RINCIAN RENCANA ANGGARAN BIAYA (RAB)

PEMELIHARAAN GEDUNG KANTOR PEMKOT CIMAHI (A, B, DAN C)


TAHUN ANGGARAN 2022 KURVA S
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot BULAN 1 BULAN 1 BULAN 1 BULAN 1

JUMLAH TOTAL PEKERJAAN PERSIAPAN 8,551,910.00


A PEKERJAAN PERSIAPAN
Rp 1.00 Pek. Pembuatan Papan Nama Proyek Ukuran 120 x 240 cm bh 1.00 1,149,010.00 1,149,010.00 #NAME? #NAME?
Rp 2.00 Pengadaan Kesehatan dan Keselamatan Kerja (K3) ls 1.00 7,402,900.00 7,402,900.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
JUMLAH TOTAL PEKERJAAN LANTAI 3 Err:509
B PEKERJAAN LANTAI 3
B.1 PEKERJAAN ARSITEKTUR Err:509
B.1.1 Pekerjaan Arsitektur Ruang Toilet 1 Err:509
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 67.27 106,420.00 7,158,873.40 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² 49.65 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² 17.62 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 polished T=280 Cm m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² 27.55 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Kusen Pintu Shaf m² Err:509 216,150.00 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Pintu Shaf m² 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.2 Pekerjaan Arsitektur DINAS SOSIAL #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 298.61 106,420.00 31,777,810.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 298.61 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru m² 3.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru m3 0.16 216,150.00 34,584.00 #NAME? #NAME? #NAME?
B.1.3 Pekerjaan Arsitektur PKK #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 73.84 106,420.00 7,857,520.70 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 73.84 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.4 Pekerjaan Arsitektur DINAS KESEHATAN #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 373.51 106,420.00 39,748,934.20 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 373.51 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.5 Pekerjaan Arsitektur DINAS PERDAGANGAN, KOPERASI, USAHA KECIL #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 308.89 106,420.00 32,871,807.75 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 308.89 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Lapis Dinding Plesteran (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.6 Pekerjaan Arsitektur Ruang Toilet 2 Err:509
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² Err:509 106,420.00 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 polished m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Waterproofing m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
Rp 2.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Plafond GRC + Frame m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pengecatan Plafond m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Kusen Pintu Shaf Baru m3 Err:509 216,150.00 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Pintu Shaf Baru m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru m² Err:509 216,150.00 Err:509 Err:509 Err:509 Err:509
B.1.7 Pekerjaan Arsitektur Ruang Panel #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 7.12 106,420.00 757,976.45 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 polished m² 7.12 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan) m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola #NAME?
Rp 1.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan) m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.9 Pekerjaan Arsitektur Selasar #NAME?
Rp 1.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding m² 482.22 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.10 Pekerjaan Plumbing #NAME?
- Pekerjaan Pemasangan Saluran Pipa/Paralon m' 80.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Floordrain bh 10.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Perapihan pipa paralon yang tidak rapih m' 16.00 #REF! #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Instalasi AC bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.11 Pekerjaan Arsitektur Eksterior #NAME?
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Lapisan Plesteran m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Plesteran m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Acian m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Waterproofing m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.12 Pekerjaan ME #NAME?
1. Pekerjaan Lampu
- Pekerjaan Instalasi
Pemasangan Lampu Downlight LED 1 X 18 w bh 37.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Lampu Panel LED RC 40w bh 100.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Lampu Panel LED RC 29 w bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Lampu Baret Ceiling 22 w bh 10.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Lampu Baret Ceiling 10 w bh 26.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Stair Lamp & Battery TL LED 2 X 14 bh 7.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Single Two Way Switch bh 20.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Double Two Way Switch bh 20.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Sensor bh 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?

JUMLAH TOTAL PEKERJAAN LANTAI 4 #NAME?


C PEKERJAAN LANTAI 4
C.1 PEKERJAAN ARSITEKTUR #NAME?
C.1.1 Pekerjaan Arsitektur Ruang Pantry #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 6.75 106,420.00 718,335.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Meja Dapur 25 x 50 m² 6.75 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Sanitasi
- Pekerjaan Pemasangan Keran bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.2 Pekerjaan Arsitektur Ruang Gudang #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 5.60 106,420.00 595,952.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 5.60 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.3 Pekerjaan Arsitektur Dinas Perumahan dan Pemukiman #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 111.64 106,420.00 11,880,196.70 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 111.64 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru bh 5.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.4 Pekerjaan Arsitektur Dinas Lingkungan Hidup #NAME?
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru bh 3.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.5 Pekerjaan Arsitektur Dinas BKPSDMD #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 345.89 106,420.00 36,809,347.75 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 345.89 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru m3 4.32 216,150.00 933,768.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Casement Jendela Baru m² 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.6 Pekerjaan Arsitektur Dinas Perhubungan #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 202.13 106,420.00 21,510,408.55 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 202.13 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.7 Pekerjaan Eksterior #NAME?
Rp 1.00 Pekerjaan waterproofing
- Pekerjaan Pembongkaran Lapis Plesteran m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Membran Waterproofing m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapis plesteran m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapis Acian m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola #NAME?
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Kusen m' 4.32 216,150.00 933,768.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Daun Pintu m² 1.60 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.9 Pekerjaan Arsitektur Ruang Panel #VALUE!
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Handle /Kunci Baru bh m2 #NAME? #VALUE! #VALUE! #VALUE! #VALUE!
C.1.10 Pekerjaan Arsitektur Toilet 1 Err:509
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Pintu Shaft Baru m² 1.60 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pembongkaran Lapis Plesteran m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Membran Waterproofing m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Lapis plesteran m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Lapis Acian m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
C.1.11 Pekerjaan Arsitektur Toilet 2 Err:509
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Pintu Shaft Baru m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pembongkaran Lapis Plesteran m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Membran Waterproofing m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Lapis plesteran m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
- Pekerjaan Pemasangan Lapis Acian m² Err:509 #NAME? Err:509 Err:509 Err:509 Err:509
JUMLAH TOTAL PEKERJAAN LANTAI 5 #NAME?
D PEKERJAAN LANTAI 5
D.1 PEKERJAAN ARSITEKTUR #NAME?
D.1.1 Pekerjaan Arsitektur Lantai 5 #NAME?
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Kanopi m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Rangka Atap Baja Ringan
Rangka Kuda-kuda baja ringan CT75-0.75 TCT m2 107.42 #NAME? #NAME? #NAME? #NAME? #NAME?
Rangka Baja Ringan 0.45 tct m' 392.70 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Penutup Atap Polycarbonate m2 130.52 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Atap Dak
- Pekerjaan Pembongkaran Lapisan Atap Dak m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME?
- Plesteran Lapisan Atap Dak m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pembongkaran Lapisan Roofdrain m2 71.10 #NAME? #NAME? #NAME? #NAME? #NAME?
- Plesteran Lapisan Roofdrain m2 71.10 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pembongkaran Lapis Plesteran (Pengerokan) m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Waterproofing m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Lapis Plesteran m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Lapis Acian m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m2 45.44 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond Gypsum + Frame Fin. Cat Plafond + Fin. Cat Minyak (Crosstea) m2 43.28 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Fin. Cat Plafond 1 m2 43.28 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC m2 2.16 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Fin. Cat Plafond 2 m2 2.16 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m2 35.69 106,420.00 3,798,129.80 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m2 28.49 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Step Nosing 10x16 cm m2 1.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Tangga 50 x 50 cm Polished m2 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Kusen Baru m3 0.04 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Daun Pintu Baru m2 1.60 #NAME? #NAME? #NAME? #NAME? #NAME?
D.1.2 Pekerjaan Plumbing #NAME?
Rp 1.00 Pekerjaan Plumbing
- Pekerjaan Pemasangan Pipa m' 16.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Floordrain Baru bh 6.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

JUMLAH TOTAL #NAME? #NAME? Err:509 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Err:509 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PPN 11% #NAME? Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH TOTAL + PPN #NAME?
DIBULATKAN #NAME?

Dinas Pekerjaan Umum & Penataan Ruang PT. ALOCITA MANDIRI


Kota Cimahi
Pejabat Pembuat Komitmen

DENI HERDIANI, S.T ISKANDAR ZULKARNAEN, S.E.


NIP. 19761028 200604 1 005 Direktur
RINCIAN RENCANA ANGGARAN BIAYA (RAB)
PEMELIHARAAN GEDUNG KANTOR PEMKOT CIMAHI (A, B, DAN C)

KURVA S
TAHUN ANGGARAN 2022

No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

JUMLAH TOTAL PEKERJAAN PERSIAPAN 8,551,910.00


A PEKERJAAN PERSIAPAN
Rp 1.00 Pek. Pembuatan Papan Nama Proyek Ukuran 120 x 240 cm bh 1.00 1,149,010.00 1,149,010.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pengadaan Kesehatan dan Keselamatan Kerja (K3) ls 1.00 7,402,900.00 7,402,900.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
B PEKERJAAN LANTAI 1 #NAME?
B.1 PEKERJAAN ARSITEKTUR #NAME?
B.1.1 Pekerjaan Arsitektur Toilet 1 #NAME?
B.1.1.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 67.27 106,420.00 7,158,873.40 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² 49.65 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² 17.62 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² 27.55 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.1.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.2 Pekerjaan Arsitektur Ruang Toilet 2 #NAME?
B.1.2.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 67.27 106,420.00 7,158,873.40 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² 49.65 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² 17.62 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² 27.55 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.2.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

C PEKERJAAN LANTAI 2 #NAME?


C.1 PEKERJAAN ARSITEKTUR #NAME?
C.1.1 Pekerjaan Arsitektur Toilet 1 #NAME?
C.1.1.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² #REF! 106,420.00 #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pengecatan Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
C.1.1.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² #REF! 106,420.00 #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pengecatan Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Handle/Kunci Baru bh #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

C.1.8 Pekerjaan Arsitektur Toilet 2 #NAME?


C.1.2.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² #REF! 106,420.00 #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pengecatan Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
C.1.2.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² #REF! 106,420.00 #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pengecatan Plafond m² #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh #REF! #NAME? #REF! #REF! #REF! #REF!
- Pekerjaan Pemasangan Handle/Kunci Baru bh #REF! #NAME? #REF! #REF! #REF! #REF!
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
JUMLAH TOTAL PEKERJAAN LANTAI 3 #NAME?
B PEKERJAAN LANTAI 3
B.1 PEKERJAAN ARSITEKTUR #NAME?
B.1.1 Pekerjaan Arsitektur Ruang Toilet 1 #NAME?
B.1.1.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 67.27 106,420.00 7,158,873.40 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² 49.65 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² 17.62 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² 27.55 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.1.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.2 Pekerjaan Arsitektur DINAS SOSIAL #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 298.61 106,420.00 31,777,810.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 298.61 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru m² 3.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru m3 0.16 216,150.00 34,584.00 #NAME? #NAME? #NAME?
B.1.3 Pekerjaan Arsitektur PKK #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 73.84 106,420.00 7,857,520.70 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 73.84 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.4 Pekerjaan Arsitektur DINAS KESEHATAN #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 373.51 106,420.00 39,748,934.20 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 373.51 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

B.1.5 Pekerjaan Arsitektur DINAS PERDAGANGAN, KOPERASI, USAHA KECIL #NAME?


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 308.89 106,420.00 32,871,807.75 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m² 308.89 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Lapis Dinding Plesteran (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.6 Pekerjaan Arsitektur Ruang Toilet 2 #NAME?
B.1.1.1 Toilet 1 Umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 67.27 106,420.00 7,158,873.40 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding 25 x 50 Polished T=150 cm m² 49.65 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished m² 17.62 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Water Proofing
- Pekerjaan Pemasangan Waterproofing m² 27.55 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame Cross T m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 22.30 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.1.2 Toilet 1 VIP
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Handle/Kunci Baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.7 Pekerjaan Arsitektur Ruang Panel #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 7.12 106,420.00 757,976.45 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 polished m² 7.12 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan) m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola #NAME?
Rp 1.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + Frame cross T m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 8.82 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan) m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding m² 8.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.9 Pekerjaan Arsitektur Selasar #NAME?
Rp 1.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan) m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plesteran m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Acian m² 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Dinding Selasar m² 674.46 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.10 Pekerjaan Plumbing #NAME?
- Pekerjaan Pemasangan Saluran Pipa/Paralon m' 80.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Floordrain bh 10.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Perapihan pipa paralon yang tidak rapih m' 16.00 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.11 Pekerjaan Arsitektur Eksterior #NAME?
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Lapisan Plesteran m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Plesteran m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Acian m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapisan Waterproofing m² 223.81 #NAME? #NAME? #NAME? #NAME? #NAME?
B.1.12 Pekerjaan ME #NAME?
1. Pekerjaan Lampu
- Pekerjaan Instalasi
-Pemasangan Lampu Downlight LED 1 X 18 w bh 37.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Lampu Panel LED RC 40w bh 100.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Lampu Panel LED RC 29 w bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Lampu Baret Ceiling 22 w bh 10.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Lampu Baret Ceiling 10 w bh 26.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Stair Lamp & Battery TL LED 2 X 14 bh 7.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Single Two Way Switch bh 20.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Double Two Way Switch bh 20.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Sensor bh 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Pemasangan Panel Sub Distribusi 3Phase bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
JUMLAH TOTAL PEKERJAAN LANTAI 4 #NAME?
C PEKERJAAN LANTAI 4
C.1 PEKERJAAN ARSITEKTUR #NAME?
C.1.1 Pekerjaan Arsitektur Ruang Pantry #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 6.75 106,420.00 718,335.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Meja Dapur 25 x 50 m² 6.75 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Sanitasi
- Pekerjaan Pemasangan Keran bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.2 Pekerjaan Arsitektur Ruang Gudang #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 5.60 106,420.00 595,952.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 5.60 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.3 Pekerjaan Arsitektur Dinas Perumahan dan Pemukiman #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 111.64 106,420.00 11,880,196.70 #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 111.64 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru bh 5.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

C.1.4 Pekerjaan Arsitektur Dinas Lingkungan Hidup #NAME?


Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru bh 3.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

C.1.5 Pekerjaan Arsitektur Dinas BKPSDMD #NAME?


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 345.89 106,420.00 36,809,347.75 #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 345.89 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru m3 4.32 216,150.00 933,768.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Casement Jendela Baru m² 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.6 Pekerjaan Arsitektur Dinas Perhubungan #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 202.13 106,420.00 21,510,408.55 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished m² 202.13 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.7 Pekerjaan Eksterior #NAME?
Rp 1.00 Pekerjaan waterproofing
- Pekerjaan Pembongkaran Lapis Plesteran m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Membran Waterproofing m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapis plesteran m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Lapis Acian m² 147.20 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola #NAME?
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Kusen m' 4.32 216,150.00 933,768.00 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Daun Pintu m² 1.60 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Plafon
- Pekerjaan Pembongkaran Plafond m² 20.64 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC Board Uk. 120x240 cm, tebal 9 mm m² 20.64 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 20.64 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Tambahan Ruang Akses Ke Dak
- Pekerjaan Pas. Dinding Bata m² 22.68 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Plesteran m² 43.74 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Acian m² 43.74 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm m' 14.40 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan m² 43.74 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Tangga Putar m' 4.20 #NAME? #NAME? #NAME? #NAME? #NAME?

C.1.9 Pekerjaan Arsitektur Ruang Panel #NAME?


Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Handle /Kunci Baru bh 2.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.10 Pekerjaan Arsitektur Toilet 1 (VIP) #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
C.1.11 Pekerjaan Arsitektur Toilet 2 (VIP) #NAME?
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m² 18.41 106,420.00 1,958,926.15 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Lantai UnPolished 50x50 m² 5.58 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 m² 12.83 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing m² 8.15 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior m² 6.50 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pengecatan Plafond m² 1.60 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Instalasi Listrik
- Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) Bobot Bulan ke 1 Bulan ke 1 Bulan ke 1 Bulan ke 1

JUMLAH TOTAL PEKERJAAN LANTAI 5 #NAME?


D PEKERJAAN LANTAI 5
D.1 PEKERJAAN ARSITEKTUR #NAME?
D.1.1 Pekerjaan Arsitektur Lantai 5 #NAME?
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Kanopi m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Rangka Atap Baja Ringan
Rangka Kuda-kuda baja ringan CT75-0.75 TCT m2 107.42 #NAME? #NAME? #NAME? #NAME? #NAME?
Rangka Baja Ringan 0.45 tct m' 392.70 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Penutup Atap Polycarbonate m2 130.52 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 2.00 Pekerjaan Atap Dak
- Pekerjaan Pembongkaran Lapisan Atap Dak m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Plesteran Lapisan Atap Dak m2 88.94 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pembongkaran Lapisan Roofdrain m2 71.10 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Plesteran Lapisan Roofdrain m2 71.10 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pembongkaran Lapis Plesteran (Pengerokan) m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Waterproofing m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Lapis Plesteran m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pemasangan Lapis Acian m2 642.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond m2 45.44 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond Gypsum + Frame Fin. Cat Plafond + Fin. Cat Minyak (Cross T) m2 43.28 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Fin. Cat Plafond 1 m2 43.28 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Plafond GRC Eksterior m2 2.16 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Fin. Cat Plafond 2 m2 2.16 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 4.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik m2 35.69 106,420.00 3,798,129.80 #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished m2 28.49 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Step Nosing 10x16 cm m2 1.20 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Keramik Tangga 50 x 50 cm Polished m2 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Rp 5.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Kusen Baru m3 0.04 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan Daun Pintu Baru m2 1.60 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
D.1.2 Pekerjaan Plumbing #NAME?
Rp 1.00 Pekerjaan Plumbing
- Pekerjaan Pemasangan Pipa m' 16.00 #NAME? #NAME? #NAME? #NAME? #NAME?
- Pekerjaan Pemasangan roofdrain Baru 3" bh 6.00 #NAME? #NAME? #NAME? #NAME? #NAME?
D.1.3 Pekerjaan Elektrikal #NAME?
- Lampu Panel LED RC 40w bh 4.00 #NAME? #NAME? #NAME? #NAME? #NAME?
-Pemasangan Stair Lamp & Battery TL LED 2 X 14 bh 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?

JUMLAH TOTAL #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PPN 11% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
JUMLAH TOTAL + PPN #NAME?
DIBULATKAN #NAME?

Dinas Pekerjaan Umum & Penataan Ruang PT. ALOCITA MANDIRI


Kota Cimahi
Pejabat Pembuat Komitmen

DENI HERDIANI, S.T ISKANDAR ZULKARNAEN, S.E.


NIP. 19761028 200604 1 005 Direktur
RINCIAN RENCANA ANGGARAN BIAYA (RAB)
PEMELIHARAAN GEDUNG KANTOR PEMKOT CIMAHI (A, B, DAN C)
TAHUN ANGGARAN 2022

No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp)

GEDUNG A
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp)

#REF! #REF! #REF!


#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
No Uraian Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp)

#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

JUMLAH TOTAL #REF!


PPN 11% #REF!
JUMLAH TOTAL + PPN #REF!
DIBULATKAN #REF!
n tul.
P L t T D A
No. Uraian Tul.Lap
m m m m mm m2 -
1 Galian dan urugan pasir
Galian pilecap & pit lift
Galian tie beam
Urugan pasir pilecap & pitlift t = 5 cm
Urugan pasir tie beam t = 5 cm
2 Pilecap P1 100 x 100 x 25 1 1 0.25
Galian 1 1 0.3
Urugan pasir t = 5 cm 1 1 0.05
Bekisting 1 1 0.3
Tul. Atas-X D13-200 13
Tul. Atas-Y D13-200 13
Tul. Bawah-X D 8-200 8
Tul. Bawah-Y D 8-200 8
Tulangan U39
3 Tie Beam 1 20 x 15 26.8 0.15 0.2
Galian 26.8 0.2 0.25
Urugan pasir t = 5 cm 26.8 0.05
Bekisting 26.8 0.2
Tul. Long 2 D 8 Tump. Atas 26.8 8
Tul. Long 2 D 8 Tump. Bawah 26.8 8
Tul. Long 2 D 8 Lap. Atas 26.8 8
Tul. Long 2 D 8 Lap. Bawah 26.8 8
Tul. Long 0 D16 Torsi 26.8 16
Tul. skg 2D 6-200 Tump. 6
Tul. skg 2D 6-200 Lap. 6
Tulangan U39
4 Kolom pedestal K2 30 x 15 0.3 0.15 0.5
Bekisting 0.3 0.15 0.5
Tul. Long 6 D13 0.5 13
Tul. skg 2D 8- 75 Tump. 0.25 8
Tul. skg 2D 8- 75 Lap. 0.25 8
Tulangan U39
5 Kolom pedestal K2 15 x 15 0.15 0.15 0.5
Bekisting 0.15 0.15 0.5
Tul. Long 2 D10 0.5 10
Tul. skg 2D 8- 75 Tump. 0.25 8
Tul. skg 2D 8- 75 Lap. 0.25 8
Tulangan U39
6 Kolom K1 15 x 5 (tambahan tebal) 0.15 0.05 3
Bekisting 0.15 0.05 3
Tul. Long 4 D13 3 13
Tul. skg 2D 8- 75 Tump. 1.5 8
Tul. skg 2D 8- 75 Lap. 1.5 8
Tulangan U39
7 Kolom K2 30 x 15 0.3 0.15 3
Bekisting 0.3 0.15 3
Tul. Long 6 D13 3 3
Tul. skg 2D 8- 75 Tump. 1.5 8
Tul. skg 2D 8- 75 Lap. 1.5 8
Tulangan U39
LANTAI 2
22 Kolom K2 30 x 15 0.3 0.15 3
Bekisting 0.3 0.15 3
Tul. Long 6 D13 3 13
Tul. skg 2D 6- 75 Tump. 1.5 6
Tul. skg 2D 6- 75 Lap. 1.5 6
Tulangan U39
25 Kolom KP 11 x 11 0.11 0.11 11
Bekisting 0.11 0.11 11
Tul. Long 4 D 6 11 6
Tul. skg 2D 6- 150 Tump. 5.5 6
Tul. skg 2D 6-150 Lap. 5.5 6
Tulangan U39
26 Balok 1 150 x 50 (tambahan tebal) 37 0.5 0.15
Bekisting 37 0.5 0.15
Tul. Long 2 D13 Tump. Atas 37 13
Tul. Long 2 D13 Tump. Bawah 37 13
Tul. Long 2 D13 Lap. Atas 37 13
Tul. Long 2 D13 Lap. Bawah 37 13
Tul. Long 2 D13 Torsi 37 13
Tul. skg 2D 6- 65 Tump. 18.5 6
Tul. skg 2D 6-100 Lap. 18.5 6
Tulangan U39
27 Balok 2 300 x 150 23.7 0.15 0.3
Bekisting 23.7 0.15 0.3
Tul. Long 2 D13 Tump. Atas 23.7 13
Tul. Long 2 D13 Tump. Bawah 23.7 13
Tul. Long 2 D13 Lap. Atas 23.7 13
Tul. Long 2 D13 Lap. Bawah 23.7 13
Tul. Long 2 D13 Torsi 23.7 13
Tul. skg 2D 6- 65 Tump. 11.85 6
Tul. skg 2D 6- 65 Lap. 11.85 6
Tulangan U39
28 Balok 3 200 x 150 11.2 0.15 0.2
Bekisting 11.2 0.15 0.2
Tul. Long 2 D13 Tump. Atas 11.2 13
Tul. Long 2 D13 Tump. Bawah 11.2 13
Tul. Long 2 D13 Lap. Atas 11.2 13
Tul. Long 2 D13 Lap. Bawah 11.2 13
Tul. Long 0 D19 Torsi 11.2 19
Tul. skg 2D 6- 70 Tump. 5.6 6
Tul. skg 2D 6- 80 Lap. 5.6 6
Tulangan U39
36 Pelat Beton t = 11 cm 9.5 8 0.11 72.25
Bekisting 72.25
Tul. Tump D 8-200 8 72.25

Tulangan U39
36 Pelat Beton t = 11 cm 0.11 4.66
Bekisting 4.66
Tul. Tump D 8-200 8 4.66
Tul. Bawah-X D 8-200 8 4.66
Tul. Bawah-Y D 8-200 8 4.66
Tulangan U39
LANTAI DAK
22 Kolom K2 30 x 15 0.3 0.15 0.67
Bekisting 0.3 0.15 0.67
Tul. Long 6 D13 0.67 3
Tul. skg 2D 8- 75 Tump. 0.3350833 8
Tul. skg 2D 8- 75 Lap. 0.3350833 8
Tulangan U39
37 Balok 2 300 x 150 14.4 0.15 0.3
Bekisting 14.4 0.15 0.3
Tul. Long 2 D13 Tump. Atas 14.4 13
Tul. Long 2 D13 Tump. Bawah 14.4 13
Tul. Long 2 D13 Lap. Atas 14.4 13
Tul. Long 2 D13 Lap. Bawah 14.4 13
Tul. Long 2 D13 Torsi 14.4 13
Tul. skg 2D 6- 65 Tump. 7.2 6
Tul. skg 2D 6- 65 Lap. 7.2 6
Tulangan U39
38 Balok 3 200 x 150 97.1575 0.15 0.2
Bekisting 97.1575 0.15 0.2
Tul. Long 2 D13 Tump. Atas 97.1575 13
Tul. Long 2 D13 Tump. Bawah 97.1575 13
Tul. Long 2 D13 Lap. Atas 97.1575 13
Tul. Long 2 D13 Lap. Bawah 97.1575 13
Tul. Long 0 D19 Torsi 97.1575 19
Tul. skg 2D 6- 70 Tump. 48.57875 6
Tul. skg 2D 6- 80 Lap. 48.57875 6
Tulangan U39
39 Balok 3 500 x 150 8 0.15 0.5
Bekisting 8 0.15 0.5
Tul. Long 2 D13 Tump. Atas 8 13
Tul. Long 2 D13 Tump. Bawah 8 13
Tul. Long 2 D13 Lap. Atas 8 13
Tul. Long 2 D13 Lap. Bawah 8 13
Tul. Long 4 D13 Torsi 8 13
Tul. skg 2D 6- 70 Tump. 4 6
Tul. skg 2D 6- 80 Lap. 4 6
Tulangan U39
40 Pelat Beton t = 10 cm 0.1 12.8
Bekisting 3.2 4 12.8
Tul. Tump D10-200 10 12.8

Tulangan U39
41 Rangka atap R1
C 150.65.20.3 68 0
Sambungan baut D12

BOQ ARSITEKTUR
n tul.
P L t T D A
No. Uraian Tul.Lap
m m m m mm m2 -

Pekerjaan Dinding dan Plesteran


Pekerjaan Pasangan dinding
Lt.2 10.23 8 3
Cantilever 5 1.73 0.9 7.65
Toilet Lt.2 1.5 1.5 3
Lt.Dak 9.5 8 0.75 0.66
Pekerjaan Acian
Lt.2 9.5 8 3
Cantilever 5 0.9 -1
Toilet Lt.2 1.5 1.5 3
Lt.Dak 9.5 8 0.75 0.66
Pekerjaan Plesteran
Lt.2 9.5 8 3
Cantilever 5 0.9 -1
Toilet Lt.2 1.5 1.5 3
Lt.Dak 9.5 8 0.75 0.66

Pekerjaan Kusen Pintu & Jendela


Pekerjaan Pemindahan Pintu
J2
Kusen 0.77 0.4 2.34
Frame Bouvenlight 0.67 0.3 1.94
Kaca 6mm Bouvenlight 0.53 0.16 0.085

Pintu Panel PVC 0.7 1.95 1.365

P2
Kusen Pintu 0.9 2.1 1.89
Frame Daun pintu 0.8 2 1.6
Kaca Polos 8mm
Pekerjaan Pemasangan Alat Penggantung
J2
Engsel Jendela
Kait Angin
Kunci Slot Jendela

P2
Engsel Pintu
Handle Pintu alumunium

Pekerjaan Penutup Atap


Atap Metal
9.95 4 39.8
6.55 4 26.2
Tangga (SPACE) 1.5 4 6
Pekerjaan Plafond
Pekerjaan Rangka Plafond
Lt.1 8 9.5 76
Lt.2 8 10.23 81.84
Pekerjaan Pasang Plafond
Lt.1 8 9.5 76
Lt.2 8 10.23 81.84
Pekerjaan List Plafond
Lt.1 8 9.5 35
Lt.2 8 10.23 36.46

Pekerjaan Lantai
Pekerjaan Urugan Pasir 5cm
Lt.1 8 9.5 0.05 76
Lt.2 8 10.23 0.05 81.84
Pekerjaan Pasangan Keramik 40 x 40
Lt.1 8 9.5 76
Lt.2 8 10.23 81.84
Pekerjaan Pemasangan Keramik 20 x 2 1.5 1.5 2.25
Pekerjaan Waterproofing Lantai

Pekerjaan keramik tangga 2.25 0.7 0.25

Stepnosing tangga 10 x 60 0.7 0.1 3

Pekerjaan Elektrikal
Instalasi titik lampu
Lampu
Saklar Ganda
Saklar tunggal
Stop Kontak
Box MCB

Pekerjaan Sanitary
Pemasangan Kloset duduk
Pekerjaan Pemasangan Shower
Pekerjaan Pemasangan Wastafel

Pekerjaan Pipa
Pipa Air Bersih 2" 2.5 4
Knee 2"
Tee PVC 2"

Pipa Air Bekas 3" 23.5 4.5


Knee 3"
Tee PVC 3"
Socket 3"

Pipa Air Kotor 4" 11 3


Knee 4"
Tee PVC 4"
Socket 4"

Pipa air hujan 3" 6


Knee PVC 3"

Pekerjaan Finishing
Pekerjaan Pengecatan Dinding Exterior
Lt1 9.5 8 3 105
Lt2 9.5 8 3 105
Cantilever 5 0.9 4.5
Pekerjaan Pengecatan Dinding Interior
Lt1 9.5 8 3 105
Lt2 9.5 8 3 105
KM lt 1 &2 1.5 1.5 3 9
Pekerjaan Pengecatan Plafond 8 9.5 76

Pekerjaan Lain-lain
Pembuatan Sepictank
Galian 2.1 1.2 1.55
Lantai kerja 5 cm 2.1 1.2 0.05
Buangan tanah
Pasangan dinding bata merah 2.1 1.2 1.5
Bawah 2.1 1.2 2.52
Dinding Luar 2.1 1.2 1.5
Dinding Sekat 1.2 0.7 0.84
Acian 2.1 1.2 1.5
Bawah 2.1 1.2 2.52
Dinding Luar 2.1 1.2 1.5
Dinding Sekat 1.2 0.7 0.84

Plesteran
Waterproofing

Tutup beton bertulang 2.1 1.2 0.1


Bekisting 2.1 1.2 0.1 2.52
pembesian D6 2.1 1.2 6 13

Pipa udara 3/4" 0.3


Bend 3/4"
Pipa PVC 4" 2
Lapisan Kerikil 13 cm 0.9 0.4 0.13 0.36
Lapisan Ijuk 0.9 0.4 0.36

PEMBUATAN SUMUR RESAPAN


Galian 1.1 1.1 2
Buis Dia. 100 cm
Pipa limpasan 2" 0.5
Tutup Buis Beton
Lapisan Kerikil 13 cm 0.9 0.9 0.13 0.81
Lapisan Ijuk 0.9 0.9 0.81
n tul. S S Jarak Jarak
n bj Volume
Tul.tump skg.lap skg.tump skg.lap skg.tump
- m m m m - kg bh kg m1 m2

5
5
5
5 4.5
0.8 0.2 5 1.042 0.833559
0.8 0.2 5 1.042 0.833559
0.8 0.2 5 0.395 0.315667
0.8 0.2 5 0.395 0.315667
2.298452

2 0.395 21.1497
2 0.395 21.1497
2 0.395 21.1497
2 0.395 21.1497
0 1.578 0
0.0084 0.2 0.222 0.009322
0.0084 0.2 0.222 5.284608
89.89275
7
7
6 1.042 21.88092
0.74 0.075 0.395 6.813151
0.74 0.075 0.395 6.813151
35.50722
2
2
2 0.617 1.233075
0.44 0.075 0.395 1.157447
0.44 0.075 0.395 1.157447
3.547968
7
7
4 1.042 87.52367
0.24 0.075 0.395 13.25802
0.04 0.075 0.395 2.209671
102.9914
5
5
6 0.055 4.993954
0.74 0.075 0.395 29.19922
0.29 0.075 0.395 11.44294
45.63611
LANTAI 2
12
12
6 1.042 225.0609
0.74 0.075 0.222 39.41895
0.29 0.075 0.222 15.44797
279.9278
3
3
4 0.222 29.29786
0.34 0.015 0.222 83.01062
0.34 0.15 0.222 8.301062
120.6095

2 1.042 77.10419
2 1.042 77.10419
2 1.042 77.10419
2 1.042 77.10419
2 1.042 77.10419
1.07 0.065 0.222 67.59338
1.07 0.1 0.222 43.9357
497.05

2 1.042 49.38836
2 1.042 49.38836
2 1.042 49.38836
2 1.042 49.38836
2 1.042 49.38836
0.52 0.065 0.222 21.04119
0.52 0.065 0.222 21.04119
289.0242

2 1.042 23.33965
2 1.042 23.33965
2 1.042 23.33965
2 1.042 23.33965
0 2.226 0
0.42 0.07 0.222 7.457638
0.42 0.08 0.222 6.525434
107.3417
0.2 3.07 221.8075

221.8075
5.919

0.2 0.395 9.193808


0.2 0.395 9.193808
0.2 0.395 9.193808
27.58142
LANTAI DAK
9
9
6 0.055 2.008069
0.74 0.075 0.395 11.74101
0.29 0.075 0.395 4.601205
18.35028

2 1.042 30.00812
2 1.042 30.00812
2 1.042 30.00812
2 1.042 30.00812
2 1.042 30.00812
0.52 0.065 0.222 12.78452
0.52 0.065 0.222 12.78452
175.6096

2 1.042 202.4662
2 1.042 202.4662
2 1.042 202.4662
2 1.042 202.4662
0 2.226 0
0.42 0.07 0.222 64.69335
0.42 0.08 0.222 56.60668
931.1649

2 1.042 16.67118
2 1.042 16.67118
2 1.042 16.67118
2 1.042 16.67118
4 1.042 33.34235
0.72 0.07 0.222 9.131802
0.72 0.08 0.222 7.990327
117.1492

0.2 3.07 39.296

39.296

1 7.07 480.76
24 24

n tul. S S Jarak Jarak


n bj Volume
Tul.tump skg.lap skg.tump skg.lap skg.tump
- m m m m - kg bh kg m1 m2

143.22
112.68
4.5
7.635
18.405
288.33
2 227.25
9
2 15.27
2 36.81
173.76
2 112.68
9
2 15.27
2 36.81

1
2
4.68
3.88
0.1696

1 1

1
5.1
5.6
1.6
4
2
2

2
1

66

2 12

145.84

145.84

99.46
49
50.46

141.34

2 4.5
4.5

2 4.62

12 1.68
6.5
5 5
2 2

28
4 4
1 1
3 3

14
1 1
1 1
2 2

6
1 1

224.19
105
110.19
9
230.46
105
110.19
2 15.27
2 152

14.1
2.52
9.9
2 1.68
15.78
2.52
9.9
2 3.36

15.78
15.78

2.52
7 0.222 6.725192

0.3
2 2
2
3
3 1.08

1 1
0.5
1 1
3
2 1.62
m3

1.5
5.36
0.25
1.34
1.25
1.5
0.25

0.804
5.36
1.34
10.72

0.1575
3.15

0.0225
0.6

0.1575
8.4

0.675
13.5

1.62
32.4

173
0.3993
14.52

302
2.775
29.6

1.0665
17.775

0.336
6.16
7.9475
72.25

28
0.5126
4.66

54

0.271418
5.42835

68
0.648
10.8

2.914725
53.43663

0.6
9.2
1.28
12.8

m3
7.292
3.5
3.792

0.07
3.906
0.126
3.906
0.252

0.1404

2.42

0.3159
No Uraian Pekerjaan Jumlah Harga

1 2 3
I Pekerjaan Persiapan Rp 7,500,000.00
II Pekerjaan Tanah Rp 1,073,719.70
III Pekerjaan Struktur Beton Bertulang Rp 115,981,062.92
IV Pekerjaan Dinding dan Plesteran Rp 51,394,677.90
V Pekerjaan Kusen Pintu & Jendela Rp 5,411,575.23
VI Pekerjaan Pemasangan Alat Penggantung Rp 641,450.00
VII Pekerjaan Penutup Atap Rp 25,942,780.00
VIII Pekerjaan Plafond Rp 24,240,879.80
IX Pekerjaan Lantai Rp 29,356,542.80
X Pekerjaan Elektrikal Rp 7,158,660.00
XI Pekerjaan Sanitary Rp 6,479,510.00
XII Instalasi Air Bersih, Air Kotor dan Air Bekas Rp 5,019,090.00
XIII Pekerjaan Finishing Rp 16,153,419.15
XIV Pekerjaan Lain-lain Rp 7,157,473.97

SUB TOTAL Rp 303,510,841.47


PPN 11% Rp 33,386,192.56
TOTAL Rp 336,897,034.04
No Uraian Pekerjaan Vol Sat Harga Satuan Jumlah Harga

1 2 3 4 5 6
I Pekerjaan Persiapan Rp 7,500,000.00
Bongkaran Dinding & Beton Eksisting 1.000 Ls 7,500,000.00 Rp 7,500,000.00

II Pekerjaan Tanah Rp 1,073,719.70


Galian pilecap & pit lift 1.500 M3 106,420.00 Rp 159,630.00
Galian tie beam 5.360 M3 106,420.00 Rp 570,411.20
Urugan pasir pilecap & pitlift t = 5 cm 0.250 M3 216,150.00 Rp 54,037.50
Urugan pasir tie beam t = 5 cm 1.340 M3 216,150.00 Rp 289,641.00

III Pekerjaan Struktur Beton Bertulang Rp 115,981,062.92


A Lantai 1 Rp 12,832,724.60
Pilecap P1 100 x 100 x 25
Galian 1.500 M3 106,420.00 Rp 159,630.00
Urugan pasir t = 5 cm 0.250 M3 216,150.00 Rp 54,037.50
Bekisting 4.500 M2 52,680.00 Rp 237,060.00
Tulangan U39 2.298 Kg 16,566.00 Rp 38,076.16
Beton K-200 1.250 M3 1,083,100.00 Rp 1,353,875.00

Tie Beam 1 20 x 15
Galian 5.360 M3 106,420.00 Rp 570,411.20
Urugan pasir t = 5 cm 1.340 M3 216,150.00 Rp 289,641.00
Bekisting 10.720 M2 52,680.00 Rp 564,729.60
Tulangan U39 89.893 Kg 16,566.00 Rp 1,489,163.25
Beton K-200 0.804 M3 1,083,100.00 Rp 870,812.40

Kolom pedestal K2 30 x 15
Bekisting 3.150 M2 123,560.00 Rp 389,214.00
Tulangan U39 35.507 Kg 15,661.20 Rp 556,085.67
Beton K-200 0.158 M3 1,083,100.00 Rp 170,588.25

Kolom pedestal K2 15 x 15
Bekisting 0.600 M2 123,560.00 Rp 74,136.00
Tulangan U39 3.548 Kg 15,661.20 Rp 55,565.44
Beton K-200 0.023 M3 1,083,100.00 Rp 24,369.75

Kolom K1 15 x 5 (tambahan tebal)


Bekisting 8.400 M2 123,560.00 Rp 1,037,904.00
Tulangan U39 102.991 Kg 15,661.20 Rp 1,612,968.38
Beton K-200 0.158 M3 1,083,100.00 Rp 170,588.25

Kolom K2 30 x 15
Bekisting 13.500 M2 123,560.00 Rp 1,668,060.00
Tulangan U39 45.636 Kg 15,661.20 Rp 714,716.25
Beton K-200 0.675 M3 1,083,100.00 Rp 731,092.50

B Lantai 2 Rp 67,474,154.73
Kolom K2 30 x 15
Bekisting 32.400 M2 123,560.00 Rp 4,003,344.00
Tulangan U39 279.928 Kg 15,661.20 Rp 4,384,004.96
Beton K-200 1.620 M3 1,083,100.00 Rp 1,754,622.00
No Uraian Pekerjaan Vol Sat Harga Satuan Jumlah Harga

1 2 3 4 5 6

Kolom KP 11 x 11
Bekisting 14.520 M2 123,560.00 Rp 1,794,091.20
Tulangan U39 120.610 Kg 15,661.20 Rp 1,888,890.18
Beton K-200 0.399 M3 1,083,100.00 Rp 432,481.83

Balok 1 150 x 50 (tambahan tebal)


Bekisting 29.600 M2 137,850.00 Rp 4,080,360.00
Tulangan U39 497.050 Kg 15,661.20 Rp 7,784,399.75
Beton K-200 2.775 M3 1,083,100.00 Rp 3,005,602.50

Balok 2 300 x 150


Bekisting 17.775 M2 137,850.00 Rp 2,450,283.75
Tulangan U39 289.024 Kg 15,661.20 Rp 4,526,465.42
Beton K-200 1.067 M3 1,083,100.00 Rp 1,155,126.15

Balok 3 200 x 150


Bekisting 6.160 M2 137,850.00 Rp 849,156.00
Tulangan U39 107.342 Kg 15,661.20 Rp 1,681,099.13
Beton K-200 0.336 M3 1,083,100.00 Rp 363,921.60

Pelat Beton t = 11 cm
Bekisting 72.250 M2 187,120.00 Rp 13,519,420.00
Tulangan U39 221.808 Kg 15,100.00 Rp 3,349,293.25
Beton K-200 7.948 M3 1,083,100.00 Rp 8,607,937.25

Pelat Beton t = 11 cm
Bekisting 4.660 M2 187,120.00 Rp 871,979.20
Tulangan U39 27.581 Kg 15,100.00 Rp 416,479.51
Beton K-200 0.513 M3 1,083,100.00 Rp 555,197.06

C Lantai Dak Rp 35,674,183.59


Kolom K2 30 x 15
Bekisting 5.428 M2 123,560.00 Rp 670,726.93
Tulangan U39 18.350 Kg 15,661.20 Rp 287,387.40
Beton K-200 0.271 M3 1,083,100.00 Rp 293,972.29

Balok 2 300 x 150


Bekisting 10.800 M2 137,850.00 Rp 1,488,780.00
Tulangan U39 175.610 Kg 15,661.20 Rp 2,750,257.47
Beton K-200 0.648 M3 1,083,100.00 Rp 701,848.80

Balok 3 200 x 150


Bekisting 53.437 M2 137,850.00 Rp 7,366,238.76
Tulangan U39 931.165 Kg 15,661.20 Rp 14,583,159.69
Beton K-200 2.915 M3 1,083,100.00 Rp 3,156,938.65

Pelat Beton t = 10 cm
Bekisting 12.800 M2 187,120.00 Rp 2,395,136.00
Tulangan U39 39.296 Kg 15,100.00 Rp 593,369.60
Beton K-200 1.280 M3 1,083,100.00 Rp 1,386,368.00

IV Pekerjaan Dinding dan Plesteran Rp 51,394,677.90


No Uraian Pekerjaan Vol Sat Harga Satuan Jumlah Harga

1 2 3 4 5 6
Pekerjaan Pasangan dinding 143.220 M2 172,920.00 Rp 24,765,602.40
Pekerjaan Acian 288.330 M2 42,590.00 Rp 12,279,974.70
Pekerjaan Plesteran 173.760 M2 82,580.00 Rp 14,349,100.80

V Pekerjaan Kusen Pintu & Jendela Rp 5,411,575.23


Pemindahan Pintu Lt.1 1.000 Unit 250,000.00 Rp 250,000.00

Jendela Type J2
Kusen Jendela 4.680 M' 221,920.00 Rp 1,038,585.60
Frame Bouvenlight 3.880 M' 221,920.00 Rp 861,049.60
Kaca 6mm Bouvenlight 0.170 M2 245,920.00 Rp 41,708.03

Pintu Panel PVC 1.000 Unit 235,000.00 Rp 235,000.00

Pintu Type P2
Kusen Pintu 5.100 M' 221,920.00 Rp 1,131,792.00
Frame Daun Jendela Kaca 5.600 M' 221,920.00 Rp 1,242,752.00
Kaca Polos 8mm 1.600 M2 381,680.00 Rp 610,688.00

VI Pekerjaan Pemasangan Alat Penggantung Rp 641,450.00


Engsel Jendela + Bouvenlight 4.000 bh 31,730.00 Rp 126,920.00
Kait Angin 15 cm 2.000 bh 40,140.00 Rp 80,280.00
Kunci Slot Jendela 2.000 bh 55,290.00 Rp 110,580.00
Engsel Pintu 2.000 bh 51,140.00 Rp 102,280.00
Handle Pintu Alumunium 1.000 bh 221,390.00 Rp 221,390.00

VII Pekerjaan Penutup Atap Rp 25,942,780.00


Rangka atap R1 68.000 M' 292,130.00 Rp 19,864,840.00
Atap metal 66.000 M2 92,090.00 Rp 6,077,940.00

VIII Pekerjaan Plafond Rp 24,240,879.80


Pekerjaan Rangka Plafond 145.840 M2 106,660.00 Rp 15,555,294.40
Pekerjaan Pasang Plafond 145.840 M2 45,650.00 Rp 6,657,596.00
Pekerjaan List Plafond 99.460 M' 20,390.00 Rp 2,027,989.40

IX Pekerjaan Lantai Rp 29,356,542.80


Urugan Pasir 5cm 7.292 M3 216,150.00 Rp 1,576,165.80
Pasangan Keramik 40 x 40 Polished 141.340 M2 196,550.00 Rp 27,780,377.00
Pasangan Keramik Tangga 40 x 40 Polished 4.620 M2 196,550.00 Rp 908,061.00
Pasang Stepnosing 10 x 60 1.680 M2 69,970.00 Rp 117,549.60
Pekerjaan Pasang Keramik 20 x 20 4.500 M2 152,530.00 Rp 686,385.00
Pekerjaan Waterproofing Lantai 4.500 M2 268,620.00 Rp 1,208,790.00

X Pekerjaan Elektrikal Rp 7,158,660.00


Instalasi titik lampu 17.000 Titik 254,640.00 Rp 4,328,880.00
Saklar Ganda 7.000 Bh 67,650.00 Rp 473,550.00
Saklar tunggal 3.000 Bh 61,600.00 Rp 184,800.00
Stop Kontak 8.000 Bh 85,250.00 Rp 682,000.00
Box MCB 1.000 Unit 1,489,430.00 Rp 1,489,430.00

XI Pekerjaan Sanitary Rp 6,479,510.00


Closet Duduk 2.000 Unit 1,393,970.00 Rp 2,787,940.00
Shower 2.000 Unit 594,680.00 Rp 1,189,360.00
Wastafel 2.000 Unit 542,940.00 Rp 1,085,880.00
Floor Drain 1.000 Bh 324,500.00 Rp 324,500.00
No Uraian Pekerjaan Vol Sat Harga Satuan Jumlah Harga

1 2 3 4 5 6
Roof Drain 1.000 Bh 54,330.00 Rp 54,330.00
Torn Air Kap. 500L 1.000 Unit 900,000.00 Rp 900,000.00
Pelampung Otomatis 1.000 Bh 137,500.00 Rp 137,500.00

