site ww
(Tempat Download Data Teknik Sipil)
V 0 #NAME?
A BOUSOME #NAME?
B PPN 10 % #NAME?
C JUMLAH TOTAL #NAME?
D DIBULATKAN #NAME?
Terbilang :
#NAME?
RAB
( RENCANA ANGGARAN BIAYA )
KODE
NO. URAIAN PEKERJAAN VOLUME Satuan HARGA SATUAN HARGA TOTAL
ANALISA
I PEK. PERSIAPAN
1 Papan Nama Kegiatan Taksir 1.00 Unit 350,000.00 350,000.00
2 Izin Mendirikan Bangunan(IMB) Taksir 1.00 Unit 3,500,000.00 3,500,000.00
3 Pemasangan Listrik Taksir 1.00 Unit 1,500,000.00 1,500,000.00
4 Bouplank / Uitzet Taksir 1.00 Unit 500,000.00 500,000.00
5 Pembersihan Lahan Taksir 1.00 Unit 650,000.00 650,000.00
SUB.TOTAL I 6,500,000.00
II PEK. TANAH
1 #NAME? A.2.3.1.1. #NAME? M3 73,312.00 #NAME?
2 #NAME? A.2.3.1.9. #NAME? M3 27,312.00 #NAME?
3 #NAME? A.2.3.1.11. #NAME? M3 199,065.00 #NAME?
4 #NAME? A.2.3.1.14. #NAME? M3 239,832.00 #NAME?
SUB.TOTAL II #NAME?
III PEK.BETON
1 #NAME? A.4.1.1.4 #NAME? M3 948,667.00 #NAME?
2 #NAME? A.4.1.1.7. #NAME? M3 1,152,167.00 #NAME?
3 #NAME? A.4.1.1.20 #NAME? M2 174,080.00 #NAME?
4 #NAME? A.4.1.1.17.a #NAME? kg 13,787.00 #NAME?
5 #NAME? A.4.1.1.7. #NAME? M3 1,152,167.00 #NAME?
6 #NAME? A.4.1.1.21 #NAME? M2 174,080.00 #NAME?
7 #NAME? A.4.1.1.17.a #NAME? kg 13,787.00 #NAME?
8 #NAME? A.4.1.1.7. #NAME? M3 1,152,167.00 #NAME?
SUB.TOTAL III #NAME?
IV PEK. PASANGAN
1 #NAME? A.3.2.1.9 #NAME? M3 502,834.00 #NAME?
2 #NAME? A.3.2.1.3 #NAME? M3 847,930.00 #NAME?
3 #NAME? A.4.4.1.17 #NAME? M2 294,024.00 #NAME?
4 #NAME? A.4.4.2.5 #NAME? M2 58,233.00 #NAME?
5 #NAME? A.4.4.2.27. #NAME? M2 34,500.00 #NAME?
6 #NAME? A.4.7.1.10 #NAME? M2 32,169.00 #NAME?
SUB.TOTAL IV #NAME?
IV 0
1 #NAME? A.4.2.1.2. #NAME? kg 30,330.00 #NAME?
2 #NAME? A.4.2.1.2. #NAME? kg 30,330.00 #NAME?
3 #NAME? A.4.2.1.2. #NAME? kg 30,330.00 #NAME?
4 #NAME? Taksir #NAME? kg 25,000.00 #NAME?
5 #NAME? Taksir #NAME? kg 25,000.00 #NAME?
6 #NAME? A.4.5.2.41. #NAME? M2 176,525.00 #NAME?
7 #NAME? Taksir #NAME? M' 97,000.00 #NAME?
8 #NAME? A.4.5.2.42. #NAME? kg 121,854.00 #NAME?
9 #NAME? Taksir #NAME? kg 14,000.00 #NAME?
SUB.TOTAL V #NAME?
VIII PEK. PENGECATAN
1 #NAME? A.4.7.1.16. #NAME? M2 26,053.00 #NAME?
SUB.TOTAL VI #NAME?
#NAME?
###
1 #NAME? Taksir #NAME? Unit 2,500,000.00 #NAME?
2 #NAME? Taksir #NAME? Unit 4,500,000.00 #NAME?
3 P3 Taksir 1.00 Unit 12,000,000.00 12,000,000.00
SUB.TOTAL VII #NAME?
VIII PEK. ELEKTRIKAL
1 #NAME? Taksir #NAME? bh 35,000.00 #NAME?
2 #NAME? Taksir #NAME? bh 75,000.00 #NAME?
3 #NAME? Taksir #NAME? bh 75,000.00 #NAME?
4 #NAME? Taksir #NAME? bh 75,000.00 #NAME?
5 #NAME? Taksir #NAME? bh 450,000.00 #NAME?
6 #NAME? Taksir #NAME? bh 400,000.00 #NAME?
SUB.TOTAL VIII #NAME?
IX PEK. AKSESORIS
1 #NAME? Taksir #NAME? m2 774,529.00 #NAME?
SUB.TOTAL IX #NAME?
