Anda di halaman 1dari 375

REKAPITULASI

RENCANA ANGGARAN BIAYA

PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGGARAN :

NO. URAIAN PEKERJAAN HARGA


1. PEKERJAAN PENDAHULUAN Rp 11,000,000.00
2. PEKERJAAN SIPIL DAN STRUKTUR #NAME?
3. PEKERJAAN ARSITEKTUR #NAME?
4. PEKERJAAN ELEKTRIKAL #NAME?
Jumlah #NAME?
PPN 11% #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
###

Terbilang : #NAME?

Pangkalpinang, November 2022

,Dibuat oleh

....................................
REKAPITULASI BIAYA PEMBANGUNAN

PEMBANGUNAN RUANG KELAS BARU (RKB) (3 RUANG)

SMP NEGERI - 2 PANGKALPINANG


APBDP - TA. 2022

JENIS PEKERJAAN TOTAL HARGA

PEMBANGUNAN RUANG KELAS BARU (RKB) (3 RUANG)

PEKERJAAN PENDAHULUAN Rp 11,000,000.00


PEKERJAAN SIPIL DAN STRUKTUR #NAME?
PEKERJAAN ARSITEKTUR #NAME?
PEKERJAAN ELEKTRIKAL #NAME?

JUMLAH BIAYA FISIK #NAME?


PPN #NAME?
JUMLAH BIAYA FISIK + PPN #NAME?

T O T A L (TERMASUK PAJAK) #NAME?

DIBULATKAN #NAME?

TERBILANG :
#SATU MILYAR ENAM PULUH TUJUH JUTA ENAM BELAS RIBU RUPIAH#
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL KODE ANL
SATUAN HARGA
1. PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Penyediaan Air Kerja Ls 1.00 - Rp 1,000,000.00 Rp 1,000,000.00
2 Pengadaan Listrik Kerja Ls 1.00 - Rp 3,000,000.00 Rp 3,000,000.00
3 Mob dan Demob Alat dan Tenaga Ls 1.00 - Rp 4,000,000.00 Rp 4,000,000.00
6 Biaya K3 Ls 1.00 - Rp 3,000,000.00 Rp 3,000,000.00

JUMLAH BIAYA PEKERJAAN PENDAHULUAN Rp 11,000,000.00

2. RUANG KEPALA SEKOLAH DAN RUANG KELAS


Plafond PVC (Rangka, Penutup Plafond,
1 List dan Acc) (ex. Shunda Plafond) m2 313.00 Dihitung 2. ck Rp 299,000.00 Rp 93,587,000.00

2 Pengecatan dinding dan pelat beton


ekspose (anti Lumut) m2 557.60 A. 4.7.1.10. Rp 53,359.74 Rp 29,753,392.66
Pasang Kusen (Aluminium Shop Front 4"
3 Fin. Clear Anodized caasement + m1 195.90 - Rp 156,000.00 Rp 30,560,400.00
accessories) setara Lexindo
Pintu / Jendela Kaca Bening/Es 5mm
4 setara Lexindo m2 58.44 A. 4.2.1.13. ck Rp 708,678.51 Rp 41,415,172.21

5 Pintu Fiber + Accessories m2 0.00 - Rp 450,000.00 Rp -

6 Pasang Kaca Bening Mati 5mm m2 0.00 A. 4.6.2.17. Rp 181,927.96 Rp -

7 Pemasangan Engsel untuk Pintu ps 6.00 A. 4.6.2.5. Rp 56,080.36 Rp 336,482.19

8 Pemasangan Engsel untuk Jendela ps 0.00 - Rp - Rp -

9 Pemasangan Cassement Aluminium ps 93.00 - Rp 62,000.00 Rp 5,766,000.00

10 Pemasangan Kunci dan Handle Pintu bh 3.00 A. 4.6.2.2.a Rp 727,473.90 Rp 2,182,421.70

11 Pemasangan Door Closer bh 3.00 A. 4.6.2.10. Rp 389,390.00 Rp 1,168,170.00

12 Pemasangan Rooster bh 54.00 - Rp 56,000.00 Rp 3,024,000.00

13 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00

14 Lantai Homogeneus Tile 60X60 cm m2 262.00 - Rp 560,000.00 Rp 146,720,000.00

15 Plint Keramik 10x60 m2 94.00 - Rp 56,000.00 Rp 5,264,000.00

JUMLAH BIAYA PEKERJAAN RUANG KEPALA SEKOLAH DAN RUANG KELAS Rp 397,763,038.76

2.RUMAH PENJAGA SEKOLAH

1 Galian tanah pondasi + penyesuaian peil lantai m3 45.92 - Rp 109,250.00 Rp 5,016,760.00

2 Urugan tanah kembali m3 34.44 A. 2.3.1.9. Rp 80,500.00 Rp 2,772,420.00

3 Urugan pasir bawah pondasi dan lantai m3 14.55 A. 2.3.1.11. Rp 130,442.86 Rp 1,897,943.57

4 Urugan Tanah Pilihan (Peninggian Lantai 50c m3 159.50 - Rp 168,000.00 Rp 26,796,000.00

1 Pondasi Batu gunung 1:4 m3 36.08 A. 3.2.1.2.a Rp 1,174,206.03 Rp 42,365,353.66

2 Pondasi Roolag Bata m2 60.20 - Rp 254,913.42 Rp 15,345,787.64

3 Pekerjaan Sloof Beton 15/20 dengan tulangan

a. Bekisting Sloof m2 32.80 A. 4.1.1.19. Rp 257,833.52 Rp 8,456,939.44

b. Pembesian kg 492.00 A. 4.1.1.17. Rp 16,975.27 Rp 8,351,832.67

c. Pengecoran Beton K-200 m3 2.46 A. 4.1.1.6. Rp 1,202,969.21 Rp 2,959,304.26


1 Kolom 20/20 dengan tulangan

a. Bekisting Kolom m2 43.20 A. 4.1.1.22. Rp 386,690.46 Rp 16,705,028.00

b. Pembesian kg 864.00 A. 4.1.1.17. Rp 16,975.27 Rp 14,666,632.98

c. Pengecoran Beton K-200 m3 4.32 A. 4.1.1.6. Rp 1,202,969.21 Rp 5,196,826.99

2 Ring balk 15/15 dengan tulangan

a. Bekisting Balok m2 29.40 A. 4.1.1.21. Rp 395,258.93 Rp 11,620,612.42

b. Pembesian kg 441.00 A. 4.1.1.17. Rp 16,975.27 Rp 7,486,093.92

c. Pengecoran Beton K-200 m3 2.21 A. 4.1.1.6. Rp 1,202,969.21 Rp 2,652,547.11

3 Beton Ringan diatas Kusen m3 0.65 - Rp 4,800,000.00 Rp 3,136,320.00

4 Pelat Beton t=10cm m3 0.90 - Rp 4,800,000.00 Rp 4,320,000.00

1 Pekerjaan Rangka Atap Baja Ringan C.75 Reng m2 406.90 - Rp 265,000.00 Rp 107,828,500.00

2 Dinding Batu Bata 1 : 3 m2 278.80 #REF! Rp 254,913.42 Rp 71,069,860.38

3 Plesteran Dinding 1 : 3 m2 557.60 A. 4.4.2.3. Rp 90,408.44 Rp 50,411,744.36

4 Acian m2 557.60 A. 4.4.2.27. Rp 55,204.60 Rp 30,782,084.96

5 Keramik Bangku Beton m2 9.00 A. 4.4.3.35.ck Rp 166,474.00 Rp 1,498,266.00

6 Keramik Dinding 20x20 m2 27.00 A. 4.4.3.36. ck Rp 159,025.48 Rp 4,293,687.90

7 Plafond PVC (Rangka, Penutup Plafond, List da m2 313.00 Dihitung 2. ck Rp 299,000.00 Rp 93,587,000.00

7 Lantai Homogeneus Tile 60X60 cm m2 262.00 - Rp 560,000.00 Rp 146,720,000.00

7 Plint Keramik 10x60 m2 94.00 - Rp 56,000.00 Rp 5,264,000.00

7 Lantai rabat Beton T= 5CM M3 3.90 A. 4.1.1.2. Rp 1,097,509.31 Rp 4,280,286.30

7 Saluran Drainase air hujan m1 78.00 - Rp 186,000.00 Rp 14,508,000.00

7 Pasang Kusen (Aluminium Shop Front 4" Fin. C m1 195.90 - Rp 156,000.00 Rp 30,560,400.00

7 Pintu / Jendela Kaca Bening/Es 5mm setara L m2 58.44 A. 4.2.1.13. ck Rp 708,678.51 Rp 41,415,172.21

7 Pintu Fiber + Accessories m2 0.00 - Rp 450,000.00 Rp -

7 Pasang Kaca Bening Mati 5mm m2 0.00 A. 4.6.2.17. Rp 181,927.96 Rp -

7 Pemasangan Engsel untuk Pintu ps 6.00 A. 4.6.2.5. Rp 56,080.36 Rp 336,482.19

7 Pemasangan Engsel untuk Jendela ps 0.00 - Rp - Rp -

7 Pemasangan Cassement Aluminium ps 93.00 - Rp 62,000.00 Rp 5,766,000.00

7 Pemasangan Kunci dan Handle Pintu bh 3.00 A. 4.6.2.2.a Rp 727,473.90 Rp 2,182,421.70

7 Pemasangan Door Closer bh 3.00 A. 4.6.2.10. Rp 389,390.00 Rp 1,168,170.00

7 Pemasangan Rooster bh 54.00 - Rp 56,000.00 Rp 3,024,000.00

7 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00

Atap Spandeck Warna t=0,4mm m2 406.90 A. 4.5.2.15. ck Rp 119,264.20 Rp 48,528,602.98

Woodplank m' 80.00 - Rp 75,000.00 Rp 6,000,000.00

Pengecatan dinding dan pelat beton ekspose ( m2 557.60 A. 4.7.1.10. Rp 53,359.74 Rp 29,753,392.66
Panel Box unit 1.00 - Rp 2,500,000.00 Rp 2,500,000.00

MCB unit 5.00 - Rp 618,103.00 Rp 3,090,515.00

Saklar tunggal (Panasonic setara) unit 7.00 - Rp 69,300.00 Rp 485,100.00

Stop kontak (Panasonic setara) unit 18.00 - Rp 50,600.00 Rp 910,800.00

Lampu downlight LED 12 watt (lengkap) (phili unit 21.00 - Rp 240,000.00 Rp 5,040,000.00

Instalasi stop kontak titik 18.00 - Rp 120,000.00 Rp 2,160,000.00

Instalasi lampu titik 21.00 - Rp 120,000.00 Rp 2,520,000.00

JUMLAH BIAYA PEKERJAAN RUANG PENJAGA SEKOLAH Rp 933,416,889.27

3.RUANG IT

1 Galian tanah pondasi + penyesuaian peil lantai m3 45.92 - Rp 109,250.00 Rp 5,016,760.00

2 Urugan tanah kembali m3 34.44 A. 2.3.1.9. Rp 80,500.00 Rp 2,772,420.00

3 Urugan pasir bawah pondasi dan lantai m3 14.55 A. 2.3.1.11. Rp 130,442.86 Rp 1,897,943.57

4 Urugan Tanah Pilihan (Peninggian Lantai 50c m3 159.50 - Rp 168,000.00 Rp 26,796,000.00

1 Pondasi Batu gunung 1:4 m3 36.08 A. 3.2.1.2.a Rp 1,174,206.03 Rp 42,365,353.66

2 Pondasi Roolag Bata m2 60.20 - Rp 254,913.42 Rp 15,345,787.64

3 Pekerjaan Sloof Beton 15/20 dengan tulangan

a. Bekisting Sloof m2 32.80 A. 4.1.1.19. Rp 257,833.52 Rp 8,456,939.44

b. Pembesian kg 492.00 A. 4.1.1.17. Rp 16,975.27 Rp 8,351,832.67

c. Pengecoran Beton K-200 m3 2.46 A. 4.1.1.6. Rp 1,202,969.21 Rp 2,959,304.26

1 Kolom 20/20 dengan tulangan

a. Bekisting Kolom m2 43.20 A. 4.1.1.22. Rp 386,690.46 Rp 16,705,028.00

b. Pembesian kg 864.00 A. 4.1.1.17. Rp 16,975.27 Rp 14,666,632.98

c. Pengecoran Beton K-200 m3 4.32 A. 4.1.1.6. Rp 1,202,969.21 Rp 5,196,826.99

2 Ring balk 15/15 dengan tulangan

a. Bekisting Balok m2 29.40 A. 4.1.1.21. Rp 395,258.93 Rp 11,620,612.42

b. Pembesian kg 441.00 A. 4.1.1.17. Rp 16,975.27 Rp 7,486,093.92

c. Pengecoran Beton K-200 m3 2.21 A. 4.1.1.6. Rp 1,202,969.21 Rp 2,652,547.11

3 Beton Ringan diatas Kusen m3 0.65 - Rp 4,800,000.00 Rp 3,136,320.00

4 Pelat Beton t=10cm m3 0.90 - Rp 4,800,000.00 Rp 4,320,000.00

1 Pekerjaan Rangka Atap Baja Ringan C.75 Reng m2 406.90 - Rp 265,000.00 Rp 107,828,500.00

2 Dinding Batu Bata 1 : 3 m2 278.80 #REF! Rp 254,913.42 Rp 71,069,860.38

3 Plesteran Dinding 1 : 3 m2 557.60 A. 4.4.2.3. Rp 90,408.44 Rp 50,411,744.36

4 Acian m2 557.60 A. 4.4.2.27. Rp 55,204.60 Rp 30,782,084.96

5 Keramik Bangku Beton m2 9.00 A. 4.4.3.35.ck Rp 166,474.00 Rp 1,498,266.00

6 Keramik Dinding 20x20 m2 27.00 A. 4.4.3.36. ck Rp 159,025.48 Rp 4,293,687.90


7 Plafond PVC (Rangka, Penutup Plafond, List da m2 313.00 Dihitung 2. ck Rp 299,000.00 Rp 93,587,000.00

7 Lantai Homogeneus Tile 60X60 cm m2 262.00 - Rp 560,000.00 Rp 146,720,000.00

7 Plint Keramik 10x60 m2 94.00 - Rp 56,000.00 Rp 5,264,000.00

7 Lantai rabat Beton T= 5CM M3 3.90 A. 4.1.1.2. Rp 1,097,509.31 Rp 4,280,286.30

7 Saluran Drainase air hujan m1 78.00 - Rp 186,000.00 Rp 14,508,000.00

7 Pasang Kusen (Aluminium Shop Front 4" Fin. C m1 195.90 - Rp 156,000.00 Rp 30,560,400.00

7 Pintu / Jendela Kaca Bening/Es 5mm setara L m2 58.44 A. 4.2.1.13. ck Rp 708,678.51 Rp 41,415,172.21

7 Pintu Fiber + Accessories m2 0.00 - Rp 450,000.00 Rp -

7 Pasang Kaca Bening Mati 5mm m2 0.00 A. 4.6.2.17. Rp 181,927.96 Rp -

7 Pemasangan Engsel untuk Pintu ps 6.00 A. 4.6.2.5. Rp 56,080.36 Rp 336,482.19

7 Pemasangan Engsel untuk Jendela ps 0.00 - Rp - Rp -

7 Pemasangan Cassement Aluminium ps 93.00 - Rp 62,000.00 Rp 5,766,000.00

7 Pemasangan Kunci dan Handle Pintu bh 3.00 A. 4.6.2.2.a Rp 727,473.90 Rp 2,182,421.70

7 Pemasangan Door Closer bh 3.00 A. 4.6.2.10. Rp 389,390.00 Rp 1,168,170.00

7 Pemasangan Rooster bh 54.00 - Rp 56,000.00 Rp 3,024,000.00

7 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00

Atap Spandeck Warna t=0,4mm m2 406.90 A. 4.5.2.15. ck Rp 119,264.20 Rp 48,528,602.98

Woodplank m' 80.00 - Rp 75,000.00 Rp 6,000,000.00

Pengecatan dinding dan pelat beton ekspose ( m2 557.60 A. 4.7.1.10. Rp 53,359.74 Rp 29,753,392.66

Panel Box unit 1.00 - Rp 2,500,000.00 Rp 2,500,000.00

MCB unit 5.00 - Rp 618,103.00 Rp 3,090,515.00

Saklar tunggal (Panasonic setara) unit 7.00 - Rp 69,300.00 Rp 485,100.00

Stop kontak (Panasonic setara) unit 18.00 - Rp 50,600.00 Rp 910,800.00

Lampu downlight LED 12 watt (lengkap) (phili unit 21.00 - Rp 240,000.00 Rp 5,040,000.00

Instalasi stop kontak titik 18.00 - Rp 120,000.00 Rp 2,160,000.00

Instalasi lampu titik 21.00 - Rp 120,000.00 Rp 2,520,000.00

JUMLAH BIAYA PEKERJAAN RUANG IT Rp 933,416,889.27

4.RUANG PERPUSTAKAAN

7 Plafond PVC (Rangka, Penutup Plafond, List da m2 313.00 Dihitung 2. ck Rp 299,000.00 Rp 93,587,000.00

7 Lantai Homogeneus Tile 60X60 cm m2 262.00 - Rp 560,000.00 Rp 146,720,000.00

7 Plint Keramik 10x60 m2 94.00 - Rp 56,000.00 Rp 5,264,000.00

7 Lantai rabat Beton T= 5CM M3 3.90 A. 4.1.1.2. Rp 1,097,509.31 Rp 4,280,286.30

7 Pasang Kusen (Aluminium Shop Front 4" Fin. C m1 195.90 - Rp 156,000.00 Rp 30,560,400.00

7 Pintu / Jendela Kaca Bening/Es 5mm setara L m2 58.44 A. 4.2.1.13. ck Rp 708,678.51 Rp 41,415,172.21

7 Pintu Fiber + Accessories m2 0.00 - Rp 450,000.00 Rp -


7 Pasang Kaca Bening Mati 5mm m2 0.00 A. 4.6.2.17. Rp 181,927.96 Rp -

7 Pemasangan Engsel untuk Pintu ps 6.00 A. 4.6.2.5. Rp 56,080.36 Rp 336,482.19

7 Pemasangan Engsel untuk Jendela ps 0.00 - Rp - Rp -

7 Pemasangan Cassement Aluminium ps 93.00 - Rp 62,000.00 Rp 5,766,000.00

7 Pemasangan Kunci dan Handle Pintu bh 3.00 A. 4.6.2.2.a Rp 727,473.90 Rp 2,182,421.70

7 Pemasangan Door Closer bh 3.00 A. 4.6.2.10. Rp 389,390.00 Rp 1,168,170.00

7 Pemasangan Rooster bh 54.00 - Rp 56,000.00 Rp 3,024,000.00

7 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00

Atap Spandeck Warna t=0,4mm m2 406.90 A. 4.5.2.15. ck Rp 119,264.20 Rp 48,528,602.98

Woodplank m' 80.00 - Rp 75,000.00 Rp 6,000,000.00

Pengecatan dinding dan pelat beton ekspose ( m2 557.60 A. 4.7.1.10. Rp 53,359.74 Rp 29,753,392.66

Panel Box unit 1.00 - Rp 2,500,000.00 Rp 2,500,000.00

MCB unit 5.00 - Rp 618,103.00 Rp 3,090,515.00

Saklar tunggal (Panasonic setara) unit 7.00 - Rp 69,300.00 Rp 485,100.00

Stop kontak (Panasonic setara) unit 18.00 - Rp 50,600.00 Rp 910,800.00

Lampu downlight LED 12 watt (lengkap) (phili unit 21.00 - Rp 240,000.00 Rp 5,040,000.00

Instalasi stop kontak titik 18.00 - Rp 120,000.00 Rp 2,160,000.00

Instalasi lampu titik 21.00 - Rp 120,000.00 Rp 2,520,000.00

JUMLAH BIAYA PEKERJAAN RUANG PERPUSTAKAAN Rp 473,278,343.04

5.MUSHOLA
7 Plafond PVC (Rangka, Penutup Plafond, List da m2 313.00 Dihitung 2. ck Rp 299,000.00 Rp 93,587,000.00

7 Lantai Homogeneus Tile 60X60 cm m2 262.00 - Rp 560,000.00 Rp 146,720,000.00

7 Plint Keramik 10x60 m2 94.00 - Rp 56,000.00 Rp 5,264,000.00

7 Lantai rabat Beton T= 5CM M3 3.90 A. 4.1.1.2. Rp 1,097,509.31 Rp 4,280,286.30

7 Pasang Kusen (Aluminium Shop Front 4" Fin. C m1 195.90 - Rp 156,000.00 Rp 30,560,400.00

7 Pintu / Jendela Kaca Bening/Es 5mm setara L m2 58.44 A. 4.2.1.13. ck Rp 708,678.51 Rp 41,415,172.21

7 Pintu Fiber + Accessories m2 0.00 - Rp 450,000.00 Rp -

7 Pasang Kaca Bening Mati 5mm m2 0.00 A. 4.6.2.17. Rp 181,927.96 Rp -

7 Pemasangan Engsel untuk Pintu ps 6.00 A. 4.6.2.5. Rp 56,080.36 Rp 336,482.19

7 Pemasangan Engsel untuk Jendela ps 0.00 - Rp - Rp -

7 Pemasangan Cassement Aluminium ps 93.00 - Rp 62,000.00 Rp 5,766,000.00

7 Pemasangan Kunci dan Handle Pintu bh 3.00 A. 4.6.2.2.a Rp 727,473.90 Rp 2,182,421.70

7 Pemasangan Door Closer bh 3.00 A. 4.6.2.10. Rp 389,390.00 Rp 1,168,170.00

7 Pemasangan Rooster bh 54.00 - Rp 56,000.00 Rp 3,024,000.00

7 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00

Atap Spandeck Warna t=0,4mm m2 406.90 A. 4.5.2.15. ck Rp 119,264.20 Rp 48,528,602.98

Woodplank m' 80.00 - Rp 75,000.00 Rp 6,000,000.00

Pengecatan dinding dan pelat beton ekspose ( m2 557.60 A. 4.7.1.10. Rp 53,359.74 Rp 29,753,392.66

Panel Box unit 1.00 - Rp 2,500,000.00 Rp 2,500,000.00

MCB unit 5.00 - Rp 618,103.00 Rp 3,090,515.00

Saklar tunggal (Panasonic setara) unit 7.00 - Rp 69,300.00 Rp 485,100.00

Stop kontak (Panasonic setara) unit 18.00 - Rp 50,600.00 Rp 910,800.00

Lampu downlight LED 12 watt (lengkap) (phili unit 21.00 - Rp 240,000.00 Rp 5,040,000.00

Instalasi stop kontak titik 18.00 - Rp 120,000.00 Rp 2,160,000.00

Instalasi lampu titik 21.00 - Rp 120,000.00 Rp 2,520,000.00

JUMLAH BIAYA MUSHOLA Rp 473,278,343.04

5.PEKERJAAN PAVING BLOCK

7 Urugan Pasir m3 45.98 A. 2.3.1.11. Rp 185,805.50 Rp 93,587,000.00

7 Pas. Pavingblock, t = 8 cm (Warna) m2 500.00 A. 4.4.3.64. Rp 305,340.99 Rp 146,720,000.00

JUMLAH BIAYA PEKERJAAN PAVING BLOCK Rp 240,307,000.00


6.RUANG GURU
7 Pemasangan Teralis Besi + fin. Cat m2 58.44 - Rp 650,000.00 Rp 37,986,000.00
JUMLAH BIAYA PEKERJAAN PAVING BLOCK Rp 37,986,000.00
7.LAPANGAN VOLI
4 Pelat Beton t=10cm m3 0.90 - Rp 4,800,000.00 Rp 4,320,000.00
JUMLAH BIAYA PEKERJAAN PAVING BLOCK Rp 4,320,000.00
8.PEKERJAAN PAGAR DAN GAPURA DEPAN
7 Pek. Pas Pagar m1 1.00 - Rp 450,000.00 Rp 93,587,000.00
7 Pek. Pas Gapura Depan Ls 1.00 - Rp 80,000,000.00 Rp 146,720,000.00
JUMLAH BIAYA PEKERJAAN PAGAR DAN GAPURA DEPAN Rp 240,307,000.00
JUMLAH Rp 3,745,073,503.39
PPN 11% Rp 411,958,085.37
JUMLAH TOTAL Rp 4,157,031,588.76
DIBULATKAN Rp 4,157,031,000.00
JADWAL WAKTU PELAKSANAAN
PEKERJAAN 0
LOKASI 0
TAHUN : 2022

JADWAL PELAKSANAAN 150 HARI KALENDER

MG 1 MG 2 MG 3 MG 4 MG 5 MG 6 MG 7 MG 8 MG 9 MG 10 MG 11 MG 12 MG 13 MG 14 MG 15 MG 16 MG 17 MG 18 MG 19 MG 20 MG 21 MG 22
NO. URAIAN PEKERJAAN VOLUME SAT. KET
BOBOT
%
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-150

1 2 3 4

1. PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN 100%
1 Penyediaan Air Kerja 1.00 Ls 0.11 0.11
2 Pengadaan Listrik Kerja 1.00 Ls 0.32 0.32
3 Mob dan Demob Alat dan Tenaga 1.00 Ls 0.42 0.42
4 Papan Nama Proyek 1.00 Ls 0.04 0.04
5 Pemasangan Bouplank 76.00 m1 0.69 0.69
6 Biaya K3 1.00 Ls 0.32 0.32

2. PEKERJAAN SIPIL DAN STRUKTUR


I PEKERJAAN TANAH
1 Galian tanah pondasi + penyesuaian peil lantai 45.92 m3 0.53 0.53
2 Urugan tanah kembali 34.44 m3 0.29 0.29
3 Urugan pasir bawah pondasi dan lantai 14.55 m3 0.20 0.20
4 Urugan Tanah Pilihan (Peninggian Lantai 50cm) 159.50 m3 2.82 2.82

II. PEKERJAAN PONDASI


1 Pondasi Batu gunung 1:4 36.08 m3 4.45 1.11 1.11 1.11 1.11
2 Pondasi Roolag Bata 60.20 m2 1.61 1.61
3 Pekerjaan Sloof Beton 15/20 dengan tulangan
a. Bekisting Sloof 32.80 m2 0.89 0.89
b. Pembesian 492.00 kg 0.88 0.88
c. Pengecoran Beton K-200 2.46 m3 0.31 0.31

III. PEKERJAAN BETON


1 Kolom 20/20 dengan tulangan
a. Bekisting Kolom 43.20 m2 1.76 0.59 0.59 0.59
b. Pembesian 864.00 kg 1.54 0.51 0.51 0.51
c. Pengecoran Beton K-200 4.32 m3 0.55 0.18 0.18 0.18
2 Ring balk 15/15 dengan tulangan
a. Bekisting Balok 29.40 m2 1.22 1.22
b. Pembesian 441.00 kg 0.79 0.79
c. Pengecoran Beton K-200 2.21 m3 0.28 0.28
3 Beton Ringan diatas Kusen 0.65 m3 0.33 0.33
4 Pelat Beton t=10cm 0.90 m3 0.45 0.45

II. PEKERJAAN RANGKA ATAP BAJA RINGAN

MASA WAKTU PEMELIHARAAN 180 HARI KALENDER


1 Pekerjaan Rangka Atap Baja Ringan C.75 Reng 32.45 T=0,75 AZ. 100 (SNI
PRODUCT) Ex. Tasso
406.90 m2 11.33 2.83 2.83 2.83 2.83

3. PEKERJAAN ARSITEKTUR
A PEKERJAAN DINDING
1 Dinding Batu Bata 1 : 3 278.80 m2 7.47 2.49 2.49 2.49
2 Plesteran Dinding 1 : 3 557.60 m2 5.30 2.65 2.65
3 Acian 557.60 m2 3.24 3.24
4 Keramik Bangku Beton 9.00 m2 0.16 0.16
5 Keramik Dinding 20x20 27.00 m2 0.45 0.45

B PEKERJAAN PLAFON

1 Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda
Plafond)
313.00 m2 9.84 9.84

C PEKERJAAN LANTAI
1 Lantai Homogeneus Tile 60X60 cm 262.00 m2 15.42 7.71 7.71
2 Plint Keramik 10x60 94.00 m2 0.55 0.55
3 Lantai rabat Beton T= 5CM 3.90 M3 0.45 0.45
4 Saluran Drainase air hujan 78.00 m1 1.52 1.52

D PEKERJAAN KUSEN, PINTU DAN JENDELA LENGKAP DENGAN RANGKA,


ENGSEL, GRENDEL, HAK ANGIN, KUNCI, HANDLE, DAN DOOR CLOSER

1 Pasang Kusen (Aluminium Shop Front 4" Fin. Clear Anodized


caasement + accessories) setara Lexindo
195.90 m1 3.21 3.21
2 Pintu / Jendela Kaca Bening/Es 5mm setara Lexindo 58.44 m2 4.35 4.35
3 Pintu Fiber + Accessories - m2 - -
4 Pasang Kaca Bening Mati 5mm - m2 - -
5 Pemasangan Engsel untuk Pintu 6.00 ps 0.04 0.04
6 Pemasangan Engsel untuk Jendela - ps - -
7 Pemasangan Cassement Aluminium 93.00 ps 0.61 0.61
8 Pemasangan Kunci dan Handle Pintu 3.00 bh 0.23 0.23
9 Pemasangan Door Closer 3.00 bh 0.12 0.12
10 Pemasangan Rooster 54.00 bh 0.32 0.32
11 Pemasangan Teralis Besi + fin. Cat 58.44 m2 3.99 3.99

E PEKERJAAN PENUTUP ATAP


1 Atap Spandeck Warna t=0,4mm 406.90 m2 5.10 1.70 1.70 1.70
2 Woodplank 80.00 m' 0.63 0.63

F PEKERJAAN PENGECATAN
1 Pengecatan dinding dan pelat beton ekspose (anti Lumut) 557.60 m2 3.13 3.13

4. PEKERJAAN ELEKTRIKAL

1 PANEL PENERANGAN
1 Panel Box 1.00 unit 0.26 0.26
2 MCB 5.00 unit 0.32 0.32

2 INSTALASI PENERANGAN
1 Saklar tunggal (Panasonic setara) 7.00 unit 0.05 0.05
2 Stop kontak (Panasonic setara) 18.00 unit 0.10 0.10
3 Lampu downlight LED 12 watt (lengkap) (philips Setara) 21.00 unit 0.53 0.53
4 Instalasi stop kontak 18.00 titik 0.23 0.23
5 Instalasi lampu 21.00 titik 0.26 0.26

BOBOT MINGGUAN (%) 100.00 1.89 1.64 1.11 3.02 3.39 2.82 3.77 3.77 3.77 3.07 2.83 2.83 6.05 3.42 3.50 1.70 1.70 2.65 6.49 17.55 10.24 12.79
RENCANA
BOBOT MINGGUAN KOMULATIF (%) 1.89 3.53 4.64 7.66 11.05 13.86 17.64 21.41 25.18 28.25 31.08 33.92 39.96 43.38 46.88 48.58 50.28 52.93 59.43 76.98 87.21 100.00
HARI KERJA 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 3
JUMLAH HARI KERJA 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 150

Pangkalpinang, 22 September 2022


Penawar,
CV.NAURA KONSTRUKSI

Afriansyah
Direktur
DAFTAR SATUAN UPAH&BAHAN

NO. URAIAN SATUAN HARGA SATUAN UPAH/


BAHAN/ALAT 2022

1 2 3
I. TENAGA KERJA
1 Pekerja Oh 120,000
2 Tenaga gali tanah/pondasi Oh 120,000
3 Tukang Oh 160,000
4 Tukang pipa Oh 160,000
5 Tukang batu Oh 160,000
6 Tukang kayu Oh 160,000
7 Tukang cat Oh 160,000
8 Tukang besi Oh 160,000
9 Tukang politur Oh 160,000
10 Tukang Listrik Oh 160,000
11 Tukang Las Konstruksi Oh 160,000
12 Tukang khusus aluminium Oh 160,000
13 Tukang Las biasa Oh 160,000
14 Tukang Pipa ledeng Oh 160,000
15 Tukang Batu/Pipa Oh 160,000
16 Tukang Vibrator Oh 160,000
17 Tukang Erection Oh 160,000
18 Operator crane Oh 180,000
19 Pembantu operator crane Oh 120,000
20 Operator Oh 200,000
21 Kepala Tukang Oh 200,000
22 Kepala tukang batu Oh 200,000
23 Kepala tukang kayu Oh 200,000
24 Kepala tukang cat Oh 200,000
25 Kepala tukang besi Oh 200,000
26 Kepala tukang politur Oh 200,000
27 Mandor Oh 200,000
28 Operator alat berat Oh 180,000