XII Instalasi Air Bersih, Air Kotor dan Air Bekas Rp 5,019,090.00
Pipa PVC Air Bersih 2" 6.500 M' 58,420.00 Rp 379,730.00
Knee 2" 5.000 Bh 8,000.00 Rp 40,000.00
Tee PVC 2" 2.000 Bh 29,000.00 Rp 58,000.00

Pipa Air Bekas 3" 28.000 M' 81,590.00 Rp 2,284,520.00


Knee 3" 4.000 Bh 15,000.00 Rp 60,000.00
Tee PVC 3" 1.000 Bh 38,900.00 Rp 38,900.00
Socket 3" 3.000 Bh 14,000.00 Rp 42,000.00

Pipa Air Kotor 4" 14.000 M' 107,650.00 Rp 1,507,100.00


Knee 4" 1.000 Bh 15,000.00 Rp 15,000.00
Tee PVC 4" 1.000 Bh 52,900.00 Rp 52,900.00
Socket 4" 2.000 Bh 18,200.00 Rp 36,400.00

Pipa air hujan 3" 6.000 M' 81,590.00 Rp 489,540.00


Knee PVC 3" 1.000 Bh 15,000.00 Rp 15,000.00

XIII Pekerjaan Finishing Rp 16,153,419.15


Pengecatan Dinding Interior 230.460 M2 25,950.00 Rp 5,980,437.00
Pengecatan Dinding Eksterior 224.190 M2 27,920.00 Rp 6,259,384.80
Pengecatan Plafond 145.840 M2 25,950.00 Rp 3,784,548.00
Pengecatan List Plafond 4.973 M2 25,950.00 Rp 129,049.35

XIV Pekerjaan Lain-lain Rp 7,157,473.97


A Pekerjaan Sepictank Rp 5,861,919.17
Galian 3.906 M3 106,420.00 Rp 415,676.52
Lantai kerja 0.126 M3 841,730.00 Rp 106,057.98
Buangan tanah 3.906 M3 37,950.00 Rp 148,232.70
Pasangan dinding bata merah 14.100 M2 143,730.00 Rp 2,026,593.00
Pekerjaan Acian 15.780 M2 42,590.00 Rp 672,070.20
Pekerjaan Plesteran 15.780 M2 82,580.00 Rp 1,303,112.40
Pipa udara PVC 3/4" 0.300 M' 44,950.00 Rp 13,485.00
Knee PVC 3/4" 2.000 Bh 6,000.00 Rp 12,000.00
Pipa PVC 4" (ke sumur resapan) 2.000 M' 107,650.00 Rp 215,300.00
Lapisan Kerikil 13 cm 0.140 M3 280,000.00 Rp 39,312.00
Lapisan Ijuk 1.080 M2 170,770.00 Rp 184,431.60
Pembuatan tutup septictank t = 10 cm
Bekisting 2.520 M2 137,850.00 Rp 347,382.00
Tulangan U39 6.725 Kg 15,661.20 Rp 105,324.57
Beton K-200 0.252 M3 1,083,100.00 Rp 272,941.20

B Pekerjaan Sumur Resapan Rp 1,295,554.80


Galian 2.420 M3 106,420.00 Rp 257,536.40
Buangan Tanah 2.420 M3 37,950.00 Rp 91,839.00
Buis Dia. 100 cm 1.000 Bh 287,870.00 Rp 287,870.00
Pipa limpasan 2" 0.500 M' 58,420.00 Rp 29,210.00
Tutup Buis Beton 1.000 Bh 264,000.00 Rp 264,000.00
Lapisan Kerikil 13 cm 0.316 M3 280,000.00 Rp 88,452.00
Lapisan Ijuk 1.620 M2 170,770.00 Rp 276,647.40
HARGA SATUAN PEKERJAAN
JP KONSTRUKSI
TAHUN ANGGARAN 2022

###
HARGA SATUAN
URAIAN
PEKERJAAN (Rp)
2 3
HARGA SATUAN PEKERJAAN PERSIAPAN
Pembersihan Lahan 13,500.00
Bouplank 37,493.02
1,149,010.00
Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12
Pengadaan Kesehatan dan Keselamatan Kerja (K3) 7,402,900.00
Pekerjaan pagar proyek sementara t = 2m dari seng gelombang 368,750.00

HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 m3 Tanah Biasa Sedalam Lebih Dari 1m s.d 2m Untuk Volume s.d 200 m3 106,420.00
Pengurugan kembali bekas galian tanah 53,210.00
Pembuangan 1 m3 Tanah sejauh 30 meter 37,950.00
Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm untuk Bidang Resapan Tangki Septik 170,770.00

HARGA SATUAN PEKERJAAN STRUKTUR


Pengurugan 1 m3 Dengan Pasir 216,150.00
Pekerjaan 1 m3 beton untuk lantai kerja beton fc'=7.4 s.d 9.8 Mpa (K-100 s.d K-125) 841,730.00
Pekerjaan 1 m3 Batu Kosong (aanstamping) 616,350.00
Pekerjaan 1 m3 Pondasi Batu Belah 994,290.00
1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) + Perancah 187,120.00
1 m2 bekisting balok beton biasa menggunakan papan kayu 3/20 cm (TP) + Perancah 137,850.00
1 m2 bekisting kolom beton biasa menggunakan papan kayu 3/20 cm (TP) + Perancah 123,560.00
1 m2 Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 52,680.00
Pemasangan 1kg Jaring Anyaman Tulangan Tunggal Wiremesh M6 - M8 15,100.00
Pekerjaan Penulangan 1 Kg dengan Besi Polos 15,661.20
Pekerjaan Penulangan 1 Kg dengan Besi Ulir 16,566.00
Pekerjaan Pembuatan 1 m3 Beton Mutu f'c = 16,9 Mpa (K200) 1,083,100.00
Pekerjaan 1 m2 Dinding Bata Ringan T=10 cm dengan Mortar Siap Pakai 172,920.00
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu dengan Mortar tipe M,fc’ 17, 2 Mpa ( Setara Campuran 1SP : 2PP). 143,730.00
Pekerjaan 1 m2 Plesteran 1SP : 1PP 15mm 82,580.00
Pekerjaan 1 m2 Acian 42,590.00
Pemasangan Kuda-kuda baja ringan bluescope + reng untuk atap genteng biasa/metal (jarak reng 36 cm - berat ± 2.5 kg perlembar) 292,130.00

HARGA SATUAN PEKERJAAN ARSITEKTUR


Pekerjaan 1 m2 Keramik 40x40 Polished Platinum 196,550.00
Pekerjaan 1 m2 Keramik 30x60 Polished Roman 215,520.00
Pekerjaan 1 m2 Keramik Dinding 20x20 UnPolished 152,530.00
Pekerjaan 1 m2 Keramik Dinding 20x25 UnPolished 149,060.00
Pekerjaan 1 m2 Keramik 60x60 UnPolished Platinum 166,020.00
Pekerjaan 1 m2 Stepnosing kermik 10x60 69,970.00
Pekerjaan 1 m2 Rangka Langit-langit Besi Hollow 40.40 Untuk Plafond 113,220.00
Pekerjaan 1 m2 Rangka Langit-langit Besi Hollow 20.40 Untuk Plafond 106,660.00
Pekerjaan 1 m2 Rangka Besi Hollow 40.40 Untuk Partisi 84,290.00
Pekerjaan 1 m2 Langit-langit Papan Gypsum T=9 mm 45,650.00
Pekerjaan 1 m2 Cat Emulsion 17,680.00
Pekerjaan 1 m Kusen Alumunium 221,920.00
Pekerjaan 1 bh Daun Pintu Aluminium 3,714,070.00
Pekerjaan 1 bh Daun Pintu Double Multiplek Lapis HPL + Kaca Polos 5 cm 1,414,400.00
Pekerjaan 1 bh Daun Pintu Double Multiplek Lapis HPL 891,900.00
Pekerjaan 1 m2 Kaca Polos Tebal 6 cm 245,920.00
Pekerjaan 1 m2 Kaca Polos Tebal 8 cm 381,680.00
Pekerjaan 1 m2 Kaca tempered 12 mm 987,080.00
Pekerjaan 1 bh Engsel Pintu 51,140.00
Pekerjaan 1 bh Engsel Jendela 31,730.00
Pekerjaan 1 bh Kait Angin 15 cm 40,140.00
Pekerjaan 1 bh Kunci Slot 55,290.00
Pekerjaan 1 bh Kunci + Handle Pintu 221,390.00
Pekerjaan 1 m Hollow Stainless 20x40 29,490.00
Pekerjaan 1 m2 Genteng Metal Berpasir 92,090.00
Pekerjaan 1 m2 Waterproofing 268,620.00
Pekerjaan 1 m' List Langit-langit Gipsum 20,390.00
Pekerjaan 1 m2 Pengecatan Tembok Eksterior 27,920.00
Pekerjaan 1 m2 Pengecatan TembokInterior 25,950.00
Pekerjaan 1 m3 Beton K350 1,257,040.00
Pekerjaan 1 m2 Trasraam tebal 2.5 cm dengan mortar tipe m fc'=17.2 Mpa 95,680.00
Pekerjaan 1 m2 Paving Block (Block Beton) Natural Tebal 6 cm 328,200.00

HARGA SATUAN PEKERJAAN MEP


Pekerjaan 1 bh titik lampu led 2x14 wat 326,140.00
Pekerjaan 1 bh titik lampu led 1x14 wat 254,640.00
Pekerjaan 1 bh AC 2,650,440.00
Pekerjaan 1 bh Stop Kontak Double 85,250.00
Pekerjaan 1 bh Saklar Tunggal 61,600.00
Pekerjaan 1 bh Saklar Double 67,650.00
Pekerjaan 1 bh MCCB 1,489,430.00
Pekerjaan 1 m' pipa AW Diameter 3/4" 44,950.00
Pekerjaan 1 m' pipa D Diameter 2" 58,420.00
Pekerjaan 1 m' pipa D Diameter 3" 81,590.00
Pekerjaan 1 m' pipa D Diameter 4" 107,650.00
Pekerjaan 1bh Floordrain 324,500.00
Pekerjaan 1bh Roofdrain 54,330.00
Pekerjaan 1bh Kran 291,360.00
Pekerjaan 1bh Shower 594,680.00
Pekerjaan 1bh Kloset Duduk 1,393,970.00
Pekerjaan 1bh Wastafel 542,940.00
K
O
T
38A

ANALISA HARGA SATUAN PEKERJAAN ###


T
JP KONSTRUKSI A
S
TAHUN ANGGARAN 2022 I
K
M
A
URAIAN KOEFISIEN SAT.
HARGA SAT.
JUMLAH (Rp.) L
(Rp.) A
2 3 4 5 6 Y
A

HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN

Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12

Multiplek t = 18 mm 0.3500 lbr 250,000.00 87,500.00


Kayu Balok Kelas III (4m) 0.0770 m3 3,750,000.00 288,750.00
Besi Siku uk. 30 x 30 x 3,0 mm (6m) 5.8000 kg 9,191.18 53,308.82
Paku Campuran 5 cm + 7 cm 1.2500 kg 20,000.00 25,000.00
Cat Kayu dan besi avian 2.5000 kg 65,000.00 162,500.00
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 1.0000 OH 120,000.00 120,000.00
Kepala Tukang 0.1000 OH 125,000.00 12,500.00
Tukang Cat 1.5000 OH 120,000.00 180,000.00
Mandor 0.1000 OH 150,000.00 15,000.00
Jumlah 1,044,558.82
Overhead + Profit 10% 104,455.88
Jumlah 1,149,014.71
Dibulatkan 1,149,010.00
Pekerjaan pagar proyek sementara t = 2m dari seng gelombang
Kayu Dolken dia 8 -10 / 400 cm 1.2500 btg 65,000.00 81,250.00
Semen PC 2.5000 kg 1,222.50 3,056.25
Seng Gelombang 180 x 80 cm t = 0,2 mm 1.2000 Lbr 74,250.00 89,100.00
Pasir Pasang 0.0050 m3 250,000.00 1,250.00
Kayu 5/7 x 4m Kayu Meranti 0.0720 m3 1,250,000.00 90,000.00
Paku Biasa 2" - 5" 0.0600 kg 18,000.00 1,080.00
Pekerja 0.4000 OH 100,000.00 40,000.00
Tukang Kayu 0.2000 OH 120,000.00 24,000.00
Kepala Tukang 0.0200 OH 125,000.00 2,500.00
Mandor 0.0200 OH 150,000.00 3,000.00
Jumlah 335,236.25
Overhead + Profit 10% 33,523.63
Jumlah 368,759.88
Dibulatkan 368,750.00
HARGA SATUAN PEKERJAAN TANAH
Penggalian 1 m3 Tanah Biasa Sedalam Lebih Dari 1m s.d 2m Untuk Volume s.d 200 m3
Pekerja 0.9000 OH 100,000.00 90,000.00
Mandor 0.0450 OH 150,000.00 6,750.00
Jumlah 96,750.00
Overhead + Profit 10% 9,675.00
Jumlah 106,425.00
Dibulatkan 106,420.00
Pembuangan 1 m3 Tanah sejauh 30 meter
Pekerja 0.3300 OH 100,000.00 33,000.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 34,500.00
Overhead + Profit 10% 3,450.00
39
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Jumlah 37,950.00
Dibulatkan 37,950.00
Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm untuk Bidang Resapan Tangki Septik
Pekerja 0.1500 OH 100,000.00 15,000.00
Mandor 0.0150 OH 150,000.00 2,250.00
Ijuk 6.0000 Kg 23,000.00 138,000.00
Jumlah 155,250.00
Overhead + Profit 10% 15,525.00
Jumlah 170,775.00
Dibulatkan 170,770.00
40
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

HARGA SATUAN PEKERJAAN STRUKTUR


Pengurugan 1 m3 Dengan Pasir
Pasir urug 1.1000 m3 150,000.00 165,000.00
Pekerja 0.3000 OH 100,000.00 30,000.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 196,500.00
Overhead + Profit 10% 19,650.00
Jumlah 216,150.00
Dibulatkan 216,150.00
Pekerjaan 1 m3 beton untuk lantai kerja beton fc'=7.4 s.d 9.8 Mpa (K-100 s.d K-125)
Semen Portland 230.00 Kg 1,222.50 281,175.00
Pasir Beton 0.64 m3 250,000.00 159,475.00
Kerikil 0.5706 m3 280,000.00 159,768.00
Air 200.0000 Liter 50.00 10,000.00
Pekerja 1.2000 OH 100,000.00 120,000.00
Tukang Batu 0.2000 OH 120,000.00 24,000.00
Kepala Tukang Batu 0.0200 OH 90,000.00 1,800.00
Mandor 0.0600 OH 150,000.00 9,000.00
Jumlah 765,218.00
Overhead + Profit 10% 76,521.80
Jumlah 841,739.80
Dibulatkan 841,730.00
Pekerjaan 1 m3 Batu Kosong (aanstamping)
Batu Belah 1.20 m3 300,000.00 360,000.00
Pasir Urug 0.43 m3 150,000.00 64,800.00
Pekerja 0.7800 OH 100,000.00 78,000.00
Tukang Batu 0.3900 OH 120,000.00 46,800.00
Kepala Tukang Batu 0.0390 OH 125,000.00 4,875.00
Mandor 0.0390 OH 150,000.00 5,850.00
Jumlah 560,325.00
Overhead + Profit 10% 56,032.50
Jumlah 616,357.50
Dibulatkan 616,350.00
Pekerjaan 1 m3 Pondasi Batu Belah
Batu Belah 1.20 m3 300,000.00 360,000.00
Semen Portland 117.00 Kg 1,222.50 143,032.50
Pasir Pasang 0.56 m3 250,000.00 140,250.00
Pekerja 1.5000 OH 100,000.00 150,000.00
Tukang Batu 0.7500 OH 120,000.00 90,000.00
Kepala Tukang Batu 0.0750 OH 125,000.00 9,375.00
Mandor 0.0750 OH 150,000.00 11,250.00
Jumlah 903,907.50
Overhead + Profit 10% 90,390.75
Jumlah 994,298.25
Dibulatkan 994,290.00
Pekerjaan 1 m2 Bekisting Untuk Pondasi Telapak Beton Bangunan Gedung
41
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Papan Kayu Kelas III 0.04 m3 1,500,000.00 60,000.00


Paku 5-10 cm 0.30 Kg 20,000.00 6,000.00
Minyak Bekisting 0.10 Liter 50,000.00 5,000.00
Pekerja 0.5200 OH 100,000.00 52,000.00
Tukang Kayu 0.2600 OH 120,000.00 31,200.00
Kepala Tukang Kayu 0.0260 OH 125,000.00 3,250.00
Mandor 0.0260 OH 150,000.00 3,900.00
Jumlah 161,350.00
Overhead + Profit 10% 16,135.00
Jumlah 177,485.00
Dibulatkan 177,480.00
Pekerjaan 1 m2 Bekisting Untuk Sloof Beton Bangunan Gedung
Papan Kayu Kelas III 0.045 m3 1,500,000.00 67,500.00
Paku 5-10 cm 0.30 Kg 20,000.00 6,000.00
Minyak Bekisting 0.10 Liter 50,000.00 5,000.00
Pekerja 0.5200 OH 100,000.00 52,000.00
Tukang Kayu 0.2600 OH 120,000.00 31,200.00
Kepala Tukang Kayu 0.0260 OH 125,000.00 3,250.00
Mandor 0.0260 OH 150,000.00 3,900.00
Jumlah 168,850.00
Overhead + Profit 10% 16,885.00
Jumlah 185,735.00
Dibulatkan 185,730.00
Pekerjaan 1 m2 Bekisting Untuk Kolom Beton Bangunan Gedung
Papan Kayu Kelas III 0.040 m3 1,500,000.00 60,000.00
Paku 5-12 cm 0.400 Kg 20,000.00 8,000.00
Minyak Bekisting 0.200 Liter 50,000.00 10,000.00
Balok Kayu Kelas II 0.015 m3 1,500,000.00 22,500.00
Plywood Tebal 9 mm 0.350 Lbr 134,000.00 46,900.00
Dolken Kayu 6-8 cm Panjang 4m 2.000 Batang 65,000.00 130,000.00
Pekerja 0.660 OH 100,000.00 66,000.00
Tukang Kayu 0.330 OH 120,000.00 39,600.00
Kepala Tukang Kayu 0.033 OH 125,000.00 4,125.00
Mandor 0.033 OH 150,000.00 4,950.00
Jumlah 392,075.00
Overhead + Profit 10% 39,207.50
Jumlah 431,282.50
Dibulatkan 431,280.00
Pekerjaan 1 m2 Bekisting Untuk Balok Bangunan Gedung
Papan Kayu Kelas III 0.040 m3 1,500,000.00 60,000.00
Paku 5-12 cm 0.400 Kg 20,000.00 8,000.00
Minyak Bekisting 0.200 Liter 50,000.00 10,000.00
Balok Kayu Kelas II 0.018 m3 1,500,000.00 27,000.00
Plywood Tebal 9 mm 0.350 Lbr 134,000.00 46,900.00
Dolken Kayu 6-8 cm Panjang 4m 2.000 Batang 65,000.00 130,000.00
Pekerja 0.660 OH 100,000.00 66,000.00
Tukang Kayu 0.330 OH 120,000.00 39,600.00
Kepala Tukang Kayu 0.033 OH 125,000.00 4,125.00
Mandor 0.033 OH 150,000.00 4,950.00
Jumlah 396,575.00
Overhead + Profit 10% 39,657.50
Jumlah 436,232.50
Dibulatkan 436,230.00
Pekerjaan 1 m2 Bekisting Untuk Plat Lantai Beton Bangunan Gedung
42
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Papan Kayu Kelas III 0.040 m3 1,500,000.00 60,000.00


Paku 5-12 cm 0.400 Kg 20,000.00 8,000.00
Minyak Bekisting 0.200 Liter 50,000.00 10,000.00
Balok Kayu Kelas II 0.015 m3 1,500,000.00 22,500.00
Plywood Tebal 9 mm 0.350 Lbr 134,000.00 46,900.00
Dolken Kayu 6-8 cm Panjang 4m 6.000 Batang 65,000.00 390,000.00
Pekerja 0.660 OH 100,000.00 66,000.00
Tukang Kayu 0.330 OH 120,000.00 39,600.00
Kepala Tukang Kayu 0.033 OH 125,000.00 4,125.00
Mandor 0.033 OH 150,000.00 4,950.00
Jumlah 652,075.00
Overhead + Profit 10% 65,207.50
Jumlah 717,282.50
Dibulatkan 717,280.00
43
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m2 Bekisting Untuk Tangga Beton Bangunan Gedung


Papan Kayu Kelas III 0.030 m3 1,500,000.00 45,000.00
Paku 5-12 cm 0.400 Kg 20,000.00 8,000.00
Minyak Bekisting 0.150 Liter 50,000.00 7,500.00
Balok Kayu Kelas II 0.015 m3 1,500,000.00 22,500.00
Plywood Tebal 9 mm 0.350 Lbr 134,000.00 46,900.00
Dolken Kayu 6-8 cm Panjang 4m 2.000 Batang 65,000.00 130,000.00
Pekerja 0.660 OH 100,000.00 66,000.00
Tukang Kayu 0.330 OH 120,000.00 39,600.00
Kepala Tukang Kayu 0.033 OH 125,000.00 4,125.00
Mandor 0.033 OH 150,000.00 4,950.00
Jumlah 374,575.00
Overhead + Profit 10% 37,457.50
Jumlah 412,032.50
Dibulatkan 412,030.00
Pemasangan 1kg Jaring Anyaman Tulangan Tunggal Wiremesh M6 - M8
Wiremesh M6-M8 1.020 Kg 12,500.00 12,750.00
Kawat Benrad 0.005 Kg 20,000.00 100.00
Pekerja 0.003 OH 100,000.00 250.00
Tukang Besi 0.003 OH 120,000.00 300.00
Kepala Tukang Besi 0.003 OH 125,000.00 312.50
Mandor 0.000 OH 150,000.00 15.00
Jumlah 13,727.50
Overhead + Profit 10% 1,372.75
Jumlah 15,100.25
Dibulatkan 15,100.00
Pekerjaan Penulangan 100 Kg dengan Besi Polos
Besi Beton Polos 100.000 Kg 12,250.00 1,225,000.00
Kawat Benrad 1.500 Kg 20,000.00 30,000.00
Pekerja 0.700 OH 100,000.00 70,000.00
Tukang Besi 0.700 OH 120,000.00 84,000.00
Kepala Tukang Besi 0.070 OH 125,000.00 8,750.00
Mandor 0.040 OH 150,000.00 6,000.00
Jumlah 1,423,750.00
Overhead + Profit 10% 142,375.00
Jumlah 1,566,125.00
Dibulatkan 1,566,120.00
Pekerjaan Penulangan 1 Kg dengan Besi Polos
Jumlah 1,423,750.00
Overhead + Profit 10% 142,375.00
Jumlah 1,566,125.00
Dibulatkan 15,661.20
Pekerjaan Penulangan 100 Kg dengan Besi Ulir
Besi Beton Ulir 105.000 Kg 12,450.00 1,307,250.00
Kawat Benrad 1.500 Kg 20,000.00 30,000.00
Pekerja 0.700 OH 100,000.00 70,000.00
Tukang Besi 0.700 OH 120,000.00 84,000.00
Kepala Tukang Besi 0.070 OH 125,000.00 8,750.00
Mandor 0.040 OH 150,000.00 6,000.00
Jumlah 1,506,000.00
Overhead + Profit 10% 150,600.00
Jumlah 1,656,600.00
Dibulatkan 1,656,600.00
44
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan Penulangan 1 Kg dengan Besi Ulir


Jumlah 1,506,000.00
Overhead + Profit 10% 150,600.00
Jumlah 1,656,600.00
Dibulatkan 16,566.00
Pekerjaan Pembuatan 1 m3 Beton Mutu f'c = 16,9 Mpa (K200)
Semen Portland 352.000 Kg 1,222.50 430,320.00
Pasir Beton 731.000 Kg 178.57 130,535.71
Kerikil 1,031.000 Kg 193.10 199,089.66
Air 215.000 Liter 50.00 10,750.00
Pekerja 1.650 OH 100,000.00 165,000.00
Tukang Batu 0.275 OH 120,000.00 33,000.00
Kepala Tukang Batu 0.028 OH 125,000.00 3,500.00
Mandor 0.083 OH 150,000.00 12,450.00
Jumlah 984,645.37
Overhead + Profit 10% 98,464.54
Jumlah 1,083,109.91
Dibulatkan 1,083,100.00
Pekerjaan 1 m2 Dinding Bata Ringan T=10 cm dengan Mortar Siap Pakai
Bata Ringan t=10 cm 8.400 bh 8,500.00 71,400.00
Mortar Siap Pakai 0.063 Kg 2,125.00 133.88
Peralatan 0.846 % 1,062.50 899.19
Pekerja 0.671 OH 100,000.00 67,100.00
Tukang Batu 0.130 OH 120,000.00 15,600.00
Kepala Tukang Batu 0.013 OH 125,000.00 1,625.00
Mandor 0.003 OH 150,000.00 450.00
Jumlah 157,208.07
Overhead + Profit 10% 15,720.81
Jumlah 172,928.88
Dibulatkan 172,920.00
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu dengan Mortar tipe M,fc’ 17, 2 Mpa ( Setara Campuran 1SP : 2PP).
Bata Merah 70.000 bh 750.00 52,500.00
Semen 18.950 Kg 1,222.50 23,166.38
Pasir Pasang 0.038 M3 250,000.00 9,500.00
Pekerja 0.300 OH 100,000.00 30,000.00
Tukang Batu 0.100 OH 120,000.00 12,000.00
Kepala Tukang Batu 0.010 OH 125,000.00 1,250.00
Mandor 0.015 OH 150,000.00 2,250.00
Jumlah 130,666.38
Overhead + Profit 10% 13,066.64
Jumlah 143,733.01
Dibulatkan 143,730.00
Pekerjaan 1 m2 Plesteran 1SP : 1PP 15mm
Semen Portland 15.504 Kg 1,222.50 18,953.64
Pasir Pasang 0.016 m3 250,000.00 4,000.00
Pekerja 0.300 OH 100,000.00 30,000.00
Tukang Batu 0.150 OH 120,000.00 18,000.00
Kepala Tukang Batu 0.015 OH 125,000.00 1,875.00
Mandor 0.015 OH 150,000.00 2,250.00
Jumlah 75,078.64
Overhead + Profit 10% 7,507.86
Jumlah 82,586.50
Dibulatkan 82,580.00
45
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m2 Acian
Semen Portland 3.250 Kg 1,222.50 3,973.13
Pekerja 0.200 OH 100,000.00 20,000.00
Tukang Batu 0.100 OH 120,000.00 12,000.00
Kepala Tukang Batu 0.010 OH 125,000.00 1,250.00
Mandor 0.010 OH 150,000.00 1,500.00
Jumlah 38,723.13
Overhead + Profit 10% 3,872.31
Jumlah 42,595.44
Dibulatkan 42,590.00
Pekerjaan 1 m2 Trasraam tebal 2.5 cm dengan mortar tipe m fc'=17.2 Mpa
Semen Portland 25.840 Kg 1,222.50 31,589.40
Pasir Pasang 0.034 m3 250,000.00 8,375.00
Pekerja 0.190 OH 100,000.00 19,000.00
Tukang Batu 0.190 OH 120,000.00 22,800.00
Kepala Tukang Batu 0.019 OH 125,000.00 2,375.00
Mandor 0.019 OH 150,000.00 2,850.00
Jumlah 86,989.40
Overhead + Profit 10% 8,698.94
Jumlah 95,688.34
Dibulatkan 95,680.00
46
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pemasangan Kuda-kuda baja ringan bluescope + reng untuk atap genteng biasa/metal (jarak reng 36 cm - berat ± 2.5 kg perlembar)
Baja Ringan C 75 mm t = 0,75 mm Taso 1.4880 m' 20,000.00 29,760.00
Baja Ringan Reng 30 mm t = 0,45 mm Taso 3.7778 m' 8,333.33 31,481.48
Self Drilling Screw dia 14 x 20 mm (Screw Truss) 2.7778 bh 600.00 1,666.67
Self Drilling Screw dia 16 x 16 mm (Screw Reng) 22.6667 bh 1,000.00 22,666.67
Dynabolt m8 4.0000 bh 3,000.00 12,000.00
Pekerja 0.7000 OH 100,000.00 70,000.00
Tukang Besi 0.7000 OH 120,000.00 84,000.00
Kepala Tukang Besi 0.0700 OH 125,000.00 8,750.00
Mandor 0.0350 OH 150,000.00 5,250.00
Jumlah 265,574.81
Overhead + Profit 10% 26,557.48
Jumlah 292,132.30
Dibulatkan 292,130.00
HARGA SATUAN PEKERJAAN ARSITEKTUR
Pekerjaan 1 m2 Keramik 40x40 Polished Platinum
Keramik 40 x 40 cm Platinum Polished 1.0500 dus 80,000.00 84,000.00
Semen PC Tiga Roda 9.6000 kg 1,222.50 11,736.00
Semen warna 1.5000 kg 20,000.00 30,000.00
Pasir Pasang 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 178,686.00
###
Overhead + Profit 10% 17,868.60
Jumlah 196,554.60
Dibulatkan 196,550.00
Pekerjaan 1 m2 Keramik 30x60 Polished Roman ###
Keramik 30 x 60 cm Platinum Roman 6.0000 bh 16,875.00 101,250.00
Semen Portland 9.6000 kg 1,222.50 11,736.00
Semen warna 1.5000 kg 20,000.00 30,000.00
Pasir Pasang 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 195,936.00
Overhead + Profit 10% 19,593.60
Jumlah 215,529.60
Dibulatkan 215,520.00
Pekerjaan 1 m2 Keramik 60x60 UnPolished Platinum
Keramik 60 x 60 cm Platinum Unpolished 3.0000 bh 18,750.00 56,250.00
Semen Portland 9.6000 kg 1,222.50 11,736.00
Semen warna 1.5000 kg 20,000.00 30,000.00
Pasir Pasang 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 150,936.00
Overhead + Profit 10% 15,093.60
Jumlah 166,029.60
Dibulatkan 166,020.00
47
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m2 Keramik Dinding 20x20 UnPolished


Keramik 20 x 20 cm Unpolished 1.0500 Dus 60,000.00 63,000.00
Semen Portland 10.4000 kg 1,222.50 12,714.00
Semen warna 0.5000 kg 20,000.00 10,000.00
Pasir Pasang 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 138,664.00
Overhead + Profit 10% 13,866.40
Jumlah 152,530.40
Dibulatkan 152,530.00
Pekerjaan 1 m2 Keramik Dinding 20x25 UnPolished
Keramik 20 x 25 cm Platinum Unpolished 1.0500 Dus 57,000.00 59,850.00
Semen Portland 10.4000 kg 1,222.50 12,714.00
Semen warna 0.5000 kg 20,000.00 10,000.00
Pasir Pasang 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 135,514.00
Overhead + Profit 10% 13,551.40
Jumlah 149,065.40
Dibulatkan 149,060.00
48
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m2 Stepnosing kermik 10x60


Stepnosing Keramik Tangga 10 cm x 60 1.6670 bh 20,000.00 33,340.00
Semen Portland 1.6500 kg 1,222.50 2,017.13
Semen warna 0.0040 kg 20,000.00 80.00
Pasir Pasang 0.0130 m3 250,000.00 3,250.00
Pekerja 0.0900 OH 100,000.00 9,000.00
Tukang batu 0.0900 OH 120,000.00 10,800.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 63,612.13
Overhead + Profit 10% 6,361.21
Jumlah 69,973.34
Dibulatkan 69,970.00
Pekerjaan 1 m2 Paving Block (Block Beton) Natural Tebal 6 cm
Paving Block 6 cm 1.0100 m2 192,500.00 194,425.00
Pasir Beton 0.0500 m3 250,000.00 12,500.00
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang batu 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0013 OH 150,000.00 195.00
Jumlah 298,370.00
Overhead + Profit 10% 29,837.00
Jumlah 328,207.00
Dibulatkan 328,200.00
Pekerjaan 1 m2 Rangka Langit-langit Besi Hollow 40.40 Untuk Plafond
Rangka Metal Hollow 40.40 4.0000 m' 4,600.00 18,400.00
Assesories 0.4000 Ls 460.00 460.00
Pekerja 0.3500 OH 100,000.00 35,000.00
Tukang Besi 0.3500 OH 120,000.00 42,000.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0180 OH 150,000.00 2,700.00
Jumlah 102,935.00
Overhead + Profit 10% 10,293.50
Jumlah 113,228.50
Dibulatkan 113,220.00
Pekerjaan 1 m2 Rangka Langit-langit Besi Hollow 20.40 Untuk Plafond
Rangka Metal Hollow 20.40 4.0000 m' 3,145.00 12,580.00
Assesories 0.4000 Ls 314.50 314.50
Pekerja 0.3500 OH 100,000.00 35,000.00
Tukang Besi 0.3500 OH 120,000.00 42,000.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0180 OH 150,000.00 2,700.00
Jumlah 96,969.50
Overhead + Profit 10% 9,696.95
Jumlah 106,666.45
Dibulatkan 106,660.00
Pekerjaan 1 m2 Rangka Besi Hollow 40.40 Untuk Partisi
Rangka Metal Hollow 40.40 3.5000 m' 4,600.00 16,100.00
Assesories 0.3500 Ls 460.00 460.00
Pekerja 0.2500 OH 100,000.00 25,000.00
Tukang Besi 0.2500 OH 120,000.00 30,000.00
Kepala tukang 0.0250 OH 125,000.00 3,125.00
Mandor 0.0130 OH 150,000.00 1,950.00
Jumlah 76,635.00
49
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Overhead + Profit 10% 7,663.50


Jumlah 84,298.50
Dibulatkan 84,290.00
Pekerjaan 1 m2 Langit-langit Papan Gypsum T=9 mm
Papan Gypsum 120x240 cm 0.3640 Lbr 60,000.00 21,840.00
Paku Sekrup 0.1100 Kg 20,833.33 2,291.67
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.0500 OH 120,000.00 6,000.00
Kepala tukang 0.0050 OH 125,000.00 625.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 41,506.67
Overhead + Profit 10% 4,150.67
Jumlah 45,657.33
Dibulatkan 45,650.00
Pekerjaan 1 m2 Cat Emulsion
Cat Dasar 0.1000 kg 26,400.00 2,640.00
Cat Penutup 0.1000 Kg 26,400.00 2,640.00
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Cat 0.0630 OH 120,000.00 7,560.00
Kepala tukang 0.0063 OH 125,000.00 787.50
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 16,077.50
Overhead + Profit 10% 1,607.75
Jumlah 17,685.25
Dibulatkan 17,680.00
50
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m Kusen Alumunium


Profil Alumunium 4 inch 1.1000 m 170,000.00 187,000.00
Skrup Fixer 2.0000 bh 416.67 833.33
Sealant 0.0600 tube 60,000.00 3,600.00
Pekerja 0.0430 OH 100,000.00 4,300.00
Tukang Alumunium 0.0430 OH 120,000.00 5,160.00
Kepala tukang 0.0043 OH 125,000.00 537.50
Mandor 0.0021 OH 150,000.00 315.00
Jumlah 201,745.83
Overhead + Profit 10% 20,174.58
Jumlah 221,920.42
Dibulatkan 221,920.00
Pekerjaan 1 bh Daun Pintu Aluminium
Daun Pintu alumunium type 210 x 80 cm 1.0000 bh 2,850,000.00 2,850,000.00
Lem Kayu 0.5000 kg 42,857.14 21,428.57
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 3.0000 OH 120,000.00 360,000.00
Kepala tukang 0.3000 OH 125,000.00 37,500.00
Mandor 0.0500 OH 150,000.00 7,500.00
Jumlah 3,376,428.57
Overhead + Profit 10% 337,642.86
Jumlah 3,714,071.43
Dibulatkan 3,714,070.00
Pekerjaan 1 m2 Kaca Polos Tebal 6 cm
Kaca Tebal 6 cm 1.1000 m2 183,700.00 202,070.00
Silicone sealant 300 ml 0.0500 ml 103.33 5.17
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kaca 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 223,570.17
Overhead + Profit 10% 22,357.02
Jumlah 245,927.18
Dibulatkan 245,920.00
Pekerjaan 1 m2 Kaca Polos Tebal 8 cm
Kaca Tebal 8 cm 1.1000 m2 295,900.00 325,490.00
Silicone sealant 300 ml 0.0500 ml 103.33 5.17
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang Kaca 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 346,990.17
Overhead + Profit 10% 34,699.02
Jumlah 381,689.18
Dibulatkan 381,680.00
Pekerjaan 1 m2 Kaca tempered 12 mm
Kaca Tempered 12 mm 1.1000 m2 783,200.00 861,520.00
Silicone sealant 300 ml 0.0700 tube 103.33 7.23
Pekerja 0.0250 OH 100,000.00 2,500.00
Tukang Kaca 0.2500 OH 120,000.00 30,000.00
Kepala tukang 0.0250 OH 125,000.00 3,125.00
Mandor 0.0013 OH 150,000.00 195.00
Jumlah 897,347.23
Overhead + Profit 10% 89,734.72
51
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Jumlah 987,081.96
Dibulatkan 987,080.00
Pekerjaan 1 bh Engsel Pintu
Engsel Pintu 1.0000 bh 25,000.00 25,000.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 46,495.00
Overhead + Profit 10% 4,649.50
Jumlah 51,144.50
Dibulatkan 51,140.00
Pekerjaan 1 bh Engsel Jendela
Engsel Jendela 1.0000 bh 18,500.00 18,500.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang 0.0700 OH 120,000.00 8,400.00
Kepala tukang 0.0070 OH 125,000.00 875.00
Mandor 0.0005 OH 150,000.00 75.00
Jumlah 28,850.00
Overhead + Profit 10% 2,885.00
Jumlah 31,735.00
Dibulatkan 31,730.00
Pekerjaan 1 bh Kait Angin 15 cm
Kait angin 15 cm 1.0000 bh 15,000.00 15,000.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 36,495.00
Overhead + Profit 10% 3,649.50
Jumlah 40,144.50
Dibulatkan 40,140.00
Pekerjaan 1 bh Kunci Slot
Kunci Slot 1.0000 bh 24,000.00 24,000.00
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang 0.2000 OH 120,000.00 24,000.00
Kepala tukang 0.0020 OH 125,000.00 250.00
Mandor 0.0001 OH 150,000.00 15.00
Jumlah 50,265.00
Overhead + Profit 10% 5,026.50
Jumlah 55,291.50
Dibulatkan 55,290.00
Pekerjaan 1 bh Kunci + Handle Pintu
Kunci + Handle Pintu Alumunium 1.0000 bh 175,000.00 175,000.00
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang 0.2000 OH 120,000.00 24,000.00
Kepala tukang 0.0020 OH 125,000.00 250.00
Mandor 0.0001 OH 150,000.00 15.00
Jumlah 201,265.00
Overhead + Profit 10% 20,126.50
Jumlah 221,391.50
Dibulatkan 221,390.00
52
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 bh Daun Pintu Double Multiplek Lapis HPL + Kaca Polos 5 cm


Daun Pintu Double Multiplek Lapis HPL + Kaca Polos 5 cm 1.0000 bh 1,250,000.00 1,250,000.00
###
Pekerja 0.0250 OH 100,000.00 2,500.00
Tukang Kayu 0.2500 OH 120,000.00 30,000.00
Kepala tukang 0.0250 OH 125,000.00 3,125.00
Mandor 0.0013 OH 150,000.00 195.00
Jumlah 1,285,820.00
Overhead + Profit 10% 128,582.00
Jumlah 1,414,402.00
Dibulatkan 1,414,400.00
Pekerjaan 1 bh Daun Pintu Double Multiplek Lapis HPL
Daun Pintu Double Multiplek Lapis HPL 1.0000 bh 775,000.00 775,000.00
Pekerja 0.0250 OH 100,000.00 2,500.00
Tukang Kayu 0.2500 OH 120,000.00 30,000.00
Kepala tukang 0.0250 OH 125,000.00 3,125.00
Mandor 0.0013 OH 150,000.00 195.00
Jumlah 810,820.00
Overhead + Profit 10% 81,082.00
Jumlah 891,902.00
Dibulatkan 891,900.00
53
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m2 Genteng Metal Berpasir


Genteng metal berpasir 1.3875 Lbr 42,500.00 58,968.75
Paku Biasa 2"-5" 0.2000 kg 18,000.00 3,600.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang 0.0700 OH 120,000.00 8,400.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 83,718.75
Overhead + Profit 10% 8,371.88
Jumlah 92,090.63
Dibulatkan 92,090.00
Pekerjaan 1 m2 Waterproofing
Waterproofing UV Resistance Polyseal- 100 u/ Roof Deck, Kamar Mandi, 1.0000 m2 268,620.00 268,620.00
Jumlah 268,620.00
Overhead + Profit 10% 26,862.00
Jumlah 295,482.00
Dibulatkan 295,480.00
Pekerjaan 1 m' List Langit-langit Gipsum
List Gypsum 1.0000 m 5,714.29 5,714.29
Paku 5.0000 bh 150.00 750.00
Pekerja 0.0500 OH 100,000.00 5,000.00
Tukang 0.0500 OH 120,000.00 6,000.00
Kepala tukang 0.0050 OH 125,000.00 625.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 18,539.29
Overhead + Profit 10% 1,853.93
Jumlah 20,393.21
Dibulatkan 20,390.00
Pekerjaan 1 m2 Pengecatan Tembok Eksterior
Cat Dasar Tembok Eksterior Dulux Catylac 0.1200 kg 39,750.00 4,770.00
Cat Tembok Eksterior Dulux Catylac 0.1800 kg 26,680.00 4,802.40

Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) 1.0000 ls 7,000.00 7,000.00
###
Pekerja 0.0280 OH 100,000.00 2,800.00
Tukang Cat 0.0420 OH 120,000.00 5,040.00
Kepala tukang 0.0042 OH 125,000.00 525.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 25,387.40
Overhead + Profit 10% 2,538.74
Jumlah 27,926.14
Dibulatkan 27,920.00
Pekerjaan 1 m2 Pengecatan TembokInterior
Cat Dasar Tembok Interior Dulux Catylac 0.1200 kg 47,500.00 5,700.00
Cat Tembok Interior Dulux Catylac 0.1800 kg 28,200.00 5,076.00
Pekerja 0.0280 OH 100,000.00 2,800.00
Tukang Cat 0.0420 OH 120,000.00 5,040.00
Kepala tukang 0.0042 OH 125,000.00 525.00
Mandor 0.0030 OH 150,000.00 450.00
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls 4,000.00 4,000.00
Jumlah 23,591.00
Overhead + Profit 10% 2,359.10
Jumlah 25,950.10
Dibulatkan 25,950.00
54
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 m3 Beton K350


Semen Portland 448.0000 kg 1,222.50 547,680.00
Pasir Beton 667.0000 kg 178.57 119,107.14
Kerikil 1,000.0000 kg 193.10 193,103.45
Air 215.0000 Liter 50.00 10,750.00
Pekerja 2.1000 OH 100,000.00 210,000.00
Tukang Batu 0.3500 OH 120,000.00 42,000.00
Kepala Tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.1050 OH 150,000.00 15,750.00
Jumlah 1,142,765.59
Overhead + Profit 10% 114,276.56
Jumlah 1,257,042.15
Dibulatkan 1,257,040.00
HARGA SATUAN PEKERJAAN MEP
Pekerjaan 1 bh titik lampu led 2x14 wat
Lampu LED 14 Watt 1.0000 bh 170,000.00 170,000.00
Pipa Listrik 5/8" 1.0000 btg 17,000.00 17,000.00
Kabel 5.0000 m 12,500.00 62,500.00
Klem 5.0000 bh 800.00 4,000.00
Mangkok 1.0000 bh 5,000.00 5,000.00
Saklar 1.0000 bh 16,500.00 16,500.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 296,495.00
Overhead + Profit 10% 29,649.50
Jumlah 326,144.50
Dibulatkan 326,140.00
Pekerjaan 1 bh titik lampu led 1x14 wat
Down light coumpourt 1.0000 bh 105,000.00 105,000.00
Pipa Listrik 5/8" 1.0000 btg 17,000.00 17,000.00
Kabel 5.0000 m 12,500.00 62,500.00
Klem 5.0000 bh 800.00 4,000.00
Mangkok 1.0000 bh 5,000.00 5,000.00
Saklar 1.0000 bh 16,500.00 16,500.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 231,495.00
Overhead + Profit 10% 23,149.50
Jumlah 254,644.50
Dibulatkan 254,640.00
55
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 bh AC
AC 1.0000 bh 2,388,000.00 2,388,000.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 2,409,495.00
Overhead + Profit 10% 240,949.50
Jumlah 2,650,444.50
Dibulatkan 2,650,440.00
Pekerjaan 1 bh Stop Kontak Double
Stop Kontak double 1.0000 bh 38,000.00 38,000.00
Mangkok Listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 77,500.00
Overhead + Profit 10% 7,750.00
Jumlah 85,250.00
Dibulatkan 85,250.00
Pekerjaan 1 bh Saklar Tunggal
Saklar Single 1.0000 bh 16,500.00 16,500.00
Mangkok Listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 56,000.00
Overhead + Profit 10% 5,600.00
Jumlah 61,600.00
Dibulatkan 61,600.00
Pekerjaan 1 bh Saklar Double
Saklar Single 1.0000 bh 22,000.00 22,000.00
Mangkok Listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 61,500.00
Overhead + Profit 10% 6,150.00
Jumlah 67,650.00
Dibulatkan 67,650.00
56
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1 bh MCCB
Pipa Listrik 5/8" 10.6667 btg 17,000.00 181,333.33
Kabel 64.0000 m 12,500.00 800,000.00
Klem 64.0000 bh 800.00 51,200.00
MCB 2.0000 bh 150,000.00 300,000.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 1,354,028.33
Overhead + Profit 10% 135,402.83
Jumlah 1,489,431.17
Dibulatkan 1,489,430.00
Pekerjaan 1 m' pipa AW Diameter 3/4"
Pipa PVC 3/4 " 1.0000 m 10,575.00 10,575.00
Perlengkapan 35.0000 % 3,701.25 3,701.25
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 40,863.75
Overhead + Profit 10% 4,086.38
Jumlah 44,950.13
Dibulatkan 44,950.00
Pekerjaan 1 m' pipa D Diameter 2"
Pipa D 2" 1.0000 m 19,650.00 19,650.00
Perlengkapan 35.0000 % 6,877.50 6,877.50
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 53,115.00
Overhead + Profit 10% 5,311.50
Jumlah 58,426.50
Dibulatkan 58,420.00
Pekerjaan 1 m' pipa D Diameter 3"
Pipa D 3" 1.0000 m 35,250.00 35,250.00
Perlengkapan 35.0000 % 12,337.50 12,337.50
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 74,175.00
Overhead + Profit 10% 7,417.50
Jumlah 81,592.50
Dibulatkan 81,590.00
Pekerjaan 1 m' pipa D Diameter 4"
Pipa D 4" 1.0000 m 52,800.00 52,800.00
Perlengkapan 35.0000 % 18,480.00 18,480.00
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 97,867.50
Overhead + Profit 10% 9,786.75
Jumlah 107,654.25
Dibulatkan 107,650.00
57
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Pekerjaan 1bh Floordrain


