000.00 20,625.00
5 Multiplek 9 mm M217 lbr 0.1750 105,000.00 18,375.00
6 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 1.0000 10,000.00 10,000.00
C PERALATAN
KODE ANALISA : G. 9
JENIS PEKERJAAN : Pasang bekisting untuk balok ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.5500 80,000.00 44,000.00
2 Tukang Kayu L08 Org/hr 0.3000 100,000.00 30,000.00
3 Kepala Tukang Kayu L03 Org/hr 0.0300 110,000.00 3,300.00
4 Mandor L01 Org/hr 0.0300 130,000.00 3,900.00
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0200 3,000,000.00 60,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.2000 21,000.00 4,200.00
3 Minyak bekisting M474 Itr 0.1000 12,500.00 1,250.00
4 Balok Kayu (Kayu Kelas III) M511 bh 0.0090 2,750,000.00 24,750.00
5 Multiplek 9 mm M217 lbr 0.1750 105,000.00 18,375.00
6 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 1.0000 10,000.00 10,000.00
C PERALATAN
KODE ANALISA : G. 10
JENIS PEKERJAAN : Pasang bekisting untuk plat lantai ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.5000 80,000.00 40,000.00
2 Tukang Kayu L08 Org/hr 0.4000 100,000.00 40,000.00
3 Kepala Tukang Kayu L03 Org/hr 0.0330 110,000.00 3,630.00
4 Mandor L01 Org/hr 0.0330 130,000.00 4,290.00
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0020 3,000,000.00 6,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.2000 21,000.00 4,200.00
3 Minyak bekisting M474 Itr 0.1000 12,500.00 1,250.00
4 Balok Kayu (Kayu Kelas III) M511 bh 0.0150 2,750,000.00 41,250.00
5 Multiplek 9 mm M217 lbr 0.3500 105,000.00 36,750.00
6 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 3.0000 10,000.00 30,000.00
C PERALATAN
KODE ANALISA : G. 11
JENIS PEKERJAAN : Pasang bekisting untuk tangga ( 2x pakai )
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.6600 80,000.00 52,800.00
2 Tukang Kayu L08 Org/hr 0.3300 100,000.00 33,000.00
3 Kepala Tukang Kayu L03 Org/hr 0.0330 110,000.00 3,630.00
4 Mandor L01 Org/hr 0.0330 130,000.00 4,290.00
B BAHAN
1 Papan Kayu (Kayu Kelas III) M509 bh 0.0150 3,000,000.00 45,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.2000 21,000.00 4,200.00
3 Minyak bekisting M474 Itr 0.0750 12,500.00 937.50
4 Balok Kayu (Kayu Kelas III) M511 bh 0.0100 2,750,000.00 27,500.00
5 Multiplek 9 mm M217 lbr 0.3500 105,000.00 36,750.00
6 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 1.0000 10,000.00 10,000.00
C PERALATAN
KODE ANALISA : G. 15
JENIS PEKERJAAN : Pekerjaan Strouss Ø 30 cm (Beton K-250)
SATUAN PEMBAYARAN : m3
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. PEKERJAAN
1 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2G. 2 m3 1.0000 1,178,900.16 1,178,900.16
2 Pembesian dengan besi ulir G. 5 kg - 16,252.50 -
3 Pembesian dengan besi polos G. 4 kg 155.0000 15,727.50 2,437,762.50
KODE ANALISA : G. 16
JENIS PEKERJAAN : Pekerjaan Foot Plat (Beton K-250)
SATUAN PEMBAYARAN : m3
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. PEKERJAAN
1 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2G. 2 m3 1.000 1,178,900.16 1,178,900.16
2 Pembesian dengan besi ulir G. 5 kg 159.190 15,727.50 2,503,660.73
3 Pasang bekisting untuk pondasi ( 2x pakai ) G. 6 m2 4.200 162,615.00 682,983.00
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. PEKERJAAN
1 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2G. 2 m3 1.000 1,178,900.16 1,178,900.16
2 Pembesian dengan besi polos G. 4 kg 52.000 15,727.50 817,830.00
3 Pembesian dengan besi ulir G. 5 kg 95.000 16,252.50 1,543,987.50
4 Pasang bekisting untuk sloof ( 2x pakai ) G. 7 m2 6.670 115,015.00 767,150.05
KODE ANALISA : G. 20
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
a. Besi Tulangan
1 Besi Beton Polos M112 kg 112.5577 9,250.00 1,041,158.42
2 Kawat Beton/Bendrat RRT M135 kg 1.6080 21,000.00 33,767.30
1,074,925.72
b. Bahan Beton
3 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
4 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
5 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 1,946,380.48
