Satuan Kerja
Pekerjaan
Lokasi
Th. Anggaran : 2018
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
I. PERSIAPAN
II. BANGUNAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST)
III. PENATAAN LANSEKAP
IV. PENGADAAN PERALATAN PENGANGKUTAN DAN PENGOLAHAN SAMPAH
V. PEKERJAAN LAIN-LAIN
REAL COST
PPN 10 %
JUMLAH
DIBULATKAN
TERBILANG :
Tujuh Milyar Lima Ratus Juta Rupiah
JUMLAH HARGA
(Rp)
26,950,000.00
#VALUE!
#VALUE!
435,100,000.00
130,000,000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Disusun oleh:
DAFTAR KUANTITAS DAN HARGA
Satuan Kerja
Pekerjaan
Lokasi
Th. Anggaran : 2018
I. PEKERJAAN PERSIAPAN
A. PEKERJAAN STRUKTUR
B. PEKERJAAN ARSITEKTUR
C. PEKERJAAN M, E & P
1 Forklift Manual (Hand Stacker) Max Load 2 Ton unit 2.00 17,100,000.00 34,200,000.00
2 Wadah Sampah/Bin (4 Roda+Tutup) HDPE Kapasitas 660 Liter unit 4.00 5,300,000.00 21,200,000.00
3 Wadah Sampah/Bin (2 Roda+Tutup) HDPE Kapasitas 240 Liter unit 8.00 1,200,000.00 9,600,000.00
4 Bioaktivator Padat kg 100.00 35,000.00 3,500,000.00
5 Bioaktivator Cair kg 100.00 35,000.00 3,500,000.00
6 Segitiga Kompos dari Bambu Laminasi (Ukuran 40x40x250 cm) unit 116.00 350,000.00 40,600,000.00
7 Conveyor Belt 5 m Elektrik Lapis Anti Karat Kapasitas 7-10 m3/jam. unit 2.00 46,500,000.00 93,000,000.00
8 Mesin Pencacah Sampah Elektrik Lapis Anti Karat Kapasitas 1.000 kg/jam unit 4.00 37,600,000.00 150,400,000.00
9 Pengayak Elektrik Lapis Anti Karat Kapasitas 5-10 m3/jam unit 2.00 21,200,000.00 42,400,000.00
10 Baler Kompaktor Press Hidrolik Anti Karat Kapasitas 12 ball/jam unit 1.00 34,000,000.00 34,000,000.00
11 Fire Extinguisher 3 Kg unit 10.00 270,000.00 2,700,000.00
V. PEKERJAAN LAIN-LAIN
Satuan Kerja
Pekerjaan
Lokasi
Th. Anggaran : 2018
1 m3 Timbunan Pasir
1.2000 m3 Pasir Urug 105,000.00 126,000.00 #VALUE!
0.3000 Pekerja #NAME? #NAME? #NAME?
0.0100 Mandor #NAME? #NAME? #NAME?
#NAME? 126,000.00 #VALUE!
1 m3 Beton Rabat
230.0000 Kg Semen 1,250.00 287,500.00 #VALUE!
0.5400 m3 Pasir 205,800.00 111,132.00 #VALUE!
0.9100 m3 Koral 278,800.00 253,708.00 #VALUE!
0.5000 Tukang batu 90,000.00 45,000.00 #VALUE!
0.0500 Kep. Tukang Batu 100,000.00 5,000.00 #VALUE!
6.0000 Pekerja 80,000.00 480,000.00 #VALUE!
0.3000 Mandor 125,000.00 37,500.00 #VALUE!
567,500.00 652,340.00 #VALUE!
1 m2 Waterproofing
0.4500 kg Waterproofing Damplix 3 45,000.00 20,250.00 #VALUE!
0.1600 Tukang Cat 90,000.00 14,400.00 #VALUE!
0.0140 Kep. Tukang Cat 100,000.00 1,400.00 #VALUE!
0.0150 Pekerja 80,000.00 1,200.00 #VALUE!
0.0050 Mandor 125,000.00 625.00 #VALUE!
17,000.00 20,250.00 #VALUE!
1 m2 Siaran PC
4.3200 Kg Semen 1,250.00 5,400.00 #VALUE!
0.0160 m3 Pasir 232,700.00 3,723.20 #VALUE!