II. BAHAN MATERIAL -

1 Aditive anti pengelupasan Liter 62,956


2 Air Ltr 61
3 Agregat Pecah Kasar M3 412,850
4 Agg. Halus LP A M3 430,738
5 Agregat Lolos # 1 " M3 435,225
6 Aspal curah Kg ###
15,048
7 Aspal drum Kg ###
15,048
8 Aspal emulsi Kg ###
12,672
9 Agr.Base Kelas A M3 406,766
10 Agr.Base Kelas B M3 390,258
11 Agregat Pecah Mesin 5-10 & 10-20 mm M3 429,932
12 Agregat Pecah Mesin 20-30 mm M3 420,370
13 All socket reducer PVC Ø 100 x 80 (mm) Unit 241,346
14 All socket reducer PVC Ø 80 x 50 (mm) unit 207,449
15 Aluminium foil air cell bubble M² 60,205
16 Ampelas Lembar 4,743
17 Anti stripping agent Liter 70,142
18 Asesoris bak cuci piring Set 117,902
19 As (1,5' x 6m) Batang 964,656
20 Atap alumunium Gelombang tebal 0,55 (Galvalum) M² 60,807
21 Atap alumunium super sheet uk. 1,8 x 6 (m), t= 0,2 mm (berwarna) M² 65,829
22 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm Lembar 38,367
23 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 42,248
24 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm Lembar 46,178
25 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 52,270
26 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm Lembar 49,994
27 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 53,940
28 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 57,576
29 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 62,898
30 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 64,502
31 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 64,724
32 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 71,883
33 Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 72,706
34 Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 73,173
35 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 80,868
36 Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 77,373
37 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 89,854
38 Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 85,971
39 Atap genteng (standar KIA) Buah 12,071
40 Atap genteng beton (jenis press) Buah 5,516
41 Atap genteng kodok Buah 4,028
42 Atap genteng soka Buah 9,056
43 Atap metal (biasa/ polos) Lembar 31,932
44 Atap metal (standar Rainbow) Lembar 37,991
45 Atap metal berpasir Lembar 50,207
46 Atap polycarbonat M² 76,240
47 Atap seng fiberglass Ft 13,264
48 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 35,371
49 Atap Selulosa Bitumen (Ukuran 0,95 x 2 m) Lembar 150,058
50 Atap Selulosa Bitumen (Ukuran 106 x 40 cm) Lembar 59,844
51 Baja Tulangan (Polos) U24 Kg 12,109
52 Baja Tulangan (Ulir) D32 Kg 12,947
53 Baja ringan Taso 75.100 Btg 127,728
54 Baja ringan Taso 75.65 Btg 71,724
55 Baja ringan Taso 75.75 Btg 78,602
56 Baja ringan Taso 75.80 Btg 93,339
57 Bak Air Fiberglass Uk. 55x55x60 cm bh 220,000
58 Bak cat bh 14,738
59 Bak cuci piring (sink) stainless steel 1 lobang Buah 193,556
60 Bak cuci piring (sink) stainless steel 2 lobang Buah 414,974
61 Bak mandi fibreglass volume 0,15 m³ Buah 211,242
62 Bak mandi fibreglass volume 0,30 m³ Buah 208,786
63 Bak mandi fibreglass volume 1,00 m³ Buah 344,373
64 Bak mandi jenis bathtub buah 4,077,458
65 Bak mandi jenis bathtub (acrilic P: 1,3 M L: 0,7 M T: 0,4M) Buah 3,242,316
66 Bata Ringan 10x20x60cm  Buah 9,825
67 Bata Ringan 7,5x20x60cm Buah 7,664
68 Batu Alam Andersit 20/40cm M2 145,145
69 Besi plat Baja (8mm x 6' x 20') Keping 9,378,600
70 Besi plat Baja (6mm x 6' x 20') Keping 7,033,950
71 Bubungan Atap Selulosa Bitumen (Ukuran 1060x 50 cm) Lembar 75,922
72 Bracket Kaca Axrilix Set 43,767
73 Bataco Buah 1,760
74 Batacote M² 44,744
75 Batu alam M² 176,854
76 Batu bata berongga uk. 5x11x24 (cm) Buah 1,376
77 Batu bata merah besar Buah 2,024
78 Batu bata merah kecil Buah 1,223
79 Batu belah 10-15 (cm) M³ 351,808
80 Batu belah 15-20 (cm) M³ 330,424
81 Batu candi M² 176,854
82 Batu gunung M³ 320,571
83 Bahan Tanah Timbunan M3 92,505
84 Bahan Pilihan M3 66,200
85 Batu kali bulat M³ 403,746
86 Batu kapur M³ 62,685
87 Batu kerikil M³ 352,000
88 Batu paras M² 153,273
89 Batu pecah 0,5 - 1 M³ 397,102
90 Batu pecah 1 - 2 M³ 440,000
91 Batu pecah 2 - 3 M³ 391,892
92 Batu pecah 3 - 5 M³ 440,000
93 Batu pecah 5 - 7 M³ 393,495
94 Batu pecah 0,5 - 1 (kg) Kg 273
95 Batu pecah 1 - 2 (kg) Kg 273
96 Batu pecah 2 - 3 (kg) Kg 273
97 Batu pecah 3 - 5 (kg) Kg 273
98 Batu pecah 5 - 7 (kg) Kg 273
99 Batu sikat M² 41,266
100 Batu teraso M³ 270,193
101 Baut Dinabold 3" Buah 531,838
102 Baut klem Buah 7,762
103 Bensin Pertalite Ltr 7,271
104 Baja Tulangan (Polos) U32 Kg 12,157
105 Baja Tulangan (Ulir) D39 Kg 13,345
106 Baja Tulangan (Ulir) D48 Kg 14,153
107 Baja Struktur Lantai Ortotropik Kg 19,695
108 Besi beton Kg 11,705
109 Besi beton Ø10mm Kg 10,349
110 Besi beton Ø12mm Kg 10,815
111 Besi beton Ø16mm Kg 11,681
112 Besi beton Ø6mm Kg 12,000
113 Besi beton Ø8mm Kg 11,282
114 Buis beton bertulang Ø 100 cm Buah 1,103,898
115 Buis beton bertulang Ø 45 cm Buah 418,655
116 Buis beton bertulang Ø 60 cm Buah 630,120
117 Buis beton bertulang Ø 80 cm Buah 869,169
118 Buis beton bertulang Ø< 45 cm Buah 454,956
119 Buis beton tak bertulang Ø 60 cm Buah 253,640
120 Besi baja CNP kg 11,198
121 Besi Baja I WF 100 x 50 x 5 x 7 mm – 12 M Kg 8,646
122 Besi Baja I WF 125 x 60 x 6 x 8 mm – 12 M Kg 8,646
123 Besi Baja I WF 148 x 100 x 6 x 9 mm – 12 M Kg 8,646
124 Besi Baja I WF 150 x 75 x 5 x 7 mm – 12 M Kg 8,646
125 Besi Baja I WF 175 x 90 x 5 x 8 mm – 12 M Kg 8,646
126 Besi Baja I WF 194 x 150 x 6 x 9 mm – 12 M Kg 8,646
127 Besi Baja I WF 198 x 99 x 4,7 x 7 mm – 12 M Kg 8,646
128 Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 12 M Kg 8,646
129 Besi Baja I WF 200 x 150 x 6,7 x 9 mm – 12 M Kg 8,646
130 Besi Baja I WF 244 x 175 x 7 x 11 mm – 12 M Kg 8,646
131 Besi Baja I WF 248 x 124 x 5 x 8 mm – 12 M Kg 8,646
132 Besi Baja I WF 250 x 125 x 6 x 9 mm – 12 M Kg 8,646
133 Besi Baja I WF 294 x 200 x 8 x 12 mm – 12 M Kg 8,646
134 Besi Baja I WF 298 x 149 x 6 x 8 mm – 12 M Kg 8,646
135 Besi Baja I WF 346 x 174 x 6 x 9 mm – 12 M Kg 8,646
136 Besi Baja I WF 350 x 175 x 7 x 11 mm – 12 M Kg 8,646
137 Besi Baja I WF 396 x 199 x 7 x 11 mm – 12 M Kg 8,646
138 Besi Baja I WF 400 x 200 x 8 x 13 mm – 12 M Kg 8,646
139 Besi Baja I WF 446 x 199 x 8 x 12 mm – 12 M Kg 8,646
140 Besi Baja I WF 450 x 200 x 9 x 14 mm – 12 M Kg 8,646
141 Besi Baja I WF 500 x 200 x 10 x 16 mm – 12 M Kg 8,646
142 Besi Baja I WF 588 x 300 x 12 x 20 mm – 12 M Kg 8,646
143 Besi Baja I WF 600 x 200 x 11 x 17 mm – 12 M Kg 8,646
144 Besi Baja I WF 700 x 300 x 13 x 24 mm – 12 M Kg 8,646
145 Besi Baja I WF 800 x 300 x 14 x 26 mm – 12 M Kg 8,646
146 Besi Baja I WF 900 x 300 x 16 x 28 x 12 M Kg 8,646
147 Besi baja IWF kg 10,050
148 Besi baut kuda-kuda Kg 16,048
149 Besi Hollow 20x40 mm t: 0,4mm m 4,667
150 Besi Hollow 20x40 mm t: 1,8mm m 7,553
151 Besi Hollow 40x40 mm t : 1,8mm m 8,597
152 Besi Hollow 100 x 100 x 3,2 mm x 6 Meter Btg 460,126
153 Besi Hollow 100 x 100 x 4,5 mm x 6 M Btg 647,110
154 Besi Hollow 125 x 125 x 3,2 mm x 6 M Btg 577,175
155 Besi Hollow 125 x 125 x 4,5 mm x 6 M Btg 811,585
156 Besi Hollow 150 x 150 x 4,5 mm x 6 M Btg 976,138
157 Besi Hollow 150 x 150 x 5 mm x 6 M Btg 1,084,571
158 Besi Hollow 40 x 40 x 2 mm x 6 Meter Btg 112,160
159 Besi Hollow 40 x 40 x 2,3 mm x 6 Meter Btg 128,848
160 Besi Hollow 50 x 50 x 2 mm x 6 Meter Btg 141,344
161 Besi Hollow 50 x 50 x 2,3 mm x 6 Meter Btg 162,534
162 Besi Hollow 50 x 50 x 2,5 mm x 6 Meter Btg 176,739
163 Besi Hollow 50 x 50 x 2,7 mm x 6 Meter Btg 194,048
164 Besi Hollow 50 x 50 x 2,8 mm x 6 Meter Btg 197,929
165 Besi Hollow 50 x 50 x 3 mm x 6 Meter Btg 212,055
166 Besi Hollow 60 x 60 x 2 mm x 6 Meter Btg 170,762
167 Besi Hollow 60 x 60 x 2,3 mm x 6 Meter Btg 196,066
168 Besi Hollow 60 x 60 x 2,5 mm x 6 Meter Btg 213,452
169 Besi Hollow 60 x 60 x 2,8 mm x 6 Meter Btg 238,834
170 Besi Hollow 60 x 60 x 3 mm x 6 Meter Btg 256,143
171 Besi Hollow 75 x 75 x 2 mm x 6 Meter Btg 214,462
172 Besi Hollow 75 x 75 x 2,3 mm x 6 Meter Btg 248,381
173 Besi Hollow 75 x 75 x 2,5 mm x 6 Meter Btg 268,019
174 Besi Hollow 75 x 75 x 3,2 mm x 6 Meter Btg 342,999
175 Besi jaring kawat baja Kg 19,650
176 Besi plat aluminium t=1mm m2 133,131
177 Besi plat baja Kg 10,329
178 Besi prestressed polos Kg 14,050
179 Besi profil kg 8,646
180 Besi strip 2 x 3 cm kg 8,843
181 Bilksem spit penangkal petir Buah 72,019
182 Bondbeam uk. 40 x 20 x20 (cm) Buah 8,646
183 Box sekering, 1 phase Buah 51,582
184 Box sekering, 2 phase Buah 40,652
185 Box sekering, 3 phase Buah 70,250
186 Box Panel PVC isi 4 MCB, merk Legran bh 66,000
187 Bubungan atap (nok) alumunium standar 40 cm, swg.22 M' 59,639
188 Bubungan atap (nok) asbes sepasang Lembar 17,563
189 Bubungan atap (nok) genteng (standar KIA) Buah 16,875
190 Bubungan atap (nok) genteng beton Buah 6,485
191 Bubungan atap (nok) genteng kodok Buah 4,176
192 Bubungan atap (nok) genteng metal berpasir M 43,722
193 Bubungan atap (nok) genteng soka Buah 4,452
194 Bubungan atap (nok) metal (biasa/ polos) M 31,932
195 Bubungan atap (nok) metal (standar Rainbow) M 31,441
196 Bubungan atap (nok) zincalume setara "Union Deck" T= 0,4 mm M 29,476
197 Chipping M3 378,146
198 Chipping (Kg) Kg 200
199 Calsiboard "IRC/ GRC" uk, 1,22 x 2,44 m Lembar 69,038
200 Calsiboard "IRC/GRC" uk, 30 cm, t = 9 mm Lembar 98,006
201 Cashing + inbow setara panasonic Set 12,282
202 Cat genteng KW I Kg 49,987
203 Cat genteng KW II Kg 57,244
204 Cat jalan (road line) Kg 29,803
205 Cat jembatan Kg 49,623
206 Cat Kayu Kg 53,240
207 Cat marka Kg 50,631
208 Cat menie Kg 36,954
209 Cat minyak Kg 49,203
210 Cat tembok (ex platon) Kg 45,771
211 Cat tembok ext (ex mowilex) Kg 82,944
212 Cat tembok in (ex mowilex) Kg 68,501
213 Cat vernis Kg 57,855
214 Closed duduk standar (Ex. America Standart) Buah 1,489,828
215 Closed Jongkok (Top inlet dan Flush 6L) Buah 2,868,958
216 Closed jongkok keramik (ex. America Standar) Buah 499,448
217 Closed jongkok porcelaint (lokal) Buah 194,594
218 Closed jongkok terraso Buah 188,578
219 Closet Duduk / Monoblock unit 1,236,010
220 Conblock tebal 6 cm (polos) M² 44,050
221 Conblock tebal 6 cm (warna) M² 47,079
222 Dempul kayu Kg 33,141
223 Dina bolt/ ramset Unit 1,651
224 Door closer Unit 242,000
225 Door holder Unit 115,446
226 Door stop Unit 20,900
227 Dop PVC Ø 50 mm Unit 36,550
228 Downlight ukuran 4" Buah 53,592
229 Downlight ukuran 5" Buah 62,524
230 Down Light / PLC 13 W Buah 62,040
231 Elastromer bearing pad Buah 982,520
232 Elektroda penghantar bumi untuk penangkal petir Buah 345,454
233 Engsel pintu kaca (pivot) stainless steel Buah 825,317
234 Engsel pintu/ jendela 3" (ex.Dexon) Buah 19,806
235 Engsel pintu/ jendela 4" (ex.Dexon) Buah 47,575
236 Engsel pintu/ jendela 5" (Ex.Dexon) Buah 73,689
237 Engsel putar jendela/ ventilasi Buah 26,430
238 Engsel Sliding door (ex.dexon) M' 394,973
239 Eternit asbes uk. 1x1 (m), tebal 4 mm M² 23,261
240 Eternit asbes uk. 1x1 (m), tebal 5 mm M² 27,019
241 Eternit asbes uk. 1x1 (m), tebal 6 mm M² 28,100
242 Exhaust Fan 10 inch (lengkap) Unit 356,655
243 Fibre Plat 0,60 x 1,20 (m) tebal 4 mm M² 12,969
244 Fibre Plat 1,20 x 2,40 (m) tebal 4 mm M² 23,089
245 Filler Kg 1,621
246 Fitting Plafond + Lampu SL, Merk Panasonic Buah 28,600
247 Floor drain (PVC) Buah 8,802
248 Floor Drain (TX 1B Ex. Toto) bh 410,080
249 Folding door/ pintu lipat M² -
250 Folding gate standar 0,4 mm m2 405,093
251 Folding gate Ukuran 0,5 mm  m² 432,309
252 Folding gate Ukuran 0,8 mm  m² 594,425
253 Formika lbr 83,514
254 Floor Deck M2 125,048
255 Gate valve/ stop kran Ø 1 ½ (inch) kuningan Buah 63,045
256 Gate valve/ stop kran Ø 1" Besi Buah 28,002
257 Gate valve/ stop kran Ø 1/2 (inch) kuningan Buah 46,752
258 Gate valve/ stop kran Ø 3/4(inch) kuningan Buah 34,204
259 Gergaji besi 34,388
260 Gergaji kayu 56,495
261 Glass bit Kg 51,284
262 Glass block 20/20 Buah 23,669
263 GRC panel dinding + rangka pipa besi M² 884,268
264 GRC rooster M² 265,608
265 Grease (minyak gemuk) Kg 28,493
266 Grendel (biasa) Buah 17,600
267 Grendel (istimewa) Buah 37,876
268 Gypsum board motif uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 93,064
269 Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 49,867
270 Gravel M3 379,957
271 Glass Bit Kg 28,415
272 Geotextile M2 29,686
273 Handle + kunci untuk pintu kusen alumunium Alumunium Set 540,386
274 Handle jendela Buah 54,653
275 Handle pintu Buah 134,200
276 Handle untuk meubeulair (furniture) + kunci Buah 8,695
277 Handle untuk pintu kaca lebar Buah 982,520
278 Hollow semi galvanis M' 19,650
279 Hook Buah 33,406
280 Huruf Stailis (ukuran t < 50 cm) cm 7,146
281 Huruf Stailis (ukuran 50 < t < 100 cm) cm 8,039
282 Isolasi bh 6,160
283 Jendela alumunium lengkap (80x120) cm Buah 736,890
284 Jendela besi M² 283,359
285 Jendela nako (kerangka + kaca 5 mm) M² 165,260
286 Kanstin UK. 0,14 x 0,20 x 0,6 m Buah 46,515
287 Kawat beton Kg 19,360
288 Kabel biasa M' 29,721
289 Kabel bulat M' 6,059
290 Kabel listrik NYY 4 x 2,5 mm² M' 47,442
291 Kabel listrik NYY 4 x 4 mm² M' 7,558
292 Kabel NYM 3x2,5 mm M' 793,254
293 Kabel NYM 4x2,5 mm M' 17,528
294 Kabel NYM 2 x 2,5 mm2 M' 522,170
295 Kabel Telephone 4 x 0,5 mm M' 275,528
296 Kabel slink M' 31,072
297 Kabel Duct (Ukuran 100 x 100 mm) M 75,922
298 Kaca bening tebal 10 mm M² 216,154
299 Kaca bening tebal 3 mm M² 93,339
300 Kaca bening tebal 5 mm M² 130,184
301 Kaca bening tebal 8 mm M² 137,553
302 Kaca buram 5 mm m2 140,679
303 Kaca Buram tebal = 12mm m2 431,416
304 Kaca cermin 8 mm m2 137,553
305 Kaca cermin tebal 3 mm M² 83,514
306 Kaca cermin tebal 5 mm M² 122,815
307 Kaca dark blue Ukuran 5 mm m² 194,539
308 Kaca dark blue Ukuran 10 mm m² 507,963
309 Kaca dark blue Ukuran 12 mm m² 540,386
310 Kaca dark blue Ukuran 6 mm m² 237,770
311 Kaca dark green Ukuran 10 mm m² 507,963
312 Kaca dark green Ukuran 12 mm m² 540,386
313 Kaca dark green Ukuran 5 mm m² 194,539
314 Kaca dark green Ukuran 6 mm m² 237,770
315 Kaca gelap (ray band) tebal 10 mm M² 21,615
316 Kaca gelap (ray band) tebal 3 mm M² 63,864
317 Kaca gelap (ray band) tebal 5 mm M² 115,937
318 Kaca gelap (ray band) tebal 8 mm M² 23,580
319 Kaca patri m2 838,090
320 Kaca polos Ukuran 10 mm m² 324,232
321 Kaca polos Ukuran 12 mm m² 378,270
322 Kaca polos Ukuran 5 mm m² 91,866
323 Kaca polos Ukuran 6 mm m² 129,693
324 Kaca polos Ukuran 8 mm m² 270,193
325 kaca rayban Ukuran 5 mm m² 129,693
326 Kaca rayban Ukuran 6 mm m² 237,770
327 Kaca Wireglassed tebal = 5mm m2 559,054
328 Kain kassa Kg 18,471
329 Kait angin biasa Buah 10,032
330 Kait angin istimewa Buah 15,720
331 Kanstin Uk. 0,14x0,20x0,6 m Bh 39,301
332 Kapur bakar M³ 69,602
333 Kapur sirih Kg 25,603
334 Karpet talang, lebar 0,60 m' M' 9,731
335 Kawat berduri Kg 97,668
336 Kawat bronjong Kg 15,426
337 Kawat harmonika M² 30,000
338 Kawat kassa/ kawat loket M² 21,405
339 Kawat Las Listrik Kg 40,676
340 Kawat nyamuk logam M² 23,335
341 Kawat nyamuk plastik M² 16,412
342 Kawat seng Kg 20,895
343 Kayu bakar M³ 78,209
344 Kayu dolken Ø8-10 (cm) panjang 4 m Batang 4,400
345 Kayu cerucuk Batang 17,336
346 Kayu gergajian kelas I, balok M³ 3,188,008
347 Kayu gergajian kelas I, papan M³ 3,110,530
348 Kayu gergajian kelas II, balok M³ 2,483,612
349 Kayu gergajian kelas II, papan M³ 2,671,939
350 Kayu gergajian kelas III, balok M³ 2,319,090
351 Kayu gergajian kelas III, papan M³ 2,231,214
352 Kayu gergajian kelas IV, balok M³ 2,120,658
353 Kayu gergajian kelas IV, papan M³ 1,970,623
354 Kayu untuk konstruksi jembatan M³ 2,692,998
355 Kayu untuk perancah M³ 1,524,778
356 Kayu Acuan M3 1,591,875
357 Kaca Axrilix Cutting Biasa M2 259,028
358 Kabel Duct (Ukuran 100 x 100 mm) M 75,922
359 Kepek Buah 4,667
360 Keramik 10x20 (cm) gelap M² 33,528
361 Keramik 10x20 (cm) polos M² 29,476
362 Keramik 10x20 (cm) terang M² 44,213
363 Keramik 20 x 20 cm (Polos) m' 54,530
364 Keramik 20x20 (cm) corak M² 58,665
365 Keramik 20x20 (cm) polos M² 50,727
366 Keramik 20x25 (cm) corak M² 58,118
367 Keramik 20x25 (cm) polos M² 54,456
368 Keramik 30x30 (cm) corak M² 56,331
369 Keramik 30x30 (cm) polos M² 52,172
370 Keramik 40x40 (cm) corak M² 62,175
371 Keramik 40x40 (cm) polos M² 51,333
372 Keramik 50x50 (cm) polos M² 88,427
373 Keramik 60x60 (cm) anti slip M² 157,203
374 Keramik 60x60 (cm) putih/ berwarna M² 88,427
375 Keramik KM/WC antislip 20x20 (cm) M² 57,267
376 Keramik Granit 60x60 (cm) putih/berwarna M2 178,283
377 Keramik 60x60 (cm) Polos M2 138,600
378 Keramik Granit 80x80 (cm) putih/berwarna M2 264,556
379 Keramik Granit 80x80 (cm) Polos M2 234,521
380 Keramik Diffabel 30/30cm Buah 16,524
381 Kitchen Zink (Hwaco 1L) Unit 190,696
382 Kloset Duduk (CW 600 J/SW 660 J Komplit Acc Unit 3,845,600
383 Kloset Jongkok type CE 6 Ex. Toto Unit 568,920
384 Knee/ elbow PVC 1 (inch) Buah 4,645
385 Knee/ elbow PVC 1/2 (inch) Buah 2,684
386 Knee/ elbow PVC 3/4(inch) Buah 3,193
387 Kompon sak 72,461
388 Kompon gypsum Kg 37,061
389 Kran air Ø 0,5 (inch) steel Buah 64,846
390 Kran air Ø 0,75 (inch) Steel Buah 35,043
391 Kran air Ø 1,5 (inch) Steel Buah 24,158
392 Kran Zink (T 30 AR13NV7N Ex. Toto) Buah 476,960
393 Kran Dinding Type T 23 B13V7N Ex. Toto Buah 302,720
394 Kuas Buah 24,809
395 Kuku keramik 2,5 x 10 cm m' 14,738
396 Kuku keramik 2,5 x 8 cm m' 8,351
397 Kunci antik set 430,522
398 Kunci jendela (ex.dexon) Set 25,546
399 Kunci KM set 92,223
400 Kunci pintu tanam (ex.dexon) Set 185,328
401 Kunci pintu tanam (istimewa) (ex.dexon) Set 168,011
402 Kunci pintu untuk meubeulair (furniture) (ex.dexon) Set 176,854
403 Kunci Selot Buah 17,424
404 Kunci silinder Buah 54,709
405 Kunci tanam Buah 160,888
406 Kusen Alumunium 3 inch Coklat m' 81,058
407 Kusen Alumunium 3 inch hitam m' 81,058
408 Kusen Alumunium 3 inch silver m' 59,442
409 Kusen Alumunium 4 inch Coklat m' 91,866
410 Kusen Alumunium 4 inch hitam m' 91,866
411 Kusen Alumunium 4 inch silver m' 81,058
412 Kusen pintu/ jendela alumunium 3" M' 78,602
413 Kusen pintu/ jendela alumunium 3" (warna gelap) M' 93,339
414 Kusen pintu/ jendela alumunium 4" M' 78,602
415 Kusen pintu/ jendela alumunium 4" (warna gelap) M' 117,902
416 Kusen, pintu fiber Unit 231,547
417 Lampu Baret 32 Watt (Lengkap) Pcs 192,574
418 Lampu Downlight 18 Watt (Lengkap) Pcs 56,495
419 Lampu LED Philips 10 watt Pcs 99,726
420 Lampu LED Philips 13 watt (Yellow) Pcs 112,990
421 Lampu LED Philips 7 watt Pcs 63,373
422 Lampu LED Philips 9 watt Pcs 83,023
423 Lampu LED Philips12 watt Pcs 118,885
424 Lampu SL bulat 10 W + aksesories Titik 106,436
425 Lampu SL bulat 20 W + aksesories Titik 136,266
426 Lampu taman 20 W + aksesories Titik 153,214
427 Lampu taman triple 20 W + aksesories Titik 309,494
428 Lampu TL 20 W + aksesories Titik 118,610
429 Lampu TL 2x18 W + aksesories type RM Titik 221,067
430 Lampu TL 40 W + aksesories Titik 158,677
431 Lampu TL 2 x 18 Watt Grille, Merk Panasonic bh 220,000
432 Lampu TL 2 x 36 Watt Grille, Merk Panasonic bh 286,000
433 Langit-langit accoustic board/ tile uk. 0,30x0,30 (m) M² 39,006
434 Langit-langit accoustic board/ tile uk. 0,30x0,60 (m) M² 47,161
435 Langit-langit accoustic board/ tile uk. 0,60x1,20x0,14 (m) M² 53,351
436 Langit-langit accoustic board/ tile uk. 0,60x1,20x0,15 (m) M² 60,425
437 Lem (standar aica aibond) Kg 27,838
438 Lem (standar Fox)/ perekat Kg 22,794
439 Lem kayu Kg 31,533
440 List gypsum m' 21,569
441 List gypsum sedang M' 21,569
442 List kayu profil m' 35,207
443 List lebar 10 - 12 cm m' -
444 List lebar 13- 15 cm m' -
445 Listplank GRC m' 17,030
446 Lolos screen1 ukuran ( 0 - 5) M3 453,545
447 Lolos screen2 ukuran ( 0 - 5) M3 453,545
448 Lolos screen2 ukuran ( 5 - 9,5) M3 453,545
449 Lolos screen2 ukuran ( 9.5 - 19,0) M3 443,909
450 Marmer 100 x 100 cm m2 245,630
451 MCB 6 A, Merk Legran bh 57,200
452 MCB 4 A, Merk Legran bh 63,067
453 Meter box (terpasang) Titik 208,540
454 Minyak bekisting Liter 8,800
455 Minyak pelarut/ pengencer cat (solvent) Liter 11,210
456 Kerosen / Minyak Tanah Liter 10,680
457 Minyak pelumas (oli) Liter 28,055
458 Multiplek + Fin. Deco sheet Lembar 2,751,056
459 Multiplek tebal 12 mm 4x8 (inch) Lembar 172,432
460 Multiplek tebal 15 mm 4x8 (inch) Lembar 225,161
461 Multiplek tebal 18 mm 4x8 (inch) Lembar 261,070
462 Multiplek tebal 6 mm 1,22 x 2,44 (m) Lembar 85,569
463 Multiplek tebal 9 mm 4x8 (inch) Lembar 126,827
464 Outlet TV, Merk Broco bh 50,160
465 Outlet Telephone, Merk Broco bh 48,400
466 Paku anti karat Kg 40,283
467 Paku asbes Kg 20,465
468 Paku berbagai ukuran (1/2"-1") Kg 22,301
469 Paku berbagai ukuran (2"-5") Kg 15,213
470 Paku jembatan Kg 18,007
471 Paku kait Kg 29,476
472 Paku sekrup (kg) Kg 43,231
473 Paku sekrup 1 cm -2,5 cm Kg 23,253
474 Paku seng Kg 20,843
475 Paku tembok Kg 46,298
476 Panel listrik/ MCB, 1 fase Buah 108,077
477 Panel listrik/ MCB, 2 fase Buah 135,097
478 Panel listrik/ MCB, 3fase Buah 162,116
479 Panel listrik/ MCB, 4 fase Buah 189,135
480 Parquette lantai M² 102,673
481 Pasir beton M³ 132,000
482 Pasir beton (Kg) Kg 73
483 Pasir pasang M³ 132,000
484 Pasir urug (ada unsur lempung) M³ 78,412
485 Pasir urug/timbun M3 62,857
486 Pasir halus (untuk HRS) M3 91,810
487 Pelitur Jadi Ltr 57,477
488 Pintu alumunium corak untuk WC (80x200)cm Buah 749,172
489 Pintu alumunium full kaca untuk WC (80x200)cm 1,473,780
490 Pintu alumunium polos untuk WC (80x200)cm Buah 424,449
491 Pintu fiber PVC (70x200) wc corak Buah 327,507
492 Pintu fiber PVC (70x200) wc polos Buah 215,991
493 Pintu fiber PVC (75x200) wc corak Buah 368,445
494 Pintu fiber PVC (75x200) wc polos Buah 218,611
495 Pintu fiber PVC (80x200) wc corak Buah 263,643
496 Pintu fiber PVC (80x200) wc polos Buah 217,792
497 Pintu fiber PVC RRC (80x200) wc kaca import 736,890
498 Pipa besi galvanis Ø 0,5 (inch)/1,8mm M' 27,938
499 Pipa besi galvanis Ø 0,75 (inch)/1,8mm M' 33,988
500 Pipa besi galvanis Ø 1 (inch)/1,8mm M' 37,475
501 Pipa besi galvanis Ø 1,25 (inch)/1,8mm M' 48,669
502 Pipa besi galvanis Ø 1,5 (inch)/1,8mm M' 66,447
503 Pipa besi galvanis Ø 2 (inch)/1,8mm M' 76,487
504 Pipa besi galvanis Ø 3 (inch) t=4 mm M' 125,576
505 Pipa besi galvanis Ø 4 (inch)/1,8mm M' 126,665
506 Pipa besi galvanis Ø 0,5 (inch)/2,6mm M' 43,906
507 Pipa besi galvanis Ø 0,75 (inch)/2,3mm M' 53,592
508 Pipa besi galvanis Ø 1 (inch)/2,7mm M' 69,921
509 Pipa besi galvanis Ø 1,25 (inch)/3,1mm M' 83,738
510 Pipa besi galvanis Ø 1,5 (inch)/3,1mm M' 85,273
511 Pipa besi galvanis Ø 2 (inch)/3,6mm M' 116,691
512 Pipa besi galvanis Ø 3 (inch) t=4 /3,8mm M' 153,061
513 Pipa besi galvanis Ø 4 (inch)/4mm M' 242,057
514 Pipa besi Ø 1 (inch)/1,7mm M' 80,770
515 Pipa besi Ø 1,25 (inch)1,7mm M' 26,870
516 Pipa besi Ø 1,5 (inch)1,7mm M' 30,844
517 Pipa besi Ø 2 (inch)1,7mm M' 42,161
518 Pipa besi Ø 1 (inch) M' 17,165
519 Pipa besi Ø 1,25 (inch) M' 25,850
520 Pipa besi Ø 1,5 (inch) M' 24,971
521 Pipa besi Ø 2 (inch) M' 49,791
522 Pipa beton Ø 20 cm, panjang 1m' Buah 85,119
523 Pipa beton Ø 60 cm, panjang 1m' Buah 141,055
524 Pipa HDPE dia. 110 mm m' 123,306
525 Pipa HDPE dia. 125mm m' 159,660
526 Pipa HDPE dia. 140 mm m' 198,960
527 Pipa HDPE dia. 200 mm m' 406,763
528 Pipa HDPE dia. 250 mm m' 634,217
529 Pipa HDPE dia. 280 mm m' 793,876
530 Pipa HDPE dia. 400 mm m' 1,619,684
531 Pipa HDPE dia. 450 mm m' 2,051,502
532 Pipa HDPE dia. 500 mm m' 2,530,775
533 Pipa HDPE dia. 560 mm m' 3,170,101
534 Pipa HDPE dia. 63 mm m' 41,069
535 Pipa HDPE dia. 800 mm m' 5,133,667
536 Pipa HDPE dia.1000 mm m' 8,026,304
537 Pipa HDPE dia.900 mm m' 6,466,161
538 Pipa PVC Ø 1 (inch) AW, panjang 4 m M' 11,037
539 Pipa PVC Ø 1,5(inch) AW, panjang 4 m M' 16,751
540 Pipa PVC Ø 2 (inch) AW, panjang 4 m M' 22,000
541 Pipa PVC Ø 3 (inch) AW, panjang 4 m M' 42,350
542 Pipa PVC Ø 4-6 (inch) AW, panjang 4 m M' 53,306
543 Pipa PVC Ø1/2 (inch) AW, panjang 4 m M' 5,977
544 Pipa PVC Ø3/4 (inch) AW, panjang 4 m M' 7,957
545 Pipa PVC RRJ Ø 63 M' 27,003
546 Pipa PVC RRJ Ø 90 M' 53,295
547 Pipa PVC RRJ Ø 110 M' 75,702
548 Pipa PVC RRJ Ø 160 M' 167,661
549 Pipa PVC RRJ Ø 200 M' 233,572
550 Pipa PVC RRJ Ø 250 M' 305,036
551 Pipa PVC RRJ Ø 315 M' 780,313
552 Pipa PVC RRJ Ø 400 M' 1,323,127
553 Pipa PVC RRJ Ø 500 M' 2,057,768
554 Pipa PVC RRJ Ø 630 M' 3,332,871
555 Plafon PVC t = 0,8 mm Keping 45,553
556 Plamir tembok Kg 40,365
557 Plamir kayu Kg 42,533
558 Plint Keramik 10 x 30 cm (Motif) Bh 13,755
559 Plint Keramik 10 x 30 cm (Polos) Bh 7,860
560 Plint Keramik 10 x 60 cm biasa Bh 24,563
561 Plint Keramik 10 x 60 cm Step Nose Bh 33,406
562 Plint keramik 10x40 Cm ( polos) Bh 3,208
563 Plint keramik 10x40 Cm (motif) Bh 13,755
564 Plint keramik 10x60 (granit) Bh 24,563
565 Plint keramik 10x60 Bh 11,550
566 Plint Keramik 60 x 30 cm Step nose Bh 49,126
567 Plywood uk. 0,30 x 0,60 (m), tebal 4 mm Lembar 51,484
568 Plywood uk. 0,30 x 0,60 (m), tebal 6 mm Lembar 55,512
569 Plywood uk. 0,30 x 1,20 (m), tebal 4 mm Lembar 54,530
570 Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar 80,567
571 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm Lembar 78,356
572 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 140,500
573 Pompa air (dengan otomatis) Buah 744,259
574 Pompa air (jet pump) Buah 2,640,000
575 Pompa air (non otomatis) Buah 578,213
576 Porcelaint uk. 11x 11 cm Buah 1,179
577 Profil kaca M' 5,895
578 Railing tangga stainless steel pipa dia. 2" dan 1" M' 1,026,733
579 Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize + genteng M² 211,242
metal
580 Rangka/ Frame accoustic board- wall angle M' 43,231
581 Rangka/ Frame accoustic board-cross tee M' 32,227
582 Rangka/ Frame accoustic board-main tee M' 39,104
583 Rangka/ Frame accoustic board-rod/ adjustable dia. 4mm M' 18,570
584 Reducer PVC dari 1/2 (inch) ke 1 (inch) Buah 3,548
585 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) Buah 3,111
586 Reducer PVC dari 3/4 (inch) ke 1 (inch) Buah 4,367
587 Rell pintu dorong set 240,717
588 Reng Taso 32.45 Btg 38,318
589 Residu atau ter Liter 53,154
590 Roll cat Buah 31,909
591 Rolling door tebal 0,4 mm (PVC) M² 245,630
592 Rolling door Ukuran 0,4 mm (besi) m² 189,135
593 Rolling door Ukuran 0,8 mm (aluminium) m² 378,270
594 Rolling door Ukuran 1 mm (aluminium) m² 432,309
595 Rolling door-alumunium tebal 0,6 mm M² 364,073
596 Rolling door-Galvalum tebal 0,4 mm M² 353,707
597 Rolling door-alumunium tebal 0,8 mm m² 378,270
598 Rooflight fibreglass uk. 1,8 x 0,9 (m) Buah 86,953
599 Rooster block uk. 12x11x24 (cm) Buah 7,172
600 Rooster block uk. 20x20 (cm) Buah 13,264
601 Rooster keramik 20x20 (cm) Buah 36,845
602 Rooster keramik 30x30 (cm) Buah 49,617
603 Rubber bearing (60x30x4) cm Buah 707,414
604 Sabun Kg 19,650
605 Saklar double Buah 17,931
606 Saklar Double (broco) Buah 19,650
607 Saklar engkel Buah 19,650
608 Saklar tunggal Buah 14,017
609 Saklar tunggal (broco) Buah 16,500
610 Saklar Ganda, Merk Broco Buah 23,320
611 Seal tape bh 3,813
612 Sealant Tube 34,143
613 Semen Mortar Kg 6,563
614 Semen Portland Kg 1,232
615 Semen putih Kg 11,678
616 Semen warna (sika graut) Kg 13,200
617 Seng BJLS 30 lebar 45 cm M' 14,738
618 Seng fibreglass Lembar 60,916
619 Seng gelombang uk. 1,50 x 0,90 (m) Lembar 44,213
620 Seng gelombang uk. 1,80 x 0,90 (m) Lembar 53,056
621 Seng gelombang uk. 2,10 x 0,90 (m) Lembar 61,899
622 Seng gelombang uk. 2,40 x 0,90 (m) Lembar 70,741
623 Seng gelombang uk. 2,70 x 0,90 (m) Lembar 79,584
624 Seng gelombang uk. 3,00 x 0,90 (m) Lembar 88,427
625 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 39,301
626 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) Lembar 49,126
627 Seng Plat BJLS 30 Lembar 57,200
628 Sherra block Buah 1,769
629 Shower + Stop kran Set 79,830
630 Shower bad Hot and cool Set 550,211
631 Shower bidet Buah 216,154
632 Shower mandi Buah 157,449
633 Shower Spray type THX 20 NBPIV Ex. Toto Unit 274,560
634 Shower Set Type TX 423 SZ Ex. Toto Unit 906,400
635 Sikat baja Buah 11,135
636 Siku 100 x 100 x 10 mm – 6 M Kg 8,646
637 Siku 100 x 100 x 11 mm – 6 M Kg 8,646
638 Siku 100 x 100 x 8 mm – 6 M Kg 8,646
639 Siku 120 x 120 x 12 mm – 6 M Kg 8,646
640 Siku 125 x 125 x 12 mm – 6 M Kg 8,646
641 Siku 130 x 130 x 12 mm – 6 M Kg 8,646
642 Siku 130 x 130 x 9 mm – 6 M Kg 8,646
643 Siku 150 x 150 x 12 mm – 6 M Kg 8,646
644 Siku 150 x 150 x 15 mm – 6 M Kg 8,646
645 Siku 20 x 20 x 3 mm – 6 M kg 8,646
646 Siku 20 x 20 x 3 mm – 6 M Kg 8,646
647 Siku 200 x 200 x 15 mm – 6 M Kg 8,646
648 Siku 200 x 200 x 16 mm – 6 M Kg 8,646
649 Siku 200 x 200 x 20 mm – 6 M Kg 8,646
650 Siku 200 x 200 x 25 mm – 6 M Kg 8,646
651 Siku 25 x 25 x 3 mm – 6 M kg 8,646
652 Siku 25 x 25 x 3 mm – 6 M Kg 8,646
653 Siku 250 x 250 x 25 mm – 6 M Kg 8,646
654 Siku 30 x 30 x 3 mm – 6 M kg 8,646
655 Siku 30 x 30 x 3 mm – 6 M Kg 8,646
656 Siku 40 x 40 x 3 mm – 6 M kg 8,646
657 Siku 40 x 40 x 3 mm – 6 M Kg 8,646
658 Siku 40 x 40 x 4 mm – 6 M kg 8,646
659 Siku 40 x 40 x 4 mm – 6 M Kg 8,646
660 Siku 40 x 40 x 5 mm – 6 M kg 8,646
661 Siku 40 x 40 x 5 mm – 6 M Kg 8,646
662 Siku 45 x 45 x 4 mm – 6 M kg 8,646
663 Siku 45 x 45 x 4 mm – 6 M Kg 8,646
664 Siku 45 x 45 x 5 mm – 6 M kg 8,646
665 Siku 45 x 45 x 5 mm – 6 M Kg 8,646
666 Siku 50 x 50 x 4 mm – 6 M kg 8,646
667 Siku 50 x 50 x 4 mm – 6 M Kg 8,646
668 Siku 50 x 50 x 5 mm – 6 M kg 8,646
669 Siku 50 x 50 x 5 mm – 6 M Kg 8,646
670 Siku 50 x 50 x 6 mm – 6 M kg 8,646
671 Siku 50 x 50 x 6 mm – 6 M Kg 8,646
672 Siku 60 x 60 x 5 mm – 6 M kg 8,646
673 Siku 60 x 60 x 5 mm – 6 M Kg 8,646
674 Siku 60 x 60 x 6 mm – 6 M kg 8,646
675 Siku 60 x 60 x 6 mm – 6 M Kg 8,646
676 Siku 65 x 65 x 6 mm – 6 M kg 8,646
677 Siku 65 x 65 x 6 mm – 6 M Kg 8,646
678 Siku 70 x 70 x 6 mm – 6 M kg 8,646
679 Siku 70 x 70 x 6 mm – 6 M Kg 8,646
680 Siku 70 x 70 x 7 mm – 6 M kg 8,646
681 Siku 70 x 70 x 7 mm – 6 M Kg 8,646
682 Siku 75 x 75 x 6 mm – 6 M kg 8,646
683 Siku 75 x 75 x 6 mm – 6 M Kg 8,646
684 Siku 75 x 75 x 7 mm – 6 M kg 8,646
685 Siku 75 x 75 x 7 mm – 6 M Kg 8,646
686 Siku 75 x 75 x 8 mm – 6 M kg 8,646
687 Siku 75 x 75 x 8 mm – 6 M Kg 8,646
688 Siku 75 x 75 x 9 mm – 6 M kg 8,646
689 Siku 75 x 75 x 9 mm – 6 M Kg 8,646
690 Siku 80 x 80 x 6 mm – 6 M Kg 8,646
691 Siku 80 x 80 x 8 mm – 6 M Kg 8,646
692 Siku 90 x 90 x 10 mm – 6 M Kg 8,646
693 Siku 90 x 90 x 8 mm – 6 M Kg 8,646
694 Siku 90 x 90 x 9 mm – 6 M Kg 8,646
695 Sirtu M³ 132,219
696 Skrup fixer Buah 2,063
697 Slot jendela Buah 24,563
698 Slot pintu Buah 21,124
699 Slot Tanam Buah 74,800
700 Slot ventilasi/ bouwvenlight Buah 4,323
701 Socket PVC Ø 1 (inch) Buah 4,210
702 Socket PVC Ø 1/2 (inch) Buah 2,675
703 Socket PVC Ø 3/4 (inch) Buah 4,232
704 Soda api Kg 17,115
705 Solar Ltr 8,575
706 Petralite Ltr 7,012
707 Spandeck zincalum setara " Union Deck", T=0,4 mm M' 59,934
708 Spring knip Buah 19,061
709 Stone Coating Kg 49,617
710 Stop Kontak + Saklar (broco) Buah 24,563
711 Stop Kontak AC (broco) Buah 45,196
712 Stop kontak ganda/ tiga Buah 24,563
713 Stop kontak lantai Buah 324,232
714 Stop kontak saklar Buah 11,790
715 Stop kontak tunggal Buah 19,650
716 Stop kontak untuk AC Buah 68,776
717 Stop kontak+ instalasi Titik 152,291
718 Stop kontak, Merk Broco bh 15,253
719 Stop Kran dia. 1” Ex. Onda bh 25,872
720 sunscreen alumunium M² 1,473,780
721 T Dus (listrik) Buah 2,456
722 Tanah puru M3 62,857
723 Tangki air fiberglass (oranye) 1000 liter Buah 1,364,000
724 Tangki air fiberglass (oranye) 2000 liter Buah 3,000,507
725 Tangki air fiberglass (oranye) 3000 liter Buah 3,733,576
726 Tangki air fiberglass (oranye) 500 liter Buah 854,333
727 Tangki air/ hydrant umum fiberglass 1000 liter Buah 1,371,598
728 Tangki air/ hydrant umum fiberglass 2000 liter Buah 2,677,367
729 Tangki air/ hydrant umum fiberglass 3000 liter Buah 6,779,388
730 Tangki air/ hydrant umum fiberglass 6000 liter (horizontal) Buah 20,632,920
731 Tangki air/ hydrant umum polyethylene 1000 liter Buah 1,326,402
732 Tangki air/ hydrant umum polyethylene 2000 liter Buah 2,677,367
733 Tangki air/ hydrant umum polyethylene 3000 liter Buah 6,779,388
734 Tangki air/ hydrant umum polyethylene 4000 liter Buah 20,632,920
735 Tangki air/ hydrant umum polyethylene 500 liter Buah 2,529,989
736 Tangki air/ hydrant umum polyethylene 5000 liter Liter 1,866,788
737 Teak oil Lembar 236
738 Teak wood 0,30 x 0,60 (m), tebal 4 mm Lembar 50,895
739 Teakwood 0,90 x 2,10 (m), tebal 4 mm Lembar 81,058
740 Teakwood 1,20 x 2,40 (m), tebal 4 mm Unit 97,269
741 Tee all socket PVC Ø 100 x 50 (mm) Unit 438,695
742 Tee all socket PVC Ø 225 x 100 (mm) Unit 438,695
743 Tee all socket PVC Ø 50 x 50 (mm) Unit 221,067
744 Tee all socket PVC Ø 80 x 50 (mm) Kg 442,134
745 Tempat Sabun (S 11 N Ex. Toto) bh 94,160
746 Ter lubang 54,694
747 Teralis jendela (60x120) cm lubang 294,756
748 Teralis pintu (90x200) cm M³ 736,890
749 Triplek tebal 2,5 mm uk. 1,22 x 2,44 (m) Lembar 51,333
750 Triplek tebal 4 mm uk. 1,22 x 2,44 (m) Lembar 67,173
751 Triplek tebal 6 mm uk. 1,22 x 2,44 (m) lbr 101,200
752 Triplek tebal 9 mm (uk. 120x240) cm lbr 108,973
753 Thinner Liter 25,696
754 Ubin abu-abu 20 x 20 (cm) Buah 6,386
755 Ubin berwarna 20 x 20 (cm) Buah 8,646
756 Ubin motif (mozaik) M² 109,354
757 Ubin wafel Buah 6,386
758 Kaca dark blue Ukuran 8 mm m² 486,347
759 Kaca dark green Ukuran 8 mm m² 486,347
760 Kaca rayban Ukuran 8 mm m² 378,270
761 Urinoir Unit 933,394
762 Urinoir Type U 57 M ex. Toto Unit 3,185,600
763 UNP (100 mm x 6 m) Batang 754,754
764 Venetion blinds M² 79,486
765 Vertical blinds M² 62,144
766 Wallpapaer bermotif M² 43,501
767 Wallpaper polos M² 37,287
768 wastafel Set 810,579
769 Wastafel Ex.American standart (Kecil) Unit 292,300
770 Wastafel Ex.American standart (Sedang) Unit 343,882
771 Wastafel (LW 240 CJ, Ex. Toto, Komplit Kran & Acc) Unit 2,204,400
772 Water drain + Assesories Set 19,650
773 Water meter dia 1" + pipa gip Unit 491,260
774 Water Profing Aquatex Kg 129,693
775 Water Profing Nodrop Kg 42,494
776 Water Profing ultraprof Kg 38,318
777 Wiremesh M5 Kg 9,626
778 Wiremesh M6 Kg 9,626
779 Wiremesh M7 Kg 9,626
780 Wiremesh M8 Kg 9,626
781 Wiremesh M9 Kg 9,626
782 Wiremesh M10 Kg 9,626
783 Wiremesh Kg 9,626
784 Wood Filler Kg 45,467
-
III. ALAT BERAT -
1 ASPHALT MIXING PLANT Jam 5,577,382
2 ASPHALT FINISHER Jam 661,611
3 POWER BROOM Jam 60,053
4 BULLDOZER 100-150 HP Jam 504,945
5 COMPRESSOR 4000-6500 L\M Jam 116,484
6 CONCRETE MIXER 0.3-0.6 M3 Jam 100,517
7 CRANE 10-15 TON Jam 246,832
8 DUMP TRUCK 3 - 4 M3 Jam 194,691
9 DUMP TRUCK 6-10 M3 Jam 271,345
10 EXCAVATOR 80-140 HP Jam 396,000
11 EXCAVATOR MINI Jam 264,000
12 EXCAVATOR LONG ARM Jam 660,000
13 FLAT BED TRUCK 3-4 TON Jam 236,897
14 GENERATOR SET Jam 244,132
15 MOTOR GRADER >100 HP Jam 453,667
16 TRACK LOADER 75-100 HP Jam 293,023
17 WHEEL LOADER 1.0-1.6 M3 Jam 398,726
18 THREE WHEEL ROLLER 6-8 T Jam 244,777
19 TANDEM ROLLER 6-8 T. Jam 199,302
20 TIRE ROLLER 8-10 T. Jam 374,563
21 VIBRATORY ROLLER 5-8 T. Jam 286,633
22 CONCRETE VIBRATOR Jam 57,819
23 STONE CRUSHER Jam 529,474
24 WATER PUMP 70-100 mm Jam 54,477
25 WATER TANKER 3000-4500 L. Jam 190,597
26 PEDESTRIAN ROLLER Jam 69,520
27 TAMPER PLATE Jam 56,763
28 JACK HAMMER Jam 54,603
29 FULVI MIXER Jam 477,715
30 CONCRETE PUMP Jam 199,343
31 TRAILER 20 TON Jam 258,211
32 PILE DRIVER + HAMMER Jam 127,296
33 CRANE ON TRACK 35 TON Jam 363,840
34 WELDING SET Jam 63,981
35 BORE PILE MACHINE Jam 651,830
36 PONTON SUPPORT Bulan 44,000,000
37 PONTON Bulan 44,000,000
A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.012 2,319,089.59 27,829.08
Paku berbagai ukuran (2"-5") Kg 0.020 15,213.43 304.27
Kayu gergajian kelas III, papan m3 0.007 2,231,213.60 15,618.50
JUMLAH HARGA BAHAN 43,751.84
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 74,751.84
E. Profit 15% * D 11,212.78
F. Harga Satuan Pekerjaan (D+E) 85,964.61
A.1.5.1 HARGA SATUAN PEKERJAAN TANAH

A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 120,000.00 90,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 95,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,000.00
E. Profit 15% * D 14,250.00
F. Harga Satuan Pekerjaan (D+E) 109,250.00

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 120,000.00 60,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 70,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,000.00
E. Profit 15% * D 10,500.00
F. Harga Satuan Pekerjaan (D+E) 80,500.00

Pengurugan kembali 1 m3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,416.67


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 44,850.00
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 53,436.67
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 48,453.33
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 73,600.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 58,650.00

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 38,000.00
B. BAHAN
Pasir urug/Timbun m3 1.200 62,857.14 75,428.57
JUMLAH HARGA BAHAN 75,428.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 113,428.57
E. Profit 15% * D 17,014.29
F. Harga Satuan Pekerjaan (D+E) 130,442.86
A.3.1.1 HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.2.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 351,327.27 421,592.72
Semen portland kg 163.000 1,232.00 200,816.00
Pasir pasang m3 0.520 132,000.00 68,640.00
JUMLAH HARGA BAHAN 691,048.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,021,048.72
E. Profit 15% * D 153,157.31
F. Harga Satuan Pekerjaan (D+E) 1,174,206.03
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 276.0000 1,232.00 340,032.00
Pasir beton (Kg) kg 828.0000 73.33 60,720.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 272.93 276,201.31
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 690,155.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 954,355.92
E. Profit 15% *D 143,153.39
F. Harga Satuan Pekerjaan (D+E) 1,097,509.31

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 352.0000 1,232.00 433,664.00
Pasir beton (Kg) kg 731.0000 73.33 53,606.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 272.93 281,386.90
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 781,860.18
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,060.18
E. Profit 15% *D 156,909.03
F. Harga Satuan Pekerjaan (D+E) 1,202,969.21
A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 120,000.00 8,400.00
Tukang Besi L.02 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.0070 200,000.00 1,400.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 21,800.00
B. BAHAN
Besi beton kg 10.5000 11,705.43 122,907.04
Kawat beton kg 0.1500 19,360.00 2,904.00
JUMLAH HARGA BAHAN 125,811.04
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 147,611.04
E. Profit 15% *D 22,141.66
F. Harga Satuan Pekerjaan (D+E) 169,752.70

A. 4.1.1.19. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
Kepala Tukang L.03 OH 0.0260 200,000.00 5,200.00
Mandor L.04 OH 0.0260 200,000.00 5,200.00
JUMLAH TENAGA KERJA 114,400.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 2,319,089.59 104,359.03
Paku berbagai ukuran (2"-5") kg 0.3000 15,213.43 4,564.03
Minyak bekisting liter 0.1000 8,800.00 880.00
JUMLAH HARGA BAHAN 109,803.06
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 224,203.06
E. Profit 15% *D 33,630.46
F. Harga Satuan Pekerjaan (D+E) 257,833.52

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0150 2,483,612.42 37,254.19
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00
JUMLAH HARGA BAHAN 191,052.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 336,252.58
E. Profit 15% *D 50,437.89
F. Harga Satuan Pekerjaan (D+E) 386,690.46

A. 4.1.1.21. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0180 2,483,612.42 44,705.02
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00
JUMLAH HARGA BAHAN 198,503.41
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 343,703.41
E. Profit 15% *D 51,555.51
F. Harga Satuan Pekerjaan (D+E) 395,258.93
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1320 120,000.00 15,840.00
Tukang Batu L.02 OH 0.0220 160,000.00 3,520.00
Kepala Tukang L.03 OH 0.0020 200,000.00 400.00
Mandor L.04 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 21,160.00
B. BAHAN
Semen portland kg 26.0800 1,232.00 32,130.56
Pasir beton (Kg) kg 60.8000 73.33 4,458.67
Batu pecah 1 - 2 (Kg) kg 82.3200 272.93 22,467.28
Air ltr 17.2000 61.41 1,056.21
JUMLAH HARGA BAHAN 60,112.72
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 81,272.72
E. Profit 15% *D 12,190.91
F. Harga Satuan Pekerjaan (D+E) 93,463.63

A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 120,000.00 19,800.00
Tukang Batu L.02 OH 0.0280 160,000.00 4,480.00
Kepala Tukang L.03 OH 0.0030 200,000.00 600.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 26,480.00
B. BAHAN
Semen portland kg 32.6000 1,232.00 40,163.20
Pasir beton (Kg) kg 76.0000 73.33 5,573.33
Batu pecah 1 - 2 (Kg) kg 102.9000 272.93 28,084.11
Air ltr 21.5000 61.41 1,320.26
JUMLAH HARGA BAHAN 75,140.90
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 101,620.90
E. Profit 15% *D 15,243.13
F. Harga Satuan Pekerjaan (D+E) 116,864.03

A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 120,000.00 23,760.00
Tukang Batu L.02 OH 0.0330 160,000.00 5,280.00
Kepala Tukang L.03 OH 0.0030 200,000.00 600.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 31,640.00
B. BAHAN
Semen portland kg 32.1200 1,232.00 39,571.84
Pasir beton (Kg) kg 91.2000 73.33 6,688.00
Batu pecah 1 - 2 (Kg) kg 123.4800 272.93 33,700.93
Air ltr 25.8000 61.41 1,584.31
JUMLAH HARGA BAHAN 81,545.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 113,185.08
E. Profit 15% *D 16,977.76
F. Harga Satuan Pekerjaan (D+E) 130,162.84

A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 120,000.00 29,760.00
Tukang Batu L.02 OH 0.0410 160,000.00 6,560.00
Kepala Tukang L.03 OH 0.0040 200,000.00 800.00
Mandor L.04 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 39,720.00
B. BAHAN
Semen portland kg 48.9000 1,232.00 60,244.80
Pasir beton (Kg) kg 114.0000 73.33 8,360.00
Batu pecah 1 - 2 (Kg) kg 154.3500 272.93 42,126.16
Air ltr 32.2500 61.41 1,980.39
JUMLAH HARGA BAHAN 112,711.35
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 152,431.35
E. Profit 15% *D 22,864.70
F. Harga Satuan Pekerjaan (D+E) 175,296.05

A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0070 120,000.00 840.00
Tukang Batu L.02 OH 0.0760 160,000.00 12,160.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 14,800.00
B. BAHAN
Lantai kerja tebal 10 cm m3 0.0800 #N/A #N/A
Besi Hollow 50 x 50 x 3 mm x 6 Meter kg 9.3940 237,410.80 2,230,237.06
Kayu gergajian kelas III, balok m3 0.0050 2,596,383.33 12,981.92
Phenol film 12 mm lbr 0.0800 #N/A #N/A
Minyak bekisting liter 0.0200 11,281.50 225.63
Dinabolt dia 12 mm ( 10-15 cm) bh 3.8820 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 120,000.00 480.00
Tukang Batu L.02 OH 0.0380 160,000.00 6,080.00
Kepala Tukang L.03 OH 0.0040 200,000.00 800.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 7,560.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0050 2,596,383.33 12,981.92
Phenol film 12 mm lbr 0.0430 #N/A #N/A
Minyak bekisting liter 0.2000 11,281.50 2,256.30
Paku 5-7 cm Kg 0.0460 #N/A #N/A
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 120,000.00 480.00
Tukang Batu L.02 OH 0.0380 160,000.00 6,080.00
Kepala Tukang L.03 OH 0.0040 200,000.00 800.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 7,560.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0040 2,596,383.33 10,385.53
Phenol film 12 mm lbr 0.0480 #N/A #N/A
Minyak bekisting liter 0.2000 11,281.50 2,256.30
Paku 5-7 cm kg 0.0460 #N/A #N/A
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0530 120,000.00 6,360.00
Tukang Kayu L.02 OH 0.0180 160,000.00 2,880.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 10,240.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 10,240.00
E. Profit 15% *D 1,536.00
F. Harga Satuan Pekerjaan (D+E) 11,776.00

A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0890 120,000.00 10,680.00
Tukang Kayu L.02 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 16,480.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 16,480.00
E. Profit 15% *D 2,472.00
F. Harga Satuan Pekerjaan (D+E) 18,952.00
A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0710 120,000.00 8,520.00
Tukang Kayu L.02 OH 0.0240 160,000.00 3,840.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 13,360.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 13,360.00
E. Profit 15% *D 2,004.00
F. Harga Satuan Pekerjaan (D+E) 15,364.00

A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0640 120,000.00 7,680.00
Tukang Batu L.02 OH 0.2440 160,000.00 39,040.00
Tukang vibrator L.02 OH 0.1280 160,000.00 20,480.00
Kepala Tukang L.03 OH 0.0340 200,000.00 6,800.00
Mandor L.04 OH 0.0730 200,000.00 14,600.00
JUMLAH TENAGA KERJA 88,600.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,600.00
E. Profit 15% *D 13,290.00
F. Harga Satuan Pekerjaan (D+E) 101,890.00

A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0690 120,000.00 8,280.00
Tukang Batu L.02 OH 0.2420 160,000.00 38,720.00
Tukang vibrator L.02 OH 0.1380 160,000.00 22,080.00
Kepala Tukang L.03 OH 0.0370 200,000.00 7,400.00
Mandor L.04 OH 0.0730 200,000.00 14,600.00
JUMLAH TENAGA KERJA 91,080.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 91,080.00
E. Profit 15% *D 13,662.00
F. Harga Satuan Pekerjaan (D+E) 104,742.00

A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0610 120,000.00 7,320.00
Tukang Batu L.02 OH 0.2130 160,000.00 34,080.00
Tukang vibrator L.02 OH 0.1220 160,000.00 19,520.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0730 200,000.00 14,600.00
JUMLAH TENAGA KERJA 82,120.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 82,120.00
E. Profit 15% *D 12,318.00
F. Harga Satuan Pekerjaan (D+E) 94,438.00

A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0670 180,000.00 12,060.00
Pembantu operator crane L.09 OH 0.0670 120,000.00 8,040.00
Pekerja L.01 OH 0.0670 120,000.00 8,040.00
Tukang Batu L.02 OH 0.0670 160,000.00 10,720.00
Tukang erection L.02 OH 0.1340 160,000.00 21,440.00
Kepala Tukang L.03 OH 0.0670 200,000.00 13,400.00
Mandor L.04 OH 0.0670 200,000.00 13,400.00
JUMLAH TENAGA KERJA 87,100.00
B. BAHAN
Solar liter 6.6760 9,600.00 64,089.60
JUMLAH HARGA BAHAN 64,089.60
C. PERALATAN
Sewa crane UH 0.0670 Err:504 Err:504
Sewa pipe support UH 1.1000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0610 180,000.00 10,980.00
Pembantu operator crane L.09 OH 0.0610 120,000.00 7,320.00
Pekerja L.01 OH 0.0610 120,000.00 7,320.00
Tukang Batu L.02 OH 0.0610 160,000.00 9,760.00
Tukang erection L.02 OH 0.1220 160,000.00 19,520.00
Kepala Tukang L.03 OH 0.0610 200,000.00 12,200.00
Mandor L.04 OH 0.0610 200,000.00 12,200.00
JUMLAH TENAGA KERJA 79,300.00
B. BAHAN
Solar liter 6.1100 9,600.00 58,656.00
JUMLAH HARGA BAHAN 58,656.00
C. PERALATAN
Sewa crane UH 0.0610 #N/A #N/A
Sewa pipe support UH 1.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0830 180,000.00 14,940.00
Pembantu operator crane L.09 OH 0.0830 120,000.00 9,960.00
Pekerja L.01 OH 0.0830 120,000.00 9,960.00
Tukang Batu L.02 OH 0.0830 160,000.00 13,280.00
Tukang erection L.02 OH 0.1660 160,000.00 26,560.00
Kepala Tukang L.03 OH 0.0830 200,000.00 16,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 107,900.00
B. BAHAN
Solar liter 8.2770 9,600.00 79,459.20
JUMLAH HARGA BAHAN 79,459.20
C. PERALATAN
Sewa crane UH 0.0830 #N/A #N/A
Sewa pipe support UH 2.2000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 120,000.00 2,280.00
Tukang Batu L.02 OH 0.0380 160,000.00 6,080.00
Operator crane OH 0.0190 180,000.00 3,420.00
Pembantu operator crane OH 0.0190 120,000.00 2,280.00
JUMLAH TENAGA KERJA 14,060.00
B. BAHAN
Solar liter 1.8970 9,600.00 18,211.20
JUMLAH HARGA BAHAN 18,211.20
C. PERALATAN
Sewa crane UH 0.0190 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 120,000.00 2,280.00
Tukang Batu L.02 OH 0.0380 160,000.00 6,080.00
Operator crane OH 0.0190 180,000.00 3,420.00
Pembantu operator crane OH 0.0190 120,000.00 2,280.00
JUMLAH TENAGA KERJA 14,060.00
B. BAHAN
Solar liter 1.8970 9,600.00 18,211.20
JUMLAH HARGA BAHAN 18,211.20
C. PERALATAN
Sewa crane UH 0.0190 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 120,000.00 2,280.00
Tukang Batu L.02 OH 0.0380 160,000.00 6,080.00
Operator crane OH 0.0190 180,000.00 3,420.00
Pembantu operator crane OH 0.0190 120,000.00 2,280.00
JUMLAH TENAGA KERJA 14,060.00
B. BAHAN
Solar liter 1.8970 9,600.00 18,211.20
JUMLAH HARGA BAHAN 18,211.20
C. PERALATAN
Sewa crane UH 0.0190 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.20. Bahan 1 m3 grouting campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,200.0000 #N/A #N/A
Screening kg 650.0000 #N/A #N/A
Air liter 350.0000 68.75 24,062.50
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,850.0000 #N/A #N/A
Air liter 400.0000 68.75 27,500.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Batu L.02 OH 0.3670 160,000.00 58,720.00
Kepala Tukang L.03 OH 0.0740 200,000.00 14,800.00
Mandor L.04 OH 0.0370 200,000.00 7,400.00
JUMLAH TENAGA KERJA 80,920.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 80,920.00
E. Profit 15% *D 12,138.00
F. Harga Satuan Pekerjaan (D+E) 93,058.00

A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1470 120,000.00 17,640.00
Tukang kayu L.02 OH 0.1470 160,000.00 23,520.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 45,160.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0120 2,596,383.33 31,156.60
Kayu gergajian kelas III, papan m3 0.0040 2,498,000.00 9,992.00
Paku berbagai ukuran (2"-5") kg 0.2640 17,032.50 4,496.58
JUMLAH HARGA BAHAN 45,645.18
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 90,805.18
E. Profit 15% *D 13,620.78
F. Harga Satuan Pekerjaan (D+E) 104,425.96

A. 4.1.2.24. Upah 1 titik join dengan sling


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2200 120,000.00 26,400.00
Tukang kayu L.02 OH 0.2200 160,000.00 35,200.00
Tukang Besi L.02 OH 0.2200 160,000.00 35,200.00
Mandor L.04 OH 0.0110 200,000.00 2,200.00
JUMLAH TENAGA KERJA 99,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 99,000.00
E. Profit 15% *D 14,850.00
F. Harga Satuan Pekerjaan (D+E) 113,850.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang Las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 18,600.00
B. BAHAN
Besi profil kg 1.1500 8,646.18 9,943.10
JUMLAH HARGA BAHAN 9,943.10
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 28,543.10
E. Profit 15% *D 4,281.47
F. Harga Satuan Pekerjaan (D+E) 32,824.57

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang Las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 18,600.00
B. BAHAN
Besi baja IWF kg 1.1500 11,251.49 12,939.21
JUMLAH HARGA BAHAN 12,939.21
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 31,539.21
E. Profit 15% *D 4,730.88
F. Harga Satuan Pekerjaan (D+E) 36,270.09

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Las konstruksi L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0010 200,000.00 200.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 29,200.00
B. BAHAN
Solar liter 1.0000 9,600.00 9,600.00
Minyak pelumas (oli) liter 0.1000 31,410.00 3,141.00
JUMLAH HARGA BAHAN 12,741.00
C. PERALATAN
Sewa alat jam 0.8000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 120,000.00 126,000.00
Tukang Las biasa L.02 OH 1.0500 160,000.00 168,000.00
Kepala tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L,04 OH 0.0520 200,000.00 10,400.00
JUMLAH TENAGA KERJA 325,400.00
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 9,680.00 145,200.00
Besi plat baja kg 32.8000 11,737.00 384,973.60
Kawat Las Listrik kg 0.0500 45,540.00 2,277.00
JUMLAH HARGA BAHAN 532,450.60
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 857,850.60
E. Profit 15% *D 128,677.59
F. Harga Satuan Pekerjaan (D+E) 986,528.19

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 120,000.00 4,800.00
Tukang Besi L.02 OH 0.0200 160,000.00 3,200.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 16,000.00
B. BAHAN
Kawat Las Listrik kg 0.4000 45,540.00 18,216.00
Solar kg 0.3000 9,600.00 2,880.00
Minyak pelumas (oli) kg 0.0400 31,410.00 1,256.40
JUMLAH HARGA BAHAN 22,352.40
C. PERALATAN
Sewa alat jam 0.1700 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 120,000.00 78,000.00
Tukang Las biasa L.02 OH 0.6500 160,000.00 104,000.00
Kepala tukang L.03 OH 0.0650 200,000.00 13,000.00
Mandor L,04 OH 0.0320 200,000.00 6,400.00
JUMLAH TENAGA KERJA 201,400.00
B. BAHAN
Besi scuare tube m 4.7600 #N/A #N/A
Besi lis kaca (1 x 1) cm m 4.5220 #N/A #N/A
Pengelasan cm 20.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 120,000.00 144,000.00
Tukang Las biasa L.02 OH 1.2000 160,000.00 192,000.00
Kepala tukang L.03 OH 0.1200 200,000.00 24,000.00
Mandor L,04 OH 0.0600 200,000.00 12,000.00
JUMLAH TENAGA KERJA 372,000.00
B. BAHAN
Pintu gulung besi' m2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 120,000.00 52,800.00
Tukang L.02 OH 0.4400 160,000.00 70,400.00
Kepala tukang L.03 OH 0.0440 200,000.00 8,800.00
Mandor L,04 OH 0.0220 200,000.00 4,400.00
JUMLAH TENAGA KERJA 136,400.00
B. BAHAN
Folding door/ pintu lipat m2 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 120,000.00 9,600.00
Tukang L.02 OH 0.8000 160,000.00 128,000.00
Kepala tukang L.03 OH 0.0800 200,000.00 16,000.00
Mandor L,04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 161,600.00
B. BAHAN
Sunscreen alumunium m2 1.0000 1,473,780.00 1,473,780.00
JUMLAH HARGA BAHAN 1,473,780.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,635,380.00
E. Profit 15% *D 245,307.00
F. Harga Satuan Pekerjaan (D+E) 1,880,687.00

A. 4.2.1.9. Pemasangan 1 m2 rolling door aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang L.02 OH 1.0000 160,000.00 160,000.00
Kepala tukang L.03 OH 0.1000 200,000.00 20,000.00
Mandor L,04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 310,000.00
B. BAHAN
Rolling door-alumunium tebal 0,8 mm m2 1.0000 378,270.20 378,270.20
JUMLAH HARGA BAHAN 378,270.20
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 688,270.20
E. Profit 15% *D 103,240.53
F. Harga Satuan Pekerjaan (D+E) 791,510.73