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 5.2562 80,000.00 420,497.20
2 Tukang Batu L07 Org/hr 0.2750 100,000.00 27,500.00
3 Tukang Kayu L08 Org/hr 1.3000 100,000.00 130,000.00
4 Tukang Besi/Baja L09 Org/hr 1.0062 100,000.00 100,621.50
5 Kepala Tukang Batu L02 Org/hr 0.2586 110,000.00 28,448.37
6 Mandor L01 Org/hr 0.2705 130,000.00 35,164.74
B BAHAN
a. Bekisting dipakai 2 x
1 Papan Kayu (Kayu Kelas III) M509 m3 0.1000 3,000,000.00 300,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.7500 21,000.00 15,750.00
3 Minyak bekisting M474 Itr 0.5000 12,500.00 6,250.00
322,000.00
b. Besi Tulangan
4 Besi Beton Polos M112 kg 150.9323 9,250.00 1,396,123.31
5 Kawat Beton/Bendrat RRT M135 kg 2.2500 21,000.00 47,250.00
1,443,373.31
c. Bahan Beton
6 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
7 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
8 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 2,636,828.07
C PERALATAN
A. TENAGA
C PERALATAN
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Papan Kayu (Kayu Kelas III) M509 m3 0.3000 3,000,000.00 900,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 21,000.00 42,000.00
3 Minyak bekisting M474 Itr 1.3333 12,500.00 16,666.67
958,666.67
b. Besi Tulangan
4 Besi Beton Polos M112 kg 189.4424 9,250.00 1,752,342.20
5 Kawat Beton/Bendrat RRT M135 kg 2.7063 21,000.00 56,832.72
1,809,174.92
c. Bahan Beton
6 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
7 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
8 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,639,296.35
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 4.0000 21,000.00 84,000.00
2 Minyak bekisting M474 Itr 4.0000 12,500.00 50,000.00
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1500 3,000,000.00 450,000.00
4 Multiplek 9 mm M217 lbr 3.5000 105,000.00 367,500.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 20.0000 10,000.00 200,000.00
1,151,500.00
b. Besi Tulangan
6 Besi Beton Polos M112 kg 166.8188 9,250.00 1,543,073.44
7 Kawat Beton/Bendrat RRT M135 kg 2.3831 21,000.00 50,045.63
1,593,119.06
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,616,073.82
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 4.0000 21,000.00 84,000.00
2 Minyak bekisting M474 Itr 4.0000 12,500.00 50,000.00
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1500 3,000,000.00 450,000.00
4 Multiplek 9 mm M217 lbr 3.5000 105,000.00 367,500.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 20.0000 10,000.00 200,000.00
1,151,500.00
b. Besi Tulangan
6 Besi Beton Polos M112 kg 120.1988 9,250.00 1,111,838.44
7 Kawat Beton/Bendrat RRT M135 kg 1.7171 21,000.00 36,059.63
1,147,898.06
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,170,852.82
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 2.6667 21,000.00 56,000.00
2 Minyak bekisting M474 Itr 2.6667 12,500.00 33,333.33
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1000 3,000,000.00 300,000.00
4 Multiplek 9 mm M217 lbr 2.3333 105,000.00 245,000.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 13.0000 10,000.00 130,000.00
764,333.33
b. Besi Tulangan
6 Besi Beton Polos M112 kg 145.5183 9,250.00 1,346,044.58
7 Kawat Beton/Bendrat RRT M135 kg 2.0788 21,000.00 43,655.50
1,389,700.08
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,025,488.18
C PERALATAN
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 4.2051 21,000.00 88,307.69
2 Minyak bekisting M474 Itr 4.2051 12,500.00 52,564.10
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1892 3,000,000.00 567,692.31
4 Multiplek 9 mm M217 lbr 3.6795 105,000.00 386,346.15
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 21.0000 10,000.00 210,000.00
1,304,910.26
b. Besi Tulangan
6 Besi Beton Ulir M113 kg - 9,750.00 -
7 Besi Beton Polos M112 kg 470.2972 9,250.00 4,350,249.13
8 Kawat Beton/Bendrat RRT M135 kg 6.7185 21,000.00 141,089.16
4,491,338.29
c. Bahan Beton
9 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