BACK UP VOLUME
Kegiatan : Pembangunan Rumah
Pekerjaan : Rumah Tinggal Type 1 100m2
Lokasi : Tegal
Tahun Anggaran : 2019
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
II PEK. TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m - - - - - - -
Horisontal 47.50 - - 0.60 0.50 - 1.00
Vertikal 41.50 - - 0.60 0.50 - 1.00
Muka Tanah
BACK UP VOLUME MC 100%
Dimensi
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
Type.1 Type.2
3 Pengurugan 1 m3 dengan pasir urug 89.00 - - 0.60 0.05 - 1.00
Pasir
'Urug
U ruga n Elevasi
6 3.50 - - 3.50 0.70 - 1.00
P as. Batu Kali
M uka Ta nah
7 2.50 - - 1.50 0.70 - 1.00
Aanstamping/
B atu Kosong
8 4.00 - - 3.50 0.70 - 1.00
U ru ga n Pasir
9 1.00 - - 0.50 0.70 - 1.00
10 3.00 - - 3.00 0.70 - 1.00
9
5
6
7 10
BACK UP VOLUME MC 100%
Dimensi
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
Pas.Batu Kali
Muka Tanah
Aanstamping/
Batu Kosong
Urugan Pasir
- - - - - - -
1-(J-K) 2.50 - - - 2.00 - 1.00
1-(A-J) 11.50 - - - 3.50 - 1.00
2-(D-G) 3.50 - - - 3.50 - 1.00
2-(H-J) 2.00 - - - 3.50 - 1.00
4-(E-G) 1.00 - - - 3.50 - 1.00
5-(I-K) 4.00 - - - 3.50 - 1.00
6-(C-6) 3.00 - - - 3.50 - 1.00
7-(C-K) 9.50 - - - 3.50 - 1.00
7-(A-G) 2.00 - - - 2.00 - 1.00
- - - - - - -
Gunung- Gunung 1 9.50 - - - 1.59 - 2.00
Gunung- Gunung 2 7.50 - - - 1.09 - 1.00
BACK UP VOLUME MC 100%
Dimensi
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
5 Pemasangan 1 m2 acian. - - - - - - -
4.50 - - - 2.00 - 2.00
5.50 - - - 3.80 - 2.00
6.00 - - - 3.50 - 2.00
ATAP 4.00 - - - 3.50 - 2.00
±6.287
BUBUNGAN
±5.787 2.00 - - - 3.50 - 2.00
4.00 - - - 3.50 - 2.00
4.50 - - - 3.50 - 2.00
RINGBALK
±3.500
4.50 - - - 3.50 - 2.00
3.00 - - - 3.50 - 2.00
1.00 - - - 3.25 - 2.00
1.00 - - - 3.25 - 2.00
LANTAI
± 0.000 2.00 - - - 3.50 - 2.00
MUKA TANAH
-0.950
GALIAN PONDASI
5.00 - - - 2.00 - 2.00
-1.050
2.50 - - - 2.00 - 2.00
11.50 - - - 3.50 - 2.00
3.50 - - - 3.50 - 2.00
2.00 - - - 3.50 - 2.00
1.00 - - - 3.50 - 2.00
4.00 - - - 3.50 - 2.00
3.00 - - - 3.50 - 2.00
9.50 - - - 3.50 - 2.00
2.00 - - - 2.00 - 2.00
9.50 - - - 1.59 - 4.00
7.50 - - - 1.09 - 2.00
BACK UP VOLUME MC 100%
Dimensi
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
2 -D10
Ø10 - 150
2 -D10
2 -D10
2 -D10
KP KP KP KP
Ø10 - 150
KP
KP KP KP
KP
KP KP
KP
KP KP
KP
KP
KP
KP KP KP
KP
KP KP
KP KP KP KP
a. Pembetonan - - - - - - -
Dinding Bangunan 3.50 - - 0.15 0.15 - 23.00
Dinding Pagar 2.00 - - 0.15 0.15 - 4.00
b. Pembesian - - - - - - -
Dinding Bangunan - - - - - - -
Tulangan Ø10 3.55 - - - - 0.62 92.00
Beaugel Ø8 0.53 - - - - 0.39 25.00
Dinding Pagar - - - - - - -
Tulangan Ø10 2.00 - - - - 0.62 16.00
Beaugel Ø8 0.53 - - - - 0.39 15.00
c. Begisting - - - - - - -
Dinding Bangunan 3.50 - - 0.15 - - 46.00
Dinding Pagar 2.00 - - 0.15 - - 8.00
3 Pek. Kolom 20 x 20
a. Pembetonan
b. Pembesian
c. Begisting
4 Pek. Ringbalk 15 x 20
a. Pembetonan
b. Pembesian
c. Begisting
5 Pek. Balok 15 x 25
a. Pembetonan
b. Pembesian
c. Begisting
BACK UP VOLUME MC 100%
Dimensi
No. Item / Uraian Pekerjaan panjang lebar 1 lebar 2 lebar total tinggi sat. berat Quantity
1 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
2
Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
3
Pengecatan Plafond ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
4 Pengecatan Listplank
IX PEK. AKSESORIS
UP VOLUME
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
- - - - - 1.00
- - - - - 1.00
- - - - - 1.00
- - - - - 1.00
- - - - - 1.00
- - 26.70 - - 26.70
47.50 28.50 14.25 - -
41.50 24.90 12.45 - -
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
- - 0.86 - - 0.86
40.00 2.00 0.25 - -
98.00 4.90 0.61 - -
- - 64.05 - - 64.05
6.00 15.00 10.50 - -
4.00 12.00 8.40 - -
2.00 4.00 2.80 - -
3.00 12.00 8.40 - -
4.50 9.00 6.30 - -
3.50 12.25 8.58 - -
2.50 3.75 2.63 - -
4.00 14.00 9.80 - -
1.00 0.50 0.35 - -
3.00 9.00 6.30 - -
- - 18.30 - - 18.30
6.00 15.00 3.00 - -
4.00 12.00 2.40 - -
2.00 4.00 0.80 - -
3.00 12.00 2.40 - -
4.50 9.00 1.80 - -
3.50 12.25 2.45 - -
2.50 3.75 0.75 - -
4.00 14.00 2.80 - -
1.00 0.50 0.10 - -
3.00 9.00 1.80 - -
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
- - 10.68 - - 10.68
40.00 24.00 4.80 - -
49.00 29.40 5.88 - -
- - 32.04 - - 32.04
40.00 18.00 14.40 - -
49.00 22.05 17.64 - -
- 319.40 - - - 319.40
- 151.40 - - -
4.50 9.00 - - -
5.50 20.90 - - -
6.00 21.00 - - -
4.00 14.00 - - -
2.00 7.00 - - -
4.00 14.00 - - -
4.50 15.75 - - -
4.50 15.75 - - -
3.00 10.50 - - -
1.00 3.25 - - -
1.00 3.25 - - -
2.00 7.00 - - -
5.00 10.00 - - -
- 129.75 - - -
2.50 5.00 - - -
11.50 40.25 - - -
3.50 12.25 - - -
2.00 7.00 - - -
1.00 3.50 - - -
4.00 14.00 - - -
3.00 10.50 - - -
9.50 33.25 - - -
2.00 4.00 - - -
- 38.25 - - -
19.00 30.12 - - -
7.50 8.14 - - -
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
- 638.81 - - - 638.81
9.00 18.00 - - -
11.00 41.80 - - -
12.00 42.00 - - -
8.00 28.00 - - -
4.00 14.00 - - -
8.00 28.00 - - -
9.00 31.50 - - -
9.00 31.50 - - -
6.00 21.00 - - -
2.00 6.50 - - -
2.00 6.50 - - -
4.00 14.00 - - -
10.00 20.00 - - -
5.00 10.00 - - -
23.00 80.50 - - -
7.00 24.50 - - -
4.00 14.00 - - -
2.00 7.00 - - -
8.00 28.00 - - -
6.00 21.00 - - -
19.00 66.50 - - -
4.00 8.00 - - -
38.00 60.23 - - -
15.00 16.28 - - -
- 638.81 - - - 638.81
9.00 18.00
11.00 41.80
12.00 42.00
8.00 28.00
4.00 14.00
8.00 28.00
9.00 31.50
9.00 31.50
6.00 21.00
2.00 6.50
2.00 6.50
4.00 14.00
10.00 20.00
5.00 10.00
23.00 80.50
7.00 24.50
4.00 14.00
2.00 7.00
8.00 28.00
6.00 21.00
19.00 66.50
4.00 8.00
38.00 60.23
15.00 16.28
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