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 120,000.00 5,160.00
Tukang khusus aluminium L.02 OH 0.0430 160,000.00 6,880.00
Kepala tukang L.03 OH 0.0043 200,000.00 860.00
Mandor L,04 OH 0.0021 200,000.00 420.00
JUMLAH TENAGA KERJA 13,320.00
B. BAHAN
Profil aluminium m 1.1000 #N/A #N/A
Skrup fixer buah 2.0000 2,063.29 4,126.58
Sealant tube 0.0600 34,142.57 2,048.55
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00 10,200.00
Tukang khusus aluminium L.02 OH 0.0850 160,000.00 13,600.00
Kepala tukang L.03 OH 0.0085 200,000.00 1,700.00
Mandor L,04 OH 0.0042 200,000.00 840.00
JUMLAH TENAGA KERJA 26,340.00
B. BAHAN
Profil aluminium m 4.4000 #N/A #N/A
Aluminium strip m 14.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00 10,200.00
Tukang khusus aluminium L.02 OH 0.0850 160,000.00 13,600.00
Kepala tukang L.03 OH 0.0090 200,000.00 1,800.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 26,600.00
B. BAHAN
Profil aluminium m 4.4000 #N/A #N/A
Profil kaca m 4.5000 5,895.12 26,528.04
Sealant tube 0.2700 34,142.57 9,218.49
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang khusus aluminium L.02 OH 0.3500 160,000.00 56,000.00
Kepala tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L,04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 108,600.00
B. BAHAN
Venetions blinds & vertical blinds m2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 120,000.00 200,400.00
Tukang las Konstruksi L.02 OH 1.6700 160,000.00 267,200.00
Kepala tukang L.03 OH 0.1670 200,000.00 33,400.00
Mandor L,04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 517,600.00
B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 8,842.68 54,621.23
Pengelasan cm 27.0800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kawat nyamuk logam m2 1.1000 23,334.85 25,668.34
Pengelasan cm 11.1100 #N/A #N/A
Baja strip (0,2 x 2) cm kg 1.7160 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang besi L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 60,200.00
B. BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 #N/A #N/A
Paku sekrup 1 cm -2,5 cm buah 10.0000 23,252.97 232,529.73
Baja strip m 7.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang besi L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 60,200.00
B. BAHAN
Seng plat m 1.0500 #N/A #N/A
Paku sekrup 1 cm -2,5 cm kg 0.0150 23,252.97 348.79
Kayu gergajian kelas III, papan m3 0.0190 2,231,213.60 42,393.06
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang besi L.02 OH 0.3000 160,000.00 48,000.00
Kepala tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L,04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 73,600.00
B. BAHAN
Seng plat m 1.0500 #N/A #N/A
Paku sekrup 1 cm -2,5 cm kg 0.0100 23,252.97 232.53
Besi strip m3 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang Besi L.02 OH 0.2500 160,000.00 40,000.00
Kepala tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L,04 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 77,600.00
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Besi L.02 OH 0.3500 160,000.00 56,000.00
Kepala tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L,04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 108,600.00
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #N/A #N/A
assesoris (perkuatan, las, dll) Ls 100%xrangka #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 120,000.00 88,080.00
Tukang Besi L.02 OH 0.734 160,000.00 117,440.00
Kepala tukang L.03 OH 0.073 200,000.00 14,680.00
Mandor L,04 OH 0.037 200,000.00 7,340.00

JUMLAH TENAGA KERJA 227,540.00


B. BAHAN
Baja ringan canai dingin C75 btg 0.8730 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.23. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 120,000.00 91,248.00
Tukang Besi L.02 OH 0.7604 160,000.00 121,664.00
Kepala tukang L.03 OH 0.0760 200,000.00 15,200.00
Mandor L,04 OH 0.0380 200,000.00 7,600.00

JUMLAH TENAGA KERJA 235,712.00


B. BAHAN
Baja ringan canai dingin C75 btg 0.8730 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Peralatan % 10.0000 #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. 4.2.1.13. ck Pemasangan 1 m2 pintu kaca rangka aluminium
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00 10,200.00
Tukang khusus aluminium L.02 OH 0.0850 160,000.00 13,600.00
Kepala tukang L.03 OH 0.0090 200,000.00 1,800.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 26,600.00
B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 93,339.40 410,693.36
Profil kaca m 4.5000 5,895.12 26,528.04
Sealant tube 0.2700 34,142.57 9,218.49
Kaca bening tebal 5 mm m2 1.1000 130,183.90 143,202.29
JUMLAH HARGA BAHAN 589,642.18
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 616,242.18
E. Profit 15% *D 92,436.33
F. Harga Satuan Pekerjaan (D+E) 708,678.51
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 57,000.00
B. BAHAN
Batu bata merah besar buah 70.0000 2,024.00 141,680.00
Semen portland kg 14.3700 1,232.00 17,703.84
Pasir pasang m3 0.0400 132,000.00 5,280.00
JUMLAH HARGA BAHAN 164,663.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 221,663.84
E. Profit 15% *D 33,249.58
F. Harga Satuan Pekerjaan (D+E) 254,913.42
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 7.7760 1,232.00 9,580.03
Pasir pasang m3 0.0230 132,000.00 3,036.00
JUMLAH HARGA BAHAN 12,616.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,616.03
E. Profit 15% *D 11,792.40
F. Harga Satuan Pekerjaan (D+E) 90,408.44

A. 4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Batu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Semen portland Kg 3.2500 1,232.00 4,004.00
JUMLAH HARGA BAHAN 4,004.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,004.00
E. Profit 15% *D 7,200.60
F. Harga Satuan Pekerjaan (D+E) 55,204.60
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A. 4.4.3.35.ck Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik 40x40 (cm) polos doos 1.0500 51,333.33 53,900.00
Semen portland Kg 10.0000 1,232.00 12,320.00
Pasir pasang m3 0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 1.5000 13,200.00 19,800.00
JUMLAH HARGA BAHAN 91,960.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 144,760.00
E. Profit 15% *D 21,714.00
F. Harga Satuan Pekerjaan (D+E) 166,474.00

A. 4.4.3.36. ck Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik KM/WC antislip 20x20 (cm) doos 1.0500 57,266.88 60,130.22
Semen portland Kg 10.4000 1,232.00 12,812.80
Pasir pasang m3 0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 0.5000 13,200.00 6,600.00
JUMLAH HARGA BAHAN 85,483.02
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 138,283.02
E. Profit 15% *D 20,742.45
F. Harga Satuan Pekerjaan (D+E) 159,025.48
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 120,000.00 3,600.00
Tukang Kayu L.02 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.0070 200,000.00 1,400.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 17,000.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 5 mm m2 1.1000 27,019.30 29,721.23
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
peralatan % 10.0000 #N/A #N/A
Bahan
JUMLAH HARGA ALAT #N/A
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x 30 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang Kayu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Akustik Lembar 12.0000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x60 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang Kayu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Akustik Lembar 5.8000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran ( 60 x 120 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Akustik Lembar 1.5000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 101,199.56 37,949.84
Paku berbagai ukuran (2"-5") Kg 0.0300 15,213.43 456.40
JUMLAH HARGA BAHAN 38,406.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,406.24
E. Profit 15% *D 10,410.94
F. Harga Satuan Pekerjaan (D+E) 79,817.17

A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.02 OH 0.8000 160,000.00 128,000.00
Kepala Tukang L.03 OH 0.0800 200,000.00 16,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 248,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0150 2,671,938.67 40,079.08
Paku berbagai ukuran (2"-5") Kg 0.0100 15,213.43 152.13
JUMLAH HARGA BAHAN 40,231.21
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 288,231.21
E. Profit 15% *D 43,234.68
F. Harga Satuan Pekerjaan (D+E) 331,465.90

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 49,866.67 18,151.47
Paku sekrup (kg) Kg 0.1100 43,230.88 4,755.40
JUMLAH HARGA BAHAN 22,906.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 44,906.86
E. Profit 15% *D 6,736.03
F. Harga Satuan Pekerjaan (D+E) 51,642.89
A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 120,000.00 60,000.00
Tukang Besi L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0250 200,000.00 5,000.00
JUMLAH TENAGA KERJA 155,000.00
B. BAHAN
Profil Allum "T" m 3.6000 #N/A #N/A
Kawat dia 4mm Kg 0.1500 #N/A #N/A
Dina bolt/ ramset Bh 1.0500 1,651.18 1,733.74
Akustik 60 x 120 Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.9.a Pemasangan 1 m list gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
List gypsum m 1.0500 21,569.30 22,647.77
Paku sekrup (kg) Kg 0.0100 43,230.88 432.31
JUMLAH HARGA BAHAN 23,080.07
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 38,680.07
E. Profit 15% *D 5,802.01
F. Harga Satuan Pekerjaan (D+E) 44,482.09

A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
List kayu profil m 1.0500 35,206.97 36,967.32
Paku sekrup 1 cm -2,5 cm Kg 0.0100 23,252.97 232.53
JUMLAH HARGA BAHAN 37,199.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 52,799.84
E. Profit 15% *D 7,919.98
F. Harga Satuan Pekerjaan (D+E) 60,719.82

A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40.2mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Besi L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 108,600.00
B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m1 4.0000 9,625.00 38,500.00
Assesoris (perkuatan, las dll) Ls 100%*rangka 9,625.00 9,625.00
JUMLAH HARGA BAHAN 48,125.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 156,725.00
E. Profit 15% *D 23,508.75
F. Harga Satuan Pekerjaan (D+E) 180,233.75

A. 4.5.1.4.a Pemasangan 1 m2 langit-langit eternit ukuran( 1 x 1 m) tebal 4 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 4 mm Lembar 1.5000 23,261.16 34,891.74
Paku berbagai ukuran (2"-5") Kg 0.0500 15,213.43 760.67
JUMLAH HARGA BAHAN 35,652.41
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 66,652.41
E. Profit 15% *D 9,997.86
F. Harga Satuan Pekerjaan (D+E) 76,650.27

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0075 200,000.00 1,500.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,100.00
B. BAHAN
Genteng palentong Bh 25.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Atap Genteng kodok Bh 25.0000 4,028.33 100,708.30
JUMLAH HARGA BAHAN 100,708.30
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 133,908.30
E. Profit 15% *D 20,086.25
F. Harga Satuan Pekerjaan (D+E) 153,994.55
A. 4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/ super
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Genteng palentong Bh 12.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.4. Pemasangan 1 m1 bubung genteng palentong


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 84,400.00
B. BAHAN
Genteng bubung Bh 5.0000 #N/A #N/A
Semen portland Kg 8.0000 1,232.00 9,856.00
Pasir pasang m3 0.0320 132,000.00 4,224.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 84,400.00
B. BAHAN
Bubungan atap (nok) genteng kodok Bh 5.0000 4,175.71 20,878.55
Semen portland Kg 8.0000 1,232.00 9,856.00
Pasir pasang m3 0.0320 132,000.00 4,224.00
JUMLAH HARGA BAHAN 34,958.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 119,358.55
E. Profit 15% *D 17,903.78
F. Harga Satuan Pekerjaan (D+E) 137,262.33

A. 4.5.2.6. Pemasangan 1 m1 bubung genteng palentong besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 84,400.00
B. BAHAN
Genteng bubung Bh 4.0000 #N/A #N/A
Semen portland Kg 8.0000 1,232.00 9,856.00
Pasir pasang m3 0.0320 132,000.00 4,224.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0670 160,000.00 10,720.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,320.00
B. BAHAN
Rooflight fibreglass uk. 1,8 x 0,9 (m) Lembar 0.6000 86,953.02 52,171.81
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
JUMLAH HARGA BAHAN 53,286.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,606.84
E. Profit 15% *D 12,541.03
F. Harga Satuan Pekerjaan (D+E) 96,147.87

A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 0.5000 73,173.18 36,586.59
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 39,042.42
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,042.42
E. Profit 15% *D 10,656.36
F. Harga Satuan Pekerjaan (D+E) 81,698.78

A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 0.6000 64,723.51 38,834.10
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 41,289.94
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 73,289.94
E. Profit 15% *D 10,993.49
F. Harga Satuan Pekerjaan (D+E) 84,283.43

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 0.6000 57,575.67 34,545.40
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 37,001.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,801.24
E. Profit 15% *D 10,170.19
F. Harga Satuan Pekerjaan (D+E) 77,971.42

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 0.7500 52,270.06 39,202.55
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 41,658.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,458.38
E. Profit 15% *D 10,868.76
F. Harga Satuan Pekerjaan (D+E) 83,327.14

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 89,853.79 31,448.83
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 33,904.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,704.66
E. Profit 15% *D 9,705.70
F. Harga Satuan Pekerjaan (D+E) 74,410.36

A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 80,868.41 33,964.73
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 36,420.57
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,220.57
E. Profit 15% *D 10,083.08
F. Harga Satuan Pekerjaan (D+E) 77,303.65

A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 71,883.03 31,628.54
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,084.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,884.37
E. Profit 15% *D 9,732.66
F. Harga Satuan Pekerjaan (D+E) 74,617.02

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 62,897.66 32,077.80
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,533.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,333.64
E. Profit 15% *D 9,800.05
F. Harga Satuan Pekerjaan (D+E) 75,133.68

A. 4.5.2.15. a Pemasangan 1 m2 atap zincalum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0,4 mm m 1.0000 59,933.72 59,933.72
Paku sekrup (kg) Kg 0.1200 43,230.88 5,187.71
JUMLAH HARGA BAHAN 65,121.43
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 95,921.43
E. Profit 15% *D 14,388.21
F. Harga Satuan Pekerjaan (D+E) 110,309.64

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 42,248.36 33,798.69
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 36,254.52
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,054.52
E. Profit 15% *D 10,058.18
F. Harga Satuan Pekerjaan (D+E) 77,112.70

A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 0.3700 85,970.50 31,809.09
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,264.92
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,064.92
E. Profit 15% *D 9,759.74
F. Harga Satuan Pekerjaan (D+E) 74,824.65

A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 0.3800 77,373.45 29,401.91
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 31,857.74
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 62,657.74
E. Profit 15% *D 9,398.66
F. Harga Satuan Pekerjaan (D+E) 72,056.40

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 0.4600 72,706.48 33,444.98
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 35,900.81
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 66,700.81
E. Profit 15% *D 10,005.12
F. Harga Satuan Pekerjaan (D+E) 76,705.93

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 0.4900 64,502.44 31,606.19
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,062.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,862.03
E. Profit 15% *D 9,729.30
F. Harga Satuan Pekerjaan (D+E) 74,591.33

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 0.5700 53,940.35 30,746.00
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 33,201.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,001.83
E. Profit 15% *D 9,600.27
F. Harga Satuan Pekerjaan (D+E) 73,602.11

A. 4.5.2.22. Pemasangan 1 m1 bubung stel gelombang 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Bubung stel gelombang Lembar 2.4000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.23. Pemasangan 1 m1 bubung stel gelombang 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Bubung stel gelombang Lembar 2.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.24. Pemasangan 1 m1 bubung stel gelombang 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Bubung stel gelombang Lembar 2.0500 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.25. Pemasangan 1 m1 nok paten 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.26. Pemasangan 1 m1 nok paten 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.27. Pemasangan 1 m1 nok paten 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.28. Pemasangan 1 m1 nok stel rata 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 39,400.00
B. BAHAN
Nok paten 92cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.29. Pemasangan 1 m1 nok stel rata 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.1250 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.0130 200,000.00 2,600.00
Mandor L.15 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 33,480.00
B. BAHAN
Nok paten 92cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 5,516.15 60,677.63
Paku berbagai ukuran (2"-5") Kg 0.0300 15,213.43 456.40
JUMLAH HARGA BAHAN 61,134.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,134.03
E. Profit 15% *D 15,770.10
F. Harga Satuan Pekerjaan (D+E) 120,904.14

A. 4.5.2.31. Pemasangan 1 m2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.3000 160,000.00 48,000.00
Kepala Tukang L.11 OH 0.0030 200,000.00 600.00
Mandor L.15 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 74,600.00
B. BAHAN
Genteng aspal Bh 6.9000 #N/A #N/A
Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar 0.3500 80,566.64 28,198.32
Paku berbagai ukuran (1/2"-1") Kg 0.0300 22,300.60 669.02
Plastic aerator Bh 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 42,200.00
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 31,931.90 41,511.47
Paku berbagai ukuran (1/2"-1") Kg 0.2000 22,300.60 4,460.12
JUMLAH HARGA BAHAN 45,971.59
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 88,171.59
E. Profit 15% *D 13,225.74
F. Harga Satuan Pekerjaan (D+E) 101,397.33

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 42,200.00
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 31,931.90 63,863.80
Paku berbagai ukuran (1/2"-1") Kg 0.2000 22,300.60 4,460.12
JUMLAH HARGA BAHAN 68,323.92
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 110,523.92
E. Profit 15% *D 16,578.59
F. Harga Satuan Pekerjaan (D+E) 127,102.51

A. 4.5.2.34. Pemasangan 1 m2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1660 120,000.00 19,920.00
Tukang Kayu L.03 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.11 OH 0.0250 200,000.00 5,000.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 66,520.00
B. BAHAN
Sirap kayu Bh 30.0000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.2000 22,300.60 4,460.12
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Bubungan atap (nok) genteng beton Bh 3.5000 6,484.63 22,696.21
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
Semen portland Kg 10.8000 1,232.00 13,305.60
Pasir pasang m3 0.0320 132,000.00 4,224.00
Semen warna (sika graut) Kg 1.0000 13,200.00 13,200.00
JUMLAH HARGA BAHAN 54,540.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 142,540.84
E. Profit 15% *D 21,381.13
F. Harga Satuan Pekerjaan (D+E) 163,921.97

A. 4.5.2.36. Pemasangan 1 m1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 120,000.00 15,000.00
Tukang Kayu L.03 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.11 OH 0.0250 200,000.00 5,000.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 61,200.00
B. BAHAN
Nok genteng aspal Bh 2.0000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
Kayu balok borneo m3 0.0035 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang Kayu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.11 OH 0.0150 200,000.00 3,000.00
Mandor L.15 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 59,600.00
B. BAHAN
Bubungan atap (nok) metal (biasa/ polos) Bh 1.1000 31,931.90 35,125.09
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
JUMLAH HARGA BAHAN 36,240.12
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 95,840.12
E. Profit 15% *D 14,376.02
F. Harga Satuan Pekerjaan (D+E) 110,216.14

A. 4.5.2.38. Pemasangan 1 m1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 120,000.00 15,000.00
Tukang Kayu L.03 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.11 OH 0.0250 200,000.00 5,000.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 61,200.00
B. BAHAN
Seng plat 3 x 6" Lembar 0.4000 #N/A #N/A
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
#REF! Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang Kayu L.03 OH 0.0600 160,000.00 9,600.00
Kepala Tukang L.11 OH 0.0060 200,000.00 1,200.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 26,400.00
B. BAHAN
Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 0.7000 35,370.72 24,759.50
Paku berbagai ukuran (1/2"-1") Kg 0.0200 22,300.60 446.01
JUMLAH HARGA BAHAN 25,205.52
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 51,605.52
E. Profit 15% *D 7,740.83
F. Harga Satuan Pekerjaan (D+E) 59,346.34

A. 4.5.2.40. Pemasangan 1 m1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 31,800.00
B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 0.3000 39,300.80 11,790.24
Paku berbagai ukuran (1/2"-1") Kg 0.0400 22,300.60 892.02
JUMLAH HARGA BAHAN 12,682.26
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 44,482.26
E. Profit 15% *D 6,672.34
F. Harga Satuan Pekerjaan (D+E) 51,154.60

A. 4.5.2.41. Pemasangan 1 m2 atap alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.7500 160,000.00 120,000.00
Kepala Tukang L.11 OH 0.0800 200,000.00 16,000.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 155,200.00
B. BAHAN
Atap alumunium Gelombang tebal 0,55 (Galvalum) Lembar 1.0500 60,807.07 63,847.42
Paku hak panj. 15cm Kg 0.0200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.42. Pemasangan 1 m1 nok alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.03 OH 1.0000 160,000.00 160,000.00
Kepala Tukang L.11 OH 0.1000 200,000.00 20,000.00
Mandor L.15 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 202,000.00
B. BAHAN
Bubungan atap (nok) alumunium standar 40 cm, swg.22 Bh 1.2000 59,638.96 71,566.76
Paku hak panj. 15cm Kg 0.0400 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.11 OH 0.0050 200,000.00 1,000.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 28,600.00
B. BAHAN
Aluminium foil air cell bubble m2 1.0500 60,204.73 63,214.97
JUMLAH HARGA BAHAN 63,214.97
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 91,814.97
E. Profit 15% *D 13,772.25
F. Harga Satuan Pekerjaan (D+E) 105,587.21

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 120,000.00 840,000.00
Tukang kayu L.03 OH 21.0000 160,000.00 3,360,000.00
Kepala tukang L.03 OH 2.1000 200,000.00 420,000.00
Mandor L.04 OH 0.3500 200,000.00 70,000.00
JUMLAH TENAGA KERJA 4,690,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,188,007.65 3,506,808.42
paku 8 s/d 12 cm Kg 1.2500 #N/A #N/A
Lem kayu Kg 1.0000 31,533.33 31,533.33
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 120,000.00 720,000.00
Tukang kayu L.03 OH 18.0000 160,000.00 2,880,000.00
Kepala Tukang L.03 OH 1.8000 200,000.00 360,000.00
Mandor L.04 OH 0.3000 200,000.00 60,000.00
JUMLAH TENAGA KERJA 4,020,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,483,612.42 2,980,334.90
paku 8 s/d 12 cm kg 1.2500 #N/A #N/A
Lem kayu kg 1.0000 31,533.33 31,533.33
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-
JUMLAH HARGA BAHAN 107,638.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 342,238.22
E. Profit 15% *D 51,335.73
F. Harga Satuan Pekerjaan (D+E) 393,573.95

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,231,213.60 89,248.54
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-
JUMLAH HARGA BAHAN 90,009.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 324,609.22
E. Profit 15% *D 48,691.38
F. Harga Satuan Pekerjaan (D+E) 373,300.60

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Batu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Lem kayu kg 0.5000 31,533.33 15,766.67
- -
JUMLAH HARGA BAHAN 122,644.21
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 792,644.21
E. Profit 15% *D 118,896.63
F. Harga Satuan Pekerjaan (D+E) 911,540.85

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 2,671,938.67 64,126.53
Lem kayu kg 0.3000 31,533.33 9,460.00
- -
JUMLAH HARGA BAHAN 73,586.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 609,586.53
E. Profit 15% *D 91,437.98
F. Harga Satuan Pekerjaan (D+E) 701,024.51

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 2,671,938.67 171,004.07
Lem kayu kg 0.5000 31,533.33 15,766.67
- -
JUMLAH HARGA BAHAN 186,770.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 856,770.74
E. Profit 15% *D 128,515.61
F. Harga Satuan Pekerjaan (D+E) 985,286.35

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Kayu L.03 OH 2.1000 160,000.00 336,000.00
Kepala Tukang L.03 OH 0.2100 200,000.00 42,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 469,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 161,590.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 630,590.12
E. Profit 15% *D 94,588.52
F. Harga Satuan Pekerjaan (D+E) 725,178.64

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,110,529.88 79,629.56
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 174,421.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 710,421.22
E. Profit 15% *D 106,563.18
F. Harga Satuan Pekerjaan (D+E) 816,984.40

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 120,000.00 80,400.00
Tukang Kayu L.03 OH 2.0000 160,000.00 320,000.00
Kepala Tukang L.03 OH 0.2000 200,000.00 40,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 507,400.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,110,529.88 186,631.79
Paku berbagai ukuran (1/2"-1") kg 0.1500 22,300.60 3,345.09
-
JUMLAH HARGA BAHAN 189,976.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,376.88
E. Profit 15% *D 104,606.53
F. Harga Satuan Pekerjaan (D+E) 801,983.41

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,110,529.88 77,763.25
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.3000 31,533.33 9,460.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90
JUMLAH HARGA BAHAN 168,950.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 704,950.16
E. Profit 15% *D 105,742.52
F. Harga Satuan Pekerjaan (D+E) 810,692.69

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 120,000.00 102,000.00
Tukang Kayu L.03 OH 2.5500 160,000.00 408,000.00
Kepala Tukang L.03 OH 0.2550 200,000.00 51,000.00
Mandor L.04 OH 0.0430 200,000.00 8,600.00
JUMLAH TENAGA KERJA 569,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.8000 31,533.33 25,226.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90
Formika lembar 0.5000 83,514.20 41,757.10

JUMLAH HARGA BAHAN 215,509.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 785,109.15
E. Profit 15% *D 117,766.37
F. Harga Satuan Pekerjaan (D+E) 902,875.52

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 120,000.00 480,000.00
Tukang Kayu L.03 12.0000 160,000.00 1,920,000.00
Kepala Tukang L.03 OH 1.2000 200,000.00 240,000.00
Mandor L.04 OH 0.2000 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,680,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.0000 160,000.00 3,200,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,473,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,188,007.65 3,825,609.18
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.1000 160,000.00 3,216,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,489,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 3.0000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0360 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0570 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang kayu L.03 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,483,612.42 34,770.57
Paku berbagai ukuran (2"-5") kg 0.0570 15,213.43 867.17
- -
JUMLAH HARGA BAHAN 35,637.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 72,837.74
E. Profit 15% *D 10,925.66
F. Harga Satuan Pekerjaan (D+E) 83,763.40

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.3000 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L.04 OH 0.0750 200,000.00 15,000.00
JUMLAH TENAGA KERJA 87,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2000 15,213.43 3,042.69
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang kayu L.03 OH 0.3000 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36

- -

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34

- -

JUMLAH HARGA BAHAN 35,115.07


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 84,115.07
E. Profit 15% *D 12,617.26
F. Harga Satuan Pekerjaan (D+E) 96,732.33

A. 4.6.1.21. ck Pemasangan 1m' lisplank ukuran lebar 20cm, kalsiplank/GRC 6mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Listplank GRC m1 1.0000 17,030.35 17,030.35
Paku sekrup (kg) kg 0.1000 43,230.88 4,323.09
JUMLAH HARGA BAHAN 21,353.43
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,353.43
E. Profit 15% *D 10,553.02
F. Harga Satuan Pekerjaan (D+E) 80,906.45

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67

JUMLAH HARGA BAHAN 34,354.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,354.39
E. Profit 15% *D 12,503.16
F. Harga Satuan Pekerjaan (D+E) 95,857.55

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.4500 200,000.00 90,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 181,600.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,319,089.59 64,934.51
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01

- -

JUMLAH HARGA BAHAN 67,216.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 248,816.52
E. Profit 15% *D 37,322.48
F. Harga Satuan Pekerjaan (D+E) 286,139.00

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.0450 200,000.00 9,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 100,600.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 97,269.48 83,651.75
Lem kayu kg 0.5600 31,533.33 17,658.67
JUMLAH HARGA BAHAN 173,133.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 273,733.58
E. Profit 15% *D 41,060.04
F. Harga Satuan Pekerjaan (D+E) 314,793.62

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang kayu L.03 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 134,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 78,355.97 67,386.13
Lem kayu kg 0.5600 31,533.33 17,658.67
JUMLAH HARGA BAHAN 156,867.96
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,867.96
E. Profit 15% *D 43,630.19
F. Harga Satuan Pekerjaan (D+E) 334,498.16

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang kayu L.03 OH 1.8000 160,000.00 288,000.00
Kepala Tukang L.03 OH 0.1800 200,000.00 36,000.00
Mandor L.04 OH 0.0300 200,000.00 6,000.00
JUMLAH TENAGA KERJA 402,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,110,529.88 21,773.71
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34
Paku sekrup (kg) kg 0.1500 43,230.88 6,484.63

JUMLAH HARGA BAHAN 29,779.68


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 431,779.68
E. Profit 15% *D 64,766.95
F. Harga Satuan Pekerjaan (D+E) 496,546.64

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 16,800.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 78,355.97 31,342.39
Paku berbagai ukuran (1/2"-1") kg 0.0500 22,300.60 1,115.03

JUMLAH HARGA BAHAN 32,457.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,257.42
E. Profit 15% *D 7,388.61
F. Harga Satuan Pekerjaan (D+E) 56,646.03

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN
Bilik bambu m2 1.5000 #N/A #N/A
Kaso-kaso 5 x 7 cm m3 0.0140 #N/A #N/A
Paku kg 0.0120 #N/A #N/A
List kayu 2/4 m3 0.0030 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang kayu L.02 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 115,800.00
B. BAHAN
Kunci antik buah 1.0000 430,522.40 430,522.40

JUMLAH HARGA BAHAN 430,522.40


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 546,322.40
E. Profit 15% *D 81,948.36
F. Harga Satuan Pekerjaan (D+E) 628,270.76

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 92,200.00
B. BAHAN
Kunci tanam buah 1.0000 160,887.65 160,887.65

JUMLAH HARGA BAHAN 160,887.65


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 253,087.65
E. Profit 15% *D 37,963.15
F. Harga Satuan Pekerjaan (D+E) 291,050.80

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 120,000.00 600.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 91,200.00
B. BAHAN
Kunci KM buah 1.0000 92,222.90 92,222.90
JUMLAH HARGA BAHAN 92,222.90
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 183,422.90
E. Profit 15% *D 27,513.44
F. Harga Satuan Pekerjaan (D+E) 210,936.34

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 120,000.00 600.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 91,200.00
B. BAHAN
Kunci silinder buah 1.0000 54,708.50 54,708.50
JUMLAH HARGA BAHAN 54,708.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 145,908.50
E. Profit 15% *D 21,886.28
F. Harga Satuan Pekerjaan (D+E) 167,794.78

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 19,805.53 19,805.53
JUMLAH HARGA BAHAN 19,805.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 48,765.53
E. Profit 15% *D 7,314.83
F. Harga Satuan Pekerjaan (D+E) 56,080.36

A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0005 200,000.00 100.00
JUMLAH TENAGA KERJA 19,300.00
B. BAHAN
Engsel kupu-kupu buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.7. Pemasangan 1 buah engsel angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0005 200,000.00 100.00
JUMLAH TENAGA KERJA 48,100.00
B. BAHAN
Engsel angin buah 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Spring knip buah 1.0000 19,060.89 19,060.89
JUMLAH HARGA BAHAN 19,060.89
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,460.89
E. Profit 15% *D 7,419.13
F. Harga Satuan Pekerjaan (D+E) 56,880.02

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kait angin biasa buah 1.0000 10,032.00 10,032.00
JUMLAH HARGA BAHAN 10,032.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 40,432.00
E. Profit 15% *D 6,064.80
F. Harga Satuan Pekerjaan (D+E) 46,496.80

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 96,600.00
B. BAHAN
Door closer set 1.0000 242,000.00 242,000.00
JUMLAH HARGA BAHAN 242,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 338,600.00
E. Profit 15% *D 50,790.00
F. Harga Satuan Pekerjaan (D+E) 389,390.00

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang kayu L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 38,600.00
B. BAHAN
Kunci Selot bh 1.0000 17,424.00 17,424.00
JUMLAH HARGA BAHAN 17,424.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 56,024.00
E. Profit 15% *D 8,403.60
F. Harga Satuan Pekerjaan (D+E) 64,427.60

A. 4.6.2.12. Pemasangan 1 buah Door holder


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 96,600.00
B. BAHAN
Door holder bh 1.0000 115,446.10 115,446.10
JUMLAH HARGA BAHAN 115,446.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 212,046.10
E. Profit 15% *D 31,806.92
F. Harga Satuan Pekerjaan (D+E) 243,853.02

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 20,200.00
B. BAHAN
Door stop bh 1.0000 20,900.00 20,900.00
JUMLAH HARGA BAHAN 20,900.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 41,100.00
E. Profit 15% *D 6,165.00
F. Harga Satuan Pekerjaan (D+E) 47,265.00

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang kayu L.02 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 115,800.00
B. BAHAN
Rell pintu dorong set 1.0000 240,717.40 240,717.40
JUMLAH HARGA BAHAN 240,717.40
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 356,517.40
E. Profit 15% *D 53,477.61
F. Harga Satuan Pekerjaan (D+E) 409,995.01

A. 4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang kayu L.02 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L.04 OH 0.0013 200,000.00 260.00
JUMLAH TENAGA KERJA 48,260.00
B. BAHAN
Kunci lemari set 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 93,339.40 102,673.34
Sealant kg 0.0500 34,142.57 1,707.13
JUMLAH HARGA BAHAN 104,380.47
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 133,340.47
E. Profit 15% *D 20,001.07
F. Harga Satuan Pekerjaan (D+E) 153,341.54

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Kaca bening tebal 5 mm m2 1.1000 130,183.90 143,202.29
Sealant kg 0.0500 34,142.57 1,707.13
JUMLAH HARGA BAHAN 144,909.42
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 173,869.42
E. Profit 15% *D 26,080.41
F. Harga Satuan Pekerjaan (D+E) 199,949.83

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 120,000.00 2,040.00
Tukang kayu L.02 OH 0.1700 160,000.00 27,200.00
Kepala Tukang L.03 OH 0.0170 200,000.00 3,400.00
Mandor L.04 OH 0.0009 200,000.00 180.00
JUMLAH TENAGA KERJA 32,820.00
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 137,552.80 151,308.08
Sealant kg 0.0700 34,142.57 2,389.98
JUMLAH HARGA BAHAN 153,698.06
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,518.06
E. Profit 15% *D 27,977.71
F. Harga Satuan Pekerjaan (D+E) 214,495.77

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang kayu L.02 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L.04 OH 0.0013 200,000.00 260.00
JUMLAH TENAGA KERJA 48,260.00
B. BAHAN
Kaca Buram tebal = 12mm m2 1.1000 431,415.60 474,557.16
Sealant kg 0.0700 34,142.57 2,389.98
JUMLAH HARGA BAHAN 476,947.14
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 525,207.14
E. Profit 15% *D 78,781.07
F. Harga Satuan Pekerjaan (D+E) 603,988.21

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 122,815.00 135,096.50
JUMLAH HARGA BAHAN 135,096.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 165,496.50
E. Profit 15% *D 24,824.48
F. Harga Satuan Pekerjaan (D+E) 190,320.98

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 120,000.00 2,040.00
Tukang kayu L.02 OH 0.1700 160,000.00 27,200.00
Kepala Tukang L.03 OH 0.0170 200,000.00 3,400.00
Mandor L.04 OH 0.0090 200,000.00 1,800.00
JUMLAH TENAGA KERJA 34,440.00
B. BAHAN
Kaca cermin 8 mm m2 1.1000 137,552.80 151,308.08
JUMLAH HARGA BAHAN 151,308.08
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 185,748.08
E. Profit 15% *D 27,862.21
F. Harga Satuan Pekerjaan (D+E) 213,610.29

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 559,053.88 614,959.27
JUMLAH HARGA BAHAN 614,959.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 645,359.27
E. Profit 15% *D 96,803.89
F. Harga Satuan Pekerjaan (D+E) 742,163.16

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 120,000.00 9,000.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 36,800.00
B. BAHAN
Kaca patri m2 1.1000 838,089.56 921,898.52
Sealant kg 0.0500 34,142.57 1,707.13
JUMLAH HARGA BAHAN 923,605.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 960,405.64
E. Profit 15% *D 144,060.85
F. Harga Satuan Pekerjaan (D+E) 1,104,466.49
Page 81 of 375

Dihitung 4.ck Pemasangan 1 m2 Pasang Atap Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 168,000.00 125,496.00
Screw Bh 9.097 1,200.00 10,916.40
JUMLAH HARGA BAHAN 136,412.40
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 167,212.40
E. Profit 0.150 *D 25,081.86
F. Harga Satuan Pekerjaan (D+E) 192,294.26

Dihitung 5.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.010 200,000.00 2,000.00
Mandor L.15 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 54,390.00 201,786.90
Screw Bh 16.129 1,200.00 19,354.80
JUMLAH HARGA BAHAN 221,141.70
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 265,141.70
E. Profit 0.150 *D 39,771.26
F. Harga Satuan Pekerjaan (D+E) 304,912.96

Dihitung 6.ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap 5 - 10)
Uk. 195 x 96 x 0.30 cm, Jarak Rangka Gording atau Reng Max. 32 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.878 150,000.00 131,700.00
Screw Bh 13.740 1,200.00 16,488.00
JUMLAH HARGA BAHAN 148,188.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 178,988.00
E. Profit 0.150 *D 26,848.20
F. Harga Satuan Pekerjaan (D+E) 205,836.20

Dihitung 7.ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.125 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.013 200,000.00 2,600.00
Mandor L.15 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 40,680.00
B. BAHAN
Bubungan Atap Selulosa Bitumen (Ukuran 75,922.00
1060x 50 cm) Lbr 1.438 109,175.84
Sekrup / Paku Bh 10.000 1,200.00 12,000.00
JUMLAH HARGA BAHAN 121,175.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 161,855.84
E. Profit 0.150 *D 24,278.38
F. Harga Satuan Pekerjaan (D+E) 186,134.21
DAFTAR ANALISA PEKERJAAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
TAHUN ANGGARAN 2021
Dihitung 2. ckPemasangan 1 m2 Plafond PVC (ex. Shunda Plafond)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 260,000.00 260,000.00

JUMLAH HARGA ALAT 260,000.00


D. Jumlah (A+B+C) 260,000.00
E. Profit 15% *D 39,000.00
F. Harga Satuan Pekerjaan (D+E) 299,000.00

A. 4.5.2.15. ckPemasangan 1 m2 atap Spandek zincalum, t=0.4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Spandeck zincalum setara " Union De m2 1.0000 67,100.00 67,100.00
Paku sekrup (kg) Kg 0.1200 48,400.00 5,808.00
JUMLAH HARGA BAHAN 72,908.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 103,708.00
E. Profit 15% *D 15,556.20
F. Harga Satuan Pekerjaan (D+E) 119,264.20
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 120,000.00 840,000.00
Tukang kayu L.03 OH 21.0000 160,000.00 3,360,000.00
Kepala tukang L.03 OH 2.1000 200,000.00 420,000.00
Mandor L.04 OH 0.3500 200,000.00 70,000.00
JUMLAH TENAGA KERJA 4,690,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,188,007.65 3,506,808.42
Paku berbagai ukuran (2"-5") Kg 1.2500 15,213.43 19,016.79
Lem kayu Kg 1.0000 31,533.33 31,533.33
JUMLAH HARGA BAHAN 3,557,358.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,247,358.54
E. Profit 15% *D 1,237,103.78
F. Harga Satuan Pekerjaan (D+E) 9,484,462.32

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 120,000.00 720,000.00
Tukang kayu L.03 OH 18.0000 160,000.00 2,880,000.00
Kepala Tukang L.03 OH 1.8000 200,000.00 360,000.00
Mandor L.04 OH 0.3000 200,000.00 60,000.00
JUMLAH TENAGA KERJA 4,020,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,483,612.42 2,980,334.90
paku 8 s/d 12 cm kg 1.2500 #N/A #N/A
Lem kayu kg 1.0000 31,533.33 31,533.33
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-
JUMLAH HARGA BAHAN 107,638.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 342,238.22
E. Profit 15% *D 51,335.73
F. Harga Satuan Pekerjaan (D+E) 393,573.95

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,231,213.60 89,248.54
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-
JUMLAH HARGA BAHAN 90,009.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 324,609.22
E. Profit 15% *D 48,691.38
F. Harga Satuan Pekerjaan (D+E) 373,300.60
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Batu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Lem kayu kg 0.5000 31,533.33 15,766.67
JUMLAH HARGA BAHAN 122,644.21
PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 792,644.21
E. Profit 15% *D 118,896.63
F. Harga Satuan Pekerjaan (D+E) 911,540.85

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 2,671,938.67 64,126.53
Lem kayu kg 0.3000 31,533.33 9,460.00
- -
JUMLAH HARGA BAHAN 73,586.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 609,586.53
E. Profit 15% *D 91,437.98
F. Harga Satuan Pekerjaan (D+E) 701,024.51

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 2,671,938.67 171,004.07
Lem kayu kg 0.5000 31,533.33 15,766.67
-
JUMLAH HARGA BAHAN 186,770.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 856,770.74
E. Profit 15% *D 128,515.61
F. Harga Satuan Pekerjaan (D+E) 985,286.35

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Kayu L.03 OH 2.1000 160,000.00 336,000.00
Kepala Tukang L.03 OH 0.2100 200,000.00 42,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 469,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 161,590.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 630,590.12
E. Profit 15% *D 94,588.52
F. Harga Satuan Pekerjaan (D+E) 725,178.64

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,110,529.88 79,629.56
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 174,421.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 710,421.22
E. Profit 15% *D 106,563.18
F. Harga Satuan Pekerjaan (D+E) 816,984.40

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 120,000.00 80,400.00
Tukang Kayu L.03 OH 2.0000 160,000.00 320,000.00
Kepala Tukang L.03 OH 0.2000 200,000.00 40,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 507,400.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,110,529.88 186,631.79
Paku berbagai ukuran (1/2"-1") kg 0.1500 22,300.60 3,345.09
-
JUMLAH HARGA BAHAN 189,976.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,376.88
E. Profit 15% *D 104,606.53
F. Harga Satuan Pekerjaan (D+E) 801,983.41

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,110,529.88 77,763.25
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.3000 31,533.33 9,460.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90
JUMLAH HARGA BAHAN 168,950.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 704,950.16
E. Profit 15% *D 105,742.52
F. Harga Satuan Pekerjaan (D+E) 810,692.69

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 120,000.00 102,000.00
Tukang Kayu L.03 OH 2.5500 160,000.00 408,000.00
Kepala Tukang L.03 OH 0.2550 200,000.00 51,000.00
Mandor L.04 OH 0.0430 200,000.00 8,600.00
JUMLAH TENAGA KERJA 569,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.8000 31,533.33 25,226.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90
Formika lembar 0.5000 83,514.20 41,757.10

JUMLAH HARGA BAHAN 215,509.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 785,109.15
E. Profit 15% *D 117,766.37
F. Harga Satuan Pekerjaan (D+E) 902,875.52

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 120,000.00 480,000.00
Tukang Kayu L.03 OH 12.0000 160,000.00 1,920,000.00
Kepala Tukang L.03 OH 1.2000 200,000.00 240,000.00
Mandor L.04 OH 0.2000 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,680,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.0000 160,000.00 3,200,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,473,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,188,007.65 3,825,609.18
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 5.6000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.15. Pemasangan 1m3 konstruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.1000 160,000.00 3,216,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,489,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
paku 8 s/d 12 cm kg 3.0000 #N/A #N/A
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0360 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm (balok klas 2) m3 0.0140 #N/A #N/A
Reng 2 x 3cm (balok klas 2) m3 0.0570 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang kayu L.03 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,483,612.42 34,770.57
Paku berbagai ukuran (2"-5") kg 0.0570 15,213.43 867.17

JUMLAH HARGA BAHAN 35,637.74


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 72,837.74
E. Profit 15% *D 10,925.66
F. Harga Satuan Pekerjaan (D+E) 83,763.40

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.3000 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L.04 OH 0.0750 200,000.00 15,000.00
JUMLAH TENAGA KERJA 87,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2000 15,213.43 3,042.69
- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang kayu L.03 OH 0.3000 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 #N/A #N/A
Paku berbagai ukuran (2"-5") kg 0.2500 15,213.43 3,803.36

- -
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34

- -

JUMLAH HARGA BAHAN 35,115.07


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 84,115.07
E. Profit 15% *D 12,617.26
F. Harga Satuan Pekerjaan (D+E) 96,732.33

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
- -
JUMLAH HARGA BAHAN 34,354.39
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,354.39
E. Profit 15% *D 12,503.16
F. Harga Satuan Pekerjaan (D+E) 95,857.55

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.4500 200,000.00 90,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 181,600.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,319,089.59 64,934.51
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01

- -

JUMLAH HARGA BAHAN 67,216.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 248,816.52
E. Profit 15% *D 37,322.48
F. Harga Satuan Pekerjaan (D+E) 286,139.00

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.0450 200,000.00 9,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 100,600.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 97,269.48 83,651.75
Lem kayu kg 0.5600 31,533.33 17,658.67
JUMLAH HARGA BAHAN 173,133.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 273,733.58
E. Profit 15% *D 41,060.04
F. Harga Satuan Pekerjaan (D+E) 314,793.62

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang kayu L.03 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 134,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 78,355.97 67,386.13
Lem kayu kg 0.5600 31,533.33 17,658.67
JUMLAH HARGA BAHAN 156,867.96
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,867.96
E. Profit 15% *D 43,630.19
F. Harga Satuan Pekerjaan (D+E) 334,498.16

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang kayu L.03 OH 1.8000 160,000.00 288,000.00
Kepala Tukang L.03 OH 0.1800 200,000.00 36,000.00
Mandor L.04 OH 0.0300 200,000.00 6,000.00
JUMLAH TENAGA KERJA 402,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,110,529.88 21,773.71
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34
Paku sekrup (kg) kg 0.1500 43,230.88 6,484.63

JUMLAH HARGA BAHAN 29,779.68


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 431,779.68
E. Profit 15% *D 64,766.95
F. Harga Satuan Pekerjaan (D+E) 496,546.64

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 16,800.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 78,355.97 31,342.39
Paku berbagai ukuran (1/2"-1") kg 0.0500 22,300.60 1,115.03

JUMLAH HARGA BAHAN 32,457.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,257.42
E. Profit 15% *D 7,388.61
F. Harga Satuan Pekerjaan (D+E) 56,646.03

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN
Bilik bambu m2 1.5000 #N/A #N/A
Kaso-kaso 5 x 7 cm m3 0.0140 #N/A #N/A
Paku kg 0.0120 #N/A #N/A
List kayu 2/4 m3 0.0030 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A. 4.6.2.2.a Pemasangan 1 set Handle + kunci untuk pintu kusen alumunium Alumunium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 92,200.00
B. BAHAN
Handle + kunci untuk pintu kusen alumunium Alumunium buah 1.0000 540,386.00 540,386.00

JUMLAH HARGA BAHAN 540,386.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 632,586.00
E. Profit 15% *D 94,887.90
F. Harga Satuan Pekerjaan (D+E) 727,473.90

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 19,805.53 19,805.53
JUMLAH HARGA BAHAN 19,805.53
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 48,765.53
E. Profit 15% *D 7,314.83
F. Harga Satuan Pekerjaan (D+E) 56,080.36

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 96,600.00
B. BAHAN
Door closer set 1.0000 242,000.00 242,000.00
JUMLAH HARGA BAHAN 242,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 338,600.00
E. Profit 15% *D 50,790.00
F. Harga Satuan Pekerjaan (D+E) 389,390.00

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Kaca gelap (ray band) tebal 5 mm m2 1.1000 115,937.36 127,531.10
Sealant kg 0.0500 34,142.57 1,707.13
JUMLAH HARGA BAHAN 129,238.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 158,198.22
E. Profit 15% *D 23,729.73
F. Harga Satuan Pekerjaan (D+E) 181,927.96
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang cat L.02 OH 0.0630 160,000.00 10,080.00
Kepala Tukang L.03 OH 0.0063 200,000.00 1,260.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 14,340.00
B. BAHAN
Plamir tembok kg 0.1000 40,365.20 4,036.52
Cat Dasar kg 0.1000 77,842.38 7,784.24
Cat penutup kg 0.2600 77,842.38 20,239.02
JUMLAH HARGA BAHAN 32,059.78
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 46,399.78
E. Profit 15% *D 6,959.97
F. Harga Satuan Pekerjaan (D+E) 53,359.74
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 120,000.00 396,000.00
Tukang batu L.02 OH 1.100 160,000.00 176,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.160 200,000.00 32,000.00
JUMLAH TENAGA KERJA 606,000.00
B. BAHAN
Closet Duduk / Monoblock unit 1.000 1,236,010.16 1,236,010.16
Perlengkapan Ls 6% x clooset 74,160.61 74,160.61
JUMLAH HARGA BAHAN 1,310,170.77
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,916,170.77
E. Profit 15% * D 287,425.62
F. Harga Satuan Pekerjaan (D+E) 2,203,596.39

A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.160 200,000.00 32,000.00
JUMLAH TENAGA KERJA 422,000.00
B. BAHAN
Closed jongkok porcelaint (lokal) unit 1.000 194,593.54 194,593.54
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00
JUMLAH HARGA BAHAN 201,985.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 623,985.54
E. Profit 15% * D 93,597.83
F. Harga Satuan Pekerjaan (D+E) 717,583.38

A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 400,000.00
B. BAHAN
Closed jongkok terraso unit 1.000 188,578.34 188,578.34
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Batu bata merah besar bh 7.000 2,024.00 14,168.00
JUMLAH HARGA BAHAN 211,458.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 611,458.34
E. Profit 15% * D 91,718.75
F. Harga Satuan Pekerjaan (D+E) 703,177.09

A. 5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.000 160,000.00 160,000.00
Kepala Tukang L.03 OH 0.100 200,000.00 20,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 310,000.00
B. BAHAN
Urinoir unit 1.000 933,394.00 933,394.00
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Perlengkapan % 30.000 280,018.20 280,018.20
JUMLAH HARGA BAHAN 1,222,124.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,532,124.20
E. Profit 15% * D 229,818.63
F. Harga Satuan Pekerjaan (D+E) 1,761,942.83

A. 5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 120,000.00 144,000.00
Tukang batu L.02 OH 1.450 160,000.00 232,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 418,000.00
B. BAHAN
Wastafel unit 1.000 810,579.00 810,579.00
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Perlengkapan % 12.000 97,269.48 97,269.48
JUMLAH HARGA BAHAN 916,560.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,334,560.48
E. Profit 15% * D 200,184.07
F. Harga Satuan Pekerjaan (D+E) 1,534,744.55

A. 5.1.1.6. Pemasangan 1 buah bathcuip porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 120,000.00 9,000.00
Tukang batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 144,600.00
B. BAHAN
Bathcuip unit 1.000 #N/A #N/A
Perlengkapan % 20.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang batu L.02 OH 4.500 160,000.00 720,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.900 200,000.00 180,000.00
JUMLAH TENAGA KERJA 1,270,000.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 344,373.26 344,373.26
Perlengkapan % 12%x bak 41,324.79 41,324.79
JUMLAH HARGA BAHAN 385,698.05
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,655,698.05
E. Profit 15% * D 248,354.71
F. Harga Satuan Pekerjaan (D+E) 1,904,052.76

A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 120,000.00 720,000.00
Tukang batu L.02 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 200,000.00 60,000.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 1,266,000.00
B. BAHAN
Batu bata merah besar bh 150.000 2,024.00 303,600.00
Semen portland kg 120.000 1,232.00 147,840.00
Pasir pasang m3 0.300 132,000.00 39,600.00
Porcelaint uk. 11x 11 cm bh 360.000 1,179.02 424,448.64
Semen warna (sika graut) kg 6.000 13,200.00 79,200.00
JUMLAH HARGA BAHAN 994,688.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,260,688.64
E. Profit 15% * D 339,103.30
F. Harga Satuan Pekerjaan (D+E) 2,599,791.94

A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang batu L.02 OH 4.500 160,000.00 720,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.900 200,000.00 180,000.00
JUMLAH TENAGA KERJA 1,270,000.00
B. BAHAN
Bak mandi fibreglass volume 0,30 m³ unit 1.000 208,785.50 208,785.50
Perlengkapan Ls 12%x bak 25,054.26 3,006.51
JUMLAH HARGA BAHAN 211,792.01
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,481,792.01
E. Profit 15% * D 222,268.80
F. Harga Satuan Pekerjaan (D+E) 1,704,060.81

A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.450 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.045 200,000.00 9,000.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 120,000.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 344,373.26 344,373.26
Perlengkapan % 12.000 41,324.79 4,958.97
JUMLAH HARGA BAHAN 349,332.23
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 469,332.23
E. Profit 15% * D 70,399.84
F. Harga Satuan Pekerjaan (D+E) 539,732.07