Floordrain 1.0000 unit 280,000.00 280,000.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 295,000.00
Overhead + Profit 10% 29,500.00
Jumlah 324,500.00
Dibulatkan 324,500.00
Pekerjaan 1bh Roofdrain
Roofdrain 1.0000 unit 37,500.00 37,500.00
Pekerja 0.0100 OH 6,877.50 68.78
Tukang 0.1000 OH 100,000.00 10,000.00
Kepala tukang 0.0100 OH 120,000.00 1,200.00
Mandor 0.0050 OH 125,000.00 625.00
Jumlah 49,393.78
Overhead + Profit 10% 4,939.38
Jumlah 54,333.15
Dibulatkan 54,330.00
Pekerjaan 1bh Kran
Kran Air 1.0000 bh 210,000.00 210,000.00
Sealtape 0.0250 bh 5,000.00 125.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang 0.4000 OH 120,000.00 48,000.00
Kepala tukang 0.0400 OH 125,000.00 5,000.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 264,875.00
Overhead + Profit 10% 26,487.50
Jumlah 291,362.50
Dibulatkan 291,360.00
Pekerjaan 1bh Shower
Shower Lengkap 1.0000 bh 485,750.00 485,750.00
Sealtape 0.0250 bh 5,000.00 125.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang 0.4000 OH 120,000.00 48,000.00
Kepala tukang 0.0400 OH 125,000.00 5,000.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 540,625.00
Overhead + Profit 10% 54,062.50
Jumlah 594,687.50
Dibulatkan 594,680.00
Pekerjaan 1bh Kloset Duduk
Kloset Duduk 1.0000 bh 1,000,000.00 1,000,000.00
Perlengkapan 6.0000 % 60,000.00 60,000.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang 1.1000 OH 120,000.00 132,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.1600 OH 150,000.00 24,000.00
Jumlah 1,267,250.00
Overhead + Profit 10% 126,725.00
Jumlah 1,393,975.00
Dibulatkan 1,393,970.00
Pekerjaan 1bh Wastafel
Wastafel 1.2000 unit 135,000.00 162,000.00
Semen Portland 6.0000 kg 1,222.50 7,335.00
Pasir Pasang 0.0100 m3 250,000.00 2,500.00
Pekerja 1.2000 OH 100,000.00 120,000.00
58
HARGA SAT.
URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
2 3 4 5 6

Tukang 1.4500 OH 120,000.00 174,000.00


Kepala tukang 0.1500 OH 125,000.00 18,750.00
Mandor 0.0600 OH 150,000.00 9,000.00
Jumlah 493,585.00
Overhead + Profit 10% 49,358.50
Jumlah 542,943.50
Dibulatkan 542,940.00
Pekerjaan 1 m2 Pengecatan Tembok Baru
Plamuur 0.1000 kg 22,500.00 2,250.00
Cat Dasar 0.1000 kg
Cat Penutup 0.2600 kg
Pekerja 0.0200 OH -
Tukang 0.0630 OH -
Kepala tukang 0.0063 OH -
Mandor 0.0030 OH -
Jumlah 2,250.00
Overhead + Profit 10% 225.00
Jumlah 2,475.00
Dibulatkan 2,470.00
KODE URAIAN KOEFI SAT.
SIEN
1 2 3 4
1 m2 bekisting lantai beton biasa menggunakan papan kayu
B.21.c
3/20 cm (TP)
Papan Kayu Kelas III 0.014 m3
Kaso 5/7 cm 0.003 m3
Paku 5-12 cm 0.200 Kg
Minyak Bekisting 0.200 Liter
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
B.21.e 1 m2 perancah bekisting lantai menggunakan dolken ø 8-10 cm
Dolken kayu klas III ø 8–10 cm, panjang 4m 1.463 Btg
Paku 5-12 cm 0.200 Kg
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
1 m2 bekisting balok beton biasa menggunakan papan kayu
B.23.c
3/20 cm (TP)
Papan Kayu Kelas III 0.014 m3
Kaso 5/7 cm 0.008 m3
Paku 5-12 cm 0.200 Kg
Minyak Bekisting 0.070 Liter
Pekerja 0.100 OH
Tukang Kayu 0.050 OH
Kepala Tukang Kayu 0.005 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
B.23.e 1 m2 perancah bekisting balok menggunakan dolken ø 8-10 cm
Dolken kayu klas III ø 8–10 cm, panjang 4m 0.813 Btg
Paku 5-12 cm 0.280 Kg
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
1 m2 bekisting kolom beton biasa menggunakan papan kayu
B.24.c
3/20 cm (TP)
Papan Kayu Kelas III 0.014 m3
Kaso 5/7 cm 0.006 m3
Paku 5-12 cm 0.150 Kg
Minyak Bekisting 0.100 Liter
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.034 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
B.24.e 1 m2 perancah bekisting kolom menggunakan dolken ø 8-10 cm
Dolken kayu klas III ø 8–10 cm, panjang 4m 0.700 Btg
Paku 5-12 cm 0.200 Kg
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
Dibulatkan
B.26.b 1 m2 Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm
Papan Kayu Kelas III 0.014 m3
Kaso 5/7 cm 0.009 m3
Paku 5-12 cm 0.200 Kg
Minyak Bekisting 0.100 Liter
Pekerja 0.070 OH
Tukang Kayu 0.035 OH
Kepala Tukang Kayu 0.004 OH
Mandor 0.030 OH
Jumlah
Overhead + Profit 10%
Jumlah
Dibulatkan
HARGA SAT. KOEFISIE
JUMLAH (Rp.)
(Rp.) N
5 6 3

1,500,000.00 21,000.00 0.014


1,250,000.00 3,750.00 0.003
20,000.00 4,000.00 0.300
50,000.00 10,000.00 0.300
100,000.00 7,000.00 0.300
120,000.00 4,200.00 0.150
125,000.00 437.50 0.015
150,000.00 4,500.00 0.030
54,887.50
5,488.75
60,376.25
60,370.00

65,000.00 95,095.00 1.463


20,000.00 4,000.00 0.300
100,000.00 7,000.00 0.340
120,000.00 4,200.00 0.170
125,000.00 437.50 0.017
150,000.00 4,500.00 0.034
115,232.50
11,523.25
126,755.75
126,750.00

1,500,000.00 21,000.00 0.014


140,000.00 1,120.00 0.008
20,000.00 4,000.00 0.300
50,000.00 3,500.00 0.200
100,000.00 10,000.00 0.360
120,000.00 6,000.00 0.180
125,000.00 625.00 0.018
150,000.00 4,500.00 0.036
50,745.00
5,074.50
55,819.50
55,810.00

65,000.00 52,845.00 0.813


20,000.00 5,600.00 0.280
100,000.00 7,000.00 0.400
120,000.00 4,200.00 0.200
125,000.00 437.50 0.020
150,000.00 4,500.00 0.040
74,582.50
7,458.25
82,040.75
82,040.00

1,500,000.00 21,000.00 0.014


160,000.00 960.00 0.006
20,000.00 3,000.00 0.300
50,000.00 5,000.00 0.200
100,000.00 7,000.00 0.340
120,000.00 4,200.00 0.170
125,000.00 437.50 0.017
150,000.00 5,100.00 0.034
46,697.50
4,669.75
51,367.25
51,360.00

65,000.00 45,500.00 0.748


20,000.00 4,000.00 0.240
100,000.00 7,000.00 0.380
120,000.00 4,200.00 0.190
125,000.00 437.50 0.019
150,000.00 4,500.00 0.038
65,637.50
6,563.75
72,201.25
72,200.00
72,200.00
papan 3/20 cm
1,500,000.00 21,000.00 0.014
195,000.00 1,755.00 0.009
20,000.00 4,000.00 0.300
50,000.00 5,000.00 0.200
100,000.00 7,000.00 0.300
120,000.00 4,200.00 0.150
125,000.00 437.50 0.015
150,000.00 4,500.00 0.030
47,892.50
4,789.25
52,681.75
52,680.00
63

ANALISA HARGA SATUAN PEKERJAAN


PEMELIHARAAN GEDUNG KANTOR PEMKOT CIMAHI (GEDUNG A, B, C)
TAHUN ANGGARAN 2022

Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016
Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

A. HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN

A.001 Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12

Multiplek t = 18 mm 0.3500 lbr


Kayu Balok Kelas III (4m) 0.0770 m3
Besi Siku uk. 30 x 30 x 3,0 mm (6m) 5.8000 kg
Paku Campuran 5 cm + 7 cm 1.2500 kg
Cat Kayu dan besi avian 2.5000 kg
Pekerja 1.0000 OH
Tukang Kayu 1.0000 OH
Kepala Tukang 0.1000 OH
Tukang Cat 1.5000 OH
Mandor 0.1000 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
A.002 Pembuatan 1 m2 Bedeng Pekerja
Kaso 5/7 0.3500 m3
Dinding triplek 4 mm 1.0000 lbr
Fondasi Pasangan Batu 0.1700 m3
GRC pelat, t = 4mm, 120x240cm 1.2400 lbr
Paku 0.7500 kg
Asbes Gelombang 0.3000 lbr
Paku Asbes 0.1000 kg
Floor lantai (Beton Lantai Kerja) 0.1500 m3
Pintu double teakwood rangka kayu 0.1000 m2
Frame besi kaca nako 1.0000 daun
Cat dinding / plafon 16.5000 m2
Pekerja 1.2000 OH
Tukang Tembok/batu 0.4000 OH
Kepala tukang 0.0400 OH
Mandor 0.1200 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
64
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

B. HARGA SATUAN PEKERJAAN BONGKARAN


B.001 Pembongkaran 1m2 Keramik
Alat Bantu ( jack hammer, Palu, linggis dodos, Sekop ) 1.00 ls
Pekerja 0.0500 OH
Mandor 0.0100 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.002 Pembongkaran 1 m2 Dinding Partisi
Pekerja 0.0600 oh
Mandor 0.0400 oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.003 Pembongkaran 1 unit Kusen + Daun Pintu
Pekerja 1.0000 oh
Mandor 0.0050 oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.004 Pembongkaran 1m2 Plafond
Alat Bantu ( Tang potong, Obeng, Palu ) 1.00 ls
Pekerja 0.1250 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.005 Pembongkaran 1m3 Dinding Bata
Pekerja 0.6670 OH
Mandor 0.0330 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.006 Pembongkaran 1m2 Dinding Plesteran (Pengrokan)
Pekerja 0.0600 OH
Mandor 0.0400 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.007 Pembongkaran 1m2 Kanopi
Alat Bantu ( Tang potong, Obeng, Palu ) 1.00 ls
Pekerja 0.1250 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
PEKERJAAN ARSITEKTUR

C HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


C.001 Perbaikan 1 m' Kusen Pintu Allumunium
Sekrup Fisher 2.0000 bh
65
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

Sealant Silicone Dow Corning / tube 0.0600 tube


Pekerja 0.0430 OH
Tukang Allumunium 0.0430 OH
Kepala tukang 0.0043 OH
Mandor 0.0021 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.002 Pemasangan 1 m' Rangka Jendela Alumunium
Rangka jendela almunium 1.1000 m
Sekrup Fisher 2.0000 bh
Sealant Silicone Dow Corning / tube 0.0600 tube
Pekerja 0.0430 OH
Tukang Allumunium 0.0430 OH
Kepala tukang 0.0043 OH
Mandor 0.0021 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
66
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

C.003 Pemasangan 1 bh Kunci dan Handle Pintu Almunium


Kunci + Handle Pintu aluminium 1.0000 bh
Tukang Allumunium 0.5000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.004 Membuat tangga putar 1 m
Anak Tangga Plat Bordes 120 x 240 x 4,0 mm 1.0000 m2
Railing Tegak Pipa Galvanis Medium Ø2" x 3,40 mm (6m) 2.0000 m1
Besi Siku Galvanis 40 x 40 x 4,0 mm 1.0000 m1
Tiang Utama Pipa Galvanis Medium Ø4" x 4,20 mm (6m) 1.0000 m
RING Plat Strip Besi 4 x 50 mm (6m) 1.0000 m1
Pekerja 0.1800 OH
Tukang batu 0.0200 OH
Tukang Besi 0.0200 OH
Kepala tukang 0.0060 OH
Mandor 0.0090 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.005 Pemasangan 1 unit Pintu Besi tebal 2mm ukuran 90 x 210 cm + Pengunci dan handle dengan engsel Dekson
Besi Siku 30 x 30 x 3,0 mm (6m) / kg 15.0000 kg
Besi Plat baja 32.8000 kg
Besi Baja CNP 150 x 50 x 20 x 3,2 mm 5.1000 m'
Kawat las 0.0500 kg
Pekerja 1.0500 Oh
Tukang Las 1.0500 Oh
Kepala Tukang 0.1050 Oh
Mandor 0.0520 Oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.006 Pemasangan 1 bh Casemant Jendela Baru
Casement Jendela 1.0000 bh
Sekrup Fisher 2.0000 bh
Sealant Silicone Dow Corning / tube 0.0600 tube
Pekerja 0.0430 OH
Tukang Allumunium 0.0430 OH
Kepala tukang 0.0043 OH
Mandor 0.0021 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.007 Pembuatan 1 m2 Daun Pintu Panel, Kayu Kelas I atau II
Kayu Papan 4 x 25 cm (4m) Meranti 1.8900 m2
Lem Kayu 0.5000 Kg
Pekerja 1.0000 OH
Tukang Kayu 3.0000 OH
Kepala tukang 0.3000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
67
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

C.008 Pembuatan 1 m2 Daun Pintu Shaft Besi


Daun Pintu Shaft Baru 1.0000 bh
Pekerja 1.0000 OH
Tukang Kayu 3.0000 OH
Kepala tukang 0.3000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
D HARGA SATUAN PEKERJAAN PASANGAN DINDING
D.001 Pemasangan 1 m2 Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
Bata Ringan 10 x 20 x 60 cm / bh 8.4000 bh
Mortar Perekat Bata Ringan 0.0630 kg
Peralatan 1.0000 ls
Pekerja 0.6710 OH
Tukang Batu 0.1300 OH
Kepala Tukang 0.0130 OH
Mandor 0.0030 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

E HARGA SATUAN PEKERJAAN PLESTERAN


E.001 Perbaikan Dinding 1 m2 Plesteran 1 SP : 3 PP, tebal 15 mm
Semen PC Tiga Roda 7.7760 kg
Pasir Pasang Cimalaka 0.0230 m3
Pekerja 0.3000 OH
Tukang Batu 0.1500 OH
Kepala tukang 0.0150 OH
Mandor 0.0150 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
68
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

E.002 Perbaikan Dinding 1 m2 Acian


Semen PC Tiga Roda 3.2500 kg
Pekerja 0.2000 OH
Tukang Batu 0.1000 OH
Kepala tukang 0.0100 OH
Mandor 0.0100 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

F HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


F.001 Pemasangan 1 m2 Lantai Keramik ukuran 25 cm x 50 cm Platinum
Keramik 25 x 50 cm Paltinum 8.0000 bh
Semen PC Tiga Roda 10.4000 kg
Semen warna 1.0000 kg
Pasir Pasang Cimalaka 0.0450 m3
Pekerja 0.2700 OH
Tukang batu 0.1350 OH
Kepala tukang 0.0140 OH
Mandor 0.0140 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.002 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Polished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh
Semen PC Tiga Roda 9.6000 kg
Semen warna 1.5000 kg
Pasir Pasang Cimalaka 0.0450 m3
Pekerja 0.2400 OH
Tukang batu 0.1200 OH
Kepala tukang 0.0120 OH
Mandor 0.0120 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.003 Pemasangan 1 m2 Keramik Dinding ukuran 25 cm x 50 cm Mulia
Keramik 25 x 50 cm Mulia 6.0000 bh
Semen PC Tiga Roda 8.1900 kg
Semen warna 1.6200 kg
Pasir Pasang Cimalaka 0.0450 m3
Pekerja 0.7000 OH
Tukang batu 0.3500 OH
Kepala tukang 0.0350 OH
Mandor 0.0350 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.004 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Unpolished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh
Semen PC Tiga Roda 9.6000 kg
Semen warna 1.5000 kg
Pasir Pasang Cimalaka 0.0450 m3
Pekerja 0.2400 OH
Tukang batu 0.1200 OH
69
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

Kepala tukang 0.0120 OH


Mandor 0.0120 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
70
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

F.005 Pemasangan 1 m' Stepnosing Keramik Tangga ukuran 10 cm x 60 cm Unpolished Platinum


Stepnosing Keramik Tangga 10 cm x 60 1.6670 bh
Semen PC Tiga Roda 1.6500 kg
Semen warna 0.0040 kg
Pasir Pasang Cimalaka 0.0130 m3
Pekerja 0.0900 OH
Tukang batu 0.0900 OH
Kepala tukang 0.0350 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.006 Pemasangan 1 m2 floor hardener
Floor Hardener Natural Sika Chapdur / 25 kg 5.0000 kg
Pekerja 0.1200 OH
Tukang batu 0.1200 OH
Kepala tukang 0.0120 OH
Mandor 0.0060 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.007 Pemasangan 1 m2 Lantai Sidewalk
Rubber Tactile 30.30.2 3.3333 Lbr
Double Tape Black VHB 3M Original Super Kuat Super Lengket 24mm 4.0000 m'
Pekerja 0.1500 OH
Mandor 0.0140 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
G HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
G.001 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120x240) cm, tebal 9 mm
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3640 lbr
Paku Sekrup 0.1100 kg
Pekerja 0.1000 OH
Tukang kayu 0.0500 OH
Kepala tukang 0.0050 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
G.002 Pemasangan 1 m2 Langit-langit Gypsum Board + Rangka Plafon Alumunium
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3640 lbr
Profil Alumunium “T” 3.6000 m'
Kawat diameter 4 mm 0.1500 kg
Ramset 1.0500 bh
Pekerja 0.5000 OH
Tukang Besi 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
G.003 Pemasangan 1 m2 Langit-langit GRC + Rangka Plafon Alumunium
71
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

Panel GRC 120 x 240 cm t = 4 mm 0.3640 lbr


Profil Alumunium “T” 3.6000 m'
Kawat diameter 4 mm 0.1500 kg
Ramset 1.0500 bh
Pekerja 0.5000 OH
Tukang Besi 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
72
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

H HARGA SATUAN PEKERJAAN KUNCI DAN KACA


H.001 Pemasangan 1 bh Kunci dan Handle Pintu Kayu
Kunci + Handle Pintu Besar 1.0000 bh
Tukang kayu 0.5000 OH
Kepala tukang 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
H.002 Perbaikan 1 unit Pintu Kayu
Paku Kayu 5 cm s/d 10 cm 0.2500 kg
Alat bantu ( Palu, serut kayu, amplas ) 1.0000 ls
Tukang kayu 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.3500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
H.003 Perbaikan 1 unit Daun Pintu Shaft Baru Kayu
Daun Pintu Shaft 1.0000 bh
Paku Kayu 5 cm s/d 10 cm 0.2500 kg
Alat bantu ( Palu, serut kayu, amplas ) 1.0000 ls
Tukang kayu 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.3500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
I HARGA SATUAN PEKERJAAN PENGECATAN
I.001 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Interior
Cat Dasar Tembok Interior Dulux Catylac 0.1200 kg
Cat Tembok Interior Dulux Catylac 0.1800 kg
Pekerja 0.0280 OH
Tukang Cat 0.0420 OH
Kepala tukang 0.0042 OH
Mandor 0.0030 OH
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
I.002 Pengecatan 1 m2 Langit-langit Lama (2 Lapis Cat Penutup)
Cat Dasar Tembok Interior Dulux Catylac 0.1200 Kg
Cat Tembok Interior Dulux Catylac 0.1800 Kg
Pekerja 0.0280 Oh
Tukang Cat 0.0420 Oh
Kepala Tukang 0.0042 Oh
Mandor 0.0030 Oh
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls
Jumlah -
Keuntungan maksimal 10% -
Jumlah -
Dibulatkan -
73
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

I.003 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Ekterior
Cat Dasar Tembok Eksterior Dulux Catylac 0.1200 kg
Cat Tembok Eksterior Dulux Catylac 0.1800 kg

Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) 1.0000 ls

Pekerja 0.0280 OH
Tukang Cat 0.0420 OH
Kepala tukang 0.0042 OH
Mandor 0.0030 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
I.004 Pengecatan 1 m2 Permukaan Baja Galvanis secara Manual Sistem 1 Lapis Cat Mutakhir
Cat Kayu dan Besi Avian 0.3000 kg
Kuas 2,5" 0.0100 bh
Thinner Impala 0.0100 ltr
Pekerja 0.0600 OH
Tukang Cat 0.0600 OH
Kepala tukang 0.0120 OH
Mandor 0.0030 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

J. HARGA SATUAN PEKERJAAN SANITASI DAN AKSESORIS


J.001 Pemasangan 1 bh Kran Diameter ¾" atau ½"
Kran Bebek Ø1/2" Onda 1.0000 bh
Seal Tape ½" Onda 0.0250 bh
Pekerja 0.0100 OH
Tukang batu 0.4000 OH
Kepala tukang 0.0400 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
J.002 Pemasangan 1 bh Kran Wasser Fleksibel
Kran Wasser Fleksibel 1.0000 bh
Seal Tape ½" Onda 0.0250 bh
Pekerja 0.0100 OH
Tukang batu 0.4000 OH
Kepala tukang 0.0400 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
J.003 Pemasangan 1 bh Bak Cuci Piring Stainles Steel
Kitchen Sink Standar (1 Lobang) Royal 1.0000 unit
Pekerja 0.0300 OH
Tukang batu 0.3000 OH
Kepala tukang 0.0300 OH
Mandor 0.0150 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
74
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

J.004 Pemasangan 1 m' Pipa PVC Tipe AW dia 2"


Pipa PVC dia 2" 1.2000 m
Perlengkapan 0.4200 Ls
Pekerja 0.0540 OH
Tukang batu 0.0900 OH
Kepala Tukang 0.0090 OH
Mandor 0.0030 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
J.005 Pemasangan 1 m' Pipa PVC Tipe AW dia 3"
Pipa PVC dia 3" 1.2000 m
Perlengkapan 0.4200 ls
Pekerja 0.0810 OH
Tukang batu 0.1350 OH
Kepala tukang 0.0135 OH
Mandor 0.0040 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
J.006 Pemasangan 1 bh Floordrain
Floordrain 1.0000 Unit
Pekerja 0.0100 OH
Tukang batu 0.1000 OH
Kepala tukang 0.0100 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
J.007 Pekerjaan Perapihan Pipa
Pekerja 0.0810 OH
Tukang Pipa 0.1350 OH
Kepala tukang 0.0135 OH
Mandor 0.0040 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
75
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

K HARGA SATUAN PEKERJAAN MEKANIKAL


K.001 Bongkar Pasang 1 Unit AC + Freon R 410
Freon R 410 1.0000 ls
Pekerja 0.1000 OH
Tukang AC 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

L HARGA SATUAN PEKERJAAN ELEKTRIKAL


L.001 Pemasangan 1 m' Cover Tray uk. 300 mm x 50 mm
Cover Tray 300 mm x 50 mm 1.0000 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.002 Pemasangan 1 bh Panel Distribusi 3 Phase 30 grup
Panel Distribusi 3Phase 1.0000 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.003 Pemasangan 1 m' Kabel Tray uk. 300 mm x 100 mm
Kabel Tray 300 mm x 100 mm 1.0000 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
76
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.004 Pemasangan 1 bh Lampu Downlight


Lampu Downlight LED 1 X 18 W Philips 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.005 Pemasangan 1 bh Lampu Panel LED RC 40 w
Lampu LED panel 40 watt 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.006 Pemasangan 1 bh Lampu Panel LED RC 29 w
Lampu LED panel 29 watt 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.007 Pemasangan 1 bh Stair Lamp & Battery TL LED 2 X 14
Stair Lamp & Battery TL LED 2 X 14 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.008 Pemasangan 1 bh Lampu Baret Ceiling 22 w
Lampu Baret Ceiling 22 w 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
77
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.009 Pemasangan 1 bh Lampu Baret Ceiling 10 w


Lampu Baret Ceiling 10 w 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.010 Perapihan 1 Titik Instalasi
Alat Bantu ( Tang Amper, tespen, tang kombinasi, tang potong, isolasi,
1.0000 ls
obeng, Multi tester)
Pembantu Instalator 2.0000 Oh
Instalator 3.0000 Oh
Mandor 1.0000 Oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.011 Pemasangan 1 bh Single Two Way Switch
Saklar Single Standar Philips 1.0000 bh
Mangkok listrik 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.012 Pemasangan 1 bh Double Two Way Switch
Saklar Double Standar Philips 1.0000 bh
Mangkok listrik 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.013 Pemasangan 1 bh Sensor Lampu
Sensor gerak 1.0000 bh
Mangkok listrik 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
78
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.014 Pemasangan 1 bh Stop Kontak


Stop Kontak Single (1 Lubang) 1.0000 bh
Mangkok listrik 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.015 Pemasangan 1 Unit Exhaust Fan
Exhaust Fan 1.0000 bh
Mangkok listrik 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
M HARGA SATUAN PEKERJAAN BETON
M.001 Membuat 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm
Kayu Kaso 5/5 Albasia (3m) 0.0020 m3
Paku Kayu 5 cm s/d 10 cm 0.0100 kg
Besi Beton Polos KSTY 3.0000 kg
Kawat Beton 0.4500 kg
Semen PC Tiga Roda 4.0000 kg
Pasir Beton 0.0060 m3
Kerikil 0.0090 m3
Pekerja 0.1800 OH
Tukang batu 0.0200 OH
Tukang kayu 0.0200 OH
Tukang Besi Beton 0.0200 OH
Kepala tukang 0.0060 OH
Mandor 0.0090 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
N HARGA SATUAN PEKERJAAN WATERPROOFING
N.001 Pemasangan WaterProofing
Reinshield Selfcross Membrane Waterproofing u/ Roof Deck, Kamar
1.0000 m2
Mandi, Toilet tebal = 1000 µ
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls
Pekerja 0.1800 OH
Tukang cat 0.0200 OH
Kepala tukang 0.0060 OH
Mandor 0.0090 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
79
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

O HARGA SATUAN PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin)
O.001
profil C75
Baja Ringan Canai dingin C.75 0.8730 btg
Aksesories 0.0873 %
Pekerja 0.7340 OH
Tukang Besi 0.7340 OH
Kepala tukang 0.0730 OH
Mandor 0.0370 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
O.002 Pemasangan 1 m' Rangka Baja Ringan 0.45 tct
Baja Ringan 0.45 tct 1.0000 m'
Aksesories 0.1000 %
Pekerja 0.7340 OH
Tukang Besi 0.7340 OH
Kepala tukang 0.0730 OH
Mandor 0.0370 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
O.003 Pemasangan 1 m2 Penutup Atap Polycarbonate 11,8 x 2,1m t = 4mm
Policarbonat 1.0000 m2
Pekerja 0.7340 OH
Tukang Besi 0.7340 OH
Kepala tukang 0.0730 OH
Mandor 0.0370 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

Dinas Pekerjaan Umum & Penataan Ruang PT. ALOCITA MANDIRI


Kota Cimahi
Pejabat Pembuat Komitmen

DENI HERDIANI, S.T ISKANDAR ZULKARNAEN, S.E.


NIP. 19761028 200604 1 005 Direktur
80

ANALISA HARGA SATUAN PEKERJAAN


REVIU PERENCANAAN PEMELIHARAAN GEDUNG A DAN B PEMKOT CIMAHI
TAHUN ANGGARAN 2022
Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016
Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

A. HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN

A.001 Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12

Multiplek t = 18 mm 0.3500 lbr


Kayu Balok Kelas III (4m) 0.0770 m3
Besi Siku uk. 30 x 30 x 3,0 mm (6m) 5.8000 kg
Paku Campuran 5 cm + 7 cm 1.2500 kg
Cat Kayu dan besi avian 2.5000 kg
Pekerja 1.0000 OH
Tukang Kayu 1.0000 OH
Kepala Tukang 0.1000 OH
Tukang Cat 1.5000 OH
Mandor 0.1000 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B. HARGA SATUAN PEKERJAAN BONGKARAN
B.001 Pembongkaran 1m2 Keramik
Alat Bantu ( jack hammer, Palu, linggis dodos, Sekop ) 1.00 ls
Pekerja 0.0500 OH
Mandor 0.0100 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.002 Pembongkaran 1 unit Kusen + Daun Pintu
Pekerja 1.0000 oh
Mandor 0.0050 oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.003 Pembongkaran 1m2 Plafond
Alat Bantu ( Tang potong, Obeng, Palu ) 1.00 ls
Pekerja 0.1250 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
81
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

B.004 Pembongkaran 1m2 Dinding Plesteran (Pengrokan)


Pekerja 0.0600 OH
Mandor 0.0400 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.005 Pembongkaran 1m2 Kanopi
Alat Bantu ( Tang potong, Obeng, Palu ) 1.00 ls
Pekerja 0.1250 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
B.006 Pembongkaran 1m2 Dinding Cat (Pengrokan)
Pekerja 0.0600 OH
Mandor 0.0400 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
PEKERJAAN ARSITEKTUR

C HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


C.001 Perbaikan 1 m' Kusen Pintu Allumunium
Sekrup Fisher 2.0000 bh
Sealant Silicone Dow Corning / tube 0.0600 tube
Pekerja 0.0430 OH
Tukang Allumunium 0.0430 OH
Kepala tukang 0.0043 OH
Mandor 0.0021 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.002 Pemasangan 1 bh Kunci dan Handle Pintu Almunium
Kunci + Handle Pintu aluminium 1.0000 bh
Tukang Allumunium 0.5000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.003 Pemasangan 1 unit Pintu Besi tebal 2mm ukuran 90 x 210 cm + Pengunci dan handle dengan engsel Dekson
Besi Siku 30 x 30 x 3,0 mm (6m) / kg 15.0000 kg
Besi Plat baja 32.8000 kg
Besi Baja CNP 150 x 50 x 20 x 3,2 mm 5.1000 m'
Kawat las 0.0500 kg
Pekerja 1.0500 Oh
Tukang Las 1.0500 Oh
Kepala Tukang 0.1050 Oh
Mandor 0.0520 Oh
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
82
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

C.004 Pembuatan 1 bh Daun Pintu Shaft Besi 900 x 1250 mm


Daun Pintu Shaft + Frame + hendel dan engsel 1.0000 bh
Pekerja 0.5000 OH
Tukang Besi 2.0000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
C.005 Pembuatan 1 bh Kusen + Daun Pintu Alumunium 210 x 80 cm + Kaca Bouven
Kusen + Daun Pintu alumunium type 210 x 80 cm 1.0000 bh
Kaca Bouven 0.4600 m2
Pekerja 0.5000 OH
Tukang Besi 2.0000 OH
Mandor 0.0500 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
D HARGA SATUAN PEKERJAAN PLESTERAN
D.001 Perbaikan Dinding 1 m2 Plesteran 1 SP : 3 PP, tebal 15 mm
Semen PC Tiga Roda 7.7760 kg
Pasir Pasang Cimalaka 0.0230 m3
Pekerja 0.3000 OH
Tukang Batu 0.1500 OH
Kepala tukang 0.0150 OH
Mandor 0.0150 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
D.002 Perbaikan Dinding 1 m2 Acian
Semen PC Tiga Roda 3.2500 kg
Pekerja 0.2000 OH
Tukang Batu 0.1000 OH
Kepala tukang 0.0100 OH
Mandor 0.0100 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

E HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


83
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

E.001 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Unpolished Platinum


Keramik 50 x 50 cm Platinum 4.0000 bh
Semen PC Tiga Roda 9.6000 kg
Semen warna 1.5000 kg
Pasir Pasang Cimalaka 0.0450 m3
Pekerja 0.2400 OH
Tukang batu 0.1200 OH
Kepala tukang 0.0120 OH
Mandor 0.0120 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
E.002 Pemasangan 1 bh floor drain
Floordrain 1.0000 unit
Pekerja 0.0100 OH
Tukang batu 0.1000 OH
Kepala tukang 0.0100 OH
Mandor 0.0050 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
F.001 Pemasangan 1 m2 Langit-langit GRC + Rangka Plafon Alumunium Interior
Panel GRC 120 x 240 cm t = 4 mm 1.0000 m2
Profil Alumunium “T” 5.0000 m'
Kawat diameter 4 mm 0.1500 kg
Ramset 1.0500 bh
Pekerja 0.5000 OH
Tukang Besi 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.002 Pemasangan 1 m2 Langit-langit GRC Eksterior
Panel GRC 120 x 240 cm t = 4 mm 0.3640 lbr
Pekerja 0.5000 OH
Tukang Besi 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
F.003 Pemasangan 1 m2 Langit-langit Akustik + Frame Crosstee
Panel Akustik 60 cm x 60 cm t = 4 mm 1.0000 m2
Profil Alumunium “T” 5.0000 m'
Kawat diameter 4 mm 0.1500 kg
Ramset 1.0500 bh
Pekerja 0.5000 OH
Tukang Besi 0.5000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
84
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
G HARGA SATUAN PEKERJAAN PENGECATAN
G.001 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Ekterior
Cat Dasar Tembok Eksterior Dulux Catylac 0.1200 kg
Cat Tembok Eksterior Dulux Catylac 0.1800 kg

Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) 1.0000 ls

Pekerja 0.0280 OH
Tukang Cat 0.0420 OH
Kepala tukang 0.0042 OH
Mandor 0.0030 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

H HARGA SATUAN PEKERJAAN ELEKTRIKAL


85
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

H.001 Pemasangan 1bh Lampu LED Downlight Meson Outbow 24W


Lampu LED Downlight Meson Outbow 24W 1.0000 bh
Pipa Listrik 5/8" 3.0000 btg
Kabel nyy 2 x 1,5 supreme 24.0000 m
Elbow 4.0000 bh
Klem 24.0000 bh
Mangkok Listrik 1.0000 bh
Saklar 1.0000 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
H.002 Pemasangan 1bh Lampu LED Baret 40w (bulat)
Lampu LED Baret 40w 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
H.003 Pemasangan 1bh Lampu LED Baret 40w (Kotak)
Lampu LED Baret 40w 1.0000 bh
Isolasi 0.2500 bh
Pekerja 0.1000 OH
Tukang Listrik 0.1000 OH
Kepala tukang 0.0500 OH
Mandor 0.0250 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
I HARGA SATUAN PEKERJAAN WATERPROOFING
86
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

I.001 Pemasangan WaterProofing


Reinshield Selfcross Membrane Waterproofing u/ Roof Deck, Kamar
1.0000 m2
Mandi, Toilet tebal = 1000 µ
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls
Pekerja 0.1800 OH
Tukang cat 0.0200 OH
Kepala tukang 0.0060 OH
Mandor 0.0090 OH
Jumlah -
Overhead + Profit 10%
Jumlah -
Dibulatkan -
J HARGA SATUAN PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
J.001 Pemasangan 1 m2 Penutup Atap Polycarbonate 11,8 x 2,1m t = 4mm
Policarbonat 1.0000 m2
Pekerja 0.7340 OH
Tukang Besi 0.7340 OH
Kepala tukang 0.0730 OH
Mandor 0.0370 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
K HARGA SATUAN PEKERJAAN PENGECORAN DAN PEMBESIAN
K.001 Pemasangan 1 m2 Bekisting untuk tangga beton bangunan gedung
Kayu Kelas III 0.0300 m3
Paku 5cm - 12cm 0.4000 kg
Minyak Bekisting 0.1500 liter
Balok kayu kelas II 0.0150 m3
Multiplek tebal 9 mm 0.3500 lbr
Dolken Kayu, dia 8-10 cm, Panjang 4m 2.0000 batang
Pekerja 0.6600 OH
Tukang Kayu 0.3300 OH
Kepala tukang 0.0330 OH
Mandor 0.0330 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
K.002 Pembesian dengan Besi Polos
Besi Polos 1.0000 Kg
Kawat Benrad 0.1500 kg
Pekerja 0.0700 OH
Tukang Besi 0.0700 OH
Kepala tukang 0.0070 OH
Mandor 0.0040 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
87
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

K.003 Pembuatan 1 m3 Beton Mutu f'c = 21,7 Mpa (K250)


Semen Portland 384.0000 Kg
Pasir Beton 692.0000 kg
Kerikil 1,039.0000 kg
Air 215.0000 Liter
Pekerja 1.6500 OH
Tukang batu 0.2750 OH
Kepala tukang 0.0280 OH
Mandor 0.0830 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
88
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

L HARGA SATUAN PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


L.001 Pemasangan 1 m' Talang air galvanis
Talang air galvanis lebar 15 cm tinggi 10 cm 1.0000 m'
paku 2- 4 cm 0.0100 kg
Plat Strip Besi 3,0 x 30 mm 0.5000 kg
Pekerja 0.1500 OH
Tukang 0.3000 OH
Kepala tukang 0.0300 OH
Mandor 0.0080 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -
L.002 Pemasangan 1 m' Pipa Galvanis Diameter 3"
Pipa Galvanis 3" 1.2000 m
Perlengkapan 0.4200 Ls
Pekerja 0.1350 OH
Tukang Pipa 0.2250 OH
Kepala tukang 0.0230 OH
Mandor 0.0070 OH
Jumlah -
Overhead + Profit 10% -
Jumlah -
Dibulatkan -

Dinas Pekerjaan Umum & Penataan Ruang PT. ALOCITA MANDIRI


Kota Cimahi
Pejabat Pembuat Komitmen

DENI HERDIANI, S.T ISKANDAR ZULKARNAEN, S.E.


NIP. 19761028 200604 1 005 Direktur
HARGA SURVEY BAHAN DAN MATERIAL
TAHUN ANGGARAN 2022

HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

A. AGREGAT HALUS, AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


1 Pasir Pasang Cimalaka Cimalaka m3 250,000
2 Pasir Beton m 3
250,000
3 Kerikil m3 280,000
4 Batu Bata Merah (Biasa) bh 750
5 Bata Ringan 10 x 20 x 60 cm / bh bh 8,500
6 Semen PC Tiga Roda / 40 kg Semen Serang 40 kg 48,900
7 Semen Warna kg 20,000
8 Mortar Perekat Bata Ringan (MU-380) / 40 kg Mortar Utama 40 kg 85,000
9 Air Liter 50
B. LOGAM DAN BAHAN JADINYA
1 Besi Beton Polos kg 12,250
2 Besi Beton Ulir kg 12,450
3 Wiremesh kg 12,500
4 Besi Siku uk. 30 x 30 x 3,0 mm (6m) btg 75,000
5 Besi Hollow uk. 40 x 40 mm (6m) 1 : 2 Galvanis btg 27,600
6 Besi Hollow uk. 20 x 40 x 1,2 mm (6m) btg 18,870
7 Baja Ringan C 75 mm tebal = 0,75 mm (6m) btg 120,000
8 Baja Ringan Reng 30 mm tebal = 0,45 mm (6m) btg 50,000
9 Kawat Beton kg 20,000
10 Kusen Alumunium t = 4" Silver, Coklat Alexindo Alexindo m 170,000
C. KAYU DAN BAHAN JADINYA
Bambu Apus Ø60-70mm btg 20,000
1 Kayu Kelas III m³ 1,500,000
2 Kayu Balok Kelas III (4m) m³ 3,750,000
3 Kayu Balok 6/12 Kelas III (4m) m³ 1,500,000
4 Kayu Kaso 5/7 Kelas III (4m) m³ 1,250,000
5 Dolken Gelam 4 s/d 6 cm btg 65,000
6 Multiplek t = 9 mm lbr 134,000
7 Multiplek t = 18 mm lbr 250,000
8 Daun Pintu alumunium type 210 x 80 cm unit 2,850,000
9 Tali Ijuk m 1,500
10 Lapisan ijuk Kg 23,000
D. KACA DAN BAHAN JADINYA
1 Kaca Polos/Clear t = 6 mm m2 183,700
2 Kaca Polos/Clear t = 8 mm m2 295,900
3 Kaca Es t = 5 mm m 2
188,100
4 Kaca Tempered Float Clear t = 12 mm m 2
783,200
E. PENUTUP LANGIT-LANGIT, DINDING DAN LANTAI
1 Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard Jayaboard lbr 60,000
2 Keramik Dinding 30 x 60 cm Roman Roman dus 135,000
3 Keramik Lantai 40 x 40 cm Roman Roman dus 80,000
4 Keramik Lantai 60 x 60 cm Platinum Platinum dus 150,000

89
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

5 Keramik Dinding 20 x 25 cm Mulia Mulia dus 57,000


6 Keramik Lantai 20 x 20 cm Mulia Mulia dus 60,000
7 Stepnosing Keramik Tangga 10 cm x 60 bh 20,000

90
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

F. PAKU DAN MUR BAUT


1 Paku Kayu 5 cm s/d 10 cm kg 20,000
2 Paku Beton 2,5 s/d 5 cm kg 18,000
3 Paku Sekrup / dus dus 25,000
4 Sekrup Fisher lsn 5,000
5 Dynabolt M8 bh 3,000
6 Sekrup Roofing 12 x 70 mm bh 1,000
7 Sekrup Roofing 12 x 40 mm bh 600

G. KUNCI DAN ASESORIS


1 Pintu Kamar Mandi PVC Model Jalosi Standar Warna Biasa Daimaru Daimaru unit 235,000
2 Engsel Pintu 4" psng 25,000
3 Engsel Jendela Unilon Unilon psng 18,500
4 Hak Angin Jendela Kait Biasa p = 15 cm bh 15,000
5 Kunci + Handle Pintu Alumunium bh 175,000
6 Slot Jendela Tanam Allumunium bh 24,000
H. PENUTUP ATAP DAN ASESORIES
1 Genteng Palentong Natural bh 2,250
2 Seng Gelombang 180 x 80 cm t = 0,2 mm lbr 74,250
Atap Metal Spandex 6 x 1 m lbr 42,500
3 Atap Metal Genteng Pasir lbr 42,500

I. PIPA DAN ASESORIES


Tipe AW (Pipa untuk Tekanan Kerja 10 kg/cm 2)
1 Pipa PVC AW Ø3/4" Rucika Rucika btg 42,300
2 Pipa PVC AW Ø2" Rucika Rucika btg 126,900
3 Pipa PVC AW Ø3" Rucika Rucika btg 260,500
4 Pipa PVC AW Ø4" Rucika Rucika btg 431,600
Tipe D (Pipa untuk Aplikasi Air Limbah)
5 Pipa PVC D Ø2" Rucika Rucika btg 78,600
6 Pipa PVC D Ø3" Rucika Rucika btg 141,000
7 Pipa PVC D Ø4" Rucika Rucika btg 211,200
8 Knee PVC AW Ø1/2" Rucika Rucika bh 4,000
9 Knee PVC AW Ø3/4" Rucika Rucika bh 5,000
10 Knee PVC AW Ø1" Rucika Rucika bh 6,000
11 Knee PVC AW Ø2" Rucika Rucika bh 8,000
12 Knee PVC AW Ø3" Rucika Rucika bh 15,000
13 Knee PVC AW Ø4" Rucika Rucika bh 15,000
14 Tee PVC AW Ø2" Rucika Rucika bh 29,000
15 Tee PVC AW Ø3" Rucika Rucika bh 38,900
16 Tee PVC AW Ø4" Rucika Rucika bh 52,900
17 Socket PVC AW Ø2" Rucika Rucika bh 13,200
18 Socket PVC AW Ø3" Rucika Rucika bh 14,000
19 Socket PVC AW Ø4" Rucika Rucika bh 18,200
20 Floordrain Wasser bh 280,000

91
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

21 Roofdrain Mulia Abadi bh 37,500


J. SANITAIR
1 Kran Angsa Ø1/2" V688CA Onda Onda bh 210,000
2 Washtafel Onda Onda unit 135,000
3 Kloset Duduk Sericite Monoblock Sericite unit 1,000,000
4 Shower Tipe TX438SE Toto Toto bh 485,750
5 Saringan Air Lantai Kamar Mandi Ø2" bh 27,500
6 Saringan Air Lantai Kamar Mandi Ø3" bh 50,000
7 Saringan Air Lantai Kamar Mandi Ø4" bh 65,000
8 Injuk kg 12,500
9 Keran Air Fleksibel Wastafel Wasser bh 455,000

K. PENAMPUNG AIR
1 Tangki Air (Toren) tipe AL-300 kap. 250 ltr Excel Excel unit 650,000
2 Tangki Air (Toren) tipe AL-550 kap. 550 ltr Excel Excel unit 900,000
3 Pelampung Air Otomatis Onda Onda bh 137,500

BUIS BETON; tanpa Penulangan


1 Buis Beton dia. 100 cm p = 1 m tanpa penulangan AMHA AMHA bh 239,470
2 Buis Beton dia. 100 cm p = 1 m tanpa penulangan Cisangkan Cisangkan bh 726,000
BUIS BETON; dengan Penulangan
1 Buis Beton dia. 100 cm p = 1 m dengan penulangan AMHA AMHA bh 287,870
Tutup Buis Beton; dengan penulangan
1 Tutup Buis Beton dia. 100 cm t = 8 cm bh 264,000

92
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

MEDIAN CONCRETE BARIER (MCB)


1 MCB Double Face 120 x 65 x 120 N AMHA AMHA bh 150,000
G. BAHAN PELAPIS DAN FINISHING
Sealant Proseal PAS-100 Warna Propan / 300 ml Propan 300 ml 31,000
1 Minyak Bekisting ltr 50,000
2 Lem Kayu 350 gr Rajawali Rajawali 350 gr 15,000
3 Seal Tape ½" Onda Onda gulung 5,000
2 Isolasi bh 10,000
3 Kuas 1,5" Eterna bh 6,000
4 Sealant Silicone Dow Corning / tube Dow Corning tube 60,000
Cat Dasar
1 Cat Dasar Tembok Interior Dulux Catylac / 4 kg Dulux 4 kg 190,000
2 Cat Dasar Tembok Eksterior Dulux Catylac / 4 kg Dulux 4 kg 159,000
3 Cat Dasar Eco Gypsum 4050 Propan / 5 kg Propan 5 kg 132,000
Cat Tembok
1 Cat Tembok Interior Dulux Catylac / 5 kg Dulux 5 kg 141,000
2 Cat Tembok Interior Dulux Catylac / 25 kg Dulux 25 kg 667,000
Cat Kayu dan Besi
1 Cat Kayu dan Besi Avian Avian kg 65,000
Waterproofing UV Resistance Polyseal- 100 u/ Roof Deck, Kamar Mandi, Toilet
1 Flexseal m2 268,620
tebal = 1000 µ (Terpasang)
2 Screed Tebal 2 cm per 1,25 m2 m2 84,000

I. ELEKTRIKAL
1 Kabel NYM 2 x 2,5 mm Prima / m Prima m 12,500
2 Saklar Single Standar Broco Broco bh 13,500
3 Stop Kontak Double (2 Lubang) Broco Broco bh 38,000
4 Lampu Bulb LED 10W Philips Philips bh 56,000
5 Lampu Bulb LED 12W Philips Philips bh 68,000
6 Lampu TL LED 8W Philips Philips bh 50,000
7 Lampu TL LED16W Philips Philips bh 60,000
8 LAMPU Panel Tipe RC091V LED38S/865 PSU W30L120 G3 MR PCV Philips bh 780,552
9 Cover Tray 300 mm x 50 mm bh 202,000
10 Panel Distribusi 3Phase bh 6,500,000
11 Kabel Tray 300 mm x 100 mm bh 244,000
12 Lampu Downlight LED 1 X 18 W Philips bh 306,000
13 Lampu LED panel 40 watt bh 711,000
14 Lampu LED panel 29 watt bh 570,000
15 Stair Lamp & Battery TL LED 2 X 14 bh 485,000
16 Lampu Baret Ceiling 22 w bh 225,000
17 Lampu Baret Ceiling 10 w bh 251,000
18 Saklar Single Standar Philips bh 16,500
19 Saklar Double Standar Philips bh 22,000
20 Mangkok listrik bh 5,000