- - 1.99 - - 1.99
80.50 12.08 1.81 - -
8.00 1.20 0.18 - -
- - - 229.44 - 229.44
- - - 206.58 -
326.60 - - 201.35 -
13.25 - - 5.23 -
- - - 22.87 -
32.00 - - 19.73 -
7.95 - - 3.14 -
- 26.55 - - - 26.55
161.00 24.15 - - -
16.00 2.40 - - -
VOLUME MC 100%
Volume
meter lari meter persegi meter
berat Jumlah Volume
kubik
( m1 ) ( m2 ) ( m3 ) ( kg ) bh/btg/unt
k = (d)x ( j ) L = (k)x(g) m =(L)x(h) n = (k) x (i) o =( j ) e
HARGA SATUAN PEKERJAAN
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c =
8 A.4.1.1.5. m³ 1,100,349.00
0,66
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c =
9 A.4.1.1.6 m³ 1,128,483.00
0,61
Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c =
8 A.4.1.1.7. m³ 1,152,167.00
0,58
Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c =
9 A.4.1.1.8. m³ 1,164,499.00
0,56
Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c =
10 A.4.1.1.9. m³ 1,185,920.00
0,53
Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c =
11 A.4.1.1.10. m³ 1,192,357.00
0,52
Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c =
12 A.4.1.1.11. m³ 1,270,439.00
0,49
Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c =
13 A.4.1.1.12. m³ 1,279,008.00
0,48
14 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir kg 137,876.00
2 A.4.1.1.17.a Pembesian 1 kg dengan besi polos atau besi ulir kg 13,787.00
3 A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands kg 132,876.00
4 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) kg 278,070.00
10 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi m² 174,080.00
11 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof m² 185,292.00
12 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom m² 402,956.00
13 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok m² 415,417.00
14 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai m² 531,756.00
15 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding m² 442,700.00
16 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga m² 380,359.00
17 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton m² 105,311.00
18 A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) m³ 4,059,100.00
19 A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) m³ 4,940,735.00
20 A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) m³ 8,783,012.00
21 A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) m³ 6,883,327.00
22 A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) m³ 6,519,994.00
23 A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m³ 5,809,998.00
24 A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) m³ 6,364,504.00
25 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m' 86,521.00
26 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m' 109,715.00
19 A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP m² 200,399.00
Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3
20 A.4.4.1.24 m² 392,590.00
PP
21 A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B. m² 122,041.00
NO. KODE JENIS PEKERJAAN SATUAN JUMLAH HARGA
( Rp. )
1 2 3 4
22 A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai m² 153,383.00
23 A.4.4.1.26.a Pemasangan 1 m2 dinding bata ringan tebal 15 cm dengan mortar siap pakai m² 155,194.00
34 A.4.6.1.14. b Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I ( Kayu Bangkirai ) m³ 16,309,116.00
35 A.4.6.1.14. c Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I ( Kayu Kruing ) m³ 13,104,756.00
36 A.4.6.1.14. d Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I ( Kayu Kempas ) m³ 11,937,276.00
Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I ( Kayu Meranti
37 A.4.6.1.14. e m³ 9,544,356.00
batu )
38 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( Kayu Kamper ) m³ 16,148,576.00
39 A.4.6.1.15. a Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( Kayu Bangkirai ) m³ 15,169,466.00
40 A.4.6.1.15. b Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( Kayu Kruing ) m³ 12,232,136.00
41 A.4.6.1.15. c Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( Kayu Kempas ) m³ 11,161,946.00
42 A.4.6.1.15. d Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( Kayu Meranti batu ) m³ 8,968,436.00
43 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Kamper ) m² 184,162.00
Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu
44 A.4.6.1.16.a m² 188,980.00
Bangkirai )
45 A.4.6.1.16.b Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Kruing ) m² 168,295.00
46 A.4.6.1.16.c Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Kempas ) m² 131,575.00
Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Meranti
47 A.4.6.1.16.d m² 97,512.00
batu )
Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu
48 A.4.6.1.16.e m² 184,162.00
Kamper )
Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu
49 A.4.6.1.16.f m² 188,980.00
Bangkirai )
50 A.4.6.1.16.g Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu Kruing ) m² 168,295.00
Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu Kempas
51 A.4.6.1.16.h m² 131,575.00
)
Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu Meranti
52 A.4.6.1.16.i m² 97,512.00
batu )
Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kaso kayu
53 A.4.6.1.16.j m² 159,046.00
Kruing reng kayu Meranti batu )
54 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II ( Kayu Kruing ) m² 188,654.00
Pemasangan 1 m2 rangka atap genteng Morando, kayu kelas II ( Kayu Bangkirai
55 A.4.6.1.17. a m² 207,246.00
)
56 A.4.6.1.17. b Pemasangan 1 m2 rangka atap genteng Morando, kayu kelas II ( Kayu Kruing ) m² 188,654.00