A. 5.1.1.11. Pemasangan 1 buah bak beton volume 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.500 120,000.00 420,000.00
Tukang batu L.02 OH 4.500 160,000.00 720,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.018 200,000.00 3,600.00
JUMLAH TENAGA KERJA 1,153,600.00
B. BAHAN
Beton 1:2:3 m3 0.900 #N/A #N/A
Baja tulangan kg 180.000 #N/A #N/A
Kayu bekisting m2 8.000 #N/A #N/A
Ubin porselin bh 500.000 #N/A #N/A
Perlengkapan % 10.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 120,000.00 3,600.00
Tukang batu L.02 OH 0.300 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.030 200,000.00 6,000.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 60,600.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 loban Unit 1.000 414,974.34 414,974.34
Water drain + Assesories bh 1.000 19,650.40 19,650.40
JUMLAH HARGA BAHAN 434,624.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 495,224.74
E. Profit 15% * D 74,283.71
F. Harga Satuan Pekerjaan (D+E) 569,508.45

A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang batu L.02 OH 0.500 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 101,000.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 loban Unit 1.000 414,974.34 414,974.34
Water drain + Assesories bh 1.000 19,650.40 19,650.40
Semen portland kg 20.000 1,232.00 24,640.00
Pasir pasang m3 0.050 132,000.00 6,600.00
JUMLAH HARGA BAHAN 465,864.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 566,864.74
E. Profit 15% * D 85,029.71
F. Harga Satuan Pekerjaan (D+E) 651,894.45

A. 5.1.1.14. Pemasangan 1 buah floor drain

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 120,000.00 1,200.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 20,200.00
B. BAHAN
Floor drain (PVC) Unit 1.000 8,801.74 8,801.74
JUMLAH HARGA BAHAN 8,801.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 29,001.74
E. Profit 15% * D 4,350.26
F. Harga Satuan Pekerjaan (D+E) 33,352.00

A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.160 120,000.00 259,200.00
Tukang batu L.02 OH 0.720 160,000.00 115,200.00
Kepala Tukang L.03 OH 0.072 200,000.00 14,400.00
Mandor L.04 OH 0.011 200,000.00 2,200.00
JUMLAH TENAGA KERJA 391,000.00
B. BAHAN
Batu bata merah besar bh 40.000 2,024.00 80,960.00
Semen portland kg 44.000 1,232.00 54,208.00
Pasir pasang m3 0.070 132,000.00 9,240.00
Pasir beton m3 0.060 132,000.00 7,920.00
Batu kerikil m3 0.070 352,000.00 24,640.00
Baja Tulangan (Polos) U24 kg 1.600 12,109.11 19,374.58
JUMLAH HARGA BAHAN 196,342.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 587,342.58
E. Profit 15% * D 88,101.39
F. Harga Satuan Pekerjaan (D+E) 675,443.97

A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 120,000.00 384,000.00
Tukang batu L.02 OH 1.150 160,000.00 184,000.00
Kepala Tukang L.03 OH 0.011 200,000.00 2,200.00
Mandor L.04 OH 0.016 200,000.00 3,200.00
JUMLAH TENAGA KERJA 573,400.00
B. BAHAN
Batu bata merah besar bh 70.000 2,024.00 141,680.00
Semen portland kg 77.000 1,232.00 94,864.00
Pasir pasang m3 0.130 132,000.00 17,160.00
Pasir beton m3 0.090 132,000.00 11,880.00
Batu kerikil m3 0.020 352,000.00 7,040.00
Baja Tulangan (Polos) U24 kg 2.600 12,109.11 31,483.69
JUMLAH HARGA BAHAN 304,107.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 877,507.69
E. Profit 15% * D 131,626.15
F. Harga Satuan Pekerjaan (D+E) 1,009,133.85

A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 120,000.00 384,000.00
Tukang batu L.02 OH 1.150 160,000.00 184,000.00
Kepala Tukang L.03 OH 0.011 200,000.00 2,200.00
Mandor L.04 OH 0.016 200,000.00 3,200.00
JUMLAH TENAGA KERJA 573,400.00
B. BAHAN
Batu bata merah besar bh 123.000 2,024.00 248,952.00
Semen portland kg 114.000 1,232.00 140,448.00
Pasir pasang m3 0.184 132,000.00 24,288.00
Pasir beton m3 0.120 132,000.00 15,840.00
Batu kerikil m3 0.033 352,000.00 11,616.00
Baja Tulangan (Polos) U24 kg 4.850 12,109.11 58,729.20
JUMLAH HARGA BAHAN 499,873.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,073,273.20
E. Profit 15% * D 160,990.98
F. Harga Satuan Pekerjaan (D+E) 1,234,264.17

A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Pipa besi galvanis Ø 0,5 (inch)/1,8mm m 1.200 27,937.81 33,525.37
Perlengkapan ls 35%x pipa 9,778.23 9,778.23
JUMLAH HARGA BAHAN 43,303.60
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,383.60
E. Profit 15% * D 10,707.54
F. Harga Satuan Pekerjaan (D+E) 82,091.14

A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 120,000.00 1,200.00
Tukang batu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.040 200,000.00 8,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 74,200.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 64,846.32 64,846.32
Seal tape bh 0.025 3,813.33 95.33
JUMLAH HARGA BAHAN 64,941.65
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 139,141.65
E. Profit 15% * D 20,871.25
F. Harga Satuan Pekerjaan (D+E) 160,012.90

A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Pipa besi galvanis Ø 0,75 (inch)/1,8mm m 1.200 33,988.49 40,786.19
Perlengkapan % 35%x pipa 11,895.97 11,895.97
JUMLAH HARGA BAHAN 52,682.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 80,762.16
E. Profit 15% * D 12,114.32
F. Harga Satuan Pekerjaan (D+E) 92,876.49

A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Pipa besi galvanis Ø 1 (inch)/1,8mm m 1.200 37,474.53 44,969.43
Perlengkapan % 35%x pipa 13,116.08 13,116.08
JUMLAH HARGA BAHAN 58,085.51
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 86,165.51
E. Profit 15% * D 12,924.83
F. Harga Satuan Pekerjaan (D+E) 99,090.34

A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.108 120,000.00 12,960.00
Tukang batu L.02 OH 0.180 160,000.00 28,800.00
Kepala Tukang L.03 OH 0.018 200,000.00 3,600.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 46,360.00
B. BAHAN
Pipa besi galvanis Ø 1,5 (inch)/1,8mm m 1.200 66,447.38 79,736.86
Perlengkapan % 35%x pipa 23,256.58 23,256.58
JUMLAH HARGA BAHAN 102,993.44
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,353.44
E. Profit 15% * D 22,403.02
F. Harga Satuan Pekerjaan (D+E) 171,756.46

A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 120,000.00 16,200.00
Tukang batu L.02 OH 0.225 160,000.00 36,000.00
Kepala Tukang L.03 OH 0.023 200,000.00 4,600.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 58,200.00
B. BAHAN
Pipa besi galvanis Ø 3 (inch) t=4 mm m 1.200 125,575.55 150,690.66
Perlengkapan % 35%x pipa 43,951.44 43,951.44
JUMLAH HARGA BAHAN 194,642.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 252,842.10
E. Profit 15% * D 37,926.31
F. Harga Satuan Pekerjaan (D+E) 290,768.41

A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 120,000.00 16,200.00
Tukang batu L.02 OH 0.225 160,000.00 36,000.00
Kepala Tukang L.03 OH 0.023 200,000.00 4,600.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 58,200.00
B. BAHAN
Pipa besi galvanis Ø 4 (inch)/1,8mm m 1.200 126,664.69 151,997.63
Perlengkapan % 35%x pipa 44,332.64 44,332.64
JUMLAH HARGA BAHAN 196,330.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 254,530.27
E. Profit 15% * D 38,179.54
F. Harga Satuan Pekerjaan (D+E) 292,709.81

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø1/2 (inch) AW, panjang 4 m m 1.200 5,976.67 7,172.00
Perlengkapan % 35%x pipa 2,091.83 2,091.83
JUMLAH HARGA BAHAN 9,263.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 24,783.83
E. Profit 15% * D 3,717.58
F. Harga Satuan Pekerjaan (D+E) 28,501.41
A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø3/4 (inch) AW, panjang 4 m m 1.200 7,956.67 9,548.00
Perlengkapan % 35%x pipa 2,784.83 2,784.83
JUMLAH HARGA BAHAN 12,332.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 27,852.83
E. Profit 15% * D 4,177.93
F. Harga Satuan Pekerjaan (D+E) 32,030.76

A. 5.1.1.26.SWK Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC 3/4" m 1.200 #N/A #N/A
Perlengkapan % 35%x pipa #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø 1 (inch) AW, panjang 4 m m 1.200 11,036.67 13,244.00
Perlengkapan % 35%x pipa 3,862.83 3,862.83
JUMLAH HARGA BAHAN 17,106.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 32,626.83
E. Profit 15% * D 4,894.03
F. Harga Satuan Pekerjaan (D+E) 37,520.86

A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 23,280.00
B. BAHAN
Pipa PVC Ø 1,5(inch) AW, panjang 4 m m 1.200 16,751.41 20,101.70
Perlengkapan % 35%x pipa 5,863.00 5,863.00
JUMLAH HARGA BAHAN 25,964.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,244.69
E. Profit 15% * D 7,386.70
F. Harga Satuan Pekerjaan (D+E) 56,631.40

A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 23,280.00
B. BAHAN
Pipa PVC Ø 2 (inch) AW, panjang 4 m m 1.200 22,000.00 26,400.00
Perlengkapan % 35%x pipa 7,700.00 7,700.00
JUMLAH HARGA BAHAN 34,100.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 57,380.00
E. Profit 15% * D 8,607.00
F. Harga Satuan Pekerjaan (D+E) 65,987.00

A. 5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0810 120,000.00 9,720.00
Tukang batu L.02 OH 0.1350 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.0135 200,000.00 2,700.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 34,820.00
B. BAHAN
Pipa PVC 2 1/2" m 1.200 #N/A #N/A
Perlengkapan % 35%x pipa #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang batu L.02 OH 0.135 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.014 200,000.00 2,700.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 34,820.00
B. BAHAN
Pipa PVC Ø 3 (inch) AW, panjang 4 m m 1.200 42,350.00 50,820.00
Perlengkapan % 35%x pipa 14,822.50 14,822.50
JUMLAH HARGA BAHAN 65,642.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 100,462.50
E. Profit 15% * D 15,069.38
F. Harga Satuan Pekerjaan (D+E) 115,531.88

A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang batu L.02 OH 0.135 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.014 200,000.00 2,700.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 34,820.00
B. BAHAN
Pipa PVC Ø 4-6 (inch) AW, panjang 4 m m 1.200 53,306.00 63,967.20
Perlengkapan % 35%x pipa 18,657.10 18,657.10
JUMLAH HARGA BAHAN 82,624.30
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 117,444.30
E. Profit 15% * D 17,616.65
F. Harga Satuan Pekerjaan (D+E) 135,060.95
A. 5.1.1.33. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 120,000.00 9,600.00
Tukang batu L.02 OH 0.040 160,000.00 6,400.00
Kepala Tukang L.03 OH 0.004 200,000.00 800.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 17,600.00
B. BAHAN
Pipa tanah bh 1.600 #N/A #N/A
Semen portland kg 35.000 1,232.00 43,120.00
Pasir pasang m3 0.014 132,000.00 1,848.00

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 5.1.1.34. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 15 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 120,000.00 7,200.00
Tukang batu L.02 OH 0.030 160,000.00 4,800.00
Kepala Tukang L.03 OH 0.003 200,000.00 600.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 13,200.00
B. BAHAN
Pipa tanah bh 1.600 #N/A #N/A
Semen portland kg 0.680 1,232.00 837.76
Pasir pasang m3 0.013 132,000.00 1,716.00
Pasir urug/timbun m3 0.011 62,857.14 691.43
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang batu L.02 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.007 200,000.00 1,400.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Pipa beton Ø 20 cm, panjang 1m' bh 1.100 85,119.28 93,631.21
Batu bata merah kecil m3 0.027 1,223.24 33.03
Semen portland kg 3.920 1,232.00 4,829.44
Pasir pasang m3 0.056 132,000.00 7,392.00
Pasir urug/timbun m3 0.024 62,857.14 1,508.57
JUMLAH HARGA BAHAN 107,394.25
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 138,194.25
E. Profit 15% * D 20,729.14
F. Harga Satuan Pekerjaan (D+E) 158,923.38

A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 120,000.00 45,600.00
Tukang batu L.02 OH 0.190 160,000.00 30,400.00
Kepala Tukang L.03 OH 0.019 200,000.00 3,800.00
Mandor L.04 OH 0.019 200,000.00 3,800.00
JUMLAH TENAGA KERJA 83,600.00
B. BAHAN
Pipa beton Ø 60 cm, panjang 1m' bh 1.100 141,054.59 155,160.05
Batu bata merah kecil m3 0.550 1,223.24 672.78
Semen portland kg 10.300 1,232.00 12,689.60
Pasir pasang m3 0.061 132,000.00 8,052.00
Pasir urug/timbun m3 0.069 62,857.14 4,337.14
JUMLAH HARGA BAHAN 180,911.57
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 264,511.57
E. Profit 15% * D 39,676.74
F. Harga Satuan Pekerjaan (D+E) 304,188.31
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A. 8.4.1.1. Pemasangan 1 m pipa PVC Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang pipa L.02 OH 0.041 160,000.00 6,560.00
Mandor L.04 OH 0.008 200,000.00 1,600.00
JUMLAH TENAGA KERJA 17,880.00
B. BAHAN
Pipa PVC Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.006 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.2. Pemasangan 1 m Pipa PVC Æ 90 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.094 120,000.00 11,280.00
Tukang Pipa L.02 OH 0.047 160,000.00 7,520.00
Mandor L.04 OH 0.009 200,000.00 1,800.00
JUMLAH TENAGA KERJA 20,600.00
B. BAHAN
Pipa PVC Æ 90 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.008 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.3. Pemasangan 1 m pipa PVC Ø 110 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.105 120,000.00 12,600.00
Tukang pipa L.02 OH 0.053 160,000.00 8,480.00
Mandor L.04 OH 0.011 200,000.00 2,200.00
JUMLAH TENAGA KERJA 23,280.00
B. BAHAN
Pipa PVC Ø 110 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.01 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.4. Pemasangan 1 m pipa PVC Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.118 120,000.00 14,160.00
Tukang pipa L.02 OH 0.059 160,000.00 9,440.00
Mandor L.04 OH 0.012 200,000.00 2,400.00
JUMLAH TENAGA KERJA 26,000.00
B. BAHAN
Pipa PVC Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.012 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.5. Pemasangan 1 m pipa PVC Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.189 120,000.00 22,680.00
Tukang pipa L.02 OH 0.095 160,000.00 15,200.00
Mandor L.04 OH 0.019 200,000.00 3,800.00
JUMLAH TENAGA KERJA 41,680.00
B. BAHAN
Pipa PVC Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.024 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.6. Pemasangan 1 m pipa PVC Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.256 120,000.00 30,720.00
Tukang pipa L.02 OH 0.128 160,000.00 20,480.00
Mandor L.04 OH 0.026 200,000.00 5,200.00
JUMLAH TENAGA KERJA 56,400.00
B. BAHAN
Pipa PVC Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.034 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.7. Pemasangan 1 m pipa PVC Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.294 120,000.00 35,280.00
Tukang pipa L.02 OH 0.147 160,000.00 23,520.00
Mandor L.04 OH 0.029 200,000.00 5,800.00
JUMLAH TENAGA KERJA 64,600.00
B. BAHAN
Pipa PVC Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.04 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.8. Pemasangan 1 m pipa PVC Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.544 120,000.00 65,280.00
Tukang pipa L.02 OH 0.272 160,000.00 43,520.00
Mandor L.04 OH 0.054 200,000.00 10,800.00
JUMLAH TENAGA KERJA 119,600.00
B. BAHAN
Pipa PVC Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.08 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.9. Pemasangan 1 m pipa PVC Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.669 120,000.00 80,280.00
Tukang pipa L.02 OH 0.335 160,000.00 53,600.00
Mandor L.04 OH 0.067 200,000.00 13,400.00
JUMLAH TENAGA KERJA 147,280.00
B. BAHAN
Pipa PVC Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.1 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.809 120,000.00 97,080.00
Tukang pipa L.02 OH 0.405 160,000.00 64,800.00
Mandor L.04 OH 0.081 200,000.00 16,200.00
JUMLAH TENAGA KERJA 178,080.00
B. BAHAN
Pipa PVC Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.122 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.957 120,000.00 114,840.00
Tukang pipa L.02 OH 0.479 160,000.00 76,640.00
Mandor L.04 OH 0.096 200,000.00 19,200.00
JUMLAH TENAGA KERJA 210,680.00
B. BAHAN
Pipa PVC Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.145 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.618 120,000.00 194,160.00
Tukang pipa L.02 OH 0.809 160,000.00 129,440.00
Mandor L.04 OH 0.162 200,000.00 32,400.00
JUMLAH TENAGA KERJA 356,000.00
B. BAHAN
Pipa PVC Ø 800 mm m 1.000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN
Sewa Tripot/Tackel & hari 0.25 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.691 120,000.00 202,920.00
Tukang pipa L.02 OH 0.846 160,000.00 135,360.00
Mandor L.04 OH 0.169 200,000.00 33,800.00
JUMLAH TENAGA KERJA 372,080.00
B. BAHAN
Pipa PVC Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.262 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.895 120,000.00 227,400.00
Tukang pipa L.02 OH 0.948 160,000.00 151,680.00
Mandor L.04 OH 0.190 200,000.00 38,000.00
JUMLAH TENAGA KERJA 417,080.00
B. BAHAN
Pipa PVC Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.294 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.099 120,000.00 251,880.00
Tukang pipa L.02 OH 1.050 160,000.00 168,000.00
Mandor L.04 OH 0.210 200,000.00 42,000.00
JUMLAH TENAGA KERJA 461,880.00
B. BAHAN
Pipa PVC Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.327 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.303 120,000.00 276,360.00
Tukang pipa L.02 OH 1.152 160,000.00 184,320.00
Mandor L.04 OH 0.230 200,000.00 46,000.00
JUMLAH TENAGA KERJA 506,680.00
B. BAHAN
Pipa PVC Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.359 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.035 120,000.00 4,200.00
Tukang pipa L.02 OH 0.017 160,000.00 2,720.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 7,520.00
B. BAHAN
Pipa HDPE Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 120,000.00 4,800.00
Tukang pipa L.02 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 8,800.00
B. BAHAN
Pipa HDPE Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.045 120,000.00 5,400.00
Tukang pipa L.02 OH 0.023 160,000.00 3,680.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 10,080.00
B. BAHAN
Pipa HDPE Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.062 120,000.00 7,440.00
Tukang pipa L.02 OH 0.031 160,000.00 4,960.00
Mandor L.04 OH 0.006 200,000.00 1,200.00
JUMLAH TENAGA KERJA 13,600.00
B. BAHAN
Pipa HDPE Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.102 120,000.00 12,240.00
Tukang pipa L.02 OH 0.051 160,000.00 8,160.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 22,400.00
B. BAHAN
Pipa HDPE Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.019 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.133 120,000.00 15,960.00
Tukang pipa L.02 OH 0.067 160,000.00 10,720.00
Mandor L.04 OH 0.013 200,000.00 2,600.00
JUMLAH TENAGA KERJA 29,280.00
B. BAHAN
Pipa HDPE Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.042 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 120,000.00 20,400.00
Tukang pipa L.02 OH 0.085 160,000.00 13,600.00
Mandor L.04 OH 0.017 200,000.00 3,400.00
JUMLAH TENAGA KERJA 37,400.00
B. BAHAN
Pipa HDPE Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.065 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.290 120,000.00 34,800.00
Tukang pipa L.02 OH 0.145 160,000.00 23,200.00
Mandor L.04 OH 0.029 200,000.00 5,800.00
JUMLAH TENAGA KERJA 63,800.00
B. BAHAN
Pipa HDPE Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.152 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.359 120,000.00 43,080.00
Tukang pipa L.02 OH 0.180 160,000.00 28,800.00
Mandor L.04 OH 0.036 200,000.00 7,200.00
JUMLAH TENAGA KERJA 79,080.00
B. BAHAN
Pipa HDPE Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.2 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.433 120,000.00 51,960.00
Tukang pipa L.02 OH 0.216 160,000.00 34,560.00
Mandor L.04 OH 0.043 200,000.00 8,600.00
JUMLAH TENAGA KERJA 95,120.00
B. BAHAN
Pipa HDPE Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.251 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.512 120,000.00 61,440.00
Tukang pipa L.02 OH 0.256 160,000.00 40,960.00
Mandor L.04 OH 0.051 200,000.00 10,200.00
JUMLAH TENAGA KERJA 112,600.00
B. BAHAN
Pipa HDPE Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.307 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.893 120,000.00 107,160.00
Tukang pipa L.02 OH 0.446 160,000.00 71,360.00
Mandor L.04 OH 0.089 200,000.00 17,800.00
JUMLAH TENAGA KERJA 196,320.00
B. BAHAN
Pipa HDPE Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.573 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.353 120,000.00 162,360.00
Tukang pipa L.02 OH 0.677 160,000.00 108,320.00
Mandor L.04 OH 0.135 200,000.00 27,000.00
JUMLAH TENAGA KERJA 297,680.00
B. BAHAN
Pipa HDPE Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.883 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.659 120,000.00 199,080.00
Tukang pipa L.02 OH 0.830 160,000.00 132,800.00
Mandor L.04 OH 0.116 200,000.00 23,200.00
JUMLAH TENAGA KERJA 355,080.00
B. BAHAN
Pipa HDPE Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.093 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.818 120,000.00 218,160.00
Tukang pipa L.02 OH 0.909 160,000.00 145,440.00
Mandor L.04 OH 0.182 200,000.00 36,400.00
JUMLAH TENAGA KERJA 400,000.00
B. BAHAN
Pipa HDPE Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.205 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.370 120,000.00 284,400.00
Tukang pipa L.02 OH 1.185 160,000.00 189,600.00
Mandor L.04 OH 0.237 200,000.00 47,400.00
JUMLAH TENAGA KERJA 521,400.00
B. BAHAN
Pipa HDPE Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.584 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.345 120,000.00 41,400.00
Tukang pipa L.02 OH 0.172 160,000.00 27,520.00
Mandor L.04 OH 0.034 200,000.00 6,800.00
JUMLAH TENAGA KERJA 75,720.00
B. BAHAN
Pipa GIP Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 120,000.00 48,000.00
Tukang pipa L.02 OH 0.200 160,000.00 32,000.00
Mandor L.04 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Pipa GIP Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.448 120,000.00 53,760.00
Tukang pipa L.02 OH 0.224 160,000.00 35,840.00
Mandor L.04 OH 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 98,600.00
B. BAHAN
Pipa GIP Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.506 120,000.00 60,720.00
Tukang pipa L.02 OH 0.253 160,000.00 40,480.00
Mandor L.04 OH 0.051 200,000.00 10,200.00
JUMLAH TENAGA KERJA 111,400.00
B. BAHAN
Pipa GIP Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.796 120,000.00 95,520.00
Tukang pipa L.02 OH 0.398 160,000.00 63,680.00
Mandor L.04 OH 0.080 200,000.00 16,000.00
JUMLAH TENAGA KERJA 175,200.00
B. BAHAN
Pipa GIP Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.949 120,000.00 113,880.00
Tukang pipa L.02 OH 0.475 160,000.00 76,000.00
Mandor L.04 OH 0.095 200,000.00 19,000.00
JUMLAH TENAGA KERJA 208,880.00
B. BAHAN
Pipa GIP Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.958 120,000.00 114,960.00
Tukang pipa L.02 OH 0.479 160,000.00 76,640.00
Mandor L.04 OH 0.096 200,000.00 19,200.00
JUMLAH TENAGA KERJA 210,800.00
B. BAHAN
Pipa GIP Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.212 120,000.00 145,440.00
Tukang pipa L.02 OH 0.606 160,000.00 96,960.00
Mandor L.04 OH 0.121 200,000.00 24,200.00
JUMLAH TENAGA KERJA 266,600.00
B. BAHAN
Pipa GIP Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.353 120,000.00 162,360.00
Tukang pipa L.02 OH 0.676 160,000.00 108,160.00
Mandor L.04 OH 0.135 200,000.00 27,000.00
JUMLAH TENAGA KERJA 297,520.00
B. BAHAN
Pipa GIP Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.469 120,000.00 176,280.00
Tukang pipa L.02 OH 0.735 160,000.00 117,600.00
Mandor L.04 OH 0.147 200,000.00 29,400.00
JUMLAH TENAGA KERJA 323,280.00
B. BAHAN
Pipa GIP Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.327 120,000.00 159,240.00
Tukang pipa L.02 OH 0.664 160,000.00 106,240.00
Mandor L.04 OH 0.133 200,000.00 26,600.00
JUMLAH TENAGA KERJA 292,080.00
B. BAHAN
Pipa GIP Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.327 120,000.00 279,240.00
Tukang pipa L.02 OH 1.163 160,000.00 186,080.00
Mandor L.04 OH 0.233 200,000.00 46,600.00
JUMLAH TENAGA KERJA 511,920.00
B. BAHAN
Pipa GIP Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.623 120,000.00 314,760.00
Tukang pipa L.02 OH 1.312 160,000.00 209,920.00
Mandor L.04 OH 0.262 200,000.00 52,400.00
JUMLAH TENAGA KERJA 577,080.00
B. BAHAN
Pipa GIP Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 120,000.00 384,000.00
Tukang pipa L.02 OH 1.600 160,000.00 256,000.00
Mandor L.04 OH 0.320 200,000.00 64,000.00
JUMLAH TENAGA KERJA 704,000.00
B. BAHAN
Pipa GIP Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.488 120,000.00 418,560.00
Tukang pipa L.02 OH 1.744 160,000.00 279,040.00
Mandor L.04 OH 0.349 200,000.00 69,800.00
JUMLAH TENAGA KERJA 767,400.00
B. BAHAN
Pipa GIP Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.489 120,000.00 58,680.00
Tukang pipa L.02 OH 0.098 160,000.00 15,680.00
Mandor L.04 OH 0.049 200,000.00 9,800.00
JUMLAH TENAGA KERJA 84,160.00
B. BAHAN
Pipa DCI Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.547 120,000.00 65,640.00
Tukang pipa L.02 OH 0.109 160,000.00 17,440.00
Mandor L.04 OH 0.055 200,000.00 11,000.00
JUMLAH TENAGA KERJA 94,080.00
B. BAHAN
Pipa DCI Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.613 120,000.00 73,560.00
Tukang pipa L.02 OH 0.123 160,000.00 19,680.00
Mandor L.04 OH 0.061 200,000.00 12,200.00
JUMLAH TENAGA KERJA 105,440.00
B. BAHAN
Pipa DCI Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.855 120,000.00 102,600.00
Tukang pipa L.02 OH 0.171 160,000.00 27,360.00
Mandor L.04 OH 0.085 200,000.00 17,000.00
JUMLAH TENAGA KERJA 146,960.00
B. BAHAN
Pipa DCI Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.38 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.951 120,000.00 114,120.00
Tukang pipa L.02 OH 0.190 160,000.00 30,400.00
Mandor L.04 OH 0.095 200,000.00 19,000.00
JUMLAH TENAGA KERJA 163,520.00
B. BAHAN
Pipa DCI Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.05 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.973 120,000.00 116,760.00
Tukang pipa L.02 OH 0.195 160,000.00 31,200.00
Mandor L.04 OH 0.097 200,000.00 19,400.00
JUMLAH TENAGA KERJA 167,360.00
B. BAHAN
Pipa DCI Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.071 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.545 120,000.00 185,400.00
Tukang pipa L.02 OH 0.309 160,000.00 49,440.00
Operator alat berat L.08 OH 0.093 180,000.00 16,740.00
Mandor L.04 OH 0.154 200,000.00 30,800.00
JUMLAH TENAGA KERJA 282,380.00
B. BAHAN
Pipa DCI Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.023 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.031 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.813 120,000.00 217,560.00
Tukang pipa L.02 OH 0.363 160,000.00 58,080.00
Operator alat berat L.08 OH 0.143 180,000.00
Mandor L.04 OH 0.181 200,000.00 36,200.00
JUMLAH TENAGA KERJA 311,840.00
B. BAHAN
Pipa DCI Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.029 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.047 120,000.00 245,640.00
Tukang pipa L.02 OH 0.409 160,000.00 65,440.00
Operator alat berat L.08 OH 0.193 180,000.00
Mandor L.04 OH 0.205 200,000.00 41,000.00
JUMLAH TENAGA KERJA 352,080.00
B. BAHAN
Pipa DCI Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.034 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.045 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.58. Pemasangan 1 m pipa DCI Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.011 120,000.00 241,320.00
Tukang pipa L.02 OH 0.402 160,000.00 64,320.00
Operator alat berat L.08 OH 0.293 180,000.00
Mandor L.04 OH 0.201 200,000.00 40,200.00
JUMLAH TENAGA KERJA 345,840.00
B. BAHAN
Pipa DCI Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.058 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.077 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.59. Pemasangan 1 m pipa DCI Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.859 120,000.00 463,080.00
Tukang pipa L.02 OH 0.772 160,000.00 123,520.00
Operator alat berat L.08 OH 0.493 180,000.00
Mandor L.04 OH 0.386 200,000.00 77,200.00
JUMLAH TENAGA KERJA 663,800.00
B. BAHAN
Pipa DCI Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.034 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.225 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.60. Pemasangan 1 m pipa DCI Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.995 120,000.00 599,400.00
Tukang pipa L.02 OH 0.999 160,000.00 159,840.00
Operator alat berat L.08 OH 0.593 180,000.00
Mandor L.04 OH 0.154 200,000.00 30,800.00
JUMLAH TENAGA KERJA 790,040.00
B. BAHAN
Pipa DCI Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.093 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.248 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.61. Pemasangan 1 m pipa DCI Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.931 120,000.00 711,720.00
Tukang pipa L.02 OH 1.186 160,000.00 189,760.00
Operator alat berat L.08 OH 0.793 180,000.00
Mandor L.04 OH 0.693 200,000.00 138,600.00
JUMLAH TENAGA KERJA 1,040,080.00
B. BAHAN
Pipa DCI Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.112 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.298 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.62. Pemasangan 1 m pipa DCI Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.949 120,000.00 833,880.00
Tukang pipa L.02 OH 1.390 160,000.00 222,400.00
Operator alat berat L.08 OH 0.793 180,000.00
Mandor L.04 OH 0.695 200,000.00 139,000.00
JUMLAH TENAGA KERJA 1,195,280.00
B. BAHAN
Pipa DCI Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.152 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.304 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.63. Pemasangan 1 m pipa DCI Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 8.056 120,000.00 966,720.00
Tukang pipa L.02 OH 1.611 160,000.00 257,760.00
Operator alat berat L.08 OH 0.893 180,000.00
Mandor L.04 OH 0.806 200,000.00 161,200.00
JUMLAH TENAGA KERJA 1,385,680.00
B. BAHAN
Pipa DCI Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa excavator type hari 0.18 #N/A #N/A
225 kap 0,5 - 1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.36 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.499 120,000.00 59,880.00
Tukang pipa L.02 OH 0.100 160,000.00 16,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 85,880.00
B. BAHAN
Pipa baja Ø 63 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.031 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.579 120,000.00 69,480.00
Tukang pipa L.02 OH 0.116 160,000.00 18,560.00
Mandor L.04 OH 0.058 200,000.00 11,600.00
JUMLAH TENAGA KERJA 99,640.00
B. BAHAN
Pipa baja Ø 100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.648 120,000.00 77,760.00
Tukang pipa L.02 OH 0.130 160,000.00 20,800.00
Mandor L.04 OH 0.065 200,000.00 13,000.00
JUMLAH TENAGA KERJA 111,560.00
B. BAHAN
Pipa baja Ø 125 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.708 120,000.00 84,960.00
Tukang pipa L.02 OH 0.142 160,000.00 22,720.00
Mandor L.04 OH 0.071 200,000.00 14,200.00
JUMLAH TENAGA KERJA 121,880.00
B. BAHAN
Pipa baja Ø 150 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.113 120,000.00 133,560.00
Tukang pipa L.02 OH 0.223 160,000.00 35,680.00
Mandor L.04 OH 0.111 200,000.00 22,200.00
JUMLAH TENAGA KERJA 191,440.00
B. BAHAN
Pipa baja Ø 200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.69. Pemasangan 1 m pipa baja Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.325 120,000.00 159,000.00
Tukang pipa L.02 OH 0.265 160,000.00 42,400.00
Mandor L.04 OH 0.133 200,000.00 26,600.00
JUMLAH TENAGA KERJA 228,000.00
B. BAHAN
Pipa baja Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.415 120,000.00 169,800.00
Tukang pipa L.02 OH 0.283 160,000.00 45,280.00
Mandor L.04 OH 0.141 200,000.00 28,200.00
JUMLAH TENAGA KERJA 243,280.00
B. BAHAN
Pipa baja Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.004 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.366 120,000.00 283,920.00
Tukang pipa L.02 OH 0.473 160,000.00 75,680.00
Mandor L.04 OH 0.237 200,000.00 47,400.00
JUMLAH TENAGA KERJA 407,000.00
B. BAHAN
Pipa baja Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.027 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.231 120,000.00 267,720.00
Tukang pipa L.02 OH 0.446 160,000.00 71,360.00
Mandor L.04 OH 0.223 200,000.00 44,600.00
JUMLAH TENAGA KERJA 383,680.00
B. BAHAN
Pipa baja Ø 450 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.026 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.037 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.432 120,000.00 291,840.00
Tukang pipa L.02 OH 0.486 160,000.00 77,760.00
Mandor L.04 OH 0.243 200,000.00 48,600.00
JUMLAH TENAGA KERJA 418,200.00
B. BAHAN
Pipa baja Ø 500 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.029 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.045 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.208 120,000.00 264,960.00
Tukang pipa L.02 OH 0.442 160,000.00 70,720.00
Mandor L.04 OH 0.221 200,000.00 44,200.00
JUMLAH TENAGA KERJA 379,880.00
B. BAHAN
Pipa baja Ø 600 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.027 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.897 120,000.00 467,640.00
Tukang pipa L.02 OH 0.779 160,000.00 124,640.00
Mandor L.04 OH 0.390 200,000.00 78,000.00
JUMLAH TENAGA KERJA 670,280.00
B. BAHAN
Pipa baja Ø 800 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.046 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.098 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.403 120,000.00 528,360.00
Tukang pipa L.02 OH 0.081 160,000.00 12,960.00
Mandor L.04 OH 0.440 200,000.00 88,000.00
JUMLAH TENAGA KERJA 629,320.00
B. BAHAN
Pipa baja Ø 900 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.052 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.115 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.895 120,000.00 587,400.00
Tukang pipa L.02 OH 0.979 160,000.00 156,640.00
Mandor L.04 OH 0.489 200,000.00 97,800.00
JUMLAH TENAGA KERJA 841,840.00
B. BAHAN
Pipa baja Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.058 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.133 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.387 120,000.00 646,440.00
Tukang pipa L.02 OH 1.077 160,000.00 172,320.00
Mandor L.04 OH 0.539 200,000.00 107,800.00
JUMLAH TENAGA KERJA 926,560.00
B. BAHAN
Pipa baja Ø 1100 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.064 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.15 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.897 120,000.00 707,640.00
Tukang pipa L.02 OH 1.176 160,000.00 188,160.00
Mandor L.04 OH 0.588 200,000.00 117,600.00
JUMLAH TENAGA KERJA 1,013,400.00
B. BAHAN
Pipa baja Ø 1200 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa exavator type hari 0.07 #N/A #N/A
225 kap 0,5-1,0 m3 #N/A #N/A
Sewa Tripot/Tackel & hari 0.167 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA

A. 8.4.2.1. Pemotongan 1 buah pipa PVC Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 120,000.00 600.00
Tukang pipa L.02 OH 0.002 160,000.00 320.00
Mandor L.04 OH 0.0005 200,000.00 100.00
JUMLAH TENAGA KERJA 1,020.00
B. BAHAN
Pipa PVC Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.2. Pemotongan 1 buah pipa PVC Ø 90 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.014 120,000.00 1,680.00
Tukang pipa L.02 OH 0.007 160,000.00 1,120.00
Mandor L.04 OH 0.001 200,000.00 200.00
JUMLAH TENAGA KERJA 3,000.00
B. BAHAN
Pipa PVC Ø 90 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.3. Pemotongan 1 buah pipa PVC Ø 110 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.022 120,000.00 2,640.00
Tukang pipa L.02 OH 0.011 160,000.00 1,760.00
Mandor L.04 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 4,800.00
B. BAHAN
Pipa PVC Ø 110 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.4. Pemotongan 1 buah pipa PVC Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.031 120,000.00 3,720.00
Tukang pipa L.02 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 6,720.00
B. BAHAN
Pipa PVC Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.003 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.5. Pemotongan 1 buah pipa PVC Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang pipa L.02 OH 0.040 160,000.00 6,400.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 17,720.00
B. BAHAN
Pipa PVC Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.017 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.6. Pemotongan 1 buah pipa PVC Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.128 120,000.00 15,360.00
Tukang pipa L.02 OH 0.064 160,000.00 10,240.00
Mandor L.04 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 28,200.00
B. BAHAN
Pipa PVC Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.03 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.7. Pemotongan 1 buah pipa PVC Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.155 120,000.00 18,600.00
Tukang pipa L.02 OH 0.077 160,000.00 12,320.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 33,920.00
B. BAHAN
Pipa PVC Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.037 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.8. Pemotongan 1 buah pipa PVC Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.331 120,000.00 39,720.00
Tukang pipa L.02 OH 0.166 160,000.00 26,560.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 72,880.00
B. BAHAN
Pipa PVC Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T1/manual hari 0.086 #N/A #N/A
( gergaji ) / saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.9. Pemotongan 1 buah pipa PVC Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.420 120,000.00 50,400.00
Tukang pipa L.02 OH 0.210 160,000.00 33,600.00
Mandor L.04 OH 0.0420 200,000.00 8,400.00
JUMLAH TENAGA KERJA 92,400.00
B. BAHAN
Pipa PVC Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.054 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.10. Pemotongan 1 buah pipa PVC Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.518 120,000.00 62,160.00
Tukang pipa L.02 OH 0.259 160,000.00 41,440.00
Mandor L.04 OH 0.0520 200,000.00 10,400.00
JUMLAH TENAGA KERJA 114,000.00
B. BAHAN
Pipa PVC Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.069 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.11. Pemotongan 1 buah pipa PVC Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.623 120,000.00 74,760.00
Tukang pipa L.02 OH 0.311 160,000.00 49,760.00
Mandor L.04 OH 0.0620 200,000.00 12,400.00
JUMLAH TENAGA KERJA 136,920.00
B. BAHAN
Pipa PVC Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.086 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.12. Pemotongan 1 buah pipa PVC Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.089 120,000.00 130,680.00
Tukang pipa L.02 OH 0.545 160,000.00 87,200.00
Mandor L.04 OH 0.1090 200,000.00 21,800.00
JUMLAH TENAGA KERJA 239,680.00
B. BAHAN
Pipa PVC Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.16 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.13. Pemotongan 1 buah pipa PVC Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.141 120,000.00 136,920.00
Tukang pipa L.02 OH 0.571 160,000.00 91,360.00
Mandor L.04 OH 0.1140 200,000.00 22,800.00
JUMLAH TENAGA KERJA 251,080.00
B. BAHAN
Pipa PVC Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.168 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.14. Pemotongan 1 buah pipa PVC Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.285 120,000.00 154,200.00
Tukang pipa L.02 OH 0.643 160,000.00 102,880.00
Mandor L.04 OH 0.1290 200,000.00 25,800.00
JUMLAH TENAGA KERJA 282,880.00
B. BAHAN
Pipa PVC Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.191 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.15. Pemotongan 1 buah pipa PVC Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 120,000.00 171,480.00
Tukang pipa L.02 OH 0.715 160,000.00 114,400.00
Mandor L.04 OH 0.1430 200,000.00 28,600.00
JUMLAH TENAGA KERJA 314,480.00
B. BAHAN
Pipa PVC Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.213 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.16. Pemotongan 1 buah pipa PVC Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.573 120,000.00 188,760.00
Tukang pipa L.02 OH 0.787 160,000.00 125,920.00
Mandor L.04 OH 0.1570 200,000.00 31,400.00
JUMLAH TENAGA KERJA 346,080.00
B. BAHAN
Pipa PVC Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.236 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.17. Pemotongan 1 buah pipa HDPE Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.002 120,000.00 240.00
Tukang pipa L.02 OH 0.001 160,000.00 160.00
Mandor L.04 OH 0.0002 200,000.00
Operator L.08 OH 0.0340 200,000.00 6,800.00
JUMLAH TENAGA KERJA 7,200.00
B. BAHAN
Pipa HDPE Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.004 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.18. Pemotongan 1 buah pipa HDPE Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.006 120,000.00 720.00
Tukang pipa L.02 OH 0.003 160,000.00 480.00
Mandor L.04 OH 0.0010 200,000.00 200.00
Operator L.08 OH 0.0710 200,000.00 14,200.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
Pipa HDPE Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.005 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.19. Pemotongan 1 buah pipa HDPE Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.009 120,000.00 1,080.00
Tukang pipa L.02 OH 0.005 160,000.00 800.00
Mandor L.04 OH 0.0010 200,000.00 200.00
Operator L.08 OH 0.0960 200,000.00 19,200.00
JUMLAH TENAGA KERJA 21,280.00
B. BAHAN
Pipa HDPE Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.006 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.20. Pemotongan 1 buah pipa HDPE Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.016 120,000.00 1,920.00
Tukang pipa L.02 OH 0.008 160,000.00 1,280.00
Mandor L.04 OH 0.0020 200,000.00
Operator L.08 OH 0.1210 200,000.00 24,200.00
JUMLAH TENAGA KERJA 27,400.00
B. BAHAN
Pipa HDPE Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.009 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.21. Pemotongan 1 buah pipa HDPE Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.044 120,000.00 5,280.00
Tukang pipa L.02 OH 0.022 160,000.00 3,520.00
Mandor L.04 OH 0.0040 200,000.00
Operator L.08 OH 0.1710 200,000.00 34,200.00
JUMLAH TENAGA KERJA 43,000.00
B. BAHAN
Pipa HDPE Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.017 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.22. Pemotongan 1 buah pipa HDPE Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.067 120,000.00 8,040.00
Tukang pipa L.02 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.0070 200,000.00
Operator L.08 OH 0.2210 200,000.00 44,200.00
JUMLAH TENAGA KERJA 57,520.00
B. BAHAN
Pipa HDPE Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.023 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.23. Pemotongan 1 buah pipa HDPE Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 120,000.00 10,800.00
Tukang pipa L.02 OH 0.045 160,000.00 7,200.00
Mandor L.04 OH 0.0090 200,000.00
Operator L.08 OH 0.2710 200,000.00 54,200.00
JUMLAH TENAGA KERJA 72,200.00
B. BAHAN
Pipa HDPE Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.03 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.24. Pemotongan 1 buah pipa HDPE Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.177 120,000.00 21,240.00
Tukang pipa L.02 OH 0.088 160,000.00 14,080.00
Mandor L.04 OH 0.0180 200,000.00
Operator L.08 OH 0.3710 200,000.00 74,200.00
JUMLAH TENAGA KERJA 109,520.00
B. BAHAN
Pipa HDPE Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.055 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.25. Pemotongan 1 buah pipa HDPE Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.225 120,000.00 27,000.00
Tukang pipa L.02 OH 0.113 160,000.00 18,080.00
Mandor L.04 OH 0.0230 200,000.00
Operator L.08 OH 0.4210 200,000.00 84,200.00
JUMLAH TENAGA KERJA 129,280.00
B. BAHAN
Pipa HDPE Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.07 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.26. Pemotongan 1 buah pipa HDPE Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.277 120,000.00 33,240.00
Tukang pipa L.02 OH 0.139 160,000.00 22,240.00
Mandor L.04 OH 0.0280 200,000.00
Operator L.08 OH 0.4710 200,000.00 94,200.00
JUMLAH TENAGA KERJA 149,680.00
B. BAHAN
Pipa HDPE Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.085 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.27. Pemotongan 1 buah pipa HDPE Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.333 120,000.00 39,960.00
Tukang pipa L.02 OH 0.167 160,000.00 26,720.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
Operator L.08 OH 0.5710 200,000.00 114,200.00
JUMLAH TENAGA KERJA 187,480.00
B. BAHAN
Pipa HDPE Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.101 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.28. Pemotongan 1 buah pipa HDPE Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.601 120,000.00 72,120.00
Tukang pipa L.02 OH 0.301 160,000.00 48,160.00
Mandor L.04 OH 0.0600 200,000.00 12,000.00
Operator L.08 OH 0.7710 200,000.00 154,200.00
JUMLAH TENAGA KERJA 286,480.00
B. BAHAN
Pipa HDPE Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.179 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.29. Pemotongan 1 buah pipa HDPE Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.913 120,000.00 109,560.00
Tukang pipa L.02 OH 0.456 160,000.00 72,960.00
Mandor L.04 OH 0.0910 200,000.00
Operator L.08 OH 0.8710 200,000.00 174,200.00
JUMLAH TENAGA KERJA 356,720.00
B. BAHAN
Pipa HDPE Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.27 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.30. Pemotongan 1 buah pipa HDPE Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.125 120,000.00 135,000.00
Tukang pipa L.02 OH 0.562 160,000.00 89,920.00
Mandor L.04 OH 0.1120 200,000.00
Operator L.08 OH 0.9710 200,000.00 194,200.00
JUMLAH TENAGA KERJA 419,120.00
B. BAHAN
Pipa HDPE Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.332 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.31. Pemotongan 1 buah pipa HDPE Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.238 120,000.00 148,560.00
Tukang pipa L.02 OH 0.619 160,000.00 99,040.00
Mandor L.04 OH 0.1240 200,000.00
Operator L.08 OH 1.0710 200,000.00 214,200.00
JUMLAH TENAGA KERJA 461,800.00
B. BAHAN
Pipa HDPE Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.365 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.32. Pemotongan 1 buah pipa HDPE Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.019 120,000.00 2,280.00
Tukang pipa L.02 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.0020 200,000.00
JUMLAH TENAGA KERJA 3,880.00
B. BAHAN
Pipa GIP Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.33. Pemotongan 1 buah pipa GIP Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.019 120,000.00 2,280.00
Tukang pipa L.02 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.0020 200,000.00
JUMLAH TENAGA KERJA 3,880.00
B. BAHAN
Pipa GIP Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.34. Pemotongan 1 buah pipa GIP Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.058 120,000.00 6,960.00
Tukang pipa L.02 OH 0.029 160,000.00 4,640.00
Mandor L.04 OH 0.0060 200,000.00
JUMLAH TENAGA KERJA 11,600.00
B. BAHAN
Pipa GIP Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.35. Pemotongan 1 buah pipa GIP Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.092 120,000.00 11,040.00
Tukang pipa L.02 OH 0.046 160,000.00 7,360.00
Mandor L.04 OH 0.0090 200,000.00
JUMLAH TENAGA KERJA 18,400.00
B. BAHAN
Pipa GIP Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.36. Pemotongan 1 buah pipa GIP Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.131 120,000.00 15,720.00
Tukang pipa L.02 OH 0.066 160,000.00 10,560.00
Mandor L.04 OH 0.0130 200,000.00
JUMLAH TENAGA KERJA 26,280.00
B. BAHAN
Pipa GIP Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.37. Pemotongan 1 buah pipa GIP Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.340 120,000.00 40,800.00
Tukang pipa L.02 OH 0.170 160,000.00 27,200.00
Mandor L.04 OH 0.0340 200,000.00
JUMLAH TENAGA KERJA 68,000.00
B. BAHAN
Pipa GIP Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.38. Pemotongan 1 buah pipa GIP Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.475 120,000.00 57,000.00
Tukang pipa L.02 OH 0.237 160,000.00 37,920.00
Mandor L.04 OH 0.0470 200,000.00
JUMLAH TENAGA KERJA 94,920.00
B. BAHAN
Pipa GIP Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.39. Pemotongan 1 buah pipa GIP Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.504 120,000.00 60,480.00
Tukang pipa L.02 OH 0.252 160,000.00 40,320.00
Mandor L.04 OH 0.0500 200,000.00
JUMLAH TENAGA KERJA 100,800.00
B. BAHAN
Pipa GIP Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.40. Pemotongan 1 buah pipa GIP Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.738 120,000.00 88,560.00
Tukang pipa L.02 OH 0.369 160,000.00 59,040.00
Mandor L.04 OH 0.0740 200,000.00
JUMLAH TENAGA KERJA 147,600.00
B. BAHAN
Pipa GIP Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.41. Pemotongan 1 buah pipa GIP Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.848 120,000.00 101,760.00
Tukang pipa L.02 OH 0.424 160,000.00 67,840.00
Mandor L.04 OH 0.0850 200,000.00
JUMLAH TENAGA KERJA 169,600.00
B. BAHAN
Pipa GIP Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.42. Pemotongan 1 buah pipa GIP Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.941 120,000.00 112,920.00
Tukang pipa L.02 OH 0.471 160,000.00 75,360.00
Mandor L.04 OH 0.0940 200,000.00
JUMLAH TENAGA KERJA 188,280.00
B. BAHAN
Pipa GIP Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.43. Pemotongan 1 buah pipa GIP Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.864 120,000.00 103,680.00
Tukang pipa L.02 OH 0.432 160,000.00 69,120.00
Mandor L.04 OH 0.0860 200,000.00
JUMLAH TENAGA KERJA 172,800.00
B. BAHAN
Pipa GIP Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.44. Pemotongan 1 buah pipa GIP Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.567 120,000.00 188,040.00
Tukang pipa L.02 OH 0.783 160,000.00 125,280.00
Mandor L.04 OH 0.1570 200,000.00
JUMLAH TENAGA KERJA 313,320.00
B. BAHAN
Pipa GIP Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.45. Pemotongan 1 buah pipa GIP Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.770 120,000.00 212,400.00
Tukang pipa L.02 OH 0.885 160,000.00 141,600.00
Mandor L.04 OH 0.1770 200,000.00
JUMLAH TENAGA KERJA 354,000.00
B. BAHAN
Pipa GIP Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.46. Pemotongan 1 buah pipa GIP Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.974 120,000.00 236,880.00
Tukang pipa L.02 OH 0.987 160,000.00 157,920.00
Mandor L.04 OH 0.1970 200,000.00
JUMLAH TENAGA KERJA 394,800.00
B. BAHAN
Pipa GIP Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.47. Pemotongan 1 buah pipa GIP Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.178 120,000.00 261,360.00
Tukang pipa L.02 OH 1.089 160,000.00 174,240.00
Mandor L.04 OH 0.2180 200,000.00
JUMLAH TENAGA KERJA 435,600.00
B. BAHAN
Pipa GIP Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.48. Pemotongan 1 buah pipa GIP Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.382 120,000.00 285,840.00
Tukang pipa L.02 OH 1.191 160,000.00 190,560.00
Mandor L.04 OH 0.2380 200,000.00
JUMLAH TENAGA KERJA 476,400.00
B. BAHAN
Pipa GIP Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.49. Pemotongan 1 buah pipa DCI Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.071 120,000.00 8,520.00
Tukang pipa L.02 OH 0.014 160,000.00 2,240.00
Mandor L.04 OH 0.0070 200,000.00
JUMLAH TENAGA KERJA 10,760.00
B. BAHAN
Pipa DCI Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.003 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.50. Pemotongan 1 buah pipa DCI Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.112 120,000.00 13,440.00
Tukang pipa L.02 OH 0.022 160,000.00 3,520.00
Mandor L.04 OH 0.0110 200,000.00
JUMLAH TENAGA KERJA 16,960.00
B. BAHAN
Pipa DCI Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.01 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.51. Pemotongan 1 buah pipa DCI Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.159 120,000.00 19,080.00
Tukang pipa L.02 OH 0.032 160,000.00 5,120.00
Mandor L.04 OH 0.0160 200,000.00
JUMLAH TENAGA KERJA 24,200.00
B. BAHAN
Pipa DCI Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.018 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.52. Pemotongan 1 buah pipa DCI Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.366 120,000.00 43,920.00
Tukang pipa L.02 OH 0.073 160,000.00 11,680.00
Mandor L.04 OH 0.0370 200,000.00
JUMLAH TENAGA KERJA 55,600.00
B. BAHAN
Pipa DCI Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.054 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.53. Pemotongan 1 buah pipa DCI Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.476 120,000.00 57,120.00
Tukang pipa L.02 OH 0.095 160,000.00 15,200.00
Mandor L.04 OH 0.0480 200,000.00
JUMLAH TENAGA KERJA 72,320.00
B. BAHAN
Pipa DCI Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.073 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.54. Pemotongan 1 buah pipa DCI Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.512 120,000.00 61,440.00
Tukang pipa L.02 OH 0.102 160,000.00 16,320.00
Mandor L.04 OH 0.0510 200,000.00
JUMLAH TENAGA KERJA 77,760.00
B. BAHAN
Pipa DCI Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa tripot/Tackel & hari 0.079 #N/A #N/A
handle crane 2 T #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.55. Pemotongan 1 buah pipa DCI Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.941 120,000.00 112,920.00
Tukang pipa L.02 OH 0.188 160,000.00 30,080.00
Mandor L.04 OH 0.0940 200,000.00
JUMLAH TENAGA KERJA 143,000.00
B. BAHAN
Pipa DCI Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.158 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.56. Pemotongan 1 buah pipa DCI Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.137 120,000.00 136,440.00
Tukang pipa L.02 OH 0.227 160,000.00 36,320.00
Mandor L.04 OH 0.1140 200,000.00
JUMLAH TENAGA KERJA 172,760.00
B. BAHAN
Pipa DCI Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.176 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.57. Pemotongan 1 buah pipa DCI Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.312 120,000.00 157,440.00
Tukang pipa L.02 OH 0.262 160,000.00 41,920.00
Mandor L.04 OH 0.1310 200,000.00
JUMLAH TENAGA KERJA 199,360.00
B. BAHAN
Pipa DCI Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.192 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.58. Pemotongan 1 buah pipa DCI Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.309 120,000.00 157,080.00
Tukang pipa L.02 OH 0.262 160,000.00 41,920.00
Mandor L.04 OH 0.1310 200,000.00
JUMLAH TENAGA KERJA 199,000.00
B. BAHAN
Pipa DCI Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.192 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.59. Pemotongan 1 buah pipa DCI Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.598 120,000.00 311,760.00
Tukang pipa L.02 OH 0.520 160,000.00 83,200.00
Mandor L.04 OH 0.2600 200,000.00
JUMLAH TENAGA KERJA 394,960.00
B. BAHAN
Pipa DCI Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.31 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.60. Pemotongan 1 buah pipa DCI Ø 900 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.370 120,000.00 404,400.00
Tukang pipa L.02 OH 0.674 160,000.00 107,840.00
Mandor L.04 OH 0.3370 200,000.00
JUMLAH TENAGA KERJA 512,240.00
B. BAHAN
Pipa DCI Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.381 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.61. Pemotongan 1 buah pipa DCI Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.021 120,000.00 482,520.00
Tukang pipa L.02 OH 0.804 160,000.00 128,640.00
Mandor L.04 OH 0.4020 200,000.00
JUMLAH TENAGA KERJA 611,160.00
B. BAHAN
Pipa DCI Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.441 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.62. Pemotongan 1 buah pipa DCI Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.731 120,000.00 567,720.00
Tukang pipa L.02 OH 0.946 160,000.00 151,360.00
Mandor L.04 OH 0.4730 200,000.00
JUMLAH TENAGA KERJA 719,080.00
B. BAHAN
Pipa DCI Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.506 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.63. Pemotongan 1 buah pipa DCI Ø 1200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.502 120,000.00 660,240.00
Tukang pipa L.02 OH 1.100 160,000.00 176,000.00
Mandor L.04 OH 0.5500 200,000.00
JUMLAH TENAGA KERJA 836,240.00
B. BAHAN
Pipa DCI Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.576 #N/A #N/A
cilinder saw #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.64. Pemotongan 1 buah pipa baja Ø 63 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 120,000.00 3,360.00
Tukang pipa L.02 OH 0.006 160,000.00 960.00
Mandor L.04 OH 0.0030 200,000.00
JUMLAH TENAGA KERJA 4,320.00
B. BAHAN
Pipa baja Ø 63 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.037 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.65. Pemotongan 1 buah pipa baja Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.085 120,000.00 10,200.00
Tukang pipa L.02 OH 0.017 160,000.00 2,720.00
Mandor L.04 OH 0.0080 200,000.00
JUMLAH TENAGA KERJA 12,920.00
B. BAHAN
Pipa baja Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.04 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.66. Pemotongan 1 buah pipa baja Ø 125 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.133 120,000.00 15,960.00
Tukang pipa L.02 OH 0.027 160,000.00 4,320.00
Mandor L.04 OH 0.0130 200,000.00
JUMLAH TENAGA KERJA 20,280.00
B. BAHAN
Pipa baja Ø 125 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.042 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.67. Pemotongan 1 buah pipa baja Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.184 120,000.00 22,080.00
Tukang pipa L.02 OH 0.037 160,000.00 5,920.00
Mandor L.04 OH 0.0180 200,000.00
JUMLAH TENAGA KERJA 28,000.00
B. BAHAN
Pipa baja Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.045 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.68. Pemotongan 1 buah pipa baja Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.476 120,000.00 57,120.00
Tukang pipa L.02 OH 0.095 160,000.00 15,200.00
Mandor L.04 OH 0.0480 200,000.00
JUMLAH TENAGA KERJA 72,320.00
B. BAHAN
Pipa baja Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.06 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.69. Pemotongan 1 buah pipa baja Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.663 120,000.00 79,560.00
Tukang pipa L.02 OH 0.133 160,000.00 21,280.00
Mandor L.04 OH 0.0660 200,000.00
JUMLAH TENAGA KERJA 100,840.00
B. BAHAN
Pipa baja Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.068 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.70. Pemotongan 1 buah pipa baja Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.745 120,000.00 89,400.00
Tukang pipa L.02 OH 0.149 160,000.00 23,840.00
Mandor L.04 OH 0.0740 200,000.00
JUMLAH TENAGA KERJA 113,240.00
B. BAHAN
Pipa baja Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.072 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.71. Pemotongan 1 buah pipa baja Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.440 120,000.00 172,800.00
Tukang pipa L.02 OH 0.288 160,000.00 46,080.00
Mandor L.04 OH 0.1440 200,000.00
JUMLAH TENAGA KERJA 218,880.00
B. BAHAN
Pipa baja Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.105 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.72. Pemotongan 1 buah pipa baja Ø 450 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.399 120,000.00 167,880.00
Tukang pipa L.02 OH 0.280 160,000.00 44,800.00
Mandor L.04 OH 0.1400 200,000.00
JUMLAH TENAGA KERJA 212,680.00
B. BAHAN
Pipa baja Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.107 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.73. Pemotongan 1 buah pipa baja Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.558 120,000.00 186,960.00
Tukang pipa L.02 OH 0.312 160,000.00 49,920.00
Mandor L.04 OH 0.1560 200,000.00
JUMLAH TENAGA KERJA 236,880.00
B. BAHAN
Pipa baja Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.107 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.74. Pemotongan 1 buah pipa baja Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.437 120,000.00 172,440.00
Tukang pipa L.02 OH 0.287 160,000.00 45,920.00
Mandor L.04 OH 0.1440 200,000.00
JUMLAH TENAGA KERJA 218,360.00
B. BAHAN
Pipa baja Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.113 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.75. Pemotongan 1 buah pipa baja Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.624 120,000.00 314,880.00
Tukang pipa L.02 OH 0.525 160,000.00 84,000.00
Mandor L.04 OH 0.2620 200,000.00
JUMLAH TENAGA KERJA 398,880.00
B. BAHAN
Pipa baja Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.166 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.2.76. Pemotongan 1 buah pipa baja Ø 900 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.971 120,000.00 356,520.00
Tukang pipa L.02 OH 0.594 160,000.00 95,040.00
Mandor L.04 OH 0.2970 200,000.00
JUMLAH TENAGA KERJA 451,560.00
B. BAHAN
Pipa baja Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.183 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.77. Pemotongan 1 buah pipa baja Ø 1000 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.319 120,000.00 398,280.00
Tukang pipa L.02 OH 0.664 160,000.00 106,240.00
Mandor L.04 OH 0.3320 200,000.00
JUMLAH TENAGA KERJA 504,520.00
B. BAHAN
Pipa baja Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.201 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.2.78. Pemotongan 1 buah pipa baja Ø 1100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.667 120,000.00 440,040.00
Tukang pipa L.02 OH 0.733 160,000.00 117,280.00
Mandor L.04 OH 0.3670 200,000.00
JUMLAH TENAGA KERJA 557,320.00
B. BAHAN
Pipa baja Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.218 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.2.79. Pemotongan 1 buah pipa baja Ø 1200 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.015 120,000.00 481,800.00
Tukang pipa L.02 OH 0.803 160,000.00 128,480.00
Mandor L.04 OH 0.4020 200,000.00
JUMLAH TENAGA KERJA 610,280.00
B. BAHAN
Pipa baja Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.236 #N/A #N/A
cilinder saw #N/A #N/A