93
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN MATERIAL/ ALAT
(Rp)

1 2 3 4 5

21 PIPA LISTRIK CLIPSAL 5/8" (1 BATANG = 2,9METER ) / 5/8 INCH 20 MM clipsal btg (3m) 17,000
22 Klem Pipa Clipsal 20 mm clipsaal bh 800

U. SEWA ALAT
1 Sewa Scaffolding t = 170 cm set/bulan 35,000

94
HARGA UPAH PEKERJA
TAHUN ANGGARAN 2022

NO. JENIS PEKERJA HARGA UPAH (Rp) SATUAN WAKTU


1 2 3 4

1 Pekerja 100,000 1 Orang/ Hari/ 8 Jam


2 Tukang Gali 120,000 1 Orang/ Hari/ 8 Jam
3 Tukang Batu 120,000 1 Orang/ Hari/ 8 Jam
4 Tukang Kayu 120,000 1 Orang/ Hari/ 8 Jam
5 Tukang Cat / Pelitur 120,000 1 Orang/ Hari/ 8 Jam
6 Tukang Besi Beton 120,000 1 Orang/ Hari/ 8 Jam
7 Tukang Besi Profil 120,000 1 Orang/ Hari/ 8 Jam
8 Tukang Besi Konstruksi 120,000 1 Orang/ Hari/ 8 Jam
9 Tukang Allumunium 120,000 1 Orang/ Hari/ 8 Jam
10 Tukang Las 120,000 1 Orang/ Hari/ 8 Jam
11 Tukang Las Konstruksi 120,000 1 Orang/ Hari/ 8 Jam
12 Tukang Pipa 120,000 1 Orang/ Hari/ 8 Jam
13 Tukang Vibrator 120,000 1 Orang/ Hari/ 8 Jam
14 Tukang Erection 120,000 1 Orang/ Hari/ 8 Jam
15 Tukang Listrik 120,000 1 Orang/ Hari/ 8 Jam
16 Operator Alat Berat 150,000 1 Orang/ Hari/ 8 Jam
17 Operator Crane 185,300 1 Orang/ Hari/ 8 Jam
18 Operator 185,300 1 Orang/ Hari/ 8 Jam
19 Pembantu Operator Crane 135,200 1 Orang/ Hari/ 8 Jam
20 Pembantu Tukang 90,000 1 Orang/ Hari/ 8 Jam
21 Kepala Tukang 125,000 1 Orang/ Hari/ 8 Jam
22 Mandor 150,000 1 Orang/ Hari/ 8 Jam
B.1.1 Pekerjaan Arsitektur Selasar
Rp 1.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Bata
Panjang Lebar m2
0.00
0.00
0.00
0.00
- Pekerjaan Pemasangan Dinding Bata
Panjang Lebar m2
0.00
0.00
0.00
0.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
0.00
0.00
0.00
0.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
0.00
0.00
0.00
0.00
- Pekerjaan Pengecatan Dinding
Panjang Lebar m2
0.00
0.00
0.00
0.00
Rp 2.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
9.05 3.70 33.49
4.95 1.05 5.20
2.15 0.85 1.83
40.51
- Pekerjaan Pemasangan Plafond Gypsum + Frame 1,2 x 0,6 m
Panjang Lebar m2
9.05 3.70 33.49
4.95 1.05 5.20
2.15 0.85 1.83
40.51
- Pekerjaan Pengecatan Plafond Gypsum + Frame
Panjang Lebar m2
9.05 3.70 33.49
4.95 1.05 5.20
2.15 0.85 1.83
40.51

B.1.2 Pekerjaan Arsitektur Toilet 1


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Dinding toilet vip 10.75 1.50 16.13
toilet tengah 4.40 1.50 6.60
4.40 1.50 6.60
3.70 1.50 5.55
8.40 1.50 12.60
toilet bawah 4.40 1.50 6.60
4.70 1.50 7.05
4.85 1.50 7.28
68.40
Lantai toilet vip 1.60 1.20 1.92
1.85 1.85 3.42
toilet tengah 0.85 1.70 1.45
0.85 1.70 1.45
1.85 1.85 3.42
2.70 2.00 5.40
toilet bawah 0.85 1.70 1.45
0.85 1.70 1.45
2.00 1.85 3.70
23.65
Total 92.05
- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm
Panjang Lebar m2
Dinding toilet vip 10.75 1.50 16.13
toilet tengah 4.40 1.50 6.60
4.40 1.50 6.60
3.70 1.50 5.55
8.40 1.50 12.60
toilet bawah 4.40 1.50 6.60
4.70 1.50 7.05
4.85 1.50 7.28
68.40

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished


Panjang Lebar m2
Lantai toilet vip 1.60 1.20 1.92
1.85 1.85 3.42
toilet tengah 0.85 1.70 1.45
0.85 1.70 1.45
1.85 1.85 3.42
2.70 2.00 5.40
toilet bawah 0.85 1.70 1.45
0.85 1.70 1.45
2.00 1.85 3.70
23.65
B.1.3 Pekerjaan Arsitektur Ruang Pantry
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Meja atas 1.85 0.30 0.56
samping/bawah 1.85 1.20 2.22
2.78

- Pekerjaan Pemasangan Keramik Meja Dapur Uk. 20 x 20


Panjang Lebar m2
Meja atas 1.85 0.30 0.56
samping/bawah 1.85 1.20 2.22
2.78

B.1.4 Pekerjaan Arsitektur Ruang Gudang


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai atas 4.50 2.15 9.68
9.68

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Lantai atas 4.50 2.15 9.68
9.68
Rp 2.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
4.50 2.15 9.68
2.55 1.85 4.72
14.39
- Pekerjaan Pemasangan Plafond Gypsum + Frame 1,2 x 0,6 m
Panjang Lebar m2
4.50 2.15 9.68
2.55 1.85 4.72
14.39
- Pekerjaan Pengecatan Plafond Gypsum + Frame
Panjang Lebar m2
4.50 2.15 9.68
2.55 1.85 4.72
14.39
B.1.5 Pekerjaan Arsitektur Ruang DISDUKCAPIL
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
dukcapil 1.00 19.90 4.50 89.55
2.00 17.65 4.65 82.07
3.00 9.70 3.00 29.10
4.00 8.50 1.95 16.58
5.00 10.70 4.95 52.97
6.00 11.90 3.05 36.30
290.37

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
dukcapil 1.00 19.90 4.50 89.55
2.00 17.65 4.65 82.07
3.00 9.70 3.00 29.10
4.00 8.50 1.95 16.58
5.00 10.70 4.95 52.97
6.00 11.90 3.05 36.30
290.37

B.1.6 Pekerjaan Arsitektur Ruang DPMPTSP


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
DPMPTSP 1.00 12.10 4.80 58.08
2.00 8.05 5.10 41.06
3.00 4.70 3.50 16.45
4.00 5.20 0.85 4.42
5.00 23.90 3.20 76.48
180.12

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
DPMPTSP 1.00 12.10 4.80 58.08
2.00 8.05 5.10 41.06
3.00 4.70 3.50 16.45
4.00 5.20 0.85 4.42
5.00 23.90 3.20 76.48
180.12
B.1.7 Pekerjaan Arsitektur Ruang Dinas Bapenda
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Bapenda 1.00 15.10 2.05 30.96
2.00 6.30 1.00 6.30
36.15

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Bapenda 1.00 15.10 2.05 30.96
2.00 6.30 1.00 6.30
36.15

B.1.8 Pekerjaan Arsitektur Ruang Bank BJB


Rp 1.00 Pekerjaan …….
- Pekerjaan ……..
- Pekerjaan ……..
- Pekerjaan ……..
- Pekerjaan ……..

B.1.9 Pekerjaan Arsitektur Ruang Mushola dan Tempat Wudhu


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Mushola 4.05 4.50 18.23
dan T.
wudhu 17.44

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Mushola 4.05 2.80 11.34
11.34

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
T. wudhu 4.05 1.60 6.48
5.70
B.1.10 Pekerjaan Arsitektur Ruang Toilet 2
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Toilet 2 1.85 1.85 3.42
1.75 1.20 2.10
3.70 1.85 6.85
2.70 1.85 5.00
3.70 1.85 6.85
23.38

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Toilet 2 2.70 1.85 5.00

5.00

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
Toilet 2 3.70 1.85 6.85
3.70 1.85 6.85
1.85 1.85 3.42
1.75 1.20 2.10
18.38
C.1.1 Pekerjaan Arsitektur Toilet 1
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Dinding K3 15.60 1.50 23.40
7.40 1.50 11.10
4.20 1.50 6.30
4.20 1.50 6.30
4.70 1.50 7.05
4.25 1.50 6.38
4.25 1.50 6.38
5.55 1.50 8.33
75.23
Lantai Toilet Tengah 2.65 1.85 4.90
4.90
Total 80.13

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
Dinding K3 15.60 1.50 23.40
7.40 1.50 11.10
4.20 1.50 6.30
4.20 1.50 6.30
4.70 1.50 7.05
4.25 1.50 6.38
4.25 1.50 6.38
5.55 1.50 8.33
75.23

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished


Panjang Lebar m2
Lantai Toilet Tengah 2.65 1.85 4.90
4.90
C.1.2 Pekerjaan Arsitektur Ruang Pantry
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Meja atas 1.85 2.55 4.72
samping/bawah 1.85 1.20 2.22
6.94

- Pekerjaan Pemasangan Keramik Meja Dapur Uk. 20 x 20


Panjang Lebar m2
Meja atas 1.85 2.55 4.72
samping/bawah 1.85 1.20 2.22
6.94
C.1.3 Pekerjaan Arsitektur Ruang Dinas PUPR
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
PUPR 7.45 7.35 54.76
16.00 8.40 134.40
8.55 7.85 67.12
9.90 3.35 33.17
12.25 4.65 56.96
341.53

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
PUPR 7.45 7.35 54.76
16.00 8.40 134.40
8.55 7.85 67.12
9.90 3.35 33.17
12.25 4.65 56.96
341.53

C.1.4 Pekerjaan Arsitektur Ruang DISNAKER


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
DISNAKER 31.90 7.85 250.42
241.74

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
DISNAKER 31.90 7.85 250.42
241.74
C.1.5 Pekerjaan Arsitektur Ruang Dinas Bapenda
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Bapenda 23.85 7.85 187.22
9.90 8.00 79.20
2.80 2.30 6.44
3.45 2.80 9.66
11.00 7.90 86.90
1.85 0.90 1.67
371.09

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Bapenda 23.85 7.85 187.22
9.90 8.00 79.20
2.80 2.30 6.44
3.45 2.80 9.66
11.00 7.90 86.90
1.85 0.90 1.67
371.09

C.1.6 Pekerjaan Arsitektur Ruang Bank BJB


Rp 1.00 Pekerjaan …….
- Pekerjaan ……..
- Pekerjaan ……..
- Pekerjaan ……..
- Pekerjaan ……..

C.1.7 Pekerjaan Arsitektur Ruang Mushola dan Tempat Wudhu


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
dinding t.wudhu 7.70 1.50 11.55
Mushola dan T. 7.10 1.50 10.65
wudhu
lantai mushola 4.50 4.05 18.23
40.43

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Mushola 4.50 4.05 18.23
18.23

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
T. wudhu 7.70 1.50 11.55
7.10 1.50 10.65
22.20
C.1.8 Pekerjaan Arsitektur Ruang Toilet 2
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Toilet 2 dinding 6.40 1.50 9.60
dinding 5.60 1.50 8.40
dinding 4.70 1.50 7.05
dinding 4.25 1.50 6.38
dinding 4.25 1.50 6.38
Lantai 2.70 1.85 5.00
dinding 5.55 1.50 8.33
dinding 4.25 1.50 6.38
dinding 4.25 1.50 6.38
63.87

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 UnPolished


K8 Panjang Lebar m2
Toilet 2 lantai 2.70 1.85 5.00

5.00

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


K3 Panjang Lebar m2
Toilet 2 dinding 6.40 1.50 9.60
5.60 1.50 8.40
4.70 1.50 7.05
4.25 1.50 6.38
4.25 1.50 6.38
5.55 1.50 8.33
4.25 1.50 6.38
4.25 1.50 6.38
58.88
C.1.9 Pekerjaan Arsitektur Ruang Panel
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
PANEL lantai 3.85 1.85 7.12
7.12
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished
Panjang Lebar m2
PANEL lantai 3.85 1.85 7.12
7.12
RENCANA ANGGARAN BIAYA UNTUK K3
NAMA PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG
LOKASI : KABUPATEN CILACAP
TAHUN ANGGARAN : 2022
Sesuai Peraturan Mentri PUPR Nomor 10 Tahun 2021

HARGA
NO URAIAN SAT VOL TOTAL HARGA KET
SATUAN

L - K3
1 Penyiapan RKK : Set 1.00 Rp 350,000.00 Rp 350,000.00
a. Pembuatan dokumen SMKK (RKK, RMPK, RKPPL, RMLLP)
b. Pembuatan prosedur dan instruksi kerja
c. Penyusunan pelaporan SMKK

2 Sosialisasi, promosi dan pelatihan :


a Spanduk (Banner) Bh 1.00 Rp 64,000.00 Rp 64,000.00
b Poster Bh 1.00 Rp 12,100.00 Rp 12,100.00

3 Alat Pelindung Kerja dan Alat Pelindung Diri


Alat Pelindung Kerja
a. Jaring Pengaman (Safety Net)(1 roll = 100 m) Roll 1.00 Rp 491,000.00 Rp 491,000.00
b. Tali Keselamatan (Life Line) Bh 1.00 Rp 120,000.00 Rp 120,000.00
c. Pembatas Area (Restricted Area) (1 roll = 300 m) Roll 1.00 Rp 35,000.00 Rp 35,000.00

Alat Pelindung Diri


a Topi Pelindung (Safety Helmet) Bh 4.00 Rp 59,000.00 Rp 236,000.00
b Pelindung Mata (Goggles, Spectacles) Psg 4.00 Rp 26,200.00 Rp 104,800.00
c. Sarung Tangan Psg 4.00 Rp 23,000.00 Rp 92,000.00
d. Sepatu Lapangan Psg 4.00 Rp 175,000.00 Rp 700,000.00
e. Body Harness Bh 2.00 Rp 250,000.00 Rp 500,000.00
f. Rompi Bh 4.00 Rp 105,000.00 Rp 420,000.00

4 Asuransi dan perijinan


a. Asuransi Org 4.00 Rp 168,000.00 Rp 672,000.00

5 Personel keselataman konstruksi


a. Petugas K3 konstruksi OB Rp 2,900,000.00 Rp -

6 Fasilitas, sarana dan prasarana kesehatan


a. Peralatan P3K (Kotak P3K) Bh 1.00 Rp 548,000.00 Rp 548,000.00

7 Rambu dan perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas
a. Rambu Petunjuk Bh 1.00 Rp 75,000.00 Rp 75,000.00
b. Rambu Peringatan Bh 1.00 Rp 225,000.00 Rp 225,000.00
c. Rambu Kewajiban Bh 1.00 Rp 60,000.00 Rp 60,000.00
d. Rambu Informasi Bh 1.00 Rp 128,000.00 Rp 128,000.00

8 Kegiatan dan peralatan terkait pengendalian resiko keselamatan konstruksi


a. Alat Pemadam Api Ringan (APAR) Portable, berat 6 kg Bh 1.00 Rp 994,000.00 Rp 994,000.00

9 Kegiatan protokol kesehatan terkait Covid-19


a. Sosialisasi dan Pengarahan Protokol COVID-19 Org 4.00 Rp 50,000.00 Rp 200,000.00
b. Spanduk (banner) tentang Himbauan/ anjuran pencegahan COVID -19 Bh 1.00 Rp 64,000.00 Rp 64,000.00
c. Poster tentang Himbauan/ anjuran pencegahan COVID -19 Bh 1.00 Rp 12,100.00 Rp 12,100.00
d. Papan Informasi COVID-19 Bh 1.00 Rp 323,900.00 Rp 323,900.00
e. Masker Medis / 50 buah Box 1.00 Rp 138,000.00 Rp 138,000.00
f. Face Shield Bh 4.00 Rp 35,000.00 Rp 140,000.00
g. Thermometer Bh 1.00 Rp 225,000.00 Rp 225,000.00
h. Hand Sanitizer Ltr 5.00 Rp 24,600.00 Rp 123,000.00
i. Pelaporan Ls 1.00 Rp 350,000.00 Rp 350,000.00

JUMLAH Rp 7,402,900.00
D.1.1 Pekerjaan Arsitektur Toilet 1
D.1.1.1 toilet 1 umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Dinding 1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
2.70 1.50 4.05
2.00 1.50 3.00
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.85 1.50 2.78
1.85 1.50 2.78
49.65
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62
Total 67.27

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
Dinding 1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
2.70 1.50 4.05
2.00 1.50 3.00
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.85 1.50 2.78
1.85 1.50 2.78
49.65

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished


Panjang Lebar m2
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62
Rp 2.00 Pekerjaan Waterproofing
- Pekerjaan Pemasangan Waterproofing
Panjang Lebar m2
Dinding 1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
0.15 0.30 0.05
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
0.15 0.30 0.05
1.85 0.30 0.56
1.85 0.30 0.56
1.85 0.30 0.56
1.85 0.30 0.56
2.70 0.30 0.81
2.00 0.30 0.60
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
1.85 0.30 0.56
1.85 0.30 0.56
9.93
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62
Total 27.55
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 4.15 2.00 8.30
2.00 3.00 2.00 6.00
3.00 4.00 2.00 8.00
22.30
- Pekerjaan Pemasangan Plafond GRC + Frame
Panjang Lebar m2
Rp 1.00 Rp 4.15 Rp2.00 8.30
Rp 2.00 Rp 3.00 Rp2.00 6.00
Rp 3.00 Rp 4.00 Rp2.00 8.00
22.30
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
Rp 1.00 Rp 4.15 Rp2.00 8.30
Rp 2.00 Rp 3.00 Rp2.00 6.00
Rp 3.00 Rp 4.00 Rp2.00 8.00
22.30
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf
Panjang Lebar Jumlah m2
2.00 2.00
2.00
- Pekerjaan Pemasangan Handle/Kunci Baru
jumlah bh
kunci 2.00 2.00
2.00
D.1.1.2 toilet 1 vip
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
18.41
- Pekerjaan Pemasangan Keramik Lantai 50 x 50 Polished
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
5.58
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 cm
Panjang Lebar m2
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
12.83
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 0.30 0.30
0.20 0.30 0.06
0.60 0.30 0.18
1.85 0.30 0.56
0.20 0.30 0.06
1.70 0.30 0.51
1.20 0.30 0.36
1.80 0.30 0.54
8.15
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
D.1.2 Pekerjaan Arsitektur Ruang Dinas Sosial
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Rp 15.75 Rp1.85 29.14
Rp 23.85 Rp7.85 187.22
Rp 9.95 8.00 79.60
Rp 4.50 2.00 9.00
298.61

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
15.75 1.85 29.14
23.85 7.85 187.22
9.95 8.00 79.60
4.50 2.00 9.00
298.61

- Pekerjaan Pemasangan Membran Waterproofing


Panjang Lebar m2
15.75 1.85 29.14
29.14
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru
Jumlah bh
1.00 1.00
1.00 1.00
1.00 1.00
3.00
- Pekerjaan Pemasangan Kusen Pintu Alumunium Baru
Panjang Lebar Tebal m3
3.20 0.50 0.10 0.16
0.16
D.1.3 Pekerjaan Arsitektur Ruang PKK
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
PKK 8.10 8.00 64.80
5.15 2.10 10.82
73.84

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
PKK 8.10 8.00 64.80
5.15 2.10 10.82
73.84

D.1.4 Pekerjaan Arsitektur Ruang Dinas KESEHATAN


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
DINKES 15.80 1.85 29.23
31.85 7.85 250.02
9.95 2.15 21.39
13.20 6.05 79.86
373.51
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished
Panjang Lebar m2
DINKES 15.80 1.85 29.23
31.85 7.85 250.02
9.95 2.15 21.39
13.20 6.05 79.86
373.51

- Pekerjaan Pemasangan Water Proofing


Panjang Lebar m2
DINKES 15.80 1.85 29.23
29.23
Rp 2.00 Pekerjaan Dinding
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan)
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00
Rp 3.00
4.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00

D.1.5 Pekerjaan Arsitektur Ruang Dinas PERDAGANGAN, KOPERASI, USAHA KECIL


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
34.10 7.85 267.69
1.90 1.80 3.42
23.70 1.85 43.85
308.89

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
34.10 7.85 267.69
1.90 1.80 3.42
23.70 1.85 43.85
308.89

- Pekerjaan Pemasangan Water Proofing


Panjang Lebar m2
23.70 1.85 43.85
43.85
Rp 2.00 Pekerjaan Dinding
- Pekerjaan Pembongkaran Dinding Bata (Pengerokan)
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
Rp 2.00 Rp 2.00 Rp 4.00

4.00
Rp 3.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Casement Jendela baru
Jumlah bh
1.00 1.00
1.00 1.00
0.00 0.00
2.00
- Pekerjaan Pemasangan Handle/Kunci Baru
Jumlah bh
1.00 1.00
0.00 0.00
0.00 0.00
1.00
D.1.6 Pekerjaan Arsitektur Ruang Toilet 2
D.1.1.1 toilet 1 umum
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Dinding 1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
2.70 1.50 4.05
2.00 1.50 3.00
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.85 1.50 2.78
1.85 1.50 2.78
49.65
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62
Total 67.27

- Pekerjaan Pemasangan Keramik Dinding Uk. 25x50 Polished T=150 mm


Panjang Lebar m2
Dinding 1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
0.15 1.50 0.23
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
1.85 1.50 2.78
2.70 1.50 4.05
2.00 1.50 3.00
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.70 1.50 2.55
0.85 1.50 1.28
1.70 1.50 2.55
1.85 1.50 2.78
1.85 1.50 2.78
49.65

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Unpolished


Panjang Lebar m2
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62

Rp 2.00 Pekerjaan Waterproofing


- Pekerjaan Pemasangan Waterproofing
Panjang Lebar m2
Dinding 1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
0.15 0.30 0.05
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
0.15 0.30 0.05
1.85 0.30 0.56
1.85 0.30 0.56
1.85 0.30 0.56
1.85 0.30 0.56
2.70 0.30 0.81
2.00 0.30 0.60
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
1.70 0.30 0.51
0.85 0.30 0.26
1.70 0.30 0.51
1.85 0.30 0.56
1.85 0.30 0.56
9.93
Lantai 1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
2.70 1.85 5.00
1.70 0.85 1.45
1.70 0.85 1.45
1.85 1.85 3.42
17.62
Total 27.55
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 4.15 2.00 8.30
2.00 3.00 2.00 6.00
3.00 4.00 2.00 8.00
22.30
- Pekerjaan Pemasangan Plafond GRC + Frame
Panjang Lebar m2
Rp 1.00 Rp 4.15 Rp2.00 8.30
Rp 2.00 Rp 3.00 Rp2.00 6.00
Rp 3.00 Rp 4.00 Rp2.00 8.00
22.30
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
Rp 1.00 Rp 4.15 Rp2.00 8.30
Rp 2.00 Rp 3.00 Rp2.00 6.00
Rp 3.00 Rp 4.00 Rp2.00 8.00
22.30
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf
Panjang Lebar Jumlah m2
2.00 2.00
2.00
- Pekerjaan Pemasangan Handle/Kunci Baru
jumlah bh
kunci 2.00 2.00
2.00
D.1.1.2 toilet 1 vip
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
18.41
- Pekerjaan Pemasangan Keramik Lantai 50 x 50 Polished
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
5.58
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 cm
Panjang Lebar m2
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
12.83
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 0.30 0.30
0.20 0.30 0.06
0.60 0.30 0.18
1.85 0.30 0.56
0.20 0.30 0.06
1.70 0.30 0.51
1.20 0.30 0.36
1.80 0.30 0.54
8.15
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
Rp 4.00 Pekerjaan Pintu/Jendela
- Pekerjaan Pemasangan Pintu Shaf
Panjang Lebar Jumlah m2
2.00 2.00
2.00
- Pekerjaan Pemasangan Handle/Kunci Baru
jumlah bh
kunci 2.00 2.00
2.00
D.1.11 Pekerjaan Arsitektur Eksterior
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Lapisan Plesteran
Panjang Lebar m2
1.00 19.55 1.35 26.39
2.00 7.75 1.35 10.46
3.00 19.30 1.35 26.06
4.00 19.55 1.35 26.39
5.00 7.85 1.35 10.60
6.00 19.55 1.35 26.39
DPKU 7.00 23.70 1.85 43.85
DINSOS 8.00 Rp 15.75 Rp1.85 29.14
DINKES 9.00 15.80 1.85 29.23
223.81
- Pekerjaan Pemasangan Lapisan Plesteran
Panjang Lebar m2
1.00 19.55 1.35 26.39
2.00 7.75 1.35 10.46
3.00 19.30 1.35 26.06
4.00 19.55 1.35 26.39
5.00 7.85 1.35 10.60
6.00 19.55 1.35 26.39
DPKU 7.00 23.70 1.85 43.85
DINSOS 8.00 15.75 1.85 29.14
DINKES 9.00 15.80 1.85 29.23
223.81
- Pekerjaan Pemasangan Lapisan Waterproofing
Panjang Lebar m2
1.00 19.55 1.35 26.39
2.00 7.75 1.35 10.46
3.00 19.30 1.35 26.06
4.00 19.55 1.35 26.39
5.00 7.85 1.35 10.60
6.00 19.55 1.35 26.39
DPKU 7.00 23.70 1.85 43.85
DINSOS 8.00 15.75 1.85 29.14
DINKES 9.00 15.80 1.85 29.23
223.81
- Pekerjaan Pemasangan Pengecatan
Panjang Lebar m2
1.00 19.55 1.35 26.39
2.00 7.75 1.35 10.46
3.00 19.30 1.35 26.06
4.00 19.55 1.35 26.39
5.00 7.85 1.35 10.60
6.00 19.55 1.35 26.39
DPKU 7.00 23.70 1.85 43.85
DINSOS 8.00 15.75 1.85 29.14
DINKES 9.00 15.80 1.85 29.23
223.81
D.1.7 Pekerjaan Arsitektur Ruang Panel
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
K1 3.85 1.85 7.12
7.12
- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 polished
Panjang Lebar m2
K1 3.85 1.85 7.12
7.12
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan)
Panjang Lebar m2
DR Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
DR Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
DR Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pengecatan Dinding
Panjang Lebar m2
DR Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
D.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola
Rp 1.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 4.10 2.15 8.82
0.00
0.00
8.82
- Pekerjaan Pemasangan Plafond GRC + Frame
Panjang Lebar m2
1.00 4.10 2.15 8.82
0.00
0.00
8.82
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
1.00 4.10 2.15 8.82
0.00
0.00
8.82
- Pekerjaan Pengecatan dengan cat minyak (crosstee)
Panjang Lebar m2
1.00 4.10 2.15 8.82
0.00
0.00
8.82
Rp 2.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan)
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
- Pekerjaan Pengecatan Dinding
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
DK Rp 2.00 Rp 2.00 Rp4.00
8.00
D.1.9 Pekerjaan Arsitektur Selasar
Rp 1.00 Pekerjaan Dinding Bata
- Pekerjaan Pembongkaran Dinding Lapis Plesteran (Pengerokan)
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
Rp - Rp - Rp -
4.00
- Pekerjaan Pemasangan Plesteran
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
Rp - Rp - Rp -
4.00
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
DB Rp 2.00 Rp 2.00 Rp4.00
Rp - Rp - Rp -
4.00
- Pekerjaan Pengecatan Dinding Selasar
Panjang Lebar m2 Panjang Lebar m2
DB Rp 7.70 Rp 3.60 ### Rp1.60 Rp3.60 Rp5.76
Rp 0.20 Rp 3.60 Rp0.72 Rp0.20 Rp3.60 Rp0.72
Rp 0.15 Rp 3.60 Rp0.54 Rp0.50 Rp3.60 Rp1.80
Rp 3.80 Rp 3.60 ### Rp0.20 Rp3.60 Rp0.72
Rp 1.15 Rp 3.60 Rp4.14 Rp7.50 Rp3.60 ###
Rp 2.15 Rp 3.60 Rp7.74 Rp0.20 Rp3.60 Rp0.72
Rp 2.00 Rp 3.60 Rp7.20 Rp0.50 Rp3.60 Rp1.80
Rp 0.95 Rp 3.60 Rp3.42 Rp0.20 Rp3.60 Rp0.72
Rp 8.00 Rp 3.60 ### Rp7.50 Rp3.60 ###
Rp 2.75 Rp 3.60 Rp9.90 Rp0.20 Rp3.60 Rp0.72
Rp 0.20 Rp 3.60 Rp0.72 Rp0.50 Rp3.60 Rp1.80
Rp 0.50 Rp 3.60 Rp1.80 Rp0.20 Rp3.60 Rp0.72
Rp 0.20 Rp 3.60 Rp0.72 Rp7.50 Rp3.60 ###
Rp 4.90 Rp 3.60 ### Rp0.20 Rp3.60 Rp0.72
Rp 10.10 Rp 3.60 ### Rp0.50 Rp3.60 Rp1.80
Rp 2.85 Rp 3.60 ### Rp0.20 Rp3.60 Rp0.72
Rp 1.60 Rp 3.60 Rp5.76 Rp1.65 Rp3.60 Rp5.94
Rp 0.20 Rp 3.60 Rp0.72 Rp0.80 Rp3.60 Rp2.88
Rp 0.05 Rp 3.60 Rp0.18 ### Rp3.60 ###
Rp 0.15 Rp 3.60 Rp0.54 Rp4.70 Rp3.60 ###
Rp 0.50 Rp 3.60 Rp1.80 Rp2.00 Rp3.60 Rp7.20
Rp 0.20 Rp 3.60 Rp0.72 Rp1.25 Rp3.60 Rp4.50
Rp 7.50 Rp 3.60 ### Rp3.15 Rp3.60 ###
Rp 0.20 Rp 3.60 Rp0.72
Rp 0.50 Rp 3.60 Rp1.80
Rp 0.50 Rp 3.60 Rp1.80
Rp 0.20 Rp 3.60 Rp0.72
Rp 7.50 Rp 3.60 ###
Rp 0.20 Rp 3.60 Rp0.72
Rp 0.50 Rp 3.60 Rp1.80
Rp 0.20 Rp 3.60 Rp0.72
Rp 7.50 Rp 3.60 ###
Rp 0.20 Rp 3.60 Rp0.72
Rp 0.50 Rp 3.60 Rp1.80
Rp 0.20 Rp 3.60 Rp0.72
Rp 7.50 Rp 3.60 ###
Rp 0.20 Rp 3.60 Rp0.72
Rp 0.50 Rp 3.60 Rp1.80
Rp 0.20 Rp 3.60 Rp0.72
Rp 1.90 Rp 3.60 Rp6.84
Rp 6.00 Rp 3.60 ###
Rp 1.95 Rp 3.60 Rp7.02
Rp 2.15 Rp 3.60 Rp7.74
Rp 0.15 Rp 3.60 Rp0.54
Rp 2.15 Rp 3.60 Rp7.74
Rp 1.20 Rp 3.60 Rp4.32
Rp 3.85 Rp 3.60 ###
Rp 0.15 Rp 3.60 Rp0.54
Rp 0.15 Rp 3.60 Rp0.54
Rp 2.55 Rp 3.60 Rp9.18
Rp 6.10 Rp 3.60 ###
Rp 13.20 Rp 3.60 ###
Rp 8.05 Rp 3.60 ###
482.22 192.24 674.46
D.1.10 Pekerjaan Plumbing
- Pekerjaan Pemasangan Saluran Pipa/Paralon
Panjang jumlah m'
Rp 8.00 Rp 10.00 ###
80.00
- Pekerjaan Pemasangan Floordrain
jumlah bh
Rp 10.00 ###
10.00
- Pekerjaan Perapihan pipa paralon yang tidak rapih
Panjang jumlah m'
Rp 8.00 Rp 2.00 ###
16.00
- Pekerjaan Pemasangan Instalasi AC
jumlah bh
Rp 1.00 Rp1.00
1.00
E.1.1 Pekerjaan Arsitektur Ruang Pantry
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Meja atas 2.55 1.80 4.59
samping/bawah 1.80 1.20 2.16
6.75

- Pekerjaan Pemasangan Keramik Meja Dapur Uk. 20 x 20


Panjang Lebar m2
Meja atas 2.55 1.80 4.59
samping/bawah 1.80 1.20 2.16
6.75

E.1.2 Pekerjaan Arsitektur Ruang Gudang


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai atas 2.80 2.00 5.60
5.60

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
Lantai atas 2.80 2.00 5.60
5.60
E.1.3 Pekerjaan Arsitektur Ruang Dinas Perumahan dan Pemukiman
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
PP 1.00 3.10 12.35 38.29
3.50 1.85 6.48
10.00 1.35 13.50
12.15 4.70 57.11

111.64

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
PP 1.00 3.10 12.35 38.29
3.50 1.85 6.48
10.00 1.35 13.50
12.15 4.70 57.11

111.64
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru
Jumlah bh
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
5.00
E.1.4 Pekerjaan Arsitektur Ruang Dinas Lingkungan Hidup
Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
LH 0.00
0.00

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
LH 0.00
0.00
0.00
0.00
0.00
0.00
Rp 2.00 Pekerjaan Kusen Jendela Pintu
- Pekerjaan Pemasangan Casement Jendela Baru
Jumlah bh
1.00 1.00
1.00 1.00
1.00 1.00
0.00
0.00
3.00

E.1.5 Pekerjaan Arsitektur Ruang Dinas BKPSDMD


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
BKPSDMD 8.10 8.05 65.21
5.10 2.00 10.20
34.60 7.95 275.07
1.95 1.35 2.63
345.89

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
BKPSDMD 8.10 8.05 65.21
5.10 2.00 10.20
34.60 7.95 275.07
1.95 1.35 2.63
345.89

Rp 2.00 Pekerjaan Kusen Jendela Pintu


- Pekerjaan Pemasangan Kusen Baru
Panjang Lebar Tebal m3
dak 4.32 0.06 0.15 4.32
4.32

- Pekerjaan Pemasangan Casement Jendela Baru


Jumlah bh
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
6.00

E.1.6 Pekerjaan Arsitektur Ruang Dinas Perhubungan


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
DISHUB 13.95 7.80 108.81
12.00 2.15 25.80
13.20 6.00 79.20
202.13

- Pekerjaan Pemasangan Keramik Lantai Uk. 50x50 Polished


Panjang Lebar m2
DISHUB 13.95 7.80 108.81
12.00 2.15 25.80
13.20 6.00 79.20
202.13
E.1.7 Pekerjaan Arsitektur Waterproofing
Rp 1.00 Pekerjaan waterproofing DAK/KANOPI
- Pekerjaan Pembongkaran lapis plesteran
Panjang Lebar m2
9.95 1.10 10.95
41.05 1.10 45.16
9.05 1.10 9.96
9.95 1.10 10.95
9.95 1.10 10.95
58.40 1.10 64.24
9.95 1.10 10.95

147.20
- Pekerjaan Pemasangan membran waterproofing
Panjang Lebar m2
9.95 1.10 10.95
41.05 1.10 45.16
9.05 1.10 9.96
9.95 1.10 10.95
9.95 1.10 10.95
58.40 1.10 64.24
9.95 1.10 10.95

147.20
- Pekerjaan Pemasangan Lapis Plesteran
Panjang Lebar m2
9.95 1.10 10.95
41.05 1.10 45.16
9.05 1.10 9.96
9.95 1.10 10.95
9.95 1.10 10.95
58.40 1.10 64.24
9.95 1.10 10.95

147.20
- Pekerjaan Pemasangan Lapis Acian
Panjang Lebar m2
9.95 1.10 10.95
41.05 1.10 45.16
9.05 1.10 9.96
9.95 1.10 10.95
9.95 1.10 10.95
58.40 1.10 64.24
9.95 1.10 10.95

147.20
E.1.8 Pekerjaan Arsitektur Tempat Wudhu dan Mushola
Rp 1.00 Pekerjaan Kusen dan Daun Pintu Baru
- Pekerjaan Pemasangan Kusen
Panjang Lebar Tebal m3
dak 4.32 0.06 0.15 4.32
4.32
- Pekerjaan Pemasangan Daun Pintu
Panjang Lebar m2
2.00 0.80 1.60
1.60

Rp 2.00 Pekerjaan Plafon


- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
4.80 4.30 20.64
20.64
- Pekerjaan Pemasangan Plafond GRC Board Uk. 120x240 cm, tebal 9 mm
Panjang Lebar m2
4.80 4.30 20.64
20.64
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
4.80 4.30 20.64
20.64

Rp 3.00 Pekerjaan Tambahan Ruang Akses Ke Dak


- Pekerjaan Pas. Dinding Bata
Panjang Lebar m2
6.30 3.60 22.68

22.68
- Pekerjaan Plesteran
Panjang Lebar m2
luar 6.30 3.60 22.68
dalam 5.85 3.60 21.06
43.74
- Pekerjaan Acian
Panjang Lebar m2
luar 6.30 3.60 22.68
dalam 5.85 3.60 21.06
43.74
- Pekerjaan Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
Panjang m'
1.00 3.60 3.60
2.00 3.60 3.60
4.00 3.60 3.60
4.00 3.60 3.60
14.40
- Pekerjaan Pengecatan Dinding
Panjang Lebar m2
luar 6.30 3.60 22.68
dalam 5.85 3.60 21.06
43.74
- Pekerjaan Pemasangan Tangga Putar
Panjang m2
luar 4.20 4.20

4.20

C.1.10 Pekerjaan Arsitektur Toilet 1 (VIP)


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
18.41
- Pekerjaan Pemasangan Keramik Lantai 50 x 50 Polished
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
5.58
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 cm
Panjang Lebar m2
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
12.83
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 0.30 0.30
0.20 0.30 0.06
0.60 0.30 0.18
1.85 0.30 0.56
0.20 0.30 0.06
1.70 0.30 0.51
1.20 0.30 0.36
1.80 0.30 0.54
8.15
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50

C.1.11 Pekerjaan Arsitektur Toilet 2 (VIP)


Rp 1.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
18.41
- Pekerjaan Pemasangan Keramik Lantai 50 x 50 Polished
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
5.58
- Pekerjaan Pemasangan Keramik Dinding Granito 50 x 50 cm
Panjang Lebar m2
Dinding 1.00 1.50 1.50
0.20 1.50 0.30
0.60 1.50 0.90
1.85 1.50 2.78
0.20 1.50 0.30
1.70 1.50 2.55
1.20 1.50 1.80
1.80 1.50 2.70
12.83
Rp 2.00 Pekerjaan waterproofing
- Pekerjaan Pemasangan Membran Waterproofing
Panjang Lebar m2
Lantai 1.85 1.85 3.42
1.80 1.20 2.16
Dinding 1.00 0.30 0.30
0.20 0.30 0.06
0.60 0.30 0.18
1.85 0.30 0.56
0.20 0.30 0.06
1.70 0.30 0.51
1.20 0.30 0.36
1.80 0.30 0.54
8.15
Rp 3.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pemasangan Plafond GRC + rangka cross T Interior
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
1.00 2.00 2.00 4.00
2.00 1.85 1.35 2.50
6.50
- Pekerjaan Pengecatan Plafond
Panjang Lebar m2
dak 2.00 0.80 1.60
1.60
F.1.1 Pekerjaan Arsitektur Kanopi
Rp 1.00 Pekerjaan Kanopi
- Pekerjaan Pembongkaran Kanopi
Panjang Lebar m2
Rp 11.55 Rp 7.70 Rp 88.94
- Pekerjaan Pemasangan Rangka Atap Baja Ringan
Rangka Kuda-kuda baja ringan CT75-0.75 TCT
Panjang Lebar m2
Rp 11.55 Rp 9.30 ###
Rangka Baja Ringan 0.45 tct
Panjang Jumlah m'
Rp 11.55 Rp 34.00 ###
- Pemasangan Penutup Atap Policarbonat
Panjang Lebar m2
Rp 11.55 Rp 11.30 ###
Rp 2.00 Pekerjaan Atap Dak
- Pekerjaan Pembongkaran Lapisan Atap Dak
Panjang Lebar m2
Rp 11.55 Rp 7.70 Rp 88.94
- Plesteran Lapisan Atap Dak
Panjang Lebar m2
Rp 11.55 Rp 7.70 Rp 88.94

Rp 3.00 Pekerjaan Roofdrain Dak


- Pekerjaan Pembongkaran Lapisan Roofdrain
Panjang Lebar m2
Rp 39.50 Rp 0.90 Rp 35.55
Rp 39.50 Rp 0.90 Rp 35.55
Rp71.10
- Plesteran Lapisan Roofdrain
Panjang Lebar m2
Rp 39.50 Rp 0.90 Rp 35.55
Rp 39.50 Rp 0.90 Rp 35.55
Rp71.10

Rp 4.00 Pekerjaan Waterproofing


- Pekerjaan Pembongkaran Lapisan Plesteran
Panjang Lebar m2
Rp 20.60 Rp 15.60 ###
Rp 20.60 Rp 15.60 ###
###
- Pekerjaan Pemasangan Waterproofing
Panjang Lebar m2
Rp 20.60 Rp 15.60 ###
Rp 20.60 Rp 15.60 ###
###
- Pekerjaan Pemasangan Plestaran
Panjang Lebar m2
Rp 20.60 Rp 15.60 ###
Rp 20.60 Rp 15.60 ###
###
- Pekerjaan Pemasangan Acian
Panjang Lebar m2
Rp 20.60 Rp 15.60 ###
Rp 20.60 Rp 15.60 ###
###
Rp 5.00 Pekerjaan Plafond
- Pekerjaan Pembongkaran Plafond
Panjang Lebar m2
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 7.70 Rp 3.75 Rp 28.88
Rp 4.00 Rp 3.60 Rp 14.40
Rp45.44
- Pekerjaan Pemasangan Plafond Gypsum + Frame Fin. Cat Plafond + Fin. Cat Minyak (Crosstea)
Panjang Lebar m2
Rp 7.70 Rp 3.75 Rp 28.88
Rp 4.00 Rp 3.60 Rp 14.40
Rp43.28
- Pekerjaan Fin. Cat Plafond 1
Panjang Lebar m2
Rp 7.70 Rp 3.75 Rp 28.88
Rp 4.00 Rp 3.60 Rp 14.40
Rp43.28
- Pekerjaan Fin. Cat Minyak (Crosstea)
Panjang Lebar m2
Rp 7.70 Rp 3.75 Rp 28.88
Rp 4.00 Rp 3.60 Rp 14.40
Rp43.28
- Pekerjaan Pemasangan Plafond GRC
Panjang Lebar m2
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 2.16
- Pekerjaan Fin. Cat Plafond 2
Panjang Lebar m2
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 0.60 Rp 1.20 Rp 0.72
Rp 2.16
Rp 6.00 Pekerjaan Keramik
- Pekerjaan Pembongkaran Keramik
Panjang Lebar Jumlah m2
dak 7.70 3.70 1.00 ###
0.10 0.60 20.00 Rp 1.20
0.50 0.60 20.00 Rp 6.00
###
- Pekerjaan Pemasangan Keramik 50 x 50 cm Polished
Panjang Lebar m2
dak 7.70 3.70 28.49
28.49
- Pekerjaan Pemasangan Keramik Step Nosing 10x16 cm
Panjang Lebar Jumlah m2
dak 0.10 0.60 20.00 Rp 1.20
Rp1.20
- Pekerjaan Pemasangan Keramik Tangga 50 x 50 cm Polished
Panjang Lebar Jumlah m2
dak 0.50 0.60 20.00 Rp 6.00
Rp6.00
Rp 7.00 Pekerjaan Kusen dan daun pintu
- Pekerjaan Pemasangan Kusen Baru
Panjang Lebar Tebal m3
dak 4.32 0.06 0.15 0.04
0.04

- Pekerjaan Pemasangan Daun Pintu


Panjang Lebar m2
dak 2.00 0.80 1.60
1.60
Rp 1.00 Pekerjaan Plumbing
- Pekerjaan Pemasangan Pipa
Panjang jumlah m2
4.00 1.00 4.00
4.00 1.00 4.00
4.00 1.00 4.00
4.00 1.00 4.00
16.00
- Pekerjaan Pemasangan Floordrain Baru
KURVA S
Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
ANALISA HARGA SATUAN PEKERJAAN

Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
HARGA SATUAN PEKERJAAN

Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
HARGA UPAH
Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
HARGA BAHAN
Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
REKAPITULASI
Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
Bill Of Quantity
BOQ

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
RAB
Rencana Anggaran Biaya

Pemerintah Daerah Kota Cimahi


Dinas Pekerjaan Umum & Penataan Ruang

PEKERJAAN
PEKERJAAN
Reviu Perencanaan Pemeliharaan Lanjuta Gedung A dan B
Pemkot Cimahi

KONSULTAN PERENCANA
146

ANALISA HARGA SATUAN PEKERJAAN


JP KONSTRUKSI
TAHUN ANGGARAN 2022
Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016
Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

A. HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN

A.001 Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12

Multiplek t = 18 mm 0.3500 lbr 250,000.00 87,500.00


Kayu Balok Kelas III (4m) 0.0770 m3 3,750,000.00 288,750.00
Besi Siku uk. 30 x 30 x 3,0 mm (6m) 5.8000 kg 9,191.18 53,308.82
Paku Campuran 5 cm + 7 cm 1.2500 kg 20,000.00 25,000.00
Cat Kayu dan besi avian 2.5000 kg 65,000.00 162,500.00
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 1.0000 OH 120,000.00 120,000.00
Kepala Tukang 0.1000 OH 125,000.00 12,500.00
Tukang Cat 1.5000 OH 120,000.00 180,000.00
Mandor 0.1000 OH 150,000.00 15,000.00
Jumlah 1,044,558.82
Overhead + Profit 10% 104,455.88
Jumlah 1,149,014.71
Dibulatkan 1,149,010.00
147
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

B. HARGA SATUAN PEKERJAAN BONGKARAN


B.001 Pembongkaran 1m2 Keramik
Alat Bantu ( jack hammer, Palu, linggis dodos, Sekop ) 1.00 ls 5,000.00 5,000.00
Pekerja 0.0500 OH 100,000.00 5,000.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 11,500.00
Overhead + Profit 10% 1,150.00
Jumlah 12,650.00
Dibulatkan 12,650.00
Pembongkaran 1 m2 Dinding Partisi
Pekerja 0.0600 oh 100,000.00 6,000.00
Mandor 0.0400 oh 150,000.00 6,000.00
Jumlah 12,000.00
Overhead + Profit 10% 1,200.00
Jumlah 13,200.00
Dibulatkan 13,200.00
B.002 Pembongkaran 1m2 Dinding Plesteran (Pengrokan)
Pekerja 0.0600 OH 100,000.00 6,000.00
Mandor 0.0400 OH 150,000.00 6,000.00
Jumlah 12,000.00
Overhead + Profit 10% 1,200.00
Jumlah 13,200.00
Dibulatkan 13,200.00
PEKERJAAN ARSITEKTUR

C HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


C.001 Perbaikan 1 m' Kusen Pintu Allumunium
Sekrup Fisher 2.0000 bh 416.67 833.33
Sealant Silicone Dow Corning / tube 0.0600 tube 60,000.00 3,600.00
Pekerja 0.0430 OH 100,000.00 4,300.00
Tukang Allumunium 0.0430 OH 120,000.00 5,160.00
Kepala tukang 0.0043 OH 125,000.00 537.50
Mandor 0.0021 OH 150,000.00 315.00
Jumlah 14,745.83
Overhead + Profit 10% 1,474.58
Jumlah 16,220.42
Dibulatkan 16,220.00
Pemasangan 1 m' Rangka Jendela Alumunium
Rangka jendela almunium 1.1000 m 160,833.33 176,916.67
Sekrup Fisher 2.0000 bh 416.67 833.33
Sealant Silicone Dow Corning / tube 0.0600 tube 60,000.00 3,600.00
Pekerja 0.0430 OH 100,000.00 4,300.00
Tukang Allumunium 0.0430 OH 120,000.00 5,160.00
Kepala tukang 0.0043 OH 125,000.00 537.50
Mandor 0.0021 OH 150,000.00 315.00
Jumlah 191,662.50
Overhead + Profit 10% 19,166.25
Jumlah 210,828.75
Dibulatkan 210,820.00
C.002 Pemasangan 1 bh Kunci dan Handle Pintu Almunium
Kunci + Handle Pintu aluminium 1.0000 bh 175,000.00 175,000.00
Tukang Allumunium 0.5000 OH 120,000.00 60,000.00
Jumlah 235,000.00
Overhead + Profit 10% 23,500.00
Jumlah 258,500.00
Dibulatkan 258,500.00
148
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Membuat tangga putar 1 m


Anak Tangga Plat Bordes 120 x 240 x 4,0 mm 1.0000 m2 1,207,738.10 1,207,738.10
Railing Tegak Pipa Galvanis Medium Ø2" x 3,40 mm (6m) 2.0000 m1 165,500.00 331,000.00
Besi Siku Galvanis 40 x 40 x 4,0 mm 1.0000 m1 24,166.67 24,166.67
Tiang Utama Pipa Galvanis Medium Ø4" x 4,20 mm (6m) 1.0000 m 309,500.00 309,500.00
RING Plat Strip Besi 4 x 50 mm (6m) 1.0000 m1 14,166.67 14,166.67
Pekerja 0.1800 OH 100,000.00 18,000.00
Tukang batu 0.0200 OH 120,000.00 2,400.00
Tukang Besi 0.0200 OH 120,000.00 2,400.00
Kepala tukang 0.0060 OH 125,000.00 750.00
Mandor 0.0090 OH 150,000.00 1,350.00
Jumlah 1,911,471.43
Overhead + Profit 10% 191,147.14
Jumlah 2,102,618.57
Dibulatkan 2,102,610.00
C.003 Pemasangan 1 unit Pintu Besi tebal 2mm ukuran 90 x 210 cm + Pengunci dan handle dengan engsel Dekson
Besi Siku 30 x 30 x 3,0 mm (6m) / kg 15.0000 kg 9,191.18 137,867.65
Besi Plat baja 32.8000 kg 2,036.01 66,780.97
Besi Baja CNP 150 x 50 x 20 x 3,2 mm 5.1000 m' 127,166.67 648,550.00
Kawat las 0.0500 kg 40,000.00 2,000.00
Pekerja 1.0500 Oh 100,000.00 105,000.00
Tukang Las 1.0500 Oh 120,000.00 126,000.00
Kepala Tukang 0.1050 Oh 125,000.00 13,125.00
Mandor 0.0520 Oh 150,000.00 7,800.00
Jumlah 1,107,123.62
Overhead + Profit 10% 110,712.36
Jumlah 1,217,835.98
Dibulatkan 1,217,830.00
Pemasangan 1 bh Casemant Jendela Baru
Casement Jendela 1.0000 bh 55,000.00 55,000.00
Sekrup Fisher 2.0000 bh 416.67 833.33
Sealant Silicone Dow Corning / tube 0.0600 tube 60,000.00 3,600.00
Pekerja 0.0430 OH 100,000.00 4,300.00
Tukang Allumunium 0.0430 OH 120,000.00 5,160.00
Kepala tukang 0.0043 OH 125,000.00 537.50
Mandor 0.0021 OH 150,000.00 315.00
Jumlah 69,745.83
Overhead + Profit 10% 6,974.58
Jumlah 76,720.42
Dibulatkan 76,720.00
Pembuatan 1 m2 Daun Pintu Panel, Kayu Kelas I atau II
Kayu Papan 4 x 25 cm (4m) Meranti 1.8900 m2 280,000.00 529,200.00
Lem Kayu 0.5000 Kg 42,857.14 21,428.57
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang Kayu 3.0000 OH 120,000.00 360,000.00
Kepala tukang 0.3000 OH 125,000.00 37,500.00
Mandor 0.0500 OH 150,000.00 7,500.00
Jumlah 1,055,628.57
Overhead + Profit 10% 105,562.86
Jumlah 1,161,191.43
Dibulatkan 1,161,190.00
149
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

C.004 Pembuatan 1 bh Daun Pintu Shaft Besi 900 x 1250 mm


Daun Pintu Shaft + Frame + hendel dan engsel 1.0000 bh 1,819,300.00 1,819,300.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Besi 2.0000 OH 120,000.00 240,000.00
Mandor 0.0500 OH 150,000.00 7,500.00
Jumlah 2,116,800.00
Overhead + Profit 10% 211,680.00
Jumlah 2,328,480.00
Dibulatkan 2,328,480.00
C.005 Pembuatan 1 bh Kusen + Daun Pintu Alumunium 210 x 80 cm + Kaca Bouven
Kusen + Daun Pintu alumunium type 210 x 80 cm 1.0000 bh 2,850,000.00 2,850,000.00
Kaca Bouven 0.4600 m2 141,900.00 65,274.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Besi 2.0000 OH 120,000.00 240,000.00
Mandor 0.0500 OH 150,000.00 7,500.00
Jumlah 3,212,774.00
Overhead + Profit 10% 321,277.40
Jumlah 3,534,051.40
Dibulatkan 3,534,050.00
HARGA SATUAN PEKERJAAN PASANGAN DINDING
Pemasangan 1 m2 Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
Bata Ringan 10 x 20 x 60 cm / bh 8.4000 bh 8,500.00 71,400.00
Mortar Perekat Bata Ringan 0.0630 kg 85,000.00 5,355.00
Peralatan 1.0000 ls 7,675.50 7,675.50
Pekerja 0.6710 OH 100,000.00 67,100.00
Tukang Batu 0.1300 OH 120,000.00 15,600.00
Kepala Tukang 0.0130 OH 125,000.00 1,625.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 169,205.50
Overhead + Profit 10% 16,920.55
Jumlah 186,126.05
Dibulatkan 186,120.00

C.001 Pemasangan 1 m2 Kaca Polos Tebal 5 mm


Kaca Panasap/Soles Dark Grey t = 5 mm 1.1000 m2 212,850.00 234,135.00
Sealant Silicone 300 ml 0.0500 tube 60,000.00 3,000.00
Pekerja 0.0150 OH 100,000.00 1,500.00
Tukang 0.1500 OH 120,000.00 18,000.00
Kepala Tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0008 OH 150,000.00 120.00
Jumlah 258,630.00
Overhead + Profit 10% 25,863.00
Jumlah 284,493.00
Dibulatkan 284,490.00
D HARGA SATUAN PEKERJAAN PLESTERAN
D.001 Perbaikan Dinding 1 m2 Plesteran 1 SP : 3 PP, tebal 15 mm
Semen PC Tiga Roda 7.7760 kg 1,222.50 9,506.16
Pasir Pasang Cimalaka 0.0230 m3 250,000.00 5,750.00
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang Batu 0.1500 OH 120,000.00 18,000.00
Kepala tukang 0.0150 OH 125,000.00 1,875.00
Mandor 0.0150 OH 150,000.00 2,250.00
Jumlah 67,381.16
Overhead + Profit 10% 6,738.12
150
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Jumlah 74,119.28
Dibulatkan 74,110.00
D.002 Perbaikan Dinding 1 m2 Acian
Semen PC Tiga Roda 3.2500 kg 1,222.50 3,973.13
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Batu 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 38,723.13
Overhead + Profit 10% 3,872.31
Jumlah 42,595.44
Dibulatkan 42,590.00
D.003 Pemasangan Screed 1 m2
Semen PC Tiga Roda 4.2000 kg 1,222.50 5,134.50
Pasir Pasang Cimalaka 0.0080 m3 250,000.00 2,000.00
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Batu 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0100 OH 150,000.00 1,500.00
Jumlah 41,884.50
Overhead + Profit 10% 4,188.45
Jumlah 46,072.95
Dibulatkan 46,070.00
151
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

E HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


Pemasangan 1 m2 Lantai Keramik ukuran 25 cm x 50 cm Platinum
Keramik 25 x 50 cm Paltinum 8.0000 bh 8,437.50 67,500.00
Semen PC Tiga Roda 10.4000 kg 1,222.50 12,714.00
Semen warna 1.0000 kg 20,000.00 20,000.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2700 OH 100,000.00 27,000.00
Tukang batu 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0140 OH 125,000.00 1,750.00
Mandor 0.0140 OH 150,000.00 2,100.00
Jumlah 158,514.00
Overhead + Profit 10% 15,851.40
Jumlah 174,365.40
Dibulatkan 174,360.00
E.001 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Polished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh 18,750.00 75,000.00
Semen PC Tiga Roda 9.6000 kg 1,222.50 11,736.00
Semen warna 1.5000 kg 20,000.00 30,000.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 169,686.00
Overhead + Profit 10% 16,968.60
Jumlah 186,654.60
Dibulatkan 186,650.00
Pemasangan 1 m2 Keramik Dinding ukuran 25 cm x 50 cm Mulia
Keramik 25 x 50 cm Mulia 6.0000 bh 7,125.00 42,750.00
Semen PC Tiga Roda 8.1900 kg 1,222.50 10,012.28
Semen warna 1.6200 kg 20,000.00 32,400.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.7000 OH 100,000.00 70,000.00
Tukang batu 0.3500 OH 120,000.00 42,000.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0350 OH 150,000.00 5,250.00
Jumlah 218,037.28
Overhead + Profit 10% 21,803.73
Jumlah 239,841.00
Dibulatkan 239,840.00
E.001 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Unpolished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh 18,750.00 75,000.00
Semen PC Tiga Roda 9.6000 kg 1,222.50 11,736.00
Semen warna 1.5000 kg 20,000.00 30,000.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 100,000.00 24,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0120 OH 150,000.00 1,800.00
Jumlah 169,686.00
Overhead + Profit 10% 16,968.60
Jumlah 186,654.60
Dibulatkan 186,650.00
Pemasangan 1 m' Stepnosing Keramik Tangga ukuran 10 cm x 60 cm Unpolished Platinum
152
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Stepnosing Keramik Tangga 10 cm x 60 1.6670 bh 20,000.00 33,340.00


Semen PC Tiga Roda 1.6500 kg 1,222.50 2,017.13
Semen warna 0.0040 kg 20,000.00 80.00
Pasir Pasang Cimalaka 0.0130 m3 250,000.00 3,250.00
Pekerja 0.0900 OH 100,000.00 9,000.00
Tukang batu 0.0900 OH 120,000.00 10,800.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 63,612.13
Overhead + Profit 10% 6,361.21
Jumlah 69,973.34
Dibulatkan 69,970.00
Pemasangan 1 m2 floor hardener
Floor Hardener Natural Sika Chapdur / 25 kg 5.0000 kg 4,600.00 23,000.00
Pekerja 0.1200 OH 100,000.00 12,000.00
Tukang batu 0.1200 OH 120,000.00 14,400.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0060 OH 150,000.00 900.00
Jumlah 51,800.00
Overhead + Profit 10% 5,180.00
Jumlah 56,980.00
Dibulatkan 56,980.00
Pemasangan 1 m2 Lantai Sidewalk
Rubber Tactile 30.30.2 3.3333 Lbr 165,000.00 550,000.00
Double Tape Black VHB 3M Original Super Kuat Super Lengket 24mm 4.0000 m' 25,000.00 100,000.00
Pekerja 0.1500 OH 100,000.00 15,000.00
Mandor 0.0140 OH 150,000.00 2,100.00
Jumlah 667,100.00
Overhead + Profit 10% 66,710.00
Jumlah 733,810.00
Dibulatkan 733,810.00
Pemasangan 1 m2 Keramik Dinding ukuran 50 cm x 50 cm Granito
Keramik 25 x 50 cm Granito 6.0000 bh 18,125.00 108,750.00
Semen PC Tiga Roda 8.1900 kg 1,222.50 10,012.28
Semen warna 1.6200 kg 20,000.00 32,400.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.7000 OH 100,000.00 70,000.00
Tukang batu 0.3500 OH 120,000.00 42,000.00
Kepala tukang 0.0350 OH 125,000.00 4,375.00
Mandor 0.0350 OH 150,000.00 5,250.00
Jumlah 284,037.28
Overhead + Profit 10% 28,403.73
Jumlah 312,441.00
Dibulatkan 312,440.00
E.002 Pemasangan 1 bh floor drain
Floordrain 1.0000 unit 280,000.00 280,000.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang batu 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 295,000.00
Overhead + Profit 10% 29,500.00
Jumlah 324,500.00
Dibulatkan 324,500.00
153
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

F HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120x240) cm, tebal 9 mm
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3640 lbr 60,000.00 21,840.00
Paku Sekrup 0.1100 kg 20,833.33 2,291.67
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang kayu 0.0500 OH 120,000.00 6,000.00
Kepala tukang 0.0050 OH 125,000.00 625.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 41,506.67
Overhead + Profit 10% 4,150.67
Jumlah 45,657.33
Dibulatkan 45,650.00
Pemasangan 1 m2 Langit-langit Gypsum Board + Rangka Plafon Alumunium
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 1.0000 m2 20,833.33 20,833.33
Profil Alumunium “T” 5.0000 m' 10,000.00 50,000.00
Kawat diameter 4 mm 0.1500 kg 20,000.00 3,000.00
Ramset 1.0500 bh 2,000.00 2,100.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Besi 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 195,933.33
Overhead + Profit 10% 19,593.33
Jumlah 215,526.67
Dibulatkan 215,520.00
F.001 Pemasangan 1 m2 Langit-langit GRC + Rangka Plafon Alumunium Interior
Panel GRC 120 x 240 cm t = 4 mm 1.0000 m2 22,569.44 22,569.44
Profil Alumunium “T” 5.0000 m' 10,000.00 50,000.00
Kawat diameter 4 mm 0.1500 kg 20,000.00 3,000.00
Ramset 1.0500 bh 2,000.00 2,100.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Besi 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 197,669.44
Overhead + Profit 10% 19,766.94
Jumlah 217,436.39
Dibulatkan 217,430.00
F.002 Pemasangan 1 m2 Langit-langit GRC Eksterior
Panel GRC 120 x 240 cm t = 4 mm 0.3640 lbr 65,000.00 23,660.00
Pekerja 0.5000 OH 100,000.00 50,000.00
Tukang Besi 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 143,660.00
Overhead + Profit 10% 14,366.00
Jumlah 158,026.00
Dibulatkan 158,020.00
F.003 Pemasangan 1 m2 Langit-langit Akustik + Frame Crosstee
Panel Akustik 60 cm x 60 cm t = 4 mm 1.0000 m2 41,666.67 41,666.67
Profil Alumunium “T” 5.0000 m' 10,000.00 50,000.00
Kawat diameter 4 mm 0.1500 kg 20,000.00 3,000.00
Ramset 1.0500 bh 2,000.00 2,100.00
Pekerja 0.5000 OH 100,000.00 50,000.00
154
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Tukang Besi 0.5000 OH 120,000.00 60,000.00


Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 216,766.67
Overhead + Profit 10% 21,676.67
Jumlah 238,443.33
Dibulatkan 238,440.00
HARGA SATUAN PEKERJAAN KUNCI DAN KACA
Pemasangan 1 bh Kunci dan Handle Pintu Kayu
Kunci + Handle Pintu Besar 1.0000 bh 150,000.00 150,000.00
Tukang kayu 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Jumlah 216,250.00
Overhead + Profit 10% 21,625.00
Jumlah 237,875.00
Dibulatkan 237,870.00
Perbaikan 1 unit Pintu Kayu
Paku Kayu 5 cm s/d 10 cm 0.2500 kg 20,000.00 5,000.00
Alat bantu ( Palu, serut kayu, amplas ) 1.0000 ls 5,000.00 5,000.00
Tukang kayu 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.3500 OH 150,000.00 52,500.00
Jumlah 128,750.00
Overhead + Profit 10% 12,875.00
Jumlah 141,625.00
Dibulatkan 141,620.00
Perbaikan 1 unit Daun Pintu Shaft Baru Kayu
Daun Pintu Shaft 1.0000 bh 1,610,000 1,610,000.00
Paku Kayu 5 cm s/d 10 cm 0.2500 kg 20,000.00 5,000.00
Alat bantu ( Palu, serut kayu, amplas ) 1.0000 ls 5,000.00 5,000.00
Tukang kayu 0.5000 OH 120,000.00 60,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.3500 OH 150,000.00 52,500.00
Jumlah 1,738,750.00
Overhead + Profit 10% 173,875.00
Jumlah 1,912,625.00
Dibulatkan 1,912,620.00
G HARGA SATUAN PEKERJAAN PENGECATAN
Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Interior
Cat Dasar Tembok Interior Dulux Catylac 0.1200 kg 47,500.00 5,700.00
Cat Tembok Interior Dulux Catylac 0.1800 kg 28,200.00 5,076.00
Pekerja 0.0280 OH 100,000.00 2,800.00
Tukang Cat 0.0420 OH 120,000.00 5,040.00
Kepala tukang 0.0042 OH 125,000.00 525.00
Mandor 0.0030 OH 150,000.00 450.00
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls 6,000.00 6,000.00
Jumlah 25,591.00
Overhead + Profit 10% 2,559.10
Jumlah 28,150.10
Dibulatkan 28,150.00
Pengecatan 1 m2 Langit-langit Lama (2 Lapis Cat Penutup)
Cat Dasar Tembok Interior Dulux Catylac 0.1200 Kg 47,500.00 5,700.00
Cat Tembok Interior Dulux Catylac 0.1800 Kg 28,200.00 5,076.00
Pekerja 0.0280 Oh 100,000.00 2,800.00
Tukang Cat 0.0420 Oh 120,000.00 5,040.00
Kepala Tukang 0.0042 Oh 125,000.00 525.00
155
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Mandor 0.0030 Oh 150,000.00 450.00


Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls 5,000.00 5,000.00
Jumlah 24,591.00
Keuntungan maksimal 10% 2,459.10
Jumlah 27,050.10
Dibulatkan 27,050.00
G.001 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Ekterior
Cat Dasar Tembok Eksterior Dulux Catylac 0.1200 kg 39,750.00 4,770.00
Cat Tembok Eksterior Dulux Catylac 0.1800 kg 37,200.00 6,696.00

Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) 1.0000 ls 6,000.00 6,000.00

Pekerja 0.0280 OH 100,000.00 2,800.00


Tukang Cat 0.0420 OH 120,000.00 5,040.00
Kepala tukang 0.0042 OH 125,000.00 525.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 26,281.00
Overhead + Profit 10% 2,628.10
Jumlah 28,909.10
Dibulatkan 28,900.00
Pengecatan 1 m2 Permukaan Baja Galvanis secara Manual Sistem 1 Lapis Cat Mutakhir
Cat Kayu dan Besi Avian 0.3000 kg 65,000.00 19,500.00
Kuas 2,5" 0.0100 bh 10,000.00 100.00
Thinner Impala 0.0100 ltr 40,000.00 400.00
Pekerja 0.0600 OH 100,000.00 6,000.00
Tukang Cat 0.0600 OH 120,000.00 7,200.00
Kepala tukang 0.0120 OH 125,000.00 1,500.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 35,150.00
Overhead + Profit 10% 3,515.00
Jumlah 38,665.00
Dibulatkan 38,660.00

HARGA SATUAN PEKERJAAN SANITASI DAN AKSESORIS


Pemasangan 1 bh Kran Diameter ¾" atau ½"
Kran Bebek Ø1/2" Onda 1.0000 bh 82,500.00 82,500.00
Seal Tape ½" Onda 0.0250 bh 5,000.00 125.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang batu 0.4000 OH 120,000.00 48,000.00
Kepala tukang 0.0400 OH 125,000.00 5,000.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 137,375.00
Overhead + Profit 10% 13,737.50
Jumlah 151,112.50
Dibulatkan 151,110.00
Pemasangan 1 bh Kran Wasser Fleksibel
Kran Wasser Fleksibel 1.0000 bh 455,000.00 455,000.00
Seal Tape ½" Onda 0.0250 bh 5,000.00 125.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang batu 0.4000 OH 120,000.00 48,000.00
Kepala tukang 0.0400 OH 125,000.00 5,000.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 509,875.00
Overhead + Profit 10% 50,987.50
Jumlah 560,862.50
Dibulatkan 560,860.00
Pemasangan 1 bh Bak Cuci Piring Stainles Steel
156
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Kitchen Sink Standar (1 Lobang) Royal 1.0000 unit 130,000.00 130,000.00


Pekerja 0.0300 OH 100,000.00 3,000.00
Tukang batu 0.3000 OH 120,000.00 36,000.00
Kepala tukang 0.0300 OH 125,000.00 3,750.00
Mandor 0.0150 OH 150,000.00 2,250.00
Jumlah 175,000.00
Overhead + Profit 10% 17,500.00
Jumlah 192,500.00
Dibulatkan 192,500.00
Pemasangan 1 m' Pipa PVC Tipe AW dia 2"
Pipa PVC dia 2" 1.2000 m 21,150.00 25,380.00
Perlengkapan 0.4200 Ls 7,402.50 3,109.05
Pekerja 0.0540 OH 100,000.00 5,400.00
Tukang batu 0.0900 OH 120,000.00 10,800.00
Kepala Tukang 0.0090 OH 125,000.00 1,125.00
Mandor 0.0030 OH 150,000.00 450.00
Jumlah 46,264.05
Overhead + Profit 10% 4,626.41
Jumlah 50,890.46
Dibulatkan 50,890.00
Pemasangan 1 m' Pipa PVC Tipe AW dia 3"
Pipa PVC dia 3" 1.2000 m 43,416.67 52,100.00
Perlengkapan 0.4200 ls 15,195.83 6,382.25
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang batu 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 85,069.75
Overhead + Profit 10% 8,506.98
Jumlah 93,576.73
Dibulatkan 93,570.00
Pemasangan 1 bh Roofdrain
Roofdrain 1.0000 Unit 37,500.00 37,500.00
Pekerja 0.0100 OH 100,000.00 1,000.00
Tukang batu 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0100 OH 125,000.00 1,250.00
Mandor 0.0050 OH 150,000.00 750.00
Jumlah 52,500.00
Overhead + Profit 10% 5,250.00
Jumlah 57,750.00
Dibulatkan 57,750.00
Pekerjaan Perapihan Pipa
Pekerja 0.0810 OH 100,000.00 8,100.00
Tukang Pipa 0.1350 OH 120,000.00 16,200.00
Kepala tukang 0.0135 OH 125,000.00 1,687.50
Mandor 0.0040 OH 150,000.00 600.00
Jumlah 26,587.50
Overhead + Profit 10% 2,658.75
Jumlah 29,246.25
Dibulatkan 29,240.00
HARGA SATUAN PEKERJAAN MEKANIKAL
Bongkar Pasang 1 Unit AC + Freon R 410
Freon R 410 1.0000 ls 619,999.00 619,999.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang AC 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 651,999.00
Overhead + Profit 10% 65,199.90
157
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Jumlah 717,198.90
Dibulatkan 717,190.00

H HARGA SATUAN PEKERJAAN ELEKTRIKAL


Pemasangan 1 m' Cover Tray uk. 300 mm x 50 mm
Cover Tray 300 mm x 50 mm 1.0000 bh 404,000.00 404,000.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 436,000.00
Overhead + Profit 10% 43,600.00
Jumlah 479,600.00
Dibulatkan 479,600.00
Pemasangan 1 bh Panel Distribusi 3 Phase 30 grup
Panel Distribusi 3Phase 1.0000 bh 6,500,000.00 6,500,000.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 6,532,000.00
Overhead + Profit 10% 653,200.00
Jumlah 7,185,200.00
Dibulatkan 7,185,200.00
Pemasangan 1 m' Kabel Tray uk. 300 mm x 100 mm
Kabel Tray 300 mm x 100 mm 1.0000 bh 488,000.00 488,000.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 520,000.00
Overhead + Profit 10% 52,000.00
Jumlah 572,000.00
Dibulatkan 572,000.00
Pemasangan 1 bh Lampu Downlight
Lampu Downlight LED 1 X 18 W Philips 1.0000 bh 306,000.00 306,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 340,500.00
Overhead + Profit 10% 34,050.00
Jumlah 374,550.00
Dibulatkan 374,550.00
Pemasangan 1 bh Lampu Panel LED RC 40 w
Lampu LED panel 40 watt 1.0000 bh 711,000.00 711,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 745,500.00
Overhead + Profit 10% 74,550.00
Jumlah 820,050.00
Dibulatkan 820,050.00
Pemasangan 1 bh Lampu Panel LED RC 29 w
Lampu LED panel 29 watt 1.0000 bh 570,000.00 570,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
158
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Pekerja 0.1000 OH 100,000.00 10,000.00


Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 604,500.00
Overhead + Profit 10% 60,450.00
Jumlah 664,950.00
Dibulatkan 664,950.00
Pemasangan 1 bh Stair Lamp & Battery TL LED 2 X 14
Stair Lamp & Battery TL LED 2 X 14 1.0000 bh 485,000.00 485,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 519,500.00
Overhead + Profit 10% 51,950.00
Jumlah 571,450.00
Dibulatkan 571,450.00
Pemasangan 1 bh Lampu Baret Ceiling 22 w
Lampu Baret Ceiling 22 w 1.0000 bh 225,000.00 225,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 259,500.00
Overhead + Profit 10% 25,950.00
Jumlah 285,450.00
Dibulatkan 285,450.00
Pemasangan 1 bh Lampu Baret Ceiling 10 w
Lampu Baret Ceiling 10 w 1.0000 bh 251,000.00 251,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 285,500.00
Overhead + Profit 10% 28,550.00
Jumlah 314,050.00
Dibulatkan 314,050.00
Perapihan 1 Titik Instalasi
Alat Bantu ( Tang Amper, tespen, tang kombinasi, tang potong, isolasi,
1.0000 ls 150,000.00 150,000.00
obeng, Multi tester)
Pembantu Instalator 2.0000 Oh 100,000.00 200,000.00
Instalator 3.0000 Oh 120,000.00 360,000.00
Mandor 1.0000 Oh 150,000.00 150,000.00
Jumlah 860,000.00
Overhead + Profit 10% 86,000.00
Jumlah 946,000.00
Dibulatkan 946,000.00
Pemasangan 1 bh Single Two Way Switch
Saklar Single Standar Philips 1.0000 bh 16,500.00 16,500.00
Mangkok listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 56,000.00
159
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Overhead + Profit 10% 5,600.00


Jumlah 61,600.00
Dibulatkan 61,600.00
Pemasangan 1 bh Double Two Way Switch
Saklar Double Standar Philips 1.0000 bh 22,000.00 22,000.00
Mangkok listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 61,500.00
Overhead + Profit 10% 6,150.00
Jumlah 67,650.00
Dibulatkan 67,650.00
Pemasangan 1 bh Sensor Lampu
Sensor gerak 1.0000 bh 600,000.00 600,000.00
Mangkok listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 639,500.00
Overhead + Profit 10% 63,950.00
Jumlah 703,450.00
Dibulatkan 703,450.00
Pemasangan 1 bh Stop Kontak
Stop Kontak Single (1 Lubang) 1.0000 bh 15,000.00 15,000.00
Mangkok listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 54,500.00
Overhead + Profit 10% 5,450.00
Jumlah 59,950.00
Dibulatkan 59,950.00
Pemasangan 1 Unit Exhaust Fan
Exhaust Fan 1.0000 bh 593,100.00 593,100.00
Mangkok listrik 1.0000 bh 5,000.00 5,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 632,600.00
Overhead + Profit 10% 63,260.00
Jumlah 695,860.00
Dibulatkan 695,860.00
Pemasangan 1 Buah Titik Lampu Ball Ice dan Instalasi
Brennenstuhl Bulk Head Light Rumah Lampu Ball Ice 1.0000 bh 125,000.00 125,000.00
Lampu LED Philips 14,5 watt 1.0000 bh 55,000.00 55,000.00
Pipa Listrik 5/8" 3.0000 btg 17,000.00 51,000.00
Kabel nyy 2 x 1,5 supreme 24.0000 m 11,572.00 277,728.00
Elbow 4.0000 bh 14,000.00 56,000.00
Klem 24.0000 bh 800.00 19,200.00
Mangkok Listrik 1.0000 bh 5,000.00 5,000.00
Saklar 1.0000 bh 13,500.00 13,500.00
160
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Pekerja 0.1000 OH 100,000.00 10,000.00


Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 634,428.00
Overhead + Profit 10% 63,442.80
Jumlah 697,870.80
Dibulatkan 697,870.00
H.001 Pemasangan 1bh Titik Lampu Lampu LED Downlight Meson Outbow 24W
Lampu LED Downlight Meson Outbow 24W 1.0000 bh 154,500.00 154,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 189,000.00
Overhead + Profit 10% 18,900.00
Jumlah 207,900.00
Dibulatkan 207,900.00
H.002 Pemasangan 1bh Lampu LED Baret 40w (bulat)
Lampu LED Baret 40w 1.0000 bh 320,000.00 320,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 354,500.00
Overhead + Profit 10% 35,450.00
Jumlah 389,950.00
Dibulatkan 389,950.00
H.003 PHILIPS PANEL LED 60X60 40W 3600LM LAMPU LED PLAFON 60 X 60 40 WATT
PANEL LED 60X60 40W 3600LM 1.0000 bh 725,000.00 725,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Listrik 0.1000 OH 120,000.00 12,000.00
Kepala tukang 0.0500 OH 125,000.00 6,250.00
Mandor 0.0250 OH 150,000.00 3,750.00
Jumlah 759,500.00
Overhead + Profit 10% 75,950.00
Jumlah 835,450.00
Dibulatkan 835,450.00
HARGA SATUAN PEKERJAAN BETON
Membuat 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm
Kayu Kaso 5/5 Albasia (3m) 0.0020 m3 1,200,000.00 2,400.00
Paku Kayu 5 cm s/d 10 cm 0.0100 kg 20,000.00 200.00
Besi Beton Polos KSTY 3.0000 kg 12,250.00 36,750.00
Kawat Beton 0.4500 kg 20,000.00 9,000.00
Semen PC Tiga Roda 4.0000 kg 1,222.50 4,890.00
Pasir Beton 0.0060 m3 250,000.00 1,500.00
Kerikil 0.0090 m3 280,000.00 2,520.00
Pekerja 0.1800 OH 100,000.00 18,000.00
Tukang batu 0.0200 OH 120,000.00 2,400.00
Tukang kayu 0.0200 OH 120,000.00 2,400.00
Tukang Besi Beton 0.0200 OH 120,000.00 2,400.00
Kepala tukang 0.0060 OH 125,000.00 750.00
Mandor 0.0090 OH 150,000.00 1,350.00
Jumlah 84,560.00
Overhead + Profit 10% 8,456.00
161
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Jumlah 93,016.00
Dibulatkan 93,010.00
J HARGA SATUAN PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin)
profil C75
Baja Ringan Canai dingin C.75 0.8730 btg 162,500.00 141,862.50
Aksesories 0.0873 % 16,250.00 1,418.63
Pekerja 0.7340 OH 100,000.00 73,400.00
Tukang Besi 0.7340 OH 120,000.00 88,080.00
Kepala tukang 0.0730 OH 125,000.00 9,125.00
Mandor 0.0370 OH 150,000.00 5,550.00
Jumlah 319,436.13
Overhead + Profit 10% 31,943.61
Jumlah 351,379.74
Dibulatkan 351,370.00
Pemasangan 1 m' Rangka Baja Ringan 0.45 tct
Baja Ringan 0.45 tct 1.0000 m' 50,000.00 50,000.00
Aksesories 0.1000 % 5,000.00 500.00
Pekerja 0.7340 OH 100,000.00 73,400.00
Tukang Besi 0.7340 OH 120,000.00 88,080.00
Kepala tukang 0.0730 OH 125,000.00 9,125.00
Mandor 0.0370 OH 150,000.00 5,550.00
Jumlah 226,655.00
Overhead + Profit 10% 22,665.50
Jumlah 249,320.50
Dibulatkan 249,320.00
J.001 Pemasangan 1 m2 Penutup Atap Polycarbonate 11,8 x 2,1m t = 4mm
Policarbonat 1.0000 m2 39,870.86 39,870.86
Pekerja 0.7340 OH 100,000.00 73,400.00
Tukang Besi 0.7340 OH 120,000.00 88,080.00
Kepala tukang 0.0730 OH 125,000.00 9,125.00
Mandor 0.0370 OH 150,000.00 5,550.00
Jumlah 216,025.86
Overhead + Profit 10% 21,602.59
Jumlah 237,628.45
Dibulatkan 237,620.00
K HARGA SATUAN PEKERJAAN PENGECORAN DAN PEMBESIAN
K.001 Pemasangan 1 m2 Bekisting untuk tangga beton bangunan gedung (2x Pakai)
Kayu Kelas III 0.0165 m3 1,500,000.00 24,750.00
Paku 5cm - 12cm 0.4000 kg 20,000.00 8,000.00
Minyak Bekisting 0.1500 liter 50,000.00 7,500.00
Balok kayu kelas II 0.0081 m3 6,000,000.00 48,600.00
Multiplek tebal 9 mm 0.2013 lbr 134,000.00 26,974.20
Dolken Kayu, dia 8-10 cm, Panjang 4m 1.1000 batang 85,000.00 93,500.00
Pekerja 0.6600 OH 100,000.00 66,000.00
Tukang Kayu 0.3300 OH 120,000.00 39,600.00
Kepala tukang 0.0330 OH 125,000.00 4,125.00
Mandor 0.0330 OH 150,000.00 4,950.00
Jumlah 323,999.20
Overhead + Profit 10% 32,399.92
Jumlah 356,399.12
Dibulatkan 356,390.00
K.002 Pembesian dengan Besi Polos
Besi Polos 1.0500 Kg 12,250.00 12,862.50
Kawat Benrad 0.0150 kg 20,000.00 300.00
Pekerja 0.0070 OH 100,000.00 700.00
Tukang Besi 0.0070 OH 120,000.00 840.00
Kepala tukang 0.0007 OH 125,000.00 87.50
Mandor 0.0004 OH 150,000.00 60.00
162
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 Rp 6.00

Jumlah 14,850.00
Overhead + Profit 10% 1,485.00
Jumlah 16,335.00
Dibulatkan 16,330.00
K.003 Pembuatan 1 m3 Beton Mutu f'c = 21,7 Mpa (K250)
Semen Portland 384.0000 Kg 1,222.50 469,440.00
Pasir Beton 0.4943 kg 250,000.00 123,571.43
Kerikil 0.7696 kg 280,000.00 215,496.30
Air 215.0000 Liter 50.00 10,750.00
Sewa Molen 0.2380 hari 351,900.00 83,752.20
Pekerja 1.0000 OH 100,000.00 100,000.00
Tukang batu 0.2500 OH 120,000.00 30,000.00
Kepala tukang 0.0250 OH 125,000.00 3,125.00
Mandor 0.0500 OH 150,000.00 7,500.00
Jumlah 1,043,634.92
Overhead + Profit 10% 104,363.49
Jumlah 1,147,998.42
Dibulatkan 1,147,990.00
L HARGA SATUAN PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
L.001 Pemasangan 1 m' Talang air galvanis
Talang air galvanis lebar 15 cm tinggi 10 cm 1.0000 m' 100,000.00 100,000.00
paku 2- 4 cm 0.0100 kg 22,000.00 220.00
Plat Strip Besi 3,0 x 30 mm 0.5000 kg 17,220.90 8,610.45
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang 0.2000 OH 120,000.00 24,000.00
Kepala tukang 0.0200 OH 125,000.00 2,500.00
Mandor 0.0010 OH 150,000.00 150.00
Jumlah 155,480.45
Overhead + Profit 10% 15,548.05
Jumlah 171,028.50
Dibulatkan 171,020.00
L.002 Pemasangan 1 m' Pipa Galvanis Diameter 3"
Pipa Galvanis 3" 1.2000 m 213,833.33 256,600.00
Perlengkapan 1.0000 Ls 89,810.00 89,810.00
Pekerja 0.1350 OH 100,000.00 13,500.00
Tukang Pipa 0.2250 OH 120,000.00 27,000.00
Kepala tukang 0.0230 OH 125,000.00 2,875.00
Mandor 0.0070 OH 150,000.00 1,050.00
Jumlah 390,835.00
Overhead + Profit 10% 39,083.50
Jumlah 429,918.50
Dibulatkan 429,910.00
No URAIAN Satuan Harga Satuan
### Pengecatan 1 m tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
2
m2 Err:509
### Pemasangan 1 m2 lantai ubin keramik ukuran 40 cm x 40 cm m2 Err:509
### Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240) cm, tebal 9 mm m2 Err:509
### Err:509 m2 Err:509
### Err:509 m2 Err:509
### Pemasangan 1 m2 plesteran/Perbaikan dinding 1 SP : 3 PP, tebal 15 mm m2 Err:509
### Err:509 m2 Err:509
### 1 Ls Perapihan instalasi kabel ls 1,134,210.00
### 1 m2 Perbaikan Plin lantai 40 x 10 m2 Err:509
### 1 Bh Perbaikan saklar Lampu tunggal bh Err:509
### 1 Bh Pemasangan Cermin t 5 mm bh 108,150.00
### 1 Ls Perbaikan Closet Duduk ls 874,970.00
### 1 BH Pemasangan Lampu cermin TL 18 WATT bh #N/A
### 1 Bh Perbaikan Lampu toilet dowlight bh Err:509
### Bongkar keramik 20 x 20 m2 Err:509
### #REF! bh Err:509
### #REF! m2 Err:509
### #REF! m2 Err:509
### #REF! m2 Err:509
### #REF! m2 Err:509
### #REF! bh Err:509
### #REF! bh Err:509
### #REF! bh
### #REF! m2
### #REF! bh Err:509
### #REF! bh
### #REF! ls
### #REF! bh Err:509
### #REF! bh
### #REF! m2
### #REF! bh 90,070.00
### #REF! ls
### #REF! bh Err:509
### #REF! bh Err:509
### #REF! bh
### #REF! m2 #N/A
### #REF! ls
### #REF! ls
### #REF! m2 Err:509
### #REF! m2 Err:509
### #REF! bh Err:509
### Pekerjaan 1 m2 Pembuatan Direksi Keet Atap Asbes Gelombang, Dinding Triplek, Kaca Nako m2 #N/A
### Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame bh #N/A
Besi Siku dan Tiang Kayu 8/12
### Pemasangan 1 m2 lantai keramik ukuran 20 cm x 20 cm Err:509
164

ANALISIS HARGA SATUAN PEKERJAAN


BIDANG CIPTA KARYA
PEMERINTAH DAERAH KOTA CIMAHI
TAHUN ANGGARAN 2021

Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016 tentang Pedoman Analisis
Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)
165

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


O.001 (K3) Pemasangan 1 buah kloset duduk/ monoblock
Kloset Duduk INA 1.0000 unit #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 3.3000 OH 129,600.00 427,680.00
Tukang batu 1.1000 OH 148,100.00 162,910.00
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Mandor 0.1600 OH 177,600.00 28,416.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.002 Pemasangan 1 buah kloset jongkok porslen
Kloset Jongkok INA 1.0000 unit #N/A #N/A
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang batu 1.5000 OH 148,100.00 222,150.00
Kepala tukang 0.1500 OH 162,500.00 24,375.00
Mandor 0.1600 OH 177,600.00 28,416.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.003 Pemasangan 1 buah kloset jongkok teraso
Kloset Jongkok Teraso 1.0000 unit #N/A #N/A
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00
Batu Bata Merah (Press) 7.0000 buah #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang batu 1.5000 OH 148,100.00 222,150.00
Kepala tukang 0.1500 OH 162,500.00 24,375.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.004 (K3) Pemasangan 1 buah urinoir
Urinal Tipe AW115J Toto 1.0000 unit #N/A #N/A
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang Batu 1.0000 OH 148,100.00 148,100.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.004 (K3) Perbaikan 1 buah urinoir
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
166

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00


Perlengkapan 1.0000 Ls 450,000.00 450,000.00
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang Batu 1.0000 OH 148,100.00 148,100.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
167

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.005 (K3) Pemasangan 1 buah wastafel


Washtafel INA 1.2000 unit #N/A #N/A
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 1.2000 OH 129,600.00 155,520.00
Tukang batu 1.4500 OH 148,100.00 214,745.00
Kepala tukang 0.1500 OH 162,500.00 24,375.00
Mandor 0.0600 OH 177,600.00 10,656.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.005 (K3) Perbaikan 1 buah wastafel
Semen PC Tiga Roda / kg 6.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0100 m3 250,000.00 2,500.00
Perlengkapan 1.0000 Ls 450,000.00 450,000.00
Pekerja 1.2000 OH 129,600.00 155,520.00
Tukang batu 1.4500 OH 148,100.00 214,745.00
Kepala tukang 0.1500 OH 162,500.00 24,375.00
Mandor 0.0600 OH 177,600.00 10,656.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Perlengkapan 1.0000 Ls - -
Pekerja 0.0750 OH 129,600.00 9,720.00
Tukang batu 0.7500 OH 148,100.00 111,075.00
Kepala tukang 0.0750 OH 162,500.00 12,187.50
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.007 (K3) Pemasangan 1 buah bak fibreglass vol 1 m3
Bak Kolam Fiber Glass 2 x 1 x 0,5 m v = 1000 liter 1.0000 Unit #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 3.0000 OH 129,600.00 388,800.00
Tukang Batu 4.5000 OH 148,100.00 666,450.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.9000 OH 177,600.00 159,840.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.009 (K3) Pemasangan 1 buah bak mandi batu bata volume 0,30 m3
Batu Bata Merah (Press) 150.0000 bh #N/A #N/A
Semen PC Tiga Roda / kg 120.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.3000 m3 250,000.00 75,000.00
Keramik 11 x 11 Polos KIA 360.0000 bh #N/A #N/A
Semen Warna 6.0000 kg 15,000.00 90,000.00
Pekerja 6.0000 OH 129,600.00 777,600.00
Tukang batu 3.0000 OH 148,100.00 444,300.00
168

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Kepala tukang 0.3000 OH 162,500.00 48,750.00


Mandor 0.0300 OH 177,600.00 5,328.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.010 Pemasangan 1 buah bak mandi teraso volume 0,30 m3
Bak Teraso 1.0000 unit #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 3.0000 OH 129,600.00 388,800.00
Tukang batu 4.5000 OH 148,100.00 666,450.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.9000 OH 177,600.00 159,840.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
169

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.011 Pemasangan 1 buah bak air fibreglass vol 0,1 m3


Bak Mandi Sudut Fiber Glass 120 liter Alco 1.0000 Unit #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.3000 OH 129,600.00 38,880.00
Tukang Batu 0.4500 OH 148,100.00 66,645.00
Kepala tukang 0.0450 OH 162,500.00 7,312.50
Mandor 0.0150 OH 177,600.00 2,664.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.012 (K3) Pemasangan 1 buah bak beton volume 1 m3
Beton Mutu K-175 0.9000 m3 #REF! #REF!
Baja Tulangan 180.0000 kg - -
Bekisting untuk dinding 8.0000 m2 #REF! #REF!
Keramik 11 x 11 Polos KIA 500.0000 bh #N/A #N/A
Perlengkapan 1.0000 Ls #REF! #REF!
Pekerja 3.5000 OH 129,600.00 453,600.00
Tukang batu 4.5000 OH 148,100.00 666,450.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0180 OH 177,600.00 3,196.80
Jumlah #REF!
Overhead + Profit 10% #REF!
Jumlah #REF!
Dibulatkan #REF!
O.013 Pemasangan 1 buah bak cuci piring stainles steel
Kitchen Sink Standar (1 Lobang) Royal 1.0000 unit 750,000.00 750,000.00
Waterdrain 1.0000 bh 63,000.00 63,000.00
Pekerja 0.0300 OH 129,600.00 3,888.00
Tukang batu 0.3000 OH 148,100.00 44,430.00
Kepala tukang 0.0300 OH 162,500.00 4,875.00
Mandor 0.0150 OH 177,600.00 2,664.00
Jumlah 868,857.00
Overhead + Profit 10% 86,885.70
Jumlah 955,742.70
Dibulatkan 955,740.00
O.014 Pemasangan 1 buah bak cuci piring teraso
Bak Cuci Piring Teraso 1.0000 unit #N/A #N/A
Waterdrain 1.0000 bh #N/A #N/A
Semen PC Tiga Roda / kg 20.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0500 m3 250,000.00 12,500.00
Pekerja 0.0500 OH 129,600.00 6,480.00
Tukang batu 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.015 Pemasangan 1 buah floor drain
Saringan Air Lantai Kamar Mandi Ø2" Onda 1.0000 unit #N/A #N/A
Pekerja 0.0100 OH 129,600.00 1,296.00
Tukang batu 0.1000 OH 148,100.00 14,810.00
170

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Kepala tukang 0.0100 OH 162,500.00 1,625.00


Mandor 0.0050 OH 177,600.00 888.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
171

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.016 Pemasangan 1 buah bak kontrol pasangan batu bata ukuran 30 cm x 30 cm tinggi 35 cm
Batu Bata Merah (Press) 40.0000 bh #N/A #N/A
Semen PC Tiga Roda / kg 44.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0700 m3 250,000.00 17,500.00
Pasir beton 0.0600 m3 300,000.00 18,000.00
Kerikil 0.0700 m3 300,000.00 21,000.00
Besi Beton Polos KSTY 1.6000 kg 10,300.00 16,480.00
Pekerja 2.1600 OH 129,600.00 279,936.00
Tukang batu 0.7200 OH 148,100.00 106,632.00
Kepala tukang 0.0720 OH 162,500.00 11,700.00
Mandor 0.0110 OH 177,600.00 1,953.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.017 Pemasangan 1 buah bak kontrol pasangan batu bata ukuran 45 cm x 45 cm tinggi 50 cm
Batu Bata Merah (Press) 70.0000 bh #N/A #N/A
Semen PC Tiga Roda / kg 77.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.1300 m3 250,000.00 32,500.00
Pasir beton 0.0900 m3 300,000.00 27,000.00
Kerikil 0.0200 m3 300,000.00 6,000.00
Besi Beton Polos KSTY 2.6000 kg 10,300.00 26,780.00
Pekerja 3.2000 OH 129,600.00 414,720.00
Tukang batu 1.1500 OH 148,100.00 170,315.00
Kepala tukang 0.0110 OH 162,500.00 1,787.50
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.018 Pemasangan 1 buah bak kontrol pasangan batu bata ukuran 60 cm x 60 cm tinggi 65 cm
Batu Bata Merah (Press) 123.0000 bh #N/A #N/A
Semen PC Tiga Roda / kg 114.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.1840 m3 250,000.00 46,000.00
Pasir beton 0.1200 m3 300,000.00 36,000.00
Kerikil 0.0330 m3 300,000.00 9,900.00
Besi Beton Polos KSTY 4.8500 kg 10,300.00 49,955.00
Pekerja 3.2000 OH 129,600.00 414,720.00
Tukang batu 1.1500 OH 148,100.00 170,315.00
Kepala tukang 0.0110 OH 162,500.00 1,787.50
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.019 Pemasangan 1 buah kran diameter ¾" atau ½"
Kran Tembok Ø1/2" Onda 1.0000 bh 25,000.00 25,000.00
Seal Tape ½" Onda 0.0250 bh 5,000.00 125.00
Pekerja 0.0100 OH 129,600.00 1,296.00
Tukang batu 0.4000 OH 148,100.00 59,240.00
Kepala tukang 0.0400 OH 162,500.00 6,500.00
Mandor 0.0050 OH 177,600.00 888.00
Jumlah 93,049.00
172