57 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II ( Kayu Kruing ) m² 145,086.00
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
58 A.4.6.1.19. m² 192,629.00
( Kayu Kruing )
NO. KODE JENIS PEKERJAAN SATUAN JUMLAH HARGA
( Rp. )
1 2 3 4
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
59 A.4.6.1.20. m² 194,515.00
( Kayu Kruing )
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II ( Kayu
60 A.4.6.1.21. m' 141,297.00
Bangkirai )
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II ( Kayu
61 A.4.6.1.21. a m' 121,425.00
Kruing )
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II ( Kayu
62 A.4.6.1.21. b m' 91,307.00
Meranti batu )
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II ( Kayu
63 A.4.6.1.22. m' 149,037.00
Bangkirai )
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II ( Kayu
64 A.4.6.1.22. a m' 90,291.00
Kruing )
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II ( Kayu
65 A.4.6.1.22. b m' 90,291.00
Meranti batu )
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
66 A.4.6.1.23. m² 296,731.00
( Kayu Kruing )
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
67 A.4.6.1.23. a m² 213,655.00
( Kayu Meranti batu )
Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
68 A.4.6.1.24. m² 432,753.00
( Kayu Kruing )
Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III
69 A.4.6.1.24. a m² 349,677.00
( Kayu Meranti batu )
Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
70 A.4.6.1.25. m² 443,315.00
( Kayu Kruing )
Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
71 A.4.6.1.25. a m² 360,239.00
( Kayu Meranti batu )
72 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kelas I ( Kayu Jati ) m² 391,394.00
73 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m² 60,762.00
74 A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV ( Kayu Kruing ) m² 150,651.00
Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV ( Kayu Meranti
75 A.4.6.1.28. a m² 89,116.00
batu )
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
357 A.4.7.1.4. m² 55,594.00
cat penutup)
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis
358 A.4.7.1.5. m² 71,059.00
cat Penutup)
359 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m² 48,392.00
360 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m² 65,984.00
361 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m² 20,700.00
362 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m² 42,761.00
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat
1 A.4.7.1.10. m² 32,169.00
penutup)
2 A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) m² 25,030.00
3 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium m² 7,435.00
4 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih m² 14,794.00
5 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) m² 5,548.00
6 A.4.7.1.15. Pemasangan 1 m2 wallpaper m² 80,908.00
18 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi m² 26,053.00
19 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah m² 55,317.00
20 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis m² 61,318.00
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat
21 A.4.7.1.19. m² 35,567.00
mutakhir
22 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis m² 137,597.00
Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat
23 A.4.7.1.21. m² 135,217.00
mutakhir
2 A.4.7.1.22. Plituran 1 m2 dengan plitur melamic m² 12,969.70
Taksir
19 Taksir Pemasangan 1 m2 ACP m² 774,529.00
20 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat m² 14,662.00
21 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual m² 15,525.00
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
22 A.4.7.1.4. m² 55,594.00
cat penutup)
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis
23 A.4.7.1.5. m² 71,059.00
cat Penutup)
24 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m² 48,392.00
25 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m² 65,984.00
26 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m² 20,700.00
27 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m² 42,761.00
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat
28 A.4.7.1.10. m² 32,169.00
penutup)
29 A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) m² 25,030.00
30 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium m² 7,435.00
31 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih m² 14,794.00
32 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) m² 5,548.00
33 A.4.7.1.15. Pemasangan 1 m2 wallpaper m² 80,908.00
34 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi m² 26,053.00
ANALISA PEKERJAAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 80,000 32,000.00
Tukang Kayu L.02.04 OH 0.2000 81,000 16,200.00
Kepala Tukang L.03.01 OH 0.0200 89,000 1,780.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 52,980.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 28,000 35,000.00
Semen portland Kg 5.0000 1,080 5,400.00
Pasir beton m3 0.0050 204,000 1,020.00
Koral beton m3 0.0090 412,000 3,708.00
Kayu 5/7 ( Meranti batu ) m3 0.0720 3,612,000 260,064.00
Paku biasa Kg 0.0600 14,000 840.00
Residu Liter 0.4000 26,000 10,400.00
JUMLAH HARGA BAHAN 316,432.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 369,412.00
E Overhead & Profit 15% 15% 55,411.80
F Harga Satuan Pekerjaan (D+E) - 424,823.00
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 80,000 16,000.00
Tukang Kayu L.02.04 OH 0.4000 81,000 32,400.00