10 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
11 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 6,667,703.31
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 3.1111 21,000.00 65,333.33
2 Minyak bekisting M474 Itr 3.1111 12,500.00 38,888.89
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1400 3,000,000.00 420,000.00
4 Multiplek 9 mm M217 lbr 2.7222 105,000.00 285,833.33
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 15.0000 10,000.00 150,000.00
960,055.56
b. Besi Tulangan
6 Besi Beton Ulir M113 kg - 9,750.00 -
7 Besi Beton Polos M112 kg 322.9811 9,250.00 2,987,574.81
8 Kawat Beton/Bendrat RRT M135 kg 4.6140 21,000.00 96,894.32
3,084,469.13
c. Bahan Beton
9 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
10 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
11 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 4,915,979.45
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 16.4346 80,000.00 1,314,766.84
2 Tukang Batu L07 Org/hr 0.2750 100,000.00 27,500.00
3 Tukang Kayu L08 Org/hr 7.0853 100,000.00 708,529.41
4 Tukang Besi/Baja L09 Org/hr 0.6140 100,000.00 61,399.73
5 Kepala Tukang Batu L02 Org/hr 0.7979 110,000.00 87,772.21
6 Mandor L01 Org/hr 0.8266 130,000.00 107,459.95
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 4.2941 21,000.00 90,176.47
2 Minyak bekisting M474 Itr 4.2941 12,500.00 53,676.47
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1932 3,000,000.00 579,705.88
4 Multiplek 9 mm M217 lbr 3.7574 105,000.00 394,522.06
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 21.0000 10,000.00 210,000.00
1,328,080.88
b. Besi Tulangan
7 Besi Beton Polos M112 kg 92.0996 9,250.00 851,921.29
8 Kawat Beton/Bendrat RRT M135 kg 1.3157 21,000.00 27,629.88
879,551.17
c. Bahan Beton
9 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
10 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
11 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,079,086.81
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 1.7500 21,000.00 36,750.00
2 Minyak bekisting M474 Itr 1.7500 12,500.00 21,875.00
3 Papan Kayu (Kayu Kelas III) M509 m3 0.0788 3,000,000.00 236,250.00
4 Multiplek 9 mm M217 lbr 1.5313 105,000.00 160,781.25
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 9.0000 10,000.00 90,000.00
545,656.25
b. Besi Tulangan
6 Besi Beton Ulir M113 kg - 9,750.00 -
7 Besi Beton Polos M112 kg 243.0353 9,250.00 2,248,076.53
8 Kawat Beton/Bendrat RRT M135 kg 3.4719 21,000.00 72,910.59
2,320,987.12
c. Bahan Beton
9 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
10 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
11 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 3,738,098.14
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 1.6667 21,000.00 35,000.00
2 Minyak bekisting M474 Itr 1.6667 12,500.00 20,833.33
3 Papan Kayu (Kayu Kelas III) M509 m3 0.0625 3,000,000.00 187,500.00
4 Multiplek 9 mm M217 lbr 1.4583 105,000.00 153,125.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 25.0000 10,000.00 250,000.00
646,458.33
b. Besi Tulangan
6 Besi Beton Polos M112 kg 96.2101 9,250.00 889,943.15
7 Kawat Beton/Bendrat RRT M135 kg 1.3744 21,000.00 28,863.02
918,806.17
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 2,436,719.27
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 2.0000 21,000.00 42,000.00
2 Minyak bekisting M474 Itr 2.0000 12,500.00 25,000.00
3 Papan Kayu (Kayu Kelas III) M509 m3 0.0750 3,000,000.00 225,000.00
4 Multiplek 9 mm M217 lbr 1.7500 105,000.00 183,750.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 30.0000 10,000.00 300,000.00
775,750.00
b. Besi Tulangan
6 Besi Beton Polos M112 kg 90.8945 9,250.00 840,774.19
7 Kawat Beton/Bendrat RRT M135 kg 1.2985 21,000.00 27,268.35
868,042.54
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 2,515,247.30
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 3.2910 21,000.00 69,111.11
2 Minyak bekisting M474 Itr 1.6455 12,500.00 20,568.78