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Overhead + Profit 10% 9,304.90


Jumlah 102,353.90
Dibulatkan 102,350.00
173

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.020 Pemasangan 1 m' pipa galvanis diameter ¾"


Pipa Galvanis Medium Ø3/4" x 2,45 mm (6m) 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0540 OH 129,600.00 6,998.40
Tukang batu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0090 OH 162,500.00 1,462.50
Mandor 0.0270 OH 177,600.00 4,795.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.021 Pemasangan 1 m' pipa galvanis diameter 1"
Pipa Galvanis Medium Ø1" x 3,00 mm (6m) 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0540 OH 129,600.00 6,998.40
Tukang batu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0090 OH 162,500.00 1,462.50
Mandor 0.0270 OH 177,600.00 4,795.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.022 Pemasangan 1 m' pipa galvanis diameter 1 ½"
Pipa Galvanis Medium Ø1½" x 3,10 mm (6m) 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.1080 OH 129,600.00 13,996.80
Tukang batu 0.1800 OH 148,100.00 26,658.00
Kepala tukang 0.0180 OH 162,500.00 2,925.00
Mandor 0.0050 OH 177,600.00 888.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.023 Pemasangan 1 m' pipa galvanis diameter 3"
Pipa Galvanis Medium Ø3" x 3,75 mm (6m) 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.1350 OH 129,600.00 17,496.00
Tukang kayu 0.2250 OH 148,100.00 33,322.50
Kepala tukang 0.0230 OH 162,500.00 3,737.50
Mandor 0.0070 OH 177,600.00 1,243.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.024 Pemasangan 1 m' pipa galvanis diameter 4"
Pipa Galvanis Medium Ø4" x 4,20 mm (6m) 1.2000 m' 267,191.67 320,630.00
Perlengkapan 1.0000 Ls 93,517.08 93,517.08
Pekerja 0.1350 OH 129,600.00 17,496.00
Tukang kayu 0.2250 OH 148,100.00 33,322.50
Kepala tukang 0.0230 OH 162,500.00 3,737.50
Mandor 0.0070 OH 177,600.00 1,243.20
Jumlah 469,946.28
Overhead + Profit 10% 46,994.63
174

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah 516,940.91
Dibulatkan 516,940.00
175

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.025 Pemasangan 1 m' pipa PVC tipe AW diameter ½"


Pipa PVC AW Ø1/2" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0360 OH 129,600.00 4,665.60
Tukang batu 0.0600 OH 148,100.00 8,886.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.026 Pemasangan 1 m' pipa PVC tipe AW diameter ¾"
Pipa PVC AW Ø3/4" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0360 OH 129,600.00 4,665.60
Tukang batu 0.0600 OH 148,100.00 8,886.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.027 Pemasangan 1 m' pipa PVC tipe AW diameter 1"
Pipa PVC AW Ø1" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0360 OH 129,600.00 4,665.60
Tukang batu 0.0600 OH 148,100.00 8,886.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.028 Pemasangan 1 m' pipa PVC tipe AW diameter 1½"
Pipa PVC AW Ø1½" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0540 OH 129,600.00 6,998.40
Tukang kayu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0090 OH 162,500.00 1,462.50
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.029 Pemasangan 1 m' pipa PVC tipe AW diameter 2"
Pipa PVC AW Ø2" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pembantu tukang 0.0540 OH #N/A #N/A
Tukang batu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0090 OH 162,500.00 1,462.50
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
176

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah #N/A
Dibulatkan #N/A
177

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.030 Pemasangan 1 m' pipa PVC tipe AW diameter 2½"


Pipa PVC AW Ø2½" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pembantu tukang 0.0810 OH #N/A #N/A
Tukang batu 0.1350 OH 148,100.00 19,993.50
Kepala tukang 0.0135 OH 162,500.00 2,193.75
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.031 Pemasangan 1 m' pipa PVC tipe AW diameter 3"
Pipa PVC AW Ø3" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pembantu tukang 0.0810 OH #N/A #N/A
Tukang batu 0.1350 OH 148,100.00 19,993.50
Kepala tukang 0.0135 OH 162,500.00 2,193.75
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.032 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
Pipa PVC AW Ø4" Rucika 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0810 OH 129,600.00 10,497.60
Tukang batu 0.1350 OH 148,100.00 19,993.50
Kepala tukang 0.0135 OH 162,500.00 2,193.75
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.033 Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 20 cm
Pipa Air Limbah SDR Class B Ø8" Rucika 1.6000 bh #N/A #N/A
Semen PC Tiga Roda / kg 0.6800 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0140 m3 250,000.00 3,500.00
Pasir urug 0.0140 m3 #N/A #N/A
Pembantu tukang 0.0800 OH #N/A #N/A
Tukang batu 0.0400 OH 148,100.00 5,924.00
Kepala tukang 0.0040 OH 162,500.00 650.00
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.034 Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 15 cm
Pipa Air Limbah SDR Class B Ø6" Rucika 1.6000 bh #N/A #N/A
Semen PC Tiga Roda / kg 0.6800 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0130 m3 250,000.00 3,250.00
Pasir urug 0.0110 m3 #N/A #N/A
Pembantu tukang 0.0600 OH #N/A #N/A
Tukang batu 0.0300 OH 148,100.00 4,443.00
178

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Kepala tukang 0.0030 OH 162,500.00 487.50


Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
179

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

O.035 Pemasangan 1 m' pipa beton, diameter 15 cm - 20 cm


Pipa Beton Ø15cm 1.1000 bh #N/A #N/A
Batu Bata Merah (Press) 0.0270 m3 #N/A #N/A
Semen PC Tiga Roda / kg 3.9200 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0560 m3 250,000.00 14,000.00
Pasir urug 0.0240 m3 #N/A #N/A
Pembantu tukang 0.1400 OH #N/A #N/A
Tukang batu 0.0700 OH 148,100.00 10,367.00
Kepala tukang 0.0070 OH 162,500.00 1,137.50
Mandor 0.0070 OH 177,600.00 1,243.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.036 Pemasangan 1 m' pipa beton, diameter 30 cm - 100 cm
PCP 300 N BEP 1.1000 bh #N/A #N/A
Batu Bata Merah (Press) 0.5500 m3 #N/A #N/A
Semen PC Tiga Roda / kg 10.3000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0610 m3 250,000.00 15,250.00
Pasir urug 0.0690 m3 #N/A #N/A
Pembantu tukang 0.3800 OH #N/A #N/A
Tukang batu 0.1900 OH 148,100.00 28,139.00
Kepala tukang 0.0190 OH 162,500.00 3,087.50
Mandor 0.0190 OH 177,600.00 3,374.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

P. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


P.001 (K3) Pemasangan 1 m pipa PVC Ø63 mm
Pipa PVC D Ø2" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0060 UH #N/A #N/A
Pekerja 0.0810 OH 129,600.00 10,497.60
Tukang pipa 0.0410 OH 148,100.00 6,072.10
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.002 (K3) Pemasangan 1 m pipa PVC Ø90 mm
Pipa PVC D Ø3" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0080 UH #N/A #N/A
Pekerja 0.0940 OH 129,600.00 12,182.40
Tukang batu 0.0470 OH 148,100.00 6,960.70
Mandor 0.0090 OH 177,600.00 1,598.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.003 (K3) Pemasangan 1 m pipa PVC Ø110 mm
Pipa PVC D Ø4" Rucika 1.0000 m' #N/A #N/A
180

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Sewa Tackel 0.0100 UH #N/A #N/A


Pekerja 0.1050 OH 129,600.00 13,608.00
Tukang pipa 0.0530 OH 148,100.00 7,849.30
Mandor 0.0110 OH 177,600.00 1,953.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
181

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.004 (K3) Pemasangan 1 m pipa PVC Ø150 mm


Pipa PVC D Ø6" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0120 UH #N/A #N/A
Pekerja 0.1180 OH 129,600.00 15,292.80
Tukang pipa 0.0590 OH 148,100.00 8,737.90
Mandor 0.0120 OH 177,600.00 2,131.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.005 (K3) Pemasangan 1 m pipa PVC Ø200 mm
Pipa PVC D Ø8" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0240 UH #N/A #N/A
Pekerja 0.1890 OH 129,600.00 24,494.40
Tukang pipa 0.0950 OH 148,100.00 14,069.50
Mandor 0.0190 OH 177,600.00 3,374.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.006 (K3) Pemasangan 1 m pipa PVC Ø250 mm
Pipa PVC D Ø10" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0340 UH #N/A #N/A
Pekerja 0.2560 OH 129,600.00 33,177.60
Tukang pipa 0.1280 OH 148,100.00 18,956.80
Mandor 0.0260 OH 177,600.00 4,617.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.007 (K3) Pemasangan 1 m pipa PVC Ø300 mm
Pipa PVC D Ø12" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0400 UH #N/A #N/A
Pekerja 0.2940 OH 129,600.00 38,102.40
Tukang pipa 0.1470 OH 148,100.00 21,770.70
Mandor 0.0290 OH 177,600.00 5,150.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.008 (K3) Pemasangan 1 m pipa PVC Ø400 mm
Pipa PVC D Ø16" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0800 UH #N/A #N/A
Pekerja 0.5440 OH 129,600.00 70,502.40
Tukang pipa 0.2720 OH 148,100.00 40,283.20
Mandor 0.0540 OH 177,600.00 9,590.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.009 (K3) Pemasangan 1 m pipa PVC Ø450 mm
Pipa PVC D Ø18" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1000 UH #N/A #N/A
182

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.6690 OH 129,600.00 86,702.40


Tukang pipa 0.3350 OH 148,100.00 49,613.50
Mandor 0.0670 OH 177,600.00 11,899.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
183

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.010 (K3) Pemasangan 1 m pipa PVC Ø500 mm


Pipa PVC D Ø20" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1220 UH #N/A #N/A
Pekerja 0.8090 OH 129,600.00 104,846.40
Tukang pipa 0.4050 OH 148,100.00 59,980.50
Mandor 0.0810 OH 177,600.00 14,385.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.011 (K3) Pemasangan 1 m pipa PVC Ø600 mm
Pipa PVC D Ø24" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1450 UH #N/A #N/A
Pekerja 0.9570 OH 129,600.00 124,027.20
Tukang pipa 0.4790 OH 148,100.00 70,939.90
Mandor 0.0960 OH 177,600.00 17,049.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.012 (K3) Pemasangan 1 m pipa PVC Ø800 mm
Pipa PVC D Ø31" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2500 UH #N/A #N/A
Pekerja 1.6180 OH 129,600.00 209,692.80
Tukang pipa 0.8090 OH 148,100.00 119,812.90
Mandor 0.1620 OH 177,600.00 28,771.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.013 (K3) Pemasangan 1 m pipa PVC Ø900 mm
Pipa PVC D Ø35" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2620 UH #N/A #N/A
Pekerja 1.6910 OH 129,600.00 219,153.60
Tukang pipa 0.8460 OH 148,100.00 125,292.60
Mandor 0.1690 OH 177,600.00 30,014.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.014 (K3) Pemasangan 1 m pipa PVC Ø1000 mm
Pipa PVC D Ø39" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2940 UH #N/A #N/A
Pekerja 1.8950 OH 129,600.00 245,592.00
Tukang pipa 0.9480 OH 148,100.00 140,398.80
Mandor 0.1900 OH 177,600.00 33,744.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.015 (K3) Pemasangan 1 m pipa PVC Ø1100 mm
Pipa PVC D Ø43" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3270 UH #N/A #N/A
184

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 2.0990 OH 129,600.00 272,030.40


Tukang pipa 1.0500 OH 148,100.00 155,505.00
Mandor 0.2100 OH 177,600.00 37,296.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
185

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.016 (K3) Pemasangan 1 m pipa PVC Ø1200 mm


Pipa PVC D Ø47" 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3590 UH #N/A #N/A
Pekerja 2.3030 OH 129,600.00 298,468.80
Tukang pipa 1.1520 OH 148,100.00 170,611.20
Mandor 0.2300 OH 177,600.00 40,848.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.017 Pemasangan 1 m pipa HDPE Ø63 mm
Pipa HDPE SDR 11 (PN 16) 2" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0190 UH #N/A #N/A
Pekerja 0.0350 OH 129,600.00 4,536.00
Tukang pipa 0.0170 OH 148,100.00 2,517.70
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.018 Pemasangan 1 m pipa HDPE Ø100 mm
Pipa HDPE SDR 11 (PN 16) 3" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0190 UH #N/A #N/A
Pekerja 0.0400 OH 129,600.00 5,184.00
Tukang pipa 0.0200 OH 148,100.00 2,962.00
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.019 Pemasangan 1 m pipa HDPE Ø125 mm
Pipa HDPE SDR 11 (PN 16) 5" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0190 UH #N/A #N/A
Pekerja 0.0450 OH 129,600.00 5,832.00
Tukang pipa 0.0230 OH 148,100.00 3,406.30
Mandor 0.0050 OH 177,600.00 888.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.020 Pemasangan 1 m pipa HDPE Ø150 mm
Pipa HDPE SDR 11 (PN 16) 6" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0190 UH #N/A #N/A
Pekerja 0.0620 OH 129,600.00 8,035.20
Tukang pipa 0.0310 OH 148,100.00 4,591.10
Mandor 0.0060 OH 177,600.00 1,065.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.021 Pemasangan 1 m pipa HDPE Ø200 mm
Pipa HDPE SDR 11 (PN 16) 8" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0190 UH #N/A #N/A
186

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.1020 OH 129,600.00 13,219.20


Tukang pipa 0.0510 OH 148,100.00 7,553.10
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
187

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.022 Pemasangan 1 m pipa HDPE Ø250 mm


Pipa HDPE SDR 11 (PN 16) 10" Rucika 1.0000 m' #N/A #N/A
Sewa Tackel 0.0420 UH #N/A #N/A
Pekerja 0.1330 OH 129,600.00 17,236.80
Tukang pipa 0.0670 OH 148,100.00 9,922.70
Mandor 0.0130 OH 177,600.00 2,308.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.023 Pemasangan 1 m pipa HDPE Ø300 mm
Pipa HDPE SDR 11 (PN 16) 12" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0650 UH #N/A #N/A
Pekerja 0.1700 OH 129,600.00 22,032.00
Tukang pipa 0.0850 OH 148,100.00 12,588.50
Mandor 0.0170 OH 177,600.00 3,019.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.024 Pemasangan 1 m pipa HDPE Ø400 mm
Pipa HDPE SDR 11 (PN 16) 16" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1520 UH #N/A #N/A
Pekerja 0.2900 OH 129,600.00 37,584.00
Tukang pipa 0.1450 OH 148,100.00 21,474.50
Mandor 0.0290 OH 177,600.00 5,150.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.025 Pemasangan 1 m pipa HDPE Ø450 mm
Pipa HDPE SDR 11 (PN 16) 18" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2000 UH #N/A #N/A
Pekerja 0.3590 OH 129,600.00 46,526.40
Tukang pipa 0.1800 OH 148,100.00 26,658.00
Mandor 0.0360 OH 177,600.00 6,393.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.026 Pemasangan 1 m pipa HDPE Ø500 mm
Pipa HDPE SDR 11 (PN 16) 20" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2510 UH #N/A #N/A
Pekerja 0.4330 OH 129,600.00 56,116.80
Tukang pipa 0.2160 OH 148,100.00 31,989.60
Mandor 0.0430 OH 177,600.00 7,636.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.027 Pemasangan 1 m pipa HDPE Ø600 mm
Pipa HDPE SDR 11 (PN 16) 24" Rucika 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3070 UH #N/A #N/A
188

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.5120 OH 129,600.00 66,355.20


Tukang pipa 0.2560 OH 148,100.00 37,913.60
Mandor 0.0510 OH 177,600.00 9,057.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
189

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.028 Pemasangan 1 m pipa HDPE Ø800 mm


Pipa HDPE Ø800 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.5730 UH #N/A #N/A
Pekerja 0.8930 OH 129,600.00 115,732.80
Tukang pipa 0.4460 OH 148,100.00 66,052.60
Mandor 0.0890 OH 177,600.00 15,806.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.029 Pemasangan 1 m pipa HDPE Ø900 mm
Pipa HDPE Ø900 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.8830 UH #N/A #N/A
Pekerja 1.3530 OH 129,600.00 175,348.80
Tukang pipa 0.6770 OH 148,100.00 100,263.70
Mandor 0.1350 OH 177,600.00 23,976.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.030 Pemasangan 1 m pipa HDPE Ø1000 mm
Pipa HDPE Ø1000 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 1.0930 UH #N/A #N/A
Pekerja 1.6590 OH 129,600.00 215,006.40
Tukang pipa 0.8300 OH 148,100.00 122,923.00
Mandor 0.1660 OH 177,600.00 29,481.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.031 Pemasangan 1 m pipa HDPE Ø1100 mm
Pipa HDPE Ø1100 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 1.2050 UH #N/A #N/A
Pekerja 1.8180 OH 129,600.00 235,612.80
Tukang pipa 0.9090 OH 148,100.00 134,622.90
Mandor 0.1820 OH 177,600.00 32,323.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.032 Pemasangan 1 m pipa HDPE Ø1200 mm
Pipa HDPE Ø1200 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 1.5840 UH #N/A #N/A
Pekerja 2.3700 OH 129,600.00 307,152.00
Tukang pipa 1.1850 OH 148,100.00 175,498.50
Mandor 0.2370 OH 177,600.00 42,091.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.033 Pemasangan 1 m pipa GIP Ø63 mm
Pipa Galvanis SCH40 Ø2" x 3,70 mm (6m) 1.0000 m' #N/A #N/A
Pekerja 0.3450 OH 129,600.00 44,712.00
190

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Tukang pipa 0.1720 OH 148,100.00 25,473.20


Mandor 0.0340 OH 177,600.00 6,038.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
191

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.034 Pemasangan 1 m pipa GIP Ø100 mm


Pipa Galvanis SCH40 Ø3" x 5,20 mm (6m) 1.0000 m' #N/A #N/A
Pekerja 0.4000 OH 129,600.00 51,840.00
Tukang pipa 0.2000 OH 148,100.00 29,620.00
Mandor 0.0400 OH 177,600.00 7,104.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.035 Pemasangan 1 m pipa GIP Ø125 mm
Pipa Galvanis SCH40 Ø5" x 6,20 mm (6m) 1.0000 m' #N/A #N/A
Pekerja 0.4480 OH 129,600.00 58,060.80
Tukang pipa 0.2240 OH 148,100.00 33,174.40
Mandor 0.0450 OH 177,600.00 7,992.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.036 Pemasangan 1 m pipa GIP Ø150 mm
Pipa Galvanis SCH40 Ø6" x 6,70 mm (6m) 1.0000 m' #N/A #N/A
Pekerja 0.5060 OH 129,600.00 65,577.60
Tukang pipa 0.2530 OH 148,100.00 37,469.30
Mandor 0.0510 OH 177,600.00 9,057.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.037 Pemasangan 1 m pipa GIP Ø200 mm
Pipa Galvanis SCH40 Ø8" x 7,80 mm (6m) 1.0000 m' #N/A #N/A
Pekerja 0.7960 OH 129,600.00 103,161.60
Tukang pipa 0.3980 OH 148,100.00 58,943.80
Mandor 0.0800 OH 177,600.00 14,208.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.038 Pemasangan 1 m pipa GIP Ø250 mm
Pipa GIP Ø250 mm 1.0000 m' #N/A #N/A
Pekerja 0.9490 OH 129,600.00 122,990.40
Tukang pipa 0.4750 OH 148,100.00 70,347.50
Mandor 0.0950 OH 177,600.00 16,872.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.039 Pemasangan 1 m pipa GIP Ø300 mm
Pipa GIP Ø300 mm 1.0000 m' #N/A #N/A
Pekerja 0.9580 OH 129,600.00 124,156.80
Tukang pipa 0.4790 OH 148,100.00 70,939.90
Mandor 0.0960 OH 177,600.00 17,049.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
192

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
P.040 Pemasangan 1 m pipa GIP Ø400 mm
Pipa GIP Ø400 mm 1.0000 m' #N/A #N/A
Pekerja 1.2120 OH 129,600.00 157,075.20
Tukang pipa 0.6060 OH 148,100.00 89,748.60
Mandor 0.1210 OH 177,600.00 21,489.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
193

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.041 Pemasangan 1 m pipa GIP Ø450 mm


Pipa GIP Ø450 mm 1.0000 m' #N/A #N/A
Pekerja 1.3530 OH 129,600.00 175,348.80
Tukang pipa 0.6760 OH 148,100.00 100,115.60
Mandor 0.1350 OH 177,600.00 23,976.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.042 Pemasangan 1 m pipa GIP Ø500 mm
Pipa GIP Ø500 mm 1.0000 m' #N/A #N/A
Pekerja 1.4690 OH 129,600.00 190,382.40
Tukang pipa 0.7350 OH 148,100.00 108,853.50
Mandor 0.1470 OH 177,600.00 26,107.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.043 Pemasangan 1 m pipa GIP Ø600 mm
Pipa GIP Ø600 mm 1.0000 m' #N/A #N/A
Pekerja 1.3270 OH 129,600.00 171,979.20
Tukang pipa 0.6640 OH 148,100.00 98,338.40
Mandor 0.1330 OH 177,600.00 23,620.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.044 Pemasangan 1 m pipa GIP Ø800 mm
Pipa GIP Ø800 mm 1.0000 m' #N/A #N/A
Pekerja 2.3270 OH 129,600.00 301,579.20
Tukang pipa 1.1630 OH 148,100.00 172,240.30
Mandor 0.2330 OH 177,600.00 41,380.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.045 Pemasangan 1 m pipa GIP Ø900 mm
Pipa GIP Ø900 mm 1.0000 m' #N/A #N/A
Pekerja 2.6230 OH 129,600.00 339,940.80
Tukang pipa 1.3120 OH 148,100.00 194,307.20
Mandor 0.2620 OH 177,600.00 46,531.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.046 Pemasangan 1 m pipa GIP Ø1000 mm
Pipa GIP Ø1000 mm 1.0000 m' #N/A #N/A
Pekerja 2.9110 OH 129,600.00 377,265.60
Tukang pipa 1.4560 OH 148,100.00 215,633.60
Mandor 0.2910 OH 177,600.00 51,681.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
194

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
P.047 Pemasangan 1 m pipa GIP Ø1100 mm
Pipa GIP Ø1100 mm 1.0000 m' #N/A #N/A
Pekerja 3.2000 OH 129,600.00 414,720.00
Tukang pipa 1.6000 OH 148,100.00 236,960.00
Mandor 0.3200 OH 177,600.00 56,832.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
195

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.048 Pemasangan 1 m pipa GIP Ø1200 mm


Pipa GIP Ø1200 mm 1.0000 m' #N/A #N/A
Pekerja 3.4880 OH 129,600.00 452,044.80
Tukang pipa 1.7440 OH 148,100.00 258,286.40
Mandor 0.3490 OH 177,600.00 61,982.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.049 Pemasangan 1 m pipa DCI Ø100 mm
Pipa DCI Ø100 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3800 UH #N/A #N/A
Pekerja 0.4890 OH 129,600.00 63,374.40
Tukang pipa 0.0980 OH 148,100.00 14,513.80
Mandor 0.0490 OH 177,600.00 8,702.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.050 Pemasangan 1 m pipa DCI Ø125 mm
Pipa DCI Ø125 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3800 UH #N/A #N/A
Pekerja 0.5470 OH 129,600.00 70,891.20
Tukang pipa 0.1090 OH 148,100.00 16,142.90
Mandor 0.0550 OH 177,600.00 9,768.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.051 Pemasangan 1 m pipa DCI Ø150 mm
Pipa DCI Ø150 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3800 UH #N/A #N/A
Pekerja 0.6130 OH 129,600.00 79,444.80
Tukang pipa 0.1230 OH 148,100.00 18,216.30
Mandor 0.0610 OH 177,600.00 10,833.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.052 Pemasangan 1 m pipa DCI Ø200 mm
Pipa DCI Ø200 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3800 UH #N/A #N/A
Pekerja 0.8550 OH 129,600.00 110,808.00
Tukang pipa 0.1710 OH 148,100.00 25,325.10
Mandor 0.0850 OH 177,600.00 15,096.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.053 Pemasangan 1 m pipa DCI Ø250 mm
Pipa DCI Ø250 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0500 UH #N/A #N/A
Pekerja 0.9510 OH 129,600.00 123,249.60
196

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Tukang pipa 0.1900 OH 148,100.00 28,139.00


Mandor 0.0950 OH 177,600.00 16,872.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
197

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.054 Pemasangan 1 m pipa DCI Ø300 mm


Pipa DCI Ø300 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0710 UH #N/A #N/A
Pekerja 0.9730 OH 129,600.00 126,100.80
Tukang pipa 0.1950 OH 148,100.00 28,879.50
Mandor 0.0970 OH 177,600.00 17,227.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.055 Pemasangan 1 m pipa DCI Ø400 mm
Pipa DCI Ø400 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0230 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0310 UH #N/A #N/A
Pekerja 1.5450 OH 129,600.00 200,232.00
Tukang pipa 0.3090 OH 148,100.00 45,762.90
Operator alat berat 0.0930 OH #N/A #N/A
Mandor 0.1540 OH 177,600.00 27,350.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.056 Pemasangan 1 m pipa DCI Ø450 mm
Pipa DCI Ø450 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0290 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0390 UH #N/A #N/A
Pekerja 1.8130 OH 129,600.00 234,964.80
Tukang pipa 0.3630 OH 148,100.00 53,760.30
Operator alat berat 0.1430 OH #N/A #N/A
Mandor 0.1810 OH 177,600.00 32,145.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.057 Pemasangan 1 m pipa DCI Ø500 mm
Pipa DCI Ø500 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0340 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0450 UH #N/A #N/A
Pekerja 2.0470 OH 129,600.00 265,291.20
Tukang pipa 0.4090 OH 148,100.00 60,572.90
Operator alat berat 0.1930 OH #N/A #N/A
Mandor 0.2050 OH 177,600.00 36,408.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.058 Pemasangan 1 m pipa DCI Ø600 mm
Pipa DCI Ø600 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0580 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0770 UH #N/A #N/A
Pekerja 2.0110 OH 129,600.00 260,625.60
Tukang pipa 0.4020 OH 148,100.00 59,536.20
Operator alat berat 0.2930 OH #N/A #N/A
198

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Mandor 0.2010 OH 177,600.00 35,697.60


Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
199

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.059 Pemasangan 1 m pipa DCI Ø800 mm


Pipa DCI Ø800 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0840 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2250 UH #N/A #N/A
Pekerja 3.8590 OH 129,600.00 500,126.40
Tukang pipa 0.7720 OH 148,100.00 114,333.20
Operator alat berat 0.4930 OH #N/A #N/A
Mandor 0.3860 OH 177,600.00 68,553.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.060 Pemasangan 1 m pipa DCI Ø900 mm
Pipa DCI Ø900 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0930 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2480 UH #N/A #N/A
Pekerja 4.9950 OH 129,600.00 647,352.00
Tukang pipa 0.9990 OH 148,100.00 147,951.90
Operator alat berat 0.5930 OH #N/A #N/A
Mandor 0.4990 OH 177,600.00 88,622.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.061 Pemasangan 1 m pipa DCI Ø1000 mm
Pipa DCI Ø1000 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.1120 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.2980 UH #N/A #N/A
Pekerja 5.9310 OH 129,600.00 768,657.60
Tukang pipa 1.1860 OH 148,100.00 175,646.60
Operator alat berat 0.7930 OH #N/A #N/A
Mandor 0.6930 OH 177,600.00 123,076.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.062 Pemasangan 1 m pipa DCI Ø1100 mm
Pipa DCI Ø1100 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.1520 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3040 UH #N/A #N/A
Pekerja 6.9490 OH 129,600.00 900,590.40
Tukang pipa 1.3900 OH 148,100.00 205,859.00
Operator alat berat 0.7930 OH #N/A #N/A
Mandor 0.6950 OH 177,600.00 123,432.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.063 Pemasangan 1 m pipa DCI Ø1200 mm
Pipa DCI Ø1200 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.1800 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.3600 UH #N/A #N/A
Pekerja 8.0560 OH 129,600.00 1,044,057.60
200

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Tukang pipa 1.6110 OH 148,100.00 238,589.10


Operator alat berat 0.8930 OH #N/A #N/A
Mandor 0.8060 OH 177,600.00 143,145.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
201

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.064 Pemasangan 1 m pipa baja Ø63 mm


Pipa Hitam Medium Ø2" x 3,40 mm (6m) 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 0.4990 OH 129,600.00 64,670.40
Tukang pipa 0.1000 OH 148,100.00 14,810.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.065 Pemasangan 1 m pipa baja Ø100 mm
Pipa Hitam Medium Ø3" x 3,75 mm (6m) 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 0.5790 OH 129,600.00 75,038.40
Tukang pipa 0.1160 OH 148,100.00 17,179.60
Mandor 0.0580 OH 177,600.00 10,300.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.066 Pemasangan 1 m pipa baja Ø125 mm
Pipa Hitam Medium Ø5" x 4,60 mm (6m) 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 0.6480 OH 129,600.00 83,980.80
Tukang pipa 0.1300 OH 148,100.00 19,253.00
Mandor 0.0650 OH 177,600.00 11,544.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.067 Pemasangan 1 m pipa baja Ø150 mm
Pipa Hitam Medium Ø6" x 4,60 mm (6m) 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 0.7080 OH 129,600.00 91,756.80
Tukang pipa 0.1420 OH 148,100.00 21,030.20
Mandor 0.0710 OH 177,600.00 12,609.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.068 Pemasangan 1 m pipa baja Ø200 mm
Pipa Hitam Medium Ø8" x 6,10 mm (6m) 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 1.1130 OH 129,600.00 144,244.80
Tukang pipa 0.2230 OH 148,100.00 33,026.30
Mandor 0.1110 OH 177,600.00 19,713.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.069 Pemasangan 1 m pipa baja Ø250 mm
Pipa baja Ø250 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
202

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 1.3250 OH 129,600.00 171,720.00


Tukang pipa 0.2650 OH 148,100.00 39,246.50
Mandor 0.1330 OH 177,600.00 23,620.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
203

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.070 Pemasangan 1 m pipa baja Ø300 mm


Pipa baja Ø300 mm 1.0000 m' #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0040 UH #N/A #N/A
Pekerja 1.4150 OH 129,600.00 183,384.00
Tukang pipa 0.2830 OH 148,100.00 41,912.30
Mandor 0.1410 OH 177,600.00 25,041.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.071 Pemasangan 1 m pipa baja Ø400 mm
Pipa baja Ø400 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0270 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0390 UH #N/A #N/A
Pekerja 2.3660 OH 129,600.00 306,633.60
Tukang pipa 0.4730 OH 148,100.00 70,051.30
Mandor 0.2370 OH 177,600.00 42,091.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.072 Pemasangan 1 m pipa baja Ø450 mm
Pipa baja Ø450 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0260 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0370 UH #N/A #N/A
Pekerja 2.2310 OH 129,600.00 289,137.60
Tukang pipa 0.4460 OH 148,100.00 66,052.60
Mandor 0.2230 OH 177,600.00 39,604.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.073 Pemasangan 1 m pipa baja Ø500 mm
Pipa baja Ø500 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0290 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0450 UH #N/A #N/A
Pekerja 2.4320 OH 129,600.00 315,187.20
Tukang pipa 0.4860 OH 148,100.00 71,976.60
Mandor 0.2430 OH 177,600.00 43,156.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.074 Pemasangan 1 m pipa baja Ø600 mm
Pipa baja Ø600 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0270 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0390 UH #N/A #N/A
Pekerja 2.2080 OH 129,600.00 286,156.80
Tukang pipa 0.4420 OH 148,100.00 65,460.20
Mandor 0.2210 OH 177,600.00 39,249.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
204

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
205

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

P.075 Pemasangan 1 m pipa baja Ø800 mm


Pipa baja Ø800 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0460 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.0980 UH #N/A #N/A
Pekerja 3.8970 OH 129,600.00 505,051.20
Tukang pipa 0.7790 OH 148,100.00 115,369.90
Mandor 0.3900 OH 177,600.00 69,264.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.076 Pemasangan 1 m pipa baja Ø900 mm
Pipa baja Ø900 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0520 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1150 UH #N/A #N/A
Pekerja 4.4030 OH 129,600.00 570,628.80
Tukang pipa 0.0810 OH 148,100.00 11,996.10
Mandor 0.4400 OH 177,600.00 78,144.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.077 Pemasangan 1 m pipa baja Ø1000 mm
Pipa baja Ø1000 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0580 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1330 UH #N/A #N/A
Pekerja 4.8950 OH 129,600.00 634,392.00
Tukang pipa 0.9790 OH 148,100.00 144,989.90
Mandor 0.4890 OH 177,600.00 86,846.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.078 Pemasangan 1 m pipa baja Ø1100 mm
Pipa baja Ø1100 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0640 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1500 UH #N/A #N/A
Pekerja 5.3870 OH 129,600.00 698,155.20
Tukang pipa 1.0770 OH 148,100.00 159,503.70
Mandor 0.5390 OH 177,600.00 95,726.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
P.079 Pemasangan 1 m pipa baja Ø1200 mm
Pipa baja Ø1200 mm 1.0000 m' #N/A #N/A
Sewa Excavator 0.0700 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2 T 0.1670 UH #N/A #N/A
Pekerja 5.8970 OH 129,600.00 764,251.20
Tukang pipa 1.1760 OH 148,100.00 174,165.60
Mandor 0.5880 OH 177,600.00 104,428.80
Jumlah #N/A
Overhead + Profit 10% #N/A
206

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah #N/A
Dibulatkan #N/A
207

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q. HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


Q.001 (K3) Pemotongan 1 buah pipa PVC Ø63 mm
Pipa PVC D Ø2" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0030 UH - -
Pekerja 0.0050 OH 129,600.00 648.00
Tukang pipa 0.0020 OH 148,100.00 296.20
Mandor 0.0005 OH 177,600.00 88.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.002 (K3) Pemotongan 1 buah pipa PVC Ø90 mm
Pipa PVC D Ø3" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0030 UH - -
Pekerja 0.0140 OH 129,600.00 1,814.40
Tukang pipa 0.0070 OH 148,100.00 1,036.70
Mandor 0.0010 OH 177,600.00 177.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.003 (K3) Pemotongan 1 buah pipa PVC Ø110 mm
Pipa PVC D Ø4" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0030 UH - -
Pekerja 0.0220 OH 129,600.00 2,851.20
Tukang pipa 0.0110 OH 148,100.00 1,629.10
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.004 (K3) Pemotongan 1 buah pipa PVC Ø150 mm
Pipa PVC D Ø6" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0030 UH - -
Pekerja 0.0310 OH 129,600.00 4,017.60
Tukang pipa 0.0150 OH 148,100.00 2,221.50
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.005 (K3) Pemotongan 1 buah pipa PVC Ø200 mm
Pipa PVC D Ø8" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0170 UH - -
Pekerja 0.0810 OH 129,600.00 10,497.60
Tukang pipa 0.0400 OH 148,100.00 5,924.00
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.006 (K3) Pemotongan 1 buah pipa PVC Ø250 mm
208

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pipa PVC D Ø10" Rucika 1.0000 btg #N/A #N/A


Alat potong pipa PVC 0.0300 UH - -
Pekerja 0.1280 OH 129,600.00 16,588.80
Tukang pipa 0.0640 OH 148,100.00 9,478.40
Mandor 0.0130 OH 177,600.00 2,308.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
209

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.007 (K3) Pemotongan 1 buah pipa PVC Ø300 mm


Pipa PVC D Ø12" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0370 UH - -
Pekerja 0.1550 OH 129,600.00 20,088.00
Tukang pipa 0.0770 OH 148,100.00 11,403.70
Mandor 0.0150 OH 177,600.00 2,664.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.008 (K3) Pemotongan 1 buah pipa PVC Ø400 mm
Pipa PVC Ø400 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0860 UH - -
Pekerja 0.3310 OH 129,600.00 42,897.60
Tukang pipa 0.1660 OH 148,100.00 24,584.60
Mandor 0.0330 OH 177,600.00 5,860.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.009 (K3) Pemotongan 1 buah pipa PVC Ø450 mm
Pipa PVC Ø450 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0540 UH - -
Pekerja 0.4200 OH 129,600.00 54,432.00
Tukang pipa 0.2100 OH 148,100.00 31,101.00
Mandor 0.0420 OH 177,600.00 7,459.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.010 (K3) Pemotongan 1 buah pipa PVC Ø500 mm
Pipa PVC Ø500 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0690 UH - -
Pekerja 0.5180 OH 129,600.00 67,132.80
Tukang pipa 0.2590 OH 148,100.00 38,357.90
Mandor 0.0520 OH 177,600.00 9,235.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.011 (K3) Pemotongan 1 buah pipa PVC Ø600 mm
Pipa PVC D Ø24" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.0860 UH - -
Pekerja 0.6230 OH 129,600.00 80,740.80
Tukang pipa 0.3110 OH 148,100.00 46,059.10
Mandor 0.0620 OH 177,600.00 11,011.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.012 (K3) Pemotongan 1 buah pipa PVC Ø800 mm
Pipa PVC Ø800 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.1600 UH - -
210

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 1.0890 OH 129,600.00 141,134.40


Tukang pipa 0.5450 OH 148,100.00 80,714.50
Mandor 0.1090 OH 177,600.00 19,358.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
211

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.013 (K3) Pemotongan 1 buah pipa PVC Ø900 mm


Pipa PVC D Ø35" Rucika 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.1680 UH - -
Pekerja 1.1410 OH 129,600.00 147,873.60
Tukang pipa 0.5710 OH 148,100.00 84,565.10
Mandor 0.1140 OH 177,600.00 20,246.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.014 (K3) Pemotongan 1 buah pipa PVC Ø1000 mm
Pipa PVC Ø1000 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.1910 UH - -
Pekerja 1.2850 OH 129,600.00 166,536.00
Tukang pipa 0.6430 OH 148,100.00 95,228.30
Mandor 0.1290 OH 177,600.00 22,910.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.015 (K3) Pemotongan 1 buah pipa PVC Ø1100 mm
Pipa PVC Ø1100 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.2130 UH - -
Pekerja 1.4290 OH 129,600.00 185,198.40
Tukang pipa 0.7150 OH 148,100.00 105,891.50
Mandor 0.1430 OH 177,600.00 25,396.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.016 (K3) Pemotongan 1 buah pipa PVC Ø1200 mm
Pipa PVC Ø1200 mm 1.0000 btg #N/A #N/A
Alat potong pipa PVC 0.2360 UH - -
Pekerja 1.5730 OH 129,600.00 203,860.80
Tukang pipa 0.7870 OH 148,100.00 116,554.70
Mandor 0.1570 OH 177,600.00 27,883.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.017 (K3) Pemotongan 1 buah pipa HDPE Ø63 mm
Pipa HDPE SDR 11 (PN 16) 2" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0040 UH #N/A #N/A
Pekerja 0.0020 OH 129,600.00 259.20
Tukang pipa 0.0010 OH 148,100.00 148.10
Mandor 0.0002 OH 177,600.00 35.52
Operator 0.0340 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.018 (K3) Pemotongan 1 buah pipa HDPE Ø100 mm
Pipa HDPE SDR 11 (PN 16) 3" Rucika 1.0000 m #N/A #N/A
212

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Alat potong pipa HDPE 0.0050 UH #N/A #N/A


Pekerja 0.0060 OH 129,600.00 777.60
Tukang pipa 0.0030 OH 148,100.00 444.30
Mandor 0.0010 OH 177,600.00 177.60
Operator 0.0710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
213

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.019 (K3) Pemotongan 1 buah pipa HDPE Ø125 mm


Pipa HDPE SDR 11 (PN 16) 5" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0060 UH #N/A #N/A
Pekerja 0.0090 OH 129,600.00 1,166.40
Tukang pipa 0.0050 OH 148,100.00 740.50
Mandor 0.0010 OH 177,600.00 177.60
Operator 0.0960 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.020 (K3) Pemotongan 1 buah pipa HDPE Ø150 mm
Pipa HDPE SDR 11 (PN 16) 6" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0090 UH #N/A #N/A
Pekerja 0.0160 OH 129,600.00 2,073.60
Tukang pipa 0.0080 OH 148,100.00 1,184.80
Mandor 0.0020 OH 177,600.00 355.20
Operator 0.1210 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.021 (K3) Pemotongan 1 buah pipa HDPE Ø200 mm
Pipa HDPE SDR 11 (PN 16) 8" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0170 UH #N/A #N/A
Pekerja 0.0440 OH 129,600.00 5,702.40
Tukang pipa 0.0220 OH 148,100.00 3,258.20
Mandor 0.0040 OH 177,600.00 710.40
Operator 0.1710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.022 (K3) Pemotongan 1 buah pipa HDPE Ø250 mm
Pipa HDPE SDR 11 (PN 16) 10" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0230 UH #N/A #N/A
Pekerja 0.0670 OH 129,600.00 8,683.20
Tukang pipa 0.0330 OH 148,100.00 4,887.30
Mandor 0.0070 OH 177,600.00 1,243.20
Operator 0.2210 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.023 (K3) Pemotongan 1 buah pipa HDPE Ø300 mm
Pipa HDPE SDR 11 (PN 16) 12" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0300 UH #N/A #N/A
Pekerja 0.0900 OH 129,600.00 11,664.00
Tukang pipa 0.0450 OH 148,100.00 6,664.50
Mandor 0.0090 OH 177,600.00 1,598.40
Operator 0.2710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
214

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah #N/A
Dibulatkan #N/A
215

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.024 (K3) Pemotongan 1 buah pipa HDPE Ø400 mm


Pipa HDPE SDR 11 (PN 16) 16" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0550 UH #N/A #N/A
Pekerja 0.1770 OH 129,600.00 22,939.20
Tukang pipa 0.0880 OH 148,100.00 13,032.80
Mandor 0.0180 OH 177,600.00 3,196.80
Operator 0.3710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.025 (K3) Pemotongan 1 buah pipa HDPE Ø450 mm
Pipa HDPE SDR 11 (PN 16) 18" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0700 UH #N/A #N/A
Pekerja 0.2250 OH 129,600.00 29,160.00
Tukang pipa 0.1130 OH 148,100.00 16,735.30
Mandor 0.0230 OH 177,600.00 4,084.80
Operator 0.4210 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.026 (K3) Pemotongan 1 buah pipa HDPE Ø500 mm
Pipa HDPE SDR 11 (PN 16) 20" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.0850 UH #N/A #N/A
Pekerja 0.2770 OH 129,600.00 35,899.20
Tukang pipa 0.1390 OH 148,100.00 20,585.90
Mandor 0.0280 OH 177,600.00 4,972.80
Operator 0.4710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.027 (K3) Pemotongan 1 buah pipa HDPE Ø600 mm
Pipa HDPE SDR 11 (PN 16) 24" Rucika 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.1010 UH #N/A #N/A
Pekerja 0.3330 OH 129,600.00 43,156.80
Tukang pipa 0.1670 OH 148,100.00 24,732.70
Mandor 0.0330 OH 177,600.00 5,860.80
Operator 0.5710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.028 (K3) Pemotongan 1 buah pipa HDPE Ø800 mm
Pipa HDPE Ø800 mm 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.1790 UH #N/A #N/A
Pekerja 0.6010 OH 129,600.00 77,889.60
Tukang pipa 0.3010 OH 148,100.00 44,578.10
Mandor 0.0600 OH 177,600.00 10,656.00
Operator 0.7710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
216

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah #N/A
Dibulatkan #N/A
217

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.029 (K3) Pemotongan 1 buah pipa HDPE Ø900 mm


Pipa HDPE Ø900 mm 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.2700 UH #N/A #N/A
Pekerja 0.9130 OH 129,600.00 118,324.80
Tukang pipa 0.4560 OH 148,100.00 67,533.60
Mandor 0.0910 OH 177,600.00 16,161.60
Operator 0.8710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.030 (K3)Pemotongan 1 buah pipa HDPE Ø1000 mm
Pipa HDPE Ø1000 mm 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.3320 UH #N/A #N/A
Pekerja 1.1250 OH 129,600.00 145,800.00
Tukang pipa 0.5620 OH 148,100.00 83,232.20
Mandor 0.1120 OH 177,600.00 19,891.20
Operator 0.9710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.031 (K3) Pemotongan 1 buah pipa HDPE Ø1100 mm
Pipa HDPE Ø1100 mm 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.3650 UH #N/A #N/A
Pekerja 1.2380 OH 129,600.00 160,444.80
Tukang pipa 0.6190 OH 148,100.00 91,673.90
Mandor 0.1240 OH 177,600.00 22,022.40
Operator 1.0710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.032 (K3) Pemotongan 1 buah pipa HDPE Ø1200 mm
Pipa HDPE Ø1200 mm 1.0000 m #N/A #N/A
Alat potong pipa HDPE 0.4770 UH #N/A #N/A
Pekerja 1.6190 OH 129,600.00 209,822.40
Tukang pipa 0.8090 OH 148,100.00 119,812.90
Mandor 0.1620 OH 177,600.00 28,771.20
Operator 1.1710 OH #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.033 (K3) Pemotongan 1 buah pipa GIP Ø63 mm
Pipa Galvanis SCH40 Ø2" x 3,70 mm (6m) 1.0000 btg #N/A #N/A
Pekerja 0.0190 OH 129,600.00 2,462.40
Tukang pipa 0.0100 OH 148,100.00 1,481.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
218

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.034 (K3) Pemotongan 1 buah pipa GIP Ø100 mm


Pipa Galvanis SCH40 Ø3" x 5,20 mm (6m) 1.0000 btg #N/A #N/A
Pekerja 0.0580 OH 129,600.00 7,516.80
Tukang pipa 0.0290 OH 148,100.00 4,294.90
Mandor 0.0060 OH 177,600.00 1,065.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
219

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.035 (K3) Pemotongan 1 buah pipa GIP Ø125 mm