Kepala Tukang L.03.01 OH 0.0200 89,000 1,780.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 53,180.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 28,000 35,000.00
Semen portland Kg 2.5000 1,080 2,700.00
Seng gelombang Lbr 1.2000 50,000 60,000.00
Pasir beton m3 0.0050 204,000 1,020.00
Koral beton m3 0.0090 412,000 3,708.00
Kayu 5/7 ( Meranti batu ) m3 0.0720 3,612,000 260,064.00
Paku biasa Kg 0.0600 14,000 840.00
Meni besi Liter 0.4500 65,000 29,250.00
JUMLAH HARGA BAHAN 392,582.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 445,762.00
E Overhead & Profit 15% 15% 66,864.30
F Harga Satuan Pekerjaan (D+E) - 512,626.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 80,000 16,000.00
Tukang Kayu L.02.04 OH 0.3000 81,000 24,300.00
Kepala Tukang L.03.01 OH 0.0200 89,000 1,780.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 45,080.00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 28,000 28,000.00
Semen portland Kg 2.0000 1,080 2,160.00
Kawat duri M’ 25.0000 7,850 196,250.00
Pasir beton m3 0.0050 204,000 1,020.00
Koral beton m3 0.0090 412,000 3,708.00
Paku biasa 2” - 5” Kg 0.0600 14,000 840.00
JUMLAH HARGA BAHAN 277,058.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 299,598.00
E Overhead & Profit 15% 15% 44,939.70
F Harga Satuan Pekerjaan (D+E) - 344,537.00
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 80,000 272,000.00
Tukang Batu L.02.03 OH 0.8500 81,000 68,850.00
Kepala Tukang L.03.01 OH 0.0850 89,000 7,565.00
Mandor L.04.01 OH 0.1700 150,000 25,500.00
JUMLAH TENAGA KERJA 373,915.00
B BAHAN
Batu belah m3 0.4800 234,000 112,320.00
Semen portland Kg 194.0000 1,080 209,520.00
Pasir Beton m3 0.3120 204,000 63,648.00
Kerikil m3 0.4680 412,000 192,816.00
Besi beton (polos/ulir) Kg 126.0000 10,000 1,260,000.00
Kawat beton Kg 1.8000 16,000 28,800.00
JUMLAH HARGA BAHAN 1,867,104.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,241,019.00
E Overhead & Profit 15% 15% 336,152.85
F Harga Satuan Pekerjaan (D+E) - 2,577,171.00
A.3.2.1.10.a (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah ( tanpa tulangan )
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 80,000 272,000.00
Tukang Batu L.02.03 OH 0.8500 81,000 68,850.00
Kepala Tukang L.03.01 OH 0.0850 89,000 7,565.00
Mandor L.04.01 OH 0.1700 150,000 25,500.00
JUMLAH TENAGA KERJA 373,915.00
B BAHAN
Batu belah m3 0.4800 234,000 112,320.00
Semen portland Kg 194.0000 1,080 209,520.00
Pasir Beton m3 0.3120 204,000 63,648.00
Kerikil m3 0.4680 412,000 192,816.00
Besi beton (polos/ulir) Kg 126.0000 - -
Kawat beton Kg 1.8000 - -
JUMLAH HARGA BAHAN 578,304.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 952,219.00
E Overhead & Profit 15% 15% 142,832.85
F Harga Satuan Pekerjaan (D+E) - 1,095,051.00
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 80,000 96,000.00
Tukang Batu L.02.03 OH 0.2000 81,000 16,200.00
Kepala Tukang L.03.01 OH 0.0200 89,000 1,780.00
Mandor L.04.01 OH 0.0600 150,000 9,000.00
JUMLAH TENAGA KERJA 122,980.00
B BAHAN
Semen portland kg 230.0000 1,080 248,400.00
Pasir Beton kg 893.0000 146 130,122.86
Kerikil (Maks 30 mm) kg 1,027.0000 305 313,425.19
Air Liter 200.0000 50 10,000.00
JUMLAH HARGA BAHAN 701,948.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 824,928.04
E Overhead & Profit 15% 15% 123,739.21
F Harga Satuan Pekerjaan (D+E) - 948,667.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000 132,000.00
Tukang Batu L.02.03 OH 0.2750 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.0280 89,000 2,492.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 326.0000 1,080 352,080.00
Pasir Beton kg 760.0000 146 110,742.86
Kerikil (Maks 30 mm) kg 1,029.0000 305 314,035.56
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 787,608.41
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 956,825.41
E Overhead & Profit 15% 15% 143,523.81
F Harga Satuan Pekerjaan (D+E) - 1,100,349.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000 132,000.00
Tukang Batu L.02.03 OH 0.2750 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.0280 89,000 2,492.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 352.0000 1,080 380,160.00
Pasir Beton kg 731.0000 146 106,517.14
Kerikil (Maks 30 mm) kg 1,031.0000 305 314,645.93
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 812,073.07
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 981,290.07
E Overhead & Profit 15% 15% 147,193.51
F Harga Satuan Pekerjaan (D+E) - 1,128,483.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000 132,000.00
Tukang Batu L.02.03 OH 0.2750 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.0280 89,000 2,492.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 371.0000 1,080 400,680.00
Pasir Beton kg 698.0000 146 101,708.57
Kerikil (Maks 30 mm) kg 1,047.0000 305 319,528.89
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 832,667.46
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,001,884.46
E Overhead & Profit 15% 15% 150,282.67
F Harga Satuan Pekerjaan (D+E) - 1,152,167.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000 132,000.00
Tukang Batu L.02.03 OH 0.2750 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.0280 89,000 2,492.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 384.0000 1,080 414,720.00
Pasir Beton kg 692.0000 146 100,834.29
Kerikil (Maks 30 mm) kg 1,039.0000 305 317,087.41
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 843,391.69
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,012,608.69
E Overhead & Profit 15% 15% 151,891.30