JUMLAH HARGA ALAT #N/A


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

A. 8.4.3.1. Pemasangan 1 Buah Valve Æ 150 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 120,000.00 171,480.00
Tukang pipa L.02 OH 0.715 160,000.00 114,400.00
Mandor L.04 OH 0.143 200,000.00 28,600.00
JUMLAH TENAGA KERJA 314,480.00
B. BAHAN
Valve Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.100 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.2. Pemasangan 1 Buah Valve Æ 200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 120,000.00 205,680.00
Tukang pipa L.02 OH 0.857 160,000.00 137,120.00
Mandor L.04 OH 0.171 200,000.00 34,200.00
JUMLAH TENAGA KERJA 377,000.00
B. BAHAN
Valve Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.300 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.3.3. Pemasangan 1 Buah Valve Æ 250 MM
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 120,000.00 205,680.00
Tukang pipa L.02 OH 0.857 160,000.00 137,120.00
Mandor L.04 OH 0.171 200,000.00 34,200.00
JUMLAH TENAGA KERJA 377,000.00
B. BAHAN
Valve Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.400 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.4. Pemasangan 1 Buah Valve Æ 300 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 120,000.00 240,000.00
Tukang pipa L.02 OH 1.000 160,000.00 160,000.00
Mandor L.04 OH 0.200 200,000.00 40,000.00
JUMLAH TENAGA KERJA 440,000.00
B. BAHAN
Valve Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.5. Pemasangan 1 Buah Valve Æ 400 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.429 120,000.00 411,480.00
Tukang pipa L.02 OH 1.715 160,000.00 274,400.00
Mandor L.04 OH 0.343 200,000.00 68,600.00
JUMLAH TENAGA KERJA 754,480.00
B. BAHAN
Valve Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.6. Pemasangan 1 Buah Valve Æ 450 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.429 120,000.00 411,480.00
Tukang pipa L.02 OH 1.715 160,000.00 274,400.00
Mandor L.04 OH 0.343 200,000.00 68,600.00
JUMLAH TENAGA KERJA 754,480.00
B. BAHAN
Valve Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.7. Pemasangan 1 Buah Valve Æ 500 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 120,000.00 480,000.00
Tukang pipa L.02 OH 2.000 160,000.00 320,000.00
Mandor L.04 OH 0.400 200,000.00 80,000.00
JUMLAH TENAGA KERJA 880,000.00
B. BAHAN
Valve Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.8. Pemasangan 1 Buah Valve Æ 600 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.421 120,000.00 170,520.00
Tukang pipa L.02 OH 0.711 160,000.00 113,760.00
Mandor L.04 OH 0.142 200,000.00 28,400.00
JUMLAH TENAGA KERJA 312,680.00
B. BAHAN
Valve Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.600 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.300 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.9. Pemasangan 1 Buah Valve Æ 700 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.429 120,000.00 171,480.00
Tukang pipa L.02 OH 0.715 160,000.00 114,400.00
Mandor L.04 OH 0.143 200,000.00 28,600.00
JUMLAH TENAGA KERJA 314,480.00
B. BAHAN
Valve Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.500 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.10. Pemasangan 1 Buah Valve Æ 800 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.786 120,000.00 214,320.00
Tukang pipa L.02 OH 0.893 160,000.00 142,880.00
Mandor L.04 OH 0.179 200,000.00 35,800.00
JUMLAH TENAGA KERJA 393,000.00
B. BAHAN
Valve Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.500 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.11. Pemasangan 1 Buah Valve Æ 900 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.714 120,000.00 205,680.00
Tukang pipa L.02 OH 0.857 160,000.00 137,120.00
Mandor L.04 OH 0.171 200,000.00 34,200.00
JUMLAH TENAGA KERJA 377,000.00
B. BAHAN
Valve Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.750 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.750 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.12. Pemasangan 1 Buah Valve Æ 1000 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.571 160,000.00 411,360.00
Tukang pipa L.02 OH 1.286 200,000.00 257,200.00
Mandor L.04 OH 0.257 200,000.00 51,400.00
JUMLAH TENAGA KERJA 719,960.00
B. BAHAN
Valve Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.13. Pemasangan 1 Buah Valve Æ 1100 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang pipa L.02 OH 1.500 160,000.00 240,000.00
Mandor L.04 OH 0.300 200,000.00 60,000.00
JUMLAH TENAGA KERJA 660,000.00
B. BAHAN
Valve Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.14. Pemasangan 1 Buah Valve Æ 1200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang pipa L.02 OH 1.500 160,000.00 240,000.00
Mandor L.04 OH 0.300 200,000.00 60,000.00
JUMLAH TENAGA KERJA 660,000.00
B. BAHAN
Valve Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 1.000 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 1.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.15. Pemasangan 1 Buah Tee Æ 150 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.106 120,000.00 12,720.00
Tukang pipa L.02 OH 0.053 160,000.00 8,480.00
Mandor L.04 OH 0.011 200,000.00 2,200.00
JUMLAH TENAGA KERJA 23,400.00
B. BAHAN
Tee Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.028 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.16. Pemasangan 1 Buah Tee Æ 200 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.216 120,000.00 25,920.00
Tukang pipa L.02 OH 0.108 160,000.00 17,280.00
Mandor L.04 OH 0.022 200,000.00 4,400.00
JUMLAH TENAGA KERJA 47,600.00
B. BAHAN
Tee Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.029 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.17. Pemasangan 1 Buah Tee Æ 250 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.326 120,000.00 39,120.00
Tukang pipa L.02 OH 0.163 160,000.00 26,080.00
Mandor L.04 OH 0.033 200,000.00 6,600.00
JUMLAH TENAGA KERJA 71,800.00
B. BAHAN
Tee Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.039 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.18. Pemasangan 1 Buah Tee Æ 300 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.436 120,000.00 52,320.00
Tukang pipa L.02 OH 0.218 160,000.00 34,880.00
Mandor L.04 OH 0.044 200,000.00 8,800.00
JUMLAH TENAGA KERJA 96,000.00
B. BAHAN
Tee Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.19. Pemasangan 1 Buah Tee Æ 400 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.656 120,000.00 78,720.00
Tukang pipa L.02 OH 0.328 160,000.00 52,480.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 144,400.00
B. BAHAN
Tee Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.20. Pemasangan 1 Buah Tee Æ 450 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.766 120,000.00 91,920.00
Tukang pipa L.02 OH 0.383 160,000.00 61,280.00
Mandor L.04 OH 0.077 200,000.00 15,400.00
JUMLAH TENAGA KERJA 168,600.00
B. BAHAN
Tee Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.500 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.21. Pemasangan 1 Buah Tee Æ 500 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.876 120,000.00 105,120.00
Tukang pipa L.02 OH 0.438 160,000.00 70,080.00
Mandor L.04 OH 0.088 200,000.00 17,600.00
JUMLAH TENAGA KERJA 192,800.00
B. BAHAN
Tee Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.600 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.22. Pemasangan 1 Buah Tee Æ 600 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.096 120,000.00 131,520.00
Tukang pipa L.02 OH 0.548 160,000.00 87,680.00
Mandor L.04 OH 0.110 200,000.00 22,000.00
JUMLAH TENAGA KERJA 241,200.00
B. BAHAN
Tee Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.193 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.096 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.23. Pemasangan 1 Buah Tee Æ 700 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.316 120,000.00 157,920.00
Tukang pipa L.02 OH 0.658 160,000.00 105,280.00
Mandor L.04 OH 0.132 200,000.00 26,400.00
JUMLAH TENAGA KERJA 289,600.00
B. BAHAN
Tee Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.225 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.113 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.24. Pemasangan 1 Buah Tee Æ 800 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.536 120,000.00 184,320.00
Tukang pipa L.02 OH 0.768 160,000.00 122,880.00
Mandor L.04 OH 0.154 200,000.00 30,800.00
JUMLAH TENAGA KERJA 338,000.00
B. BAHAN
Tee Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.257 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.129 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.3.25. Pemasangan 1 Buah Tee Æ 900 MM
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.756 120,000.00 210,720.00
Tukang pipa L.02 OH 0.876 160,000.00 140,160.00
Mandor L.04 OH 0.176 200,000.00 35,200.00
JUMLAH TENAGA KERJA 386,080.00
B. BAHAN
Tee Ø 900 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.321 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.161 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.26. Pemasangan 1 Buah Tee Æ 1000 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.976 120,000.00 237,120.00
Tukang pipa L.02 OH 0.988 160,000.00 158,080.00
Mandor L.04 OH 0.198 200,000.00 39,600.00
JUMLAH TENAGA KERJA 434,800.00
B. BAHAN
Tee Ø 1000 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.366 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.183 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.3.27. Pemasangan 1 Buah Tee Æ 1100 MM


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.196 120,000.00 263,520.00
Tukang pipa L.02 OH 1.098 160,000.00 175,680.00
Mandor L.04 OH 0.220 200,000.00 44,000.00
JUMLAH TENAGA KERJA 483,200.00
B. BAHAN
Tee Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.386 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.193 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.3.28. Pemasangan 1 Buah Tee Æ 1200 MM
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.416 120,000.00 289,920.00
Tukang pipa L.02 OH 1.208 160,000.00 193,280.00
Mandor L.04 OH 0.242 200,000.00 48,400.00
JUMLAH TENAGA KERJA 531,600.00
B. BAHAN
Tee Ø 1200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Tripot/Tackel & hari 0.450 #N/A #N/A
handle crane 2 T #N/A #N/A
Mobile crane =< 3 ton hari 0.225 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

A. 8.4.4.1. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.466 120,000.00 175,920.00
Tukang pipa L.02 OH 0.733 160,000.00 117,280.00
Mandor L.04 OH 0.147 200,000.00 29,400.00
JUMLAH TENAGA KERJA 322,600.00
B. BAHAN
Pipa Ø 80 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.606 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.075 #N/A #N/A
sewa pompa submersible 3m3/h hari 0.968 #N/A #N/A
Sewa Tripot/Tackel & hari 0.865 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.2. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.646 120,000.00 197,520.00
Tukang pipa L.02 OH 0.823 160,000.00 131,680.00
Mandor L.04 OH 0.165 200,000.00 33,000.00
JUMLAH TENAGA KERJA 362,200.00
B. BAHAN
Pipa Ø 100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.65 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.159 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.078 #N/A #N/A
Sewa Tripot/Tackel & hari 0.911 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.3. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.096 120,000.00 251,520.00
Tukang pipa L.02 OH 1.048 160,000.00 167,680.00
Mandor L.04 OH 0.210 200,000.00 42,000.00
JUMLAH TENAGA KERJA 461,200.00
B. BAHAN
Pipa Ø 150 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.76 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.369 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.353 #N/A #N/A
Sewa Tripot/Tackel & hari 1.026 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.4. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.546 120,000.00 305,520.00
Tukang pipa L.02 OH 1.273 160,000.00 203,680.00
Mandor L.04 OH 0.255 200,000.00 51,000.00
JUMLAH TENAGA KERJA 560,200.00
B. BAHAN
Pipa Ø 200 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.87 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.579 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.628 #N/A #N/A
Sewa Tripot/Tackel & hari 1.141 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.5. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.996 120,000.00 359,520.00
Tukang pipa L.02 OH 1.498 160,000.00 239,680.00
Mandor L.04 OH 0.300 200,000.00 60,000.00
JUMLAH TENAGA KERJA 659,200.00
B. BAHAN
Pipa Ø 250 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 0.98 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.789 #N/A #N/A
sewa pompa submersible 3m3/h hari 1.903 #N/A #N/A
Sewa Tripot/Tackel & hari 1.256 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.6. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.446 120,000.00 413,520.00
Tukang pipa L.02 OH 1.723 160,000.00 275,680.00
Mandor L.04 OH 0.345 200,000.00 69,000.00
JUMLAH TENAGA KERJA 758,200.00
B. BAHAN
Pipa Ø 300 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.09 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 0.999 #N/A #N/A
sewa pompa submersible 3m3/h hari 2.178 #N/A #N/A
Sewa Tripot/Tackel & hari 1.371 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.7. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.346 120,000.00 521,520.00
Tukang pipa L.02 OH 2.173 160,000.00 347,680.00
Mandor L.04 OH 0.435 200,000.00 87,000.00
JUMLAH TENAGA KERJA 956,200.00
B. BAHAN
Pipa Ø 400 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.31 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.419 #N/A #N/A
sewa pompa submersible 3m3/h hari 2.728 #N/A #N/A
Sewa Tripot/Tackel & hari 1.601 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 8.4.4.8. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.796 120,000.00 575,520.00
Tukang pipa L.02 OH 2.398 160,000.00 383,680.00
Mandor L.04 OH 0.480 200,000.00 96,000.00
JUMLAH TENAGA KERJA 1,055,200.00
B. BAHAN
Pipa Ø 450 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.42 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.629 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.003 #N/A #N/A
Sewa Tripot/Tackel & hari 1.716 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.9. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 5.246 120,000.00 629,520.00
Tukang pipa L.02 OH 2.623 160,000.00 419,680.00
Mandor L.04 OH 0.525 200,000.00 105,000.00
JUMLAH TENAGA KERJA 1,154,200.00
B. BAHAN
Pipa Ø 500 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.53 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 1.839 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.278 #N/A #N/A
Sewa Tripot/Tackel & hari 1.831 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.10. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.146 120,000.00 737,520.00
Tukang pipa L.02 OH 3.073 160,000.00 491,680.00
Mandor L.04 OH 0.615 200,000.00 123,000.00
JUMLAH TENAGA KERJA 1,352,200.00
B. BAHAN
Pipa Ø 600 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.75 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 2.259 #N/A #N/A
sewa pompa submersible 3m3/h hari 3.828 #N/A #N/A
Sewa Tripot/Tackel & hari 2.061 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.11. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.046 120,000.00 845,520.00
Tukang pipa L.02 OH 3.523 160,000.00 563,680.00
Mandor L.04 OH 0.705 200,000.00 141,000.00
JUMLAH TENAGA KERJA 1,550,200.00
B. BAHAN
Pipa Ø 700 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 1.97 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 2.679 #N/A #N/A
sewa pompa submersible 3m3/h hari 4.378 #N/A #N/A
Sewa Tripot/Tackel & hari 2.291 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.4.12. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.946 120,000.00 953,520.00
Tukang pipa L.02 OH 3.973 160,000.00 635,680.00
Mandor L.04 OH 0.795 200,000.00 159,000.00
JUMLAH TENAGA KERJA 1,748,200.00
B. BAHAN
Pipa Ø 800 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan potong pipa T2/mekanik/ hari 2.19 #N/A #N/A
cilinder saw #N/A #N/A
Sewa genset 1500 watt hari 3.099 #N/A #N/A
sewa pompa submersible 3m3/h hari 4.928 #N/A #N/A
Sewa Tripot/Tackel & hari 2.521 #N/A #N/A
handle crane 2 T #N/A #N/A
JUMLAH HARGA ALAT #N/A
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A. 8.4.5.1. Pengetesan 1 m pipa Ø 50 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.002 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.2. Pengetesan 1 m pipa Ø 75 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.004 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.3. Pengetesan 1 m pipa Ø 100 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.008 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.4. Pengetesan 1 m pipa Ø 150 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.018 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.5. Pengetesan 1 m pipa Ø 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.031 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.6. Pengetesan 1 m pipa Ø 250 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.049 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.7. Pengetesan 1 m pipa Ø 300 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.071 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.8. Pengetesan 1 m pipa Ø 400 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.126 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.9. Pengetesan 1 m pipa Ø 500 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.158 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 8.4.5.10. Pengetesan 1 m pipa Ø 600 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 1,120.00
B. BAHAN
Air test ( air bersih ) m3 0.283 #N/A #N/A
Bahan bakar liter 0.060 #N/A #N/A
Oli liter 0.002 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen Portland kg 247.0000 1,232.00 304,304.00
Pasir beton (Kg) kg 869.0000 73.33 63,726.67
Batu pecah 1 - 2 (Kg) kg 999.0000 272.93 272,653.27
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 653,886.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 918,086.54
E. Profit 15% *D 137,712.98
F. Harga Satuan Pekerjaan (D+E) 1,055,799.53

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 276.0000 1,232.00 340,032.00
Pasir beton (Kg) kg 828.0000 73.33 60,720.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 272.93 276,201.31
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 690,155.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 954,355.92
E. Profit 15% *D 143,153.39
F. Harga Satuan Pekerjaan (D+E) 1,097,509.31

A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 299.0000 1,232.00 368,368.00
Pasir beton (Kg) kg 799.0000 73.33 58,593.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 272.93 277,565.94
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 717,729.88
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 981,929.88
E. Profit 15% *D 147,289.48
F. Harga Satuan Pekerjaan (D+E) 1,129,219.37

A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 120,000.00 144,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0600 200,000.00 12,000.00
JUMLAH TENAGA KERJA 192,000.00
B. BAHAN
Semen portland kg 230.0000 1,232.00 283,360.00
Pasir beton (Kg) kg 893.0000 73.33 65,486.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 272.93 280,295.20
Air ltr 200.0000 61.41 12,281.50
JUMLAH HARGA BAHAN 641,423.37
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 833,423.37
E. Profit 15% *D 125,013.50
F. Harga Satuan Pekerjaan (D+E) 958,436.87

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 326.0000 1,232.00 401,632.00
Pasir beton (Kg) kg 760.0000 73.33 55,733.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 272.93 280,841.05
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 751,409.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,015,609.00
E. Profit 15% *D 152,341.35
F. Harga Satuan Pekerjaan (D+E) 1,167,950.35

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 352.0000 1,232.00 433,664.00
Pasir beton (Kg) kg 731.0000 73.33 53,606.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 272.93 281,386.90
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 781,860.18
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,060.18
E. Profit 15% *D 156,909.03
F. Harga Satuan Pekerjaan (D+E) 1,202,969.21

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 371.0000 1,232.00 457,072.00
Pasir beton (Kg) kg 698.0000 73.33 51,186.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 272.93 285,753.72
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 807,215.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,071,415.00
E. Profit 15% *D 160,712.25
F. Harga Satuan Pekerjaan (D+E) 1,232,127.25

A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 384.0000 Err:504 Err:504
Pasir beton (Kg) kg 692.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,039.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 406.0000 Err:504 Err:504
Pasir beton (Kg) kg 684.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,026.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 Err:504 Err:504
Tukang Batu L.02 OH 0.2750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0280 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 413.0000 Err:504 Err:504
Pasir beton (Kg) kg 681.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,021.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 439.0000 Err:504 Err:504
Pasir beton (Kg) kg 670.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,006.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 448.0000 Err:504 Err:504
Pasir beton (Kg) kg 667.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 1,000.0000 Err:504 Err:504
Air ltr 215.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.1050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 400.0000 Err:504 Err:504
Pasir beton m3 0.4800 Err:504 Err:504
Batu pecah 1 - 2 (Kg) m3 0.8000 Err:504 Err:504
Storox - 100 kg 1.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.14. Membuat 1 m' PVC waterstop lebar 150 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Batu L.02 OH 0.0300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 150 mm m3 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.15. Membuat 1 m' PVC waterstop lebar 200 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Batu L.02 OH 0.0350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.16. Membuat 1 m' PVC waterstop lebar 230 mm - 320 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu/Pipa L.02 OH 0.0400 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Waterstop lebar 200 mm m3 1.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Besi L.02 OH 0.0700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0070 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi beton kg 10.5000 Err:504 Err:504
Kawat beton kg 0.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang Besi L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi beton kg 10.5000 Err:504 Err:504
Kawat beton kg 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang Besi L.02 OH 0.0250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Jaring kawat baja dilas kg 10.2000 Err:504 Err:504
Kawat beton kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.20. Membuat 1 m2 bekisting untuk pondasi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang Kayu L.02 OH 0.2600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.3000 Err:504 Err:504
Minyak bekisting liter 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.21. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang Kayu L.02 OH 0.2600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.3000 Err:504 Err:504
Minyak bekisting liter 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.23. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0180 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.24. Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0200 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 Err:504 Err:504
Penjaga jarak bekisting/spacer buah - - -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.26. Membuat 1 m2 bekisting untuk tangga


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang Kayu L.02 OH 0.3300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.4000 Err:504 Err:504
Minyak bekisting liter 0.1500 Err:504 Err:504
Kayu gergajian kelas II, balok m3 0.0150 Err:504 Err:504
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.6000 Err:504 Err:504
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 Err:504 Err:504
Tukang Batu L.02 OH 0.0200 Err:504 Err:504
Tukang Kayu L.02 OH 0.0200 Err:504 Err:504
Tukang Besi L.02 OH 0.0200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.0100 Err:504 Err:504
Minyak bekisting liter - Err:504 Err:504
Besi beton kg 3.0000 Err:504 Err:504
Kawat beton kg 0.4500 Err:504 Err:504
Semen portland kg 4.0000 Err:504 Err:504
Pasir beton m3 0.0060 Err:504 Err:504
Batu pecah 1 - 2 m3 0.0090 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 Err:504 Err:504
Tukang Batu L.02 OH 0.0330 Err:504 Err:504
Tukang Kayu L.02 OH 0.0330 Err:504 Err:504
Tukang Besi L.02 OH 0.0330 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.0200 Err:504 Err:504
Minyak bekisting liter - Err:504 Err:504
Besi beton kg 3.6000 Err:504 Err:504
Kawat beton kg 0.0500 Err:504 Err:504
Semen portland kg 5.5000 Err:504 Err:504
Pasir beton m3 0.0090 Err:504 Err:504
Batu pecah 1 - 2 m3 0.0150 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1320 Err:504 Err:504
Tukang Batu L.02 OH 0.0220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0020 Err:504 Err:504
Mandor L.04 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 26.0800 Err:504 Err:504
Pasir beton (Kg) kg 60.8000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 82.3200 Err:504 Err:504
Air ltr 17.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1650 Err:504 Err:504
Tukang Batu L.02 OH 0.0280 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.6000 Err:504 Err:504
Pasir beton (Kg) kg 76.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 102.9000 Err:504 Err:504
Air ltr 21.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1980 Err:504 Err:504
Tukang Batu L.02 OH 0.0330 Err:504 Err:504
Kepala Tukang L.03 OH 0.0030 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 32.1200 Err:504 Err:504
Pasir beton (Kg) kg 91.2000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 123.4800 Err:504 Err:504
Air ltr 25.8000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2480 Err:504 Err:504
Tukang Batu L.02 OH 0.0410 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland kg 48.9000 Err:504 Err:504
Pasir beton (Kg) kg 114.0000 Err:504 Err:504
Batu pecah 1 - 2 (Kg) kg 154.3500 Err:504 Err:504
Air ltr 32.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0070 Err:504 Err:504
Tukang Batu L.02 OH 0.0760 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Lantai kerja tebal 10 cm m3 0.0800 Err:504 Err:504
Besi hollow 50.50.3 mm kg 9.3940 Err:504 Err:504
Kayu gergajian kelas III, balok m3 0.0050 Err:504 Err:504
Phenol film 12 mm lbr 0.0800 Err:504 Err:504
Minyak bekisting liter 0.0200 Err:504 Err:504
Dinabolt dia 12 mm ( 10-15 cm) bh 3.8820 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0050 Err:504 Err:504
Phenol film 12 mm lbr 0.0430 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Paku 5-7 cm Kg 0.0460 #REF!
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0040 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0040 Err:504 Err:504
Phenol film 12 mm lbr 0.0480 Err:504 Err:504
Minyak bekisting liter 0.2000 Err:504 Err:504
Paku 5-7 cm kg 0.0460 #REF! #REF!
Dinabolt dia 12 mm ( 10-15 cm) bh 0.6930 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0530 Err:504 Err:504
Tukang Kayu L.02 OH 0.0180 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0890 Err:504 Err:504
Tukang Kayu L.02 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0710 Err:504 Err:504
Tukang Kayu L.02 OH 0.0240 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0640 Err:504 Err:504
Tukang Batu L.02 OH 0.2440 Err:504 Err:504
Tukang vibrator L.02 OH 0.1280 Err:504 Err:504
Kepala Tukang L.03 OH 0.0340 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0690 Err:504 Err:504
Tukang Batu L.02 OH 0.2420 Err:504 Err:504
Tukang vibrator L.02 OH 0.1380 Err:504 Err:504
Kepala Tukang L.03 OH 0.0370 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0610 Err:504 Err:504
Tukang Batu L.02 OH 0.2130 Err:504 Err:504
Tukang vibrator L.02 OH 0.1220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0730 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0670 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0670 Err:504 Err:504
Pekerja L.01 OH 0.0670 Err:504 Err:504
Tukang Batu L.02 OH 0.0670 Err:504 Err:504
Tukang erection L.02 OH 0.1340 Err:504 Err:504
Kepala Tukang L.03 OH 0.0670 Err:504 Err:504
Mandor L.04 OH 0.0670 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 6.6760 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0670 Err:504 Err:504
Sewa pipe support UH 1.1000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0610 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0610 Err:504 Err:504
Pekerja L.01 OH 0.0610 Err:504 Err:504
Tukang Batu L.02 OH 0.0610 Err:504 Err:504
Tukang erection L.02 OH 0.1220 Err:504 Err:504
Kepala Tukang L.03 OH 0.0610 Err:504 Err:504
Mandor L.04 OH 0.0610 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 6.1100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0610 Err:504 Err:504
Sewa pipe support UH 1.1000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Operator crane L.08 OH 0.0830 Err:504 Err:504
Pembantu operator crane L.09 OH 0.0830 Err:504 Err:504
Pekerja L.01 OH 0.0830 Err:504 Err:504
Tukang Batu L.02 OH 0.0830 Err:504 Err:504
Tukang erection L.02 OH 0.1660 Err:504 Err:504
Kepala Tukang L.03 OH 0.0830 Err:504 Err:504
Mandor L.04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 8.2770 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0830 Err:504 Err:504
Sewa pipe support UH 2.2000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0190 Err:504 Err:504
Tukang Batu L.02 OH 0.0380 Err:504 Err:504
Operator crane OH 0.0190 Err:504 Err:504
Pembantu operator crane OH 0.0190 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.8970 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa crane UH 0.0190 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.20. Bahan 1 m3 grouting campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,200.0000 Err:504 Err:504
Screening kg 650.0000 Err:504 Err:504
Air liter 350.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
JUMLAH TENAGA KERJA -
B. BAHAN
Semen grout kg 1,850.0000 Err:504 Err:504
Air liter 400.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Batu L.02 OH 0.3670 Err:504 Err:504
Kepala Tukang L.03 OH 0.0740 Err:504 Err:504
Mandor L.04 OH 0.0370 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1470 Err:504 Err:504
Tukang kayu L.02 OH 0.1470 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0120 Err:504 Err:504
Kayu gergajian kelas III, papan m3 0.0040 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2640 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.1.2.24. Upah 1 titik join dengan sling


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2200 Err:504 Err:504
Tukang kayu L.02 OH 0.2200 Err:504 Err:504
Tukang Besi L.02 OH 0.2200 Err:504 Err:504
Mandor L.04 OH 0.0110 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.0600 Err:504 Err:504
Kepala tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi profil kg 1.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.0600 Err:504 Err:504
Kepala tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi baja IWF kg 1.1500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Las konstruksi L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0010 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Solar liter 1.0000 Err:504 Err:504
Minyak pelumas liter 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa alat jam 0.8000 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Las biasa L.02 OH 1.0500 Err:504 Err:504
Kepala tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L,04 OH 0.0520 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 Err:504 Err:504
Besi plat baja kg 32.8000 Err:504 Err:504
Kawat Las Listrik kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang Besi L.02 OH 0.0200 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kawat Las Listrik kg 0.4000 Err:504 Err:504
Solar kg 0.3000 Err:504 Err:504
Minyak pelumas kg 0.0400 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Sewa alat jam 0.1700 Err:504 Err:504
JUMLAH HARGA ALAT Err:504
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6500 Err:504 Err:504
Tukang Las biasa L.02 OH 0.6500 Err:504 Err:504
Kepala tukang L.03 OH 0.0650 Err:504 Err:504
Mandor L,04 OH 0.0320 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi scuare tube m 4.7600 Err:504 Err:504
Besi lis kaca (1 x 1) cm m 4.5220 Err:504 Err:504
Pengelasan cm 20.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 Err:504 Err:504
Tukang Las biasa L.02 OH 1.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.1200 Err:504 Err:504
Mandor L,04 OH 0.0600 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pintu gulung besi' m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4400 Err:504 Err:504
Tukang L.02 OH 0.4400 Err:504 Err:504
Kepala tukang L.03 OH 0.0440 Err:504 Err:504
Mandor L,04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pintu lipat m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang L.02 OH 0.8000 Err:504 Err:504
Kepala tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L,04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sunscreen aluminium m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang L.02 OH 1.0000 Err:504 Err:504
Kepala tukang L.03 OH 0.1000 Err:504 Err:504
Mandor L,04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rolling door aluminium m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0430 Err:504 Err:504
Kepala tukang L.03 OH 0.0043 Err:504 Err:504
Mandor L,04 OH 0.0021 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 1.1000 Err:504 Err:504
Skrup fixer buah 2.0000 Err:504 Err:504
Sealant tube 0.0600 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0850 Err:504 Err:504
Kepala tukang L.03 OH 0.0085 Err:504 Err:504
Mandor L,04 OH 0.0042 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 4.4000 Err:504 Err:504
Aluminium strip m 14.6000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.0850 Err:504 Err:504
Kepala tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil aluminium m 4.4000 Err:504 Err:504
Profil kaca m 4.5000 Err:504 Err:504
Sealant tube 0.2700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang khusus aluminium L.02 OH 0.3500 Err:504 Err:504
Kepala tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vebetions blinds & vertical blinds m2 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 Err:504 Err:504
Tukang las konstruksi L.02 OH 1.6700 Err:504 Err:504
Kepala tukang L.03 OH 0.1670 Err:504 Err:504
Mandor L,04 OH 0.0830 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Besi strip kg 6.1770 #REF! #REF!
Pengelasan cm 27.0800 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kawat nyamuk m2 1.1000 #REF! #REF!
Pengelasan cm 11.1100 Err:504 Err:504
Baja strip (0,2 x 2) cm kg 1.7160 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang besi L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 Err:504 Err:504
Paku skrup 1 - 2,5 cm buah 10.0000 #REF! #REF!
Baja strip m 7.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang besi L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat m 1.0500 Err:504 Err:504
Paku skrup 1 - 2,5 cm kg 0.0150 #REF! #REF!
papan kayu kelas III m3 0.0190 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang besi L.02 OH 0.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L,04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat m 1.0500 Err:504 Err:504
Paku skrup 1 - 2,5 cm kg 0.0100 #REF! #REF!
Besi strip m3 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Besi L.02 OH 0.2500 Err:504 Err:504
Kepala tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L,04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 3.5000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Besi L.02 OH 0.3500 Err:504 Err:504
Kepala tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka hollow 40.40.2 mm m 4.0000 #REF! #REF!
assesoris (perkuatan, las, dll) Ls 100%xrangka #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 Err:504 Err:504
Tukang Besi L.02 OH 0.734 Err:504 Err:504
Kepala tukang L.03 OH 0.073 Err:504 Err:504
Mandor L,04 OH 0.037 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Baja ringan canai dingin C75 Kg 3.0650 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
Peralatan % 10.0000 Err:504 Err:504

JUMLAH HARGA ALAT Err:504


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.2.1.22. Pemasangan 1 m2 atap Jurai rangka atap baja canai dingin profil C.75

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 Err:504 Err:504
Tukang Besi L.02 OH 0.7604 Err:504 Err:504
Kepala tukang L.03 OH 0.0760 Err:504 Err:504
Mandor L,04 OH 0.0380 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Baja ringan canai dingin C75 Kg 4.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
Peralatan % 10.0000 Err:504 Err:504

JUMLAH HARGA ALAT Err:504


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 43.5000 Err:504 Err:504
Pasir pasang m3 0.0800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 32.9500 Err:504 Err:504
Pasir pasang m3 0.0910 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 26.5500 Err:504 Err:504
Pasir pasang m3 0.0930 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.4. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 22.2200 Err:504 Err:504
Pasir pasang m3 0.1020 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 18.5000 Err:504 Err:504
Pasir pasang m3 0.1220 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang Batu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L,04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 86.0000 Err:504 Err:504
Semen portland kg 10.0800 Err:504 Err:504
Kapur padam m3 0.0275 Err:504 Err:504
Pasir pasang m3 0.0925 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 18.9500 Err:504 Err:504
Pasir pasang m3 0.0380 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 14.3700 Err:504 Err:504
Pasir pasang m3 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.9. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 11.5000 Err:504 Err:504
Pasir pasang m3 0.0430 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 9.6800 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 8.3200 Err:504 Err:504
Pasir pasang m3 0.0490 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 6.5000 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen portland kg 4.5000 Err:504 Err:504
Kapur padam m3 0.0150 Err:504 Err:504
Pasir pasang m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.14. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0180 Err:504 Err:504
Kapur padam m3 0.0180 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.15. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Batu bata merah besar buah 43.0000 Err:504 Err:504
Semen merah m3 0.0140 Err:504 Err:504
Kapur padam m3 0.0140 Err:504 Err:504
Pasir pasang m3 0.0280 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.16. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 20 buah 12.5000 Err:504 Err:504
Semen portland kg 30.3200 Err:504 Err:504
Pasir pasang m3 0.7280 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.17. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 20 buah 12.5000 Err:504 Err:504
Semen portland kg 24.2600 Err:504 Err:504
Pasir pasang m3 0.7720 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.18. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L,04 OH 0.0160 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 15 buah 12.5000 Err:504 Err:504
Semen portland kg 22.7400 Err:504 Err:504
Pasir pasang m3 0.5500 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.19. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L,04 OH 0.0160 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 15 buah 12.5000 Err:504 Err:504
Semen portland kg 18.2000 Err:504 Err:504
Pasir pasang m3 0.5820 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.20. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 10 buah 12.5000 Err:504 Err:504
Semen portland kg 15.1600 Err:504 Err:504
Pasir pasang m3 0.3640 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.21. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
HB - 10 buah 12.5000 Err:504 Err:504
Semen portland kg 12.1300 Err:504 Err:504
Pasir pasang m3 0.3880 Err:504 Err:504
Besi angker 8 mm kg 0.2800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata rooster buah 30.0000 #REF! #REF!
Semen portland kg 11.0000 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata rooster buah 30.0000 #REF! #REF!
Semen portland kg 11.0000 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L,04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata berongga ekspose buah 70.0000 Err:504 Err:504
Semen portland kg 14.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 Err:504 Err:504
Tukang Batu L.02 OH 1.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.1300 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 Err:504 Err:504
Semen Mortar kg 0.4730 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 Err:504 Err:504
Tukang Batu L.02 OH 1.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.1300 Err:504 Err:504
Mandor L,04 OH 0.0030 Err:504 Err:504

JUMLAH TENAGA KERJA Err:504


B. BAHAN
Bata Ringan 10x20x60cm  m3 8.4000 Err:504 Err:504
Semen Mortar kg 0.0630 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504

B. BAHAN
Semen portland Kg 15.5040 Err:504 Err:504
Pasir pasang m3 0.0160 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.2240 Err:504 Err:504
Pasir pasang m3 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 7.7760 Err:504 Err:504
Pasir pasang m3 0.0230 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.2400 Err:504 Err:504
Pasir pasang m3 0.0240 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.1840 Err:504 Err:504
Pasir pasang m3 0.0260 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 4.4160 Err:504 Err:504
Pasir pasang m3 0.0270 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.9360 Err:504 Err:504
Pasir pasang m3
0.0280 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.4560 Err:504 Err:504
Pasir pasang m3 0.0290 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP :3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.7600 Err:504 Err:504
2. KP m3 0.0030 Err:504 Err:504
Pasir pasang m3 0.0130 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP :8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.0000 Err:504 Err:504
2. KP m3 0.0050 Err:504 Err:504
Pasir pasang m3 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP :1PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland m3 0.0090 Err:504 Err:504
2. KP m3 0.0090 Err:504 Err:504
Pasir pasang m3 0.0090 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 0.0070 Err:504 Err:504
2. KP m3 0.0070 Err:504 Err:504
Pasir pasang m3 0.0150 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 13.6320 Err:504 Err:504
Pasir pasang m3 0.0270 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.3680 Err:504 Err:504
Pasir pasang m3 0.0310 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 8.3200 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.9120 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Batu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.8880 Err:504 Err:504
Pasir pasang m3 0.0360 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4400 Err:504 Err:504
Tukang Batu L.03 OH 0.2200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0220 Err:504 Err:504
Mandor L.04 OH 0.0220 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland m3 0.0090 Err:504 Err:504
2. KP m3 0.0090 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 5.1840 Err:504 Err:504
Pasir pasang m3 0.0260 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu L.03 OH 0.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0400 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 0.5000 Err:504 Err:504
Pasir pasang m3 0.0130 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 Err:504 Err:504
Tukang Batu L.03 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0230 Err:504 Err:504
Mandor L.04 OH 0.0230 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.0000 Err:504 Err:504
Batu granit Kg 15.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4500 Err:504 Err:504
Tukang Batu L.03 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0230 Err:504 Err:504
Mandor L.04 OH 0.0230 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 10.0000 Err:504 Err:504
Batu granit Kg 15.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 4.3200 Err:504 Err:504
Pasir pasang Kg 0.0060 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.24. Pemasangan 1 m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.1080 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang Batu L.03 OH 0.0350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 1.6000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 Err:504 Err:504
Tukang Batu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0150 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 6.3400 Err:504 Err:504
Pasir pasang m3 0.0120 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.27. Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Batu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Semen portland Kg 3.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - Err:504 Err:504
Tukang Batu L.03 OH - Err:504 Err:504
Kepala Tukang L.03 OH - Err:504 Err:504
Mandor L.04 OH - Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Mortar Kg - Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.2.29. Pemasangan 1 m2 plesteran acian dengan mortar siap pakai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH - Err:504 Err:504
Tukang Batu L.03 OH - Err:504 Err:504
Kepala Tukang L.03 OH - Err:504 Err:504
Mandor L.04 OH - Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Mortar Kg - Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


A. 4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 Err:504 Err:504
Tukang Batu L.02 OH 0.1350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0140 Err:504 Err:504
Mandor L.04 OH 0.0140 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin abu-abu Bh 26.5000 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna (sika graut) Kg 1.3000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna (sika graut) Kg 1.5000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 Err:504 Err:504
Tukang Batu L.02 OH 0.1350 Err:504 Err:504
Kepala Tukang L.03 OH 0.0140 Err:504 Err:504
Mandor L.04 OH 0.0140 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin warna Bh 26.5000 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Semen warna Kg 1.0000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.7. Pemasangan 1 m2 lantai ubin traso ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin traso Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.8. Pemasangan 1 m2 lantai ubin traso ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin traso Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin granit Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin granit Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.11. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.12. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0120 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 3.1000 Err:504 Err:504
Semen portland Kg 9.6000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.1250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 6.6300 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Semen warna Kg 1.3000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 Err:504 Err:504
Tukang Batu L.02 OH 0.1300 Err:504 Err:504
Kepala Tukang L.03 OH 0.0130 Err:504 Err:504
Mandor L.04 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin teralux marmer Bh 11.8700 Err:504 Err:504
Semen portland Kg 10.0000 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
Pasir pasang m3 0.0450 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.16. Pemasangan 1 m1plint ubin PC abu-abu ukuran 15cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.6500 Err:504 Err:504
Pasir pasang m3 0.0040 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.17. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.2400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.18. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin PC Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.2400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.4.3.19. Pemasangan 1 m1 plint ubin warna ukuran 10cm x20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1500 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.20. Pemasangan 1 m1 plint ubin warna ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.21. Pemasangan 1 m1 plint ubin warna ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin warna Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.22. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin teraso Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.23. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin teraso Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.24. Pemasangan 1 m1 plint ubin granit ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin granit Bh 2.6500 Err:504 Err:504
Semen Portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.25. Pemasangan 1 m1 plint ubin granit ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint ubin granit Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.26. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux kerang Bh 2.6300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.27. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux kerang Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.28. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 1.7000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.29. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 2.6500 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.30. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0090 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint teralux marmer Bh 3.5300 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
Pasir pasang m3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3600 Err:504 Err:504
Tukang Batu L.02 OH 0.1800 Err:504 Err:504
Kepala Tukang L.03 OH 0.0180 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Teraso cor m3 0.0360 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 53.0000 Err:504 Err:504
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 106.0000 Err:504 Err:504
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 3.2000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 33cm x 33cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 Err:504 Err:504
Semen Portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 #REF! #REF!
Semen portland Kg 10.0000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 1.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.36. Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik doos 1.0500 #REF! #REF!
Semen portland Kg 10.4000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0500 Err:504 Err:504
Tukang Batu L.02 OH 0.5250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0530 Err:504 Err:504
Mandor L.04 OH 0.0530 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 33.0000 Err:504 Err:504
Semen portland Kg 9.8000 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 4.3700 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Ubin keramik Bh 11.8700 Err:504 Err:504
Semen portland Kg 14.1500 Err:504 Err:504
Pasir pasang m3 0.0390 Err:504 Err:504
Semen warna Kg 2.0000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.0250 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.40. Pemasangan 1 m1 plint keramik ukuran 10cm x 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 10.6000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.41. Pemasangan 1 m1 plint keramik ukuran 5cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 Err:504 Err:504
Tukang Batu L.02 OH 0.0900 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 0.5700 Err:504 Err:504
Pasir pasang m3 0.0015 Err:504 Err:504
Semen warna Kg 0.0130 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.42. Pemasangan 1 m1 plint internal cove artistik 5cm x 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7500 Err:504 Err:504
Tukang Batu L.02 OH 0.7500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0750 Err:504 Err:504
Mandor L.04 OH 0.0380 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plint keramik Bh 5.3000 Err:504 Err:504
Semen portland Kg 1.1400 Err:504 Err:504
Pasir pasang m3 0.0030 Err:504 Err:504
Semen warna Kg 0.1000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Marmer Bh 1.0600 #REF! #REF!
Semen portland Kg 8.1900 Err:504 Err:504
Pasir pasang m3 0.0450 Err:504 Err:504
Semen warna Kg 0.1340 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.44. Pemasangan 1 m2 lantai karpet


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1700 Err:504 Err:504
Tukang Batu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Karpet m2 1.0500 Err:504 Err:504
Lem Kg 0.3500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.45. Pemasangan 1 m2 underlayer ( pelapis bawah karpet )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Underlayer m2 1.0500 Err:504 Err:504
Lem Kg 0.3500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.46. Pemasangan 1 m2 lantai parquet kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Parquet m2 1.0500 #REF! #REF!
Lem Kg 0.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Parquet m2 1.0500 #REF! #REF!
Lem Kg 0.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.48. Pemasangan 1 m2 dinding porslen 11cmx 11cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen doos 1.0500 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.49. Pemasangan 1 m2 dinding porslen 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen Bh 53.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.50. Pemasangan 1 m2 dinding porslen 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Poerslen Bh 26.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 1.9400 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 53.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 106.0000 Err:504 Err:504
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.9000 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.53. Pemasangan 1 m2 dinding keramik 10cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik artistik Bh 53.0000 #REF! #REF!
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.54. Pemasangan 1 m2 dinding keramik 20cmx 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 Err:504 Err:504
Tukang Batu L.02 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0450 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Keramik Bh 26.5000 #REF! #REF!
Semen portland Kg 9.3000 Err:504 Err:504
Pasir pasang m3 0.0180 Err:504 Err:504
Semen warna Kg 1.9400 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.55. Pemasangan 1 m2 dinding marmer 100cmx 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.3000 Err:504 Err:504
Tukang Batu L.02 OH 0.6500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0650 Err:504 Err:504
Mandor L.04 OH 0.0650 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Marmer Bh 1.0600 #REF! #REF!
Semen portland Kg 12.4400 Err:504 Err:504
Pasir pasang m3 0.0250 Err:504 Err:504
Semen warna Kg 0.6500 #REF! #REF!
Paku 12cm Bh 3.0300 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cmx 7cmx 24cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata pelapis Bh 63.0000 Err:504 Err:504
Semen portland Kg 12.4400 Err:504 Err:504
Pasir pasang m3 0.0250 Err:504 Err:504
Semen warna Kg 2.7500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.57. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata paras Bh 1.1000 Err:504 Err:504
Semen portland Kg 11.7500 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Batu L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bata tempel hitam m2 1.1000 Err:504 Err:504
Semen portland Kg 11.7500 Err:504 Err:504
Pasir pasang m3 0.0350 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cmx 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Batu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vynil Bh 11.8700 Err:504 Err:504
Lem Kg 0.3500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Batu L.02 OH 0.1750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wallpaper m 2.2000 #REF! #REF!
Lem Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.61. Pemasangan 1 m2 floor harderner