Pipa Galvanis SCH40 Ø5" x 6,20 mm (6m) 1.0000 btg #N/A #N/A
Pekerja 0.0920 OH 129,600.00 11,923.20
Tukang pipa 0.0460 OH 148,100.00 6,812.60
Mandor 0.0090 OH 177,600.00 1,598.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.036 (K3) Pemotongan 1 buah pipa GIP Ø150 mm
Pipa Galvanis SCH40 Ø6" x 6,70 mm (6m) 1.0000 btg #N/A #N/A
Pekerja 0.1310 OH 129,600.00 16,977.60
Tukang pipa 0.0660 OH 148,100.00 9,774.60
Mandor 0.0130 OH 177,600.00 2,308.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.037 (K3) Pemotongan 1 buah pipa GIP Ø200 mm
Pipa Galvanis SCH40 Ø8" x 7,80 mm (6m) 1.0000 btg #N/A #N/A
Pekerja 0.3400 OH 129,600.00 44,064.00
Tukang pipa 0.1700 OH 148,100.00 25,177.00
Mandor 0.0340 OH 177,600.00 6,038.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.038 (K3) Pemotongan 1 buah pipa GIP Ø250 mm
Pipa GIP Ø250 mm 1.0000 btg #N/A #N/A
Pekerja 0.4750 OH 129,600.00 61,560.00
Tukang pipa 0.2370 OH 148,100.00 35,099.70
Mandor 0.0470 OH 177,600.00 8,347.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.039 (K3) Pemotongan 1 buah pipa GIP Ø300 mm
Pipa GIP Ø300 mm 1.0000 btg #N/A #N/A
Pekerja 0.5040 OH 129,600.00 65,318.40
Tukang pipa 0.2520 OH 148,100.00 37,321.20
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.040 (K3) Pemotongan 1 buah pipa GIP Ø400 mm
Pipa GIP Ø400 mm 1.0000 btg #N/A #N/A
Pekerja 0.7380 OH 129,600.00 95,644.80
Tukang pipa 0.3690 OH 148,100.00 54,648.90
Mandor 0.0740 OH 177,600.00 13,142.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
220

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
Q.041 (K3) Pemotongan 1 buah pipa GIP Ø450 mm
Pipa GIP Ø450 mm 1.0000 btg #N/A #N/A
Pekerja 0.8480 OH 129,600.00 109,900.80
Tukang pipa 0.4240 OH 148,100.00 62,794.40
Mandor 0.0850 OH 177,600.00 15,096.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
221

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.042 (K3) Pemotongan 1 buah pipa GIP Ø500 mm


Pipa GIP Ø500 mm 1.0000 btg #N/A #N/A
Pekerja 0.9410 OH 129,600.00 121,953.60
Tukang pipa 0.4710 OH 148,100.00 69,755.10
Mandor 0.0940 OH 177,600.00 16,694.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.043 (K3) Pemotongan 1 buah pipa GIP Ø600 mm
Pipa GIP Ø600 mm 1.0000 btg #N/A #N/A
Pekerja 0.8640 OH 129,600.00 111,974.40
Tukang pipa 0.4320 OH 148,100.00 63,979.20
Mandor 0.0860 OH 177,600.00 15,273.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.044 (K3) Pemotongan 1 buah pipa GIP Ø800 mm
Pipa GIP Ø800 mm 1.0000 btg #N/A #N/A
Pekerja 1.5670 OH 129,600.00 203,083.20
Tukang pipa 0.7830 OH 148,100.00 115,962.30
Mandor 0.1570 OH 177,600.00 27,883.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.045 (K3) Pemotongan 1 buah pipa GIP Ø900 mm
Pipa GIP Ø900 mm 1.0000 btg #N/A #N/A
Pekerja 1.7700 OH 129,600.00 229,392.00
Tukang pipa 0.8850 OH 148,100.00 131,068.50
Mandor 0.1770 OH 177,600.00 31,435.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.046 (K3) Pemotongan 1 buah pipa GIP Ø1000 mm
Pipa GIP Ø1000 mm 1.0000 btg #N/A #N/A
Pekerja 1.9740 OH 129,600.00 255,830.40
Tukang pipa 0.9870 OH 148,100.00 146,174.70
Mandor 0.1970 OH 177,600.00 34,987.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.047 (K3) Pemotongan 1 buah pipa GIP Ø1100 mm
Pipa GIP Ø1100 mm 1.0000 btg #N/A #N/A
Pekerja 2.1780 OH 129,600.00 282,268.80
Tukang pipa 1.0890 OH 148,100.00 161,280.90
Mandor 0.2180 OH 177,600.00 38,716.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
222

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
Q.048 (K3) Pemotongan 1 buah pipa GIP Ø1200 mm
Pipa GIP Ø1200 mm 1.0000 btg #N/A #N/A
Pekerja 2.3820 OH 129,600.00 308,707.20
Tukang pipa 1.1910 OH 148,100.00 176,387.10
Mandor 0.2380 OH 177,600.00 42,268.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
223

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.049 (K3) Pemotongan 1 buah pipa DCI Ø100 mm


Pipa DCI Ø100 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0030 UH #N/A #N/A
Pekerja 0.0710 OH 129,600.00 9,201.60
Tukang pipa 0.0140 OH 148,100.00 2,073.40
Mandor 0.0070 OH 177,600.00 1,243.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.050 (K3) Pemotongan 1 buah pipa DCI Ø125 mm
Pipa DCI Ø125 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0100 UH #N/A #N/A
Pekerja 0.1120 OH 129,600.00 14,515.20
Tukang pipa 0.0220 OH 148,100.00 3,258.20
Mandor 0.0110 OH 177,600.00 1,953.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.051 (K3) Pemotongan 1 buah pipa DCI Ø150 mm
Pipa DCI Ø150 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0180 UH #N/A #N/A
Pekerja 0.1590 OH 129,600.00 20,606.40
Tukang pipa 0.0320 OH 148,100.00 4,739.20
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.052 (K3) Pemotongan 1 buah pipa DCI Ø200 mm
Pipa DCI Ø200 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0540 UH #N/A #N/A
Pekerja 0.3660 OH 129,600.00 47,433.60
Tukang pipa 0.0730 OH 148,100.00 10,811.30
Mandor 0.0370 OH 177,600.00 6,571.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.053 (K3) Pemotongan 1 buah pipa DCI Ø250 mm
Pipa DCI Ø250 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0730 UH #N/A #N/A
Pekerja 0.4760 OH 129,600.00 61,689.60
Tukang pipa 0.0950 OH 148,100.00 14,069.50
Mandor 0.0480 OH 177,600.00 8,524.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.054 (K3) Pemotongan 1 buah pipa DCI Ø300 mm
Pipa DCI Ø300 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.0790 UH #N/A #N/A
224

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.5120 OH 129,600.00 66,355.20


Tukang pipa 0.1020 OH 148,100.00 15,106.20
Mandor 0.0510 OH 177,600.00 9,057.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
225

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.055 (K3) Pemotongan 1 buah pipa DCI Ø400 mm


Pipa DCI Ø400 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.1580 UH #N/A #N/A
Pekerja 0.9410 OH 129,600.00 121,953.60
Tukang pipa 0.1880 OH 148,100.00 27,842.80
Mandor 0.0940 OH 177,600.00 16,694.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.056 (K3) Pemotongan 1 buah pipa DCI Ø450 mm
Pipa DCI Ø450 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.1760 UH #N/A #N/A
Pekerja 1.1370 OH 129,600.00 147,355.20
Tukang pipa 0.2270 OH 148,100.00 33,618.70
Mandor 0.1140 OH 177,600.00 20,246.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.057 (K3) Pemotongan 1 buah pipa DCI Ø500 mm
Pipa DCI Ø500 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.1920 UH #N/A #N/A
Pekerja 1.3120 OH 129,600.00 170,035.20
Tukang pipa 0.2620 OH 148,100.00 38,802.20
Mandor 0.1310 OH 177,600.00 23,265.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.058 (K3) Pemotongan 1 buah pipa DCI Ø600 mm
Pipa DCI Ø600 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.1920 UH #N/A #N/A
Pekerja 1.3090 OH 129,600.00 169,646.40
Tukang pipa 0.2620 OH 148,100.00 38,802.20
Mandor 0.1310 OH 177,600.00 23,265.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.059 (K3) Pemotongan 1 buah pipa DCI Ø800 mm
Pipa DCI Ø800 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.3100 UH #N/A #N/A
Pekerja 2.5980 OH 129,600.00 336,700.80
Tukang pipa 0.5200 OH 148,100.00 77,012.00
Mandor 0.2600 OH 177,600.00 46,176.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.060 (K3) Pemotongan 1 buah pipa DCI Ø900 mm
Pipa DCI Ø900 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.3810 UH #N/A #N/A
226

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 3.3700 OH 129,600.00 436,752.00


Tukang pipa 0.6740 OH 148,100.00 99,819.40
Mandor 0.3370 OH 177,600.00 59,851.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
227

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.061 (K3) Pemotongan 1 buah pipa DCI Ø1000 mm


Pipa DCI Ø1000 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.4410 UH #N/A #N/A
Pekerja 4.0210 OH 129,600.00 521,121.60
Tukang pipa 0.8040 OH 148,100.00 119,072.40
Mandor 0.4020 OH 177,600.00 71,395.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.062 (K3) Pemotongan 1 buah pipa DCI Ø1100 mm
Pipa DCI Ø1100 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.5060 UH #N/A #N/A
Pekerja 4.7310 OH 129,600.00 613,137.60
Tukang pipa 0.9460 OH 148,100.00 140,102.60
Mandor 0.4730 OH 177,600.00 84,004.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.063 (K3) Pemotongan 1 buah pipa DCI Ø1200 mm
Pipa DCI Ø1200 mm 1.0000 btg #N/A #N/A
Alat potong pipa DCI 0.5760 UH #N/A #N/A
Pekerja 5.5020 OH 129,600.00 713,059.20
Tukang pipa 1.1000 OH 148,100.00 162,910.00
Mandor 0.5500 OH 177,600.00 97,680.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.064 (K3) Pemotongan 1 buah pipa baja Ø63 mm
Pipa Hitam Medium Ø2" x 3,40 mm (6m) 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0370 UH #N/A #N/A
Pekerja 0.0280 OH 129,600.00 3,628.80
Tukang pipa 0.0060 OH 148,100.00 888.60
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.065 (K3) Pemotongan 1 buah pipa baja Ø100 mm
Pipa Hitam Medium Ø3" x 3,75 mm (6m) 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0400 UH #N/A #N/A
Pekerja 0.0850 OH 129,600.00 11,016.00
Tukang pipa 0.0170 OH 148,100.00 2,517.70
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.066 (K3) Pemotongan 1 buah pipa baja Ø125 mm
Pipa Hitam Medium Ø5" x 4,60 mm (6m) 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0420 UH #N/A #N/A
228

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.1330 OH 129,600.00 17,236.80


Tukang pipa 0.0270 OH 148,100.00 3,998.70
Mandor 0.0130 OH 177,600.00 2,308.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
229

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.067 (K3) Pemotongan 1 buah pipa baja Ø150 mm


Pipa Hitam Medium Ø6" x 4,60 mm (6m) 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0450 UH #N/A #N/A
Pekerja 0.1840 OH 129,600.00 23,846.40
Tukang pipa 0.0370 OH 148,100.00 5,479.70
Mandor 0.0180 OH 177,600.00 3,196.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.068 (K3) Pemotongan 1 buah pipa baja Ø200 mm
Pipa Hitam Medium Ø8" x 6,10 mm (6m) 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0600 UH #N/A #N/A
Pekerja 0.4760 OH 129,600.00 61,689.60
Tukang pipa 0.0950 OH 148,100.00 14,069.50
Mandor 0.0480 OH 177,600.00 8,524.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.069 (K3) Pemotongan 1 buah pipa baja Ø250 mm
Pipa baja Ø250 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0680 UH #N/A #N/A
Pekerja 0.6630 OH 129,600.00 85,924.80
Tukang pipa 0.1330 OH 148,100.00 19,697.30
Mandor 0.0660 OH 177,600.00 11,721.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.070 (K3) Pemotongan 1 buah pipa baja Ø300 mm
Pipa baja Ø300 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.0720 UH #N/A #N/A
Pekerja 0.7450 OH 129,600.00 96,552.00
Tukang pipa 0.1490 OH 148,100.00 22,066.90
Mandor 0.0740 OH 177,600.00 13,142.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.071 (K3) Pemotongan 1 buah pipa baja Ø400 mm
Pipa baja Ø400 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1050 UH #N/A #N/A
Pekerja 1.4400 OH 129,600.00 186,624.00
Tukang pipa 0.2880 OH 148,100.00 42,652.80
Mandor 0.1440 OH 177,600.00 25,574.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.072 (K3) Pemotongan 1 buah pipa baja Ø450 mm
Pipa baja Ø450 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1070 UH #N/A #N/A
230

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 1.3990 OH 129,600.00 181,310.40


Tukang pipa 0.2800 OH 148,100.00 41,468.00
Mandor 0.1400 OH 177,600.00 24,864.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
231

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.073 (K3) Pemotongan 1 buah pipa baja Ø500 mm


Pipa baja Ø500 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1070 UH #N/A #N/A
Pekerja 1.5580 OH 129,600.00 201,916.80
Tukang pipa 0.3120 OH 148,100.00 46,207.20
Mandor 0.1560 OH 177,600.00 27,705.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.074 (K3) Pemotongan 1 buah pipa baja Ø600 mm
Pipa baja Ø600 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1130 UH #N/A #N/A
Pekerja 1.4370 OH 129,600.00 186,235.20
Tukang pipa 0.2870 OH 148,100.00 42,504.70
Mandor 0.1440 OH 177,600.00 25,574.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.075 (K3) Pemotongan 1 buah pipa baja Ø800 mm
Pipa baja Ø800 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1660 UH #N/A #N/A
Pekerja 2.6240 OH 129,600.00 340,070.40
Tukang pipa 0.5250 OH 148,100.00 77,752.50
Mandor 0.2620 OH 177,600.00 46,531.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.076 (K3) Pemotongan 1 buah pipa baja Ø900 mm
Pipa baja Ø900 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.1830 UH #N/A #N/A
Pekerja 2.9710 OH 129,600.00 385,041.60
Tukang pipa 0.5940 OH 148,100.00 87,971.40
Mandor 0.2970 OH 177,600.00 52,747.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.077 (K3) Pemotongan 1 buah pipa baja Ø1000 mm
Pipa baja Ø1000 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.2010 UH #N/A #N/A
Pekerja 3.3190 OH 129,600.00 430,142.40
Tukang pipa 0.6640 OH 148,100.00 98,338.40
Mandor 0.3320 OH 177,600.00 58,963.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
Q.078 (K3) Pemotongan 1 buah pipa baja Ø1100 mm
Pipa baja Ø1100 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.2180 UH #N/A #N/A
232

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 3.6670 OH 129,600.00 475,243.20


Tukang pipa 0.7330 OH 148,100.00 108,557.30
Mandor 0.3670 OH 177,600.00 65,179.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
233

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Q.079 (K3) Pemotongan 1 buah pipa baja Ø1200 mm


Pipa baja Ø1200 mm 1.0000 btg #N/A #N/A
Alat potong pipa baja 0.2360 UH #N/A #N/A
Pekerja 4.0150 OH 129,600.00 520,344.00
Tukang pipa 0.8030 OH 148,100.00 118,924.30
Mandor 0.4020 OH 177,600.00 71,395.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

R. HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


R.001 (K3) Pemasangan 1 buah valve Ø150 mm
Valve Ø150 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.1000 UH #N/A #N/A
Pekerja 1.4290 OH 129,600.00 185,198.40
Tukang pipa 0.7150 OH 148,100.00 105,891.50
Mandor 0.1430 OH 177,600.00 25,396.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.002 (K3) Pemasangan 1 buah valve Ø200 mm
Valve Ø200 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.3000 UH #N/A #N/A
Pekerja 1.7140 OH 129,600.00 222,134.40
Tukang pipa 0.8570 OH 148,100.00 126,921.70
Mandor 0.1710 OH 177,600.00 30,369.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.003 (K3) Pemasangan 1 buah valve Ø250 mm
Valve Ø250 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.4000 UH #N/A #N/A
Pekerja 1.7140 OH 129,600.00 222,134.40
Tukang pipa 0.8570 OH 148,100.00 126,921.70
Mandor 0.1710 OH 177,600.00 30,369.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.004 (K3) Pemasangan 1 buah valve Ø300 mm
Valve Ø300 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Pekerja 2.0000 OH 129,600.00 259,200.00
Tukang pipa 1.0000 OH 148,100.00 148,100.00
Mandor 0.2000 OH 177,600.00 35,520.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
234

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.005 (K3) Pemasangan 1 buah valve Ø400 mm


Valve Ø400 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Pekerja 3.4290 OH 129,600.00 444,398.40
Tukang pipa 1.7150 OH 148,100.00 253,991.50
Mandor 0.3430 OH 177,600.00 60,916.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
235

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.006 (K3) Pemasangan 1 buah valve Ø450 mm


Valve Ø450 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Pekerja 3.4290 OH 129,600.00 444,398.40
Tukang pipa 1.7150 OH 148,100.00 253,991.50
Mandor 0.3430 OH 177,600.00 60,916.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.007 (K3) Pemasangan 1 buah valve Ø500 mm
Valve Ø500 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Pekerja 4.0000 OH 129,600.00 518,400.00
Tukang pipa 2.0000 OH 148,100.00 296,200.00
Mandor 0.4000 OH 177,600.00 71,040.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.008 (K3) Pemasangan 1 buah valve Ø600 mm
Valve Ø600 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.6000 UH #N/A #N/A
Mobile Crane ≤ 3T 0.3000 UH #N/A #N/A
Pekerja 1.4210 OH 129,600.00 184,161.60
Tukang pipa 0.7110 OH 148,100.00 105,299.10
Mandor 0.1420 OH 177,600.00 25,219.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.009 (K3) Pemasangan 1 buah valve Ø700 mm
Valve Ø700 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Mobile Crane ≤ 3T 0.5000 UH #N/A #N/A
Pekerja 1.4290 OH 129,600.00 185,198.40
Tukang pipa 0.7150 OH 148,100.00 105,891.50
Mandor 0.1430 OH 177,600.00 25,396.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.010 (K3) Pemasangan 1 buah valve Ø800 mm
Valve Ø800 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Mobile Crane ≤ 3T 0.5000 UH #N/A #N/A
Pekerja 1.7860 OH 129,600.00 231,465.60
Tukang pipa 0.8930 OH 148,100.00 132,253.30
Mandor 0.1790 OH 177,600.00 31,790.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
236

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.011 (K3) Pemasangan 1 buah valve Ø900 mm


Valve Ø900 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.7500 UH #N/A #N/A
Mobile Crane ≤ 3T 0.7500 UH #N/A #N/A
Pekerja 1.7140 OH 129,600.00 222,134.40
Tukang pipa 0.8570 OH 148,100.00 126,921.70
Mandor 0.1710 OH 177,600.00 30,369.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.012 (K3) Pemasangan 1 buah valve Ø1000 mm
Valve Ø1000 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Mobile Crane ≤ 3T 1.0000 UH #N/A #N/A
Pekerja 2.5710 OH 129,600.00 333,201.60
Tukang pipa 1.2860 OH 148,100.00 190,456.60
Mandor 0.2570 OH 177,600.00 45,643.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.013 (K3) Pemasangan 1 buah valve Ø1100 mm
Valve Ø1100 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Mobile Crane ≤ 3T 1.0000 UH #N/A #N/A
Pekerja 3.0000 OH 129,600.00 388,800.00
Tukang pipa 1.5000 OH 148,100.00 222,150.00
Mandor 0.3000 OH 177,600.00 53,280.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.014 (K3) Pemasangan 1 buah valve Ø1200 mm
Valve Ø1200 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0000 UH #N/A #N/A
Mobile Crane ≤ 3T 1.0000 UH #N/A #N/A
Pekerja 3.0000 OH 129,600.00 388,800.00
Tukang pipa 1.5000 OH 148,100.00 222,150.00
Mandor 0.3000 OH 177,600.00 53,280.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.015 (K3) Pemasangan 1 buah tee Ø150 mm
Tee Ø150 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.0280 UH #N/A #N/A
Pekerja 0.1060 OH 129,600.00 13,737.60
Tukang pipa 0.0530 OH 148,100.00 7,849.30
Mandor 0.0110 OH 177,600.00 1,953.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
237

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Dibulatkan #N/A
238

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.016 (K3) Pemasangan 1 buah tee Ø200 mm


Tee Ø200 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.0290 UH #N/A #N/A
Pekerja 0.2160 OH 129,600.00 27,993.60
Tukang pipa 0.1080 OH 148,100.00 15,994.80
Mandor 0.0220 OH 177,600.00 3,907.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.017 (K3) Pemasangan 1 buah tee Ø250 mm
Tee Ø250 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.0390 UH #N/A #N/A
Pekerja 0.3260 OH 129,600.00 42,249.60
Tukang pipa 0.1630 OH 148,100.00 24,140.30
Mandor 0.0330 OH 177,600.00 5,860.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.018 (K3) Pemasangan 1 buah tee Ø300 mm
Tee Ø300 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Pekerja 0.4360 OH 129,600.00 56,505.60
Tukang pipa 0.2180 OH 148,100.00 32,285.80
Mandor 0.0440 OH 177,600.00 7,814.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.019 (K3) Pemasangan 1 buah tee Ø400 mm
Tee Ø400 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Pekerja 0.6560 OH 129,600.00 85,017.60
Tukang pipa 0.3280 OH 148,100.00 48,576.80
Mandor 0.0660 OH 177,600.00 11,721.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.020 (K3) Pemasangan 1 buah tee Ø450 mm
Tee Ø450 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.5000 UH #N/A #N/A
Pekerja 0.7660 OH 129,600.00 99,273.60
Tukang pipa 0.3830 OH 148,100.00 56,722.30
Mandor 0.0770 OH 177,600.00 13,675.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.021 (K3) Pemasangan 1 buah tee Ø500 mm
Tee Ø500 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.6000 UH #N/A #N/A
239

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.8760 OH 129,600.00 113,529.60


Tukang pipa 0.4380 OH 148,100.00 64,867.80
Mandor 0.0880 OH 177,600.00 15,628.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
240

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.022 (K3) Pemasangan 1 buah tee Ø600 mm


Tee Ø600 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.1930 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.0960 UH #N/A #N/A
Pekerja 1.0960 OH 129,600.00 142,041.60
Tukang pipa 0.5480 OH 148,100.00 81,158.80
Mandor 0.1100 OH 177,600.00 19,536.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.023 (K3) Pemasangan 1 buah tee Ø700 mm
Tee Ø700 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.2250 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.1130 UH #N/A #N/A
Pekerja 1.3160 OH 129,600.00 170,553.60
Tukang pipa 0.6580 OH 148,100.00 97,449.80
Mandor 0.1320 OH 177,600.00 23,443.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.024 (K3) Pemasangan 1 buah tee Ø800 mm
Tee Ø800 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.2570 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.1290 UH #N/A #N/A
Pekerja 1.5360 OH 129,600.00 199,065.60
Tukang pipa 0.7680 OH 148,100.00 113,740.80
Mandor 0.1540 OH 177,600.00 27,350.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.025 (K3) Pemasangan 1 buah tee Ø900 mm
Tee Ø900 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.3210 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.1610 UH #N/A #N/A
Pekerja 1.7560 OH 129,600.00 227,577.60
Tukang pipa 0.8780 OH 148,100.00 130,031.80
Mandor 0.1760 OH 177,600.00 31,257.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.026 (K3) Pemasangan 1 buah tee Ø1000 mm
Tee Ø1000 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.3660 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.1830 UH #N/A #N/A
Pekerja 1.9760 OH 129,600.00 256,089.60
Tukang pipa 0.9880 OH 148,100.00 146,322.80
Mandor 0.1980 OH 177,600.00 35,164.80
Jumlah #N/A
Overhead + Profit 10% #N/A
241

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Jumlah #N/A
Dibulatkan #N/A
242

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

R.027 (K3) Pemasangan 1 buah tee Ø1100 mm


Tee Ø1100 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.3860 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.1930 UH #N/A #N/A
Pekerja 2.1960 OH 129,600.00 284,601.60
Tukang pipa 1.0980 OH 148,100.00 162,613.80
Mandor 0.2200 OH 177,600.00 39,072.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
R.028 (K3) Pemasangan 1 buah tee Ø1200 mm
Tee Ø1200 mm 1.0000 bh #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.4500 UH #N/A #N/A
Sewa Mobile Crane ≤ 3T 0.2250 UH #N/A #N/A
Pekerja 2.4160 OH 129,600.00 313,113.60
Tukang pipa 1.2080 OH 148,100.00 178,904.80
Mandor 0.2420 OH 177,600.00 42,979.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

S. HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


S.001 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø80 mm
Pipa HDPE SDR 11 (PN 16) 2½" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 0.6060 UH #N/A #N/A
Sewa Genset 0.0750 UH #N/A #N/A
Sewa Pompa Submersible 0.9680 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.8650 UH #N/A #N/A
Pekerja 1.4660 OH 129,600.00 189,993.60
Tukang pipa 0.7330 OH 148,100.00 108,557.30
Mandor 0.1470 OH 177,600.00 26,107.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.002 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø100 mm
Pipa HDPE SDR 11 (PN 16) 3" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 0.6500 UH #N/A #N/A
Sewa Genset 0.1590 UH #N/A #N/A
Sewa Pompa Submersible 1.0780 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 0.9110 UH #N/A #N/A
Pekerja 1.6460 OH 129,600.00 213,321.60
Tukang pipa 0.8230 OH 148,100.00 121,886.30
Mandor 0.1650 OH 177,600.00 29,304.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
243

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

S.003 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø150 mm
Pipa HDPE SDR 11 (PN 16) 5" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 0.7600 UH #N/A #N/A
Sewa Genset 0.3690 UH #N/A #N/A
Sewa Pompa Submersible 1.3530 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.0260 UH #N/A #N/A
Pekerja 2.0960 OH 129,600.00 271,641.60
Tukang pipa 1.0480 OH 148,100.00 155,208.80
Mandor 0.2100 OH 177,600.00 37,296.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.004 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø200 mm
Pipa HDPE SDR 11 (PN 16) 8" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 0.8700 UH #N/A #N/A
Sewa Genset 0.5790 UH #N/A #N/A
Sewa Pompa Submersible 1.6280 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.1410 UH #N/A #N/A
Pekerja 2.5460 OH 129,600.00 329,961.60
Tukang pipa 1.2730 OH 148,100.00 188,531.30
Mandor 0.2550 OH 177,600.00 45,288.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.005 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø250 mm
Pipa HDPE SDR 11 (PN 16) 10" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 0.9800 UH #N/A #N/A
Sewa Genset 0.7890 UH #N/A #N/A
Sewa Pompa Submersible 1.9030 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.2560 UH #N/A #N/A
Pekerja 2.9960 OH 129,600.00 388,281.60
Tukang pipa 1.4980 OH 148,100.00 221,853.80
Mandor 0.3000 OH 177,600.00 53,280.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.006 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø300 mm
Pipa HDPE SDR 11 (PN 16) 12" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.0900 UH #N/A #N/A
Sewa Genset 0.9990 UH #N/A #N/A
Sewa Pompa Submersible 2.1780 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.3710 UH #N/A #N/A
Pekerja 3.4460 OH 129,600.00 446,601.60
Tukang pipa 1.7230 OH 148,100.00 255,176.30
Mandor 0.3450 OH 177,600.00 61,272.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
244

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

S.007 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø400 mm
Pipa HDPE SDR 11 (PN 16) 16" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.3100 UH #N/A #N/A
Sewa Genset 1.4190 UH #N/A #N/A
Sewa Pompa Submersible 2.7280 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.6010 UH #N/A #N/A
Pekerja 4.3460 OH 129,600.00 563,241.60
Tukang pipa 2.1730 OH 148,100.00 321,821.30
Mandor 0.4350 OH 177,600.00 77,256.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.008 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø450 mm
Pipa HDPE SDR 11 (PN 16) 18" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.4200 UH #N/A #N/A
Sewa Genset 1.6290 UH #N/A #N/A
Sewa Pompa Submersible 3.0030 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.7160 UH #N/A #N/A
Pekerja 4.7960 OH 129,600.00 621,561.60
Tukang pipa 2.3980 OH 148,100.00 355,143.80
Mandor 0.4800 OH 177,600.00 85,248.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.009 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø500 mm
Pipa HDPE SDR 11 (PN 16) 20" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.5300 UH #N/A #N/A
Sewa Genset 1.8390 UH #N/A #N/A
Sewa Pompa Submersible 3.2780 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 1.8310 UH #N/A #N/A
Pekerja 5.2460 OH 129,600.00 679,881.60
Tukang pipa 2.6230 OH 148,100.00 388,466.30
Mandor 0.5250 OH 177,600.00 93,240.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.010 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø600 mm
Pipa HDPE SDR 11 (PN 16) 22" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.7500 UH #N/A #N/A
Sewa Genset 2.2590 UH #N/A #N/A
Sewa Pompa Submersible 3.8280 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 2.0610 UH #N/A #N/A
Pekerja 6.1460 OH 129,600.00 796,521.60
Tukang pipa 3.0730 OH 148,100.00 455,111.30
Mandor 0.6150 OH 177,600.00 109,224.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
245

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

S.011 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø700 mm
Pipa HDPE SDR 17 (PN 10) 28" Rucika 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 1.9700 UH #N/A #N/A
Sewa Genset 2.6790 UH #N/A #N/A
Sewa Pompa Submersible 4.3780 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 2.2910 UH #N/A #N/A
Pekerja 7.0460 OH 129,600.00 913,161.60
Tukang pipa 3.5230 OH 148,100.00 521,756.30
Mandor 0.7050 OH 177,600.00 125,208.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
S.012 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø800 mm
Pipa Ø800 mm 1.0000 btg #N/A #N/A
Peralatan potong pipa T2/ mekanik/ cilinder saw 2.1900 UH #N/A #N/A
Sewa Genset 3.0990 UH #N/A #N/A
Sewa Pompa Submersible 4.9280 UH #N/A #N/A
Sewa Tripot/ Tackel & Handle Crane 2T 2.5210 UH #N/A #N/A
Pekerja 7.9460 OH 129,600.00 1,029,801.60
Tukang pipa 3.9730 OH 148,100.00 588,401.30
Mandor 0.7950 OH 177,600.00 141,192.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

T. HARGA SATUAN PEKERJAAN PENGETESAN PIPA


T.001 (K3) Pengetesan 1 m pipa Ø50 mm
Air 0.0020 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
Pekerja 0.0080 OH 129,600.00 1,036.80
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
T.002 (K3) Pengetesan 1 m pipa Ø75 mm
Air 0.0040 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
Pekerja 0.0080 OH 129,600.00 1,036.80
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
T.003 (K3) Pengetesan 1 m pipa Ø100 mm
Air 0.0080 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
246

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Pekerja 0.0080 OH 129,600.00 1,036.80


Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
247

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

T.004 (K3) Pengetesan 1 m pipa Ø150 mm


Air 0.0180 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
Pekerja 0.0080 OH 129,600.00 1,036.80
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
T.005 (K3) Pengetesan 1 m pipa Ø200 mm
Air 0.0310 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
Pekerja 0.0080 OH 129,600.00 1,036.80
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
T.006 (K3) Pengetesan 1 m pipa Ø250 mm
Air 0.0490 m3 #N/A #N/A
Bensin Pertalite 0.0600 ltr #N/A #N/A
Minyak Pelumas 0.0020 ltr #N/A #N/A
Pekerja 0.0080 OH 129,600.00 1,036.80
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
248

ANALISIS HARGA SATUAN PEKERJAAN


BIDANG CIPTA KARYA
PEMERINTAH DAERAH KOTA CIMAHI
TAHUN ANGGARAN 2021

Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016 tentang Pedoman Analisis
Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

U. HARGA SATUAN PEKERJAAN ELEKTRIKAL


U.001 (K3) Pemasangan 1 buah titik lampu
Pipa listrik 5/8" 3.0000 btg #N/A #N/A
Kabel 24.0000 m #N/A #N/A
T Dus 3.0000 bh #N/A #N/A
L Bow 4.0000 bh #N/A #N/A
Las Dop 3.0000 bh #N/A #N/A
Klem 24.0000 bh #N/A #N/A
Mangkok 1.0000 bh #N/A #N/A
Saklar Single Standar Broco 1.0000 bh #N/A #N/A
Fitting 1.0000 bh #N/A #N/A
Upah Pekerja 1.0000 Ls #N/A #N/A
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
U.002 1 TITIK -Perapihan INSTALASI
Bahan :
Alat Bantu 1.0000 ls 150,000.00 150,000.00
Pembantu Instalator 2.0000 Oh 129,600.00 259,200.00
Instalator 3.0000 Oh 148,100.00 444,300.00
Mandor 1.0000 Oh 177,600.00 177,600.00
Jumlah 1,031,100.00
Keuntungan maksimal 10% 103,110.00
Jumlah 1,134,210.00
Dibulatkan 1,134,210.00
U.003 1 TITIK - PASANG SAKLAR TUNGGAL
Bahan :
Saklar Tunggal 1.0000 bh Err:509 Err:509
Perlengkapan 1.0000 bh Err:509 Err:509
Tenaga Kerja :
Pekerja listrik 0.0800 Oh 129,600.00 10,368.00
Tukang Listrik 0.1000 Oh 148,100.00 14,810.00
Kepala Tukang Listrik 0.0020 Oh 148,100.00 296.20
Mandor 0.0015 Oh 177,600.00 266.40
Jumlah Err:509
Keuntungan maksimal 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
U.004 1 TITIK - PASANG LAMPU TL 18 WATT
249

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 ### Rp 5.00 6=(3x5)

Bahan :
Lampu TL 18 watt 1.0000 bh 15,600.00 15,600.00
Dudukan lampu TKO 1 x 18 watt 1.0000 bh 50,000.00 50,000.00
Perlengkapan 1.0000 bh 3,280.00 3,280.00
Tenaga Kerja :
Pekerja listrik 0.0900 Oh #N/A #N/A
Tukang Listrik 0.1200 Oh 148,100.00 17,772.00
Kepala Tukang Listrik 0.0020 Oh #N/A #N/A
Mandor 0.0015 Oh 177,600.00 266.40
Jumlah #N/A
Keuntungan maksimal 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
U.005 1 M2 PLESTERAN WATERPROOF BATACOTE, 3 LAPIS
Bahan :
Semen Portland 0.5000 Kg 48,000.00 24,000.00
Batacote 2.9000 Kg 95,700.00 277,530.00
Pasir Pasang 0.0060 M3 Err:509 Err:509
Tenaga Kerja :
Pekerja 0.3000 Oh #N/A #N/A
Tukang Batu 0.2000 Oh 148,100.00 29,620.00
Kepala Tukang Batu 0.0200 Oh #N/A #N/A
Mandor 0.0150 Oh 177,600.00 2,664.00
Jumlah #N/A
Keuntungan maksimal 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
U.006 Pemasangan 1 buah Lampu Downlight
Lampu Downlight LED 12W Philips 1.0000 bh Err:509 Err:509
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
ANALISIS HARGA SATUAN PEKERJAAN
BIDANG CIPTA KARYA
PEMERINTAH DAERAH KOTA CIMAHI
TAHUN ANGGARAN 2021

** Sumber :
Dikutip dari Analisis Harga Satuan pekerjaan yang pernah digunakan
dan berbagai sumber lainnya

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)

HARGA SATUAN PEKERJAAN PERSIAPAN


HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.015 Pemasangan 1 m' rangka jendela alumunium
Rangka jendela almunium 1.0500 M Err:509 Err:509
Paku Sekrup / bh 1.0000 bh 45,000.00 45,000.00
Pekerja 0.0450 OH 129,600.00 5,832.00
Tukang kayu 0.1350 OH 148,100.00 19,993.50
Kepala tukang 0.0140 OH 162,500.00 2,275.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.022 Bongkaran 1 m2 Dinding Partisi
Pekerja 0.0600 oh 129,600.00 Rp 7,776.00
Mandor 0.0400 oh 177,600.00 Rp 7,104.00
Jumlah 14,880.00
Overhead + Profit 10% 1,488.00
Jumlah 16,368.00
Dibulatkan 16,360.00
x.023 Bongkaran 1 unit Kusen + Daun Pintu
Pekerja 1.0000 oh 129,600.00 Rp 129,600.00
Mandor 0.0050 oh 177,600.00 Rp 888.00
Jumlah 130,488.00
Overhead + Profit 10% 13,048.80
Jumlah 143,536.80
Dibulatkan 143,530.00
x.024 Pemasangan 1 m2 Rangka Partisi Steel Stud (CS) Jarak Maks 60 cm
Rangka Steelstud (CS) 4.0000 m' #N/A #N/A
Assesoris (perkuatan, las, dll) 0.1000 lot #N/A #N/A
Pekerja 0.0800 oh 129,600.00 Rp 10,368.00
Tukang kayu 0.2400 oh 148,100.00 Rp 35,544.00
Kepala tukang 0.0240 oh 162,500.00 Rp 3,900.00
Mandor 0.0040 oh 177,600.00 Rp 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

HARGA SATUAN PEKERJAAN PLESTERAN


x.025 Pemasangan 1 m2 Plesteran 1 SP : 3 PP, tebal 10 mm
Semen Tiga Roda / kg 5.1840 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0155 m3 m3 #VALUE!
Pekerja 0.2000 OH 129,600.00 25,920.00
Tukang Batu 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


x.026 Pemasangan 1 m2 dinding granit tile ukuran 40 cm x 40 cm
Granito Tile Ukuran 40 x 40 Polis Essenza 1.0600 m2 #N/A #N/A
Semen Tiga Roda 0.1860 zak #N/A #N/A
Pasir Pasang Cimalaka 0.0180 m3 m3 #VALUE!
Semen warna 1.9400 kg kg #VALUE!
Pekerja 0.6000 OH 129,600.00 77,760.00
Tukang batu 0.4500 OH 148,100.00 66,645.00
Kepala tukang 0.0450 OH 162,500.00 7,312.50
Mandor 0.3000 OH 177,600.00 53,280.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.027 Pemasangan 1 m2 dinding keramik ukuran 30 cm x 30 cm
Keramik 30 x 30 Polos Roman 1.0600 m2 #N/A #N/A
Semen Tiga Roda 0.1860 zak #N/A #N/A
Pasir Pasang Cimalaka 0.0180 m3 m3 #VALUE!
Semen warna 1.9400 kg kg #VALUE!
Pekerja 0.6000 OH 129,600.00 77,760.00
Tukang batu 0.4500 OH 148,100.00 66,645.00
Kepala tukang 0.0450 OH 162,500.00 7,312.50
Mandor 0.3000 OH 177,600.00 53,280.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.028 Pekerjaan railing tangga besi hollow
Plat Besi 15.0000 kg #N/A #N/A
Cat Besi Siev 1.0000 kg #N/A #N/A
Pekerja 0.1500 OH 129,600.00 19,440.00
Tukang batu 0.0750 OH 148,100.00 11,107.50
Kepala tukang 0.0080 OH 162,500.00 1,300.00
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.029 Pekerjaan 1 m2 rabat beton ad. 1 : 3 : 5 finish acian
Semen Tiga Roda 0.4540 zak #N/A #N/A
Pasir beton 0.0540 m3 m3 #VALUE!
Kerikil / Batu Pecah 1/2 0.0910 m3 #N/A #N/A
Pekerja 0.3000 OH 129,600.00 38,880.00
Tukang batu 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)

HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


x.030 Pemasangan 1 m2 rangka plafond metal furing
Rangka plafond metal furing 1.0500 M2 #N/A #N/A
Pekerja 0.2000 OH 129,600.00 25,920.00
Tukang Besi konstruksi 0.3000 OH 148,100.00 44,430.00
Kepala tukang 0.0300 OH 162,500.00 4,875.00
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

HARGA SATUAN PEKERJAAN PENUTUP ATAP


x.031 Pekerjaan 1 m2 rangka atap baja ringan
Rangka Atap Baja Ringan 1.0000 m2 Err:509 Err:509
Pekerja 0.0800 OH 129,600.00 10,368.00
Tukang kayu 0.2400 OH 148,100.00 35,544.00
Kepala tukang 0.0240 OH 162,500.00 3,900.00
Mandor 0.0040 OH 177,600.00 710.40
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
x.032 Pemasangan 1 m2 atap genteng keramik
Genteng Keramik Natural 14,5 / m2 25.0000 bh #N/A #N/A
Pekerja 0.1500 OH 129,600.00 19,440.00
Tukang batu 0.0750 OH 148,100.00 11,107.50
Kepala tukang 0.0080 OH 162,500.00 1,300.00
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.033 Pemasangan 1 m2 atap genteng keramik glazuur
Genteng Keramik Glasur Standard 14,5 / m2 14.5000 bh #N/A #N/A
Pekerja 0.1500 OH 129,600.00 19,440.00
Tukang batu 0.0750 OH 148,100.00 11,107.50
Kepala tukang 0.0080 OH 162,500.00 1,300.00
Mandor 0.0080 OH 177,600.00 1,420.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.034 Pemasangan 1 M' bubung genteng keramik
Bubungan Genteng Keramik 5.0000 bh #N/A #N/A
Semen Tiga Roda 0.2160 zak #N/A #N/A
Pasir Pasang Cimalaka 0.0320 M3 m3 #VALUE!
Pekerja 0.4000 OH 129,600.00 51,840.00
Tukang batu 0.2000 OH 148,100.00 29,620.00
Kepala tukang 0.0200 OH 162,500.00 3,250.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.035 Pemasangan 1 M' fleshing seng plat
Seng Plat t = 0,25 mm l = 120 cm 0.4500 M2 #N/A #N/A
Paku Kayu 5 cm s/d 10 cm 0.1000 kg kg #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang kayu 0.2000 OH 148,100.00 29,620.00
Kepala tukang 0.0200 OH 162,500.00 3,250.00
Mandor 0.0050 OH 177,600.00 888.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A

HARGA SATUAN PEKERJAAN KUNCI DAN KACA


x.036 Pemasangan 1 bh kunci dan handle pintu almunium
Kunci + Handle Pintu Alumunium (Set) 1.0000 bh Err:509 Err:509
Tukang kayu 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
Pemasangan 1 bh kunci dan handle pintu kayu
Kunci + Handle Pintu Alumunium (Set) 1.0000 bh Err:509 Err:509
Tukang kayu 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509

1 M2 PASANGAN KACA CERMIN, T = 5 MM


Bahan :
Kaca Cermin 0.2400 M2 299,200.00 71,808.00
Tenaga Kerja :
Pekerja 0.0150 Oh 129,600.00 1,944.00
Tukang Kayu 0.1500 Oh 148,100.00 22,215.00
Kepala Tukang Kayu 0.0150 Oh 148,100.00 2,221.50
Mandor 0.0008 Oh 177,600.00 133.20
Jumlah 98,321.70
Keuntungan maksimal 10% 9,832.17
Jumlah 108,153.87
Dibulatkan 108,150.00

HARGA SATUAN PEKERJAAN PENGECATAN


x.037 Pengecatan 1 m2 synthetic kayu
Dempul Kayu Impra / kg 0.1500 kg #N/A #N/A
Cat Meni Kayu Nippon 0.2000 kg #N/A #N/A
Cat Kayu / Besi Avian 0.4300 kg #N/A #N/A
Pekerja 0.0700 OH 129,600.00 9,072.00
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Tukang Cat / Pelitur 0.0900 OH #N/A #N/A
Kepala tukang 0.0600 OH 162,500.00 9,750.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.038 Penyabunan 1 m2 permukaan tembok lama
Dempul Kayu Impra / kg 0.0500 kg #N/A #N/A
Pekerja 0.1500 OH 129,600.00 19,440.00
Mandor 0.0025 OH 177,600.00 444.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.039 Pengerokan 1 m2 karat atau cat lama permukaan baja dengan pancar pasir (sand blasting) tingkat kebersihan Sa 2,5
Pasir Silika 40.0000 kg #N/A #N/A
Bensin Premium 10.0000 ltr #N/A #N/A
Kompresor, blasting pot, seland dan nozzle 1.0000 Hr #N/A #N/A
Pekerja 1.6000 OH 129,600.00 207,360.00
Tukang Cat / Pelitur 1.6000 OH #N/A #N/A
Kepala tukang 0.8000 OH 162,500.00 130,000.00
Mandor 0.5000 OH 177,600.00 88,800.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.040 Pendempulan dan penggosokan 1 m2 kayu
Dempul Kayu Impra / kg 0.0800 kg #N/A #N/A
Thinner Cat Impala 0.0200 ltr #N/A #N/A
Batu apung 0.0100 kg #N/A #N/A
Pekerja 0.0400 OH 129,600.00 5,184.00
Tukang Cat / Pelitur 0.0400 OH #N/A #N/A
Kepala tukang 0.0040 OH 162,500.00 650.00
Mandor 0.0025 OH 177,600.00 444.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.041 Pengecatan 1 m2 bidang kayu lama
Dempul Kayu Impra / kg 0.1500 kg #N/A #N/A
Cat Meni Kayu Nippon 0.1700 kg #N/A #N/A
Cat Kayu / Besi Avian 0.1700 kg #N/A #N/A
Pekerja 0.0700 OH 129,600.00 9,072.00
Tukang Cat / Pelitur 0.0750 OH #N/A #N/A
Kepala tukang 0.0075 OH 162,500.00 1,218.75
Mandor 0.0025 OH 177,600.00 444.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.042 1 m2 Waterproofing Emulsion
Waterproofing Emulsion 1.0000 kg #N/A #N/A
Rol Cat Tembok 0.0100 bh #N/A #N/A
Pekerja 0.0300 OH 129,600.00 3,888.00
Tukang cat / pelitur 0.0750 OH #N/A #N/A
Kepala tukang 0.0075 OH 162,500.00 1,218.75
Mandor 0.0030 OH 177,600.00 532.80
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
x.043 Pemasangan 1 buah bak kontrol pasangan batu bata ukuran 30 cm x 30 cm tinggi 50 cm
Batu Bata Merah (Press) 0.1450 m3 #N/A #N/A
Semen Tiga Roda / kg 44.0000 kg #N/A #N/A
Pasir Pasang Cimalaka 0.0700 m3 m3 #VALUE!
Split / Kerikil / Batu Pecah 1/2 0.0700 m3 #N/A #N/A
Besi Beton Polos 1.6000 kg #N/A #N/A
Pasir beton 0.0600 m3 m3 #VALUE!
Pekerja 3.2000 OH 129,600.00 414,720.00
Tukang batu 1.0150 OH 148,100.00 150,321.50
Kepala tukang 0.0015 OH 162,500.00 243.75
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.044 Pemasangan 1 buah shower spray
Shower spray 1.0000 bh #N/A #N/A
Seal Tape 1" 0.0250 bh #N/A #N/A
Tukang batu 0.1000 OH 148,100.00 14,810.00
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.045 Pemasangan 1 buah shower set
Shower Dengan Tiang TOTO 1.0000 bh #N/A #N/A
Seal Tape 1" 0.0250 bh #N/A #N/A
Tukang batu 1.1000 OH 148,100.00 162,910.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.046 Pemasangan 1 buah tempat sabun keramik
Tempat Sabun Keramik 1.0000 bh #N/A #N/A
Semen Tiga Roda / kg 0.1200 kg #N/A #N/A
Tukang batu 0.2500 OH 148,100.00 37,025.00
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.047 Pemasangan 1 bh meja pantry uk 600x1500 mm
Beton K - 225 0.0900 m3 Err:509 Err:509
Besi Beton Polos 9.0000 kg #N/A #N/A
Bekisting beton plat lantai 0.9900 m2 Err:509 Err:509
Pas. Dinding keramik 300x300 0.9900 m2 #N/A #N/A
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
x.048 Pemasangan 1 bh stop kran dia 1"
Ball Valve Ø1" Onda 1.0000 bh #N/A #N/A
Perlengkapan 0.3500 ls #N/A #N/A
Pekerja 0.0360 OH 129,600.00 4,665.60
Tukang batu 0.0600 OH 148,100.00 8,886.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
O.019 Pemasangan 1 m' pipa galvanis diameter ½"
Pipa Galvanis Medium Ø1/2" x 2,45 mm (6m) 1.2000 m' #N/A #N/A
Perlengkapan 1.0000 Ls #N/A #N/A
Pekerja 0.0540 OH 129,600.00 6,998.40
Tukang batu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0090 OH 162,500.00 1,462.50
Mandor 0.0270 OH 177,600.00 4,795.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.049 Pemasangan 1 bh klep kran dia ¾"
Klep dia ¾" 1.2000 bh #N/A #N/A
Perlengkapan 0.3500 ls Err:504 Err:504
Pekerja 0.0360 OH 129,600.00 4,665.60
Tukang batu 0.0600 OH 148,100.00 8,886.00
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0020 OH 177,600.00 355.20
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.050 Pemasangan 1 m1 roofdrain
Roof drain metal 1.2000 m #N/A #N/A
Semen Tiga Roda 0.1200 zak #N/A #N/A
Tukang batu 1.1000 OH 148,100.00 162,910.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.051 Pemasangan 1 bh mesin jet pump kap. 250 watt
Pompa Zet pump 250 W Sanyo 1.2000 UH #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang listrik 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.052 Pemasangan 1 bh mesin pompa kap. 150 watt
Mesin Pompa Air 150 W - Sanyo 1.2000 UH #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang listrik 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.053 Pemasangan 1 bh tangki air 1000 ltr
Tangki Air (Toren) 1050 ltr Penguin 1.0000 bh #N/A #N/A
Floater (Pelampung) Plastik 1" Onda 1.0000 bh #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang listrik 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.054 Pemasangan 1 bh tangki air 500 ltr
Tangki Air (Toren) 520 ltr Penguin 1.0000 bh #N/A #N/A
Floater (Pelampung) Plastik 1" Onda 1.0000 bh #N/A #N/A
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang listrik 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.1100 OH 162,500.00 17,875.00
Mandor 0.0160 OH 177,600.00 2,841.60
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.055 Pemasangan 1 unit septictank pas. Bata kap 3 m3 + rembuk 2x1,5x1 m + rembesan
Galian tanah, dalam s/d 1 m 6.3750 m3 Err:509 Err:509
Pas. urugan pasir 0.3000 m3 Err:509 Err:509
Pas. lantai kerja beton k 100 3.0000 m2 Err:509 Err:509
Pas. Dinding batu bata camp. 1:2 10.5000 m2 Err:509 Err:509
Pas. Plester acian camp. 1:2 12.0000 m2 Err:509 Err:509
Beton k - 225 0.3600 m3 Err:509 Err:509
Pipa PVC type AW Ø4" Rucika 14.4000 m1 Err:509 Err:509
Pipa PVC RUCIKA type AW Ø 1" 1.2000 m1 Err:509 Err:509
Split / Kerikil / Batu Pecah 2/3 1.0500 m3 #N/A #N/A
Urugan tanah kembali 1.1250 m3 Err:509 Err:509
Jumlah Err:509
Overhead + Profit 10% Err:509
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Jumlah Err:509
Dibulatkan Err:509
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.056 Pemasangan 1 unit septictank pas. Bata kap 6 m3 + rembuk 2x1,5x2 m + rembesan
Galian tanah, dalam s/d 1 m 9.3750 m3 Err:509 Err:509
Pas. urugan pasir 0.3000 m3 Err:509 Err:509
Pas. lantai kerja beton k 100 3.0000 m2 Err:509 Err:509
Pas. Dinding batu bata camp. 1:2 17.0000 m2 Err:509 Err:509
Pas. Plester acian camp. 1:2 20.0000 m2 Err:509 Err:509
Beton k - 225 0.3600 m3 Err:509 Err:509
Pipa PVC RUCIKA type AW Ø 4" 14.4000 m1 Err:509 Err:509
Pipa PVC RUCIKA type AW Ø 1" 1.2000 m1 Err:509 Err:509
Kerikil / Batu Pecah 2/3 1.0500 m3 #N/A #N/A
Urugan tanah kembali 1.1250 m3 Err:509 Err:509
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOCK
Bahan :