F Harga Satuan Pekerjaan (D+E) - 1,164,499.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000 132,000.00
Tukang Batu L.02.03 OH 0.2750 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.0280 89,000 2,492.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 406.0000 1,080 438,480.00
Pasir Beton kg 684.0000 146 99,668.57
Kerikil (Maks 30 mm) kg 1,026.0000 305 313,120.00
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 862,018.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,031,235.57
E Overhead & Profit 15% 15% 154,685.34
F Harga Satuan Pekerjaan (D+E) - 1,185,920.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 1.650 80,000 132,000.00
Tukang Batu L.02.03 OH 0.275 81,000 22,275.00
Kepala Tukang L.03.01 OH 0.028 89,000 2,492.00
Mandor L.04.01 OH 0.083 150,000 12,450.00
JUMLAH TENAGA KERJA 169,217.00
B BAHAN
Semen portland kg 413.0000 1,080 446,040.00
Pasir Beton kg 681.0000 146 99,231.43
Kerikil (Maks 30 mm) kg 1021.0000 305 311,594.07
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 867,615.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,036,832.50
E Overhead & Profit 15% 15% 155,524.88
F Harga Satuan Pekerjaan (D+E) - 1,192,357.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 80,000 168,000.00
Tukang Batu L.02.03 OH 0.3500 81,000 28,350.00
Kepala Tukang L.03.01 OH 0.0350 89,000 3,115.00
Mandor L.04.01 OH 0.1050 150,000 15,750.00
JUMLAH TENAGA KERJA 215,215.00
B BAHAN
Semen portland kg 439.0000 1,080 474,120.00
Pasir Beton kg 670.0000 146 97,628.57
Kerikil (Maks 30 mm) kg 1,006.0000 305 307,016.30
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 889,514.87
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,104,729.87
E Overhead & Profit 15% 15% 165,709.48
F Harga Satuan Pekerjaan (D+E) - 1,270,439.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 80,000 168,000.00
Tukang Batu L.02.03 OH 0.3500 81,000 28,350.00
Kepala Tukang L.03.01 OH 0.0350 89,000 3,115.00
Mandor L.04.01 OH 0.1050 150,000 15,750.00
JUMLAH TENAGA KERJA 215,215.00
B BAHAN
Semen portland kg 448.0000 1,080 483,840.00
Pasir Beton kg 667.0000 146 97,191.43
Kerikil (Maks 30 mm) kg 1,000.0000 305 305,185.19
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 896,966.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,112,181.61
E Overhead & Profit 15% 15% 166,827.24
F Harga Satuan Pekerjaan (D+E) - 1,279,008.00
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 80,000 168,000.00
Tukang Batu L.02.03 OH 0.3500 81,000 28,350.00
Kepala Tukang L.03.01 OH 0.0350 89,000 3,115.00
Mandor L.04.01 OH 0.1050 150,000 15,750.00
JUMLAH TENAGA KERJA 215,215.00
B BAHAN
Semen portland kg 448.0000 1,080 483,840.00
Pasir Beton kg 667.0000 146 97,191.43
Kerikil (Maks 30 mm) kg 1,000.0000 305 305,185.19
Bahan tambahan kimia Liter 4.5000 47,000 211,500.00
Air Liter 215.0000 50 10,750.00
JUMLAH HARGA BAHAN 1,108,466.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,323,681.61
E Overhead & Profit 15% 15% 198,552.24
F Harga Satuan Pekerjaan (D+E) - 1,522,233.00
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
1 2 3 4
A. UPAH TENAGA :
1 L.01 Pekerja hari
2 Tukang gali hari
2 L.02 Mandor Lapangan hari
3 Tukang cat / plitur / batu hari
3 Kepala tukang cat / plitur / batu hari
4 Tukang kayu hari
4 Kepala tukang kayu hari
5 Tukang Besi hari
5 Kepala Tukang besi hari
6 Tukang Besi Profil hari
6 Kepala Tukang Besi Profil hari
7 Tukang las biasa hari
7 Tukang las konstruksi hari
8 Tukang khusus allumunium hari
8 Tukang allumunium / kaca hari
9 Tukang Instalasi hari
9 Mekanik terlatih hari
10 Mekanik Pembantu hari
10 Operator terlatih / masinis hari
11 Operator kurang terlatih hari
11 Pembantu operator / pemb. Masinis hari
12 Sopir Material / Truck hari
12 Sopir personil hari
13 Pembantu Sopir / Kenek hari
13 Buruh lapangan tak terlatih hari
14 Buruh lapangan kurang terlatih hari
14 Buruh lapangan terlatih hari
15 Tukang masak aspal hari
15 Penjaga malam hari
16 Sewa Bekisting jalan m²
16 Sewa Skafolding set/hari
17 Sewa Mesin Gilas, alat tahun ke VII ( 8 - 10 ton ) + bahan bakar hari
17 Sewa Mesin Gilas, alat tahun ke V ( 6 - 8 ton ) + bahan bakar hari
18 Sewa Mesin Gila Tandem Roller 2,5 ton + bahan bakar hari
18 Sewa Mesin Gila Tandem Roller 1,5 ton + bahan bakar hari
19 Sewa Excavator EX 100, EX 200 + bahan bakar Jam
19 Sewa Dump Truck, alat tahun ke V ( 5 ton ) + bahan bakar hari
20 Sewa Mesin Gilas (Walls) + bahan bakar (25) hari bulan
20 Sewa Mesin Concrate Pump beton hari
21 Sewa Ponton hari
21 Sewa Vibrator hari
22 Sewa Alat perakitan baja hari
B. BAHAN:
Kelompok Material Alam :
1 Air liter
2 Tanah urug m³
3 Tanah urug Pilihan m³
4 Pasir urug (Pasir Ladon) m³
5 Pasir batu (sirtu) m³
6 Pasir pasang m³
7 Pasir pasang Muntilan ( ditempat ) m³
8 Batu blonos m³
9 Batu belah 15/20 m³
NO. KODE URAIAN SATUAN
1 2 3 4
1 2 3 4
69 Kapur m³
Kelompok Kayu
1 a. Kayu Jati Klas 2 : Balok 8/15 m³
2 b. Kayu Jati Klas 3 : Balok 8/15 m³
3 c. Papan kayu jati m³
4 a. Kayu Kamper : Balok 8/15 m³
5 b. Kayu Kamper : 5/7 & 4/6 m³
6 c. Kayu Kamper : 3/4 & 3/5 m³
7 d. Kayu Kamper : 2/3 m³
8 e. Papan kamper m³
9 a. Kayu Bangkirai : Balok 8/15 m³
10 b. Kayu Bangkirai : 5/7 & 4/6 (ikat) m³
11 Kayu Bangkirai : 5/7 & 4/6 (lepas) m³
12 c. Kayu Bangkirai : 3/4 & 3/5 m³
13 d. Kayu Bangkirai : 2/3 m³
14 e. Papan bangkirai ( 2 x 20 x 400 ) m³
15 f. Papan bangkirai ( 2 x 25 x 400 ) m³
16 g. Papan bangkirai ( 2 x 30 x 400 ) m³
17 a. Kayu Kruing : Balok 8/15 m³
18 b. Kayu Kruing : 5/7 & 4/6 m³