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Floor harderner Kg 5.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.62. Pemasangan 1 m1 plint vynil 15cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 Err:504 Err:504
Tukang Batu L.02 OH 0.0800 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Vynil Bh 1.7600 Err:504 Err:504
Lem Kg 0.0800 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.63. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Batu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu kelas 1 m3 0.0030 #REF! #REF!
Paku/ skrup 5cm Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.4.3.64. Pemasangan 1 m² paving block natural tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.65. Pemasangan 1 m² paving block natural tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 2.0700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.66. Pemasangan 1 m² paving block berwarna tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block warna 6 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.67. Pemasangan 1 m² paving block berwarna tebal 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Batu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Paving block warna 8 cm m² 1.0100 Err:504 Err:504
Pasir beton m3 2.0700 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 Err:504 Err:504
Tukang Kayu L.02 OH 0.0700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0070 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Asbes semen m2 1.1000 Err:504 Err:504
Paku tripleks Kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x 30 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 12.0000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x60 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.02 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 5.8000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran ( 60 x 120 )cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Akustik Lembar 1.5000 Err:504 Err:504
Paku tripleks Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Tripleks Lembar 0.3750 Err:504 Err:504
Paku tripleks Kg 0.0300 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.02 OH 0.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu papan m3 0.0150 Err:504 Err:504
Paku tripleks Kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Gypsum board Lembar 0.3640 #REF! #REF!
Paku skrup Kg 0.1100 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.5000 Err:504 Err:504
Tukang Besi L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0250 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Profil Allum "T" m 3.6000 Err:504 Err:504
Kawat dia 4mm Kg 0.1500 Err:504 Err:504
Ramset Bh 1.0500 #REF! #REF!
Akustik 60 x 120 Lembar 1.5000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang Kayu L.02 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
List kayu profil m 1.0500 Err:504 Err:504
Paku Kg 0.0100 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Besi L.02 OH 0.3500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0350 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rangka metal hollow 40.40.2mm m1 4.0000 #REF! #REF!
Assesoris (perkuatan, las dll) Ls 100%*rangka #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0075 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng palentong Bh 25.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng kodok Bh 25.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/ super


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng palentong Bh 12.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.4. Pemasangan 1 m1 bubung genteng palentong


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 5.0000 Err:504 Err:504
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 5.0000 #REF! #REF!
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.6. Pemasangan 1 m1 bubung genteng palentong besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng bubung Bh 4.0000 Err:504 Err:504
Semen portland Kg 8.0000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0670 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rooflight 90 x 180 Lembar 0.6000 #REF! #REF!
Paku biasa 1/2" - 1" Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.5000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.6000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.6000 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.7500 #REF! #REF!
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.3700 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.3800 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.4600 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.4900 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
#REF! Lembar 0.5700 Err:504 Err:504
Paku pancing 6 x 23 Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.22. Pemasangan 1 m1 bubung stel gelombang 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.4000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.5.2.23. Pemasangan 1 m1 bubung stel gelombang 1,05m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.24. Pemasangan 1 m1 bubung stel gelombang 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bubung stel gelombang Lembar 2.0500 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.25. Pemasangan 1 m1 nok paten 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.26. Pemasangan 1 m1 nok paten 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.27. Pemasangan 1 m1 nok paten 1,08m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.2000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.28. Pemasangan 1 m1 nok stel rata 0,92m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.29. Pemasangan 1 m1 nok stel rata 1,05m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0840 Err:504 Err:504
Tukang Kayu L.03 OH 0.1250 Err:504 Err:504
Kepala Tukang L.11 OH 0.0130 Err:504 Err:504
Mandor L.15 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok paten 92cm Lembar 1.1000 Err:504 Err:504
Paku skrup 3,5" Bh 6.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 Err:504 Err:504
Paku biasa 2"-5" Kg 0.0300 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.31. Pemasangan 1 m2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0030 Err:504 Err:504
Mandor L.15 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Genteng aspal Bh 6.9000 Err:504 Err:504
Plywood 6mm Lembar 0.3500 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0300 Err:504 Err:504
Plastic aerator Bh 0.5000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang Kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.34. Pemasangan 1 m2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1660 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sirap kayu Bh 30.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang Kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng beton Bh 3.5000 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Semen portland Kg 10.8000 Err:504 Err:504
Pasir pasang m3 0.0320 Err:504 Err:504
Semen warna Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.36. Pemasangan 1 m1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng aspal Bh 2.0000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Kayu balok borneo m3 0.0035 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang Kayu L.03 OH 0.1500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0150 Err:504 Err:504
Mandor L.15 OH 0.0130 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok genteng metal Bh 1.1000 #REF! #REF!
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.38. Pemasangan 1 m1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1250 Err:504 Err:504
Tukang Kayu L.03 OH 0.2500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0250 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat 3 x 6" Lembar 0.4000 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0500 Err:504 Err:504
Paku biasa 2"-5" Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang Kayu L.03 OH 0.0600 Err:504 Err:504
Kepala Tukang L.11 OH 0.0060 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng gelombang 3"x 6" Lembar 0.7000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.40. Pemasangan 1 m1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0700 Err:504 Err:504
Kepala Tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Seng plat 3"x 6" bjls 28 Lembar 0.3000 Err:504 Err:504
Paku berbagai ukuran (1/2"-1") Kg 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.41. Pemasangan 1 m2 atap alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.7500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0800 Err:504 Err:504
Mandor L.15 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Alumunium gel. Tbl 0,55 Lembar 1.0500 #REF! #REF!
Paku hak panj. 15cm Kg 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #REF!
E. Profit 15% *D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.5.2.42. Pemasangan 1 m1 nok alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang Kayu L.03 OH 1.0000 Err:504 Err:504
Kepala Tukang L.11 OH 0.1000 Err:504 Err:504
Mandor L.15 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Nok standard 40 x 18 Bh 1.2000 Err:504 Err:504
Paku hak panj. 15cm Kg 0.0400 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang Kayu L.03 OH 0.0500 Err:504 Err:504
Kepala Tukang L.11 OH 0.0050 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Alumunium foil m2 1.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 Err:504 Err:504
Tukang kayu L.03 OH 21.0000 Err:504 Err:504
Kepala tukang L.03 OH 2.1000 Err:504
Mandor L.04 OH 0.3500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok Kayu m3 1.1000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem Kayu Kg 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.03 OH 18.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.2000 #REF! #REF!
Paku 10 cm kg 1.2500 #REF! #REF!
Lem kayu kg 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang Kayu L.03 OH 1.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Paku 5-7 cm kg 0.0500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang kayu L.03 OH 1.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Paku 5-7 cm kg 0.0500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Batu L.03 OH 3.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0400 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0240 #REF! #REF!
Lem Kayu kg 0.3000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang Kayu L.03 OH 3.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0640 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang Kayu L.03 OH 2.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2100 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
Plywood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0256 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.5000 Err:504 Err:504
Plywood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 Err:504 Err:504
Tukang Kayu L.03 OH 2.0000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2000 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0600 #REF! #REF!
Paku 1-2,5 cm kg 0.1500 #REF! #REF!
-
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang Kayu L.03 OH 2.4000 Err:504 Err:504
Kepala Tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.3000 Err:504 Err:504
Teakwood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 Err:504 Err:504
Tukang Kayu L.03 OH 2.5500 Err:504 Err:504
Kepala Tukang L.03 OH 0.2550 Err:504 Err:504
Mandor L.04 OH 0.0430 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0250 #REF! #REF!
Paku 1-2,5 cm kg 0.0300 #REF! #REF!
Lem Kayu kg 0.8000 Err:504 Err:504
Teakwood tebal 4mm uk 90x220 cm lembar 1.0000 #REF! #REF!
Formika lembar 0.5000 Err:504 Err:504

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang Kayu L.03 OH 12.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.1000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 5.6000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.03 OH 20.0000 Err:504 Err:504
Kepala Tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.2000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 5.6000 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.03 OH 20.1000 Err:504 Err:504
Kepala Tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 1.1000 #REF! #REF!
Besi strip tebal 5mm kg 15.0000 #REF! #REF!
Paku 12 cm kg 3.0000 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Reng 2 x 3cm m3 0.0360 Err:504 Err:504
Paku 5 dan 10 cm kg 0.2500 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Reng 2 x 3cm m3 0.0570 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2500 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 Err:504 Err:504
Tukang kayu L.03 OH 0.1200 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kayu kelas II m3 0.0140 #REF! #REF!
Paku berbagai ukuran (2"-5") kg 0.0570 Err:504 Err:504
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0750 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0154 Err:504 Err:504
Paku berbagai ukuran (2"-5") kg 0.2000 Err:504 Err:504
- -
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.3000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaso-kaso 5 x 7 cm m3 0.0163 Err:504 Err:504
Paku 7 - 10 cm kg 0.2500 #REF! #REF!

- -

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0108 #REF! #REF!
Paku 5 - 7 cm kg 0.1000 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0108 #REF! #REF!
Paku 5 - 7 cm kg 0.0500 #REF! #REF!
- -
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.4500 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu m3 0.0280 #REF! #REF!
Paku 5 - 7 cm kg 0.1500 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.4500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu 6 x 12 m3 0.0280 #REF! #REF!
Paku 5 - 10 cm kg 0.1500 #REF! #REF!
Teakwood tebal 4mm uk 120x240 lembar 0.8600 #REF! #REF!
Lem Kayu kg 0.5600 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Balok kayu 6 x 12 m3 0.0280 #REF! #REF!
Paku 5 - 10 cm kg 0.1500 #REF! #REF!
plywood tebal 4mm uk 120x240 lembar 0.8600 #REF! #REF!
Lem Kayu kg 0.5600 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang kayu L.03 OH 1.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.1800 Err:504 Err:504
Mandor L.04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Papan kayu m3 0.0070 #REF! #REF!
Paku 5 - 10 cm kg 0.1000 #REF! #REF!
Paku skrup 10 cm kg 0.1500 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.03 OH 0.0750 Err:504 Err:504
Kepala Tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plywood tebal 4mm lembar 0.4000 #REF! #REF!
Paku 1 - 2,5 cm kg 0.0500 #REF! #REF!

- -

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.03 OH 0.0500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Bilik bambu m2 1.5000 Err:504 Err:504
Kaso-kaso 5 x 7 cm m3 0.0140 Err:504 Err:504
Paku kg 0.0120 Err:504
List kayu 2/4 m3 0.0030 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam antik buah 1.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam biasa buah 1.0000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci tanam KM buah 1.0000 #REF!
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci silinder buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel pintu buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel kupu-kupu buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.7. Pemasangan 1 buah engsel angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Engsel angin buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Spring knip buah 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kait angin buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door closer set 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci slot bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door holder bh 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Door stop bh 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.14. Pemasangan 1 buah Rel pintu sorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Rel pintu sorong set 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kunci lemari set 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 3mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 5mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 Err:504 Err:504
Tukang kayu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0009 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca tebal 8mm m2 1.1000 #REF! #REF!
Sealant kg 0.0700 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca buram 12 mm m2 1.1000 #REF! #REF!
Sealant kg 0.0700 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca cermin 5 mm m2 1.1000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 Err:504 Err:504
Tukang kayu L.02 OH 0.1700 Err:504 Err:504
Kepala Tukang L.03 OH 0.0170 Err:504 Err:504
Mandor L.04 OH 0.0090 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca cermin 8 mm m2 1.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca wireglassed 5 mm m2 1.1000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0040 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kaca patri 5 mm m2 1.1000 #REF! #REF!
Sealant kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Soda api kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sabun kg 0.0500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Sabun kg 0.0500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang cat L.02 OH 0.0090 Err:504 Err:504
Kepala Tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat menie kg 0.2000 Err:504 Err:504
Plamir tembok kg 0.1500 Err:504 Err:504
Cat dasar kg 0.1700 #REF! #REF!
Cat penutup kg 0.2600 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 Err:504 Err:504
Ampelas lbr 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 Err:504 Err:504
Tukang cat L.02 OH 0.1050 Err:504 Err:504
Kepala Tukang L.03 OH 0.0040 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat menie kg 0.2000 Err:504 Err:504
Plamir tembok kg 0.1500 Err:504 Err:504
Cat dasar kg 0.1700 #REF! #REF!
Cat penutup kg 0.3500 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 Err:504 Err:504
Ampelas lbr 0.2000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0630 Err:504 Err:504
Kepala Tukang L.03 OH 0.0630 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Teak Oil liter 0.3600 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0160 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Politur liter 0.1500 Err:504 Err:504
Politur jadi liter 0.3720 #REF! #REF!
Ampelas lb 2.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Mandor L.04 OH 0.0060 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Residu atau ter liter 0.3500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 Err:504 Err:504
Tukang cat L.02 OH 0.1600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0160 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
cat Vernis liter 0.1500 Err:504 Err:504
Dempul kayu kg 0.0500 Err:504 Err:504
Ampelas lb 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.0630 Err:504 Err:504
Kepala Tukang L.03 OH 0.0063 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Plamur kg 0.1000 #REF! #REF!
Cat dasar kg 0.1000 #REF! #REF!
Cat penutup kg 0.2600 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 Err:504 Err:504
Tukang cat L.02 OH 0.0420 Err:504 Err:504
Kepala Tukang L.03 OH 0.0042 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Cat dasar kg 0.1200 #REF! #REF!
Cat penutup kg 0.1800 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.12. 1 M2 Pelaburan tembok dengan kalkarim

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 Err:504 Err:504
Tukang cat L.02 OH 0.0420 Err:504 Err:504
Kepala Tukang L.03 OH 0.0042 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kajkarim kg 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.13. 1 M2 Pelaburan tembok dengan kapur sirih

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang cat L.02 OH 0.0010 Err:504 Err:504
Kepala Tukang L.03 OH 0.0001 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kapur sirih kg 0.1500 Err:504 Err:504
Ampelas lembar 0.1000 Err:504 Err:504
Alang-alang ikat 0.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.14. 1 M2 Pelaburan tembok lama dengan kapur sirih ( pemeliharaan )

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 Err:504 Err:504
Tukang cat L.02 OH 0.0050 Err:504 Err:504
Kepala Tukang L.03 OH 0.0005 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Kapur sirih kg 0.3000 Err:504 Err:504
Ampelas lembar 0.2000 Err:504 Err:504
Alang-alang ikat 0.2500 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wallpaper m2 1.2000 #REF! #REF!
Lem kg 0.2000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 Err:504 Err:504
Tukang cat L.02 OH 0.2000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie besi kg 0.1000 Err:504 Err:504
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang cat L.02 OH 0.2250 Err:504 Err:504
Kepala Tukang L.03 OH 0.0225 Err:504 Err:504
Mandor L.04 OH 0.0075 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie besi kg 0.1000 Err:504 Err:504
Pengencer liter 0.0100 #REF! #REF!
Perancah kayu m3 0.0100 #REF! #REF!
Kuas bh 0.0020 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 Err:504 Err:504
Tukang cat L.02 OH 0.2500 Err:504 Err:504
Kepala Tukang L.03 OH 0.0250 Err:504 Err:504
Mandor L.04 OH 0.0013 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Menie A kg 0.1000 Err:504 Err:504
Menie B kg 0.1000 Err:504 Err:504
Pengencer liter 0.0800 #REF! #REF!
Cat kg 0.0100 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang cat L.02 OH 0.0600 Err:504 Err:504
Kepala Tukang L.03 OH 0.0120 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.3000 #REF! #REF!
Cat kg 0.0100 #REF! #REF!
Kuas bh 0.0100 Err:504 Err:504

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang cat L.02 OH 0.8000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0800 Err:504 Err:504
Mandor L.04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.1100 #REF! #REF!
Cat dasar kg 0.1700 Err:504 Err:504
Kuas bh 0.0800 Err:504 Err:504
Cat antara kg 0.0100 Err:504 Err:504
Cat penutup kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang cat L.02 OH 0.7000 Err:504 Err:504
Kepala Tukang L.03 OH 0.0700 Err:504 Err:504
Mandor L.04 OH 0.0200 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Pengencer liter 0.3000 #REF! #REF!
Cat dasar kg 0.0100 Err:504 Err:504
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.7.1.22. 1 M2 Pelituran 10 m² dengan plitur melamic

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 Err:504 Err:504
Tukang cat L.02 OH 12.0000 Err:504 Err:504
Kepala Tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.1000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B. BAHAN
Wood filler kg 1.5000 Err:504 Err:504
woodstain kg 1.5000 Err:504 Err:504
sanding kg 1.5000 Err:504 Err:504
melamic kg 2.4000 Err:504 Err:504
thinner Ltr 2.0000 Err:504 Err:504
Amplas Lmbr 6.0000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) Err:504
E. Profit 15% *D Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504
A. 2.2.1.16. Pembuatan 1 m2 Pagar panel beton pracetak 5x50x213 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 120,000.00 45,000.00
Tukang L.02 OH 0.125 160,000.00 20,000.00
Kepala Tukang L.03 OH 0.012 200,000.00 2,400.00
Mandor L.04 OH 0.019 200,000.00 3,800.00
JUMLAH TENAGA KERJA 71,200.00
B. BAHAN
Panel beton pracetak Lbr 0.986 #N/A #N/A
Kolom beton pracetak btg 0.525 #N/A #N/A
Semen PC kg 45.000 #N/A #N/A
Pasir beton m3 0.074 132,000.00 9,768.00
Koral beton m3 0.146 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Profit 10% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

harga pasaran september 2018


Rp. 320,000
per m1
DAFTAR ANALISA PEKERJAAN
BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PANGKALPINANG
TAHUN ANGGARAN 2021
(Koefisien Analisa Berdasarkan PermenPUPR No.28/PRT/M/2016)

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1. Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.020 200,000.00 4,000.00
Mandor L.04 OH 0.020 200,000.00 4,000.00
JUMLAH TENAGA KERJA 96,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 4,400.00 5,500.00
Semen Portland kg 2.500 1,232.00 3,080.00
Pasir beton m3 0.005 132,000.00 660.00
Batu pecah 1 - 2 m3 0.009 440,000.00 3,960.00
Kayu gergajian kelas III, balok m3 0.072 2,319,089.59 166,974.45
Paku berbagai ukuran (2"-5") kg 0.060 15,213.43 912.81
Residu atau ter ltr 0.400 53,154.33 21,261.73
JUMLAH HARGA BAHAN 202,348.99
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 298,348.99
E. Profit 15% * D 44,752.35
F. Harga Satuan Pekerjaan (D+E) 343,101.34

A. 2.2.1.2. Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.020 200,000.00 4,000.00
Mandor L.04 OH 0.020 200,000.00 4,000.00
JUMLAH TENAGA KERJA 96,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 4,400.00 5,500.00
Seng gelombang uk. 1,80 x 0,90 (m) lbr 1.200 53,056.08 63,667.30
Semen Portland kg 2.500 1,232.00 3,080.00
Pasir beton m3 0.005 132,000.00 660.00
Batu pecah 1 - 2 m3 0.009 440,000.00 3,960.00
Kayu gergajian kelas III, balok m3 0.072 2,319,089.59 166,974.45
Paku berbagai ukuran (2"-5") kg 0.060 15,213.43 912.81
Cat menie ltr 0.450 36,954.25 16,629.41
JUMLAH HARGA BAHAN 261,383.97
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 357,383.97
E. Profit 15% * D 53,607.59
F. Harga Satuan Pekerjaan (D+E) 410,991.56

A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari Kawat berduri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.020 200,000.00 4,000.00
Mandor L.04 OH 0.020 200,000.00 4,000.00
JUMLAH TENAGA KERJA 96,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.000 4,400.00 4,400.00
Kawat berduri kg 25.000 97,668.38 2,441,709.58
Semen Portland kg 2.000 1,232.00 2,464.00
Pasir beton m3 0.005 132,000.00 660.00
Batu pecah 1 - 2 m3 0.009 440,000.00 3,960.00
Paku berbagai ukuran (2"-5") kg 0.030 15,213.43 456.40

JUMLAH HARGA BAHAN 2,453,649.98


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,549,649.98
E. Profit 15% * D 382,447.50
F. Harga Satuan Pekerjaan (D+E) 2,932,097.48

A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.012 2,319,089.59 27,829.08
Paku berbagai ukuran (2"-5") Kg 0.020 15,213.43 304.27
Kayu gergajian kelas III, papan m3 0.007 2,231,213.60 15,618.50

JUMLAH HARGA BAHAN 43,751.84


C. PERALATAN

Page 283 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 74,751.84
E. Profit 15% * D 11,212.78
F. Harga Satuan Pekerjaan (D+E) 85,964.61

Page 284 of 375


A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 120,000.00 240,000.00
Tukang Kayu L.02 OH 2.000 160,000.00 320,000.00
Tukang Batu L.02 OH 1.000 160,000.00 160,000.00
Kepala Tukang L.03 OH 0.300 200,000.00 60,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 790,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 4,400.00 5,500.00
Kayu gergajian kelas III, balok m3 0.180 2,319,089.59 417,436.13
Paku berbagai ukuran (2"-5") kg 0.080 15,213.43 1,217.07
Besi strip 2 x 3 cm kg 1.100 8,842.68 9,726.95
Semen portland kg 35.000 1,232.00 43,120.00
Pasir pasang m3 0.150 132,000.00 19,800.00
Pasir beton m3 0.100 132,000.00 13,200.00
Batu pecah 1 - 2 m3 0.150 440,000.00 66,000.00
Batu bata merah besar bh 30.000 2,024.00 60,720.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 0.250 53,056.08 13,264.02
Jendela nako (kerangka + kaca 5 mm) bh 0.200 165,259.86 33,051.97
Kaca bening tebal 5 mm m2 0.080 130,183.90 10,414.71
Kunci pintu tanam (ex.dexon) bh 0.150 185,327.84 27,799.18
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 0.060 85,568.56 5,134.11

JUMLAH HARGA BAHAN 726,384.14


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,516,384.14
E. Profit 15% * D 227,457.62
F. Harga Satuan Pekerjaan (D+E) 1,743,841.76

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 400,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 3.000 4,400.00 13,200.00
Kayu gergajian kelas III, balok m3 0.276 2,319,089.59 640,068.73
Paku berbagai ukuran (2"-5") kg 0.700 15,213.43 10,649.40
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 53,056.08 79,584.12

JUMLAH HARGA BAHAN 743,502.25


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,143,502.25
E. Profit 15% * D 171,525.34
F. Harga Satuan Pekerjaan (D+E) 1,315,027.59

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.02 OH 2.000 160,000.00 320,000.00
Kepala Tukang L.03 OH 0.200 200,000.00 40,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 490,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.700 4,400.00 7,480.00
Kayu gergajian kelas III, balok m3 0.210 2,319,089.59 487,008.81
Paku berbagai ukuran (2"-5") kg 0.300 15,213.43 4,564.03
Semen portland kg 10.500 1,232.00 12,936.00
Pasir beton m3 0.030 132,000.00 3,960.00
Batu pecah 1 - 2 m3 0.050 440,000.00 22,000.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 53,056.08 79,584.12
Seng BJLS 30 lebar 45 cm Lbr 0.250 14,737.80 3,684.45

JUMLAH HARGA BAHAN 621,217.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,111,217.41
E. Profit 15% * D 166,682.61
F. Harga Satuan Pekerjaan (D+E) 1,277,900.03

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.02 OH 2.000 160,000.00 320,000.00
Kepala Tukang L.03 OH 0.200 200,000.00 40,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 490,000.00
B. BAHAN
Kayu dolken Ø8-10 (cm) panjang 4 m btg 1.250 4,400.00 5,500.00
Kayu gergajian kelas III, balok m3 0.186 2,319,089.59 431,350.66
Paku berbagai ukuran (2"-5") kg 0.300 15,213.43 4,564.03
Semen portland kg 18.000 1,232.00 22,176.00
Pasir beton m3 0.030 132,000.00 3,960.00
Batu pecah 1 - 2 m3 0.050 440,000.00 22,000.00
Seng gelombang uk. 1,80 x 0,90 (m) Lbr 1.500 53,056.08 79,584.12
Multiplek tebal 6 mm 1,22 x 2,44 (m) Lbr 1.350 85,568.56 115,517.56

JUMLAH HARGA BAHAN 684,652.37


C. PERALATAN

Page 285 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,174,652.37
E. Profit 15% * D 176,197.86
F. Harga Satuan Pekerjaan (D+E) 1,350,850.22

Page 286 of 375


A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 22,000.00
E. Profit 15% * D 3,300.00
F. Harga Satuan Pekerjaan (D+E) 25,300.00

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 54,000.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.036 2,231,213.60 80,323.69
Kayu gergajian kelas III, balok m3 0.014 2,319,089.59 32,467.25
Paku berbagai ukuran (2"-5") m3 0.080 15,213.43 1,217.07

JUMLAH HARGA BAHAN 114,008.02


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 168,008.02
E. Profit 15% * D 25,201.20
F. Harga Satuan Pekerjaan (D+E) 193,209.22

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 121,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.150 351,808.38 52,771.26
Batu pecah 1 - 2 m3 0.090 440,000.00 39,600.00
Pasir pasang m3 0.010 132,000.00 1,320.00

JUMLAH HARGA BAHAN 93,691.26


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 214,691.26
E. Profit 15% * D 32,203.69
F. Harga Satuan Pekerjaan (D+E) 246,894.95

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 120,000.00 1,600,080.00
Mandor L.04 OH 0.666 200,000.00 133,200.00
JUMLAH TENAGA KERJA 1,733,280.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,733,280.00
E. Profit 15% * D 259,992.00
F. Harga Satuan Pekerjaan (D+E) 1,993,272.00

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 120,000.00 800,040.00
Mandor L.04 OH 0.333 200,000.00 66,600.00
JUMLAH TENAGA KERJA 866,640.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 866,640.00
E. Profit 15% * D 129,996.00
F. Harga Satuan Pekerjaan (D+E) 996,636.00

Page 287 of 375


A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 120,000.00 90,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 95,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,000.00
E. Profit 15% * D 14,250.00
F. Harga Satuan Pekerjaan (D+E) 109,250.00

A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 120,000.00 108,000.00
Mandor L.04 OH 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 117,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 117,000.00
E. Profit 15% * D 17,550.00
F. Harga Satuan Pekerjaan (D+E) 134,550.00

A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 120,000.00 126,000.00
Mandor L.04 OH 0.067 200,000.00 13,400.00
JUMLAH TENAGA KERJA 139,400.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 139,400.00
E. Profit 15% * D 20,910.00
F. Harga Satuan Pekerjaan (D+E) 160,310.00

A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Mandor L.04 OH 0.032 200,000.00 6,400.00
JUMLAH TENAGA KERJA 126,400.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 126,400.00
E. Profit 15% * D 18,960.00
F. Harga Satuan Pekerjaan (D+E) 145,360.00

A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Mandor L.04 OH 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 192,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 192,000.00
E. Profit 15% * D 28,800.00
F. Harga Satuan Pekerjaan (D+E) 220,800.00

Page 288 of 375


A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 153,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 153,000.00
E. Profit 15% * D 22,950.00
F. Harga Satuan Pekerjaan (D+E) 175,950.00

A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 7,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,000.00
E. Profit 15% * D 1,050.00
F. Harga Satuan Pekerjaan (D+E) 8,050.00

A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 120,000.00 39,600.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 41,600.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 41,600.00
E. Profit 15% * D 6,240.00
F. Harga Satuan Pekerjaan (D+E) 47,840.00

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 120,000.00 60,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 70,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,000.00
E. Profit 15% * D 10,500.00
F. Harga Satuan Pekerjaan (D+E) 80,500.00

Pengurugan kembali 1 m 3 galian dihitung dari 1/3 dari koefisien pekerjaan galian

1 m3 Urugan kembali galian tanah biasa sedalam 1 meter Rp 36,416.67


1 m3 Urugan kembali galian tanah biasa sedalam 2 meter Rp 44,850.00
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter Rp 53,436.67
1 m3 Urugan kembali galian tanah keras sedalam 1 meter Rp 48,453.33
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter Rp 73,600.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter Rp 58,650.00

A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 120,000.00 60,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 70,000.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,000.00
E. Profit 15% * D 10,500.00
F. Harga Satuan Pekerjaan (D+E) 80,500.00

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 38,000.00
B. BAHAN
Pasir urug/timbun m3 1.200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Page 289 of 375
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 15% * D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

Page 290 of 375


A. 2.3.1.14. Pemasangan 1 m3 sirtu padat
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 120,000.00 30,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 35,000.00
B. BAHAN
Sirtu m3 1.200 132,218.61 158,662.33

JUMLAH HARGA BAHAN 158,662.33


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 193,662.33
E. Profit 15% * D 29,049.35
F. Harga Satuan Pekerjaan (D+E) 222,711.68

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A. 3.2.1.1. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 202.000 1,232.00 248,864.00
Pasir pasang m3 0.485 132,000.00 64,020.00

JUMLAH HARGA BAHAN 735,054.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,065,054.06
E. Profit 15% * D 159,758.11
F. Harga Satuan Pekerjaan (D+E) 1,224,812.17

A. 3.2.1.1.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 202.000 1,232.00 248,864.00
Pasir pasang m3 0.485 132,000.00 64,020.00

JUMLAH HARGA BAHAN 697,569.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,027,569.71
E. Profit 15% * D 154,135.46
F. Harga Satuan Pekerjaan (D+E) 1,181,705.17

A. 3.2.1.2. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 163.000 1,232.00 200,816.00
Pasir pasang m3 0.520 132,000.00 68,640.00

JUMLAH HARGA BAHAN 691,626.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,021,626.06
E. Profit 15% * D 153,243.91
F. Harga Satuan Pekerjaan (D+E) 1,174,869.97

A. 3.2.1.2.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 163.000 1,232.00 200,816.00
Pasir pasang m3 0.520 132,000.00 68,640.00
JUMLAH HARGA BAHAN 654,141.71
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 984,141.71
Page 291 of 375
E. Profit 15% * D 147,621.26
F. Harga Satuan Pekerjaan (D+E) 1,131,762.97

Page 292 of 375


A. 3.2.1.3. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 136.000 1,232.00 167,552.00
Pasir pasang m3 0.544 132,000.00 71,808.00

JUMLAH HARGA BAHAN 661,530.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 991,530.06
E. Profit 15% * D 148,729.51
F. Harga Satuan Pekerjaan (D+E) 1,140,259.57

A. 3.2.1.3.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 5PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 136.000 1,232.00 167,552.00
Pasir pasang m3 0.544 132,000.00 71,808.00

JUMLAH HARGA BAHAN 624,045.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 954,045.71
E. Profit 15% * D 143,106.86
F. Harga Satuan Pekerjaan (D+E) 1,097,152.57

A. 3.2.1.4. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 117.000 1,232.00 144,144.00
Pasir pasang m3 0.561 132,000.00 74,052.00

JUMLAH HARGA BAHAN 640,366.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 970,366.06
E. Profit 15% * D 145,554.91
F. Harga Satuan Pekerjaan (D+E) 1,115,920.97

A. 3.2.1.4.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 6PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 117.000 1,232.00 144,144.00
Pasir pasang m3 0.561 132,000.00 74,052.00

JUMLAH HARGA BAHAN 602,881.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 932,881.71
E. Profit 15% * D 139,932.26
F. Harga Satuan Pekerjaan (D+E) 1,072,813.97

A. 3.2.1.5. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 91.000 1,232.00 112,112.00
Pasir pasang m3 0.584 132,000.00 77,088.00

JUMLAH HARGA BAHAN 611,370.06


C. PERALATAN

JUMLAH HARGA ALAT -

Page 293 of 375


D. Jumlah (A+B+C) 941,370.06
E. Profit 15% * D 141,205.51
F. Harga Satuan Pekerjaan (D+E) 1,082,575.57

Page 294 of 375


A. 3.2.1.5.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 91.000 1,232.00 112,112.00
Pasir pasang m3 0.584 132,000.00 77,088.00

JUMLAH HARGA BAHAN 573,885.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 903,885.71
E. Profit 15% * D 135,582.86
F. Harga Satuan Pekerjaan (D+E) 1,039,468.57

A. 3.2.1.6. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland Kg 0.170 1,232.00 209.44
Batu kapur m3 0.170 62,684.78 10,656.41
Pasir pasang m3 0.340 132,000.00 44,880.00

JUMLAH HARGA BAHAN 477,915.91


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 807,915.91
E. Profit 15% * D 121,187.39
F. Harga Satuan Pekerjaan (D+E) 929,103.30

A. 3.2.1.6.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 1KP : 2PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 0.170 1,232.00 209.44
Batu Kapur m3 0.170 62,684.78 10,656.41
Pasir pasang m3 0.340 132,000.00 44,880.00

JUMLAH HARGA BAHAN 440,431.57


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 770,431.57
E. Profit 15% * D 115,564.73
F. Harga Satuan Pekerjaan (D+E) 885,996.30

A. 3.2.1.7. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 61.000 1,232.00 75,152.00
Batu Kapur m3 0.147 62,684.78 9,214.66
Pasir pasang m3 0.492 132,000.00 64,944.00

JUMLAH HARGA BAHAN 571,480.72


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 901,480.72
E. Profit 15% * D 135,222.11
F. Harga Satuan Pekerjaan (D+E) 1,036,702.83

A. 3.2.1.7.a Pemasangan 1 m3 Pondasi batu gunung campuran 1SP : 3KP : 10PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 61.000 1,232.00 75,152.00
Batu Kapur m3 0.147 62,684.78 9,214.66
Pasir pasang m3 0.492 132,000.00 64,944.00

Page 295 of 375


JUMLAH HARGA BAHAN 533,996.38
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 863,996.38
E. Profit 15% * D 129,599.46
F. Harga Satuan Pekerjaan (D+E) 993,595.83

Page 296 of 375


A. 3.2.1.8. Pemasangan 1 m3 Pondasi Batu belah 10-15 (cm) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Semen portland kg 41.000 1,232.00 50,512.00
Batu Kapur m3 0.131 62,684.78 8,211.71
Pasir pasang m3 0.523 132,000.00 69,036.00

JUMLAH HARGA BAHAN 549,929.76


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 879,929.76
E. Profit 15% * D 131,989.46
F. Harga Satuan Pekerjaan (D+E) 1,011,919.23

A. 3.2.1.8.a Pemasangan 1 m3 Pondasi batu gunung campuran 1/4SP : 1KP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang Batu L.02 OH 0.750 160,000.00 120,000.00
Kepala Tukang L.03 OH 0.075 200,000.00 15,000.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 330,000.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Semen portland kg 41.000 1,232.00 50,512.00
Batu Kapur m3 0.131 62,684.78 8,211.71
Pasir pasang m3 0.523 132,000.00 69,036.00

JUMLAH HARGA BAHAN 512,445.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 842,445.42
E. Profit 15% * D 126,366.81
F. Harga Satuan Pekerjaan (D+E) 968,812.23

A. 3.2.1.9. Pemasangan 1 m3 batu hitam kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 120,000.00 93,600.00
Tukang Batu L.02 OH 0.390 160,000.00 62,400.00
Kepala Tukang L.03 OH 0.039 200,000.00 7,800.00
Mandor L.04 OH 0.039 200,000.00 7,800.00
JUMLAH TENAGA KERJA 171,600.00
B. BAHAN
Batu belah 10-15 (cm) m3 1.200 351,808.38 422,170.06
Pasir urug/timbun m3 0.432 62,857.14 27,154.29

JUMLAH HARGA BAHAN 449,324.34


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 620,924.34
E. Profit 15% * D 93,138.65
F. Harga Satuan Pekerjaan (D+E) 714,063.00

A. 3.2.1.9.a Pemasangan 1 m3 batu putih kosong (anstamping)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 120,000.00 93,600.00
Tukang Batu L.02 OH 0.390 160,000.00 62,400.00
Kepala Tukang L.03 OH 0.039 200,000.00 7,800.00
Mandor L.04 OH 0.039 200,000.00 7,800.00
JUMLAH TENAGA KERJA 171,600.00
B. BAHAN
batu gunung m3 1.200 320,571.43 384,685.71
Pasir urug/timbun m3 0.432 62,857.14 27,154.29

JUMLAH HARGA BAHAN 411,840.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 583,440.00
E. Profit 15% * D 87,516.00
F. Harga Satuan Pekerjaan (D+E) 670,956.00

A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% Batu belah 10-15 (cm).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 120,000.00 408,000.00
Tukang Batu L.02 OH 0.850 160,000.00 136,000.00
Kepala Tukang L.03 OH 0.085 200,000.00 17,000.00
Mandor L.04 OH 0.170 200,000.00 34,000.00
JUMLAH TENAGA KERJA 595,000.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.480 351,808.38 168,868.02
Semen Portland kg 194.000 1,232.00 239,008.00
Pasir beton m3 0.312 132,000.00 41,184.00
Batu pecah 0,5 - 1 m3 0.468 397,101.83 185,843.66
Besi beton kg 126.000 11,705.43 1,474,884.49
Kawat beton kg 1.800 19,360.00 34,848.00

JUMLAH HARGA BAHAN 2,144,636.17

Page 297 of 375


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,739,636.17
E. Profit 15% * D 410,945.42
F. Harga Satuan Pekerjaan (D+E) 3,150,581.59

Page 298 of 375


A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu gunung.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 120,000.00 408,000.00
Tukang Batu L.02 OH 0.850 160,000.00 136,000.00
Kepala Tukang L.03 OH 0.085 200,000.00 17,000.00
Mandor L.04 OH 0.170 200,000.00 34,000.00
JUMLAH TENAGA KERJA 595,000.00
B. BAHAN
batu gunung m3 0.480 320,571.43 153,874.29
Semen Portland kg 194.000 1,232.00 239,008.00
Pasir beton m3 0.312 132,000.00 41,184.00
Batu pecah 0,5 - 1 m3 0.468 397,101.83 185,843.66
Besi beton kg 126.000 11,705.43 1,474,884.49
Kawat beton kg 1.800 19,360.00 34,848.00

JUMLAH HARGA BAHAN 2,129,642.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,724,642.43
E. Profit 15% * D 408,696.36
F. Harga Satuan Pekerjaan (D+E) 3,133,338.79

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran Batu belah 10-15 (cm), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 120,000.00 288,000.00
Tukang Batu L.02 OH 0.800 160,000.00 128,000.00
Kepala Tukang L.03 OH 0.080 200,000.00 16,000.00
Mandor L.04 OH 0.119 200,000.00 23,800.00
JUMLAH TENAGA KERJA 455,800.00
B. BAHAN
Batu belah 10-15 (cm) m3 0.450 351,808.38 158,313.77
Semen Portland kg 194.000 1,232.00 239,008.00
Pasir beton m3 0.312 132,000.00 41,184.00
Batu pecah 0,5 - 1 m3 0.468 397,101.83 185,843.66

JUMLAH HARGA BAHAN 624,349.43


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,080,149.43
E. Profit 15% * D 162,022.41
F. Harga Satuan Pekerjaan (D+E) 1,242,171.84

A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu gunung, diameter 100 cm.


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 120,000.00 288,000.00
Tukang Batu L.02 OH 0.800 160,000.00 128,000.00
Kepala Tukang L.03 OH 0.080 200,000.00 16,000.00
Mandor L.04 OH 0.119 200,000.00 23,800.00
JUMLAH TENAGA KERJA 455,800.00
B. BAHAN
batu gunung m3 0.450 320,571.43 144,257.14
Semen Portland kg 194.000 1,232.00 239,008.00
Pasir beton m3 0.312 132,000.00 41,184.00
Batu pecah 0,5 - 1 m3 0.468 397,101.83 185,843.66

JUMLAH HARGA BAHAN 610,292.80


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,066,092.80
E. Profit 15% * D 159,913.92
F. Harga Satuan Pekerjaan (D+E) 1,226,006.72

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen Portland kg 247.0000 1,232.00 304,304.00
Pasir beton (Kg) kg 869.0000 73.33 63,726.67
Batu pecah 1 - 2 (Kg) kg 999.0000 272.93 272,653.27
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 653,886.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 918,086.54
E. Profit 15% *D 137,712.98
F. Harga Satuan Pekerjaan (D+E) 1,055,799.53

A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 276.0000 1,232.00 340,032.00
Page 299 of 375
Pasir beton (Kg) kg 828.0000 73.33 60,720.00
Batu pecah 1 - 2 (Kg) kg 1,012.0000 272.93 276,201.31
Air ltr 215.0000 61.41 13,202.61

JUMLAH HARGA BAHAN 690,155.92


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 954,355.92
E. Profit 15% *D 143,153.39
F. Harga Satuan Pekerjaan (D+E) 1,097,509.31

Page 300 of 375


A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 299.0000 1,232.00 368,368.00
Pasir beton (Kg) kg 799.0000 73.33 58,593.33
Batu pecah 1 - 2 (Kg) kg 1,017.0000 272.93 277,565.94
Air ltr 215.0000 61.41 13,202.61

JUMLAH HARGA BAHAN 717,729.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 981,929.88
E. Profit 15% *D 147,289.48
F. Harga Satuan Pekerjaan (D+E) 1,129,219.37

A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 120,000.00 144,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0600 200,000.00 12,000.00
JUMLAH TENAGA KERJA 192,000.00
B. BAHAN
Semen portland kg 230.0000 1,232.00 283,360.00
Pasir beton (Kg) kg 893.0000 73.33 65,486.67
Batu pecah 1 - 2 (Kg) kg 1,027.0000 272.93 280,295.20
Air ltr 200.0000 61.41 12,281.50

JUMLAH HARGA BAHAN 641,423.37


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 833,423.37
E. Profit 15% *D 125,013.50
F. Harga Satuan Pekerjaan (D+E) 958,436.87

A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 326.0000 1,232.00 401,632.00
Pasir beton (Kg) kg 760.0000 73.33 55,733.33
Batu pecah 1 - 2 (Kg) kg 1,029.0000 272.93 280,841.05
Air ltr 215.0000 61.41 13,202.61

JUMLAH HARGA BAHAN 751,409.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,015,609.00
E. Profit 15% *D 152,341.35
F. Harga Satuan Pekerjaan (D+E) 1,167,950.35

A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 352.0000 1,232.00 433,664.00
Pasir beton (Kg) kg 731.0000 73.33 53,606.67
Batu pecah 1 - 2 (Kg) kg 1,031.0000 272.93 281,386.90
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 781,860.18
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,046,060.18
E. Profit 15% *D 156,909.03
F. Harga Satuan Pekerjaan (D+E) 1,202,969.21

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 371.0000 1,232.00 457,072.00
Pasir beton (Kg) kg 698.0000 73.33 51,186.67
Batu pecah 1 - 2 (Kg) kg 1,047.0000 272.93 285,753.72
Air ltr 215.0000 61.41 13,202.61

Page 301 of 375


JUMLAH HARGA BAHAN 807,215.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,071,415.00
E. Profit 15% *D 160,712.25
F. Harga Satuan Pekerjaan (D+E) 1,232,127.25

Page 302 of 375


A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 384.0000 1,232.00 473,088.00
Pasir beton (Kg) kg 692.0000 73.33 50,746.67
Batu pecah 1 - 2 (Kg) kg 1,039.0000 272.93 283,570.31
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 820,607.59
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,084,807.59
E. Profit 15% *D 162,721.14
F. Harga Satuan Pekerjaan (D+E) 1,247,528.73

A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 406.0000 1,232.00 500,192.00
Pasir beton (Kg) kg 684.0000 73.33 50,160.00
Batu pecah 1 - 2 (Kg) kg 1,026.0000 272.93 280,022.27
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 843,576.89
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,107,776.89
E. Profit 15% *D 166,166.53
F. Harga Satuan Pekerjaan (D+E) 1,273,943.42

A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 120,000.00 198,000.00
Tukang Batu L.02 OH 0.2750 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.0280 200,000.00 5,600.00
Mandor L.04 OH 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 264,200.00
B. BAHAN
Semen portland kg 413.0000 1,232.00 508,816.00
Pasir beton (Kg) kg 681.0000 73.33 49,940.00
Batu pecah 1 - 2 (Kg) kg 1,021.0000 272.93 278,657.64
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 850,616.25
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,114,816.25
E. Profit 15% *D 167,222.44
F. Harga Satuan Pekerjaan (D+E) 1,282,038.69

A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 120,000.00 252,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.1050 200,000.00 21,000.00
JUMLAH TENAGA KERJA 336,000.00
B. BAHAN
Semen portland kg 439.0000 1,232.00 540,848.00
Pasir beton (Kg) kg 670.0000 73.33 49,133.33
Batu pecah 1 - 2 (Kg) kg 1,006.0000 272.93 274,563.75
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 877,747.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,213,747.69
E. Profit 15% *D 182,062.15
F. Harga Satuan Pekerjaan (D+E) 1,395,809.85

A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 120,000.00 252,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.1050 200,000.00 21,000.00
JUMLAH TENAGA KERJA 336,000.00
B. BAHAN
Semen portland kg 448.0000 1,232.00 551,936.00
Pasir beton (Kg) kg 667.0000 73.33 48,913.33
Batu pecah 1 - 2 (Kg) kg 1,000.0000 272.93 272,926.19
Air ltr 215.0000 61.41 13,202.61
JUMLAH HARGA BAHAN 886,978.14
C. PERALATAN

JUMLAH HARGA ALAT -

Page 303 of 375


D. Jumlah (A+B+C) 1,222,978.14
E. Profit 15% *D 183,446.72
F. Harga Satuan Pekerjaan (D+E) 1,406,424.86

Page 304 of 375


A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 120,000.00 8,400.00
Tukang Besi L.02 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.0070 200,000.00 1,400.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 21,800.00
B. BAHAN
Besi beton kg 10.5000 11,705.43 122,907.04
Kawat beton kg 0.1500 19,360.00 2,904.00
JUMLAH HARGA BAHAN 125,811.04
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 147,611.04
E. Profit 15% *D 22,141.66
F. Harga Satuan Pekerjaan (D+E) 169,752.70

A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang Besi L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
Besi beton kg 10.5000 11,705.43 122,907.04
Kawat beton kg 0.1000 19,360.00 1,936.00

JUMLAH HARGA BAHAN 124,843.04


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 140,443.04
E. Profit 15% *D 21,066.46
F. Harga Satuan Pekerjaan (D+E) 161,509.50

A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang Besi L.02 OH 0.0250 160,000.00 4,000.00
Kepala Tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 12,200.00
B. BAHAN
Besi jaring kawat baja kg 10.2000 19,650.40 200,434.08
Kawat beton kg 0.0500 19,360.00 968.00

JUMLAH HARGA BAHAN 201,402.08


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 213,602.08
E. Profit 15% *D 32,040.31
F. Harga Satuan Pekerjaan (D+E) 245,642.39

A. 4.1.1.20. Membuat 1 m2 bekisting untuk pondasi


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
Kepala Tukang L.03 OH 0.0260 200,000.00 5,200.00
Mandor L.04 OH 0.0260 200,000.00 5,200.00
JUMLAH TENAGA KERJA 114,400.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.3000 15,213.43 4,564.03
Minyak bekisting liter 0.1000 8,800.00 880.00

JUMLAH HARGA BAHAN 98,207.61


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 212,607.61
E. Profit 15% *D 31,891.14
F. Harga Satuan Pekerjaan (D+E) 244,498.75

A. 4.1.1.20. ck Membuat 1 m2 bekisting untuk pondasi (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
Kepala Tukang L.03 OH 0.0260 200,000.00 5,200.00
Mandor L.04 OH 0.0260 200,000.00 5,200.00
JUMLAH TENAGA KERJA 114,400.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 1,970,622.50 78,824.90
Paku berbagai ukuran (2"-5") kg 0.3000 15,213.43 4,564.03
JUMLAH HARGA BAHAN 83,388.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 197,788.93
E. Profit 15% *D 29,668.34
F. Harga Satuan Pekerjaan (D+E) 227,457.27

A. 4.1.1.21. Membuat 1 m2 bekisting untuk sloof


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
Page 305 of 375
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
Kepala Tukang L.03 OH 0.0260 200,000.00 5,200.00
Mandor L.04 OH 0.0260 200,000.00 5,200.00
JUMLAH TENAGA KERJA 114,400.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0450 2,319,089.59 104,359.03
Paku berbagai ukuran (2"-5") kg 0.3000 15,213.43 4,564.03
Minyak bekisting liter 0.1000 8,800.00 880.00

JUMLAH HARGA BAHAN 109,803.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 224,203.06
E. Profit 15% *D 33,630.46
F. Harga Satuan Pekerjaan (D+E) 257,833.52

Page 306 of 375


A. 4.1.1.21. ck Membuat 1 m2 bekisting untuk sloof (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5200 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
Kepala Tukang L.03 OH 0.0260 200,000.00 5,200.00
Mandor L.04 OH 0.0260 200,000.00 5,200.00
JUMLAH TENAGA KERJA 114,400.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0450 1,970,622.50 88,678.01
Paku berbagai ukuran (2"-5") kg 0.3000 15,213.43 4,564.03
Minyak bekisting liter - - -
JUMLAH HARGA BAHAN 93,242.04
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,642.04
E. Profit 15% *D 31,146.31
F. Harga Satuan Pekerjaan (D+E) 238,788.35

A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0150 2,483,612.42 37,254.19
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00

JUMLAH HARGA BAHAN 191,052.58


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 336,252.58
E. Profit 15% *D 50,437.89
F. Harga Satuan Pekerjaan (D+E) 386,690.46

A. 4.1.1.22. ck Membuat 1 m2 bekisting untuk kolom (kls IV)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 1,970,622.50 78,824.90
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Kayu gergajian kelas IV, balok m3 0.0150 2,120,658.44 31,809.88
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00
JUMLAH HARGA BAHAN 125,520.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 270,720.15
E. Profit 15% *D 40,608.02
F. Harga Satuan Pekerjaan (D+E) 311,328.17

A. 4.1.1.23. Membuat 1 m2 bekisting untuk balok


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0180 2,483,612.42 44,705.02
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00

JUMLAH HARGA BAHAN 198,503.41


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 343,703.41
E. Profit 15% *D 51,555.51
F. Harga Satuan Pekerjaan (D+E) 395,258.93

A. 4.1.1.23. ck Membuat 1 m2 bekisting untuk balok (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 1,970,622.50 78,824.90
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37

Page 307 of 375


Kayu gergajian kelas IV, balok m3 0.0180 2,120,658.44 38,171.85
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00
JUMLAH HARGA BAHAN 131,882.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 277,082.12
E. Profit 15% *D 41,562.32
F. Harga Satuan Pekerjaan (D+E) 318,644.44

Page 308 of 375


A. 4.1.1.24. Membuat 1 m2 bekisting untuk lantai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0400 2,319,089.59 92,763.58
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0150 2,483,612.42 37,254.19
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 4,400.00 26,400.00

JUMLAH HARGA BAHAN 208,652.58


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 353,852.58
E. Profit 15% *D 53,077.89
F. Harga Satuan Pekerjaan (D+E) 406,930.46

A. 4.1.1.24.ck Membuat 1 m2 bekisting untuk lantai


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0400 1,970,622.50 78,824.90
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Kayu gergajian kelas IV, balok m3 0.0150 2,120,658.44 31,809.88
Kayu dolken Ø8-10 (cm) panjang 4 m batang 6.0000 4,400.00 26,400.00
JUMLAH HARGA BAHAN 143,120.15
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 288,320.15
E. Profit 15% *D 43,248.02
F. Harga Satuan Pekerjaan (D+E) 331,568.17