3 Papan Kayu (Kayu Kelas III) M509 m3 0.1234 3,000,000.00 370,238.10
4 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 25.0000 10,000.00 250,000.00
709,917.99
b. Besi Tulangan
6 Besi Beton Polos M112 kg 65.6841 9,250.00 607,577.48
7 Kawat Beton/Bendrat RRT M135 kg 0.9383 21,000.00 19,705.22
627,282.69
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 2,208,655.44
C PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS JUMLAH HARGA (Rp)
(Rp)
A. TENAGA
B BAHAN
a. Bekisting dipakai 2 x
1 Paku Kayu Segala Ukuran M140 kg 1.7333 21,000.00 36,400.00
2 Minyak bekisting M474 Itr 1.7333 12,500.00 21,666.67
3 Papan Kayu (Kayu Kelas III) M509 m3 0.0650 3,000,000.00 195,000.00
4 Multiplek 9 mm M217 lbr 1.5167 105,000.00 159,250.00
5 Dolken Kayu Ø 8-10 cm/400 cm M089 btg 26.0000 10,000.00 260,000.00
672,316.67
b. Besi Tulangan
6 Besi Beton Polos M112 kg 111.2853 9,250.00 1,029,389.33
7 Kawat Beton/Bendrat RRT M135 kg 1.5898 21,000.00 33,385.60
1,062,774.93
c. Bahan Beton
8 Portland Cement (PC) - 40 Kg M037 kg 371.0000 1,350.00 500,850.00
9 Pasir Cor M004 m³ 0.4986 300,000.00 149,571.43
10 Batu pecah mesin 2/3 M019 m³ 0.7756 285,000.00 221,033.33
871,454.76
JUMLAH HARGA BAHAN 2,606,546.36
C PERALATAN
KODE ANALISA : H. 1
JENIS PEKERJAAN : Pasang atap genteng keramik glazuur KIA
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : H. 2
JENIS PEKERJAAN : Pasang bubung genteng keramik KIA
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : I. 1
JENIS PEKERJAAN : Langit-langit Gypsum board 9mm + Rangka Hollow Galvalum
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : J. 1
JENIS PEKERJAAN : Pasang kloset jongkok standart TOTO
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : J. 2
JENIS PEKERJAAN : Pasang kloset duduk standart TOTO
SATUAN PEMBAYARAN : unit
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : J. 2
JENIS PEKERJAAN : Pasang wastafel Komplit Kran dan Sipon
SATUAN PEMBAYARAN : unit
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
KODE ANALISA : J. 5
JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 3/4"
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : J. 6
JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 2"
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
1 pipa PVC tipe AW, diameter 2" M336 m¹ 1.200 18,000.00 21,600.00
2 Perlengkapan 35.00% 21,600.00 7,560.00
C PERALATAN
KODE ANALISA : J. 7
JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 3"
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
KODE ANALISA : J. 8
JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 4"
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
KODE ANALISA : J. 9
JENIS PEKERJAAN : Pasang bak cuci piring stainles steel
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
KODE ANALISA : J. 10
JENIS PEKERJAAN : Pasang kran diameter 1/2" ONDA
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : J. 11
JENIS PEKERJAAN : Pasang kran diameter 1/2" tempat cuci ONDA
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
1 Kran Air 1/2" bak cuci piring M237 bh 1.0000 1,500,000.00 1,500,000.00
2 Seal Tape / TBA M481 bh 0.0250 5,500.00 137.50
C PERALATAN
KODE ANALISA : J. 12
JENIS PEKERJAAN : Pasang Floordrain Stainless Steel ONDA
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : K. 1
JENIS PEKERJAAN : Pasang Kusen Alluminium Coklat Alexindo 4"
SATUAN PEMBAYARAN : m1
PERKIRAAN JUMLAH
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : K. 2
JENIS PEKERJAAN : Pasang Pintu Dan Jendela Kaca Rangka Aluminium Coklat Alexindo
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : K. 3
JENIS PEKERJAAN : Pasang pintu Alumunium KM Lengkap
SATUAN PEMBAYARAN : Unit
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : K. 4
JENIS PEKERJAAN : Pasang Rangka Atap Baja Ringan untuk Penutup Atap Genteng
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : K. 5
JENIS PEKERJAAN : Pasang Pagar Besi Hollow
SATUAN PEMBAYARAN : m²
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