19 c. Kayu Kruing : 3/4 & 3/5 m³
20 d. Kayu Kruing : 2/3 m³
21 e. Papan Kruing ( 2 x 20 x 400 ) m³
22 f. Papan Kruing ( 3 x 30 x 400 ) m³
23 a. Kayu Kalimantan ( Meranti Batu ) : Balok 8/15 m³
24 b. Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (ikat) m³
25 Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (lepas) m³
26 c. Kayu Kalimantan ( Meranti Batu ) : 3/4 & 3/5 m³
27 d. Kayu Kalimantan ( Meranti Batu ) : 2/3 m³
28 e. Papan Meranti Batu ( 2 x 20 x 400 ) m³
29 f. Papan Meranti Batu ( 2 x 25 x 400 ) m³
30 a. Kayu Kempas : Balok 8/15 m³
31 b. Kayu Kempas Ukuran 5/7 & 4/6 (ikat) m³
32 Kayu Kempas Ukuran 5/7 & 4/6 (lepas) m³
33 c. Kayu Kempas Ukuran 3/4 & 3/5 m³
34 d. Kayu Kempas Ukuran 2/3 m³
35 e. Papan Kempas m³
36 a. Kayu Punak : Balok 8/15 m³
37 b. Kayu Punak Ukuran 5/7 & 4/6 (ikat) m³
38 Kayu Punak Ukuran 5/7 & 4/6 (lepas) m³
39 c. Papan Punak m³
40 a. Kayu Glugu : Balok 12/12 ( prapatan ) m'
41 Kayu Glugu : Balok 12/12 ( prapatan ) m³
42 b. Kayu Glugu 5/7 & 4/6 ( lepas ) m'
43 Kayu Glugu 5/7 & 4/6 ( lepas ) m³
44 Kayu Rawa (Pinus) m³
45 Papan Cetak ( kayu pinus ) uk 2 x 20 x 200 m³
46 Kayu lokal sekwalitas Laban / sengon merah m³
47 Kayu tahun m³
48 Kayu bakar m³
49 Kayu stoot btg
50 Alat - alat bantu ( @ 3 alat ) set
51 Kayu untuk perancah ( kayu pinus / rawa ) m3
52 Kayu Struktural ( jati klas 2 ) m3
53 Tripleks tebal 3 mm uk. 120 x 240 cm lbr
54 Tripleks tebal 4 mm uk. 120 x 240 cm lbr
55 Tripleks tebal 6 mm uk. 120 x 240 cm lbr
56 Tripleks tebal 8 mm uk. 120 x 240 cm lbr
NO. KODE URAIAN SATUAN
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
Kelompok Atap :
1 Genteng pres lokal buah
2 Genteng Palentong pres Jatiwangi buah
3 Genteng Palentong besar ( Super ) pres Jatiwangi buah
4 Genteng kodok pres jatiwangi buah
5 Genteng beton polos buah
NO. KODE URAIAN SATUAN
1 2 3 4
1 2 3 4
1 2 3 4
59 Sealant tube
60 Lem Kayu kg
61 Lem Kuning kg
62 Wood Filler kg
NO. KODE URAIAN SATUAN
1 2 3 4
1 2 3 4
1 2 3 4
2 Pipa PVC
Ukuran Ø ½" ( AW ) ex Wavin m'
Ukuran Ø ¾" ( AW ) ex Wavin m'
Ukuran Ø 1" ( AW ) ex Wavin m'
NO. KODE URAIAN SATUAN
1 2 3 4
1 2 3 4
1 2 3 4
HARGA BAHAN
( Rp. )
TAHUN 2019
5
80,000.00
120,000.00
150,000.00
81,000.00
89,000.00
81,000.00
89,000.00
81,000.00
89,000.00
81,000.00
89,000.00
81,000.00
94,000.00
81,000.00
81,000.00
81,000.00
89,000.00
81,000.00
116,000.00
94,000.00
81,000.00
81,000.00
81,000.00
77,000.00
75,000.00
67,000.00
77,000.00
77,000.00
72,000.00
78,000.00
7,000.00
498,000.00
498,000.00
398,000.00
344,000.00
178,000.00
498,000.00
11,769,000.00
5,065,000.00
429,000.00
298,000.00
77,000.00
50.00
103,000.00
129,000.00
123,000.00
154,000.00
204,000.00
245,000.00
204,000.00
234,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
252,000.00
2,100.00
319,000.00
412,000.00
412,000.00
430,000.00
454,000.00
454,000.00
166,000.00
144,000.00
133,000.00
139,000.00
144,000.00
158,000.00
170,000.00
180,000.00
191,000.00
-
158,000.00
170,000.00
180,000.00
191,000.00
-
158,000.00
170,000.00
180,000.00
191,000.00
-
158,000.00
170,000.00
180,000.00
191,000.00
203,000.00
218,000.00
-
180,000.00
191,000.00
-
71,000.00
71,000.00
89,000.00
76,000.00
55,000.00
52,000.00
48,000.00
48,000.00
93,000.00
93,000.00
93,000.00
93,000.00
1,000.00
764,000.00
800,000.00
815,000.00
1,700.00
1,900.00
2,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
516,000.00
17,329,000.00
15,111,000.00
17,439,000.00
10,320,000.00
8,462,000.00
6,708,000.00
5,676,000.00
11,094,000.00
9,546,000.00
8,204,000.00
8,204,000.00
7,740,000.00
7,843,000.00
8,772,000.00
9,288,000.00
9,288,000.00
7,224,000.00
7,434,000.00
6,795,000.00
5,841,000.00
7,172,000.00
4,644,000.00
4,644,000.00
3,612,000.00
3,702,000.00
3,611,000.00
3,607,000.00
4,747,000.00
4,644,000.00
6,378,000.00
5,315,000.00
5,263,000.00
5,212,000.00
5,212,000.00
6,811,000.00
6,502,000.00
5,315,000.00
5,263,000.00
6,708,000.00
32,000.00
2,219,000.00
19,000.00
5,366,000.00
1,950,000.00
2,477,000.00
2,683,000.00
1,858,000.00
351,000.00
13,000.00
48,000.00
1,909,000.00
14,396,000.00
56,000.00
68,000.00
80,000.00
124,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
47,000.00
54,000.00
93,000.00
95,000.00
118,000.00
102,000.00
113,000.00
124,000.00
155,000.00
186,000.00
217,000.00
22,000.00
60,000.00
98,000.00
108,000.00
196,000.00
186,000.00
108,000.00
62,000.00
310,000.00
103,000.00
39,000.00
258,000.00
109,000.00
20,000.00
5,000.00
7,000.00
9,000.00
4,000.00
19,000.00
26,000.00
9,000.00
27,000.00
14,000.00
17,000.00
400.00
1,500.00
26,000.00
16,000.00
16,000.00
10,000.00
1,342,000.00
568,000.00
599,000.00
645,000.00
743,000.00
1,238,000.00
547,000.00
372,000.00
346,000.00
109,000.00
99,000.00
65,000.00
68,000.00
1,960,000.00
1,290,000.00
671,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
516,000.00
119,000.00
9,900.00
9,900.00
10,600.00
12,000.00
17,000.00
15,000.00
16,000.00
39,000.00
160,000.00
248,000.00
346,000.00
475,000.00
619,000.00
789,000.00
980,000.00
1,444,000.00
230,000.00
242,000.00
265,000.00
278,000.00
270,000.00
305,000.00
327,000.00
367,000.00
390,000.00
403,000.00
448,000.00
496,000.00
466,000.00
489,000.00
513,000.00
538,000.00
610,000.00
587,000.00
611,000.00
647,000.00
661,000.00
750,000.00
773,000.00
789,000.00
835,000.00
920,000.00
997,000.00
152,000.00
159,000.00
372,000.00
165,000.00
173,000.00
393,000.00
405,000.00
504,000.00
520,000.00
631,000.00
647,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
773,000.00
788,000.00
621,000.00
637,000.00
694,000.00
762,000.00
735,000.00