0.0700 Tukang Batu 90,000.00 6,300.00 #VALUE!
0.0070 Kep. Tukang Batu 100,000.00 700.00 #VALUE!
0.1500 Pekerja 80,000.00 12,000.00 #VALUE!
0.0080 Mandor 125,000.00 1,000.00 #VALUE!
20,000.00 9,123.20 #VALUE!
1 m2 Acian
4.3200 Kg Semen 1,250.00 5,400.00 #VALUE!
0.0085 m3 Pasir 232,700.00 1,977.95 #VALUE!
0.0700 Tukang Batu 90,000.00 6,300.00 #VALUE!
0.0070 Kep. Tukang Batu 100,000.00 700.00 #VALUE!
0.1500 Pekerja 80,000.00 12,000.00 #VALUE!
0.0080 Mandor 125,000.00 1,000.00 #VALUE!
20,000.00 7,377.95 #VALUE!
1 m1 Pekerjaan Benangan
4.3200 Kg Semen 1,250.00 5,400.00 #VALUE!
0.0700 Tukang Batu 90,000.00 6,300.00 #VALUE!
0.0070 Kep. Tukang Batu 100,000.00 700.00 #VALUE!
0.1500 Pekerja 80,000.00 12,000.00 #VALUE!
0.0080 Mandor 125,000.00 1,000.00 #VALUE!
20,000.00 5,400.00 #VALUE!
1 m2 Pas. Keramik 20 x 20
1.000 m2 Keramik 20 x 20 52,500.00 52,500.00 #VALUE!
11.3800 Kg. Semen 1,250.00 14,225.00 #VALUE!
0.0420 m3 Pasir Super 232,700.00 9,773.40 #VALUE!
0.3500 Tukang Batu 100,000.00 35,000.00 #VALUE!
0.0350 Kep. Tukang Batu 100,000.00 3,500.00 #VALUE!
0.6200 Pekerja 80,000.00 49,600.00 #VALUE!
0.0300 Mandor 125,000.00 3,750.00 #VALUE!
91,850.00 76,498.40 #VALUE!
1 m2 Pas. Keramik 20 x 25
1.0000 m2 Keramik 20 x 25 54,200.00 54,200.00 #VALUE!
11.3800 Kg. Semen 1,250.00 14,225.00 #VALUE!
0.0420 m3 Pasir Pasang 222,700.00 9,353.40 #VALUE!
0.3500 Tukang Batu 90,000.00 31,500.00 #VALUE!
0.0350 Kep. Tukang Batu 100,000.00 3,500.00 #VALUE!
0.6200 Pekerja 80,000.00 49,600.00 #VALUE!
0.0300 Mandor 125,000.00 3,750.00 #VALUE!
88,350.00 77,778.40 #VALUE!
1 buah Urinoir
1.0000 bh Urinoir 1,900,000.00 1,900,000.00 1,900,000.00
10%xHarga UrinoirPerlengkapan 190,000.00 190,000.00
6.0000 kg Semen Portland 1,250.00 7,500.00 7,500.00
0.0100 m3 Pasir Pasang 222,700.00 2,227.00 2,227.00
1.1000 Tukang Pipa 85,000.00 93,500.00 #VALUE!
0.0100 Kep. Tukang Pipa 60,000.00 600.00 #VALUE!
1.0000 Pekerja 55,000.00 55,000.00 #VALUE!
0.0100 Mandor 100,000.00 1,000.00 #VALUE!
150,100.00 2,099,727.00 #VALUE!
1 buah Washtafel
1.0000 bh Washtafel 1,700,000.00 1,700,000.00 1,700,000.00
10%xHarga UrinoirPerlengkapan 170,000.00 170,000.00
6.0000 kg Semen Portland 1,250.00 7,500.00 7,500.00
0.0100 m3 Pasir Pasang 222,700.00 2,227.00 2,227.00
1.4500 Tukang Pipa 90,000.00 130,500.00 #VALUE!
0.1500 Kep. Tukang Pipa 100,000.00 15,000.00 #VALUE!
1.2000 Pekerja 80,000.00 96,000.00 #VALUE!
0.0100 Mandor 125,000.00 1,250.00 #VALUE!
242,750.00 1,879,727.00 #VALUE!