A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0300 2,319,089.59 69,572.69
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.2000 8,800.00 1,760.00
Kayu gergajian kelas II, balok m3 0.0200 2,483,612.42 49,672.25
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 4,400.00 13,200.00
Penjaga jarak bekisting/spacer buah - - -

JUMLAH HARGA BAHAN 184,679.74


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 329,879.74
E. Profit 15% *D 49,481.96
F. Harga Satuan Pekerjaan (D+E) 379,361.70

A. 4.1.1.25. ck Membuat 1 m2 bekisting untuk dinding (kls IV)


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 1,970,622.50 59,118.68
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Kayu gergajian kelas IV, balok m3 0.0200 2,120,658.44 42,413.17
Kayu dolken Ø8-10 (cm) panjang 4 m batang 3.0000 4,400.00 13,200.00
JUMLAH HARGA BAHAN 120,817.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 266,017.22
E. Profit 15% *D 39,902.58
F. Harga Satuan Pekerjaan (D+E) 305,919.80

A. 4.1.1.26. Membuat 1 m2 bekisting untuk tangga


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN

Page 309 of 375


Kayu gergajian kelas III, balok m3 0.0300 2,319,089.59 69,572.69
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Minyak bekisting liter 0.1500 8,800.00 1,320.00
Kayu gergajian kelas II, balok m3 0.0150 2,483,612.42 37,254.19
Multiplek tebal 9 mm 4x8 (inch) lbr 0.3500 126,826.96 44,389.43
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00

JUMLAH HARGA BAHAN 167,421.68


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 312,621.68
E. Profit 15% *D 46,893.25
F. Harga Satuan Pekerjaan (D+E) 359,514.93

Page 310 of 375


A. 4.1.1.26. ck Membuat 1 m2 bekisting untuk tangga (kls IV)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
Kepala Tukang L.03 OH 0.0330 200,000.00 6,600.00
Mandor L.04 OH 0.0330 200,000.00 6,600.00
JUMLAH TENAGA KERJA 145,200.00
B. BAHAN
Kayu gergajian kelas IV, papan m3 0.0300 1,970,622.50 59,118.68
Paku berbagai ukuran (2"-5") kg 0.4000 15,213.43 6,085.37
Kayu gergajian kelas IV, balok m3 0.0150 2,120,658.44 31,809.88
Kayu dolken Ø8-10 (cm) panjang 4 m batang 2.0000 4,400.00 8,800.00
JUMLAH HARGA BAHAN 105,813.92
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 251,013.92
E. Profit 15% *D 37,652.09
F. Harga Satuan Pekerjaan (D+E) 288,666.01

A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 28,600.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0264 2,319,089.59 61,223.97
Paku berbagai ukuran (2"-5") kg 0.6000 15,213.43 9,128.06
Kayu dolken Ø8-10 (cm) panjang 4 m batang 0.5000 4,400.00 2,200.00

JUMLAH HARGA BAHAN 72,552.02


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 101,152.02
E. Profit 15% *D 15,172.80
F. Harga Satuan Pekerjaan (D+E) 116,324.83

A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1800 120,000.00 21,600.00
Tukang Batu L.02 OH 0.0200 160,000.00 3,200.00
Tukang Kayu L.02 OH 0.0200 160,000.00 3,200.00
Tukang Besi L.02 OH 0.0200 160,000.00 3,200.00
Kepala Tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L.04 OH 0.0090 200,000.00 1,800.00
JUMLAH TENAGA KERJA 34,200.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0020 2,319,089.59 4,638.18
Paku berbagai ukuran (2"-5") kg 0.0100 15,213.43 152.13
Minyak bekisting liter - 8,800.00 -
Besi beton kg 3.0000 11,705.43 35,116.30
Kawat beton kg 0.4500 19,360.00 8,712.00
Semen portland kg 4.0000 1,232.00 4,928.00
Pasir beton m3 0.0060 132,000.00 792.00
Batu pecah 1 - 2 m3 0.0090 440,000.00 3,960.00

JUMLAH HARGA BAHAN 58,298.61


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,498.61
E. Profit 15% *D 13,874.79
F. Harga Satuan Pekerjaan (D+E) 106,373.40

A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2970 120,000.00 35,640.00
Tukang Batu L.02 OH 0.0330 160,000.00 5,280.00
Tukang Kayu L.02 OH 0.0330 160,000.00 5,280.00
Tukang Besi L.02 OH 0.0330 160,000.00 5,280.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,480.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0030 2,319,089.59 6,957.27
Paku berbagai ukuran (2"-5") kg 0.0200 15,213.43 304.27
Minyak bekisting liter - 8,800.00 -
Besi beton kg 3.6000 11,705.43 42,139.56
Kawat beton kg 0.0500 19,360.00 968.00
Semen portland kg 5.5000 1,232.00 6,776.00
Pasir beton m3 0.0090 132,000.00 1,188.00
Batu pecah 1 - 2 m3 0.0150 440,000.00 6,600.00

JUMLAH HARGA BAHAN 64,933.09


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 121,413.09
E. Profit 15% *D 18,211.96
F. Harga Satuan Pekerjaan (D+E) 139,625.06

Page 311 of 375


A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. 4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang Las Konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00

JUMLAH TENAGA KERJA 18,600.00


B. BAHAN
Besi profil kg 1.1500 8,646.18 9,943.10

JUMLAH HARGA BAHAN 9,943.10


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 28,543.10
E. Profit 15% *D 4,281.47
F. Harga Satuan Pekerjaan (D+E) 32,824.57

A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang Las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
Kepala tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L,04 OH 0.0030 200,000.00 600.00

JUMLAH TENAGA KERJA 18,600.00


B. BAHAN
Besi Baja IWF kg 1.1500 10,049.83 11,557.30

JUMLAH HARGA BAHAN 11,557.30


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 30,157.30
E. Profit 15% *D 4,523.60
F. Harga Satuan Pekerjaan (D+E) 34,680.90

A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Las Konstruksi L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0010 200,000.00 200.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00

JUMLAH TENAGA KERJA 29,200.00


B. BAHAN
Solar liter 1.0000 8,574.72 8,574.72
Minyak pelumas (oli) liter 0.1000 28,055.41 2,805.54

JUMLAH HARGA BAHAN 11,380.26


C. PERALATAN
Sewa alat jam 0.8000 - -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 40,580.26
E. Profit 15% *D 6,087.04
F. Harga Satuan Pekerjaan (D+E) 46,667.30

A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 120,000.00 126,000.00
Tukang Las biasa L.02 OH 1.0500 160,000.00 168,000.00
Kepala tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L,04 OH 0.0520 200,000.00 10,400.00

JUMLAH TENAGA KERJA 325,400.00


B. BAHAN
Siku 30 x 30 x 3 mm – 6 M kg 15.0000 8,646.18 129,692.64
Besi plat baja kg 32.8000 10,328.56 338,776.77
Kawat Las Listrik kg 0.0500 40,676.33 2,033.82

JUMLAH HARGA BAHAN 470,503.22


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 795,903.22
E. Profit 15% *D 119,385.48
F. Harga Satuan Pekerjaan (D+E) 915,288.71

A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 120,000.00 4,800.00
Tukang Besi L.02 OH 0.0200 160,000.00 3,200.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0200 200,000.00 4,000.00

JUMLAH TENAGA KERJA 16,000.00


B. BAHAN
Kawat Las Listrik kg 0.4000 40,676.33 16,270.53
Solar kg 0.3000 8,574.72 2,572.42
Page 312 of 375
Minyak pelumas (oli) kg 0.0400 28,055.41 1,122.22

JUMLAH HARGA BAHAN 19,965.16


C. PERALATAN
Sewa alat jam 0.1700 - -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 35,965.16
E. Profit 15% *D 5,394.77
F. Harga Satuan Pekerjaan (D+E) 41,359.94

Page 313 of 375


A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0800 120,000.00 9,600.00
Tukang L.02 OH 0.8000 160,000.00 128,000.00
Kepala tukang L.03 OH 0.0800 200,000.00 16,000.00
Mandor L,04 OH 0.0400 200,000.00 8,000.00

JUMLAH TENAGA KERJA 161,600.00


B. BAHAN
Sunscreen alumunium m2 1.0000 1,473,780.00 1,473,780.00

JUMLAH HARGA BAHAN 1,473,780.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,635,380.00
E. Profit 15% *D 245,307.00
F. Harga Satuan Pekerjaan (D+E) 1,880,687.00

A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang L.02 OH 1.0000 160,000.00 160,000.00
Kepala tukang L.03 OH 0.1000 200,000.00 20,000.00
Mandor L,04 OH 0.0500 200,000.00 10,000.00

JUMLAH TENAGA KERJA 310,000.00


B. BAHAN
Rolling door-alumunium tebal 0,8 mm m2 1.0000 378,270.20 378,270.20

JUMLAH HARGA BAHAN 378,270.20


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 688,270.20
E. Profit 15% *D 103,240.53
F. Harga Satuan Pekerjaan (D+E) 791,510.73

A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 120,000.00 5,160.00
Tukang khusus aluminium L.02 OH 0.0430 160,000.00 6,880.00
Kepala tukang L.03 OH 0.0043 200,000.00 860.00
Mandor L,04 OH 0.0021 200,000.00 420.00

JUMLAH TENAGA KERJA 13,320.00


B. BAHAN
Kusen Alumunium 3 inch silver m 1.1000 59,442.46 65,386.71
Skrup fixer buah 2.0000 2,063.29 4,126.58
Sealant tube 0.0600 34,142.57 2,048.55

JUMLAH HARGA BAHAN 71,561.84


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 84,881.84
E. Profit 15% *D 12,732.28
F. Harga Satuan Pekerjaan (D+E) 97,614.12

A. 4.2.1.13. ck Pemasangan 1 m2 pintu kaca rangka aluminium


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00 10,200.00
Tukang khusus aluminium L.02 OH 0.0850 160,000.00 13,600.00
Kepala tukang L.03 OH 0.0090 200,000.00 1,800.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00

JUMLAH TENAGA KERJA 26,600.00


B. BAHAN
Kusen pintu/ jendela alumunium 3" (warna gelap) m 4.4000 93,339.40 410,693.36
Profil kaca m 4.5000 5,895.12 26,528.04
Sealant tube 0.2700 34,142.57 9,218.49
Kaca bening tebal 5 mm m2 1.1000 130,183.90 143,202.29
JUMLAH HARGA BAHAN 589,642.18
C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 616,242.18
E. Profit 15% *D 92,436.33
F. Harga Satuan Pekerjaan (D+E) 708,678.51

A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang khusus aluminium L.02 OH 0.3500 160,000.00 56,000.00
Kepala tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L,04 OH 0.0180 200,000.00 3,600.00

JUMLAH TENAGA KERJA 108,600.00


B. BAHAN
Vertical blinds m2 1.0000 62,144.39 62,144.39

Page 314 of 375


JUMLAH HARGA BAHAN 62,144.39
C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 170,744.39
E. Profit 15% *D 25,611.66
F. Harga Satuan Pekerjaan (D+E) 196,356.05

Page 315 of 375


A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6700 120,000.00 200,400.00
Tukang las konstruksi L.02 OH 1.6700 160,000.00 267,200.00
Kepala tukang L.03 OH 0.1670 200,000.00 33,400.00
Mandor L,04 OH 0.0830 200,000.00 16,600.00

JUMLAH TENAGA KERJA 517,600.00


B. BAHAN
Besi strip 2 x 3 cm kg 6.1770 8,842.68 54,621.23
Pengelasan cm 27.0800 2,125.00 57,545.00

JUMLAH HARGA BAHAN 112,166.23


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 629,766.23
E. Profit 15% *D 94,464.94
F. Harga Satuan Pekerjaan (D+E) 724,231.17

A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0050 200,000.00 1,000.00

JUMLAH TENAGA KERJA 31,000.00


B. BAHAN
Kawat nyamuk logam m2 1.1000 23,334.85 25,668.34
Pengelasan cm 11.1100 2,125.00 23,608.75
Besi strip 2 x 3 cm kg 1.7160 8,842.68 15,174.04

JUMLAH HARGA BAHAN 64,451.12


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 95,451.12
E. Profit 15% *D 14,317.67
F. Harga Satuan Pekerjaan (D+E) 109,768.79

A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang besi L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0010 200,000.00 200.00

JUMLAH TENAGA KERJA 60,200.00


B. BAHAN
Jendela nako (kerangka + kaca 5 mm) m2 1.1000 165,259.86 181,785.85
Paku sekrup 1 cm -2,5 cm buah 10.0000 23,252.97 232,529.73
Besi strip 2 x 3 cm m 7.0000 8,842.68 61,898.76

JUMLAH HARGA BAHAN 476,214.34


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 536,414.34
E. Profit 15% *D 80,462.15
F. Harga Satuan Pekerjaan (D+E) 616,876.50

A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang besi L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0010 200,000.00 200.00

JUMLAH TENAGA KERJA 60,200.00


B. BAHAN
Seng plat BJLS 27 uk. 0.9 x 1.83 (m) m 1.0500 49,126.00 51,582.30
Paku sekrup 1 cm -2,5 cm kg 0.0150 23,252.97 348.79
Kayu gergajian kelas III, papan m3 0.0190 2,231,213.60 42,393.06

JUMLAH HARGA BAHAN 94,324.15


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,524.15
E. Profit 15% *D 23,178.62
F. Harga Satuan Pekerjaan (D+E) 177,702.78

A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang besi L.02 OH 0.3000 160,000.00 48,000.00
Kepala tukang L.03 OH 0.0300 200,000.00 6,000.00
Mandor L,04 OH 0.0080 200,000.00 1,600.00

JUMLAH TENAGA KERJA 73,600.00

Page 316 of 375


B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) m 1.0500 39,300.80 41,265.84
Paku sekrup 1 cm -2,5 cm kg 0.0100 23,252.97 232.53
Besi strip 2 x 3 cm m3 0.5000 8,842.68 4,421.34

JUMLAH HARGA BAHAN 45,919.71


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 119,519.71
E. Profit 15% *D 17,927.96
F. Harga Satuan Pekerjaan (D+E) 137,447.67

Page 317 of 375


A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang Besi L.02 OH 0.2500 160,000.00 40,000.00
Kepala tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L,04 OH 0.0130 200,000.00 2,600.00

JUMLAH TENAGA KERJA 77,600.00


B. BAHAN
Besi Hollow 40x40 mm t : 1,8mm m 3.5000 8,597.05 30,089.68
assesoris (perkuatan, las, dll) Ls 100%xrangka 8,597.05 8,597.05

JUMLAH HARGA BAHAN 38,686.73


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 116,286.73
E. Profit 15% *D 17,443.01
F. Harga Satuan Pekerjaan (D+E) 133,729.73

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Besi L.02 OH 0.3500 160,000.00 56,000.00
Kepala tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L,04 OH 0.0180 200,000.00 3,600.00

JUMLAH TENAGA KERJA 108,600.00


B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m 4.0000 112,159.57 448,638.28
assesoris (perkuatan, las, dll) Ls 100%xrangka 112,159.57 112,159.57

JUMLAH HARGA BAHAN 560,797.85


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 669,397.85
E. Profit 15% *D 100,409.68
F. Harga Satuan Pekerjaan (D+E) 769,807.53

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 43.5000 1,232.00 53,592.00
Pasir pasang m3 0.0800 132,000.00 10,560.00

JUMLAH HARGA BAHAN 238,216.00


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 352,216.00
E. Profit 15% *D 52,832.40
F. Harga Satuan Pekerjaan (D+E) 405,048.40

A. 4.4.1.2. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 32.9500 1,232.00 40,594.40
Pasir pasang m3 0.0910 132,000.00 12,012.00

JUMLAH HARGA BAHAN 226,670.40


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 340,670.40
E. Profit 15% *D 51,100.56
F. Harga Satuan Pekerjaan (D+E) 391,770.96

A. 4.4.1.3. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Page 318 of 375
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 26.5500 1,232.00 32,709.60
Pasir pasang m3 0.0930 132,000.00 12,276.00

JUMLAH HARGA BAHAN 219,049.60


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 333,049.60
E. Profit 15% *D 49,957.44
F. Harga Satuan Pekerjaan (D+E) 383,007.04

Page 319 of 375


A. 4.4.1.4. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 22.2200 1,232.00 27,375.04
Pasir pasang m3 0.1020 132,000.00 13,464.00

JUMLAH HARGA BAHAN 214,903.04


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 328,903.04
E. Profit 15% *D 49,335.46
F. Harga Satuan Pekerjaan (D+E) 378,238.50

A. 4.4.1.5. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 18.5000 1,232.00 22,792.00
Pasir pasang m3 0.1220 132,000.00 16,104.00

JUMLAH HARGA BAHAN 212,960.00


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 326,960.00
E. Profit 15% *D 49,044.00
F. Harga Satuan Pekerjaan (D+E) 376,004.00

A. 4.4.1.6. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang Batu L.02 OH 0.2000 160,000.00 32,000.00
Kepala tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L,04 OH 0.0300 200,000.00 6,000.00

JUMLAH TENAGA KERJA 114,000.00


B. BAHAN
Batu bata merah besar buah 86.0000 2,024.00 174,064.00
Semen portland kg 10.0800 1,232.00 12,418.56
Kapur padam m3 0.0275 - -
Pasir pasang m3 0.0925 132,000.00 12,210.00

JUMLAH HARGA BAHAN 198,692.56


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 312,692.56
E. Profit 15% *D 46,903.88
F. Harga Satuan Pekerjaan (D+E) 359,596.44

A. 4.4.1.7. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 18.9500 1,232.00 23,346.40
Pasir pasang m3 0.0380 132,000.00 5,016.00

JUMLAH HARGA BAHAN 115,394.40


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 172,394.40
E. Profit 15% *D 25,859.16
F. Harga Satuan Pekerjaan (D+E) 198,253.56

A. 4.4.1.8. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

Page 320 of 375


JUMLAH TENAGA KERJA 57,000.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 14.3700 1,232.00 17,703.84
Pasir pasang m3 0.0400 132,000.00 5,280.00

JUMLAH HARGA BAHAN 110,015.84


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 167,015.84
E. Profit 15% *D 25,052.38
F. Harga Satuan Pekerjaan (D+E) 192,068.22

Page 321 of 375


A. 4.4.1.9. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 11.5000 1,232.00 14,168.00
Pasir pasang m3 0.0430 132,000.00 5,676.00

JUMLAH HARGA BAHAN 106,876.00


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 163,876.00
E. Profit 15% *D 24,581.40
F. Harga Satuan Pekerjaan (D+E) 188,457.40

A. 4.4.1.10. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 9.6800 1,232.00 11,925.76
Pasir pasang m3 0.0450 132,000.00 5,940.00

JUMLAH HARGA BAHAN 104,897.76


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 161,897.76
E. Profit 15% *D 24,284.66
F. Harga Satuan Pekerjaan (D+E) 186,182.42

A. 4.4.1.11. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 8.3200 1,232.00 10,250.24
Pasir pasang m3 0.0490 132,000.00 6,468.00

JUMLAH HARGA BAHAN 103,750.24


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 160,750.24
E. Profit 15% *D 24,112.54
F. Harga Satuan Pekerjaan (D+E) 184,862.78

A. 4.4.1.12. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 6.5000 1,232.00 8,008.00
Pasir pasang m3 0.0500 132,000.00 6,600.00

JUMLAH HARGA BAHAN 101,640.00


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 158,640.00
E. Profit 15% *D 23,796.00
F. Harga Satuan Pekerjaan (D+E) 182,436.00

A. 4.4.1.13. Pemasangan 1 m2 dinding Batu bata merah besar tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

Page 322 of 375


JUMLAH TENAGA KERJA 57,000.00
B. BAHAN
Batu bata merah besar buah 43.0000 2,024.00 87,032.00
Semen portland kg 4.5000 1,232.00 5,544.00
Kapur bakar m3 0.0150 69,601.72 1,044.03
Pasir pasang m3 0.0500 132,000.00 6,600.00

JUMLAH HARGA BAHAN 100,220.03


C. PERALATAN
-

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 157,220.03
E. Profit 15% *D 23,583.00
F. Harga Satuan Pekerjaan (D+E) 180,803.03

Page 323 of 375


A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 7,172.40 215,171.88
Semen portland kg 11.0000 1,232.00 13,552.00
Pasir pasang m3 0.0350 132,000.00 4,620.00

JUMLAH HARGA BAHAN 233,343.88


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,343.88
E. Profit 15% *D 43,551.58
F. Harga Satuan Pekerjaan (D+E) 333,895.46

A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Rooster block uk. 12x11x24 (cm) buah 30.0000 7,172.40 215,171.88
Semen portland kg 11.0000 1,232.00 13,552.00
Pasir pasang m3 0.0350 132,000.00 4,620.00

JUMLAH HARGA BAHAN 233,343.88


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,343.88
E. Profit 15% *D 43,551.58
F. Harga Satuan Pekerjaan (D+E) 333,895.46

A. 4.4.1.23.a Pemasangan 1 m2 dinding terawang (rooster) 20x20 cm, camp. 1 SP : 4PP


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1000 160,000.00 16,000.00
Kepala tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 57,000.00


B. BAHAN
Rooster block uk. 20x20 (cm) buah 25.0000 13,264.02 331,600.50
Semen portland kg 11.0000 1,232.00 13,552.00
Pasir pasang m3 0.0350 132,000.00 4,620.00

JUMLAH HARGA BAHAN 349,772.50


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 406,772.50
E. Profit 15% *D 61,015.88
F. Harga Satuan Pekerjaan (D+E) 467,788.38

A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.02 OH 0.1500 160,000.00 24,000.00
Kepala tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L,04 OH 0.0150 200,000.00 3,000.00

JUMLAH TENAGA KERJA 66,000.00


B. BAHAN
Batu bata berongga uk. 5x11x24 (cm) buah 70.0000 1,375.53 96,286.96
Semen portland kg 14.0000 1,232.00 17,248.00
Pasir pasang m3 0.0320 132,000.00 4,224.00

JUMLAH HARGA BAHAN 117,758.96


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 183,758.96
E. Profit 15% *D 27,563.84
F. Harga Satuan Pekerjaan (D+E) 211,322.80

A. 4.4.1.25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 120,000.00 80,400.00
Tukang Batu L.02 OH 1.3000 160,000.00 208,000.00
Kepala tukang L.03 OH 0.1300 200,000.00 26,000.00
Mandor L,04 OH 0.0030 200,000.00 600.00

Page 324 of 375


JUMLAH TENAGA KERJA 315,000.00
B. BAHAN
Bata Ringan 7,5x20x60cm m3 8.4000 7,663.66 64,374.71
Semen Mortar kg 0.4730 6,563.23 3,104.41

JUMLAH HARGA BAHAN 67,479.12


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 382,479.12
E. Profit 15% *D 57,371.87
F. Harga Satuan Pekerjaan (D+E) 439,850.99

Page 325 of 375


A. 4.4.1.26. Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 120,000.00 80,520.00
Tukang Batu L.02 OH 1.3000 160,000.00 208,000.00
Kepala tukang L.03 OH 0.1300 200,000.00 26,000.00
Mandor L,04 OH 0.0030 200,000.00 600.00

JUMLAH TENAGA KERJA 315,120.00


B. BAHAN
Bata Ringan 10x20x60cm  m3 8.4000 9,825.20 82,531.68
Semen Mortar kg 0.0630 6,563.23 413.48

JUMLAH HARGA BAHAN 82,945.16


C. PERALATAN
- -

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 398,065.16
E. Profit 15% *D 59,709.77
F. Harga Satuan Pekerjaan (D+E) 457,774.94

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 15.5040 1,232.00 19,100.93
Pasir pasang m3 0.0160 132,000.00 2,112.00
JUMLAH HARGA BAHAN 21,212.93
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 87,212.93
E. Profit 15% *D 13,081.94
F. Harga Satuan Pekerjaan (D+E) 100,294.87

A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 10.2240 1,232.00 12,595.97
Pasir pasang m3 0.0200 132,000.00 2,640.00
JUMLAH HARGA BAHAN 15,235.97
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 81,235.97
E. Profit 15% *D 12,185.40
F. Harga Satuan Pekerjaan (D+E) 93,421.36

A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 7.7760 1,232.00 9,580.03
Pasir pasang m3 0.0230 132,000.00 3,036.00
JUMLAH HARGA BAHAN 12,616.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 78,616.03
E. Profit 15% *D 11,792.40
F. Harga Satuan Pekerjaan (D+E) 90,408.44

A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 6.2400 1,232.00 7,687.68
Pasir pasang m3 0.0240 132,000.00 3,168.00
JUMLAH HARGA BAHAN 10,855.68
C. PERALATAN
-
Page 326 of 375
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,855.68
E. Profit 15% *D 11,528.35
F. Harga Satuan Pekerjaan (D+E) 88,384.03

Page 327 of 375


A. 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 5.1840 1,232.00 6,386.69
Pasir pasang m3 0.0260 132,000.00 3,432.00
JUMLAH HARGA BAHAN 9,818.69
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,818.69
E. Profit 15% *D 11,372.80
F. Harga Satuan Pekerjaan (D+E) 87,191.49

A. 4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 4.4160 1,232.00 5,440.51
Pasir pasang m3 0.0270 132,000.00 3,564.00
JUMLAH HARGA BAHAN 9,004.51
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,004.51
E. Profit 15% *D 11,250.68
F. Harga Satuan Pekerjaan (D+E) 86,255.19

A. 4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 3.9360 1,232.00 4,849.15
Pasir pasang m3 0.0280 132,000.00 3,696.00
JUMLAH HARGA BAHAN 8,545.15
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 74,545.15
E. Profit 15% *D 11,181.77
F. Harga Satuan Pekerjaan (D+E) 85,726.92

A. 4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 3.4560 1,232.00 4,257.79
Pasir pasang m3 0.0290 132,000.00 3,828.00
JUMLAH HARGA BAHAN 8,085.79
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 74,085.79
E. Profit 15% *D 11,112.87
F. Harga Satuan Pekerjaan (D+E) 85,198.66

A. 4.4.2.13. Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Batu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0220 200,000.00 4,400.00
JUMLAH TENAGA KERJA 88,400.00
B. BAHAN
Semen portland Kg 13.6320 1,232.00 16,794.62
Pasir pasang m3 0.0270 132,000.00 3,564.00
JUMLAH HARGA BAHAN 20,358.62
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 108,758.62
E. Profit 15% *D 16,313.79
F. Harga Satuan Pekerjaan (D+E) 125,072.42

Page 328 of 375


A. 4.4.2.14. Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2600 120,000.00 31,200.00
Tukang Batu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 69,800.00
B. BAHAN
Semen portland Kg 10.3680 1,232.00 12,773.38
Pasir pasang m3 0.0310 132,000.00 4,092.00
JUMLAH HARGA BAHAN 16,865.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 86,665.38
E. Profit 15% *D 12,999.81
F. Harga Satuan Pekerjaan (D+E) 99,665.18

A. 4.4.2.15. Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Batu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0220 200,000.00 4,400.00
JUMLAH TENAGA KERJA 88,400.00
B. BAHAN
Semen portland Kg 8.3200 1,232.00 10,250.24
Pasir pasang m3 0.0320 132,000.00 4,224.00
JUMLAH HARGA BAHAN 14,474.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 102,874.24
E. Profit 15% *D 15,431.14
F. Harga Satuan Pekerjaan (D+E) 118,305.38

A. 4.4.2.16. Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Batu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0220 200,000.00 4,400.00
JUMLAH TENAGA KERJA 88,400.00
B. BAHAN
Semen portland Kg 6.9120 1,232.00 8,515.58
Pasir pasang m3 0.0350 132,000.00 4,620.00
JUMLAH HARGA BAHAN 13,135.58
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 101,535.58
E. Profit 15% *D 15,230.34
F. Harga Satuan Pekerjaan (D+E) 116,765.92

A. 4.4.2.17. Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Batu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0220 200,000.00 4,400.00
JUMLAH TENAGA KERJA 88,400.00
B. BAHAN
Semen portland Kg 5.8880 1,232.00 7,254.02
Pasir pasang m3 0.0360 132,000.00 4,752.00
JUMLAH HARGA BAHAN 12,006.02
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 100,406.02
E. Profit 15% *D 15,060.90
F. Harga Satuan Pekerjaan (D+E) 115,466.92

A. 4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Batu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Semen portland Kg 5.1840 1,232.00 6,386.69
Pasir pasang m3 0.0260 132,000.00 3,432.00
JUMLAH HARGA BAHAN 9,818.69
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 43,018.69
E. Profit 15% *D 6,452.80
F. Harga Satuan Pekerjaan (D+E) 49,471.49

Page 329 of 375


A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0800 120,000.00 9,600.00
Tukang Batu L.03 OH 0.4000 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.0400 200,000.00 8,000.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 82,400.00
B. BAHAN
Semen portland Kg 0.5000 1,232.00 616.00
Pasir pasang m3 0.0130 132,000.00 1,716.00
JUMLAH HARGA BAHAN 2,332.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 84,732.00
E. Profit 15% *D 12,709.80
F. Harga Satuan Pekerjaan (D+E) 97,441.80

A. 4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 57,000.00
B. BAHAN
Semen portland Kg 4.3200 1,232.00 5,322.24
Pasir pasang Kg 0.0060 132,000.00 792.00
JUMLAH HARGA BAHAN 6,114.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 63,114.24
E. Profit 15% *D 9,467.14
F. Harga Satuan Pekerjaan (D+E) 72,581.38

A. 4.4.2.24. Pemasangan 1 m2 finishing siar pasangan Batu bata merah besar


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Batu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Semen portland Kg 3.1080 1,232.00 3,829.06
JUMLAH HARGA BAHAN 3,829.06
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 37,029.06
E. Profit 15% *D 5,554.36
F. Harga Satuan Pekerjaan (D+E) 42,583.41

A. 4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0700 120,000.00 8,400.00
Tukang Batu L.03 OH 0.0350 160,000.00 5,600.00
Kepala Tukang L.03 OH 0.0040 200,000.00 800.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
Semen portland Kg 1.6000 1,232.00 1,971.20
JUMLAH HARGA BAHAN 1,971.20
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 17,571.20
E. Profit 15% *D 2,635.68
F. Harga Satuan Pekerjaan (D+E) 20,206.88

A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 120,000.00 36,000.00
Tukang Batu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0150 200,000.00 3,000.00
JUMLAH TENAGA KERJA 66,000.00
B. BAHAN
Semen portland Kg 6.3400 1,232.00 7,810.88
Pasir pasang m3 0.0120 132,000.00 1,584.00
JUMLAH HARGA BAHAN 9,394.88
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 75,394.88
E. Profit 15% *D 11,309.23
F. Harga Satuan Pekerjaan (D+E) 86,704.11

Page 330 of 375


A. 4.4.2.27. Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Batu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Semen portland Kg 3.2500 1,232.00 4,004.00
JUMLAH HARGA BAHAN 4,004.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,004.00
E. Profit 15% *D 7,200.60
F. Harga Satuan Pekerjaan (D+E) 55,204.60

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 120,000.00 32,400.00
Tukang Batu L.02 OH 0.1350 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.0140 200,000.00 2,800.00
Mandor L.04 OH 0.0140 200,000.00 2,800.00
JUMLAH TENAGA KERJA 59,600.00
B. BAHAN
Ubin abu-abu 20 x 20 (cm) Bh 26.5000 6,386.38 169,239.07
Semen portland Kg 10.4000 1,232.00 12,812.80
Pasir pasang m3 0.0450 132,000.00 5,940.00
JUMLAH HARGA BAHAN 187,991.87
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 247,591.87
E. Profit 15% *D 37,138.78
F. Harga Satuan Pekerjaan (D+E) 284,730.65

A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2700 120,000.00 32,400.00
Tukang Batu L.02 OH 0.1350 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.0140 200,000.00 2,800.00
Mandor L.04 OH 0.0140 200,000.00 2,800.00
JUMLAH TENAGA KERJA 59,600.00
B. BAHAN
Ubin berwarna 20 x 20 (cm) Bh 26.5000 8,646.18 229,123.66
Semen portland Kg 10.4000 1,232.00 12,812.80
Semen warna (sika graut) Kg 1.0000 13,200.00 13,200.00
Pasir pasang m3 0.0450 132,000.00 5,940.00
JUMLAH HARGA BAHAN 261,076.46
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 320,676.46
E. Profit 15% *D 48,101.47
F. Harga Satuan Pekerjaan (D+E) 368,777.93

A. 4.4.3.13. Pemasangan 1 m2 lantai ubin Keramik ukuran 60cm x60cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik 60x60 (cm) putih/ berwarna granit Bh 3.1000 #N/A #N/A
Semen portland Kg 9.6000 1,232.00 11,827.20
Semen warna (sika graut) Kg 1.5000 13,200.00 19,800.00
Pasir pasang m3 0.0450 132,000.00 5,940.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.35.ck Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik 40x40 (cm) polos doos 1.0500 51,333.33 53,900.00
Semen portland Kg 10.0000 1,232.00 12,320.00
Pasir pasang m3 0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 1.5000 13,200.00 19,800.00
JUMLAH HARGA BAHAN 91,960.00
C. PERALATAN
Page 331 of 375
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 144,760.00
E. Profit 15% *D 21,714.00
F. Harga Satuan Pekerjaan (D+E) 166,474.00

Page 332 of 375


A. 4.4.3.35. ck Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik 30x30 (cm) polos doos 1.0500 52,171.81 54,780.40
Semen portland Kg 10.0000 1,232.00 12,320.00
Pasir pasang m 3
0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 1.5000 13,200.00 19,800.00
JUMLAH HARGA BAHAN 92,840.40
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 145,640.40
E. Profit 15% *D 21,846.06
F. Harga Satuan Pekerjaan (D+E) 167,486.46

A. 4.4.3.36. ck Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2400 120,000.00 28,800.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0120 200,000.00 2,400.00
JUMLAH TENAGA KERJA 52,800.00
B. BAHAN
Keramik 20x20 (cm) polos doos 1.0500 50,727.14 53,263.50
Semen portland Kg 10.4000 1,232.00 12,812.80
Pasir pasang m3 0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 0.5000 13,200.00 6,600.00
JUMLAH HARGA BAHAN 78,616.30
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 131,416.30
E. Profit 15% *D 19,712.45
F. Harga Satuan Pekerjaan (D+E) 151,128.75

A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 30cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 120,000.00 10,800.00
Tukang Batu L.02 OH 0.0900 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Plint Keramik 10 x 30 cm (Polos) Bh 5.3000 7,860.16 41,658.85
Semen portland Kg 1.1400 1,232.00 1,404.48
Pasir pasang m 3
0.0030 132,000.00 396.00
Semen warna (sika graut) Kg 0.0250 13,200.00 330.00
JUMLAH HARGA BAHAN 43,789.33
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 76,989.33
E. Profit 15% *D 11,548.40
F. Harga Satuan Pekerjaan (D+E) 88,537.73

A. 4.4.3.39.ck Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0900 120,000.00 10,800.00
Tukang Batu L.02 OH 0.0900 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Plint keramik 10x40 Cm ( polos) Bh 5.3000 3,208.33 17,004.17
Semen portland Kg 1.1400 1,232.00 1,404.48
Pasir pasang m3 0.0030 132,000.00 396.00
Semen warna (sika graut) Kg 0.0250 13,200.00 330.00
JUMLAH HARGA BAHAN 19,134.65
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 52,334.65
E. Profit 15% *D 7,850.20
F. Harga Satuan Pekerjaan (D+E) 60,184.84

A. 4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 154,000.00
B. BAHAN
Marmer 100 x 100 cm Bh 1.0600 245,630.00 260,367.80
Semen portland Kg 8.1900 1,232.00 10,090.08
Pasir pasang m 3
0.0450 132,000.00 5,940.00
Semen warna (sika graut) Kg 0.1340 13,200.00 1,768.80
JUMLAH HARGA BAHAN 278,166.68
Page 333 of 375
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 432,166.68
E. Profit 15% *D 64,825.00
F. Harga Satuan Pekerjaan (D+E) 496,991.68

Page 334 of 375


A. 4.4.3.46. Pemasangan 1 m2 lantai parquet kayu
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 154,000.00
B. BAHAN
Parquette lantai m2 1.0500 102,673.34 107,807.01
Lem (standar aica aibond) Kg 0.6000 27,838.07 16,702.84
JUMLAH HARGA BAHAN 124,509.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 278,509.85
E. Profit 15% *D 41,776.48
F. Harga Satuan Pekerjaan (D+E) 320,286.32

A. 4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 154,000.00
B. BAHAN
Parquette lantai m2 1.0500 102,673.34 107,807.01
Lem (standar aica aibond) Kg 0.6000 27,838.07 16,702.84
JUMLAH HARGA BAHAN 124,509.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 278,509.85
E. Profit 15% *D 41,776.48
F. Harga Satuan Pekerjaan (D+E) 320,286.32

A. 4.4.3.54. ck Pemasangan 1 m2 dinding keramik 20cmx 25cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.9000 120,000.00 108,000.00
Tukang Batu L.02 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.0450 200,000.00 9,000.00
Mandor L.04 OH 0.0450 200,000.00 9,000.00
JUMLAH TENAGA KERJA 198,000.00
B. BAHAN
Keramik 20x25 (cm) polos Bh 20.0000 2,722.81 54,456.17
Semen portland Kg 9.3000 1,232.00 11,457.60
Pasir pasang m 3
0.0180 132,000.00 2,376.00
Semen warna (sika graut) Kg 1.9400 13,200.00 25,608.00
JUMLAH HARGA BAHAN 93,897.77
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 291,897.77
E. Profit 15% *D 43,784.67
F. Harga Satuan Pekerjaan (D+E) 335,682.44

A. 4.4.3.57. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 154,000.00
B. BAHAN
Batu paras Bh 1.1000 153,273.12 168,600.43
Semen portland Kg 11.7500 1,232.00 14,476.00
Pasir pasang m3 0.0350 132,000.00 4,620.00
JUMLAH HARGA BAHAN 187,696.43
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 341,696.43
E. Profit 15% *D 51,254.46
F. Harga Satuan Pekerjaan (D+E) 392,950.90

A. 4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Batu L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 154,000.00
B. BAHAN
Batu alam m2 1.1000 176,853.60 194,538.96
Semen portland Kg 11.7500 1,232.00 14,476.00
Pasir pasang m 3
0.0350 132,000.00 4,620.00
JUMLAH HARGA BAHAN 213,634.96
C. PERALATAN
-
JUMLAH HARGA ALAT -

Page 335 of 375


D. Jumlah ( A+B+C) 367,634.96
E. Profit 15% *D 55,145.24
F. Harga Satuan Pekerjaan (D+E) 422,780.20

Page 336 of 375


A. 4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Batu L.02 OH 0.1750 160,000.00 28,000.00
Kepala Tukang L.03 OH 0.0170 200,000.00 3,400.00
Mandor L.04 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 73,800.00
B. BAHAN
Wallpaper polos m 2.2000 37,286.63 82,030.59
Lem (standar Fox)/ perekat Kg 0.2500 22,794.46 5,698.62
JUMLAH HARGA BAHAN 87,729.21
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 161,529.21
E. Profit 15% *D 24,229.38
F. Harga Satuan Pekerjaan (D+E) 185,758.59

A. 4.4.3.63. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang Batu L.02 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0030 3,110,529.88 9,331.59
Paku sekrup (kg) Kg 0.0500 43,230.88 2,161.54
JUMLAH HARGA BAHAN 11,493.13
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 48,693.13
E. Profit 15% *D 7,303.97
F. Harga Satuan Pekerjaan (D+E) 55,997.10

A. 4.4.3.66. Pemasangan 1 m² paving block berwarna tebal 6 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang Batu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0013 200,000.00 260.00
JUMLAH TENAGA KERJA 120,260.00
B. BAHAN
Conblock tebal 6 cm (polos) m² 1.0100 44,049.65 44,490.14
Pasir beton m3 0.0500 132,000.00 6,600.00
JUMLAH HARGA BAHAN 51,090.14
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 171,350.14
E. Profit 15% *D 25,702.52
F. Harga Satuan Pekerjaan (D+E) 197,052.66

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0300 120,000.00 3,600.00
Tukang Kayu L.02 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.0070 200,000.00 1,400.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 17,000.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 5 mm m2 1.1000 27,019.30 29,721.23
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) #N/A
E. Profit 15% *D #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar 0.3750 101,199.56 37,949.84
Paku berbagai ukuran (2"-5") Kg 0.0300 15,213.43 456.40
JUMLAH HARGA BAHAN 38,406.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 69,406.24
E. Profit 15% *D 10,410.94
F. Harga Satuan Pekerjaan (D+E) 79,817.17

Page 337 of 375


A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.02 OH 0.8000 160,000.00 128,000.00
Kepala Tukang L.03 OH 0.0800 200,000.00 16,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 248,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0150 2,671,938.67 40,079.08
Paku berbagai ukuran (2"-5") Kg 0.0100 15,213.43 152.13
JUMLAH HARGA BAHAN 40,231.21
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 288,231.21
E. Profit 15% *D 43,234.68
F. Harga Satuan Pekerjaan (D+E) 331,465.90

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN
Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar 0.3640 49,866.67 18,151.47
Paku sekrup (kg) Kg 0.1100 43,230.88 4,755.40
JUMLAH HARGA BAHAN 22,906.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 44,906.86
E. Profit 15% *D 6,736.03
F. Harga Satuan Pekerjaan (D+E) 51,642.89

A. 4.5.1.9.a Pemasangan 1 m list gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
List gypsum m 1.0500 21,569.30 22,647.77
Paku sekrup (kg) Kg 0.0100 43,230.88 432.31
JUMLAH HARGA BAHAN 23,080.07
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 38,680.07
E. Profit 15% *D 5,802.01
F. Harga Satuan Pekerjaan (D+E) 44,482.09

A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang Kayu L.02 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.0050 200,000.00 1,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 15,600.00
B. BAHAN
List kayu profil m 1.0500 35,206.97 36,967.32
Paku sekrup 1 cm -2,5 cm Kg 0.0100 23,252.97 232.53
JUMLAH HARGA BAHAN 37,199.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 52,799.84
E. Profit 15% *D 7,919.98
F. Harga Satuan Pekerjaan (D+E) 60,719.82

A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40.2mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Besi L.02 OH 0.3500 160,000.00 56,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 108,600.00
B. BAHAN
Besi Hollow 40 x 40 x 2 mm x 6 Meter m1 4.0000 112,159.57 448,638.28
Assesoris (perkuatan, las dll) Ls 100%*rangka 112,159.57 112,159.57
JUMLAH HARGA BAHAN 560,797.85
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 669,397.85
E. Profit 15% *D 100,409.68
F. Harga Satuan Pekerjaan (D+E) 769,807.53

Page 338 of 375


A. 4.5.1.4.a Pemasangan 1 m2 langit-langit eternit ukuran( 1 x 1 m) tebal 4 mm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 31,000.00
B. BAHAN
Eternit asbes uk. 1x1 (m), tebal 4 mm Lembar 1.5000 23,261.16 34,891.74
Paku berbagai ukuran (2"-5") Kg 0.0500 15,213.43 760.67
JUMLAH HARGA BAHAN 35,652.41
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 66,652.41
E. Profit 15% *D 9,997.86
F. Harga Satuan Pekerjaan (D+E) 76,650.27

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Atap Genteng kodok Bh 25.0000 4,028.33 100,708.30
JUMLAH HARGA BAHAN 100,708.30
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 133,908.30
E. Profit 15% *D 20,086.25
F. Harga Satuan Pekerjaan (D+E) 153,994.55

A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0020 200,000.00 400.00
JUMLAH TENAGA KERJA 84,400.00
B. BAHAN
Bubungan atap (nok) genteng kodok Bh 5.0000 4,175.71 20,878.55
Semen portland Kg 8.0000 1,232.00 9,856.00
Pasir pasang m3 0.0320 132,000.00 4,224.00
JUMLAH HARGA BAHAN 34,958.55
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 119,358.55
E. Profit 15% *D 17,903.78
F. Harga Satuan Pekerjaan (D+E) 137,262.33

A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0670 160,000.00 10,720.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,320.00
B. BAHAN
Rooflight fibreglass uk. 1,8 x 0,9 (m) Lembar 0.6000 86,953.02 52,171.81
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
JUMLAH HARGA BAHAN 53,286.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 83,606.84
E. Profit 15% *D 12,541.03
F. Harga Satuan Pekerjaan (D+E) 96,147.87

A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm Lembar 0.5000 73,173.18 36,586.59
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 39,042.42
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 71,042.42
E. Profit 15% *D 10,656.36
F. Harga Satuan Pekerjaan (D+E) 81,698.78

Page 339 of 375


A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.11 OH 0.0080 200,000.00 1,600.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm Lembar 0.6000 64,723.51 38,834.10
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 41,289.94
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 73,289.94
E. Profit 15% *D 10,993.49
F. Harga Satuan Pekerjaan (D+E) 84,283.43

A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm Lembar 0.6000 57,575.67 34,545.40
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 37,001.24
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,801.24
E. Profit 15% *D 10,170.19
F. Harga Satuan Pekerjaan (D+E) 77,971.42

A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm Lembar 0.7500 52,270.06 39,202.55
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 41,658.38
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 72,458.38
E. Profit 15% *D 10,868.76
F. Harga Satuan Pekerjaan (D+E) 83,327.14

A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm Lembar 0.3500 89,853.79 31,448.83
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 33,904.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,704.66
E. Profit 15% *D 9,705.70
F. Harga Satuan Pekerjaan (D+E) 74,410.36

A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm Lembar 0.4200 80,868.41 33,964.73
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 36,420.57
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,220.57
E. Profit 15% *D 10,083.08
F. Harga Satuan Pekerjaan (D+E) 77,303.65

Page 340 of 375


A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm Lembar 0.4400 71,883.03 31,628.54
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,084.37
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,884.37
E. Profit 15% *D 9,732.66
F. Harga Satuan Pekerjaan (D+E) 74,617.02

A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm Lembar 0.5100 62,897.66 32,077.80
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,533.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,333.64
E. Profit 15% *D 9,800.05
F. Harga Satuan Pekerjaan (D+E) 75,133.68

A. 4.5.2.15. a Pemasangan 1 m2 atap zincalum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T=0,4 59,933.72
mm m 1.0000 59,933.72
Paku sekrup (kg) Kg 0.1200 43,230.88 5,187.71
JUMLAH HARGA BAHAN 65,121.43
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 95,921.43
E. Profit 15% *D 14,388.21
F. Harga Satuan Pekerjaan (D+E) 110,309.64

A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm Lembar 0.8000 42,248.36 33,798.69
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 36,254.52
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 67,054.52
E. Profit 15% *D 10,058.18
F. Harga Satuan Pekerjaan (D+E) 77,112.70

A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm Lembar 0.3700 85,970.50 31,809.09
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,264.92
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 65,064.92
E. Profit 15% *D 9,759.74
F. Harga Satuan Pekerjaan (D+E) 74,824.65

Page 341 of 375


A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm Lembar 0.3800 77,373.45 29,401.91
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 31,857.74
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 62,657.74
E. Profit 15% *D 9,398.66
F. Harga Satuan Pekerjaan (D+E) 72,056.40

A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm Lembar 0.4600 72,706.48 33,444.98
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 35,900.81
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 66,700.81
E. Profit 15% *D 10,005.12
F. Harga Satuan Pekerjaan (D+E) 76,705.93

A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm Lembar 0.4900 64,502.44 31,606.19
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 34,062.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,862.03
E. Profit 15% *D 9,729.30
F. Harga Satuan Pekerjaan (D+E) 74,591.33

A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm Lembar 0.5700 53,940.35 30,746.00
Paku asbes Kg 0.1200 20,465.27 2,455.83
JUMLAH HARGA BAHAN 33,201.83
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 64,001.83
E. Profit 15% *D 9,600.27
F. Harga Satuan Pekerjaan (D+E) 73,602.11

A. 4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Atap genteng beton (jenis press) Bh 11.0000 5,516.15 60,677.63
Paku berbagai ukuran (2"-5") Kg 0.0300 15,213.43 456.40
JUMLAH HARGA BAHAN 61,134.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 105,134.03
E. Profit 15% *D 15,770.10
F. Harga Satuan Pekerjaan (D+E) 120,904.14

Page 342 of 375


A. 4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 42,200.00
B. BAHAN
Atap metal (biasa/ polos) Bh 1.3000 31,931.90 41,511.47
Paku berbagai ukuran (1/2"-1") Kg 0.2000 22,300.60 4,460.12
JUMLAH HARGA BAHAN 45,971.59
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 88,171.59
E. Profit 15% *D 13,225.74
F. Harga Satuan Pekerjaan (D+E) 101,397.33

A. 4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.0100 200,000.00 2,000.00
Mandor L.15 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 42,200.00
B. BAHAN
Atap metal (biasa/ polos) Bh 2.0000 31,931.90 63,863.80
Paku berbagai ukuran (1/2"-1") Kg 0.2000 22,300.60 4,460.12
JUMLAH HARGA BAHAN 68,323.92
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 110,523.92
E. Profit 15% *D 16,578.59
F. Harga Satuan Pekerjaan (D+E) 127,102.51

A. 4.5.2.35. Pemasangan 1 m1 nok genteng beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang Kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.11 OH 0.0200 200,000.00 4,000.00
Mandor L.15 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Bubungan atap (nok) genteng beton Bh 3.5000 6,484.63 22,696.21
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
Semen portland Kg 10.8000 1,232.00 13,305.60
Pasir pasang m3 0.0320 132,000.00 4,224.00
Semen warna (sika graut) Kg 1.0000 13,200.00 13,200.00
JUMLAH HARGA BAHAN 54,540.84
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 142,540.84
E. Profit 15% *D 21,381.13
F. Harga Satuan Pekerjaan (D+E) 163,921.97

A. 4.5.2.37. Pemasangan 1 m1 nok genteng metal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang Kayu L.03 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.11 OH 0.0150 200,000.00 3,000.00
Mandor L.15 OH 0.0130 200,000.00 2,600.00
JUMLAH TENAGA KERJA 59,600.00
B. BAHAN
Bubungan atap (nok) metal (biasa/ polos) Bh 1.1000 31,931.90 35,125.09
Paku berbagai ukuran (1/2"-1") Kg 0.0500 22,300.60 1,115.03
JUMLAH HARGA BAHAN 36,240.12
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 95,840.12
E. Profit 15% *D 14,376.02
F. Harga Satuan Pekerjaan (D+E) 110,216.14

A. 4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang Kayu L.03 OH 0.0600 160,000.00 9,600.00
Kepala Tukang L.11 OH 0.0060 200,000.00 1,200.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 26,400.00
B. BAHAN
Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) Lembar 0.7000 35,370.72 24,759.50
Paku berbagai ukuran (1/2"-1") Kg 0.0200 22,300.60 446.01
JUMLAH HARGA BAHAN 25,205.52
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 51,605.52
E. Profit 15% *D 7,740.83
F. Harga Satuan Pekerjaan (D+E) 59,346.34

Page 343 of 375


A. 4.5.2.40. Pemasangan 1 m1 nok atap seng
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 31,800.00
B. BAHAN
Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar 0.3000 39,300.80 11,790.24
Paku berbagai ukuran (1/2"-1") Kg 0.0400 22,300.60 892.02
JUMLAH HARGA BAHAN 12,682.26
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 44,482.26
E. Profit 15% *D 6,672.34
F. Harga Satuan Pekerjaan (D+E) 51,154.60

A. 4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.0500 160,000.00 8,000.00
Kepala Tukang L.11 OH 0.0050 200,000.00 1,000.00
Mandor L.15 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 28,600.00
B. BAHAN
Aluminium foil air cell bubble m2 1.0500 60,204.73 63,214.97
JUMLAH HARGA BAHAN 63,214.97
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 91,814.97
E. Profit 15% *D 13,772.25
F. Harga Satuan Pekerjaan (D+E) 105,587.21