765,000.00
796,000.00
826,000.00
933,000.00
131,000.00
142,000.00
175,000.00
186,000.00
19,000.00
448,000.00
358,000.00
613,000.00
26,000.00
26,000.00
27,000.00
15,000.00
14,000.00
246,000.00
203,000.00
10,000.00
12,000.00
17,000.00
18,000.00
5,000.00
6,000.00
14,000.00
14,000.00
15,000.00
24,000.00
13,000.00
13,000.00
13,000.00
608,000.00
16,000.00
23,000.00
3,000.00
38,000.00
157,000.00
31,000.00
413,000.00
91,000.00
31,000.00
100,000.00
191,000.00
5,366,000.00
6,914,000.00
5,882,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
8,049,000.00
206,000.00
77,000.00
157,000.00
134,000.00
49,000.00
22,000.00
17,000.00
26,000.00
21,000.00
24,000.00
14,000.00
18,000.00
32,000.00
18,000.00
17,000.00
19,000.00
222,000.00
127,000.00
63,000.00
13,000.00
9,000.00
20,000.00
43,000.00
175,000.00
320,000.00
222,000.00
851,000.00
1,084,000.00
1,290,000.00
1,806,000.00
299,000.00
320,000.00
27,000.00
42,000.00
194,000.00
413,000.00
113,000.00
93,000.00
-
310,000.00
1,290,000.00
1,238,000.00
2,683,000.00
2,000.00
2,000.00
1,700.00
49,000.00
57,000.00
56,000.00
62,000.00
45,000.00
54,000.00
165,000.00
149,000.00
175,000.00
51,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
64,000.00
170,000.00
91,000.00
118,000.00
175,000.00
170,000.00
251,000.00
258,000.00
1,548,000.00
53,000.00
58,000.00
138,000.00
75,000.00
84,000.00
72,000.00
8,000.00
19,000.00
5,000.00
7,000.00
5,000.00
6,000.00
12,000.00
17,000.00
29,000.00
15,000.00
47,000.00
69,000.00
79,000.00
319,000.00
191,000.00
37,000.00
117,000.00
37,000.00
19,000.00
22,000.00
27,000.00
65,000.00
65,000.00
70,000.00
70,000.00
85,000.00
97,000.00
98,000.00
110,000.00
37,000.00
28,000.00
41,000.00
4,000.00
10,000.00
38,000.00
31,000.00
22,000.00
2,100.00
2,000.00
3,400.00
2,400.00
8,700.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
2,900.00
4,100.00
99,000.00
62,600.00
15,400.00
2,400.00
3,600.00
5,900.00
6,100.00
5,900.00
4,900.00
7,700.00
43,800.00
75,300.00
26,800.00
67,000.00
134,000.00
90,000.00
1,000.00
69,000.00
74,000.00
111,000.00
92,000.00
100,000.00
77,000.00
72,000.00
64,000.00
62,000.00
54,000.00
46,000.00
41,000.00
48,000.00
37,000.00
50,000.00
51,000.00
59,000.00
51,000.00
32,000.00
19,000.00
175,000.00
55,000.00
69,000.00
17,000.00
4,000.00
4,000.00
66,000.00
99,000.00
183,000.00
356,000.00
388,000.00
453,000.00
345,000.00
405,000.00
62,000.00
72,000.00
72,000.00
77,000.00
10,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
65,000.00
65,000.00
49,000.00
26,000.00
59,000.00
41,000.00
51,000.00
284,000.00
67,000.00
32,000.00
106,000.00
258,000.00
52,000.00
31,000.00
19,000.00
32,000.00
15,000.00
8,000.00
3,000.00
72,000.00
77,000.00
27,000.00
4,000.00
12,000.00
122,000.00
12,000.00
32,000.00
8,300.00
6,200.00
15,900.00
9,500.00
33,900.00
5,300.00
8,500.00
8,700.00
15,800.00
33,900.00
8,400.00
1,300.00
12,600.00
3,100.00
42,300.00
26,500.00
42,300.00
6,700.00
56,000.00
16,000.00
11,000.00
67,000.00
8,000.00
10,000.00
19,000.00
10,000.00
5,000.00
27,000.00
26,000.00
9,000.00
6,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
12,000.00
14,000.00
30,000.00
32,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
54,000.00
1,080.00
15,000.00
3,000.00
46,000.00
3,000.00
3,000.00
142,000.00
4,000.00
88,000.00
2,000.00
47,000.00
1,011,000.00
1,023,000.00
1,036,000.00
1,048,000.00
1,052,000.00
1,062,000.00
1,089,000.00
1,120,000.00
1,126,000.00
1,165,000.00
1,183,000.00
1,214,000.00
1,225,000.00
1,260,000.00
1,313,000.00
1,319,000.00
1,346,000.00
1,411,000.00
16,000.00
10,000.00
13,000.00
316,000.00
395,000.00
474,000.00
553,000.00
632,000.00
69,000.00
77,000.00
94,000.00
111,000.00
223,000.00
282,000.00
323,000.00
374,000.00
429,000.00
3,285,000.00
4,161,000.00
6,022,000.00
7,336,000.00
7,336,000.00
61,000.00
80,000.00
144,000.00
206,000.00
108,000.00
129,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
588,000.00
799,000.00
877,000.00
1,011,000.00
382,000.00
711,000.00
273,000.00
382,000.00
410,000.00
70,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
547,000.00
153,000.00
16,000.00
37,000.00
25,000.00
266,000.00
288,000.00
387,000.00
1,011,000.00
7,224,000.00
1,702,000.00
505,000.00
557,000.00
1,548,000.00
206,000.00
175,000.00
1,279,000.00
12,000.00
31,000.00
165,000.00
1,083,000.00
639,000.00
1,491,000.00
185,000.00
1,204,000.00
3,066,000.00
22,996,000.00
77,000.00
44,000.00
104,000.00
55,000.00
164,000.00
186,000.00
218,000.00
131,000.00
153,000.00
175,000.00
530,000.00
695,000.00
146,000.00
216,000.00
18,000.00
22,000.00
28,000.00
45,000.00
55,000.00
69,000.00
90,000.00
115,000.00
5,000.00
7,000.00
10,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
14,000.00
16,000.00
21,000.00
31,000.00
42,000.00
65,000.00
114,000.00
160,000.00
413,000.00
593,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
14,000.00
3,000.00
2,000.00
2,000.00
3,000.00
4,000.00
6,000.00
8,000.00
11,000.00
16,000.00
24,000.00
31,000.00
64,000.00
92,000.00
197,000.00
17,000.00
4,000.00
9,000.00
78,000.00
26,000.00
39,000.00
25,000.00
34,000.00
44,000.00
67,000.00
45,000.00
27,000.00
39,000.00
78,000.00
145,000.00
15,000.00
19,000.00
26,000.00
29,000.00
38,000.00
81,000.00
222,000.00
16,000.00
62,000.00
14,000.00
21,000.00
135,000.00
47,000.00
52,000.00
93,000.00
21,000.00
238,000.00
11,000.00
155,000.00
186,000.00
104,000.00
176,000.00
114,000.00
217,000.00
HARGA BAHAN
( Rp. )
TAHUN 2019
5
774,000.00
289,000.00
73,000.00
86,000.00
114,000.00
6,000.00
29,000.00
104,000.00
44,000.00
38,000.00
21,000.00