1 titik Instalasi Stop Kontak, Saklar, Exhaust/Inhaust Fan, Alat-Alat Pengolah Sampah
6.0000 m1 Kabel NYM 3x2,5 mm ex Supreme 10,000.00 60,000.00 60,000.00
3.0000 btg Pipa Clipsal 20 mm Hitam 3,000.00 9,000.00 9,000.00
2.0000 bh Tee Dos Clipsal 20 mm Hitam 7,000.00 14,000.00 14,000.00
10.0000 bj Klem Clipsal 20 mm Hitam 10,000.00 100,000.00 100,000.00
2.0000 bj Sock Clipsal 20 mm Hitam 3,000.00 6,000.00 6,000.00
1.0000 bj Inbow Dos Plastik Clipsal 10,000.00 10,000.00 10,000.00
1.0000 ttk Biaya Pasang 25,000.00 25,000.00 25,000.00
25,000.00 199,000.00 224,000.00
Satuan Kerja
Pekerjaan
Lokasi
Th. Anggaran : 2018
BAHAN:
Batu Kali m3 254,400.00
Koral Pecah m3 278,800.00
Pasir Cor m3 205,800.00
Pasir Pasang m3 222,700.00
Pasir Super m3 232,700.00
Pasir Urug m3 133,300.00
Tanah Urug m3 114,200.00
Portland cement 50 kg kg 1,250.00
Portland cement 50 kg zak 62,500.00
Besi Polos kg 8,900.00
Kawat Ikat kg 22,500.00
Besi Baja kg 15,300.00
Wire Mesh M6 lbr 225,000.00
Wire Mesh M8 lbr 424,600.00
Batako Lubang bh 2,900.00
Genteng pres pejaten bh 1,300.00
Genteng bubungan bh 3,500.00
Trimdek warna (0,35x620x75)cm lbr 213,800.00
Trimdek biasa (0,35x620x75)cm lbr 208,300.00
Kayu Kamper Papan m3 8,600,000.00
Kayu Kamper Usuk m3 7,875,000.00
Kayu Bekas Kapal m3 7,000,000.00
Kayu Bangkirai m3 11,300,000.00
Kayu Meranti Papan/Bekesting m3 4,500,000.00
Kayu Meranti Usuk m3 4,500,000.00
Kayu Keruing Balok m3 6,750,000.00
Kayu Keruing Usuk 5/7 m3 7,285,700.00
Kayu Keruing Reng 3/5 m3 7,285,700.00
Kayu Keruing Papan m3 7,285,700.00
Kayu Kelas III m3 2,985,675.00
Plywood 9 mm lbr 148,500.00
Gypsum 9 mm lbr 71,000.00
Kalsiboard tebal 4 mm lbr 136,500.00
Teakwood 4 mm lbr 95,000.00
Lampit Bambu m2 75,000.00
Plywood Aluminium lbr 128,500.00
Kaca Bening 5 mm m2 102,600.00
Kaca Bening 6 mm m2 125,000.00
Paku/Baut Atap bj 950.00
Paku List kg 19,600.00
Paku Reng kg 17,300.00
Paku Usuk kg 17,300.00
Paku Sekrup bj 300.00
Besi Strip kg 33,500.00
Cat Tembok kg 52,500.00
Plamur Tembok ex. Tartar kg 18,800.00
Amplas Kasar lbr 9,000.00
Keramik Warna 20/20 m2 52,500.00
Keramik Warna 20/25 m2 54,200.00
PT. MITRA TRI SAKTI Harga Satuan Upah dan Bahan; Halaman 25 dari 30
URAIAN SATUAN HARGA SATUAN (Rp)
PT. MITRA TRI SAKTI Harga Satuan Upah dan Bahan; Halaman 26 dari 30
URAIAN SATUAN HARGA SATUAN (Rp)
UPAH:
Mandor orang 125,000.00
Kepala Tukang Kayu orang 100,000.00
Tukang Kayu orang 90,000.00
Kepala Tukang Batu orang 100,000.00
PT. MITRA TRI SAKTI Harga Satuan Upah dan Bahan; Halaman 27 dari 30
URAIAN SATUAN HARGA SATUAN (Rp)
PT. MITRA TRI SAKTI Harga Satuan Upah dan Bahan; Halaman 28 dari 30
URAIAN SATUAN HARGA SATUAN (Rp)
PT. MITRA TRI SAKTI Harga Satuan Upah dan Bahan; Halaman 29 dari 30
RENCANA ANGGARAN BIAYA ( RAB )
Satuan Kerja
Pekerjaan
Lokasi
Th. Anggaran : 2018