Perlengkapan ( 6% x Harga Kloset ) 1.0000 Ls 9,960.00 9,960.00

Pekerja 3.3000 Oh 129,600.00 427,680.00


Tukang Batu 1.6500 Oh 148,100.00 244,365.00
Kepala Tukang Batu 0.5500 Oh 148,100.00 81,455.00
Mandor 0.1800 Oh 177,600.00 31,968.00
Jumlah 795,428.00
Keuntungan maksimal 10% 79,542.80
Jumlah 874,970.80
Dibulatkan 874,970.00
HARGA SATUAN PEKERJAAN ELEKTRIKAL
x.057 Pemasangan 1 titik box panel
Box Panel PVC isi 4 MCB 1.0000 bh #N/A #N/A
MCB 6 A 2.0000 bh #N/A #N/A
MCB 4 A 2.0000 bh #N/A #N/A
Kabel NYM 3 x 2,5 Prima 6.0000 m #N/A #N/A
Pekerja 0.5000 OH 129,600.00 64,800.00
Tukang Listrik 1.0000 OH 148,100.00 148,100.00
Kepala tukang 1.0000 OH 162,500.00 162,500.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.058 Pemasangan 1 titik instalasi stop kontak
Kabel NYM 3 x 2,5 Prima 6.0000 m #N/A #N/A
Isolasi 0.5000 bh bh #VALUE!
Klem 3.0000 bh #N/A #N/A
Pekerja 0.0500 OH 129,600.00 6,480.00
Tukang Listrik 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.1000 OH 177,600.00 17,760.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.059 Pemasangan 1 titik instalasi lampu
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Kabel NYM 2 x 2,5 Prima 6.0000 m #N/A #N/A
Isolasi 0.5000 bh bh #VALUE!
Klem 3.0000 bh #N/A #N/A
Pekerja 0.0500 OH 129,600.00 6,480.00
Tukang Listrik 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.1000 OH 177,600.00 17,760.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.060 Pemasangan 1 titik instalasi antena TV
Kabel antena 10.0000 m #N/A #N/A
Isolasi 0.5000 bh bh #VALUE!
Klem 3.0000 bh #N/A #N/A
Pekerja 0.0500 OH 129,600.00 6,480.00
Tukang Listrik 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.1000 OH 177,600.00 17,760.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.061 Pemasangan 1 titik instalasi telephone
Kabel telephone 4 x 0,5 mm 10.0000 m #N/A #N/A
Isolasi 0.5000 bh bh #VALUE!
Klem 3.0000 bh #N/A #N/A
Pekerja 0.0500 OH 129,600.00 6,480.00
Tukang Listrik 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.1000 OH 162,500.00 16,250.00
Mandor 0.1000 OH 177,600.00 17,760.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.062 Pemasangan 1 buah saklar engkel
Saklar Single Standar Broco 1.0000 bh Err:509 Err:509
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
x.063 Pemasangan 1 buah saklar double
Saklar Single Standar Broco 1.0000 bh #N/A #N/A
Mangkok listrik 1.0000 bh bh #VALUE!
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.064 Pemasangan 1 buah stop kontak
Socket / Stop Kontak Single (1 Lubang) Broco 1.0000 bh 36,550.00 36,550.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Jumlah 81,885.00
Overhead + Profit 10% 8,188.50
Jumlah 90,073.50
Dibulatkan 90,070.00
x.065 Pemasangan 1 buah outlet TV
Outlet TV 1.0000 bh #N/A #N/A
Mangkok listrik 1.0000 bh bh #VALUE!
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.066 Pemasangan 1 buah outlet telephone
Outlet telephone 1.0000 bh #N/A #N/A
Mangkok listrik 1.0000 bh bh #VALUE!
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.067 Pemasangan 1 buah outlet exhausefan
Outlet exhausfan 1.0000 bh #N/A #N/A
Mangkok listrik 1.0000 bh bh #VALUE!
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.068 Pemasangan 1 buah down light & PLC 13 W
Lampu Downlight LED 12W Philips 1.0000 bh Err:509 Err:509
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah Err:509
Overhead + Profit 10% Err:509
Jumlah Err:509
Dibulatkan Err:509
x.069 Pemasangan 1 buah fitting plafond + lampu SL
Fitting plafond + lampu SL 1.0000 bh #N/A #N/A
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.070 Pemasangan 1 buah lampu TL 2 X 18 watt grille
Lampu TL 2 X 18 watt grille 1.0000 bh -
Isolasi 0.2500 bh -
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 40,335.00
Overhead + Profit 10% 4,033.50
Jumlah 44,368.50
Dibulatkan 44,360.00
x.071 Pemasangan 1 buah lampu TL 2 X 36 watt grille
Lampu TL 2 X 36 watt grille 1.0000 bh #N/A #N/A
Isolasi 0.2500 bh bh #VALUE!
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.072 Pemasangan 1 m2 Rangka Partisi Steel Stud (CS) Jarak Maks 60 cm
Rangka Steelstud (CS) 4.0000 m' #N/A #N/A
Assesoris (perkuatan, las, dll) 0.1000 ls #N/A #N/A
Pekerja 0.0800 OH 129,600.00 10,368.00
Tukang Listrik 0.2400 OH 148,100.00 35,544.00
Kepala tukang 0.0240 OH 162,500.00 3,900.00
Mandor 0.0040 OH 177,600.00 710.40
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.073 Pemasangan 1 m2 Pemasangan Gypsum Board t=9 mm
Plafon Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3750 m' #N/A #N/A
Paku GRC 0.0300 ls #N/A #N/A
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Kayu 0.0500 OH 148,100.00 7,405.00
Kepala tukang 0.0050 OH 162,500.00 812.50
Mandor 0.0050 OH 177,600.00 888.00
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
x.074 Pemasangan 1 m2 Lapisan HPL Motif Kayu
HPL Motif Kayu Jati 1.0500 m' #N/A #N/A
Lem Kayu DN / 4 kg 0.2000 ls #N/A #N/A
Pekerja 0.0250 OH 129,600.00 3,240.00
Tukang Kayu 0.0750 OH 148,100.00 11,107.50
Kepala tukang 0.0075 OH 162,500.00 1,218.75
Mandor 0.0013 OH 177,600.00 230.88
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
### Rp 2.00 3 ### Rp 5.00 6=(3x5)
x.075 Pemasangan 1 m2 Sandblast Sticker
Sticker Sandblast 1.0000 m2 #N/A #N/A
Pekerja 0.0150 OH 129,600.00 1,944.00
Tukang Kayu 0.1500 OH 148,100.00 22,215.00
Kepala tukang 0.0150 OH 162,500.00 2,437.50
Mandor 0.0008 OH 177,600.00 142.08
Jumlah #N/A
Overhead + Profit 10% #N/A
Jumlah #N/A
Dibulatkan #N/A
PEMERINTAH DAERAH KOTA CIMAHI
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Rd. Demang Hardjakusumah Blok Jati Cihanjuang Gedung C Lt. II Cimahi
Telp/Fax. (022) 6631031 Website. www.cimahikota.go.id
Kota Cimahi Jawa Barat 40513
PEMERINTAH DAERAH KOTA CIMAHI
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Rd. Demang Hardjakusumah Blok Jati Cihanjuang Gedung C Lt. II Cimahi
Telp/Fax. (022) 6631031 Website. www.cimahikota.go.id
Kota Cimahi Jawa Barat 40513
277

ANALISA HARGA SATUAN PEKERJAAN


PEMELIHARAAN GEDUNG KANTOR PEMKOT CIMAHI (GEDUNG A, B, C)
TAHUN ANGGARAN 2021

Sumber :
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28 Tahun 2016
Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

A. HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN

A.001 Pekerjaan 1 Buah Papan Nama Proyek Ukuran 0,8 x 1,2 m2 Menggunakan Multiplek t=18mm, Frame Besi Siku dan Tiang Kayu 8/12

Multiplek t = 18 mm 0.3500 lbr 235,000.00 82,250.00


Kayu Balok 10/10 Albasia (3m) / m3 0.0770 m3 1,815,000.00 139,755.00
Besi Siku 40 x 40 x 4,0 mm (6m) / kg 5.8000 kg 10,793.10 62,600.00
Paku Kayu 5 cm s/d 10 cm 1.2500 kg 18,000.00 22,500.00
Cat Kayu dan Besi Avian 2.5000 kg 60,000.00 150,000.00
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang Kayu 1.0000 OH 148,100.00 148,100.00
Kepala Tukang 0.1000 OH 162,500.00 16,250.00
Tukang Cat 1.5000 OH 148,100.00 222,150.00
Mandor 0.1000 OH 177,600.00 17,760.00
Jumlah 990,965.00
Overhead + Profit 10% 99,096.50
Jumlah 1,090,061.50
Dibulatkan 1,090,060.00
A.002 Pembuatan 1 m2 Bedeng Pekerja
Dolken Gelam 8 s/d 10 cm 1.2500 btg 35,000.00 43,750.00
Kayu Balok 6/12 Borneo (4m) 0.1860 m3 4,500,000.00 837,000.00
Paku Kayu 5 cm s/d 10 cm 0.3000 kg 18,000.00 5,400.00
Semen PC Tiga Roda 18.0000 kg 1,200.00 21,600.00
Pasir Beton 0.0300 m3 300,000.00 9,000.00
Kerikil 0.0500 m3 300,000.00 15,000.00
Seng Gelombang BJLS 28 1.5000 lbr 60,000.00 90,000.00
Multiplek t = 4 mm 1.3500 lbr 75,000.00 101,250.00
Pekerja 1.0000 OH 129,600.00 129,600.00
Tukang kayu 2.0000 OH 148,100.00 296,200.00
Kepala tukang 0.2000 OH 162,500.00 32,500.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah 1,590,180.00
Overhead + Profit 10% 159,018.00
Jumlah 1,749,198.00
Dibulatkan 1,749,190.00
278

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

B. HARGA SATUAN PEKERJAAN BONGKARAN


B.001 Pembongkaran 1m2 Keramik
Alat Bantu ( jack hammer, Palu, linggis dodos, Sekop ) 1.00 ls 5,000.00 5,000.00
Pekerja 0.0500 OH 129,600.00 6,480.00
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah 13,256.00
Overhead + Profit 10% 1,325.60
Jumlah 14,581.60
Dibulatkan 14,580.00
B.002 Pembongkaran 1 m2 Dinding Partisi
Pekerja 0.0600 oh 129,600.00 7,776.00
Mandor 0.0400 oh 177,600.00 7,104.00
Jumlah 14,880.00
Overhead + Profit 10% 1,488.00
Jumlah 16,368.00
Dibulatkan 16,360.00
B.003 Pembongkaran 1 unit Kusen + Daun Pintu
Pekerja 1.0000 oh 129,600.00 129,600.00
Mandor 0.0050 oh 177,600.00 888.00
Jumlah 130,488.00
Overhead + Profit 10% 13,048.80
Jumlah 143,536.80
Dibulatkan 143,530.00
B.004 Pembongkaran 1m2 Plafond
Alat Bantu ( Tang potong, Obeng, Palu ) 1.00 ls 5,000.00 5,000.00
Pekerja 0.1250 OH 129,600.00 16,200.00
Mandor 0.0050 OH 177,600.00 888.00
Jumlah 22,088.00
Overhead + Profit 10% 2,208.80
Jumlah 24,296.80
Dibulatkan 24,290.00

PEKERJAAN ARSITEKTUR

C HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


C.001 Perbaikan 1 m' Kusen Pintu Allumunium
Sekrup Fisher 2.0000 bh 2,500.00 5,000.00
Sealant Silicone Dow Corning / tube 0.0600 tube 37,500.00 2,250.00
Pekerja 0.0430 OH 129,600.00 5,572.80
Tukang Allumunium 0.0430 OH 148,100.00 6,368.30
Kepala tukang 0.0043 OH 162,500.00 698.75
Mandor 0.0021 OH 177,600.00 372.96
Jumlah 20,262.81
Overhead + Profit 10% 2,026.28
Jumlah 22,289.09
Dibulatkan 22,280.00
C.002 Pemasangan 1 m' Rangka Jendela Alumunium
Rangka jendela almunium 1.1000 m 120,000.00 132,000.00
Sekrup Fisher 2.0000 bh 2,500.00 5,000.00
Sealant Silicone Dow Corning / tube 0.0600 tube 37,500.00 2,250.00
Pekerja 0.0430 OH 129,600.00 5,572.80
Tukang Allumunium 0.0430 OH 148,100.00 6,368.30
Kepala tukang 0.0043 OH 162,500.00 698.75
Mandor 0.0021 OH 177,600.00 372.96
Jumlah 152,262.81
Overhead + Profit 10% 15,226.28
Jumlah 167,489.09
Dibulatkan 167,480.00
279

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

C.003 Pemasangan 1 bh Kunci dan Handle Pintu Almunium


Kunci + Handle Pintu aluminium 1.0000 bh 125,000.00 125,000.00
Tukang Allumunium 0.5000 OH 148,100.00 74,050.00
Mandor 0.0500 OH 177,600.00 8,880.00
Jumlah 207,930.00
Overhead + Profit 10% 20,793.00
Jumlah 228,723.00
Dibulatkan 228,720.00
C.004 Membuat tangga putar 1 m
Anak Tangga Plat Bordes 120 x 240 x 4,0 mm 1.0000 m2 617,500.00 617,500.00
Railing Tegak Pipa Galvanis Medium Ø2" x 3,40 mm (6m) 2.0000 m1 112,105.00 224,210.00
Besi Siku Galvanis 40 x 40 x 4,0 mm 1.0000 m1 26,083.33 26,083.33
Tiang Utama Pipa Galvanis Medium Ø4" x 4,20 mm (6m) 1.0000 m 267,191.67 267,191.67
RING Plat Strip Besi 4 x 50 mm (6m) 1.0000 m1 21,003.33 21,003.33
Pekerja 0.1800 OH 129,600.00 23,328.00
Tukang batu 0.0200 OH 148,100.00 2,962.00
Tukang Besi 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0090 OH 177,600.00 1,598.40
Jumlah 1,187,813.73
Overhead + Profit 10% 118,781.37
Jumlah 1,306,595.11
Dibulatkan 1,306,590.00
C.005 Pemasangan 1 unit Pintu Besi tebal 2mm ukuran 90 x 210 cm + Pengunci dan handle dengan engsel Dekson
Besi Siku 30 x 30 x 3,0 mm (6m) / kg 15.0000 kg 10,793.10 161,896.55
Besi Plat baja 32.8000 kg 15,818.00 518,830.40
Besi Baja CNP 150 x 50 x 20 x 3,2 mm 5.1000 m' 96,191.67 490,577.50
Kawat las 0.0500 kg 40,000.00 2,000.00
Pekerja 1.0500 Oh 129,600.00 136,080.00
Tukang Las 1.0500 Oh 148,100.00 155,505.00
Kepala Tukang 0.1050 Oh 162,500.00 17,062.50
Mandor 0.0520 Oh 177,600.00 9,235.20
Jumlah 1,491,187.15
Overhead + Profit 10% 149,118.72
Jumlah 1,640,305.87
Dibulatkan 1,640,300.00

D HARGA SATUAN PEKERJAAN PASANGAN DINDING


D.001 Pemasangan 1 m2 Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
Bata Ringan 10 x 20 x 60 cm / bh 8.4000 bh 8,433.73 70,843.37
Mortar Perekat Bata Ringan 0.0630 kg 2,750.00 173.25
Peralatan 1.0000 ls 7,101.66 7,101.66
Pekerja 0.6710 OH 129,600.00 86,961.60
Tukang Batu 1.3000 OH 148,100.00 192,530.00
Kepala Tukang 0.1300 OH 162,500.00 21,125.00
Mandor 0.0030 OH 177,600.00 532.80
Jumlah 379,267.69
Overhead + Profit 10% 37,926.77
Jumlah 417,194.45
Dibulatkan 417,190.00

E HARGA SATUAN PEKERJAAN PLESTERAN


E.001 Perbaikan Dinding 1 m2 Plesteran 1 SP : 3 PP, tebal 15 mm
Semen PC Tiga Roda 7.7760 kg 1,200.00 9,331.20
Pasir Pasang Cimalaka 0.0230 m3 250,000.00 5,750.00
Pekerja 0.3000 OH 129,600.00 38,880.00
Tukang Batu 0.1500 OH 148,100.00 22,215.00
Kepala tukang 0.0150 OH 162,500.00 2,437.50
Mandor 0.0150 OH 177,600.00 2,664.00
Jumlah 81,277.70
Overhead + Profit 10% 8,127.77
Jumlah 89,405.47
Dibulatkan 89,400.00
280

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

E.002 Perbaikan Dinding 1 m2 Acian


Semen PC Tiga Roda 3.2500 kg 1,200.00 3,900.00
Pekerja 0.2000 OH 129,600.00 25,920.00
Tukang Batu 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0100 OH 162,500.00 1,625.00
Mandor 0.0100 OH 177,600.00 1,776.00
Jumlah 48,031.00
Overhead + Profit 10% 4,803.10
Jumlah 52,834.10
Dibulatkan 52,830.00

F HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


F.001 Pemasangan 1 m2 Lantai Keramik ukuran 20 cm x 20 cm Platinum
Keramik 20 x 20 cm Platinum 26.5000 bh 2,200.00 58,300.00
Semen PC Tiga Roda 10.4000 kg 1,200.00 12,480.00
Semen warna 1.0000 kg 15,000.00 15,000.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2700 OH 129,600.00 34,992.00
Tukang batu 0.1350 OH 148,100.00 19,993.50
Kepala tukang 0.0140 OH 162,500.00 2,275.00
Mandor 0.0140 OH 177,600.00 2,486.40
Jumlah 156,776.90
Overhead + Profit 10% 15,677.69
Jumlah 172,454.59
Dibulatkan 172,450.00
F.002 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Polished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh 20,000.00 80,000.00
Semen PC Tiga Roda 9.6000 kg 1,200.00 11,520.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 129,600.00 31,104.00
Tukang batu 0.1200 OH 148,100.00 17,772.00
Kepala tukang 0.0120 OH 162,500.00 1,950.00
Mandor 0.0120 OH 177,600.00 2,131.20
Jumlah 178,227.20
Overhead + Profit 10% 17,822.72
Jumlah 196,049.92
Dibulatkan 196,040.00
F.003 Pemasangan 1 m2 Keramik Dinding ukuran 25 cm x 50 cm Platinum
Keramik 25 x 50 cm Platinum 6.0000 bh 7,000.00 42,000.00
Semen PC Tiga Roda 8.1900 kg 1,200.00 9,828.00
Semen warna 1.6200 kg 15,000.00 24,300.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.7000 OH 129,600.00 90,720.00
Tukang batu 0.3500 OH 148,100.00 51,835.00
Kepala tukang 0.0350 OH 162,500.00 5,687.50
Mandor 0.0350 OH 177,600.00 6,216.00
Jumlah 241,836.50
Overhead + Profit 10% 24,183.65
Jumlah 266,020.15
Dibulatkan 266,020.00
F.004 Pemasangan 1 m2 Lantai Keramik ukuran 50 cm x 50 cm Unpolished Platinum
Keramik 50 x 50 cm Platinum 4.0000 bh 20,000.00 80,000.00
Semen PC Tiga Roda 9.6000 kg 1,200.00 11,520.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pasir Pasang Cimalaka 0.0450 m3 250,000.00 11,250.00
Pekerja 0.2400 OH 129,600.00 31,104.00
Tukang batu 0.1200 OH 148,100.00 17,772.00
Kepala tukang 0.0120 OH 162,500.00 1,950.00
Mandor 0.0120 OH 177,600.00 2,131.20
Jumlah 178,227.20
Overhead + Profit 10% 17,822.72
Jumlah 196,049.92
Dibulatkan 196,040.00
281

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

F.005 Pemasangan 1 m' Stepnosing Keramik Tangga ukuran 10 cm x 60 cm Unpolished Platinum


Stepnosing Keramik Tangga 10 cm x 60 1.6670 bh 13,000.00 21,671.00
Semen PC Tiga Roda 1.6500 kg 1,200.00 1,980.00
Semen warna 0.0040 kg 15,000.00 60.00
Pasir Pasang Cimalaka 0.0130 m3 250,000.00 3,250.00
Pekerja 0.0900 OH 129,600.00 11,664.00
Tukang batu 0.0900 OH 148,100.00 13,329.00
Kepala tukang 0.0350 OH 162,500.00 5,687.50
Mandor 0.0050 OH 177,600.00 888.00
Jumlah 58,529.50
Overhead + Profit 10% 5,852.95
Jumlah 64,382.45
Dibulatkan 64,380.00
F.006 Pemasangan 1 m2 floor hardener
Floor Hardener Natural Sika Chapdur / 25 kg 5.0000 kg 5,400.00 27,000.00
Pekerja 0.1200 OH 129,600.00 15,552.00
Tukang batu 0.1200 OH 148,100.00 17,772.00
Kepala tukang 0.0120 OH 162,500.00 1,950.00
Mandor 0.0060 OH 177,600.00 1,065.60
Jumlah 63,339.60
Overhead + Profit 10% 6,333.96
Jumlah 69,673.56
Dibulatkan 69,670.00

G HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


G.001 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120x240) cm, tebal 9 mm
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3640 lbr 70,000.00 25,480.00
Paku Sekrup 0.1100 kg 45,000.00 4,950.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang kayu 0.0500 OH 148,100.00 7,405.00
Kepala tukang 0.0050 OH 162,500.00 812.50
Mandor 0.0050 OH 177,600.00 888.00
Jumlah 52,495.50
Overhead + Profit 10% 5,249.55
Jumlah 57,745.05
Dibulatkan 57,740.00
G.002 Pemasangan 1 m2 Langit-langit Gypsum Board + Rangka Plafon Alumunium
Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard 0.3640 lbr 70,000.00 25,480.00
Profil Alumunium “T” 3.6000 m' 9,722.22 35,000.00
Kawat diameter 4 mm 0.1500 kg 25,900.00 3,885.00
Ramset 1.0500 bh 2,000.00 2,100.00
Pekerja 0.5000 OH 129,600.00 64,800.00
Tukang Besi 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 217,880.00
Overhead + Profit 10% 21,788.00
Jumlah 239,668.00
Dibulatkan 239,660.00
282

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

H HARGA SATUAN PEKERJAAN KUNCI DAN KACA


H.001 Pemasangan 1 bh Kunci dan Handle Pintu Kayu
Kunci + Handle Pintu Besar 1.0000 bh 190,000.00 190,000.00
Tukang kayu 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Jumlah 272,175.00
Overhead + Profit 10% 27,217.50
Jumlah 299,392.50
Dibulatkan 299,390.00
H.002 Perbaikan 1 unit Pintu Kayu
Paku Kayu 5 cm s/d 10 cm 0.2500 kg 18,000.00 4,500.00
Alat bantu ( Palu, serut kayu, amplas ) 1.0000 ls 5,000.00 5,000.00
Tukang kayu 0.5000 OH 148,100.00 74,050.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.3500 OH 177,600.00 62,160.00
Jumlah 153,835.00
Overhead + Profit 10% 15,383.50
Jumlah 169,218.50
Dibulatkan 169,210.00
I HARGA SATUAN PEKERJAAN PENGECATAN
I.001 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Interior
Cat Dasar Tembok Interior Dulux Catylac 0.1200 kg 29,400.00 3,528.00
Cat Tembok Interior Dulux Catylac 0.1800 kg 26,000.00 4,680.00
Pekerja 0.0280 OH 129,600.00 3,628.80
Tukang Cat 0.0420 OH 148,100.00 6,220.20
Kepala tukang 0.0042 OH 162,500.00 682.50
Mandor 0.0030 OH 177,600.00 532.80
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls 6,000.00 6,000.00
Jumlah 25,272.30
Overhead + Profit 10% 2,527.23
Jumlah 27,799.53
Dibulatkan 27,790.00
I.002 Pengecatan 1 m2 Langit-langit Lama (2 Lapis Cat Penutup)
Cat Dasar Tembok Interior Dulux Catylac 0.1200 Kg 29,400.00 3,528.00
Cat Tembok Interior Dulux Catylac 0.1800 Kg 26,000.00 4,680.00
Pekerja 0.0280 Oh 129,600.00 3,628.80
Tukang Cat 0.0420 Oh 148,100.00 6,220.20
Kepala Tukang 0.0042 Oh 162,500.00 682.50
Mandor 0.0030 Oh 177,600.00 532.80
Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) 1.0000 ls 6,000.00 6,000.00
Jumlah 25,272.30
Keuntungan maksimal 10% 2,527.23
Jumlah 27,799.53
Dibulatkan 27,790.00
283

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

I.003 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Ekterior
Cat Dasar Tembok Eksterior Dulux Catylac 0.1200 kg 40,050.00 4,806.00
Cat Tembok Eksterior Dulux Catylac 0.1800 kg 37,000.00 6,660.00

Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) 1.0000 ls 7,500.00 7,500.00

Pekerja 0.0280 OH 129,600.00 3,628.80


Tukang Cat 0.0420 OH 148,100.00 6,220.20
Kepala tukang 0.0042 OH 162,500.00 682.50
Mandor 0.0030 OH 177,600.00 532.80
Jumlah 30,030.30
Overhead + Profit 10% 3,003.03
Jumlah 33,033.33
Dibulatkan 33,030.00
I.004 Pengecatan 1 m2 Permukaan Baja Galvanis secara Manual Sistem 1 Lapis Cat Mutakhir
Cat Kayu dan Besi Avian 0.3000 kg 60,000.00 18,000.00
Kuas 2,5" 0.0100 bh 11,150.00 111.50
Thinner Impala 0.0100 ltr 25,000.00 250.00
Pekerja 0.0600 OH 129,600.00 7,776.00
Tukang Cat 0.0600 OH 148,100.00 8,886.00
Kepala tukang 0.0120 OH 162,500.00 1,950.00
Mandor 0.0030 OH 177,600.00 532.80
Jumlah 37,506.30
Overhead + Profit 10% 3,750.63
Jumlah 41,256.93
Dibulatkan 41,250.00

J. HARGA SATUAN PEKERJAAN SANITASI DAN AKSESORIS


J.001 Pemasangan 1 bh Kran Diameter ¾" atau ½"
Kran Tembok Ø1/2" Onda 1.0000 bh 25,000.00 25,000.00
Seal Tape ½" Onda 0.0250 bh 5,000.00 125.00
Alat bantu ( Kunci Pipa ) 1.0000 ls 2,500.00 2,500.00
Pekerja 0.0100 OH 129,600.00 1,296.00
Tukang batu 0.4000 OH 148,100.00 59,240.00
Kepala tukang 0.0400 OH 162,500.00 6,500.00
Mandor 0.0050 OH 177,600.00 888.00
Jumlah 95,549.00
Overhead + Profit 10% 9,554.90
Jumlah 105,103.90
Dibulatkan 105,100.00
J.002 Pemasangan 1 bh Bak Cuci Piring Stainles Steel
Kitchen Sink Standar (1 Lobang) Royal 1.0000 unit 750,000.00 750,000.00
Pekerja 0.0300 OH 129,600.00 3,888.00
Tukang batu 0.3000 OH 148,100.00 44,430.00
Kepala tukang 0.0300 OH 162,500.00 4,875.00
Mandor 0.0150 OH 177,600.00 2,664.00
Jumlah 805,857.00
Overhead + Profit 10% 80,585.70
Jumlah 886,442.70
Dibulatkan 886,440.00
284

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

K HARGA SATUAN PEKERJAAN MEKANIKAL


K.001 Bongkar Pasang 1 Unit AC + Freon R 410
Freon R 410 1.0000 ls 450,000.00 450,000.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang AC 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 490,335.00
Overhead + Profit 10% 49,033.50
Jumlah 539,368.50
Dibulatkan 539,360.00

L HARGA SATUAN PEKERJAAN ELEKTRIKAL


L.001 Pemasangan 1 m' Cover Tray uk. 300 mm x 50 mm
Cover Tray 300 mm x 50 mm 1.0000 bh 549,000.00 549,000.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 589,335.00
Overhead + Profit 10% 58,933.50
Jumlah 648,268.50
Dibulatkan 648,260.00
L.002 Pemasangan 1 bh Panel Distribusi 3 Phase 30 grup
Panel Distribusi 3Phase 1.0000 bh 6,200,000.00 6,200,000.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 6,240,335.00
Overhead + Profit 10% 624,033.50
Jumlah 6,864,368.50
Dibulatkan 6,864,360.00
L.003 Pemasangan 1 m' Kabel Tray uk. 300 mm x 100 mm
Kabel Tray 300 mm x 100 mm 1.0000 bh 445,500.00 445,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 485,835.00
Overhead + Profit 10% 48,583.50
Jumlah 534,418.50
Dibulatkan 534,410.00
285

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.004 Pemasangan 1 bh Lampu Downlight


Lampu Downlight LED 1 X 18 W Philips 1.0000 bh 180,000.00 180,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 222,835.00
Overhead + Profit 10% 22,283.50
Jumlah 245,118.50
Dibulatkan 245,110.00
L.005 Pemasangan 1 bh Lampu Panel LED RC 40 w
Lampu LED panel 40 watt 1.0000 bh 635,000.00 635,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 677,835.00
Overhead + Profit 10% 67,783.50
Jumlah 745,618.50
Dibulatkan 745,610.00
L.006 Pemasangan 1 bh Lampu Panel LED RC 29 w
Lampu LED panel 29 watt 1.0000 bh 560,000.00 560,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 602,835.00
Overhead + Profit 10% 60,283.50
Jumlah 663,118.50
Dibulatkan 663,110.00
L.007 Pemasangan 1 bh Stair Lamp & Battery TL LED 2 X 14
Stair Lamp & Battery TL LED 2 X 14 1.0000 bh 485,000.00 485,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 527,835.00
Overhead + Profit 10% 52,783.50
Jumlah 580,618.50
Dibulatkan 580,610.00
L.008 Pemasangan 1 bh Lampu Baret Ceiling 22 w
Lampu Baret Ceiling 22 w 1.0000 bh 480,000.00 480,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 522,835.00
Overhead + Profit 10% 52,283.50
Jumlah 575,118.50
Dibulatkan 575,110.00
286

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.009 Pemasangan 1 bh Lampu Baret Ceiling 10 w


Lampu Baret Ceiling 10 w 1.0000 bh 197,000.00 197,000.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 239,835.00
Overhead + Profit 10% 23,983.50
Jumlah 263,818.50
Dibulatkan 263,810.00
L.010 Perapihan 1 Titik Instalasi
Alat Bantu ( Tang Amper, tespen, tang kombinasi, tang potong,
1.0000 ls 150,000.00 150,000.00
isolasi, obeng, Multi tester)
Pembantu Instalator 2.0000 Oh 129,600.00 259,200.00
Instalator 3.0000 Oh 148,100.00 444,300.00
Mandor 1.0000 Oh 177,600.00 177,600.00
Jumlah 1,031,100.00
Overhead + Profit 10% 103,110.00
Jumlah 1,134,210.00
Dibulatkan 1,134,210.00
L.011 Pemasangan 1 bh Single Two Way Switch
Saklar Single Standar Philips 1.0000 bh 17,000.00 17,000.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 62,335.00
Overhead + Profit 10% 6,233.50
Jumlah 68,568.50
Dibulatkan 68,560.00
L.012 Pemasangan 1 bh Double Two Way Switch
Saklar Double Standar Philips 1.0000 bh 22,950.00 22,950.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 68,285.00
Overhead + Profit 10% 6,828.50
Jumlah 75,113.50
Dibulatkan 75,110.00
L.013 Pemasangan 1 bh Sensor Lampu
Sensor gerak 1.0000 bh 600,000.00 600,000.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 645,335.00
Overhead + Profit 10% 64,533.50
Jumlah 709,868.50
Dibulatkan 709,860.00
287

HARGA SAT.
NO. URAIAN KOEFISIEN SAT. JUMLAH (Rp.)
(Rp.)
Rp1.00 Rp 2.00 3 Rp 4.00 Rp 5.00 6=(3x5)

L.014 Pemasangan 1 bh Stop Kontak


Stop Kontak Single (1 Lubang) 1.0000 bh 18,275.00 18,275.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 63,610.00
Overhead + Profit 10% 6,361.00
Jumlah 69,971.00
Dibulatkan 69,970.00
L.015 Pemasangan 1 Unit Exhaust Fan
Exhaust Fan 1.0000 bh 725,000.00 725,000.00
Mangkok listrik 1.0000 bh 2,500.00 2,500.00
Isolasi 0.2500 bh 10,000.00 2,500.00
Pekerja 0.1000 OH 129,600.00 12,960.00
Tukang Listrik 0.1000 OH 148,100.00 14,810.00
Kepala tukang 0.0500 OH 162,500.00 8,125.00
Mandor 0.0250 OH 177,600.00 4,440.00
Jumlah 770,335.00
Overhead + Profit 10% 77,033.50
Jumlah 847,368.50
Dibulatkan 847,360.00
M HARGA SATUAN PEKERJAAN BETON
M.001 Membuat 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm
Kayu Kaso 5/7 Albasia (3m) 0.0020 m3 1,500,000.00 3,000.00
Paku Kayu 5 cm s/d 10 cm 0.0100 kg 18,000.00 180.00
Besi Beton Polos KSTY 3.0000 kg 10,300.00 30,900.00
Kawat Beton 0.4500 kg 20,000.00 9,000.00
Semen PC Tiga Roda 4.0000 kg 1,200.00 4,800.00
Pasir Beton 0.0060 m3 300,000.00 1,800.00
Kerikil 0.0090 m3 300,000.00 2,700.00
Pekerja 0.1800 OH 129,600.00 23,328.00
Tukang batu 0.0200 OH 148,100.00 2,962.00
Tukang kayu 0.0200 OH 148,100.00 2,962.00
Tukang Besi Beton 0.0200 OH 148,100.00 2,962.00
Kepala tukang 0.0060 OH 162,500.00 975.00
Mandor 0.0090 OH 177,600.00 1,598.40
Jumlah 87,167.40
Overhead + Profit 10% 8,716.74
Jumlah 95,884.14
Dibulatkan 95,880.00
HARGA BAHAN DAN MATERIAL
PEMERINTAH DAERAH KOTA CIMAHI
TAHUN ANGGARAN 2021

SUMBER HARGA
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN BAHAN
MATERIAL/ ALAT (Rp)
MATERIAL

1 2 Rp 3.00 Rp 5.00 Rp 4.00 Rp 5.00

A. AGREGAT HALUS, AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


### Pasir Pasang Cimalaka Cimalaka m3 250,000 PU
### Pasir Beton m3 300,000 PU
### Kerikil m3 300,000 PU
### Bata Ringan 10 x 20 x 60 cm / bh Hebel Broco bh 8,434 Tokopedia
### Semen PC Tiga Roda 40 kg Tiga Roda kg 48,000 PU
### Semen PC Tiga Roda Tiga Roda kg 1,200 PU
### Semen Warna kg 15,000 PU
### Mortar Perekat Bata Ringan mortar utama zak 110,000 PU

B. LOGAM DAN BAHAN JADINYA


### Besi Siku Galvanis 40 x 40 x 4,0 mm (6m) / btg krakatau steel btg 156,500 PU
### Besi Siku Galvanis 40 x 40 x 4,0 mm (6m) / btg krakatau steel kg 10,793 PU
### Plat Strip Besi 4 x 50 mm (6m) krakatau steel btg 126,020 PU
### Plat Bordes 120 x 240 x 4,0 mm krakatau steel lbr 1,778,400 PU
### Pipa Galvanis Medium Ø2" x 3,40 mm (6m) krakatau steel btg 672,630 PU
### Pipa Galvanis Medium Ø4" x 4,20 mm (6m) krakatau steel btg 1,603,150 PU
### Rangka jendela almunium ykk m 120,000 Tokopedia
### Profil Alumunium “T” owa m' 9,722 Tokopedia
### Kawat diameter 4 mm kg 25,900 Tokopedia
### Ramset bh 2,000 Tokopedia
### Besi Beton Polos KSTY KSTY kg 10,300 PU
### Kawat Beton kg 20,000 PU
### Tangga putar unit 2,500,000 Tokopedia
### Besi Plat baja kg 15,818 PU
### Besi Baja CNP 150 x 50 x 20 x 3,2 mm m' 96,192 PU
### Kawat las kg 40,000 PU

C. KAYU DAN BAHAN JADINYA


### Kayu Balok 10/10 Albasia (3m) / btg btg 55,000 PU
### Kayu Balok 10/10 Albasia (3m) / m3 m³ 1,815,000 PU
### Kayu Balok 6/12 Borneo (4m) m³ 4,500,000 PU
### Dolken Gelam 8 s/d 10 cm btg 35,000 PU
### Multiplek t = 4 mm lbr 75,000 PU
### Multiplek t = 18 mm lbr 235,000 PU
### Kayu Kaso 5/7 Albasia (3m) m³ 1,500,000 PU

D. PENUTUP LANGIT-LANGIT, DINDING DAN LANTAI


### Panel Gypsum 120 x 240 cm t = 9 mm Jayaboard Jayaboard lbr 70,000 PU
### Keramik 20 x 20 cm Platinum Platinum dus 55,000 PU
### Keramik 50 x 50 cm Platinum Platinum dus 80,000 PU
### Keramik 25 x 50 cm Platinum Platinum dus 70,000 Tokopedia
### Stepnosing Keramik Tangga 10 cm x 60 Platinum bh 13,000 Tokopedia
### Floor Hardener (MU-700) / 25 kg Mortar Utama 25 kg 135,000 PU
### Floor Hardener (MU-700) / 1 kg Mortar Utama 1 kg 5,400 PU

E. BAHAN PELAPIS DAN FINISHING


### Cat Dasar Tembok Interior Dulux Catylac / 4 kg Dulux 4 kg 117,600 PU
### Cat Dasar Tembok Interior Dulux Catylac Dulux kg 29,400 PU
### Cat Dasar Tembok Eksterior Dulux Catylac / 4 kg Dulux 4 kg 160,200 PU
### Cat Dasar Tembok Eksterior Dulux Catylac Dulux kg 40,050 PU
### Cat Tembok Interior Dulux Catylac / 5 kg Dulux 5 kg 130,000 PU
### Cat Tembok Interior Dulux Catylac Dulux kg 26,000 PU
### Cat Tembok Eksterior Dulux Catylac / 5 kg Dulux 5 kg 185,000 PU
### Cat Tembok Eksterior Dulux Catylac Dulux kg 37,000 PU
### Cat Kayu dan Besi Avian Avian kg 60,000 PU
### Thinner Impala Impala ltr 25,000 PU
### Sealant Silicone Dow Corning / tube Dow Corning tube 37,500 PU
### Seal Tape ½" Onda Onda gulung 5,000 PU
### Isolasi bh 10,000 PU
### Kuas 2,5" bh 11,150 PU
### Kuas 1,5" bh 7,500 PU

F. KACA DAN BAHAN JADINYA


### Kaca Cermin t = 5 mm Asahimas Asahimas m² 299,200 PU

G. PAKU DAN MUR BAUT


SUMBER HARGA
HARGA BAHAN/
NO. NAMA BAHAN/ MATERIAL/ ALAT KUALITAS/ MERK SATUAN BAHAN
MATERIAL/ ALAT (Rp)
MATERIAL

1 2 Rp 3.00 Rp 5.00 Rp 4.00 Rp 5.00


### Paku Kayu 5 cm s/d 10 cm kg 18,000 PU
### Paku Sekrup kg 45,000 PU
### Sekrup Fisher lsn 30,000 PU

H. PIPA DAN ASESORIS


### Kran Tembok Ø1/2" Onda Onda bh 25,000 PU
### Kitchen Sink Standar (1 Lobang) Royal Royal unit 750,000 PU

I. PENUTUP ATAP DAN ASESORIES


### Seng Gelombang BJLS 28 lbr 60,000 PU

J. ELEKTRIKAL
### Saklar Single Standar Philips Philips bh 17,000 PU
### Saklar Double Standar Philips Philips bh 22,950 PU
### Stop Kontak Single (1 Lubang) Philips Philips bh 18,275 PU
### Lampu TL-D Standar 18W Philips Philips bh 15,600 Tokopedia
### Lampu Downlight LED 1 X 18 W Philips Philips bh 180,000 Tokopedia
### Lampu LED panel 40 watt Philips bh 635,000 Tokopedia
### Lampu LED panel 29 watt Philips bh 560,000 Tokopedia
### Lampu Baret Ceiling 22 w Philips bh 480,000 Tokopedia
### Lampu Baret Ceiling 10 w Philips bh 197,000 Tokopedia
### Stair Lamp & Battery TL LED 2 X 14 bh 485,000 Tokopedia
### Cover Tray 300 mm x 50 mm bh 549,000 Tokopedia
### Panel Distribusi 3Phase bh 6,200,000 Tokopedia
### Kabel Tray 300 mm x 100 mm bh 445,500 Tokopedia
### Mangkok listrik bh 2,500 Tokopedia
### Sensor gerak bh 600,000 Tokopedia
### Freon R 410 ls 450,000 Tokopedia

K. KUNCI DAN ASESORIS


### Kunci + Handle Pintu Besar JLDOOR set 190,000 Tokopedia
### Exhaust Fan Panasonic unit 725,000 Tokopedia
### Kunci + Handle Pintu aluminium DOWS bh 125,000 Tokopedia

L. ALAT BANTU
### Alat Bantu ( jack hammer, Palu, linggis dodos, Sekop ) ls 5,000
### Alat Bantu ( Tang potong, Obeng, Palu ) ls 5,000
### Alat bantu ( Palu, serut kayu, amplas ) ls 5,000
### Alat Bantu ( Kuas Rol, Kuas 1. 1/5 inc, amplas ) ls 6,000
### Alat Bantu (Scaffolding, skrap, amplas) ls 6,000
### Alat bantu ( Kunci Pipa ) ls 2,500
### Alat Bantu (Scaffolding, skrap, Kuas Rol, Kuas 1. 1/5 inc, amplas) ls 7,500

### Alat Bantu ( Tang Amper, tespen, tang kombinasi, tang potong, isolasi, obeng, Multi tester) ls 150,000
HARGA UPAH PEKERJA
PEMERINTAH DAERAH KOTA CIMAHI
TAHUN ANGGARAN 2021

NO. JENIS PEKERJA HARGA UPAH (Rp) SATUAN WAKTU

### Rp 2.00 Rp 3.00 Rp 4.00

### Pekerja 129,600 1 Orang/ Hari/ 8 Jam


### Pembantu Instalator 129,600 1 Orang/ Hari/ 8 Jam
### Tukang Batu 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Besi 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Kayu 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Cat 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Allumunium 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Pipa 148,100 1 Orang/ Hari/ 8 Jam
### Tukang AC 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Listrik 148,100 1 Orang/ Hari/ 8 Jam
### Tukang Las 148,100 1 Orang/ Hari/ 8 Jam
### Instalator 148,100 1 Orang/ Hari/ 8 Jam
### Kepala Tukang 162,500 1 Orang/ Hari/ 8 Jam
### Mandor 177,600 1 Orang/ Hari/ 8 Jam