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 7.0000 120,000.00 840,000.00
Tukang kayu L.03 OH 21.0000 160,000.00 3,360,000.00
Kepala tukang L.03 OH 2.1000 200,000.00 420,000.00
Mandor L.04 OH 0.3500 200,000.00 70,000.00
JUMLAH TENAGA KERJA 4,690,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.1000 3,188,007.65 3,506,808.42
Paku berbagai ukuran (2"-5") Kg 1.2500 15,213.43 19,016.79
Lem kayu Kg 1.0000 31,533.33 31,533.33
JUMLAH HARGA BAHAN 3,557,358.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,247,358.54
E. Profit 15% *D 1,237,103.78
F. Harga Satuan Pekerjaan (D+E) 9,484,462.32

A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 120,000.00 720,000.00
Tukang kayu L.03 OH 18.0000 160,000.00 2,880,000.00
Kepala Tukang L.03 OH 1.8000 200,000.00 360,000.00
Mandor L.04 OH 0.3000 200,000.00 60,000.00
JUMLAH TENAGA KERJA 4,020,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.2000 2,483,612.42 2,980,334.90
Paku berbagai ukuran (2"-5") kg 1.2500 15,213.43 19,016.79
Lem kayu kg 1.0000 31,533.33 31,533.33

JUMLAH HARGA BAHAN 3,030,885.02


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,050,885.02
E. Profit 15% *D 1,057,632.75
F. Harga Satuan Pekerjaan (D+E) 8,108,517.78

A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang Kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-

JUMLAH HARGA BAHAN 107,638.22


C. PERALATAN

Page 344 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 342,238.22
E. Profit 15% *D 51,335.73
F. Harga Satuan Pekerjaan (D+E) 393,573.95

Page 345 of 375


A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 120,000.00 42,000.00
Tukang kayu L.03 OH 1.0500 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.1050 200,000.00 21,000.00
Mandor L.04 OH 0.0180 200,000.00 3,600.00
JUMLAH TENAGA KERJA 234,600.00
B. BAHAN
Kayu gergajian kelas III, papan m3 0.0400 2,231,213.60 89,248.54
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67
-

JUMLAH HARGA BAHAN 90,009.22


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 324,609.22
E. Profit 15% *D 48,691.38
F. Harga Satuan Pekerjaan (D+E) 373,300.60

A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Batu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0400 2,671,938.67 106,877.55
Lem kayu kg 0.5000 31,533.33 15,766.67
- -

JUMLAH HARGA BAHAN 122,644.21


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 792,644.21
E. Profit 15% *D 118,896.63
F. Harga Satuan Pekerjaan (D+E) 911,540.85

A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0240 2,671,938.67 64,126.53
Lem kayu kg 0.3000 31,533.33 9,460.00
- -

JUMLAH HARGA BAHAN 73,586.53


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 609,586.53
E. Profit 15% *D 91,437.98
F. Harga Satuan Pekerjaan (D+E) 701,024.51

A. 4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.0000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.3000 200,000.00 60,000.00
Mandor L.04 OH 0.0500 200,000.00 10,000.00
JUMLAH TENAGA KERJA 670,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0640 2,671,938.67 171,004.07
Lem kayu kg 0.5000 31,533.33 15,766.67
- -

JUMLAH HARGA BAHAN 186,770.74


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 856,770.74
E. Profit 15% *D 128,515.61
F. Harga Satuan Pekerjaan (D+E) 985,286.35

A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.7000 120,000.00 84,000.00
Tukang Kayu L.03 OH 2.1000 160,000.00 336,000.00
Kepala Tukang L.03 OH 0.2100 200,000.00 42,000.00
Mandor L.04 OH 0.0350 200,000.00 7,000.00
JUMLAH TENAGA KERJA 469,000.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67

Page 346 of 375


Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 161,590.12
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 630,590.12
E. Profit 15% *D 94,588.52
F. Harga Satuan Pekerjaan (D+E) 725,178.64

Page 347 of 375


A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0256 3,110,529.88 79,629.56
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.5000 31,533.33 15,766.67
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 1.0000 78,355.97 78,355.97
JUMLAH HARGA BAHAN 174,421.22
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 710,421.22
E. Profit 15% *D 106,563.18
F. Harga Satuan Pekerjaan (D+E) 816,984.40

A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 120,000.00 80,400.00
Tukang Kayu L.03 OH 2.0000 160,000.00 320,000.00
Kepala Tukang L.03 OH 0.2000 200,000.00 40,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 507,400.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0600 3,110,529.88 186,631.79
Paku berbagai ukuran (1/2"-1") kg 0.1500 22,300.60 3,345.09
-

JUMLAH HARGA BAHAN 189,976.88


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 697,376.88
E. Profit 15% *D 104,606.53
F. Harga Satuan Pekerjaan (D+E) 801,983.41

A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.4000 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.2400 200,000.00 48,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 536,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0250 3,110,529.88 77,763.25
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.3000 31,533.33 9,460.00
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90

JUMLAH HARGA BAHAN 168,950.16


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 704,950.16
E. Profit 15% *D 105,742.52
F. Harga Satuan Pekerjaan (D+E) 810,692.69

A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 120,000.00 102,000.00
Tukang Kayu L.03 OH 2.5500 160,000.00 408,000.00
Kepala Tukang L.03 OH 0.2550 200,000.00 51,000.00
Mandor L.04 OH 0.0430 200,000.00 8,600.00
JUMLAH TENAGA KERJA 569,600.00
B. BAHAN
Kayu gergajian kelas II, papan m3 0.0250 2,671,938.67 66,798.47
Paku berbagai ukuran (1/2"-1") kg 0.0300 22,300.60 669.02
Lem kayu kg 0.8000 31,533.33 25,226.67
Teakwood 0,90 x 2,10 (m), tebal 4 mm lembar 1.0000 81,057.90 81,057.90
Formika lembar 0.5000 83,514.20 41,757.10

JUMLAH HARGA BAHAN 215,509.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 785,109.15
E. Profit 15% *D 117,766.37
F. Harga Satuan Pekerjaan (D+E) 902,875.52

A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 120,000.00 480,000.00
Tukang Kayu L.03 12.0000 160,000.00 1,920,000.00
Kepala Tukang L.03 OH 1.2000 200,000.00 240,000.00
Mandor L.04 OH 0.2000 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,680,000.00

Page 348 of 375


B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
Paku berbagai ukuran (2"-5") kg 5.6000 15,213.43 85,195.20

JUMLAH HARGA BAHAN 2,949,809.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 5,629,809.06
E. Profit 15% *D 844,471.36
F. Harga Satuan Pekerjaan (D+E) 6,474,280.42

Page 349 of 375


A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.0000 160,000.00 3,200,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,473,000.00
B. BAHAN
Kayu gergajian kelas I, balok m3 1.2000 3,188,007.65 3,825,609.18
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
Paku berbagai ukuran (2"-5") kg 5.6000 15,213.43 85,195.20
- -

JUMLAH HARGA BAHAN 4,043,444.59


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 8,516,444.59
E. Profit 15% *D 1,277,466.69
F. Harga Satuan Pekerjaan (D+E) 9,793,911.27

A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.7000 120,000.00 804,000.00
Tukang kayu L.03 OH 20.1000 160,000.00 3,216,000.00
Kepala Tukang L.03 OH 2.0100 200,000.00 402,000.00
Mandor L.04 OH 0.3350 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,489,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 1.1000 2,483,612.42 2,731,973.66
Besi strip 2 x 3 cm kg 15.0000 8,842.68 132,640.20
Paku berbagai ukuran (2"-5") kg 3.0000 15,213.43 45,640.29
- -

JUMLAH HARGA BAHAN 2,910,254.15


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,399,254.15
E. Profit 15% *D 1,109,888.12
F. Harga Satuan Pekerjaan (D+E) 8,509,142.27

A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1200 120,000.00 14,400.00
Tukang kayu L.03 OH 0.1200 160,000.00 19,200.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 37,200.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0140 2,483,612.42 34,770.57
Paku berbagai ukuran (2"-5") kg 0.0570 15,213.43 867.17

- -

JUMLAH HARGA BAHAN 35,637.74


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 72,837.74
E. Profit 15% *D 10,925.66
F. Harga Satuan Pekerjaan (D+E) 83,763.40

A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34

- -

JUMLAH HARGA BAHAN 35,115.07


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 84,115.07
E. Profit 15% *D 12,617.26
F. Harga Satuan Pekerjaan (D+E) 96,732.33

A. 4.6.1.21. ck Pemasangan 1m' lisplank ukuran lebar 20cm, kalsiplank/GRC 6mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00

Page 350 of 375


B. BAHAN
Listplank GRC m1 1.0000 17,030.35 17,030.35
Paku sekrup (kg) kg 0.1000 43,230.88 4,323.09
JUMLAH HARGA BAHAN 21,353.43
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 70,353.43
E. Profit 15% *D 10,553.02
F. Harga Satuan Pekerjaan (D+E) 80,906.45

Page 351 of 375


A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang kayu L.03 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 49,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0108 3,110,529.88 33,593.72
Paku berbagai ukuran (2"-5") kg 0.0500 15,213.43 760.67

JUMLAH HARGA BAHAN 34,354.39


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,354.39
E. Profit 15% *D 12,503.16
F. Harga Satuan Pekerjaan (D+E) 95,857.55

A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.4500 200,000.00 90,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 181,600.00
B. BAHAN
Kayu gergajian kelas III, balok m3 0.0280 2,319,089.59 64,934.51
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01

- -

JUMLAH HARGA BAHAN 67,216.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 248,816.52
E. Profit 15% *D 37,322.48
F. Harga Satuan Pekerjaan (D+E) 286,139.00

A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 120,000.00 18,000.00
Tukang kayu L.03 OH 0.4500 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.0450 200,000.00 9,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 100,600.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Teakwood 1,20 x 2,40 (m), tebal 4 mm lembar 0.8600 97,269.48 83,651.75
Lem kayu kg 0.5600 31,533.33 17,658.67

JUMLAH HARGA BAHAN 173,133.58


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 273,733.58
E. Profit 15% *D 41,060.04
F. Harga Satuan Pekerjaan (D+E) 314,793.62

A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 120,000.00 24,000.00
Tukang kayu L.03 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0100 200,000.00 2,000.00
JUMLAH TENAGA KERJA 134,000.00
B. BAHAN
Kayu gergajian kelas II, balok m3 0.0280 2,483,612.42 69,541.15
Paku berbagai ukuran (2"-5") kg 0.1500 15,213.43 2,282.01
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.8600 78,355.97 67,386.13
Lem kayu kg 0.5600 31,533.33 17,658.67

JUMLAH HARGA BAHAN 156,867.96


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,867.96
E. Profit 15% *D 43,630.19
F. Harga Satuan Pekerjaan (D+E) 334,498.16

Page 352 of 375


A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 120,000.00 72,000.00
Tukang kayu L.03 OH 1.8000 160,000.00 288,000.00
Kepala Tukang L.03 OH 0.1800 200,000.00 36,000.00
Mandor L.04 OH 0.0300 200,000.00 6,000.00
JUMLAH TENAGA KERJA 402,000.00
B. BAHAN
Kayu gergajian kelas I, papan m3 0.0070 3,110,529.88 21,773.71
Paku berbagai ukuran (2"-5") kg 0.1000 15,213.43 1,521.34
Paku sekrup (kg) kg 0.1500 43,230.88 6,484.63

JUMLAH HARGA BAHAN 29,779.68


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 431,779.68
E. Profit 15% *D 64,766.95
F. Harga Satuan Pekerjaan (D+E) 496,546.64

A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0250 120,000.00 3,000.00
Tukang kayu L.03 OH 0.0750 160,000.00 12,000.00
Kepala Tukang L.03 OH 0.0080 200,000.00 1,600.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 16,800.00
B. BAHAN
Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar 0.4000 78,355.97 31,342.39
Paku berbagai ukuran (1/2"-1") kg 0.0500 22,300.60 1,115.03

JUMLAH HARGA BAHAN 32,457.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,257.42
E. Profit 15% *D 7,388.61
F. Harga Satuan Pekerjaan (D+E) 56,646.03

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang kayu L.02 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 115,800.00
B. BAHAN
Kunci antik buah 1.0000 430,522.40 430,522.40

JUMLAH HARGA BAHAN 430,522.40


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 546,322.40
E. Profit 15% *D 81,948.36
F. Harga Satuan Pekerjaan (D+E) 628,270.76

A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 92,200.00
B. BAHAN
Kunci tanam buah 1.0000 160,887.65 160,887.65

JUMLAH HARGA BAHAN 160,887.65


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 253,087.65
E. Profit 15% *D 37,963.15
F. Harga Satuan Pekerjaan (D+E) 291,050.80

A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 120,000.00 600.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 91,200.00
B. BAHAN
Kunci KM buah 1.0000 92,222.90 92,222.90

JUMLAH HARGA BAHAN 92,222.90


C. PERALATAN

Page 353 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 183,422.90
E. Profit 15% *D 27,513.44
F. Harga Satuan Pekerjaan (D+E) 210,936.34

Page 354 of 375


A. 4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0050 120,000.00 600.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 91,200.00
B. BAHAN
Kunci silinder buah 1.0000 54,708.50 54,708.50

JUMLAH HARGA BAHAN 54,708.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 145,908.50
E. Profit 15% *D 21,886.28
F. Harga Satuan Pekerjaan (D+E) 167,794.78

A. 4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Engsel pintu/ jendela 3" (ex.Dexon) buah 1.0000 19,805.53 19,805.53

JUMLAH HARGA BAHAN 19,805.53


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 48,765.53
E. Profit 15% *D 7,314.83
F. Harga Satuan Pekerjaan (D+E) 56,080.36

A. 4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Spring knip buah 1.0000 19,060.89 19,060.89

JUMLAH HARGA BAHAN 19,060.89


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,460.89
E. Profit 15% *D 7,419.13
F. Harga Satuan Pekerjaan (D+E) 56,880.02

A. 4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kait angin biasa buah 1.0000 10,032.00 10,032.00

JUMLAH HARGA BAHAN 10,032.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 40,432.00
E. Profit 15% *D 6,064.80
F. Harga Satuan Pekerjaan (D+E) 46,496.80

A. 4.6.2.10. Pemasangan 1 buah door closer

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 96,600.00
B. BAHAN
Door closer set 1.0000 242,000.00 242,000.00

JUMLAH HARGA BAHAN 242,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 338,600.00
E. Profit 15% *D 50,790.00
F. Harga Satuan Pekerjaan (D+E) 389,390.00

Page 355 of 375


A. 4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang kayu L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0010 200,000.00 200.00
JUMLAH TENAGA KERJA 38,600.00
B. BAHAN
Kunci Selot bh 1.0000 17,424.00 17,424.00

JUMLAH HARGA BAHAN 17,424.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 56,024.00
E. Profit 15% *D 8,403.60
F. Harga Satuan Pekerjaan (D+E) 64,427.60

A. 4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 120,000.00 6,000.00
Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.0500 200,000.00 10,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 96,600.00
B. BAHAN
Door holder bh 1.0000 115,446.10 115,446.10

JUMLAH HARGA BAHAN 115,446.10


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 212,046.10
E. Profit 15% *D 31,806.92
F. Harga Satuan Pekerjaan (D+E) 243,853.02

A. 4.6.2.13. Pemasangan 1 buah Door stop

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0100 120,000.00 1,200.00
Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0100 200,000.00 2,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 20,200.00
B. BAHAN
Door stop bh 1.0000 20,900.00 20,900.00

JUMLAH HARGA BAHAN 20,900.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 41,100.00
E. Profit 15% *D 6,165.00
F. Harga Satuan Pekerjaan (D+E) 47,265.00

A. 4.6.2.14. Pemasangan 1 buah Rel pintu dorong

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang kayu L.02 OH 0.6000 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.0600 200,000.00 12,000.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 115,800.00
B. BAHAN
Rell pintu dorong set 1.0000 240,717.40 240,717.40

JUMLAH HARGA BAHAN 240,717.40


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 356,517.40
E. Profit 15% *D 53,477.61
F. Harga Satuan Pekerjaan (D+E) 409,995.01

A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Kaca bening tebal 3 mm m2 1.1000 93,339.40 102,673.34
Sealant kg 0.0500 34,142.57 1,707.13

JUMLAH HARGA BAHAN 104,380.47


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 133,340.47
E. Profit 15% *D 20,001.07
F. Harga Satuan Pekerjaan (D+E) 153,341.54

Page 356 of 375


A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0008 200,000.00 160.00
JUMLAH TENAGA KERJA 28,960.00
B. BAHAN
Kaca bening tebal 5 mm m2 1.1000 130,183.90 143,202.29
Sealant kg 0.0500 34,142.57 1,707.13

JUMLAH HARGA BAHAN 144,909.42


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 173,869.42
E. Profit 15% *D 26,080.41
F. Harga Satuan Pekerjaan (D+E) 199,949.83

A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 120,000.00 2,040.00
Tukang kayu L.02 OH 0.1700 160,000.00 27,200.00
Kepala Tukang L.03 OH 0.0170 200,000.00 3,400.00
Mandor L.04 OH 0.0009 200,000.00 180.00
JUMLAH TENAGA KERJA 32,820.00
B. BAHAN
Kaca bening tebal 8 mm m2 1.1000 137,552.80 151,308.08
Sealant kg 0.0700 34,142.57 2,389.98

JUMLAH HARGA BAHAN 153,698.06


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,518.06
E. Profit 15% *D 27,977.71
F. Harga Satuan Pekerjaan (D+E) 214,495.77

A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kaca cermin tebal 5 mm m2 1.1000 122,815.00 135,096.50

JUMLAH HARGA BAHAN 135,096.50


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 165,496.50
E. Profit 15% *D 24,824.48
F. Harga Satuan Pekerjaan (D+E) 190,320.98

A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0170 120,000.00 2,040.00
Tukang kayu L.02 OH 0.1700 160,000.00 27,200.00
Kepala Tukang L.03 OH 0.0170 200,000.00 3,400.00
Mandor L.04 OH 0.0090 200,000.00 1,800.00
JUMLAH TENAGA KERJA 34,440.00
B. BAHAN
Kaca cermin 8 mm m2 1.1000 137,552.80 151,308.08

JUMLAH HARGA BAHAN 151,308.08


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 185,748.08
E. Profit 15% *D 27,862.21
F. Harga Satuan Pekerjaan (D+E) 213,610.29

A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN
Kaca Wireglassed tebal = 5mm m2 1.1000 559,053.88 614,959.27

JUMLAH HARGA BAHAN 614,959.27


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 645,359.27
E. Profit 15% *D 96,803.89
F. Harga Satuan Pekerjaan (D+E) 742,163.16

A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA

Page 357 of 375


Pekerja L.01 OH 0.0750 120,000.00 9,000.00
Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0040 200,000.00 800.00
JUMLAH TENAGA KERJA 36,800.00
B. BAHAN
Kaca patri m2 1.1000 838,089.56 921,898.52
Sealant kg 0.0500 34,142.57 1,707.13

JUMLAH HARGA BAHAN 923,605.64


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 960,405.64
E. Profit 15% *D 144,060.85
F. Harga Satuan Pekerjaan (D+E) 1,104,466.49

Page 358 of 375


A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 2,400.00
B. BAHAN
Soda api kg 0.0500 17,114.99 855.75

JUMLAH HARGA BAHAN 855.75


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,255.75
E. Profit 15% *D 488.36
F. Harga Satuan Pekerjaan (D+E) 3,744.11

A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 2,400.00
B. BAHAN
Sabun kg 0.0500 19,650.40 982.52

JUMLAH HARGA BAHAN 982.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,382.52
E. Profit 15% *D 507.38
F. Harga Satuan Pekerjaan (D+E) 3,889.90

A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0080 200,000.00 1,600.00
JUMLAH TENAGA KERJA 3,400.00
B. BAHAN
Sabun kg 0.0500 19,650.40 982.52

JUMLAH HARGA BAHAN 982.52


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,382.52
E. Profit 15% *D 657.38
F. Harga Satuan Pekerjaan (D+E) 5,039.90

A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 120,000.00 8,400.00
Tukang cat L.02 OH 0.0090 160,000.00 1,440.00
Kepala Tukang L.03 OH 0.0060 200,000.00 1,200.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 11,640.00
B. BAHAN
Cat menie kg 0.2000 36,954.25 7,390.85
Plamir tembok kg 0.1500 40,365.20 6,054.78
Cat Dasar kg 0.1700 57,191.67 9,722.58
Cat Penutup kg 0.2600 57,191.67 14,869.83
Kuas bh 0.0100 24,808.63 248.09
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 11,209.66 336.29
Ampelas lbr 0.2000 4,742.55 948.51
JUMLAH HARGA BAHAN 39,570.93
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 51,210.93
E. Profit 15% *D 7,681.64
F. Harga Satuan Pekerjaan (D+E) 58,892.57

A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 120,000.00 8,400.00
Tukang cat L.02 OH 0.1050 160,000.00 16,800.00
Kepala Tukang L.03 OH 0.0040 200,000.00 800.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 26,600.00
B. BAHAN
Cat menie kg 0.2000 36,954.25 7,390.85
Plamir tembok kg 0.1500 40,365.20 6,054.78
Cat dasar kg 0.1700 57,191.67 9,722.58
Cat penutup kg 0.3500 57,191.67 20,017.08
Kuas bh 0.0100 24,808.63 248.09
Minyak pelarut/ pengencer cat (solvent) kg 0.0300 11,209.66 336.29
Ampelas lbr 0.2000 4,742.55 948.51
JUMLAH HARGA BAHAN 44,718.18
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,318.18
E. Profit 15% *D 10,697.73
F. Harga Satuan Pekerjaan (D+E) 82,015.91
Page 359 of 375
A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 120,000.00 4,800.00
Tukang cat L.02 OH 0.0630 160,000.00 10,080.00
Kepala Tukang L.03 OH 0.0630 200,000.00 12,600.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Teak Oil liter 0.3600 235.80 84.89
JUMLAH HARGA BAHAN 84.89
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 28,164.89
E. Profit 15% *D 4,224.73
F. Harga Satuan Pekerjaan (D+E) 32,389.62

A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0400 120,000.00 4,800.00
Tukang cat L.02 OH 0.0600 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.0160 200,000.00 3,200.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 18,200.00
B. BAHAN
Pelitur liter 0.1500 64,350.00 9,652.50
Pelitur Jadi liter 0.3720 57,477.42 21,381.60
Ampelas lb 2.0000 4,742.55 9,485.10
JUMLAH HARGA BAHAN 40,519.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 58,719.20
E. Profit 15% *D 8,807.88
F. Harga Satuan Pekerjaan (D+E) 67,527.08

A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat Residu atau ter dan cat
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Mandor L.04 OH 0.0060 200,000.00 1,200.00
JUMLAH TENAGA KERJA 13,200.00
B. BAHAN
Residu atau ter liter 0.3500 53,154.33 18,604.02
JUMLAH HARGA BAHAN 18,604.02
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 31,804.02
E. Profit 15% *D 4,770.60
F. Harga Satuan Pekerjaan (D+E) 36,574.62

A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1600 120,000.00 19,200.00
Tukang cat L.02 OH 0.1600 160,000.00 25,600.00
Kepala Tukang L.03 OH 0.0160 200,000.00 3,200.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 48,600.00
B. BAHAN
cat Vernis liter 0.1500 57,855.31 8,678.30
Dempul kayu kg 0.0500 33,141.16 1,657.06
Ampelas lb 0.1000 4,742.55 474.25
JUMLAH HARGA BAHAN 10,809.61
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 59,409.61
E. Profit 15% *D 8,911.44
F. Harga Satuan Pekerjaan (D+E) 68,321.05

A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang cat L.02 OH 0.0630 160,000.00 10,080.00
Kepala Tukang L.03 OH 0.0063 200,000.00 1,260.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 14,340.00
B. BAHAN
Plamir Tembok kg 0.1000 40,365.20 4,036.52
Cat Dasar kg 0.1000 76,692.00 7,669.20
Cat penutup kg 0.2600 76,692.00 19,939.92
JUMLAH HARGA BAHAN 31,645.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 45,985.64
E. Profit 15% *D 6,897.85
F. Harga Satuan Pekerjaan (D+E) 52,883.49

Page 360 of 375


A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 120,000.00 3,360.00
Tukang cat L.02 OH 0.0420 160,000.00 6,720.00
Kepala Tukang L.03 OH 0.0042 200,000.00 840.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 11,520.00
B. BAHAN
Cat dasar kg 0.1200 76,692.00 9,203.04
Cat penutup kg 0.1800 76,692.00 13,804.56
JUMLAH HARGA BAHAN 23,007.60
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 34,527.60
E. Profit 15% *D 5,179.14
F. Harga Satuan Pekerjaan (D+E) 39,706.74

Dihitung-1 1 M2 Pengecatan Genteng dengan Cat Spesial

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 120,000.00 12,000.00
Tukang cat L.02 OH 0.1000 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.0150 200,000.00 3,000.00
Mandor L.04 OH 0.0050 200,000.00 1,000.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Cat genteng KW II kg 0.3000 57,244.10 17,173.23
JUMLAH HARGA BAHAN 17,173.23
C. PERALATAN
Kuas bh 0.0100 24,808.63 248.09
JUMLAH HARGA ALAT 248.09
D. Jumlah (A+B+C) 49,421.32
E. Profit 15% *D 7,413.20
F. Harga Satuan Pekerjaan (D+E) 56,834.51

A. 4.7.1.15. 1 M2 Pemasangan wallpaper

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang cat L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0025 200,000.00 500.00
JUMLAH TENAGA KERJA 38,900.00
B. BAHAN
Wallpaper polos m2 1.2000 37,286.63 44,743.96
Lem (standar Fox)/ perekat kg 0.2000 22,794.46 4,558.89
JUMLAH HARGA BAHAN 49,302.85
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,202.85
E. Profit 15% *D 13,230.43
F. Harga Satuan Pekerjaan (D+E) 101,433.28

A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 120,000.00 2,400.00
Tukang cat L.02 OH 0.2000 160,000.00 32,000.00
Kepala Tukang L.03 OH 0.0200 200,000.00 4,000.00
Mandor L.04 OH 0.0025 200,000.00 500.00
JUMLAH TENAGA KERJA 38,900.00
B. BAHAN
Cat menie kg 0.1000 36,954.25 3,695.43
kuas bh 0.0100 24,808.63 248.09
JUMLAH HARGA BAHAN 3,943.51
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 42,843.51
E. Profit 15% *D 6,426.53
F. Harga Satuan Pekerjaan (D+E) 49,270.04

A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang cat L.02 OH 0.2250 160,000.00 36,000.00
Kepala Tukang L.03 OH 0.0225 200,000.00 4,500.00
Mandor L.04 OH 0.0075 200,000.00 1,500.00
JUMLAH TENAGA KERJA 72,000.00
B. BAHAN
Cat menie kg 0.1000 36,954.25 3,695.43
Minyak pelarut/ pengencer cat (solvent) liter 0.0100 11,209.66 112.10
Kayu dolken Ø8-10 (cm) panjang 4 m m3 0.0100 4,400.00 44.00
Kuas bh 0.0020 24,808.63 49.62

JUMLAH HARGA BAHAN 3,901.14


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 75,901.14
E. Profit 15% *D 11,385.17
F. Harga Satuan Pekerjaan (D+E) 87,286.31

Page 361 of 375


A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 120,000.00 30,000.00
Tukang cat L.02 OH 0.2500 160,000.00 40,000.00
Kepala Tukang L.03 OH 0.0250 200,000.00 5,000.00
Mandor L.04 OH 0.0013 200,000.00 260.00
JUMLAH TENAGA KERJA 75,260.00
B. BAHAN
Menie A kg 0.1000 41,372.88 4,137.29
Menie B kg 0.1000 41,372.88 4,137.29
Minyak pelarut/ pengencer cat (solvent) liter 0.0800 11,209.66 896.77
Cat kg 0.0100 41,372.88 413.73
Kuas bh 0.0100 24,808.63 248.09

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 75,260.00
E. Profit 15% *D 11,289.00
F. Harga Satuan Pekerjaan (D+E) 86,549.00

A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 120,000.00 7,200.00
Tukang cat L.02 OH 0.0600 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.0120 200,000.00 2,400.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 19,800.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 11,209.66 3,362.90
Cat kg 0.0100 41,372.88 413.73
Kuas bh 0.0100 24,808.63 248.09

JUMLAH HARGA BAHAN 4,024.71


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 23,824.71
E. Profit 15% *D 3,573.71
F. Harga Satuan Pekerjaan (D+E) 27,398.42

A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang cat L.02 OH 0.8000 160,000.00 128,000.00
Kepala Tukang L.03 OH 0.0800 200,000.00 16,000.00
Mandor L.04 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 196,000.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.1100 11,209.66 1,233.06
Cat dasar kg 0.1700 41,372.88 7,033.39
Kuas bh 0.0800 24,808.63 1,984.69
Cat antara kg 0.0100 41,372.88 413.73
Cat penutup kg 0.0100 41,372.88 413.73
JUMLAH HARGA BAHAN 11,078.60
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 207,078.60
E. Profit 15% *D 31,061.79
F. Harga Satuan Pekerjaan (D+E) 238,140.39

A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.4000 120,000.00 48,000.00
Tukang cat L.02 OH 0.7000 160,000.00 112,000.00
Kepala Tukang L.03 OH 0.0700 200,000.00 14,000.00
Mandor L.04 OH 0.0200 200,000.00 4,000.00
JUMLAH TENAGA KERJA 178,000.00
B. BAHAN
Minyak pelarut/ pengencer cat (solvent) liter 0.3000 11,209.66 3,362.90
Cat dasar kg 0.0100 41,372.88 413.73
JUMLAH HARGA BAHAN 3,776.63
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 181,776.63
E. Profit 15% *D 27,266.49
F. Harga Satuan Pekerjaan (D+E) 209,043.12

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 120,000.00 396,000.00
Tukang batu L.02 OH 1.100 160,000.00 176,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.160 200,000.00 32,000.00
JUMLAH TENAGA KERJA 606,000.00
Page 362 of 375
B. BAHAN
Closet Duduk / Monoblock unit 1.000 1,236,010.16 1,236,010.16
Perlengkapan Ls 6% x clooset 74,160.61 74,160.61
JUMLAH HARGA BAHAN 1,310,170.77
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,916,170.77
E. Profit 15% * D 287,425.62
F. Harga Satuan Pekerjaan (D+E) 2,203,596.39

Page 363 of 375


A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porselin

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.160 200,000.00 32,000.00
JUMLAH TENAGA KERJA 422,000.00
B. BAHAN
Closed jongkok porcelaint (lokal) unit 1.000 194,593.54 194,593.54
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00
JUMLAH HARGA BAHAN 201,985.54
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 623,985.54
E. Profit 15% * D 93,597.83
F. Harga Satuan Pekerjaan (D+E) 717,583.38

A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 400,000.00
B. BAHAN
Closed jongkok terraso unit 1.000 188,578.34 188,578.34
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Batu bata merah besar bh 7.000 2,024.00 14,168.00
JUMLAH HARGA BAHAN 211,458.34
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 611,458.34
E. Profit 15% * D 91,718.75
F. Harga Satuan Pekerjaan (D+E) 703,177.09

A. 5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.000 160,000.00 160,000.00
Kepala Tukang L.03 OH 0.100 200,000.00 20,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 310,000.00
B. BAHAN
Urinoir unit 1.000 933,394.00 933,394.00
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Perlengkapan % 30.000 280,018.20 280,018.20
JUMLAH HARGA BAHAN 1,222,124.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,532,124.20
E. Profit 15% * D 229,818.63
F. Harga Satuan Pekerjaan (D+E) 1,761,942.83

A. 5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 120,000.00 144,000.00
Tukang batu L.02 OH 1.450 160,000.00 232,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 418,000.00
B. BAHAN
Wastafel unit 1.000 810,579.00 810,579.00
Semen portland kg 6.000 1,232.00 7,392.00
Pasir pasang m3 0.010 132,000.00 1,320.00
Perlengkapan % 12.000 97,269.48 97,269.48
JUMLAH HARGA BAHAN 916,560.48
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,334,560.48
E. Profit 15% * D 200,184.07
F. Harga Satuan Pekerjaan (D+E) 1,534,744.55

A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang batu L.02 OH 4.500 160,000.00 720,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.900 200,000.00 180,000.00
JUMLAH TENAGA KERJA 1,270,000.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 344,373.26 344,373.26
Perlengkapan % 12%x bak 41,324.79 41,324.79
JUMLAH HARGA BAHAN 385,698.05

Page 364 of 375


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,655,698.05
E. Profit 15% * D 248,354.71
F. Harga Satuan Pekerjaan (D+E) 1,904,052.76

Page 365 of 375


A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 120,000.00 720,000.00
Tukang batu L.02 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 200,000.00 60,000.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 1,266,000.00
B. BAHAN
Batu bata merah besar bh 150.000 2,024.00 303,600.00
Semen portland kg 120.000 1,232.00 147,840.00
Pasir pasang m3 0.300 132,000.00 39,600.00
Porcelaint uk. 11x 11 cm bh 360.000 1,179.02 424,448.64
Semen warna (sika graut) kg 6.000 13,200.00 79,200.00
JUMLAH HARGA BAHAN 994,688.64
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,260,688.64
E. Profit 15% * D 339,103.30
F. Harga Satuan Pekerjaan (D+E) 2,599,791.94

A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 120,000.00 360,000.00
Tukang batu L.02 OH 4.500 160,000.00 720,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.900 200,000.00 180,000.00
JUMLAH TENAGA KERJA 1,270,000.00
B. BAHAN
Bak mandi fibreglass volume 0,30 m³ unit 1.000 208,785.50 208,785.50
Perlengkapan Ls 12%x bak 25,054.26 3,006.51
JUMLAH HARGA BAHAN 211,792.01
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,481,792.01
E. Profit 15% * D 222,268.80
F. Harga Satuan Pekerjaan (D+E) 1,704,060.81

A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.450 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.045 200,000.00 9,000.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 120,000.00
B. BAHAN
Bak mandi fibreglass volume 1,00 m³ unit 1.000 344,373.26 344,373.26
Perlengkapan % 12.000 41,324.79 4,958.97
JUMLAH HARGA BAHAN 349,332.23
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 469,332.23
E. Profit 15% * D 70,399.84
F. Harga Satuan Pekerjaan (D+E) 539,732.07

A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 120,000.00 3,600.00
Tukang batu L.02 OH 0.300 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.030 200,000.00 6,000.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 60,600.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 414,974.34 414,974.34
Water drain + Assesories bh 1.000 19,650.40 19,650.40
JUMLAH HARGA BAHAN 434,624.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 495,224.74
E. Profit 15% * D 74,283.71
F. Harga Satuan Pekerjaan (D+E) 569,508.45

A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang batu L.02 OH 0.500 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.050 200,000.00 10,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 101,000.00
B. BAHAN
Bak cuci piring (sink) stainless steel 2 lobang Unit 1.000 414,974.34 414,974.34
Water drain + Assesories bh 1.000 19,650.40 19,650.40
Semen portland kg 20.000 1,232.00 24,640.00
Pasir pasang m3 0.050 132,000.00 6,600.00
JUMLAH HARGA BAHAN 465,864.74
C. PERALATAN

Page 366 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 566,864.74
E. Profit 15% * D 85,029.71
F. Harga Satuan Pekerjaan (D+E) 651,894.45

Page 367 of 375


A. 5.1.1.14. Pemasangan 1 buah floor drain

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 120,000.00 1,200.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 200,000.00 2,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 20,200.00
B. BAHAN
Floor drain (PVC) Unit 1.000 8,801.74 8,801.74
JUMLAH HARGA BAHAN 8,801.74
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 29,001.74
E. Profit 15% * D 4,350.26
F. Harga Satuan Pekerjaan (D+E) 33,352.00

A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.160 120,000.00 259,200.00
Tukang batu L.02 OH 0.720 160,000.00 115,200.00
Kepala Tukang L.03 OH 0.072 200,000.00 14,400.00
Mandor L.04 OH 0.011 200,000.00 2,200.00
JUMLAH TENAGA KERJA 391,000.00
B. BAHAN
Batu bata merah besar bh 40.000 2,024.00 80,960.00
Semen portland kg 44.000 1,232.00 54,208.00
Pasir pasang m3 0.070 132,000.00 9,240.00
Pasir beton m3 0.060 132,000.00 7,920.00
Batu kerikil m3 0.070 352,000.00 24,640.00
Baja Tulangan (Polos) U24 kg 1.600 12,109.11 19,374.58
JUMLAH HARGA BAHAN 196,342.58
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 587,342.58
E. Profit 15% * D 88,101.39
F. Harga Satuan Pekerjaan (D+E) 675,443.97

A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 120,000.00 384,000.00
Tukang batu L.02 OH 1.150 160,000.00 184,000.00
Kepala Tukang L.03 OH 0.011 200,000.00 2,200.00
Mandor L.04 OH 0.016 200,000.00 3,200.00
JUMLAH TENAGA KERJA 573,400.00
B. BAHAN
Batu bata merah besar bh 70.000 2,024.00 141,680.00
Semen portland kg 77.000 1,232.00 94,864.00
Pasir pasang m3 0.130 132,000.00 17,160.00
Pasir beton m3 0.090 132,000.00 11,880.00
Batu kerikil m3 0.020 352,000.00 7,040.00
Baja Tulangan (Polos) U24 kg 2.600 12,109.11 31,483.69
JUMLAH HARGA BAHAN 304,107.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 877,507.69
E. Profit 15% * D 131,626.15
F. Harga Satuan Pekerjaan (D+E) 1,009,133.85

A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.200 120,000.00 384,000.00
Tukang batu L.02 OH 1.150 160,000.00 184,000.00
Kepala Tukang L.03 OH 0.011 200,000.00 2,200.00
Mandor L.04 OH 0.016 200,000.00 3,200.00
JUMLAH TENAGA KERJA 573,400.00
B. BAHAN
Batu bata merah besar bh 123.000 2,024.00 248,952.00
Semen portland kg 114.000 1,232.00 140,448.00
Pasir pasang m3 0.184 132,000.00 24,288.00
Pasir beton m3 0.120 132,000.00 15,840.00
Batu kerikil m3 0.033 352,000.00 11,616.00
Baja Tulangan (Polos) U24 kg 4.850 12,109.11 58,729.20
JUMLAH HARGA BAHAN 499,873.20
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,073,273.20
E. Profit 15% * D 160,990.98
F. Harga Satuan Pekerjaan (D+E) 1,234,264.17

A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00

Page 368 of 375


B. BAHAN
Pipa besi galvanis Ø 0,5 (inch)/1,8mm m 1.200 27,937.81 33,525.37
Perlengkapan ls 35%x pipa 9,778.23 9,778.23
JUMLAH HARGA BAHAN 43,303.60
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 71,383.60
E. Profit 15% * D 10,707.54
F. Harga Satuan Pekerjaan (D+E) 82,091.14

Page 369 of 375


A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 120,000.00 1,200.00
Tukang batu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.040 200,000.00 8,000.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 74,200.00
B. BAHAN
Kran air Ø 0,5 (inch) steel bh 1.000 64,846.32 64,846.32
Seal tape bh 0.025 3,813.33 95.33
JUMLAH HARGA BAHAN 64,941.65
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 139,141.65
E. Profit 15% * D 20,871.25
F. Harga Satuan Pekerjaan (D+E) 160,012.90

A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Pipa besi galvanis Ø 0,75 (inch)/1,8mm m 1.200 33,988.49 40,786.19
Perlengkapan % 35%x pipa 11,895.97 11,895.97
JUMLAH HARGA BAHAN 52,682.16
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 80,762.16
E. Profit 15% * D 12,114.32
F. Harga Satuan Pekerjaan (D+E) 92,876.49

A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.027 200,000.00 5,400.00
JUMLAH TENAGA KERJA 28,080.00
B. BAHAN
Pipa besi galvanis Ø 1 (inch)/1,8mm m 1.200 37,474.53 44,969.43
Perlengkapan % 35%x pipa 13,116.08 13,116.08
JUMLAH HARGA BAHAN 58,085.51
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 86,165.51
E. Profit 15% * D 12,924.83
F. Harga Satuan Pekerjaan (D+E) 99,090.34

A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.108 120,000.00 12,960.00
Tukang batu L.02 OH 0.180 160,000.00 28,800.00
Kepala Tukang L.03 OH 0.018 200,000.00 3,600.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 46,360.00
B. BAHAN
Pipa besi galvanis Ø 1,5 (inch)/1,8mm m 1.200 66,447.38 79,736.86
Perlengkapan % 35%x pipa 23,256.58 23,256.58
JUMLAH HARGA BAHAN 102,993.44
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,353.44
E. Profit 15% * D 22,403.02
F. Harga Satuan Pekerjaan (D+E) 171,756.46

A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 120,000.00 16,200.00
Tukang batu L.02 OH 0.225 160,000.00 36,000.00
Kepala Tukang L.03 OH 0.023 200,000.00 4,600.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 58,200.00
B. BAHAN
Pipa besi galvanis Ø 3 (inch) t=4 mm m 1.200 125,575.55 150,690.66
Perlengkapan % 35%x pipa 43,951.44 43,951.44
JUMLAH HARGA BAHAN 194,642.10
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 252,842.10
E. Profit 15% * D 37,926.31
F. Harga Satuan Pekerjaan (D+E) 290,768.41

Page 370 of 375


A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 120,000.00 16,200.00
Tukang batu L.02 OH 0.225 160,000.00 36,000.00
Kepala Tukang L.03 OH 0.023 200,000.00 4,600.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 58,200.00
B. BAHAN
Pipa besi galvanis Ø 4 (inch)/1,8mm m 1.200 126,664.69 151,997.63
Perlengkapan % 35%x pipa 44,332.64 44,332.64
JUMLAH HARGA BAHAN 196,330.27
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 254,530.27
E. Profit 15% * D 38,179.54
F. Harga Satuan Pekerjaan (D+E) 292,709.81

A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø1/2 (inch) AW, panjang 4 m m 1.200 5,976.67 7,172.00
Perlengkapan % 35%x pipa 2,091.83 2,091.83
JUMLAH HARGA BAHAN 9,263.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 24,783.83
E. Profit 15% * D 3,717.58
F. Harga Satuan Pekerjaan (D+E) 28,501.41

A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø3/4 (inch) AW, panjang 4 m m 1.200 7,956.67 9,548.00
Perlengkapan % 35%x pipa 2,784.83 2,784.83
JUMLAH HARGA BAHAN 12,332.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 27,852.83
E. Profit 15% * D 4,177.93
F. Harga Satuan Pekerjaan (D+E) 32,030.76

A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 160,000.00 9,600.00
Kepala Tukang L.03 OH 0.006 200,000.00 1,200.00
Mandor L.04 OH 0.002 200,000.00 400.00
JUMLAH TENAGA KERJA 15,520.00
B. BAHAN
Pipa PVC Ø 1 (inch) AW, panjang 4 m m 1.200 11,036.67 13,244.00
Perlengkapan % 35%x pipa 3,862.83 3,862.83
JUMLAH HARGA BAHAN 17,106.83
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 32,626.83
E. Profit 15% * D 4,894.03
F. Harga Satuan Pekerjaan (D+E) 37,520.86

A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 23,280.00
B. BAHAN
Pipa PVC Ø 1,5(inch) AW, panjang 4 m m 1.200 16,751.41 20,101.70
Perlengkapan % 35%x pipa 5,863.00 5,863.00
JUMLAH HARGA BAHAN 25,964.69
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 49,244.69
E. Profit 15% * D 7,386.70
F. Harga Satuan Pekerjaan (D+E) 56,631.40

Page 371 of 375


A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 120,000.00 6,480.00
Tukang batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.009 200,000.00 1,800.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 23,280.00
B. BAHAN
Pipa PVC Ø 2 (inch) AW, panjang 4 m m 1.200 22,000.00 26,400.00
Perlengkapan % 35%x pipa 7,700.00 7,700.00
JUMLAH HARGA BAHAN 34,100.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 57,380.00
E. Profit 15% * D 8,607.00
F. Harga Satuan Pekerjaan (D+E) 65,987.00

A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang batu L.02 OH 0.135 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.014 200,000.00 2,700.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 34,820.00
B. BAHAN
Pipa PVC Ø 3 (inch) AW, panjang 4 m m 1.200 42,350.00 50,820.00
Perlengkapan % 35%x pipa 14,822.50 14,822.50
JUMLAH HARGA BAHAN 65,642.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 100,462.50
E. Profit 15% * D 15,069.38
F. Harga Satuan Pekerjaan (D+E) 115,531.88

A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 120,000.00 9,720.00
Tukang batu L.02 OH 0.135 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.014 200,000.00 2,700.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 34,820.00
B. BAHAN
Pipa PVC Ø 4-6 (inch) AW, panjang 4 m m 1.200 53,306.00 63,967.20
Perlengkapan % 35%x pipa 18,657.10 18,657.10
JUMLAH HARGA BAHAN 82,624.30
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 117,444.30
E. Profit 15% * D 17,616.65
F. Harga Satuan Pekerjaan (D+E) 135,060.95

A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang batu L.02 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.03 OH 0.007 200,000.00 1,400.00
Mandor L.04 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Pipa beton Ø 20 cm, panjang 1m' bh 1.100 85,119.28 93,631.21
Batu bata merah kecil m3 0.027 1,223.24 33.03
Semen portland kg 3.920 1,232.00 4,829.44
Pasir pasang m3 0.056 132,000.00 7,392.00
Pasir urug/timbun m3 0.024 62,857.14 1,508.57
JUMLAH HARGA BAHAN 107,394.25
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 138,194.25
E. Profit 15% * D 20,729.14
F. Harga Satuan Pekerjaan (D+E) 158,923.38

A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 120,000.00 45,600.00
Tukang batu L.02 OH 0.190 160,000.00 30,400.00
Kepala Tukang L.03 OH 0.019 200,000.00 3,800.00
Mandor L.04 OH 0.019 200,000.00 3,800.00
JUMLAH TENAGA KERJA 83,600.00
B. BAHAN
Pipa beton Ø 60 cm, panjang 1m' bh 1.100 141,054.59 155,160.05
Batu bata merah kecil m3 0.550 1,223.24 672.78
Semen portland kg 10.300 1,232.00 12,689.60
Pasir pasang m3 0.061 132,000.00 8,052.00
Pasir urug/timbun m3 0.069 62,857.14 4,337.14
JUMLAH HARGA BAHAN 180,911.57
C. PERALATAN

Page 372 of 375


JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 264,511.57
E. Profit 15% * D 39,676.74
F. Harga Satuan Pekerjaan (D+E) 304,188.31

Page 373 of 375


Dihitung 1. ck Pemasangan 1 m2 Rangka atap baja ringan C.75
Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanize


m2 1.0000 183,093.75 183,093.75

JUMLAH HARGA ALAT 183,093.75


D. Jumlah (A+B+C) 183,093.75
E. Profit 15% *D 27,464.06
F. Harga Satuan Pekerjaan (D+E) 210,557.81

Dihitung 2. ck Pemasangan 1 m2 Plafond PVC (ex. Shunda Plafond)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Shunda Plafond)
m2 1.0000 180,000.00 180,000.00

JUMLAH HARGA ALAT 180,000.00


D. Jumlah (A+B+C) 180,000.00
E. Profit 15% *D 27,000.00
F. Harga Satuan Pekerjaan (D+E) 207,000.00

Dihitung 3. ck Pemasangan 1 m2 Plafond PVC (ex. Wifon)


Harga Satuan (Rp) Jumlah Harga
No. Uraian KodeSatuan Koefisien
(Rp) (Rp)

Plafond PVC (Rangka, Penutup Plafond, List dan Acc) (ex. Wifon)
m2 1.0000 165,000.00 165,000.00

JUMLAH HARGA ALAT 165,000.00


D. Jumlah (A+B+C) 165,000.00
E. Profit 15% *D 24,750.00
F. Harga Satuan Pekerjaan (D+E) 189,750.00

A. 4.5.2.15. ck Pemasangan 1 m2 atap Spandek zincalum, t=0.4mm


Harga Satuan Jumlah Harga
No. Uraian KodeSatuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.1400 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.0700 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.0070 200,000.00 1,400.00
Mandor L.15 OH 0.0070 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Spandeck zincalum setara " Union Deck", T= m2 1.0000 59,933.72 59,933.72
Paku sekrup (kg) Kg 0.1200 43,230.88 5,187.71
JUMLAH HARGA BAHAN 65,121.43
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 95,921.43
E. Profit 15% *D 14,388.21
F. Harga Satuan Pekerjaan (D+E) 110,309.64

Dihitung 4. ck Pemasangan 1 m2 Pasang Atap Bergelombang Monolayer 3 mm (Kemiringan atap Min. 10-15 )
(Uk. 200 x 95 x 0.30), Jarak Rangka Gording Atau Reng Max.45 cm (ex. Onduline)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Atap Bergelombang Monolayer 3 mm Lbr 0.747 168,000.00 125,496.00
Screw Bh 9.097 1,200.00 10,916.40
JUMLAH HARGA BAHAN 136,412.40
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 167,212.40
E. Profit 0.150 *D 25,081.86
F. Harga Satuan Pekerjaan (D+E) 192,294.26

Page 374 of 375


Dihitung 5. ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Monolayer 3 mm (Kemiringan Atap >15)
Uk. 106 x 40 x 0.30 cm, Jarak Rangka Max. 45 cm (ex. Onduvilla)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.11 OH 0.010 200,000.00 2,000.00
Mandor L.15 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 44,000.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 3.710 54,390.00 201,786.90
Screw Bh 16.129 1,200.00 19,354.80
JUMLAH HARGA BAHAN 221,141.70
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 265,141.70
E. Profit 0.150 *D 39,771.26
F. Harga Satuan Pekerjaan (D+E) 304,912.96

Dihitung 6. ck Pemasangan 1 m2 Genteng Bitumen Bergelombang Memanjang Monolayer 3 mm (Kemiringan Atap 5 - 10)
Uk. 195 x 96 x 0.30 cm, Jarak Rangka Gording atau Reng Max. 32 cm (ex. Onduline - Tile)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.03 OH 0.070 160,000.00 11,200.00
Kepala Tukang L.11 OH 0.007 200,000.00 1,400.00
Mandor L.15 OH 0.007 200,000.00 1,400.00
JUMLAH TENAGA KERJA 30,800.00
B. BAHAN
Genteng Bitumen Bergelombang Monolayer 3 mm Lbr 0.878 150,000.00 131,700.00
Screw Bh 13.740 1,200.00 16,488.00
JUMLAH HARGA BAHAN 148,188.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 178,988.00
E. Profit 0.150 *D 26,848.20
F. Harga Satuan Pekerjaan (D+E) 205,836.20

Dihitung 7. ck Pemasangan 1 m Panjang Nok Bitumen Monolayer

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.084 120,000.00 10,080.00
Tukang Kayu L.03 OH 0.125 160,000.00 20,000.00
Kepala Tukang L.11 OH 0.013 200,000.00 2,600.00
Mandor L.15 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 40,680.00
B. BAHAN
Nok / Ridge Onduline Lbr 1.438 85,000.00 122,230.00
Sekrup / Paku Bh 10.000 1,200.00 12,000.00
JUMLAH HARGA BAHAN 134,230.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 174,910.00
E. Profit 0.150 *D 26,236.50
F. Harga Satuan Pekerjaan (D+E) 201,146.50

Pangkalpinang, Februari 2021

Menyetujui,
KEPALA BIDANG KEPALA BIDANG KEPALA BIDANG KEPALA BIDANG KEPALA BIDANG
TATA RUANG SUMBER DAYA AIR PERTANAHAN BINA MARGA CIPTA KARYA

ADINUL AMAL, S. Si. RM. IKMANTO, ST., M. Tech. MUHAMMAD YASIN, SE. M. AGUS SALIM, ST. PAHALA R. TOBING, ST.
NIP. 19840718 201001 1 018 NIP. 19730926 200501 1 005 NIP. 19731122 200212 1 006 NIP. 19740716 200501 1 008 NIP. 19810831 200604 1 007

Mengetahui,

KEPALA DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG KOTA PANGKALPINANG

SUPARLAN DULASPAR, ST.


NIP. 19620705 198503 1020

Page 375 of 375

Anda mungkin juga menyukai