1 Sewa Mesin Las E1 hari 1.2500 -
KODE ANALISA : L. 1
JENIS PEKERJAAN : Pasang kunci selot/pintu dan handle dexon
SATUAN PEMBAYARAN : bh
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 1
JENIS PEKERJAAN : Pasang kunci selot pintu kupou tarung dexon
SATUAN PEMBAYARAN : bh
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 2
JENIS PEKERJAAN : Pasang engsel pintu 4" dexon
SATUAN PEMBAYARAN : bh
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 3
JENIS PEKERJAAN : Pasang engsel jendela 3" dexon
SATUAN PEMBAYARAN : bh
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 4
JENIS PEKERJAAN : Pasang grendel jendela Solid
SATUAN PEMBAYARAN : bh
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 5
JENIS PEKERJAAN : Pasang hak angin Solid
SATUAN PEMBAYARAN : bh
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : L. 6
JENIS PEKERJAAN : Pasang kaca polos, tebal 5 mm
SATUAN PEMBAYARAN : m²
JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : M. 1
JENIS PEKERJAAN : Pasang lantai granite ukuran 60 x 60 cm
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN 5% 11,679.00
KODE ANALISA : M. 2
JENIS PEKERJAAN : Pasang lantai keramik KM ukuran 25 x 25 cm Roman
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
5% 8,184.50
KODE ANALISA : M. 3
JENIS PEKERJAAN : Pasang dinding keramik ukuran 25 x 50 cm Roman
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
5% 9,502.25
KODE ANALISA : M. 4
JENIS PEKERJAAN : Pasang dinding batu palimanan
SATUAN PEMBAYARAN : m2
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : N. 1
JENIS PEKERJAAN : Pengecatan tembok baru interior /Catylac
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : N. 2
JENIS PEKERJAAN : Pengecatan tembok baru eksterior / Dulux Watershield
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : N. 3
JENIS PEKERJAAN : Pengecatan plafon / Catylac
(1 lapis plamir, 2 lapis cat penutup)
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : N. 4
JENIS PEKERJAAN : Pekerjaan waterproofing Aquaproof
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : N. 5
JENIS PEKERJAAN : Coating Batu Alam
SATUAN PEMBAYARAN : m²
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 1
JENIS PEKERJAAN : Pemasangan stop kontak Broco
SATUAN PEMBAYARAN : Titik
HARGA SATUAN
NO. KOMPONEN SATUAN KUANTITAS (Rp) JUMLAH HARGA (Rp)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 4
JENIS PEKERJAAN : Pemasangan saklar ganda Broco
SATUAN PEMBAYARAN : Titik
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 5
JENIS PEKERJAAN : Pemasangan titik lampu LED Philip pitting plafon 9 Watt
SATUAN PEMBAYARAN : Titik
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 7
JENIS PEKERJAAN : Pemasangan titik lampu LED Fiting Downlight
SATUAN PEMBAYARAN : Titik
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 8
JENIS PEKERJAAN : Kabel Listrik 3 x NYA 2,5 mm2
SATUAN PEMBAYARAN : m'
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 9
JENIS PEKERJAAN : Kabel Listrik NYFGbY 4 x 70 mm2
SATUAN PEMBAYARAN : m'
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 10
JENIS PEKERJAAN : Pemasangan Exhaust Fan Panasonic 10"
SATUAN PEMBAYARAN : set
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.2500 -
2 Tukang Listrik L11 Org/hr 0.2500 -
3 Kepala Tukang Listrik L06 Org/hr 0.0250 -
4 Mandor L01 Org/hr 0.0250 -
B BAHAN
1 Exhaust Fan 10" M454 bh 1.0000 -
C PERALATAN
KODE ANALISA : P. 11
JENIS PEKERJAAN : Pemasangan Kipas Angin Dinding 18"
SATUAN PEMBAYARAN : set
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.2500 -
2 Tukang Listrik L11 Org/hr 0.2500 -
3 Kepala Tukang Listrik L06 Org/hr 0.0250 -
4 Mandor L01 Org/hr 0.0250 -
B BAHAN
1 Kipas Angin Dinding Besi 18" M455 bh 1.0000 -
C PERALATAN
KODE ANALISA : P. 3
JENIS PEKERJAAN : Pemasangan saklar tunggal Broco
SATUAN PEMBAYARAN : Titik
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 2
JENIS PEKERJAAN : Pemasangan stop kontak + Steker AC Broco
SATUAN PEMBAYARAN : Titik
A. TENAGA
B BAHAN
C PERALATAN
KODE ANALISA : P. 12
JENIS PEKERJAAN : Pemasangan Pompa Air Merk Grundfos
SATUAN PEMBAYARAN : set
A. TENAGA
B. BAHAN
C PERALATAN
KODE ANALISA : P. 13
JENIS PEKERJAAN : Pemasangan AC 1 1/2 PK
SATUAN PEMBAYARAN : set
PERKIRAAN JUMLAH
NO. KOMPONEN SATUAN KUANTITAS HARGA
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN -
A. TENAGA
B BAHAN
C PERALATAN
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN -
A. TENAGA
B BAHAN
C PERALATAN
B BAHAN
C PERALATAN
3 1 m3 Beton PONDASI FOOT PLAT (Type K2), mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting G. Rp 162,615.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
4 1 m3 Beton PONDASI FOOT PLAT (Type K3), mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting G. Rp 162,615.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
6 1 m3 Beton SLOOF Struktur 15/25 cm, mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting G. Rp 115,015.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
7 1 m3 Beton SLOOF Praktis 15/20 cm, mutu K.175 Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting G. Rp 115,015.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
8 1 m3 Beton KOLOM 30/50 cm (K1), mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Begisting 9 mm G. Rp 169,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
14 1 m3 Beton Balok ANAK 20/30 cm, mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
15 1 m3 Beton Balok KONSOL 30/40 - 30/30 cm, mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
16 1 m3 Beton Balok TEPI / LISPLANK 20/30 cm, mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
17 1 m3 Beton Balok BORDES 15/30 cm, mutu K.225 Kode Harga Satuan
1.000 m3 Mengecor G. Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
18 1 m3 Beton RING BALK + GEWEL 15/20 cm, mutu K.175 Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
19 1 m3 Beton RING 15/15 cm, mutu K.175_Kantin Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
20 1 m3 Beton Balok RING LEUNENG 10/15 cm, mutu K.175 Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
21 1 m3 Beton BALOK LEUFEL 15/40 cm, mutu K.175 Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
22 1 m3 Beton BALOK LATEI 15/20 cm, mutu K.175 Kode Harga Satuan
1.000 m3 Mengecor G.005 Rp -
- kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos G. Rp 15,727.50
- m2 Bekisting (9 mm) G. Rp 199,775.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
23 1 m3 Beton PLAT LANTAI Tbl 12 cm, mutu K.225 Kode Harga Satuan
Tebal plat 1.000 m3 Mengecor G. Rp -
0.12 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting (12 mm) G. Rp 207,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
24 1 m3 Beton PLAT ATAP Tbl 10 cm, mutu K.225
Tebal plat 1.000 m3 Mengecor G. Rp -
0.10 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting G. Rp 207,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
25 1 m3 Beton PLAT LISPLANK Tbl 10 cm, mutu K.225
Tebal plat 1.000 m3 Mengecor G. Rp -
0.10 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting G. Rp 207,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
26 1 m3 Beton CANOPI Tbl 10 cm, mutu K.175_Induk
Tebal plat 1.000 m3 Mengecor G.005 Rp -
0.10 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting G. Rp 207,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
27 1 m3 PLAT MEJA Beton Tbl 10 cm, mutu K.175
Tebal plat 1.000 m3 Mengecor G.005 Rp -
0.10 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting G. Rp 207,370.00
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
28 1 m3 PLAT TANGGA Tbl 15 cm, mutu K.225
Tebal plat 1.000 m3 Mengecor G. Rp -
0.15 - kg Pembesian Ulir G. Rp 16,252.50
- kg Pembesian Polos (Konvensiona G. Rp 15,727.50
- m2 Bekisting G. Rp 218,107.50
1.000 ls Alat bantu Rp -
Jumlah
Pembulatan
ANALISA BETON DALAM 1 M3
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Jumlah
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
ANALISA HARGA SATUAN